Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2018-30220 Resolution
RESOLUTION NO. 2018-30220 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 2 TO THE DESIGN/BUILD AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND RIC- MAN CONSTRUCTION, INC. FOR THE STORMWATER PUMP STATION ON 19TH STREET BETWEEN CONVENTION CENTER DRIVE AND MERIDIAN AVENUE PROJECT; SAID AMENDMENT NO. 2 PROVIDING FOR THE DESIGN AND CONSTRUCTION OF AN EXTENSION TO THE MIAMI BEACH BOTANICAL GARDEN ALONG THE COLLINS CANAL AS PART OF THE STORMWATER PUMP STATION IMPROVEMENTS, IN AN AMOUNT NOT TO EXCEED $387,124, PLUS OWNER'S CONTINGENCY IN THE AMOUNT OF $38,712, FOR A TOTAL AMOUNT OF $425,836; WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, on January 17, 2017, the City entered into a Design/Build Agreement with Ric-Man Construction, Inc. (Ric-Man) to develop, design, and construct the Stormwater Pump Station on 19th Street between Convention Center Drive and Meridian Avenue, in the amount of $6,332,389.80; and WHEREAS, as part of the scope of the Project, Ric-Man is to replace the existing seawall along the south perimeter of Collins Canal, abutting the Miami Beach Botanical Garden (Botanical Garden) property and the Holocaust Memorial; and WHEREAS, in order to gain access to the seawall and complete its replacement, some of the surrounding landscaping and portions of the existing walkway bordering Collins Canal in the vicinity of the Botanical Garden will be affected; and WHEREAS, on April 26, 2017, the City Commission referred an item to the Neighborhood/Community Affairs Committee (NCAC) to discuss the vision of the Botanical Garden's expansion to the northern swale and landscaped area along Collins Canal; and WHEREAS, the NCAC requested the City Commission refer this item to the Finance and Citywide Projects Committee (FCWPC); and WHEREAS, at the June 16, 2017 FCWPC meeting, the item was presented and the FCWPC favorably recommended to the City Commission to proceed with the design and construction of the improvements north of the Botanical Garden; and WHEREAS, staff recommended that a Change Order to the current Design/Build Agreement between Ric-Man and the City be issued to incorporate the proposed extension of the Botanical Garden as part of Ric-Man's seawall reconstruction, because adding the scope under this contract will be more efficient and expedient; and WHEREAS, on September 13, 2017, the Mayor and City Commission adopted Resolution No. 2017-30010, accepting the recommendation of the FCWPC, and approving the extension of the Botanical Garden to the Collins Canal, with previously appropriated funding in the current fiscal year budget; and WHEREAS, on January 5, 2018, Ric-Man presented a negotiated Cost Proposal for $387,123.61, for the extension of the Botanical Gardens to the Collins Canal; and WHEREAS, on February 9, 2018, Amendment No. 1 to the Design/Build Agreement was executed in the amount of $630,013.00, as approved by the City Commission pursuant to Resolution No. 2017-30020, to incorporate a permanent emergency generator as part of the Project; and WHEREAS, this Amendment No. 1 revised the total contract amount to $6,962,402.80; and WHEREAS, this Amendment No. 2, in the amount of $387,124.00, plus $38,712.00 for Owner's Contingency, will revise the total contract amount to a not-to-exceed total of $7,388,238.80. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission approve and authorize the City Manager to execute Amendment No. 2 to the Design/Build agreement between the City of Miami Beach, Florida, and Ric-Man Construction, Inc., for the Stormwater Pump Station on 19th Street between Convention Center Drive and Meridian Avenue Project; said Amendment No. 2 providing for the design and construction of an extension to the Miami Beach Botanical Garden along the Collins Canal as part of the stormwater pump station improvements, in an amount not to exceed $387,124, plus owner's contingency in the amount of $38,712, for a total amount of$425,836; with previously appropriated funding. PASSED and ADOPTED this ? day of arc k, , 2018. AN GELBER, MAYOR ATTEST: RAFA L . RANA 0, kITY CLERK 'e' r APPROVED AS TO FORM &LANGUAGE ,• .......... 0 &FOR EXECUTION (22.12....02r City Attorney I4cio Date Resolutions - C7 P MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: March 7, 2018 SUBJECT A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 2 TO THE DESIGN/BUILD AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND RIC-MAN CONSTRUCTION, INC. FOR THE STORMWATER PUMP STATION ON 19TH STREET BETWEEN CONVENTION CENTER DRIVE AND MERIDIAN AVENUE PROJECT; SAID AMENDMENT NO. 2 PROVIDING FOR THE DESIGN AND CONSTRUCTION OF AN EXTENSION TO THE MIAMI BEACH BOTANICAL GARDEN ALONG THE COLLINS CANAL AS PART OF THE STORMWATER PUMP STATION IMPROVEMENTS, IN AN AMOUNT NOT TO EXCEED $387,124, PLUS OWNER'S CONTINGENCY IN THE AMOUNT OF $38,712, FORATOTALAMOUNT OF $425,836; WITH PREVIOUSLY APPROPRIATED FUNDING. RECOMMENDATION The Administration recommends adopting the Resolution. ANALYSIS On January 17, 2017 the City entered into a Design/Build Agreement with RicMan Construction, Inc. (Ric-Man) to develop, design, and construct the Stormwater Pump Station on 19th Street between Convention Center Drive and Meridian Avenue in the amount of$6,332,389.80. As part of the scope of the Project, Ric-Man is to replace the existing seawall along the south perimeter of Collins Canal, abutting the Miami Beach Botanical Garden (Botanical Garden) property and the Holocaust Memorial. In order to gain access to the seawall and complete its replacement, some of the surrounding landscaping and portions of the existing walkway bordering Collins Canal in the vicinity of the Botanical Garden will be affected. On April 26, 2017, the City Commission referred an item to the Neighborhood/Community Affairs Committee (NCAC)to discuss the vision of the Botanical Garden's expansion, north to the swale and landscaped area along Collins Canal. The NCAC requested the City Commission refer this item to the Finance and Citywide Projects Committee (FCWPC). At the June 16, 2017 FCWPC meeting, the item was presented and the committee favorably recommended to the City Commission, to proceed with the design and construction of the improvements north of the Botanical Garden. Staff recommended that a Change Order to the current Agreement between Ric-Man and the City be issued to incorporate the proposed extension of the Botanical Garden as part of their seawall reconstruction. Adding the scope under this contract will be more efficient and expedient. Page 899 of 1522 On September 13, 2017 the City Commission adopted a resolution accepting the recommendation of the FCWPC, approving the extension of the Botanical Gardens to the Collins Canal with the funding coming from previously appropriated funds in the current fiscal year budget. On January 5, 2018, Ric-Man presented a negotiated Cost Proposal for $387,123.61, for the extension of the Botanical Gardens to the Collins Canal. The cost proposal was reviewed and analyzed by the Office of Capital Improvement Projects and the Public Works Department and was found to be fair and reasonable considering the complex logistics of construction. On February 9, 2018, Amendment No. 1 to the Design/Build Agreement was executed for $630,013.00 as requested by the City Commission under Resolution 2017-30020, to incorporate a permanent emergency generator as part of the Project. This Amendment No. 1 revised the total contract amount to$6,962,402.80. This Amendment No. 2 (Exhibit A), in the amount of $387,124.00, plus $38,712.00 owner's contingency, will revise the total contract amount to a not-to-exceed total of$7,388,238.80. CONCLUSION The Administration recommends adopting the Resolution. Amount 1 $387,124 Account 1 365-0815-069357-29-410-546-00-00-00- 27600- City Center RDA Amount 2 $38,712 Account 2 365-0815-069357-29-410-546-00-00-00- 27600- City Center RDA Total $425,836 Legislative Tracking Capital Improvement Projects ATTACHMENTS: Description o Exhibit A Amendment No.2 o Form Approved Reso Page 900 of 1522 Exhibit A AMENDMENT NO. 2 TO THE DESIGN/BUILD AGREEMENT BETWEEN THE CITY OF MIAMI BEACH,AND RIC-MAN CONSTRUCTION, INC. IN AN AMOUNT NOT-TO-EXCEED $425,836.00 FOR THE DESIGN AND CONSTRUCTION OF AN EXTENSION OF THE BOTANICAL GARDEN ALONG THE DADE CANAL, FOR THE STORMWATER PUMP STATION ON 19TH STREET BETWEEN CONVENTION CENTER DRIVE AND MERIDIAN AVENUE PROJECT This Amendment No. 2 to the Agreement made and entered this _day of 2018, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139 (hereinafter referred to as CITY), and Ric-Man Construction, Inc., as Design/Builder, having its offices at 3100 SW 15th Street, Deerfield Beach, Florida 33442 (hereinafter referred to as Ric-Man). RECITALS WHEREAS, on January 17, 2017 the City entered into a Design/Build Agreement with Ric-Man to develop, design, and construct the Stormwater Pump Station on 19th Street between Convention Center Drive and Meridian Avenue in the amount of$6,332,389.80; and WHEREAS, as part of the scope of the Project, Ric-Man is to replace the existing seawall along the south perimeter of Collins Canal, abutting the Miami Beach Botanical Garden (Botanical Garden) property and the Holocaust Memorial and in order to gain access to the seawall and complete its replacement, some of the surrounding landscaping and portions of the existing walkway bordering Collins Canal in the vicinity of the Botanical Garden will be affected; and WHEREAS, at the June 16, 2017 FCWPC meeting, the item was presented and the committee favorably recommended to City Commission, to proceed with the design and construction of the improvements north of the Botanical Garden; and WHEREAS, staff recommended that a Change Order to the current Agreement between Ric-Man and the City be issued to incorporate the proposed extension of the Botanical Garden as part of their seawall reconstruction; and WHEREAS, Ric-Man has submitted a proposal to perform the aforementioned Botanical Garden work for the amount of $387,123.61 and the Public Works Department and the Office of Capital Improvement Projects have found this proposal to be fair and reasonable; and WHEREAS, on February 9, 2018, Amendment No. 1 to the Design/Build Agreement was executed, for $630,013.00 as requested by the City Commission under Resolution 2017-30020, to incorporate a permanent emergency generator as part of the Project; and WHEREAS, this Amendment No. 1 revised the total contract amount to $6,962,402.80; and WHEREAS, this Amendment No. 2, in the amount of $387,124.00, plus $38,712.00 owner's contingency, will revise the total contract amount to a not-to-exceed total of$7,388,238.80. Page 901 of 1522 NOW. THEREFORE. the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration,the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No. 2. 2. MODIFICATIONS The Agreement is amended to incorporate Exhibit"A-1 (proposal)attached hereto. 3. OTHER PROVISIONS All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 2. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 2 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH, FLORIDA Rafael E. Granado, Dan Gelber City Clerk City Mayor ATTEST: DESIGN/BUILDER: RIC-MAN CONSTRUCTION FLORIDA, INC. Secretary President Print Name Print Name Attachment: Exhibit A-1 Page 902 of 1522 3100 SW I COST. Mt Dee�he\dBeach' Hohda33442 ] 00ioc(964)436-1221 ---~- Fax{954)426'1226 City of Miami Beach January 18, 2018 1700 Convention Center Drive Sent Via Email Miami Beach,FL 33139 Original Email Sent on 1/5/2018 Atto:Jorge Rodriguez Re: RFP NO. 2016-052-KB Design/Build Services for Stormwater Pump Station on 19'h Street Between Convention Center Drive arid Meridian Avenue (Phase li) Subfect: Botanical Gardens Change Order Jorge, As a follow-up to the meeting with Botanical Gardens in Mid-December and to supplement our submission made to you on 12/9/17, please accept this final version of our estimate to perform the extra work contemplated along the newly constructed Sea Wall bordering the Holocaust Memorial and Convention Center Drive.Our revised cost is $387,123.61 as detailed on the attached spread sheet along with support documentation attached. As previously stated we recommend a healthy contingency for this work since the Botanical Garden management may request upgrades not included in the attached scope of work.Also,a time extension will be required to the contract if Notice to Proceed is not provided onorbefore}auuacy31, 3018. With respect to the Landscaping component of the work, it is RMCF's position that the plantings defined under the 100%drawings at the Seawall area are covered under the Contingency Allowance for Landscaping, item 33 in the amount of$50,000. Our support for this is the description of work in the DCP and as supported under Addendum 4- Question 23 wherein the City confirmed that*The allowance provided in the cost proposal form will be for the construction of any Landscaping required at the seawall and energy dissipater. (Addendum 4 attached). Consequently, RMCF carried no budget for Landscaping in its original proposal over and above item 33. We await your approval to proceed with this important work. Regards, Michael R. Fischer, COO. Ric-Man Construclion FL, inc K | C ' w ^ w ( " , . / x uc / / p ^ ^ n ' u * . | ` ^ Page 903 of 1522 31003W15yStreet Decr5e>dBeach, Hnhda3J442 ° O[�ce (9S4)426-132I --- -- Fas(954)426'1226 __-_ -__... .... City of Miami Beach January 18, 2018 1700 Convention Center Drive Sent Via Email Miami Beach,FL 33139 Original Email Sent on 1/5/2018 Attn: Jorge Rodriguez Re: RFP NO. 2016-052-KB Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue (Phase 11) Subject: Botanical Gardens Change Order Jorge, As a follow-up to the meeting with Botanical Gardens in Mid-December and to supplement our submission made to you on 12/9/17, please accept this final version of our estimate to perform the extra work contemplated along the newly constructed Sea Wall bordering the Holocaust Memorial and Convention Center Drive. Our revised cost is $387,123.61 as detailed on the attached spread sheet along with support documentation attached. As previously stated we recommend a healthy contingency for this work since the Botanical Garden management may request upgrades not included in the attached scope of work.Also,a time extension will be required to the contract if Notice to Proceed is not provided on or before January 31, 2018. With respect to the Landscaping component of the work,it is RMCF's position that the plantings defined under the 100%drawings at the Seawall area are covered under the Contingency lowance for Landsca ^ug,item 33 in the amount of$5O,0DU.Our support for this is the daucripUouu[vvurkiodbeDCpandausuppo/^todunderAddeodwom4' OuesCion 23 wherein the City confirmed that'The allowance provided in the cost proposal form will be for the construction of any Landscaping required at the seawall and energy dissipater. (Addendum 4 attached). Consequently, RMCF carried no budget for Landscaping in its original proposal over and above item 33. We await your approval to proceed with this important work. Regards, \_-.- c - / `^ /�� Michael R. Fischer,COO. Ric-Man Construction FL, Inc K | C - \I A \ t ^ � x / ^ " ' / 1 ° \ I ' n x / " ` | w ' Page 904 of 1522 3100 SW 15th Street dT. R,owl Deerfield Beach,Florida 33442 DEIRmaosEg,,,sod Office:(954)426-1221 Fax:(954)426-1226 CC: Jon Klion Carlos Tort Luis Soto Sabrina Baglieri R I C - M ,A N C u N s t R t i o \ E t. o K E t) s . IN ( Page 905 of 1522 . ......_..__................. -I f? .a.7.i...;74::•-::: ••''•••:. ',,Z",:i.-i'..,,, 7't; ;:3 fi.;;;;::i:'::14 ,4- 4' Hi ',',": .:4', Z G' ,.;. _ ,. •..,. _ - ..- - — ... ',.T 7....:;,',..;:-.:',.:1;2 ,-,f.;:-,-...3,-',.. :', ...: -,--]4 4.3 8 f•';', ..;',•• '1 3 .7 -,,, -:i. `,...i 7 7 7;77-7',.7,-".;,'T.--;.':;-• . '..r.,,,,, -7,.2 7-.-..: ,...z ,i-; !c2 CV •., . '' .-,' C\I .1 Lo 4 -1; T..':7,7:.•. •4,t'• ;-;7,7 4 4'4 7 7 „f;7,;••I.: :'. ,—• = ... 4- 0 4 (0 .. 1,:F; i..74 ,t,-'-9, '..--:‘, ...--,:-; :,:::r i..'i:-;is 0 M z z -,:- w c; , Oa 0_ 4. :1 3 -7-:. ...: 8 ?,,, , , 7., , '2,•,..1 ..., - „ - i i n ,.", L,. -,. .,,, '..;'.%."',.,.'i -'7.. .,.: .:: '1.. :::- :".. -;,•-,;•:. .1s, ..; . '.? 4 .„ ” = 4 'n,. t =".' ''' '''. " ;; ,f ;:',',.-„Ji ; ' s s , .°•.' ,,.. ,,', F ,,, • i, =,,,,,E. :; '. 72. '' 4 li '..';' ..=i•,'• ''.. 4'3 '' ' :-- ...;i. '''' '."4 :.' :t .'!: 7 F t 1 1;:f: ''' -I -,-.' ..;:- i• 7 ,? r; -.. e z -; !:- t.. I, _ ': ',., s e:'''e,..,. 4. zi 4 ,•;,.. ..i ',..' ,7-• n -,i'-i z ..-; , ; T,' z ', ji 6. .. ,, '%, ; , .'. ';'. : s, !,1.- ", ':. = ,,, ; — c 7.. , i.., r ‘.4 •- ,,-, ,, ,.. •,; c ,:- '.... ..,,.,, %.• 1 .-:4 -..-: 2 .;.:- ,-. t `.. -•,,--,--- S :, ..,:= '.. ,, ,?• 4. ;., .t•'4 -; t = „,-..,f,• ?; =;;; . :.., : .ti .:. 1 • , ..; . .. ;• 4 .r.— = = ..4, ...... -- ='!:. i : ...,-; ,.4 4 .,;; -.?. ..-.:, =, - 4'—.„ „ ,...'; _ ,.. , -• ., • ,. 2 'l 1 '''; t '''. :7- 7,''',' :c. `; -:..., 7, ....1.';'..''t..7!'7.!•:_i "2. 1, :-5,''''.' '.4 i'-', ., .7t: t. tv f, :'. t :f*-.Ts: ; li: '4 ., 7 7 11 it ,, : 71 a 4.1 . ' .. ' 'l.f.' .i.'. -S4 ,', �c2 y y fy'§ ti a_ p t sem 4/`° '�4 i.-+�+ ` , —' ...,' i. r.„,17,1,.., ,...,...,.., ,y; ,..„..,...„!,,.:: . ,..: ,,,„ -..,3N,. :. , ,:::, .,: ,.-.,.., ..,41,,,,i, .ist...i.7„,,,,,,,:: ,,,,-,. ,-...,, i ,t, -,,,,,,A\ ,..,,_ , , a- ,,-,--„,e �- e C aux 4 - Page 907 of 1522 DI 0::als AI lOP, IMO Arozozo Bros., Corp. , . ....,..,...., P.O. Box 924890. Homestead, FL 33092 - (305)24-6-3223 Fax(305)244-0481 LI 5754-17R.19th Street Miami Beadl Pump Station - Revised Description _ 1 , Size !Totai qty i Unit cost I Total Cost i ITiets&Palms -.. Bambusa malingents/StabreeIe Bamboo 12'OA lit 2.6 $750.00 $19,500.00 Bursera siman..talGumbe Limbo 12'OA lit,2.5'Cal. s \ 6 $450.00 $2,700.00 Cecooloba diveavfolla/Figecet Plum 12'OA tit,2.5"Cal. \ 11 $550.00 $6,050.00 Conecarpus erectus'Senceus'iSaver Butonweed 12'GA Ht.,2.5"Cal. .., \1/4,, 7 $400,00 $2,800.00 Conocanns erectus/Green Butenwood 12'OA Ft,2.5"Cal. \ 12 $400.00 $4,800.00 Cordia sehestena/Orange Geiger 12'OA Ht.,2.5'Cal. '`‘N. 7 $55000 $3,850.00 Myrelanthes fraornasiSimpsan Stopper 16'111,3'Cal. 21 $14250.00._ ....426,2511.00 Quer=v•vginianadime Oak 12'OA Ht.,2.5"Cal. '',... \'1,,i- 4 $550.00 i24000 /111 a Thrinax radiate/Red:1a Thatch Palm 6'CT,Matched -‘,.. 26 $1,500.00 $35,00k0.00 i j c, e, $1tri4r.00 It 10-12'tit X 8-10'Ser.,2-6"DEH 1 $750.00 $750.00 e . . ,.,.,. -..Jeantaso Palm 8'Ht.X 8'Spr. 1 $ 00.00 $400.00 Guatacum -i •num vitae 8'Ht.X 6'Spr.,2"0811 1 $. 00 $900.00 Hamel's. 4.s, fivebustt 1$'Fit X 15"Spr.,a"OEM 1 $1,000.*t $1,000,00. 'Simpson Stopper 10 Ht.X 8'Spr.,2.5*OBH 1 $500•v $500.00 sato;a- 4../Se01,,Palrn 15-20*Ht.X 12.Spr.,10*UM 3 •+.00 $1,200.00 Scattierla rrutescensitionda Boxwood 8Mt.X 8'Spr.,3"081-4 1 $'al.0° $500.00 c„1/ , .i,•. ' , ..--nn , • Total tao4scaaa—: $11 i.i 00 Budget:Irrigation System Lump Sum 1 $10,000.00 $10,000.00 inigaiiOn $10,000.00 Total Intgadtioi $10,000.00 rannuiTotal $122,400.00 OtiatintattOartSt '''----t. - tandstils. *Landscape proposal is based upon dneiviri3144,kast dated 11121/2017 by Miller Legg. 5 / I. -Excavation of planting areas,soil to finish grade by others.All landscaped areas to be received denuded at+I-1"of finish grade. Excavation and Backfill of soils Is not included in proposal. q Al work associated with existing trees/plants/lawns to remain(inducting tree protection),be removed,or be relocated is not Included T , Inproposal. 0-,,,•,..4i., *Standard 2"x 4*wood bracing for trees and palms is induried in proposal. *Initial fertilizer is included in proposal.. r t I e *Tree grates,site furnishing,and hardscape items are not included In proposal, *Maintenance through acceptance only is included in propesai. A d *Root barrier,weed cloth and filter fabric are not included in proposal. a Structural soli(If needed)is not included in proposal. *Landscape permit fee is not Included in proposal. *All living material to be provided will be Florida#1 quality Kim iL . to the Florida Grades&Standards. *tioLinstallations-are-guarantaecifor_l_year from completion/final acceptance. 7- White Mangrove not included iri proposal.Not Available,„., i) .c i 1 I { i / ' - ------, tic( oi‘e ___ .. _ _,............., , 4 -----i.,;„ i.-`1 al",,11. .1.t Mt 1*12 ;...1.‘ i"A - Page 908 of 1522 (i i U?2(1/5 Arozozo Bros., Corp. P.0, Box 924890, Homestead, FL 33092 - (30$) 2464223 Fax(305)246.0481 ton. *irrigation proposal Is based upon drawings L-2last dated 11/21/2017 by Mr *Electrical drop and power hook-up fees for pump stations and controllers is not included in proposal. Trenching through/boring under paving/asphalt,or coring through existing concrete,are not included in proposal. *Water meter,deposit tapping services,service charges,and/or capital or impact fees are not included in proposal. SFWMDfeesarenotI ed in proposal. *-Pipe hanging is not included in proposal. "All sleeves are to be open c no bores are Included in proposal. consideration was given to the condition of any existing system herein. tion fee is not Included in proposal. . able Fel`(if needed)is not Included in proposal. 4`*i n Included In proposal. ''tLgigation proposal Is strictly budgetary and subject to change pending completed trriagtlon drawings.(Design fees are not Included If required) Any item not specifically listed is excluded from proposal. *Bond is not included In proposal. *MOT is not included in proposal,unless specifically detailed. *Hoisting of material,If needed,is not included In proposal, *This proposal shall be valid for ninety(90)days from date of issue. *Alternates,..If present,are to be added to the cost of proposal. *Please read all qualifications carefully,as there could be references to specific materials,quantities,or pricing that pertain to this particular project. Accepted By: Date: Submitted By: Date: **Acceptance shall serve as notice that proposal has been reviewed and approved and contract is forthcoming. tPioe eta Page 909 of 1522 AUSTIN TUPLER TRUCKING INC. M & G FILL CORP. 6570 S. I. 47TH COURT DAVIE, FLORIDA 33314 PHONE (954) 583-0801 FAX (954) 583-0844 Customer :RIC-MAN CONSTRUCTION, INC. Quoted To:BRUCE Project Name: BOTANICAL GARDENS Phone#: 954-426-1221 Project Address: 2000 CONVENTION CENTER DR Fax # : 954-426-1226 MIAMI BEACH Quote Date 12/06/17 DELIVERED PRICES OF TRUCKING AND MATERIALS These estimates are based on payment being made on a monthly basis with no retainage. These estimates are subject to change if FAX is not returned within five (5) working days of the date listed above. TAXES ARE INCLUDED IN THESE PRICES. These. Prices do not include supplying a Performance or PaymentBond. Exp-Date Quote#-Det Type of Material Rate Per(Ton/Cyd) 12/31/18 198210- 1 CR. LIME ROCK $ 15.57 Per TON Incl. Tax 12/31/18 198210- 2 # 57 ROCK $ 23.27 Per TON Incl. Tax 12/31/18 198210 3 SAND FILL $ 12.61 Per TON Incl. Tax 6/30/18 198210- 4 TOP SOIL $ 12.17 Per YRD Incl. Tax 6/30/18 198210- 5 50/50 SAND/TOP SOIL $ 19.39 Per YRD Incl. Tax Note: a 7.00 % Tax is included in the above prices, Any difference on the taxes will have to be paid by the customer. There will be a Diesel Surcharge of 2% for every $ .10 that diesel prices go up higher than $ 3.00 per Gallon (see www.fuelgaugereport.com) . All prices are based on hauling full size loads ONLY unless otherwise spedified. ,i b i.L actx, _ 1 - L 1 iit ki By signing delivery tickets, customer is fully liable for all trucking and materials and no credits or discounts will be given after tickets are signed. Prices are subject to change if the Quarry we are trucking from cannot fulfill it's obligation. Damage claims must be brought to our attention within twenty four (24 ) hours by Fax (954-583-0844) of occurrence with proof of all related cause of claim. Prices and deliveries cannot be guaranteed in the event of hurricane emergency clean up or work stoppages caused by any Unions or Labor Organizations. Accepted By: PLEASE CALL ME IF YOU Company name HAVE ANY QUESTIONS Name Title FROM : ERNIE CEBALLOS Page 910 of 1522 Sc WY , - A&M Brothers Concrete Carpi PROPOSAL /CONTRACT 91 tiE 12 Street PROPOSAL VALID FOR 90(NINETY) Homestead Fl,33030 CALENDAR DAYS Phone:(786)296 5979 Date.December 6.2017, 4 nt.f MR 1itorrii,I.4 4441) CONTRATIOR.:RIC-MAN Mint BROCA itt.OES-0-04:y PHONE: COUNT? PROf Ecr NAME: DOTANICA GARDENS ftm0001:011* 4ufts Utdtprke 11.#;frtiMq4,X0:61t Amount 6;"Sidswars with wire ineidi(Rork salt finish; S SJa.00 445 S 16,910.00 Nate:wtEtt:invoice base ois 'ttt.e:st'.raettsurstmenta TOTAL I PRICE INCLtJIDE LABOR,MATERIALS WIRE MESH AND 3000 REG CONCRETE. S 16,910.08 ittyd office,Impettcr)Conc:ete COrree-''eSt.311 NOT rtoteia MANITeArree of Traffic NOT meereeO V4,A.4144 Grathra 4114 5411. •.,.tp4r.,1t.tIA 4,eFIC 1C,44-C.1 5.2.1-4iLlytk4M.%Suet NOT 411e rock Br. )4I4 44448 stilt I . I48 CWIete Pump VI NOT ires:de,1 PAYMENT TO A&M Brat heta Cett,ttetts CottS CU,wIt,'1,r1 d..70f1 cireCetPt thSre cc A .P-3rn41rl "1"-:e'vez ttrte S-hafi tre oubrea.toimettst.at ttle.7-,:+1•42 of1.1%pe r month,ie.the everit 444legal as'Eon84teLtsarccl44402 CC this'1,4-44,c,!,A&Cleforw,. czawete smli,be en Med 144 r mover ito thne, ee aott oast Rir 40,4 N. The abrwc prices,specifications dnd s:onditions are satiseactory arigi are het easy accepted.You are authorized to do.the work as specified Payment will be made as outlined above Hate Name I Ittle Signature Page 911 of 1522 Michael Fischer From: Carlos Tort Sent: Thursday, December 07, 2017 2:34 PM To: Michael Fischer Cc: Jonathan Khan Subject: Botanical Gardens Gate Pr ice Mike I requested a quote from Solis Iron Works(I sent you and Bruce the contact info),they didn't provide a hard copy quote even though I asked for it instead they sent me a text message showing me the price. They charge$120.00 LEI of gate 10'ft tall or less it includes the fabrication,installation and paint. 40'Rolling Gate 8$4800.00 each 8'x 6'Security Gate 8$960.00 Carlos Tort, El Project Engineer Ric-Man Construction Fl, Inc, Cell:787-225-6194 Office:305-379-4000 -",,*A----eriA1 ' --------11" •"6141 ; MN- ,CONRON.8T. 1 (!?:F-,. EAFIELD 8E10,noitt,1?—) www.mancimcompanies.com 1 Page 912 of 1522 Bruce Roemmich From: Bruce Roemmich Sent: Thursday.July 13,2017 8:37 AM To: Albert Dominguez Subject: oolite I spoke with Lewis from Epic Stoneworks(305-255-2848) this morning and we will need to take care of the cranes to load at his place and unload at the job site he will take care of the trucking from his pit which is in Homestead He also advised to place the planters on a concrete slab do to the weight of them his price for the planters is 4600.00 and 200,00 for each one for trucking then we need to take care of the concrete slab,and the cranes if you have any further questions please call him, remember I think you might be a little low on those tree removals since we will need to trim some of them up so we can get in there and work Page 913 of 1522 ".steLlJ rash Rceeptacle. Sieci 11-3,h in - I hc1)',11.1'," I 2 tt• l',0Wtr,Ft PtV o 0$04! ,tf,t,".kost.ctot,:ft-ttt t, 14714 „:„.„ ••• •-4 0.04,0 „,• • 0#0 00-fr 0-kg 41*V7: 0.11,0 01,4rf 0 - fV http : ..therrIrkcatalog.c(wil stl-tnish-recet)tztyles 11 2 2(117 Page 914 of 1522 ( nott,:.ard F urtlittn,.. ( i'llitnerci d 13ctill.:-. in 1/4.1,1, c1,.. - t t I', GO .....:...c Azi r.-.•_1-..,*. EaL.,,,,--r•Nt.,,...r*.',,..*t.. : *-1..":,.,F,.x,:'t....1--3E4 ,._---er, COURTYARD FURNITURE elecar-cCoic.a for toes clic.'ShOppng cene .1- f-1 , ':`,. ',,,i44,140.73,".. , „,;44.--x-*..:7'„..f., . Durrable hea.y-duty tterat bar con3Lruclian Bencaes-L'croo,h camrartat e sect arra arrHteas —1 a -„d,Pted for Latrobe.cc eArHfcc,a Planter-C.Golfrt.)di.)...:,I 4.9caon 41-ser f.,,,,elf , ,......:-.,........5.,:' -4. tOiiacle . , rrosTra.ng.hay Owace sold.V3p0.atelv i , I . C0.240 ,Inc C-..u.',0,1 ctLypra --a,-.0 ab e bOurYARD EarrrLiTuRE MODEL stzt wr VICE EACH ADD TO DESCRIPTION tIO I.xWxH all 1 3.,. CART .c.taI 6 aencrt wth clf..it. 't r 26 I*.3: 257 $'*.SPS- $985 H-5CIrc .6 eartahLetrtroa-e0.-1,, 71 ,21 2!` ICS et:'z 145 -- L. I-4.F*7.X P‘ont,,,, 30Doro x'',-,'H l'....1: .6';E 5,55 morit41.NG'Oa-Dv/ARE ., MODEL P;rCE EACIT Apo re DESCRIPTIOI.1 FITS NO 1 3„, CAPT tL.,--.4.W•1 earch Mia,,,s,ing).4.atC....,-.„^.4 .2...C__E.cr,-L-,AD LL" V C ,..--.L.,,,- ,,,•rT..,4,L' iltt.p..s.,* \\‘‘LL.1.11.iLIQ CLAIL 1111 8.857 (-calrt\,itii-ittriltttitc Ii11117 Page 915 of 1522 in Stt)cl; t I [NI 1 1 - , GO. , LANDSCAPE BOLLARDS Inc:let:se safety w ge øtç.rYoul 410. buildng ona,.s/cikweyS r$osns on EmOnCt PebOunCts to its orginc.ftorn Etastornenc aolyrnet needs pctdnling, won't fuS`Of den! • Sate/ton trocithorcit Cos'iFOP OF Sle'01 t,040fd Oferf Installs soourelv with 4 cornenlIc boIts. ' • flat Top4,,?Itect.we tt-TP ot:tOs 340 Ler PPICZ TACH ADD To "°°11 DESCRIPTION HEIGHT "' NO CART Patina TOO " 5 c5 N-5,17.4 f'at loc„ http,„" I,N.t.11211e.k,IIIIIII 111 11 1 Page 916 of 1522 4,- . = . . i . . - - t.1 t 4: i 1.. . 0 0 g.2, Cis 6 l" 1 i R ie.8 • • glg ,,,, ,x? , I. I <0 5g t Q u! ! I i - , , ,4 p ; & . . , . U. . . i p- • ' 0 05 C\J i 0 f Lu Lc) 24 — i ou, i • 4- fX.4 0 , 1. 0) a) i ? • cr) co , c t a. • ,- - .5. t.. 2 ' , , • : i1 .,,..• 1 : , . r 55--,:•..7, ' EXHIBIT D-AMENDMENT s DESIGN SCOPE AND FEES (following page) Page 918 of 1522 DESIGN!SERVICES FOR STORM WATER PUMP STATION ON 19TH STREET BETWEEN CONVENTION CENTER DRIVE AND MERIDIAN AVENUE ADDITIONAL SERVICES AMENDMENT No. 5 BOTANICAL GARDEN EXPANSION January 3, 2018 . Prepared By: e‘, s 7650 Corporate Center Dm e Suite 300 Miami* FL 33126 Page 919 of 1522 Table of Contents DESCRIPTION OF SERVICES Design and Permitting • 60%Design Submittal • 100%Design Submittal • Limited Construction Support Services COMPENSATION ASSUMPTIONS List of Attachments A. Project Location B. Consultant Fee proposal C. Sub-consultants Fee Proposal D. Design Schedule soope_ot Work k'ump station @ 19 Street2 2 Page 920 of 1522 Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue DESCRIPTION OF ADDITIONAL SERVICES The scope of work is revised to include Botanical Garden Expansion improvements. The proposed scope of work is based on the request received from the City of Miami Beach on June 2017. / ,A frt. +Figure No. 01 Additional services to be provided shall include the following activities: * Civil Engineering Design, including paving, grading and drainage for the area shown on Figure No. 01 • Structural Engineering including fence and ancillary structures design O Electrical Engineering including circuiting, lighting specs and photornetrics • Landscape Architecture including hardscape,landscape and irrigation design. Design Services WSP shall prepare and submit design plans as part of the following phases: 60%Design Submittal For the development of this sub-task,WSP shall provide the following: • Site Plan/Demolition Plan,Legend and Notes • Fence structural plan and details • Lighting Plan including: Page 921 of 1522 Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue • Conducting a site visit to ascertain the existing conditions. • Coordination with City and utility company for verification of power availability. • Coordinate bollard/fixtures to be used, in accordance with City standards. • Prepare construction documents including circuiting, lighting specifications, photometrics, etc. • Provide construction specifications. • Landscape and Irrigation (see attachment C for scope of services) 60%Deliverables: • 60%Design Plans as follows: • Three(3)Copies,24"x 36"Design Plans 100%Design Submittal/Issued for Construction (IFC) The 100%Additional Services Submittal will include the following items: • Copy of Comments and Responses from 60%Submittal • IFC Package containing Plan Sheets, 100%Deliverables: • Provide Revised 100%Design Plans as follows: • Three(3)signed and sealed sets,24"x 36"Design Plans Limited Construction Support Services The Limited Construction Support Services will include the following items: a Responses to Request for Information (RFI) • Review and approval of Shop Drawings (maximum 3 submittals each) • As-Built Certification Limited Construction Services Deliverables: • Response up to 5 RFI's related to the Botanical Garden expansion • Review and approval of up to 10 Shop Drawings(maximum 2 submittals each) • As Built certification set. COMPENSATION The additional services described in the amendment to the Scope of Work shall be performed on a lump sum fee basis in the amount of SEVENTY-SEVEN THOUSAND SEVEN HUNDRED THIRTY-NINE DOLLARS AND FORTY-EIGHT CENTS($77,739.48). Reimbursable expenses for this contract include, printing and reproduction costs. Fees for limited construction Page 922 of 1522 Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue support services are accounted for in the total compensation. See attachment B for man-hour estimate for the additional services. See attachment C for Sub consultant Scope of Services breakdown for additional services. ASSUMPTIONS This scope of work and deliverables are based on the following assumptions: • At the end of each design milestone(60%,100%),Owner/Client will review the plans and technical specifications (if available) and forward review comments to WSP within 15 calendar days. • WSP shall make every effort to expedite the design process, including making necessary revisions(if necessary)to procure permits_ • A copy of all project related correspondence sent or received by WSP shall be sent to the Client/Owner as needed • WSP will utilize the City of Miami Beach's latest standard forms, construction contracts, standard design details, and design criteria and policies in completing the Construction Package. • Client will provide all construction observation services.WSP shall only provide support with RFI and shop drawings review. • Surveying services during construction are not included. • Utility relocations and test hole underground investigations are not part of the scope of work. • Landscape plan to be completed to comply with existing Tree Disposition Plan. • No soil investigation is included as part of the scope of work. • It is understood that current R/VV permit covers the improvements associated with the proposed design, • No dewatering activities are anticipated;therefore, a Class V permit is not included. Page 923 of 1522 Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue Ali DBIA assumptions remain in effect In executing this Amendment 5 to the Agreement,Design- Builder and Design Consultant each individually represents that it has the necessary financial resources to fulfill its obligations under this Agreement, and each has the necessary corporate approvals to execute this Amendment,and perform the Services described herein. DESIGN-BUILDER: DESIGN CONSULTANT: RIC-MAN CONSTRUCTION WSP USA,INC. (Name of Design-Builder) (Name of Design Consultant) (Signature) (Signature) Michael Fischer Rodritto Pigna (Printed Name) (Printed Name) CO© Area Manager (Tide) (Title) Date: Date: 01/04118 Page 924 of 1522 Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue ATTACHMENT A PROJECT LOCATION Srepa_or 4Vork_Puxnp_Stathon a 19 Street Page 925 of 1522 and Meridian Avenue ' Center Drive Between Convention , obit ,, Design/Build Services for Stormwater Pump Station on 19th Street S. _ f % Le .54:fely-t*4 .4,,4---- ., -„.444‘,,,'i- - - • - ,,..', * 1.,, 4'.*4 ' •''''., ,,...' :„..„, . ' , :,l'rt_or. t°4 lt,/04*° ifoelt• - .-t;- - ,i''' ,°"" "", -A 4.:i'' 1,' .k'' - ,7'4' e' 't t,-417'i---4,- 01.' ' •1‘,' % ',ts''' •:=,,, ' ----i,,': , „--4 -- ,"".- , , ,_,,p. *Ae'l' " ''':-frAA? , A"."' ...k4,=, ;17—t ''.3A‘V ?';'''' ''A *'4, Wrir -' --A1A\ ; ,f V .A, ''. ' ' A;:',A f . ii ., - ,4-, .,..„ f, ,e, I "N *,....1 , '- 0 ,„"„El.> h*"1/4„4,.. IIPW , '',P0-'- I i; , 'I ' s , , ,,,„,,,,,,,,.. „ - < i ' ,\}..,- : , c ,,,, ,,. '-.,,1„4,,,,,,,,' *:( 4: - ..., . ------.,:, `,, - I „ i5 , ilf-f, ‘. .c '-' ' 4- „;,,.‘0,1-\,--.R--f‘, i, 4 a 0111449. ' ' ° \ -tX .s, * 19th Street ', . •, ,*' ''i ''' k',,. .,,' '- , k'\, ft..6'. .• .‘‘,,,,- •,\. r, _ ...ak.. rfr' .„4.4-` '' Scope_of Work_PumP....Stabon @ l' Strec't Page 926 of 1522 Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue ATTACHMENT CONSULTANT FEE PROPOSAL Scope_of WorkkPump_Station 49 Street Page 927 of 1522 ___ -, Page 928 of 1522 Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue ATTACHMENT Sl BCONSULTANTS FEE PROPOSAL Scope of Work_Pwnp_Station @19 Street Page 929 of 1522 MILLER LEGG January 2, 2018 Via E-mai! werner.retnefeid@wsp.com Werner J. Reinefeld, P.E. Senior Project Manager WSP(Parsons Brinckerhoff) 7650 Corporate Center Drive, Suite 300 Miami, FL 33126 Re: Miami Beach 19th Street Pump Station (the "Project") Miller Legg Project No. 16.0B005 Additional Services—Additional Landscape Architecture Services Dear Werner: Thank you for the opportunity to submit the attached Additional Service Agreement for the above-referenced Project. Please have an authorized Client signatory sign and initial the attached Agreement and Exhibit A pages where indicated and return for Miller Legg's execution. A fully executed copy will be emailed to you for your file. Should you have any questions, please do not hesitate to contact me at (786) 581- 2513, or miuncaIOmillerlega.com. Again, thank you for this opportunity, and I look forward to speaking with you soon. Very truly yours, 444,717-004.4./ C. Miguel Juncat, RLA Landscape Architect CMJ/brs Attachments V:441MeK xis is OeCca fAatn.ea►:1t 19e S,Sx.,-nrfate,Po,*fiaimn•Gbrorwts`,com±xESAS 1 3m6 moon Sonat gro1er'AWdamane for DRQ.S•a?.1;..f'.clrcx Documeni1 IMPROVING COMMUNITIES. CREATING ENVIRONMENTS. South Florida Office: 5747 N Andrews Way• Fort Lauderdale,Florida 33309.2364 (954)436-7001 - Fax: (954)493-6539 (.1,,i'F www.millerlegg.com Page 930 of 1522 ADDITIONAL SERVICE AGREEMENT FOR PROFESSIONAL SERVICES Client• WSP (Parsons Brinckerhoff) Werner Reinefefd, P.E. Client Representative: 7650 Corporate Center Drive. Ste Address: 300 Address: Same Miami, FL 33126 Phone/Fax: 305-514-3100 Email: wemer.reinefeld@wsp.com Date: 1/2/18 Project No: 16-DB005 T: R: S: Project Name and Location: NW 1e Street Pump Station (the "Project") Miami Beach,Miami, FL Additional Services-Additional Landscape Architecture Services Description of Services to be Provided: See Exhibit A Fee: Lump Sum of $13,650.00 AND/OR Hourly not to exceed (NTE)fee of $ NIA AND/OR Reimbursable Expenses Lump Sum of $N/A AND/OR Reimbursable Expenses initial Budget of SN/A Retainer: (Payable upon execution of this Agreement) $N/A Special Conditions: N/A Notice to Owner: is the Client the Owner of the Property? pities EINo If"No", Owner's name and address:City of Miami Beach The undersigned agree [that these Additional Services shall be in compliance with the Agreement, General Conditions and Special Provisions dated December 20,2016. Any additional requested services will be addressed in a separate agreement. Miller, Legg&Associates, Inc.d/b/a Miller Legg WSP(Parsons Brinckerhoff)(Client) (Consultant) Date: Date: Signature Signature Michael 0. Kroll, ALA, FASLA President Printed Name/Title CMJ/brs Attachment: Exhibit A ML Project No: 16-DB005 AS 1 2 of 3 Initial.ML CNent:- ` Page 931 of 1522 • January 2.2018 EXHIBIT A-SCOPE OF SERVICES NW 19th Street Pump Station(the "Project") Additional Services-Additional Landscape Architecture Services 1.0 PROJECT DESCRIPTION 1.1 The Project is generally described as follows: Consultant shall provide additional landscape architecture and hardscape design services related to the canal seawall. The project Is located in Miami Beach, FL 2.0 BASIS OF SCOPE 2.1 General: • The 'Client"for this proposal shall be WSP. The "Consultant"is Miller Legg. • Consultant's design scope is limited to landscape and hardscape improvements associated with the seawall. • The Project will be designed, permitted, and constructed in one (1) phase. An additional service will be required it phasing plans are needed. • The site is not subject to any requirements stemming from a Phase 1 or Phase 2 environmental site assessment(ESA). • No book format specifications are included in the scope. All specifications and notes will be provided on the drawings. If book format specifications are required, they will be provided as an additional service. • Record drawing preparation is not included in the scope. If required, this can be provided as an additional service. • The design submittals shall be structured into the following phased submittals: • 60% Final Design Documents • 100% Final Construction Documents • Maintenance of traffic design and permitting are not included in the scope. 2.2 Landscape Architecture: • Additional tree removal and/or relocation plan shall be provided for only the project area. Additional Tree Permitting shall also be provided to the City of Miami Beach. ▪ Additional Landscape.Plan shall be provided for only the project area. ML Project No. 1 6-DB005 AS1 Page 1 of 7 Initial: ML: Page 932 of 1522 January 2,2018 • A hardscape plan shall be provided for only the Project area. • An Irrigation plan shall be provided for only the Project area. 3.0 INFORMATION/SERVICES TO BE PROVIDED BY CLIENT 3.1 All required digital AutoCAD format survey, subsurface utility and as-built information prior to design commencement. 3.2 Client will provide all permit submittal and processing services, except for tree mitigation and FDEP SWPPP permitting to be done by Consultant. 3.3 Client will provide all construction observation services. Consultant shall only provide support with RFI and shop drawing review. 3.4 Filing and permit application fees, review fees, impact fees or any other associated assessments by other governments/agencies. 3.5 Copies of all relevant data, including correspondence, traffic reports, plans or information in Client's/Owner's possession which may be beneficial to the work effort performed by Consultant. 3.6 All civil engineering, traffic,parking or transportation study or design services. 3.7 Geotechnical services for soils determination of the paving, earthwork and "k' value prior to civil and drainage design. 3.8 A letter from the property owner granting access to the site and giving approval for Consultant to perform the services listed below. 3.9 Any and/or as-built information on existing irrigation system or location of water source point of connection. 4.0 SCOPE OF BASIC SERVICES AND FEE The scope of services to be provided by Consultant shall be as follows: LANDSCAPE ARCHITECTURE TASK'S Task 1 Additional Landscape Construction Documents - Consultant shall prepare landscape construction documents based on the approved 100% CD hardscape plans. The documents shall include plans, details, quantities, notes and size specifications for landscape installation. The landscape design shall complement the site design, define boundaries and spaces, enhance desirable views, discourage unwanted foot traffic and screen undesirable views. One (1) iteration of revisions based on Client comments shall be included in this Task. ML Project No. 16-DB005 AS1 Page 2 of 7 Initial: ML: Client Page 933 of 1522 January 2.2018 • Consultant shall make the following CD submittals and attend up to two (2) CD Review meetings as follows: = 60%CD submittal/review. • 100%CD submittaVreview. • Additional meeting attendance shall be provided as additional services. Task 2 Hardscape Construction Documents - Consultant shall prepare hardscape construction documents based on the approved civil plans. These drawings shall include plans, details, notes and specifications for the proposed hardscape. One (1) iteration of revisions based on Client comments shall be included in this Task. • Consultant shall make the following CD submittals and attend up to two (2) DE Review meetings as follows: • 60%CD submittaVreview. • 100%CD submittaVreview. • Additional meeting attendance shall be provided as additional services. Task 3 irrigation Construction Documents-Consultant shall prepare irrigation construction documents based on the approved 100% CD landscape plans. The documents shall include plans, details, quantities, notes and size specifications for irrigation installation. One (1) iteration of revisions based on Client comments shall be included in this Task. • Consultant shall make the following CD submittals and attend up to two (2) DE Review meetings as follows: • 60%CD submittal/review. • 100%CD submittal/review. • Additional meeting attendance shall be provided as additional services. FEE SUMMARY TASK TASK LUMP SUM l HOURLY NTE NUMBER FEE Task t Additional Landscape Plan $4,750.00 _ Task 2 Hardscape Plan $4,900.00 Task 3 Irrigation Plan $4,000.00 TOTAL FEE $13,sso.00 $0.0o V:1Projects-.20t6516 DB005 Miami Beach 19th St Stormwater Pump Stattoni0ocunientslConuads4AS Revised 1.2.181ExhibitA O1 02 18.docx ML Project No. 16-0I3005 AS1 Page 3 of 7 Initial: ML: Client Page 934 of 1522 ATTACHMENT D DESIGN SCHEDULE Page 935 of 1522 ATTACHMENT D DESIGN SCHEDULE The design schedule for the Additional Services Project is provided below. DELIVERABLE _COMPLETION DATE(*) 60%Design Construction documents-Revised NTP+20 Working Days 100%Design Construction Documents-Revised NTP+40 Working Days Limited Construction Services(') NTP+152 Working Days *Subject to Client/Owner providing review 10 calendar days after 60%milestone submittal and 10 calendar days after 100%milestone submittal **Limited Construction Services includes Preconstnrction Meeting, RFTs,Site Visits(refer to Exhibit C), Page 936 of 1522 ___............i.______, 1 ! ., ` I x'31:it! .0.17A, , ,11 --••,4 i-- -- i -7--\ :t.-1,3 f 's,.,,..,4"";t,"1-;f,• i.,';q,' (--,' -1/2,ti .----k.,, _...0, < 1 : -,A9i ,- \ --Th., -„- z___.". '..,'„?!'"-‘ , ,.,1 .4 . .`I --1.- i \\ , --'7.--,- f, . r \\ ,,,, 211. u.1 ' I'• i %.\ A „, 1 \-`---- i r..,;6, , i--- -,‘-, ,.... ..,.\.7. -L., ., , • li, ).. s, 1; .S. ';. g . . . f . , ---.16'.34,- tx•V't ( ,1,11 ..'.° i ; :i 1 4 4 3 1. ; < ; ; ; i - f;' / ---1. — ....,„ --\- — \(._• ) — k, , ...Q--' 4 4 \ :: I I '1: 11 1,- 't. i .4: ; : ! : , • -H-1.__ :\„----------i . ('''' 1 I , ,,, ,, :. ', ,-., ", ":' ; ' • - 1 ' , • : ' 0401404,44f... -- t / t ,./ , .c•,, t ', - , it - ' " — 1 ' ' I cf;.---t-AL f'7--;m-•-*4. C-----.14,\7 :---;.:.--:• 1 A 1/2 3 '----,,_/11 \,,,,,- I • ,4' lc ' ' I ,);W 't.-11Alt'-il ' ,N--sr-----' c'.''....) 1-- (1*°* '-':1' ..... . --- z, ‘ ' 1/2.•1-1.sv0-.--;:a5` I.'' I \,,/ •, ,r"."11, "!,,,,'„, -V.t "."-- u., ,.1 , r., . , ; t 1.„ : 1,..-6....i'••---,t1""'" ,r1 ''.,(-k ‘,2lz ' .5' ' ! " f!, i',.. ' 1' '', ri',.• i .... J .....„ . .,. itl ..,. (‘ /I'''''' ','*'' i:1,'..,;i 't I\.------7•J fi, 3.':. i,4 il 14 ,4 ii :IA ..,4 1,; ,,/ e ,.7,4a, 5 tri co II 4 ?:.', -.4 v 11 „,;, 1`.„, a i s. ,„. , s, \...., ...,„ ., , (NI CV f,. .?:.-• ! , 10 -. •,— 0 '—ftf ft 0Ncvac)))o. , as ,Y,1'e-0 vst 22 2 I , ,-,1, ''.-' .c.. ....., -...k3y . .0 •NtaL. „1,...4 .,:1 ..',. --?: "be 1 41114(4:7W lir -,. ' r : 1 ,,S.) ........4' tl. '' ' \ _ 2 ..i . • ir,'f7t,l; ,_ !ff..:io",- 7.L.S \ ,,,'yt'' - 17" ..jr,-i .1 i - ' ,... ! 1 , - 1 I ti. i (7-` ,""\''' I !O III I ! . ; ; a i I j ,.ij I 3 1 - 22 t�� 5...t # 3 S z? r 7 1 Yk i`k� +.{ ' -;.;1.; s 1 t?4I i3 ;* 3 : 3l 3:£ i s lit 3 i 34 T } 4 1 'k ill' X n ri4 ii, ij l* z * f alt -f ! ' t3 1 s r3 i 1z i{ S! t 3 si Li ? ii e, T 1 7F it;3 0 4 • $ k' r e j 4 f{ f.1tit: it a 1 j ,1: {r$ 1 Z s I .k 1 1 `. x {a = E D ii t9 1{ + ; v 1 ,i it t ; ;t 3 3 t T" x3r : 3 ; r A 11 : ' r P F3t . 3 , 3 I I E ' '1 4 > /3 ' #> # } 3 3 3 i 33 #x £ E 2 l 1 1 I=" ft it�, s P ; 7 i a tP ` v �: i la x } s# 3 x . j ; I t i iT a } LA ¢ � 'k, ;a\a I ( li 4f i i 4 11 S 1, { 1., i , £ # I r s :. Gx . SV?'. t '' ` t`t, ' I 3, s"l g r a� p-----------0 21 3 r 3 1 13 f k. f f < 3 n TY `�F•351 f —A,: ; i; # 3> -,AA s 3 r; i f , iE e s C ' d 3T g i r t, kr ! ; t t 1 Ar;rif :t i WO� z if j 1 i#x£ x 44 1 3 4 t i 1 331 3 i { 3 zw E 51 S jI 0,a t g t3 ;!it i ids 't. 3 r N I '`3 y t R a a MI!!"P.„ 3r try r J 3 i F CV t ;: t 'BsiE-t-tii 3 t T # 3 s+ 9 • d Y.a #4 _ ` t 33d yp'}`i�! i fr3 r { c f f 33 s T 0 1 s f _. " * q -F i3 rI7 1 1 coco „..--,,,;;;;;;;;4t;;;;,;,....„,A,' -12 3 I cri t. ta t iI Sv C 1 k 'L � -11 3 444 ` a 33, r, i S . °' j > Al 1 ; s 6 a s !.P! s 9 ; 3;,t d (.1 A It t r ; ., 3? a 1 d s ; i e F ; 3 r 1 , ''2'. I ll`} 1 +d 3 s 1'14 3/,.33; "3k: ! i B j �, l' ; ztt x 1 33;3 ff n k tra t ., i A,• i4$493 3 3 1 _ tr r ,;!..i.,t i' 3 a Yt 42.-( {` ik i h., ,,,�+ririrrr. A.4, ; 's.ins .,,,t tAA,A :_ ; .{�' ‘fr i tri, T�# „„els is i *Y 3; :t 7 } t��' I W 1 f „tea .T _ ' `( 3X i`r i' }r t 5`r o tts + 3 p.r 2 4 I