Ordinance 92-2796 ORDINANCE NO. 92-2796
AN ORDINANCE OF THE CITY COMMISSION OF THE
CITY OF MIAM:t BEACH, FLORIDA, AMENDING
MIAMI BEACH CITY CODE CHAPTER 8 ENTITLED
"BUILDING REGULATIONS" BY AMENDING SECTION
8-3 ENTITLED "SCHEDULE OF PERMIT FEES",
PROVIDING FOR AN INCREASE IN PERMIT AND
INSPECTION FEES FOR BUILDING, PLUMBING,
ELECTRICAL AND MECHANICAL WORK AND FOR
OTHER BUILDING DEPARTMENT ACTIVITIES
REPEALING ALL ORDINANCES IN CONFLICT
THEREWITH, PROVIDING FOR SEVERABILITY, AND
PROVIDING FOR AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF MIAMI BEACH,
FLORIDA:
SECTION 1
That Section 8-3 of the Code of the City of Miami Beach is hereby
amended to read as follows:
SECTION 8-3. SCHEDULE OF PERMIT FEES.
(A) Permits, inspections and other fees of the Building Department of
the city are hereby levied and imposed and shall apply to building,
plumbing, electrical and mechanical permits and other activities
undertaken by that Department.
(1) DOUBLE FEES:
When work for which a permit is required is commenced prior to the
obtaining of a permit, the permit applicant shall be required to pay
one hundred dollars ($100. 00) plus a double permit fee as specified
in this Ordinance. In no event shall the applicant pay less than
one hundred dollars plus double the amount of the minimum fee as
specified for each type of work. The payment of the required fee
shall not relieve any person, firm or corporation from fully
complying with all of the applicable regulations and codes, nor
shall it relieve them from being subject to any of the penalties
therein. The double fee requirement shall be applicable to all
sections of the Building Department as noted herein.
For second offense of doing work without a permit, the permit
applicant shall be required to pay twice the double permit fee plus
two hundred dollars ($200. 00) . For each offense thereafter, the
permit applicant shall be required to pay twice the double permit
fee plus five hundred dollars ($500. 00) .
(2) REINSPECTION FEES:
When extra inspection trips are due to: (a) incorrect address given
on call for inspection; (b) prior rejection of work due to faulty
construction; (c) work not being ready for inspection at time
specified; (d) failure to call for final or other inspections; or
(e) required corrections not being made or completed at time
specified, a fee of - - ' . - _ _ - - , e : thirty five dollars
($35. 00) for the first reinspection may be charged to the permit
holder in the trade concerned.
If it is determined by the field inspector concerned, that the job
has the same problem after the reinspection fee is assessed, paid
and the reinspection made, then a second reinspection fee of Fifty
dollaro ($50. 00) sixty five dollars ($65. 00) shall be charged.
Subsequently reinspection fees shall also be fifty dollars ($50. 00)
sixty five dollars ($65. 00) applicable to all sections of the
Building Department.
Payment of the reinspection fee shall be required before any
subsequent permits will be issued to the person or firm owing same.
Further inspections may be refused until payment of reinspection
fees has been made.
1
The reinspection fee of existing buildings by divisions to determine
compliance with the South Florida Building Code shall be Twenty-five
dollars ($25. 00) thirty five dollars ($35. 00) per trade inspection
including Inspection of Elevator if required. This shall not
include inspections to determine compliance with the South Florida
Building Code section dealing with forty-year recertification.
(3) LOST PLANS FEE:
When plans for new buildings and additions are lost by the owner or
contractor, a recertification fee will be required to review, stamp
and approve a new set of plans as a field copy. Such fee shall be
based on twenty percent (20%) twenty five percent (25%) of the
original building permit fee, with a minimum fee for Group I
Occupancy (Single-Family Residence) of . : - e . ee sixty
sixty five dollars ($65. 001 and a minimum fee for all other types of
occupancies, dwellings and buildings of - • - : :
($75. 00) one hundred dollars ($100. 00) .
(4) REVISED PLANS PROCESSING FEE:
The charge for plans processing of major revisions to plans which
were processed and permitted shall be based on a fee of thirty
percent (30%) of the original building permit, but shall not exceed
a charge of - - - . -_ _ : . - e . e : two hundred
dollars ($200. 00) .
(5) LOST PERMIT CARD FEE:
After a permit has been issued, if the permit inspection card has
been lost, a replacement fee of twenty dollars $20. 00 per hour
$25. 00 per hour research fee shall be charged not to exceed fifty
dollars $50.00) sixty five dollars ($65. 00) for residential and
seventy five dollars (75. 00)- one hundred dollars ($100. 00) for other
occupancies.
(6) SPECIAL PROJECTS FEE:
A fee equal to actual staff time and related costs shall be assessed
for special projects reauiri.ng research by the Building Department
in order to answer questions proposed by developers, attorneys,
realtors, etc. in connection with the use and development of
properties, or to determine if any existing violations are on the
property through a review of departmental records. Such special
fees will be levied only for requests outside the scope of normal
departmental work. A minimum fee of twenty dollars- ($20 0) twenty
five dollars ($25. 00) per hour shall be charged.
(B) THE FOLLOWING FEES SHALL DEAL SOLELY WITH BUILDING PERMITS:
(1) "UP FRONT" PROCESSING FEE:
When the building permit application is received, the applicant
shall pay an "up front" processing fee equal to two dollars and
fifty cents ($2 . 50) three dollars ($3 . 00) per hundred square feet or
fractional part thereof for new Buildings and/or Additions or three
dollars ($3 . 00) four dollars ($4 . 00) per each one thousand dollars
($1, 000. 00) of estimated value of construction or fractional part
thereof for Alterations and Repairs.
This processing fee is not refundable, but shall be credited toward
the final building permit fee. The "up front" processing fee, after
it is calculated, shall be rounded up to the nearest five dollars
($5. 00) , with a minimum fee set at thirty dollars ($30. 00) forty
dollars ($40. 00) .
When the "up front" process fee is larger that the final permit fee
not including surcharges, that "up front" processing fee amount
shall become the permit fee for that application.
2
(2) REFUNDS, TIME LIMITATIONS, CANCELLATIONS
The fees charged pursuant to this schedule, provided the same are
for a permit required by Section 301. 1 of the South Florida
Building Code, may be refunded by the Building Official subject to
the following:
(1) No refunds shall be made on requests involving:
(a) Permit fees of fifty dollars ($50.00) sixty five dollars
($65. 00) or less; or
(b) Permits revoked by the Building Official under authority
granted by the South Florida Building Code; or
(c) Permits cancelled by court order; or
(d) Permits which have expired; or
(e) Permits under which work has commenced as evidenced by any
recorded inspection having been made by the department.
(2) A full refund shall be granted to a permit holder who takes out
a permit covering work outside the jurisdictional inspection
area.
(3) A full refund less fifty dollars ($50. 00) sixty five dollars
($65. 00) or thirty percent (30%) of the permit fee, whichever
amount is greater, rounded down to the nearest dollar shall be
granted to a permit holder who requests a refund in writing,
provided:
(a) That the permit holder makes a written request prior to
the permit expiration date; and,
(b) That a validated copy of the permit be submitted with such
request; and,
(c) That no work as evidenced by any recorded inspection has
commenced under such permit.
(4) Where there is a change of contractor involving a permit for
which a fee of more than fifty dollars ($50. 00) was paid:
A. The original permit holder:
1. Is not entitled to any refund if the permit has
expired or if work, as evidenced by any recorded
inspection, has commenced under such permit;
2 . Is entitled to a full refund less the up-front
processing fee, where the permit has not expired and
no work, as evidenced by any recorded inspection, has
commenced.
B. The second permit holder shall pay:
1. A full fee if the original permit has expired; or
2 . ' - -_ _ _ - • • • • One hundred and thirty
dollars ($130. 00) to cover the cost of transferring
the data from the original to the second permit and
processing the second permit in instances where work,
as evidenced by any recorded inspection, has
commenced under the original unexpired permit; or,
3 . A full fee plus one hundred dollars ($100. 00) one
hundred and thirty dollars $130. 00) to cover the
transferring and reprocessing costs where no work, as
evidenced by any recorded inspection has commenced
under the original unexpired permit.
(5) A fee of fifty dollars ($50. 00) sixty five dollars ($65. 00)
shall be paid by the permit holder who submits a written
request for a permit extension as authorized under Section
304 . 3 (b) , South Florida Building Code.
(6) Where a permit has become null and void pursuant to Sec.
304 . 3 (d) , South Florida Building Code, and no work, as
evidenced by at least one recorded inspection, has been made by
the department, a credit of fifty per cent (50%) of the
original permit fee covering the same project and involving the
same plans shall be given, provided that a complete
reapplication is made within six (6) months of the expiration
3
date of the original permit and provided that no refund has
been made according to this section. Said reapplication
must be submitted with the plans and the applicant's validated
copy of the original permit. The amount of this fee shall be,
at least, equal to or higher than the minimum fee for the trade
concerned.
(7) The Building Official is authorized to charge the fees assessed
prior to July 25, 1988 October 1, 1992 to those applications
that are scheduled for sub-contract permits, where the master
building permit was issued prior to July 25, 1988 October 1,
1992 and where written evidence such as a signed and dated copy
of the subcontract was entered into prior to July 25, 1988
October 1, 1992 .
(8) The Building Department Director is authorized to charge an
interest to any amount due when not paid by the Due Date. The
interest rate shall be at the highest legal limit authorized by
law; plus collection costs and attorneys fees.
(D) BUILDING PERMIT FEES:
The following shall be building permit fees and shall not include
plumbing, electrical or mechanical installations or use and
occupancy fees:
PRESENT PROPOSED
(1) NEW BUILDING AND/OR ADDITIONS:
For each 100 sq. ft. or fractional part $ 10. 00 $ 13 . 00
of floor area
Minimum fee $ 30. 00 $ 40. 00
Except that for buildings for storage and
industrial uses of the Group E and F
Occupancies as defined in the South Florida
Building Code, the fee shall be:
For each 100 sq. ft. , or fractional part of
floor area up to 20, 000 sq. ft. $ 10. 00 $ 13 . 00
For each additional 100 sq. ft. or fractional
part of floor area thereafter $ 5. 00 $ 6. 50
Minimum fee $ 30. 00 $ 40. 00
Except that for greenhouses and buildings
for agricultural uses (non-residential) when
located on the premises so used, screen
enclosures and trailer additions:
For each 100 sq. ft. or fractional part of
floor area $ 5. 00 $ 6. 50
Minimum fee $ 30. 00 $ 40. 00
(2) NEW CONSTRUCTION OTHER THAN AS SPECIFIED
HEREIN: (WATER TOWERS, PYLONS, BULK STORAGE
TANK FOUNDATIONS, SEA WALLS, BULKHEADS, UN-
USUAL LIMITED-USE BUILDINGS, FREE-STANDING
RIGID CANOPIES, MARQUEES AND SIMILAR
CONSTRUCTION)
For each $1, 000 of estimated cost or
fractional part $ 10. 50 $ 13 . 50
Minimum permit fee $ 30. 00 $ 40. 00
Metal-wood and/or prefab storage sheds,
first 100 sq. ft. $ 10. 00 $ 15. 00
4
Each additional 100 sq. ft. $ 7 . 50 $ 10. 00
(Except for each service station underground
storage tank and each approved fallout
shelter which conforms to the specifications
established by the civil defense and mobili-
zation agency and the South Florida Building
Code) $ 35. 00 $ 45. 00
Minimum fee (storage tank only) $ 40. 00 $ 50. 00
(3) ALTERATIONS AND REPAIRS TO BUILDINGS AND
OTHER STRUCTURES:
Up to $1, 000 of estimated cost or fractional
part $ 35. 00 $ 45. 00
For each additional $1, 000 of estimated cost
or fractional part $ 14 . 00 $ 18 . 00
Painting up to $1, 000 of estimated cost $ 25. 00 $ 35. 00
Each additional $1, 000 $ 10. 00 $ 13 . 00
(4) INSTALLATION OR REPLACEMENT OF:
Windows and exterior doors in all build-
ings, or storefronts and fixed glass:
New installation or replacement, for each
window or door unit up to the first 100
units* $ 3 .00 $ 4 . 00
For each additional unit $ 2.00 $ 2 . 50
Minimum fee $ 50. 00 $ 65. 00
*Unit is the opening between structural
columns
Curtain Walls including windows and doors
therein:
For each 100 sq. ft. or fractional part
thereof up to 10, 000 sq. ft. $ 10. 00 $ 13 . 00
For each additional 100 sq. ft. or
fractional part thereof $ 8 . 00 $ 10. 50
Minimum fee $ 30. 00 $ 40. 00
(5) MOVING BUILDINGS OR OTHER STRUCTURES:
For each 100 sq. ft. or fractional part
thereof (does not include cost of new
foundation or repairs to building or
structure. ) $ 10. 00 $ 13 . 00
Minimum Fee Per building or structure $100. 00 $130. 00
(6) CONCRETE SLABS (OTHER THAN PAVING)
(Where separate installation not covered by
prior permit)
For first 1, 000 sq. ft. or fractional part
of area $ 50. 00 $ 65. 00
For each additional 1, 000 sq. ft. or
fractional part of area $ 10. 00 $ 13 . 00
5
(7) PAVING:
For first 1, 000 sq. ft. or fractional
part of area $ 30. 00 $ 40. 00
For each additional 1, 000 sq. ft. or
fractional part of area $ 15. 04 $ 19. 50
(8) SIGNS:
Signs 36-4 (sign erector) (minimum) $ 25. 00 $ 35. 00
Signs 36-4 (sign writer) $. 15 per sq.
ft. minimum $ 25. 00 $ 35. 00
Signs 36-2 (for sale, lease, open inspection)
6 month period $ 5. 00 $ 7 . 00
(9) ROOFING:
(Including reroofing)
For first 2 , 000 sq. ft. or fractional
part of area $ 50. 00 $ 65. 00
For each additional 1, 000 sq. ft. or
additional part of area $ 10. 00 $ 13 . 00
(10) FENCES AND/OR WALLS:
For first 100 lineal feet or fractional
part $ 50. 00 $ 65. 00
For each additional 100 lineal feet or
fractional part thereof $ 10. 00 $ 13 . 00
(11) AWNINGS, CANOPIES AND RESIDENTIAL PATIO
COVER:
First $1, 000 of estimated cost $ 50. 00 $ 65. 00
For each additional $1, 000 or fractional
part thereof $ 5. 00 $ 6. 50
(12) SWIMMING POOLS:
For the first 20, 000 gallon capacity or
fractional part $ 0 $100. 00
For each additional 1, 000 gallon capacity
or fractional part $ 10. 04 $ 13 . 00
(13) TEMPORARY PLATFORMS AND TEMPORARY
BLEACHERS TO BE USED FOR PUBLIC ASSEMBLY:
For each 100 sq. ft. or fractional part of
platform area $ 50. 00 $ 65. 00
For each 100 lineal feet or fractional
part of seats $ 10. 00 $ 13 . 00
(14) DEMOLITION OF BUILDINGS:
For the first 1, 500 sq. ft. or fractional
part of floor area $ 50. 00 $100. 00
For each additional 1, 000 sq. ft. or
fractional part of floor area $ 15. 00 $ 20. 00
Minimum Fee $ 0 $250. 00
(15) DEMOLITION OF SIGNS, FENCES AND/OR WALLS
AND STRUCTURES OTHER THAN ABOVE:
For each $100. 00 or fractional part of
estimated cost up to $1, 000. 00. $ 30. 00 $ 40. 00
For each additional $1, 000. 00 or fractional
part of estimated cost $' 5. 00 $ 6. 50
6
(16) TREES; LANDSCAPING
Each tree $ 3 .00 $ 4 . 00
Hedges per 100 lineal ft. $ 10. 00 $ 13 . 00
Ground cover per 1, 000 sq. ft. $ 25. 00 $ 32 . 50
Minimum fee $ 25. 00 $ 35. 00
(17) FUMIGATION: $ 30. 00 $ 40. 00
(18) PARKING AREA LIGHTING:
Each footing and pole $ 4-r-G9 $ 5. 00
Minimum fee $ 30. 00 $ 40. 00
(19) ELEVATOR HOISTWAY CONSTRUCTION PERMIT FEES
1-5 Floors $150. 00 $ 200. 00
6-10 Floors $200. 00 $ 300. 00
11-15 Floors $250. 00 $ 325. 00
16-20 Floors $300. 00 $ 400. 00
21-25 Floors $350. 00 $ 450. 00
26-30 Floors $400. 00 $ 500. 00
31-35 Floors $500. 00 $ 650. 00
41-45 Floors $550. 00 $ 700. 00
46-50 Floors $600. 00 $ 775. 00
Above 50 Floors $ 0. 00 $1000. 00
(E) PLUMBING PERMIT FEES:
(1) MINIMUM PLUMBING FEE PER PERMIT: $ 30. 00 $ 40. 00
(This minimum does not apply to permits
issued as supplementary to current outstand-
ing permits for the same job. )
(2) ROUGHING-IN OR PLUGGED OUTLETS FOR:
BATHTUBS, CLOSETS, DOCTORS, DENTISTS, AND
HOSPITAL STERILIZERS, AUTOCLAVES, AUTOPSY
TABLES AND OTHER FIXTURES, APPURTENANCES OR
OTHER APPLIANCES HAVING WATER SUPPLY OR WASTE
OUTLETS, OR BOTH, DRINKING FOUNTAINS, FIXTURES
DISCHARGING INTO TRAPS OR SAFE WATER PIPES,
FLOOR DRAINS, LAUNDRY TUBS, LAVATORIES, SAFE
WASTE PIPES, SHOWERS, SINKS, SLOP SINKS, AND
URINALS:
For first roughing-in or plugged outlet $ 7 . 50 $ 10. 00
For each additional outlet $ 7 . 50 $ 10. 00
Fixtures set on new roughing-in or plugged
outlets or replaced on old roughing-in:
First fixture $ 7 . 50 $ 10. 00
For each additional fixture $ 7 . 50 $ 10. 00
(3) SEPTIC TANKS, SETTLING TANKS, GAS AND
OIL INTERCEPTORS, GREASE TRAPS:
(Including draintile for same)
1, 200 gallon capacity or less $ 30. 00 $ 40. 00
Over 1, 200 gallon capacity $ 3 589 $ 45. 00
Draintile relay $ 35. 00 $ 45. 00
Septic tank abandonment (where being
abandoned) $30. 00 $ 40. 00
7
(4) SEWER:
Each building storm sewer and each building
sewer where connection is made to a septic
tank, to a collector line or to an existing
sewer or to a city sewer or soakage pit or
to a building drain outside of a building. $ 30. 00 $ 40. 00
Sewer capping $ 30. 00 $ 40. 00
(5) WATER DRAINAGE:
RAINWATER ROOF INLET:
Each inlet $ 10-.00 $ 13 . 00
AREA, YARD, SIDEWALK OR RAINWATER DRAIN
FOR WHICH NO OTHER FEE IS PROVIDED:
Each surface inlet $ 10. 00 $ 13 . 00
Each catch basin $ 30. 00 $ 40. 00
Each soakage pit (each 200 cu. ft. ) $ 15. 00 $ 20. 00
(6) CONDENSATE DRAIN: (AIR CONDITIONING)
Per outlet $ 6. 00 $ 7 . 50
Except single not manifolded A/C outlet,
not exceeding 5 hp $ 6. 00 $ 7 . 50
(7) WATER PIPING:
Water service connection to a municipal or
private water supply system. For the first
meter on each lot $ 30. 00 $ 40. 00
Each additional meter on same lot $ 15. 00 $ 20. 00
Water connection to or outlets for appliances
or installations not covered by fixtures or
other permit. $ 15. 00 $ 20. 00
Irrigation system and underground sprinkler
system, etc. $ 30. 00 $ 40. 00
Fire sprinkler system connection to city
water $ 50. 00 $ 65. 00
(8) FIRE CONTROL SYSTEM: (INCLUDING STAND-
PIPE, SIAMESE CONNECTIONS AND PUMPS)
Each standpipe $ 50. 00 $ 65 . 00
Each hose rack or each hose bid $ 15. 00 $ 20. 00
Each sprinkler head $ 1. 00 $ 1. 50
Standby for emergency potable water supply
outlet $ 30.00 $ 40. 00
Solar waterheater installations or repairs $ 30. 00 $ 40. 00
Solar waterheater booster connection $ 30. 00 $ 40. 00
Swimming pool piping installation, not
including wells or water supply $ 40. 00 $ 50. 00
Sump pump $ 25. 00 $ 35. 00
Swimming pool piping replacement or repair
work. Each job. $ 30. 00 $ 40. 00
Repairs to piping. For each $100. 00 $ 30. 00 $ 40. 00
8
DOMESTIC WATER:
Risers, piping less than 1 1/2" each floor $ 10. 00 $ 13 . 00
Risers, piping 1 1/2" and larger each floor $ 20. 00 $ 25. 00
Repipe bathrooms $ 30. 00 $ 40. 00
Repipe kitchen $ 15. 00 $ 20. 00
REPIPE MAINS, TOP OR BOTTOM:
Less than 6 floors. $150. 00 $200. 00
6 floors or more $250. 00 $325. 00
Water connections to pool $ 25. 00 $ 40. 00
Water supply to firepump or system $ 25. 00 $ 40. 00
Water supply to each domestic pump or
replacement $ 25. 00 $ 35. 00
All wells $ 30. 00 $ 40. 00
(9) NATURAL GAS & LIQUIFIED PETROLEUM:
Minimum gas fee per permit $ 30. 00 $ 40. 00
(This minimum does not apply to permits
issued as supplementary to current out-
stand-ing permits for the same job. )
For the first outlet (including cylinders
and regulators) $ 10. 00 $ 13 . 00
For each additional outlet $ 3 . 00 $ 4 . 00
For the first appliance (does not include
warm air heating units, but does include
unvented space heaters and vented wall
heaters-no duct work) . $ 3 . 00 $ 4 . 00
SEE SUBSECTION (G) (2) FOR HEATING.
For each additional appliance or replace-
ment $ 3 . 00 $ 4 . 00
For first meter $ 30. 00 $ 40. 00
For each additional meter $ 5. 00 $ 7 . 00
For change from a master to an individual
meter $ 3 . 00 $ 4 . 00
For major repairs of gas pipe where no
fixture or appliance installation is
involved $ -3. 00 $ 4 . 00
Underground L.P. gas tanks $ 30. 00 $ 40. 00
Above ground L.P. tanks $ 30. 00 $ 40. 00
Change of company (no additional appliances
or outlets) $ 30. 00 $ 40. 00
9
I
(10) WATER TREATMENT PLANTS, PLUMBING
STATION, SEWAGE TREATMENT PLANT AND LIFT
STATION:
Water treatment plant (interior plant
piping) $150. 00 $200. 00
Sewage treatment plant (interior plant
piping) $150. 00 $200. 00
Lift station (Interior station piping) $150. 00 $200. 00
(11) WATER AND GAS MAINS:
(On private property and other than public
utility easements)
Each 50 feet or part thereof $ 10. 00 $ 13 . 00
(12) STORM AND SANITARY UTILITY AND/OR
COLLECTOR LINES:
(On private property other than public
utility easements)
Each 50 feet or part thereof $ 10.00 $ 13 . 00
In addition - each manhole $ 30. 00 $ 40. 00
(13) TEMPORARY TOILETS
(A) WATER BORNE
For each installation $ 30. 00 $ 40. 00
(B) CHEMICAL TOILETS:
For each installation $ 30. 00 $ 40. 00
(14) MISCELLANEOUS:
Siphon breakers on old installations,
required when repair of unapproved water
closet is made, each. $ 30. 00 $ 40. 00
(15) WATER HEATERS, ELECTRICAL OR GAS,
LESS THAN 200, 000 BTU $ 30. 00 $ 40. 00
(F) ELECTRICAL PERMIT FEES.
The following shall be the electrical permit
fees:
(1) Minimum permit fee including repair work
per permit (unless other minimum fee
specified) $ 25. 00 $ 35. 00
(This minimum does not apply to permits
issued as supplementary to current outstan-
ding permits for the same job. )
(2) ROUGH WIRING OUTLETS:
(Light, receptacle, switch, sign and also
telephone and other low voltage outlets)
1 through 10 outlets $ 18 . 00 $ 24 . 00
For each additional outlet $ 1. 50 $ 2 . 00
10
(3) SERVICES:
(The following fees shall be charged for each
service and for each subfeed in new installa-
tions only. No charge will be made for sub-
feeds in existing installations) . Each ser-
vice fee shall include one subfeed.
(A) Temporary for construction, test, etc. $ 25. 00 $ 50. 00
(B) Sub feeds:
100 amperes and under $ 6.00 $ 7 . 50
Over 100 amperes to 200 amperes $ 8. 00 $ 10. 50
Over 200 amperes to 400 amperes $ 9. 00 $ 12 . 00
Over 400 amperes to 600 amperes $ 10. 00 $ 13 . 00
Over 600 amperes to 800 amperes $ 14 . 00 $ 18 . 00
For each additional 100 amperes
(Over 800 amperes) $ 4 . 00 $ 5. 00
(C) Service repair and/or meter change $ 30. 00 $ 45. 00
(4) SWITCHBOARDS:
(By amperes, same as SERVICES shown in
subsection (F) (3) above)
(5) EQUIPMENT OUTLETS OR PERMANENT
CONNECTIONS:
Range $ 7 . 50 $ 10. 00
Range top $ 7 . 50 $ 10. 00
Oven $ 7 . 50 $ 10. 00
Waterheater $ 7 . 50 $ 10. 00
Spaceheater $ 7 . 50 $ 10. 00
Washing machine $ 7 . 50 $ 10. 00
Dryer $ 7 . 50 $ 10. 00
Fan (with fraction HP motor) $ 7 . 50 $ 10. 00
Garbage disposal $ 7 . 50 $ 10. 00
Dishwasher $ 7 . 50 $ 10. 00
Deep Freezer $ 7 . 50 $ 10. 00
Refrigerator $ 7. 50 $ 10. 00
Air conditioners, window and through wall
units, each $ 10. 00 $ 13 . 00
Central Units, per Ton (minimum $13 . 00) $ 4 . 50 $ 6. 00
MOTORS:
Each up to 1 horsepower $ 7 . 50 $ 10. 00
From 2 hp through 10 hp $ 40. 00 $ 50. 00
Each hp over 10 hp $ 2 . 00 $ 3 . 00
11
(6) MACHINE OUTLETS OR PERMANENT CONNECTIONS:
X-ray - Portable (dentist) $ 20. 00 $ 25. 00
X-ray - Stationary (doctor) $ 25. 00 $ 35. 00
Diathermic $ 20. 00 $ 25. 00
Isolation Units $ 40. 00 $ 50. 00
(7) GENERATORS AND TRANSFORMERS,
COMMERCIAL HEATING EQUIPMENT AND STRIP
HEATERS:
Each generator or transformer up to 5 KVA
or KW $ 5. 00 $ 6. 50
Each generator or transformer over 5 KVA
or KW through 10 KVA or KW $ 10. 00 $ 13 . 00
Each generator or transformer over 10 KVA
or KW through 15 KVA or KW $ 12 . 50 $ 16. 00
Each generator or transformer over 15 KVA
or KW through 20 KVA or KW $ 17 . 50 $ 22 . 50
Each generator or transformer over 20 KVA
or KW through 25 KVA or KW $ 25. 00 $ 35. 00
Each generator or transformer over 25 KVA
or KW through 50 KVA or KW $ 50. 00 $ 65. 00
Each generator or transformer over 50 KVA
or KW. Each additional KVA or KW $ 0. 50 $ 0. 75
Generators and transformers, where located on
the same floor, fee for largest, plus each
additional. $ 1. 20 $ 1. 50
(8) WELDING MACHINE OUTLETS:
Up to 25 amperes $ 6. 00 $ 8 . 00
Over 25 amperes for each additional 25
amperes or fractional part thereof $ 6. 00 $ 8 . 00
(9) SPECIAL PURPOSE OUTLETS: (COMMERCIAL) .
Popcorn, doughnut, drink machines, coin
music machines, toasters, coffee urn, deep
fryer, telephone booths, refrigerators,
display cases, sign circuit, etc. , each $ 7 . 00 $ 9 . 00
Painting - bake ovens, each $ 30. 00 $ 40 . 00
(10) SIGNS:
Per each square foot of face of sign $ 2 . 00 $ 2 . 50
New Strips:
First 100 L. F. $ 0. 00 $ 50. 00
Each Additional 100 L.F. or part
thereof $ 44-9 $ 30. 00
Signs Repairs & Reconnection:
Each $ 15. 00 $ 50. 00
(11) FIXTURES:
Lights - 1 through 10 sockets $ 7:-0-G $ 9. 00
1 through 10 florescent tubes $ 7. 00 $ 9 . 00
Each additional socket or tube $ 1. 00 $ 1. 50
Light Poles each (fixture Additional) $ 0 $ 6 . 00
12
(12) COMBINATION:
Light fixtures and outlets up through 10 -
one inspection. $ 18 . 50 $ 24 . 00
(13) STREAMERS OR FESTOON LIGHTS:
First 10 lights or less $ x.00 $ 7 . 00
Each additional 10 or less $ 5. 00 $ 6. 50
(14) PLUGMOLD:
First 25 feet $ 18 . 50 $ 24 . 00
Each 5 feet thereafter $ 3a $ 4 . 00
(15) SWIMMING POOL LIGHTING:
Residential Pool or Spa. $ 0=0,-G $ 45. 00
Combination Pool and Spa $ 0. 00 $ 70. 00
Commercial or Multi-family Pool, or Spa $ 0=4'6 $ 90. 00
Commercial or Multi-family combination
Pool and Spa $ 00 $150. 00
(16) TEMPORARY WORK ON CIRCUSES, CARNIVALS.
Per show. $175. 00 $250. 00
Equipment Ground, each $ 6. 00 $ 0. 00
(17) FIRE DETECTION SYSTEM:
Installation, central system $ 20. 00 $ 25. 00
Smoke Detector, each $ 2 . 00 $ 2 . 50
Head or target area, with product or wire
of similar character, each $ 2 . 00 $ 2 . 50
Speaker, each $ 2 . 00 $ 2 . 50
Bell alarm station, each $ 2 . 00 $ 2 . 50
Proximity Station $ 2 . 00 $ 2 . 50
Reinspection fee, semi-annually $ 20. 00 $ 25. 00
(18) MASTER TELEVISION, INTERCOM, BURGLAR
ALARM, TELEPHONE, AND RADIO:
Receiving Antenna Master Control $ 0 $ 35. 00
TV and radio antenna devices, wall outlets,
suppressors, splitters, lightning arrestors,
receivers, input devices, audio amplifiers,
ground connections, etc.
1 through 5 devices $ 18. 50 $ 24 . 00
Each additional device $ 1. 00 $ 1. 30
Fire Alarm and or Fire Pump Test, per hour $ 44=09 $ 50. 00
Minimum fee $ 75. 00 $100. 00
13
(G) MECHANICAL PERMIT FEES:
The following shall be the mechanical permit
fees:
(1) AIR CONDITIONING AND REFRIGERATION:
(Includes all component parts of the system
except water, duct, electric and gas lines
and connections that feed separately. )
(Where BTU rating is not known, substitute
one horsepower for one ton or 12 , 000 BTU' s
for one ton. )
For each ton capacity or fractional part
thereof $ 10. 00 $ 13 . 00
DUCT WORK:
For the first $1, 000 or less $ $ 30. 00
For each additional $1, 000 or fractional
part thereof $ 0. 00 $ 20. 00
Minimum fee $ 2-5-r.49 $ 35. 00
(2) FURNACES AND HEATING EQUIPMENT,
INCLUDING COMMERCIAL DRIERS, OVENS AND
OTHER FIRED OBJECTS NOT ELSEWHERE
CLASSIFIED:
(Includes all component parts of the system
except fuel and electrical lines. ) (For
vented and unvented wall heaters, see sub-
section (E) (9) . )
For the first 200, 000 BTU per hour or
fractional part for Gas or Oil Furnaces $ 25. 00 $ 32 . 00
For each additional 100, 000 BTU per hour
or fractional part for Gas or Oil Furnaces $ 10 00 $ 13 . 00
Strip Heater, Electric, each $ 0 $ 25. 00
Air Handling units per Ton (A.H.U. ) $ 10. 00 $ 13 . 00
(3) OTHERS:
Window or Room Air Conditioner, each $ 0. 00 $ 25. 00
Hoods, per foot $ 0. 00 $ 10. 00
Minimum $ 4444 $100. 00
(Inspected annually: First inspection twelve
months after installation and inspection
every twelve months thereafter)
Inspection per Year $ 0. 00 $100 . 00
Reinstallation or Removal of Fuel Tank,
above or below grade, each $ 0 $100. 00
Fire Suppression and Bag Test $ 4 -99 $ 75. 00
Contaminate Ground Water
Piping and installation, each $ 0 $250. 00
Walk-in Collers and Walk-in
Freezers, each $ 0 $100. 00
(Equipment Fee' s Add. )
Colling Towers per Ton $ ,10. 00 $ 13 . 00
14
(4) ELEVATORS, ESCALATORS AND OTHER LIFTING
APPARATUS:
(A) Fee for permit for new installation
or major revamping (includes initial
inspection and certificate)
Installation of Elevators and Escala-
tors, up to three stories $250. 00 $325. 00
Each additional story $ 0. 00 $ 25. 00
Installation of Wheel Chair Lifts,
Stair Chairs, Home Elevators,
Handicap Elevators. $ 60. 00 $ 80. 00
Casing Fee, per foot $ 2 . 00 $ 2 . 50
Minimum Fee per Casing $ 25. 00 $ 35. 00
Annual Maintenance Repair Permit
(not to include major revamping) $400.00 $500. 00
Permit Fee for Repairs of Elevators and
Other Transporting Apparatus, Estimated
Cost.
Up to $1000. 00 or Fractional Part
thereof $ 30. 00 $ 40. 00
Each additional $1000. 00 of Fractional
Part thereof $ 10. 00 $ 13 . 00
Fee Schedule for Escalators Per Rise $ 60. 00 $ 80. 00
Fee Schedule for Roof Window Cleaning
Machine. Each Machine $ 70. 00 $ 90. 00
(B) Annual Fees for Certificate of Operation and Inspection.
Date Due: October 1st every year
DUMBWAITERS - CERTIFICATE AND INSPECTION
LANDINGS ANNUAL FEES
0-2 40.00 53 . 00
3-4 47 .00 61. 00
5-6 54 . 00 70. 00
7-8 61. 00 79 . 00
9-10 68 . 00 88 . 00
11-12 75. 00 97 . 00
13-14 €2 . 00 106. 00
15-16 89. 00 115. 00
More than 16 0. 00 135. 00
Reinspection Fee. Each Reinspection $ 50. 00 $ 65. 00
Duplicate of Certificate. Each $ 10. 00 $ 15. 00
ELEVATORS AND ESCALATORS - CERTIFICATE AND INSPECTION
LANDINGS ANNUAL FEES
0-2 55. 00 71. 00
3-4 62 . 00 80. 00
5-6 69 . 00 89 . 00
7-8 76. 00 98 . 00
9-10 €3 . 00 107. 00
11-12 90. 00 116. 00
13-14 97 . 00 125. 00
15-16 104. 00 134 . 00
17-18 1 0 143 . 00
15
19-20 118 . 00 152 . 00
21-22 125. 00 161. 00
23-24 132 . 00 170. 00
25-26 139. 00 179 . 00
27-28 146. 00 188 . 00
29-30 153 . 00 198 . 00
31-32 160. 00 207 . 00
33-34 167 . 00 216. 00
35-36 174 . 00 225. 00
37-38 181. 00 234 . 00
39-40 188 . 00 243 . 00
41-42 195. 00 252 . 00
43-44 202 . 00 261. 00
45-46 209. 00 270. 00
47-48 216. 00 279 . 00
49-50 223 . 00 288 . 00
51-52 230. 00 297 . 00
53-54 237 . 00 306. 00
55-56 244 . 00 315. 00
57-58 251. 00 324 . 00
59-60 258. 00 333 . 00
More than 60 0 400. 00
Reinspection Fee. Each Reinspection $ 50. 00 $ 75. 00
Duplicate Certificate. Each $ 10. 00 $ 25. 00
The annual charge is based on the condition that the equipment is
under a maintenance agreement with a qualified maintenance company, in
which case there is no obligation for the City Inspection to be given
every year. If no maintenance agreement is in effect August 1st of every
year, the City Inspection will be performed every year and above charges
for the next fiscal year shall be 150% of the one shown in these tables.
(C) Any elevator, escalator, etc, owner who fails to comply with the
order to correct a violation issued within 30 days, is subject to
an administrative fine up to $500. 00 in addition to any other
penalty provided by law. Fines can be imposed for every 30 days
period that the violation remains active.
These fines, before or after paid, can be appealed to the
Department Director whose decision shall be final. No clearance for
the use of the elevator shall be given until these fines have been
paid or waived.
The Department Director can delegate this appeal function to the
Department Assistant Director, the City Building Official or the
Deputy Building Official.
(5) AMUSEMENT RIDES AND DEVICES:
Verification of certificates of safety:
Examine copy of current certification by
State of Florida, for each device (ride) $ 25. 00 $ 35. 00
(6) BOILERS AND PRESSURE VESSELS:
Installation permit fees (including initial
inspections and certificate) (Does not in-
clude installation or connection of fuel
and water lines)
Steam boilers (as defined in the ASME
Boiler and Pressure Vessel Code) each $ 75. 00 $ 100. 00
Hot water boilers (as defined in the ASME
Boiler and Pressure Vessel Code) each $ 75. 00 $ 100. 00
Miniature boilers (as defined in the ASME
Boiler and Pressure Vessel Code) each $, 35. 00. $ 50. 00
16
Steam drive prime movers, each $100. 00 $ 150. 00
Steam actuated machinery, each $ 40. 00 $ 100. 00
Unfired pressure vessels (Operating at
pressures in excess of 60 psi and having
a volume of more than 5 cu. ft. ) $ 50. 04 $ 100. 00
Fees for periodic reinspection:
Steam boilers (Semi-annual) , internal and
external:
Internal inspection $ 75. 00 $ 100. 00
External inspection $ 75. 00 $ 100. 00
Hot water boilers (annual) $ 15. 00 $ 25. 00
Unfired pressure vessels (annual) $ 75. 00 $ 100. 00
Miniature boilers: (semi-annual) , each
inspection $ 75. 00 $ 100. 00
Certificate of inspection where inspected
by insurance company. $ 50. 04 $ 75. 00
Shop inspection of boiler or pressure vessel
per completed vessel. (Limit $100. 00 $150. 00
per 1/2 day, $200. 04 $260. 00, full day,
regardless of number of vessels inspected)
(7) FIRE SPRINKLER SYSTEM:
Per sprinkler head $ 1. 00 $ 1. 30
Minimum permit fee $ 25. 00 $ 35. 00
CO2 and dry power systems for estimated cost
up to $1, 000. 00 $ 20. 00 $ 25. 00
For each additional $1, 000. 00 or fractional
part thereof $ 25. 00 $ 35. 00
Fire wells (where applicable) $100. 00 $ 130. 00
Acceptance tests for sprinkler systems $100. 00 $ 130. 00
Acceptance tests for stand pipes $100. 00 $ 130. 00
Hydrant use permits N/C
Construction meters $ 25. 00 $ 35. 00
Pest control, lawn spraying, etc. (Fees are
annual and per meter) $ 50. 00 $ 75. 00
Hydrant flow tests unless in conjunction
with acceptance test for sprinkler systems $100. 04 $ 130. 00
(8) STORAGE TANKS FOR FLAMMABLE LIQUIDS $ 50. 00 $ 75. 00
(9) INTERNAL COMBUSTION ENGINES:
Stationary. Per Engine. $ 50. 00 $ 75. 00
Generetor Test, Full Load $125. 00 $ 160. 00
17
(10) OTHER FEES:
Pressure and process piping, sheet metal and
duct work and other mechanical lines:
For estimated costs up to $1, 000. 00 $ 25. 00 $ 35 . 00
For each additional $1, 000. 00 or fraction
part $ 10.00 $ 13 . 00
(H) PREMISE PERMIT
The premise permit is adopted as outlined in the South Florida Building
Code, Chapter 3 , Section 301. 3 and the annual fees are:
(1) CALCULATION OF THE INITIAL AND FINAL PREMISE PERMIT FEE:
Each firm or organization which obtains an annual premise permit shall
include in their application for such permit the total number of maintenance
personnel including helpers and trainees thereunder assigned to building,
electrical, plumbing or mechanical work. The premise fee shall be computed
by multiplying the total number of such employees times - - _ _ -
($25. 00) thirty five dollars ($35. 00) . The minimum premise permit fee shall
be -- : : • • nine hundred dollars ($900. 00)
At the expiration of the Premise Permit the job log shall be submitted to the
Building Department for the calculation and payment of any additional fee due
for to the work performed according to the Job Log: No new premise permit
shall be issued until the full amount for the prior year have been paid.
(2) CERTIFICATE OF OCCUPANCY:
In order to obtain a certificate of temporary or permanent occupancy as
required by Ordinance No. 1891, City of Miami Beach, and the South Florida
Building Code, the following original fees shall be paid for the purpose of
defraying the costs of the original necessary zoning and building
inspections.
No refunds shall be made of fees paid for occupancy permits.
FINAL CERTIFICATE OF OCCUPANCY
Certificate of occupancy fees shall be as
follows:
For H Occupancy:
a) Apartment, Hotel, Motel etc.
Per Unit $ 10. 00 $ 13 . 00
Minimum $150. 00, Maximum $1500. 00
b) Condominium and Townhouses. Shell $ 0. 00 $ 150. 00
Per Unit $ 10. 00 $ 50. 00
For G Occupancy, Division 1 & Division 2 :
Mercantile, Business
a) One business in whole building $ 0.00 $ 250. 00
b) More than one Rental Spaces. Shell $ 0 $ 150. 00
plus per space $ 4=G9 $ 50. 00
Minimum $ 4=09 $ 250. 00
For A, B, C, & D, Occupancies, Assembly Uses
(Theaters, Restaurants, Night Clubs, Hospi-
tals, Old Age Homes, Prisons, Schools, etc)
Per use $ 4=G9 $ 250. 00
18
I
For E, F Occupancies (Storage Facilities,
Warehouses, Gas Stations, Factories, etc)
a) One use in whole building $ 0 $ 250. 00
b) For more than one rental space. $ 0.00 $ 150. 00
Shell plus, per space $ 449 $ 50. 00
Minimum $ 0.00 $ 250. 00
For J Occupancies - Special Projects:
Parking Garages, Marinas, Commercial Par-
king Lots, Public Pools, etc. $ 0 0.1% of valuation
(Minimum $150. 00, Maximum $1, 000. 00
TEMPORARY CERTIFICATE OF USE
Temporary certificate of Occupancy Fees 50% of Final C. O. FEE
(Maximum Period 90 days)
Extension of temporary C.O.
Per Period 100% of Final C.O FEE
When Final C.O. is issued the appropriate Final
Fee charge shall be paid.
The C.O. is the certificate of use for that
facility for the first year of operation or
part thereof.
CERTIFICATE OF COMPLETION
Certificate of Completion Fees for the
Rehabilitation, Remodeling or Repairs of
Structures when a Certificate of Occupancy
is not required, shall be as follows:
Occupancy I Single Family Duplex and Triplex $100. 00 $ 125. 00
All other Occupancies $ .6444 0.1% of Valuation
($100. 00 Min. - $500. 00 Max)
(I) FORTY-YEAR BUILDING RECERTIFICATION PROGRAM.
(A) There shall be a fifty dollars ($50. 00) one hundred dollars
$100. 00) fee per building, for the Forty-Year Building Recertification
Program as required under the South Florida Building Code and Dade
County Ordinance 75-34 .
(B) If a building has not been Recertified in the time limitation
established by the Ordinance a Late Compliance Fee of one hundred and
fifty dollars ($150. 00) shall be paid in addition to the regular
Recertification fee. This fee shall also apply if the building is
declared Unsafe and Posted and the time limitation for the requirement
of a new Inspection and Report does not apply.
(C) When the Building Recertification Process has not been completed
for a particular building within the maximum time limitations
established by the County Ordinance a Notice of Violation shall be
issued. If the process is not completed within 45 days of the Notice of
Violation Date, the building shall be declared Unsafe and Vacated at
owner' s expenses. The building shall remain secured while Vacated. If
the Recertification is not complete within 90 days of the date when the
building was declared Unsafe a new Inspection Report with a new Fee of
two hundred and fifty dollars ($250. 00) shall be processed before the
building can be declared Safe for Occupancy.
(J) OCCUPANT CONTENT SIGN
There shall be a one hundred dollars ($100. 00) fee for the processing of
an Occupant Content Sign as per S.F.B.C. Chapter 3102 . 2 (8) (aa)
19
(K) EMPLOYEES TRAINING, EDUCATION AND SAFETY
A Surcharge to Building, Electrical, Mechanical, Plumbing and Demolition
Permits will be added for Training, Education and Safety of the Building
Department Employees according to the following schedule:
a) When fees are based on Sq. Ft.
Per Sq. Ft. of gross area $ 0. 01
b) When fees are based on Valuation.
Per $1000. 00 or part thereof $ 0. 25
c) When fees are based on Units for
Electrical and Plumbing Work
Per Unit $ 0. 01
d) When fees are based on A.C. Ton.
Per TON or BTU $ 0. 15
(L) GENERAL INFORMATION
Following is a list of other fees collected by the Building Department
for other Departments or Agencies.
1) A fee of $0. 01 per Sq. Ft. of covered area will be added to Building
Permits for the State of Florida to study building code requirements for
Radon Gas
2) Road Impact Fees will be added to Building Permits in cases of new
construction or change of use, according to a Fee Schedule established
by Dade County.
3) A Surcharge of $0. 50 per $1000. 00 of work valuation will be added to
Building Permits for the Code Compliance Program established by Dade
County.
4) A Surcharge to the Building Permits will be added when processing
"Marine Structures" according to schedule established by City
Ordinance.
5) A Surcharge to the Building Permits will be added for the Fire Safety
Process according to schedule established by City Ordinance.
6) For Building Permits Walk-Thru process a surcharge will be added for
Zoning Process based on schedule established by City Ordinance.
7) An Interim General and Proprietary Fee shall be charged to any building
or structure for which a certificate of Occupancy is being issued based
on $0. 03 per Square Foot of floor area, per month or part thereof, until
the last day of December of that year.
SECTION 2 . REPEALER
All ordinances or parts of ordinances in conflict therewith be and the
same are hereby repealed.
SECTION 3. SEVERABILITY
If any section, sentence, clause or phrase of this ordinance is held to
be invalid or unconstitutional by any court of competent jurisdiction,
then said holding shall in no way affect the validity or the remaining
portions of this ordinance.
20
SECTION 4. EFFECTIVE DA'L..
This ordinance shall take effect on October/ •, 1992 .
PASSED and ADOPTED this 16th day of Se. emb-r , 199 ,
— MAY(.
Attest:
1-ckciLAA,
City Clerk
1st reading 9/2/92
2nd reading 9/16/92
JAM/ng 6/30/92
FORM APPROVED
LEGAL DEPT.
By S . 2 scikke.
Date 2e_ 9�
21
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH FLORIDA 33139
OFFICE OF THE CITY MANAGER TELEPHONE: (305) 673-7010
FAX: (305) 673-7782
COMMISSION MEMORANDUM NO. 5
TO: Mayor Seymour Gelber and DATE: September 16 , 1992
Members of the City Commission
FROM: Roger M. C "
,00,11.____ _
City Manager
SUBJECT: AMENDMENTS TO SECTION 8-3 OF THE CODE OF THE CITY OF
MIAMI BEACH, PROVIDING FOR FEE STRUCTURE CHANGES.
RECOMMENDATION:
The City Administration recommends that the City Commission
approves on the second reading the attached Ordinance which would
amend the Fee Ordinance Section 8-3 as it relates to certain fees
imposed in the City of Miami Beach by the Building Department for
permits and inspections in the City of Miami Beach.
BACKGROUND:
On a regular basis, the City monitors the fees it collects for
Permit and Inspection services that are provided to the community.
Upon the most recent review, it was determined that a restructuring
of these fees is necessary to bring revenues in line with
additional services that are required to be provided for compliance
with the American Disabilities Act and to the South Florida
Building Code Ordinance 92-1 Certification for Roofing Inspections.
1) The fees increases being recommended are reflected in the
Proposed Budget for FY92/93 . As projected, the revised and new
fees proposed in the Ordinance under consideration will generate
additional revenues of $397,400 during the Fiscal Year commencing
October 1, 1992 .
ANALYSIS:
The Building Department Director has based his recommendation for
fee changes on the attached documents.
CONCLUSION:
Based on the foregoing, the Administration has concluded that the
proposed changes to fees charged for permits and inspection
services will defray the cost of providing for additional personnel
and will meet the need to ensure that the quality of services to
the development industry remains high. Revenues in excess of
expenses will be utilized to enhance quality of life issues through
the City of Miami Beach.
PG/ap
Attachments 34
comm92fe.92
AGENDA R,:S
_
ITEM
DATE 1 --)L 2-
i I ,-4 a n u n
+. C1 Ca CO 0 O 0
.l 41 C ,-4 0 ,-i 0
co v a. cu a. v
O 0 N 0 G O C Ni
LI Cl. -i Q. -i
y �, a -i Q. .-I
G Z1 u ¢ v ¢ 0 O
C G L L 1. 01 a] CJ 0
o =.. r1 . r4
U a17 c0 CJ O .b L X L Z
4_4 ._4 O C C G G C
j aC7 ul > y„I •ri •••4 +l ,i ,-i
co
0 cn C1 G v C1 CJ C) 4
c .° ro 0 cu > > 47
• C1.4 i y
rl o > E .i •v --I .-I '9 -
0 u CO u u CO u
O >) IQ 40 G 14 C C L C
E-. L a. ,a I-4 p. FL 1.4 E... i..
O 0 0 0 0 0 0 0 0
L 0 0 p en
t c
Syy N
L 4.T Q
g N. 7 1 CT0 rai . 4!1 ,r.
CJ
N. 4-7 N 0 CO - N I'.
N. N N N .-r
.-1
v
o 0 0 O 0 0 0 O 0 N
rn oL' CI O 0 0 0 0 O 0
. ri �j 0 ch co — O NI c*f N. N
'A O CT N. 4.p 47 c*1 -. NI
�
C7 )4:7 •. .-. -. .. —
c,
Z v O
}
0 0 O O O O 0
0
W cv U 0 0 0 0O0W CT 0 0 '...TZ U. cC o 0 cl CO --+ 0 NI r1 n
N
U Z cI a C a1 N. - s r1 4.1
W W ...
�-
m �w CO N. N ,p N 0 •-• �7 �7
�•/ r'1 N CO NI CT CO -• Co en
c Z , •a) j c''1 O .7 N .T C•'1 O P1
< �
Q 4 s Cr) N M O14;3In h c•r
C— I CZ 0. Co O al a1 Ni fa. rn
c U } u'1 ,.4 c•) ..r
W 00 0000 O 00 0000 00 000 O c%]
O W U 17
43 y In o 0 0 In In Irl In In In 0 0 0 In In 0 0 o o I-1
rn • • • •
•
¢
O } 0. N CO -7 r'l N CT CT NI O1 N 0 0 In N N 0 Irl In In
r- lL o — c.'1 . .c — NI .al C 0 C 1 .r .r0
U a a` In O+ o N �o �c
O W
CC
4 00 0000 0 00 0000 CO 000 0
j 0 0 D o o In In o In o 0 0 0 0 0 000 0
CC en
Oc moor` r• CON. cool"; 00 000 0
c j t .-I en cn In -• .-I .--4 0 0 N 6 .1 . In N--I In In
W
-).7
Irl
W
W
00 0000 0 00 O 00 00 C O O 0
of 00 000In In OIn O 00 00 000 0
CO InOOr, N. Corte OOOIn 00 Coo 0
0 N r -4 In N In In IW
I
L Z
I • ,i r. C) o � > Co TI 3
r4 k V 0 N >, °' 0 C s~ • u 1a L W
'° • *-1 a. � >4 .-1 O >+ r
. r1 7 .., $4 CO C1 c0 CC, Z
¢ E+ w L 60 41 o L 0 a c
a+ F C C E C c - xw a G C- '
aJ co y
RC
E os C o ,i ,i c w a 0 0 14 $4 w 01 n • U4 C Q. cn • w LI F. L ra (0 ¢ 0 ,- a7 C) CJ 0 C) V N U2 v a ,i , uu a s 1.., it a,, I,; "0 w x O GO 00 L 0 .-4 Q4 a. V V a u 0. • a1 00 14.1
y a C i L - Q 0 C , a I ' 0.. 0 -4 CI 0 CC C1 GO W
'o „ Cr ro o• 47 0 0 ,-I C 00 0 • co CO Q. c L o i. H • c.• 0
C o Cl, G ••O .G O s. O O U C r.. L u. E O u ,i L+
o d1 c0 0 N 0 00 C1 o • G F r1 0 0 rl C1 CO G C) E VI C
E 0
a � too O X 7 4 CL y+
° ¢ c E U L+ +-1 C O 1•1 U O C C
w O ,CI —O V C O m ~ rY. a. k •–• •0 CU 4 .-I Cl a) u w c0 O C) 0 c0 m C cC y
4 'v w o o -• • r1 �0 0 43 m a. a. co o ,� ate.. )< w cu o V u u
-I 1 +i 0 'S7 co to 4., u CP 0 14 U V. W 0 > f.
o O. E LN C'a G C ,-I W rl O CJ C1 - • •,-.4 .-I O CO W T L ?
¢ ,'I r1 CC 14 L
co E 1. u} ,r .a . C L C) • COcCOrr ,moi 4,1 o LL. "al M Cu0 no u CU
.17 N C
3
C044-4
G u F+ 'a+
u o 7 u y u CU u C>1 ai V 3.4 4.4,1L. 0 V 4E+ CCO cc C1 E C0J v C
011 0 ,. •1 aJ 0 c0 .-1 -i 0 -I O -I V -1 N 1.4 C) a1 CJ Cl. 01 ..0 .0 CO r ^ c0
Z ,-+ Z¢ a. x w aa. c0 C 0 W X w a. a. c� c. ac cn a. c.., c.) 4. cc E-• co u a)
COn. mac - _ Z
0
w
35
111
I —
A.+
01 NI
C' 1
U
`o °a •
C g ii v
m 7 U 44444
N
U CD cO 40
44.: U a.v)
H 43
Q.
41 71
co
8 O O
,.4 r+ >~
0 a. a.
-• E 8
E W rl
O
0
O
° Oe• rc
CO 0
t go N
0
ri o c
_ ° o
o
LO m •••.?
N � ge
W
N
W > o0 0 0
= LL CC 4. o s
0Z � a. N
C,-)
m W N
o
0s
gZ � o
CV
2U m
L
n
O W a cwv 2Nait
N1 n o ...
F- Oii bio 0 a
UQ. a. o
H
O I.L, 9
CC I
0. r..
egcC
O
N O
w
w
u.
o+ O
(7
W
LU
Z
• I o C) 7 u G V)
u 00 u a) r-+ C) U ,4 41
w > >, U v.+ u �+ -. u
o v o c 1uo
Z• 0 c .-I ,a 0 +j v
cu Q
Enw uva E .w a w
0 11
2 a o w of v 0 ao o CU k u -4-4 14
). 0
a a. �+ o w o co .0 o C' k 7
Cil
C v C O cO •.•1 a) 6 C s o 1-i cn
o w v) L+ o u c aJ , O
a �.
0 "" O O ,-4 C) 4-4 U C) )+ Z O u C) a)
C `p u a) y a a) 7 O 0 aG E C) s+ C) 0
a e CU i-+ G +1 cn u u.
O u> 7 rl C) 0 7 a) o C' 7 0. u cn eL
H ° Ir co 0. o CT .--4 v m0 .a o ... 64 se Ir
a W u a. X ,-+ b v) C) > ,.. .a a U C) U CI
O a) C) C) L CO C) C' O cn�+ cY+ a) 4+ C) u CO .a
C n u u CO c0 an .0 CI L
C) O L U 00 rl V) C7 Z U C77 U U 3 co O
C) C) G C) 7 0 > Z.
U- O > 410 ,-4 C) ..--44..4-,.4-.4 .-,.-. .-, ....
W '. co W b C) —I esi cn -a t!1 '0 1ss LL
d O L+ U
N () . u'1 +O 1. m Of .—
-
Z
0
2 l3 6
y
v
PROPOSAL FOR NEN PROGRAM
FY 1992/93
Part I - Description of Program or Service
Pisan prowls a description of the proposed new program or wince.
The Building Department proposes an increase of 29% on Permit Fees. With that
increase we will not need the attrition of 6 positions. Instead we will be
able to add 4 new positions badly needed at this time.
Part II'- Justification
Please provide a justification for the proposed new program or change in senna.
With the increase the Department will meet the Administrative needs and will
insure the Quality of Service that is being paid for by our users.
Part III - Cost
Number Base Total
Position Classification Positions Salary Salaries
Building Inspector 1 28,997.36 28,997.36
Plumbing Inspector 1 26,809.66 26,809.66
Permit Clerk 1 19,948.49 19,948.49
Clerk 1 17,207.99 17,207.99
Sub Total 92.963,50
Obi Code Account Description Amount
000111 Salaries and Wages 92,963.50
TOTAL PROGRAM COST 1
Part IV - Revenues
Description and Method of Calculation Amount
Increase of Building Permits Revenue 174,000.00
Increase of Electric Permits Revenue 56,000.00
Increase of Plumbing Permits Revenue 51,700.00
Increase of Mechanic Permits Revenue 46,700.00
Other Permits Revenue 69.000,00
TOTAL 397,400.00
OMB Form 5.0-PROPOSAL FOR NEW PROGRAM
1 of 2
:37
CITY OF MIAMI BEACH
PROPOSAL FOR NEW PROGRAM
FY 1992/93
FY 92/93 RECAPITULATION
1) Department Budget:
a) Department Request $1,446,800
Less Cars Replacement Cost 90, 000
Corrected Department Request $1,356,890 . $1,356, 890
b) OMB Limit 1 267 540
c) Excess Request Amount . . . . 89,350 . $ 89,350
2) Department Revenue:
a) Estimated FY 92/93 $1, 722,100
(29% Increase in Fees)
b) Estimated FY 91/92 1,324, 700
c) Excess Revenue $ 397, 400
3) Revenue Distribution:
a) Administrative Savings . . . $ 225,000
b) Net Additional Revenue . . . 172,400 . ___124_400
c) Net Excess Over All Requirements $ 83, 050
Omb Form 5.0 Proposal for New Program
•
co
} a)
U
PA w
cit D, o
T U U
'--I
•--•1 U GC 0
'NI 0 0 U
U •r I •0
U
d-1 r-1
•H
q; C) by TJ
:i aJ
4- L) ..a {Y r I
C z U 4.1
<C Q! ?10•rl
1 t-i co •H >~ .
Fa b a)
c4 •r1 r-1
0 •rl M .
ca t .
•-I r.10
. CO, •
•
b0 ty bA
g U p
d 4-+ d
g •r-1 C rn
ci +-1 U U
ci N
b