Loading...
312-99 RDA RESOLUTION 312-99 A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, APPROPRIATING $78,500 FROM THE CITY CENTER REDEVELOPMENT AREA CONSTRUCTION FUND TO IMPLEMENT THE ARCHITECTURAL AND ENGINEERING DESIGN AGREEMENT WITH ROBERT A.M. STERN ARCHITECTS FOR THE PROPOSED REGIONAL LIBRARY PROJECT. WHEREAS, on September 23,1998, the Mayor and City Commission adopted Resolution No, 98-22904, authorizing the Administration to execute an Agreement with the firm of Robert A. M. Stem Architects (the Agreement) for the architectural and engineering design of a Regional Library; a 400-space Parking Garage; and Park and Streetscape Improvements in the area surrounding Collins Park (the Project); and WHEREAS, the proposed 400-space Parking Garage must be deleted from the scope of the Project; and WHEREAS, two surface parking lots will be provided in place of the proposed 400-space Parking Garage; and WHEREAS, the Administration is requesting the appropriation of $1,370,000 to implement the Agreement; and WHEREAS, a portion of this appropriation is comprised of $78,500, to be appropriated from the City Center Redevelopment Area Construction Fund. NOW, THEREFORE BE IT DULY RESOLVED BY THE CHAIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, that the Chairman and Members of the Miami Beach Redevelopment Agency authorize the appropriation of $78,500 from the City Center Redevelopment Area Construction Fund to implement the Architectural and Engineering Agreement with Robert A.M. Stern Architects for the proposed Regional Library Project. PASSED AND ADOPTED this 6th day ofJanuary1999. ~ A MAYOR :~ fcuck- CITY CLERK APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION F:\A TTO\TURN\RESOS\L1BRFUND,ARC ~ IJI.U-:- 1~7l' I dy ~omey fI!! Miami Beach Redevelopment Agency 1700 Convention Center Drive Miami Beach, Florida 33139 Telephone: (305) 673- 7295 Fax: (305) 673- 7772 REDEVELOPMENT AGENCY MEMORANDUM NO. 99-3 January 6, 1999 TO: Chairman and Members of the Miami Beach Redevelopment Agency FROM: Sergio Rodriguez Executive Director SUBJECT: A RESOLUTION OF THE AIRMAN AND MEMBERS OF THE MIAMI BEACH REDEVELOPMENT AGENCY, APPROPRIATING THE FUNDING NECESSARY TO IMPLEMENT THE ARCHITECTURAL AND ENGINEERING DESIGN AGREEMENT WITH ROBERT A. M. STERN ARCHITECTS FOR THE PROPOSED REGIONAL LIBRARY PROJECT IN THE AMOUNT OF $78,500. ADMINISTRATION RECOMMENDATION: Adopt the Resolution. BACKGROUND: On June 3, 1998, a recommendation was made by the City Manager to the Mayor and City Commission for authorization to negotiate an agreement with the firm of Mateu, Carreno, Rizzo and Partners for the architectural and engineering design of a regional Library, a 400-space Parking Garage and Park and Streetscape Improvements in the area surrounding Collins Park, After substantial discussion, the Mayor and City Commission recommended that the Administration negotiate with the top ranked firm of Robert A. M. Stem Architects (Stem). On September 23, 1998, the Administration presented a resolution to the Mayor and City Commission requesting authorization to execute an agreement with Stem for a Regional Library, a 400-space Parking Garage and Park and Streetscape Improvements in the area surrounding Collins Park. The total negotiated fee was $1,570,000 which included basic design services for the Library and a 400-space Parking Garage, park schematics, landscaping, and schematic design for the Rotunda Building in Collins Park. The Mayor and City Commission adopted Resolution No. 98- 22904 authorizing the Administration to execute the agreement. S()IJTti V()I~T~ l?edevel()pment Ulstrict Agenda Item 36 V.Date~ -Co -99 On November 18, 1998, the City Commission directed the Administration not to proceed with the design of a 400-space Parking Garage and to instead design two surface lots in parcels 2 and 4. ANALYSIS: The City's Administration is presenting a companion resolution on the January 6th Commission Agenda, requesting the appropriation of funds from the General Fund Reserve for the above described agreement with Stern for A&E (Architectural and Engineering) design services, as modified by the change in scope of the project. The 400-space Parking Garage has been deleted from the scope and the two surface lots have been added in its place, The agreement with Stern in the original amount of $1,570,000 has been modified to reflect the changes in scope and the new contract amount of$I,370,000, The proposed A&E budget is as follows: Regional Library Surface Lots Site/Landscape Design Master Plan Schematics for Rotunda Interior Design Public Reviews and Meetings Reimbursables Project Funding: $915,000 $ 10,000 $ 55,000 $ 65,000 $ 60,000 $ 60,000 $ 205,000 $1,370,000 The proposed funding for the A&E services contract with Stern is comprised of $1,281,500 in available General Fund Reserve for Capital Improvements - (Library funds of $11.5 Million); $10,000 from the $21 million Parking Revenue Bond issue; and $78,500 from the City Center RDA Construction Fund. The total amount of$1,370,000 will be appropriated and a work order will be established to pay the A&E design fees for the Cultural Campus/Regional Library, CONCLUSION: The Chairman and Members of the Miami Beach Redevelopment Agency should appropriate the necessary share of funding in the amount of $78,500 from the City Center RDA construction fund to implement the architectural and engineering design agreement with Robert A. M, S~em Architects for the proposed Regional Library and Park and Streetscape Improvements in the area surrounding Collins Park. SR/CC/KOB T:lagenda\1999~an\liblTda