Loading...
2002-25012 Reso RESOLUTION NO. 2002-25012 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ADOPTING THE FISCAL YEAR 2002-03 OPERATING BUDGET FOR THE ELECTROWAVE SHUTTLE SERVICE, IN THE AMOUNT OF $2,310,000; AND APPROPRIATING A FUNDING PACKET WHICH INCLUDES $350,000 IN SERVICE DEVELOPMENT PROGRAM FUNDS FROM THE FLORIDA DEPARTMENT OF TRANSPORTATION (FOOT), FOR THE WASHINGTON ROUTE; $300,000 IN CONCURRENCY MITIGATION FUNDS-SOUTH BEACH; $100,000 IN PROJECTED FARE COLLECTION REVENUES; $20,000 IN PROJECTED ON-BOARD ADVERTISING REVENUES; AND FURTHER INCLUDING $300,000 IN FEDERAL CONGESTION MITIGATION AND AIR QUALITY (CMAQ) FUNDS PREVIOUSLY APPROPRIATED FOR THE PURPOSE BY RESOLUTION NO. 2002-24923, DATED JULY 10, 2002; AND $1,240,000 IN THE FY 2002-03 PARKING ENTERPRISE FUND BUDGET, SUBJECT TO APPROVAL ON SEPTEMBER 26,2002. WHEREAS, the Electrowave Shuttle Service to South Beach has been in operation since January 1998, and has carried over 4.1 million passengers to date; and WHEREAS, the Fiscal Year 2002-03 Operating Budget is proposed at $2.31 million (the Budget); and WHEREAS, the City is being asked to contribute $1.24 million in FY 2002-03 Parking Enterprise Fund Budget, or 53.68% of the total Budget; these local funds also include the required matching funds to the FDOT and FTA contributions to the operating budget; and WHEREAS, the additional 46.32% will come from $350,000 in FOOT funds for the Washington Route; $300,000 in Federal Congestion Mitigation and Air Quality (CMAQ) funds for both routes; $300,000 in Concurrency Mitigation funds; $100,000 in projected fare collection revenues; and $20,000 in projected on-board advertising revenues; and WHEREAS, the above mentioned funds need to be appropriated for the Budget purposes. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby adopt a Fiscal Year 2002-03 Operating Budget for the Electrowave Shuttle Service, in the amount of $2,310,000; and appropriate a funding packet which includes $350,000 in Service Development Program funds from the Florida Department of Transportation (FOOT), for the Washington Route; $300,000 in Concurrency Mitigation Program funds-South Beach; $100,000 in projected fare collection revenues; $20,000 in projected on-board advertising revenues; and further including $300,000 in Congestion Mitigation and Air Quality (CMAQ) funds previously appropriated for the purpose by Resolution No. 2002-24923, dated July 10, 2002; and $1,240,000 in the FY 2002-03 Parking Enterprise Fund budget, subject to approval on September 26, 2002. PASSED AND APPROVED this the 26th ,2002. ~ CITY CLERK \\CH2\VOL 1\WORK\$TRA\AMELIA\ELECTWVE\EWBdgto2.memo.doc N"PRCNfiDM1O FORMaLANGUAGII . FORDECUTION ~ Yfo/~ D* CITY OF MIAMI BEACH COMMISSION ITEM SUMMARY m ~ Condensed Title: A Resolution adopting a FY 2002-03 Electrowave Operating Budget, in the amount of $2,310,000; appropriating a funding packet which includes $350,000 in FOOT Joint Participation Agreement (JPA) funds, $300,000 in Concurrency Mitigation funds-South Beach, $100,000 in projected fare revenues, and $20,000 in on-board advertisement revenues; and further including $300,000 in Congestion Mitigation Air Quality (CMAQ) funds, and $1,240,000 in the FY 02/03 Parking Enterprise Fund budget, subject to approval on September 26, 2002. Issue: Shall the City Commission adopt the FY 2002-03 Electrowave Operating Budget? Item Summary/Recommendation: On September 25, 2001, the Mayor and City Commission gave the City and MBTMA an opportunity for one additional year of funding, either to bring the Electrowave Shuttle Service back to its original level of effectiveness and success, or have the project terminated by September 30, 2002. MBTMA reports, and the Administration confirms, that the goals and standards established by the City for the Service have been met or exceed during the first six-month period (April 2002), and either maintained or improved upon in the last six months (September 2002). The proposed FY 2002-03 Electrowave Operating Budget, in the amount of $2,310,000, is $156,064 larger than last year's, mainly due to the addition of a 12th shuttle vehicle (hybrid) to the existing fleet and service (approx. April 2003), plus Union and FTA-required cost of living increases. The City remains the major funding partner in the Service, by providing 53.68% of the total budget funds, utilizing Parking Enterprise funds. Oue to the fact that MBTMA did bring the service back into full operation, and met or exceeded the established FY 2001-02 performance standards, the Administration recommends approval of the FY 2002-03 Electrowave Operating Budget, at $2,310,000. Advisory Board Recommendation: IN/A Financial Information: Source of Funds: FY 2002-03 Parking Enterprise Bud et FOOT CMAQ 158.6217. CMF-SB (already approprtd.) Fare Revenue Advertising. Revenue Approved 1,240,000 D Finance Oept. 350,000 300,000 300,000 100,000 20,000 2,310,000 City Clerk's Office Legislative Tracking: I Amelia Johnson Sign-Ofts: Department Director City Manager \\CH2\VOL 1 \WORK\$TRA\AMELlA\ELECTWVE\EWBudget03.CIS.doc AGENDA ITEM DATE f{7I '1-,26 -() 2.. CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www.ci.miami-beach.f1.us CITY OF MIAMI BEACH To: From: COMMISSION MEMORANDUM Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez \ rJ-#~ City Manager () tJ Date: September 26, 2002 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, ADOPTING A FISCAL YEAR 2002-03 OPERATING BUDGET FOR THE ELECTROWA VE SHUTTLE SERVICE, IN THE AMOUNT OF $2,310,000; APPROPRIATING A FUNDING PACKET WHICH INCLUDES $350,000 IN SERVICE DEVELOPMENT PROGRAM FUNDS FROM THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT), FOR THE WASHINGTON ROUTE; $300,000 IN CONCURRENCY MITIGATION FUNDS-SOUTH BEACH; $100,000 IN PROJECTED FARE COLLECTION REVENUES; $20,000 IN PROJECTED ON-BOARD ADVERTISING REVENUES; AND FURTHER INCLUDING A $300,000 IN CONGESTION MITIGATION AND AIR QUALITY (CMAQ) FUNDS PREVIOUSLY APPROPRIATED FOR THE PURPOSE BY RESOLUTION NO. 2002-24923, DATED JULY 10, 2002; AND $1,240,000 IN THE FY 2002-03 PARKING ENTERPRISE FUND BUDGET, SUBJECT TO APPROVAL ON SEPTEMBER 26, 2002. ADMINISTRATION RECOMMENDATION Subject: Adopt the Resolution ANALYSIS Approximately one year ago, the Administration brought to the City Commission's attention the fact that the Electrowave Shuttle Service (the Project) had deteriorated considerably from March to September 2001, as a direct result of poor maintenance of buses and batteries, and lack of an appropriate and effective administrative structure. As a result, the City Commission set in motion several corrective actions, among them: o That an Administration-proposed Immediate Action Plan for the Electrowave Shuttle Service be implemented, in an attempt to correct the problems and bring the service back to an optimum level, within a period of six months, beginning October 1, 2001. o That the Electric Transit Vehicle Institute (ETVI) be hired to perform the expert mechanical maintenance services needed by the electric shuttle vehicles and batteries, replacing the City's Fleet Management Division. Proposed FY 2002-03 EW Operating Budget September 26, 2002 Page 2 o Completely outsource the general management for administration and operations of the Project to the Miami Beach Transportation Management Association (MBTMA), beginning October 1, 2001. o Hold MBTMA 100% accountable and liable for the success of the project; and o That MBTMA report back to the City Commission within a period of six months. o Via Resolution No. 2001-24586, dated September 21, 2001, which adopted the FY 2001-02 Electrowave Operating Budget, the City and MBTMA were given the opportunity for one additional year of funding, either to bring the shuttle service back to its original level of effectiveness and success, or have the project terminated by September 30,2002. RESULTS: At a Commission Workshop for the Electrowave, held on April 4, 2002, MBTMA made the required six-month presentation/report, based on the performance standards established by the City, as part of the MBTMA contract. The following 6-month and 12-month summary will fully describe the progress made by MBTMA and ETVI in bringing the Electrowave service back to its original level of effectiveness and success: Previous MBTMA MBTMA CITY / MBTMA 04/04/02 09/25/02 Performance Standards FY 2000-01 6-Mos.Report 12-Mos.Est. Goal Exceeded Reduce tows to less than 5 per week 3455 tows/year 5 tows in 03/02 less than 1 tcmNleek Improve shuttle availability to 75% Half of fleet Improved by 80% Goal Exceeded of existing fleet (11 vehicles) unavailable One bus unavailable 11 vehs.avail. Improve headways from previous 14-20 minutes 5-10 minutes Goal Exceeded 14-20 minutes to 10-12 minutes 5-10 minutes Evaluate/adjust service hours to meet 1 Oam-4am Wknd Up to 1 :00 a.m.only Goal Met ridership demands/efficiency of service 8am-2am Wkday (Continued process) Improve communication between Minimum to no Fully accomplished Goal Met operations and fleet maintenance communication Conduct quarterly evaluations of Accomplished. Goal Met transit operator & fleet maintenance Never done Quarterly reports and meet w/City to review results submitted. Submitted Develop & Implement marketing plan Under development Stage I implemented Increase ridership by 35% by 9/30/02 32,000 in 09/01 46,450 in 03/02 46,999 in 08/02 45% increase Goal Exceeded Proposed FY 2002-03 EW Operating Budget September 26, 2002 Page 3 Based on the above report, the Administration recommends the continuation of the Electrowave Shuttle Service, and the approval of both the proposed FY 2002-03 funding sources and of a Project operating budget, as follows: 1. PRESENT AND PROPOSED FUNDING SOURCES FY 2001-02 Funding Sources Proposed FY 2002-03 Funding Sources Parking Enterprise Funds - FY 02/03 Budget Congestion Mitigation Air Quality (CMAQ) Program FOOT Service Development Program/Collins Route. FOOT Service Development Program/Washington Route Concurrency Mitigation Funds-South Beach Projected fare collection revenues Projected on-board advertising revenues $1,283,936 300,000 150,000 139,993 150,000 110,007 * 20,000 $2,153,936 $1,240,000 300,000 -0- 350,000 300,000 100,000 20.000 $2,310,000 * Farebox revenue this year will be approx. $80,000 due to impacts of weather and diminished tourism. 2. PRESENT AND PROPOSED OPERATING BUDGETS: Expenditure Categories FY 2001-02 Budget Projected FY 2001-02 Costs Proposed FY 2002-03 Budget Red Top Transportation (transit operator contract) ETVI (shuttle vehicle/battery maintenance contract) MBTMA administrative costs Insurance on shuttle vehicles (12 vehicles) Miscellaneous operating costs Information services (Marketing) Electricity to charge batteries Propane for AlC, and diesel fuel Communications (shuttle radios) Uniforms for shuttle drivers Telephones FY Budget Totals: $1,038,992 688,844 144,250 91,350 80,000 30,000 35,000 33,000 5,000 6,000 1,500 $2,153,936 $1,035,000 670,000 144,250 87,000 (11vs.) 80,000 30,000 32,000 60,000 o 4,800 100 $2,140,150 $1,124,900 * 1 690,000 * 2 160,000 * 3 92,000 * 4 82,000 * 5 40,000 * 6 35,000 80,000 * 7 o * 8 6,000 100 $2,310,000 Asterisk ( * ) Items -Justifications for the budget line items which propose cost increases: 1* The Red Top Transportation, Inc. contract, at $1,124,900, includes the following: o Union wages for drivers @ $8.40/hr., as required by FTA, plus cost of living increases for dispatchers and supervisors. o Bus service 365 days/year, 7:30 a.m. to 1 :30 a.m., 8 vehicle-service, 2 in rotation service, 1 being maintained. o Addition of a 12th bus (electric-hybrid) to route service, beginning April 2003. Proposed FY 2002-03 EW Operating Budget September 26, 2002 Page 4 2.* The Electric Transit Vehicle Institute (ETVI) contract for maintenance services to shuttle vehicles, batteries and equipment, at $690,000, includes the following: o One full-time maintenance manager o Four (4) senior mechanics and 3 mechanic helpers (1 mechanic/1 helper per shift) o One 40-hour clerk o Maintenance schedules based on 4-day shifts /1 O-hour days o Cost of living increases o $35,000/year Insurance (garage keepers, general liability, umbrella policy, errors and omissions). o Upgrade old A1C lines/compressors in original buses (reduce propane consumption) 3.* MBTMA administrative costs, at $160,000, include the following: o Cost of living salary increases for four (4) employees. o Additional duties regarding FTA funds (preparation/filing of Section 15 Reports and electronic filing of all applications for earmarked funds). o Costs of hiring an independent auditor for the transferred EW Budget funds. A subsequent Item on this City Commission Agenda includes a General Management Agreement with MBTMA. 4.* Insurance on 12 Shuttle Vehicles, at $92,000. As approved by Resolution No. 2001- 24544, dated July 18, 2001, the City intends to purchase one electric/hybrid vehicle for testing purposes of the Electrowave project, bringing the shuttle fleet to 12 vehicles. 5.* Miscellaneous Operatino Costs, at $82,000. This category includes several items: o $30,000 agreement with the Parking Department/Loomis Fargo for the collection, processing and depositing of transit fares generated by the route services; o Debit-card reader maintenance and service; minor professional service contracts. o County-required permits, fees and inspection services for 12 shuttle vehicles. o Preparation of ridership surveys, market analysis and other services, as needed. o City internal service costs (water and sewer service, property maintenance, etc.) to be billed to MBTMA by the respective City divisions. o Other miscellaneous unforeseen expenses. 6.* Marketino (Public Information), at $40,000, includes the following additional items: o New informational signage for the shuttle stops. o Develop w/merchants a Park & Shop program for Washington Ave / Lincoln Road. o Focused marketing with hoteliers to increase the Collins Route ridership. 7.* Propane and diesel fuel, at $80,000, for the following reasons: o Increased propane costs due to the fact that the entire shuttle fleet is back to full operation. o Diesel fuel is now needed for tow truck, forklift, and one electric-hybrid vehicle. o The rate per gallon of propane has increased, and a surcharge is being added per refill of the propane storage tank in Terminal Island. Proposed FY 2002-03 EW Operating Budget September 26, 2002 Page 5 8.* Shuttle Radios: The cost of shuttle radios has been included as part of the transit operator contract (Red Top Transportation). Since 1998, when the Electrowave Service began operations, the City has learned that there is a very limited number of outside sources available to help fund transit operations, and these sources are shrinking each year, due to competition from other Miami-Dade communities which are also implementing their local shuttle services. In the future, additional sources of recurring operating funds may become available to the City, iflwhen the following happens: CJ Miami-Dade voters approve a half-cent increase on the sales tax, in November 2002. q The City will soon become a "designated recipient" of Federal Transit Administration (FT A) funds. As a result of the new status, but beginning in FY 2004-05, two additional sources of FTA operating funds will become available, potentially bringing $400,000 to $500,000 in recurring funds to the Electrowave operating budget. CJ At the same time, the CMAQ program funds may no longer be available to the City, due to the fact that Miami-Dade County has attained Federal air quality standards. Based on the above-mentioned facts, it is essential that the City accept and assume its role as the maior contributor to the Electrowave operating budget, if the shuttle service is to continue to operate and prosper into the future, while doing the following for the City: CJ Helping reduce traffic impacts on the City's limited roadway network which, in places, is already at capacity or beyond capacity; CJ Being an essential component of a comprehensive parking and transportation system. CJ Helping the City meet concurrency requirements and prevent a building moratorium, due to the 'transit credits' received for providing a circulator/park-and-ride service. Transit systems worldwide are not self-supporting. Excepting for the San Francisco Trolley and the Tokyo Subway system, no other transit system worldwide is self- supporting. Any and all unaffiliated local circulator services, such as the Electrowave, are expensive to operate, since they do not possess the infrastructure and fleet size needed to generate substantial recurring revenues, or the outside funding opportunities that full- scale transit agencies command, due to the extent of the services provided. Therefore, the Electrowave requires full commitment on the City's part for continued operations and funding. CONCLUSION: MBTMA and its sub-contractors did bring the Electrowave shuttle vehicles, batteries, and route service back to the original level of efficiency and effectiveness, within the six-month period established one year ago by the Mayor and City Commission. Therefore, the Administration recommends approval of the FY 2002-03 Electrowave Operating Budget. JMG/RM/FB/PW/JC/JJ/AJ F:\WORK\$TRA\AMELlA\ELECTWVE\EWBdgt02.memo.doc