2001-24701 Reso
RESOLUTION NO. 2002-24701
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, APPROVING THE
ASSIGNMENT OF THE EXISTING PROFESSIONAL SERVICES
AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND
GAMBACH-SKLAR ARCHITECTS, INC. DATED SEPTEMBER 13,
1995, TO GAMBACH ARCHITECTS, INC., FOR THE PROVISION
OF ARCHITECTURAL AND ENGINEERING SERVICES FOR THE
MARSEillE DRIVE STREETSCAPE IMPROVEMENTS PROJECT;
IF SAID ASSIGNMENT IS APPROVED, AUTHORIZING AND
APPROVING AN AMENDMENT TO THE AGREEMENT WITH
GAMBACH ARCHITECTS INC., IN THE AMOUNT OF $10,990;
$8,272 OF WHICH IS AVAILABLE FROM PREVIOUSLY
APPROPRIATED WATER AND SEWER BOND FUND NO. 426,
AND $2,718 OF WHICH IS AVAILABLE FROM PREVIOUSLY
APPROPRIATED GENERAL OBLIGATION BOND FUND NO. 373,
FOR THE PROVISION OF CONSTRUCTION ADMINISTRATION,
AND MANAGEMENT, BIDDING AND OTHER RELATED
PROFESSIONAL SERVICES NECESSARY TO COMPLETE THE
WATER MAIN REPLACEMENTS, AND STREETLlGHTlNG
IMPROVEMENT PORTIONS OF THE PROJECT.
WHEREAS, on September 13, 1995, the City entered into a Professional Services
Agreement with Gambach-Sklar Architects, Inc. develop drawings and specifications, and to
provide construction documentation services for the Marseille Drive Streetscape Project (the
Agreement); and
WHEREAS, on January 26, 2000, the Agreement was amended, in the amount of
$18,392, to provide additional services for the North end of Rue Notre Dame portion of the
Project; and
WHEREAS, on September 28, 2001, Mr. Roberto Gambach, formerly a principal in the
firm of Gambach-Sklar Architects, Inc., notified the City that, as of August 1, 2001, the firm
Gambach-Sklar Architects, Inc., had ceased its operations; and
WHEREAS, the Administration, after evaluating the options available to complete the
Project, determined that it would be in the best interest of the City to assign the Agreement to
Gambach Architects, Inc., the firm subsequently established by Roberto Gambach, with Mr.
Gambach as principal; and
WHEREAS, on October 30, 2001, the Administration informed the principals of
Gambach-Sklar Architects, Inc. of the City's intent to assign the Agreement to Gambach
Architects, Inc; and
WHEREAS, the Administration wishes to proceed with the bidding and construction
phases of the Project; and
WHEREAS, the Administration reviewed the terms of the Agreement, which provides for
assignment of same, subject to the prior consent of the Mayor and City Commission; and
WHEREAS, the balance due under the Agreement of $11,800, comprised of $8,800 for
bidding and construction administration services and $3,000 for reimbursable expenses, is
available to cover the professional services fee; and
WHEREAS, if the assignment is herein approved, Gambach Architects, Inc., shall also
provide to the City, Professional Liability Insurance, and all other provisions of the Agreement
shall remain unchanged and in full force and effect; and
WHEREAS, in addition, the water main replacement and streetlighting upgrades of the
Project were independently designed by the Public Works Engineering staff; and
WHEREAS, the Administration evaluated and determined that it will be in the best interest
of the City to consolidate the construction phase of the work, and that the Construction
Administration for the underground, and the above ground improvements on the Project should
be done by the firm of Gambach Architects, Inc.; and
WHEREAS, the compensation for Gambach Architects, Inc. to perform the Construction
Administration for the water main and street lighting installation portion of the work was agreed
by both parties to be $10,990; and
WHEREAS, funding to cover the Construction Administration for the water main and
street lighting installation, which will be addressed as an Amendment to the Agreement, is
available from the Water and Sewer Bond Fund No. 426.
NOW, THEREFORE BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission approve the
assignment of the existing Professional Services Agreement between the City of Miami Beach
and Gambach-Sklar Architects, Inc., dated September 13, 1995, for the Marseille Drive
Streetscape Project, to Gambach Architects, Inc., for the provision of architectural and
engineering services for the Marseille Drive Streetscape Improvements Project; if said
assignment is approved, authorizing and approving an Amendment to the Agreement with
Gambach Architects, Inc., in the amount of $10,990; $8,272 of which is available from previously
appropriated Water and Sewer Bond Fund No. 426, and $2,718 of which is available from
previously appropriated General Obligation Bond Fund No. 373, for the provision of construction
administration, and management, bidding and other related professional services, necessary to
complete the water main replacements, and streetlighting improvement portion of the Project.
PASSED AND ADOPTED this 9th
day of January, 2002,_
ATTEST:
APPROVED AS TO
FORM a LANGUAGI
a FOR EXECUTION
~~c~
- I~"- 3>--0 (
<<--
FROM :
(,.0'. .
FAX NO.
ATTACHMENT 1
G.6MB6CH' SKL6.R
ARCHITECTS
11"C
"~C"ITFCTU~F
"Ht~IO~ DeSIG'l
rL..NNING
....
',J '';.'1,
'. r .d:
, , .' ;
.. l ~ J U i' I: /
September 28. 2001
.' ~;': :J I: r ~ "I:' i ,; to
" '.'. l' I d'l,l' ~~: It;
Ii". ";' ..,/. 'i i ~. ...
Mr. Michel Magloire
Capital Improvement Projects Office
City of~liami Beach
1700 Convention Cc.ntcrDr.
Miami Beach, FI- 33139
Re: Marseille Drive Streetscapc Improvements
Dear Mr. Magloire:
The nm, ofGambach Sklar Architects ha!> ceased operations as of August 1,200 I, lt is our opinion
that the contractlhat Gambach Sklar Architects has with the City oCMiami Beach tor the referenced
project, Marseille Drive Streetscape Improvements, needs to be reassigned, It may be reassigned to
either Gambach Architects, Sklar Arkitckts or to a third firm of your choice,
Prior to reassignment of the contract. Gambach Sklar Architects will turn over to the City all the
plam and specifications that have been produced for the project in their present condition,
At this time the City owes Gambach Sklar the amount of$119,91 for blueprints (Invoice #3452).
Payment of this invoice will complete all payments owed to date under the contract The balance
due under the contract INiIl be payable to either Gambach Architects or Sklar Arkitekl!> or ,,,'hoever
is assigned the contract.
Whatever your choice. we are very INilling to cooperate with the City in any way necessary to bling
this job to a successful completion. Please let us know what you decide to do.
~LI
--
Oscar Sklar
RJGlbg
L__
.-. "'l r \ Ii c-~
CITY OF MIAMI BEACH
COMMISSION ITEM SUMMARY
1Q
Condensed Title:
A Resolution approving and authorizing the assignment of the existing Professional Services Agreement
between the City and Gambach-Sklar Architects, Inc, to Gambach Architects, Inc. for the Marseille Drive
Streetscape Improvements Project, and approving additional services in the amount of $10,990 for the
proiect.
Issue:
Shall the existing Professional Services Agreement between the City and Gambach-Sklar Architects, Inc.
be reassigned to Gambach Architects, Inc., and shall an amendment in the amount of $10,990 for the
provision of Construction Administration, Management, bidding and other related Professional Services,
necessa to com lete the water mains and street Ii htin im rovements ortion of the work be a roved.
Item Summary/Recommendation:
On September 13, 1995, the City of Miami Beach entered into a Professional Services Agreement with
Gambach-Sklar Architects, Inc., for architectural, engineering and land surveying services, for the proposed
Marseille Drive Streetscape Improvements. In a letter dated September 28, 2001, Gambach-Sklar
Architects, Inc., notified the City that as of August 1, 2001, the firm Gambach-Sklar Architects, Inc., had
ceased its operations. Mr. Roberto Gambach of Gambach Architects, Inc. is the Principal that has been
most involved in the Project.
The Administration has determined that in order to proceed with the project, and for a smooth transition, it
will be necessary to assign the existing Contract dated September 13,1995, and as amended on January 26,
2000, between the City and Gambach-Sklar Architects, Inc to Gambach Architects, Inc., in accordance with
Article 18, of the Contract entitled "Additional Conditions". The balance remaining in the Contract, $8,800,
shall be the compensation to Gambach Architects, Inc., for all the work remaining to complete the Marseille
Drive Streetscape Project. The successor firm, Gambach Architects, Inc. is capable of performing the
balance of the work in the agreement.
Further, the Administration recommends an amendment to the Agreement with Gambach Architects, Inc., in
the amount of $10,990 for the Construction Administration, and Management, bidding and other related
Professional Services, necessary to complete the water mains replacement and streetlighting portion of the
work.
Advisory Board Recommendation:
I N/A
Financial Information:
Amount to be expended:
I Fin~~ oet
Source of Funds:
AGENDA ITEM C7 B
DATE 1-9-{) 2
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139
www.ci.miami-beach.f1.us
m
To:
From:
Subject:
COMMISSION MEMORANDUM
Mayor David Dermer and
Members of the City Commission
Date: January 9, 2002
JorgeM.Gonzalez \, .~.'
City Manager tJ 11' - 0 .
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND
AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE THE
ASSIGNMENT OF THE EXISTING PROFESSIONAL SERVICES
AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND
GAMBACH-SKLAR ARCHITECTS, INC., TO GAMBACH
ARCHITECTS, INC., FOR THE PROVISION OF ARCHITECTURAL
AND ENGINEERING SERVICES FOR THE MARSEILLE DRIVE
STREETSCAPE IMPROVEMENTS PROJECT; FURTHER
AUTHORIZING AND APPROVING AN AMENDMENT TO THE
AGREEMENT WITH GAMBACH ARCHITECTS INC., IN THE
AMOUNT OF $10,990, $8,272 OF WHICH IS AVAILABLE FROM
PREVIOUSLY APPROPRIATED WATER AND SEWER BOND
FUND NO. 426 AND $2,718 OF WHICH IS AVAILABLE FROM
PREVIOUSLY APPROPRIATED GENERAL OBLIGATION BOND
FUND NO. 373, FOR THE PROVISION OF CONSTRUCTION
ADMINISTRATION, AND MANAGEMENT, BIDDING AND OTHER
RELATED PROFESSIONAL SERVICES NECESSARY TO
COMPLETE THE WATER MAINS REPLACEMENT, AND
STREETLlGHTING IMPROVEMENT PORTIONS OF THE WORK.
ADMINISTRATION RECOMMENDATION:
Adopt the Resolution.
FUNDING:
Funding for the additional services is available from the previously appropriated project funds from
the Water and Sewer Bond Fund No. 426 and General Obligation Bond Fund No. 373.
ANALYSIS:
On September 13, 1995, the City of Miami Beach entered into a Professional Services Agreement
with Gambach-Sklar Architects, Inc., for the provision of architectural, engineering and land
surveying services, for the proposed Marseille Drive Streetscape Improvements.
l
Marseille Drive
January 9, 2002
Page 2
The Scope of the project includes streetscape improvements to the following streets:
. Marseille Drive, from Bay Drive to Rue Notre Dame,
. Rue Versailles, from Marseille Drive to Normandy Drive, and
. Rue Notre Dame from Marseille Drive to Normandy Drive.
The project's program generally includes:
. The provision of 5' wide sidewalks, with 6" deep valley gutter system to catch basins,
. Paved angular parking, including handicap parking,
. Paving, regrading and striping of roadways,
. Landscaping, including shade trees,
. Irrigation System, and
. Improvement of the drainage system
Pursuant to the infusion of additional funds to the project's budget, on January 26, 2000, the City
Commission approved and authorized (Resolution No. 2000-23768) an amendment to the
Professional Services Agreement between the City and Gambach-Sklar Architects, Inc., in the
amount of $18,392. The Additional Services consisted of additional enhancements to the design
such as new landscaping at the north end of Rue Notre Dame and provision of additional trees.
As a result, Gambach-Sklar Architects, Inc.'s contract with the City increased from $50,000 to
$68,392. Thereafter, the design and construction documents were completed. .
On September 28, 2001, Mr. Roberto Gambach, notified the City (Attachment I) that as of August
1,2001, the firm Gambach-Sklar Architects, Inc., had ceased its operations. Further, the City also
learned of the creation of the two (2) independent firms of Gambach Architects, Inc., and Sklar
Arkitekts, Inc., lead by the former principals of Gambach-Sklar architects, Inc. In light of the above
circumstances, the Administration reviewed the terms of the Agreement with Gambach-Sklar
Architects, Inc. The options available to the City to complete the project while having a smooth
transition are as follows:
Option #1
. Selection of a firm other that Gambach Architects, Inc, or Sklar Arkitekts, Inc. to complete the
work.
This option would require the annulment of the existing Agreement, and the selection of a new
Architectural/Engineering firm, through an approved procurement process. It would also be
necessary to execute a new Agreement. This process, in addition to the hardship of hiring a firm
with no previous knowledge of the project, would result in additional delays.
Option #2
. Assignment of the existing Agreement to Sklar Arkitekts, Inc., or Gambach Architects, Inc.
Mr. Roberto Gambach of Gambach Architects, Inc., is the Principal that has been most involved in
the Project. He is intricately familiar with the Project's scope, its program and design. Therefore,
assigning the current Agreement to Gambach Architects, Inc., is recommended as being in the
best interest of the Project and the City.
Marseille Drive
January 9, 2002
Page 3
In a letter dated October 30,2001, the Administration informed Mr. Gambach, and Mr. Sklarofthe
City's intent to assign the Contract to Gambach Architects, Inc., in accordance with Article 18, of
the Contract entitled "Additional Conditions". As a condition of the assignment, all documents,
including drawings, calculations. specifications, correspondence, and other materials relevant to
the Marseille Drive Streetscape Project will be assembled and submitted to the City by Gambach-
Sklar Architects, Inc.
The compensation for the remaining work will be a total of $11,800, which is comprised of $920
for the Bid Administration Phase, and $7,880 for the Construction Administration Phase, and no
more than $3,000 to cover the reimbursable expenses for the Project. This amount ($11 ,800) will
be assigned to Gambach Architects, Inc. if the Agreement is so assigned. As defined in the
current Agreement, Gambach Architects, Inc., shall also provide to the City Professional Liability
Insurance in the amount of $1 million to cover the work. All other provisions of the contract shall
remain unchanged and in full force and effect.
The design of another portion of the Marseille Drive I mprovements, consisting of water mains and
street lighting upgrades, was undertaken and completed by the Public Works Engineering staff. In
an effort to streamline both portions of the work, and consolidation of the Construction Contract
for both the underground and the above ground improvements, the Administration established that
it is in the best interest of the Project to assign the Construction Administration phase of that
portion of the work to Gambach Architects, Inc. Negotiations with Gambach Architects, Inc.
regarding the fees associated with these additional Construction Administration services have
concluded. It is the Administration's recommendation that an amendment to the agreement in the
amount of $10,990 be approved for the additional Construction Administration services.
CONCLUSION:
At this time, bid drawings for both portions of the project have been completed. Upon approval
and authorization by the Mayor and City Commission, the Administration will issue a Notice to
Gambach Architects, Inc. to take the necessary steps to proceed with the bidding phase ofthe
work. Therefore the Administration recommends that the Mayor and City Commission adopt the
Resolution.
Marseille Drive
January 9. 2002
Page 4
The following table indicates the funding distribution for the project.
Fundina Distribution Table
Marseille Drive Streetscape Project Costs Construction Available
Cost Estimate funding
Soft Costs:
A&E Fees and Reimbursable Expenses $68,392
Public Works Design Fee $14,362
Additional Services - Construction Admin $10,990
Survey and TestinQ (Allowance) $5,000
Subtotal $98,744 $102,754
CIP Management Fee $40,584
Subtotal $40,584 $40,584
Hard Costs:
Marseille Drive $487,898
Rue Notre Dame w/Street End $ 71,021
Rue Versailles $ 52,730
Landscaping $ 101,727
Irrigation $ 39,810
Water Main Installation $97,200
Street Lighting $59,500
Subtotal $909,886 $1,229,828
10% Contingency $ 90,988
Subtotal $ 90,988 $122,983
Grand Total $1,140,202 $1,496,149
\\CH2\VOl1IWORK\SAll\DIXC\PARKPROJECTS\MARSElllE DRIVE STREETSCAPE\GAM8ACH-RE-ASSlGN,doc
ASSIGNMENT OF
THE PROFESSIONAL SERVICES AGREEMENT,
DATED SEPTEMBER 13, 1995,
BETWEEN THE CITY OF MIAMI BEACH, FLORIDA
AND GAMBACH-SKLAR ARCHITECTS, INC, (ASSIGNOR),
TO GAMBACH ARCHITECTS, INC., (ASSIGNEE)
AND
AMENDMENT NO.2
TO THE PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF MIAMI BEACH, FLORIDA
AND GAMBACH ARCHITECTS, INC., AS ASSIGNEE
UNDER THE AGREEMENT DATED SEPTEMBER 13,1995,
IN THE AMOUNT OF $10,990.00,
FOR THE PROVISION OF 'CONSTRUCTION ADMINISTRATION AND
MANAGEMENT, BIDDING, AND OTHER RELATED PROFESSIONAL SERVICES
NECESSARY
TO COMPLETE THE WATER MAIN REPLACEMENT, AND STREET LIGHTING
IMPROVEMENTS FOR THE MARSEILLE DRIVE STREETSCAPE PROJECT.
RECITALS
WHEREAS, on September 13, 1995, the City of Miami Beach, Florida (the City) entered into
a Professional Services Agreement with Gambach-Sklar Architects, Inc. (Consultant), to perform
Professional Architectural, Engineering, and Land Surveying Services for Various Capital Projects
Where Basic Construction Does Not Exceed $500,000 per Project for a Two (2) Year Period (the
Agreement); subsequent thereto, a Service Order was issued to develop drawings and specifications,
and to provide construction documents to Gambach-Sklar Architects, Inc. for the Marseille Drive
Streetscape Project (the Project); said Agreement was amended (Amendment No.1) on January 26,
2000, in the amount of$39,380, for a total of$89, 380; and
WHEREAS, the scope of the Project is comprised of improvements to the following streets:
Marseille Drive, from Bay Drive to Rue Notre Dame; Rue Versailles, from Marseille Drive to
Normandy Drive; and Rue Notre Dame, from Marseille Drive to Normandy Drive; and
WHEREAS, on September 28, 2001, Gambach-Sklar, notified the City that, as of August 1,
2001, the firm had ceased operations; and
WHEREAS, the City also learned of the creation of the two (2) independent firms ofGambach
Architects, Inc. and Sklar Arkitekts, Inc., lead by the former principals ofGambach-Sklar Architects,
Inc.; and
WHEREAS, in light of the above, the Administration reviewed the terms of the Agreement
with Gambach-Sklar Architects, Inc. and, on October 30, 2001, the Administration informed the
principals ofGambach-Sklar Architects, Inc. of the Administration's proposal recommendation to the
Mayor and City Commission to approve an assignment ofthe Agreement to Gambach Architects, Inc,;
and
WHEREAS, on January 9, 2002 the Mayor and City Commission concurred with the
Administration, and adopted Resolution No. 2002-24701, approving and authorizing the assignment of
the Agreement from Gambach-Sklar Architects, Inc. (the Assignor) to Gambach Architects, Inc. (the
Assignee), to provide architectural and engineering services for the Project during the public bidding
process, management, and construction administration phases; and
WHEREAS, in addition, the water main replacement and street lighting upgrades portion of
the Project were independently designed by the City's Public Works Department engineering staff; and
WHEREAS, in order to bid and construct concuITently both portions of the Project, the
Administration determined that it would be in the best interest of the Project to incorporate the
construction administration and management, and bidding phases into the Agreement; and
WHEREAS, the compensation to Gambach Architects, Inc. to perform the construction
administration for the water main and street lighting installation designed by the City's Public Works
staff, was agreed by both parties to be $10,990; and
WHEREAS, on January 9, 2002, in addition to the approval of aforestated Assignment, the
Mayor and City Commission also approved the Amendment No, 2 to the Agreement, in the amount of
$10,990, for the provision of construction administration and management, bidding and other related
professional services necessary to complete the water line replacement and street lighting
improvements portion ofthe Project; and
WHEREAS, funding to cover the construction administration for the water main and street
lighting installation is available from previously appropriated funds as follows: $8,272 from the Water
and Sewer Bond Fund No, 426, and $2,718, from the General Obligation Bond Fund No.373.
NOW, THEREFORE, the parties hereto, and in consideration ofthe mutual promises, covenants,
agreements, terms, and conditions herein contained, and other good and valuable consideration, the
respect and adequacy are hereby acknowledged, do agree as follows:
1. ABOVE RECITALS
The above recitals are true and COITect and are incorporated as a part ofthis Amendment No.2.
2. MODIFICATIONS
a. The City herein approves the assignment of the Agreement from Gambach-Sklar
Architects, Inc., as Assignor, to Gambach Architects, Inc., as Assignee.
b. The Agreement is amended to incorporate the Additional Services to the Agreement, as
described in Schedule "A" entitled "Scope of Services/Compensation for Additional
Services", attached hereto; and Schedule "B", entitled "Project Schedule", to be provided
by the Contractor.
3. OTHER PROVISIONS.
All other provisions of the Agreement, as amended, are unchanged.
4. RATIFICATION.
The City and Consultant ratify the terms of the Agreement, as amended by this Amendment
No.2.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.2 to be executed in
their names by their duly authorized officials as of the date first set forth above.
ATTEST:
CITY OF MIAMI BEACH
~ 'f-- ~
t CITY CLERK . J
GAMBACH ARCHITECTS, INC.
(?~b,,-L
P SIDENT
By
ATTEST:
BY~~
I S RETARY
'p,~~-tt:> -1. 6b}.M3b~\-\
Print Name
fi3 ~/jr7G I z- G/j-mL3A C-J+
Print Name
APPROVED NJTO
FORM &LANGUAGI!
& FOR EXECUTlON
5-1 Lj_ vlf
D*
Schedule" A"
To Amendment No.2 to the Professional Services Agreement
between the City of Miami Beach, Florida and Gambach Architects, Inc., as Assignee
under the Agreement dated September 13, 1995
Scope of Services/Compensation for Additional Services
for the Construction Administration and Management, Bidding, and Other Related
Professional Services of the Marseille Drive Water Main Replacement and
Street Lighting Installation:
Scope of Services:
The Scope of the Consultant's services shall include the following:
1. Bidding Phase Services:
a) Assist the City in obtaining lump sum bids with Additional and/or Deductive
Alternatives.
b) Assist the City in awarding and preparing the Contract for Construction of the water
main lines and the street lighting system.
2. Construction Administration and Management Phase Services:
Field Inspections for Water Main Construction:
Perform field inspections for the review and conformance of water main construction as
per the record plans. Included as part of these services shall be the following:
a) Field review of water main construction
b) Review of water main plans and shop drawings as required.
c) Inspection of pipe installation; verification of pipe connection installation, as per the
manufacturer's recommendations.
d) Verification of pipe torque of bolted fitting connections.
e) Review of field density tests during backfilling of trenches.
f) Pressure test (monitoring)
g) Order bacteriological water samples (Tests are Reimbursable)
h) Submission of the Certification of Construction Completion form to the Department of
Health (HRS) (City will reimburse $250.00 application fee).
3. Other Related Professional Services:
As-Built Preparation:
Prepare as-builts of water main plans as they are being constructed. Included as part of
these services shall be the following items:
a) The fieldwork for obtaining the as-built information
b) As-built plans certified by a Registered Land Surveyor and Mapper
c) Prepare As-built drawings signed and sealed based on information received from the
Contractor and field inspections and submittal of one hard copy with Mylar and one
digital file Auto CADD 14 or later version).
d) Obtain a final survey at project completion.
e) Coordinate streetlight inspection with relevant Public Works staff.
Compensation:
. Original Agreement amount $50.000.00,
. Amendment No.1 (to include North End of Rue Notre Dame) amount $39.380.00.
. Amendment No.2 (for the above described services) amount $10.990.00.
. Revised Agreement amount $100.370.00,
Schedule "B"
To Amendment No.2 to the Professional Services Agreement
between the City of Miami Beach, Florida and Gambach Architects, Inc., as Assignee
under the Agreement dated September 13, 1995
Project Schedule:
(To be Provided by Contractor)