2002-25007 Reos
RESOLUTION NO. 2002-25007
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF
THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE CITY OF
MIAMI BEACH AND MIAMI BEACH REDEVELOPMENT AGENCY
CAPITAL BUDGET FOR FISCAL YEAR 2002-2003 AND THE
CAPITAL IMPROVEMENT PLAN FOR FISCAL YEARS 2003-2007.
WHEREAS, the 2003-2007 Capital Improvement Plan (CIP) for the City of Miami Beach
is a five year plan for public improvements and capital expenditures by the City; and
WHEREAS, this document is an official statement of public policy regarding long-range
physical development n the City of Miami Beach; and
WHEREAS, on July 21, 1999 the Commission approved the FY 1999 - FY 2004 CIP for
the City and the Redevelopment Agency; and
WHEREAS, since that time, the City has authorized the issuance of $92 million of
General Obligation Bonds, pursuant to a referendum; issued $54 million of Water and
Sewer Bonds; and $52 million of Stormwater Revenue Bonds; and
WHEREAS, the approved Capital Improvement Plan has been updated to include
projects that will be active during the fiscal years 2003 through 2007; and
WHEREAS, the Proposed Capital Budget for FY 2002-2003 totals $52,383,623 and
includes ninety four projects and capital equipment acquisitions recommended for
appropriation in conjunction with the FY 2002-2003 Operating Budget; and
WHEREAS, the Proposed Capital Budget itemizes project funds to be committed during
the upcoming fiscal year detailing expenses for project components which include:
architect and engineer (AlE), construction, equipment, art in public places, and other
related project costs; and
WHEREAS, the projected costs of program manager services provided by Hazen and
Sawyer and URS for FY 2002-2003 are included; and
WHEREAS, on September 23, 2002 the FY2002-2003 Proposed Capital Budget and
updated Capital Improvement Plan were discussed at a joint meeting of the Finance and
Citywide Projects Committee and the General Obligation Bond Oversight Committee; and
WHEREAS, a copy of the proposed Capital Budget for FY 2002-2003 is included
below.
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION
OF THE CITY OF MIAMI BEACH, FLORIDA, that they hereby adopt and appropriate, the
City of Miami Beach/Miami Beach Redevelopment Agency Capital Budget for Fiscal Year
2002-2003 and adopt the Capital Improvement Plan for Fiscal Year 2002-2007.
Proposed Sources of Funding
GO Bond - Parks Proposed
Equipment Master Lease
GO Bond - Proposed
GO Bond 375
W&S Bond 2000
Storm Water Bond
SP ROA TIF
COT Interlocal Agreement
Parking Bond Fund 485
GO Bond 373
Parking Bond Fund 481
Local Gas Tax
GO Bond - Fire Safety Proposed
CMB General Fund
Parks Bond Fund 370
GO Bond 376
$
Revenue
10,570,403
7,202,147
6,629,130
6,282,035
5,346,082
4,825,939
4,025,706
3,096,239
1,571,600
1,446,050
370,000
355,000
350,000
224,438
70,000
18,854
Total $
52,383,623
This resolution shall take effect immediately upon its adoption.
ADOPTED this 26th
day of
(SEAL)
A~j p~
City Clerk
APPROVED AS TO
FORM & LANGUAGE
& FOR EXECUTION
~ r""""~
City Attorn Date
CITY OF MIAMI BEACH
COMMISSION ITEM SUMMARY
lQ
Condensed Title:
A Resolution adopting the City of Miami Beach and Miami Beach Redevelopment Agency Capital Budget
for Fiscal Year 2002-2003 and the Capital Improvement Plan for Fiscal Years 2003-2007.
Issue:
Shall the City Commission adopt the City of Miami Beach and Miami Beach Redevelopment Agency
Capital Budget for Fiscal Year 2002-2003 and the Capital Improvement Plan for Fiscal Years 2003-2007?
Item Summa IRecommendation:
The City's first Capital Budget was adopted concurrently with the Fiscal Year (FY) 2001- 2002 operating
budget. It included the portion of the five year plan that would be committed during that fiscal year. This
year, following a comprehensive review of the CIP to insure that the Plan accurately reflects all project
budgets, funding sources and commitments, the Administration is presenting the updated CIP for FY 2003-
2007 for adoption by the City Commission. In future years, the Administration will submit an updated CIP
and the annual Ca ital Bud et concurrent with the submission of the annual 0 eratin Bud et.
Advisory Board Recommendation:
I N/A
Financial Information:
Finance Dept.
Source of
Funds:
D
Ci Clerk's Office Le islative Trackin
Patricia D. Walker
T:\AGENDA\2002\SEP2502\REGULAR\capital budget.doc
AGENDA ITEM
DATE
R'7D
'1-~-o~
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139
www.ci.miami-beach.f1.us
COMMISSION MEMORANDUM
Subject:
Mayor David Dermer and
Members of the City Commission
Jorge M. Gonzalez \~
City Manager Cp- U
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY
OF MIAMI BEACH, FLORIDA, ADOPTING THE CITY OF MIAMI BEACH
AND MIAMI BEACH REDEVELOPMENT AGENCY CAPITAL BUDGET
FOR FISCAL YEAR 2002-2003 AND THE CAPITAL IMPROVEMENT
PLAN FOR FISCAL YEARS 2003-2007.
Date: September 26, 2002
To:
From:
ADMINISTRATION RECOMMENDATION
Adopt the Resolution.
BACKGROUND
Planning for capital improvements is an ongoing process; as needs change within the City,
capital programs and priorities must be adjusted. The Capital Improvement Plan ("CIP")
serves as the primary planning tool for systematically identifying, prioritizing and assigning
funds to critical City capital development, improvements and associated needs.
Each year, City departments submit their projected capital needs for the next five year
period. All projects submitted for inclusion in the City's CIP are reviewed on the basis of
relative need, cost and availability of funding. The Finance Department and the Capital
Improvement Office provide assistance in preparing and reviewing the CIP for budgetary
planning purposes. The proposed documents are presented to the Finance and Citywide
Projects Committee and General Obligation Bond Oversight Committee for review, and to
the City Commission/RDA for approval and adoption.
The CIP was created as a plan for projects that require significant capital investment and is
intended to serve as an official statement of public policy regarding long-range physical
development in the City of Miami Beach. The CIP specifies and describes the City's capital
project plan and establishes priorities for the upcoming five year period.
Following the adoption of the CIP by the Mayor and City Commission in July of 1999,
individual projects within neighborhood areas have been combined to create "packages" of
projects that address the neighborhood needs for infrastructure upgrades, traffic flow,
enhancements, etc. This comprehensive approach minimizes disruptions and generates
costs savings. The projects address many needs in different areas of the City including:
neighborhood enhancements such as landscaping, sidewalk restoration, traffic calming,
parking, drainage improvements and roadway resurfacing/reconstruction; park renovation
and upgrades; and construction or renovation of public facilities. Additionally, to forward
this effort, the City has entered into agreements with Hazen and Sawyer, P.C. and URS
Corp. to provide program management and assist in obtaining architectural, engineering
and other relevant professional services.
The City's first Capital Budget was adopted concurrently with the Fiscal Year (FY) 2001-
2002 operating budget. It included the portion of the five year plan that would be
committed during that fiscal year. This year, following a comprehensive review of the CIP
to insure that the Plan accurately reflects all project budgets, funding sources and
commitments, the Administration is presenting the updated CIP for FY 2003-2007 for
adoption by the City Commission. In future years, the Administration will submit an
updated CIP and the annual Capital Budget concurrent with the submission of the annual
Operating Budget.
ANALYSIS
CaDital Budaet
The Proposed Capital Budget for FY 2002-2003, attached as Exhibit A, totals $52,383,623
and includes ninety-four projects and capital equipment acquisitions recommended for
appropriation in conjunction with the FY 2002-2003 Operating Budget. It itemizes project
funds to be committed during the upcoming fiscal year detailing expenses for project
components which include: architect and engineer (AlE), construction, equipment, art in
public places, and other related project costs. Additionally, the projected costs of program
manager services provided by Hazen and Sawyer and URS for FY 2002-2003 are
included. Capital reserves, debt service payments, and other capital purchases found in
the Operating Budget are not included in this budget.
Major projects that are underway or scheduled to begin in FY 2002-2003 include the
following:
Parks
Improvements to Flamingo Park
Improvements to Lummus Park
Improvements to Collins Park
Improvements to North Shore Golf Course & Club House
Improvements to Fairway Park
Improvements to Muss Park
Improvements to Washington Park
The Garden Center Renovations: Phase II
Public Facilities
Redesign and renovations to the Public Works Yard
Convention Center Restroom and ADA Renovations
Public Safety
Fire Station 4 renovation
Fire Station 2 renovation
Public Works
La Gorce Neighborhood Streetscape
Ocean Front Neighborhood Streetscape
Washington Avenue Master Plan
Palm Island Guard House
ParkinQ
UPwade Electrical Systems
1 i Street Parking Garage Structural Repairs
Surface Lot Renovations - Phase "
Eauipment
Replacement and Purchase of cars and light trucks
New Radio System and Tower
Capital Improvement Plan
The 2003-2007 CIP for the City of Miami Beach is a five year plan for public improvements
and capital expenditures by the City. This document is an official statement of public policy
regarding long-range physical development the City of Miami Beach. The approved Capital
Improvement Plan has been updated to include projects that will be active during the fiscal
years 2003 through 2007 and to reflect additional funding sources that have become
available, changes in project timing, and other adjustments to ongoing projects as they
have become better defined.
Certain adjustments have been made to reclassify for budgeting purposes, previously
appropriated funds from a cash flow basis to a commitment basis; other project
appropriations have been adjusted to reflect projects that have been reconfigured, re-titled,
combined with or separated from other projects and/or project groupings. Adjustments for
appropriations that were made at the funding source level rather than at a project level
have also been included. These adjustments have no fiscal or cash impact and are as a
result of a comprehensive review of the program to insure that our plan accurately reflects
all project budgets, funding sources and commitments.
On September 23, 2002 the FY2002-2003 Proposed Capital Budget and updated Capital
Improvement Plan was discussed at a joint meeting of the Finance and Citywide Projects
Committee and the General Obligation Bond Oversight Committee. A presentation was
made outlining the neighborhood enhancements, park renovation and upgrades,
construction of new facilities, and upgrades to utility systems that were planned for FY
2002-2003. Copies of the Proposed Capital Budget for FY 2002-2003 and the updated
Capital Improvement Plan were distributed to each member in advance. The Capital
Improvement Project Office Director, Chief Financial Officer, department directors,
representatives from URS and Hazen and Sawyer (program managers) and other City staff
were available to discuss specific projects and respond to the Committee's questions.
The Proposed Capital Budget for FY 2002-2003 along with the updated Capital
Improvement Plan for FY 2003 - 2007 has been provided under separate cover.
CONCLUSION:
The Administration recommends adoption of the attached Resolution, which establishes
the Capital Budget for Fiscal Year 2002-2003 and the Capital Improvement Program for
Fiscal Years 2003-2007.
JMG:PDW:mim
F:\FINA\@CIP\Manuel\Capitallmprovement Program\FY 2003 CAPITAL BUDGEnFY 03 Capital Budget Memo.doc
Funding by Project
COT Interlocal Agreement
FY 03 Replacement of Chillers (SE Chiller Room)
Convention Center & Topa Restroom, Interior and ADA Renovations & Porte Cochere
FY 03 Theater Interiors
FY 03 Painting of Convention Center Interior Halls and East Concourses
FY 03 /lJrway Recovery
FY 03 Miscellaneous Replacement
FY 03 Landscaping Convention Center & Theater
FY 03 ADA/Restroom Renovations .
FY 03 Seating Riser Maintenance
FY 03 Theater Walk of Stars Refurbishment
FY 03 A Hall Divider Drape
FY 03 Valet Booth Construction
FY 03 Boom Lift
FY 03 Replacement of Door Closures - Convention Center Glass Doors
FY 03 Cleaning Equipment
FY 03 Table Replacement
FY 03 Theater Marquee Refurbishment (Complete refurbishment of pylon)
FY 03 Insulation of West Wrap Chilled Water Pipes
FY 03 Linen Replacement
FY 03 Security Camera Replacement
FY 03 Scooter Replacement
FY 03 Landscaping (General)
FY 03 Replacement Benches
FY 03 ATC Security Camera Maintenance
CMB General Fund
Fire Station 4 Renovation
Equipment Master Lease
Infonnation Technology
Fleet Management
Water and Sewer
GO Bond - Fire Safety Proposed
Fire Apparatus Replacement
GO Bond - Parks Proposed
Flamingo Park - Park
South Pointe Park
Collins Park
"The Garden Center" Botanical Garden Renovations: Phase II
Lummus Park
Beach Patrol & 10th Street Auditorium
Normandy Shores Golf Course and Clubhouse
ADA City-Wide Renovations
Beach Planting - North Beach Segment
ADA Beach Access
Public Works Facility & Yard Renovation
Beach Planting - Middle Beach Segment
EXHIBIT A
Appropriation
Total by Source
$ 900,000
248,914
228,200
225,000
175,000
150,000
125.000
124.125
100,000
100,000
100,000
100,000
95,000
85,000
50,000
50,000
50,000
45,000
25,000
25,000
25,000
25,000
25,000
20,000
3 096 239
224,438
224 438
3,275,000
3,539,687
387,460
7202 147
350,000
350 000
1,951,878
1,812,435
1,665,910
1,250,410
1,001,058
627,000
512,996
250,000
231,710
207,000
189,499
181,711
Funding by Project
Roof Repairs - City Facilities
Beach Planting - South Beach Segment
Altos del Mar Park Improvements
Allison Park
Property Management Facility
GO Bond - Proposed
Ocean Front Neighborhood Streetscape
Public Works Facility & Yard Renovation
Pine Tree Park Shoreline
Collins Canal Bicycle and Pedestrian Trail
Normandy Shores Waterway Access
La Gorce Neighborhood Streetscape
Property Management Facility
Hydrographic Waterway Survey
Dickens Avenue Shoreline
GO Bond 373
Biscayne Point Neighborhood Streetscape
Bayshore Neighborhood Bid Package A: Bayshore-Ph I, Flamingo Terr-Ph II, & 40th St. Streetsc
Venetian Islands - Phase I - Islands (Bid Package C)
North Shore Neighborhood Streetscape
South Pointe Streetscape - Phase I
Fire Statlon 4 Seawall Repair and North Beach Police Dock
Lake Pancoast Streetscape (Bayshore Phase IV, Bid Package C)
Lower North Bay Road Streetscape '(Bayshore Phase II, Bid Package B)
Venetlan Islands - Belle Isle (Bid Package B)
Nautilus Neighborhood Streetscape
Ocean Front Neighborhood Streetscape
Normandy Isle I Normandy Sud Neighborhood Streetscape
Normandy Shores Neighborhood Streetscape
Lummus Area Neighborhood Streetscape (Flamingo Bid Package B)
Flamingo South Neighborhood Streetscape (Flamingo Bid Package A)
Flamingo North, East, and West Neighborhoods Streetscape (Bid Package C)
Venetian Islands - Phase II - Causeway (Bid Package D)
West Avenue I Bay Road Neighborhood Streetscape
Palm and Hibiscus Islands Streetscape
La Gorce Neighborhood Streetscape
South Pointe Streetscape - Phase III & Phase IV
Star Island
Sunset Islands (Bayshore Phase VI. Bid Package D)
GO Bond 375
Fire Station 2 Renovatlon
Fire Stetion 4 Renovation
Fire Apparatus Replacement
GO Bond 376
Venetlan Islands - Phase I - Islands (Bid Package C)
EXHIBIT A
Appropriation
175,000
156.710
144.150
137.105
75,831
Total by Source
10 570.403
3,613,886
2,231,154
185,000
176,250
141,500
130.207
64.883
60,000
26,250
6629130
286,543
250,068
220,362
202.683
100,000
67,980
65,317
38,171
36,380
30,693
25,836
25,083
21,495
15.544
15,525
14,642
11,607
11 ,269
2.465
1.662
1,266
1,164
95
1 446 050
4,482,160
1,738,095
61,760
6 282 035
18.854
18854
Funding by Project
Local Gas Tax
Pavements & Sidewalks
Street Lighting
ADA ROW Improvements
Parking Bond Fund 481
Upgrade Electrical Systems
Parking Bond Fund 485
Surface Lot Renovations - Phase II
17th Street Par1dng Garage Structural Repairs
Parks Bond Fund 370
Parks Administration
SP RDA TIF
South Pointe Park
South Pointe District Shoreline
South PoInte Streetscape - Phase I
South Polnte Streetscape - Phase III & Phase IV
South Pointe Streetscape - Phase V
South Pointe Streetscape - Phase II
Washington Avenue Master Plan Streetscape
Storm Water Bond
Washington Avenue Master Plan Streetscape
La Gorce Neighborhood Streetscape
Bayshore Neighborhood Bid Package A: Bayshora-Ph I, Flamingo Terr-Ph II, & 40th St. Slreetsc
West Avenue I Bay Road Neighborhood Streetscape
Venetian Islands - Belle Isle (Bid Package B)
Lower North Bay Road Streetscape (Bayshore Phase II, Bid Package B)
Aamingo North, East, and West Neighborhoods Streetscape (Bid Package C)
Flamingo South Neighborhood Streetscape (Flamingo Bid Package A)
Collins Canal Bicycle and Pedestrian Trail
Normandy Shores Neighborhood Streetscape
Convention Center East Streetscape
Nautilus Neighborhood Streetscape
South Pointe Streetscape - Phase III & Phase IV
City-Wide Flood Mitigation
Palm and Hibiscus Islands Streetscape
Venetian Islands - Phase I - Islands (Bid Package C)
South Pointe Straetscape - Phase II
South Pointe Streetscape - Phase V
South Pointe Streetscape - Phase I
Fira Station 4 Seawall Repair and North Beach Police Dock
Sunset Harbor Streetscape
South Pointe District Shoreline
Normandy Isle I Normandy SOO Neighborhood Streetscape
Sunset Islands (Bayshore Phase VI, Bid Package D)
EXHIBIT A
Appropriation
Total by Source
250,000
75,000
30,000
355 000
370,000
370000
1,271,600
300.000
1 571 600
70,000
70000
3,004,204
750,000
96.598
74.311
58.258
38.555
3,780
4 025 706
1,515.722
1,234,096
454,240
444.654
316.873
116,515
111,362
94,768
92,700
64.983
52.883
51,735
51,290
40,500
34,807
34,776
20.787
18,665
18,251
13,390
12,000
11.845
10.812
8,285
4 825 939
Funding by Project
W&S Bond 2000
Washington Avenue Master Plan Streetscape
Collins Avenue 12" Water Main 41 st to 44th Streets
17th Street Force Main
Pump Station 29 Upgrade
North Shore Neighborhood Streelscape
III Mitigation - Waste Water Sewer Renovation & Upgrades
Venetian Islands - Phase I - Islands (Bid Package C)
Lower North Bay Road Streetscape (Bayshora Phase Ii, Bid Package B)
Venetian Islands - Belle Isle (Bid Package B)
Flamingo North, East, and West Neighborhoods Streetscape (Bid Package C)
Normandy Isle I Normandy SOO Neighborhood Streetscape
Bayshore Neighborhood Bid Package A: Bayshore-Ph I, Flamingo Terr-Ph Ii, & 40th SI. Streetsc
Collins Ave Waste Water Force Main
Nautilus Neighborhood Streetscape
South Pointe Streetscape - Phase III & Phase IV
Sunset Islands (Bayshore Phase VI, Bid Package D)
Normandy Shoras Neighborhood Streetscape
Lummus Area Neighborhood Streetscape (Flamingo Bid Package B)
Blscayne Point Neighborhood Streetscape
Palm and Hibiscus Islands Streetscape
South Poinle Streetscape - Phase I
South Pointe Streetscape - Phase Ii
Flamingo South Neighborhood St~pe (Flamingo Bid Package A)
Star Island
EXHIBIT A
Appropriation
Total by Source
2,292,075
960,856
550.826
236.022
167.879
146.011
137,088
120,127
95,213
88.874
86,569
81,027
73,443
57,712
50,821
50,739
47,939
38,244
15.740
14,680
11.337
8,575
7,308
~
Grand Total $ 52,383,623