Loading...
2018-30221 Resolution RESOLUTION NO. 2018-30221 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A SUPPLEMENTAL WORK ORDER WITH SHIFF CONSTRUCTION & DEVELOPMENT, INC., FOR THE BISCAYNE POINT ISLAND ENTRANCE ENHANCEMENT PROJECT, IN THE NOT-TO-EXCEED AMOUNT OF $47,296.87, PLUS OWNER'S CONTINGENCY IN THE AMOUNT OF $4,729.00, FOR A TOTAL AMOUNT OF $52,025.87, UTILIZING THE COMPETITIVELY BID NATIONAL JOINT POWERS ALLIANCE (NJPA) COOPERATIVE CONTRACT; TO BE FUNDED WITH PREVIOUSLY APPROPRIATED FUNDING IN THE CAPITAL BUDGET. WHEREAS, construction of the Biscayne Point Island Neighborhood Project (the "Project") started in March, 2009, and was substantially completed in October, 2013; and WHEREAS, as part of the Substantial Completion punch list for the Project, the Biscayne Point Island residents requested that additional items be incorporated into the scope of the Project, to enhance the entryway to the island, including the following modifications: hardscape improvement, new landscaping areas, enhanced landscaping, irrigation, structural modifications to existing columns, installation of new column lights, new neighborhood entrance monument, and improvements to the guardhouse, including a new roof, windows, lighting and paint; and WHEREAS, through the NJPA process, Shiff Construction & Development, Inc. ("Schiff') was identified as the contractor with the requisite qualifications and experience in performing the proposed renovations along the entryway of the Biscayne Point Neighborhood; and WHEREAS, on July 8, 2016, Schiff submitted a proposal utilizing the NJPA cooperative contract system, through the Gordian Group, for the above scope of services in the amount of $222,748.37; and WHEREAS, modifications to the original scope were required during the construction phase, such as structural and electrical upgrades to the existing columns; additional costs related to the design and manufacturing of the custom column lights; removal of the entrance monument from the scope; and inclusion of conduits for landscaping up lights; and WHEREAS, the neighborhood entrance monument was removed from the scope to allow for the development of the final concept by the Home Owner Association (HOA) and the Planning Department: and WHEREAS, on October 2, 2017, a supplemental work order was submitted by Shiff Construction & Development, Inc, for the preceding scope of work, which resulted in a contract increase of$26,913.63, for the total contract amount of$249,662.00; and WHEREAS, the final concept for the neighborhood entrance monument was approved by the Biscayne Point Island Neighborhood HOA and Planning Department; and WHEREAS, in February 2018, the supplemental work order No. 2, in the amount of $47,296.87 was submitted by Shiff for the following scope of work: design, permitting and construction of the entrance monument sign (reflecting the final concept approved by the HOA and Planning Department); modifications to the design and construction of the fencing; and modifications to the landscaping up lights; and WHEREAS, the fencing modification was a result of the Building Department requirements, and the HOA requested the modification to the landscaping up lights; and WHEREAS, the supplemental work order No. 2 cost proposal was reviewed by CIP and the Gordian Group and was found to be fair and reasonable; and WHEREAS, the total amount for this NJPA contract, including supplemental work order No. 2, is $296,958.87. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby approve and authorize the City Manager to execute a supplemental work order with Shiff Construction & Development, Inc., for the Biscayne Point Island Entrance Enhancement Project, in the not-to-exceed amount of $47,296.87, plus Owner's Contingency in the amount of $4,729.00, for a total of $52,025.87, utilizing the competitively bid National Joint Powers Alliance (NJPA) cooperative contract; to be funded with previously appropriated funding in the Capital Budget. PASSED and ADOPTED this 7 day of /'1CUrCIi , 2018. ATTEST: DAN GELBER, MAYOR 3 t 4y RAF EL E. GRANADO, CI CLERK B APPROVED AS TO /AV-. • '' FORM&LANGUAGE � &FOR EXECUTION ri NCO R.P1pR, TEL 01-2.7- 1b' z� CityAttorney Date ��� . Y Resolutions - C7 Q MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: March 7, 2018 SUBJECT A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A SUPPLEMENTAL WORK ORDER WITH SHIFF CONSTRUCTION & DEVELOPMENT, INC., FOR THE BISCAYNE POINT ISLAND ENTRANCE ENHANCEMENT PROJECT, IN THE NOT-TO-EXCEED AMOUNT OF $47,296.87, PLUS OWNER'S CONTINGENCY IN THE AMOUNT OF $4,729.00, FOR A TOTAL AMOUNT OF $52,025.87, UTILIZING THE COMPETITIVELY BID NATIONAL JOINT POWERS ALLIANCE (NJPA) COOPERATIVE CONTRACT; TO BE FUNDED WITH PREVIOUSLY APPROPRIATED FUNDING IN THE CAPITAL BUDGET. RECOMMENDATION The Administration recommends adopting the Resolution. ANALYSIS Construction of the Biscayne Point Island Neighborhood project started in March 2009 and was substantially completed in October 2013. As part of the Substantial Completion punch list, the Biscayne Point Island residents requested additional items to be incorporated into the scope of the project and enhance the entryway to the island, the requested modifications include: hardscape improvement, new landscaping areas, enhanced landscaping, irrigation , structural modifications to existing columns, installation of new column lights, new neighborhood entrance monument and improvements to the guardhouse including; new roof, windows, lighting and paint. Through the NJPA process, Shiff Construction & Development, Inc. was identified as the contractor that has the qualifications and experience in performing the renovations along the entryway of Biscayne Point Neighborhood. On July 8, 2016 the Contractor submitted a proposal utilizing the NJPA cooperative contract system, through the Gordian Group, for the above scope of services in the amount of$222,748.37. The Gordian Group is the local representative managing the IQC NJPA (Indefinite Quantity Contract for Construction Services). Modifications to the original scope were required during the construction phase, such as structural and electrical upgrades to the existing columns; additional costs related to the design and manufacturing of the custom column lights; removal of the entrance monument from the scope; and inclusion of conduits for landscaping up lights. The neighborhood entrance monument was removed from the scope to allow for the development of the final concept by the Home Owner Association (HOA) and the Planning Department. On October 2, 2017, a supplemental work order was submitted by Shiff Construction &Development, Page 941 of 1522 Inc, for the preceding scope of work, which resulted in a contract increase of$26,913.63, for the total contract amount of$249,662.00. The final concept for the neighborhood entrance monument was approved by the Biscayne Point Island Neighborhood HOA and Planning Department. In February 2018 the supplemental work order No. 2, in the amount of $47,296.87 (Exhibit A) was submitted by Shiff Construction for the following scope of work: reestablishing the previously removed task of design, permitting and construction of the entrance monument sign; changes to the design and construction of the fencing; and modifications to the landscaping up lights. The fencing modification was a result of the Building Department requirements. The HOA requested the modification to the landscaping up lights. The supplemental work order No. 2 cost proposal was reviewed by CIP and the Gordian Group and was found to be fair and reasonable. The total amount for this NJPA contract, including supplemental work order No. 2 is $296,958.87. CONCLUSION The Administration recommends adopting the Resolution. Amount 1 $52,025.87 Account 1 304-0820-000342-00-403-521-00-00-00- 64170- Contracted Services Repair Total $52,025.87 Legislative Tracking Capital Improvement Projects ATTACHMENTS: Description D Exhibit A. Supplemental Work Order#2 D Form Approved Reso Page 942 of 1522 Exhibit A Work Order Signature Document THE GORDIAN GROUP NJPA EZIQC Contract No.: FLO6-022912-SCD New Work Order X Modify an Existing Work Order Work Order Number.: 037300.01 Work Order Date: 02/22/2018 Work Order Title: Biscayne Point Neighborhood Renovation Supplemental Owner Name: City of Miami Beach Contractor Name: Shiff Construction &Development, Inc. Contact: Pilar Caurin Contact: Justen Shiff Phone: 305-673-7071 Phone: 9545242575 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIQC Contract No FLO6-022912-SCD. Brief Work Order Description: Design, permitting and manufacturing of the new entrance monument sign,fencing improvements along the entryway, Guardhouse and landscaping up-light modifications and installation of backflow preventer for the irrigation system. Signed and sealed drawings will be provided for electrical work only. Time of Performance Estimated Start Date: Estimated Completetion Date: Liquidated Damages Will apply: Will not apply: X Work Order Firm Fixed Price: $47,296.87 Owner Purchase Order Number: Approvals Owner Date Contractor Date Work Order Signature Document Page 1 of 1 2/22/2018 Page 943 of 1522 SI C Detailed Scope of Work THE GORDIAN GROUP To: Justen Shiff From: Pilar Caurin Shiff Construction& Development, Inc. City of Miami Beach 1350 NE 56th St-Ste. 100 1700 Convention Center Drive Fort Lauderdale, FL 33334 Miami Beach, FL 33139 9545242575 305-673-7071 Date Printed: February 22, 2018 Work Order Number: 037300.01 Work Order Title: Biscayne Point Neighborhood Renovation Supplemental Brief Scope: Design, permitting and manufacturing of the new entrance monument sign,fencing improvements along the entryway, Guardhouse and landscaping up-light modifications and installation of backflow preventer for the irrigation system. Signed and sealed drawings will be provided for electrical work only. Preliminary Revised X Final The following items detail the scope of work as discussed at the site.All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Design, permitting and manufacturing of the new entrance monument sign,fencing improvements along the entryway, Guardhouse and landscaping up-light modifications and installation of backflow preventer for the irrigation system. Signed and sealed drawings will be provided for electrical work only. Subject to the terms and conditions of JOC Contract FL06-022912-SCD. Contractor Date Owner Date Scope of Work Page 1 of 1 2/22/2018 Page 944 of 1522 Contractor's Price Proposal - Summary Date: February 22,2018 Re: IQC Master Contract#: FLO6-022912-SCD Work Order#: 037300.01 Owner PO#: Title: Biscayne Point Neighborhood Renovation Supplemental Contractor: Shiff Construction&Development,Inc. Proposal Value: $47,296.87 10-Monument Design $7,701.76 10-Monument Sign $8,904.00 10-Monument Sign and Improvements $17,128.15 26-Relo Guard House Lights $1,416.29 26-Relocate Landscape Lighting $3,911.27 32-Exterior Fence $9,026.49 32-Irrigation $402.85 Credit from original proposal -$1,193.94 Proposal Total $47,296.87 Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 18.83% Contractor's Price Proposal-Summary Page 1 of 1 2/22/2018 Page 945 of 1522 Contractor's Price Proposal - Detail Date: February 22,2018 Re: 100 Master Contract#: FL06-022912-SCD Work Order#: 037300.01 Owner PO#: Title: Biscayne Point Neighborhood Renovation Supplemental Contractor: Shiff Construction&Development,Inc. Proposal Value: $47,296.87 Sect. Item Mod. UOM Description Line Total Labor Equip. Material (Excludes) 10-Monument Design 1 01 22 20 00 0048 HR Investigating Engineer Or Specialty ConsultantFor special investigatory $7,701.76 engineering requirements or other miscellaneous professional services. Quantity Unit Price Factor Total Installation 80.00 x - 80.00 x 1.2034 7,701.76 12 revisions of design between HOA and City planning. Subtotal for 10-Monument Design $7,701.76 10-Monument Sign City Of Miami=.Beach Biscayne Pomt Monument Sign \ '$8',904,00 A \� Quantity= t�lnit Price,: Factor Total o\/ *44FP Installation f, 1.00 7�( Or? .v x 1'18T2 8 904 00 , !cationsy, vvv to exlsang monumentsign�iPP-p�rrce by p,plex ' �„ �, . m , Subtotal for 10-Monument Sign $8,904.00 10-Monument Sign and Improvements 3 01 22 16 00 0002 EA Reimbursable FeesReimbursable Fees will be paid to the contractor for the $0.00 actual cost of all permits,without mark-up,for which a receipt or bill is received.The Adjustment Factor applied to Reimbursable Fees will be 1.0000. The labor cost involved in obtaining all permits is in the Adjustment Factor.The base cost of the Reimbursable Fee is$1.00.The quantity used will adjust the base cost to the actual Reimbursable Fee(e.g.quantity of 125=$125.00 Reimbursable Fee).If there are multiple Reimbursable Fees,each one shall be listed separately with a comment in the"note"block to identify the Reimbursable Fees(e.g.sidewalk closure,road cut,various permits, extended warrantee,expedited shipping costs,etc.).A copy of each receipt shall be included with the Proposal. Quantity Unit Price Factor Total Installation0.00 x 1.00 x 1.1872 = 0.00 Graphplex and Signs has been engaging in the re-design of the entryway monument sign for nearly a year with the City of Miami Beach CIP department and HOA.The resulting proposal is the culmination of numerous revisions.Please find attached. 4 01 22 20 00 0010 HR ElectricianTasks in the CTC include appropriate costs to cover labor.These $816.58 tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 16.00 x 42.41 x 1.2034 816.58 Installation of new Eco Sense light fixtures connecting to site lighting system at monument sign 5 01 22 20 00 0034 HR Tile LayerTasks in the CTC include appropriate costs to cover labor.These $1,219,28 tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 40.00 x 25.33 x 1.2034 1,219.28 Labor to demolish existing tile around monument sign including 1st.tier at base Contractor's Price Proposal-Detail Page 1 of 5 2/22/2018 Page 946 of 1522 Contractor's Price Proposal - Detail Continues.. Work Order Number: 037300.01 Work Order Title: Biscayne Point Neighborhood Renovation Supplemental 10-Monument Sign and Improvements 6 01 22 20 00 0038 HR WelderTasks in the CTC include appropriate costs to cover labor.These items $3,633.31 will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 60.00 x 50.32 x 1.2034 3,633.31 Welding required for all decorative metal on monument sign. 7 02 82 00 00 0048 EA <10 SF Stucco $1,858.60 Quantity Unit Price Factor Total Installation 6.00 x 257.41 x 1.2034 1,858.60 Stucco exsiting sign including coverage over sidelight junction boxes 8 03 01 30 71 0039 EA Patch Up To 16 SF Of Decks Or Floors,Portland Cement Based Repair $1,391.44 Material Quantity Unit Price Factor Total Installation 1.50 x 770.84 x 1.2034 = 1,391.44 Patch and repair large cracks throughout existing monument sign. 9 10 14 53 00 0255 EA >10 SF To 20 SF Sign Area,Remove And Reinstall Sign $388.65 Quantity Unit Price Factor Total Installation 2.00 x 161.48 x 1.2034 388.65 Catalogue item used to remove lettering from existing sign 10 23 09 23 00 0022 EA Install Metal Box And Conduit Stub-Up For Sensor In Masonry Wall $233.94 Quantity Unit Price Factor Total Installation 2.00 x 97.20 x 1.2034 = 233.94 Catalogue item used to stub up and electrical connection for monument letter lighting 11 26 05 33 13 0004 CLF 1/2"EMT With 4#12 THHN/THWN Assemblylncludes conduit,set screw $469.95 connectors,set screw couplings,straps,wire as indicated.Not for use where detail is available. Quantity Unit Price Factor Total Installation 1.00 390.52 x =1.2034 469.95 x Required to provide new conduit wiring for north and south side up light illumination for the monument 12 26 56 26 00 0022 EA 50 Watt Incandescent Recessed Uplight $1,618.72 Quantity Unit Price Factor Total Installation 2.00 x 604.24 x 1.2034 = 1,454.28 Demolition 2.00 x 68.32 x 1.2034 = 164.43 Catalogue item used for new Eco Sense uplight fixtures. 13 32 84 23 00 0003 EA 2"Pop-Up Height,Spray Sprinkler Head $22.91 Quantity Unit Price Factor Total Installation 1.00 x 15.11 x 1.2034 = 18.18 Demolition 1.00 x 3.93 x 1.2034 = 4.73 Removal of sprinkler head along monument sign. 14 32 91 13 16 0010 CY Shredded Redwood Mulch $236.22 Quantity Unit Price Factor Total Installation 3.00 x 65.43 x 1.2034 = 236.22 Required for removal and reinstall of mulch along the monument sign area. 15 32 91 13 16 0011 CY Stone/Gravel Mulch $4,361.99 Quantity Unit Price Factor Total Installation 24.00 x 151.03 x 1.2034 = 4,361.99 Catalogue item used for 60 SF of decorative smooth stream stones at monument sign.The round smooth river rock will be a mixture between 2"-3"(50%),3"-5"(25%)and 5"-10"(25%). Contractor's Price Proposal-Detail Page 2 of 5 2/22/2018 Page 947 of 1522 Contractor's Price Proposal - Detail Continues.. Work Order Number: 037300.01 Work Order Title: Biscayne Point Neighborhood Renovation Supplemental 10-Monument Sign and Improvements 16 32 91 13 36 0008 MSF Remove Rocks And Debris By Hand $130.21 Quantity Unit Price Factor Total Installation 10.00 x 10.82 x 1.2034 - 130.21 Required for removal of rocks/debris of monument sign area. 17 32 93 53 00 0068 EA 5 Gallon Container Groundcover And Flower Planting $438.28 Quantity Unit Price Factor Total Installation 30.00 x 12.14 x 1.2034 438.28 Required for removal of plants around monument sign area. 18 32 94 13 00 0016 LF 3/16"x 5-1/2",Black Anodized,Aluminum Alloy Landscape Edging $308.07 Quantity Unit Price Factor Total Installation 40.00 x 6.40 x 1.2034 308.07 Catalogue item used for 1/2"x4"black aluminum border for rock retainage. Subtotal for 10-Monument Sign and Improvements $17,128.15 26-Relo Guard House Lights 19 01 22 20 00 0010 HR ElectricianTasks in the CTC include appropriate costs to cover labor.These $1,224.87 tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 24.00 x 42.41 x 1.2034 1,224.87 3 men 1 day to relocate guard house lights. 20 09 01 20 00 0002 SF Cut And Patch Hole In Drywall To Match Existing,>8 To 16 SFPer location. $45.85 Quantity Unit Price Factor Total Installation 10.00 x 3.81 x 1.2034 = 45.85 Patch drywall once lights relocated 21 09 91 23 00 0064 SF Paint Interior Plaster/Drywall,2 Coats Paint,Brush/Roller Work $113.22 Quantity Unit Price Factor Total Installation 168.00 x 0.56 x 1.2034 113.22 Re-paint interior of guard house 22 09 91 23 00 0064 0294 MOD For>100 To 250,Add $32.35 Quantity Unit Price Factor Total Installation 168.00 x 0.16 x 1.2034 = 32.35 Subtotal for 26-Relo Guard House Lights $1,416.29 26-Relocate Landscape Lighting 23 01 22 20 00 0010 HR ElectricianTasks in the CTC include appropriate costs to cover labor.These $2,551.81 tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation 50.00 x 42.41 x 1.2034 = 2,551.81 Relocate installed uplighting as per request by Owner and HOA 24 32 91 13 16 0008 CY Shredded Cedar Mulch $1,359.46 Quantity Unit Price Factor Total Installation 18.00 x 62.76 x 1.2034 1,359.46 Re-mulch planting beds where uplights relocated. Subtotal for 26-Relocate Landscape Lighting $3,911.27 32-Exterior Fence Contractor's Price Proposal-Detail Page 3 of 5 2/22/2018 Page 948 of 1522 Contractor's Price Proposal - Detail Continues.. Work Order Number: 037300.01 Work Order Title: Biscayne Point Neighborhood Renovation Supplemental 32-Exterior Fence 25 01 22 20 00 0015 HR LaborerTasks in the CTC include appropriate costs to cover labor.These $1,047.44 tasks will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation = 21.76 x 1,047.44 40.00 x 1.2034 (2)people(2.5)days hours for labor to remove soil and debris from digging required on decorative fence. 26 01 22 20 00 0038 HR WelderTasks in the CTC include appropriate costs to cover labor.These items $1,211.10 will be requested specifically by the owner for miscellaneous work not covered in the CTC. Quantity Unit Price Factor Total Installation = 50.32 x 1,211.10 20.00 x 1.2034 Required for repairs made to existing removed and modified decorative fencing 27 03 31 13 00 0042 CF Hand Mix And Place ConcreteFor use where conventional equipment access $715.69 is limited or when directed by the owner. Quantity Unit Price Factor Total Installation 48.00 x 12.39 x 1.2034 = 715.69 Required for 12"x12"hole 48"deep for each post(approximately 12 locations) 28 03 31 13 00 0042 0031 MOD For 2500 PSI Concrete,Deduct -$108.31 Quantity Unit Price Factor Total Installation 1,000.00 x -0.09 x 1.2034 -108.31 29 31 13 13 00 0037 EA Remove 2'To 3'Shrub,Broadleaf Evergreen $359.58 Quantity Unit Price Factor Total Installation 12.00 x 24.90 x 1.2034 359.58 r. Required to remove planting around areas where posts will be inserted. 30 32 31 13 00 0010 VLF 12"Diameter Hole,Auger By Machine Fence Post Hole In Soil $594.96 Quantity Unit Price Factor Total Installation 60.00 x 8.24 x 1.2034 594.96 Required to dig hole for approximately 12 posts 31 32 31 19 00 0006 LF 6'Wrought Iron Fence,Verticals At>2-1/2"To 3"On Center $4,593.14 Quantity Unit Price Factor Total Installation 40.00 x 95.42 x 1.2034 = 4,593.14 Catalogue item used for custom built decorative fencing to match existing,including circular element and picket end condition. 32 32 31 19 00 0086 LF Replace 3/4"Square x 16 Gauge Steel Tube Fence Picket $129.37 Quantity Unit Price Factor Total Installation 10.00 x 10.75 x 1.2034 129.37 Repairs made to replace pickets on existing removed fence to be installed. 33 32 91 13 16 0004 CY Pine Wood Chip Mulch $284.24 Quantity Unit Price Factor Total Installation 5.00 x 47.24 x 1.2034 = 284.24 Required to add removed mulch from area where decorative fence has been installed,including posts area. 34 32 93 53 00 0036 EA 3 Gallon Container Shrub Planting $199.28 Quantity Unit Price Factor Total Installation 20.00 x 8.28 x 1.2034 = 199.28 Replant shrubs as required outside areas where fence has been installed. Subtotal for 32-Exterior Fence $9,026.49 32-Irrigation Contractor's Price Proposal-Detail Page 4 of 5 2/22/2018 Page 949 of 1522 Contractor's Price Proposal - Detail Continues.. Work Order Number: 037300.01 Work Order Title: Biscayne Point Neighborhood Renovation Supplemental 32-Irrigation 35 01 22 20 00 0051 HR On-site Material Testing Technician $238.27 Quantity Unit Price Factor Total Installation 4.00 x 49.50 x 1.2034 238.27 _ Required for backflow certification testing 36 22 11 19 00 0434 EA 2-1/2"To 3"Diameter Air Gap For Backflow Preventer $164.58 Quantity Unit Price Factor Total Installation 1.00 x 136.76 x 1.2034 164.58 Catalogue item used for client requested backflow preventer on irrigation system Subtotal for 32-Irrigation $402.85 Credit from original proposal 37 32 31 13 00 0004 VLF 2-1/2"Diameter Hole,Auger By Machine Fence Post Hole In Soil -$89.46 Quantity Unit Price Factor Total Installation -18.00 x 4.13 x 1.2034 - -89.46 38 32 31 19 00 0037 LF 6'Steel Tube Fence,Verticals At>2-1/2"To 3"On Center With 2-1/2"Square -$1,104.48 Posts Quantity Unit Price Factor Total Installation -20.00 x 45.89 x = -1,104.48 1.2034 Subtotal for Credit from original proposal -$1,193.94 Proposal Total $47,296.87 This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 18.83% Contractor's Price Proposal-Detail Page 5 of 5 2/22/2018 Page 950 of 1522 s ., Att A Q , _,...„._ Subcontractor Listing THE GORDIAN GROUP Date: February 22,2018 Re: IQC Master Contract#: FLO6-022912-SCD Work Order#: 037300.01 Owner PO#: Title: Biscayne Point Neighborhood Renovation Supplemental Contractor: Shiff Construction&Development,Inc. Proposal Value: $47,296.87 Name of Contractor CJtities Amoant °la No Subcontractors have been $0.00 0.00 selected for this Work Order Page 1 of 1 Subcontractor Listing 2/22/2018 Page 951 of 1522 GRAPHPLEX S IGNS 2830 North 28th Terrace Date Proposal # Hollywood,FL 33020 2/19/2018 29124 State License: EC13004975 City of Miami Beach Biscayne Point. Entry Sign Feature Design NOTE: Structural drawing and pricing based on utilizing existing structure of sign. Miami Beach to provide structural drawings of existing sign. GP will fabricate and install ONE aluminum welded/powder coated tubing onto existing structure to create reveals. Faces are cladded and countersunk screws will be painted to match. One set of reverse channel letters reading Biscayne Point. We will fabricate and install LED illuminated tubing powder coated metallic silver for details at top of sign. Permit Acquisition Fee. This fee includes,but is not limited to: signed and sealed engineering drawings,Notice of Commencement, oversized copies,permit facilitation, Certificate of Liability Insurance(Additional Insureds), Certificate of Completion(if required), including incorporation of review comments, as builts,etc. Net Cost of Permit—Not included in this Proposal 7,500.00 Phone# Fax# Subtotal 9549200905 954-239-6872 E-mail Web Site Sales Tax(7.0%) jack@graphplex.com www.graphplex.com Total Paget 6f 1522 GRAPHPLEX S IGNS 2830 North 28th Terrace Date Proposal # Hollywood,FL 33020 2/19/2018 29124 State License: EC13004975 City of Miami Beach Thank you for providing GraphPlex the opportunity to design your sign. TERMS: Payment due within 15 days of approval. TIMING: Original design within 3 weeks of all input. Revisions within 5 business days. RUSH FEE: If the timing above does not meet your requirements, a RUSH FEE will be added,IF sign(S) can be manufactured in the time frame requested. NOTES: 1.5%per month(18%per annum)finance charge will be added to all past due accounts.Please pay promptly to avoid finance charges.All credit card payments will be charged an additional 3%convenience fee. Phone# Fax# Subtotal $7,500.00 9549200905 954-239-6872 E-mail Web Site Sales Tax(7.0%) Woo jack@graphplex.com www.graphplex.com Total $7,500.00 Page Zif 1522 Neon Sign Solutions, Inc. 631 W 27th St Hialeah, FL 33010 N . y!..r (305)885-7900 la `j(, s info@neonsignsolutions.com - sOLUTf neonsignsolutions.com INC.. ADDRESS ESTIMATE # 1517 City of Miami Beach-Office of DATE 02/14/2018 Capital Improvement Projects 1700 Convention Center Drive Miami Beach, Fl 33139 P.O. # JOB ADDRESS 1202 South Biscayne Point Installation 1 15,200.00 15,200.00 Manufacture and Install one monument sign that will be mounted over existing structure. Size:119 1/2" H x 23"Wx 37"Deep Sign will include one set of illuminated reverse channel letters to read: Biscayne Point The minimum height of letters has to be 6" and stroke of letters 1" Top part of the sign will be powder coated. Price will include Site survey Permit Processing NOC Processing Microfilm Processing and Fees in case City will not have the existing permits. Plans signed and seal by the engineer Obtain final inspections City Fees Note: Decorative lamps not included in price Landscape not included in price Sign to be connected to the existing electrical The sign will be attached to the existing structure In case if needs to remove the existing cover-tile and letters it will be performed by another contractor Biscayne Pointe Entrance TOTAL $15 , 200 . 00 1202 South Biscayne Point Road Accepted By Accepted Date Page 954 of 1522 ESTIMATE/CONTRACT 7230 NW 46tH St. �SA Miami,FL 33166 Ph:305.470.2333 Fax:305.470.2320 Date Contract# SIGNSIn� www.Email.usasiginfo ns.0 ssigns.us /,y . 2/13/2018 0210910 The right image for your business... Name/Address City of Miami Beach Capital Improvements 1700 Convention Center Dr. Miami Beach,FL 33139 T.305.673.7071 x.6954 Pilarlmariacaurin@miamibeachfl.gov Rep Initial Deposit Job Location MB 50%advance Miami Beach Item Description Qty Cost TOTAL Mon/Sign Produce&Install(01)Monument Sign*@ existing sign structure and(01)set of Reverse 1 7,140.00 7,140.00T Channel Letters**,copy"BISCAYNE POINT",letters up to 5"(h),total size sign approx. 119 1/2"(h)x 37"(w),per layout provided by customer *Aluminum fabricated Cabinet with Stucco Finish(color TBD),Decorative Aluminum Bars with powder coating finish color silver(RAL code TBD) **Aluminum fabricated reverse channel letters(all welded),.090 face&.063 returns,color TBD,interior U.L.LED illumination(White),U.L.LED Power Supply,color TBD Permit/Sery City of Miami Beach Sign Permit:Preparation of Documents,license and insurances, 1 500.00 500.00T Master Electrician's signature,city process and inspections. *Price does not include city fees,to be billed on final invoice at cost *Customer must provide electrical feed at sign location and Electronic Timer Clock prior to installation. Engin/Sery Signed and Seal Engineering Drawings 1 150.00 150.00T Job Site: 1202-1100 South Biscayne Point Road Miami Beach,FL 33141 We look forward to working with you! SUBTOTAL $7,790.00 AS A COMPANY POLICY 50%DEPOSIT IS REQUIRED AT SIGNED CONTRACT,AND 50%FINAL AT INSTALLATION OR SERVICE DAY. ALL SIGNS ARE CUSTOM MADE.THEREFORE THIS CONTRACT IS NOT SUBJECT TO CANCELLATION. SALES TAX(0.0%) $0.00 CUSTOMER WILL PROVIDE ALL ELECTRICAL LINES&OUTLETS REQUIRED FOR FINAL HOOK-UP INSTALLATION ON SITE OF SIGN,AND TIMER CLOCK CONTROL REQUIRED AT CUSTOMER'S EXPENSE. ALL SIGNS ARE GUARANTEED AGAINST DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF NINETY DAYS,EXCLUDING NATURAL DISASTERS. TOTAL $7,790.00 THIS IS A"RETAIN TITLE"CONTRACT.TITLE DOES NOT PASS UNTIL FINAL PAYMENTS HAS BEEN RECEIVED.IF FINAL PAYMENT IS NOT RECEIVED AT COMPLETION,USA SIGNS,Inc.HAS THE RIGHT TO REMOVED THE SIGN AT CUSTOMER'S EXPENSE.SHOULD IT BE NECESSARY TO RETAIN THE SERVICES OF AN ATTORNEY TO EFFECT COLLECTION,EITHER THROUGH DEMAND OR LITIGATION, CUSTOMER AGREES TO PAY ALL ATTORNEY'S FEES,COURT COSTS AND RELATED EXPENSES EXPENDED BY USA SIGNS,Inc.IN OBTAINING COLLECTION OF THE ACCOUNT,AT TRIAL AND/OR APPEAL. *PAYMENT METHODS:CHECKS,DIRECT DEPOSITS,AND CREDIT CARDS(3°o ADMINISTRATIVE FEE WILL BE CHARGE WITH EACH CREDIT CARD TRANSACTION) BUYER ACKNOWLEDGES,THAT HE/SHE HAS READ ALL TERMS AND CONDITIONS OF THIS CONTRACT AND HAS RECEIVED A COPY OF THIS ENTIRED AGREEMENT. CUSTOMER-Approved by USA SIGNS,Inc.-Approved by: Page 955 of 1522