Loading...
Amendment No. 32 to the Agreement with Fentress Architects in the amount of $11,43020/c/-c53 AMENDMENT NO. 32 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF $11,430 This Amendment No. 32 to the Agreement made and entered this la day of Si 'T. 2017, by and between the CITY OF MIAMI BEACH, a municipal corporation existing unaer the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as "Consultant" or "Architect -Engineer"). RECITALS WHEREAS, pursuant to Request for: Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project (the "Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of $41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of $179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of $76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of $2,442,400 (part of Resolution No -201-5.28.92,5); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of $3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro -climate services, in the amount of $117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required 1 of the Architect -Engineer for the Project, in the total amount of $15,156,359 (part of Resolution No. 2015- 28925); and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of $302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of $15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of $36,875; and WHEREAS, on March 29, 2016, Amendment No, 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the amount of $34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of $173,790; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of $148,999; and WHEREAS, on July 18, 2016, Amendment No, 15 was executed for design changes associated with raising 18th Street, 19th Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of $111,338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of $70,270; and WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of $49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of $112,649; and WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291; and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals -and -for revis' two -and five truss loading -for -temporary -conditions for Art Basel 2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark Construction, in the amount of $96,710; and WHEREAS, on December 20, 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions (RFIs), construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work, in the amount of $80,330; and WHEREAS, on December 20, 2016, Amendment No. 22 was executed for revisions to the construction documents as needed for artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program, in the amount of $17,121; and 2 WHEREAS, on December 20, 2016, Amendment No. 23 was executed for additional structural engineering services due to non -conformances by Clark Construction, in the amount of $10,000; and WHEREAS, on January 18, 2017, Amendment No. 24 was executed for additional design, permitting and construction administration services related to a new sanitary sewer lateral for the Carl Fisher Clubhouse, in the amount of $18,625; and WHEREAS, on May 5, 2017, Amendment No. 25 was executed for revisions to the signage package, in the amount of $12,030; and WHEREAS, on May 5, 2017, Amendment No, 26 was executed for additional reviews of structural submittals and for design revisions associated with non -conforming field conditions, funded from a deductive change order to the Agreement with Clark Construction, in the amount of $15,580; and WHEREAS, on May 5, 2017, Amendment No, 27 was executed for design services to incorporate a new vertical circulation connection between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2, in the amount of 124,240, as approved by the City Commission on April 26, 2017 (Agenda Item R7T); and WHEREAS, on June 30, 2017, Amendment No. 28 was executed for design revisions associated with the relocation of the 19th Street pump station, in the amount of $2,585; and WHEREAS, on August 15, 2017, Amendment No. 29 was executed for design solutions for contractor -requested items related to closing non -conforming conditions related to RFI 3251, and for additional reviews of structural submittals, funded from a deductive change order to the Agreement with Clark Construction, in the amount of $30,875 ; and WHEREAS, on associated with revisions to in the amount of 349,076; and , 2017, Amendment No. 30 was executed for additional services P -Lot Park design, as approved by the City Commission on July 26, 2017, WHEREAS, on , 2017, Amendment No. 31 was executed for revisions to the construction documents as needed for artwork installations by Joseph Kosuth, selected as part of the Art in Public Places Program, in the amount of $14,570; and WHEREAS, this Amendment No. 32 is for revisions to the construction documents approved in Amendment No. 27, to accommodate the construction that progressed during the delayed issuance of the package due to extended negotiations with Art Basel, and for the removal of the elevator machine room as a result of further coordination with the elevator contractor for potential cost savings, in the amount of $11,430; and NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above-reeltals--are-true-and correct- and -ere incorporated-as-a-part-of-this-Arn end ment-No7-32. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix "A-32", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 32. 3 IN WITNESS WHEREOF, the parties hereto have caused this Amendmen No, 32 to be executed in their names by their duly authorized officials as of the date first et forth above. ATTEST. Raf-1 Granad City Clerk AT EST. take Signature: IL CITY OF 111 Jimmy Imok11 44 ity Ma -is E.4 0 .......... IAMI BE4 Print Name/Title Exe_d_ 4 orales er ANT: S ARCHJT e \0, POF,kikkkaan me/TMe APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION Appendix "A-32" 1. SCOPE OF SERVICES Refer to attached proposal dated August 15, 2017. 2. TIME OF COMPLETION 2,5 weeks. PAYMENT AND COMPENSATION $11,430 Lump Sum 5 Summary Added Project Contingency Total Scope OriOi»u|AQreeme»t — ` - -' $ $1,096,7201�g67�UU 20 Amendment Reso 2015-28925 (5, 6 & 8) Amendment 5 $ 2,442,40Q. $ 2,441480 Amendment $(3? ?-42$P.). $(�12�259) Amendment $ 1�1S�3S9' $15,156359 Contingencyreduction __ $ (98�29_ -- .$Total $25,,436,700 $1,000,000 $26,436,790 - Amendment 2 - Civil __. $ 41 079___ Amendment J'Bal1nnchange $ 179,982 Amendment4 - $76,605 Amendrnent 7- Wind study/ roof survey $ 117200 Amendment 9 -Co � $302,876 Amendment 10 - Parapet Analysis, ____ $ 15,000 Amendment 11 - Event Plaris $ 36,8756 Amendment 12 - Stormwater Revisions $ 34,073 Amendment 13 - Smoke ControRemoval $ 173,790 Amendmerit 14 - Site Visits & Alternative Design $ - $ 148,999 Amendment 15 - Streets Regrading $22,52O $ 88,818 Amendment 16 - Culvert and ConvCtr Dr redesign-_-_-_ _-_$7�l70 Amendment 17 - GMP Reconciliation -addl $ 49,360 Amendment 18 - Additional Site Visits $ 112,649 Amendment 19 - East Bridge Retention $ 220,291 Amendment 20 - Steel submittals and Truss loading analysis $ 96,710 Amendment 21 - Cameras, vaults, RFIs, kitchen, transition slab $ 80,330 Amendment 22-AIPP (Morris, Ackermann & Harvey) Amendment 23 - NCRs * Arnendm.nt24-SanitarySewerLaterat-Carl Fisher Clubhouse Amendment 25 - Signage Package Revisions Amendment 26'Structural submittals &NCRo AmendmentZ7'ExNbithaU/BaUmomVe��aCkcu��on � � � ' Amendment 28'19thStreet Pump Station Relocation Amendment 29 - RFI 3251 &Structural Submittals $ 17,121 $ 10,000 $ 18,625 $ 12,030 $ 15,580 $ 124 240 $ 2,585 $ 30,875 Amendment 30 - Lot Park Revision$. `_-__-- Amendment 31_/Ipp.(Joseph Kosuth Amendment 32 - Exhibit Hall / Ballroom Vertical Circulation rev $ 14,570_ $ 11,430 Total $25,436J00 $1,000/000 $1,473,559 $27910,259 1. Amendments 14, 18, 20, 23, 26 & 29 totaling $414,813, funded from Clark's contracvia deductive change orders. 2. Amendments 22 & 31 totaling $31,691 funded from AIPP fund. 6 FENTRESS M14:14111-1= tantressarchitects.com August 10, 2017 August 15, 2017 rev Mr. Jimmy Morales, City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach, FL 33 139 Re: Miami Beach Convention Center Renovation Resolution No, 2014-28538 Proposal 53 — Art Basel North Revision Project 20140021,001 A55 Dear Mr, Morales: This proposal is to provide design services to modify the layout of a new vertical circulation connection in Exhibit Hall 0 to accommodate construction that has progressed during the delay in issuance of this scope. The delay was due to the timing of negotiations between Art Basel and the City and that of contractor input. This rework and reissuance of the package prepared in June is outside of the Fentress team's current contracted scope. Below is our understanding of the scope of services required: SCOPE OF SERVICES I. General: a. Provide contract documents and contract administration services for the concept design depicted in the attached sketch, b. Rework CCD 24 from what was prepared as issued as a review package on June 6, 2017, c. Prepare issuance of two CCD packages (F0-007/CCD 25A and CCD 025) to accommodate City Commission review timing and construction progress. 2. Amend designed building systems to accommodate new configuration scope: a. Architectural: 1) Revise locations of stair and escalator, 2) Remove elevator machine room per elevator subcontractor suggestion and revise layout of adjacent janitor's closet. 3) Prepare revised background content of the above items for team's updated sheet content. b. Mechanical: 1) Revise HVAC system to address a Machine RoomLess elevator and move the controller to the hoistway. c.ecal: I) Revise power locations for mechanical equipment and panel schedules as required; 2) Revise lighting remove Elevator Machine Room. d. Plumbing: 1) Revise layouts of sanitary waste system for elevator and escalator pits for new location. 2) Sand/oil interceptor relocation. e. Structural: 1) Revise and amend building structural system to conform to new configuration including: a) Revised locations for steel framing for new landing and escalator support; b) Revised locations of foundations for new escalator and elevator shaft, DEN DT, LA SF LON SH 1 421 Broadway 1 Denver CO 60203 1 303 722.5000 Mr. Jimmy Morales, City Manager City Manager's Office City of Miami Beach Proposal 53 _,. Art Basel North Revisions August 10, 201.7 August 15, 2017 rev Page 2 f Fire Suppression: 1) No new scope. g. Fire Alarm. 1) Modify zone boundaries and remove fire alarms intended for the elevator room in the June 28 version of the scope. h. Life Safety: 1.) No new scope. i. Low Voltage: 1) Telecomm: a) Relocate control cabling from. Elevator Machine .R.00m to elevator shaft, 2) Security: a)' Remove card reader from Elevator Control Room door and security devices from within • Control Room. J, Vertical Transportation by Lerch Bates (design and coordination provided by Otis): 1) No new scope. k. Signage Design: 1) No new scope. SCHEDULE Starting from meeting on July 26: Contract Documents and Chance Directive Pre aration: 2.5 weeks Totk , 2,5 weeks FEE Fees for all services will be a total proposed lump sum amount of Eleven Thousand Four Hundred Thirty Dollars ($11,430), Costs for printing, telephone, delivery, and travel are included in the lump sum portion of this fee. Billings for these services will be invoiced under the heading of#20140021.001 A55. Attached is the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated, Please feel free to contact me with any further questions or comments you may have. If the foregoing correctly states your understanding, please prepare a contract arnerulment for our execution. We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects Joh21 Kudrycki, AIA, 1 EED BD -FC Principal. encl: Design Fee Summary dated August 10, 2017 Architectural sketches Fentress Architects SKA.-201a, SKA-201b dated 8/3/2017 (2 shee c: Maria Hernandez, Thais Vieira, City of Miami Beach Jeff Sachs, Jones Lang Lasalle Steven DiBartolo, Heidi Wigand, Hill International, Inc. Holly Carson, David Burkey, Anne McNeely, Mikaia Casillas, Fentress Architects Project: Art Basel North Connection Miami Beach Convention Center Renovation & Expansion 8/10/17 Firm Name Firm Number Study & IDesi9n Pee Fire/Life Safety/Code Consulting Civil/Utility Engineering (Lump S Landscape Structural Engineering Plumb, Mech, Elec, Lighting IT, Security, AV Acoustics Food Service Graphics and Signage Parking Consultation Vertical Transportation Sub total Fentress Architects Jensen Hughes Kimley-Horn West 8 Caruso TKD Walker Parking Lerch Bates Design Fees Total(Lump Sum) Expense Total $11,430 Total Art Basel North Revisions Fentress Architects tior$ Job Title Project Architect Architect III Architect 11 Interior Designer II John Kudrycki Totals this activity: Hourly Rate Hours ilours $150,00 $200,00 $130.00 $110.00 $225.00 Extension '''It:AkiftigfYV:fikgeqfP 8 $1,200,00 0 $0,00 8 $1,040,00 4 $440.00 4 $900,00 24,0 $3,580,00 Total, Sub 1 Hours Total Page 2 of 8 24.0 $3,580.00 24.0 $3,580.00 .Art Basel North Revisions Miami Beach Convention Center Fentress Project No:20140021 August 10, 2017 Art Basel North 1 Consultant u $ visions Jensenu h s Job Title Vice President Senior Consultant/Associate Manager Consultant Associate II Associate 1 Project Administrator Totals this activity: Hourly Rate Hours Extension $250.00 $205,00 $175,00 $150.00 $135.00 $75.00 0.0 $0.00 2.0 $410,00 8.0 $1,400.00 0.0 $0,00 0.0 $0,00 0.0 $0.00 ours 10.0 $1,810.00 Total, Sub 1 Hours Total 10.0 $1,810.00 10.0 $1,810.00 Page 3 of 8 Art Basel North Revisions Miami Beach Convention Center Fentress Project No:20140021 August 9, 2017 Art Basel North Revisions Job Title Principal Associate Registered Engineer 11 Registered Engineer 1 CAD Technician III Totals this activity: Total, Sub 1 Hours Total Hourly Rate Hours Hours $170.00 $150,00 $135,00 $120.00 $105.00 Extension 2.0 2.0 8,0 2.0 8.0 $340,00 $300.00 $1,080,00 $240.00 $840.00 22.0 $2,800.00 22.0 $2,800.00 22.0 $2,800,00 Page 4 of 8 Art Basel North Revisions Miami Beach Convention Center Fentress Project No:20140021 August 10, 2017 Art Basel North Revisions IVI-E Engineers flours Job Title Principal Senior Project Manager Project Engineer CAD Operator Totals this activity: Hourly Rate Hours Extension Hours $200.00 $150.00 $120.00 $95.00 $0.00 2,0 $300,00 $0,00 4.0 $380.00 6,0 $680.00, Principal $200,00 0,0 $0.00 Associate $160.00 4.0 $640,00 CAD Operator $95.00 $0.00 Totals this activity: Hours 4.0 $640,00 !kJ Principal Designer Totals this activity: Total, Sub 1 Total, Sub 2 Total, Sub 3 Hours Total Hours $200.00 $110.00 2.0 $400.00 $0,00 .0 $400.00 6,0 $680.00 4.0 $640.00 2.0 $400.00 12.0 $1,720.00 Page 5 of 8 Art Basel North Revisions Miami Beach Convention Center Fentress Project No:20140021 August 10, 2017 Art Basel North Revisions DL Adams & Associates Job Title Principal Associate Principal Project Manager Senior Consultant Project Consultant Staff Consultant Technician Totals this activity: Hourly Rate limit's Extension $210.00 $190.00 $155.00 $135,00 $100.00 $90,00 $75,00 Hours 0,0 1,5 1.0 8,0 0.0 0.0 0.0 0.5 $0.00 $285.00 $155.00 $1,080,00 $0,00 .$0.00 $0,00 $ ,520.00 Page 6 of 8 Art Basel North Revisions Miami Beach Convention Center Fentress Project No:20140021 August 10, 2017 Art Basel North Revisions Tamara l( ciryeesign Job Title Hourly Rate Hours Extension President $125.00 0.0 $0.00 Totals this activity: $0,00 Total, Sub 1 0,0 $0.00 Hours Total 0.0 Page 7 of 8 $0.00 Art Basel North Revisions Miami Beach Convention Center Fentress Project No:20140021 August 9, 2017 Art Basel North Revisions Consultant Lerch Bates urs Job Title 44 k1L citf. Vice President Senior Consultant/Associate Manager Associate 11 (3 reveiws) Associate 1 Project Administrator otals this activity: 1.L Hourly Rate Hours Extension Hours Total, Sub 1 Flours Total $250.00 $205,,00 $150,00 $135,00 $75.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $0,00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 Page 8 of 8 Art l3asel North Revisoins Miami Beach Convention Center Fentress Project No:20140021 August 9, 2017 8 if 8 a 8a 8 8 3 8 3 8 8 71 1 a 8 8 8 C6) 6 9 ‹) 230" ui votam l 1/2".,,, ,,2'.0 1/2"--,.. r-zu 1,08,04 LI L6 A' 2 II k r' ...4... 1[ . - if , 1 08 23 -1.- ----- 9101/4" ',9 1.? e E X I 0WS.08 H I ..1‘,.._../ vvs-iol L5 —1- - L8 0 to ED A 24-2 3/4" FV 1 Co [ r, 1 08 21 WS -10A, (LTJ -, E/C(:;2S.,N LINE or FLOOR ABOVE iz. II zn ,,,, ‘-' • i 04 4A7r. rljr ..-:-VI, _J'AF, ....Igtiz 7-i r„ 1.5 t006 A2 -, - , - :.t., ELEVATOR L - _ _. Et,08.01- -L----- -- ---.., _.... EX ST YPE esmoolv C . 0 ir 0fi08 -12 I 4" i „; 0 ', Li --,-, - Lt 0 ' STAIR— -0- ' IYPE TROOM C 71 k,,:, i — - I F -12d ...) ,.. 62 ..... co .... - -.= r 1 08 7 ERALATCEISCAt.JjArd PAP Ig,08 14 ' ,', K .43 (---c. - ,,;,.)1 :19 ,.,,T - - IS .......1., -.1S,.. --E-3, '''. .'10 . ,1 08 22 'zsTi -I \,_....,1 — K4 ,...1 0 J JANITOR K.) 'I PAIR 1— E2 ; I-6-- , Ar - 28 1/4" 22.-8 - - - — 08.18 - ` r L 0816 , 1 4.1 EWS.08 1.08,26 EVVS-08 ;7, A1 21 L6 A 2 07 9500.57 EIS 17 (INT) Aj 2 .ft p 6 ci _—__ or 1 , ,,,- <- gv,-...,,,, -5,, , rz I J 99 Preliminary Not for Construction J 98 SKETCH NUMBER: SKA-201 a F E NTRESS ARCHITECTS DRAWING TITLE hVEL I CONNECTOR CAL , 4/6..1 o^ OAT3 81 /33303 - - 76REiS117667,-116T P6/T311.6 I SHEET 3 32108 ....-;- - PROJECT mum roR REVIM MIAMI BEACH CONVENTION CENTER RENOVATION & EXPANSION RevisioN DA re arnosma PROJrat 3 2(1140021 C6 , i.) 23',0" 7 20'-11 1/2" 2'.0. 112"-- 8 9141/2 8'•2112" q to N 2.08. 3 L7 ..=. q1 _ w - SERVICE t CORRIDOR L7 2A —u__._ �–/ LANDING 2,08,26 a a F270871-81 (•20 o _ 05 731 z _, y ,..� 2,06.4 _ L7 I m_-- 0 EXPANSION -• -, JOINT `i i'n ` 2,08 F4 -S1 Al 4 8 96 , �. "..5 :s�. . ....4 ` L` A reR SERVICE CORRIDOR IliaSk; [ F-23 1 }p �.�,,.,�y f1M7' QT,2,08;0-1- --7.28- : "w•, ERVICE s 'Y • -62 I1 A a 2,07i.02-----'1 SP = TYP. AT ALL CORNERS., — �r K. 3 IN SERVICE CORRIDOR WHERE_ NO BOLLARD ..: .4 LB -S. \ 'AD.- ESCALATOR ` STORAGE PANELS 'Y — - E X089021 2 l ESCALATOR l 26/ F29 kr 0 f Preliminary Not for Construction J.98 SKETCH NUMBER: SKA--20Th DRAWING TITLE: scm.E: ve•„ 1'0. LEVEL2CONNECTOR DATE: 2017108100 FENTRESS FENTRESS _ .___ _.__— 7_....._ -...... SKETCH LOCATION: omit. #: 1 ------..- PROJECT: ..............._- MIAMI BEACH CONVENTION CENTER RENOVATION & EXPANSION "77-777-7-7 SSUED FOR'. REVIEW REVISION DATE: 2017;00!43 SHEET N: A2208. r—'__,_ PRO T0.20144021