LTC 502-2017 Miami Beach Convention Center Construction Project UpdateNA •
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, ..miamibeachfl.gov
OFFICE OF THE CITY MANAGER
LTC# 501-2017 LETTE&TO COMMISSION
TO: Mayor Philip Levine and Members f the City
FROM: Jimmy L. Morales, City Manager
DATE: October 18, 2017
SUBJECT: Miami Beach Convention Center Construction Project Update
The purpose of this LTC is to update the Mayor and City Commission on the Miami Beach
Convention Center (MBCC) Renovation and Expansion Project. The financial information
provided is through August 31, 2017. Project Dashboard is attached as Exhibit A and
corresponding Budget Summary Breakdown is attached as Exhibit S.
SCHEDULE UPDATE & PROJECT MILESTONES
Construction of the project commenced in December 2015 and is 65% complete as depicted in
Schedule A below. The project remains on schedule for a substantial completion target date of
August 2018:
Schedule A
Phase 2B - June 7 to the Present
Commencement of Phase 2B occurred on June 7, 2017, when the building re -opened for the
load -in of the eMerge Americas event. Six additional events, including the Major League
Baseball Fanfest, the Swimwear Show and Home Show occurred on the east side of the building
facing Washington Avenue until early September.
August 1, 2017 "Rain Bomb"
On August 1, a significant rain event with no advance notice and with an accumulation of 6.5
inches in a three-hour period caused portions of the completed east side of the project to suffer
damage through the roof. Upon initial visual inspections the following day, a rough order of
magnitude (ROM) estimated approximately $450,000 in potential damage. On August 11, 2017
IID35 I
WIG
1 2031 1 2038
1
Ge le s, ll 1 2
a e s 6 1 i 1 te11
3 3 2 3 0 1 6 1 8 910 11 N a 1 1 3 C 5 s 1 9 9 11 Il
1
Mwl
I
1
EE: # LE. Wyfle
-
1
Malls
-------
-
.all ell.NallS
xaaboeelvaa
--------
_-..---ssetnrcarambsl.nan
ss. St. Purn, State..
--------
ao
0
0
1n
nl
ro
Phase
1 _
WeRFznlexnn x
v
------- -----_-_
v
Weit Caxamx/.,and LOMY
2ntl
- - m -
¢
- -
Q
6
0
Q
eakinC enter Drwm
Conven[bn Center Orale
--
Catl FkperC4bMme
-
- �� �.
..
PoaFelll
1
1
al.tt Ir8allmom
i3II5trtet VarX
--
.. ..
..
Phase 2B - June 7 to the Present
Commencement of Phase 2B occurred on June 7, 2017, when the building re -opened for the
load -in of the eMerge Americas event. Six additional events, including the Major League
Baseball Fanfest, the Swimwear Show and Home Show occurred on the east side of the building
facing Washington Avenue until early September.
August 1, 2017 "Rain Bomb"
On August 1, a significant rain event with no advance notice and with an accumulation of 6.5
inches in a three-hour period caused portions of the completed east side of the project to suffer
damage through the roof. Upon initial visual inspections the following day, a rough order of
magnitude (ROM) estimated approximately $450,000 in potential damage. On August 11, 2017
Miami Beach Convention Center Monthly Construction Project Update
October 18, 2017
Page 2 of 8
a report and inspections from Clark Construction's Industrial Hygienist, GLE, uncovered much
more drywall and ceiling damage, which was not readily apparent during initial visual inspections
but were recommended to be replaced in order to avoid future latent defects. As a result, a
claim under the City's Builder's Risk insurance policy in the estimated amount of $1.8 million will
be filed. The repair work is currently underway and the City's project team is meeting on a weekly
basis with Risk Management staff to manage the claims process and provide proper
documentation for maximum reimbursement.
Hurricane Irma
On September 5, 2017, Hurricane preparedness execution began and portions of the project site
began to demobilize and be locked down under the threat of Hurricane Irma making landfall in
South Florida by the following weekend. By Friday, September 8, the building and site had been
completely evacuated of all personnel. After the hurricane struck on September 9 and 10, the
building lost electrical power until it was restored on September 13, The Contractor's work force
was allowed to return to the jobsite on September 12 to begin post -hurricane clean up and
damage assessment. Fortunately, the building did not incur any structural damage or other major
damage. Some damage to roofing, glazing, insulation, and drywall from water and wind
infiltration was documented and a preliminary clean-up and a damage estimate was provided by
the Contractor. By September 18, and as required by the Building Official, the structural re-
certification of the building was completed, and construction crew sizes began to return to pre -
Hurricane levels.
Hurricane Irma Damages (Delay and Cost)
the Contractor calculated that the project lost 15 calendar days which included one week for
hurricane related preparations and one week after the storm to remobilize once power was
brought back to the building and office trailers. Full work crews, many of who left the state, were
not beginning to return until the week of September 18 for a total of almost 3 weeks of project
momentum that was lost since before the storm.
In addition, and significant, is the impact the storm had on the work scheduled to be performed
by FPL in September to provide power to the west side of the building as part of the renovation
and expansion project and specifically for the Art Basel show deadline. Due to the loss of FPL
crews to statewide repairs, as well as delays suffered by Clark, temporary diesel generators will
need to be provided and operated in lieu of a completed electrical vault.
Preliminary estimates for the issues noted above and other costs incurred in order to make the
2017 Art Basel milestone have been submitted by the Contractor and are under review by the
City's consulting team, owner's representative, Hill International, and Convention Center
consultant, Jones Lang LaSalle (JILL). The additional costs will be paid from the project's
contingencies and the City will be filing a claim to FEMA for potential reimbursement of Hurricane
related costs. A separate LTC summarizing the cost results and details will be forthcoming.
Events Affected
A total of 4 events had to either cancel or be relocated as a result of Irma's impact. For both, the
cancellation and relocation of shows, City and MBCC staff have worked in lockstep with each
show to protect the best interests, safety and security, and overall event success for the show
producers, exhibitors, and guests. The 4 effected events (listed below) are under contract to
return in 2018:
1. Auto Show — Irma made landfall during the scheduled Auto Show event, therefore the show
had no other option but to cancel.
Miami Beach Convention Center Monthly Construction Project Update
October 18, 2017
Page 3 of 8
2. America's Food & Beverage - The City cancelled the show due to there not being enough
time to clear the building for public occupancy of any event or show by the Building Official
and Fire Marshall.
3. ICFF Miami — For similar reasons related to the ability to clear the MBCC for occupancy by
the general public, the event was relocated to the Broward County Convention Center (Fort
Lauderdale)
4. Jewelry Trade Show — For similar reasons related to the inability to clear the MBCC for
occupancy by the general public, the event was relocated to the Broward County Convention
Center (For Lauderdale)
Art Basel Miami Beach 2017
December 6 through December 10, 2017, Art Basel Miami Beach is scheduled to return to the
building in the only 4 -hall event of this year. As per the license agreement, the building must be
turned over on November 20 for Art Basel to commence load -in of the event. The delays caused
by Hurricane Irma's impact will require some modifications to the originally planned west entry
access, valet drop off and other logistics, however 4 halls originally committed will be made
available, as well as the east side completed lobby, the north and south loading docks and the
north west ground floor Jr. Ballroom. The City's design and construction team have been working
closely with Art Basel's event staff and administration to assist with event logistics to guarantee
success of the event.
Design Miami 2017
Design Miami will also be returning to the preferred parking lot (P -Lot) in 2017. Clark's labor force
parking area and a portion of the material and equipment staging area will be relocated in order
to allow the construction of Design Miami's tent facility which commences on October 23.
P -Lot Park Revision
On July 26, 2017 the City Commission adopted resolution 2017-29964 approving a revised
concept design for the urban park to replace the existing surface parking lot known as the
preferred parking lot, or P -Lot. The revised design will include an open area large enough to
accommodate staging for events such as the annual Design Miami show. The Commission also
approved an amount not -to -exceed $355,000 for design to be funded from the allowance
currently allocated for the park as part of the MBCC project renovation.
Since late July the City has been coordinating with Design Miami staff and consultants to
incorporate a design which will have as minimal impact as possible to the Park design. During
this process, it became evident that any future tent facility would ideally need pre -constructed
concrete footings underground, which can be hooked on to. This could potentially facilitate future
construction and reduce the amount of repairs and time required for the set up and removal of
the tent structure.
In addition, electrical services which are currently not available and require generators are being
considered under the new design plan. This will also facilitate the more expeditious connection
points for any events electrical needs, This additional design coordination has pushed the final
submittal to the Design Review Board to early 2018 and construction commencement of the Park
from mid -2018 to early 2019.
2018 Substantial Completion
The project is currently scheduled to be substantially completed by August 23, 2018. The first
4 -Hall event of 2018 will be the American Health Information Management Systems Association
(AHIMA) Convention scheduled for September 23, 2018.
Miami Beach Convention Center Monthly Construction Project Update
October 18, 2017
Page 4 of 8
FINANCIAL UPDATE TO AUGUST 31. 2017
The project is currently on budget. The usual project dashboard with updated financial
information is attached as Exhibit A and a corresponding Budget Summary Breakdown is
attached as Exhibit B. Narrative updates are as follows:
Construction Draw
Taking into account direct purchases and payments for the construction, a total of $355.7 million,
or 65.3°/x, of the total updated GMP amount of $545 million has been paid through August 27,
2017. For a detailed breakdown, refer to Exhibit B (GMP + Direct Purchases Line Item).
Construction Manager's (CM) Contingency
Refer to Exhibit B1 for a summary of the total CM Contingency use to date.
For the month of July and August, and additional $1.5 million was utilized to bring the total to
$27.6 million out of the $29.7 million CM contingency. A total amount of $23.7 million has been
utilized under the "Trade Cost" category.
Direct Purchase
The City continues its direct purchase of materials for the project originally budgeted at a sales
tax savings of approximately $6 million. Through August 31, the City has directly purchased
$59.4 million in materials resulting in sales tax savings of $4.4 million.
There are certain materials that were planned for direct purchase that have not materialized due
to a variety of reasons such as risk to the City disagreement on purchasing terms, and
disagreement on early deposit requirements. Although the City and the construction team
pursued as many direct purchase opportunities as possible, it is currently estimated that there
will be a shortfall amount of approximately $1.6 million, which will be funded from the Owner's
Contingency.
OWNER COSTS
A total of $44.5 million, or 69°/x, of the owner cost budget has been expended to date. Below
are more detailed updates for two major components of the project being funded by Owner
Costs.
Art in Public Places (AIPP)
A total of $789K out of the $7.1 million has been expended to date.
AiPP staff continues to meet and work closely with the project team and Miami -Dade County's
Department of Cultural Affairs to ensure the seamless integration of the six public art projects
into the MBCC project. The following provides a brief update on the status of each commission:
1. Franz Ackermann (Berlin), Southeast Corner Exterior Walls
Ackermann conducted a site visit on September 5, 2017 to assess and
finalize the surface treatment of the Southeast Corner Exterior Wall.
Ackermann is working with a team of local and internationally based
conservators to conduct paint test studies to ensure the longevity of the
mural. In response to the paint studies, the team has developed a new,
highly pigmented paint that will be used for the mural. Paint samples were
presented to AiPP staff on September 6, 2017. The studio is in the process
of hiring a general contractor and is scheduled to begin painting the mural
in early 2018. '
(Image: Franz Ackermann approving treatment of wall surface)
Miami Beach Convention Center Monthly Construction Project Update
October 18, 2017
Page 5 of 8
2. Michael Elmgreen and Ingar Dragset (London/Berlin), Convention Center Park
Sculpture
The artist agreement with Elmgreen and Dragset has been finalized. The artists are
scheduled for a site visit on October 27, 2017. During this meeting, the artists will present
material samples and staff, along with a conservation team, will evaluate UV standards,
durability and anti -graffiti properties. Coordination of the project is dependent upon the final
design of the Convention Center Park. Art in Public Places staff is working closely with the
project team to ensure utilities and landscaping will not interfere with the foundation or
visibility of the work. It is anticipated the sculpture will be installed in fall 2018.
3.
(Image: Study for Fabrication o/Sculpture)
Ellen Harvey (Brooklyn), Grand Ballroom Pre -Function Room
Ellen Harvey conducted a site visit on August 28, 2017 to survey the Grand Ballroom Pre -
Function Room Walls. Harvey is now working with Franz Mayer of Munich to fabricate the
art glass panels and the structural system to support the glass panels. The artist has
completed studies of the work and fabrication of the art glass will take at least eight months.
It is anticipated the work will be installed in sprinq 2018.
Harvey Stuft)
Miami Beach Convention Center Monthly Construction Project Update
October 18, 2017
Page 6 of 8
El
Joseph Kosuth (New York/London), West Lobby
Kosuth studio and the Art in Public Places project team
have expressed concern regarding the visibility of the
four walls (North Junior Ballroom, South Junior
Ballroom) that were originally suggested to house
Kosuth's work. Kosuth studio conducted a site visit on
October 3, 2017 to further assess the visibility and
concurred with staff recommendation to relocate theair !S
_ +! ... work to the soffit that runs the entire length of the space.
Electrical requirements for the soffit area will be
submitted by Neonlauro to the project team on October
_ 13, 2017. Kosuth will submit a finalized design for the
new location in February 2018. It is anticipated the work will be installed in late spring 2018.
(Image: West Lobby soffit to be used for relocation of installation)
5. Joep Van Lieshout (Netherlands), Northeast Park Collins Canal
Joep Van Lieshout conducted a site visit on May 9, 2017. Staff has been working closely
with the artist studio and a conservator to finalize materials for the sculptural seating
elements. Van Lieshout submitted his final design for placement of the nine sculptures in
May 2017. It is anticipated the work will be installed in fall 2018.
L++4n r:.�l:eu+.3rr
(Image: Final design development submitted by Atelier Van Lieshout)
6. Sarah Morris (New York), Northeast Corner Exterior Walls
Morris conducted a site visit on March 10, 2017 and was made aware of existing site
conditions. On August 17, 2017, Art in Public Places staff coordinated a surveying crew to
scan the walls on behalf of the artist, as exact measurements are needed to fabricate the
tiles. Additionally, Morris met with the project team to determine surface treatment of the
wall, lighting and landscaping for the northeast corner exterior walls. Morris is now in the
process of hiring a general contractor and has begun fabrication of the tiles with the
selected manufacturer located in Guadalajara, Mexico. It is anticipated the tile mural will
be completed in fall 2018.
Miami Beach Convention Center Monthly Construction Project Update
October 18, 2017
Page 7 of 8
Carl Fisher Clubhouse Historic Restoration
The City's CIP Department is managing the project for the MBCC project team and a total amount
of 302K out of the $2.5 million budget has been expended.
Construction documents have been submitted to the building department and comments have
been received. Those comments have been incorporated into the drawings and are now ready
for resubmittal. Permitting should be completed prior to construction contract award.
The Construction Manager completed their pre -construction services but, due to insufficient bid
response, the City will have no other option but to issue an ITS for the project. The Procurement
Department is currently beginning the advertising process and may anticipate contract award as
early as the December Commission meeting. While this pushes construction start, it is still
anticipated that the project will be complete with improvements by the end of October, 2018.
OWNER CONTINGENCY
For a full detailed breakdown of all Owner costs and credits, refer to Exhibit B2. A total of $23.4
million of the available owner contingency of $35 million has been utilized.
OVERALL COSTS
From an overall project perspective, $393 million, or 64.7% has been spent on the $620 million
project.
LOCAL HIRE
Clark Construction continues their commitment to maximizing workforce opportunities for City of
Miami Beach and Miami -Dade County residents. A total of 4,575 workers have been employed
by the project. This includes all certified payroll from October 2015 to August 30, 2017. The
labor force includes full-time, part-time, temporary labor, and includes daytime and nighttime
shifts.
Attached, as Exhibit C, is a summary of the local hiring efforts to date, for Clark and its
subcontractors. The current report shows a summary of all employees on the project thus far,
sorted by zip code. Clark is currently 64°/, local hire by individual (Miami Beach, with 52
employees, and Miami -Dade County with a total of 2,891).
Miami Beach Convention Center Monthly Construction Project Update
October 18, 2017
Page 8 of 8
CONSTRUCTION MATERIAL DIVERSION / RECYCLING
The City continues to be on track to exceed the goals of the Silver LEED designation for diversion
/ recycling of waste. Over 95% of the material demolished is being recycled and / or diverted,
which exceeds the target goal of 75%.
PUBLIC INFORMATION
Various weekly advisories and postings for June sent on the City's social media outlets including
Twitter, Facebook, and Constant Contact are attached as Exhibit D.
If there are any questions, please do not hesitate to contact myself or Maria Hernandez at
Extension 2584.
Attachments:
Exhibit A —
Project Dashboard and Site Photos
Exhibit B —
Budget Summary Breakdown
Exhibit B1
— Contractor Contingency Log
Exhibit B2
— Owner Contingency Log
Exhibit C —
Clark Construction Local Hiring Summary
Exhibit D —
Public Outreach Report
JLM / MH
F:\cmgr\$ALL\Convention Center\Commission Updates\2017 August Monthly\LTC - August 2017 MBCC Update.docx
•
EXHIBIT A
2016 (25 Events) 2017 (8 Events) 2018(+/-14 Events)
M ABMB •
D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J AS
Total Project Cost
64.7% Expended
$600m -
$500m -
$400m -
$300m -
$200m -
$100m -
Net GMP Draw
65.27% Expended
$550m - f
$500m -�
$450m -
$400m -
$350m
$300m
$250m
$200m
$150m
$100m
$50m
$Om
CM Contingency
$30m
$25m
$20m
$15m
$10m
$5m
$Om
Owner Costs
69.13% Expended
$70m
$60m -
$50m -
Construction Notes:
$40m
• 64.7% of the total
project budget has been
expended.
$30m
• 65.27% of the total GMP
budget has been
expended.
• $27.6M of CM
$20m
contingency has been
utilized. Refer to LTC
narrative and Exhibit 131
$10m
for description and
detail.
$Om
Owner's Contingency
$35m
$30m
$25m — —
$20m — —
$15m — —
$10m — —
$5m — —
$Om -- —
Owner Budget
Notes:
• 69.13% of owner
budget has been
expended.
• $22.3 M of the
owner's contingency
budget has been
expended.
Other Notes:
• Impacts of Hurricane
Irma caused the
cancellation and / or
relocation of 4 events
in 2017.
0-170.01
TR 1.19-14 - View E from Grids D-55& 17
0-170-04
Service Cofr 2-24-09 - Vlew N from Grads 23 & F-35
I -
rMMMr__
EXHIBIT A
r' 11111 111�91�4
0-170.02
Lobby 1.20 -03 -View Sfrorn i3rids 14.4R, D.45
0-170.03
Electrical 2-19-32 - View 9 from Grids 16 & E-3
0-170.05
Public Conc. 228.01 -View W from G's J-95 & SW3
0-170-07 0
West Rocif Parkiflg -View 8 from Grads 19.34 & SW1 Public RR 2.07.02 -View 8 from Grids 3-81 & Q-31
17 -_1 7 f" q6'
Hail C - View N from Grids 20 & H
IMMMFF_�
0-170.09
Escala' or 08.01 -02 - View E f ro ni Grids K & 7
4-171.01
Exhibit Pref 1.20.101- View E fromGrids 11 & Q.2
w
0-171.04
West Rmf Parking -View N from Grids 21.1 & G
0-171.07
Lobby 1.24.03 - View S from Grids 11.6 & 9.69
•
EXHIBIT A
00 71.02 0-171.03
Jr Ball roam 1.1 0-22 - View W from Grids E.7 & 7.57 Jr Ballroom 1.14104 - View S from G rinds F & 7.57
0-171.05
Bridge Roof Infill- View W from Grids L & 16
611
0-171.08
Mechanical 1.19.13 - View S #ram Grids 15.85 & F
0-171.06
Serve Gorr 2.07.16 - View E from Grids H.719 7
0-171-09
Elevator 08.01 -View W from Grids L_3 & 7
0-171.10
Hall D -View Wfrom Grids J_53 & 8
Open Stair 1.01.42 - View E from Grids 0.92 & 3
0-169.44
Lobby 1.20.03 -View N from Grids 13.78 & C,55
EXHIBIT A
1-171.11
Hall D- View N from G ds H& 12
0-17'1.12
Elec. Vault 1.29.40-V wN irom,.,rids H & 2
South Loading Dock - View N from Grids SW3 & M South Loading Dock - View N from G's SW4 & P.33
0-169.05
Meeting Pref 1.15.01 - View N from G's 9.45 & B.58
0-169.D6
Meeting 'Pref 2.15.03 - View N from Grids 10.52 & B
EXHIBIT B
Miami Beach Convention Center Expansion & Renovation Project
Approved Budget
Dashboard Summary
10/7/15
Current
Current
Budget
Current
Balance
Original
%Total
Variance
Forecasted
Budget
Expenses
% Spent
Remaining
Budget
Budget
%
Trade Costs
$410,205,803
66.62%
1,202,676
$411,408,479
66.37%
Direct Purchase
0
0.00%
-63,337,362
-63,337,362
-10.22%
Storm Water Drainage Culvert
0
3,309,692
3,309,692
0.53%
Recon
50,803,086
50,803,086
8.20%
Change Orders
0
0.00%
6,922,598
6,922,598
1.12%
Subtotal
410,205,803
66.62
-1,099,310
409,106,493
66.00%
262,692,890
64.21%
146,413,603
Contractor Soft Costs
General Conditions (Clark Staffing)
24,465,886
3.97%
3,700,000
28,165,886
4.54%
20,421,158
72.50%
7,744,728
General Requirements
14,760,103
2.40%
2,545,258
17,305,361
2.79%
11,234,931
64.92%
6,070,430
Payment& Performance Bond
3,708,000
0.60%
45,950 7
3,753,950
0.61%
3,752,332
99.96%
1,618
GL Insurance
1,807,650
0.29%
248,436
2,056,086
0.33%
1,455,830
70.81%
600,256
CMrFees (3.8%)
17,288,003
2.81%
2,555,078
19,843,081
3.20%
12,180,910
61.39%
7,662,171
CCIP GL Wrap
0
0.00%
4,740,576 8
4,740,576
0.76%
4,740,576
100.00%
0
CM Contingency
29,747,613
4.83%
-27,569,710 9
2,177,903
0.35%
0
0.00%
2,177,903
Base GMP
501,983,05$
81.53
-14,833,722
487,149,336
78.58%
316,478,627
64.97%
170,670,709
Other GMP Items (Including all mark ups)
P -Lot Park (allowance)
10,000,000
1.62%
-10,000,000 14
0
0.00%
0
0.00%
0
Storm water Drainage Culvert
3,475,000
0.56%
-3,475,000
0
0.00%
0
0.00%
0
Subtotal
13,475,000
2.19%
-13,475,000
0
0.00%
0
0.00%
0
Total GMP (Clark)
515,458,058
83.72%
-28,308,722
487,149,336
78.58%
316,478,627
64.97%
170,670,709
Direct Purchase Tax Savings
-6,000,000
-0.97%
4,356,226 16
-1,643,774
-0.27%
0
0.00%
-1,643,774 16
Total Net GMP
509,458,058
82.74
-23,952,496
485,505,562
78.32%
316,478,627
65.19%
169,026,935
Direct Purchases
0
0.00%
59,435,855
59,435,855
9.59%
39,181,761
65.92%
20,254,094
GMP + Direct Purchases
509,458,058
82.74
35,483,358
544,941,417
87.91%
355,660,388
65.27%
189,281,029
Owner's Cost
City Staffing & Expenses
1,561,000
0.25%
793,318 5
2,354,318
0.38%
1,654,884
70.29%
699,434
Consultant Fees (SAG)
1,047,725
0.17%
160,000
1,207,725
0.19%
1,060,679
87.82%
147,046
Owner's Rep (Hill)
5,585,673
0.91%
0
5,585,673
0.90%
3,936,389
70.47%
1,649,284
Design Fees (Fentress)
26,669,442
4.33%
817,745 10
27,487,187
4.43%
26,307,263
95.71%
1,179,924
Owner's Cost Estimator (US Cost)
400,030
0.06%
709,326 6
1,109,356
0.18%
1,009,249
90.98%
100,107
Pre GMP CM Fee (Clark)
2,594,073
0.42%
-1,037,629
1,556,444
0.25%
1,556,444
100.00%
0
Testing & Inspections
2,328,943
0.38%
0
2,328,943
0.38%
1,320,739
56.71%
1,008,204
Permit &Plan Reviews
2,400,000
0.39%
746,07413
3,146,074
0.51%
2,956,687
93.98%
189,387
Other
783,526
0.13%
108,436 3
891,962
0.14%
657,337
73.70%
234,625
Other - Legal/ DAP Board
63,515
0.01%
150,000 11
213,515
0.03%
182,618
85.53%
30,897
Other -Spectra
0
0.00%
292,00012
292,000
0.05%
291,950
99.98%
50
Other -Design Miami
0
0.00%
0
0
0.00%
0
0.00%
0
Public Art (AIPP)
6,900,000
1.12%
220,422 2
7,120,422
1.15%
788,942
11.08%
6,331,480 2
MBCC FF&E
6,830,945
1.11%
0
6,830,945
1.10%
34,811
0.51%
6,796,134
Insurance:
OCIP GL Wrap
9,000,000
1.46%
-9,000,000 4
0
0.00%
0
0.00%
0
Builder Risk/Building(net)
1,600,000
0.26%
-450.000
1,150,000
0.19%
1,837,501
159.78%1
-687,5011
Professional Liability Umbrella
1,000,000
0.16%
-382.117
617,883
0.10%
617,883
100.00%
0
Carl Fisher Renovation Allowance
2,500,000
0.41%
0
2,500,000
0.40%
302,144
12.09%
2,197,856
Subtotal
71,264,872
11.57%
-6,872,425
64,392,447
10.39%
44,515,520
69.13%
19,876,927
P -Lot Park (allowance)
0
0.00%
5,000,000 14
5,000,000
0.81%
0
0.00%
5,000,000
Escalator/Elevator
0
0.00%
2,755,53718
2,755,537
0.44%
0
0.00%
2,755,537
Reimbursement from other CMB Funds
0
0.00%
-9,915,70717
-9,915,707
-1.60%
-7,306,946
73.69%
-2,608,761
Total Without Owner's Contingency
580,722,930
94.329/
26,450,764
607,173,694
97.95%
392,868,962
64.70%
214,304,731
Owner's Contingency - SoftCosts
0.00%
2,837,415
2,837,415
0.46%
0
0.00%
2,837,415
Owner's Contingency -Hard Costs
0.00%
-25,106,105
9,893,895
1.60%
0
0.00%
9,893,895
Total Owner's Contingency
35,000,000
5.68%
-22,268,690 i5
12,731,310
2.05%
0
0.00%
12,731,310
Total Budget With Owner's Contingency
$615,722,930
100.00%
$4,182,074 19
$619,905,004
100.0%
$392,868,962
1
64.70%
$227,036,042
1. The property insurance portion of the Builders Risk policy to be reimbursed $68,501 by CMB Risk Dept.
2. A portion of the savings from insurance was allocated to AiPP to provide for actual costs. Pursuant to Sec. 82-587 of the CMB Code, the total amount allocated
to APP has been transferred to the Art in Public Places Fund.
3. Miscellaneous costs such as surveys, studies, public information officer (PIO), and utility fees.
4. Insurance Savings as a result of implementing a CCIP (Contractor Controlled Insurance Program) rather than an OCIP (Owner Controlled Insurance Program).
5. A portion of the savings from insurance was allocated to City Staffing to cover costs from Fiscal Year 2014 through December 2018. The previous budget
estimate included only Fiscal Years 2015 through part of 2018.
6. Additional Cost Estimating services to support GMP reconciliation negotiations with Construction Manager.
7. Credit balance due to savings from Clark Bond on Direct Purchases executed to date.
8. $4.7M in general liability insurance was originally to be purchased directly by the owner, but was actually purchased by the contractor. Also refer to Footnote No. 4.
9. Total use of Contractor Contingency to Date. Refer to Exhibit B1 for detailed summary.
10. Additonal fees for miscellaneous design revisions and extra site visits requested by Contractor; approx. $384K of the total has been deducted from Clark's Contract.
11. Additional Costs for Dispute Avoidance Panel and outside legal counsel.
12. Moving expenses, parking fees and other expenses for relocation of building operator.
13. Costs for additional permitting fees.
14. P -Lot Park Allowance temporarily deducted from Clark's Contract. $5M remains in allowance and $5M moved to owner's contingency.
15. Total use of Owner Contingency to Date. Refer to Exhibit B2 for detailed summary.
16. Projected Sales Tax Savings from submitted Direct Purchase Orders; Future anticipated $1.5M shortfall in Direct Purchase of materials.
17. Reimbursement for operational expenses (Reso 2017-29830), stormwater culvert (2017-29829) & re -roofing of existing building previously allocated under separate project
18. Additional improvements (Reso 2017-29829) for Escalator/Elevator/Kitchen Upgrades to be added to GMP.
19. Total budget variance includes additional bond proceds of $147,449 +Additional funding in the amount of $4,034,625 per April 26, 2017 budget amendment.
Page 1 of 1
W:/:11419_3I
Miami Beach Convention Center Expansion & Renovation Project
Construction Manager's (CM) Contingency Report
thru August 24, 2017
- SUMMMARY
Total CM Contingency
USES
May 2016 **
Jun 2016
Jul 2016
Aug 2016
Sep 2016
Oct 2016
Nov 2016
Dec 2016
Jan 2017
Feb 2017
Mar 2017
April 2017 - Interim
Apr 2017
May 2017
Jun 2017
Jul 2017
Aug 2017
Total Uses
REMAINING CM CONTINGENCY
Settlement Agreement - Increase to Contingency
REVISED REMAINING CM CONTINGENCY
$29,747,613.00
3,516,099.28
3,539,694.47
2,345,812.72
678,014.32
1,373,672.04
555,095.86
1,453,031.74
82,810.97
1,491,842.15
2,008,667.81
1,413,331.31
5,226,384.54
3,075,943.46
(1,130,888.46)
447,556.19
398,299.40
1,094,342.36
27,569,710.16
$2,177,902.84
$963,391.00
$3,141,293.84
Trade Contract Buyout - 2016
MONTH
SUBCONTRACTOR
DESCRIPTION
AMOUNT
MARK -Ups*
TOTAL COST
MAY
ACOUSTI
Temporary Walls
$1,706,560.00
$84,734.24
$1,791,294.24
MAY
ALPHA DEMO
Demolition
-203,020.00
-10,080.36
-213,100.36
MAY
AMERICAN FIRE PROFF
Spray Fireproofing
-177,812.00
-8,828.73
-186,640.73
MAY
BANKER
Structural Steel
-334,138.00
-16,590.64
-350,728.64
MAY
BARING INDUSTRIES
Food Service
33,244.00
1,650.63
34,894.63
MAY
CAMARATA
Masonry
-171,200.00
-8,500.43
-179,700.43
MAY
CDPW
Dewatering
-118,399.00
-5,878.76
-124,277.76
MAY
DAVID ALLEN
Tile
-142,590.00
-7,079.89
-149,669.89
MAY
DUFFY & LEE
Carpet
-19,965.00
-991.30
-20,956.30
MAY
FORD AV
Audio/Visual
-10,642.00
-528.40
-11,170.40
MAY
HAYWOOD BAKER
Soil Stabilization
434,185.00
21,558.18
455,743.18
MAY
HONEYWELL
Low Voltage
-713,361.00
-35,419.85
-748,780.85
MAY
HUFCOR
Operable Partions
-267,272.00
-13,270.61
-280,542.61
MAY
ISEC
Expansion Joints
160,317.00
7,960.07
168,277.07
MAY
JAFFER
Dewatering - Wells
1,421.00
70.56
1,491.56
MAY
NASH
Dewatering - Underground Utility
95,531.00
4,743.31
100,274.31
MAY
NFP
Fire Suppression
-102,500.00
-5,089.34
-107,589.34
MAY
RITE HITE
Loading Dock
-6,600.00
-327.70
-6,927.70
MAY
R&M
Structural Concrete
1,115,752.00
55,399.40
1,171,151.40
MAY
SPECIFIED ARCH SYS
Operable Partions
-4,568.00
-226.81
-4,794.81
MAY
TECTA
Roofing
9,075.00
450.59
9,525.59
MAY
TRIDENT
Resilient Flooring
-25,560.00
-1,269.11
-26,829.11
MAY
WON DOOR
Operable Doors
5,650.00
280.53
5,930.53
MAY
WPM
Site Civil
1,164,378.00
57,813.78
1,222,191.78
SUBTOTAL
2,428,486.00
120,579.36
2,549,065.36
JUNE
LOUVERS (Nash Mech.)
Louvers
-433,354.00
-21,516.92
-454,870.92
JUNE
WPM
Site Civil
-429,,292.00
-21,315.24
-450,607.24
SUBTOTAL
-862,646.00
-42,832.16
-905,478.16
JULY
ACOUSTI
Temporary Walls
4,480.00
222.44
4,702.44
JULY
AERIAL PHOTOGRAPHY INC.
Aerial Job Site Photos
43.00
2.14
45.14
JULY
GEOSYNTEC
Environmental Consultant
5,800.00
287.98
6,087.98
JULY
MICHEAL WOOD
FDEP Consultant
10,200.00
506.45
10,706.45
JULY
MODSPACE
Owner Trailer
-3,197.00
-158.74
-3,355.74
MONTH
SUBCONTRACTOR
DESCRIPTION
JULY
GOAL ASSOCIATES
MOT
JULY
SMITH FENCE
Fencing
JULY
TR PERMITTING
Permitting
0.00
SUBTOTAL
AUGUST
NO CHANGES
0.00
3,000.00
SUBTOTAL
3,000.00
SEPTEMBER
NO CHANGES
0.00
0.00
SUBTOTAL
-150,000.00
OCTOBER
EVENSTAR
Decking
-176,952.00
SUBTOTAL
-5,000.00
NOVEMBER
NO CHANGES
-124.13
-4,000.00
SUBTOTAL
-25,000.00
DECEMBER
HOISTWAY MODIFICATION
(3b) Modifications for EL16.02 not used
DECEMBER
FIREPROOFING Scraping
(3c) Related to elevator only
DECEMBER
PILING UNBOUGHT
(16A) Additional length per GMP Clarification
DECEMBER
POCKET DOOR
(42b) Pocket Door for WON DOOR
DECEMBER
SPOIL REMOVAL
(16c) Spoil removal for jet grouting
DECEMBER
UNDERPINNING
(16d) Underpinning for East Concourse
DECEMBER
EXISTING STRUCTURE
(16e) Monitoring of existing structure
DECEMBER
DEWATERING EQUIPMENT
(19f) Dewatering Equipment Temp Power & Fuel
DECEMBER
SECONDARY ELEC SERV
(84.31) With MEP Subs, from GR to CM
DECEMBER
OPPORTUNITY TRAILER
(84.36d) Moved from GR's to CM
DECEMBER
ALUMINIUM STEPS
(84.36e) Moved from GRs to CM
DECEMBER
TEMP TRAILER
(84.36f) Permitting
DECEMBER
TR PERMITTING
Permitting
SUBTOTAL
JANUARY'17
DEWATERING EQUIPMENT
(19f) Dewatering Equipment Temp Power & Fuel
JANUARY'17
SECONDARY ELEC SERV
(84.31) With MEP Subs, from GR to CM
SUBTOTAL
TOTAL SINCE INCEPTION
MONTH
SUBCONTRACTOR
MAY
BARING INDUSTRIES
MAY
CDPW
MAY
HAYWOOD BAKER
MAY
HJ FOUNDATION
MAY
HJ FOUNDATION
MAY HONEYWELL
SUBTOTAL
JUNE ACOUSTI
JUNE ALPHA WRECKING
JUNE
JUNE
JUNE
JUNE
JUNE
JUNE
BARRING INDUSTRIES
CDPW
Trade Costs M
DESCRIPTION
Temporary Kitchen
Cost associated with dewatering due to the tremmie
seal pumping water disposal - Initial set up and monthly
disposals.
Additional costs for soil stabilization at the northwest
Florida Power & Light vault that was unable to be
quanitified at the time of GMP.
Additional costs for soil stabilization at the northwest
Florida Power & Light vault that was unable to be
quanitified at the time of GMP.
Additional costs for soil stabilization at the northwest
Florida Power & Light vault that was unable to be
quanitified at the time of GMP.
Building Separation
Additional costs for the mechanical fastening of the
insulation due to inability to remove via air compressors
by demo subcontrcator
INTERIM FUNDING - costs associated with extended
dump hours, additional demolition or parapet walls,
structural members abd block removal
Cost reallocated to GR Life Safety line item
Cost associated with dewatering due to the tremmie
seal pumping water disposal - monthly expenses and
contaminated water fees.
HARMON INTERIM FUNDING - Costs associated with the design
and engineering associated with modifications to the
exterior of the building
HONEYWELL Cost reallocated to GR Life Safety line item
HJ FOUNDATION INTERIM FUNDING - Costs for work in place associated
with the additional piles and ties from the design
completion
JAFFER INTERIM FUNDING - Costs associated with the 3
additional dewatering required for the project
Exhibit B1
Page 2 of 8
AMOUNT
MARK -Ups*
46,500.00
2,308.82
-367.00
-18.22
66,000.00
3,277.04
129,459.00
6,427.91
0.00
0.00
0.00
0.00
0.00
0.00
3,000.00
148.96
3,000.00
148.96
0.00
0.00
0.00
0.00
-150,000.00
-7,447.81
-4,571.00
-226.96
-176,952.00
-8,786.03
-5,000.00
-248.26
-2,500.00
-124.13
-4,000.00
-198.61
-25,000.00
-1,241.30
-140,000.00
-6,951.29
-255,000.00
-12,661.28
-30,000.00
-1,489.56
-21,600.00
-1,072.48
-10,000.00
-496.52
-66,000.00
-3,277.04
-890,623.00
-44,221.28
140,000.00
6,951.29
255,000.00
12, 661.28
395,000.00
19,612.57
$1,202,676.00 $59,715.35
AMOUNT: MARK -Ups*
$321,004.66 $0.00
186,092.37 9,239.87
23,000.00 1,142.00
33,846.80 1,680.56
38,823.07 1,927.65
289,721.73
892,488.63 13,990.08
300,000.00 14,895.62
420,000.00 20,853.87
-321,004.66 0.00
89,312.00 4,434.53
160,000.00 7,944.33
-289,721.73 0.00
141,000.00 7,000.94
85,000.00 4,220.43
TOTAL COST
48,808.82
-385.22
69,277.04
135,886.91
0.00
0.00
0.00
0.00
3,148.96
3,148.96
0.00
0.00
-157,447.81
-4,797.96
-185,738.03
-5,248.26
-2,624.13
-4,198.61
-26,241.30
-146,951.29
-267,661.28
-31,489.56
-22,672.48
-10,496.52
-69,277.04
-934,844.28
146,951.29
267,661.28
414,612.57
$1,262,391.35
TOTAL COST
$321,004.66
195,332.24
24,142.00
35,527.36
40,750.72
289,721.73
906,478.71
314,895.62
440,853.87
-321,004.66
93,746.53
167,944.33
-289,721.73
148,000.94
89,220.43
MONTH
SUBCONTRACTOR
DESCRIPTION
AMOUNT
MARK -Ups'
TOTAL COST
JUNE
NASH
Additional dewatering costs associated with the
221,426.00
10,994.26
232,420.26
temporary FPL ductbank being routed from Washington
Ave to NW FPL Vault
JUNE
NASH
INTERIM FUNDING - Costs associated with work in
500,000.00
24,826.04
524,826.04
place for replacement of the existing restrooms, misc
material changes to the sanitary, storm and chilled water
systems made during design completion, and new duct
Heaters
JUNE
NATIONAL FIRE
INTERIM FUNDING - Costs associated with work in
400,000.00
19,860.83
419,860.83
PROTECTION
place for the implementation and installation of the
higher density sprinklers requested by the AHJ
JUNE
ROBINS & MARTIN
INTERIM FUNDING - Costs for completed work for
2,000,000.00
99,304.14
2,099,304.14
tremmie seals as requested by CM and rebar bending;
costs for work in place including structural changes to
the vault, shearwalls, footings and elevated beams.
SUBTOTAL
3,706,011.61
214,334.98
3,920,346.59
JULY
ALPHA WRECKING
INTERIM FUNDING - costs associated with extended
330,000.00
16,385.18
346,385.18
JULY
ALPHA WRECKING
Deletion of scope for the removal of the insulation.
-396,962.00
-19,709.99
-416,671.99
JULY
CAMARATA
Deletion of intregal water repellant per contract
-163,000.00
-8,093.29
-171,093.29
JULY
FL CIVIL
Dewatering permit
23,452.21
1,164.45
24,616.66
JULY
MCDEAN
INTERIM FUNDING -FPL ductbank
250,000.00
12,413.02
262,413.02
JULY
MCDEAN
INTERIM FUNDING - Costs for completed work for
500,000.00
24,826.04
524,826.04
electrical changes to the FPL vaults and camera
infrastructure.
JULY
R&M
INTERIM FUNDING - Costs for completed work for
700,000.00
34,756.45
734,756.45
structural changes to the vault, shearwalls, footings and
elevated beams.
JULY
WPM / R&M
SCOPE CHANGE - Fine grading
-766.71
-38.07
-804.78
SUBTOTAL
1,242,723.50
61,703.80
1,304,427.30
AUGUST
JAFFER
Additional drainage wells - Phase 2
358,500.00
17,800.27
376,300.27
AUGUST
TRU-STEEL
Miscellaneous metals scope
50,000.00
2,482.60
52,482.60
SUBTOTAL
408,500.00
20,282.87
428,782.87
SEPTEMBER
HONEYWELL
INTERIM FUNDING - Engineering
200,000.00
9,930.41
209,930.41
SEPTEMBER
HONEYWELL
INTERIM FUNDING - Equipment
250,000.00
12,413.02
262,413.02
SEPTEMBER
ACOUSTI
INTERIM FUNDING - Additional drywall scope
500,000.00
24,826.04
524,826.04
SEPTEMBER
ALPHA
INTERIM FUNDING - credit for moneys paid under
-42,821.00
-2,126.15
-44,947.15
OCO #35 for z -wall scope
SEPTEMBER
ALPHA
INTERIM FUNDING - additional demo scope
42,821.00
2,126.15
44,947.15
SEPTEMBER
R&M
SCOPE GAP- Additional labor for floor boxes formwork
69,998.00
3,475.55
73,473.55
SEPTEMBER
BANKER
SCOPE CHANGE - Cutting out grating for new AHU
152,037.00
7,548.95
159,585.95
SEPTEMBER
NFP/MARDALE
SCOPE GAP - Installation for fire extinguisher cabinets
35,513.00
1,763.29
37,276.29
SUBTOTAL
1,207,548.00
59,957.26
1,267,505.26
OCTOBER
R&M
Temp work for Art Basel - Transition slab
408,604.00
20,288.03
428,892.03
OCTOBER
ACOUSTI
Temp work for Art Basel - NW egress tunnel
180,001.30
8,937.44
188,938.74
OCTOBER
ACOUSTI
Electrical room 1.7.07 build out
18,609.80
924.02
19,533.82
OCTOBER
RITE HITE
Dock leveler size
1,770.00
87.88
1,857.88
SUBTOTAL
608,985.10
30,237.37
639,222.47
NOVEMBER
WPM
Import fill for NE helix
79,128.00
3,928.87
83,056.87
NOVEMBER
FLORIDA BLACKTOP
Temp work for Art Basel - temp asphalt
366,867.42
18,215.73
385,083.15
NOVEMBER
TECTA
Temp work for Art Basel - waterproofing for metal deck
73,669.00
3,657.82
77,326.82
at north loading dock
NOVEMBER
ACOUSTI
Temp work for Art Basel - patch & repair throughout
127,553.62
6,333.30
133,886.92
NOVEMBER
ACOUSTI
Temp work for Art Basel - temp tunnels for NW egress
184,843.37
9,177.86
194,021.23
NOVEMBER
DASH DOORS
Temp work for Art Basel - repair exist. storefront
43,835.87
2,176.54
46,012.41
NOVEMBER
ACOUSTI
Temp work for Art Basel - temp walls for north loading
21,530.33
1,069.03
22,599.36
dock dry -in
Exhibit 61
Page 3 of 8
MONTH
SUBCONTRACTOR
DESCRIPTION
AMOUNT i
MARK-Ups*
TOTAL COST
NOVEMBER
MCDEAN
Floor box shims
188,643.00
9,366.52
198,009.52
NOVEMBER
TECTA
Temp work for Art Basel - electrical room 1.07.07
8,997.00
446.72
9,443.72
waterproofing
NOVEMBER
JAFFER
Scope reduction - base contract
-17,000.00
-844.09
-17,844.09
NOVEMBER
JAFFER
New scope - Additional transport of pile spoils
17,000.00
844.09
17,844.09
NOVEMBER
TECTA
Temp work for Art Basel - electrical room 1.06.04
5,212.00
258.79
5,470.79
waterproofing
NOVEMBER
ALPHA
Asbestos abatement
65,452.00
3,249.83
68,701.83
NOVEMBER
ALPHA
Lead Paint abatement
151,500.00
7,522.29
159,022.29
SUBTOTAL
1,317,231.61
65,403.28
1,382,634.89
DECEMBER
CAMARATA
Existing conditions - Z wall infil & patching
71,868.00
3,568.40
75,436.40
DECEMBER
ALPHA
West Concourse - Acceleration
100,000.00
4,965.21
104,965.21
DECEMBER
ALPHA
Temporary separation - GL-7
125,000.00
6,206.51
131,206.51
DECEMBER
ALPHA
Hall C/D SOG demo acceleration
100,000.00
4,965.21
104,965.21
DECEMBER
EUGENIO PAINTING
Temp work for Art Basel - to be voided
23,916.00
1,187.48
25,103.48
DECEMBER
MCDEAN
Temp work for Art Basel - to be voided
77,123.00
3,829.32
80,952.32
DECEMBER
PJ STRIPPING
Temp work for Art Basel
2,915.54
144.76
3,060.30
DECEMBER
UNDERPOWER
Repair of damaged traffic signals Wash Ave
1,938.00
96.23
2,034.23
DECEMBER
DUFFY & LEE
Temp work for Art Basel - floor prep for carpet
7,431.00
368.96
7,799.96
DECEMBER
STAGING CONCEPTS
Temp work for Art Basel - infill plexi panels for new
7,776.00
386.09
8,162.09
guardrails at east concourse
DECEMBER
EAST COAST METALS
Temp work for Art Basel - to be voided
20,600.00
1,022.83
21,622.83
DECEMBER
WPM
Temp work for Art Basel - subgrade prep for temp
192,869.95
9,576.39
202,446.34
asphalt for loading dock and east sidewalk
DECEMBER
AMERICAN FIREPROOFING
Temp work for Art Basel - fire proofing shear wall braces
24,619.40
1,222.40
25,841.80
and beam in elec room
DECEMBER
TECTA
Waterproofing north elec room & FPL vault
35,049.01
1,740.26
36,789.27
DECEMBER
DAVID ALLEN
Acceleration for AB16 - terrazzo stairs & restrooms tile
5,783.37
287.16
6,070.53
instal.
DECEMBER
NFP
Replace & repair exist. fire hose & nozzles
7,428.00
368.82
7,796.82
SUBTOTAL
804,317.27
39,936.02
844,253.29
JANUARY
MCDEAN
Relocation of TC-133 Telcom Room
75,761.00
3,761.69
79,522.69
JANUARY
WPM
Fix Storm Box Culvert
4,685.00
232.62
4,917.62
JANUARY
OTIS
Rembursement to Elevator Pit
2,696.00
133.86
2,829.86
JANUARY
DUFFY LEE
Remove and reinstall carpet - due to asbestos removal
8,939.00
443.84
9,382.84
JANUARY
ACOUSTI
Temp work for Art Basel
23,501.00
1,166.87
24,667.87
JANUARY
EAST COAST METALS
Temp work for Art Basel - Change Order Not Executed
-20,600.00
-1,022.83
-21,622.83
JANUARY
DECON
Rejected Change Order - Lead Paint Abatement
815,476.00
40,490.07
855,966.07
SUBTOTAL
910,458.00
45,206.13
955,664.13
FEBRUARY
DECON
Rejected Change Order - Lead Paint Abatement
833,128.28
41,366.54
874,494.82
FEBRUARY
AMERICAN FIREPROOFING
Rejected Change Order - Additional fireproofing on
79,335.06
3,939.15
83,274.21
exisiting members
FEBRUARY
GLE ASSOCIATES
Asbestos abatement
5,872.50
291.58
6,164.08
FEBRUARY
GLE ASSOCIATES
Lead abatement
27,537.72
1,367.30
28,905.02
FEBRUARY
WPM
Fillmore parking modifications
1,405.00
69.76
1,474.76
FEBRUARY
WPM
Dewatering for MC Dean ductbank
4,931.00
244.83
5,175.83
FEBRUARY
WPM
Pump Roof Drain Manhole
3,994.00
198.31
4,192.31
FEBRUARY
WPM
Pump Roof Drain Manhole
5,883.00
292.10
6,175.10
FEBRUARY
FLORIDA BLACKTOP
Fillmore parking modifications
4,552.00
226.02
4,778.02
FEBRUARY
ACOUSTI
East Facade Exterior Stucco (810135)
312,004.51
15,491.67
327,496.18
FEBRUARY
BANKER
Fabrication and Installation of Floor Boxes
200,000.00
9,930.41
209,930.41
FEBRUARY
BRAZOS
Spray Fireproofing - Pending OCO
83,000.00
4,121.12
87,121.12
FEBRUARY
EUGENIO PAINTING
Temp work for Art Basel - Dec C/O to be voided
-23,916.00
-1,187.48
-25,103.48
FEBRUARY
MCDEAN
Temp work for Art Basel - Dec C/O to be voided
-77,123.00
-3,829.32
-80,952.32
FEBRUARY
CAMARATA
December amount adjusted - correct typo
-300.00
-14.90
-314.90
FEBRUARY
JAFFER
Correction - November CO reversal was incorrectly listed
17,000.00
844.09
17,844.09
- C/O to subcontractor was issued.
FEBRUARY
JAFFER
Scope Reducion
-24,000.00
-1,191.65
-25,191.65
FEBRUARY
FLORIDA CIVIL
Dewatering plan modification
9,202.00
456.90
9,658.90
FEBRUARY
BANKER
East facade acceleration
150,338.00
7,464.59
157,802.59
FEBRUARY
BANKER
Supply floor opening penetration north addition
100,000.00
4,965.21
104,965.21
SUBTOTAL
1,712,844.07
85,046.26
1,797,890.33
MARCH
BRAZOS
Scope Change - Interim Funding
-83,000.00
-4,121.12
-87,121.12
MARCH
CAMARATA
Z-Wall Infills & Patching
5,309.00
263.60
5,572.60
MARCH
ACOUSTI
Temp work for Art Basel
8,765.10
435.21
9,200.31
MARCH
ACOUSTI
East Concourse - Unforseen conditions
88,210.00
4,379.81
92,589.81
MARCH
DECON
Lead abatement
219,342.00
10,890.78
230,232.78
MARCH
EAST COAST METALS
Temp work for Art Basel
20,600.00
1,022.83
21,622.83
MARCH
BANKER
Supply Floor opening penetration - N. Addition
133,253.00
6,616.29
139,869.29
MARCH
BANKER
CM RFI 2575 Beam (a) Level 3
4,608.00
228.80
4,836.80
MARCH
BANKER
CM - RFI 2617 East Facade Plates
7,804.00
387.48
8,191.48
Exhibit B1
Page 4 of 8
MONTH SUBCONTRACTOR
DESCRIPTION
AMOUNT i
MARK -Ups*
TOTAL COST
MARCH NFP
Settlement - Reverse Interim Funding (June)
-400,000.00
-19,860.83
-419,860.83
MARCH NFP
Settlement - CM Contribution
600,415.00
29,811.85
630,226.85
MARCH NASH
Settlement- Reverse Interim Funding (June)
-721,426.00
-35,820.30
-757,246.30
MARCH NASH
Settlement - CM Contribution
1,260,871.89
62,604.90
1,323,476.79
MARCH HJ Foundation
Plant fee for opening
1,150.00
57.10
1,207.10
SUBTOTAL
1,145,901.99
56,896.41
1,202,798.40
APRIL - Interim NASH
Settlement - CM Contribution - Settlement correction
-59,643.89
-2,961.44
-62,605.33
APRIL - Interim NFP
Settlement - CM Contribution - Settlement correction
-28,402.18
-1,410.23
-29,812.41
APRIL - Interim ALPHA
Settlement - Reverse Interim Funding (June)
-420,000.00
-20,853.87
-440,853.87
APRIL - Interim ALPHA
Settlement - Reverse Interim Funding (July)
-330,000.00
-16,385.18
-346,385.18
APRIL - Interim ALPHA
Settlement - CM Contribution
285,709.00
14,186.04
299,895.04
APRIL - Interim WPM
Settlement - Reverse Interim Funding (Jan)
-4,685.00
-232.62
-4,917.62
APRIL - Interim WPM
Settlement - Reverse Interim Funding (Feb)
-5,883.00
-292.10
-6,175.10
APRIL - Interim WPM
Settlement- Reverse Interim Funding (Dec)
-192,869.95
-9,576.39
-202,446.34
APRIL - Interim WPM
Settlement- Reverse Interim Funding (Feb)
-4,931.00
-244.83
-5,175.83
APRIL - Interim WPM
Settlement - CM Contribution
814,668.00
40,449.95
855,117.95
APRIL - Interim R&M
Settlement - Reverse Interim Funding (July)
-700,000.00
-34,756.45
-734,756.45
APRIL - Interim R&M
Settlement - Reverse Interim Funding (June)
-2,000,000.00
-99,304.14
-2,099,304.14
APRIL - Interim R&M
South FP&L Vault - Added Mat for Footing & Walls
94,098.00
4,672.16
98,770.16
APRIL - Interim R&M
Settlement - CM Contribution
2,408,478.00
119,585.92
2,528,063.92
APRIL - Interim CAMARATA
Temporary work for Art Basel 16
1,806.31
89.69
1,896.00
APRIL - Interim CAMARATA
Settlement - Reverse Interim Funding (April)
-1,806.31
-89.69
-1,896.00
APRIL - Interim CAMARATA
Settlement - Reverse Interim Funding (March)
-5,309.00
-263.60
-5,572.60
APRIL - Interim CAMARATA
Settlement - CM Contribution
331,166.00
16,443.08
347,609.08
APRIL - Interim CM Fee
Settlement - Change Order 34
6,000.00
297.91
6,297.91
APRIL - Interim CM Fee/Banker
Settlement - Change Order 43
96,710.00
4,801.85
101,511.85
APRIL - Interim Banker
Settlement - CM Contribution
3,712,187.00
184,317.77
3,896,504.77
APRIL - Interim TruSteel
Settlement - CM Contribution
71,953.00
3,572.62
75,525.62
APRIL - Interim American Fireproofing
Settlement - CM Contribution
34,622.00
1,719.05
36,341.05
APRIL - Interim Agyle
Settlement - CM Contribution
301,060.00
14,948.25
316,008.25
APRIL - Interim OTIS
Elevator 16.02 pit fill - Reclassed to CM from Allowance
2,696.00
133.86
2,829.86
APRIL - Interim Eugenio
Settlement - CM Contribution
53,589.00
2,660.80
56,249.80
APRIL - Interim SAS
Settlement - CM Contribution
40,441.00
2,007.98
42,448.98
APRIL - Interim Honeywell
Settlement - Reverse Interim Funding (Sept)
-450,000.00
-22,343.43
-472,343.43
APRIL - Interim Honeywell
Settlement - CM Contribution
873,073.00
43,349.88
916,422.88
APRIL - Interim HJ Foundation
Settlement - Reverse Interim Funding (June)
-141,000.00
-7,000.94
-148,000.94
APRIL- Interim HJ Foundation
Settlement - Reverse Interim Funding (March)
-1,150.00
-57.10
-1,207.10
APRIL - Interim HJ Foundation
Settlement - CM Contribution
119,311.00
5,924.04
125,235.04
APRIL - Interim HAYWARD BAKER
Settlement - CM Contribution
77,272.00
3,836.71
81,108.71
SUBTOTAL
4,979,158.98
247,225.56
5,226,384.54
APRIL EAST COAST METALS
Settlement - Reverse CM Contribution (March)
-20,600.00
-1,022.83
-21,622.83
APRIL EAST COAST METALS
Settlement - CM Contribution
112,897.00
5,605.57
118,502.57
APRIL Staging Concepts
Settlement - CM Contribution
36,127.00
1,793.78
37,920.78
APRIL Tecta
Settlement - CM Contribution
118,919.00
5,904.57
124,823.57
APRIL ISEC
Settlement - CM Contribution
60,212.00
2,989.65
63,201.65
APRIL Harmon
Settlement - Reverse Interim Funding (June)
-160,000.00
-7,944.33
-167,944.33
APRIL Harmon
Settlement- CM Contribution
782,755.00
38,865.41
821,620.41
APRIL Acousti
Settlement - Reverse CM Contribution (Sept)
-500,000.00
-24,826.04
-524,826.04
APRIL Acousti
Settlement -Reverse CM Contribution (March)
-23,501.00
-1,166.87
-24,667.87
APRIL Acousti
Settlement - Reverse CM Contribution (Feb)
-312,005.00
-15,491.69
-327,496.69
APRIL Acousti
Settlement- CM Contribution
1,655,829.00
82,215.34
1,738,044.34
APRIL MCDean
Settlement - Reverse CM Contribution (July & Nov)
-938,643.00
-46,605.57
-985,248.57
APRIL MCDean
Settlement- CM Contribution
2,108,923.00
104,712.39
2,213,635.39
APRIL Trident
CM Interim Funding - CCD 21 - Kitchen Floor
30,000.00
1,489.56
31,489.56
APRIL Arazoza
Settlement- CM Contribution
-20,472.00
-1,016.48
-21,488.48
SUBTOTAL
2,930,441.00
145,502.46
3,075,943.46
MAY Tate Ornamental
Settlement - CM Contribution
50,369.00
2,500.93
52,869.93
MAY Hollywood Woodwork
Settlement- CM Contribution
-1,204.00
-59.78
-1,263.78
MAY Won -Door
Settlement - CM Contribution
30,106.00
1,494.83
31,600.83
MAY Over head door
Settlement - CM Contribution
21,545.00
1,069.75
22,614.75
MAY Dash Door
Settlement - CM Contribution
6,021.00
298.96
6,319.96
MAY Florida Blacktop
Settlement - Reverse Interim Funding (June)
-366,867.00
-18,215.71
-385,082.71
MAY Florida Blacktop
Settlement - CM Contribution
-4,552.00
-226.02
-4,778.02
MAY Florida Blacktop
Settlement - Reverse CM Contribution (Sept)
106,876.00
5,306.61
112,182.61
MAY Duffy Lee
Settlement - Reverse CM Contribution (March)
-36,127.00
-1,793.78
-37,920.78
MAY David Allen
Settlement - Reverse CM Contribution (Feb)
16,558.00
822.14
17,380.14
MAY HUFCOR
Settlement - CM Contribution
13,758.00
683.11
14,441.11
MAY Baring
Settlement - Reverse CM Contribution (July & Nov)
38,235.00
1,898.45
40,133.45
MAY Decon
Settlement - Reverse CM Contribution (July & Nov)
-833,128.00
-41,366.53
-874,494.53
MAY Decon
Settlement - Reverse CM Contribution (March)
-219,342.00
-10,890.78
-230,232.78
MAY Decon
Settlement - Reverse CM Contribution (July & Nov)
-815,476.00
-40,490.07
-855,966.07
MAY Decon
Settlement - Reverse CM Contribution (July & Nov)
752,649.00
37,370.58
790,019.58
MAY CDPW
Settlement - Reverse CM Contribution (July & Nov)
-275,404.00
-13,674.38
-289,078.38
MAY CDPW
Settlement - Reverse CM Contribution (July & Nov)
78,655.00
3,905.38
82,560.38
MAY CDPW
Settlement - Reverse CM Contribution (July & Nov)
-4,243.00
-210.67
-4,453.67
MAY Florida Civil
CM Interim Fundinq - CCD 21 - Kitchen Floor
22,920.00
1,138.03
24,058.03
SUBTOTAL
-1,418,651.00
-70,438.96
-1,489,089.96
Exhibit B1
Page 5 of 8
MONTH
SUBCONTRACTOR
DESCRIPTION
AMOUNT i
MARK -Ups*
TOTAL COST
JUNE
WPM
Crane Pads (off west Side & South Loading dock
204,791.41
10,168.32
214,959.73
JUNE
OTIS
Settlement- CM Contribution
86,770.00
4,308.31
91,078.31
JUNE
Underpower
Settlement - CM Contribution
1,204.00
59.78
1,263.78
JUNE
Underpower
Settlement - Reverse CM Contribution (Dec)
-1,938.98
-96.27
-2,035.25
SUBTOTAL
290,826.43
14,440.13
305,266.56
JULY
R&M
AESS Steel Shoring
166,517.00
8,267.91
174,784.91
JULY
R&M
AESS Steel Shoring
72,242.00
3,586.96
75,828.96
JULY
Banker
CM - RFI 2396 Baseplate conflict w/ rainwater pipes -
3,681.00
182.77
3,863.77
ECO #21
JULY
Banker
CM - RFI 2465.1 Steel Support Beam Conflict - CR 303
7,656.00
380.14
8,036.14
- ECCO #22
JULY
Tru -Steel
Reinstallation and Repair of Catwalk - CO#8
86,885.37
4,314.04
91,199.41
JULY
Tru -Steel
Field Order 4 Revisions at the East Helix Roof - CO#9
36,669.67
1,820.73
38,490.40
Partially paid via CM
JULY
NASH
PH 2 Dewatering for Plumbing Work - ECO #21
129,367.22
6,423.35
135,790.57
JULY
Ford AV
Global Settlement - CM Settlement Adjustment ECO #2
-72,584.00
-3,603.95
-76,187.95
JULY
FL Blacktop
Temp Asphalt for May 2017 Turnover
55,233.86
2,742.48
57,976.34
JULY
Smith Fence
Barricades - ECO#8
192,556.47
9,560.83
202,117.30
JULY
Smith Fence
Fence Reconciliation through Feb 2017 - ECO#9
53,050.13
2,634.05
55,684.18
JULY
Smith Fence
Allowance for Future Fence Work - ECO#10
125,000.00
6,206.51
131,206.51
SUBTOTAL
856,274.72
42,515.81
898,790.53
AUGUST
Alpha
SCO#19 CM Settlement
376,600.00
18,698.97
395,298.97
AUGUST
Camarata Masonry
May 2017 Turnover Premium Time
15,701.00
779.59
16,480.59
AUGUST
Banker Steel
SCO#24 - CM RFI 2415 CMU Pocket Alternate Detail
32,724.00
1,624.81
34,348.81
AUGUST
Banker Steel
SCO#25 - CM RFI 2565 East Facade Differing Site
3,537.00
175.62
3,712.62
Conditions at Top of Wall
AUGUST
Banker Steel
SCO#27 - CM Banker Settlement
460,000.00
22,839.95
482,839.95
AUGUST
Banker Steel
SCO#28 - Banker Scope Deduct for Allowance 5
-250,000.00
-12,413.02
-262,413.02
AUGUST
TRUSTEEL
SCO#10 CM Settlement
33,017.15
1,639.37
34,656.52
AUGUST
Acousti
SCO#25 - CM PH1 Water Damage Drywall & Temp
17,442.93
866.08
18,309.01
Roof Repairs at East Concourse
AUGUST
Acousti
SCO#28 CM Settlement
329,000.00
16,335.53
345,335.53
AUGUST
Florida Blacktop
SCO#05 Asphalt Patching on Washington Ave for MLB
1,271.05
63.11
1,334.16
Fanfest Show
AUGUST
CDPW
SCO#5 - Phase 2 Area Al West Damaged Suction and
4,402.65
218.60
4,621.25
Layflat Hoses
AUGUST
CDPW
SCO#6 - Phase 2 Dewatering Zone 4 & 7 Septic Tank
10,545.00
523.58
11,068.58
Installation
AUGUST
CDPW
SCOP - Phase 2 Dewatering Zone 2 Sanitary Run
8,335.51
413.88
8,749.39
SUBTOTAL
1,042,576.29
51,766.07
1,094,342.36
TOTAL SINCE INCEPTION
$22,637,636.20
$1,124,005.52
$23,761,641.72
— General Requirements
-
MONTH
SUBCONTRACTOR
DESCRIPTION
AMOUNT:
MARK -Ups*
TOTAL COST
MAY
GEOSYNTEC
DERM approval
$57,690.75
$2,864.47
$60,555.22
SUBTOTAL
57,690.75
2,864.47
60,555.22
JUNE
LIFE SAFETY
Costs associated with the separation and life safety
500,000.00
24,826.04
524,826.04
costs
SUBTOTAL
500,000.00
24,826.04
524,826.04
JULY
ACOUSTI
Procurement realocation from CM cont. for temporary
132,953.01
6,601.39
139,554.40
wall
JULY
BISCAYNE ENGINEERING
Procurement realocation from CM cont. for Surveying -
75,000.00
3,723.91
78,723.91
Increase Contract
JULY
GEOSYNTEC
Procurement realocation from CM cont. for NPDES
13,348.06
662.76
14,010.82
permits
JULY
GEOSYNTEC
Procurement realocation from CM cont. for NPDES
88,355.59
4,387.04
92,742.63
permits
JULY
HURRICANE PROTECTION
Procurement realocation from CM cont. for Hurricane
50,000.00
2,482.60
52,482.60
Preparation
JULY
MICHEAL WOOD
Procurement realocation from CM for FDEP permits
3,192.90
158.53
3,351.43
JULY
MODSPACE
Procurement realocation from CM for Owner Trailer
30,893.69
1,533.94
32,427.63
JULY
OWNER COST
Realocation from CM for Life Safety expenses (ie Fire
320,922.14
15,934.45
336,856.59
Watch)
JULY
OWNER - Fentress Architects
CM expense for additional Design Team site visits and
148,000.00
7,348.51
155,348.51
Onsite Visits
alternate design configurations
SUBTOTAL
862,665.39
42,833.12
905,498.51
Exhibit B1
Page 6 of 8
MONTH
SUBCONTRACTOR
DESCRIPTION
AMOUNT i
MARK -Ups*
TOTAL COST
AUGUST
BISCAYNE ENGINEERING
Procurement realocation from CM for additional
150,000.00
7,447.81
157,447.81
Surveying - contract increase
AUGUST
VALLEY FIELD
Cost for the repair of damaged irrigation lines at Filmore
1,538.00
76.36
1,614.36
AUGUST
OWNER COST
Realocation from CM for Life Safety expenses (ie Fire
-320,922.14
-15,934.45
-336,856.59
Watch)
AUGUST
OWNER COST
Realocation from CM for Life Safety expenses (ie Fire
370,138.10
18,378.12
388,516.22
Watch)
AUGUST
BRAND ENERGY
Procurement realocation from CM for scaffolding
35,689.00
1,772.03
37,461.03
AUGUST
OWNER - Fentress Architects
CM expense for additional Design Team site visits and
-148,000.00
-7,348.51
-155,348.51
Onsite Visits
alternate design configurations - ERROR
AUGUST
OWNER - Fentress Architects
CM expense for additional Design Team site visits and
148,999.00
7,398.11
156,397.11
Onsite Visits
alternate design configurations - ACTUAL
SUBTOTAL
237,441.96
11,789.49
249,231.45
SEPTEMBER
OWNER COST
Realocation from CM for Life Safety expenses (ie Fire
-370,138.10
-18,378.12
-388,516.22
Watch)
SEPTEMBER
OWNER COST
Realocation from CM for Life Safety expenses (ie Fire
391,261.00
19,426.92
410,687.92
Watch)
SEPTEMBER
MICHEAL WOOD
Procurement realocation from CM for FDEP permits
10,080.00
500.49
10,580.49
SEPTEMBER
BRAND ENERGY
Procurement realocation from CM for scaffolding
-35,689.00
-1,772.03
-37,461.03
OCTOBER
ACOUSTI
Temp exterior impact partition - GR
87,060.84
4,322.75
91,383.59
SEPTEMBER
GLE
Haz-mat survey west concourse
18,570.00
922.04
19,492.04
SUBTOTAL
101,144.74
5,022.05
106,166.79
OCTOBER
GLE
Haz-Mat survey west concourse
-18,570.00
-922.04
-19,492.04
OCTOBER
OWNER COST
Realocation from CM for Life Safety expenses (ie Fire
-391,261.00
-19,426.92
-410,687.92
Watch)
OCTOBER
OWNER COST
Realocation from CM for Life Safety expenses (ie Fire
401,877.54
19,954.05
421,831.59
Watch)
OCTOBER
ACOUSTI
Temp exterior impact partition - GR
-87,060.84
-4,322.75
-91,383.59
OCTOBER
ACOUSTI
Credit for Bond Rate Adjustment
-431.00
-21.40
-452.40
OCTOBER
ACOUSTI
Hurricane Matthew Preparation - October 16
12,298.16
610.63
12,908.79
SUBTOTAL
-83,147.14
-4,128.43
-87,275.57
NOVEMBER
ACOUSTI
Hurricane Matthew Preparation - October 16
-12,298.16
-610.63
-12,908.79
NOVEMBER
HURRICANE PROTECTION
Additional funds for Hurricane Protection
15,000.00
744.78
15,744.78
NOVEMBER
HURRICANE PROTECTION
Additional funds for Hurricane Protection
16,000.00
794.43
16,794.43
NOVEMBER
SCAFFOLDING SHRINKWRAP Temp work for Art Basel - Engineering for NE egress
2,875.00
142.75
3,017.75
tunnel
NOVEMBER
SCAFFOLDING SHRINKWRAP Extended rental for East Concourse
33,535.00
1,665.08
35,200.08
NOVEMBER
SCAFFOLDING SHRINKWRAP Adjustments to East Concourse
11,955.00
593.59
12,548.59
SUBTOTAL
67,066.84
3,330.01
70,396.85
DECEMBER
EVENTSTAR
Temp work for Art Basel - metal stairs
56,828.00
2,821.63
59,649.63
DECEMBER
HURRICANE PROTECTION
Additional funds/NASH
20,000.00
993.04
20,993.04
DECEMBER
HURRICANE PROTECTION
Additional funds for Hurricane Protection
15,000.00
744.78
15,744.78
DECEMBER
GEOSYNTEC
Environmental Consultant
8,545.00
424.28
8,969.28
DECEMBER
OWNER COST
Reallocation from CM for Life Safety expenses (ie Fire
-401,877.54
-19,954.05
-421,831.59
Watch)
DECEMBER
OWNER COST
Reallocation from CM for Life Safety expenses (ie Fire
464,173.00
23,047.15
487,220.15
Watch)
DECEMBER
TRUSTEEL
Temporary Bracing
2,531.00
125.67
2,656.67
SUBTOTAL
165,199.46
8,202.50
173,401.96
JANUARY
OWNER COST
Reallocation from CM for Life Safety expenses (ie Fire
-464,173.00
-23,047.15
-487,220.15
Watch)
JANUARY
OWNER COST
Reallocation from CM for Life Safety expenses (ie Fire
509,844.00
25,314.81
535,158.81
Watch)
JANUARY
FPL/FILMORE VAULT
Vault upgrade at Fillmore
70,144.00
3,482.79
73,626.79
SUBTOTAL
115,815.00
5,750.45
121,565.45
Exhibit B1
Page 7 of 8
MONTH
SUBCONTRACTOR
DESCRIPTION
AMOUNT i
MARK -Ups*
TOTAL COST
FEBRUARY
OPTIKA
Misc Invoices - Art Basel 2016
9,588.00
476.06
10,064.06
FEBRUARY
OWNER - Fentress Architects
CM expense for additional Design Team site visits and
112,649.00
5,593.26
118,242.26
Onsite Visits
alternate design configurations
FEBRUARY
GLE
October - GLE correction no credit was given
18,570.00
922.04
19,492.04
This is GLE Base Contract
FEBRUARY
Hurricane Protection
Credit for monies not used
-15,000.00
-744.78
-15,744.78
FEBRUARY
TRUSTEEL
Rein. Existinq Catwalk Gratinq
75,000.00
3,723.91
78,723.91
SUBTOTAL
200,807.00
9,970.48
210,777.48
MARCH
BISCAYNE ENGINEERING
Survey- Contract increase
135,574.00
6,731.53
142,305.53
MARCH
Walter P Moore
Weekly site visits
65,000.00
3,227.38
68,227.38
SUBTOTAL
200,574.00
9,958.91
210,532.91
MAY
Acousti
FO #5 - Temporary Lid for Electrical Room 1.06/1.09
41,125.00
2,041.94
43,166.94
MAY
Acousti
May 2017 Turn over
300,132.37
14,902.19
315034.56
SUBTOTAL
341,257.37
16,944.14
358,201.51
JUNE
Tecta
Temp Waterpffoing - May Turnover
30,000.00
1,489.56
31,489.56
JUNE
Eugenio
Painting of AESS Welds - GR
105,558.85
5,241.22
110,800.07
SUBTOTAL
135,558.85
6,730.78
142,289.63
JULY
Acousti
FO #5 - Temporary Lid for Electrical Room 1.06/1.09
-41,125.00
-2,041.94
-43,166.94
(Reverse - Paid thru GR)
JULY
Acousti
May 2017 Turn over (Reverse - Paid thru GR)
-300,132.37
-14,902.19
-315,034.56
JULY
Tecta
Temp Waterpffoing - May Turnover (Paid thru GR)
-30,000.00
-1,489.56
-31,489.56
JULY
Eugenio
Painting of AESS Welds - GR
-105,558.85
-5,241.22
-110,800.07
SUBTOTAL
-476,816.22
-23,674.91
-500,491.13
SUBTOTAL
0.00
0.00
0.00
TOTAL SINCE INCEPTION
$2,425,258.00
$120,419.08
$2,545,677.08
Buyout $1,202,676.00 $59,715.35 $1,262,391.35
Trade Costs 22,637,636.20 1,124,005.52 23,761,641.72
General Requirements 2,425,258.00 120,419.08 2,545,677.08
Total CM Contingency Use $26,265,570.20 $1,304,139.96 $27,569,710.16
* Mark ups include insurance, bond and CM fees.
**May amounts are $156,070 lower than reported in May due to the reconciliation/audit process.
Exhibit 131
Page 8 of 8
EXHIBIT B-2
Miami Beach Convention Center Expansion & Renovation Project
Owner's Contingency Report
Through August 2017
116 SUMMMARY --.i
ORIGINAL OWNER'S CONTINGENCY $35,000,000
MODIFICATIONS (ADDS)
SUBTOTAL
Bond offering additional proceeds
$147.449
Total Modifications
$147.449
USES
Mark-ups
Jun 2016
4,630
Jul 2016
-
Auq 2016
29,967
Sep 2016
-
Oct 2016
2,518,080
Nov 2016
(96,710)
Dec 2016
179,685
Jan 2017
794,486
Feb 2017
(58,386)
Mar 2017
4,321,164
Apr 2017
16,125,999
May 2017
-
Jun 2017
78,710
Jul 2017
(16,224)
Auq 2017
(1.465.262)
Total Use
22,416,139
TOTAL CONTINGENCY USE ($22,268,690)
REMAINING OWNER'S CONTINGENCY $12.731.310
MONTH
SUBTOTAL
CHANGE ORDER # DESCRIPTION
Trade Cost
Mark-ups
AMOUNT
June
Deductive change order against CM's contingency for extra site visits by design team
SUBTOTAL
-
32
179.685
-
N/A
-148,999
June
34
Deductive change order against's CM's fee for design remediation work
January
52
-6,000
June
35
Additional fire rated 2nd floor service corridor wall
107,849.83
5,354.97
113,205
June
36
Additional construction fence panels
44,228.45
2,196.03
46,424
739.160.50
SUBTOTAL
794.486
152.078.28
7.551.00
4.630
Auaust
40
New 8" sanitary sewer line on Washington Avenue
28,549.47
1,417.54
29,967
SUBTOTAL
-20,000
28.549.47
1.417.54
29.967
October
N/A
US Cost - GMP Reconciliation
February
55
945,080
October
N/A
Permit & Plan Reviews
February
56
855,000
October
N/A
Design Miami 2016 - Generators
SUBTOTAL
408,000
70.750.00
3.512.89
Additional amount needed for the first 12 months of warehouse lease payments for
March
58
Nash - GMP Reconciliation
October
N/A
Spectra Staff (Total costs of months 1-12: 531,316.50)
March
61
287,800
October
N/A
Spectra - Cost associated with relocation of the warehouse equipment
SUBTOTAL
22,200
4.028.712.93
SUBTOTAL
4.321.164
April
64
2,518,080
(2,729,128.11)
(198,112.05)
Clark / Banker backcharge for additional structural engineering services approved for
April
64
Reverse NFP - GMP Reconciliation
November
43
Fentress in Amendment 20.
April
65
-96,710
Exhibit B2
Page 1 of 2
SUBTOTAL
-96.710
December
N/A
Design budget adjustment to increase Fentress PO through Amendment 23.
179,685
SUBTOTAL
-
179.685
January
N/A
Design budget adjustment to increase Fentress PO through Amendment 24
18,625
January
52
Additional cost of generator
319,160.50
15,846.98
335,007
January
57
Honeywell GMP Reconciliation Interim Funding
420,000.00
20,853.88
440,854
SUBTOTAL
739.160.50
36.700.86
794.486
Clark backcharge for additional structural engineering services required due to non-
February
54
conforming work
-20,000
Clark backcharge for extra design team site visits and additional structural engineering
February
55
design changes requested by Clark
-112,649
February
56
Switchgear replacement due to arc flash incident
70,750.00
3,512.89
74,263
SUBTOTAL
70.750.00
3.512.89
-58.386
March
58
Nash - GMP Reconciliation
2,729,128.11
198,112.05
2,927,240
March
61
NFP - GMP Reconciliation
1,299,584.82
94,339.08
1,393,924
SUBTOTAL
4.028.712.93
292.451.13
4.321.164
April
64
Reverse Nash - GMP Reconciliation
(2,729,128.11)
(198,112.05)
-2,927,240
April
64
Reverse NFP - GMP Reconciliation
(1,299,584.82)
(94,339.08)
-1,393,924
April
65
Removal of Park Allowance from Clark's GMP
(10,000,000.00)
-
-10,000,000
Exhibit B2
Page 1 of 2
EXHIBIT B-2
MONTH
CHANGE ORDER # DESCRIPTION
Trade Cost Mark-ups
AMOUNT
April
66
GMP Reconciliation
37,627,222.00 1,808,836.00
39,436,058
April
67
GMP Reconciliation - Pre -Construction Services fee balance
1,037,626.00
1,037,626
April
N/A
Reimbursement of Design Miami 2016 generators cost per Resolution 2017-29830
-408,000
Reimbursement of temporary FPL service for Art Basel 2016 per Resolution 2017-
April
N/A
29830
-148,726
April
N/A
Reimbursement of Spectra's building operation costs per Resolution 2017-29830
-518,000
April
N/A
Remove additional funds previously allocated to FF&E
-250,000
April
N/A
Remove additional funds previously added to raise Carl Fisher Clubhouse
-1,000,000
April
N/A
Close PO for Clark Pre -GMP CM Fee
-1,037,629
April
N/A
Reimbursement of stormwater infrastructure / road raising per Resolution 2017-29829
-4,513,591
Re -roofing of existing building structure (funded from separate capital renewal and
April
N/A
replacement project)
-1,689,254
Reimbursement of temporary kitchen trailer costs for Art Basel 2016 per Resolution
April
N/A
2017-29830
-76,267
April
N/A
Reimbursement of temporary partition per Resolution 2017-29830
-1,010,500
Reimbursement of Art Basel temporary work for 2016 show per Resolution 2017-
April
N/A
29830
-2,542,220
April
N/A
P -Lot Park allowance
5,000,000
April
N/A
Additional allocation for permit fees
39,800
April
N/A
Design budget adjustment to increase Fentress PO through Amendment 26
27,610
April
N/A
Cost estimating budget reduction
-302,202
April
N/A
Budget reduction for miscellaneous (Other) costs
-1,597,542
SUBTOTAL
24.636.135.07 1.516.384.87
16.125.999
June
N/A
JLL Amendment No. 9 - Additional consulting services
160,000
Fentress Amendment 28 - design revisions associated with relocation of 19th St pump
June
N/A
station
-
2,585
Mark-ups associated with re -roofing scope of work - funded from separate capital
June
N/A
renewal and replacement project
-83,875
SUBTOTAL
0.00 0.00
78.710
July
68
Additional power requirements necessary in the DMARC room
4,812.00 238.93
5,051
July
73
Reverse CO 56 - MC Dean
(70,750.00) (3,512.89)
-74,263
Additional door hardware at East Concourse to accommodate the needs of the events,
July
75
building operator and project phasing.
50,481.00 2,506.49
52,987
SUBTOTAL
-15.457.00 -767.47
-16.224
August
76
Scope removal - Canal Seawall
(1,500,000.00) (74,478.10)
-1,574,478
Addition of a drywall soffit at East Concourse - work associated with acoustical panel
August
77
ceiling connection issues.
45,990.16 2,283.51
48,274
Deductive change order to cover additional arch / eng services performed by A/E due
August
78
to non conforming field conditions related to RFI 3251 / NCR 1255
-20,875
August
79
Installation of water meters
1,959.00 97.27
2,056
August
81
Field modification of urinal screens as directed by the A/E for ADA compliance
1,226.00 60.88
1,287
Construction Change Directive #022 - new sanitary sewer line for Carl Fisher
August
82
Clubhouse
74,315.00 3,689.90
78,005
August
87
Repairs to fire protection line in north loading dock damaged during an event
447.00 22.20
469
SUBTOTAL
-1.376.062.84 -68.324.34
-1.465.262
TOTAL SINCE INCEPTION
28.263.866.41 1.788.926.48
22.416.139
Exhibit B2
Page 2 of 2
EXHIBIT C
LOCAL WORKER UTILIZATION REPORT BY PROJECT
From Date: 10/1/2015
To Date: 8/31/2017
Zip Lists
864
18.89%
w
13.51%
Miami Beach 52
1.14%
30,315
1.42%
Miami Dade County 2,891
63.19%
1,195,259
56.11%
Employees Not in Specified 1,632
35.67%
904,711
42.47%
Demographic Profile
939,350
44.10%
Caucasian
African American
864
18.89%
287,881
13.51%
Native American
7
0.15%
4,999
0.23%
Asian
11
0.24%
3,759
0.18%
Hispanic
1,898
41.49%
939,350
44.10%
Caucasian
578
12.63%
243,624
11.44%
Other
1,217
26.60%
650,672
30.54%
Male
4,437
96.98%
2,082,206
97.74%
Female
138
3.02%
48,079
2.26%
Total Employees 4,575 2,130,285
Miami Beach Convention Center Renovation Project
Social Media Posts for August 2017
Facebook: MBCC & City of Miami Beach
,40 City of Miami Beach Government
'i,w augus y k+
View the latest construction advisory as part of @TheMiamiBeachCC
project. #MBCCFuture
C —crru h -n AAV, Sury .. A;ag„H 5 7nIP
MIAl111 mooch c.—M- CenW Rarto Ii- Prolaci
tr11141r CLCQi —
l4
a IMm�aYI «abraabe4aw Yalrlt ar,9
Gmabnf: M.O�Mr�rd4 Wl nwtrm
AY 10aY �w
� laNbC9q MON YlagaM bYY1PeP1 Ypn 17 61W
a! Ii lYa1. fiYane�'ISY n�e�l[wmaeo
nwYreab
FW C WY PprYbw MANN/
a dealr6ML1a5eaiaaP fYblf b7YwP17 blurb
Wry Ilsas6. IleleeYraamq lifglYl pMq
9nAp Yrs lY bwal W Mwlw, Array
la b1aY �aab6 «abd CitlYia a49bas AYPYe a...
1'h�faiCwMrQMAamblw lriYeb G+ .
RYabbaff*W WA YW YYeswYI PY aN aYew n. r.
a « M raM 1M b~YMY, AwMw
6ksaWK F4d®dw as+sf ,wPS Yb n§b a9aM sa
O�wrPa wpwM�elLawbaiJt PYa,
�illY9��W1 W OMqW4 14 Cdb140,! %nXWwb
ngiYaam Yoe. Paaen a.+q�oMalr.Y Yebwn a
mm w.e r �. >wa u,+nwe, was �.a+Y wr vera
ea-cten rleearb o eonaee as Ia�Pa�tb w aa+..a.rr
rr P.ea
Cb a.**W mr..Y...aa. wfn.rtawa
arw.rw bnow+'Mws+qa +bn.+w w Can.aram
Ca1Y D��. wTae M fJYeP Mlr dYln efo-Ai e19a �9
C CarllmvndeW
rOPw. n0uY5 �Ma.M
Was ween m9w Valeel rra wen6am mitl Pm.Rlw.wa'P•ay,7rYq. ilarwaYYYlwra YYaMY•rwerkY
ePpNfa n aw.+aaayawla V446,NI�Ae+�Mw
Yraaa a Paw e+Bear «wab bc�oaro m,.ero+u wsaaoaa w eAlra 714 rYbYelb IIb 1.alpblyp mama Ir..e..,..w .n ewwq. an �e,eew+..w +:..ma rwar w wa,rYaaa.«� e.nr,uwr..
ao.uaxr alaac
tPi•vrYms aYryawYY�rriaMMYbdIY baYYYwaa�PaaYllrxA«�w aY lArtln
Caw�FaKM Y,bVa Ntlar 41adMM M iY1Wllla M W 8}17
tPWwfeatAilOY
CnWRAaM wloi�.�Yfabano.Yb.Y1N.]M MbaY7 ew✓fYmasa•.eePra.wePwn. �y. b.
SII P941 WaaYa Y
NNW
n5 Like (�) Comment O Share
- City of Miami Beach Government
In case you missed it, read the latest advisory as part of the Miami Beach
Convention Center project # MBCCFuture httpJlus 11campaign-
archivel.00ml...
71
–11, 1 *e (�D Comment k--� Share a
ikiii$ City of Miami Beach Government •••
August 25 to
Check out the Miami Beach Convention Center upcoming event lineup!
#MBCCFuture
DATE:
LOCATION:
EVENT NAME:
• 8/25/2017.8/26/2017
MBCC
Asia America Trade Show
• 9/1%2017-9/5/2017
MBCC
Migmi Han. Desi &
R.mo"i' Shaw
to renovate
47flololAutoShow
•9/9/2017-9/17/2011
MBCC
Inlernotional Auto Shaw
-9/25/2017-9/2612017
MBCC
71st Americo's Food ond'
Beverage Show
• 10/3/2017 10/4/2017
MBCC
ICFFM1omi
t5 Like 0 Comment � Share e 7
44 City of Miami Beach Government
.ak, August 28 al 6.13pm - 0
Take a look at the Miami Beach Convention Center's main entrance on
Convention Center Drive as it's coming up! #MBCCFuture
488 Views
Like Q Comment Share
Posted to Facebook - Published August 28, 2017
Viarini Beach Convention Center shared City of Miami ••'
Beach Governments post.
ALpst- 0
lip
Miami Be ch/mior11F
liL
0
1M64*-
� ►
Lode County local
laborers being used
_
� •
to renovate
��11
the real ogined
Convention Center
(Other laborers
r! hired to support
this on Pr
milGCirl Project
AlqCurrent construction
jobs at the Miami Beach
Convention Center
'Figur., r•p.,Wd ar. Komi pr jW i-gAia. IIS.a.n,her 201 sl r. dar. fJ—.2017).
iz&_
City of Miami Beach. Govemment illit Like Page
Posted to Facebook - Published August 7, 2017
6fiami Beach Convention Center
The Miami Beach Convention Center is open for business during the
renovation project. Be sure to attend the Asia America Trade Show August
25-27, 2017. #IYIBCCFuture#MBCCReimagined #sode
etas is americatrades hove #veh olesale @themiamibeachcc
6 Like l 1 Comment 0�> Share a -
Miami Beach Convention Center shared City of 11v1iami
Beach Government's post.
August 25 d
DATE:
LOCATIOR
EVENT NAME:
• 8/25/2017- 8/26/2017
marc
Aw Anwta Trade Show
Minmi Ham® Desiggn d.
-91112017-9/5/2017
marc
Remmodlelirrg Shtiw
47AnwolSo thflorido
• 9/912017- 9117/21717
htiaCC
lrYerm lond Awo 5howr
21 st Amariaa%Food an d
• 9/25/2017 9/26/2017
mac[
Beveroge %Q.
-IC/3/2017 10/4/2017
matic
ICFF Miami
City of Miami Beach Government 16 Like Page
i August 25 - 43
Check out the Miami Beach Convention Center upcoming event lineup! #MBCCFuture
bLike (� Comment i5 Share
01
�_. Miami Beach Convention Center is at 0 Miami Beach •••
Convention Center.
August 28 at 2 58ami Miami Beach 0
Take a look at the Convention Center's main entrance on Convention Center
Drive as it's coming up! #MBCCFuture #MBCCreimagined #foundinmiami
@themiamibeachcc
246 Views
05 Like Q Comment �:i Share
t7. Miami BeachConvCenter Retweeted
City of Miami Beach 0 @MiamiBeach�lews Aug 25
Check out @TheMiamiBeachCC's upcoming event lineup! #MBCCFuture
N/
DATE:
• 8/25/2017-8/26/2017
• 9/1/2017-9/5/2017
• 9/9/2017-9/17/2017
• 9/25/2017-9/26/2017
• 10/3/2017-10/4/2017
Q 1 t1 z Q S
!LOCATION: EVENT NAME:
MECC
Asia America Trade Shaw
Miami Home Design&
MECC
Remodeling Show
47 Annual South Florida
MECC
International Auto Show
21 sl America's Food and
MECC
Beverage Show
MECC ICFF Miami
`/,
Miami BeachConvCenter @TheMiamiBeachCC - Aug 28 v
RF— Take a look at the Convention Center's main entrance on Convention Center
Drive as it's coming up! #MBCCFuture #MBCCreimagined
01 t1 Q 4
Instagram: MBCC
themiamibeachcc
Miami Beach Convention Center > eee
,Mud YVpdM newer MIAMI BEACH CONVENTION CENTER
r';.IAMIIBEACH HISTORY AT A GLANCE
The nea 1A.6- A—
Imt UFM <ernnetl la[ilily
Y' - Includes aRale-PltM-
- erl6N,60(1 sgeem Coat
grand 1pallrnPm, addlNpnal
meahng rooms, advanced
m[hnpl[gy. rpp'Nop
Vevr of Pngairq wnslruRiem The Mim uni— pageant pavking, nmv veauti7e
of the Mramr Beach C[msxMinn - --dtothe Convention IMPPr/94Woor publl[
Cencar Hall Ceetn In 1997 aNrr 26 year. spades and moms
1974 1990 Fall 2018
w �A
1988
Mlaml Berth C—6w
Centel Manages WCrm LIS
mob —P-1 rucN.
e( the nex additl. to Ibe
Com t- Cenle[
12015
RenovaNPns P.O. pegm
m oxempn zulsayax
aMicipnM tp Ne cumyleted
by Augas12U161Ne [oral
I»o�e[tbrrdgalxsfinsm�mpn
entl ilS (undetl lYy CeuMy acrd '
Municipal bends.
a
themiamibeachcc
Miami Beach Convention Center
Val a
Miami Beach Convention Center Renovation & Expansion Project
August 25, 2017
Construction Update
Wftat's New
On Thursday, September 1, the tvilanni Home Design & Remodeling Snow will be
underway at the Miami Beach Convention Center and will run through tlanday.
September 5. The event will take place on the east wing of the Miami Beach
Convention Center. Take note of the following traffic modifications that continue to be
in effect to accommodate event load -in (see map below):
• Northbound and southbound traffic on Washington Avenue between Dade
Boulevard and 17 Street remains reduced to one way in each direction
• Pedestrian access and vehicular drop-off to the event will be located only in
the vicinity of Washington Avenue and 18 Street and only during the event.
Therewill be no pedestrian access at any other location
• Vehicles traveling northbound on Washington Avenue who want to access the
vehicular drop-off will be detoured at 19 Street and follow the signs for NB
Event Drop -Off
Friendly reminder, the Asia America Trade Show will be at the Convention Center
starting today and through this Sunday, August 27
Please follow all traffic signals and drive carefully.
Click here to see the ongoing work.
Mana Wemandez, Ftcject Direax tar the Cclnrention Center District tails about ccgstriction underway at the Miami
Beach Con rrtion Centeron Tka dayAugust S,2017.Thedtysaysconst7uction is Corrmarethan halfdone-AlDiaz-
The Miami Herald
MIAMI BEACH
Half finished and half gutted, Miami
Beach Convention Center has one
year of renovation left
HYJOEYFUGUS
�ahtimm
Rig --r now, it's the tAe of rwo hahw in the 5600 mMion renm-a ion of'li nmi Beach
C9nL'&n7Un Center,