Loading...
Ordinance 92-2794 ORDINANCE NO. 92-2794 AN ORDINANCE OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING MIAMI BEACH CITY CODE CHAPTER 39, ENTITLED "STREETS, SIDEWALKS AND PUBLIC FACILITIES", AMENDING ARTICLE II, ENTITLED "EXCAVATION"; AMENDING SECTION 39-11, ENTITLED "SAME- APPLICATION; AMOUNT OF DEPOSIT; USE OF DEPOSIT TO REPLACE SURFACE; PERMIT FEE," BY ESTABLISHING A NEW SCHEDULE OF PERMIT FEES FOR EXCAVATIONS, SIDEWALK, DRIVEWAY, STREET AND PARKWAY REPAIR, CONSTRUCTION, PAVING OR RESURFACING, SURVEYS CONNECTED THEREWITH, UTILITY PLACEMENT AND UTILITY CONNECTION EXCAVATIONS AND GROUND WATER MONITORING WELLS; PROVIDING FEES FOR RENEWAL OF PERMITS, ISSUANCE OF AFTER-THE-FACT PERMITS AND FOR REINSPECTION; PROVIDING FOR REPEALER, SEVERABILITY AND AN EFFECTIVE DATE. WHEREAS, it is necessary to establish a schedule of fees for City permitting and inspections related to sidewalk and street excavations to defray City expenses resulting from such activities; and WHEREAS, the provisions set forth herein are necessary to the welfare of the residents of the City of Miami Beach. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA: SECTION 1. AMENDMENT OF SECTION 39-11. That Section 39-11 of Article II, entitled "Excavations" of Miami Beach City Code Chapter 39 , entitled "Streets, Sidewalks and Public Facilities" is hereby amended to read as follows: Sec. 39-11. Same - Application; amount of deposit; use of deposit to replace surface; permit fee. The city cnginccr Public Works Director is hereby authorized to grant a permit to any person, firm or corporation to dig up, disturb or make an excavation in any street, parks, parkways, alleys, easements, other public way, or sidewalk within the city upon application made in writing, stating adequately when and where such digging up, disturbing or excavating is to be made, the depth, width and length of such proposed excavation, the purpose for which the same is to be made and for what period of time it is necessary to keep such excavation open. Such application shall be accompanied by payment of the required permit fees and by a deposit in an amount established by the eIty cnginccr Public Works Director based on his estimate of the cost of repairing and replacing the excavation. 1 It shall be agreed that the city may use all or such part of such deposit as may be necessary in repairing or replacing the street, park, parkway, alley, easement, other public way or sidewalk in as good condition as it was before the making of such excavation or disturbance; provided, that the person, firm or corporation obtaining the permit shall not have within ten days after the period during which such excavation is to remain open, replaced and repaired such street or sidewalk and put the same in as good condition as it was before being disturbed, to the satisfaction of the eIty engineer Public Works Director. In ordcr to secure a permit from the city engineer to do work on or to make excavations in the sidewalks, streets, parks, parkways, alleys, easemento or other public ways within the city, construction cost of ouch work or excavation. The term "construction cost" shall be construed throughout this article to mean the total cost or good faith estimated cost of the work or excavation, including at current market rates the cost of labor, and profit. In the event the good faith estimated cost stated on The permit fees to be charged by the Public Works Department for street excavation, sidewalk repair, paving or resurfacing of parkway or shoulder area, building line and grade survey, sidewalk construction, driveway construction, flume excavation, utility placement, underground utility service connection excavation, groundwater monitoring wells, permit renewal, after-the-fact permit and reinspection within the city are hereby fixed as follows: (1) Street excavation permit: 50 lineal feet or less $250. 00 Each additional lineal foot 1. 00 (2) Sidewalk repair permit: 50 lineal feet or less 50. 00 Each additional lineal foot 1. 00 2 (3) Sidewalk construction permit: 50 lineal feet or less 100. 00 Each additional lineal foot 2 . 00 (4) Paving or resurfacing of parkway or shoulder area permit: 25 lineal feet or less 100. 00 Each additional lineal foot 5. 00 _(5) Building line and grade survey permit: 50 lineal feet or less 250. 00 Each additional lineal foot 5. 00 (6) Driveway construction permit, each driveway 100. 00 (7) Flume excavation permit, each excavation 100. 00 (8) Utility placement permit (poles, splice pits, manholes, hand holes, catch basins, pedestals, vaults and auger holes 100. 00 plus, for each additional, per block (on same permit) 10. 00 (9) Underground utility service connection right-of-way excavation permit (each water, gas, electric, telephone, cable, television or sanitary sewer connection from base building line to the utility located within the public right-of-way) . . . . 100. 00 (10) Groundwater monitoring wells, each well 50. 00 (11) Permit renewal fee: Ninety-day extension of permit fee expiration date 100. 00 3 (12) After-the-fact permit fee: For any work described in (1) through (10) herein, performed without proper permits and inspections, quadruple the above fees. (13) Reinspection fees: When additional inspection is required for work previously inspected and rejected by the Public Works Department, a reinspection fee will be required, for each reinspection 25. 00 Permit fees will be computed only for the primary item of work for which a permit is required. The fee collected will also cover items of work incidental to the primary item and all processing and inspection services rendered by the Public Works Department. SECTION 2 . REPEALER. All Ordinances or parts of Ordinances in conflict herewith be and the same are hereby repealed. SECTION 3. SEVERABILITY. If any section, subsection, clause or provision of this Ordinance is held invalid, the remainder shall not be affected by such invalidity. SECTION 4. EFFECTIVE DATE. This Ordinance shall take effect on the 27th day of September , 1992 . PASSED and ADOPTED this 16th day of September , 1992 . ATTEST: MAYOR '7----"K(A\cAAx't CITY CLERK 1st reading 9/2/92 2nd reading 9/16/92 SWS:scf:\Disk2\strtwalk.ord FORM APPROVED LEGAL DEPT. 4 By 5 .54E-1 'late • CITY OF MIAMI BEACHr_ra CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33 139 TELEPHONE: (305) 673-7010 OFFICE OF THE CITY MANAGER FAX: (305) 673-7762 COMMISSION MEMORANDUM NO. 50-72_, TO: Mayor Seymour Gelber and DATE: Sept. 2, 1992 Members of the City Commission FROM: Roger M. gerttQ /,/ �/� City Manager ��(, �(,/(-{,LLz"-- — SUBJECT: APPROVAL OF AN ORDINANCE OF THE CITY OF MIAMI BEACH, FLORIDA, AMENDING THE MIAMI BEACH CODE, CHAPTER 39, ENTITLED "STREETS, SIDEWALKS AND PUBLIC FACILITIES", BY AMENDING ARTICLE II, ENTITLED 'EXCAVATIONS" ADMINISTRATION RECOMMENDATION: The Administration recommends that the City Commission approve an ordinance amending Chapter 39 of the Miami Beach Code entitled "Streets, Sidewalks and Public Facilities" by amending Article II, entitled "Excavations". BACKGROUND: The City of Miami Beach currently charges a permit fee of one (1) percent of the construction value for all excavations in the sidewalks, streets, parks, parkways, alleys, easements, or other public rights-of-way within the City limits. This percentage fee docs not cover the cost of issuing the permit, including researching utility records or inspecting the work during and after completion. ANALYSIS: The revised permit schedule will allow coverage of the City's cost of the permit research, issuance and inspection. The proposed fee will range from $25.00 to $250.00 depending upon the nature of the work rather than the one (1) percent of construction cost fee structure currently utilized. CONCLUSION: It is anticipated that this revised fee schedule will generate approximately $13,500 in revenue to offset the cost of permit issuance and inspection. RMC/RAG/b cm.�lvcm�v.(a 8 AGENDA ITEM R —� " DATE ( - I _ f v • • • M • U CU �•ri1 a,.n ca 0 4 pa U H • h 'C7 H • - N a) • I "0 cd a) • N O H • C\ U Cl) U • H • • J,r-I 1.J • O a+ cU • 7.1 c d 7 U N Z Gx] -e •bD Ho co7:1 y •- O H Fq 4.1 a) cj O E 3 u cd min a) 0o v •ri - O a) +-) a) b 4-1 • HH •r-I a) +J C.) 4.1 • acd a