Loading...
2002-24799 ResoRESOLUTION NO. 2002-24799 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF MIAMI BEACH, FLORIDA, APPROVING AMENDMENT NO. 4, TO THE ARCHITECTURAL AND ENGINEERING AGREEMENT WITH ROBERT A. M. STERN ARCHITECTS FOR THE CULTURAL CAMPUS/REGIONAL LIBRARY PROJECT, FOR ADDITIONAL SERVICES, IN THE AMOUNT OF $20,798, TO COMPLETE THE CONCEPTUAL DESIGN OF THE RENOVATION OF THE EXISTING ROTUNDA BUILDING AT COLLINS PARK UNDER THE TERMS OF THE APPROVED MASTER PLAN. WHEREAS, on September 23, 1998, the Mayor and City Commission adopted Resolution No. 98-22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A. M. Stem Architects (Stern) for the architectural and engineering design of a Regional Library, a 400-space Parking Garage, and a Master Plan for Park and Streetscape Improvements in the area surrounding Collins Park (the Project); and WHEREAS, the Master Plan included the schematic programming of the existing Rotunda Building, which was to be retained and renovated after the existing Library demolition; and WHEREAS, on November 2, 1999, the voters of Miami Beach approved the issuance of approximately $92 million in General Obligation (GO) Bonds which included $1,800,000 for a complete renovation of Collins Park and the Cultural Campus, which includes the Regional Library, the Bass Museum, the Rotunda Building, and the Miami City Ballet building; and WHEREAS, the scope of work did not include the Renovation of the Rotunda Building and therefore no funds were identified for this portion of the Project; and WHEREAS, the Administration is now requesting approval of Amendment No. 4, in the amount of $20,798, to the Agreement with Stern, to develop a design concept for the renovation of the existing Rotunda Building, as defined in the Master Plan of Collins Park, as previously approved by the Administration and the City Commission; and WHEREAS, the scope of work of the additional services includes assistance with the programming of the facility; the schematic design of the Rotunda Building once the programming has been defined; attendance by Stern at community workshop(s) with adjacent property owners and residents and parties interested in the use of the building; a small charette with City of Miami Beach professional staff; and a presentation of the design and the recommendations of Stern; and WHEREAS, the requested fees, in the amount of $20,798, include $715 for reimbursables; $1,000 for a preliminary cost estimate; and $2,406 for contingency; once all parties approve the schematic plan, Stem will provide a proposal for the completion of the design, the construction documents and the construction administration phase of the Project; and WHEREAS, the preliminary cost of the renovation and additions to the existing Rotunda Building were estimated by Stern to be $643,443 at the time the Master Plan was submitted and an additional ten-percent, or $64,344, must be added to take into account the fact that the estimate is based on a schematic design with only a preliminary program and no definite information on the full scope of the Project construction; and WHEREAS, a preliminary cost estimate was provided for mostly code corrections and improvements to the facility with minimal programming considerations which established construction costs at $365,560 to which a similar ten-percent, or $36,556, must be added to account for the preliminary nature of the estimate; and WHEREAS, the range of costs for the Project therefore lies between $402,116 and $707,787, depending on the extent of the modifications to the building; and WHEREAS, at this time, the cost of full professional services is estimated at approximately $100,000, which would include the $20,798 for the conceptual design phase now being requested; and WHEREAS, funding sources for the construction of the renovation to the Rotunda Building should be secured for the highest estimated amount, given the current preliminary status of the building programming and possible unforeseen conditions, which can be expected in a renovation project, and should include funds for the complete design and construction administration of the Project. NOW THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission herein approve Amendment No. 4, to the architectural and engineering Agreement with Robert A. M. Stern Architects, for the Cultural/Campus Regional Library Project, for additional services, in the amount of $20,798, to complete the conceptual design of the renovation of the existing Rotunda Building at Collins Park, under the terms of the approved Master Plan. PASSED and ADOPTED this 20th day of M2rf..h, 2002. ATTEST: CITY CLERK F:\WORK~$ALL\chartrandXLibrary~otunda Reso.doc FORM & LANGUAGE & FOR EXECUTION FILE No.113 03/06 '02 13:54 ID:Ronica FA× 9635 FAX:2129675588 PAGE 2 460 West 34th Street, New York, NY 10001 '1~.1 212 967 5100 Fax 212 967 5588 obcrt A.M. Stern Architects March 6, 2002 Jorge E. Chartrand, Construction Matsager City of Miami Beach 1700 Convention Center Drive Miami Beach, FL 331'39 Dear Jorge: Sent by E-mail and Fax Robert A.M. Stern Architects LLP, (RAMSA) is pleased m submit this proposal fhr professional services in connection with Collins Park Rotnndn Renovation. The Project The Project. as we understand it consist~ of restoration of and renovations to the existing 'rotunda' meeting room at the Miami Beach Regional Library in Collins Park. Scope of Services The current proposal is for conceptual design services only. The intent is to develop the design to tile point where it can be shown to a potential donor. Services are anticipated to take 3 weeks from the date of the notice to proceed. and will not include the sewices of engineers or specialty outside consultants including acoustical, theater design, and lighting cunsultants. A separate proposal for cost estimating services is attached. We will rely on the City of Miami Beach Rotunda Buildira! Code Analysis dated February ! 0. 1999 previously provided by the City. Our work product is anticipated to include a !/8"--1'-0" floor plan showing one potential seating configuration, 2 building elevations at I/8"= 1'-0" indicating new and existing materials, and one building cross- section at I/8":=! '-0". Our services will include an initial 'community meeting' with all inlerested parties, as coordinated by the City of Miami Beach, to receive input ti'om potential users. This meeting will be artended by Alex l.amis and Sol Pens. We will then develop the design concept based on the input received, The resulting concept will be presented by Alex Lamis. The Project Team Robert A.M. Stem Architects and Cost Estimators Cumming/McGillivray will be the sole consultants fhr this phase ofthe work. It is anticipated that other consultants will be involved in fixture phases of the project.. Budget and Schedule The budget for the project has not been definitively established but will be in the range of $500,000.00 construction cost. The construction will not begin until the new Mianri Beach Regional Library is completed in 2003. If City of Miami Beach authorizes changes to the scope of the project wl'dch cause RAMSA m revise drawings and other documents which have been previously approvcd, if the cost ol' construction increases or the project schedule is extended wi~ City of Miami Beach's approval, or RAMSA is required to modify drawings orother documents as a resuh or inadequate, incomplete or erroneous information received from City of Miami Beach or ~'om other consultants employed by City of Miami Beach or not under A limited liability Pannrrship I-iLl- No. II~ Ud/UIO 'U:~ ld;Oo iu;Konlo8 PHA ~o~0 rNA.~l~OrO~O 460 We~t 34rh ~tr~t. N~ York, NY 10O0[ 'l~l 212 967 5100 F~ 2t2 9~7 5588 rl, tk,T_ o lorge E. Chartrand, Construction Manager City of Miami Beach, Proposal March 6, 2002 Page 2of4 Robert A.M. Stern Architecu RAMSA direct control, or due to changes in laws, rules, or regulations which govern the project, RAMSA will be entitled to an adjustment in its compensation unless such changes are caused by RAMSA negligent errors or omissions. Assumptions In addit/on to the foregoing, this proposal is based on the following assumptiuns which are material conditions to the agreement to provide the services described herein: This proposal is based on certain information provided by City of Miami Beach on which RAMSA is entitled to rely for completeness and accuracy. Additional information which will be provided by City of Miami Beach will include, but is not limited to surveys, existing conditions documentation, testing services, complete approved program information, legal and accounting services r~quired by the Project and any rules or regulations of winch City of Miami Beach may be aware that affect RAMSA's performance otits services henunder. RAMSA shah be entitled to rely on the timeliness, accuracy and completeness of all information provided by City of Miami Beach or its consultants. City of Miami Beach has designated .forge E. Chartrand as its Project Manager for the Project. RAMSA is entitled to rely on the City of Miami Beach Project Manager tbr timely and complete information and decisions with respect to the Project. City of Miami Beach will provide written approval at the conc ltmion of each tbas phase of RAMSA's services. RAMSA will have no obligation to proceed in the absence ofsuch vaStten approval or written notice describing the speci~c reasons such approval has been withheld. City of Miami Beach acknowledges that public reviews and approvals which may be required for the Project, except where listed in the Scope of Services section above, are outside of RAMSA's control and will be provided by RAMSA as an additional service at the hourly rates described below. RAMSA will use its best efforts to assist City of Miami Beach to obtain such approvals but cannot he liable for the Failure to obtain such approvals. Basic services include RAMSA's services in connection with drawings and other documents required to obtain a standard as-of-right building permit. Compensa lion Compensation lhr the services described here in, based on the foregoing assumptions and the following terms and conditions will be a stipulated lump stun of Seventeen Thousand Five Hundred Dollars ($17.500.00), exclusive of reimbursable expenses. Reimbtu'sable expenses are expected to be in the ratlee of $2,250. A work-sheet showing assumptions that underlie this Fee basis is attached. A l,imited Liability Partnership 460 West Mth Street, New York, NY 10001 'IH 212 967 5100 Fax 212 967 5588 Jorge E. Charlrand, Construction Manager City of Miami Beach, Proposal Match 6, 2002 Page 3of4 robert A.M. Stern Archirccu Standard Contract Terms Fees described do not include surveys, soils testing, verification or documentation of existing conditions, or any other engineering or consultants or base site information except as specifieally described above. Drawings zmd specifications are and rema in, the sole property ofRAM SA and may, when completed, be used for the construction of this project, provided City of Miami Beach is not in breach of this agreement, but may not be used on any other project without RAMSA's prior written approval. No public use of the names of RAM SA or its consultants in connection with this project ~my be made without RAMSA's prior written approval. Services in connection with zoning,, subdivision, or other public regulatory approvals, ifrequirecL will be provided as additional services at our current hourly rates. Publicity and marketing services, detailed models, additional meetings, and coordination of additional consultants will be performed as requested as additional services. Reimbursable expenses, which will be billed at cost plus fifteen percent (15%) will include other outside consultants. long distance telephone calls, facsimile transmission, travel and accommodations, printing and photocopying, model supplies, photographic services and reproductions, CADD plotting services. and express mail or courier services. Compensation for services provided by Robert A.M. Stern Architects on art hourly basis shall be computed as described in the attached schedule of hourly billing rates. Rates may be adjusted annually no sooner than one year from the date of this letter lbrm of agreement. We will invoice for services performed on a tnonthly basis with payments due upon receipt. For amounts outstanding over thirty (30) days a finance charge of I-I/2% per month (I 8% annually) will be assessed on the outstanding balance, If payment has not been made within thirty (30) days, RAMSA may suspend it's services on the project without fhrther liability until such payment has been received. City of Miami Beach may suspend services in connection with the Project, orcancel the Project upon no less than fifteen (15) days prior written notice to RAMSA. RAMSA's sole obligation shall be to organize and arehive drawings, files and other documents relating to the Project within seven (7) days of such notice. City of Miami Beach agrees to compensate RAMSA for all services completed, including organizing and archiving of files and other documents, and expenses incurred through the date of suspension or cancellation of the Project. If you have any questions regarding this proposal, please do not hesitate to give me a call. I would be pleased to discuss it with you in more detail. With your acceptance as indicated below together with your initial paineat we can get the project started. Terms and conditions of this letter agreement are intended to be consistent with the AIA Abbreviated Form of Agreement between Owner and Architect, A limited t,iahility Partnership FILE No.llj Ub~/Ut~ '(Yd 1L~:b~ IU:Kon~ca rM~ ~odo rHA:~l~ooo~ 460 Wc,t 34th Strut, N~Yo~, NY 10OOl Tel 2[2 967 5100 r~ 212 967 5588 Jorge E: Chartrand, Constructran Mnnager City of Miami Beach, Proposal March 6, 2002 Page 4of4 Rnbert A.M. Stern Archi tecl:s AIA Form B 151, 1997 Edition, except as modified hereby. Sincerely, ,7 .. 1 , ,:½' A 12auder [jamis Partner Date: Read and Agreed: Ci,ty of Miami Beach (Signature and Title) Enclosures: Hourly Rate Schedule Labor Cost and Reimbursable Spreadsheet Proposal from Cost Es~mator Copy to: Robert S. Buforck Managing Partner Salvador Penn A l.imited Liability !'arnxership FILE No.11~ O~/UB 460W~t34th Strut, New~rk, NYl000] '~1212967 5100 Fu 2129675588 March 6, 2002 robert A.M. Ster,~ Architects Schedule of Hourly Billing Rates Compensation for services provided by Robert A.M. Stem Architects on the basis of hourly billing rates shall be computed as follows. for staff time directly associated with the pertbrmance of services on the Project (Rates will be adjusted annually no sooner than one year from the date of this Agreement): Robert A.M. Stem's time at the fixed rate of three hundred fifty dollars ($3 50.430) per hour. d, Partners' time at the fixed rate of two hundred fifty dollars (5250.00) per hour. Associate Partners' time at the fixed rate of two hundred dollan ($200.00) per hour. e, Seuior Associates' time at the fixed rate of one hundred seventy-five dollars ($175.00) per hour. g, Associates' and Project Managers' time at the fixed rate of one hiredred fifty-five dollars ($155.00) per hour. Senior Project Staff time at the fixed rate of one hundred twenty-five dollars ($12100) per hour. Project Staff Level I time at the fixed rate of one hundred dollars ($100.00) per hour. h. Project Staff Level II time at the fixed rate of ninety dollars ($90.00) per hour. Project Staff Level Ill and Modelmakers' time at the fixed rate of seventy-five dollars ($75.00) per hour. Project related Administrative Staff time at the fixed rate of seventy-five dollars ($75.00) per hour. A I.imitcd Liability Partnership iu:Kon~ca hH~ U~D rHA;~l~uo{oooo ~HLf_ ( . flLh No.ll~ U~/UO 'U~ l~:Oo CLJMMING McGILLIVRAY L|.C: February 26, 2002 Alex Lamis Robert A.M. Stern Architects 460 W, 34n' Street New York, N Y 10001 Re: Miami Beach Library- Rotunda Renovation Dear Alex: I am in receipt of the fitcsimi lc that you sent this morning and ! have met with our team to discuss the project. We certainly appreciate the opportunity to develop a conceptual estimate for Robca A.M. Stern Architeet.s for the Miami Beach Library Rotunda Renovation. As such, CMLLC is proposing a t~e of $1,000.00 dollars. The fee is based upon the sketch titxcd to us earlier today. Thank you For this opportunity and wc trust this proposal meets with your approval. Wc will begin the conceptual cst/mate upon receipt or this signed agreement. Paymenl will be duc upon receipt of the invoice. John Sprinkle, Senior Estimator, and ! will contact you shortly after lunch to discuss the fee and discuss the additional information that we will need from you to do ihe estimate. Sincerely, erine Frank iin ~Business Development Cureruing McGilliway LLC Approved to proceed: __ Robert A.M. Stern Architects Date: ,\1~( '1 I!'I'I':C'I'- C( )N,"';UI ;I'ANI' I;1'~1{ I'l{()l't ),";AI. PROGRAMMING AND CONCEPTUAL DESIGN PHASE Direct Labor Costs SPECIALITIES Prujcct Management and Coordinatl,n Architecture Landscape Ardfifeetu:'e Inleriors IIOURS HOURS POSFrlON (week) (phnse) Robert A.M. Nlern 0 0 ParmeT 1.0 Associate I~zrtner 0.0 Sr. A,sociatc (}.0 A~soeiate [).fi St. Project Assistant 0.{) RATE (~) 0.0 $350.00 3.0 $250.00 o.0 $200.01) 0.0 $175.00 0.0 $155.00 0,0 $125.00 Rt~hcrt A.M. Stern 0.0 0.0 ~j350,(}0 Partner 4.0 12.0 $250.00 Associate Parincr {).0 0-0 $2(10 fl0 ,*Or. Associate 0.(} 0.0 $175.00 Asst)cxale [).0 0.0 $155 .(R] Sr. l'rqicct Assistant [) 0 0 0 $125.00 I )raft,'iman Level I 0.0 0.0 $100.00 Draffxman L,uvel II 40.0 120.0 $90.00 Drntisman I.cvul III (1.0 0.0 $75.00 Mtxlelmakcr (} .O 0.0 $75.00 Administrative Stafr 3.0 O.Q $75.00 Robcrl A,M. Stern 0.O 0.0 .$350 00 Part ncr 0.O 0. C) $2.~0.00 Asgoeiate l~irtncr 0 0 0.0 $200.00 Sr. Associate 0 0 O0 $175.00 ASSOCiale 2.0 6.0 $155.00 St. I'miect AssisUinl 0 o 00 $ t25.00 i )re ft,,man I_cvcl [ 0 0 [).0 $ [ 00.00 I)raf~sm;m Ixvel {[ 0 0 [).0 $90.00 Drall.qtn, rl I,uvcl {[1 0 0 00 $75.00 Mt>dchnakcr O.(l 0 0 $75.00 Adtnlnlsll tfiivC stlt'rl' o.(1 0 O $7.~.{}{I Robert A M. Stcra 0.O O.0 $35{1.00 Patrtlxel' (] {) t).0 $250,00 Associntc [~al'lllcr 0.0 [).0 $200.00 St. Associate 0.0 0.0 $I75.00 Associntc 0.0 0.0 $155,fi0 St. r'rOiect A~sistant 0.0 0.0 $125.00 {)r~tftsman L,eve{ I 0.0 O.O $ I00 O0 Di,'aftsrnun Level II 0.0 0.0 $*)0.00 Dnd'tsman Level Ill O.t) 0 0 $75.00 Mtxlclmakcr 0.[) (10 $'75.0{) Administrutive ,";taft' 0.0 0 0 $75.{1t) Project Nurab~r 98.011 FEE ($) Utu-,mon m Weeks 3 I~TAL$($) $o oo; $750,00 $0.00 S0.00 $0.00 $0.00~ $750.00 .~o.0o1 ~;7._::': : $3,000.00~ ';51:,. · ' $0.00i ~.,~;:'_ ', $lO,SO0001 -;.~:'.':' ' '; ~ S0 00{. ~ :',;:; ', . ' ~ ..oor.' ,-.,: $67S 00~~' ');:-~ .: .._ _ ,: ' _, ~ $14,475 .(~) $0.00 . .r= '_, $0.00 $0.00 _ ,? ': :, :: ~ $0.00 ~.~ ' ~ - ~o.oo ;~'~ .... '~*-. = $930.~ $0,00 ~ ~'~' ~ $0.00, .~: . [ $0.00' ,: ~ :-: - $0,00 ~~-7 ~: '.7~ $0.~ FiLE No.l13 05/06 'O~ l~:b8 f,h,ltc:{ A I%1 Nlcln .\rchih.c(,,, I 1.1'. PROGRAMMING AND CONCEPTUAL DESIGN PHASE Other Direct Costs (See Attachments) TASK Repmcluctinn and C'opying Photogn~pl~c S~:rvices Phulographic .Supplies I~acsimjlc Services Posl~l. ('miner. and Delivery Se~iees Lollg I)istance Talephone Calls 7'[~lvcj alld A~col~m(KJali¢3ns Nmt-'Fn~cl Meals Mndcl Stlppl}~s [~'l>lessiunai Modchtlaker l~nlcs~itmn I Renderer C'.nll~ullnnl Rdmbunallles ()thor Misceihutcous Expenses Suh.'l'atal: Administrative B, Other l)h'ccl (~'osts 'l'otah PFOjL, Cl Ntunl~'~' 98.011 Cost $500.00 $0.00 $0.00 $0.00 52[).00 1,200.IK) $0.[1l) $0.00 $0.00 $O.oOl $172 15,0g6 1)uratimt itt Weeks 3 TOTALS ($) $ I,~lg2.0O $1,892,00 $283.80 $2,175.811 Fee SunUnary A, Direcl Labor Cost Totah B. Od'~er Direcf Costs Totah C, Ctullnlgcncy: I'l'ul)li~;ed ]tee 'l'nluh 8.0% $16.155.00 $2. [ 75.80 $ [.466.46 $1 ~),797.26 Project Manager 26-Feb-02 AllJirow:d [ly Project Partner CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY Condensed Title: A Resolution of the Mayor and City Commission approving additional services to Robert A. M. Stem for the conceptual design of the existing Rotunda Building at Collins Park. Issue: Existing Rotunda Building at Collins Park was part of the Master Plan created by Stern and approved by the Mayor and City Commission. The building needs renovation and re-programming for use as part of the Collins Park Cultural Center and as recommended by the Arts Council and others in the community. Item Summary/Recommendation: The Administration recommends approving an amendment to the Agreement with Robert A. M. Stern for additional services to provide a schematic design for the existing Rotunda Building which will be generated after comments from the community and the City's professional staff. Advisory Board Recommendation: IThe Collins Park Cultural Center Oversight Committee recommended award at their 2/28/02 meeting. Financial Information: Amount to be expended: $20,798 Source of Funds: Finance Dept. . ':~':, !~"$20,798 City Center RDA Funds Sign-Offs: AGENDA ITEM R?(---.,' CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www. ci.miami-beach.fl.us COMMISSION MEMORANDUM To: Mayor David Dermer and Members of the City Commission Date: March 20, 2002 From: Subject: Jorge M. Gonzalez ~F~O N R AND CITY COMMISSION OF MIAMI BEACH, FLORIDA, APPROVING AMENDMENT NO. 4, TO THE ARCHITECTURAL AND ENGINEERING DESIGN AGREEMENT WITH ROBERT A. M. STERN ARCHITECTS, FOR THE CULTURAL CAMPUS/REGIONAL LIBRARY PROJECT, FOR ADDITIONAL SERVICES, IN THE AMOUNT OF $20,798, TO COMPLETE THE CONCEPTUAL DESIGN OF THE RENOVATION OF THE EXISTING ROTUNDA BUILDING AT COLLINS PARK UNDER THE TERMS OF THE APPROVED MASTER PLAN. ADMINISTRATION RECOMMENDATION: Adopt the Resolution. FUNnlNG: Funding will be provided by the City Center Redevelopment Agency (RDA). ANAl YSIS: On September 23, 1998, the Mayor and City Commission adopted Resolution No. 98-22904, authorizing the Mayor and City Clerk to execute an agreement with the firm of Robed A. M. Stem Architects (Stem) for the architectural and engineering design of a Regional Library, a 400-space Parking Garage and a Master Plan for Park and Streetscape Improvements in the area surrounding Collins Park. The Master Plan included the schematic programming of the existing Rotunda Building, which was to be retained and renovated after existing Library demolition. On November 2, 1999, the voters of Miami Beach approved the issuance of approximately $92 million in General Obligation (GO) Bonds. The proposed and reCOmmended improvements included $1,800,000 for a COmplete renovation of Collins Park, and for the Streetscape surrounding the Cultural Campus, which includes the Regional Library, the Bass Museum and the Miami City Ballet building. This sCOpe did not include the Renovation of the Rotunda Building and therefore no funds were identified for this podion of the Project. The Administration is now requesting approval of Amendment No. 4, in the amount of $20,798, to the Agreement with Stem, to develop a design COncept for the renovation of the existing Rotunda Building as defined in the Master Plan of Collins Park, previously approved by the Administration and the City Commission. Funding will be approved and appropriated by the RDA. Commission Memorandum Page 2 Rotunda Building The scope of work of the additional services includes assistance with the programming of the facility; the schematic design of the Rotunda Building once the programming has been defined; attendance by Stern at community workshop(s) with adjacent property owners and residents and parties interested in the use of the building; a small charette with City of Miami Beach professional staff; and a presentation of the design and the recommendations of the consultant. The requested fees, in the amount of $20,798, include $715 for reimbursables, $1,000 for a preliminary cost estimate and $2,406 for contingency. Once all parties approve the schematic plan, Stern will provide a proposal for the completion of the design, the construction documents and the construction administration phase of the project. The Administration will present this proposal at that time to the Mayor and City Commission for approval and appropriation of funds. The preliminary cost of the renovation and additions to the existing Rotunda Building were estimated by Stem to be $643,443 at the time the Master Plan was submitted. An additional ten- percent, or $64,344, must be added to take into account the fact that the estimate is based on a schematic design with only a preliminary program and no definite information on the full scope of the project construction. The estimate, which is neady three years old, included asbestos removal; code related corrections and improvements, the addition of a space for restrooms and other amenities and minimal programming improvements. A preliminary cost estimate was provided for mostly code corrections and improvements to the fadlity with minimal programming considerations, since these were not firmly established. This cost was established at $365,560 to which a similar ten-percent, or $36,556, must be added to account for the preliminary nature of the estimate. The range of costs for the project therefore lies between $707,787 and $402,116 depending on the extent of the modifications to the building. Funding sources for the construction of the renovation to the Rotunda should be secured for the highest amount given the current preliminary status of the building programming and the possible unforeseen conditions, which can be expected in a renovation project. In addition, funds for the complete design and construction administration of the project must also be secured. At this time, the cost of full professional services is estimated at approximately $100,000, which would include the $20,798 for the conceptual design phase now being requested. It is recommended that the Mayor and City Commission adopt the Resolution approving Amendment No. 4, in the amount of $20,798, to the Robert A. M. Stem Agreement, for the conceptual design of the existing Rotunda Building within Collins Park as proposed in the Master Plan previously approved. The City Center Redevelopment Agency will provide funds. T:\CMGR~AGENDA~2002MVlAR2002~CONSE~otunda fees.doc