319-99 RDA
RESOLUTION NO.
319-99
A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF
THE MIAMI BEACH REDEVELOPMENT AGENCY
APPROVING AND AUTHORIZING THE CHAIRMAN AND
SECRET ARY TO EXECUTE AMENDMENT NO.1 TO THE
AGREEMENT WITH KIMLEY-HORN AND ASSOCIATES,
INC., APPROVED UNDER RESOLUTION NO. 314-99 FOR
PROFESSIONAL ENGINEERING AND LANDSCAPE
ARCHITECTURAL SERVICES, IN THE AMOUNT NOT TO
EXCEED $389,100 FOR PREPARATION OF
CONSTRUCTION DOCUMENTS, BIDDING AND
PERMITTING SERVICES FOR THE SOUTH POINTE
REDEVELOPMENT AREA FIRST PHASE OF 3RD STREET
FROM MICHIGAN AVENUE TO OCEAN DRIVE, AND
WASHINGTON AVENUE FROM 5TH STREET TO SOUTH
POINTE DRIVE.
WHEREAS, the Miami Beach Redevelopment Agency issued a Request for Qualifications
(RFQ No. 15-98/99) to provide Professional Engineering and Landscape Architectural Services for
Design of Street Improvements in the South Pointe Redevelopment Area; and
WHEREAS, on January 7,1999, and January 11, 1999, Evaluation Committee reviewed
the proposals submitted and, after presentations, recommended the firm of Kim1ey-Hom and
Associates, Inc. to the City Manager; and
WHEREAS, on January 20,1999, the Miami Beach Redevelopment Agency was granted
authorization from the Administration to negotiate an agreement with Kimley-Hom and Associates,
Inc.; and
WHEREAS, on February 17,1999 the Miami Beach Redevelopment Agency approved the
initial professional services Agreement with Kim1ey-Hom and Associates, Inc., for a negotiated fee
of$75,925 for the Master Plan, $69,835 for surveying, with an additional $25,000 for reimbursable
expenses, for a total amount not to exceed $170,760.
WHEREAS, accordingly, the Administration recommends that the Chairman and Members
of the Miami Beach Redevelopment Agency approve the attached Amendment No.1 to the
Agreement with Kim1ey-Horn and Associates, Inc., for a negotiated fee of$389,100 for preparation
of construction documents, bidding and permitting services for the South Pointe Redevelopment
Area of3rd Street from Michigan Avenue to Ocean Drive, and Washington Avenue to 5th Street to
South Pointe Drive.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND
MEMBER OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Chairman and
Members of the Miami Beach Redevelopment Agency herein approve and authorize the Chairman
and Secretary to execute the attached Amendment to the Agreement with Kim1ey-Horn and
Associates, Inc., pursuant to Request for Qualifications No. 15-98/99, in the amount of $389, 100 for
the preparation of construction documents, bidding and permitting services for Professional
Engineering and Landscape Architectural Services for the Design and Implementation of Street
Improvements in the South Pointe Redevelopment Area.
PASSED and ADOPTED this 26th day of
May
,1999.
CHAIlI:
ATTEST:
~rJ?~
1':\Wl)RK'$AI.!},MERCl])J':S',COMMEMO\KMRDA2,JU,S
APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
4(IL~
Attol'nlly
~lt.~
~=~
~
Attachment No.1
Kimley-Horn
and Associates, Inc.
May 18, 1999
.
Suite 353
420 Lincoln Road
Miami Beach, Florida
33139
Ms. Mercedes Sosa
Project Manager
City of Miami Beach
1700 Convention Center Drive
Miami Beach, FL 33139
Re: South Pointe Streetscape
Dear Mercedes:
During the Stanley Sutnick hour of the last City of Miami Beach Commission Meeting,
one of the residents of the South Pointe area made several statements that need to be
clarified. I am drafting this letter to clarify some of the statements that were made by this
individual. I would further like to volunteer my time to provide an overview of the entire
project and specifically the proposed first phase with City Administration and City
Commission as a group or as individuals.
Per your request, we have reviewed the recorded segments of the May 12, 1999
Commission meeting that included the comments from this resident and have formatted
this letter to respond to the issues raised regarding the South Pointe Streetscape
Redevelopment Area project. Furthermore, where appropriate, we have outlined the
background information associated with the topics.
At the last South Pointe Advisory Board (SPAB) meeting on May 4, 1999 we presented
the draft masterplan to the SPAB. The masterplan includes the proposed phasing of the
construction, estimated construction costs, and outlined the specific improvements
proposed in the area. Much of our presentation revolved around the phasing, costs, and
streetscape issues. After our presentation, we answered all questions from anyone who
asked them at the meeting. This presentation/question & answer session was conducted
until all parties with questions had their questions answered satisfactory. This session
lasted for over two hours and we had to relocate to another conference room due to the
length of the session.
Therefore, when this resident stated "Not unlike the South Point Advisory Board, we had
to vote and then have the presentation by Kimberley and Horn (Kimley-Horn and
Associates)" he was incorrect. In fact, over two hours of dialogue had been conducted
prior to the SPAB voting to support the approval of the first phase of the project. To my
knowledge, the only item that the SPAB voted on prior to our presentation was that they
continue their support of the priorities that had been previously voted on by the SP AB
and the Commission, which was also approved.
Later in his address to commission, this resident discussed that there were "completed
streets" in the proposed project area and that the City was "paying for another survey".
As part of the masterplan contract, we, along with members of City staff, DPZ, and the
.
TEL 305 673 2025
FAX 305 673 4882
~-n
......... _ u
=--
Kimley-Horn
and Associates, Inc.
community walked the project area. During this walk, the areas of the project were
discussed. In the first phase of the project (3'd Street and Washington Avenue) there is
only one area that could be identified as "the streets have been done". - This area is in
front of the parcel that is on Washington Avenue in front of Joe's Stone Crab.
The improvements that are in front of Joe's are contained behind the existing back of
curb and gutter. Their improvements include landscaping, brick pavers, and on site
improvements. The original DPZ study and our latest masterplan outlined that upgrades
in the area will be implemented even in front of Joe's. The intent of the masterplan is to
provide a consistent theme for the south pointe area. This will require the upgrade of
lighting, irrigation, and replacement of the sidewalks. Additionally, the improvements
along Washington Avenue outline a center-landscaped median that will be added and
milling and resurfacing of the existing roadway. The existing live oak trees that are in
front of Joe's will be saved and utilized in place.
Along 3rd Street there are two locations where the private owners have landscaped the
public right of way in front of their lots. With the proposed narrowing of the streets and
addition of curb and gutter that is outlined in the masterplan, this entire area will be
modified. Additionally, there were several drainage problem areas identified in the area
that will be addressed.
Overall, there have been minor improvements to the City's right-of-way in the area.
Where possible, we will be utilizing the existing features. In the majority of the project
area, substantial construction will be required to achieve the intent of the masterplan.
The current proposal that is pending authorization by the commission is for the
construction documents that are required for the construction and permitting of the
improvements. The survey work for this area (phase I) was completed during the
masterplan element of the project.
Another issue raised by the resident was regarding the extension of Washington A venue
south of South Pointe Drive. During the study performed by DPZ and the subsequent
masterplan that was completed by us, the City did not own this property. After the City
acquired the rights to this property in a settlement agreement (March I, 1999), we were
approached to add this segment to our contract for the area. We have a proposal
currently pending for the planning, surveying, and construction documentation for this
section of the project.
There were several occasions where this resident questioned the proposed upgrades to the
water distribution system. Some of his comments included that we were "replacing old
lines", that there were "6-inch upsized to 12-inch waterlines", and that there was "proof
from public works new water lines have been put in recently". Additionally, he
discussed that watermains had been replaced in "1973, 1992, and 1995". This resident
further went on to imply that the current proposal had outlined "duplicative services" and
these services were not needed.
These remarks regarding duplicative services are totally false. The current proposal
outlines that watermains will be replaced along 3'd Street and at several cross streets
~=~
_-:;;0..-
Kimley-Horn
and Associates, Inc.
along Washington A venue. The improvements along 3rd Street are to replace a 6-inch
main that is not looped in the system and is over 60 years old. There is one section of
watermain along 3rd Street that extends for approximately one half of a block that is 8-
inch and was constructed nearly 30 years ago. This half block section of main is
proposed to be replaced also to complete the 12-inch grid. The cross street watermain
improvements along Washington A venue are intended to allow for the interconnections
from east to west off of the existing watermain along Washington Avenue. This will
allow for the future phases of the streetscape program to be constructed without having to
disturb the work that will be completed along Washington A venue during the first phase.
The City's Water System Masterplan, as prepared by Camp Dresser and McKee (COM)
in 1994, clearly states the need for these proposed watermain improvements. In Section
11.0, Required and Recommended Improvements to the Water System, the masterplan
states that "There are also several locations within the distribution system where main
replacement, or main strengthening, is necessary to provide minimum fire flow
requirements. These locations include: the 6-inch distribution grid south of Sth Street to
be replaced with 8- and 12-inch pipe;". This is the basis of our recommendations to
replace the watermains where outlined in the scope. (see attachments)
While he was technically correct in that "new watermains have been put in recently", he
did not explain that the "new" watermains were installed in areas outside of the limits of
the current proposed improvements. The watermains that had been put in recently were
installed by City crews and were along sections of Alton Road (1985), 2nd Street (1996),
1st Street (west of Washington Ave)(199S), Washington Avenue (1992), South Pointe
Drive (1985), and Ocean Drive (1985). The vast majority of these improvements were
made prior to the CDM study and there is still the need for the improvements that are
outlined in the COM study.
Once again, we will gladly meet and review or discuss these issues with you at your
convenience. Please let me know how to proceed from here.
Very truly yours,
Copy: Matthew D. Schwartz
Christina Quervo
Julio Grave de Peralta, P.E.
Mercedes So sa
Marla Dumas
attachments
. CDM Camp Dresser & McKee ~
I
I .
I
I
I
I
I
I
I
I
1
I
I
j
I
WATER 5Y5TEH HA5TER PLAN
CfTY OF HfAHf EEACH,
FLORfDA .
CITY OF MIAMI BEACH
NOVEHKER 11111
~C:O--
Section 8.0
Analysis of Fire Flow Requirements
of the city where the Department has experienced problems with either fin~ flows or fire floW
tests are as followS:
· The South Beach area south of 5th Street - This area is served by a grid of old 6-inch cast
iron pipe which hydrant flow tests indicate may be hi~hly tuberculated. Hydraulic
modeling shows this apparently tuberculated grid to be capable of sustainin~ only a 50Q
GPM hydrant flow when development in the area requires a fire-flow of 2,000 GPM
presently, and as much as 3,000 GPM in the future. Many of the buildings being
.renovated within this area are failing fire flow tests.
· The area between 5th Street and Lincoln Road - The future plans for redevelopment in
this area are unknown at this time, but due to the many low density residential units
present, it appears the required fire flow in this area will be 1,000 GPM. Limited hydrant
flow tests indicate the available fire flows range from 670 GPM to 2,800 GPM. Here
again the problem appears to be tuberculated water mains in some streets.
· Belle Isle - High-rise development on Belle Isle has created a required fire flow of 3,000
GPM. The existing 6-inch main on the south side of island cannot supply this quantity of
water.
· Miscellaneous Other Areas of Concerns - Bay Road south of 16th Street is served by a
deadend 8-inch main which cannot supply the required 3,000 GPM fire flow to the high-
rise development along Bay Road. Due to an undersized main in Drexel Avenue
between Espanola Way and 12th Street fire flow to the Fisher/Feinberg Elementary
School is inadequate_ Particular attention was paid to fire protection for schools and
hospitals and this was the only public facility of these types where fire flows were found
to be lacking. Finally, Fire Department personnel expressed concern about fire protection
at the Lincoln Road Mall.
Recommended remedial actions for these areas of concern are discussed in Sections 10.0 and 11.0
of this master plan report. Generally, the combination of the capacities of the water booster
pump stations and the storage facilities is more than adequate to meet fire flow requirements.
The deficiencies in the water distribution system are generally minor, with one exception, theJ
South Pointe area south of 5th Street. This area is served by a grid of 6-inch mains which ~ve
every indication of being extensively tuberculated. This combination of small diameter mains
and tuberculation seriously impacts delivery of required fire flows.'
8.5 Building Fire Suppression
The South Florida Building Code (1994 Revisions) requires the installation of building fire
suppression systems of various types based upon occupancy groups (Chapter 38) and building
height (Chapter 39, High Rise Fire Protection and Life Safety). Chapter 38 relates primarily to
automatic sprinkler systems and alternative extinguishment systems and where these systems
are required in accordance with building occupancy groups. Standpipes are required in all
buildings 50 feet and more in height. The water supply for sprinklers and standpiDPc; f...~
buildings not more than 275 feet in height shall be 500 GPM for or-
than one standpipe is required the water supply shall be 750 GPM.
CDM Camp Dresser & McKee
bo 1 009
5
I
-
,
I
I
J
I
I
r
,:0;..
Section 11
Required and Recommended Improvements to the Water System
interconnections between the 24-inch main in Dickens Avenue and Byron Avenue and the 6- and
8-inch mains running east/west in 76th through 85th Streets. This 24-inch main presently
provides service to the City of Surfside and with that service being terminated it may be used to
strengthen the distribution system in the north end of the city. These are all relatively small
projects; however, they will improve the level of service at specific locations within the system.
There are also several locations within the distribution system where main replacement, or main
strengthening, is necessary to provide minimum fire flow requirements. These locations include:
the 6-inch distribution grid south of 5th Street to be replaced with 8- and 12-inch pipe;
installation of a new 8-inch main in Island Avenue on Belle Isle; elimination of a deadend in the
8-inch water main in Bay Road south of 16th Street; a new 12-inch main in Drexel Avenue from
Espanola Way to 13th Street to improve fire flow to the Fisher/Feinberg Elementary School and
new 8- and 12-inch mains in the Lincoln Road Mall area to improve fire flows to the mall. It is
recommended that all of the required improvements, that is, upgrading the five existing water
booster pump stations, construction of the Tenninal Island water booster pump station,
rehabilitation of the four existing welded steel ground storage tanks or replacing them with
prestressed concrete tanks and the water main extensions and replacements described above be
induded in the Series A bond issue scheduled for the spring or summer of 1995 and that these
improvements be constructed over a two-year period beginning on October I, 1995.
11.2 Recommended Improvements
The following recommended improvements: replacement of galvanized iron water pipe and
rehabilitation of tuberculated water mains, by cleaning and cement lining, are also very
important in regard to improving the level of service and meeting fire flow requirements within
specific sections of the distribution system. However, the scopes of these projects are of such
size that a realistic time for completion of each project is a minimum of five years. These
projects may be performed simultaneously without interference.
The estimated length of galvanized iron pipe requiring replacement is 82,600 feet, which will be
replaced ,with 8-inch cement lined ductile iron pipe. A five year replacement program would
provide for replacing about 16,500 feet, a little over 3 miles, of pipe per year. This would appear
to be a reasonable schedule which may be comfortably met. At the same time it can probably be
made to dovetail with future streets improvements programs. It is recommended that this
program also begin on October I, 1995 with an estimated annual expenditure of $660,000 in year
one and $680,000 in year two. _.
For budgetary purposes and detennination of project costs for inclusion in the water and sewer
rate study in preparation, a conservative estimate (high) of the total length of tuberculated pipe
which would be cleaned and cement lined was developed based upon the following
assumptions. The only mains to be cleaned and cement lined under this initial program would
be 6- and 8-inch diameter pipe. Table 2-2 in Section 2.0 of this report shows the length of 6- and
8-inch diameter pipe, with an age of 40 years and older, to be about 348,000 feet. The main
replacement project south of 5th Street will reduce this estimated footage to about 335,000 feet.
It is assumed that all of this pipe is unlined cast iron pipe which has become tuberculated and
requires cleaning and cement lining.
CDM Camp Dresser & McKee
0010504
11-2
-:;;...
Miami Beach
Redevelopment Agency
1700 Convention Center Drive
Miami Beach, Florida 33139
Telephone: (305) 673-7193
Fax: (305) 673-7772
REDEVELOPMENT AGENCY MEMORANDUM NO. gq-"2. L
TO:
Chairman and Members of the Board
of the Miami Beach Redev pment Agency
DATE: May 26,1999
FROM:
Sergio Rodriguez
Executive Director
SUBJECT:
A RESOLUTI F THE CHAIRMAN AND MEMBERS OF THE MIAMI
BEACH REDEVELOPMENT AGENCY APPROVING AND AUTHORIZING
THE CHAIRMAN AND SECRETARY TO EXECUTE AMENDMENT NO.1
TO THE AGREEMENT WITH KIMLEY-HORN AND ASSOCIATES, INC.,
APPROVED UNDER RESOLUTION NO. 314-99 FOR PROFESSIONAL
ENGINEERING AND LANDSCAPE ARCHITECTURAL SERVICES, IN
THE AMOUNT NOT TO EXCEED $389,100 FOR PREPARATION OF
CONSTRUCTION DOCUMENTS, BIDDING AND PERMITTING
SERVICES FOR THE SOUTH POINTE REDEVELOPMENT AREA FIRST
PHASE OF 3RD STREET FROM MICHIGAN AVENUE TO OCEAN DRIVE,
AND WASHINGTON AVENUE FROM 5TH STREET TO SOUTH POINTE
DRIVE.
ADMINISTRA TION RECOMMENDATIONS
Adopt the Resolution.
FUNDING
Funding has been appropriated from South Pointe tax increment funds for the project. Funding for
the first phase in the amount of $3,800,000 was appropriated at the September 23, 1998, Miami
Beach Redevelopment Agency Board meeting.
BACKGROUND
On November 25, 1998, the Miami Beach Redevelopment Agency (RDA) issued Request for
Qualifications (RFQ) No. 15-98/99, for professional engineering and landscape architectural services
for design of streetscape improvements in the South Pointe Redevelopment Area.
AGENDA ITEM
'2.. A
5. '2L. '9'l
DATE
SUUTIl VUI~-=
l2edevel()pment Uistr1{:t
(:Iff C-=~T-=l?
l?edevel()pment Uistli{:t
~=-
On January 7, 1999, and January 11, 1999, an Evaluation Committee reviewed the proposals
submitted. After presentations were made, the committee recommended selecting the firm of
Kimley-Horn and Associates, Inc. to the City Manager acting as Executive Director of the RDA.
On January 20, 1999, the City Commission authorized the Administration to negotiate an agreement
with Kimley-Horn and Associates, Inc. The scope of services included in the initial phase of the
work consisted of data collection and a review of existing documents resulting in the preparation of
a master plan and surveying for a portion of the Phase I improvements fOLwhich funds have been
appropriated. Additionally, Kim1ey-Horn and Associates, Inc. will participate in meetings with City
and Redevelopment Agency staff and the community with regard to this project.
The Administration negotiated a not to exceed fee of$170,760 for the preparation of the final master
plan and opinion of probable cost for the entire project. The final master plan, phasing plan and
associated project construction cost estimate per phase were submitted to the City on April 30, 1999
for review and is being referred to the Finance and Citywide Projects Committee for discussion. The
master plan was presented to the South Pointe Advisory Board, at its May 4, 1999 meeting, during
which the members also unanimously approved this Amendment No. 1 to the Kimley-Horn
agreement for construction documents for Phase I and reaffirmed the priority listing for the project.
ANALYSIS
In order to accelerate the implementation of the project, the Administration has negotiated an
amendment to the professional services agreement with Kim1ey-Horn and Associates, Inc. for Phase
I of engineering and landscape architectural services. This Amendment No. 1 includes preparation
of construction documents, permitting and bidding services for Phase I of the project, which includes
3rd Street from Michigan Avenue to Ocean Drive, and Washington Avenue from 5th Street to South
Pointe Drive.
This item was deferred at the May 12, 1999 City Commission meeting, after concerns were raised
by a resident regarding duplication of professional services and the unnecessary replacement of
existing utilities. City staffhas confirmed that no duplication of professional services exists and that
the proposed replacement of water lines is proper. The recommended replacements are based on the
findings and recommendations contained in the City's Water System Master Plan, prepared by
Camp, Dresser and McKee, and further documented in Kimley-Horn's letter dated May 18, 1999
(Attachment No.1). The upgrading of water lines included in Phase I consists of the replacement
of an existing 60 year old 6" water line on 3rd Street, and the east to west interconnections to the
existing watermain along W ashington Avenue, at the cross streets of 1 st, 3rd and 4th Streets, and
the alleyways between 1 st Street and South Pointe Drive.
The Administration has negotiated a fee of $303,000 for construction documents and bidding
services; $82,100 for permitting and $4,000 for reimbursable expenses for a total amount not to
exceed $389,100. The scope of work does not include any additional surveys, studies or reports.
In the event the project's scope of work is reduced, the professional services fee for basic services
will be reduced proportionally, based upon 5.98% of the estimated construction budget. Should the
scope of work be increased, the basic services fee will be increased based upon 5.98% ofthe actual
construction cost of the additional work requested. If there is no change in scope, but the actual
construction cost exceeds the estimated construction budget, the basic services fee remains at the
negotiated price of$303,000, and no percentage increase will be realized.
.::.0.-
Based on the results of this phase and the direction given by the Redevelopment Agency Board, the
Administration will negotiate a final amendment to the agreement with Kim1ey-Hom and Associates,
Inc. for professional services for the remainder ofthis project.
CONCI~USION
The Administration recommends that the Chairman and Members of the Redevelopment Agency
Board approve Amendment No. 1 to the agreement with Kimley-Hom and Associates, Inc. for
professional engineering and landscape architectural services, which consists of the preparation of
construction documents, bidding and permitting services for Phase I of the South Pointe
Redevelopment Area project for 3rd Street from Michigan Avenue to Ocean Drive, and Washington
Avenue ~m~ ~et to South Pointe Drive.
SR/CMC/J /MS
P:\WORKISALL RCEDES\COMMEM0\D42899SP.RDA
/'
AMENDMENT NO.1
TO THE
PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE
MIAMI BEACH REDEVELOPMENT AGENCY, FLORIDA
AND KIMLEY-HORN AND ASSOCIATES, INCORPORATED FOR PROFESSIONAL
ENGINEERING AND LANDSCAPE ARCHITECTURAL SERVICES FOR DESIGN OF
STREET IMPROVEMENTS IN THE SOUTH POINTE REDEVELOPMENT AREA
This Amendment No.1, dated as of UUA). (p ,1999, to that certain Agreement, dated
February 17,1999, by and between the Mia~velopment Agency (RDA), Florida and
Kimley-Horn and Associates, Inc. (Consultant).
RECIT ALS
WHEREAS, the Agreement provides for the preparation of the final master plan for the
South Pointe Redevelopment Area project; and
WHEREAS, the Agreement also provides for an opinion of probable construction cost for
the entire project; and
WHEREAS, the City is proposing to implement the streetscape work for the South Pointe
Redevelopment Area in phases; and
WHEREAS, in order to implement the streetscape work, the City needs to obtain
construction documents for permitting and bidding purposes.
1. ABOVE RECITALS
The above recitals are true and correct and are incorporated as a part of this First
Amendment.
2. MODIFICATIONS
The Agreement is amended as follows:
Exhibit "A", entitled "Scope of Services /Fee", is amended to add the following work
at the end of Exhibit "A":
Exhibit "B", entitled" Hourly Rates", is amended to add the following professional
services fee rates at the end of Exhibit "B":
Exhibit "C", entitled" Schedule", is amended to add the following schedule at the end
of Exhibit "C":
3. OTHER PROVISIONS.
All other provisions of the Agreement, as amended, are unchanged.
4. RA TIFICA TION.
The City and Consultant ratify the terms of the Agreement, as modified by this Amendment
No.1.
IN WITNESS WHEREOF, the parties hereto have caused this First Amendment to be
executed in their names by their duly authorized officials as of the date first set forth above.
ATTEST:
MIAMI
BEACH REDEVELOPMENT AGENCY
It
.
CHAIRMAN
~J--{J~
SECRETARY
By
SEAL
By
'./J( . --
v' Ct::;:
PRESIDENT
ATTEST:
CORPORATE SEAL
SECRETARY
P:\ WORK\$ALL\ VGK\COMMEMOIOTHER\URGTRAP.AM 1
APPROVED AS TO
FORl'A & LANGUAGE
& fOR EXECUTION
1{#L~
5/1/19
00,.
~="
Kimley-Horn
and Associates, Inc.
South Po;n,. Phase I. April 10. 1999. Pa~. I
Exhibit "A"
SCOPE OF SERVICES
Task 1 - Construction Documentation
1.1 30% Design Plan
A base map of the existing conditions will be prepared, at a scale of I" = 40' (11" x 17"),
utilizing the Raster aerial imagery and field survey data obtained during development of
the Master Plan. We will develop a 30% design plan based upon the approved typical
sections developed during the master plan process. This 30% design plan will show the
geometric layout over top the Raster aerial imagery. The basis for design will be the
approved master plan, Dade County Design Standards and FOOT's design standards as
found in The Roadwav and Traffic Design Standards dated 1994.
A meeting will be scheduled with City of Miami Beach staff to review the 30% design
plans. The purpose of the meeting will be to review the 30% plan, solicit comments
from City staff and SP AB representatives, concluding the meeting with an approved
Plan.
During this meeting the street lighting illumination level(s) will be established based on
the City's standards for this area. Following this meeting, KHA will provide a layout of
lighting based on the recommended illumination levels and standard City of Miami
Beach pedestrian pole and luminaire.
Two copies of the approved 30% design plan will be forwarded to each utility company
known to operate in the vicinity of the project. Each utility company will be requested to
return one set. of redl ined plans, identi fying the horizontal and vertical location of their
faciiities, to the engineer. The engineer will log in each set of plans when returned by the
utility companies. This information will be added to the plans. We will attend up to two
meetings with City staff and the utility companies to review the project and potential
impacts to the utility owners.
In general, the set of 30% design plans may contain the follo\vin~. information:
1. A cover sheet will be prepared containing project identificati,)O information, a
vicinity map, index of sheets and other information as may be appropriate.
2. Typical sections \vill be prepared, detailing the proposed work for mainline and
cross street construction. It is anticipated that four typical sections will be required,
one each for \Vasbington Avenue and Third Street and t\.vo for the cross streets. A
geotechnical engineering firm, retained by the City under their Geotechnical
Continuing Services Agreement, will obtain pavement cores; complete an analysis of
the existing pavement and subgrade conditions; and prepare a report summarizing
their findings as well as providing a pavement design recommendation.
~="
Kimley-Horn
and Associates, Inc.
SOUlh Poinlc Phasc I. April 20, 1999, PJge 2
3. A table will be prepared listing the anticipated pay items, estimated quantities and
the appropriate pay item footnotes.
4. Horizontal alignments and geometric improvements will be detailed on the Raster
aerial plan sheets.
5. Proposed mainline and cross street profiles will be developed.
6. General notes defining the basis of design and construction requirements.
7. Revisions to the existing drainage system that will include construction notes and
details. Work along the side streets could include conversion ofinl~tsto manholes
and the addition of new inlets as required. Our drainage sub-consultant, CH2M Hill,
will determine drainage requirements for both water quantity and quality, provide
Kimley-Horn with final hydraulic design calculations, assist with the layout of the
inlet/pipe/well systems, and prepare the permit applications. Kimley-Hom will use
the hydraulic calculations to establish the systems pipe invert elevations to avoid as
many of the existing utilities as possible. Kimley-Horn will then draft the proposed
drainage design and details into the plans. A copy of the preliminary plans will be
furnished to CH2M Hill for their review and comment. Our geotechnical sub-
consultant will provide all subsurface investigation and testing information to CH2M
Hill for their use in designing the drainage system.
8. Existing utility information, as obtained during survey data c.)lIection and the
information providd by the respective utility owners, will be added to the plans.
9. Signing arid paveme:1t marking pbns will be pre?ared at a s;:ale of I" = 40' (II" x
17").
1 O. Landscape and irrigation plans with the summary of quantities, necessary
construction details and specifications.
11. Street lighting plans that will include a pole summary, wiring schematics, pole
details, and service point details. Proposed street light poles, conduit, service points
will be shown on the roadway construction plans.
12. NPDES erosion control plans.
1.2 Construction Documents
Third Street and Washington Avenue plan set will include the following:
a) Key Sheet - Project title, vicinity map, engineer of record, and other appropriate
information.
~=r'
Kimley-Horn
and Associates, Inc.
SOlllh Pointe Phase I. April 20. 1999. PJ~e 3
b) Typical Sections - One typical section describing work along Third Street and
Washington Avenue, two typical sections describing work on the cross streets
and general notes.
c) Summary of Roadway Quantities - Sheet to include table listing the anticipated
pay items, the estimated quantities, and appropriate pay item footnotes.
d) Plan sheets ( @ II" x 17" format) - Containing the geometric and horizontal
alignment as well as modifications to the existing drainage and street lighting
systems.
e) Proposed Profiles - Containing profiles for Third Street and the cross streets
(Michigan Avenue, Jefferson Avenue and Meridian Avenue).
f) Soil Data Sheet - Containing soil stratification information.
g) Tabulation of Signing and Pavement Markings - Sheet to include a table listing
the anticipated pay items, the estimated quantities and appropriate pay item
footnotes.
h) Signing and Pavement Marking Plans - Signing and pavement markings will be
detailed at a scale of I" = 40' (II" x 17") with two strip per sheet.
i) Landscape Horizontal Control Plans - These sheets will be prepared at a scale of
1" = 40' (II" x I T) and ....ill detai! the location of tree pits, landscape materials,
street furnishings, pavers, and sidewalk treatments.
j) Washington Avenue and Third Street Plaza Enlargements and Associated
Special Details - Provide details and information at plaza feature which cannot
be conveyed completely on horizontal control plans.
k) Typical Sections and Area Enlargements - Provide details and information at
special features which cannot be conveyed completely on the Horizontal Control
Plans.
I) Irrigation and Electrical Plans - These sheets will be prepared at a scale of I" =
40" (I I" x 17") and will identify irrigation requirements, location of irrigation
lines and control equipment as well as electrical service point locations.
m) Hardscape, Softscape, Irrigation, and Electrical Details - Details required for
implementation of the design.
~=r'
Kimley-Horn
and Associates, Inc.
South Point. Phase I. April 20. 19'1'1. Pa~c ~
n) Miscellaneous Details and Summary of Quantities - Construction details and a
table listing anticipated pay items, the estimated quantities, and appropriate pay
item footnotes.
0) Lighting Service Point detail.
p) Tabulation of Lighting and General. Notes - Sheet to include table listing the
anticipated pay items, the estimated quantities, appropriate pay item footnotes,
and general notes.
q) Pole Data and Coded Notes - Sheet will identify street light poles, their lighting
circuit, mounting height and wattage as well as the coded notes for the wiring
schematic.
r) Special Lighting detail sheet.
s) Miscellaneous Roadway and Drainage Construction details - These sheets would
include special details for roadway and drainage construction elements that are
not standard Metro-Dade County of FOOT construction details.
t) NPDES Plans - These sheets will detail erosion control measures required to
meet NPDES permit requirements.
Plan set summary of estimated sheets:
Key Sheet I
Typical Sections I
Summary of Quantities I
Plan Sheets 9
Frofile Sheets 7
Soii Data Sheet I
Tabulations of Signs and Pavement Markings I
Signing and Pavement Marking Plans 5
Landscape Horizontal Control Plans 9
Washington AvenuelThird Street Plaza Enlargements 3
Typical Sections and Area Enlargements 4
Irrigation and Electrical Plans 9
HardJSoftscape, Irrigation and Electrical Details 9
Miscellaneous Details and Summary of Quantities 3
Lighting Service Point Details 1
Tabulation of Lighting and General Notes I
Pole Data and Coded Notes 1
Special Lighting Details I
Miscellaneous Roadway and Drainage Construction Details 2
NPDES Plans 3
Total Number of Sheets 70
~=r'
Kimley-Horn
and Associates, Inc.
SOlllh Pointe Phase 1. April 20. 1999. Pa~. S
Task 2 - Water Main Extensions
The Consultant will provide construction documents for the replacement of a 6"
watermain with a 12" watermain within the following limits as outlined in the following
tasks.
· Third Street (Michigan Avenue to Ocean Drive)
· Washington Avenue Cross Streets
1. First Street
2. Third Street
3. Fourth Street
4. Alleyway between 1 st Street and Commerce Street
5. Alleyway between Commerce Street and South Pointe Drive
2.1 The Consultant shall collect existing utility and as-built data from the City. The
existing data will be reviewed and compared to the survey topographic
information. Existing data will be plotted on the base sheets as needed for design
purposes.
2.2 The Consultant shall design and prepare plans for the watermain extensions in
the locations noted. Both horizontal and vertical design will be submitted along
with the applicable details.
2.3 The Consultant shall prepare specifications that describe the details of materials
to be used and payment methods for the project. A bid package that will list the
description and quantities of the materials to be used for construction will also
be provided for the City to utilize for bidding purposes and for opinions of
probable construction costs.
Task 3 - Air Release Valve Replacements (Forcemain)
The Consultant will provide construction documents for the replacement of four air
release valves within Third Street (Michigan Avenue to Ocean Drive).
3.1 The Consultant shall collect existing utility and as-built data from the City. The
existing data will be reviewed and compared to the survey topographic
information. Exis~ing data "viII be plotted cn the base sheet.s as needed for design
purposes.
3.2 The Consultant shall design and prepare plans for the air release valves in the
locations noted. Both horizontal and vertical design will be submitted along with
the applicable details.
~=r'
Kimley-Horn
and Associates, Inc.
SOlllh Pointe Phase I. Apnl :0. I ~<)9. P,;;e 6
3.3 The Consultant shall prepare specifications that describe the details of materials
to be used and payment methods for the project. A bid package that will list the
description and quantities of the materials to be used for construction will also
be provided for the City to utilize for bidding purposes and for opinions of
probable construction costs.
3.4 Since this is a project that is replacing existing features on an existing main, no
permits are anticipated associated with this project.
Task 4 - Utility Coordination
The City of Miami Beach will be seeking the undergrounding of the existing overhead
utility lines at two locations with this Phase - Third Street at Ocean Court and Collins
Court. There are multiple utility companies involved in this endeavor, FPL, BellSouth
and cable television. We will meet with each of the utility companies and coordinate the
development of our plans in conjunction with their design. Kimley-Horn has no control
over the schedule of the private utility companies who will be providing construction
documents for this task.
Task 5 - Specifications and Contract Documents
The City of Miami Beach's standard contract documents will be utilized for this project.
It is intended that the Florida Department of Transportation technical Specifications be
used for this project. Supplemental Technical Specifications will be prepared by the
Engineer that will address construction elements not addressed in said standard technical
specifications or that are included but require modifications to make them project
specific. These Supplemental specifications will be forwarded to the City for review and
approval
Task 6 - Permitting
It is anticipated that permits will be required for the roadway improvements from the
following agencies:
· DERtv{ - Water Quality Class II permit.
· DERM - Tree Removal permit
· HRS - Miami-Dade County Health and Rehabilitative Services
Kimley-Horn will meet witl: DERtv{ to review the project as it relates to potential tree
removals. Specific permit issues identified at the review meeting will be addressed
during the preparation of the plans. Kimley-Horn will prepare the permit application
associated with the tree removal and forward the applications to the City for signature.
The signed permits '.vill be returned to the Engineer for submittal to DERtvL The
Consultant shall prepare and submit permit applications to the Dade County Health &
Rehabilitative Services (HRS) for the extension of a watermain. All permit fees will be
~=r'
Kimley-Horn
and Associates, Inc.
Soulh Paint. Phase I. April 20. 1999. Pa~e 7
paid directly by the City and are not included in the fee below. Any significant plan
revisions, additional meetings or coordination will be considered as Additional Services.
Our drainage sub-consultant, CH2M Hill, will be responsible for ascertaining permit
requirements relating to the project's drainage design. They will provide the following
services associated with pennitting the project.
6.1 Coordination Meetings
The Associate Consultant will attend up to six (6) coordination meetings with various
team members and the City during the course of the design and permitting process. The
meetings will consist of a project kick-off meeting, a meeting to review the conceptual
stonnwater design, a meeting to review the 50% design package with the City, a meeting
to review the stonnwater pennit package prior to submittal to the Miami-Dade County-
Department of Environmental Resources Management (DERL\-l), a meeting with the City
to review the Final Design Package, and a discretionary meeting to be conducted with
members of the RDA or neighborhood associations.
6.2 Hydraulic and Pollutant Load Reduction Analysis
A hydraulic analysis will be conducted On the project area (Third Street from Alton Road
to Ocean Drive and Washington Avenue from Biscayne Point to Fifth Street). During
the analysis, the volume of stonnwater runoff will be calculated from the design stonn,
the capacity of the existing stormwater collection system will be evaluated, and the
pollutant loading from the initial runoff of storm water will be calculated. Following the
calculation of excess stonnwater volume and pollutant loading, an analysis of pollutant
reduction techniques will be conducted to establish a combination of methods to provide
\vate:- quality treatment goals. Various methods including on-site disposal, oil-water
separators, sedimentation sumps, and street maintenance activities will be evaluated to
provid~ water quality treatment goals within the project area. Methods previously
developed by the Associate Consultant for the City and DERM will be used to predict
stonnwater pollutant loads and treatment capability.
6.3 Conceptual Design
Following the hydraulic and pollutant load analyses, the Associate Consultant will
prepare a conceptual design for improvements to the storm water collection and disposal
systems within the project area. The conceptual design will include locations and
capacities of catch basins and localized disposal systems (e.g., French drains and
drainage wells), a listing of details to include into drainage features.
The Consultant shall prepare the Associate figures illustrating topographic infonnation
and separate figures to use as a base for design sketches. The Associate Consultant will
prepare conceptual design sketches to the Consultant. The Consultant will provide the
specific details, engineering drawings, and technical specifications for final design.
~-r'
...... - . -
Kimley-Horn
and Associates, Inc.
South ~ointe Phase I. April ~O. 199'1. Page 3
Following the design, the Associate Consultant will review the design and will co-sign
the appropriate sections to the engineering drawings.
6.4 Permitting
Prior to beginning the final design and permitting process, the Associate Consultant will
conduct a pre-application meeting with the DERM. During this meeting, the conceptual
design will be reviewed as well as the technical approach to pollutant reduction.
Meeting minutes will be prepared and submitted to the Consultant and the City.
The Associate Consultant will prepare and submit an Environmental Resources Permit
(ERP) application to the DEIUvL The package will consist of the pennit application
fonn, pre- and post-development runoff calculations, calculations of pollutant reduction,
a schedule of proposed maintenance activities (with City approval), and the engineering
drawings. The Associate Consultant will conduct an application meeting at the time the
application is submitted and will respond to up to two sets of review comments by the
DERM. Application fees for the ERP will be paid directly by the City. The pennit
application fonn will not contain a Class II section for any proposed wells. The Class II
pennit will ultimately be obtained by the Contractor separately prior to initiating work.
Task 7 - Sequence of Construction
A narrative will be included in the specifications that will outline the general sequence of
construction expected for the implementation of this project phase. The contractor will
be required to submit a phasing plan to the City that follows the above noted narrative
f0r the Cicy tc re'/iew.
Task 8 - Public Meetings and Presentations
Our proposal includes preparation and attendance at the following meetings:
· 30% Design Plan review with City staff.
· Two meetings with City staff to review schematic design for the selection of plant,
street furniture, and paving materials.
· Up to two coordination meetings with City staff.
· Two meetings associated with utility coordination.
· Meeting with FPL representative in the filed to establish service points for lighting
and irrigation.
· Up to t\'10 meetings/presentations to the SPAB.
~=~
Kimley-Horn
and Associates, Inc.
South Paiute Phase I, April 20. 1999, Page 9
Additional Services
Upon your authorization, we will provide any additional services that may be required
beyond those described in Task 1 through 8. These services may include but are not
limited to such items as the following:
. Preparation of right of way acquisition sketches or descriptions.
. Significant redesigns of the drainage system to meet additional DERM requirements.
. Conducting subsurface geotechnical investigations.
. Providing construction phase services. Preparation of penn it applications other than
those identified in Task 6.
. Making traffic counts or undertaking other traffic related analysis.
. Traffic signal plans.
. Cross sections.
COMPENSATION
We will provide the Basic Design Services described in Tasks 1,2,3,5 & 7 for the lump
sum amount of $303,000 and for Specialty Services described in Tasks 4,6 & 8 for the
lump sum amount of $82,100 as outlined below.
Task Description
1 Construction Documentation
2 Water Main Extensions
3 Air Release Valve Replacements
4 Utility Coordination
5 Specifications and Contract Documents
6 Pennitting
7 Sequence of Construction
8 Public Meetings and Presentations
Estimated Phase I Construction Budget ........................ $5,066,000
*Basic Design Services (5.98% of construction budget)
Kimley-Hom and Associates, Inc. ......................... $285,260
CH2MHill ................................................................. $17,740
To tal ........................................................................ $303,000
* A reduction in scope will result in a proportionally reduced fee for basic services
based upon the 5.98 % budget allocated above.
Specialty Services
Kimley-Hom and Associates, Inc. ........................... $35,215
CH2MHill .......... ... ............. ................ .......... ............. $46,885
Total.......................... ................................................. $82,100
Reimbursements
Geo tech n i cat .............................................................. $4,000
........-n
~-, ,
Kimley-Horn
and Associates, Inc.
South Pointe Phase I, April 20. 199<), Pa~e 10
SCHEDULE
We will provide the services outlined in task 1 through 8 in accordance with the time
frame outlined below:
Deliverable
30% Submission
90% Submission
100% Submission
Schedule
6 weeks after Notice to Proceed
9 weeks after 30% review comments received
2 weeks after 90% review comments received
\\MlB _SER VER\MINGONE1\ Word Docs\South Pointc\contr:lcts\3&w:lShscopc4.doc
Exhibit "B"
KHA DETAIL HOURLY RATES
Principal $145
Project Manager $100
Registered Professional $130
Senior Professional $115
Professional $95
Analyst/Professional Intern $70
Technical Support $60
Clerical Support! Administration $45
CHlM HILL DETAIL HOURLY RATES
Principal
Professional Engineer
Senior Engineer
Project Manager
Staff Engineer
Technician
Office Support
$145
$130
$115
$100
$95
$60
$45
F:\ WORK\SALL \MERCEDES\SOPOrNTPKHARA TES.WPD
Exhibit "C"
SCHEDULE
We will provide the services outlined in task 1 through 8 in accordance with the time frame outlined
below:
Deliverable
30% Submission
90% Submission
1 00% Submission
Schedule
6 weeks after Notice to Proceed
9 weeks after 30% review comments received
2 weeks after 90% review comments received
F:\ WORK\SALL\MERCEDES\SOPOINTE\KHARA TES. WPD