2017-30080 Resolution RESOLUTION NO.
2 0 1 7 -- 3 0 0 8
0
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE FIRST
AMENDMENT TO THE CAPITAL BUDGET FOR FISCAL YEAR
2017/18.
WHEREAS, the final Capital Improvement Plan for Fiscal Years 2017/18 —
2021/22 and the final Capital Budget for FY 2017/18 were adopted via Resolution No.
2017-30026 on September 25, 2017; and
WHEREAS, City budget amendments pursuant to Section 166.241(4)(c) of the
Florida Statutes must be adopted in the same manner as the original budget; and
WHEREAS, the proposed amendments to the FY 2017/18 Capital Budget are
included in Attachment A (Source of Funds) and Attachment B (Programs); and
WHEREAS, further, it is recommended by the Administration that the FY 2017/18
Capital Budget be amended to reduce appropriations by $757,543.93 and to re-
appropriate $3
p 9
621,416.79 between existing projects as highlighted in Attachments C
and D (Projects) and as further detailed in the attached Commission Memorandum.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission hereby adopt the First Amendment to the Capital Budget for Fiscal Year
2017/18 as set forth in Attachment A (Source of Funds), Attachment B (Programs), and
Attachments C and D (Projects).
PASSED AND ADOPTED this 31st day of October, 2017.
ATTEST:
...................
• h
lNCORP ORATPhi1` me or
/jJ• 444.,94
City
Rafael E. Granado, C y Clerk
APPROVED AS TO
FORM & LANGUAGE
&FOR EXE .TION
01_ 1,
/la �rZ41„,,,T .
OF City Attome Date
ATTACHMENT A
FY 2017/18 CAPITAL BUDGET
SOURCE OF FUNDS
Amended 10/31/17
Adopted Capital Revised Capital
Funding Source Budget Amended 10/31/17
9 Budget
Transportation
$ 913,575 $ 913,575
Capital Renewal&Replacement 2,185,048 (390,560.00) 1,794,488
Comm.Dev.Block Grant 538,483 538,483
Cultural Arts Council Endowment 800,000 800,000
7th Street Garage 1,399,500 1,399,500
Art in Public Places 875,334 875,334
Fees in Lieu of Parking Fund
5,386,347 5,386,347
Concurrency Mitigation Fund
5,555,000 5,555,000
RDA-Non TIF
6,865,154 6,865,154
Mami City Ballet
25,000 25,000
HOME Invest Part.Prog.Grant 344,482 344,482
Half Cent Transit Surtax-Cnty 1,322,000 1,322,000
Capital Projects Financed By Other Funds 4,500,000 4,500,000
Pay As You Go-Capital Fund 2,401,658 (151,134.67) 2,250,523
Capital Reserve 395,492 (215,849.26) 179,643
Resort Tax-South Beach 2,433,579 2,433,579
Resort Tax-Md Beach 2,133,082 2,133,082
Resort Tax-North Beach 2,891,067 2,891,067
Fire Safety 99 GO Bond 337,000 337,000
RDA South Pointe Capital Proj 685,000 685,000
2001 Gulf Breeze-Normandy Golf 85,000 85,000
2003 G.O.Bonds-Parks&Rec 651,342 651,342
Water&Sewer Impact Fees 257,211 257,211
Stormwater Projects-MDC ILA 650,000 650,000
RDA Garages 2,138,000 2,138,000
Parking Operations 11,361,541 11,361,541
2015 Parking Bonds CC Project 185,260 185,260
Property Management Fund 295,000 295,000
Communications Fund 2,202,000 2,202,000
Total Appropriation as of 10/31/17 _$ 59,812,155.00 $ (757,543.93) $ 59,054,611.07
Please refer to attachment D for the details of the dollars which will be transferred between existing projects.
ATTACHMENT B
FY 2017/18 CAPITAL BUDGET
PROGRAMS
Amended 10/31/17
Adopted Capital Revised Capital
Program Area et Amended 10/31/17
9 Budget
Art in Public Places $ 875,334.00 $ 875,334.00
Bridges
0.00 0.00
Community Centers 0.00 0.00
Convention Center 0.00 0.00
Environmental 138,724.00 138,724.00
Equipment 4,649,057.00 90,000.00 4,739,057.00
General Public Buildings 1,587,467.00 (1,515,069.71) 72,397.29
Golf Courses 0.00 0.00
Lighting 800,979.00 800,979.00
Monuments 279,000.00 279,000.00
Parking 250,000.00 250,000.00
Parking Garages 12,540,785.00 12,540,785.00
Parking Lots 600,000.00 600,000.00
Parks 12,108,963.00 12,108,963.00
Renewal&Replacement 9,689,841.00 50,490.00 9,740,331.00
Seawalls 650,000.00 (26,250.00) 623,750.00
Streets/Sidewalk Improvements 7,331,430.00 643,285.78 7,974,715.78
Transit/Transportation 8,208,575.00 8,208,575.00
Utilities 102,000.00 102,000.00
Total Appropriation as of 10/31/17 _$ 59,812,155.00 $ (757,543.93) $ 59,054,611.07
Please refer to attachment D for the details of the dollars which will be transferred between existing projects.
ATTACHMENT C
FY 2017/18 CAPITAL BUDGET
PROJECTS
Amended 10/31/17
Adopted Capital Revised Capital
Capital Project Name Budget Amended 10/31/17
g Budget
Espanola Way Conversion between Washington
Avenue and Drexel Avenue(Project#28580) $ 2,545,466.00 $ 100,000.00 $ 2,645,466.00
555 Building Mold Remediation
(Project#60627) 222,712.00 186,760.76 409,472.76
South Shore Community Center Exterior Paint
(Project#67080) 64,700.00 (27,446.11) 37,253.89
South Shore Community Center Switch Gear
Replacement(Project#60127) 42,000.00 (16,700.00) 25,300.00
South Shore Community Center-Replacement
Chilled Water Pump(Projet#69250) 118,862.00 (48,514.65) 70,347.35
Indian Creek Greenway
(Project#20150) 100,000.00 (33,453.82) 66,546.18
Seawall-Dickens Avenue Shoreline
(Project#20220) 461,644.00 (26,250.00) 435,394.00
La Gorce Neighborood Improvement
(Project#23240) 3,953,690.00 (1,455,549.32) 2,498,140.68
Public Works Facility
(Project#23130) 1,090,094.00 (304,961.13) 785,132.87
Parks Maintenance Facility
(Project#21660) 932,039.00 (732,255.42) 199,783.58
Property Management Facility
(Project#23140) 6,352,317.00 (36,803.16) 6,315,513.84
West Avenue Bay Road Neighborhood
Improvement(Project#23360) 26,184,596.00 (157,433.53) 26,027,162.47
Normandy Isle Neighborhood ROW Phase II
(Project#29730) 643,119.00 (231,013.65) 412,105.35
West Avenue Phase II
(Project#20597) 56,108,748.00 2,420,736.10 58,529,484.10
Fire Station#1 Refurbishment
(Project#20160) 500,000.00 (441,050.00) 58,950.00
Fire Station#4 Exterior Painting&Waterproofing
(Project#67000) 60,610.00 (43,610.00) 17,000.00
Flamingo Park
(Project#23200) 18,100,716.00 - 18,100,716.00
La Gorce Island Lighting
(Project#20250) 66,376.00 - 66,376.00
Altos Del Mar Park Development
(Project#22750) 4,295,492.00 - 4,295,492.00
Fire Station#3 Emergency Generator
(Project#60057) 100,000.00 - 100,000.00
Fire Station#3 Emergency Generator
(Project#67220) 95,000.00 - 95,000.00
Fire Station#2 Alarm System
(Project#60077) 89,000.00 - 89,000.00
Fire Station#4 Roof
(Project#60587) 73,757.00 - 73,757.00
Fire Station#1 Electrical Replacement
(Project#62070) 69,000.00 - 69,000.00
Fire Station#1 Floor Replacement
(Project#62080) 138,000.00 - 138,000.00
Fire Station#4 Security Enhancements(New
Project) - 90,000.00 90,000.00
Total $ 122,407,938.00 $ (757,543.93) $ 121,650,394.07
Please refer to attachment D for the details of the dollars which will be transferred between existing projects.
ATTACHMENT D
FY 2017/18 CAPITAL BUDGET
PROJECTS
Amended 10/31/17
Witgalag ...,.,. ...,...... ..,,�..... :::. _:.� .z,•„ee .., >. :.;.:.iz�.,:. ...,, ..x �c.�:.:�it��.ays�y. SQA...:a�'�a`\3'� �<.:; SyF.. `3},ya'z>�� �.:;�,,,
10
S \.. >.... ..... .. , C 3 1. .J .... .,.. \ ..}... :::.. i' ...:.... ..... ........ .........\�, l ':\ SJ ::
Espanola Way between Washington Avenue and
Drexel Avenue $ 100,000.00 304 STREET/SIDEWALKS STREESCAPE 28580
555 Building Mold Remediation $ 94,100.00 125 RENEWAL&REPLACEMENT 60627
555 Building Mold Remediation $ 92,660.76 125 RENEWAL&REPLACEMENT 60627
South Shore Community Center Exterior Paint $ (27,446.11) 125 RENEWAL&REPLACEMENT 67080
South Shore Community Center Switch Gear
Replacement $ (16,700.00) 125 RENEWAL&REPLACEMENT 60127
South Shore Community Center-Replacement
Chilled Water Pump $ (48,514.65) 125 RENEWAL&REPLACEMENT 69250
Indian Creek Greenway $ (33,453.82) 384 STREET/SIDEWALKS STREESCAPE 20150
West Avenue Phase II $ 33,453.82 384 STREET/SIDEWALKS STREESCAPE 20597
Seawall-Dickens Ave Shoreline $ (26,250.00) 384 SEAWALLS 20220
West Avenue Phase II $ 26,250.00 384 STREET/SIDEWALKS STREESCAPE 20597
La Gorce Neighborhood Improvement $ (1,455,549.32) 384 STREET/SIDEWALKS STREESCAPE 23240
West Avenue Phase II $ 1,455,549.32 384 STREET/SIDEWALKS STREESCAPE 20597
Public Works Facility $ (21,378.72) 384 GENERAL PUBLIC BUILDINGS 23130
Parks Maintenance Facility $ (404,882.31) 384 GENERAL PUBLIC BUILDINGS 21660
Normandy Ilse Neighborhood ROW Phase II $ (231,013.65) 384 STREET/SIDEWALKS STREESCAPE 29730
Property Management Facility $ (24,398.75) 384 GENERAL PUBLIC BUILDINGS 23140
West Ave Phase II $ 681,673.43 384 STREET/SIDEWALKS STREESCAPE 20597
La Gorce Island Lighting $ (66,376.00) 384 STREET/SIDEWALKS STREESCAPE 20250
La Gorce Island Lighting $ 66,376.00 302 STREET/SIDEWALKS STREESCAPE 20250
West Ave Phase II $ 66,376.00 384 STREET/SIDEWALKS STREESCAPE 20597
West Avenue/Bay Road Neigborhood Improvement $ (157,433.53) 384 STREET/SIDEWALKS STREESCAPE 23360
West Ave Phase II $ 157,433.53 384 STREET/SIDEWALKS STREESCAPE 20597
Public Works Facility $ (283,582.41) 383 GENERAL PUBLIC BUILDINGS 23130
Parks Maintenance Facility $ (11,523.85) 383 GENERAL PUBLIC BUILDINGS 21660
Property Management Facility $ (12,404.41) 383 GENERAL PUBLIC BUILDINGS 23140
Flamingo Park $ 307,510.67 383 PARKS 23200
Flamingo Park $ (307,510.67) 302 PARKS 23200
Parks Maintenance Facility $ (315,849.26) 370 GENERAL PUBLIC BUILDINGS 21660
Altos Del Mar Park Development $ 315,849.26 370 PARKS 22750
Altos Del Mar Park Development $ (315,849.26) 304 PARKS 22750
Fire Station#1 Refurbishment $ (441,050.00) 382 GENERAL PUBLIC BUILDINGS 20160
Fire Station#3 Emergency Generator $ 122,435.00 382 RENEWAL&REPLACEMENT 60057
Fire Station#2 Alarm System $ 89,000.00 382 RENEWAL&REPLACEMENT 60077
Fire Station#4 Roof $ 73,757.00 382 RENEWAL&REPLACEMENT 60587
Fire Station#1 Electrical Replacement $ 69,000.00 382 RENEWAL&REPLACEMENT 62070
Fire Station 1 Floor Replacement $ 86,858.00 382 RENEWAL&REPLACEMENT 62080
Fire Station#3 Emergency Generator $ (122,435.00) 125 RENEWAL&REPLACEMENT 60057
Fire Station#2 Alarm System $ (89,000.00) 125 RENEWAL&REPLACEMENT 60077
Fire Station#4 Roof $ (73,757.00) 125 RENEWAL&REPLACEMENT 60587
Fire Station#1 Electrical $ (69,000.00) 125 RENEWAL&REPLACEMENT 62070
Fire Station#1 Floor Replacement $ (86,858.00) 125 RENEWAL&REPLACEMENT 62080
Fire Station#4 Exterior Painting&Waterproofing $ (43,610.00) 382 RENEWAL&REPLACEMENT 67000
Fire Station#3 Emergency Generator Replacement $ 43,610.00 382 RENEWAL&REPLACEMENT 67220
Fire Station#3 Emergency Generator Replacement $ (43,610.00) 125 RENEWAL&REPLACEMENT 67220
Fire Station#4 Security Enhancement $ 90,000.00 302 EQUIPMENT TBD
Resolutions - R7 B
M I MAI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Jimmy L. Morales, City Manager
DATE: October 31, 2017
9:45 a.m. Public Hearing
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, ADOPTING THE FIRST AMENDMENT TO THE
CAPITAL BUDGET FOR FISCAL YEAR 2017/18.
Legislative Tracking
Budget and Performance Improvement
ATTACHMENTS:
Description
❑ MEMO- First Amendment to the FY17 Capital Budget
o Resolution
Page 104 of 376
MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov
COMMISSION MEMORANDUM
TO: Mayor Philip Levine and Members of the City Commission
FROM: Jimmy L. Morales, City Manager
DATE: October 31, 2017
SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, ADOPTING THE FIRST AMENDMENT TO THE
CAPITAL BUDGET FOR FISCAL YEAR 2017/18.
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
BACKGROUND
Planning for capital improvements is an ongoing process; as needs change within the City,
capital programs and priorities must be adjusted. The Capital Improvement Plan ("CIP") serves
as the primary planning tool for systematically identifying, prioritizing and assigning funds to
critical City capital development, improvements and associated needs.
The City's capital improvement plan process begins in the spring when all departments are
asked to prepare capital improvement updates and requests on the department's ongoing and
proposed capital projects. Individual departments prepare submittals identifying potential
funding sources and requesting commitment of funds for their respective projects.
The CIP is updated annually and submitted to the City Commission for adoption. The 2017/18 —
2021/22 Capital Improvement Plan and FY 2017/18 Capital Budget was adopted on September
25, 2017 by Resolution 2017-30026.
Section 166.241(4) (c.), Florida Statutes, requires that a municipality's budget amendment must
be adopted in the same manner as the original budget. Administration recommends adopting
the Resolution for the First Amendment to the FY 2017/18 Capital Budget.
FIRST AMENDMENT TO THE FY 2017/18 CAPITAL BUDGET
The First Amendment to the FY 2017/18 Capital Budget totals a decrease of $847,543.93 and
re-appropriations of $3,621,461.79 in order to provide additional funding, and to reallocate
funding between the following capital projects.
Page 105 of 376
Resolution Adopting the First Amendment to the Capital Budget for FY 2017/18
October 31, 2017
Page 2 of 6
1. Espanola Way Conversion between Washington Avenue and Drexel Avenue:
The scope of this project includes the reconstruction of the existing pavement to
pavers or colored concrete, replacement of existing water main, drainage
improvements and rehabilitation of existing sanitary sewer main, laterals and
manholes. The project also includes new decorative LED pedestrian street lights.
During the development of the FY 2017/18 Capital budget, $400,276 was added to
this project to allow for the installation of security bollards on Espanola Way.
This budget amendment would increase funding to this project by $100,000, as the
bids received to purchase and install the bollards at this location have exceeded the
original estimate. Funding for this amendment would come from the Capital Reserve
Fund balance- Fund 304
Prior Years' Appropriations $2,545,466
October 31, 2017 Budget Amendment 100,000
Proposed Total Appropriations $2,645,466
2. 555 Building Mold Remediation: The scope of this project comprises mold
remediation work, including roof work, exterior wall repair, new flooring, and drywall
repair to the 555 Building. This budget amendment would increase funding to the
project by $186,760.76 in order to cover the cost of additional expenditures
encountered after the initial demolition and abatement of the mold at the 555
building.
Complete remediation of the mold will include removal and replacement of ductwork
currently built with asbestos, as well as replacement of the kitchen cabinets due to
significant water damage. Funding for this amendment would come from the transfer
of funds, which are not needed in the three projects outlined below, as well as
$94,100 from the Capital Renewal & Replacement Fund balance- Fund 125
• South Shore Community Center Exterior Paint - $27,446.11
• South Shore Community Center Switch Gear Replacement - $16,700
• South Shore Community Center- Replacement Chilled Water Pump -
$48,514.65
Prior Years' Appropriations $222,712.00
October 31, 2017 Budget Amendment 186,760.76
Proposed Total Appropriations $409,472.76
Page 106 of 376
Resolution Adopting the First Amendment to the Capital Budget for FY 2017/18
October 31, 2017
Page 3of6
3. Reallocation of Funds between General Obligation (G.O.) Bond-Funded
Projects: A general obligation bond is a form of debt financing payable solely from
property taxes, backed by a pledge of the City's "full faith and credit" or taxing power,
and used to finance capital projects that do not produce revenues. The City currently
has unspent dollars associated with five G.O. bonds. These include the 1996 Parks
bond, the 1999 Fire Safety bond, the 2003 Fire Safety bond, the 2003 Parks &
Recreation bond, and the 2003 Neighborhood bond.
During the development of the FY 2017/18 budget, the Commission decided to
develop a new G.O. Bond program for voter approval on November 6, 2018. As part
of this process, the Finance department advised that an analysis of the unspent G.O.
Bond funds would be conducted with a goal of expediting the expenditure of these
bond funds by re-allocating the dollars from projects which are either completed (as
indicated below), or will not be completed within this fiscal year to projects which are
projected to spend these funds in FY 2017/18. The funding from the donor projects
in this realignment is anticipated to be replaced by new funding from the new
proposed G.O. bond program. This budget amendment would transfer G.O. bond
funding between existing projects in order to meet this objective as follows:
West Avenue Phase II - Funding would be transferred from the projects outlined
below in order to increase funding in the West Avenue Phase II project. These 2003
Neighborhood G.O. bond dollars would be used to fund a portion of the unfunded
above-ground costs of this project:
• Indian Creek Greenway - $33,453.82
• Seawall- Dickens Avenue Shoreline - $26,250.00
• La Gorce Neighborhood Improvement - $1,455,549.32
• La Gorce Island Lighting - $66,376.00 (swapping 2003 Neigh. Bond funding
with PAYGO funding, and releasing PAYGO funds)
• Public Works Facility - $21,378.72
• Parks Maintenance Facility - $404,882.31
• Normandy Isle Neighborhood ROW Phase II - $231,013.65
• Property Management Facility (completed) - $24,398.75
• West Avenue /Bay Road Neighborhood Facility - $157,433.53
Prior Years' Appropriations $56,108,748.00
October 31, 2017 Budget Amendment 2,420,736.10
Proposed Total Appropriations $58,529,484.10
Page 107 of 376
Resolution Adopting the First Amendment to the Capital Budget for FY 2017/18
October 31, 2017
Page 4 of 6
Flamingo Park — $307,510.67 in 2003 Parks & Recreation G.O. bond funds (Fund
383) would be transferred to this project from the projects outlined below. An existing
$307,510.67 in Pay As You Go funds (Fund 302) would be released from the
Flamingo Park project, resulting in a net $0 change in funding to this project.
• Public Works Facility - $283,582.41
• Parks Maintenance Facility - $11,523.85
• Property Management Facility - $12,404.41
Prior Years' Appropriations $18,100,716.00
October 31, 2017 Budget Amendment 0.00
Proposed Total Appropriations $18,100,716.00
Altos Del Mar Park Development — $315,849.26 in 1996 Parks G.O. bond funds
(Fund 370) would be transferred to this project from the Parks Maintenance Facility
project. $315,849.26 in Capital Reserve funds (Fund 304) would be released from
the Altos Del Mar Park Development project, resulting in a net $0 change in funding
to this project.
Prior Years' Appropriations $4,295,492.00
October 31, 2017 Budget Amendment 0.00
Proposed Total Appropriations $4,295,492.00
Fire Station #1 Refurbishment- Due to the station's current condition, construction
of a new facility is being considered as a result of the updated refurbishment costs.
In the interim, $441,050 in 2003 Fire Safety G.O. bond funds (Fund 382) would be
transferred to the projects outlined below. $441,050 in Capital Renewal &
Replacement funds (Fund 125) would be released from these projects, resulting in
the budgets of these projects remaining the same.
• Fire Station #3 Emergency Generator- $122,435
• Fire Station #2 Alarm System - $89,000
• Fire Station #4 Roof- $73,757
• Fire Station #1 Electrical Replacement - $69,000
• Fire Station #1 Floor Replacement- $86,858
Prior Years' Appropriations $500,000.00
October 31, 2017 Budget Amendment -441,050.00
Proposed Total Appropriations $58,950.00
Page 108 of 376
Resolution Adopting the First Amendment to the Capital Budget for FY 2017/18
October 31, 2017
Page 5 of 6
Fire Station #4 Exterior Painting & Waterproofing — This project has been
completed. As a result, $43,610 in 2003 Fire Safety G.O. bond funds (Fund 382) is
proposed to be transferred to the Fire Station #3 Emergency Generator Replacement
project. $43,610 in Capital Renewal & Replacement funds (Fund 125) would be
released from Fire Station #3 Emergency Generator Replacement project, resulting
in its budget remaining the same.
Prior Years' Appropriations $60,610.00
October 31, 2017 Budget Amendment -43,610.00
Proposed Total Appropriations $17,000.00
As a result of the proposed G.O. Bond funding realignments included in this budget
amendment, the following funds would be released increasing the available balance in each
fund as follows:
• Capital Renewal & Replacement (Fund 125) - $390,560.00
• Pay As You Go (Fund 302) - $241,134.67
• Capital Reserve (Fund 304) - $215,849.26
Attachment A- FY 2017/18 Capital Budget- Projects
JLM/JW/TOS
Page 109 of 376
Resolution Adopting the First Amendment to the Capital Budget for FY 2017/18
October 31, 2017
Page 6 of 6
ATTACHMENT A
FY 2017/18 CAPITAL BUDGET
PROJECTS
Amended 10/31/17
Project New$ Transfer$ Fund Program Proj.#
Espanola Way between Washington Avenue and
Drexel Avenue $ 100,000.00 304 STREET/SIDEWALKS STREESCAPE 28580
555 Building Mold Remediation $ 94,100.00 125 RENEWAL&REPLACEMENT 60627
555 Building Mold Remediation $ 92,660.76 125 RENEWAL&REPLACEMENT 60627
South Shore Community Center Exterior Paint $ (27,446.11) 125 RENEWAL&REPLACEMENT 67080
South Shore Community Center Switch Gear
Replacement $ (16,700.00) 125 RENEWAL&REPLACEMENT 60127
South Shore Community Center-Replacement
Chilled Water Pump $ (48,514.65) 125 RENEWAL&REPLACEMENT 69250
Indian Creek Greenway $ (33,453.82) 384 STREET/SIDEWALKS STREESCAPE 20150
West Avenue Phase II $ 33,453.82 384 STREET/SIDEWALKS STREESCAPE 20597
Seawall-Dickens Ave Shoreline $ (26,250.00) 384 SEAWALLS 20220
West Avenue Phase II $ 26,250.00 384 STREET/SIDEWALKS STREESCAPE 20597
La Gorce Neighborhood Improvement $(1,455,549.32) 384 STREET/SIDEWALKS STREESCAPE 23240
West Avenue Phase II $ 1,455,549.32 384 STREET/SIDEWALKS STREESCAPE 20597
Public Works Facility $ (21,378.72) 384 GENERAL PUBLIC BUILDINGS 23130
Parks Maintenance Facility $ (404,882.31) 384 GENERAL PUBLIC BUILDINGS 21660
Normandy Ilse Neighborhood ROW Phase II $ (231,013.65) 384 STREET/SIDEWALKS STREESCAPE 29730
Property Management Facility $ (24,398.75) 384 GENERAL PUBLIC BUILDINGS 23140
West Ave Phase II $ 681,673.43 384 STREET/SIDEWALKS STREESCAPE 20597
La Gorce Island Lighting $ (66,376.00) 384 STREET/SIDEWALKS STREESCAPE 20250
La Gorce Island Lighting $ 66,376.00 302 STREET/SIDEWALKS STREESCAPE 20250
West Ave Phase II $ 66,376.00 384 STREET/SIDEWALKS STREESCAPE 20597
West Avenue/Bay Road Neigborhood
Improvement $ (157,433.53) 384 STREET/SIDEWALKS STREESCAPE 23360
West Ave Phase II $ 157,433.53 384 STR1T/SIDEWALKS STREESCAPE 20597
Public Works Facility $ (283,582.41) 383 GENERALI&JBLIC BUILDINGS 23130
Parks Maintenance Facility $ (11,523.85) 383 GENERAL PUBLIC BUILDINGS 21660
Property Management Facility $ (12,404.41) 383 GENERAL PUBLIC BUILDINGS 23140
Flamingo Park $ 307,510.67 383 PARKS 23200
Flamingo Park $(307,510.67) 302 PARKS 23200
Parks Maintenance Facility $ (315,849.26) 370 GENERAL PUBLIC BUILDINGS 21660
Altos Del Mar Park Development $ 315,849.26 370 PARKS 22750
Altos Del Mar Park Development $(315,849.26) 304 PARKS 22750
Fire Station#1 Refurbishment $ (441,050.00) 382 GENERAL PUBLIC BUILDINGS 20160
Fire Station#3 Emergency Generator $ 122,435.00 382 RENEWAL&REPLACEMENT 60057
Fire Station#2 Alarm System $ 89,000.00 382 RENEWAL&REPLACEMENT 60077
Fire Station#4 Roof $ 73,757.00 382 RENEWAL&REPLACEMENT 60587
Fire Station#1 Electrical Replacement $ 69,000.00 382 RENEWAL&REPLACEMENT 62070
Fire Station 1 Floor Replacement $ 86,858.00 382 RENEWAL&REPLACEMENT 62080
Fire Station#3 Emergency Generator $(122,435.00) 125 RENEWAL&REPLACEMENT 60057
Fire Station#2 Alarm System $ (89,000.00) 125 RENEWAL&REPLACEMENT 60077
Fire Station#4 Roof $ (73,757.00) 125 RENEWAL&REPLACEMENT 60587
Fire Station#1 Electrical $ (69,000.00) 125 RENEWAL&REPLACEMENT 62070
Fire Station#1 Floor Replacement $ (86,858.00) 125 RENEWAL&REPLACEMENT 62080
Fire Station#4 Exterior Painting&Waterproofing $ (43,610.00) 382 RENEWAL&REPLACEMENT 67000
Fire Station#3 Emergency Generator
Replacement $ 43,610.00 382 RENEWAL&REPLACEMENT 67220
Fire Station#3 Emergency Generator
Replacement $ (43,610.00) 125 RENEWAL&REPLACEMENT 67220
Page 110 of 376
RESOLUTION NO.
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE FIRST
AMENDMENT TO THE CAPITAL BUDGET FOR FISCAL YEAR
2017/18.
WHEREAS, the final Capital Improvement Plan for Fiscal Years 2017/18 --
2021/22 and the final Capital Budget for FY 2017/18 were adopted via Resolution No.
2017-30026 on September 25, 2017; and
WHEREAS, City budget amendments pursuant to Section 166.241(4)(c) of the
Florida Statutes must be adopted in the same manner as the original budget; and
WHEREAS, the proposed amendments to the FY 2017/18 Capital Budget are
included in Attachment A (Source of Funds) and Attachment B (Programs); and
WHEREAS, further, it is recommended by the Administration that the FY 2017/18
Capital Budget be amended to reduce appropriations by $847,543.93 and to re-
appropriate $3,621,416.79 between existing projects as highlighted in Attachments C
and D (Projects) and as further detailed in the attached Commission Memorandum.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission hereby adopt the First Amendment to the Capital Budget for Fiscal Year
2017/18 as set forth in Attachment A (Source of Funds), Attachment B (Programs), and
Attachments C and D (Projects).
PASSED AND ADOPTED this 31st day of October, 2017.
ATTEST:
Philip Levine, Mayor
Rafael E. Granado, City Clerk
APPROVED AS TO
FORM & LANGUA E
&FOR XECUT 40 NY
Ala "6-\h
Arif
Fr ity Otomey Date
Page 111 of 376
ATTACHMENT D
FY 2017/18 CAPITAL BUDGET
PROJECTS
Amended 10/31/17
r'-• .,r it -ti •.. ..s.�•. ,r- .i:t _'.
ri r T' ; '�r> :t:<••r S%;`�: F- z»=:.�. ..2. - . .y'a1•...
.1 ..l ,:•s.r-a..Sr' F.! .wT--.. •:t...'r• F s i.r,
xiY 'r _ -:;(�,_•.s.tt.. .v�}< Oti4:0011Ylligikrikl':i_11-410-414:04$0,ittig4.0.141-4.-0*-1V
� �� � 4� r _ `t• ttu 'cE.- x.:.+s-: '-a�l.� .f t:. .,h-.4:r s��fi`3�X`S�'-as�:4y�...`t�,;•4�' Y'+`U}>.;r,,,'.t -�-J.3a: team•u mss'sou sr;'�...'i - 5% �&r i:.� ii�Riw-��1f/:r,.��C.s. .'It-;06,1‘1‘10 Tlansf r-.ac:., .l unaf=a. ;..: _��:�- ro'[] ..�:� •-,•, _.ayfs.T �lb.�5�. -r � ��sy3..�3 _',-.D',...✓. �?:t• �.- >.f �. 4,,e :�....r.r s`\;.}"{�.q�;a-.�..�.s z .+^>.i,�s�.:.�.-t:: ..t.n�,c`!r,. 7J.r,-.�.,�,i1-,..! -�Yom.�.•�Y:t�t �i�..s..�-..[P ,,.V ,.,.;. :.i- :.".<:4+..�.w- . c i.... t.>.. �'s.>... ..,<,t.-a.,....,w�.....-..�J�.,3. .�+.......,..-ra.:h.r....�r•> '
Espanola Way between Washington Avenue and
Drexel Avenue $ 100,000.00 304 STREET/SIDEWALKS STREESCAPE 28580
555 Building Maid Remedlation $ 94,100.00 125 RENEWAL&REPLACEMENT 60627
555 Building.Mold Remediation $ 92,660.76 125 RENEWAL&REPLACEMENT 60627
South Shore Community Center Exterior Paint $ (27,446,11) 125 RENEWAL&REPLACEMENT 67080
South Shore Community Center Switch Gear
Replacement. $ (16,700.00) 125 RENEWAL&REPLACEMENT 60127
South Shore Community Center-Replacement
Chilled Water Pump $ (48,514.65) 125 RENEWAL&REPLACEMENT 69250
Indian Creek Greenway $ (33,453.82) 384 STREET/SIDEWALKS STREESCAPE 20150
West Avenue Phase li $ 33,453.82 384 STREET/SIDEWALKS STREESCAPE 20597
Seawall-Dickens Ave Shoreline $ (26,250.00) 384 SEAWALLS 20220
West Avenue Phase II $ 26,250.00 384 STREET/SIDEWALKS STREESCAPE 20597
La Gorce Neighborhood improvement $ (1,455,549.32) 384 STREET/SIDEWALKS STREESCAPE 23240
West Avenue Phase iI $ 1,455,549.32 384 STREET/SIDEWALKS STREESCAPE 20597
Public Works Facility $ (21,378.72) 384 GENERAL PUBLIC BUILDINGS 23130
Parks Maintenance Facility $ (404,882.31) 384 GENERAL PUBLIC BUILDINGS 21660.
Normandy Ilse Neighborhood ROW Phase iI. $ (231,013,65) 384 STREET/SIDEWALKS STREESCAPE 29730
Property Management Facility $ (24,398;75) - '384 - GENERAL PUBLIC BUILDINGS 23140
West Ave Phase II $ 681,673.43 384 STREET/SIDEWALKS STREESCAPE 20597
La Gorce Island Lighting $ (66,376.00) 384 STREET/SIDEWALKS STREESCAPE 20250
La Gorce island Lighting $ 66,376.00 302 STREET/SIDEWALKS STREESCAPE 20250
West Ave Phase II $ 66,376.00 384 STREET/SIDEWALKS STREESCAPE 20597
West Avenue/Bay Road Neigborhood
Improvement_ • $ (157,433.53) 384 STREET/SIDEWALKS STREESCAPE. 23360
WestAve Phase II $ 157,433,53 384 STREET/SIDEWALKS STREESCAPE 20597
Public Works Facility $ -(283,582.41): 383 GENERAL.PUBLIC BUILDINGS • 23130
Parks:Maintenance.Facility $ (11,523;85) 383 GENERAL PUBLIC BUILDINGS 21660
Property Management Facility $ (12;404.41) '383 GENERAL PUBLIC BUILDINGS 23140•
Flamingo Park $ 307,510.67 383 PARKS 23200 •
Flamingo Park $ (307,5.10.67) 302 PARKS 23200
Parks Maintenance Facility $ (315,849.26) 370 GENERAL PUBLIC BUILDINGS 21660
Altos Del Mar Park Development $ 315,849.26 370 PARKS 22750
Altos Del Mar Park Development $ (315,849.26) 304 PARKS 22750
Fire Station#1 Refurbishment: $ (441,050,00) 382 GENERAL PUBLIC BUILDINGS 20160.
Fire Station#3 Emergency Generator • $ 122,435;00 .382 RENEWAL'&REPLACEMENT -60057
Fire Station#2:Alarm.System • $ 89,000.00 382 RENEWAL&REPLACEMENT .60077
Fire Station#4 Roof $ 73,757;00 382 RENEWAL.&REPLACEMENT 60587
Fire Station#•1 Electrical Replacement $ 69,000.00 382 RENEWAL&.REPLACEMENT 62070
Fire Station 1 Floor.Replacement $ 86,858.00 382 RENEWAL&REPLACEMENT 62080
Fire Station#3-Emergency Generator $ (122,435.00) 125 RENEWAL&REPLACEMENT 60057
Fire Station#2 Alarm System $ (89,000.00) 125 RENEWAL&REPLACEMENT 60077
Fire Station#4 Roof $ (73,757.00) 125 RENEWAL&REPLACEMENT 60587
Fire.Station#1 Electrical $ (69,000.00). 125 RENEWAL&REPLACEMENT 62070
Fire Station#1 Floor Replacement $ (86,858.00) 125 RENEWAL&REPLACEMENT 62080
Fire Station#4 Exterior Painting&Waterproofing $ (43,610.00) 382 RENEWAL&REPLACEMENT 67000
Fire Station#3 Emergency Generator
Replacement $ 43,610.00 382 RENEWAL&REPLACEMENT 67220
Fire Station#3 Emergency Generator
Replacement $ (43,610.00) 125 RENEWAL&REPLACEMENT 67220
Page 115 of 376
ATTACHMENT A
FY 2017/18 CAPITAL BUDGET
SOURCE OF FUNDS
Amended 10/31/17
Funding Source Adopted Capital Amended 10131/17 Revised Capital
Budget Budget
Transportation $ 913,575 $ 913,575
Capital Renewal&Replacement 2,185,048 (390,560.00) 1,794,488
Comm.Dev.Block Grant 538,483 538,483
Cultural Arts Council Endowment 800,000 800,000
7th Street Garage 1,399,500 1,399,500
Art in Public Places 875,334 875,334
,
Fees in Lieu of Parking Fund 5,386,347 5,386,347
, ,
Concurrency Mitigation Fund 5,555,000 5,555,000
RDA-Non TIF 6,865,154 6,865,154
Miami City Ballet 25,000 25,000
HOME Invest Part.Prog.Grant 344,482 344,482
Half Cent Transit Surtax Cnty 1,322,000 1,322,000
Capital Projects Financed By Other Funds 4,500,000 4,500,000
Pay As You Go-Capital Fund 2,401,658 (241,134.67) 2,160,523
Capital Reserve 395,492 (215,849,26) 179,643
Resort Tax-South Beach 2,433,579 2,433,579
Resort Tax-Mid Beach 2,133,082 2,133,082
Resort Tax-North Beach 2,891,067 2,891,067
Fire Safety 99 GO Bond 337,000 337,000
RDASouth Pointe Capital Proj 685,000 685,000
2001 Gulf Breeze-Normandy Golf 85,000 85,000
2003 G.O.Bonds-Parks&Rec 651,342 651,342
Water&Sewer Impact Fees 257,211 257,211
Stormwater Projects-MDC ILA 650,000 650,000
RDA Garages 2,138,000 2,138,000
Parking Operations 11,361,541 11,361,541
2015 Parking Bonds CC Project 185,260 185,260
Property Management Fund 295,000 - 295,000
Communications Fund 2,202,000 2,202,000
Total Appropriation as of 10/31117 $ 59,812,1 55.00 $ (847,543.93) $ 58,964,611.07
Please refer to attachment D for the details of the dollars which will be transferred between existing projects.
Page 112 of 376
ATTACHMENT B
FY 2017/18 CAPITAL BUDGET
PROGRAMS
Amended 10/31/17
•
Pro ram Area Adopted Capital Amended 10/31/17 Revised Capital
g Budget Budget
Art in Public Places $ 875,334.00 $ 875,334.00
Bridges 0.00 0.00
Com munity Centers 0.00 0.00_
Convention Center 0.00 0.00
Environmental 138,724.00 138,724.00
Equipment 4,649,057.00 4,649,057.00
General Public Buildings 1,587,467.00 (1,515,069.71) 72,397.29
Golf Courses 0.00 0.00
Lighting 800,979.00 800,979.00
Monuments 279,000,00 279,000.00
Parking 250,000.00 250,000.00
Parking Garages 12,540,785.00 12,540,785.00
Parking Lots 600,000.00 600,000.00
Parks 12,108,963.00 12,108,963.00
Renewal&Replacement 9,689,841.00 50,490.00 9,740,331.00
Seawalls 650,000.00 (26,250.00) 623,750.00
Streets/Sidewalk Improvements 7,331,430.00 643,285.78 7,974,715.78
Transit/Transportation 8,208,575.00 8,208,575.00
Utilities 102,000.00 102,000.00
Total Appropriation as of 10/31/17 $ 59,812,155.00 $ (847,543.93) $ 58,964,611.07
Please refer to attachment D for the details of the dollars which will be transferred between existing projects.
Page 113 of 376
ATTACHMENT C
FY 2017/18 CAPITAL BUDGET
PROJECTS
Amended 10/31/17
Capital Project Name Adopted Capital Amended 10/31/17 Revised Capital
Budget Budget
Espanola Way Conversion between Washington
Avenue and Drexel Avenue(Project#28580) $ 2,545,466.00 $ 100,000.00 $ 2,645,466.00
555 Building Mold Remediation
(Project#60627) 222,712.00 186,760.76 409,472.76
South Shore Community Center Exterior Paint
(Project#67080) 64,700.00 (27,446.11) 37,253.89
South Shore Community Center Switch Gear
Replacement(Project#60127) 42,000.00 (16,700.00) 25,300.00
South Shore Community Center-Replacement
Chilled Water Pump(Projet#69250) 118,862.00 (48,514.65) 70,347.35
Indian Creek Greenway
(Project#20150) 100,000.00 (33,453.82) 66,546.18
Seawall-Dickens Avenue Shoreline
(Project#20220) 461,644.00 (26,250.00) 435,394.00
La Gorce Neighborood Improvement
(Project#23240) 3,953,690.00 (1,455,549.32) 2,498,140.68
Public Works Facility
(Project#23130) 1,090,094.00 (304,961.13) 785,132.87
Parks Maintenance Facility
(Project#21660) 932,039.00 (732,255.42) 199,783.58
Property Management Facility
(Project#23140) 6,352,317.00 (36,803.16) 6,315,513.84
West Avenue Bay Road Neighborhood
Improvement (Project#23360) 26,184,596.00 (157,433.53) 26,027,162.47
Normandy Isle Neighborhood ROW Phase II
(Project#29730) 643,119.00 (231,013.65) 412,105.35
West Avenue Phase II
(Project#20597) 56,108,748.00 2,420,736.10 58,529,484.10
Fire Station#1 Refurbishment
(Project#20160) 500,000.00 (441,050.00) 58,950.00
Fire Station#4 Exterior Painting&Waterproofing
(Project#67000) 60,610.00 (43,610.00) 17,000.00
Flamingo Park
(Project#23200) 18,100,716.00 18,100,716,00
La Gorce Island Lighting
(Project#20250) 66,376.00 - 66,376.00
Altos Del Mar Park Development
(Project#22750) 4,295,492.00 - 4,296,492.00
Fire Station#3 Emergency Generator
(Project#60057) 100,000,00 - 100,000.00
Fire Station#2 Alarm System
(Project#60077) 89,000.00 - 89,000.00
Fire Station#4 Roof
(Project#60587) 73,757.00 - 73,757.00
Fire Station#1 Electrical Replacement
(Project#62070) 69,000.00 - 69,000.00
Fire Station#1 Floor Replacement
(Project#62080) 138,000.00 - 138,000.00
Total $ 122,312,938.00 $ (847,543.93), $ 121,465,394.07
Please refer to attachment D for the details of the dollars which will be transferred between existing projects.
Page 114 of 376