Loading...
LTC 587-2017 Miami Beach Convention Center Update No. 20MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachfl.gov OFFICE OF THE CITY MANAGER LTC # 587-2017 LETTER TO COMMISSION TO: Mayor Dan Gelber and Members of the City Commission FROM: Jimmy L. Morales, City Manager • DATE: December 8, 2017 SUBJECT: Miami Beach Convention Center Construction Project Update No. 20 The purpose of this LTC is to update the Mayor and City Commission on the Miami Beach Convention Center (MBCC) Renovation and Expansion Project. The financial information provided is through October 30, 2017. Project Dashboard is attached as Exhibit A and corresponding Budget Summary Breakdown is attached as Exhibit B. SCHEDULE UPDATE & PROJECT MILESTONES Construction of the project commenced in December 2015 and is 69% complete as depicted in Schedule A below. The building and adjoining streets and green spaces remain on schedule for a substantial completion target date of August 2018. The P -lot Park is scheduled for completion by June 2019: Schedule A 1 2015 1 2016 1 2017 I 2018 Phase I East Lobby Renovation East Exhibition Halls North Addition 21st Street Pump Station Phase II N West Exhibition Halls - oN West Concourse / Grand Lobby - 2nd Floor Grand Ballroom - Convention Center Drive - Carl Fisher Clubhouse - < Phase III Rooftop Ballroom 21st Street Park Phase IV P -Lot Park 2019 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 Art Basel 2016 N 0 a� m ft al n=1 Art Basel 2018 I 7 Art Basel Miami Beach 2017 The project, once again, met the Art Basel Miami Beach (ABMB) milestone for the only 4 -hall event for 2017. As per the license agreement with ABMB, the building was turned over for partial commencement of show load -in on November 20 and full load -in on November 22. The delays caused by Hurricane Irma's impact required some modifications to the originally planned west entry access, valet drop off and other show programming, however 4 halls originally committed were made available, as well as the east side completed lobby, the north Miami Beach Convention Center Monthly Construction Project Update No. 20 December 8, 2017 Page 2 of 5 and south loading docks and the north west ground floor Jr. Ballroom. Despite the challenges which arose as a result of the hurricane's impact, the City's design and construction team and the City's administration worked closely with ABMB's event staff to assist with logistics to guarantee success of the event. The event opened for First Choice VIP's on December 6 and will end on December 10 with complete load -out by December 15. Hurricane Irma and August 1 "Rain Bomb" Impacts The impacts of the August 1 rain event (referred to as a "rain bomb" event) followed by Hurricane Irma created delays which severely challenged the City's ability to deliver the facility at the level required by ABMB. During the months of September and October the City's design and construction team and City administration, together with ABMB event staff and administration agreed on a plan, which would provide the basic needs of the show in order to avoid cancellation and provide exhibitors and patrons everything necessary for a successful event. The effects of the two storms and the additional work required to maintain the event deadline added unforeseen costs in the amount of $6.9 million. Refer to Exhibit Al for an additional work summary and cost. At the December 13th City Commission meeting, the administration will be recommending an amendment to the RDA agreement with Miami -Dade County to provide this additional funding from excess RDA trust fund revenues. Design Miami 2017 Design Miami (DM) mobilized on the preferred parking lot (P -Lot) site on October 23 as scheduled. Clark's labor force parking area and a portion of the material and equipment staging area have been relocated in order to allow the construction of DM's tent facility. DM's event is from December 5 to December 10 with complete load out by December 21. P -Lot Park Revision On July 26, 2017 the City Commission adopted resolution 2017-29964 approving a revised concept design for the urban park to replace the existing surface parking lot known as the preferred parking lot, or P -Lot. The revised design will include an open area large enough to accommodate staging for the annual Design Miami show. This additional design coordination, which includes underground footings for Design Miami's tent and a more robust electrical system for Design Miami's electrical needs, has pushed the final submittal of the Design Review Board (DRB) to February 2018 and postponed construction commencement of the Park from mid -2018 to early 2019. The additional footings and electrical services will facilitate the installation and deconstruction of the tent to be done in the most expedited way possible. The Administration will present the DRB submittal package to the Palm View HOA on Monday, December 11, 2017. It is anticipated that the park will be completed by June 2019. 2018 Building Substantial Completion The project is currently scheduled to be substantially completed by August 23, 2018. The first 4 -Hall event of 2018 will be the American Health Information Management Systems Association (AHIMA) Convention scheduled for September 23, 2018. FINANCIAL UPDATE TO October 30, 2017 The project is currently on budget. The usual project dashboard with updated financial information is attached as Exhibit A and a corresponding Budget Summary Breakdown is attached as Exhibit B. Narrative updates are as follows: Miami Beach Convention Center Monthly Construction Project Update No. 20 December 8, 2017 Page 3 of 5 Construction Draw Taking into account direct purchases and payments for the construction, a total of $383 million, or 70%, of the total updated GMP amount of $546.9 million has been paid through October 30, 2017. For a detailed breakdown, refer to Exhibit B (GMP + Direct Purchases Line Item). Construction Manager's (CM) Contingency Refer to Exhibit B1 for a summary of the total CM Contingency use to date. For the month of September and October, an additional $978K was utilized to bring the total to $28.5 million out of the $29.7 million CM contingency. A total amount of $24.7 million has been utilized under the "Trade Cost" category. Direct Purchase The City continues its direct purchase of materials for the project originally budgeted at a sales tax savings of approximately $6 million. Through October 30, the City has directly purchased $61.7 million in materials resulting in sales tax savings of $4.5 million. There are certain materials that were planned for direct purchase that have not materialized due to a variety of reasons such as risk to the City disagreement on purchasing terms, and disagreement on early deposit requirements. Although the City and the construction team pursued as many direct purchase opportunities as possible, it is currently estimated that there will be a shortfall amount of approximately $1.48 million, which will be funded from the Owner's Contingency. OWNER COSTS A total of $46.4 million, or 69.2%, of the owner cost budget has been expended to date. Below are more detailed updates for two major components of the project being funded by Owner Costs. Art in Public Places (AIPP) A total of $1.2 million out of the $7.1 million has been expended to date. AiPP staff continues to meet and work closely with the project team and Miami -Dade County's Department of Cultural Affairs to ensure the seamless integration of the six public art projects into the MBCC project. The following provides a brief update on the status of each commission: 1. Franz Ackermann (Berlin), Southeast Corner Exterior Walls Ackermann conducted a site visit on November 30, 2017 to finalize the surface treatment of the Southeast Corner Exterior Wall. Ackermann is working with a team of local and internationally based conservators to conduct paint test studies to ensure the longevity of the mural. In response to the paint studies, the team has developed a new, highly pigmented paint that will be used for the mural. Paint samples were presented to AiPP staff on September 6, 2017. The studio is in the process of hiring a general contractor and is scheduled to begin painting the mural on March 5, 2018. 2. Michael Elmgreen and Ingar Dragset (London/Berlin), Convention Center Park Sculpture The artist agreement with Elmgreen and Dragset has been finalized. The artists conducted a site visit on October 27, 2017. During this meeting, the artists presented a maquette that is being used to assess ADA requirements and siting of the work. The artists are working with a conservation team to evaluate UV standards, durability and anti -graffiti properties. Miami Beach Convention Center Monthly Construction Project Update No. 20 December 8, 2017 Page 4 of 5 Coordination of the project is dependent upon the final design of the Convention Center Park, which is estimated to be completed in summer 2019. Art in Public Places staff is working closely with the project team to ensure utilities and landscaping will not interfere with the foundation or visibility of the work. It is anticipated the sculpture will be installed in Fall 2019. 3. Ellen Harvey (Brooklyn), Grand Ballroom Pre -Function Room Ellen Harvey is now working with Franz Mayer of Munich to fabricate the art glass panels and the structural system to support the glass panels. The artist has completed studies of the work and fabrication of the art glass will take at least eight months. It is anticipated the work will be installed in spring 2018. 4. Joseph Kosuth (New York/London), West Lobby Kosuth studio and the Art in Public Places project team had great concern regarding the visibility of the four walls (North Junior Ballroom, South Junior Ballroom) that were originally suggested to house Kosuth's work. Kosuth studio conducted a site visit on October 3, 2017 to further assess the visibility and concurred with staff recommendation to relocate the work to the soffit that runs the entire length of the West Lobby. Neonlauro submitted electrical requirements for the soffit area to the project team on November 30, 2017. Kosuth will submit a finalized artistic concept for the new location in February 2018. It is anticipated the work will be installed in fall 2018. 5. Joep Van Lieshout (Netherlands), Northeast Park Collins Canal Joep Van Lieshout conducted a site visit on May 9, 2017. Staff has been working closely with the artist studio and a conservator to finalize materials for the sculptural seating elements. Van Lieshout submitted his final design for placement of the nine sculptures in May 2017. The project team is working with West 8, the landscape architect, to determine proper plantings surrounding the sculptures. It is anticipated the work will be installed in fall 2018. 6. Sarah Morris (New York), Northeast Corner Exterior Walls Morris conducted a site visit on March 10, 2017 and was made aware of existing site conditions. On August 17, 2017, Art in Public Places staff coordinated a surveying crew to scan the west facing walls on behalf of the artist, as exact measurements are needed to fabricate the tiles. It is anticipated Morris will be able to complete the measurements of the two north facing walls at the end of January 2018. Additionally, Morris met with the project team to determine surface treatment of the wall, lighting and landscaping for the northeast corner exterior walls. Morris is now in the process of hiring a general contractor and has begun fabrication of the tiles with the selected manufacturer located in Guadalajara, Mexico. If the measurements of the north facing walls can be completed by the end of January 2018, it is anticipated the tile mural will be completed in fall 2018. Carl Fisher Clubhouse Historic Restoration The City's CIP Department is managing the project for the MBCC project team and a total amount of 422K out of the $2.5 million budget has been expended. Construction documents have been submitted to the building department for permit, which should be approved over the next two to three weeks. Permit issuance is anticipated prior to construction award. The Construction Manager completed their pre -construction services but, due to insufficient subcontractor bid response, the City had no alternative but to issue an ITB for the project. ITB Miami Beach Convention Center Monthly Construction Project Update No. 20 December 8, 2017 Page 5 of 5 No. 2018 -032 -ZD was issued on October 19, 2017 with a bid opening date of November 20, 2017. Three bidders were deemed responsive and responsible. The Administration has submitted an item on the December 13th agenda for the Mayor and Commission's consideration. Once an agreement is executed, a more definitive construction schedule will be submitted. It is currently anticipated that the project will be completed during the fourth quarter of 2018 and before Art Basel 2018. OWNER CONTINGENCY For a full detailed breakdown of all Owner costs and credits, refer to Exhibit B2. A total of $26.7 million of the available owner contingency of $35 million has been utilized. OVERALL COSTS From an overall project perspective, $421.4 million, or 68.9% has been spent on the $620 million project. LOCAL HIRE Clark Construction continues their commitment to maximizing workforce opportunities for City of Miami Beach and Miami -Dade County residents. A total of 5,018 workers have been employed by the project. This includes all certified payroll from October 2015 to October 30, 2017. The labor force includes full-time, part-time, temporary labor, and includes daytime and nighttime shifts. Attached, as Exhibit C, is a summary of the local hiring efforts to date, for Clark and its subcontractors. The current report shows a summary of all employees on the project thus far, sorted by zip code. Clark is currently 64% local hire by individual (Miami Beach, with 60 employees, and Miami -Dade County with 3,163). CONSTRUCTION MATERIAL DIVERSION / RECYCLING The City continues to be on track to exceed the goals of the Silver LEED designation for diversion / recycling of waste. Over 95% of the material demolished is being recycled and / or diverted, which exceeds the target goal of 75%. PUBLIC INFORMATION Various weekly advisories and postings for June sent on the City's social media outlets including Twitter, Facebook, and Constant Contact are attached as Exhibit D. If there are any questions, please do not hesitate to contact myself or Maria Hernandez at Extension 2584. Attachments: Exhibit A — Project Dashboard and Site Photos Exhibit Al — Hurricane Irma and Rain Bomb Impact Summary Exhibit B — Budget Summary Breakdown Exhibit B1 — Contractor Contingency Log Exhibit B2 — Owner Contingency Log Exhibit C — Clark Construction Local Hiring Summary Exhibit D — Public Outreach Report JLM / MH F:\cmgr\$ALL\Convention Center\Commission Updates\2017 October Monthly\LTC - October 2017 MBCC Update.docx Convention Center Renovation & Ex•ansion Project Dashboard 2016 (25 Events) EXHIBIT A 2017 (8 Events) DJ FMAMJ JASONDJFMAMJ J A CM Contingency $30m $25m $20m $15m $10m $5m $0m Total Project Cost 68.89% Expended $600m 1 $500m - $400m $300m $200m - $100m $0m - Net GMP Draw 70.04% Expended $550m $500m - $450m - $400m - $350m - $300m $250m - $200m $150m $100m $50m $0m Payment Application 24 October 2017 2018 (+1-14 Events) ABMB S 0 N D J F M A M J JAS BLACK OUT Owner Costs 69.24% Expended - $70m - $60m - - $50m - $40m - $30m - $20m $10m $0m Construction Notes: • 68.89% of the total project budget has been expended. • 70.04% of the total GMP budget has been expended. • $28.5M of CM contingency has been utilized. Refer to LTC narrative and Exhibit B1 for description and detail. Owner's Contingency $35m $30m $25m $20m $15m $10m $5m $0m Owner Budget Notes: • 69.24% of owner budget has been expended. • $26.8M of the owner's contingency budget has been expended. Other Notes: • Art Basel 2017 Milestone completed. Convention Center Renovation & Ex•ansion Project Dashboard 4111 November, 2017 0-183.01 South Loading Dock - View E from Grids G & 25 4 43-1E3_Q4 0-183.02 0-183.03 South Loading Dock - View E from Us K.32 & 23.5 South Loading Dock - View E from G s 23 18 & L.5 0-183.05 South Loading Dock -View N from G's N_04 & 23.5 South Loading Dock - View E from G's P_33 & 23 Vilest Concourse Ext -View 5 From Grids 8 & A. 0-163.0 I Exhibit Pref 1.20.01 - View E from Grids 13 NW2 Existing RR 1.28.04 - View S from Grids 23 & K.32 Public Circ 1.16_81- View N From Grids 11.32 & T.78 Convention Center Renovation & Ex ansion Project Dashboard 4111 EXHIBIT A November 2017 0-181.01 CC Drive - View N from 176 Street G-181 02 0-101.03 Fire Pump Room 1.29.08 - View N from Gs S143 & E South Loading Dock - View N from G's SW3 & M.22 0-181.04 0-181.05 0-181.06 South Loading Dock -View IN from Grids P.33 & 25 South Load Dock - View W from G's N.09 & 2318 Meeting 1.31117 - View E from Grids SW3 & A 71•11•1111 0-181.07 0-181.08 0-181.01 Exist RR 1.2&04 - View 3 from Grids 23 & K.32 Loading Bev Circ 1.08.14 View 3 from Gs J.:3 & 6 Parking 5 08 01 - View E from Grids P.29 & 7 Convention Center Renovation & Ex•ansion Project Dashboard 0-18i_1O 0-181.11 0-181.12 Jr Ballroom 4.30.08 - View S from Grids D.0 & 21.38 Public Conc. 226e04 -View E from Grids K & SW4 South Ext Facade - View N from Grids f] & 25 0-184.07 0-184.08 Grand Ball B 2.08.01- View SW from Grids 3 & L.3 Grand Ball C 2.08.02 - View S from Grids 3.5 & J l 0-184.09 Hall D -View S from Grids K & 7 EXHIBIT Al HURRICANE IRMA AND RAIN BOMB IMPACTS Hurricane Irma Damages: 1 Site Prep & Demobilization (Pre -Irma) 2 Clean -Up & Damage (Post -Irma) 3 Excusable Delay - 15 day Time Extension 4 Art Basel Acceleration 5 Art Basel Temp Generators 6 Art Basel Temp. Requirements 7 City Reimbursements to Art Basel for Costs incurred due to Irma's impact August 1 Heavy Rain Event 8 Rain Event Remediation TOTAL Item Description Costs include: labor on straight and premium time to secure stored materials in place; relocate material and equipment out of harm's way; dismantle scaffolds and ship offsite; shut down electrical equipment and rooms; prepare storm water structures; purchasing tarps, plywood, lumber, sandbags, ropes and cables to secure work and stored materials and incomplete structures and to close openings; remove MOT's; remove portable toilets; lower booms on cranes and lifts; remove fence screening. Costs include: Clean-up of insulation blown off levels 4 and 5 and scattered on the site, replacement of damaged insulation and reinforcing steel for parking level concrete deck; damage to fireproofing, damage to pipe and duct insulation, damage to trees and landscaping stored off-site, broken curtain wall glazing and insulation, engineering costs to recertify structural integrity of building. Remobilize materials and equipment from safe storage areas, repair fencing and windscreen, damaged material trash hauling, clean-up supplies, reinstall MOT on Washington Ave and Dade Blvd. Costs include lost time wages of workers and management, time to remobilize workers; site security during non-productive days, equipment rental cost during non- productive days; redeliver materials stored off-site. Costs include premium time for items of work, specific to delivering Art Basel, including: completing structural steel and concrete work for the south loading dock, hall - separating service corridors at north, south and west hall boundaries; roofing installation over the west concourse; fire separation wall and roof construction; build- out of the NW junior ballroom; installation of fire sprinkler, chilled water, power and low voltage systems; and finishes work in Halls C and D. Hurricane Irma delayed the ability of Clark and FPL to complete an electrical vault required to provide electrical service to a portion of the Exhibit halls for Art Basel. As a result Clark had to procure and install temporary generators. Costs include: rental for 8 weeks for 2 x 1500 kW generators for power, 1 x 1500kW generator for standby power, and 1 x 500 kW for emergency power; labor to run underground conduit and cable; diesel fuel based on estimated consumption; standby personnel to run and monitor generators and power. Costs include additional Maintenance of Traffic for the Art Basel event as a result of AHJ requrements and storm caused delays; relocation of site trailers and Parking lot configuration for Art Basel Valet. Temporary walls, doors & ceilings in West Concourse. Temporary paving in south alley and standby personnel during show load - in, load -out and event days. Costs include the need for tent structures outside of interior, rental space for Botanical Garden, and other expenses incurred by Art Basel due to the inability to complete construction as a result of Irma. Costs include the costs to remediate areas of the East Concourse following damages caused by a significant rain event on 8/1/17, and includes, cutting out and replacing drywall, mold remediation, ceiling grid and tile replacement, light fixture replacement. $6,914,221 EXHIBIT B Miami Beach Convention Center Expansion & Renovation Project Approved Budget Trade Costs Direct Purchase Storm Water Drainage Culvert Recon Change Orders Subtotal Dashboard Summary 10/7/15 Budget Current Current Current Original % Total Forecasted Budget % Spent Budget Variance Budget % Expenses $410,205,803 66.62% 1,202,676 $411,408,479 66.37% 0 0.00% -65,813,699 -65,813,699 -10.62% 0 3,309,692 3,309,692 0.53% 50,803,086 50,803,086 8.20% 0 0.00% 9,705,042 9,705,042 1.57% 410,205,803 66.62° -793.204 409,412,599 66.04% 278,464,705 68.02% Contractor Soft Costs General Conditions (Clark Staffing) 24,465,886 3.97% 3,700,000 28,165,886 4.54% 22,330,774 79.28% General Requirements 14,760,103 2.40% 2,545,258 17,305,361 2.79% 12,028,180 69.51% Payment & Performance Bond 3,708,000 0.60% 49,267 7 3,757,267 0.61% 3,704,537 98.60% GL Insurance 1,807,650 0.29% 258,834 2,066,484 0.33% 1,536,085 74.33% CMr Fees (3.8%) 17,288,003 2.81% 2,668,613 19,956,616 3.22% 13,149,294 65.89% CCIP GL Wrap 0 0.00% 4,740,576 8 4,740,576 0.76% 4,740,576 100.00% CM Contingency 29,747,613 4.83% -28,548,210 9 1,199,404 0.19% 0 0.00% Base GMP 501,983,058 81.53 -15,378,865 486,604,193 78.50% 335,954,151 69.04% Other GMP Items (Including all mark ups) P -Lot Park (allowance) 10,000,000 1.62% -10,000,000 74 0 0.00% 0 0.00% Storm water Drainage Culvert 3,475,000 0.56% -3,475,000 0 0.00% 0 0.00% Subtotal 13,475,000 2.19% -13,475,000 0 0.00% 0 0.00% Total GMP (Clark) 515,458,058 83.72° -28,853,865 486,604,193 78.50% 335,954,151 69.04% Direct Purchase Tax Savings -6,000,000 -0.97% 4,516,475 76 -1,483,525 -0.24% 0 0.00% Total Net GMP 509,458,058 82.741( -24,337,390 485,120,668 78.26% 335,954,151 69.25% Direct Purchases 0 0.00% 61,769,641 61,769,641 9.96% 47,078,363 76.22% GMP + Direct Purchases 509,458,058 82.74 37,432,251 546,890,309 88.22% 383,032,514 70.04% Owner's Cost City Staffing & Expenses 1,561,000 0.25% 793,318 5 2,354,318 0.38% 1,714,746 72.83% Consultant Fees (SAG) 1,047,725 0.17% 160,000 1,207,725 0.19% 1,072,545 88.81% Owner's Rep (Hill) 5,585,673 0.91% 0 5,585,673 0.90% 4,308,685 77.14% Design Fees (Fentress) 26,669,442 4.33% 1,222,461 70 27,891,903 4.50% 26,541,002 95.16% Owner's Cost Estimator (US Cost) 400,030 0.06% 709,326 6 1,109,356 0.18% 1,009,249 90.98% Pre GMP CM Fee (Clark) 2,594,073 0.42% -1,037,629 1,556,444 0.25% 1,556,444 100.00% Testing & Inspections 2,328,943 0.38% 831,520 3,160,463 0.51% 1,662,859 52.61% Permit & Plan Reviews 2,400,000 0.39% 746,074 73 3,146,074 0.51% 2,964,521 94.23% Other 783,526 0.13% 1,386,015 3 2,169,541 0.35% 895,776 41.29% Other - Legal / DAP Board 63,515 0.01% 260,000 71 323,515 0.05% 203,616 62.94% Other -Spectra 0 0.00% 292,000 72 292,000 0.05% 291,950 99.98% Other -Design Miami 0 0.00% 0 0 0.00% 0 0.00% PublicArt(AIPP) 6,900,000 1.12% 220,422 2 7,120,422 1.15% 1,270,249 17.84% MBCC FF&E 6,830,945 1.11% 0 6,830,945 1.10% 34,811 0.51% Insurance: OCIP GL Wrap 9,000,000 1.46% -9,000,000 4 0 0.00% 0 0.00% Builder Risk/Building (net) 1,600,000 0.26% -450.000 1,150,000 0.19% 1,837,501 159.78% 1 Professional Liability Umbrella 1,000,000 0.16% -382.117 617,883 0.10% 617,883 100.00% Carl Fisher Renovation Allowance 2,500,000 0.41% 0 2,500,000 0.40% 422,093 16.88% Subtotal 71,264,872 11.57 -4,248,610 67,016,262 10.81% 46,403,930 69.24% P -Lot Park (allowance) 0 0.00% 4,650,924 74 4,650,924 0.75% 0 0.00% Escalator/Elevator/Kitchen Upgrades 0 0.00% 3,106,729 78 3,106,729 0.50% 0 0.00% Reimbursement from other CMB Funds 0 0.00% -9,979,820 77 -9,979,820 -1.61 % -8,036,235 80.52% Total Without Owner's Contingency 580,722,930 94.32 30,961,473 611,684,403 98.67% 421,400,209 68.89% Owner's Contingency Total Owner's Contingency Total Budget With Owner's Contingency 0.00% -26,779,398 35,000,000 5.68% -26,779,39815 $615,722,930 100.00% $4,182,075 79 8,220,602 1.33% 0 0.00% 8,220,602 1.33% 0 0.00% $619,905,005 100.0% $421,400,209 68.89% Balance Remaining 130,947,894 5,835,112 5,277,181 52,730 530,399 6,807,322 0 1,199,404 150,650,042 0 0 0 150,650,042 -1,483,525 16 149,166,517 14,691,278 163,857,795 639,572 135,180 1,276,988 1,350,901 100,107 0 1,497,604 181,553 1,273,765 119,899 50 0 5,850,173 2 6,796,134 0 -687.501 1 0 2,077,907 20,612,332 4,650,924 3,106,729 -1,943,586 190,284,194 8,220,602 8,220,602 $198,504,796 1. The property insurance portion of the Builders Risk policy to be reimbursed $68,501 by CMB Risk Dept. 2. A portion of the savings from insurance was allocated to AiPP to provide for actual costs. Pursuant to Sec. 82-587 of the CMB Code, the total amount allocated to AiPP has been transferred to the Art in Public Places Fund. 3. Miscellaneous costs such as surveys, studies, public information officer (P10), and utility fees. 4. Insurance Savings as a result of implementing a CCIP (Contractor Controlled Insurance Program) rather than an OCIP (Owner Controlled Insurance Program). 5. A portion of the savings from insurance was allocated to City Staffing to cover costs from Fiscal Year 2014 through December 2018. The previous budget estimate included only Fiscal Years 2015 through part of 2018. 6. Additional Cost Estimating services to support GMP reconciliation negotiations with Construction Manager. 7. Credit balance due to savings from Clark Bond on Direct Purchases executed to date. 8. $4.7M in general liability insurance was originally to be purchased directly by the owner, but was actually purchased by the contractor. Also refer to Footnote No. 4. 9. Total use of Contractor Contingency to Date. Refer to Exhibit B1 for detailed summary. 10. Additonal fees for miscellaneous design revisions and extra site visits requested by Contractor; approx. $384K of the total has been deducted from Clark's Contract. 11. Additional Costs for Dispute Avoidance Panel and outside legal counsel. 12. Moving expenses, parking fees and other expenses for relocation of building operator. 13. Costs for additional permitting fees. 14. P -Lot Park Allowance temporarily deducted from Clark's Contract. $5M remains in allowance and $5M moved to owner's contingency. 15. Total use of Owner Contingency to Date. Refer to Exhibit B2 for detailed summary. 16. Projected Sales Tax Savings from submitted Direct Purchase Orders; Future anticipated $1.5M shortfall in Direct Purchase of materials. 17. Reimbursement for operational expenses (Reso 2017-29830), stormwater culvert (2017-29829) & re -roofing of existing building previously allocated under separate projects 18. Additional improvements (Reso 2017-29829) for Escalator/Elevator/Kitchen Upgrades to be added to GMP. 19. Total budget variance includes additional bond proceds of $147,449 + Additional funding in the amount of $4,034,625 per April 26, 2017 budget amendment. Page 1 of 1 MONTH MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY JUNE JUNE JULY JULY JULY JULY JULY EXHIBIT B1 Miami Beach Convention Center Expansion & Renovation Project Construction Manager's (CM) Contingency Report thru October 30, 2017 Total CM Contingency USES May 2016 ** Jun 2016 Jul 2016 Aug 2016 Sep 2016 Oct 2016 Nov 2016 Dec 2016 Jan 2017 Feb 2017 Mar 2017 April 2017 - Interim Apr 2017 May 2017 Jun 2017 Jul 2017 Aug 2017 Sep 2017 Oct 2017 Total Uses REMAINING CM CONTINGENCY Settlement Agreement - Increase to Contingency REVISED REMAINING CM CONTINGENCY SUBCONTRACTOR ACOUSTI ALPHA DEMO AMERICAN FIRE PROFF BANKER BARING INDUSTRIES CAMARATA CDPW DAVID ALLEN DUFFY & LEE FORD AV HAYWOOD BAKER HONEYWELL HUFCOR ISEC JAFFER NASH NFP RITE HITE R&M SPECIFIED ARCH SYS TECTA TRIDENT WON DOOR WPM SUBTOTAL LOUVERS (Nash Mech.) WPM SUBTOTAL ACOUSTI AERIAL PHOTOGRAPHY INC. GEOSYNTEC MICHEAL WOOD MODSPACE SUMMMARY Trade Contract Buyout - 2016 pescRIPTI91V Temporary Walls Demolition Spray Fireproofing Structural Steel Food Service Masonry Dewatering Tile Carpet Audio/Visual Soil Stabilization Low Voltage Operable Partions Expansion Joints Dewatering - Wells Dewatering - Underground Utility Fire Suppression Loading Dock Structural Concrete Operable Partions Roofing Resilient Flooring Operable Doors Site Civil Louvers Site Civil Temporary Walls Aerial Job Site Photos Environmental Consultant FDEP Consultant Owner Trailer Exhibit B1 Page 1 of 8 $29,747,613.00 $ 3,516,099.28 $ 3,539,694.47 $ 2,345,812.72 $ 678,014.32 $ 1,373,672.04 $ 555,095.86 $ 1,453,031.74 $ 82,810.97 $ 1,491,842.15 $ 2,008,667.81 $ 1,413,331.31 $ 5,226,384.54 $ 3,075,943.46 $ (1,130,888.46) $ 447,556.19 $ 398,299.40 $ 1,094,342.36 $ 222,823.27 $ 755,676.28 28,548,209.71 $1,199,403.29 $963,391.00 $2,162,794.29 AMOUNT MARK -Ups* TOTAL COST $1,706,560.00 $84,734.24 $1,791,294.24 -203,020.00 -10,080.36 -213,100.36 -177,812.00 -8,828.73 -186,640.73 -334,138.00 -16,590.64 -350,728.64 33,244.00 1,650.63 34,894.63 -171,200.00 -8,500.43 -179,700.43 -118,399.00 -5,878.76 -124,277.76 -142,590.00 -7,079.89 -149,669.89 -19,965.00 -991.30 -20,956.30 -10,642.00 -528.40 -11,170.40 434,185.00 21,558.18 455,743.18 -713,361.00 -35,419.85 -748,780.85 -267,272.00 -13,270.61 -280,542.61 160,317.00 7,960.07 168,277.07 1,421.00 70.56 1,491.56 95,531.00 4,743.31 100,274.31 -102,500.00 -5,089.34 -107,589.34 -6,600.00 -327.70 -6,927.70 1,115,752.00 55,399.40 1,171,151.40 -4,568.00 -226.81 -4,794.81 9,075.00 450.59 9,525.59 -25,560.00 -1,269.11 -26,829.11 5,650.00 280.53 5,930.53 1,164,378.00 57,813.78 1,222,191.78 2,428,486.00 120,579.36 2,549,065.36 -433,354.00 -21,516.92 -454,870.92 -429,292.00 -21,315.24 -450,607.24 -862,646.00 -42,832.16 -905,478.16 4,480.00 222.44 4,702.44 43.00 2.14 45.14 5,800.00 287.98 6,087.98 10,200.00 506.45 10,706.45 -3,197.00 -158.74 -3,355.74 MONTH JULY JULY JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER DECEMBER JANUARY '17 JANUARY '17 MONTH MAY MAY MAY MAY MAY MAY JUNE JUNE JUNE JUNE JUNE JUNE JUNE JUNE SUBCONTRACTOR GOAL ASSOCIATES SMITH FENCE TR PERMITTING SUBTOTAL NO CHANGES SUBTOTAL NO CHANGES SUBTOTAL EVENSTAR SUBTOTAL NO CHANGES SUBTOTAL HOISTWAY MODIFICATION FIREPROOFING Scraping PILING UNBOUGHT POCKET DOOR SPOIL REMOVAL UNDERPINNING EXISTING STRUCTURE DEWATERING EQUIPMENT SECONDARY ELEC SERV OPPORTUNITY TRAILER ALUMINIUM STEPS TEMP TRAILER TR PERMITTING SUBTOTAL DEWATERING EQUIPMENT SECONDARY ELEC SERV SUBTOTAL TOTAL SINCE INCEPTION SUBCONTRACTOR BARING INDUSTRIES CDPW HAYWOOD BAKER HJ FOUNDATION HJ FOUNDATION HONEYWELL SUBTOTAL ACOUSTI ALPHA WRECKING BARRING INDUSTRIES CDPW HARMON HONEYWELL HJ FOUNDATION EXHIBIT B1 DE CRIPTION MOT Fencing Permitting Decking (3b) Modifications for EL16.02 not used (3c) Related to elevator only (16A) Additional length per GMP Clarification (42b) Pocket Door for WON DOOR (16c) Spoil removal for jet grouting (16d) Underpinning for East Concourse (16e) Monitoring of existing structure (19f) Dewatering Equipment Temp Power & Fuel (84.31) With MEP Subs, from GR to CM (84.36d) Moved from GR's to CM (84.36e) Moved from GRs to CM (84.36f) Permitting Permitting (19f) Dewatering Equipment Temp Power & Fuel (84.31) With MEP Subs, from GR to CM Trade Costs DESCRIPTION Temporary Kitchen Cost associated with dewatering due to the tremmie seal pumping water disposal - Initial set up and monthly disposals. Additional costs for soil stabilization at the northwest Florida Power & Light vault that was unable to be quanitified at the time of GMP. Additional costs for soil stabilization at the northwest Florida Power & Light vault that was unable to be quanitified at the time of GMP. Additional costs for soil stabilization at the northwest Florida Power & Light vault that was unable to be quanitified at the time of GMP. Building Separation Additional costs for the mechanical fastening of the insulation due to inability to remove via air compressors by demo subcontrcator INTERIM FUNDING - costs associated with extended dump hours, additional demolition or parapet walls, structural members abd block removal Cost reallocated to GR Life Safety line item Cost associated with dewatering due to the tremmie seal pumping water disposal - monthly expenses and contaminated water fees. INTERIM FUNDING - Costs associated with the design and engineering associated with modifications to the exterior of the building Cost reallocated to GR Life Safety line item INTERIM FUNDING - Costs for work in place associated with the additional piles and ties from the design completion AMOUNT MARK -Ups* 46,500.00 2,308.82 -367.00 -18.22 66,000.00 3,277.04 129,459.00 6,427.91 0.00 0.00 0.00 0.00 0.00 0.00 3,000.00 148.96 3,000.00 148.96 0.00 0.00 0.00 0.00 -150,000.00 -7,447.81 -4,571.00 -226.96 -176,952.00 -8,786.03 -5,000.00 -248.26 -2,500.00 -124.13 -4,000.00 -198.61 -25,000.00 -1,241.30 -140,000.00 -6,951.29 -255,000.00 -12,661.28 -30,000.00 -1,489.56 -21,600.00 -1,072.48 -10,000.00 -496.52 -66,000.00 -3,277.04 -890,623.00 -44,221.28 140,000.00 6,951.29 255,000.00 12,661.28 395,000.00 19,612.57 $1,202,676.00 $59,715.35 AMOUNT MARK -Ups" $321,004.66 $0.00 186,092.37 9,239.87 23,000.00 1,142.00 33,846.80 1,680.56 38,823.07 1,927.65 289,721.73 892,488.63 13,990.08 300,000.00 14,895.62 420,000.00 20,853.87 -321,004.66 0.00 89,312.00 4,434.53 160,000.00 7,944.33 -289,721.73 0.00 141,000.00 7,000.94 TOTAL COST 48,808.82 -385.22 69,277.04 135,886.91 0.00 0.00 0.00 0.00 3,148.96 3,148.96 0.00 0.00 - 157,447.81 -4,797.96 -185,738.03 -5,248.26 -2,624.13 -4,198.61 -26,241.30 -146,951.29 - 267,661.28 -31,489.56 -22,672.48 -10,496.52 -69 277.04 -934,844.28 146,951.29 267,661.28 414,612.57 $1,262,391.35 TOTAL COST $321,004.66 195, 332.24 24,142.00 35,527.36 40, 750.72 289,721.73 906,478.71 314,895.62 440,853.87 -321,004.66 93,746.53 167,944.33 -289,721.73 148,000.94 JAFFER INTERIM FUNDING - Costs associated with the 3 additional 85,000.00 4,220.43 89,220.43 dewatering required for the project Exhibit B1 Page 2 of 8 MONTH SUBCONTRACTOR JUNE NASH JUNE NASH JUNE NATIONAL FIRE PROTECTION JUNE ROBINS & MARTIN SUBTOTAL JULY ALPHA WRECKING JULY ALPHA WRECKING JULY CAMARATA JULY FL CIVIL JULY MCDEAN JULY MCDEAN JULY R&M JULY WPM/R&M SUBTOTAL AUGUST AUGUST JAFFER TRU-STEEL SUBTOTAL SEPTEMBER HONEYWELL SEPTEMBER HONEYWELL SEPTEMBER ACOUSTI SEPTEMBER ALPHA SEPTEMBER ALPHA SEPTEMBER R&M SEPTEMBER BANKER SEPTEMBER NFP/MARDALE OCTOBER OCTOBER OCTOBER OCTOBER SUBTOTAL R&M ACOUSTI ACOUSTI RITE HITE SUBTOTAL NOVEMBER WPM NOVEMBER FLORIDA BLACKTOP NOVEMBER TECTA NOVEMBER ACOUSTI NOVEMBER ACOUSTI NOVEMBER DASH DOORS NOVEMBER ACOUSTI NOVEMBER MCDEAN EXHIBIT B1 DESCRIPTION Additional dewatering costs associated with the temporary FPL ductbank being routed from Washington Ave to NW FPL Vault INTERIM FUNDING - Costs associated with work in place for replacement of the existing restrooms, misc material changes to the sanitary, storm and chilled water systems made during design completion, and new duct Heaters AMOUNT MARK -Ups' TOTAL COST 221,426.00 10, 994.26 500,000.00 24,826.04 INTERIM FUNDING - Costs associated with work in place 400,000.00 19,860.83 for the implementation and installation of the higher density sprinklers requested by the AHJ INTERIM FUNDING - Costs for completed work for tremmie 2,000,000.00 99,304.14 seals as requested by CM and rebar bending; costs for work in place including structural changes to the vault, shearwalls, footings and elevated beams. INTERIM FUNDING - costs associated with extended dump Deletion of scope for the removal of the insulation. Deletion of intregal water repellant per contract Dewatering permit INTERIM FUNDING -FPL ductbank INTERIM FUNDING - Costs for completed work for electrical changes to the FPL vaults and camera infrastructure. INTERIM FUNDING - Costs for completed work for structural changes to the vault, shearwalls, footings and elevated beams. SCOPE CHANGE - Fine grading Additional drainage wells - Phase 2 Miscellaneous metals scope INTERIM FUNDING - Engineering INTERIM FUNDING - Equipment INTERIM FUNDING -Additional drywall scope INTERIM FUNDING - credit for moneys paid under OCO #35 for z -wall scope INTERIM FUNDING - additional demo scope SCOPE GAP - Additional labor for floor boxes formwork SCOPE CHANGE - Cutting out grating for new AHU SCOPE GAP - Installation for fire extinguisher cabinets Temp work for Art Basel - Transition slab Temp work for Art Basel - NW egress tunnel Electrical room 1.7.07 build out Dock leveler size Import fill for NE helix Temp work for Art Basel Temp work for Art Basel north loading dock Temp work for Art Basel Temp work for Art Basel Temp work for Art Basel Temp work for Art Basel dry -in Floor box shims - temp asphalt - waterproofing for metal deck at - patch & repair throughout - temp tunnels for NW egress - repair exist. storefront - temp walls for north loading dock Exhibit B1 Page 3 of 8 3,706, 011.61 214,334.98 330,000.00 16,385.18 -396,962.00 -19,709.99 -163,000.00 -8,093.29 23,452.21 1,164.45 250,000.00 12,413.02 500,000.00 24,826.04 700,000.00 34,756.45 -766.71 -38.07 1,242,723.50 61,703.80 358,500.00 17,800.27 50,000.00 2,482.60 408,500.00 20,282.87 200,000.00 9,930.41 250,000.00 12,413.02 500,000.00 24,826.04 -42,821.00 -2,126.15 42,821.00 2,126.15 69,998.00 3,475.55 152,037.00 7,548.95 35,513.00 1,763.29 1,207,548.00 59,957.26 408,604.00 20,288.03 180,001.30 8,937.44 18,609.80 924.02 1,770.00 87.88 608,985.10 30,237.37 79,128.00 3,928.87 366,867.42 18,215.73 73,669.00 3,657.82 127,553.62 6,333.30 184,843.37 9,177.86 43,835.87 2,176.54 21,530.33 1,069.03 232,420.26 524,826.04 419,860.83 2,099,304.14 3,920,346.59 346,385.18 -416,671.99 -171,093.29 24,616.66 262,413.02 524,826.04 734, 756.45 -804.78 1,304,427.30 376,300.27 52,482.60 428,782.87 209,930.41 262,413.02 524,826.04 -44,947.15 44,947.15 73,473.55 159, 585.95 37,276.29 1,267,505.26 428,892.03 188,938.74 19,533.82 1,857.88 639,222.47 83,056.87 385,083.15 77,326.82 133,886.92 194,021.23 46,012.41 22,599.36 188,643.00 9,366.52 198,009.52 EXHIBIT B1 MONTH SUBCONTRACTOR DESCRIPTION AMOUNT MARK -Ups* TOTAL COST NOVEMBER TECTA Temp work for Art Basel - electrical room 1.07.07 8,997.00 446.72 9,443.72 waterproofing NOVEMBER JAFFER Scope reduction - base contract -17,000.00 -844.09 -17,844.09 NOVEMBER JAFFER New scope - Additional transport of pile spoils 17,000.00 844.09 17,844.09 NOVEMBER TECTA Temp work for Art Basel - electrical room 1.06.04 5,212.00 258.79 5,470.79 waterproofing NOVEMBER ALPHA Asbestos abatement 65,452.00 3,249.83 68,701.83 NOVEMBER ALPHA Lead Paint abatement 151,500.00 7,522.29 159,022.29 SUBTOTAL 1,317,231.61 65,403.28 1,382,634.89 DECEMBER CAMARATA Existing conditions - Z wall infil & patching DECEMBER ALPHA West Concourse - Acceleration DECEMBER ALPHA Temporary separation - GL -7 DECEMBER ALPHA Hall C/D SOG demo acceleration DECEMBER EUGENIO PAINTING Temp work for Art Basel - to be voided DECEMBER MCDEAN Temp work for Art Basel - to be voided DECEMBER PJ STRIPPING Temp work for Art Basel DECEMBER UNDERPOWER Repair of damaged traffic signals Wash Ave DECEMBER DUFFY & LEE Temp work for Art Basel - floor prep for carpet DECEMBER STAGING CONCEPTS Temp work for Art Basel - infill plexi panels for new guardrails at east concourse DECEMBER EAST COAST METALS Temp work for Art Basel - to be voided DECEMBER WPM Temp work for Art Basel - subgrade prep for temp asphalt for loading dock and east sidewalk DECEMBER AMERICAN FIREPROOFING Temp work for Art Basel - fire proofing shear wall braces and beam in elec room DECEMBER TECTA Waterproofing north elec room & FPL vault DECEMBER DAVID ALLEN DECEMBER NFP SUBTOTAL Acceleration for AB16 - terrazzo stairs & restrooms tile instal. Replace & repair exist. fire hose & nozzles 71,868.00 3,568.40 75,436.40 100,000.00 4,965.21 104,965.21 125,000.00 6,206.51 131,206.51 100,000.00 4,965.21 104,965.21 23,916.00 1,187.48 25,103.48 77,123.00 3,829.32 80,952.32 2,915.54 144.76 3,060.30 1,938.00 96.23 2,034.23 7,431.00 368.96 7,799.96 7,776.00 386.09 8,162.09 20,600.00 1,022.83 21,622.83 192,869.95 9,576.39 202,446.34 24,619.40 1,222.40 25,841.80 35,049.01 1,740.26 36,789.27 5,783.37 287.16 6,070.53 7,428.00 368.82 7,796.82 804,317.27 39,936.02 844,253.29 JANUARY MCDEAN Relocation of TC -D3 Telcom Room 75,761.00 3,761.69 79,522.69 JANUARY WPM Fix Storm Box Culvert 4,685.00 232.62 4,917.62 JANUARY OTIS Rembursement to Elevator Pit 2,696.00 133.86 2,829.86 JANUARY DUFFY LEE Remove and reinstall carpet - due to asbestos removal 8,939.00 443.84 9,382.84 JANUARY ACOUSTI Temp work for Art Basel 23,501.00 1,166.87 24,667.87 JANUARY EAST COAST METALS Temp work for Art Basel - Change Order Not Executed -20,600.00 -1,022.83 -21,622.83 JANUARY DECON Rejected Change Order - Lead Paint Abatement 815,476.00 40,490.07 855,966.07 SUBTOTAL 910,458.00 45,206.13 955,664.13 FEBRUARY DECON Rejected Change Order- Lead Paint Abatement 833,128.28 41,366.54 874,494.82 FEBRUARY AMERICAN FIREPROOFING Rejected Change Order -Additional fireproofing on exisiting 79,335.06 3,939.15 83,274.21 members FEBRUARY GLE ASSOCIATES Asbestos abatement 5,872.50 291.58 6,164.08 FEBRUARY GLE ASSOCIATES Lead abatement 27,537.72 1,367.30 28,905.02 FEBRUARY WPM Fillmore parking modifications 1,405.00 69.76 1,474.76 FEBRUARY WPM Dewatering for MC Dean ductbank 4,931.00 244.83 5,175.83 FEBRUARY WPM Pump Roof Drain Manhole 3,994.00 198.31 4,192.31 FEBRUARY WPM Pump Roof Drain Manhole 5,883.00 292.10 6,175.10 FEBRUARY FLORIDA BLACKTOP Fillmore parking modifications 4,552.00 226.02 4,778.02 FEBRUARY ACOUSTI East Facade Exterior Stucco (810135) 312,004.51 15,491.67 327,496.18 FEBRUARY BANKER Fabrication and Installation of Floor Boxes 200,000.00 9,930.41 209,930.41 FEBRUARY BRAZOS Spray Fireproofing - Pending OCO 83,000.00 4,121.12 87,121.12 FEBRUARY EUGENIO PAINTING Temp work for Art Basel - Dec C/O to be voided -23,916.00 -1,187.48 -25,103.48 FEBRUARY MCDEAN Temp work for Art Basel - Dec C/O to be voided -77,123.00 -3,829.32 -80,952.32 FEBRUARY CAMARATA December amount adjusted - correct typo -300.00 -14.90 -314.90 FEBRUARY JAFFER Correction - November CO reversal was incorrectly listed - 17,000.00 844.09 17,844.09 C/O to subcontractor was issued. FEBRUARY JAFFER Scope Reducion -24,000.00 -1,191.65 -25,191.65 FEBRUARY FLORIDA CIVIL Dewatering plan modification 9,202.00 456.90 9,658.90 FEBRUARY BANKER East facade acceleration 150,338.00 7,464.59 157,802.59 FEBRUARY BANKER Supply floor opening penetration north addition 100,000.00 4,965.21 104,965.21 SUBTOTAL 1,712,844.07 85,046.26 1,797,890.33 MARCH BRAZOS Scope Change - Interim Funding -83,000.00 -4,121.12 -87,121.12 MARCH CAMARATA Z -Wall Infills & Patching 5,309.00 263.60 5,572.60 MARCH ACOUSTI Temp work for Art Basel 8,765.10 435.21 9,200.31 MARCH ACOUSTI East Concourse - Unforseen conditions 88,210.00 4,379.81 92,589.81 MARCH DECON Lead abatement 219,342.00 10,890.78 230,232.78 MARCH EAST COAST METALS Temp work for Art Basel 20,600.00 1,022.83 21,622.83 MARCH BANKER Supply Floor opening penetration - N. Addition 133,253.00 6,616.29 139,869.29 MARCH BANKER CM RFI 2575 Beam @ Level 3 4,608.00 228.80 4,836.80 MARCH BANKER CM - RFI 2617 East Facade Plates 7,804.00 387.48 8,191.48 Exhibit B1 Page 4 of 8 MONTH MARCH MARCH MARCH MARCH MARCH SUBCONTRACTOR NFP NFP NASH NASH HJ Foundation SUBTOTAL APRIL - Interim NASH APRIL - Interim NFP APRIL - Interim ALPHA APRIL - Interim ALPHA APRIL - Interim ALPHA APRIL - Interim WPM APRIL - Interim WPM APRIL - Interim WPM APRIL - Interim WPM APRIL - Interim WPM APRIL - Interim R&M APRIL - Interim R&M APRIL - Interim R&M APRIL - Interim R&M APRIL - Interim CAMARATA APRIL - Interim CAMARATA APRIL - Interim CAMARATA APRIL - Interim CAMARATA APRIL - Interim CM Fee APRIL - Interim CM Fee/Banker APRIL - Interim Banker APRIL - Interim TruSteel APRIL - Interim American Fireproofing APRIL - Interim Agyle APRIL - Interim OTIS APRIL - Interim Eugenio APRIL - Interim SAS APRIL - Interim Honeywell APRIL - Interim Honeywell APRIL - Interim HJ Foundation APRIL - Interim HJ Foundation APRIL - Interim HJ Foundation APRIL - Interim HAYWARD BAKER SUBTOTAL APRIL APRIL APRIL APRIL APRIL APRIL APRIL APRIL APRIL APRIL APRIL APRIL APRIL APRIL APRIL MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY MAY EAST COAST METALS EAST COAST METALS Staging Concepts Tecta ISEC Harmon Harmon Acousti Acousti Acousti Acousti MCDean MCDean Trident Arazoza SUBTOTAL Tate Ornamental Hollywood Woodwork Won -Door Over head door Dash Door Florida Blacktop Florida Blacktop Florida Blacktop Duffy Lee David Allen HUFCOR Baring Decon Decon Decon Decon CDPW CDPW CDPW Florida Civil SUBTOTAL EXHIBIT B1 DESCRIPTION Settlement - Reverse Interim Funding (June) Settlement - CM Contribution Settlement - Reverse Interim Funding (June) Settlement - CM Contribution Plant fee for opening Settlement - CM Contribution - Settlement correction Settlement - CM Contribution - Settlement correction Settlement - Reverse Interim Funding (June) Settlement - Reverse Interim Funding (July) Settlement - CM Contribution Settlement - Reverse Interim Funding (Jan) Settlement - Reverse Interim Funding (Feb) Settlement - Reverse Interim Funding (Dec) Settlement - Reverse Interim Funding (Feb) Settlement - CM Contribution Settlement - Reverse Interim Funding (July) Settlement - Reverse Interim Funding (June) South FP&L Vault - Added Mat for Footing & Walls Settlement - CM Contribution Temporary work for Art Basel 16 Settlement - Reverse Interim Funding (April) Settlement - Reverse Interim Funding (March) Settlement - CM Contribution Settlement - Change Order 34 Settlement - Change Order 43 Settlement - CM Contribution Settlement - CM Contribution Settlement - CM Contribution Settlement - CM Contribution Elevator 16.02 pit fill - Reclassed to CM from Allowance Settlement - CM Contribution Settlement - CM Contribution Settlement - Reverse Interim Funding (Sept) Settlement - CM Contribution Settlement - Reverse Interim Funding (June) Settlement - Reverse Interim Funding (March) Settlement - CM Contribution Settlement - CM Contribution Settlement - Reverse CM Contribution (March) Settlement - CM Contribution Settlement - CM Contribution Settlement - CM Contribution Settlement - CM Contribution Settlement - Reverse Interim Funding (June) Settlement - CM Contribution Settlement - Reverse CM Contribution (Sept) Settlement - Reverse CM Contribution (March) Settlement - Reverse CM Contribution (Feb) Settlement - CM Contribution Settlement - Reverse CM Contribution (July & Nov) Settlement - CM Contribution CM Interim Funding - CCD 21 - Kitchen Floor Settlement - CM Contribution Settlement - CM Contribution Settlement - CM Contribution Settlement - CM Contribution Settlement - CM Contribution Settlement - CM Contribution Settlement - Reverse Interim Funding (June) Settlement - CM Contribution Settlement - Reverse CM Contribution (Sept) Settlement - Reverse CM Contribution (March) Settlement - Reverse CM Contribution (Feb) Settlement - CM Contribution Settlement - Reverse CM Contribution (July & Nov) Settlement - Reverse CM Contribution (July & Nov) Settlement - Reverse CM Contribution (March) Settlement - Reverse CM Contribution (July & Nov) Settlement - Reverse CM Contribution (July & Nov) Settlement - Reverse CM Contribution (July & Nov) Settlement - Reverse CM Contribution (July & Nov) Settlement - Reverse CM Contribution (July & Nov) CM Interim Funding - CCD 21 - Kitchen Floor Exhibit B1 Page 5 of 8 AMOUNT MARK -Ups* -400,000.00 -19,860.83 600,415.00 29,811.85 -721,426.00 -35,820.30 1,260,871.89 62,604.90 1,150.00 57.10 1,145,901.99 56,896.41 -59,643.89 -2,961.44 -28,402.18 -1,410.23 -420,000.00 -20,853.87 -330,000.00 -16,385.18 285,709.00 14,186.04 -4,685.00 -232.62 -5,883.00 -292.10 -192,869.95 -9,576.39 -4,931.00 -244.83 814,668.00 40,449.95 -700,000.00 -34,756.45 -2,000,000.00 -99,304.14 94,098.00 4,672.16 2,408,478.00 119, 585.92 1,806.31 89.69 -1,806.31 -89.69 -5,309.00 -263.60 331,166.00 16,443.08 6,000.00 297.91 96,710.00 4,801.85 3,712,187.00 184, 317.77 71,953.00 3,572.62 34,622.00 1,719.05 301,060.00 14,948.25 2,696.00 133.86 53,589.00 2,660.80 40,441.00 2,007.98 -450,000.00 -22,343.43 873,073.00 43,349.88 -141,000.00 -7,000.94 -1,150.00 -57.10 119,311.00 5,924.04 77,272.00 3,836.71 4,979,158.98 247,225.56 -20,600.00 -1,022.83 112,897.00 5,605.57 36,127.00 1,793.78 118,919.00 5,904.57 60,212.00 2,989.65 -160,000.00 -7,944.33 782,755.00 38,865.41 -500,000.00 -24,826.04 -23,501.00 -1,166.87 -312,005.00 -15,491.69 1,655,829.00 82,215.34 -938,643.00 -46,605.57 2,108,923.00 104,712.39 30,000.00 1,489.56 -20,472.00 -1,016.48 2,930,441.00 145, 502.46 50,369.00 2,500.93 -1,204.00 -59.78 30,106.00 1,494.83 21,545.00 1,069.75 6,021.00 298.96 -366,867.00 -18,215.71 -4,552.00 -226.02 106,876.00 5,306.61 -36,127.00 -1,793.78 16,558.00 822.14 13,758.00 683.11 38,235.00 1,898.45 -833,128.00 -41,366.53 -219,342.00 -10,890.78 -815,476.00 -40,490.07 752,649.00 37,370.58 -275,404.00 -13,674.38 78,655.00 3,905.38 -4,243.00 -210.67 22,920.00 1,138.03 -1,418,651.00 -70,438.96 TOTAL COST - 419,860.83 630,226.85 - 757,246.30 1,323,476.79 1,207.10 1,202,798.40 -62,605.33 -29,812.41 -440,853.87 -346,385.18 299,895.04 -4,917.62 -6,175.10 -202,446.34 -5,175.83 855,117.95 -734,756.45 -2,099,304.14 98,770.16 2,528,063.92 1,896.00 -1,896.00 -5,572.60 347,609.08 6,297.91 101,511.85 3,896,504.77 75, 525.62 36, 341.05 316,008.25 2,829.86 56,249.80 42,448.98 -472,343.43 916,422.88 -148,000.94 -1,207.10 125,235.04 81,108.71 5,226,384.54 -21,622.83 118,502.57 37,920.78 124,823.57 63,201.65 -167,944.33 821,620.41 -524,826.04 -24,667.87 -327,496.69 1,738,044.34 -985,248.57 2,213,635.39 31,489.56 -21,488.48 3,075,943.46 52,869.93 -1,263.78 31,600.83 22,614.75 6,319.96 -385,082.71 -4,778.02 112,182.61 -37,920.78 17,380.14 14,441.11 40,133.45 -874,494.53 -230,232.78 -855,966.07 790,019.58 -289,078.38 82,560.38 -4,453.67 24,058.03 -1,489,089.96 MONTH SUBCONTRACTOR DESCRIPTION EXHIBIT B1 AMOUNT MARK -Ups* TOTAL COST JUNE WPM Crane Pads @ west Side & South Loading dock 204,791.41 10,168.32 214,959.73 JUNE OTIS Settlement - CM Contribution 86,770.00 4,308.31 91,078.31 JUNE Underpower Settlement - CM Contribution 1,204.00 59.78 1,263.78 JUNE Underpower Settlement - Reverse CM Contribution (Dec) -1,938.98 -96.27 -2,035.25 SUBTOTAL 290,826.43 14,440.13 305,266.56 JULY R&M AESS Steel Shoring 166,517.00 8,267.91 174,784.91 JULY R&M AESS Steel Shoring 72,242.00 3,586.96 75,828.96 JULY Banker CM - RFI 2396 Baseplate conflict w/ rainwater pipes - ECO 3,681.00 182.77 3,863.77 JULY Banker CM - RFI 2465.1 Steel Support Beam Conflict - CR 303 - 7,656.00 380.14 8,036.14 JULY Tru -Steel Reinstallation and Repair of Catwalk - CO#8 86,885.37 4,314.04 91,199.41 JULY Tru -Steel Field Order 4 Revisions at the East Helix Roof - CO#9 36,669.67 1,820.73 38,490.40 JULY NASH PH 2 Dewatering for Plumbing Work - ECO #21 129,367.22 6,423.35 135,790.57 JULY Ford AV Global Settlement - CM Settlement Adjustment ECO #2 -72,584.00 -3,603.95 -76,187.95 JULY FL Blacktop Temp Asphalt for May 2017 Turnover 55,233.86 2,742.48 57,976.34 JULY Smith Fence Barricades - ECO#8 192,556.47 9,560.83 202,117.30 JULY Smith Fence Fence Reconciliation through Feb 2017 - ECO#9 53,050.13 2,634.05 55,684.18 JULY Smith Fence Allowance for Future Fence Work - ECO#10 125,000.00 6,206.51 131,206.51 SUBTOTAL 856,274.72 42,515.81 898,790.53 AUGUST Alpha ECO#19 CM Settlement 376,600.00 18,698.97 395,298.97 AUGUST Camarata Masonry May 2017 Turnover Premium Time 15,701.00 779.59 16,480.59 AUGUST Banker Steel ECO#24 - CM RFI 2415 CMU Pocket Alternate Detail 32,724.00 1,624.81 34,348.81 AUGUST Banker Steel ECO#25 - CM RFI 2565 East Facade Differing Site 3,537.00 175.62 3,712.62 Conditions at Top of Wall AUGUST Banker Steel ECO#27 - CM Banker Settlement 460,000.00 22,839.95 482,839.95 AUGUST Banker Steel ECO#28 - Banker scope Deduct for Allowance 5 -250,000.00 -12,413.02 -262,413.02 AUGUST TRUSTEEL ECO#10 CM Settlement 33,017.15 1,639.37 34,656.52 AUGUST Acousti ECO#25 - CM PH1 Water Damage Drywall & Temp Roof 17,442.93 866.08 18,309.01 Repairs at East Concourse AUGUST Acousti ECO#28 CM Settlement 329,000.00 16,335.53 345,335.53 AUGUST Florida Blacktop ECO#05 Asphalt Patching on Washington Ave for MLB 1,271.05 63.11 1,334.16 Fanfest Show AUGUST CDPW ECO#5 - Phase 2 Area Al West Damaged Suction and 4,402.65 218.60 4,621.25 Layflat Hoses AUGUST CDPW ECO#6 - Phase 2 Dewatering Zone 4 & 7 Septic Tank 10,545.00 523.58 11,068.58 Installation AUGUST CDPW ECO#7 - Phase 2 Dewatering Zone 2 Sanitary Run 8,335.51 413.88 8,749.39 SUBTOTAL 1,042,576.29 511766.07 1,094,342.36 SEPTEMBER American Fireproofing ECO#06 - CM Settlement 20,774.00 1,031.47 21,805.47 SEPTEMBER Argyle ECO#04 - CM Settlement for door replacements &, 76,508.98 3,798.83 80,307.81 adjustments SEPTEMBER MC Dean ECO#21 - CM Settlement 145,000.00 7,199.55 152,199.55 SEPTEMBER Trident ECO#02 - Reverse Interim funding for CCD -21 - kitchen -30,000.00 -1,489.56 -31,489.56 floor SUBTOTAL 212,282.98 10,540.29 222,823.27 OCTOBER WPM ECO#23 - CM Settlement for various sitework issues 243,000.00 12,065.45 255,065.45 OCTOBER East Coast ECO#05 - CM Settlement for miscellaneous metals scope 54,720.93 2,717.01 57,437.94 OCTOBER Tecta ECO#11 - CM Settlement for various roofing issues 50,000.00 2,482.60 52,482.60 OCTOBER MC Dean ECO#21 - September CM Settlement - reversed -145,000.00 -7,199.55 -152,199.55 OCTOBER MC Dean ECO#21 -CM Settlement 151,000.00 7,497.46 158,497.46 OCTOBER Brazos ECO#05 - CM Settlement 4,140.00 205.56 4,345.56 OCTOBER Harmon ECO#08 - CM Settlement for various curtainwall issues 60,000.00 2,979.12 62,979.12 OCTOBER Acousti ECO#39 - RFI 2846 Ceiling enclosure for chiller plant 52,745.02 2,618.90 55,363.92 OCTOBER Duffy Lee ECO#05 - CM Settlement for extra floor leveling and 19,935.00 989.81 20,924.81 transitions OCTOBER Eugenio ECO#08 - CM Settlement for additional painting scope due 31,255.00 1,551.88 32,806.88 to field conditions OCTOBER CDPW ECO#08 - CM Settlement for additional dewatering scope 53,394.30 2,651.14 56,045.44 OCTOBER R&M ECO#28 - Acceleration and interim funding for hurricane 144,740.00 7,186.64 151,926.64 prep SUBTOTAL 719,930.25 35,746.03 755,676.28 TOTAL SINCE INCEPTION $23,569,849.43 $1,170,291.84 $24,740,141.27 General Requirements MONTH SUBCONTRACTOR 4E VJ2IPTIOIy AMOUNT MARK -Ups* TOTAL COST MAY GEOSYNTEC DMA approval $57,690.75 $2,864.47 $60,555.22 SUBTOTAL 57,690.75 2,864.47 60,555.22 JUNE LIFE SAFETY Costs associated with the separation and life safety costs SUBTOTAL Exhibit B1 Page 6 of 8 500,000.00 24,826.04 524,826.04 500,000.00 24,826.04 524,826.04 EXHIBIT B1 MONTH SUBCONTRACTOR DESCRIPTION AMOUNT MARK -Ups* TOTAL COST JULY ACOUSTI Procurement realocation from CM cont. for temporary wall 132,953.01 6,601.39 139,554.40 JULY BISCAYNE ENGINEERING Procurement realocation from CM cont. for Surveying - 75,000.00 3,723.91 78,723.91 Increase Contract JULY GEOSYNTEC Procurement realocation from CM cont. for NPDES permits 13,348.06 662.76 14,010.82 JULY GEOSYNTEC Procurement realocation from CM cont. for NPDES permits 88,355.59 4,387.04 92,742.63 JULY HURRICANE PROTECTION Procurement realocation from CM cont. for Hurricane 50,000.00 2,482.60 52,482.60 Preparation JULY MICHEAL WOOD Procurement realocation from CM for FDEP permits 3,192.90 158.53 3,351.43 JULY MODSPACE Procurement realocation from CM for Owner Trailer 30,893.69 1,533.94 32,427.63 JULY OWNER COST Realocation from CM for Life Safety expenses (ie Fire 320,922.14 15,934.45 336,856.59 Watch) JULY OWNER - Fentress Architects CM expense for additional Design Team site visits and 148,000.00 7,348.51 155,348.51 Onsite Visits alternate design configurations SUBTOTAL 862,665.39 42,833.12 905,498.51 AUGUST BISCAYNE ENGINEERING Procurement realocation from CM for additional Surveying - 150,000.00 7,447.81 157,447.81 contract increase AUGUST VALLEY FIELD Cost for the repair of damaged irrigation lines at Filmore 1,538.00 76.36 1,614.36 AUGUST OWNER COST Realocation from CM for Life Safety expenses (ie Fire -320,922.14 -15,934.45 -336,856.59 Watch) AUGUST OWNER COST Realocation from CM for Life Safety expenses (ie Fire 370,138.10 18,378.12 388,516.22 Watch) AUGUST BRAND ENERGY Procurement realocation from CM for scaffolding 35,689.00 1,772.03 37,461.03 AUGUST OWNER - Fentress Architects CM expense for additional Design Team site visits and -148,000.00 -7,348.51 -155,348.51 Onsite Visits alternate design configurations - ERROR AUGUST OWNER - Fentress Architects CM expense for additional Design Team site visits and 148,999.00 7,398.11 156,397.11 Onsite Visits alternate design configurations - ACTUAL SUBTOTAL 237,441.96 11,789.49 249,231.45 SEPTEMBER OWNER COST Realocation from CM for Life Safety expenses (ie Fire -370,138.10 -18,378.12 -388,516.22 Watch) SEPTEMBER OWNER COST Realocation from CM for Life Safety expenses (ie Fire 391,261.00 19,426.92 410,687.92 Watch) SEPTEMBER MICHEAL WOOD Procurement realocation from CM for FDEP permits 10,080.00 500.49 10,580.49 SEPTEMBER BRAND ENERGY Procurement realocation from CM for scaffolding -35,689.00 -1,772.03 -37,461.03 OCTOBER ACOUSTI Temp exterior impact partition - GR 87,060.84 4,322.75 91,383.59 SEPTEMBER GLE Haz-mat survey west concourse 18,570.00 922.04 19,492.04 SUBTOTAL 101,144.74 5,022.05 106,166.79 OCTOBER GLE Haz-Mat survey west concourse -18,570.00 -922.04 -19,492.04 OCTOBER OWNER COST Realocation from CM for Life Safety expenses (ie Fire -391,261.00 -19,426.92 -410,687.92 Watch) OCTOBER OWNER COST Realocation from CM for Life Safety expenses (ie Fire 401,877.54 19,954.05 421,831.59 OCTOBER ACOUSTI OCTOBER ACOUSTI OCTOBER ACOUSTI SUBTOTAL Watch) Temp exterior impact partition - GR Credit for Bond Rate Adjustment Hurricane Matthew Preparation - October 16 -87,060.84 -4,322.75 -91,383.59 -431.00 -21.40 -452.40 12,298.16 610.63 12,908.79 -83,147.14 -4,128.43 -87,275.57 NOVEMBER ACOUSTI Hurricane Matthew Preparation - October 16 -12,298.16 -610.63 -12,908.79 NOVEMBER HURRICANE PROTECTION Additional funds for Hurricane Protection 15,000.00 744.78 15,744.78 NOVEMBER HURRICANE PROTECTION Additional funds for Hurricane Protection 16,000.00 794.43 16,794.43 NOVEMBER SCAFFOLDING SHRINKWRAP Temp work for Art Basel - Engineering for NE egress tunnel 2,875.00 142.75 3,017.75 NOVEMBER SCAFFOLDING SHRINKWRAP Extended rental for East Concourse 33,535.00 1,665.08 35,200.08 NOVEMBER SCAFFOLDING SHRINKWRAP Adjustments to East Concourse 11,955.00 593.59 12,548.59 SUBTOTAL 67,066.84 3,330.01 70,396.85 DECEMBER EVENTSTAR Temp work for Art Basel - metal stairs DECEMBER HURRICANE PROTECTION Additional funds/NASH DECEMBER HURRICANE PROTECTION Additional funds for Hurricane Protection DECEMBER GEOSYNTEC Environmental Consultant DECEMBER OWNER COST Reallocation from CM for Life Safety expenses (ie Fire Watch) Exhibit B1 Page 7 of 8 56,828.00 2,821.63 59,649.63 20,000.00 993.04 20,993.04 15,000.00 744.78 15,744.78 8,545.00 424.28 8,969.28 -401,877.54 -19,954.05 -421,831.59 MONTH SUBCONTRACTOR DECEMBER OWNER COST DECEMBER TRUSTEEL SUBTOTAL JANUARY OWNER COST JANUARY OWNER COST JANUARY FPL/FILMORE VAULT SUBTOTAL FEBRUARY OPTIKA FEBRUARY OWNER - Fentress Architects Onsite Visits FEBRUARY GLE FEBRUARY FEBRUARY MARCH MARCH MAY MAY JUNE JUNE JULY JULY JULY JULY Hurricane Protection TRUSTEEL SUBTOTAL BISCAYNE ENGINEERING Walter P Moore SUBTOTAL Acousti Acousti SUBTOTAL Tecta Eugenio SUBTOTAL Acousti Acousti Tecta Euaenio SOTAL TOTAL SINCE INCEPTION EXHIBIT B1 PESCRIPTIOft Reallocation from CM for Life Safety expenses (ie Fire Watch) Temporary Bracing Reallocation from CM for Life Safety expenses (ie Fire Watch) Reallocation from CM for Life Safety expenses (ie Fire Watch) Vault upgrade at Fillmore Misc Invoices - Art Basel 2016 CM expense for additional Design Team site visits and alternate design configurations October - GLE correction no credit was given This is GLE Base Contract Credit for monies not used Rein. Existing Catwalk Grating Survey - Contract increase Weekly site visits FO #5 - Temporary Lid for Electrical Room 1.06/1.09 May 2017 Turn over Temp Waterpffoing - May Tumover Painting of AESS Welds - GR FO #5 - Temporary Lid for Electrical Room 1.06/1.09 (Reverse - Paid thru GR) May 2017 Tum over (Reverse - Paid thru GR) Temp Waterpffoing - May Tumover (Paid thru GR) Painting of AESS Welds - GR TOTALS Buyout Trade Costs General ) eguirements Total CM Contingency Use * Mark ups include insurance, bond and CM fees. **May amounts are $156,070 lower than reported in May due to the reconciliation/audit process. Exhibit B1 Page 8 of 8 AMOUNT MARK -Ups" TOTAL COST 464,173.00 23,047.15 487,220.15 2,531.00 125.67 2,656.67 165,199.46 8,202.50 173,401.96 -464,173.00 -23,047.15 -487,220.15 509,844.00 25,314.81 535,158.81 70,144.00 3,482.79 73,626.79 115,815.00 5,750.45 121,565.45 9,588.00 476.06 10,064.06 112,649.00 5,593.26 118,242.26 18,570.00 922.04 19,492.04 -15,000.00 -744.78 -15,744.78 75,000.00 3,723.91 78,723.91 200,807.00 9,970.48 210,777.48 135,574.00 6,731.53 142,305.53 65,000.00 3,227.38 68,227.38 200,574.00 9,958.91 210,532.91 41,125.00 2,041.94 43,166.94 300,132.37 14,902.19 315,034.56 341,257.37 16,944.14 358,201.51 30,000.00 1,489.56 31,489.56 105,558.85 5,241.22 110,800.07 135,558.85 6,730.78 142,289.63 -41,125.00 -2,041.94 -43,166.94 -300,132.37 -14,902.19 -315,034.56 -30,000.00 -1,489.56 -31,489.56 -105,558.85 -5,241.22 -110,800.07 -476,816.22 -23,674.91 -500,491.13 $2,425,258.00 $120,419.08 $2,545,677.08 $1,202,676.00 $59,715.35 $1,262,391.35 23,569,849.43 1,170,291.84 24,740,141.27 2,425,258.00 120,419.08 2,545,677.08 $27,197,783.43 $1,350,426.28 $28,548,209.71 EXHIBIT B2 Miami Beach Convention Center Expansion & Renovation Project Owner's Contingency Report Through October 2017 SUMMMARY ORIGINAL OWNER'S CONTINGENCY $35,000,000 MODIFICATIONS (ADDS) Bond offering additional proceeds Total Modifications $147,449 $147,449 USES Jun 2016 4,630 Jul 2016 Aug 2016 29,967 Sep 2016 Oct 2016 2,518,080 Nov 2016 (96,710) Dec 2016 179,685 Jan 2017 794,486 Feb 2017 (58,386) Mar 2017 4,321,164 Apr 2017 16,125,999 May 2017 - Jun 2017 78,710 Jul 2017 (16,224) Aug 2017 (1,465,262) Sep 2017 131,865 Oct 2017 4,378,844 Total Use 26,926,847 TOTAL CONTINGENCY USE ($26,779,398) REMAINING OWNER'S CONTINGENCY $8,220,602 Mlim Month Change Order Description Trade Cost Mark-ups AMOUNT Deductive change order against CM's contingency for extra site visits by design team June 32 -148,999 June 34 Deductive change order against's CM's fee for design remediation work - -6,000 June 35 Additional fire rated 2nd floor service corridor wall 107,850 5,355 113,205 June 36 Additional construction fence panels 44,228 2,196 46,424 SUBTOTAL 152,078 7,551 4,630 August 40 New 8" sanitary sewer line on Washington Avenue 28,549 1,418 29,967 SUBTOTAL 28,549 1,418 29,967 October N/A US Cost - GMP Reconciliation 945,080 October N/A Permit & Plan Reviews 855,000 October N/A Design Miami 2016 - Generators 408,000 Additional amount needed for the first 12 months of warehouse lease payments for October N/A Spectra Staff (Total costs of months 1-12: 531,316.50) 287,800 October N/A Spectra - Cost associated with relocation of the warehouse equipment 22,200 SUBTOTAL 2,518,080 Clark / Banker backcharge for additional structural engineering services approved for November 43 Fentress in Amendment 20. -96,710 SUBTOTAL -96,710 December N/A Design budget adjustment to increase Fentress PO through Amendment 23. 179,685 SUBTOTAL 179,685 January N/A Design budget adjustment to increase Fentress PO through Amendment 24 18,625 January 52 Additional cost of generator 319,161 15,847 335,007 January 57 Honeywell GMP Reconciliation Interim Funding 420,000 20,854 440,854 SUBTOTAL 739,161 36,701 794,486 Clark backcharge for additional structural engineering services required due to non - February 54 conforming work -20,000 Clark backcharge for extra design team site visits and additional structural February 55 engineering design changes requested by Clark -112,649 February 56 Switchgear replacement due to arc flash incident 70,750 3,513 74,263 SUBTOTAL 70,750 3,513 -58,386 Exhibit B2 Page 1 of 2 EXHIBIT B2 Month Change Order Description Trade Cost Mark-ups AMOUNT March 58 Nash - GMP Reconciliation 2,729,128 198,112 2,927,240 March 61 NFP - GMP Reconciliation 1,299,585 94,339 1,393,924 SUBTOTAL 4,028,713 292,451 4,321,164 April 64 Reverse Nash - GMP Reconciliation (2,729,128) (198,112) -2,927,240 April 64 Reverse NFP - GMP Reconciliation (1,299,585) (94,339) -1,393,924 April 65 Removal of Park Allowance from Clark's GMP (10,000,000) - -10,000,000 April 66 GMP Reconciliation 37,627,222 1,808,836 39,436,058 April 67 GMP Reconciliation - Pre -Construction Services fee balance 1,037,626 1,037,626 April N/A Reimbursement of Design Miami 2016 generators cost per Resolution 2017-29830 -408,000 Reimbursement of temporary FPL service for Art Basel 2016 per Resolution 2017 - April N/A 29830 -148,726 April N/A Reimbursement of Spectra's building operation costs per Resolution 2017-29830 -518,000 April N/A Remove additional funds previously allocated to FF&E -250,000 April N/A Remove additional funds previously added to raise Carl Fisher Clubhouse -1,000,000 April N/A Close PO for Clark Pre -GMP CM Fee -1,037,629 Reimbursement of stormwater infrastructure / road raising per Resolution 2017 - April N/A 29829 -4,513,591 Re -roofing of existing building structure (funded from separate capital renewal and April N/A replacement project) -1,689,254 Reimbursement of temporary kitchen trailer costs for Art Basel 2016 per Resolution April N/A 2017-29830 -76,267 April N/A Reimbursement of temporary partition per Resolution 2017-29830 -1,010,500 Reimbursement of Art Basel temporary work for 2016 show per Resolution 2017 - April N/A 29830 -2,542,220 April N/A P -Lot Park allowance 5,000,000 April N/A Additional allocation for permit fees 39,800 April N/A Design budget adjustment to increase Fentress PO through Amendment 26 27,610 April N/A Cost estimating budget reduction -302,202 April N/A Budget reduction for miscellaneous (Other) costs -1,597,542 SUBTOTAL 24,636,/35 1,516,385 16,125,999 June N/A JLL Amendment No. 9 - Additional consulting services 160,000 Fentress Amendment 28 - design revisions associated with relocation of 19th St June N/A pump station - 2,585 Mark-ups associated with re -roofing scope of work - funded from separate capital June N/A renewal and replacement project -83,875 SUBTOTAL 78,710 July 68 Additional power requirements necessary in the DMARC room 4,812 239 5,051 July 73 Reverse CO 56 - MC Dean (70,750) (3,513) -74,263 Additional door hardware at East Concourse to accommodate the needs of the July 75 events, building operator and project phasing. 50,481 2,506 52,987 SUBTOTAL (15,457) (767) -16,224 August 76 Scope removal - Canal Seawall (1,500,000) (74,478) -1,574,478 Addition of a drywall soffit at East Concourse - work associated with acoustical panel August 77 ceiling connection issues. 45,990 2,284 48,274 Deductive change order to cover additional arch / eng services performed by NE due August 78 to non conforming field conditions related to RFI 3251 / NCR 1255 -20,875 August 79 Installation of water meters 1,959 97 2,056 August 81 Field modification of urinal screens as directed by the NE for ADA compliance 1,226 61 1,287 Construction Change Directive #022 - new sanitary sewer line for Carl Fisher August 82 Clubhouse 74,315 3,690 78,005 August 87 Repairs to fire protection line in north loading dock damaged during an event 447 22 469 SUBTOTAL (1,376,063) (68,324) -1,465,262 September 88 Deductive change order against CM Contingency for additional design services -10,000 September 89 Cost above the GMP allowance for the rooftop ballroom trellis 22,652 1,125 23,777 September 90 Additional cost associated with weatherproofing the rooftop parking crash walls 60,955 3,027 63,982 September 92 Fire rated enclosure around gas line in egress area required by Code 10,849 539 11,388 September 94 AIPP - De -scope expansion joint covers for Sarah Morris walls (1,420) (70) -1,491 September N/A Design budget adjustment to increase Fentress PO through Amendment 33 44,210 SUBTOTAL 93,036 4,619 131,865 CCD 021 - DRER Sewer main revisions, Convention Center Dr. and Meridian Road October 74 grading and reconfiguration revisions, and South Dock grading revisions 360,980 17,924 378,904 October 96 Builders Risk Claim - Rain Event 8/1/17 1,696,601 84,240 1,780,841 October N/A Budget reallocation to Other for utilities bills 1,277,579 October N/A Budget reallocation to Legal for monthly outside legal council 110,000 October N/A Budget reallocation for Testing / Inspections 831,520 SUBTOTAL 2,057,581 102,163 4,378,844 TOTAL SINCE INCEPTION 30,414,484 1,895,709 26,926,847 Exhibit B2 Page 2 of 2 % of Total Hours Worked EXHIBIT C LOCAL WORKER UTILIZATION REPORT BY PROJECT CLARK CO TRUcTl N From Date: 10/1/15 To Date: 10/31/17 Total Number % of Total of Workers Workers Total Hours Worked Zip Lists Miami Beach 60 Miami Dade County 3,163 Employees Not in Specified Zip 1,795 1.20% 63.03% 35.77% 36,368 1,339,163 1,001,746 1.53 % 56.33% 42.14% Demographic Profile African American 947 18.87% 308,793 12.99% Native American 9 0.18% 5,597 0.24% Asian 12 0.24% 3,927 0.17% Hispanic 2,075 41.35% 1,033,328 43.47% Caucasian 608 12.12% 264,905 11.14% Other 1,367 27.24% 760,726 32.00% Male 4,842 96.49% 2,321,961 97.67% Female 176 3.51% 55,315 2.33% Veteran 1 0.02% 752 0.03% Disadvantaged 1 0.02% 18 0.00% Total Employees 5,018 2,377,276 tpq EXHIBIT D iIIIINfflIIIIIillglpll�ui�u�ll+� "'tltt, MIAMI BEACH CONVENTION CENTER October 2017 - Media Report Miami Beach Convention Center Renovation Project Social Media Posts for October 2017 111 City of Miami Beach Government Washington Avenue between Dade Boulevard and 17 Street w:ll be closed today from 5 PM t0 midnight 10r the BE 1 Awards at i tie F: 'mote Miami Beach et the Jackie Gleason Theater e1JBCCFure Read more here http //bh.ry/2sSmOr Miami Beach Convention Center Posted to Facebook - Published October 6, 2017 ■City of Miami Beach Government Octevv Waahntgton Avenue between Dade Boulevard and 17 Street will be closed Fdday, October 6 between 5 PM and midnight for the BET Awards 0t The Fillnwre Miami Beach at the Jackie Gleason Theater. Please drive safely. IMBCCFuture Miami Beach Convention Center Posted to Facebook - Published October 11, 2017 _ Miami Beach Convention Center shared City M Miami 8 h Govnnnteni ti POG' Ower. e N c c. ,t MAem Beed.aoewwr.nt watn+gpn 0011.10 MAW Ow 8000~0 0077503.000003.00 way son a pmts. moonlit to e. BET Awwb at the Farre. RUM arch w IMAM* Oilman newer wredcPW.e Mies re= hoc mseribalyaedhDe Mem, Beata Gormwo00 C.Mar t 0. ■ eaeen.m Posted to Facebook - Published October 6, 2017 Miami Beach Convention Center October 11 N Great news for Miami, Art Basel confirmed for 5 more years at the Convention Center/ PMBCCfuture t$themiamibeachec www.mbccfuture.com Art Basel Agrees to Five More Years at the Miami Beach Convention Center l� Like * Comment Posted to Facebook - Published October 11, 2017 City of Miami Beach 1 1700 Convention Center Drive Miami Beach, FL 33139 1 305.673.7010 1 www.mbccfuture.com 0pllilliillillill111111 00101ll,,,itiiiiiittttt44.' MIAMI BEACH CONVENTION CENTER Miami Beach Convention Center October 10 ri View of MBCC on Convention Center Drive. fkMBCCfuture themiamibeachcc ruction Pr rens "" -16410 of Co .tum Cuter rive 14 Like * Comment Posted to Facebook - Published October 10, 2017 themiamibeachcc Miami Beach Convention Center > Q • 41 likes themiamibeachcc Today was the unveiling of the new plaque to commemorate the hard work of the Mayor & City Commission on the Miami Beach... snore Posted to Instagram - Published October 13, 2017 IICity of Miami Beach Government October 13 A We're commemorating our Mayor & Commission's hard work with a plaque unveiling at the Miami Beach Convention Center today! Join us #MBCCFuture JOIN THE CITY OF MIAMI BEACH FOR A PLAQUE UNVEILING AT THE MIAMI BEACH CONVENTION CENTER To commamorole the Mere & City Commission o ware invrvmenlol In malting dr renovation al this slore-olLhe-ari lecdily a lop pr;ariry and ensuring a nmely delivery rridey, °thaw 13, 2017 10AM M.omi Beach Convennon Canter EA Lobby 1700 Canwnrim Cerner 0ri.e,. Komi Beach. n e.-... n.�ie`.n�-.• a `�. ro�2�.ns+-a`b rr.e�r. :.w cm .s°'r'wlrn metr1'�•r". Poste to Face oo - Pu . ishe •`cto . er 13, 2017 Mlaml Beach Convention Center shared City of Miami Beach — Government's post. October 23 at 12 35p • • City of Miami Beach Government October 23 at 11,12am • H Beginning this week, the Miami Beach Convention Center contractor will be Implementing a =To shift on 17 Street between Pennsylvania Avenue and Convention Center Drive In order to complete the installallan of an sanitary sewer line In this area. Westbound traffp In this area will be reduced to one lane. This work will last approximately one week. Glick hereto reed the lull advisory: http0lmallchl.mpmieb15c1513Bdfs7rtktedxa- 1117877 #MBCCFuture 1+ Like IF Comment Posted to Facebook - Published October 23, 2017 City of Miami Beach 1 1700 Convention Center Drive Miami Beach, FL 33139 1 305.673.7010 1 www.mbccfuture.com CONVENTION CENTER IICity of Miami Beach Government Beginning this week, the Miami Beach Convention Center contractor Will be implementing a traffic shift on 17 Street between Pennsylvania Avenue and Convent;on Center Drive in order 10 complete the installation 01 an sanitary sewer rine in this area. Westbound traffic in this area will be reduced to one lane. This work will last eppmzimetely one week. Click Mn to rood the full advisory: http:fImaIkhkmp/68b15c1513801v7dkfedxB-1117877 MBCCFvtun Posted to Facebook - Published October 23, 2017 U h - - .i. Rotwee/leo 0 City Of Miami Beach 0 @MiamiBeachNews . Oct 6 Washington Ave btwn Dade Blvd 817 ST will be closed TODAY from 5PM to v midnight for BET Awards at (3Ftlmo•, '. B. #MBCC Future #H,pHopAwards BET, IHipHopAwerds, Miami Beach Po'ce and MiarTBeachConvConter 0e Uso 0se Posted to Twitter - Published October 6, 2017 themiamibeachcc aulveahm vv h Basel Agrees to Five More Years al Miami Beach Convention Center LAVELLE SE Fl EMBER 29, M Q V 64 likes themiamibeachcc Great news for Miami, Art Basel confirmed for 5 more years at the Convention Center! #MBCCfuture @themiamibeachcc Posted to Instagram - Published October 11, 2017 themiamibeachcc Q 28 likes themiamibeachcc View of MBCC on Convention Center Drive. #MBCCfuture @themiamibeachcc OCTOBER 10 Posted to Twitter - Published October 10, 2017 City of Miami Beach 1 1700 Convention Center Drive Miami Beach, FL 33139 1 305.673.7010 1 www.mbccfuture.com MIAMI BEACH CONVENTION CENTER October 23 -Newsletter What's New? On the week of October 23, 2017, the contractor will be implementing a traffic shift on 17 Street between Pennsylvania Avenue and Convention Center Drive in order to complete the installation of an sanitary sewer line in this area. Westbound traffic in this area will be reduced to one lane. This work will last approximately one week. Please drive carefully and obey all traffic signals. Ongoing Work • The contractor continues to close the east and west sidewalks along Convention Center Drive from Dade Boulevard to 17 Street, in order to perform work safely • Access to City Hall will always be maintained from 17 Street and 18 Street Full closure of Convention Center Drive from 17 Street to Dade Boulevard. Motorists can access the City Hall parking garage from 18 Street and Meridian Avenue • 19 Street remains closed between Meridian Avenue and Convention Center Drive. Access to the Botanical Gardens and Holocaust Memorial parking lot and entrance will be maintained at all times via Meridian Avenue • Concrete pours continue on the north and south ends of the building. Due to the high volume of concrete and project related material being used, the contractor sometimes is required to begin this work during off peak hours between 3 a.m. and 7 a.m. The contractor has implemented noise reduction measures to minimize the impact to the community ent via E- • a - Published October 23, 2017 City of Miami Beach 1 1700 Convention Center Drive Miami Beach, FL 33139 1 305.673.7010 1 www.mbccfuture.com MIAMI BEACH CONVENTION CENTER October 23, 2017 - Newslette • All pedestrians are directed to use the north sidewalk of Dade Boulevard between Washington Avenue and Convention Center Drive, while the canal walk on the south side (along Collins Canal) remains closed • Washington Avenue traffic pattern remains one lane in each direction Construction hours on this project are from 6 a.m. to 10 p.m., Monday through Friday. Extended work hours and weekend work is approved in order to expedite the construction schedule and make up lost time due to the impact of Hurricane Irma. Increase of noise will) occur at various locations during the duration of the project. The contractor has implemented noise reduction measures to minimize the impact to the community. Adjacent Work • As part of the 19 Street Pump Station Installation Project, the canal walk along the Botanical Gardens between Convention Center Drive and Meridian Avenue will be closed to pedestrian access due to the reconstruction of the seawall. This work is expected to last approximately five months. These schedules may change due to the impact of Hurricane Irma and/or any other unforeseen circumstance. Sent via E -blast - Published October 23, 2017 City of Miami Beach 1 1700 Convention Center Drive Miami Beach, FL 33139 1 305.673.7010 1 www.mbccfuture.com MIAMI BEACH CONVENTION CENTER October 23, 2017 - Newslette LEGEND, MCC Renemllon. Stdwalk tecengrudion laroncel Garden. Vendor Enfrare. Sideem& Cks.d N dd, oe pod. Bled Rood dread FPL W♦ibank .Mhnen IP SI Pump Seonen - Sece«e II ReeanRueian T.dFc Shif1 O . wee+mund lana Inn plc., Eman" I' lncoln Lone Sent via E -b ast - Published October 23, 2017 City of Miami Beach 1 1700 Convention Center Drive Miami Beach, FL 33139 1 305.673.7010 1 www.mbccfuture.com