Loading...
LTC 218-2002 CITY OF MIAMI BEACH Office of the City Manager Letter to Commission No. 218-2002 To: Mayor David Dermer and Members of the City Commission Date: September 24, 2002 From: Subject: Jorge M. Gonzalez }d-~),~...~ City Manager Locker Room Repairs at Flamingo Pool The purpose of this LTC is to advise of the proposed repairs to the men's and women's locker rooms at the recently completed Flamingo Pool project. On June 14, 2002, the Flamingo Pool project was issued a Certificate of Occupancy by the City's Building Department. A substantial completion certificate was subsequently issued to the contractor, Regosa Engineering, Inc. on June 20, 2002, by the project architect, Corradino Group. As part of the substantial completion punch list, deficiencies were noted in the bathroom floors of both the men's and women's locker rooms. Specifically, the drains that were installed were placed at an improper elevation causing the bathroom floors to drain improperly. As part of the punch-list issued, the contractor has agreed to come back at a later date to repair these deficiencies along with other items identified during the substantial completion phase. Because of the City's desire to open this facility for use by our residents and the Parks & Recreation summer camp program that began in late June, the City determined that it was more beneficial to maintain the pool facility open for the summer and resume with the needed repairs at the completion of the summer program. On September 23, 2002, the contractor commenced with the needed repairs to both locker rooms. It is anticipated that the pool facilities will need to be closed for approximately one week for these repairs. JMG\RCM\TH~JDP