Resolution 2731 e.
RESOLUTION NO. Pi ':
BE IT RESOLVED BY THE CITY COUNCIL OF' THF CITY
OF MIAMI BEACH, FLORIDA:
THAT the City of Miami Beach will furnish on the Civil Works
Administration Project Number 13-195, all such foremen and engineering
services as are deemed necessary by the City rngineer for the proper
execution of said project.
That the City of Miami Beach will also furnish certain equipment
and miscellaneous labor and material.
All in accordance with the attached list of EXTRAORDINARY EXPENDITURES:
CWA PROJECT 13-195;
Read end adopted at a Regular Meeting of the City Council of the
City of Miami Beach, the County of Dade, State of Florida , this
29th day of January, AO, 1934.
62 „e9
President of the City Council
Attest:
•
.w_
City Clerk
1/29/34-LE
EXTRAORDINARY EXPENSES: _ CWA PROJECT 13-191
2 Foremen 13.625 Weeks @ 20,00 4545.00
1 Material Checker 1 Week 20.00 20.00
2 Man Field Party 3i weeks 40.00 140.73
Use of Concrete Mixer 17i Days 4.00 70.00
Use of Roller 64 hours 2.00 128.00
Use of Tree Truck 16 Hours 2.00 32.00
2" Water Line for Tennis Court 2721 60.00
250,000 Gal, Water Consumption .20 per 1,000
1,045.73
Material for Baseballgtand
Lumber
Per M.B.M.
2" X 4" - 15/16 21/12 25/18 42.00 24.99
1" X 6" - 52/12 42,00 23.87
4" X 4" - 4/14 52.00 3.85
1" X 10" - 6/ 16 Select 90.00 7.20
1" X 6" -35/12, 45/16, 72/ 14, 1200'
Random Lengths 35.00 79.59
1" X 2" - 2/16, 2/10 Per Lin. Ft. ,01i .65
2" X 4" - 12/16 39,00 4,99
1" X 6" - Random Lengths 3 M.B.M. 36.00 108,00
2" X 6" - 56/16, 56/14, 30/16 37.00 79.72
2" X 8" - Random Lengths 4200 Lineal Ft. . 39,00 218.40
3" X 8" - 41/18, 82/14 55.00 207,46
6" X 10" - 6/18, 6/16 60.00 61.20
6" X 8" - 12/18, 12/ 16 55,00 89.76
6" X 6" - 16/16, 8/14, 9/8 52.00 68.64
4" X 4" - 14/12, 11/16 52.00 23.82
3" X 17)" - 5/16 60.00 12.00
2" X 6" - 12/18 40,00 8.64
2" X 4" - 15/16 37.00 5.96
2" X 6" - 18/16 42.00 12.10
2" X 4" - 45/18 45.00 24. 30
Total Lumber 1,065.14
EXTRAORDINARftY EXPENDITURES: CWA PROJECT 13-195
16 Gauge Galv. Wire 22# 5.05 1,11
1" X 16 Gauge Pipe Strap 3002 1,85 per 1002 5,55
8d Galy, Nails 50# 3.23
Concrete Sand 4 Cu,Yds 1.25 5,00
Rock 6 Cubic Yds. 1.50 9.00
15# Felt 5 Rolls 2.00 10,00
8d Galv.Nails 1 Keg 6.05 6.05
16d " " 1 Keg 5,85 5,85
20d " " 2 Kegs 5.80 10.60
8d " " 1 Keg 5.55 5.55
16d " " 1 Keg 5.35 5.35
20d " " 2 Kegs 5.30 10.60
40d " " 1 Keg 5,30
1/2" round reinf, steel 72 pieces 12 6" long)
1/2" round reinf. steel 112 " 2' 0" long
1/2" round reinf, steel 40 " 22 6" long Contract 13.40
3/4" round reinf. steel 25 " 22 R" long)
Hook on one end ' a
3/8" boiler plate 22 pieces 14" X 8" Contract 18,50
3/8" boiler plate 2 " 20" X 8"
5/8 holes drilled for bolts
5/8" X 7*" machine bolts 350 7.30 per 100 ) 25.55
1/2" round reinforc, steel 72 pcs, 1' 6" long
1/2" round reinforc, steel 122 " 21 0" long
1/2" round reinforc. steel 40 " 2' 6" long) Contract 14,22
3/4" round reinforc, steel 30 " 22 6" long)
Hook on one end
4154,86
; otaa_ a all �tand material #1,220,00
Grand Total 'p+ ' rdinary Expenses 42,265.73
3/6/ 34-L
,
{
t-+ fit mc=
we c+
N cc ry 44 tt)
0' o o
p , d.
t b y0 ti
p. h+�
0 p'
itcf
II