Resolution 1722 RESOLUTION NO. 1722
WHEREAS, the City Council of the City of Miami Beach,
did, on the 30th day of November, A. D. , 1927, pass a resolu-
tion approving certain payments made by C. A. Renshaw, W. A.
Kohlhepp, Jno. C. Knight , J. N. Lummus and T. J. Pancoast ,
acting as the Dade County Ocean Front Protective Commission,
and the City Council did also approve certain contracts and
Acts of C. A. Renshaw , W. A. Kohlhepp, Jno. C. Knight , J. N.
Lummus and T. J. Pancoast , acting as the Dade County Ocean
Front Protective Commission, and
WHEREAS, C. A. Renshaw, W. A. Kohlhepp, Jno. C. Knight ,
J. N. Lummus and T. J. Pancoast , acting as the Dade County
Ocean Front Protective Commission, have presented to the City
Council of the City of Miami Beach, a statement showing the
following amount to be due on the said ocean front protection
work:
G. 0. Reed, Inc. Final Estimate $27,347.01
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Miami Beach, that the payment set out hereinafter
be authorized to be made by C. A. Renshaw , W. A. Kohlhepp,
Jno. C. Knight , J. N. Lummus and T. J. Pancoast , acting as
the Dade County Ocean Front Protective Commission, and that
such payment when so made shall be considered to have been so
made with the full approval and authorization of the City of
Miami Beach:
G. 0. Reed, Inc. Final Estimate $27,347.01
PASSED AND ADOPTED this 25th day of January, A. D. , 192$.
----- President o City Council
ATTEST: �T
4.70
City Clerk
k
•
OFFICE 0F 'IEE CITY ENGINEER
January loth,
1928
Mr. Claude A. Renshaw, Chairman,
Dade County Ocean Front Protective Commission,
Miami beach, Florida.
Dear Sir:-
I attach hereto Sixth and Final Estimate in favor
of Geo. 0. Reed, Inc. , for work done by them under
their BP-1 Contract with the Daue County Ocean
Front Protective Commission.
This Final Estimate is in the amount of $27,34(.Ol,
which brings the total , of $225,920.21, paid to
the aoove named Companyon this Contract.
Yours v:ry t ul
-*zit
00,) ,
916
ERN:
Eof En;ineer/ -
Estimate at cached.
•
T 4,477.16
.(b) GROYNE SECTION: 140.17 LIN. FT.
_, 05 .06 Sq.Ft. Steel Sheet Filing ! , 1.15 $ 18845.82
918 Sq.Ft. Steel Sheet Piling ! .96 881.28
L..O00 Lin.;Ft, Untreated Timber
Piling ! .71 710.00
MBM 6* Z 8• Wales
(Untreated) ! 383.59 �.._..._5±4
4,010.61
a,„e I
:1/ 4/28
•
SIXTH & FINAL FINAL ESTIMATE BEACH PROTECTION
ESTIMATE CONTRACT BP-1
TO
GEO. 0. REED, INO.
JANUARY 17th, 1928.
For work performed and materials furnished under. their Contract
with the Dade County Ocean Front . Protective Commission:
MAIN BULKHEAD: 3,551.7 LIN. FT.
89,234.1 Sq.Ft. Steel Sheet Piling • $ .96 $85,664.74
35,537 Bq.Ft. Protective Treatment • .24 8,528.88
11,300 Lin.Ft. Untreated Timber
Piling • .71 8,023.00
35,537 MBM 10' X 12" Anchor Wale
(Untreated) • 383.59 13,631.64
25,553 MBM 8" X 8" Struts
(Treated) • 361.47 9,236.64
106 611 I, > 30# Channel Wales 0 16 1L057,76
8,067 0u.Yds. of Filling In • .25 2,016.75
4 Pairs o! Steps • 137.99 551. 6
'144,711.37
CUTOFF WALLS
(a) t7L____YBEAD SECTI 121.83 LIN.FT.
20837,6 Sq.Ft. Steel Sheet Piling • $ .96 $ 2,724.10
1,096.47 " " Protective Treatment • .24 263.15
300 Lin.Ft. Untreated Timber
Piling • .71 213.00
1;216; YBM 10" X 12" Anchor Wales
(Untreated) • 383.59 467.33
6a19 MBM 8" X 8" Struts.
(Treated) • 361.47 224.80
3,654.9 Lbs. 30# Channel Wales • .16 84. 8
4A77.16
(b) GROYNE SECTION: 140.17 LIN. FT.
' 1,605,0S SccFt. Steel Sheet Piling • 0 1.15 4 1445,82 .
=18 Bq.Ft. Steel Sheet Piling • .96 881.28
1„000 Lin.Ft. Untreated Timber
Piling I .71 710.00
,>l MBM S I 8' Wales
(Untreated) • 383,59
� . 4,010.61
t4_y".4+ 1$4 -ice. My. �{..... ��TX•`+:+
•
PAGE #2 ESTIVATE TO G80. 0. REED, INC. BP-1
JANUARY 17th, 1928. FINAL
ESTIMATE.
GROYNES NOS. 1 t• 12, inclusive: 2,225,95 Lin.Ft.
40,067.1 Sq.Ft. Steel Sheet Piling 4 $ 1.15 $ 46,077.17
11,154.9 Sq.Ft. Protective Treatment • .24 2,677,18
14,625 Lin.Ft. Treated Timber Piling • 1.07 15,648.75
22.2595 IBM Treated 6' X 1041 Wale • 353.36 7‘065.62
72,268.72
•
EXTRA WORD:
Special construction at Roman Poole 2 0,00
Windmill, as per Agreement 5
Pulling Steel Sheet Piling to Newllrads
at roynes 11 and 12, 6 3/4 hours time
fot Crane and Crew • 12.50 84.38
Moving Pile puller to the job as per 34.15
attached Bills
Steel in Extra "T" Sheet, (1544 #s
less 755 #s) 789 #5 • 61.00 T 24,06
Treatment in two extra •T" Sheets,
6.6 Sq.Ft. • .24 1.58
Burning holes and bolting extra "T' 14.48
Sheets as per attached bill
Welding extentions on 'T" Sheets
as per attached bill - 4 0# 452.35
GRAND TOTAL $225,920.21
DEDUCTIONS:
Less September let, 1927, Estimate $ 30,526.52
Less October let, 1927, • 30,821.21
Less November let, 19279 • 60,816.01
Less December Pat, 1927; " 24��F95.48 198.�3�
913.08
Less January 1st, 19269 20
DUE TWIS DATE $ 279347.01
I HEREBY CERTIFY to the correctnesa of the above Final
Estimate and that the work has been done according to
Plans and Specifications.
ME ri E
1/14/28
X
•
FOUNDATIONS BASCULE AND FIXED BRIDGES CONCRETE
STEEL
DOCKS
N G. 0. REED, INC.
ENGINEERS AND -CONTRACTORS •
MICHIGAN CITY,IND. -- MIAMI BEACH,FLA. January 13 , 1928.
i3ox Glc Beach,Fla
Address Reply to
• Mr. Ed . P. Neff, Engineer,
Dade County Ocean Front Protective Comm . ,
Miami Beach, Florida.
To extra work done in connection with contract for
building Ocean Front Protection Bulkhead:
To transportation of pulling frame from office to job one return, -
Oct. 18, 192:7:
Foreman 3 hours 1.00 per hour 3.00
Laborers 3 hours . 65 per hour . - - 1.95
0. 3 n: ..60 n n - - - 1.80
6 " . 50 " " - - - 3.00
Truck hire , 3 hours, 3.00 per hour- - 9.00
Oct. 28, 1927:
Foreman 2 hours 1.00 per hour 2.00
Laborers 2 hours b .65 per hour - - - - 1.30
a 6 K 60 " n — — — - 3.60
Truck hire 2 hours 3.00 per hour - - 6.00
31.65
Plus labor - - - 2.50
$34.15
�' 1
•
FOUNDATIONS BASCULE AND FIXED BRIDGES CONCRETE
STEEL
DOCKS
G. 0. :FED, INC.
ENGINEERS AND CONTRACTORS
MICHIGAN CITY, IND. .- MIAMI BEACH,FLA. January 13, 1928.
Address R04 ,Box 228,Miami Beach,Fia.
Mr. Ed. R. Neff , engineer ,
Dade County Ocean Front Protective Comm. ,
Miami Beach, Florida.
To extra work done in connection with contract for
building Ocean Front Protection Bulkhead :
Labor and material furnished due to change of location
of groyne No. 4: -
Labor - 5 hours $1 .10 per hour - - - - $5.50
5 " • .60 " - - 3.00
22 bolts 3/4" x 22" - 17 lbs . L .10 - - - 1.70
Acetylene and Oxygen 3.00
13.20
Plus 15 labor 1.28
414.48
FOUNDATIONS BASCULE AND FIXED BRIDGES CONCRETE
DOCKS STEEL
.
`-' . 4t G. 0. REED, INC. '' `,
ENGINEERS AND CONTRACTORS
MICHIGAN CITY,IND. -- MIAMI BEACH,FLA. January la, 1928.
Address Reply toBOX 22S,Miami Beach,Fla.
Mr. Ed. R. Neff, Engineer, .
Lade County Ocean Front Protective Comm. ,
Miami Beach, Florida.
To extra work done in connection with contract for building
Ocean Front Protection Bulkhead:
To welding extensions on groyne Tees account chLnL;e
in elevation:
Labor:
11/3/27 - Welder ,outfit , acetylene and oxygen - 2 hours
11/5/27 - n n H u n - 2 a
11/7/27 - n. it. n It a — Il, n
11/8/27 — II n n n n. _ 3 n
11/21/27 It n It II n — 1 n
11/22/27 II n It n n — 1 II
12/14/27 It n ' n II It — 2 n
1'1.7/27 II U. n H fI - 2 u
12/19/27 " II II It U — �, U
12/20/27 n n n It It — 1 n
19 u
19 hours 42.30 per hour - 443.70
1
/7.
; 1 , , ---7-
A
i_ii5 /line))c
if
1
I
v.). '.. 'ei"-,...- '..-• , .1)
it e
c s
0
„,....,r
.......
(---------,
%.
NI.*1006.
. \
NI
K.._._)
0J
r\N
)".•
. ,
. .
';',.