July 21st FCWPC Agenda1
2
3
MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, wwv^.miamibeachfl.gov
COMMITTEE MEMORANDUM
TO:
FROM:
Members of the Finance & City Wide Projects Committee
Jimmy L. Morales, City ManageirT\^'^^ll^rt^yvj-i,/v^
DATE: July 21, 2017
SUBJECT: FY 2017/18 PROPOSED CAPITAL BUDGET DEVELOPMENT
The FY 2017/18 Proposed Capital Budget was reviewed by the Finance and Citywide Projects
Committee on June 16, 2017, by the City Commission at the June 22, 2017 Commission Retreat,
and again by the Finance and Citywide Projects Committee on July 10, 2017.
Attachment A contains a full funding summary of the proposed FY 2018-22 Capital Program sorted
by fund.
The following items were amended, as requested by the Committee and the Commission:
Transportation Fund (page 1 of 6)
• The remaining available balance in this fund was reduced from $949,225 to $532,225 to
account for $417,000 which will be used for the City's contribution towards the Memorandum
of Understanding for the Beach Corridor Connection project during FY2016/17. All projects
previously funded remain unchanged.
Cultural Arts Council Endowment Fund (page 2 of 6)
• Collins Park Rotunda/ Performing Arts Venue (#51) - Added this project and moved
funding in the amount of $800,000 to the proposed column, based on direction from the
Committee on July 10, 2017 to fund this project. As approved by Commission, the Cultural
Arts Council will oversee a flexible performing arts center; it can be used for spoken word
performances, theater in the round, a small dance performance, an art installation, and a
generally flexible, multi-use space.
PAYGO Fund (page 3 of 6)
• Baywalk - South Bay Club, Bayview Terrace, Bay Garden Manor (#88) - As a result of
the dollars made available from funding a portion of the Maurice Gibb Park Redesign project
from the 2003 Parks GO Bond, moved funding for this project in the amount of $386,000 to
the proposed column, based on direction from the Committee on July 10, 2017 to fund this
project.
Resort Tax- South Beach Fund (page 4 of 6)
• 5*" Street Flyover Lighting Enhancement (#156) - Moved funding in the amount of
4
FY 2017/18 Proposed Capital Budget Development
Page 2
$148,779 to the proposed column, based on direction from the Committee on July 10, 2017
to fund this project.
1999 Fire Safety General Obligation Bond (GOB) Fund (page 5 of 6)
Based on a recent reconciliation of the GOB funds, the Finance department advised that $347,858
of 1999 Fire Safety GOB dollars were available for appropriation. The Committee approved funding
the following projects with these dollars:
F-550 Mobile Air Truck Unit- Fire Department (#184) - $271,000 (previously operating
budget request)
Fire Station #2 Garage Doors Replacement (#185) - $30,000 (previously PAYGO request)
Fire Station #1 Interior & Exterior Painting (#186) - $36,000 (previously PAYGO request)
2003 Parks General Obligation Bond (GOB) Fund (page 5 of 6)
Based on a recent reconciliation of the GOB funds, the Finance department advised that $676,342
of Parks GOB dollars were available for appropriation. Of this amount, the Sixth Capital Budget
Amendment includes a request to appropriate $25,000 to fund a wheel chair lift at the North Shore
Bandshell. The Committee recommended that the Parks department prioritize the parks needs and
provide an update at today’s meeting. Administration’s recommendations are outlined below:
Maurice Gibb Park Redesign (#190) – Move $521,342 previously proposed to be funded
in FY 2017/18 from PAYGO dollars to be funded from the 2003 Parks GO Bond fund. This
would create capacity for other projects to be funded from the PAYGO fund.
South Pointe Park Splash Pad Rubber and Drainage Improvement (#191) – Move
funding for this project in the amount of $50,000 to the proposed column, based on the
Parks and Recreation department’s recommendation.
Mid-Beach Park Restroom Renovation (#192) – Move funding for this project in the
amount of $80,000 to the proposed column, based on the Parks and Recreation
department’s recommendation.
CONCLUSION
The City administration recommends the changes listed above to the proposed FY 2017/18 Capital
Budget. The funding recommendations in the proposed FY 2017/18 Capital Budget are based on
the City Commission’s priorities and needs identified by various City departments. The final FY
2017/18 Capital Budget will be adopted at the second public hearing in September.
JLM/CGR
5
CITY OF MIAMI BEACH
PROPOSED FY 2018-2022 CAPITAL IMPROVEMENT PROGRAM
Funding Source Project Name Prior Years
Adopted
FY 2016/17
Amendments
FY 2016/17
Programmed
FY 2017/18
New Requests
FY 2017/18
Proposed
FY 2017/18
Proposed
Programmed
FY 2018/19
Proposed
Programmed
FY 2019/20
Proposed
Programmed
FY 2020/21
Proposed
Programmed
FY 2021/22 Total Future
1 Building Department - Property Purchase 10,000,000 -
---- 10,000,000 -------
10,436,543
-
10,436,543
2 Bayshore Neighborhood Traffic Calming Phase 1A 378,075 378,075 378,075
3 Bayshore Neighborhood Traffic Calming Phase 1B --141,000
4 Nautilus Neighborhood Traffic Calming/ Complete Streets - Phase I 594,068 355,500 355,500
5 Nautilus Neighborhood Traffic Calming/ Complete Streets - Phase II 661,000 661,000
6 Venetian Causeway Internally Illuminated (LED) Crosswalks 180,000 180,000 180,000
----1,152,143 913,575 661,000 ---1,574,575 141,000
1,445,800
-
532,225
7 Police Station Backup Chiller Replacement 80,000 80,000 80,000
8 Storage Tank Replacement 200,000 200,000 200,000 400,000
9 Scott Rakow Youth Center Emergency Generator 500,000 500,000 500,000
10 Historic City Hall HVAC Fresh Air Unit Humidity Control 50,000 50,000 50,000
60018 11 Scott Rakow Community Center Aluminum Windows Renewal 446,000 700,000 700,000 700,000
12 Historic City Hall Pressure Booster Pump-Duplex 5 HP Renewal 53,306 53,306 53,306
13 North Shore Park Youth Center Replacement of A/C Units 90,000 90,000 90,000
60038 14 South Shore Community Center Fire Alarm System Renewal 112,086 112,086 112,086 112,086
15 Police Station Replace Domestic Water Pump 35,000 35,000 35,000
16 Historic City Hall Fire Alarm System Renewal 151,618 151,618 151,618
61100 17 P.A.L. Building Fire Alarm Renewal 95,000 86,692 95,000
18 777 Building Branch Wiring - Equipment & Devices Renewal 96,661 96,661 -
19 City Hall Generator Replacement 250,000 -
20 Police Station Lighting Protection System Renewal 90,153 -
21 Botanical Garden Roof Renewal 50,000 -
22 Historic City Hall Roof and Balcony Renewal 35,000 -
23 Police Garage Aged Surfaces 235,000 -
24 Police Station Main Electrical Service 09-1200A 480Y/277V Renewal 118,572 -
25 Police Station Main Electrical Service 11-1200A 480Y/277V Renewal 156,382 -
26 10th Street Auditorium Metal Wall Louvers Renewal 43,220 -
27 777 Building Replace Up Lighting 38,000 -
28 Police Station Swinging Doors - 3x7 HM-Rated Renewal 35,141 -
29 City Hall Ceramic Tile in Restrooms Renewal 75,000 -
30 Police Garage Concrete Paving: Aged Coatings 32,820 -
31 City Hall Restroom Renovations (Floors 1, 3, and 4)200,000 -
60028 32 South Shore Community Center Electrical Distribution Renewal 160,552 160,552 -
33 Historic City Hall Emergency Battery Pack Renewal 28,541 -
34 City Hall Exit Signs Renewal 74,521 -
35 Fire Station #3 D5020 - Lighting and Branch Wiring Renewal 96,808 -
36 Police Station Restroom Fixtures Renewal 254,850 -
37 City Hall Exterior Restoration and Painting 80,210 -
38 Police Station Swinging Doors - 3x7 HM-Rated Renewal 65,178 -
39 Police Station Branch Wiring - Equipment & Devices Renewal 247,088 -
40 The Fillmore Exterior Restoration and Painting 50,000 -
41 Public Works Water Heater-Electric Renewal 36,883 -
42 Byron Carlyle Fire Alarm System Renewal 169,088 -
43 Byron Carlyle Flooring/Carpet Replacement 195,900 -
44 Byron Carlyle Interior Door Replacement 153,958 -
45 Miami Beach Golf Club A/C and Kitchen Refrigeration Replacement 50,000 -
46 Lifeguard Stand Replacements (Additional funding in #150, 164, #174)-141,189 141,189
47 Fire Station #4 Kitchen Equipment Renewal 41,849 41,849 41,849
48 Fire Station #3 Kitchen Renewal- New Equipment & Grease Trap 30,000 30,000 30,000
95,000 -- 815,299 5,250,077 2,185,048 200,000 --- 2,480,048 -
1,464,048
721,000
-
49 Neptune Apartments Repairs 60,028 320,000 320,000 330,000 330,000 330,000 1,370,028
50 Madeleine Village Required (Additional funding in #70)195,426 195,426 195,426
--60,028 -515,426 515,426 330,000 330,000 330,000 -1,565,454 -
-
515,426
-
Building Reserve
Total:
Building Reserve Available Balance
FY18 Projected Revenue
FY18 Projected Revenue
Remaining Available Balance
FY18 Projected Revenue
Remaining Available Balance
Total:
131 Available Balance
106 Transportation
Total:
106 Available Balance
FY18 Projected Revenue
Remaining Available Balance
125 Capital Renewal & Replacement
131 Community Development Block Grant - Year 33
Total:
125 Available Balance
Customer/Department requests
Priority 1 - Deferred
Maintenance
Priority 2 - Recommended based on
asset life, not condition
Page 1 of 6
6
CITY OF MIAMI BEACH
PROPOSED FY 2018-2022 CAPITAL IMPROVEMENT PROGRAM
Funding Source Project Name Prior Years
Adopted
FY 2016/17
Amendments
FY 2016/17
Programmed
FY 2017/18
New Requests
FY 2017/18
Proposed
FY 2017/18
Proposed
Programmed
FY 2018/19
Proposed
Programmed
FY 2019/20
Proposed
Programmed
FY 2020/21
Proposed
Programmed
FY 2021/22 Total Future
51 Collins Park Rotunda/ Performing Arts Venue 800,000 800,000 800,000
----800,000 800,000 ----800,000 -
1,500,000
-
700,000
52 7th Street Parking Garage Upgrade Lighting (LED)200,000 200,000 200,000
53 7th Street Parking Garage Vestibule Roof Top Renewal 30,000 30,000 30,000
20087 54 P23 - New Garage - 1623 West Avenue - Intercept Garage (Additional funding in #62, #223)1,169,500 1,169,500 1,169,500
----1,399,500 1,399,500 ----1,399,500 -
1,399,537
-
37
20377 55 Art in Public Places Miami Beach Convention Center 6,250,000 810,797 470,000 470,000 7,530,797
56 Art in Public Places Flamingo Park Project 194,000 194,000 194,000
57 Fire Station 2 - Miami Dade County Arts in Public Places 95,334 95,334 95,334
58 Art in Public Places Lummus Park 116,000 116,000 116,000
-6,250,000 810,797 -875,334 875,334 ----7,936,131 -
887,147
- Pending FY18 recommended projects
11,813
59 72nd Street Park and Parking Structure - Parking Component (Additional funding in #121, #122)300,000 300,000 21,166,000 21,466,000
20547 60 Parking Garage at Biscayne Beach (Additional funding in #103, #237)1,180,000 1,180,000 1,180,000
----1,480,000 1,480,000 21,166,000 ---22,646,000 -
2,837,053
-
1,357,053
20107 61 P55 - New Garage 2660 Collins Avenue (Additional funding in #235)1,960,000 2,240,000 1,406,270 3,366,270
-1,960,000 -2,240,000 -1,406,270 ----3,366,270 -
1,406,270
-
-
20087 62 P23 - New Garage - 1623 West Avenue - Intercept Garage (Additional funding in #54, #223)3,000,000 3,080,077 3,080,077 6,080,077
--3,000,000 -3,080,077 3,080,077 ----6,080,077 -
3,080,077
-
-
20018 63 41st Street Adaptive Traffic Control Project 840,000 -840,000
27920 64 Shared-Use Path Along Alton Road from Chase Avenue to North Michigan Avenue 418,000 (418,000) (418,000)418,000 418,000
28080 65 Intelligent Transportation and Smart Parking System (Additional funding in #225)2,060,000 5,555,000 5,555,000 1,469,000 818,000 9,902,000
66 Alton Road (5th Street to North Michigan Avenue) Signalization Improvement -1,400,000
67 MacArthur Causeway/5th Street Corridor Adaptive Traffic Signal Control -1,000,000
2,478,000 --840,000 5,137,000 5,137,000 1,469,000 1,236,000 --10,320,000 3,240,000
5,562,055
425,055
29300 68 Lincoln Road Washington Avenue to Lenox Avenue - Refurbishment of Lincoln Road Pedestrian Mall 23,965,000 6,865,154 6,865,154
69 Lincoln Road Washington Avenue to Collins Avenue - Refurbishment 5,318,000 -
---- 29,283,000 6,865,154 ----6,865,154 -
6,865,154
-
-
70 Madeleine Village Repairs (Additional funding in #50)316,448 316,448 300,000 300,000 150,000 1,066,448
----316,448 316,448 300,000 300,000 150,000 -1,066,448 -
316,448
-
FY18 Projected Revenue
Remaining Available Balance
158 Concurrency Mitigation Fund
147 Available Balance
FY18 Projected Revenue
Remaining Available Balance
FY18 Projected Revenue
Remaining Available Balance
155 Fees in Lieu of Parking Fund - Mid Beach
Total:
155 Available Balance
155 Available Balance
FY18 Projected Revenue
Remaining Available Balance
155 Fees in Lieu of Parking Fund - South Beach
Total:
155 Available Balance
Remaining Available Balance
Total:
184 HOME Invest Part. Program Grant
FY18 Projected Revenue
Remaining Available Balance
Total:
FY18 Projected Revenue
165 RDA - Non TIF
Total:
FY18 Projected Revenue
158 Available Balance
165 Available Balance
FY18 Projected Revenue
Remaining Available Balance
Total:
Total:
Total:
142 7th Street Garage
147 Art in Public Places
155 Fees in Lieu of Parking Fund - North Beach
Remaining Available Balance
142 Available Balance
140 Cultural Arts Council Endowment
Total:
142 Available Balance
181 Available Balance
FY18 Projected Revenue
Remaining Available Balance
Page 2 of 6
7
CITY OF MIAMI BEACH
PROPOSED FY 2018-2022 CAPITAL IMPROVEMENT PROGRAM
Funding Source Project Name Prior Years
Adopted
FY 2016/17
Amendments
FY 2016/17
Programmed
FY 2017/18
New Requests
FY 2017/18
Proposed
FY 2017/18
Proposed
Programmed
FY 2018/19
Proposed
Programmed
FY 2019/20
Proposed
Programmed
FY 2020/21
Proposed
Programmed
FY 2021/22 Total Future
71 Meridian Avenue Protected Bicycle Lanes 250,000 250,000 250,000
72 Signal Installation on Alton Road and 4th Street 580,000 580,000 580,000
73 Royal Palm Neighborhood Greenway (between 34th Street and 42nd Street)430,000 430,000 430,000
27880 74 72nd Street Protected Bike Lane (Additional funding in #117)39,000 200,000 3,175,000 239,000
27940 75 Euclid Avenue Between 17th and 5th Streets (Bike Lane)470,000 --470,000
509,000 200,000 -3,175,000 1,260,000 1,260,000 ----1,969,000 -
1,974,629
-
714,629
27950 76 North Shore Open Space Park Redevelopment 9,447,134 4,310,000 5,137,134 9,447,134
77 North Shore Beach Neighborhood Parks Restroom Renovations 190,000 190,000 190,000
----9,637,134 4,500,000 5,137,134 ---9,637,134 -
4,500,000
-
-
23200 78 Flamingo Park (Additional funding in #151)37,000 1,090,000 1,090,000 1,384,000 2,511,000
79 Brittany Bay Park Overlooks and Living Shoreline 772,000 772,000 772,000
80 Maurice Gibb Park Redesign (Additional funding in #166, 190)984,518 28,658 955,860 984,518
23360 81 West Avenue - Above Ground 6,112,000 -
20607 82 11th Street Flamingo Neighborhood Improvements - Above Ground 1,059,000 -
23240 83 La Gorce Neighborhood Improvement - Above Ground (Additional funding in #195, #211)7,500,000 7,500,000 7,500,000
84 Middle North Bay Road & Mount Sinai Stormwater Pump Station - Above Ground ( Additional funding in #214)5,400,000 5,400,000
23220 85 North Shore Neighborhood Improvement - Above Ground (Additional funding in #196, #212)5,000,000 5,000,000 10,000,000
86 Flamingo Neighborhood - Above Ground (Additional funding in #206, #219)- 20,000,000
87 Nautilus Neighborhood Improvements - Above Ground (Additional funding in #204, #217)-5,000,000
88 Baywalk - South Bay Club, Bayview Terrace, Bay Garden Manor 386,000 386,000 4,994,000 5,380,000
20028 89 La Gorce Neighborhood Right of Way Improvement - North Bay Road Neighborhood Greenway 3,720,000 2,685,000 -
20447 90 Lummus Park Lighting Improvement 2,100,000 -
60327 91 10th & 11th Street Neighborhood Greenway 1,494,000 1,494,000 1,494,000
29860 92 Flamingo 10G-6 Street Right of Way Improvements 1,441,264 -
20048 93 North Shore Neighborhood Right of Way Improvements - 85th Street Neighborhood Greenway 1,090,000 990,000 990,000 990,000
20078 94 Citywide Street Pavement Restoration 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 4,000,000
20058 95 Central Bayshore - Chase Avenue/43rd Street Shared Use Path 830,000 830,000 830,000
20068 96 North Shore Neighborhood Right of Way Improvements - Tatum Waterway Neighborhood Greenway 830,000 830,000 830,000
20038 97 North Shore Neighborhood Right of Way Improvements - 77th Street Neighborhood Greenway 690,000 690,000 690,000
60177 98 South Beach Pedestrian Priority Zones 300,000 300,000 1,500,000 650,000 2,450,000
20167 99 Citywide Dog Park Lighting 191,000 90,000 -
20168 100 Intermodal - New Garage 5th Street & Alton Road -- 17,500,000
26270 101 Par 3 Golf Course/Community Park Renovations 490,000 13,075,000 490,000
102 Palm and Hibiscus Landscaping 2,267,000 -
20547 103 Parking Garage at Biscayne Beach (Additional funding in #60, #237)300,000 -300,000
104 Central Bayshore Neighborhood Landscaping 1,466,000 -
105 555 17th Street Building Replacement 1,000,000 8,931,000 8,931,000
106 Pocket Park at 20th Street and Sunset Drive 693,000 -
68730 107 Police Station Building - Firing Range Renovation 538,120 573,000 538,120
108 Street Lighting Improvements Citywide 500,000 12,500,000 12,500,000 12,500,000 12,500,000 50,000,000
20160 109 Fire Station No. 1 500,000 10,000,000 11,005,000 21,005,000
110 City Hall Office Reconfiguration 4th Floor (Public Works/City Attorney)305,000 -
111 Sidewalk Repairs 250,000 250,000 250,000
112 Parks and Recreation Security Enhancements 250,000 -
113 Concrete Repair Sidewalk/Curb & Gutter 220,000 220,000 220,000 220,000 220,000 880,000
114 Restorative Tree Wells Citywide 220,000 220,000 220,000 220,000 220,000 880,000
115 Police Patrol and Third Floor Build Out 213,000 -
21660 116 Parks Maintenance Facility 200,000 1,989,000 1,989,000
27880 117 72nd Street Protected Bike Lanes (Additional funding in #74)161,000 161,000 161,000 161,000
118 Code Compliance Cubicle Replacement 160,000 -
67290 119 Normandy Isle Park Turf Replacement 255,000 143,000 255,000
29810 120 Alleyway Restoration 412,500 120,000 120,000 120,000 120,000 120,000 892,500
22150 121 72nd Street Park & Parking Structure- Parks Component (Additional funding in #59, #122)246,000 100,000 8,682,000 8,928,000
22150 122 72nd Street Park & Parking Structure- Civic Center Component (Additional funding in #59, #121)100,000 8,747,000 8,747,000
123 Police Detention Facility Renovation 101,000 -
124 Special Investigations Unit New Office Build-out 100,000 -
125 5th Street Flyover Lighting Enhancement 100,000 -
20237 126 Fairway Park Artificial Turf Soccer Field, Drainage & Playground Replacement 1,181,000 91,000 1,181,000
127 Scott Rakow Youth Center Outdoor Patio Flooring Installation 80,000 -
128 Florida Friendly Landscape and Educational Garden at City Hall 77,000 -
129 1130 Washington Avenue Buildout 57,000 -
130 Resiliency Educational Signage 50,000 -
131 Police Station 2nd Floor Locker Room Remodel Men & Women Restrooms 50,000 -
60257 132 Bay Drive Neighborhood Greenway (Additional funding in #193)1,125,000 1,125,000
FY18 Projected Revenue
Remaining Available Balance
Total:
301 Available Balance
187 Available Balance
187 Half Cent Transit Surtax - County
Total:
FY18 Projected Revenue
Remaining Available Balance
302 Pay As You Go - Capital Fund
301 Capital Projects Financed By Other Funds - 8701 Collins Avenue Development Agreement
All new revenue in Fund 187 is dedicated to Trolley
Operations.
Page 3 of 6
8
CITY OF MIAMI BEACH
PROPOSED FY 2018-2022 CAPITAL IMPROVEMENT PROGRAM
Funding Source Project Name Prior Years
Adopted
FY 2016/17
Amendments
FY 2016/17
Programmed
FY 2017/18
New Requests
FY 2017/18
Proposed
FY 2017/18
Proposed
Programmed
FY 2018/19
Proposed
Programmed
FY 2019/20
Proposed
Programmed
FY 2020/21
Proposed
Programmed
FY 2021/22 Total Future
26150 133 Baywalk Phase 1 3,000,000 3,000,000
134 81st Street Neighborhood Greenway 500,000 500,000
27870 135 Byron Avenue Protected Bike Lanes 350,000 350,000
136 La Gorce Drive / Pine Tree Drive Protected / Buffered Bicycle Lanes 300,000 1,500,000 1,800,000
23270 137 City Center - Above Ground (Additional funding in #201, #215)11,200,000 11,200,000
138 16th Street Improvement/Protected Bike Lanes 827,000 827,000
60011 139 Irrigation System MacArthur Causeway Repair/Upgrade 28,000 28,000
20021 140 Indian Creek Pedestrian Bridges -595,000
20101 141 North Shore Open Beach Maintenance Facility -2,754,000
20150 142 Seawall-Indian Creek Greenway -
20161 143 Repair & Upgrade Irrigation System 2000-6300 Alton Road -
60031 144 Water Tower Restoration Star Island -593,000
20071 145 Palm Island Fountain -100,000
146 Lincoln Road to Lincoln Bay Towers Baywalk -1,778,000
147 Bayview Terrace Baywalk (Additional funding in #88)-1,020,000
148 Bay Garden Manor Baywalk (Additional funding in #88)-1,020,000
149 Normandy Isles Drainage Improvements -9,000,000
1,732,620 1,481,000 546,000 13,686,264 44,890,518 2,276,658 75,885,860 28,004,000 39,075,000 19,088,000 168,089,138 59,521,000
13,781
2,400,000 Pending Final FY18 CSL
137,123
28550 150 Lifeguard Stand Replacements (Additional funding in #46, #164, #174)600,000 720,000 478,800 478,800 1,798,800
23200 151 Flamingo Park (Additional funding in #78)1,438,322 1,090,000 1,090,000 1,384,000 3,912,322
20001 152 Alton Road Fountain at 20th Street 279,000 279,000 279,000
20011 153 World War Memorial 62,000 62,000
20177 154 Ocean Drive Extended Sidewalk Projects - Western Sidewalks 405,000 2,295,000 405,000
27800 155 Street Lighting Improvements (Additional funding in #162, #173)-333,000 333,000 333,000 666,000
156 5th Street Flyover Lighting Enhancement 100,000 148,779 148,779
157 Soundscape Park Air Conditioning System Replacement 75,000 75,000 75,000
158 Flamingo Park Football Stadium Fence Replacement 220,000 -
159 Flamingo Park Outdoor Fitness Equipment 90,000 -
160 South Beach Park Restroom Renovation 35,000 -
2,038,322 1,458,000 -3,106,800 1,889,000 2,404,579 1,384,000 -62,000 -7,346,901 -
442,579
1,962,000 Pending Final FY18 Resort Tax Projections
0
20108 161 Miami Beach Golf Course Practice Tee Renovation 77,000 88,000 -
27800 162 Street Lighting Improvements (Additional funding in #155, #173)334,000 333,000 159,600 493,600
28070 163 Middle Beach Recreational Corridor Phase III 475,000 2,200,000 9,894,000 2,675,000
28550 164 Lifeguard Stand Replacements (Additional funding in #46, #150, #174)300,000 240,000 159,600 -540,000
165 Scott Rakow Youth Center Pool Restroom Renovations, Pool Deck Resurfacing and Pool Fencing Replacement 190,000 -
28850 166 Maurice Gibb Park Redesign (Additional funding in #80, #190)1,973,482 1,973,482 1,973,482
1,109,000 2,440,000 -10,463,600 2,251,482 2,133,082 ----5,682,082 -
171,082
1,962,000 Pending Final FY18 Resort Tax Projections
-
20138 167 71st Street Eastern Street End Improvement Design Study 25,000 -
20141 168 7300 Dickens Avenue Landscape-Irrigation System 37,000 37,000
20198 169 North Beach Streetscape 550,000 550,000 550,000 8,800,000 9,900,000
20257 170 North Shore Park & Youth Tennis Center Proshop / Office Area Expansion 512,000 115,000 115,000 627,000
60237 171 Collins/Harding Alleyway Reconstruction 100,000 850,000 100,000
26500 172 Kayak Launch Docks 538,080 275,000 400,000 813,080
27800 173 Street Lighting Improvements (Additional funding in #155, #162)334,000 333,000 333,000 159,600 333,000 333,000 1,492,600
28550 174 Lifeguard Stand Replacements (Additional funding in #48, #150, #164)300,000 240,000 159,600 -540,000
28600 175 North Shore Park & Youth Center Restroom Addition 410,000 591,000 591,000 1,001,000
28610 176 Rue Vendome Public Plaza 100,000 1,000,000 654,000 654,000 1,754,000
28630 177 Bonita Drive Street End Improvements 35,000 100,000 200,000 135,000
64160 178 Painting & Lighting of Bridges 1,100,000 60,000 165,000 165,000 165,000 910,000 2,400,000
64190 179 Entrance Signs to North Beach 300,000 2,200,000 2,064,658 2,364,658
65600 180 North Shore Bandshell Canopy 100,000 125,000 443,000 443,000 668,000
181 North Beach Yard 553,467 553,467 553,467
182 Normandy Isle Park Playground and Surface Replacement 264,000 -
183 Normandy Isle Park Pool Renovations and New Pool Playground 375,000 375,000 375,000
3,217,080 2,745,000 -2,682,600 5,195,467 2,891,067 3,112,658 1,048,000 9,747,000 -22,760,805 -
929,067
1,962,000 Pending Final FY18 Resort Tax Projections
-
305 Resort Tax - South Beach
306 Resort Tax - Mid Beach
307 Resort Tax - North Beach
FY18 Projected Revenue
Remaining Available Balance
305 Available Balance
306 Available Balance
FY18 Projected Revenue
Remaining Available Balance
Total:
Total:
Sum:
FY18 Projected Revenue
Remaining Available Balance
FY18 Projected Revenue
Remaining Available Balance
307 Available Balance
302 Available Balance
Total:
Page 4 of 6
9
CITY OF MIAMI BEACH
PROPOSED FY 2018-2022 CAPITAL IMPROVEMENT PROGRAM
Funding Source Project Name Prior Years
Adopted
FY 2016/17
Amendments
FY 2016/17
Programmed
FY 2017/18
New Requests
FY 2017/18
Proposed
FY 2017/18
Proposed
Programmed
FY 2018/19
Proposed
Programmed
FY 2019/20
Proposed
Programmed
FY 2020/21
Proposed
Programmed
FY 2021/22 Total Future
184 F-550 Mobile Air Truck Unit- Fire Department 271,000 271,000 271,000
185 Fire Station #2 Garage Doors Replacement 30,000 30,000 30,000
186 Fire Station #1 Interior & Exterior Painting 36,000 36,000 36,000
----337,000 337,000 ----337,000 -
347,858
10,858
187 Normandy Shores Golf Club A/C and Kitchen Refrigeration Replacement 50,000 50,000 50,000
188 Normandy Shores Golf Club Restroom Roof Replacement 35,000 35,000 35,000
189 Normandy Shores Golf Club - Painting of Building 65,000 -
----150,000 85,000 ----85,000 -
128,210
43,210
190 Maurice Gibb Park Redesign (Additional funding in #80, #166)521,342 521,342 521,342
191 South Pointe Park Splash Pad Rubber and Drainage Improvements 50,000 50,000 50,000
192 Mid Beach Parks Restroom Restoration 80,000 80,000 80,000
----651,342 651,342 ----651,342 -
651,342
-
60257 193 Bay Drive Neighborhood Greenway (Additional funding in #132)100,000 3,260,000 -100,000
-100,000 -3,260,000 ------100,000 -
-
-
-
194 Water Meter Replacement Program 250,000 250,000 250,000 250,000 250,000 1,000,000
23240 195 La Gorce Neighborhood Improvement (Additional funding in #83, #211)297,347 22,500,000 45,000,000 45,297,347
23220 196 North Shore Neighborhood Improvement (Additional funding in #85, #212)15,000,000 15,000,000
197 Lincoln Road Washington Avenue to Lenox - Utility Main Replacement 2,000,000 2,000,000
198 Alton Road Water Main Improvements - Michigan Avenue to Allison Road 9,000,000 9,000,000
199 Citywide Water and Sewer Main Assessment and Replacement 800,000 800,000 1,600,000
200 County DERM & EPA Decree - Preventative Maintenance 400,000 400,000 800,000 500,000
23270 201 City Center - Commercial District Bid Pack 9B (Additional funding in #137, #215)11,200,000 11,200,000
202 Water and Sewer Lines on Venetian Bridge 4,500,000 4,500,000 4,500,000
203 Waste Water Pump Stations Rehabilitations 4,000,000 4,000,000 4,000,000
204 Nautilus Neighborhood Improvements (Additional funding in #87, #217)-7,500,000
205 Scada and PLC Replacement for Water, Wastewater, and Stormwater Pumping Stations 1,512,500 1,512,500 1,512,500
206 Flamingo Neighborhood (Additional funding in #86, #219)20,000,000 20,000,000 20,000,000
297,347 --- 32,762,500 - 58,462,500 10,450,000 26,450,000 20,250,000 115,909,847 28,000,000
-
-
-
207 Pump Station 27 Replacement of Fuel Storage Tank 59,428 59,428 59,428
208 Pump Station 28 Replacement of Fuel Storage Tank 108,623 108,623 108,623
209 Pump Station 29 Replacement of Fuel Storage Tank 89,160 89,160 89,160
----257,211 257,211 ----257,211 -
685,864
428,653
20587 210 1st Street Alton Road to Washington Avenue South Pointe Neighborhood 358,201 6,032,000 6,032,000 12,422,201
23240 211 La Gorce Neighborhood Improvement (Additional funding in #83, #195)20,000,000 20,000,000 20,000,000
23220 212 North Shore Neighborhood Improvement (Additional funding in #85, #196)25,000,000 15,000,000 40,000,000
213 Lincoln Road Washington Avenue to Lenox - Utility Main Replacement 5,035,000 5,035,000
214 Middle North Bay Road & Mount Sinai Stormwater Pump Station (Additional funding in #84)7,500,000 5,100,000 5,100,000
23270 215 City Center (Additional funding in #137, #201)33,600,000 33,600,000
216 Normandy Isles Drainage Improvements 14,260,000 14,260,000 14,260,000
217 Nautilus Neighborhood Improvements (Additional funding in #87, #204)17,454,000 17,454,000 10,000,000
218 Scada and PLC Replacement for Water, Wastewater, and Stormwater Pumping Stations 1,237,500 -
219 Flamingo Neighborhood (Additional funding in #86, #206)45,000,000 45,000,000 45,000,000
--358,201 -28,737,500 -36,167,000 6,032,000 58,600,000 91,714,000 192,871,201 69,260,000
-
-
378 Fire Safety 99 GO Bond
Total:
383 Available Balance
FY18 Projected Revenue
Remaining Available Balance
381 2001 Gulf Breeze-Normandy Golf
Total:
Remaining Available Balance
FY18 Projected Revenue
381 Available Balance
383 2003 G. O. Bonds-Parks & Rec
384 2003 G. O. Bonds-Neighborhoods
Total:
Total:
383 Available Balance
Remaining Available Balance
FY18 Projected Revenue
Remaining Available Balance
419 Available Balance
Remaining Available Balance
FY18 Projected Revenue
384 Available Balance
FY18 Projected Revenue
Remaining Available Balance
FY18 Projected Revenue
429 Available Balance
Total:
Remaining Available Balance
FY18 Projected Revenue
422 Available Balance
Proposed Future Stormwater Bond
Total:
Proposed Future Water and Sewer Bond
422 Water & Sewer Impact Fees
Total:
Page 5 of 6
10
CITY OF MIAMI BEACH
PROPOSED FY 2018-2022 CAPITAL IMPROVEMENT PROGRAM
Funding Source Project Name Prior Years
Adopted
FY 2016/17
Amendments
FY 2016/17
Programmed
FY 2017/18
New Requests
FY 2017/18
Proposed
FY 2017/18
Proposed
Programmed
FY 2018/19
Proposed
Programmed
FY 2019/20
Proposed
Programmed
FY 2020/21
Proposed
Programmed
FY 2021/22 Total Future
220 16th Street Parking Garage Fire Sprinkler Renewal 300,000 300,000 300,000
221 16th Street Parking Garage Renewal of Pedestrian Coating in Stairways 30,000 30,000 30,000
222 16th Street Parking Garage Roof and Parking Deck Coating 1,808,000 1,808,000 1,808,000
----2,138,000 2,138,000 ----2,138,000 -
3,376,956
1,238,956
20087 223 P23 - New Garage - 1623 West Avenue - Interceptor Garage (Additional funding in #54, #62)1,165,000 4,165,000 1,678,995 1,678,995 2,843,995
27830 224 Parking Garage at Parking Lot P16- 13th Street & Collins Avenue 1,148,000 6,169,000 6,169,000 7,317,000
28080 225 Intelligent Transportation System (Additional funding in #65)2,500,000 2,500,000 3,500,000
226 Lighting Enhancement in City Parking Lots 250,000 250,000 250,000
227 12th Street Parking Garage Upgrade lighting (LED)64,000 64,000 64,000
228 13th Street Parking Garage Upgrade lighting (LED)86,000 86,000 86,000
229 42nd Street Parking Garage Upgrade lighting (LED)200,000 200,000 200,000
230 12th Street Parking Garage Roof and Parking Deck Coating 598,806 598,806 598,806
231 13th Street Parking Garage Roof and Parking Deck Coating 800,000 800,000
232 17th Street Parking Garage Roof and Parking Deck Coating 2,000,000 2,000,000
233 1755 Meridian Parking Garage Roof and Parking Deck Coating 1,900,000 1,900,000 1,900,000
234 Convention Center Garage Parking Gated Revenue Control Equipment (Additional funding in #239)464,740 464,740 464,740
20107 235 P55 - New Garage 2660 Collins Avenue (Additional funding in #61)2,500,000 7,300,000 7,300,000
20019 236 Intermodal - New Garage Julia Tuttle - 17,500,000
20547 237 Parking Garage at Biscayne Beach (Additional funding in #60, #103)1,000,000 1,000,000 1,000,000
20031 238 North Beach Parking Garage - 25,000,000
2,500,000 2,313,000 -6,665,000 12,411,541 12,411,541 9,300,000 800,000 --27,324,541 46,000,000
12,800,000
-
388,459
239 Convention Center Garage Parking Gated Revenue Control Equipment (Additional funding in #234)185,260 185,260 185,260
----185,260 185,260 ----185,260 -
185,260
-
-
240 Property Management Facility New 500kw Generator and Transfer Switch 250,000 250,000 250,000
241 Property Management Facility Carpentry Shop Dust Control System 45,000 45,000 45,000
----295,000 295,000 ----295,000 -
1,739,561
-
1,444,561
242 Locally Funded Agreement for Fiber Communications Installation along Alton Road (Michigan Avenue to 63rd
Street)
102,000 102,000 59,000 131,000 292,000
243 Public Safety Radio & Viper System 16,000,000 2,100,000 2,100,000
----16,102,000 2,202,000 59,000 131,000 --2,392,000 -
3,873,992
-
1,671,992
46,934,563 218,439,960 59,001,572 213,634,152 48,331,000 134,414,000 131,052,000 624,131,119 206,162,000
Potential GO Bond Funding
Above Ground Projects
Grand Total:
Remaining Available Balance
FY18 Projected Revenue
Remaining Available Balance
Remaining Available Balance
FY18 Projected Revenue
480 Available Balance
Total:
Total:
Remaining Available Balance
FY18 Projected Revenue
463 Available Balance
Remaining Available Balance
480 Parking Operations
463 RDA Garages
488 2015 Parking Bonds CC Project
550 Communications Fund
520 Property Management Fund
Total:
Total:
488 Available Balance
550 Available Balance
FY18 Projected Revenue
Total:
136,948,000
73,771,000
Key
FY18 Projected Revenue
520 Available Balance
Page 6 of 6
11
12
MIAMI BEACH
city of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 331 39, wwv/.miamibeachfi.gov
COMMITTEE MEMORANDUM
TO: Members of the Finance & City Wide Projects Committee
FROM: Jimmy L. Morales, City Manager
DATE: July 21, 2017
SUBJECT: FINALIZING THE FY 2017/18 CURRENT SERVICE LEVEL BUDGET
The FY 2017/18 Current Service Level (CSL) budget was reviewed by the Finance and Citywide
Projects Committee on June 16, 2017, by the City Commission at the June 22, 2017 Commission
Retreat, and again by the Finance and Citywide Projects Committee on July 10, 2017.
The CSL budget represents the cost of providing the same level of services as in the prior year
(which includes any operating budget amendments during FY2016/17, and serves as the baseline of
funding for the budget process).
CSL BUDGET STATUS
The following table illustrates the difference between the 2016 and the 2017 certified values, and the
impact on FY 2017/18 property tax revenue projections. Property taxes comprise approximately half
(53%) of the total General Fund revenues.
July 2016
Certified
Property Assessment
Existing Values 33,532,510,312
New Construction 1,165,246,796
July 2017
Certified
36,538,197,107
858,865,383
Total 34,697,757,108 37,397,062,490
City Center CRA 5,612,744,843
Citywide Total 29,085,012,265
5,702,556,459
31,694,506,031
operty Tax Revenue Projection 160,612,000 175,363,000
Property Tax Revenue Projection Variance 14,751,000
Other sources of General Fund revenues include Licenses and Permits, Intergovernmental
Revenues, Charges for Services, Fines and Forfeits, Rents and Leases, and contributions from the
Resort Tax and Parking Funds. Non-property tax revenues are projected to increase by $772,000
(0.5%) in FY 2017/18.
Expenditures
Overall, the CSL expenditures for FY 2017/18 have increased by $12.3 million, primarily due to the
following personnel expenditures, the majority of which are contractually required:
13
Finalizing the FY 2017/18 Current Service Level Budget
Page 2
2 percent merit pay for all groups except Police and Fire : $2.2 million
5 percent Step for Police and Fire: $2.9 million
3 percent Cost of Living Adjustment effective, July 2018: $1 million
Increase in Citywide Health and Life Insurance: $2.56 million
Increase in Annual Required Contribution for Fire & Police Pension: $1.9 million
Increase in Annual Required Contribution for Non-Police & Fire Pension: $2.2 million
In addition, the CSL budget includes:
Increase in Debt Service payments: $700,000
$3 million decrease in funds set aside for pension mortality impact
Increase in operating expenditures: $875,000, which includes $343,000 in expenditures
related to the insourcing of the North Shore Tennis Center; $133,000 related to the
increased cost of shelter beds for the homeless; and $110,000 for the maintenance and
repair of City sidewalks and light poles.
The following Education Initiatives totaling $324,000 were added to the CSL budget as
directed at the July 10, 2017 FCWPC meeting:
-Anti-Defamation League- $4,000
-Common Threads- $19,000
-FIU Dual Enrollment- $62,000
-Miami Dade County Dual Enrollment- $28,000
-Nurse Enhancement Initiative- $16,000
-Nurse Initiative- Behavioral Health- $54,000
-VPK Year 3- $141,000
These expenditures do not reflect additional savings from potential efficiencies or reductions. The
proposed CSL is based on the certified July 1st property values and reflects a revenue increase of
$15.5 million and an expenditure increase of $12.3 million for a net surplus of approximately $3.2
million. A summary of FY 2017/18 Projected Revenues and Expenditures can be found in
Attachment C.
Proposed Millage Rate
At the June 16, 2017 Finance and Citywide Projects Committee meeting, the Committee directed
staff to transfer the 0.0132 mill reduction from the debt service millage rate to the operating millage
rate, and to maintain the Capital Renewal and Replacement millage rate at the current rate, resulting
in a zero mill increase in the overall combined millage rate. The Proposed Operating, Debt Service
FY 2016/17
Adopted
FY 2017/18
Proposed $ Variance % Variance
General Fund Revenues 317,252,000 332,775,000 15,523,000 4.9%
General Fund Expenditures 317,252,000 329,511,000 12,259,000 3.9%
Surplus / (Deficit)‐ 3,264,000 3,264,000
14
Finalizing the FY 2017/18 Current Service Level Budget
Page 3
Median Average Median Average
Preliminary Taxable Value*167,342$ 427,845$ 182,343$ 463,617$
City of Miami Beach
Operating 955$ 2,443$ 1,043$ 2,653$
Voted Debt 30$ 77$ 30$ 77$
Total Miami Beach 985$ 2,519$ 1,073$ 2,730$
$ Change in Taxes
Operating 88$ 210$
Voted Debt 0$ 0$
Total Miami Beach 88$ 210$
Homesteaded Properties
FY 2016/17 FY 2017/18
* Source: Miami-Dade County Property Appraiser's Office: 2016 and 2017 Preliminary Average Median
Homestead Residential Values Report
and Capital Renewal and Replacement millage rates will be set at the July 26, 2017 Commission
Meeting. The City’s proposed operating millage rate as well as that of other taxing authorities will be
included in the Truth-in-Millage (TRIM) statement sent to each property owner in the City.
Based on the January 1, 2017 homesteaded property values as of July 1, 2017, the median value of
homesteaded property in Miami Beach was $182,343 and the average was $463,617. The impact of
the millage rate adjustment to homesteaded properties would be $88 for the median and $210 for
the average value homesteaded property as reflected in the table below.
CSL UPDATES
Lincoln Road Business Improvement District (LRBID) Block by Block Contribution
During FY 2016/17, a Memorandum of Understanding was executed between the City of Miami
Beach and the Lincoln Road Business Improvement District. The City agreed to allocate a one-time
contribution of $103,333.68 of pro-rated funding ($160,000 full year cost) included in the City Center
RDA budget for security services on Lincoln Road, as the LRBID agreed to provide these services
instead. These funds are currently budgeted in the FY 2017/18 CSL budget for the City Center
RDA. City Administration is seeking direction from the Committee as to the intent regarding
extending this contribution to the LRBID in FY 2017/18.
June 1st July 1st
Preliminary Certified
Operating 5.6984 5.6989
Debt Service 0.1669 0.1664
5.8653 5.8653
Capital Renewal & Replacement 0.0235 0.0235
Combined Millage Rate 5.8888 5.8888
Combined Millage Rate Analysis
15
Finalizing the FY 2017/18 Current Service Level Budget
Page 4
The City of Miami Beach School Bus Pilot
During FY 2016/17, the City Commission approved the School Transportation Pilot Program for the
fall semester only (August 21, 2017 until January 18, 2018). Funding for this effort was identified in
the current fiscal year.
The Administration will evaluate the service, and if the pilot program is deemed successful, and
there is a desire to continue and/or expand the service after the fall semester, additional funding
would need to be identified during FY 2017/18.
BALANCING THE FY 2017/18 BUDGET
As part of the development of the proposed FY 2017/18 budget, departments were requested to
submit lists of potential reductions/efficiencies totaling 4 percent of their FY 2017/18 CSL budgets.
A list of the potential efficiencies and reductions can be found in Attachment A. The list was
reviewed by the City Manager and the Budget Office. As a result of this review, and based on the
Committee’s direction at the July 10, 2017 FCWPC meeting, recommended reductions/efficiencies
totaling $2,003,000 for the General Fund were identified.
In addition, departments submitted potential enhancements to their budgets which can be found in
Attachment B. Based on the Committee’s direction at the July 10, 2017 FCWPC meeting,
enhancements totaling $504,000 for the General Fund were identified.
Some recommended enhancements to be funded by the General Fund include:
City Prosecutor- $72,000
Living Wage Increase- $56,000
Second Annual Youth Music Festival- $12,000
Portable Luxury Restrooms for ITF Tennis Tournament- $24,000
Normandy Shores Neighborhood/Golf Course Security Guard Rover- $27,000
Professional Service for Comprehensive Plan (Planning Department)- $100,000
Film Incentive- $100,000
Lummus Park Cultural Activation and Programming- $100,000
Recommendations
Administrative Fee
The City Administration recommends that in order to fully compensate the General Fund for
the services provided to other funds, the entire projected administrative fee of $1.45 million
be transferred from the Enterprise and Special revenue Funds.
Parking Subsidy
In an effort to move toward reducing the General Fund’s reliance on the Parking subsidy at a
less aggressive pace, the City Administration is recommending reducing the transfer by $2
million, for a FY 2017/18 transfer to the General Fund of $4.4 million.
Resort Tax
The FY 2017/18 2% Resort Tax revenues are projected to be $56.0 million, while
expenditures are projected to be $59.6 million, resulting in a gap of $3.6 million. The City
16
Finalizing the FY 2017/18 Current Service Level Budget
Page 5
Administration recommends transferring the $2.11 million in increased administrative fees to
the General Fund, reducing the Resort Tax contribution to the General Fund by $2,865,000,
reducing the Resort Tax transfer to the Sanitation Fund by $2,800,000, and setting aside
$250,000 in the FY 2017/18 budget as a reserve for high impact events.
Based on the Committee’s direction at the July 10, 2017 FCWPC meeting, recommended
reductions/efficiencies totaling $751,000 and $453,000 in enhancements for the Resort Tax
Fund were identified, the details of which are outlined in Attachment A and Attachment B.
Some recommended enhancements to be funded by the Resort Tax Fund include:
o Air and Sea Show- $350,000
o International Tennis Federation- $100,000
o Living Wage Increase- $3,000
If Resort Tax revenue trend continues at the same rate over the next fiscal year, more
efficiencies will be recommended during the FY 2018/19 budget development process.
PAYGO Vehicle and Equipment Purchase
The City Administration recommends the deferral of replacement of vehicle and equipment
with cash in FY 2017/18, with a goal of revisiting this best practice in FY 2018/19.
General Fund Reserve
At the July 7, 2017 Commission Meeting, the City Commission accepted the Finance and
Citywide Projects Committee’s recommendation to pursue a goal of focusing on one-time
enhancements and setting aside a reserve in the FY 2017/18 General Fund operating budget
in order to prepare for potentially lower property tax revenues in the event that voters
approve the creation of an additional $25,000 exemption of homesteaded properties. The
Administration recommends setting aside $1,355,000 for this purpose.
The following tables outline the Administration’s recommendation for balancing the FY 2017/18
General Fund and Resort Tax budgets, which incorporate the direction given by the Committee at
the July 10, 2017 FCWPC meeting.
17
Finalizing the FY 2017/18 Current Service Level Budget
Page 6
Property Tax Revenues 175,532,000
Non‐Property Tax Revenues 157,243,000
Total Revenues 332,775,000
General Fund Operating CSL 329,511,000
CSL Surplus/ Gap 3,264,000
Recommended Reduction in Parking
Revenues (2,000,000)
Recommended Efficiencies
(see Attachment A)2,003,000
Recommended Enhancements
(see Attachment B)(504,000)
Recommended Transfer of All
Admin Fees to the General Fund 1,457,000
Recommended Reduction in
Contribution from Resort Tax (2,865,000)
Recommended Reserve for Future
Reduction in Property Tax Revenues
due to Homestead Exemption (1,355,000)
Unallocated Surplus ‐
Recommended General Fund FY2017/18 CSL
18
Finalizing the FY 2017/18 Current Service Level Budget
Page 7
JLM/CGR
Total CSL Revenues 56,043,000
Total CSL Expenditures 59,645,000
CSL Gap (3,602,000)
Administrative Fee Increase due to
the General Fund (2,111,000)
CSL Gap with Administrative Fee (5,713,000)
Reduce Contribution to General
Fund in FY18 2,865,000
Reduce Transfer to Sanitation Fund
in FY18 2,800,000
Recommended Reserve for Special
Events (250,000)
Recommended Efficiencies
(see Attachment A)751,000
Recommended Enhancements
(see Attachment B)(453,000)
Unallocated Surplus ‐
Recommended Resort Tax FY2017/18 CSL
19
ATTACHMENT A
PROPOSED FY 2017/18 SERVICE REDUCTIONS AND EFFICIENCIES
Program/Function Fund
Potential
Efficiency/
Reduction
Recommended
Efficiency/
Reduction
FT PT Potential Impact
BUILDING
Eliminate Engineering Inspector position (current filled)General $88,000 $88,000 1 The Building Department no longer uses Engineer Inspectors as
this is now a function of the Public Works Department.
$88,000 $88,000 1
CAPITAL IMPROVEMENT PROJECTS (CIP)
Eliminate One (1) Vacant Financial Analyst I Position General $66,000 $66,000 1
The financial unit in the department has increased their efficiency
and productivity in all financial aspects of capital projects
managed by CIP. Therefore, the impact of eliminating this position
would be minimal.
Eliminate 1 Vacant Field Inspector Supervisor Position General $107,000 $107,000 1
The Field Inspection Unit has become more efficient and the work
load has been distributed among four field inspectors. Therefore,
the impact of eliminating this position would be minimal.
$173,000 $173,000 2
CENTRAL SERVICES
Convert one (1) Central Service Technician position to Part-Time
(currently filled)Internal $32,000
Reducing this position to part-time will impact every City
Department, as everyone sends and receives mail. The timeliness
of getting mail to clients and residents is crucial. The change
would increase the intervals between mail distribution and pickup.
Large outgoing mailings, especially those requiring collating letters
or brochures and stuffing and stamping the envelops may be
delayed. The turnaround time required for print jobs will also be
impacted, as the staff that is currently assigned to the print shop
would be utilized to undertake the essential functions of the
mailroom.
Eliminate Travel Internal $2,000 $2,000 Central Services Coordinator cannot attend annual Postal Forum
conference
Reduce Temporary Labor Internal $1,000
Reduce Office Supplies Internal $1,000
$36,000 $2,000
CITY ATTORNEY
Eliminate vacant First Asst City Attorney Position General $122,000 1
The vacancy would cause stress on the employee morale who
would have to pickup the additional workload. Time required to
resolve matters would increase.
Reduction to Legal Fees (Public)General $33,000 $33,000
The Legal Fees line item is used to pay the City's labor counsel.
The reduction would impact possible future lawsuits, and labor
issues and matters would take longer to resolve.
Reduction to Professional Services General $30,000
Professional service fees used to pay outside (non-labor) counsel.
The impact is that more work would be required in-house, and the
knowledge and specialized training of outside counsel would be
reduced.
$185,000 $33,000
CITY CLERK
Eliminate the voluntary advertisement of opened and continued items
and Subscription to the Miami Herald General $6,000
By undertaking all or some of these potential reductions,
transparency and communication will be impacted. It will be more
difficult for both internal and external customer to follow the
legislative history of items and for our residents to see the
evolution of our Code supported by the actual ordinances that
adopted, amended, or repealed a section of the Code. The
impact, however, may be lessened by MBResidentConnect.com.
Reduce the number of Special Master hearings from four (4) times a
month to three (3) times a month General $15,000
By undertaking these potential reductions, compliance with the
Code within a reasonable time frame may be impacted, as
hearings will be set further into the future.
Reduce overtime for City Clerk Special Master staff General $3,000
Reduce the office supplies budget by 44%General $4,000
Reduce the number of notaries by eliminating renewals General $1,000
$29,000 $0
CITY MANAGER
Eliminate vacant Part-Time Office Assistant position in conjunction with
the Best Buddies program General $14,000 1 Reduction in possible assistance for other operational
departments who are currently under staffed
Eliminate Overtime General $4,000
Eliminating overtime for the Rapid Response team would impact
the City’s clean-up and recovery efforts from disaster and major
events
Eliminate vacant Office Associate IV position General $61,000 $61,000 1
Eliminating the Office Associate IV Position would hinder the
department with the planning and staffing of major events,
publishing of the Neighborhood and Community Affairs Committee
agenda, and affect coverage for the front desk and other
administrative staff during absences.
Reduce Operating Account for Travel General $8,000 $8,000
Reducing the operating account for travel would limit the ability for
staff to attend meetings with State officials and other
municipalities on issues affecting the City.
Reduce Operating Account for Professional Services General $10,000 $10,000
Reducing the operating account for professional services would
limit the ability for the City Manger to procure specialty services
such as recruiters, consultants, auditors etc. on an ad-needed
basis that may be required for special projects.
Reduce Operating Account for Promotion General $8,000
Reducing the operating account for promotion would limit the
City's ability to promote its brand though charitable sponsorship
opportunities and would limit the support the City offers to various
non-profit organizations throughout Miami-Dade County.
Reduce Operating Account for Other Operating Expenditures General $10,000
The impact to the other operating expenditures account would
reduce the supply budget for the Rapid Response Team, limiting
the number of repair projects performed Citywide, and thus
reducing the effective resolution of residents' complaints. It would
also eliminate the department's ability to replace old and broken
furniture within the office.
Total
Total
Total
Total
Total
Although the public impact may be minimal impact for the
proposed miscellaneous cuts, the efficiency of the Office of the
City Clerk will suffer
20
ATTACHMENT A
PROPOSED FY 2017/18 SERVICE REDUCTIONS AND EFFICIENCIES
Program/Function Fund
Potential
Efficiency/
Reduction
Recommended
Efficiency/
Reduction
FT PT Potential Impact
Reduce Operating Account for Contract Maintenance General $1,000
The impact to the operating account for contract maintenance
would limit the department's ability to provide water for public
meetings.
Eliminate Operating Account for Subscriptions General $1,000
This impact would eliminate the department's subscriptions to the
Miami Herald and Watch Dog Report, limiting the ability to be
aware of news affecting the City and surrounding area.
Reduce Operating Account for Office Supplies General $1,000
Reducing the operating account for Office Supplies would limit the
department's ability to procure special materials needed to
conduct workshops and special events.
Reduce Operating Account for Training General $4,000 $4,000
This reduction in the operating account would limit the number of
trainings staff could attend, limiting the ability to gain insight from
industry experts, and research innovative solutions to problems
affecting similar cities which could be applied to Miami Beach.
$122,000 $83,000 1
CODE COMPLIANCE
Freeze Two (2) vacant Code Compliance Officer I Positions for six
months General $63,000 2
Reduction in the timeliness of Code Compliance response to calls
for service in the high demand Entertainment District which
primarily consists of noise complaints, sanitation issues, illegal
vendors, sidewalk cafes, proactive inspections including BTR
inspections, alcohol sales, and property maintenance issues
Reduction of Overtime and Additional Expenses General $38,000 $38,000 Overtime reductions may impact Zika inspections, special
deployments, and targeted area sweeps.
$101,000 $38,000
COMMUNICATIONS
Professional Services General $15,000
Postage and Shipping General $5,000
Supplies - Information Technology General $7,000
Other Operating Expenditures General $6,000
Subscriptions General $2,000
Travel General $2,000 $2,000
Local Mileage Reimbursement General $1,000
Training & Awards General $8,000 $8,000
Machinery & Equipment General $20,000
$66,000 $10,000
EMERGENCY MANAGEMENT
Security Guard Services in Entertainment District Resort $501,000 $501,000 This includes $130,000 for Special Events security and $371,000
for Parks Security
Printing Services General $1,000
This proposed efficiency/reduction will reduce the number/quantity
of emergency operations print material available to the citizens of
the City of Miami Beach such as hurricane brochures, re-entry
tags, etc.
Emergency Management Technician (Filled)General $58,000 $58,000 1
This proposed efficiency reduction will impact the Department of
Emergency Management's ability to effectively and efficiently
provide volunteer coordination, including the emergency
evacuation re-entry program, goodwill ambassadors, Community
Emergency Response Teams (CERT), etc.
Communications Operator #1 (Vacant)General $56,000 1
This proposed efficiency/reduction will impact the Public Safety
Communications Unit (PSCU) by increasing forced overtime due
to less staff available to perform the Communications Operator
function, which will also reduce the availability of staff time off for
existing employees for vacations.
Communications Operator #2 (Vacant)General $56,000 1
This proposed efficiency/reduction will impact the Public Safety
Communications Unit (PSCU) by increasing forced overtime due
to less staff available to perform the Communications Operator
function, which will also reduce the availability of staff time off for
existing employees for vacations.
Training & Awards General $48,000 $48,000 This proposed efficiency/reduction will reduce the number of
trainings available to staff.
Security Guard Services - City Hall 4th Floor General $64,000
This proposed efficiency/reduction will eliminate the City Hall 4th
Floor Security post. This will impact the level of security in City
Hall and reduce the ability to effectively adapt and address the
ever changing security risk associated with the building.$784,000 $607,000 1
ENVIRONMENTAL
Reduction of Citywide Dune Restoration General $11,000
The reduction in available funding toward these efforts will result
in the restoration of fewer dune blocks this coming year. The
blocks that are not restored this coming fiscal year will need to be
restored in a future fiscal year to prevent the spread of non-native
vegetation and stabilization of sand in barren areas to reduce
beach erosion, protect upland properties from storm surge, and
improve the health of the beach-dune habitat.
Reduction of Citywide Reforestation Tree Planting and Pruning Services General $15,800
The Urban Forestry Division will resume reforestation services at
$84,200 for FY18. Upon a successful second full year of the Tree
Preservation Trust Fund revenues, the funds should have
sufficient fund balance to cover any additional unexpected
expenditures beyond the designated $84,200 for FY18. In the
interim, the reduction will result in a reduced number of trees that
can be planted in the city by the program and citywide canopy
loss..
Eliminate Emergency Environmental Fuel Spill Remediation General $2,000
By eliminating this funding source, the cost of clean-up will fall on
the responding department, such as Public Works for sewer spills
and the Fire Department for oil spills.
Reduce General Environmental Testing and Sampling General $2,000
The reduction will result in a potential reduction in the frequency of
sampling. However, the city can work with the regulatory agencies
to identify properties or facilities with stable plumes to account for
the reduced sampling frequency.
Total
The items proposed will reduce the amount of contracted and/or
temp employees which can be utilized, decrease the budgets for
equipment repairs/upgrades, as well as eliminate all travel and
training. There will be a need for prioritizing items which need
repair and replacement, and departments which need to have a
photographer or additional graphic work will need to be billed.
Total
Total
Total
21
ATTACHMENT A
PROPOSED FY 2017/18 SERVICE REDUCTIONS AND EFFICIENCIES
Program/Function Fund
Potential
Efficiency/
Reduction
Recommended
Efficiency/
Reduction
FT PT Potential Impact
Reduction of General Event Planning Supplies General $4,000
The Department regularly hosts events to educate city staff, as
well as residents and visitors about the importance of protecting
our environmental resources and making sustainable choices.
These supplies include education and outreach materials and
other educational tools that make these events successful.
Reducing the funding available for supplies will result in a reduced
frequency of events. Alternately, the Department can hold events
reusing supplies or without supplies, and look for alternate
sources of funding to purchase supplies.
Reduce general research for the department such as water quality
testing General $2,000
The city is required to investigate environmental incidents for
regulatory compliance, as well as to make data-driven
management decisions. Furthermore, the city has several facilities
and properties with known contamination that are required to be
sampled regularly to confirm the plume is not spreading off-site, to
confirm whether the contamination is naturally attenuating, or to
develop a remediation plan to bring the property into regulatory
compliance. The reduction will result in a potential reduction in the
frequency of sampling, general environmental research, and
permitting assistance that the Department will be able to conduct
in FY 18.
Reduction of In-House Training Supplies General $2,000 $2,000
Reducing the funding available for supplies will result in a
reduced frequency of in-house trainings. Alternately, the
Department can hold trainings reusing supplies or without
supplies, and look for alternate sources of funding to purchase
supplies.
Training & Awards General $12,000 $12,000 This proposed efficiency/reduction will reduce the number of
trainings available to staff.
Reduction of the Purchase of Two Laptops General $2,000 $2,000
The Department requested this funding to purchase laptops for
department staff that due to the nature of their job responsibilities
and department spread across several offices would benefit from
access to a mobile work station. This efficiency will result in the
ability to purchase a laptop for only one departmental staff
member, rather than two.$52,800 $16,000
FINANCE
Reduce furniture and fixtures line item for cubicle redesign project.General $45,000 $45,000
Eliminate Financial Analyst I position (Payroll Analyst), currently filled. General $63,000 $63,000 1
Position was created to assist in the conversion and
implementation of the Munis payroll module. Following the
successful implementation of the payroll module in May 2017, this
position is no longer critical for operations.
$108,000 $108,000 1
FIRE
Operating Expenditures General $150,000 $150,000
This proposed reduction would impact the overall level of service
provided by the Department by reducing funding allocated for
travel and professional development training, rental of necessary
equipment utilized during daily operations, printing of materials, as
well as other resources necessary for operation of the department
Lifeguard I (10 Filled Positions)General $550,000 10
This proposed efficiency/reduction would drastically impact the
level of service provided to the large number of residents and
visitors that frequently visit the City's beaches.
Firefighter I (9 Filled Positions)General $739,000 9
This proposed efficiency/reduction would drastically impact the
level of emergency medical services provided to not only the
residents of Miami Beach, but also the large number of visitors
that frequently visit.
Data Entry Clerk (Filled)General $55,000 1
This proposed efficiency/reduction would drastically impact the
daily operations of the Fire Department since it provides
administrative support to all divisions of the Department.
$1,494,000 $150,000
FLEET MANAGEMENT
Reclassify vacant Office Associate V position to Office Associate IV Internal $26,000 $26,000
Reduce Tires & Tubes Internal $13,000 Reducing tires & tubes purchases will affect vehicle availability
and productivity.
$39,000 $26,000
HOUSING & COMMUNITY SERVICES
Reduce Part-Time Case Worker II P/T by 10 Hours p/wk, currently
vacant General $11,000 $11,000 By reducing to 20 hours per week and shifting the position's start
time, we will minimally impact operations.
Reduce the rent assistance for individuals transitioning from shelter General $3,000
The reduction in rent assistance of $2,848 can be shifted to the
Emergency Food and Shelter Program by prioritizing client
processing upon grant award.
Eliminate Office Associate V in Housing Division (currently filled) and
Shift 25% of CDBG Coordinator to CDBG Administration funds
(currently filled)
General $78,000 $78,000 1
Only 60% of this position is GF, 40% funded by CDBG. By
eliminating the OAV position, the CDBG funds would be freed up
to cover a greater portion (85%) of the CDBG Coordinator
position, providing further relief to the General Fund.
$92,000 $89,000 1
HUMAN RESOURCES & LABOR RELATIONS
Defer Hiring of Assistant Human Resources Director (Vacant)General $120,000 $120,000
This proposed efficiency would defer the planned hiring of the
Assistant Human Resources Director that has been vacant since
April 2016.
Operating Expenditures General $33,000 $33,000
This proposed efficiency/reduction would impact the overall level
of service provided by the Department by reducing funding
allocated for travel and professional development training, rental
of necessary equipment utilized during daily operations, printing of
materials, as well as other resources necessary for operation of
the department$153,000 $153,000
OFFICE OF BUDGET & PERFORMANCE IMPROVEMENT
Reduce Internal Audit Professional Services budget for outside audits General $71,000 $71,000 Will result in less outside audits performed.
$71,000 $71,000
ORGANIZATIONAL DEVELOPMENT & PERFORMANCE INITIATIVES
Reduction in budget for New Hire Orientation onboarding welcome
packet materials General $2,340 Limitation on new employees' welcome material at Orientation
Total
Total
Total
Total
Total
Total
Total
22
ATTACHMENT A
PROPOSED FY 2017/18 SERVICE REDUCTIONS AND EFFICIENCIES
Program/Function Fund
Potential
Efficiency/
Reduction
Recommended
Efficiency/
Reduction
FT PT Potential Impact
Reduction in budget for mileage reimbursement for cleanliness
assessors General $2,100
Assessors will use Enterprise Rental Car, funded by Parking, for
all garage and garage attendant assessments beginning July 6,
2017. Personal vehicles will be used only if Organization
Development vehicle is with Fleet and a loaner is not available.
Reduction in budget for: E-Learning videos for requested topics
(coaching, leadership, etc.); Additional Adobe licenses; Refreshments,
copies, supplies
General $15,000 $15,000
Request from departments to expand online training offerings will
not be an option and only required trainings will be available;
concurrent users licenses on the Adobe platform will remain at 30
licenses (this has not been exceeded); limited refreshments will
be provided during live training sessions$19,440 $15,000
PARKS & RECREATION
Elimination of Furniture and Fixture Replacements General $20,000 $20,000
The Parks and Recreation Department replaces facility furniture
that is in poor condition throughout all the City parks. These
include pool lounge chairs, pool umbrellas and folding tables and
chairs. With the elimination of this budget, there will not be any
replacements, unless there are savings found within the budget
towards the end of FY 18.
Elimination of Fall Fest Event at Flamingo Park General $15,000
Each year the Parks and Recreation Department hosts an event
to celebrate the fall season called "Fall Fest" at Flamingo Park.
This event brings hundreds of residents; however, the department
is prepared to eliminate it from the budget if necessary.
Elimination of Safe Night of Fright Event at North Shore Park Youth
Center General $10,000
Each year the Parks and Recreation Department hosts a
Halloween event called "Safe Night of Fright" at North Shore Park
Youth Center. The department is prepared to eliminate this event
from the budget if needed. The department also hosts a
Halloween event at Scott Rakow Youth Center; therefore, even if
the City eliminates "Safe Night of Fright," there will still be another
event in the City for Halloween.
Eliminate Hispanic Heritage Event at North Shore Park General $18,000
Each year the Parks and Recreation Department hosts an event
to celebrate Hispanic Heritage Month at North Shore Park. The
department is prepared to eliminate this event from its budget if
necessary. If it is eliminated from the budget, it is recommended
for the City to look at obtaining corporate or private sponsorship to
coordinate and execute this event for the community
Reduction of Litter Control Services in City Parks General $330,000
The elimination and reduction of services may result in increased
litter in City Parks, which in turn may increase resident and visitor
complaints and an overall decrease of performance during the
City's Cleanliness Index inspections.
Reduction of Advertising General $5,000
The proposed FY18 Advertising budget for Parks and Recreation
is $10,000. This budget is used for all creative advertising efforts
in print and social media outlets for programming and events year-
round. The department is proposing a $5,000 cut from this
budget, leaving $5,000 in the budget.
Reduction of Department Training Budget to Attend Conferences General $8,000 $8,000
The proposed cut will be reducing the amount of staff attending
FRPA conference from 6 to 3 ($2,400.00), reducing the amount of
staff attending NRPA conference from 2 to 1 ($2,500.00) and
removing the NARCE conference from the budget as well
($2,600).
Reduction of Dog Waste Disposal Bags and Dispensers General $10,000 Reducing the budget for dog waste disposal bags and dispensers
will cause an increase in fecal matter throughout the City.
Reduction of funds to paint parks facilities General $10,000
This budget is used to for the painting of any park facility
throughout the year. The department is proposing a $10,000 cut
from this budget, leaving $40,000 in the budget. Reducing the
budget will negatively impact the appearance of the facilities.
Reduction of Locksmith Services General $10,000
Reducing the budget for locksmith services will increase the time
needed to replace broken and vandalized locks at the beachfront
restrooms.
Reduction of Machinery Repairs General $3,000 Decreasing this budget will leave equipment inoperable.
Reduction of Neighborhood Court Supplies General $10,000 Reducing this budget will impact the appearance and safety of the
courts.
Reduction of Palm Pruning & Plant Bed/Shrub Pruning Services in City
Parks General $100,000 $100,000
The reduction of services may result in increase resident and
visitor complaints and an overall decrease the parks' appeal.
Since the palms will only be pruned twice a year instead of every
quarter, complaints may arise concerning fallen palms fronds.
With the reduction of plant/shrub pruning, landscape areas will not
be as well kept as they would be with the current service level.
Reduction of Plant Material General $25,000 This will decrease the amount of plants citywide.
Reduction of Pressure Cleaning Service in City Parks General $107,000
The elimination and reduction of services may result in pathways
and facilities in City Parks not being clean which may increase
resident and visitor complaints.
Reduction of Rental Equipment General $4,000
Reducing this budget will decrease the amount of special projects
that staff can perform as they will not have the appropriate
equipment to perform such tasks.
Elimination of 2 Vacant FT Recreation Leader I Positions General $80,000 2
If the positions are eliminated, it may cause the department to not
be able to increase the amounts of participants attending
afterschool and summer camp programs that may eventually be in
demand.
Reduce funding for Citywide Orchid Project General $20,000 $20,000
The payment in FY2017/18 is $18,750 therefore, the department
is proposing to reduce the budget to $20,000 in order to meet the
minimum commitment that was agreed upon with the Fairchild
Botanical Tropical Gardens. This will reduce additional orchids
planted throughout the city.
Training & Travel General $10,000 $10,000 This proposed efficiency/reduction will reduce the number of
trainings available to staff.
Reduction of Ice Skating Instructors for Programming General $10,000 Reducing this budget will decrease the number of ice skating
instructors for year-round year round programming.
Total
23
ATTACHMENT A
PROPOSED FY 2017/18 SERVICE REDUCTIONS AND EFFICIENCIES
Program/Function Fund
Potential
Efficiency/
Reduction
Recommended
Efficiency/
Reduction
FT PT Potential Impact
Reduce Operating Supplies for Year-Round Youth Programming General $10,000 Reducing the budget may cause a decrease in youth satisfaction
with the programming.
$815,000 $158,000
PLANNING
Funds overtime pay for planners performing plans review after hours General $50,000 $50,000
Department will attempt to process after hours reviews more
efficiently (using one planner per review) in order to reduce OT
with minimal impact to the Plans After Hours review revenues that
is generated from this OT.
Reduce funds for consulting services, subject matter experts General $47,000
Department may not be able to absorb costs associated with
special studies. Funding may have to be identified by CC when
directive is issued.
Reduce funds for postage and courier services to ensure compliance
with CMB Code and enhanced transparency of the public process General $10,000 $10,000
Department may not be able to absorb costs associated with
special noticing efforts as often requested by City Commission.
Funding may have to be identified by City Commission when
directive is issued.Reduce supplies needed to conduct business, develop presentations,
produce maps and graphics.General $5,000 $5,000 Reduction to this line item may reduce the department's ability to
produce hard-copy documents, maps and graphics.
Reduce costs associated with electronic recording of documents with
the Clerk of Courts at Miami Dade County.General $15,000 Reduction to this line item may reduce the department's ability to
timely record documents.
$127,000 $65,000
POLICE
Replace 1 Office Associate V at max of salary range with 1 Office
Associate V at minimum of range (Filled)General $32,000 $32,000
This position is critical to maintain the court liaison function, as
this replacement ensures that police officers are processed in and
out of court with maximum efficiency and that the City does not
suffer an unnecessary loss of officer patrol time.
Special Events Overtime Resort $250,000 $250,000 Included based on Resort Tax meeting with Manager and TCED
Office Associate V (Filled)General $112,000 $112,000 1
This proposed education will adversely impact the administrative
support functions of the department, which will impact the
department's efficiency and workload.
Public Safety Specialist (Vacant)General $61,000 $61,000 1
This proposed reduction will eliminate one vacant Public Safety
Specialist in the Police Department, which will result in longer wait
times for preparation of routine reports related to accidents, etc.
Defer Hiring of 10 Police Officer Positions for 6 Months (Vacant)General $515,000 $515,000
This proposed efficiency/reduction will delay the hiring of 10 Police
Officer positions for 6 months to meet the budgetary needs of the
City, which will result in the Police Department operating below
the authorized sworn strength until positions are filled.
$970,000 $970,000 2
PROCUREMENT
Eliminate 1 Vacant Part-Time Procurement Contracting Analyst Position General $27,000 $27,000 1
It is important to note that the freezing of this position will impact
operations, including the recommendations of EMA and BDO
regarding the transferring of the management of vendor files from
the Finance Department to the Procurement Department in order
to assure a segregation of duties. This position has been fully
dedicated to assist in the clean-up, verification and data entry of
vendors. So far, approximately 3,500 vendor files, representing
approximately 37% of vendors, have been cleaned up. The clean-
up of the remaining 62% will be delayed by eliminating this
position.
Reduce Overtime General $1,000
Although the public may be minimally impacted from the proposed
miscellaneous general funded cut from our operating budget, the
efficiency and operations of the Procurement Department will be
impacted by the following reductions.
Reduce Uniforms General $2,000 $2,000
Although the public may be minimally impacted from the proposed
miscellaneous general funded cut from our operating budget, the
efficiency and operations of the Procurement Department will be
impacted by the following reductions.
Reduce Postage and Shipping General $1,000
Although the public may be minimally impacted from the proposed
miscellaneous general funded cut from our operating budget, the
efficiency and operations of the Procurement Department will be
impacted by the following reductions.
Reduce Advertising General $1,000
Although the public may be minimally impacted from the proposed
miscellaneous general funded cut from our operating budget, the
efficiency and operations of the Procurement Department will be
impacted by the following reductions.
Reduce Office Supplies General $2,000
Although the public may be minimally impacted from the proposed
miscellaneous general funded cut from our operating budget, the
efficiency and operations of the Procurement Department will be
impacted by the following reductions.
Eliminate Bonfire Software and reduce LCP Tracker General $34,000
LCP Tracker is a software solution that assists Procurement
Department staff in managing, due to a shortage of staff,
compliance with mandated social programs such as Living Wage
and Local Workforce Participation. The reduction will impact the
department’s ability to efficiently and effectively manage these
programs, and provide program reports. For example, on July 13,
2016, the City Commission approved the first reading of an
ordinance requiring City Contractors to implement a program to
promote the hiring of Miami Dade County and Miami Beach
residents. The ordinance tasks staff with the oversight of
compliance with the ordinance. In lieu of additional staffing, LCP
Tracker was approved so that compliance efforts could be
managed electronically through labor compliance software, which
is commonly used to manage these sorts of compliance matters.
Elimination of this resource will impact staff’s ability to track these
efforts.
Reduce Training and Awards General $16,000 $16,000
It is important to note that reducing the Training and Awards
budget can impact staffing certifications to include but not limited
to contracting, procurement, internal controls, and Munis.
$84,000 $45,000Total
Total
Total
Total
24
ATTACHMENT A
PROPOSED FY 2017/18 SERVICE REDUCTIONS AND EFFICIENCIES
Program/Function Fund
Potential
Efficiency/
Reduction
Recommended
Efficiency/
Reduction
FT PT Potential Impact
PROPERTY MANAGEMENT
Reduction in Training Internal $5,000 $5,000
This proposed reduction will impact the department's ability to
keep existing personnel up-to-date with the most recent skills
applicable to their trades.
Reduction in Overtime Internal $50,000
This proposed reduction will adversely impact the department's
ability to maintain adequate staffing during high impact periods
and special events when additional personnel is sometimes
necessary.
Reduction in Preventative Maintenance (Electric)Internal $75,000 This proposed reduction will reduce the level of service for
electrical maintenance needed for City facilities.
Reduction in Preventative Maintenance (Paint)Internal $10,000 This proposed reduction will reduce the level of service for
painting of City facilities.
Reduction in Professional Services Internal $15,000 This proposed reduction will reduce the frequency of facility
remediation testing to be conducted across all City facilities.
Reduction in Grainger Materials (Citywide)Internal $50,000
This proposed reduction will reduce the level of service for general
materials needed for routine repairs and maintenance, which will
impact maintenance for existing City facilities.
Reduction in Hurricane Preparation Services Internal $10,000
This proposed reduction will reduce funding allocated for
hurricane preparation services thereby reducing the level of
service provided during preparation for a potential storm.
Reduction in General Preventative Maintenance Internal $20,000 This proposed reduction will reduce the level of service for general
preventative maintenance services provided citywide.
Reduction in General Repairs and Maintenance Internal $20,000 This proposed reduction will reduce the level of service for general
repairs and maintenance services provided citywide.
Reduction in Additional Janitorial Services Internal $15,000 This proposed reduction will reduce the level of service of
janitorial services provided for City facilities.
$270,000 $5,000
PUBLIC WORKS
Unforeseen Expenditures - Engineering General $20,000 $20,000
This proposed reduction will result in the department not having
funding allocated for unforeseen expenditures, which the
department routinely encounters.
Tree Shrubbery Materials - Greenspace Management General $25,000
This proposed reduction of replacement of tree and shrubbery
materials Citywide will impact the Department's ability to quickly
replace damaged plant materials and/or materials that have
reached the end of their life cycle.
Specialized Tree Services - Greenspace Management General $40,000
This proposed reduction in specialized tree services for trimming
and removal of large trees in hazardous locations will result in
services being provided less frequently.
Office Chairs - Engineering General $2,000
Reduction of office chairs for the Engineering Division will halt the
replacement program of OSHA standardized office chairs. The
department has already replaced half of the chairs in the office
and intended on replacing the next half in FY2017/18.
Public Works Greenspace - Landscape Services General $90,000
This proposed reduction reduces contract maintenance for
landscape services Citywide. Various sites will receive services
less frequently, which will impact the appearance of many City
owned and/or maintained properties potentially impacting the
City's overall cleanliness report.
Engineering Assistant III - Engineering (Vacant)General $63,000 $63,000 1
This position is the senior computer animated design (CAD)
operator and is responsible for the coordination of electronic
databases of the City's infrastructure. Elimination of this position
will require those duties to be performed by an existing
engineering position, which will reduce the productivity of this
engineer since the position will be taking on additional
responsibilities.
E-Builder Software Maintenance - Engineering General $3,000
Elimination of the e-builder software, which is a construction
management tool that tracks expenditures, timelines and
deliverables, will reduce project management productivity.
Consulting Services - Engineering General $30,000
This proposed reduction in consulting services will result in an
inability to conduct real estate appraisals and other consulting
services that occur annually.
Public Works Administration - Consulting Services and Office Supplies General $14,000 $14,000 This proposed reduction will result in the department being unable
to fund necessary consulting services.
Training & Travel General $10,000 $10,000 This proposed efficiency/reduction will reduce the number of
trainings available to staff.
Public Works Administration - Consulting Services and Office Supplies General $2,000 This proposed reduction will result in the department being unable
to fund necessary supplies for the Public Works Admin Division.
$299,000 $107,000 1
TOURISM, CULTURE, & ECONOMIC DEVELOPMENT
Reduce Arts in the Park General $30,000
Reducing the Arts in the Park budget will decrease the amount of
events held in Soundscape Park and will nearly eliminate the
Cinema Series program.
Reduce Management Fee that is paid to the Bass Museum General $72,000
The City will have to negotiate an 11% reduction in City funding to
the Bass Museum and require the non-profit to cover a larger
share of the expenses.
Eliminate Training and Awards General $8,000 $8,000
Employees will not be able to obtain the Economic Development
Certification or attend the Economic Development Council
Training which will ultimately hinder professional growth.
$110,000 $8,000
10 Grand Total Positions
Fund
Potential
Efficiency/
Reduction
Recommended
Efficiency/
Reduction
General Fund $5,192,240 $2,236,000
Internal Service impact (% could change based on allocations; 82% assumption) $283,000 $28,000
$5,475,240 $2,264,000 -$261,000
Internal Service $345,000 $33,000
Enterprise $0 $0
Special Revenue $0 $0
Resort $751,000 $751,000
TBD $0 $0
General Fund reductions which also reduce General Fund Revenues
(Net Efficiency is $2,003,000)
Total
Grand Total of Positions Recommended
Total
Total
25
ATTACHMENT B
PROPOSED FY 2017/18 ENHANCEMENTS
FT PT
Building
Living Wage Impact General 2,000$2,000$0$
Convert Financial Analyst III to Administrative Services Manager General 8,000$8,000$
Convert Permit Clerk I to Building Records Supervisor General 8,000$8,000$
Convert Office Associate IV to Office Associate V General 3,000$3,000$
Convert Office Associate IV to Office Associate V General 4,000$4,000$
Convert Office Manager to Senior Special Projects Manager General 7,000$7,000$
Senior Special Projects Manager General 111,000$138,000$1
Graphic Design Professional Services General 35,000$0$
Convert Plumbing Inspector to Senior Plumbing Inspector General (8,000)$11,000$
170,000$2,000$179,000$1 0
City Attorney
Cell Phone Stipends General 4,000$4,000$
City Prosecutor General 72,000$72,000$89,000$1
Legal Secretary to City Prosecutor General 68,000$81,000$1
144,000$72,000$174,000$2 0
Citywide
Living Wage Impact RDA $ 1,000 1,000$$ 0
Living Wage Impact Resort Tax $ 3,000 3,000$$ 0
$ 4,000 $ 4,000 $ 0 0 0
Communications
Part-Time Visual Communications Specialist General 38,000$39,000$1
Living Wage Impact General 3,000$3,000$0$
41,000$3,000$39,000$0 1
Convention Center
Living Wage Impact Enterprise 10,000$10,000$0$
10,000$10,000$0$0
Emergency Management/9-1-1
Security Guard Services - Building Department North Beach Office General 28,000$28,000$28,000$
City Center RDA Security Guards (additional hours for Lincoln Road)RDA 166,000$166,000$
Living Wage Impact General 4,000$4,000$0$
DEM Security Guards (1 Project Mgr & 2 Security Coordinators)General 284,000$284,000$
IT Specialist I General 63,000$76,000$1
Mount Sinai Public Safety Liaison Center (Furniture/Equipment)General 20,000$0$
Physical Security Technology Master Plan General 234,000$234,000$
Police Department Security Guard Services General 113,000$113,000$
PSCU Furniture Component & Appliance Replacement General 20,000$0$
Public Health Coordinator General 94,000$113,000$1
Security Guard Services - Parking Enterprise Fund Enterprise 3,000$2,000$3,000$
Security Guard Services - Sanitation (Waste Haulers)Special
Revenue 2,000$2,000$2,000$
Security Guard Services - RDA Anchor Garage RDA 2,000$2,000$2,000$
Security Guard Services - RDA Penn Garage RDA 116,000$116,000$116,000$
Additional Security Guard Services for High Impact Periods Resort Tax 34,000$34,000$
1,183,000$154,000$1,171,000$2 0
Finance
Additional Temp Labor for ongoing Munis Project Implementation and
Optimization General 30,000$0$
30,000$0$0$0 0
Fire
F-550 Mobile Air Truck Unit General 271,000$0$
271,000$0$0$0 0
Housing & Community Services
Miami-Dade County Homeless Trust Agreement Resort Tax 3,500,000$0$
3,500,000$0$0$0 0Information Technology
IT Specialist I for Public Records Internal 63,000$79,000$1
Senior Security Administrator Internal 89,000$113,000$1
152,000$0$192,000$2 0
Organizational Development & Performance Improvement
Office Associate IV from Part-Time to Full-Time General 30,000$41,000$1 -1
30,000$0$41,000$1 -1
Year 2
Impact
Total PositionsFundDepartmentRecommended
Enhancement
Requested
Enhancement
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
26
ATTACHMENT B
PROPOSED FY 2017/18 ENHANCEMENTS
FT PT
Year 2
Impact
Total PositionsFundDepartmentRecommended
Enhancement
Requested
EnhancementParking
Art Basel / City Employee Uber Initiative Enterprise 50,000$50,000$0$
Living Wage Impact Enterprise 46,000$46,000$0$
Living Wage Impact Special
Revenue 29,000$29,000$0$
Senior Systems Analyst Enterprise 76,000$91,000$1
201,000$125,000$91,000$1 0
Parks & Recreation
Parks and Recreation Vehicle Modifications General 10,000$0$
Living Wage Impact General 43,000$43,000$0$
Convert 1 Part-Time MSWII to 1 FT MSWII, and removing 1 PT Recreation
Leader General 8,000$8,000$12,000$1 -2
Second Annual Youth Music Festival General 12,000$12,000$-$
Parks and Recreation - 3 Vehicles General 92,000$0$
2 Part-Time Park Rangers at North Shore Park & Youth Center General 72,000$64,000$2
Additional Park Ranger Supervisor General 75,000$83,000$1
10 Additional Part-Time Year-Round Inclusionary Aides General 196,000$201,000$10
10 Part-Time Year-Round Municipal Service Worker III - Bus Driver General 205,000$212,000$10
Body Cameras for Park Rangers General 35,000$23,000$
Portable Luxury Restrooms & Daily Porter Services for ITF Tennis
Tournament General 24,000$24,000$0$
Grounds Maintenance Reorganization-
1. Convert 1 Parks Operations Supervisor into two full-time Landscape
Inspectors.
2. Add three full-time MSW I positions and three part-time MSW I positions
to assist with daily grounds maintenance duties.
3. Convert two full-time MSW III positions into two Trades worker I
positions.
General (41,000)$(41,000)$23,000$4 3
Beach Maintenance Division Operational Needs (Beach Maintenance
Division) for uniforms, office supplies, telephone chargers, mobi mats,
ropes and posts, lumber for the board walks and
memberships/conferences.
General 129,000$129,000$
2 Beach Maintenance Vehicles (Beach Maintenance Division)General 88,000$0$
2 Municipal Service Worker III Positions & Ford Vactron Unit (Beach
Maintenance Division)General 201,000$119,000$2
Beachwalk Tree Wells 14th to 22nd Street - Bonded Aggregate (Beach
Maintenance Division)General 135,000$0$
Part-Time Park Ranger for Maurice Gibb Memorial Park General 48,000$47,000$1
Normandy Shores Neighborhood/Golf Course Security Guard Rover (Split
Funded: 50% Normandy Neighborhood/50% Normandy Golf Course)General 27,000$27,000$27,000$
1,359,000$73,000$940,000$8 24
Planning
2 Senior Planner Positions General 187,000$223,000$2
Living Wage Impact General 2,000$2,000$0$
Temporary Administrative/Clerical Staff General 32,000$32,000$
Professional Services for Comprehensive Plan (Required by Florida
Statutes)General 100,000$100,000$0$
Rental - Building & Equipment (1 Additional Sharp Copier/Scanner)General 6,000$6,000$
327,000$102,000$261,000$2 0
Police
Convert 1 Police Officer position to a Police Lieutenant position General 37,000$38,000$
37,000$0$38,000$0 0
Property Management
Chiller Preventative Maintenance (Citywide)Internal 13,000$13,000$
Elevator Maintenance (Citywide)Internal 100,000$100,000$
Grainger Materials (Citywide)Internal 100,000$100,000$
Living Wage Impact Internal 21,000$21,000$0$
Holiday Lighting and Visual Décor Resort Tax 700,000$575,000$
HVAC Maintenance (Citywide)Internal 150,000$150,000$
Janitorial Services (Citywide)Internal 155,000$155,000$
Normandy Shores Neighborhood/Golf Course Security Guard Rover (Split
Funded: 50% Normandy Neighborhood/50% Normandy Golf Course)
Special
Revenue 27,000$27,000$27,000$
Lincoln Road Halloween Event RDA 50,000$50,000$
Mobile Phone Upgrades Internal 6,000$0$
Special Event Support Services Resort Tax 25,000$25,000$
Total
Total
Total
Total
27
ATTACHMENT B
PROPOSED FY 2017/18 ENHANCEMENTS
FT PT
Year 2
Impact
Total PositionsFundDepartmentRecommended
Enhancement
Requested
Enhancement2 Trades worker I Positions Internal 121,000$145,000$2
Trades worker I Internal 72,000$87,000$1
1,540,000$48,000$1,427,000$3 0
Public Works
Convert Engineer Assistant III to Civil Engineer II General 25,000$25,000$
Convert MSW I to Heavy Equipment Operator I General 10,000$10,000$
Living Wage Impact General 2,000$2,000$0$
Convert Street Lighting Tech I to Street Lighting Operations Supervisor General 17,000$15,000$
GIS Software Enhancements General 14,000$14,000$
Greenspace Mgmt. Landscape Projects Coordinator General 115,000$99,000$1
Public Works Engineering - Hybrid Vehicle General 25,000$0$
208,000$2,000$163,000$1 0
Public Works - Sewer
1 Ton F-350 Single Cab with Utility Box (Sewer)Enterprise 45,000$0$
TPC Trainco Training (50% Water & 50% Sewer)Enterprise 21,000$21,000$0$
66,000$21,000$0$0 0
Public Works - Storm Water
Electrician (Storm Water)Enterprise 101,000$87,000$1
Field Supervisor (Storm Water)Enterprise 59,000$70,000$1
2 Pumping Mechanic Positions Storm Water Enterprise 156,000$140,000$2
LP 360 (LIDAR) Software Enhancement Enterprise 7,000$7,000$
323,000$0$304,000$4 0
Public Works - Water
Valve Turner and Vacuum Tank Water Division (Water)Enterprise 100,000$0$
1 Ton F-550 Single Cab Dump Truck with Trailer and Mini Excavator
(Water)Enterprise 150,000$0$
1- F-150 Single Cab Pick-up Truck (Water)Enterprise 28,000$0$
Additional Temporary Labor for Munis Utility Billing Implementation (Water) Enterprise 30,000$0$
TPC Trainco Training (50% Water & 50% Sewer)Enterprise 21,000$21,000$0$
329,000$21,000$0$0 0
Sanitation
Living Wage Impact Enterprise 14,000$14,000$0$
Standardization of Litter Receptacles Enterprise 240,000$240,000$
254,000$14,000$240,000$0 0
TCED
Bass Museum Management Agreement Increase General 550,000$550,000$
International Tennis Federation Resort Tax 100,000$100,000$0$
Air & Sea Show Resort Tax 350,000$350,000$0$
Miami Design Preservation League-Art Deco Weekend General 100,000$0$
Economic Development Plan for the City General 75,000$0$
Film Incentive General 100,000$100,000$100,000$
Lummus Park Cultural Activation and Programming General 100,000$100,000$100,000$
Super Bowl 2020 General 150,000$0$
1,525,000$650,000$750,000$0 0
Transportation
Transit Extension to Omni Transportation/
Parking 2,134,000$2,134,000$
Living Wage Impact Transportation/
Parking 16,000$16,000$0$
Express Trolley Service Transportation/
Parking 0$2,501,000$
Transit Corporate Discount Program Transportation/
Parking 45,000$0$
Citywide Origin-Destination Survey Transportation/
Parking 500,000$0$
Part-Time Community Outreach Coordinator Transportation/
Parking 40,000$40,000$1
2,735,000$16,000$4,675,000$0 1
Grand Total of Positions Recommended 7 0
Fund Requested
Enhancement
Proposed
Enhancement
General Fund 4,552,000$486,000$
Internal Service Impact (assumes 82% allocation) 730,000$18,000$
5,282,000$504,000$
Internal Service 890,000$21,000$
Resort Tax 4,712,000$453,000$
RDA 335,000$119,000$
Enterprise 1,157,000$164,000$
Special Revenue 58,000$58,000$
Transportation/ Parking 2,735,000$16,000$
Total
Total
Total
Total
Total
Total
Total
Total
28
General Fund Revenues
FY 2016/17
Adopted
FY 2017/18
Proposed $ Variance % Variance
Property Tax Revenue
Ad Valorem 159,950,000 174,642,000 14,692,000 9.2%
Renewal & Replacement 662,000 721,000 59,000 8.9%
Normandy Shores 169,000 169,000 ‐ 0.0%
Non‐Property Tax Revenue
Other Taxes 23,732,000 22,448,582 (1,283,418) ‐5.4%
Licenses and Permits 30,244,000 29,778,000 (466,000) ‐1.5%
Intergovernmental 11,439,000 11,251,227 (187,773) ‐1.6%
Charges for Services 12,174,000 11,948,000 (226,000) ‐1.9%
Fines & Forfeits 1,799,000 1,527,783 (271,217) ‐15.1%
Rents & Leases 6,426,000 5,969,000 (457,000) ‐7.1%
Miscellaneous 13,165,000 15,197,000 2,032,000 15.4%
Resort Tax Contribution 37,609,000 37,609,000 ‐ 0.0%
Parking Fund Contribution 6,400,000 6,400,000 ‐ 0.0%
Other Non‐Operating Revenue 13,483,000 15,114,408 1,631,408 12.1%
Total 317,252,000 332,775,000 15,523,000 4.9%
Property Tax Revenue 160,781,000 175,532,000 14,751,000 9.2%
Non Property Tax Revenue 156,471,000 157,243,000 772,000 0.5%
Percent Property Tax 51%53%
General Fund Expenditures
FY 2016/17
Adopted
FY 2017/18
Proposed $ Variance % Variance
Building 15,146,000 15,447,000 301,000 2.0%
CIP 5,051,000 5,151,000 100,000 2.0%
City Attorney 5,370,000 5,707,000 337,000 6.3%
City Clerk 1,560,000 1,656,000 96,000 6.2%
City Manager 3,625,000 4,041,000 416,000 11.5%
Code Compliance 5,845,000 5,984,000 139,000 2.4%
Communications 1,995,000 2,093,000 98,000 4.9%
Emergency Management 9,509,000 10,448,000 939,000 9.9%
Environment & Sustainability 1,064,000 1,263,000 199,000 18.7%
Finance 5,746,000 6,047,000 301,000 5.2%
Fire 71,938,000 75,235,000 3,297,000 4.6%
Housing & Community Services 2,798,000 3,298,000 500,000 17.9%
Human Resources 2,780,000 2,903,000 123,000 4.4%
Internal Audit*923,000 961,000 38,000 4.1%
Mayor and Commission 2,093,000 2,312,000 219,000 10.5%
OBPI 1,576,000 1,616,000 40,000 2.5%
ODPI**629,000 979,000 350,000 55.6%
Parks & Recreation 31,934,000 33,491,000 1,557,000 4.9%
Planning 4,156,000 4,424,000 268,000 6.4%
Police 104,470,000 109,825,000 5,355,000 5.1%
Procurement 2,258,000 2,403,000 145,000 6.4%
Public Works 14,698,000 16,052,000 1,354,000 9.2%
TCED 3,680,000 3,993,000 313,000 8.5%
Citywide Accounts***17,746,000 12,854,000 (4,892,000) ‐27.6%
Internal Service Allocation ‐ 607,000 607,000
Capital Renewal & Replacement 662,000 721,000 59,000 8.9%
Total 317,252,000 329,511,000 12,259,000 3.9%
Surplus ‐ 3,264,000 3,264,000
*** Education Initiatives totaling $324,000 added to the CSL budget
*** FY 2016/17 Adopted Budget included $3,000,000 set aside for Pension Mortality
ATTACHMENT C
* In FY 2016/17, Internal Audit was part of OBPI.
General Fund FY2017/18 CSL Budget
29
30
MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov
COMMIHEE MEMORANDUM
FROM:
TO: Finance and Citywide Projects Committee
Jimmy L. Morales, City ManageA ^ yvlxl
DATE: July 21, 2017
SUBJECT: General Obligation (G.O.) Bond Program Update
This memo provides an update of the status of the 1999 G.O. Bond program as well as information
regarding a potential 2018 G.O. Bond program.
1999 G.O. Bond Program Background
A general obligation bond is a form of debt financing payable solely from property taxes, backed by
a pledge of the City's "full faith and credit" or taxing power, and used to finance capital projects that
do not produce revenues.
Pursuant to Article VII of the Florida Constitution, G.O. bonds may only be issued if they are
approved by the voters in a city-wide referendum. Consistent with Florida law requirements
(including the requirement that ballot measures be limited to "one topic" per referendum questions),
on November 2, 1999, the voters of the City approved three separate ballot measures for the
issuance of an aggregate principal amount of $92.4 million in G.O. bonds for capital projects In the
following program areas and amounts:
• Fire Safety Facilities & Equipment: $9.7 million
• Improvements to Parks & Beaches: $24.8 million
• Improvements to Neighborhood Infrastructure: $57.9 million
The Fire Safety Facilities & Equipment measure was approved by 68.5%, Improvements to Parks &
Beaches measure was approved by 56.9%, and Improvements to Neighborhood Infrastructure
measure was approved by 54.2%.
The annual debt service for the 1999 G.O. Bonds is approximately $5.9 million which is paid from
property taxes. The property taxes are generated by the Debt Service Millage Rate. In FY 2017, the
annual payment is equivalent to 0.1796 mills. Each year the Debt Service Millage Rate is adjusted
to generate sufficient property tax revenues to pay the required annual debt service payment. As
property values normally increase and the payment remains relatively level, the millage rate is
decreased accordingly. A schedule of future payments can be found in the Debt Management
section on page 146 of the FY 2017 Budget document. The final maturity of the 1999 G.O. Bond
Program bonds is 2033 and the outstanding principal is currently $50.1 million in the aggregate.
Operating Millage Rate
Debt Service Millage Rate
Total
5.7092
0.1796
5.8888
31
G.O. Bond Program Update
Page 2
1999 G.O. Bond Program Status
The 1999 G.O. Bond Program totals 62 projects across the three ballot measures. At this point in
time, 56 of the projects are either complete or in progress and 5 of the projects are incomplete. All 5
of the incomplete projects are in Improvements to Neighborhood Infrastructu re as shown in the
summary below. More detailed information can be found in Attachment A.
Bond Measure Projects Projects Completed
or In Progress
Incomplete
Projects
Fire Safety Facilities 4 4 0
Parks & Beaches 31 31 0
Neighborhood Infrastructure 27 21 5
Total 62 56 5
The five incomplete projects are listed in the table below. These projects currently need additional
funding. In the case of the Neighborhood Infrastructure projects the funding below incorporates a
significant expansion of the scope in order to deliver a completely renovated streetscape. For the
City facilities, the unfunded needs represent the differential cost in order for the projects to be
completed due to increases in construction costs since the initial bond issuance. The total unfunded
needs are estimated at $27.5 million. The additional funding needed is proposed to be funded in a
2018 G.O. Bond Program as it is unlikely that sufficient pay-as-you-go funding would be available in
the near term for these projects.
Project Unfunded Needs
La Gorce Neighborhood Improvements $14.0 M
North Shore Neighborhood Improvements $10.0 M
Public Works Facility $1.5 M
Parks Maintenance Facility $1.0 M
La Gorce Island Improvements $1.0 M
Total $27.5 M
The LaGorce, North Shore and La Gorce Island Neighborhoods have not been addressed since
2013 due to the worst first approach to the stormwater program and the scheduling of the
neighborhood improvements in alignment with the stormwater improvements. The Parks
Maintenance Facility was not addressed due to major reconfiguration of the Department and the
lack of sufficient funding. The Public Works facility was put on hold pending the outcome of the
evaluation of using that facility for the light rail maintenance facility. It is important to note that the list
above is not an exhaustive list of unfunded needs for future neighborhood improvements as the
stormwater program advances.
The 1999 G.O. Bond Program consisted of $92.4 million of G.O. bonds proceeds in the aggregate
with principal of approximately $92 million, which over the years has generated $13 million of
interest earnings for total funds of $105 million. Of the $105 million, $92.4 million has been spent
and currently $12.6 million is currently unspent (as of June, 2017). The breakout of unspent funds is
shown in the table below.
32
G.O. Bond Program Update
Page 3
Bond Measure Unspent $ % of Total
Fire Safety Facilities $835 K 7%
Parks & Beaches $3.2 M 26%
Neighborhood Infrastructure $8.5 M 67%
Total $12.6 M 100%
The majority of the unspent funds are allocated to projects that require additional funding in order to
be completed at 2017 prices or current scope. However, in order to potentially issue additional tax
exempt G.O. bonds to cover the additional funding needs, it is necessary to spend virtually all of the
1999 G.O. Bond Program bond funds to maintain favorable tax treatment. Staff will be proposing
realigning unspent funds to active capital projects, subject to the provisions of the bond documents
related to the 1999 G.O. Bond Program b onds, to the City Commission in upcoming capital budget
amendments.
Proposed 2018 G.O. Bond Program
The first step in a bond program process is to identify potential dates for the voter referendum.
Primary Election: August 28, 2018
General Election: November 6, 2018
Special Election: TBD
If the City Commission adopts a resolution calling for a referendum on scheduled countywide
election dates such as for the Primary Election or General Election dates noted above, the cost to
the City is approximately $30,000. However, if the decision is to schedule a special election on
another date, the cost is significantly higher, approximately $300,000.
An additional consideration when selecting a date is the timing for City Commission approval of a
millage rate increase to cover the new annual debt service payment. The amount of the debt service
payment would depend on the overall amount borrowed for the proposed 2018 G.O. Bond Program,
but would likely be significant enough that it would not be able to be absorbed into the current
service level budget without a millage rate increase. The table below shows annual debt service
amounts and equivalent millage rates for different bond program amounts as well as the annual cost
impact to an average homeowner. For example, if the proposed bond program amount was set by
City Commission at $200 million, the annual debt payment would be $15 million, which equates to
almost half a mill and would have an estimated $232 cost impact to an average homeowner.
Bond Program
Amount
Annual Debt
Service
Equivalent Millage
Rate
Annual Cost to
Average
Homeowner
$25 M $1.5 M 0.0498 $23
$50 M $3.0 M 0.0996 $46
$100 M $6.0 M 0.1992 $93
$150 M $9.0 M 0.2988 $139
$200 M $12.0 M 0.3984 $185
$250 M $15.0 M 0.4980 $232
$300 M $18.0 M 0.5976 $278
33
G.O. Bond Program Update
Page 4
Because the timing for setting the City’s millage rate takes place in September during adoption of
the annual budget, the referendum dates would either take place before or after the Commission
vote setting the millage rate as shown in the table below. Normally, the millage rate would be
increased following the voter referendum date, but the millage rate increase could be included in the
adopted budget in advance of the vote and then lowered the following year if the voter referendum is
not successful. Following voter approval of the ballot measures, the proposed 2018 G.O. Bond
Program bond proceeds would be available approximately six months later. The bond issuance
process takes approximately six months and includes approvals from the Finance & Citywide
Projects Committee and the City Commission, preparation of bond documents, obtaining credit
ratings for the bond issuance, and the actual sale of the bonds.
Election Referendum Date Millage Vote Bond Proceeds
Available
Primary Election August 28, 2018 September, 2018 Spring, 2019
General Election November 6, 2018 September, 2019 Spring, 2020
The overall process for the proposed 2018 G.O. Bond Program would take approximately twelve
months and consists of the following steps:
Identify Potential Projects – This step includes compiling a wish list of projects from various
sources including staff and the community. Over $300 million in potential projects have
been identified to date. For example, approximately $30 million is needed to complete the 5
remaining projects from the 1999 G.O. Bond Program. A preliminary list of projects is
included in Attachment B.
Size of Bond Program and Propositions – Based on the amount on the needs in the
community and the affordability of the necessary debt service, the overall dollar amount of
the proposed 2018 G.O. Bond Program would be set along with amounts for each
proposition or ballot measure (for example, $200 million bond program with $50 million for
Parks & Beaches). In terms of debt capacity, the City is authorized to issue G.O. debt up to
15% of assessed property value, which is $4.6 billion (as of 9/30/16). Currently, the City is
well under the debt cap at 1.1% of the debt limit.
Prioritization of Projects – Next, the wish list would be prioritized to fit within the overall
proposed 2018 G.O. Bond Program dollar amount within each of the propositions or ballot
measures. This process could also include community input. The proposed projects would
also be programmed out over the next five years .
Community Outreach – Since G.O. bond programs have to be approved by voters, a
significant amount of time and energy would be devoted for several months of community
outreach to educate voters regarding the proposed 2018 G.O. Bond Program.
Voter Referendum – The actual date of the vote to approve the proposed 2018 G.O. Bond
Program. If all or individual ballot measures are not approved, they would have to be
presented to the voters in a subsequent year.
If the Commission wishes to proceed with a proposed 2018 G.O. Bond Program, the first step would
be to select a target date for the voter referendum so that Administration can develop a schedule for
all of the steps above between now and the vote. The following steps of identifying potential
projects and sizing the proposed 2018 G.O. Bond Program and each proposition would take place
during the next three to four months.
JLM/JW
34
ATTACHMENT A
Projects Funded Unfunded Total
Street Lighting Improvements Citywide 1,634,000 51,818,200 53,452,200
Above Ground (Lighting, Landscaping)50,000,000 50,000,000
Resilient Seawalls 35,000,000 35,000,000
North Beach Library/ City Hall Annex/ Parking 34,000,000 34,000,000
Fire Station No. 1 500,000 21,505,000 22,005,000
Artificial Reef 20,000,000 20,000,000
Flamingo Park Neighborhood Improvements 20,000,000 20,000,000
Par 3 Golf Course/Community Park Renovations 5,660,190 13,075,000 18,735,190
72nd Street Park & Parking Structure (Non-Parking
Portion)246,000 17,629,000 17,875,000
Resiliency Fund for Parks 17,000,000 17,000,000
Public Safety Radio & Viper System - 16,000,000 16,000,000
Middle Beach Recreational Corridor Phase III 2,715,000 9,894,000 12,609,000
North Shore Open Space Park 850,000 9,455,000 10,305,000
Olympic Size Pool without Parking - 8,710,000 8,710,000
Bay Drive Neighborhood Greenway 100,000 4,385,000 4,485,000
Ocean Drive Improvement Project - 2,779,000 2,779,000
Ocean Drive Extended Sidewalk Projects - Western
Sidewalks 405,000 2,295,000 2,700,000
Lummus Park 2,100,000 2,100,000
North Shore Park & Youth Center 1,300,000 1,300,000
Total 12,110,190 336,945,200 349,055,390
Potential Projects for 2018 G.O. Bond Program
35
ATTACHMENT B
Project Name and Description Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
Fire Apparatus Replacement Replacement of 5 fire/rescue vehicles (2 ladder trucks, 3 pumpers 2,700,000 Fire Apparatus Replacement 2,698,920 2,698,920 - - Complete 2005
Fire Station No. 2 Renovation
Full historic restoration, renovation, new apparatus bays and living
quarters 4,686,449 Fire Station No. 2 6,566,298 6,566,298 - -
Complete 2012
Fire Station #4 Renovations 1,036,648 1,036,648 - - Complete 2007
Fire Station #4 Air Handler Replacement 59,602 59,602 - - Complete 2016
Fire Station No. 4 Exterior Paint 43,610 - - 43,610 Design
Related Maintenance Facilities Restoration -
Fire Safety
Ten-percent (10%) share Of Property Maintenance Facility renovation
($215,750), which Provides maintenance services to fire and rescue
facilities. Property Maintenance Facility (#574) includes: replacement of
10,000 sq.ft. maintenance and warehouse facility, parking for 40 City
vehicles, 40 employee vehicles, ADA compliance.
215,750 Property Management Facility 217,229 217,229 - - Complete 2016
Fire Station 3 Fuel Tank and Piping Rest 65,000 65,000 - Complete 2017
Fire Station No. 1 Refurbishment 500,000 58,950 13,800 427,250 Planning
LP15 Cardiac Monitor/Defibrillator
Replacement 146,998 146,998 - Complete 2012
TOTAL FIRE SAFETY BONDS:11,334,305 10,849,645 13,800 470,860
UN-APPROPRIATED / UNENCUMBERED & LIABILITES 350,732
835,392
PROJECTS FUNDED BY FIRE GOB & NON-GO BOND FUNDS
TOTAL CURRENTLY UNSPENT
TOTAL FIRE SAFETY BONDS:
FUNDS 372,378,382 9,527,724
Projects not identified in Original Resolution
1999 GENERAL OBLIGATION BOND PROGRAM - FIRE SAFETY FACILITIES & EQUIPMENT
ORIGINAL G.O. BOND PROGRAM - FIRE & SAFETY
Fire Station # 4 Renovation 1,925,525 Historic restoration and renovation, including new apparatus bays and
living quarters
FIRE SAFETY FACILITIES EQUIPMENT 1 of 1036
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
Biscayne Point Neighborhood Improvements
Area-wide street improvement (integrates Municipal Mobility Plan Project
#2). Funding $4,550,000 342. 343, includes traffic calming planning,
structures and monitoring, sidewalk improvements, street 411
pavement, lighting, bike facilities. landscaping and irrigation, and
increased on-street parking concepts. $300,000 Section 108 Loans to be
used in CDBG area only. $100,000 Gas Tax funding allocated from #343,
#341, #342, #411
4,150,000 Biscayne Point Neighborhood Improvements 5,017,243 5,017,243 - - Complete 2013
North Shore Neighborhood Improvements, Funds from this
projects were allocated thru Budget Amendment # 1 FY14-15
to appropriate $544,155 to West Avenue Project.
FY16 Budget Amendment #4, to appropriate $3,577,268.68 to
Bayshore Central South pursuant to Reso #2016-29381
1,366,920 1,366,920 - - Pending Future Funding
of $10 million
Non-GO Funds - HUD Section 108 Loan 1,017,347 1,017,347 - - Complete 2013
Non-GO Funds - ARRA grant 1,021,869 1,021,869 - - Complete 2013
Biscayne Elementary School Circulation Imp.Improve traffic circulation, pedestrian safety along 77th St. In front of
Biscayne Elementary School (Municipal Mobilty Plan Project #4)
36,250 Biscayne Elem Circulation-$92M 38,419 38,419 - - Complete 2013
Normandy Shores Neighborhood Streetscape
Imp.
Area-wide street improvement (integrates Municipal Mobility Plan Project
#2). Funding $3, 500,000 342. 343, includes traffic calming planning,
structures and monitoring, sidewalk improvements, street 411 pavement,
lighting, bike facilities, landscaping and Irrigation, and increased on-
street parking concepts. Includes all areas of Normandy Island north of
the canal. $1oo,ooo Gas Tax funding allocated from #343, #341, #342,
#411
3,400,000 Normandy Shores Neighborhood Improvement 3,398,964 3,398,964 - - Complete 2010
Normandy Isle Neighborhood Improvements 4,098,120 4,098,120 - - Complete 2011
Normandy Isle Neighborhood Phase II 456,556 65,320 109,961 281,275 Ongoing
Marseille Dr Streetscape 36,616 36,616 - - Complete 2011
Bay Drive Neighborhood Greenway 100,000 - - 100,000 Study
Normandy Dr./71St. Corridor Enhancement
Provide increased landscaping and pedestrian amenities along
Normandy Dr & 71st St. Continuation of existing streetscape west from
Rue Notre Dame to City Limit (Municipal Mobility Plan Project #6 293,000 Non-GO Funds - NB Qual of Life Resort Tax 1%331,003 331,003 - - Complete 2016
PROJECTS FUNDED BY NEIGHBORHOOD GOB & NON-GO BOND FUNDS
North Shore and Park View Island
Neighborhood
Area-w1de street improvement (integrates Municipal Mobility Plan Project
#2). Funding $4,650,000 342, 343, includes traffic calming planning,
structures and monitoring, sidewalk improvements, street 411 pavement,
lighting, bike facilities, landscaping and irrigation, and increased on-
street parking concepts. Area includes all areas north of 63rd Street, and
east of Indian Creek and Tatum Wate!Way. This area includes Park View
Island. $400,000 from Section 108 Loans to be used in CDBG areas only.
$100,000 Gas Tax funding allocated from #343, #341, #342, #411
4,150,000
Area-wide street Improvement (Integrates Municipal Mobility Plan Project
#2). Funding $4,550,000 342, 343, includes traffic calming planning,
structures and monitoring, sidewalk improvements, street 411 pavement,
lighting, bike facilities, landscaping and irrigation, and increased on-
street parking concepts, Includes all areas of Normandy Island south of
the canal, Including the Normandy Sud neighborhood. $300,000 from
Section 108 Loans to be used in CDBG areas only. $100,000 Gas Tax
funding allocated from #343, #341, #342. #411
1999 GENERAL OBLIGATION BOND PROGRAM - NEIGHBORHOOD IMPROVEMENTS
ORIGINAL G.O. BOND PROGRAM - NEIGHBORHOODS
4,150,000 Normandy Isle and Normandy Sud Neighborhood
NEIGHBORHOOD IMPROVEMENTS 2 of 1037
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
PROJECTS FUNDED BY NEIGHBORHOOD GOB & NON-GO BOND FUNDS
1999 GENERAL OBLIGATION BOND PROGRAM - NEIGHBORHOOD IMPROVEMENTS
ORIGINAL G.O. BOND PROGRAM - NEIGHBORHOODS
La Gorce Neigh. Alton Road Enhancement
Operational Improvements to mitigate traffic impact along Alton Road.
Traffic calming $4,095,000 $0 Improvements may include: landscaping
and irrigation, light\in improvements, pavement Restoration I
improvements, curb & gutter improvements, roadway markings, signage,
signal improvements, bicycle facilities, and/or traffic calming structures.
Funding includes Planning process. Capital cost Identified by Municipal
Mobility Plan. (Municipal Mabtlity Plan Projects #14 & #24))
819,000 Included in La Gorce Neighborhood Improvements project - - - -
La Gorce Neighborhood Streetscape
Improvements
Area-wide street improvements on City-owned roads (except Alton,
LaGorce, Pinetree). Coordinate with Municipal Mobility Plan Project #14.
Includes $300,000 realocated from Gas Tax funding t#341, 342,#343,#411
). Includes unfunded need of $500,000 from Pinetree and LaGorce Traffic
Calming Project (#634) which complements the MDC DPW Traffic
Calming project with additional landscape, lighting, irrigation, and
signage. Complements Alton Road Enhancements.
200,000 La Gorce Neighborhood Improvements 1,894,012 414,863 33,806 1,445,343 Pending Future Funding
of $14 million
La Gorce Island Lighting trees 66,376 - - 66,376 Ongoing
La Gorce Island Enhancements 130,743 130,743 - - Pending Future Funding
of $1 million
Oceanfront Neigh. Indian Creek Greenway (24th
to 54th Street)
Streetscape along Collins and Indian Creek Drive; landscape, street
furniture, Irrigation, lighting to create a linear pedestrian park and
bikeway along Indian Creek from 23rd St & Lake Pancoast to 54th St.
Connects Collins Canal Bikeway and North Shore Seachwalk. (Municipal
Mobility Plan Projects #15 & #44). Partial funding to start. Completion
requrres control ancl/or use or other shoreline properties, and FOOT
participation
300,000
Oceanfront Neigh. Street Ends Landscape and
Pedestrian Imp. (25th to 43rd Street)
New lmpro ements to increase pedestrian comfort and enjoyment for
beach access at street $4,300,000
ends (26th to 43rd Sts,). Eighteen street ends are included at
approximately $200,000 each for pedestrian facilities, streetscape
restorations, lighting, and slgnage. Additional funding provide for the
location of secure, accessible restroom and shower f'lcilltles where
needed,
4,300,000
Nautilus Neighborhood Improvements 5,070,355 5,070,355 - - Complete 2010
Nautilus-Pinetree Dr Sidewalk 1,698 1,698 - - Complete 2010
2 Way Conversion 42nd Street 510,000 - - 510,000 Design
42nd ST. Green Bicycle Lanes 150,000 - - 150,000 Design
Bayshore Neighborhood - Bid Pack A 3,085,932 2,912,193 - 173,739 Substantial Completion 2018
Bayshore Neighborhood South 3,611,247 725,475 2,309,772 576,000 Construction
Bayshore Neighborhood - Bid Pack B 616,106 586,205 - 29,900 Complete 2016
6,616,211 Oceanfront Neighborhood Improvements 2010- 6,616,211 -
Nautilus Neighborhood Improvements 5,150,000
Area-wide street improvement (integrates Municipal Mobility Plan
PrOJect #17). Funding $5,250,000
342, 343, includes traffic calming planning, structures and monitoring,
sidewalk improvements, street
411 p11vement, lighting, bike facilities, landscaping and irrigation, and
Increased on-street parking concepts, $100,000 G'ls Tax funding
allocated from #343, #341, #342, #411
Area-wide street improvement (Not listed in Municipal Mobility Plan
Project Sank, requires 342, 343, coordination wit Projects #17, #18. and
#24). Funding includes traffic calming planning, 411 structures and
mbnitoring, sidewalk improvements, street pavement. lighting, b1ke
facilities, landscaping and irrigation, and increased on-street parking
concepts. $tOO,OOO Gas Tax funding allocated from #343, #341, #342,
#41 I
Bayshore Neighborhood Streetscape and Traffic
Calming
Traffic enhancements, landscaping, signage, lighting, and park
improvements on LaGorce Island.200,000
Complete
3,400,000
La Gorce Island Enhancement
NEIGHBORHOOD IMPROVEMENTS 3 of 1038
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
PROJECTS FUNDED BY NEIGHBORHOOD GOB & NON-GO BOND FUNDS
1999 GENERAL OBLIGATION BOND PROGRAM - NEIGHBORHOOD IMPROVEMENTS
ORIGINAL G.O. BOND PROGRAM - NEIGHBORHOODS
Bayshore Neighborhood - Bid Pack C 896,625 896,625 - - Complete 2015
Lake Pancoast Neighborhood Irrigation 15,297 15,297 - - Complete 2015
Bayshore Neighborhood - Bid Pack D 300,000 300,000 - - Construction
Sunset Island 1 & 2 Curb Project 12,614 12,614 - - Complete 2010
40th Street Streetscape
Streetscape, roadway, drainage, sidewalk, curb& gutter, landscape along
40th Street from Chase Avenue to Pinetree Drive. Project complements
Orchard Park lmprovments, and provides needed buffering between
residential nelghborhhood and the back of commercial wses along the
41st Street business district. (Not listed In Municipal Mobility Plan
Project Bank, requires coordination with Project #18)
500,000 Broken out from Bayshore Bid Pack A project 500,000 500,000
- -
Complete 2015
Alton Road & 20th Street & Sunset Drive
Reconfiguration Imp.
Reconfigure intersections to increase capacity and reduce cut-through
traffic to North Bay $375,000 $0
Road. This project mitigates traffic impacts to the North Bay Road
residential community from 20th Street to lhe Chase Avenue intersection.
(Municipal Mobility Plan #28, requires coordination with Project #24)
75,000 Alton Road Enhance Middle Bch 210,390 210,390 - - Complete 2007
Flamingo Neighborhood-East 272,821 272,821 - - Complete 2008
Flamingo Neighborhood-West 390,492 390,492 - - Complete 2012
Flamingo Neighborhood-South 277,710 277,710 - - Complete 2015
Flamingo Park North 100,464 100,464 - - To Be Closed 2017
Flamingo 11th Street 1,511,348 - - 1,511,349 Construction
Flam Ngh-Lummus 16 St So Prj (BPB package)4,854,301 4,854,301 - - Complete 2007
West Avenue/Bay Road Improvements Ph I 4,306,401 4,147,087 150,292 9,022 Substantial Completion 2017
West Avenue Bridge over Collins Canal 67,703 - 65,738 1,965 Construction
Sunset Islands Enhancement
900,000
Area-wide street improvement (Not listed in Municipal Mobility Plan
Project Bank, requires 342, 343, coordination with Projects #33, and #35).
Funding includes traffic calming planning, structures and monitoring,
sidewalk Improvements, street pavement. lighting, bike facilities,
landscaping and irrigation, and increased on-street parking concepts,
$100,000 Gas Tax funding allocated from #343, #341, #342. #411.
Includes $300,000 developer contributions from Parkshore and Grand
Flamingo.
Streetscape, roadway, curb & gutter, storm rJrain, landscape, irrigation.
Runoff debris and Collins side as part of seawalls and greenway. (Not
listed in Municipal Mobility Plan Pro;ed Bank, re cires coordination with
Project #18)
Area-wide street improvement (Municipal Mobility Plan Project# 33, and
#35, requires 342, 343, coordination with Project #37). Funding includes
tr<1ffic calming plann1ng, structures and monitoring, Sidewalk
improvements, street pavement, lighting, bike lacllities, landscaping and
irrigation, and increased on-street parking concepts. Capital costs based
on right-of- way related projects proposed through the Flamingo
Neighborhood Charrette in 1997. $100,000 Gas Tax funding allocated
from #343, #341, #342, #411. $33,000 developercontribution from Crown
Royale mitigation
Lake Pancoast Streetscape
Flamingo Neighborhood Improvements
Traffic enhancements, landscaping, Signage. lighting, and park
improvements on Sunset Islands
1,800,000
200,000
West Avenue/ Bay Road Improvements
7,400,000
NEIGHBORHOOD IMPROVEMENTS 4 of 1039
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
PROJECTS FUNDED BY NEIGHBORHOOD GOB & NON-GO BOND FUNDS
1999 GENERAL OBLIGATION BOND PROGRAM - NEIGHBORHOOD IMPROVEMENTS
ORIGINAL G.O. BOND PROGRAM - NEIGHBORHOODS
Venetian Neigh - Venetian Islands 4,240,388 4,212,215 28,174 - Construction
Venetian Neighborhood - Belle Isle 2,536,800 2,536,800 - - Complete 2013
Venetian Causeway Master Plan Phase II
Causeway
Infrastructure and landscaping Improvements for the Venetian Causeway,
from the Dade Boulevard intersection to the City Line. Includes sidewalk,
curb and gutter, lighting, landscaping, traffic control device
improvements, and gateway tre< tment. Phase 2
Improvements are for the causeway only. ( Municipal Mobility Plan #32,
requires
1,827,000 Venetian Neigh - Causeway (Bid D)1,819,129 1,819,129
- -
Complete 2014
Palm & Hibiscus Island Enhancement 565,284 527,874 37,410 - Construction
Star Island Enhancements 474,046 474,046 - - Complete 2015
Lincoln Rd Capital Imprv Proj.175,645 175,645 - - Complete 2015
Non-GO Funds - RDA City Center Projects 1,071,942 1,071,942 - - Complete 2006
South Pointe Neigh. Meridian Avenue Extension
Streetscape
Streetscape, landscape, lighting, for reopening of Meridian Avenue from
1st Street to 2nd Streei Not covered under ROA funding. (Coordinate
with Municipal Mobility Plan Project.
200,000 S Pointe Improvements - Ph III-V 200,010 200,010 - - Complete 2017
Washington and Third Street Public Plaza
Provide aesthetic improvements at the pump station location to integrate
with a public plaza improvement at Intersection of Washington Avenue,
Third Street, and Euclid Avenue
100,000 Non-GO Funds - Art in Public Places 32,362 32,362 - - Complete 2010
Traffic enhancements, landscaping, sign age, lighting, and park
improvements to Star.
Palm, and Hibiscus Islands 600,000
Infrastructure and landscaping Improvements for Venetian Islands,
including San Marino, $13,091,150 01 Lido, Rive Alto, and Belle Islands,
and a section ·from Alton Road to Island View Park. Includes sidewalk,
curb and gutter, lighting, landscaping, traffic control device
improvements, and gateway treatment. Phase 1 Improvements Include
Island sldestreets (Not listed in Municipal Mobility Plan Project Bank,
requires coordination with MMP Project
#32)
300,000
Star, Palm, Hibiscus Islands Enhancement
Venetian Causeway Master Plan Phase I
Venetian Islands 3,844,150
Lincoln Road Improvements
Improvements to lincoln Road to upgrade lighting, pools, fountains. and
other amenities for the purposes of replacing malfunctioning and/or
unservicable equipment with equipment that can provide for better
maintenance and performance
NEIGHBORHOOD IMPROVEMENTS 5 of 1040
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
PROJECTS FUNDED BY NEIGHBORHOOD GOB & NON-GO BOND FUNDS
1999 GENERAL OBLIGATION BOND PROGRAM - NEIGHBORHOOD IMPROVEMENTS
ORIGINAL G.O. BOND PROGRAM - NEIGHBORHOODS
Seawall & Docks NB Police 451,517 451,517 - - Complete 2011
Bonita Drive Seawall Repairs (Normandy Isle Channel)310,323 310,323 - - Complete 2011
Seawall Struct Evaluati Survey 35,000 35,000 - - Complete 2011
Shoreline Imprv-La Gorce Neigh 5,098 5,098 - - Complete 2011
Cherokee Ave South End Seawall 140,000 129,783 10,125 152 Construction
Seawall-Sunset Lake Pk (Sunset Is #4) SW 389,187 389,187 - - Complete 2011
Seawall-Lincoln Road Streetend W 717,660 717,660 - - Complete 2011
Seawall-Pine Tree Dr Rehab 63 St 168,170 168,170 - - Complete 2011
Seawall-Waterways Dredging 33,565 33,565 - - Complete 2,011
Dickens Av Shoreline & Bike Path 49,869 23,619 - 26,250 Construction
Seawall-Pine Tree Pk Shoreline Rest 205,848 205,848 - - Complete 2014
Flamingo Drive Seawall Rehabil 18,615 18,615 - - Complete 2011
Collins Canal Waterway Revital 259,700.00 259,700.00 - - Complete 2005
Collins Canal Enc. Project 1,428,192 1,428,192 - - Complete 2016
Bayfront Streetend Public Access Enhance 30,763 30,763 - - Complete 2011
Hydrographic Waterway Survey 69,356 69,356 - - Complete 2011
Indian Creek Greenway 100,000 66,546 - 33,454 Design
13 projects - Non-GO Funds - various 2,819,264 2,819,264 - - Complete 2016
Property Management Facility 977,776 946,912 30,864 - Complete 2016
Non-GO Bond Funds 1,311,927 1,311,927 - - Complete 2016
Parks Maintenance Facility 432,170 27,286 - 404,884 Pending Future Funding
of $1 million
Non-GO Bond Funds 65,853 65,853 - - Complete 2003
Public Works Facility 778,203 756,825 21,379 - Pending Future Funding
of $1.5 million
Non-GO Bond Funds 303,286 303,286 - - Complete 2010
Repl Beach Restroom Facility 174,999 174,999 - - Complete 2015
Signage Master Plan - wayfinding 6,833 6,833 - - Complete 2013
TOTAL NEIGHBORHOOD GO BOND FUNDING:66,775,831 58,658,663 2,797,522 5,319,709
TOTAL NEIGHBORHOOD NON-GO BOND FUNDING:7,974,853 7,974,853 - -
TOTAL NEIGHBORHOOD FUNDING:2,797,522 5,319,709
402,081
8,519,311
3,682,399
Shares: 65% of Property Maintenance Facility renovation ($1,402,375)
which maintains $4,114,569
574 City structures and street property, 72% of Public Works Facility
renovation ($2,280,024)
which maintains public rights of way, and 72% of Parks Maintenance
Facility renovation ($432,170) which maintains landscaping in public
rights of way. Property Maintenance Faculty Includes: replacement Of
10,000 sq.ft. maintenance and warehouse facility, parking for 40 City
vehicles, 40 employee vehicles, ADA compliance. Present facility Is
unsafe for workers and in need of full restoration. Public Works
renovation includes: renovation of 20,000 sq.ft. facility, 5,000 sq.ft.
expansion, ADA compliance, access road, environmental remediation,
paving, drainage, lighting, parking, and fueling facility for City vehicles.
Parks Maintenance renovation includes renovation of building and
greenhouse, security lighting, screening landscape, and new employee
lot. Funded amount from 72% share of Parks Maintenance Facility
4,800,000
Replace and repair deteriorated City-owned seawalls. For,
bulkhead/seawalls with $10,300,000
drainage outfalls, deteriorated outfalls are to be repaired in the
immediate vicinity. This component, including approximatey 350 outfalls
for $3.5-mi/lion Is a stormwater runoff function, and Is to be funded by
water and sewer revenue sources. Seawalls without outfalls include
Collins Canal, Indian Creek, Lake Pancoast, Parkview Island, and street
ends throughout the City, except in South Pointe ROA (ROA funds
allocated for South Pointe seawall restoration. Other seawalls are
vertical bulkheads at approximately $800 I linear ft. or living seawalls at
approximately $1oo I linear fl. Many of these seawall sections are
coordinated wnh other projects and will be Incorporated Into their cpaltal
costs, including bikeway I greenway projects along Collins Canal and
Indian Creek ($2- mllllon)
UN-APPROPRIATED / UNENCUMBERED & LIABILITES
TOTAL CURRENTLY UNSPENT
TOTAL NEIGHBORHOOD BONDS: FUNDS 373,
376, 384 56,776,799
Shoreliine Seawall Rehabilitation Program
Related Maintenance Facilities Restoration -
Neighborhoods
NEIGHBORHOOD IMPROVEMENTS 6 of 1041
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
Biscayne Point Neighborhood - Crespi Park
New restroom, renovate basketball courts, tot lot, landscape, and
irrigation. Proposed GO Bond components include new basketball
court, court and security lighting, and perimeter aluminum picket
fencing
150,000 Crespi Park 118,759 118,759 - - Complete 2002
Biscayne Point Neighborhood - Stillwater Park
New recreation building and basketball courts, limited security lighting,
landscape & irngn,tion' .. Proposed GO Bond components Include
court and security lighting, and perimeter al.uminum picket fencing
160,000 Stillwater Park 131,165 131,165 - - Complete 2004
Biscayne Point Neighborhood - Tatum Park
Building renovations, playground. landscape & irrigation, limited
security lighting & entry gate. Proposed GO Bond components include
court and security lighting, and penmeter aluminum picket fencing.
150,000 Tatum Park 118,525 118,525 - - Complete 2003
North Shore Open Space Park 300,000 300,000 - - Complete 2006
Altos Del Mar Park-$92M GO Bd 2,900,000 1,044,138 355,985 1,499,877 Construction
North Shore Park 1,461,118 1,461,118 - - Complete 2004
NSP Tennis Rest.33,000 33,000 - - Complete 2016
NSPYC-Fitness Ctr Refurb 71,228 71,228 - - Complete 2014
Rsurf/rblt Basket Ball Centers 55,000 55,000 - - Complete 2013
Normandy Shores Clubhouse 747,073 747,073 - - Complete 2008
Normandy Shores Golf Course Pr 90,164 90,164 - - Complete 2008
Normandy Shores Park Tot-lot 112,000 - 4,200 107,800 Ongoing
Fairway Park
Building, basketball and tennis courts renovation, lighting, playground,
landscape. Proposed GO Bond components include perimeter
aluminum picket fenc1ng 250,000 Fairway Park 245,972 245,972 - - Complete 2013
Normandy Isle Park
Renovate pool and fields, new recreational center, basketball courts,
secunty lighting, tot lot landscape & irrigation. Proposed GO Sand
components include security lighting and perimeter aluminum picket
fencing.
300,000 Normandy Isle Park 889,632 889,632 - - Complete 2008
New recreation center, tennis courts, renovate bandshell, lighting,
landscape & irrigation. accessible playground. Proposed GO Bond
components include baseball field lighting, perimeter aluminum picket
fencing, and $1,000,000 for Youth Center
Phase II Renovation and restoration of golf course and club house.
Proposed GO Bond component to provide additional resources per
community request for clubhouse renovations and development of
community center facilities for the neighborhood residents.
North Shore Park & Youth Center 1,350,000
1999 GENERAL OBLIGATION BOND PROGRAM - PARKS & BEACHES
PROJECTS FUNDED BY PARKS GOB & NON-GO BOND FUNDS
New Recreation I Nature Center, renovate restrooms, lighting,
landscape & irrigation, funded by CIP. Proposed GO Bond components
include expanded Nature Center, additional beach plantings, security
lighting and fencing, and provides for expansion into Altos del Mar.
Expansion includes conversion to passive park of eleven contiguous
lots in Altos,del Mar, renovate or move historic structures, provide
Infrastructure. and extend Ocean Terrace to 76th Street
3,200,000
750,000 Normandy Isle Neighborhood- Normandy
Shores Club House Community Center
ORIGINAL G.O. BOND PROGRAM - PARKS & BEACHES
North Shore Open Space Park
PARKS BEACHES 7 of 1042
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
1999 GENERAL OBLIGATION BOND PROGRAM - PARKS & BEACHES
PROJECTS FUNDED BY PARKS GOB & NON-GO BOND FUNDSORIGINAL G.O. BOND PROGRAM - PARKS & BEACHES
La Gorce Neighborhood - Fisher Park
Shade pavillion, restroom, tot lot, secunty lighting, landscape,
decorative fencing. Proposed GO Bond cdmponents Include security
lighting and perimeter aluminum picket fencing 150,000 Fisher Park 116,339 116,339 - - Complete 2013
La Gorce Neighborhood - La Gorce Park
New tot lot, security lighting, landscape & irrigation. Proposed GO
Bond components include security lighting and perimeter aluminum
picket fencing.
50,000 La Gorce Park 56,980 56,980 - - Complete 2004
Allison Park 22,100 22,100 - - Complete 2003
Non-GO Bond Funds - NB Quality of Life Resort
Tax 1%1,332,000 444,586 391,485 495,929 Construction
Nautilus Neighborhood - Muss Park
Renovate recreational building, sports courts, court lighting, tot lot,
landscape & Irrigation. Proposed GO Bond components include
replacement playground equipment, irrigation, perimeter aluminum
picket fencing, security lighting, and court lighting.
75,000 Muss Park 152,276 134,978 17,038 260 Construction
Pine tree Park
Parking lot, landscape, irrigation, pedestrian walkways. Proposed GO
Bond components include security lighting, additional landscaping,.
and site furnishings
90,000 Pine Tree Park 69,197 69,197 - - Complete 2004
Scott Rakow Youth Center 195,727 195,727 - - Complete 2013
SRYC - Ice Rink Mec 367,000 367,000 - - Complete 2015
Flamingo Park Neighborhood - 10th Street
Auditorium/Beachfront Aud.
Renovate 10th St Auditorium /Beach Patrol Headquarters, including
ADA requirements, painting, and restoration of deteriorated facilities 690,000 Lummus Park Improvement 673,472 673,472 - - Complete 2009
South Shore Community Center Renovation and reconstruction of complete facility, with new
landscaping, irrigation, signage, and playground 1,350,000 South Shore Comm Center 1,307,823 1,307,823 - - Complete 2006
Flamingo Park - Pool Expansion 670,561 670,561 - - Complete 2002
Flamingo Park - Pool Playground 76,026 680 - 75,346 Ongoing
Flamingo Park 4,695,049 4,694,705 133 211 Construction
Flamingo Park Baseball Stadium Scoreboard 20,432 20,432 - - Complete 2014
Non-GO Bond Funds - General Fund 2004Complete- - 28,034 28,034
New ice rink, building renovation, parking lot, and landscaping.
Proposed GO Band components provide funding necessary to
complete Parks Bond Fund renovations
New pool, renovate all sports facilities, tot lot, landscape, and signage.
Proposed GO Bond components include: perimeter aluminum picket
fencing, security lighting, football field renovations, new bleachers,
track resuriacing, completion of tennis court improvements, court
lighting, new shade pavillion, and a new Irrigation system. Renovation
and buffering for compatibility of the Property Maintenance Facility In
Flamingo Park is funded separately.
2,500,000
Allison Park Renovations, gateway, and beach access. Project added by community
request. Specific components to be further defined 170,000
Bayshore Neighborhood - Scott Rakow Youth
Center 150,000
Flamingo Park
Oceanfront Neighborhood - Brittany Park General lighting per the Parks Master Plan 10,000
PARKS BEACHES 8 of 1043
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
1999 GENERAL OBLIGATION BOND PROGRAM - PARKS & BEACHES
PROJECTS FUNDED BY PARKS GOB & NON-GO BOND FUNDSORIGINAL G.O. BOND PROGRAM - PARKS & BEACHES
Lummus Park
Renovate restroom, renovate serpentine sidewalk, new playground
equipment, landscape, $2,031,229 & irrigation. Proposed GO Bond
components include additional landscaping, and widening of the
sidewalks on the east Side of Ocean Drive
1,100,000 Lummus Park 1,121,553 1,121,553 - - Complete 2009
West Avenue -Island View Park
Playgrownd suriace, landscape & irrigation. Proposed GO Bond
components include security lighting, perimeter aluminum picket
fencing, and shade pavillion.
150,000 Island View Park 115,727 115,727 - - Complete 2004
Venetian Islands, Star Islands, Palm Islands,
Hibiscus - Palm Island Park
Repair existing shade pavillion, new basketball courts, new playground
eqwlpment, accessible routes, Proposed GO Bond components
include court and security lighting, and refurbishment of tennis courts.
75,000 Palm Island Park 75,608 75,608 - - Complete 2004
Belle Isle Park Improvements Proposed GO Bond funding to provide playground, landscape,
irrigation, site furnishings, pedestrian. and lighting Improvements 600,000 Belle Island Park Improvmnts 598,351 598,351 - - Complete 2010
South Pointe Park (Project was funded with South
Pointe Capital fund\s)- - - - Complete 2010
Non-GO Bond Funds - various 28,121,082 28,121,082 - - Complete 2010
Collins Park Construct park improvements: walkways, lighting, landscape, amen1ty,
etc.1,800,000 Collins Park/Streetscape/Rotunda 1,681,428 1,681,428 - - Complete 2012
Garden Center Renovation Renovations to building and ADA compliance 1,500,000 Garden Center Renovations - Botanical Garden 1,589,634 1,589,634 - - Complete 2012
Beach Planting Middle Beach 143,389 143,389 - - Complete 2004
Non-GO Bond Funds - County Safe Neighborhood
Bonds 332,436 332,436 - - Complete 2004
Beach Planting South Beach 118,568 118,568 - - Complete 2003
Non-GO Bond Funds - County Safe Neighborhood
Bonds 305,747 305,747 - - Complete 2003
Beach Planting North Beach 143,290 143,290 - - Complete 2004
Non-GO Bond Funds - County Safe Neighborhood
Bonds 332,799 332,799 - - Complete 2004
North Beach Recreational Corridor Bicycle and pedestrian facility on beach ROW from 60th Street to 75th
Street. To be coordlanted with Allison Park improvements 500,000 N. Beach Recreation Corridor 735,000 735,000 - - Complete 2011
ADA Beach Access System 4,254 4,254 - - Complete 2006
Non-GO Bond Funds - Grants & Donations 343,104 343,104 - - Complete 2014
2,000,000 Improvements at South Pointe Park.South Pointe Park Improvements
ADA Beach Access
Wheelchair accessible over-dunes, with decked, railed, lookout point.
w/ shade trees, and additional parking space, made out of bar grading
in the sand -srew anchored below grade with large deck area at seaside
with rails
225,000
Plantings for dune system and beaches throughout CityBeach Planting Citywide 1,000,000
PARKS BEACHES 9 of 1044
Project Name Description Amount Project Name BUDGET EXPEND.ENCUMB.Balance as of
06/30/2017 Project Status Year
1999 GENERAL OBLIGATION BOND PROGRAM - PARKS & BEACHES
PROJECTS FUNDED BY PARKS GOB & NON-GO BOND FUNDSORIGINAL G.O. BOND PROGRAM - PARKS & BEACHES
ADA Improvements Settlement 651,853 651,853 - - Complete 2011
Non-GO Bond Funds - Reallo. Funds Other Cap.
Proj.15,243 15,243 - - Complete 2006
Non-GO Bond Funds - Grants & Donations;
additional expenditures for ADA renovations have
been made throughout city-owned facilities as part
of other projects (example restroom renovation
would also include ADA compliance)
85,414 85,414 - - Complete 2014
Parks Maintenance Facility 133,287 116,450 5,313 11,524
Pending Future
Funding of $1
million
Public Works Facility 447,678 164,095 - 283,582
Pending Future
Funding of $1.5
million
Property Mgmt Facility 3,704,665 3,615,897 82,344 6,424 Substantially
Completed 2017
Support Svc Facility-Fire St 2 199,708 199,708 - - Complete 2002
Parks Facilities Roof Repair Plan
Provide for comprehensive root surveys of large facilities and roof
replacment and repair. This is 80% of the Roof Repair Plan. 10% is
incorporated Into the Public Works Facility, and 10% into the Property
Maintenance Facility.
700,000 Roof Repr/Repl-City Facilities 576,837 576,837 - - Complete 2012
Shane Watersports Center 1,368 1,368 - 2006
Park View Island 197,838 74,123 51,099 72,616 In progress
Polo Park Basketball Courts 73,907 73,907 - - Complete 2016
Polo Park Improvements 49,787 49,787 - - Complete 2016
TOTAL PARKS & BEACHES GO BOND FUNDING:28,060,349 25,486,595 516,112 2,057,641
TOTAL PARKS & BEACHES NON-GO BOND
FUNDING:30,895,859 30,008,445 - -
TOTAL PARKS & BEACHES FUNDING:516,112 2,057,641
688,221
3,261,974
1,000,000
Projects not identified in Original Resolution
Shares: 25% of Property Maintenance Facility renovation ($539.250)
which maintains City structures and street property, 22% of Public
Works Facility renovation ($696,674) which maintains public rights of
way, and 22% of Parks Maintenance Facility renovation ($211 ,343)
which maintams landscaping in public rights of way. Property
Maintenance Facilty Includes: replacement of 10,000 sq.ft. maintenance
and warehouse facility, parking for 40 City vehicles, 40 employee
vehicles, ADA compliance. Present facility is unsafe for workers and In
need of full restoration. Public Works renovation includes: renovation
of 20,000 sq.ft. facility, 5.000 sq.ft. expansion, ADA compliance, access
road, environmental remediation, paving, drainage, lighting, parking,
and fueling facility for City vehicles. Parks Maintenance renovation
includes renovation of building and greenhouse, security lighting,
screening landscape, and new employee lot.
1,447,267 Related Maintenance Facilities Parks & Beaches
ADA City-Wide Renovations Renovate City-owned facilities to Improve safe access to persons with
disabilities
TOTAL PARKS & BEACHES BONDS: FUNDS:
374, 377, 383 23,642,267
UN-APPROPRIATED / UNENCUMBERED & LIABILITES
TOTAL CURRENTLY UNSPENT
PARKS BEACHES 10 of 1045
46
•
•
47
•
•
•
•
48
49
•
•
50
•
51
•
–
•
–
•
–
52
53
Identify
Potential
Projects
Size of Bond
Program and
Propositions
Prioritization
of Projects
Community
Outreach
Voter
Referendum
54
55
To cover annual debt service, offsetting
millage rate increase would be necessary
56
Size the
bond
program
and each
proposition
Identify
potential
projects
Select
target date
for voter
referendum
Next Steps
57
58
59
60
DISCUSSION AT COMMITTEE MEETING