Loading...
1675-1 Singapore Hotel mh SINGAPORE HOTEL GOING; 11/28/1993 THE MIAMI HERALD Copyright (c) 1993, The Miami Herald DATE: Sunday, November 28, 1993 EDITION: FINAL SECTION: NEIGHBORS MB PAGE: 2 LENGTH: 40 lines ILLUSTRATION: photo: The 22-story 165-unit Majestic Tower will be built at 9601 Collins Ave. SOURCE/CREDIT LINE: RAFAEL LORENTE Herald Staff Writer SINGAPORE HOTEL GOING; CONDO TOWER ON THE WAY And then there were two. The Singapore Resort Hotel, 9601 Collins Ave. , will be demolished at the end of this tourist season to make way for another shimmering condominium in the Bal Harbour skyline. The only hotels left in the village will be the Sheraton Bal Harbour Resort and the Seaview Hotel. The Singapore, built in 1958, will be torn down to make way for the Majestic Tower at Bal Harbour, a 22-story condominium with 165 units. "The city and everybody will be proud of it," said Jerry Oren, the builder who is convinced his tower will be the most magnificent in South . Florida. Oren is planning to finish his other building, The Palace, just a few blocks north, before starting on the Majestic. On a busy afternoon before Thanksgiving, Oren was already making changes in the floor plans of the Majestic -- enlarging a bathtub and a vanity in the guest bathroom at the expense of a little closet space. Details are very important, Oren said. "You don't want to open the living room door and look at a toilet." The amenities will include 10-foot ceilings, built-in electric hurricane shutters, his and her bathrooms and closets, exercise rooms and ocean and city views from every apartment. The building also will have a pool, tennis and basketball courts and private elevators that open into apartment foyers. The condos will sell for $300,000 and up. Oren wouldn't be any more specific with the prices, but a sales office with a model should be open in front of the Singapore in a few weeks. The Singapore, which Oren has been running for about a year, will be torn down in April or May. Oren expects construction of the Majestic to take about 1 1/2 years. TAG: 9303210583 :4