Loading...
2002-24986 Reso . . RESOLUTION NO: 2002-24986 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA; AUTHORIZING THE APPROPRIATION OF, $384,000 FROM THE SERIES 2000 STORMW ATER BOND FUND 428; AND AUTHORIZING THE AWARD IN THE AMOUNT OF $384,000 TO TRAN CONSTRUCTION, INC., PURSUANT TO BID NO. 61-01102 FOR THE CONSTRUCTION OF THE SUNSET HARBOUR DRAINAGE STRUCTURES MODIFICATIONS. WHEREAS, In 1996, the Sunset Harbour Streetscape Project was constructed, which included a complete modification of the stormwater drainage system in the area bounded by 20th Street, Purdy Avenue, Dade Blvd. and Alton Road, and WHEREAS, subsequent to the construction of the Project and partly due to the water quality level of service restrictions imposed by DERM, the stormwater drainage improvements which were constructed did not resolve the stormwater drainage problems which existed in the Sunset Harbour neighborhood; and WHEREAS, during high tide events, especially when compounded by severe rain events, severe flooding occurs; and WHEREAS, in response to citizen complaints, design modifications were completed for the existing drainage system on Sunset Harbour Drive and 20th Streets in order to alleviate the flooding situation; and WHEREAS, on August 6,2002, an Invitation to Bid No. 61-01/02 was issued. One- thousand-two-hundred-ten (1,210) vendors were notified which resulted in forty (40) requests for plans and specifications and four (4) bids received; and WHEREAS, the Contractor's total base bid proposal for the construction of the Project, as stipulated in the bid documents, is three hundred and eighty four thousand dollars ($384,000), which is within the Project's construction budget; and WHEREAS, The Administration and the City's Consultant, CH2M Hill, have evaluated the bides) received, the bidders' references, and have determined that Tran Construction, Inc. is the "lowest and best" bidder. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby approve and authorize the City Manager or his designee to award a contract to the "best and lowest bidder", Tran Construction, Inc., pursuant to Invitation to Bid No. 61-01/02, for the construction of the Sunset Harbour Drainage Structures Modifications; authorizing the Mayor and City Clerk to execute a contract, for an amount of $384,000.00; and authorize the appropriation of such funds from the Series 2000 Stormwater Bond Fund 428. e1U~AJ p~ CITY CLERK F:\WORK\$all\Antebi\Comm\resoluUons\SunsetHarbourReso.doc APPROVED AS TO FORM & lANGUAGE & FOR EXECUllON 7-d~ CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY to ""IiiiiiiP' Condensed Title: A Resolution approving and authorizing a contract award to Tran Construction, Inc. for $384,000 pursuant to Bid No. 61-0'/02for the construction of the Sunset Harbour Drainage Structures Modifications. Issue: Shall the City award a contract to Tran Construction, Inc. Item Summary/Recommendation: In 1996, the Sunset Harbour Streetscape Project was constructed, which Included a complete modification of the stormwater drainage system in the area bounded by 20th Street, Purdy Avenue, Dade Blvd. and Alton Road. Subsequent to the construction of the Project and partly due to the water quality level of service restrictions imposed by DERM, the stormwater drainage improvements which were constructed did not resolve the stormwater drainage problems which existed In the Sunset Harbour neighborhood. In fact, during high tide events, especially when compounded by severe rain events, severe flooding occurs. The bidder's proposal includes thefumlshing all labor, machinery, tools, means oftransportatlon, supplies, equipment, materials, services necessary for the modification of drainage structures and piping systems at three different locations. The Work will include the removal of existing control structures, and inlet and outlet pipes; installation of new well boxes, control structures, catch basins, manholes, inlet and outlet pipes; modification and development of existing drainage wells; pumping system at one location; relocation of asphalt pathway; and restoration of roadway, curbs, gutters, and sidewalks Incidental to installation of Project components. Additionally, the project requires restoration of all sod, landscaping, and irrigation within the limits of construction. APPROVE THE AWARD. Advisory Board Recommendation: I Financial Information: Source of Funds: ..lInt 1 $384,000 2 . ~t Series 2000 Stormwater Bond Fund 428 D Finance Dept. TO.I $384,000.00 City Clerk's OffIce Legislative Tracking: I Fred Beckman AssIstant "gel' RCM T:\AGENOA .doc AGENDA ITEM DATE G7H 'f-;1.S-oL CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www.ci.mlaml-beach.ft.us COMMISSION MEMORANDUM From: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez ~'A~ City Manager () (IV-a A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA; AUTHORIZING THE APPROPRIATION OF, $384,000 FROM THE SERIES 2000 STORMWATER BOND FUND 428; AND AUTHORIZING THE AWARD IN THE AMOUNT OF $384.000 TO TRAN CONSTRUCTION, INC., PURSUANT TO BID NO. 61-01/02 FOR THE CONSTRUCTION OF THE SUNSET HARBOUR DRAINAGE STRUCTURES MODIFICATIONS. Date: September 25, 2002 To: Subject: AQ~INJ'TRATlON RECOMMENDATION: Adopt the Resolution. ~ Funding in the total amount of $384,000 is available in the series 2000 Stormwater Bond Fund 428. ~ In 1996, the Sunset Harbour Streetscape Project was constructed, which inciuded a complete modification of the stormwater drainage system in the area bounded by 20th Street, Purdy Avenue, Dade Blvd. and Alton Road. Subsequent to the construction ofthe Project and partly due to the water quality level of service restrictions imposed by DERM, the stormwater drainage improvements which were constructed did not resolve the stormwater drainage problems which existed in the Sunset Harbour neighborhood. In fact, during high tide events, especially when compounded by severe rain events, severe flooding occurs. Bid No. 81-G1/02 September 25, 2002 Page 2 ANALYSIS (Continued\ In response to citizen complaints, the City issued Task Order No. 26 to the City's drainage consultant, CH2M Hill, under an existing contract for a citywide Stormwater Management Program, to design and permit proposed improvements to the existing drainage system on Sunset Harbour Drive and 20th Streets in order to alleviate the flooding situation. The design includes the modification of three existing drainage well structures by installing appropriate pollution reduction boxes and modifying elevations of various pipes at the following locations:, - ,- - . In Island View Park at the intersection of Dade Boulevard and Purdy Avenue (Sunset Harbour Drive) . At the entrance to the Marina located at the intersection of Purdy Avenue and 18th Street . In the median strip at the intersection of 20th Street and West Avenue The new structures will allow for overflow onto the existing outfalls, which are connected to the existing drainage wells. The existing drainage wells, which have by this time become clogged with debris, will be redeveloped. Additionally, pollution control boxeswiU be added to the structures to prevent future clogging of the wells. Under the original design, the proposed improvements included a one-year observation period to ensure adequate function of the new drainage structures and the ability to retrofit the new structures with a pumping system at a later date should the City determine that pumping is required. In meetings with the Sunset Harbour Task Force, the City agreed to fund at least one pumping system at the entrance to the Marina located at the intersection of Purdy Avenue (Sunset Harbour Drive) and 18th Street (the location which currently experiences the greatest flooding problems). On August 6,2002, Invitation to Bid No. 61-01/02 was issued. One-thousand-two-hundred- ten (1,210) vendors were notified which resulted in forty (40) requests for plans and specifications. A pre-bid conference was held on August 22, 2002, 10:00 AM at City Hall. The Contractor's total base bid proposal for the construction of the Project as stipulated in the bid documents is $384,000. The bidder's proposal includes furnishing all labor, machinery, tools, means of transportation, supplies, equipment, materials, services necessary for the modification of drainage structures and piping systems at three different locations. The Work will include the removal of existing control structures, and inlet and outlet pipes; installation of new well boxes, control structures, catch basins, manholes, inlet and outlet pipes; modification and development of existing drainage wells; pumping system at one location; relocation of asphalt pathway; and restoration of roadway, curbs, gutters, and sidewalks incidental to installation of Project components. Additionally, the project requires restoration of all sod, landscaping, and irrigation within the limits of construction. Bid No. 61-01/02 Septernber25.2002 Page 3 ANALYSIS (Continued) The work on the Sunset Harbour Drainage Structures Modifications is to be completed under a single prime contract. Two (2) Notices to Proceed will be issued for this Contract. CONTRACTOR shall commence scheduling activities, permit applications and other pre- construction work within five (5) calendar days after the Project Initiation Date, which shall be the same as the date of the first Notice to Proceed. The CONTRACTOR shall submit all necessary documents required by this provision within twenty-one (21) calendar days of the issuance of the first Notice to Proceed. The contract document stipulates that the contractor shall attain substantial completion within one hundred-seventy (170) calendar days after the date of issuance of the Second Notice to Proceed. Additionally, the project must be completed and ready for final payment thirty (30) calendar days following the substantial completion date. ~ References have been checked by Procurement staff and Dun and Bradstreet reports have been secured for Tran Construction, Inc. and this Contractor is highly recommended. Tran Construction, Inc. has been in business since 1998 as a General Contractor and is based in the City of Miami Beach, and pursuant to the reference check, the information provided indicates that Tran Construction, Inc. provides quality work, and completes jobs within the required completion dates. The Administration recommends the adoption of the Resolution by the Mayor and City Commission, authorizing the negotiation of a contract with Tran Construction, Inc. for the construction of the Sunset Harbour Drainage Structures Modifications. Attachment T:\AGENOA\2OO2\SEP2502\REGULAR\SunsetHarboutCommMem.doc \ Bid No. 61"()1/02 September 25, 2002 Page 4 BID TAB BID NO. 61-01/02 FOR THE CONSTRUCTION OF THE SUNSET HARBOUR DRAINAGE STRUCTURES MODIFICATIONS Bidder GRAND TOTAL LUMP SUM Tran Construction, Inc. $384,000.00 JCM Enteprises $456,000.00 Regosa Engineering, Inc. $478,000.00 Intercounty Engineering, Inc. $872,870.00