Loading...
Resolution 2760 RESOLUTION NO 2760 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MIAMI BEACH, FLORIDA: That the City of Miami Beach will furnish on Civil Works Administration Project Number , which is a project for the construction of a reinforced concrete box culvert storm sewer on 14th Street and that general vicinity all such foremen and engineering services as are deemed necessary by the City Engineer for the proper execution of said project. That the City of Miami Beach will also furnish certain equipment and miscellaneous materials. All as shown on the following list: Description Unit of No. of Unit Total Cost Measure Units , Price Superintendent Weeks 12 3.70 (390.00 2 Foremen Weeks 12 48.00 578.00 5 Foremen Weeks 12 100.00 1200.00 2 Mixers with fuel Days 60 8.00 480.00 1 Crane " " Days 6 35.00 210.00 1 Roller " " Days 15 12.00 180.00 13 Pumps " " Days 60 3.50 2730.00 Air Blower " " Days 60 2.00 120.00 Nails, Oakum, C.I.Pipe,Muslin 555.00 46441.00 Read and adopted at a Regular Meeting of the City Council of the City of Miami Beach, the County of Dade, State of Florida, this 16th day of February, 1934. 7 President of City Council Attest:' City Clerk. 2/10/ 34.LE MATTPIALS ITEM UNIT OF MEASURE NO. OF UNITS UNIT PRICE TOTAL COST Cement Barrels 3800 3.25 412,350.00 Concrete Pock Cubic Yerde 1520 1. 50 2,280.00 Rock for roundEtion Cubic Yards 1050 1.50 1,575,00 Concrete Sand Cubic Yards 990 1.25 1 ,237.50 Hy' .rated Lime 50# Sacks 1390 .60 334.00 6" Drain Tile Ft, 670 .09 606,60 ,4" Drain Tile Ft. 27b0 .06 165.00 Timber ii. .M. 27 45. 00 1,215.00 Brick ic 49 18,00 882.00 ME.nhole Castings & Covers Each M.H. 24 17.00 408.00 Baein Caetings I & Covers Each Basin 81 18.00 1 ,296.00 Ynhole Steps Each 100 .55 55.00 Reinforcing Steel Lbe. 195,710 .03 54871430 Uableaoha4 Mwel4a . 12" Sewer Pipe Ft. 150 .*0 60.00 15" Sewer Pipe wt. 1555 .36 1,026.30 18" Sewer Pipe Ft. 650 ,88 572.00 21" Sewer Pipe Ft, 1000 1. 10 1,100.00 24" Sewer Pipe Ft, 500 1.65 825.00 2?" Sewer Pipe Ft. 160 2.20 352.00 Pit Rock Cubic Yards 1100 1118B 1,230.00 Oil for Hot Appl, Gal 1320 ,16 211.20 I 2/10/34—LE MATERIALS ITEM UNIT CF MEASURE NO. OF UNITS UNIT PRICE TOTAL COST Catt Iron Pipe ( Donated) 200.00 Unbleached Muslin (Donated) 30" Nide Yards 750 .14 105.00 Oakum fer Joints (Donated) 100.00 Nails . (i)onated) -150 00 434,706.90 Practically all materials with the exception of reinforcing steel produced in Florida. 41604 9080101116 0$ CIVIL •flaKr. MI1IS1A1101 PFOJICT Ni l'OY lei WIWI RIMIN1100 COWItra.; OULVTRT MRS San DosorivAion Unit of tio. of Unit Toss% cost Seamus, Unite Vries wporialemdeal 2 Yoram** **eke 1P 4 .,D0 5?6,00 b Toreson looks 12 100.00 1200.00 , 7 141.xese with fuel. Ufa 60 6.00 480.00 1 Creme N 11 Days 6 35,00 210.00 1 f,ollor " " Days 15 12,00 160.00 N li Pa umps Soy* 60 3.60 M0.30 1 his blower " a pays 60 2,00 10,00 11141*. Oaken. C./,Fipe,wunlin lablii XiND Or 'on? FY-rit TOTAL usr i` v r T", It 2,41011, , 40 ilttro 1040 .44.0003010 0 t , .s.with tut .) 110 SO P441# 0 , . '416 _ e with fus1 , t T40 0 r1*;tyv 35,00 2104011 * f° Tod 1 , t� e 121,E 1 ( 4 ted. 1 $053 0"100 4107,0000 N• O.O Q H c-} N W 1.4t Ct -P' 0 .' • H ',.Sorqci CD Et ct H C/ cam 0 E--: • CCO K 0 0 • 1• 3 5 oc, tt.N- tj 0 rCDCDw 0 CI 0 H CO 1-k cl- C t—+ • m