Loading...
LTC 220-2018 PROPERTY MANAGEMENT MONTHLY CONSTRUCTION PROJECTS UCity of Miami Beach, 1700 Convention Center Drive, Miami Beach FL 33139 LTC# 220-2018 LETTER TO COMMISSION TO: Mayor Dan Gelber and Members of i! le City Co mission FROM: Jimmy L. Morales, City Manager DATE: April 24, 2018 SUBJECT: PROPERTY MANAGEMENT MONTHL CONSTRUCTION PROJECTS UPDATE The purpose of this LTC is to update the Mayor and City Commission of the Capital Renewal and Replacement projects being conducted by Property Management. In 2004, the Mayor and City Commission authorized the establishment of a permanent Capital Renewal and Replacement Fund to provide dedicated funding for capital renewal and replacement projects that would extend the useful life of general fund assets by more than five (5) years. The City's real property assets include over 84 municipal buildings and properties; the Lincoln Road District; 39 bridges; 15 monuments; 23 fountains; 3 swimming pools; over 6 miles of pedestrian areas along the beaches and boardwalk; and lifeguard stands. Property Management has over 100 active projects (attachment A) and below are key project highlights that are underway. 28th Street Obelisk Restoration Scope: Restoration of the obelisk, base building and the surrounding plaza. Status: At current, the Architect of Record is finalizing plan review comments issued by the CMB Building Department. Given the Classification of Work for the project, a requirement for vertical accessibility has been triggered. The waiver application has been filed with the Florida Building Commission and has been approved. Estimated completion for this project is September 2018. 42nd Street Garage Lighting Scope: Retrofit all interior garage lighting to LED fixtures. Status: The manufacturer, Holophane has begun to produce LED retro fit kits for their 100W HPS Bantam Fixture. These kits will be a newly installed system. The 42nd Street Garage will be a pilot for the new fixtures. Upon their successful implementation at 42nd Street garage, the new retro fit kits will be installed at remaining garages. Estimated start date is April 30th and estimated completion is May 2018. LTC: Property Management Monthly Construction Report Page: 2 of 7 777 4th Floor HVAC Replacement Scope: Installation of new variable air volume dampers, replacement of HVAC ductwork, air handlers and vents. Status: All trades with the exception of electrical have been approved by Building Department. Revisions for electrical will be re -submitted. The estimated completion for this project is May 2018. Bass Museum Emergency Generator Replacement Scope: Replace the existing generator and associated switch gear with a new, more efficient unit. Status: Project permit has been finalized. Bid packages have been sent to other contractors for proposals. Projected start date for this project is April 25th and the estimated completion for this project is May 2018. Beach Shower Replacement (Phase II) Scope: Replace and remodel 17 beach showers from South Pointe to 81st Street. Status: Currently waiting for engineer to make final corrections which include stating the locations of various backflow preventers and additional sketches of shower locations. Completion for this project is now dependent on project funding in FY18/19. City Hall Air Handling Unit Replacement Scope: Replacement of 10 air handling units at City Hall. Status: The project is currently nearing the end of completion. Final inspections occurred on April 6th, 2018 and have been passed. In addition, final payments are being reconciled. The estimated completion for this project is April 30, 2018. Marine Patrol Emergency Generator Installation Scope: Install a new emergency generator for the Marine Patrol building. Status: Department is currently reviewing engineering drawings for the new generators. The estimated completion for this project is August 2018. Miami Beach Police Department Generators Replacement Scope: Replace the existing emergency generators for two new 500 KVA generators that are EPA Tier 4 certified; ensuring the new equipment meets the EPA's most stringent regulations for emissions reductions. Status: Department is currently procuring generators directly from the manufacturer. Concurrently, proposal has been received for the mechanical scope of the project and a revised proposal has been solicited for the electrical scope of the project. All of these proposals should be ready for the requisitioning process during this week. The estimated completion for this project is June 2018. Miami City Ballet Window Replacement Scope: Replace approximately 83 existing windows at the Miami City Ballet with new, impact resistant, energy efficient windows and doors capable of rejecting solar heat gain. Surrounding concrete restoration work also included. Status: At current, permit issuance is pending completion of Construction Parking Management Plan (CPMP). Department is preparing bid documents for Request For Proposals (RFP) using reconciled permit drawings in lieu of final permit set. The estimated completion for this project is September 2018. LTC: Property Management Monthly Construction Report Page: 3 of 7 North Shore Youth Center A/C Replacement Scope: Replace two (2) 30 -ton air handling units at North Shore Youth Center including new piping. Status: Project has been completed. Final payment and close out still pending. Property Management Facility Generator Installation Scope: Installation of a new generator, fuel tank and transfer switch. Status: Design drawings have been received and are being reviewed by the department. Once reviewed, department will issue bid packages. The estimated completion is June 2018. Public Works Facility Generator Replacement Scope: Installation of a new generator, fuel tank and transfer switch. Status: Purchase Order for engineering fees received on February 23, 2018. The engineering firm is working on the design and should be submitting them by April 25, 2018. Once received, department will issue bid packages. The estimated completion is June 2018. South Shore Community Center Flooring Replacement Scope: Removal and replacement of the existing vinyl floors and baseboards throughout with new vinyl flooring and baseboards. Status: Attempting to coordinate closing of space with end-users through the City's leasing office. The estimated completion is July 2018. Scott Rakow Youth Center Generator Installation Scope: Installation of a new generator, fuel tank and transfer switch. Status: This project has been re -prioritized and defunded and will be submitted with GO Bond package. Scott Rakow Youth Center Window Replacement Scope: Installation of new, hurricane -rated impact windows. Status: This project has been re -prioritized and defunded and will be submitted with GO Bond package. Scott Rakow Youth Center Fire Alarm Renewal Scope: Replacement of old fire alarm system. Status: This project has been re -prioritized and defunded and will be submitted with GO Bond package. Several completion dates have changed due to coordination with stakeholders, material availability, and to avoid disruption. Project Number Project Title Project Manager Estimated Completion Date 62570 1100 Block of Lincoln Road Updates Adrian Morales TBD 62418 12TH STREET PARKING GARAGE ROOF AND PARKING DECK COATING Jorge Guanchez 07/30/18 62118 12TH STREET PARKING GARAGE UPGRADE LIGHTING (LED) Mark Morgan 07/01/18 LTC: Property Management Monthly Construction Report Page: 4 of 7 61660 13th St PARKING GARAGE - ELEVATOR Jorge Guanchez 07/30/18 60130 13th St PARKING GARAGE - FIRE ALARM Jorge Guanchez 06/30/18 62218 13TH STREET PARKING GARAGE UPGRADE LIGHTING (LED) Mark Morgan 07/01/18 61718 16TH STREET PARKING GARAGE FIRE SPRINKLER RENEWAL Mark Morgan 09/30/18 61818 16TH STREET PARKING GARAGE RENEWAL OF PEDESTRIAN COATING IN STAIRWAYS Jorge Guanchez 05/30/18 61918 16TH STREET PARKING GARAGE ROOF AND PARKING DECK COATING Jorge Guanchez 07/30/18 62518 1755 MERIDIAN PARKING GARAGE ROOF AND PARKING DECK COATING Jorge Guanchez 07/30/18 61930 17th St PARKING GARAGE - ELEVATOR Jorge Guanchez 07/30/18 26290 17th ST. PARKING GARAGE - MAINTENANCE - 4th floor drains Jorge Guanchez 08/30/18 20110 28th St OBELISK STABILIZATION (RESTORATION) Frank Garcia 09/01/18 69380 42nd St PARKING GARAGE - ELEVATOR REPLACEMENT Jorge Guanchez 07/30/18 69370 42nd St PARKING GARAGE - FIRE ALARM SYSTEM Jorge Guanchez 06/30/18 60227 42nd St PARKING GARAGE - LIGHTING FIXTURES Mark Morgan 05/01/18 62100 42nd St PARKING GARAGE - MAINTENANCE Mark Morgan 09/30/18 67240 777 BUILDING - HVAC 4th FLOOR Lily Alvarez 05/01/18 69310 7th St PARKING GARAGE - FIRE ALARM SYSTEM Jorge Guanchez 06/30/18 61118 7TH STREET PARKING GARAGE UPGRADE LIGHTING (LED) Mark Morgan 07/01/18 61218 7TH STREET PARKING GARAGE VESTIBULE ROOFTOP RENEWAL Jorge Guanchez 05/31/18 20001 ALTON ROAD FOUNTAIN AT 20TH STREET Frank Garcia 11/01/18 60190 16 St - ANCHOR GARAGE ELEVATOR REPLACEMENT Jorge Guanchez 07/30/18 62530 BASS MUSEUM - HEAT PUMP REPLACEMENT Lily Alvarez 05/01/18 28000 BASS MUSEUM - HVAC Replacement Lily Alvarez 05/01/18 26030 BASS MUSEUM - Light Control Replacement Lily Alvarez 05/01/18 25960 BASS MUSEUM ELECT. BREAKER BOX REPLACEMENT Lily Alvarez 05/01/18 67360 BASS MUSEUM EMERGENCY GENERATOR Lily Alvarez 05/01/18 25980 BASS MUSEUM EMERGENCY GENERATOR Lily Alvarez 05/01/18 25970 BASS MUSEUM EXTERIOR LIG REPL. REPAIR Lily Alvarez 05/01/18 26010 BASS MUSEUM HYDRAULIC ELEVATOR Lily Alvarez 09/01/18 LTC: Property Management Monthly Construction Report Page: 5 of 7 67100 BASS MUSEUM - Exterior Walls & Paint Lily Alvarez 05/01/18 27710 BASS MUSEUM WEATHER SEAL Lily Alvarez 05/01/18 27970 BEACH SHOWER DRAINAGE Jorge Guanchez TBD 63090 CITY HALL - AIR HANDLING UNIT REPLACEMENT Jorge Guanchez 04/30/18 68760 CITY HALL - ELECTRICAL UPGRADES Oniel Toledo 04/30/18 61290 CITY HALL - FIRE ALARM SYSTEM REPLACEMENT Frank Garcia 06/15/18 67210 CITY HALL - ROOF & SKYLIGHT RESTORATION Oniel Toledo 05/31/18 62940 CITYWIDE PARKING LOT LIGHTING Mark Morgan 09/30/18 60637 COLONY THEATER HVAC Adrian Morales 06/11/18 60117 FIRE 1-12 F2020- HAZARDOUS COMPONENTS Jorge Guanchez 09/30/18 62060 FIRE STATION #1 - CARPET REPLACEMENT Jorge Guanchez 06/30/18 62070 FIRE STATION#1 - ELECTRICAL REPLACEMENT Jorge Guanchez 09/30/18 62080 FIRE STATION #1 - FLOOR REPLACEMENT Jorge Guanchez 09/30/18 63770 FIRE STATION #1 - FY 08 Oniel Toledo 09/30/18 68530 FIRE STATION#1 - INTERIOR & EXTERIOR DOOR REPLACEMENT Oniel Toledo 09/30/18 62918 FIRE STATION #1 INTERIOR & EXTERIOR PAINTING Oniel Toledo 04/30/18 60077 FIRE STATION #2 - ALARM SYSTEM Rene Guerra 05/30/18 67220 FIRE STATION #3 - EMERGENCY GENERATOR Ramon Duarte 09/30/18 60167 FIRE STATION #2 - ENGINE BAY ALARM Rene Guerra 05/01/18 62818 FIRE STATION #2 - GARAGE DOORS REPLACEMENT Rene Guerra 05/01/18 60057 FIRE STATION #3 - EMERGENCY GENERATOR Jorge Guanchez 07/30/18 67200 FIRE STATION #3 - FIRE ALARM UPGRADE Rene Guerra 05/30/18 61018 FIRE STATION #3 - KITCHEN RENEWAL Rene Guerra 05/01/18 60918 FIRE STATION #4 -KITCHEN EQUIPMENT RENEWAL Rene Guerra 05/01/18 60587 FIRE STATION #4 ROOF REPLACEMENT Oniel Toledo 06/01/18 23118 FIRE STATION #4 SECURITY ENHANCEMENT Rene Guerra 09/01/18 69470 FLEET/SANITATION FIRE ALARM SYSTEM Lily Alvarez 09/30/18 60618 HISTORIC CITY HALL FIRE ALARM SYSTEM RENEWAL Frank Garcia 06/15/18 LTC: Property Management Monthly Construction Report Page: 6 of 7 60418 HISTORIC CITY HALL HVAC FRESH AIR UNIT HUMIDITY CONTROL Oniel Toledo 09/30/18 60518 HISTORIC CITY HALL PRESSURE BOOSTER PUMP Oniel Toledo 05/28/18 69480 MARINE PATROL - EMERGENCY GENERATOR Jorge Guanchez 08/30/18 60097 MIAMI CITY BALLET - EMERG. LIGHT REPLACEMENT (BATTERY PACK) Frank Garcia 05/01/18 27760 MIAMI CITY BALLET - EXT. CONCRETE RESTORATION Frank Garcia 09/15/18 27780 MIAMI CITY BALLET - WINDOW REPLACEMENT Frank Garcia 09/15/18 63118 NORMANDY SHORES GOLF CLUB RESTROOM ROOF REPLACEMENT Rene Guerra 04/30/18 67070 P.A.L. BUILDING - EXTERIOR PAINT, Exit signs, Emergency lights & interior paint. Jorge Guanchez 05/30/18 68720 POLICE HQ & PARKING GARAGE- FIRE ALARM REPLACEMENT Frank Garcia 06/15/18 63350 POLICE HQ ELEVATOR & FIRE ALARM REPLACEMENT Frank Garcia 06/15/18 60030 POLICE STATION MEN'S LOCKER ROOM Frank Garcia 04/15/18 60007 POLICE STATION NEW GENERATOR Frank Garcia 06/01/18 21918 PROPERTY MANAGEMENT FACILITY CARPENTRY SHOP DUST CONTROL SYSTEM Ramon Duarte 06/30/18 21818 PROPERTY MANAGEMENT FACILITY NEW 500KW GENERATOR AND TRANSFER SWITCH Ramon Duarte 06/30/18 69210 PUBLIC WORKS MAINT. FACILITY EXTERIOR WINDOW REPLACEMENT Frank Garcia Pending budget amendment 69220 PUBLIC WORKS MAINT. FACILITY GENERATOR Ramon Duarte 06/30/18 64220 PUBLIC WORKS OPERATIONS -EXTERIOR RESTORATION Jorge Guanchez 05/30/18 61518 PUMP STATION 28 STORAGE TANK REPLACEMENT Lily Alvarez 06/30/18 61618 PUMP STATION 29 STORAGE TANK REPLACEMENT Lily Alvarez 06/30/18 62410 REPLACE SOUTH SHORE COMM. CARPET VINYL TILE Lily Alvarez 07/01/18 27350 SANITATION - INTERIOR REPLACEMENT Lily Alvarez 08/01/18 60087 SCOTT RAKOW CENTER ALARM SECURITY SY REP Lily Alvarez 08/01/18 60037 SCOTT RAKOW CNTR. FIRE ALARM REPLACEMENT Lily Alvarez Deferred to FY19 60018 SCOTT RAKOW COMMUNITY CENTER ALUMINIUM WINDOWS RENEWAL Ramon Duarte Deferred to FY19 60318 SCOTT RAKOW GENERATOR REPLACEMENT Ramon Duarte Deferred to FY19 61318 SOUNDSCAPE PARK AIR CONDITIONING SYSTEM REPLACEMENT Adrian Morales 05/01/18 60038 SOUTH SHORE COMMUNITY CENTER FIRE ALARM SYSTEM RENEWAL Lily Alvarez 08/01/18 60218 STORAGE TANK REPLACEMENT Lily Alvarez 08/01/18 LTC: Property Management Monthly Construction Report Page: 7 of 7 60647 WHEELCHAIR LIFT N. SHORE BANDSHELL Valeria Mejia 05/01/18 62220 POLICE STATION A/C REPLACEMENT Frank Garcia 05/01/18 68520 FIRE STATION 3 INTERIOR AND OVERHEAD DOOR REPLACEMENT Jorge Guanchez 09/30/18 69960 SOUTH SHORE COMMUNITY ELEVATOR Lily Alvarez 09/01/18 64120 POLICE ST PNEUMATIC CONTROLS REPLACEMENT Frank Garcia Completed 63750 POLICE STATION BUILDING -VARIOUS PROJECTS Frank Garcia Completed 60067 POLICE EXIT SIGN RENEWAL Frank Garcia Completed 64140 POLICE VARIABLE AIR VOLUME DAMPERS Frank Garcia Completed 64150 POLICE VARIABLE FREQUENCY DRIVES Frank Garcia Completed 20557 ANCHOR GARAGE LIGHTING Mark Morgan Completed 60187 17TH STREET GARAGE LIGHTING FIXTURE Mark Morgan Completed 63018 NORMANDY SHORES GOLF CLUB NC AND KITCHEN REFRIGERATOR REPLACEMENT Rene Guerra Completed 67080 SOUTH SHORE COMM. CNTR ELASTOMERIC COAT Lily Alvarez Completed 62130 FLEET MGMT HVAC CONTROLS REPLACEMENT Oniel Toledo Completed 60127 SOUTH SHORE COMM. CNTR. SWITCH GEAR REPLACEMENT Lily Alvarez Completed 67050 NORTH END SUBSTATION - RESTROOM RENOVATION Frank Garcia Completed 69250 SOUTH SHORE COMMUNITY CENTER - CHLLD WTR PUMP Lily Alvarez Completed 62510 BASS MUSEUM HVAC CONTROLS Lily Alvarez Completed 60718 NORTH SHORE PARK YOUTH CENTER A/C REPLACEMENT Rene Guerra Completed Should you have any additional questions, please contact Adrian Morales at 305.673.7000 ext. 2932. JLM/MT/AM/SX