Loading...
2002-24980 Reso RESOLUTION NO. 2002-24980 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 2 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND GLATTING JACKSON KERCHER ANGLIN LOPEZ RINEHART FOR THE DESIGN OF WEST AVENUEIBAY ROAD NEIGHBORHOOD IMPROVEMENTS INCREASING THE NOT TO EXCEED FEE BY AN AMOUNT OF $19,980 TO PROVIDE FOR ADDITIONAL DESIGN SERVICES FOR BAY ROAD STORMWATER IMPROVEMENTS NECESSARY TO SUPPORT RELATED STREETSCAPE IMPROVEMENTS AND AUTHORIZING THE APPROPRIATION OF SAID AMOUNT FROM THE SERIES 2000 STORMWATER REVENUE BOND FUND. WHEREAS On May 16, 2001, the Mayor and City Commission adopted Resolution No. 2001-24388 authorizing the execution of a Professional Services agreement with the firm of Glatting Jackson Kercher Anglin Lopez Rinehart, Inc., for Professional Landscape Architectural and Engineering Services for the design of the West Avenue/Bay Road Neighborhood Right of Way Improvement Project in the amount of $231 ,444; and WHEREAS, On April 1 0, 2002, the Mayor and City Commission adopted Resolution No. 2002-24821 authorizing the execution of Amendment Number One to the agreement to provide for additional professional services associated with BaX Road drainage improvements, streetscape and street end improvements to 10th, 14 , and 16th streets, and a community planning meeting for a fee not to exceed $86,959; and WHEREAS, The City had a need to complete the design of the improvements to Bay Road between 14th and 16th Street ahead of the design of West Avenue Neighborhood project as this component is required to be completed by the developer of the adjacent Grand Flamingo project prior to its scheduled Fall 2002 opening; and WHEREAS, After the approval of Amendment Number One to the agreement with Glatting Jackson, staff and consultants proceeded with the development of improvement plans based on the streetscape concept plan which was originally referenced in the DRB approval order for the Grand Flamingo project and which received general community support when presented at a November 8, 2001 Community Design Workshop; and WHEREAS, the streetscape improvement concept plan was subsequently 1 l substantially revised over the course of three public meetings in order to respond to affected residents concems about the project; and WHEREAS, the revisions to the streetscape design necessitated changes to the partially completed design of related stormwater improvements resulting in the need for additional services to complete the project design; and WHEREAS, The City retained the services of Engineering Management Consultants Pappas and Associates to negotiate the fees for the required additional services; and WHEREAS, Pappas and Associates negotiated an Additional Services fee in the not to exceed amount of $19,980 which they recommend as reasonable; and WHEREAS, Funding in this amount is available from Series 2000 Stormwater Revenue Bonds; NOW, THEREFORE BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that Amendment No. 2 of the City's Agreement with Glatting Jackson Kercher Anglin Lopez Rinehart for the design of the West Avenue/Bay Road Neighborhood Right of Way Improvement Project is hereby approved and authorized by increasing the not to exceed fee by $19,980 to provide for additional design services for Bay Road stormwater improvements necessary to support related streetscape improvements and authorizing the appropriation of said amount from the Series 2000 stormwater revenue bond funds. PASSED and ADOPTED this 25th day of September ,2002. ATTEST: -~~ p~ CITY CLERK T:\AGENDA\2002\SEP2502\REGULAR\BayRdreso.doc APPROVED /tS TO FORM & LANGUAGE & FOR EXECUTION ~ ,.. (~- y1- Datil ATTACHMENT A '. ' r ~- l D ~ ---r.zt:n..t . ~, . I td > ~ ~ 80 ~> ~tj o ~I-ol ~~ ...."d > ~ ~ ~ ~ ~ 0 ~ttl< ~ trI tn 0>';1 l" \.l ~ ~t:d "rt~ ~~ o ?:l~ g~ >0 o ~ > ~ ~. .J.,(I. /'/1 ~ ( , .~,~ .I 'i.i t..~;rI~~~:"; '..~. ');, Ii.... "f7 ~I\ ~.....'.'i.'_ /~~~ ....~.... 'G'. -r;.i,..1--t &j :':i.:<<.I.-ii..., ~ I$~.l _ ~ ~ ~{>':f; ~" ~ .u.. / :~~~~~ ~ .,.1 \ ~... ~. .~~~I,-- ~ ('t':(bL '~~ ~ ~~ '.{~~ ,. ~ 11 ~~....---- 'l'f .;Ii,..'A If. , ...\ ~.Ir.t - I _ I\'i.'.~ -==- 1I~ .,~ ::1f. ~ .~ I \,.'/>"')1, .... - ~"lllf"'.!"\I.). ( I ...):/ I'" . ~~.'~'~l 'I{.~ I ~....~y"..\., of-- 1 '\' .:-;." ....~ ~" " ~. ~- / .~:?~ . \:,'1# t'~ '(' . .,4,0:: ,'. '''1" t n 'j';~ , ~ ".~)~.. J;t7 ~A'" ]......... .r.~"j;~. ........ t~1'~~'" ~n} -t< ~ ..,/'t; i..-- I ~~p~ lL 17;I~.~ J F\~~I~ ( ;~!.l j ] ~ 7~~~ ~ ~~~ 1\ ~ \~y: ----I- J~~l' r I" ~,~.'t / '= f,! ,) ~~,3~ Y' ]~ .? @~ tI.... .t. '~...,~,; ~J ,,~!).1 ~ ,.~,4}~ .~ ~:-~'( - ~~ \. ~~}1 J " 1(' :i";---L. )~, {~~~:~ ~'1. ~ i'-. ~n?."l~"~l I ~1 '- h..- .V"....'\. r I ~ ,',~r'tl ,- ~ ~t(~\~~;? () L" -.{IIU'.I~'. ~ ~I E:'ll~\'li~":':; . r. I~ '_~~ "" ~ ~ ~~' ,~ ~""'" i I jl--~; ) \~ CP '-- lJ ~ ~ &~~: ,~~ ~~' ~~ !I II : :Ji D ~ LJ .......-~~"."l \! ~ ~i:tJf ~~:~'::I<ol ~ - t 1 ~ ~ ~ ~ ~~~~ ______ \::~ l) - - -- m~ ~~1 ~~ Ei~ r: ! ~ -!. II I I ~ ~ i I ~ 0 I I ~ ~II \ ! L.- I \ C- ~J y ~ - - "\ \ \ ----t=bA~r ....... t :::> ....-.. ,.- 1\ ~,' ,- l.I ~~ ~~L I A ~ II /' ~l!t h D ~r ~, ~I' ID !~ ~ i.) V ~~ ~~ - NOS>Ol:ll' '~NIlll:::ll~ WdH:9 210102 '22'~nl:::l.__ 9/E'd t7t7E.ON ATTACHMENT B 09/18/2002 11:21 407-699-2154 PAPPAS PAGE 05 -.v-T...... )(7 -~ ..1It~'" PAPPAtI AND AseoQATa , , 1 IS DEal RUM DIIIVIE WINTER SPRINGS. fI'L 3a7()8041'-' PHoME: .07.....'" p~.o'1~IM ......... 1....~....ClO. 4 ICn~U;GM1el'.1.W ~I. ProcrUl. end Prqject MaD-.ea1eDt lafre~ 8ecW'it:r ~ __ M. Pappu, r.1. p~ September 18. 2002 (ReviMd) Mr. Tim Hemstreet Asst, to the City Manager City of Miami BeachlCIP Office 1701 Meridian Avenue. Suite 201 Uillmi Bach. FL 33139 Re: BAY ROADI Additional SeMcea Neighborhood NO. 11 West AvenuelBay Road Dear Mr. HematrMt: Negotietione were held on September 5. 2002 WIth the AlE firm of Gletting JackIon, and their aub-<:onaultant R.J. Beh.r and Company. The amount I felt wu re.-onable, fair. and indleMive ofthe level of effort to accomplish the additionaleervicel wu $18.340.00. However. et the ctoee of the meeting, Behar Indicated that that ftgure w.- acceptable bUt he did not include the amount of $1887.00 for planning MMoeI which O_ng JKk.on proposed and walS included in the fee propoeeI. It ie my underStanding th8t the City of Miami Beach hal had furth_ diecuUk)nS with Ctty staff and ltaff of the Program Manager and believe that the amount of $19,980.00 is lCC8Plable to the City. Th8t amount doea include Planning Sefvioes in the amount of $1640,00. VIa FAX and U.8. Ma'" The City will have seved $15,488.00 (S35,.w8-S19,980) through negotlationa for the additional eerviC:eS required for Bay Roed deIlgn, Recom....nd .pproval for nil! .ncI.........1a HOT TO EXCEED '11,110.00 for the .ddltJoMI I*nnlng aervac.. for ~peI.tonn-watar d..ta" and the pre~ratIon of the atrMUcapelatotm...r conatructlon documenta .MOC~ with tile re...lgn of Bay Road due to the reduction In "Ohta-of way from .,0 _. to 10 feet. Respectfully submitted, ~P~~E. cc: K. McKew. D. Shock. . J. dePazoe. CIP Office R. Middaugh, Asst. City Mlll'Ulger Hazen ancl S8WYer Engmeera (ClIIl1Ino. Mistry. Hoffman Vidal) , t Ii! == e ; .._...=:~:!oo In lil 11 ! III ..... .. lil i 118 .1 ~I ~ 8 .. ! ~III~ ~~Ifti a .... .. - ~ U*II ~I 31= 1lI 8 ~Qi OQDD .. .... 0\0 .. - ~ i .. I ... I ... I . t CJoa_a 0 0 iii 8 .. ! j I 4 ~ j j ~ CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY m Condensed Title: A Resolution authorizing Amendment Number Two to the City's agreement with Glatting Jackson Kercher Anglin Lopez Rinehart, Inc. for the design of West Avenue Neighborhood right of way improvements increasing the not to exceed fee by an amount of $19,980 to provide for additional design services for Bay Road stormwater improvements necessary to support related streetscape improvements and further authorizing the appropriation of said amount. Issue: Should the City amend its agreement with Glatting Jackson Kercher Anglin Lopez Rinehart, Inc. for the design of West Avenue Neighborhood Right Of Way Improvements by increasing the not to exceed fee by an amount of $19,980 to provide for additional services required to modify the design of proposed Bay Road stormwater improvements to address affected residents' concerns while still achieving the basic streetscape improvement goals of the project, and, further, appropriate Series 2000 Stormwater Revenue bond fundina in that amount? Item Summa /Recommendation: On May 16 , 2001, the City entered into an agreement with Glatting Jackson Kercher Anglin Lopez Rinehart for the design of West Avenue Neighborhood Improvements. On November 8,2001, the City held a West Avenue Community Design Workshop at which attendees expressed general support for the improvements concept plan presented. The City had a need to expedite the design of the improvements to Bay Road between 14th and 16th Street as this component is required to be completed by the developer of the adjacent Grand Flamingo development prior to the opening of the project. Preliminary construction drawings based on the previously presented concept plan were developed and notices of required right-of- way reclamation sent to affected property owners. Affected residents unanimously opposed the plan, and staff and the consultants developed a revised plan which addressed residents concerns while still meeting the basic improvement objectives of the project. The revised plan required changes to the originally contemplated stormwater improvements which resulted in the need for additional stormwater design services. The City retained the services of Engineering Management Consultants Pappas and Associates to negotiate the fees for the required additional services. Pappas and Associates negotiated with Glatting Jackson and their stormwater sub-consultant Behar and Associates and agreed on a fee of $19,980 which they recommend as reasonable in the attached memo. Funding for this amount is available from Series 2000 Stormwater Revenue Bonds. The Administration recommends the approval of the Amendment and the a ro riation of $19,980 of Series 2000 Stormwater Revenue Bond funds for this ur ose. Advisory Board Recommendation: I NA Financial Information: Source of Amount ACcount Approved Funds: 1 $19,980 Series 2000 Storm water Bond D ..,a 3 Finance Dept. Total islative Trackin As istant City Manager City Manager AGENDA ITEM C. 7/3 DATE 9~(J;).. CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www.cLmiami-beach.fl.us To: From: Subject: COMMISSION MEMORANDUM Date: September 25, 2002 Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez ~ City Manager u. 0 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO.2 TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND GLATTING JACKSON KERCHER ANGLIN LOPEZ RINEHART FOR THE DESIGN OF WEST AVENUEIBAY ROAD NEIGHBORHOOD IMPROVEMENTS INCREASING THE NOT TO EXCEED FEE BY AN AMOUNT OF $19,980 TO PROVIDE FOR ADDITIONAL DESIGN SERVICES FOR BAY ROAD STORMWATER IMPROVEMENTS NECESSARY TO SUPPORT RELATED STREETSCAPE IMPROVEMENTS AND AUTHORIZING THE APPROPRIATION OF SAID AMOUNT FROM THE SERIES 2000 STORMWATER REVENUE BOND FUND. ADMINISTRATION RECOMMENDATION: Adopt the Resolution. FUNDING: Funds for this project are available as follows: ANALYSIS: $92M G.O. Bond $57.7 M - SIW Bond Neighborhood Series 2000 Series 2000 West Avenue/Bay Road $19,980 On May 16, 2001, the Mayor and City Commission adopted Resolution No. 2001-24388 authorizing the execution of a Professional Services agreement with the firm of Glatting Jackson Kercher Anglin Lopez Rinehart, Inc., for Professional Landscape Architectural and Engineering Services for the design of the West Avenue/Bay Road Neighborhood Right of Way Improvement Project in the amount of $231 ,444. On April 1 0, 2002, the Mayor and City Commission adopted Resolution No. 2002-24821 authorizing the execution of Amendment Number One to the agreement to provide for additional professional services associated with Bay Road drainage improvements, streetscape and street end improvements to 10th, 14th, and 16th streets, and a community planning meeting for a fee not to exceed $86,959. The City had a need to complete the design of the improvements to Bay Road between 14th and 16th Street ahead of the design of West Avenue Neighborhood project as this component is required to be completed by the developer of the adjacent Grand Flamingo project prior to its scheduled Fall 2002 opening. After the approval of Amendment Number One to the agreement with Glatting Jackson, staff and consultants proceeded with the development of improvement plans based on the streetscape concept plan which was originally referenced in the ORB approval order for the Grand Flamingo project and which received general community support when presented at a November 8, 2001 Community Design Workshop. Preliminary construction drawings were developed and notices of required right-of-way reclamation sent to affected property owners. Staff met with individual owners to explain the plans and discuss ways of minimizing the impact of the work but encountered a large degree of opposition to the overall plan as it required the reclamation of 10 feet of City right-of-way on the east side of the 1400 and 1500 blocks of Bay Road. In recognition of residents' sentiment, staff and consultant revised the plan so that only 5 feet of right-of-way reclamation was required and presented the revised plan at a meeting on July 30, 2002 of residents who still unanimously opposed the project. At a second community meeting held on August 13, 2002 additional landscaping and other changes were proposed to lessen the perceived project impact but residents still overwhelmingly opposed the plan. At that time, it was agreed that the plan would be further revised to eliminate all proposed parking on the east side of Bay Road so that no reclamation of the City right-of-way would be required. Residents in attendance agreed to this plan. However, because this compromise required the elimination of 25 proposed new parking spaces from the plan, staff and consultants revisited an earlier scheme to alternate bump- out planter areas with parking on the east side of the street. This concept had been previously considered and ruled out because the resulting stormwater improvement cost would have been prohibitive. Upon further consideration, staff proposed the following creative stormwater design variation which would allow this plan to be implemented in an affordable manner. In a typical road section, the pavement slopes down each side from the centerline high point to the gutter at the curb. Water follows this route and then further travels a slight downgrade at the curb line into a collection basin. The introduction of bump outs into this typical section prevents the water from flowing along the curb line. To overcome this obstacle, numerous additional collection basins must be installed at the curb line in between the bump-outs which increases the cost of the work dramatically. Under the design variation developed by staff, a continuous valley gutter runs along the edge of the travel lane abutting the bump-outs. The collection basins are located in the valley gutter rather than at the curb edge. The pavement from the centerline of the road slopes downward to the valley gutter. The pavement from the edge of the road where the parking spaces abut the curb slopes back inward towards the center of the street down to the valley gutter. Through this design, no additional collection basins are required as the water flows unimpeded along the length of the valley gutter. The cost of the additional valley gutter required is minimal. The attached drawing (Attachment A) illustrates a typical block based on this design. This alternative plan was presented at a third community meeting held on August 26,2002 and was unanimously supported by the attendees. The final revised plan required changes to the already partially completed design for stormwater improvements which resulted in the need for additional stormwater design services. The City retained the services of Engineering Management Consultants Pappas and Associates to negotiate the fees for the required additional services. Glatting Jackson initially proposed a fee of $35,448 for the additional services. Pappas and Associates negotiated with Glatting Jackson and its stormwater sub-consultant Behar and Associates and agreed on an additional services fee of $19,980 which they recommend as reasonable in the attached memo (Attachment B). This represents a savings of $15,468, or approximately 44%, from the initially proposed additional fee. Funding in this amount is available from Series 2000 Stormwater Revenue Bonds. It should be noted that this proposed contract Amendment No. 2 and associated fee increase is not due to an addition to the scope of work of or funding for the project but rather to a change in design from the original concept plan to a plan that was acceptable to the directly affected property owners. Because of the need to expedite the design of these two blocks to enable the Grand Flamingo to construct improvements as required by their DRB approval order, design work had to proceed prior to the Commission adoption of the neighborhood Basis of Design Report. Ideally, challenges to concept plans such as this will be resolved prior to the initiation of design work. The Administration recommends the approval of Amendment No.2 and the appropriation of $19,980 of Series 2000 Stormwater Revenue Bond funds for this purpose. JMG:RC~:DP. T:\AGENDA\2002\SEP2502\REGULAR\BayRdamendmemo.doc ,. . . . [C William J. Anglin, Jr. David L. Barth Jay H. Exum Jack F. Glatting Jay R. Hood Timothy T. Jackson William C. Kercher,Jr. Walter M. Kulash Sharon K. Lamantia S. Raymond Lopez John F. Rinehart Gregory A. Bryb David R. Claus Charles P. Cobble Michael R. Cochran Jeffrey S. Collins Richard E. Durr.Jr. Bruce C. Hall Carey S. Hayo Frank A. Jaskiewicz Gail D. Lacey William D. Lites Edward J. McKinney Thomas J. McMacken,Jr. John J. Moore III John H. Percy Mark N. Platts Troy P. Russ Kelley J. Samuels Peter C. Sechler Nathan P. Silva Laura K. Turner Ronald L. Urbaniak G. Wade Walker Community Planning i l 222 Clematis Street Suite 200 West Palm Beach Florida, 33401 P: 561 6596552 F: 561 833 1790 www.glatting.com License # EB 0005812 LC C000049 o.fatuIo . Rbt PlIIm Btadl GLA TTING JACKSON KERCHER ANGLIN LOPEZ RINEHAR T AMENDMENT NO.2 to Letter of Agreement September 12, 2002 Project Name: Revisions to Bay Road Streetscape/Stormwater Improvements 15788.06 May 16, 2001 Capital Improvement Projects Office, City of Miami Beach Glatting Jackson Project No.: Original Agreement Dated: Person Requesting Work: DESCRIPTION OF WORK GlattinQ Jackson is providing planning services and construction documents for improvements to West Avenue Neighborhood, as outlined in the Agreement between the City of Miami Beach and Glatting Jackson dated May 16, 2001. The City desires for Glatting Jackson to provide these same services for revisions to Bay Road, including: 1. Planning services for streetscape/stormwater design of Bay Road 2. Streetscape/stormwater construction documents and design for Bay Road Revisions to the 90% design submittal including but not limited to streetscape, stormwater, roadway, pavement markings etc. is required to comply with the City's desire to accommodate the neighborhoods request to limit the proposed improvements within an approximate 50 foot +1- corridor. DELIVERABLES As a result of the work outlined above, Glatting Jackson shall provide: . Six (6) sets of Bay Road Streetscape/Stormwater Construction Documents SUBCONSUL TANTS Glatting Jackson will serve as the Project Manager and Planner for this part of the project. The project also requires the services of a Civil Engineer, who shall be a subconsultant to Glatting Jackson. The Civil Engineer for this project is R.J. Behar & Company. SCHEDULE GlattinQ Jackson will begin work on this scope upon written authorization from the City of Miami Beach, and will complete the above items by September 30, 2002. Page 10'2 AS3 - Bay Road H&S Format . . [C COMPENSATION D Lump Sum including direct project costs. [8J Hourly (with an estimated budget of $19,980), including direct project costs D Hourly plus Other Direct Costs @ 1.15x D Other AGREED TO AND ACCEPTED BY: Glatting Jackson Kercher Anglin ~:w Dale: '7?/OZ. Date: ~;2-6 2-0()~ ATTEST: ~(2v~ Robert Parcher~ City Clerk APPROVED AS 10 FORM & LANGUAGE & FOR EXECUTION 10 -r6-dY Date Page 2 of 2 AS3 - Bay Road H&S Format 8 '" :: I l If) N .... 0 ZZ c(.... !:iz :::lWCI) CI)~w zoo oZ> oWO:: ~w LYc(CI) c(wo ~..Jo c(:::lc( ~o::oo oC)wc( 1O~~~~ W a..CI)>- ~~~~~ w~:::l . ~ ....z... 011.00... Cl)O:::l~o ~e:~z oCl)zO ~wo 11.0..0 z~~ -00:: >-00 c(CI)IO 3:F-~ II.zS! oc(w ....!:iz ~:::l C)CI) -z !Xo o \ ~ o ~ o 0 II~ ~n;~ ~I !I[I I f !III II tl"':I'" '" "'II N '" U) 0 II ~~ao~~~oaaooaaoooaooo~~~~~~~~~~~oooo ~ ~ ,~g~ ~ ...+,,,, "','" ...'...1......... ......1... "'1'" ~ ~,~ ~~...... 0;; ~!:;; ~ ...1......... +- -- : -I - I c- -1+ -t c-c- +- : . . . ~ ~ ~ ~. . . .. .i.. '1' ... · " .1. . + - N ." .. ... ;;; N 0;; o o II) ... o 00 '" '" 0;; N N o ___ _u _-j_____ I 000 __ 000000 <:) 0 0 0 0 010 0 <:) <:) 0 0 010 <:) 0 0 0 <:) <:) <:) <:) 0 <:) 0 <:) I I ,--r---+~ I , i NNON~~~OOO~~~~~~~~~~~~~~~~______~~~oooo I ..-- o o ci ;:t ~ M o o N II) ... -- '" i N N 0 ~:!:!:! 0 0 <:) 0000000000 0 ~ ~I~ ~ ~ 0 <:) 0 "lit "'I:t N 0 <:) <:) 0 , I I __ _+__ _ ____ __ __1 ..L ! I o 0 0 ~ .... .... .... 0 0 0 0 0 0 0 0 0 010 0 0 0 ~ ~b ~ ~ 0 0 0 0 0 0 0 0 0 0 I -1 ~- -- - e- - -f- I I i I ' , ! I I ~o 0 0 0 "'I:t"'" "'It 0 0 0 0 <:) 0 0 0 0 O!O 0 0 0...... 0 0 010 <:) <:) 0 -- 0 <:) 0 0 <:) Ot I i I I i i I i i i e- e- e- .... 00 o o Pi .... ... . 00 ~ ~ N ,..... (3 ~~ I- Z W ::;; W oW 00: :! ~ ~ o;;~ I U ili 0: gz ~ ~ ~ ~=> ...~ Cl Z o et: 00 oU ...... ~ ~ O;;ffl => -' ~ I- et: W ~ ti I ,.; 0 I Z 0 o fil 1 I ~ ~ , I I g ~ I ii" i ~ ~ I I I' I- 00 i , ~ W II i II I ~ ~ ~I ~ : I Ii: 00 ~ lLlLlLoooooooo a ~ W I z' - ClClClZZZZ U Iu : Q " 'I 00 ~ ~ ~ ~ ~ :s :s ~ ' Cl l5 ~ Zo I I- 'I I I =~ ZZZlLlLlLa. 'i ~ Z 00 I <(, <( ClClCl-,-,-,-, et: 0 W ~ 00 ~ I 1 I ' I, tul!JuOOOOOO~~~~ oo~ 15 i= 0 Cl W 1 woooooooo 00000000000000, I 0<(U:~~~=>=>=>=> I~Z OO:S ~ 001 1 I E 00'00 oil ~ ~I~ ~ l~N:! ~ ~ ~ ~ ~ I 'ti,~!;\: <( <( <( G GIG G I '5 ~ ~ I a ~I oo~ I I- zzz=>=>'=>=>=>'=>=>=>=>=>=> oI~O:ClClCl=>=>=>=> 0: 00 ~ <( -' W ~ -' 001 Z ~ ~ ~ ~ G G G G G G G G G G G 00 00 00 00 00 U 0 :;: ~ ~ ~ ~ ~ ~ ~ I ~ 00 <( et: I (3 ~' 5<(w aOO=>wwwa.a.a.=>=>=>=>=>=>=>=>=>=>=>zzzzzooooa~~~oooooooo mz~ ~ ~ W W et: !z ~ - ~ 0 -' -' -' z z Z et: et: et: et: et: et: et: et: et: et: et: a a 0 a 0 => => W <( <( <( z ZIZ Z -' 0 00 00 I- et: 1 et: Cl wa> Go~U:U:U:aaol-l-l-l-l-l-l-l-l-l-l-i=i=i=i=i=@@u::;;::;;::;;aaaa mi=o et:ffl- => 00 00 00 N 0: W Z a 0 a 0 i= i= i= 00100 00 00 00 00 00 00,00 00 00 u u u u ul Z Z i= i= i= i= < u => '" 0 ! W W Cl a: ~ tu 00 -' >- et: et: et: < < <( W W W W W W W W'W W W W W W w w,:;: < <(!z!z!z <( <( < <( ,~=> ~ 0 tlj ~ I 0 W 0 Z a W -' < et: lL a. Q. I- I- I- Cl Cl Cl Cl Cl Cl Cl ClICl Cl ClOO 00 00 00 00 ...J ...J Z W W W I- I- I- 1-1 ' 0, I I ~ .. I' ~ => I- => Z Ilz I < et: <( oil oil oil 00 00 00 <( < <( <(1<( <( <( <( < < < 00 00 00100 00 -' -' w::;;::;:::;; 00 00 00 00 'ill aluJ -,,-, ~ 001 en 13 <(-' Cloo U w::;; Q. Q. Q. Z Z Z Z!Z Z Z Z Z Z Zoo 00 00'00 00 W W I- W W W Q.ilia.1 Q. Q.[ , et: >1 <(1< ~::::;, W ::;; 0, ~~IOO>- O:Z::;:~:;: ~::;;::;:::;; <1-<'< <1< <,<< <,<oaalolo,~~~ > > >::;:::;;::;:::;: '~o.l.o::' 1-1-"5 ID~ I-o:!: i=~: .J wlw W >- Wj=>...J...J -' => => =>'et: et: et:let: et:~et: et:~iet: et:let: et: et: et: et:jet: - - < < <( < => => =>:J W W et: Ja a 0 <( I oo! ' lI:-+~l?_~t:-~ '!! Q. Q.lI:-~jj(l. _11:-100 0 l?~9 9..f9 olQj9..I~Q ~ Ule,.> ~,::;;::;;~ ~~Q.II:- a. a, Q. __~o:_I:t:It::-~_ .1:-111:" I ti :<;. ---':I:lf~ ~ I...... '......'NI('I')I"lt It) (0 t-- 00 0) ar;:lN ~"lt LO CD..... 001"'10'1...... N M "It11():<oI" cO 0) a...... N ('I') "It It) co 1_11(\1 I W I I ...... I. : : : ....'-1............ ..... ......,......1..... ............ N N1N N N1N,NIN N N (l')IM (1'),('1') C"') ("'),('1')1 lu:i cOl I : i '-: IN! I : i i: i' ii':;! i I I I II! I I Ii :01: I: ~ill i II ! i : ill i I i I!: I!! II 1 II i i Iii i I I, I : i u i i I -l'1 N ~ !! .. E l ! If) II lL J: (j 0( W ID :E 0( ~ a: o o II) 1 ' I I I I~OOOMM('I')OOOOOOOOOOOOOO......oooooo""''''''''''''ooooo H ~ 1000000000 0000100 I I --I+e- i I i i ! ! , I 00000000000000000100 Memo September 5, 2002 To: Tim Hemstreet, Asst. to City Manager From: Jim Pappas. P.E~ Re: Negotiations on Bay I\1d tfuprovements/ Glatting Jackson A meeting was held today with the prime AlE consultant, Glatting Jackson, their sub- consultant Behar and Associates, City of Miami Beach staff, John dePazos, Hazen and Sawyer Engineers Suresh Mistry and John Hoffinan, and Jim Pappas, of Pappas and Associates. Behar submitted a proposal in the amount of$35,448 to re-work their design as the right- of way was cut back from 70 feet to 50 feet. After a 2 hours of a tough negotiation session, I stated that the amount the City is willing to pay for the extra work was $18,340. Behar said he could live with that number, but it did not include the $1887 amount for Gladding Jackson.. I said the bottom line was $18, 340 and if Glatting Jackson and Behar wanted to lose a contract for $1887, then the City will start negotiating with another firm. Sarah Wilkinson of Glatting Jackson had no authority to negotiate something different than what Behar wanted. We tried twice to get a hold of Richard Durr ofGlatting Jackson, but could not reach him. Bottom line for the City is $18, 340. Glatting Jackson should get back to the City tomorrow. CC: Hazen and Sawyer City of Miami Beach, CIP Office ~P.c. HAZBI~P.C. Miami Beach. Florida ~~~ ~ ~9,9~ irb No. :=>~~;:)~. I ~ 0"15 ob No. . 4-0 I' / I. ~