Loading...
Resolution 1750 RESOLUTION NO. 1750 WHEREAS, the City Council of the City of Miami Beach, did by Resolution, on June 241-th, 1925 , authorize an election for bond issue for ocean front improvement , such election to be held July 31st , 1925 , and, WHEREAS, such election was held on July 31st , 1925 , and the issue of bonds in amount of $ 300,000.00 was authorized for ocean front protection, and, WHEREAS, the City Council of the City of Miami Beach, did, on February 214-th, 1926, vote to issue $ 300,000.00 of bonds in accordance with the mandates of the election held on July 31st , 1925 , and, WHEREAS, the .2855. ,000.00 par value of said bonds were sold for $ 27 ,1.550.00, in accordance with resolution of the City Council of March 16, 1927, and, WHEREAS, the City Council of Miami Beach did call for bids for ocean front Improvement work by resolution on May 11th, 1927, said bids to be received June 1st , 1927, and, WHEREAS, said bids were not opened on June 1st , 1927, for the reason that in the meantime, the Legislature of the State of Florida, has passed House Bill #1692, of the Special Acts of the State of Florida, of 1927, and, WHEREAS, Claude A. Renshaw, Walter A. Kohlhepp, Jno. C. Knight , J. E. Lummus and T. J. Pancoast , acting as the Dade County Ocean Front Protective Commission, created by House Bill #1692 of the Special Acts of the Legislature of the State of Florida of 1927, did approve certain plans for the protection and improve- ment of the ocean front of the City of Miami Beach, said plans being known as Dade County Ocean Front Protective Commission Plan No. 1, and, WHEREAS, the City Council of the City of Miami Beach, and the Board of County Commissioners of Dade County, and the Dade County Ocean Front Protective Commission, did, in joint meeting, on June 24th, 1927, unanimously approve said plans for said ocean front protection, the same to be known as Dade County Ocean Front Protective Plan No. 1, and, WHEREAS, the City Council of the City of Miami Beach, has heretofore caused to be deposited by the City Clerk, to the credit of the said Dade County Ocean Front Protective Commission, 250,000.00, by Resolution No. 1629 of the City Council of the City of Miami Beach, adopted July 6th, 1927, to be expended for said ocean front protection in accordance with the purpose for which said bonds were issued and sold, and, WHEREAS, the said Claude A. Renshaw, Walter A. Kohlhepp, Jno. C. Knight , J. E. Lummus and T. J. Pancoast , acting as the Dade County Ocean Front Protective Commission, at the direction and with the approval of this Council, entered into a contract with G. 0. Reed, Inc. , for the construction of sea walls, jetties, and proper supports in accordance with bids submitted by the said G. 0. Reed, Inc. , to the City Council of the City of Miami Beach, said contract being entered into, the 12th day of July A. D. , 1927, for the purposes of such ocean front protection, and, t U WHEREAS, certain payments have been made under this con- tract with G. 0. Reed, Inc. , and certain other payments have been made by the said Dade County Ocean Front Protective Commission, in order to carry out the said ocean front protective work, all of which payments were made with the consent and authorityof this Council, and all of which are set forth more in detail hereinafter, and all of which were, and are considered by this Council as its act and deed, and, WHEREAS, the City Council of the City of Miami Beach, Florida, did on the 21st day of December , A. D. , 1927 pass a resolution requesting C. A. Renshaw, John C. Knight , W. A. Kohlhepp, J. E. Lummus and T. J. Pancoast , acting as the Dade County Ocean Front Protective Commission, to construct additional ocean front protective work on behalf of the City of Miami Beach from a point approximately 125' north of 30th Street ,Miami Beach, Florida to approximately the north line of 32nd Street , Miami Beach, Florida, and to pay for such work, insofar as possible, out of funds at that time in their hands, or from further funds which the City of Miami Beach promised to furnish them at that time , and, WHEREAS, Claude A. Renshaw, John C. Knight , W. A. Kohlhepp, J. E. Lummus and T. J. Pancoast , acting as the Dade County Ocean Front Protective Commission, have presented to the Council of the City of Miami Beach the following statement of receipts and dis- bursements of the said Dade County Ocean Front Protective Com- mission from July 1st , 1927 to March 20th, 1925: STATEMENTS OF RECEIPTS AND DISBURSE" ENTS DADE COUNTY OCEAN FRONT PROTECTIVE COMMISSION FROM JULY 1st 1927 TO MARCH 20th 1928. ******************* RECEIPTS: City of Miami Beach, Fla. $250,000.00 Interest on Bank Balances 121111t9,11 TOTAL AVAILABLE FUNDS $251,842.90 DI SBRU SEMENT S: APPLICABLE ON CONTRACTS: G. 0. Reed, Inc. , Estimate #1,Original Contract $30,526.52 2 30,521.21 60,816.91 5 2�;913 .08 6 95.18 TOTAL PAID G. 0 . REED, INC. ORIGINAL CONT.225 ,3 7 .O1 G. 0. Reed, Inc. , Estimate #1,-BP-1 Add. 13,71.79 2 .1+ TOTAL PAID TO G. 0. REED, INC. , $21+7,660.1-5 EXPENSE: W. B. Buchanan, Premium on Bonds 250.00 Claude A. Renshaw, Salary 1,666.66 John G. McKay, salary 2,083.33 3 ,999.99 TOTAL EXPENSES REFUNDED TO CITY OF MIAMI BEACH, FLA. , 182.46 TOTAL DISBURSEMENTS, $251,811-2.90 G v li I, Claude A. Renshaw, Chairman of the Dade County Ocean Front Protective Commission, do hereby certify that the foregoing is a true and correct statement of the monies received and disbursed by the said Dade County Ocean Front Protective Commission. Done at Miami Beach, Florida this 20th day of March, 1928. (Signed) Claude A. Renshaw Chairman. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Miami Beach, Florida, that the payments set out hereinafter having been made and approved, and be considered to have been made with the full approval and authority of the City of Miami Beach, and to be considered as payments by the City of Miami Beach, the complete statement being as follows: RECEIPTS: City of Miami Beach, Fla. $ 250,000.00 Interest on Bank Balances1 542.90 TOTAL AVAILABLE FUNDS 512.90 DISBURSEMENTS: APPLICABLE ON CONTRACTS: G. 0. Reed , Inc. , Estimate #1 Original Contract $ 30,526.52 #2 30,521.21 #3 60,816.91 #4 51, 13 .05 #524,495.48 #b 27!347.01 TOTAL PAID G.O.REED,INC. ORIGINAL CONTRACT $225 ,920.21 G. 0. Reed, Inc. , Estimate #1, BP-1 Addition 13 ,771.79 G. 0. Reed, Inc. , Estimate #2, BP-1 Addition —"A905. 5 TOTAL PAID G. 0 . REED, INC. $ 247 ,660.45 EXPENSE: W. B. Buchanan, Premium on Bonds ,$250.00 Claude A. Renshaw, Salary, 1,666. 66 John G. McKay, Salary, 2.053 .33 3 ,999.99 TOTAL EXPENSES REFUNDED TO CITY OF MIAMI BEACH, FLA. , 152.46 TOTAL DISBURSEMENTS $Z51.2.822.90 PASSED AND ADOPTED this 21st day of March, A. D. , 1925. President of City Council ATTEST: City Clerk . • 1 Ocu ea o.O Ot 0.. .. 0 CO O f+i 1+3 r•11 In N N - A . LO Nrir•110tOr- rI Cl- O MO m0SM: 12°4.1.1 LlSOw1-�• I N � Od a' 4 • 0 LC\N0lOA• Nf•- Ol0r 0 o a) > I • • • • w • • • • • • • Cd ti Q •r1 -1 1 • l.0r- l0hr'lto Ori1O Ol0C+` N N r-1 r-t CT‘...1' t"t! t -. 0 1O o 4a 0 C) • 1 0 11O 1O r-* m N- N k..0 0 O 0 ar= I .. w w w n n w '� n aO 4.,0 O O r-I� U1 tvl 1 r-1 N „0 Si 0 Si •riF Z MN\'OinNNNrl O Eta N w p., \ I. co 10 O O a3 •r1 •N H I E-i 02 • •N U A a) 0 rr�+ H CO C.) * +) 0 0 WAN al El m o Si m Si z p„ 1. z1 ?a £� W0 -P �1 c(oo � g 0 p ..'"'rto5 C4 , �I s~ .s; c3 A DW +' C.) a 0 k +' 0 +) • o o 0 HEdi O H rd +•00 4- + O N 0 * •r1 H .. 4-t �a w A H P1 * nM P4 r-) • O ,,oQ w +a w-t ZOQ * vi O 1 C) 0 to 0 0 4., 1(4 * Si Pi ~li a3 a) a) O cn Pi * 0 •0 At 1.-.4 CA so E3 .>~ 0 C) O r4 H E l H * w ►� .. . A 'di a) �d P4 H * ri N 141...1- tf1kD 1-4 r-1 CVA 0 0 •ri . +a al d •rt 1-4 O N- * i A A �' ,s; raS d +) td a ri O f ON a) A a) M g ►� � t J F w A 1ri fri C4 cd . c43 • 0 Siti 0 • •• 0a +) rd +' Ii A to O o -1-1 •• a W W w -r'i •r► 0 1-4 ^ W H O to FOi m 0 0 CJ r-1 Ui +1 • 4.) • •r•t C Qaa A W 01 w Si QI Si 0 �+ 3 a)z •• O W C) a0 to 1 CO 1."1 m g •r1 O a) C) r� }"1H r-1 0,0. co • 0 ;-1w .4 0 a) I~ U .) A P H 0 W0 W E-4C!' •• El p.1 B AI tri H u2 F:4 1E1 4Ord •ra N A 'a," w ri W 0 0 A 0 A ..A to A • U f." a • al Il H0 2. .C+ a3 a g H >;.' 1-1 €." w apo p:, tl2 `� a) cd 5 r -4 0 O 0 Pq W Ei •-1 Ar t•-, . a3 A 'va0.4 O 1-1 0 I- G) Ti O w El 1)4 c3 •4 P4 P4 t~ a) QI x7 A rd •ri 0 (I) •ri VI cx1 4r1 a) rN'r H 0 w .. al P4 /xI al0mA Adad � 0A E- 4' ic � � ri I • S +A • Aa *4EO EI 0 P cd ,0 0 a)$4 � o a) o o S 0Ow •c OEl El ��H O •• F.r co •i O 0 ri H 1- P4 •r1 o AA -•a o o P4 g g +'H tr A •• es A A 4-I C 0 H • • Pr-1 • ri 0 W O 0 E. M C) Cr3 Ch tf) I= C� t7 A Si wH z z • g (OO p. A E4 P4 0 H 14 . A C4 Pa W PR C, vi fr-i H P=I A BLOND AND FINAL CONTRACT BP. ADDITION BEACH RPROTEACT CTION AD�3.. • ESTIMATT MARCH lith, 1928, ESTIMATE GEO. 0. REED, INC. 'or work performed and ere.terl 'n furtished t,ter their Contract with he Dade Courcy Onttn -;.r ,tecttre Co i.._M1 es1 )n, _esu k .er 32A.,251t. 10,,023,31 SQ.St. Steel Shet Pilins:; e $ 0,96 $9,622.38 3,987.5 Protective Treataeuf * 004 717.75 1x275 L{aGFt. Untreated Timber Piling ! 0.71 905.25 3.9875 MB1i 10" 1121D Anchor Wale (Untreated) • 383.59 1.529.56 2,8867 MBM 8" X 8° Struts (Treated) • 361.47 1,021.77 11,962.5 #s 30# Charnel u14 • o.16 1 ,914.00 1 - In.Yue :t W1111.7:, Tn 435„00 1 P!ltr Bteps 4 TOTAL $16,283.70 __ ..AA+='t.. a `x011.4 Sq. Ft. Steel Sheet Piling • $ 1.15 $3,463011 963.9 Sq. Ft. Protective Treatment • 0.18 173.50 1,125 Lin, Ft. Treated Timber Piling 1.07 1,203.75 1.673 ICBM Treated 6" 110" Wale • 353.36 59..4. TOTAL $ 5.431.53 • Rztrs Mork_md Steel in Extra "T" Sheet for future Groyne 789 It;, (151}4 # leas 755 #) • 5104 T 24.06 -3 -« C.: Tr t "i i n 71?" SI i'•a:. � , Si. Material left over Dr future gxoy:' as per bill attached 4,9O79 TO ANL GRANll TpxAt'. }ff.at-iita Le;aa February 7th, lyii'S; Estimate ..�.' .Z,7. ,!- 2 DTfl THIS , : $8.975.49 I HEREBY CERTIFY to the corr.ctnesa of the atom Final .I $ yrVettaate and that the work hes been dont aoc©rrl! g to Plana end Specificationet, 6( I t !F CHZ: ;F E? ,I LAE R I 04.14A FIRST ESTIMATE FIRST ESTIMATE BEACH PROTECTION TO CONTRACT BP-1 ADD GEO.O0 USD, INC FEBRUARY 7th, 1928 For work performed and materials furnished under their Contract with the Dade County Ocean Front Protective °Omission: STEAD€ 398.75 LIJAFT. 10,023.31 Se.Ft. Steel Sheet Piling • $ .96 $ 9,622.38 3,987.5 Ss.Ft. Protective Treatment O .18 717.75 1,250 Lin.Ft. Untreated Timber Piling i .71 905.25 3.9875 M M '1O* Z 12* Anchor Male (Untreated) 0383.59 1,529056 1.696 MBM 8* Z 8* Struts (Treated) $361.17 613.05 11,962 Lbs° 30# Channel Taloa 0 016 __LULU $15,301.99 pipumpip, Less 10* Retainer $1,530.20 1,530.20 DUE THIS DATE 1213,771 . I HEREBY CERTIFY to the correctness of the above approximate Monthly Estimate and that the work has been done according to Plans and Specifications. Mt 2/6/28 Ai tw:!* MOM �"\ g 4 e SIXTH & FINAL FINAL ESTIMATE BEACH PROTECTION ESTIMATECONTRACT BP-1 TO GEO. 0. REED, INC. JANUARY 17th 1928. For work performed and materials furnished under their Cant :- ;; with the Dade County Ocean Front Protective Commission: MAIN BULKHEAD: 3_,553. L N. FT® 89,234.1 Sq.Ft. Steel Sheet Piling • $ .96 $85,664.74 35,537 Sq.Ft. Protective Treatment • .24 8,528.88 11,300 Lin.Ft. Untreated Timber Piltng • .71 8,023.00 35,537 MBM 10• X 12» Anchor Wale (Untreated) I 383.59 13,631.64 259553 MBM 8' 2 ge struts (Treated) • 361.47 9,236.64 106;611 Lbs'. '30# Channel Wales • .16 17,057.76 8,067 Ou.T-Is. of Filling In i . 25 2. 015- 75 4 Pairs of Steps I 137,99 CHT0F7 WALL S (a) IIULKHEAD SECTION 121.83 LZ1t.FTs 29837.6 Sq.Ft. Steel Sheet Piling • $ .96 $ 2,724.10 1,096.47 ' ' Protective Treatment • .24 263.15 300 Lin.Ft. Untreated Timber Piling • .71 213.00 1$2183 MBE 10" X 12* Anchor Wales (Untreated) • 383.59 467.33 .6219 MBM 8" X 8* Struts, (Treated) • 361.47 224.80 3,654.9 Lbs. 30# Channel Wales • .16 .� 8 (b) GROYNE SECTION: 140,17 LIN, FT., 1,605,06 Sq.Ft. Steel Sheet Piling • $ 1x15 $ 1„84fp,82 918 Sq.Ft. Steel Sheet Piling • .96 e461, n 1 ,000 Lin.Ft. Untreated Timber Piling • .71 71.0,00 1.4951 MBM 8' X 8' Wales (Untreated) • 383.59 57301 4,010o1 3 { 1/14/28 k • FAGS #2 EST/MATZ TO GZO. 0. REED, /WO.. , BP-1 ! JANUARY 17th, 1921. FINAL ZSTIIMATB. iilYriilr+i Y ■ ��! .. 3 21‘1. Ltn. .• .. • 10,°67.1 Sq.?t. Steel Sheet Piling ! $ 1.15 $ 46,477.1/ 3.1,1 Sei t # 'e Tr tt x,677.18 14,625 Lint t. Treated. Tomes Piling 1 1.07 15,618i 22.2595.. Malt--Treated 6' 1 10' ra* •• 353.36 7.165t62 - a $ /2,265./z Speots] construction at Raman Peelat lindt#aill, as per Lgreea $ 0 0.0 Pulling Steel Sheet 11.11to * at oynes U 12, ,o 3 I� time tot crane.: • ze__50 +ri . 1tiS Pile �.1a� tri the. � j�iT attached .Bills34015 .Steel in Extra 'T' Sheet, (151411- #e 1e �► C4 211. • 6.6 tiger*. • Surnirg Solus and bolting extra . Sheets as per attached. billh4. Bolding ezteratione , "'?'' sheer as per attaohed bill :►:. ...,..` TOTAL _ . $225,920.21 BQ3S Leave September last, 1 : , Seta to 0, uf4 • Less October - let, 3 2 , ' *1816* toes en ar 1st , ! �e .6 . Les. .psi 1ee _'_ • a 1;i. Lees wry let, 1 ' ` - 1 SSS 'ISIS DATE 27$347001 ,. I WREST _CTRT to thea ect .= Estimate that the wank hast been``done accordi to Plana and SpeoUTioations. x • a _ w itz 14/FB -� - _ . f r ptet' ° r • .'IF T t `' `1'"�? 'IF; NBTZATU B A� Pit0'f'CC a ICtt • CONTRACT t --I OW. Q 1lZ$y13, Ilit'e`. • JAITUA:ilY let, 192 t E ntrictF9,,k-i—wr _ � . e ". . moi oftis ` ;. 2. , 6 , 74 .1 ,f 3 ,.1 130..F t. Stec) .heet Piling 4 »96 4_5t • 35,537 firl.rti, Protective Treatment g .2k S452g05011 11,300lGin. `t. :I treated f'1er Pi11.24 ti .71 6,023.00 • 537 MBlf. 100X 120 Anchor Vitae} . Oestri?= ed) .1.3,633..% - ' ' ' ..,25:553 g" X` (Tre t 0 34.47 9,23 . • rr �! 140,G1.1 Lbs. 30# Cbt-.zriel tii�.],Ae 36 17,057.76 •8,06 u.`. 4, -s, of , 1ll ng In f -, .__ •..2._f?..., ti - F '- z%r 'r i. rp rx �g .s"F v X+ °`' ' z - - .y. ,£„3„�. �€ lt A ►. 7 2,326.2 S4 it. 8taC Sheet P13tsg $ $ .96 $ 2.113,17 1,096,k7 *cart. Pro-, attvtitier t +• .21t263.15 300 Lt rt. ttro&ted °Ti er`' 1,22 1 110X12* ei �.w .- ° r+�et }., ` 3113059 ` 4 .1 ..6218 11 66 X $tri, • .§ *,- (? 3F t ,w* 3.61.04r,--- '• :. i, 'r#x.99 , ;pr . • $ - - : ' ...:: d .9 .7.6 Ac . . Sre1 . .1 9 1,000 LII .! t,. tmt*' 'At .,�Titab r : , %-• " 2re - 'AI, 1. 95 �_ ��„, *,8 :: . tett :ted) -•• ee Y 3 �, Y .a.i.. ..- '�' „� i s � r 41 ' I ' ,_;(.....4,-&.40,.. � .F:'�i, .' �rf # .. ;tR*> ,i- • , ,. "p.t .v r � 0,11 *4 al `` PAGE 42 3 3TIMA TE TO OL'O. 0, REED, INC. SP--1 JAM:ATI let,192e - i 33,250.0 3q. "t. Steel met Piling 4 4 1.15 4 324237• 9,175.55 &lat, Protective Treatment • .24 2,202.13 11,975 Liu.l?t. Treated 2tmm2 .:r ' Piling 1.07 12p&13.25 . li;250 iilli Treated 411 1 10" Wale _tafisa 59,701.70 mIsta mos, a & 7. T. car"t ul 5000 Scat. Steel eh::et Piling 6 4 1.15 $ 6,210.00 1.750 Seat. Protective ?r ; tent 6 .24 420.00 575 Lin.Ft. T°r¢:ted Timber Piling 4 1.01 615.25 2.400 liBU Trer.,ted 6" 1 10" Wales 6 353.36 70472 . . 7.951.97 Sp,,cial conger}action z.t Roman n Pools Ful iiriE Steel :heat Pilin& to New orale ;.t Groynes 11 ..nd 12, 6 3/4 hours time for Crane .-*i d Grew 6 12.50 84.38 Steel in Zxtra "T" 3heet,(14 /te les 753 I°a) 7e9 0 € 61.03 T 24.06 351444 ORM T4R`AL $20,636.g9 =MOTIONS* , Less 1$ Reta=iner $22i063.49 Lis $e'te ber let, 192 # Nittmrto 30,526.52 hese October 1st, 1 r 21 Les ember 1st, 1 t 0 60;$ .91 Leri er 1st, 192 , * 1960141,41 ATS THIS DATN $ 24,495.E 1 f' T,RY OtRTIPT to the correctness of the above apprort .te 'monthly tatilAte rnd that the fork has been done According to Plans end fpeoificati aus. • / . .. .,_ • { = is r trisg I :..Ar. • lf1STT•# 1 F<7A'311 P. OTrfjT tON oO aT AC"z 3P-1 TO ^4. 0. a ED, Inc. !) qr,I.,-1 r ;, 1927. POT Vet•per Gritted ;lad utpte?..rials .:=ni theJ. urider theta (ton tr- et with tha D?de Comity Oc .en Trout x t!#t1*►' • ;. o: :zfae aut SAI ' T'L1 i `.h;)t 0' *1 .. `ts Steel Bbua t i i : _ .96 sq,Jt. prtt 'se Te .•t;inn* t . s ► 11,300 Lin. 't. Untrep,tec. Timber ' 8,023.00 023400 • 35,537 rm 10"2:12" Anchor Y<Ae, (Untreated) 6 353.59 1;i0631.64 55 M tat ! ' Stet : 45:.��3 q }� (T r+•ted) . 0 _361.4. 91236.64 106 611 Lb. 30# Chanel W 1 ee .16 17,057.76 124000 tit. /us. a ' a ilh to In to 025 2,750.00 . « 2,826.22 S • ` . Sten1 7.b,- rit Pt1in p g 1 .96 .13 2,713,17 • 1,096.47 so.?t, a roue.:: >iv 'fix':: E tment 4 .24 263.15 300 Lin. rt. n►tr r;tr'd Timber ber Piling 0 .71 213.00 1.210 USX 10" X 12* Moho? lei 'Y (untroat;..d) , • �. 9 'R • 6.g =V g" X do Strut, ,� ,.._ ) . 361.47 224,x' 3,604.8 Lbs. 30f O8!sone1 "1a1ee it .16 , ,.,S, .7,Z 4,t 54-.99 (b) � �� � � 170* Sciert. Sheet a .96 681 1a 1,000 LinvIrt. Thitrefltod i 11 8 .; . 110.00 1.k95 Y c t' X 83 W'3.c (1111t 'rtt.t t *10.59 4 010.78 1P'INNe NOS. 1 . 2. i. 1 r k . 18,430.2 Sq,Ft. S e 1 ^: t ;;�-� . . -1.15 • r`• •1:7 r . Tr), 1:J3• 9 OT1rl ri11—1 . 1 9 3,1 st ,J0I,Ttog )4.770.7 . . Prot Tr .ntr..'Ant tt 4 1144.9( , • ;.7:1775 P13 1.07 7, 10,739 .m:! 63 X 1(:" W-le 12",5 .36 t 33,207.00 Tolm„ 41,86 r4r Eltr“.1 r511,,,:J.it 1.15 4,111:0.00 30i) j•-, -fo ir .24 7,19• •CO 1221jC Tiietb-YePi1 C 1.07 1,337.60 6" K 10" c 353.36 703 72 Y777.1A ' • J. A.; `i3t. ( T rrt! r op cf 1-• 0 1: 2- "Tn ;7:A2r:ti (1 , i' 'lb . liter.' 11)- t-21000 T at; 4 (V.til 7,1i19.(1) f3 :rqorri T't:r e 1. t, 1927 ( "--**7)7 7/ ' 7 t 1T - 7 L1 ,5O661 LA :-.51,91300g • " tnec oiT of?' t; :1 • .;-1.1 1"TOr1: L'% 1' (.4 -.1.)tiC' r. I : 41. G THIRD ESTIMATE CONTRACT BP-1 BEACH PROTECTION CONTRACT BP-1 ESTIMATE OF NOVEMBER 1st , 1927 TO GEO. O. REED, INC. For work performed and materials furnished under their contract with the Dade County Ocean Front Protective Commission. MAIN BULKHEAD: 77 ,330 Sq. Ft. Steel Sheet Piling ® $ .96 $74,236.50 29,020 Sq. Ft. Protective Treatment ® .24 7 ,156.50 7,450 Lin.Ft. Untreated Timber Piling® .71 5,259.50 23 ,370 MBM 10" X 12" Anchor Wale, (Untreated) ® 383 .59 0,964.50 14,616 MBM 0" X 0" Strut (Treated) 0 361.47 5,203.25 64,470 Lbs. - 300 Channel Wales 0 .16 10,315.20 4,500 Cu. Yds. of Filling In 0 .25 1,125.00 TOTAL $112,371.05 CUTOFF WALLS: (a) BULKHEAD SECTION: 2 ,026.22 Sq. Ft. Sheet Piling ® .96 $ 2,713.17 1,096.47 Sq. Ft. Protective Treatment 0 .24 263.15 300 Lin. Ft. Untreated Timber Pilin:z .71 213.00 1.210 MBM 10" X 12" Anchor Wales 464 14 (Untreated) e 303.59 • .616 MBM 0" X 0" Strut (Treated) 0 361.47 222.67 3 ,604.0 Lbs. - 300 ChannelWalesTAL ® .16 576.77 4,452.90 (b ) GROYNE SECTION: 1,605 Sq. Ft. Steel Sheet Piling 0 1.15 $ 1,545.75 917.00 Sq. Ft. Steel Sheet Piling © .96 001.16 1,000 Lin. Ft. Untreated Timber Piling 0 .71 710.00 1.495 MBM 0" X 0" Wale (Untreated) © 303.59 573 .47 TOTAL $ 4,010.30 s M Q PAGE #2 CONTRACT BP-1 ESTIMATE NOVEMBER lst , 1927 GROYNES NOS. 1, 2 & 12: 8,087.94 Sq. Ft. Steel Sheet Piling ® $ 1.15 $ 9 ,301.13 2,100 Sq. Ft. Protective Treatment 0 .24 504.00 2,975 Lin. Ft. Treated Timber Piling® 1.07 3 ,183.25 4,493 MBM Treated 6" X 10" Wale 0 353.36 1 ,587.65 $ 14,576.03 EXTRA WORK: Special Construction gl.t Roman Pools Wind Mill as per Agreement $ 250.00 Pulling Steel Sheet Piling to New Grade at Groyne No. 12, 64 hours Crane & Crew@ 12.50 TOTAL $ 328.13 GRAND TOTAL $135,738.49 DEDUCTIONS: Less 101 Retainer $ 13 ,573.85 Less September 1st , 1927 ,Estimate 30,526.52 Less October 1st , 1927 ,Estimate 30,821.21 3 74,921.58 DUE THIS DATE $ 60,816.91 I HEREBY CERTIFY to the correctness of the above approximate Monthly Estimate and that the work has been done according to Plans and Specifications. (Signed) Ed R. Neff Chief Engineer k - 45 0 i n J SECOND ESTIMATE ESTIMATE BEACH PROTECTION BP-1 TO GEO. 0 . REED, INC. OCTOBER 1st , 1927 For work performed and materials furnished under their Contract with the Dade County Ocean Front Protective Commission. MAIN BULKHEAD: 37,512.54 Sq. Ft. Steel Sheet Piling @ $ .96 $36,012.04 14,980 Sq. Ft. Protective Treatment ® $ .24 3 ,595.20 3 ,500 Lin. Ft. Untreated Timber Piling 43 $ .71 2,485.00 10.960 MBM 10" X 12" Anchor Wale _ (Untreated) @ 383.59 4,204.15 7.840 MBM 8" X 8" Strut , (Treated) @ 361.47 2 ,833.92 33 ,330 Lbs. - 30# Channel Wales ® .16 5 .332.80 $54,463.11 CUTOFF WALL: (a) BULKHEAD SECTION: 1,372 Sq. Ft. Steel Sheet Piling @ .96 1,317.12 547 Sq. Ft. Protective Treatment ® .24 131.28 150 Lin. Ft. Untreated Timber Piling .71 106.50 .600 MBM 10" X 12" Anchor Wales (Untreated) 383 .59 230.15 .280 MBM 8" X 8" Strut (Treated) @ 361.47 101.21 1,800 Lbs. - 30# Channel Wales ® .16 288.00 $ 2,174.26 (b ) GROYNE SECTION: 1,605 Sq. Ft. Steel Sheet Piling 0 1.15 $ 1,845.75 600 Lin. Ft. Untreated Timber Piling @ .71 426.00 .951 MBM 8" X 8" Wale (Untreated) ® 383.59 364.79 $ 2,636.54 GROYNES NO. 1 & 2: 4,950 Sq. Ft. Steel Sheet Piling ® 1.15 $ 5,692.50 1,250 Sq. Ft. Protective Treatment ® .24 300.00 1,800 Lin. Ft. Treated Timber Piling @ 1.07 1,926.00 2.75 MBM Treated 6" X 10" Wale ® 353.36 971.74 $ 8,890.24 GRAND TOTAL $68 ,164.15 Q t BEACH pROTECT IOId FIRST ESTIMATECONTRACT BP-1 ESTIMATE NO. 1 TO GEO. 0 . REED, INC. , SEPTEMBER let , 1927 For work performed and eFront` Protectiveunder Commission,Contract with the Dade County Ocean MAS LiEAD: 19 ,387.03 Sq. Ft . Steel Sheet Piling @ 4 .96 018,611.55 7 ,780 Sq. Ft . Protective Treatment @ .24 1,867.20 400 Lin. Ft. Untreated TiPiling 43 .71 284.00 $ 20,762.75 CUTOFF WALLS: (a) Bulkhead Section: 1,449 Sq. Ft. Steel Sheet Piling ® -96 $ 1,391.04 547 Sq. Ft. Protective Treatment @ .24 131.28 150 Lin. Ft. Untreated Timber 106.50 Piling @ .71 1,628.82 (b) Grovne Section: 1,605 Sq. Ft. Steel Sheet Piling @ 1.15 $ 1,845.75 600 Lin. Ft. Untreated Timber 426.00 Piles C .71 .951 M.B.M. Untreated gu X 8a+ ;vale0383 .59 364.79 2 ,636.54 GROYNES NO. 1 & 2: 4,950 Sq. Ft. Steel Sheet Piling @ 1.15 $ 5,692.50 1,250 Sq . Ft. Protective Treatment @ .24 390.00 1,800 Lin. Ft . Treated Timber Piling @1.07 1,926.00 2.75 M.B.M. Treated 60 X 10" Wale X353.36 971.74 8,890.24 GRAND TOTAL $ 33 ,91 .35 DEDUCT IOfl: Less 10% Retainer 3 ,391. 3 3 ,31 DUE THIS DATE $ 30,526.52 e I HEREBY CtimatY to e andthe thatothecworksof the has beenabove done accordingto Monthly Es Plans and Specifications. (Signed) Ed R Neff Chief Engineer k 0411, PAGE #2 ESTIMATE TO GEO . 0. REED, INC. , BEACH PROTECTION CONTRACT BP-1 OCTOBER 1st , 1927 BROUGHT FORWARD — — GRAND TOTAL $ 68,164.15 DEDUCTIONS: Less 10% Retainer $ 6,816.42 Less September lst , 1927, Estimate 30,526.52 37,342.94 DUE THIS DATE $ 30,821.21 I HEREBY CERTIFY to the correctness' of the above approximate Monthly Estimate and that the work has been done according to Plans and Specifications. (Signed) . Ed R. Neff Chief Engineer „ • - ( \t • \f's 4 so