Resolution 1722 RESOLUTION NO. 1722 WHEREAS, the City Council of the City of Miami Beach, did, on the 30th day of November, A. D. , 1927, pass a resolu- tion approving certain payments made by C. A. Renshaw, W. A. Kohlhepp, Jno. C. Knight , J. N. Lummus and T. J. Pancoast , acting as the Dade County Ocean Front Protective Commission, and the City Council did also approve certain contracts and Acts of C. A. Renshaw , W. A. Kohlhepp, Jno. C. Knight , J. N. Lummus and T. J. Pancoast , acting as the Dade County Ocean Front Protective Commission, and WHEREAS, C. A. Renshaw, W. A. Kohlhepp, Jno. C. Knight , J. N. Lummus and T. J. Pancoast , acting as the Dade County Ocean Front Protective Commission, have presented to the City Council of the City of Miami Beach, a statement showing the following amount to be due on the said ocean front protection work: G. 0. Reed, Inc. Final Estimate $27,347.01 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Miami Beach, that the payment set out hereinafter be authorized to be made by C. A. Renshaw , W. A. Kohlhepp, Jno. C. Knight , J. N. Lummus and T. J. Pancoast , acting as the Dade County Ocean Front Protective Commission, and that such payment when so made shall be considered to have been so made with the full approval and authorization of the City of Miami Beach: G. 0. Reed, Inc. Final Estimate $27,347.01 PASSED AND ADOPTED this 25th day of January, A. D. , 192$. ----- President o City Council ATTEST: �T 4.70 City Clerk k • OFFICE 0F 'IEE CITY ENGINEER January loth, 1928 Mr. Claude A. Renshaw, Chairman, Dade County Ocean Front Protective Commission, Miami beach, Florida. Dear Sir:- I attach hereto Sixth and Final Estimate in favor of Geo. 0. Reed, Inc. , for work done by them under their BP-1 Contract with the Daue County Ocean Front Protective Commission. This Final Estimate is in the amount of $27,34(.Ol, which brings the total , of $225,920.21, paid to the aoove named Companyon this Contract. Yours v:ry t ul -*zit 00,) , 916 ERN: Eof En;ineer/ - Estimate at cached. • T 4,477.16 .(b) GROYNE SECTION: 140.17 LIN. FT. _, 05 .06 Sq.Ft. Steel Sheet Filing ! , 1.15 $ 18845.82 918 Sq.Ft. Steel Sheet Piling ! .96 881.28 L..O00 Lin.;Ft, Untreated Timber Piling ! .71 710.00 MBM 6* Z 8• Wales (Untreated) ! 383.59 �.._..._5±4 4,010.61 a,„e I :1/ 4/28 • SIXTH & FINAL FINAL ESTIMATE BEACH PROTECTION ESTIMATE CONTRACT BP-1 TO GEO. 0. REED, INO. JANUARY 17th, 1928. For work performed and materials furnished under. their Contract with the Dade County Ocean Front . Protective Commission: MAIN BULKHEAD: 3,551.7 LIN. FT. 89,234.1 Sq.Ft. Steel Sheet Piling • $ .96 $85,664.74 35,537 Bq.Ft. Protective Treatment • .24 8,528.88 11,300 Lin.Ft. Untreated Timber Piling • .71 8,023.00 35,537 MBM 10' X 12" Anchor Wale (Untreated) • 383.59 13,631.64 25,553 MBM 8" X 8" Struts (Treated) • 361.47 9,236.64 106 611 I, > 30# Channel Wales 0 16 1L057,76 8,067 0u.Yds. of Filling In • .25 2,016.75 4 Pairs o! Steps • 137.99 551. 6 '144,711.37 CUTOFF WALLS (a) t7L____YBEAD SECTI 121.83 LIN.FT. 20837,6 Sq.Ft. Steel Sheet Piling • $ .96 $ 2,724.10 1,096.47 " " Protective Treatment • .24 263.15 300 Lin.Ft. Untreated Timber Piling • .71 213.00 1;216; YBM 10" X 12" Anchor Wales (Untreated) • 383.59 467.33 6a19 MBM 8" X 8" Struts. (Treated) • 361.47 224.80 3,654.9 Lbs. 30# Channel Wales • .16 84. 8 4A77.16 (b) GROYNE SECTION: 140.17 LIN. FT. ' 1,605,0S SccFt. Steel Sheet Piling • 0 1.15 4 1445,82 . =18 Bq.Ft. Steel Sheet Piling • .96 881.28 1„000 Lin.Ft. Untreated Timber Piling I .71 710.00 ,>l MBM S I 8' Wales (Untreated) • 383,59 � . 4,010.61 t4_y".4+ 1$4 -ice. My. �{..... ��TX•`+:+ • PAGE #2 ESTIVATE TO G80. 0. REED, INC. BP-1 JANUARY 17th, 1928. FINAL ESTIMATE. GROYNES NOS. 1 t• 12, inclusive: 2,225,95 Lin.Ft. 40,067.1 Sq.Ft. Steel Sheet Piling 4 $ 1.15 $ 46,077.17 11,154.9 Sq.Ft. Protective Treatment • .24 2,677,18 14,625 Lin.Ft. Treated Timber Piling • 1.07 15,648.75 22.2595 IBM Treated 6' X 1041 Wale • 353.36 7‘065.62 72,268.72 • EXTRA WORD: Special construction at Roman Poole 2 0,00 Windmill, as per Agreement 5 Pulling Steel Sheet Piling to Newllrads at roynes 11 and 12, 6 3/4 hours time fot Crane and Crew • 12.50 84.38 Moving Pile puller to the job as per 34.15 attached Bills Steel in Extra "T" Sheet, (1544 #s less 755 #s) 789 #5 • 61.00 T 24,06 Treatment in two extra •T" Sheets, 6.6 Sq.Ft. • .24 1.58 Burning holes and bolting extra "T' 14.48 Sheets as per attached bill Welding extentions on 'T" Sheets as per attached bill - 4 0# 452.35 GRAND TOTAL $225,920.21 DEDUCTIONS: Less September let, 1927, Estimate $ 30,526.52 Less October let, 1927, • 30,821.21 Less November let, 19279 • 60,816.01 Less December Pat, 1927; " 24��F95.48 198.�3� 913.08 Less January 1st, 19269 20 DUE TWIS DATE $ 279347.01 I HEREBY CERTIFY to the correctnesa of the above Final Estimate and that the work has been done according to Plans and Specifications. ME ri E 1/14/28 X • FOUNDATIONS BASCULE AND FIXED BRIDGES CONCRETE STEEL DOCKS N G. 0. REED, INC. ENGINEERS AND -CONTRACTORS • MICHIGAN CITY,IND. -- MIAMI BEACH,FLA. January 13 , 1928. i3ox Glc Beach,Fla Address Reply to • Mr. Ed . P. Neff, Engineer, Dade County Ocean Front Protective Comm . , Miami Beach, Florida. To extra work done in connection with contract for building Ocean Front Protection Bulkhead: To transportation of pulling frame from office to job one return, - Oct. 18, 192:7: Foreman 3 hours 1.00 per hour 3.00 Laborers 3 hours . 65 per hour . - - 1.95 0. 3 n: ..60 n n - - - 1.80 6 " . 50 " " - - - 3.00 Truck hire , 3 hours, 3.00 per hour- - 9.00 Oct. 28, 1927: Foreman 2 hours 1.00 per hour 2.00 Laborers 2 hours b .65 per hour - - - - 1.30 a 6 K 60 " n — — — - 3.60 Truck hire 2 hours 3.00 per hour - - 6.00 31.65 Plus labor - - - 2.50 $34.15 �' 1 • FOUNDATIONS BASCULE AND FIXED BRIDGES CONCRETE STEEL DOCKS G. 0. :FED, INC. ENGINEERS AND CONTRACTORS MICHIGAN CITY, IND. .- MIAMI BEACH,FLA. January 13, 1928. Address R04 ,Box 228,Miami Beach,Fia. Mr. Ed. R. Neff , engineer , Dade County Ocean Front Protective Comm. , Miami Beach, Florida. To extra work done in connection with contract for building Ocean Front Protection Bulkhead : Labor and material furnished due to change of location of groyne No. 4: - Labor - 5 hours $1 .10 per hour - - - - $5.50 5 " • .60 " - - 3.00 22 bolts 3/4" x 22" - 17 lbs . L .10 - - - 1.70 Acetylene and Oxygen 3.00 13.20 Plus 15 labor 1.28 414.48 FOUNDATIONS BASCULE AND FIXED BRIDGES CONCRETE DOCKS STEEL . `-' . 4t G. 0. REED, INC. '' `, ENGINEERS AND CONTRACTORS MICHIGAN CITY,IND. -- MIAMI BEACH,FLA. January la, 1928. Address Reply toBOX 22S,Miami Beach,Fla. Mr. Ed. R. Neff, Engineer, . Lade County Ocean Front Protective Comm. , Miami Beach, Florida. To extra work done in connection with contract for building Ocean Front Protection Bulkhead: To welding extensions on groyne Tees account chLnL;e in elevation: Labor: 11/3/27 - Welder ,outfit , acetylene and oxygen - 2 hours 11/5/27 - n n H u n - 2 a 11/7/27 - n. it. n It a — Il, n 11/8/27 — II n n n n. _ 3 n 11/21/27 It n It II n — 1 n 11/22/27 II n It n n — 1 II 12/14/27 It n ' n II It — 2 n 1'1.7/27 II U. n H fI - 2 u 12/19/27 " II II It U — �, U 12/20/27 n n n It It — 1 n 19 u 19 hours 42.30 per hour - 443.70 1 /7. ; 1 , , ---7- A i_ii5 /line))c if 1 I v.). '.. 'ei"-,...- '..-• , .1) it e c s 0 „,....,r ....... (---------, %. NI.*1006. . \ NI K.._._) 0J r\N )".• . , . . ';',.