Class II Permit Agmt OF-0106201
~ ,"
,
200)..- Ufq&'
. '
,
.,.'.:"
'.
~v':~Arli~:-Dk:Jt: t.;UUi~ ~ ~, =-":_!.J,RIDA'~ '.. f'
. - ~..
.-.
'6'......
" + '~'l
!f
'r
\
June 21, 2001
ENVIRONMENTAL RESOURCES MANAGEMENT
WATER CONTROL SEc''TION
SUITE 200 '
33 s.w, 2nd AVENUE
MIAMI, FLORIDA 33130-1540
(305) 372-6681
Michael Alvarez
Assistant Public Works Director
City of Miami Beach
1700 Convention Center Drive
Miami Beach, Florida 33139
Re: Class II Permit Agreement No. OF-010620-1
Dear Mr. Alvarez:
Enclosed are three (3) copies of Permit Agreement OF-OI0620-1 for the construction of drainage
improvements to the Sunset Harbour Drive, City of Miami Beach, in Section 28-53-42.
The documents are to be executed by the Permittee and Contractor and returned to. this office for final
execution and distribution, One (1) copy of the construction drawings is attached for your information
and should be returned with the executed documents. This permit does not become effective until it is
signed by the Director of the Department of Environmental Resources Management.
Please make a check to cover permit application and construction fees in the amount of $5,236.00
payable to Miami-Dade County and forward it to this office.
If you have any questions, please contact Camilo P. Ignacio of this office at (305) 372-6681,
Sincerely,
lie Mehu, Engineer I
Water Control Section
CI:ms
Enclosure
MIAMI DADE COUNTY
DEPARTMENT OF ENVIRONMENTAL RESOURCES MANAGEMENT
WATER MANAGEMENT DIVISION
33 SOUTHWEST 2ND AVENUE
MIAMI. FLORIDA 33130-1540
TEL: (305) 372-6681
PERMIT DOCUMENT
FOR
The construction of drainage improvements to the Sunset Harbour Drive, City of Miami Beach, in
Section 28-53-42.
PERMIT NO.: OF-010620-1
DATE: June, 2001
Reviewer: Cami10 P. Ignacio
'.
AGREEMENT FOR
DADE COUNTY DEPARTMENT OF ENVIRONMENTAL RESOURCES MANAGEMENT
. WATER MANAGEMENT DIVISION
WC 680.42
BASIN: Biscayne Bay
This agreement, between the Permittee and the Contractor named herein and Dade County, is made for
the purpose of accomplishing the work described herein as further described by approved drawings
attached hereto and made a part hereof. Such drawings may be required to be prepared by a Registered
Engineer and must be approved by the Director of Environmental Resources Management. (instructions
and general requirements for Water Control Permits are attached hereto and made a part of this
agreement.)
1. Proposed Work. Construction. or Use:
. The construction of drainage improvements consisting of a replacement of drainage pipes, and
pollution control structures along the Sunset Harbour Drive, City of Miami Beach, in Section 28-
53-42.
1A. Special Conditions: See attachment
2. Location: Purdy Avenue and 20th Street
3. Name. Address and Phone of
Permittee:
Contractor: (Must be Licensed by
Miami-Dade County)
City of Miami Beach
Public Works Department
1700 Convention Center Drive
Miami Beach, Florida 33139
Attn: Mr. Michael Alvarez
Assistant Public Works Director
Tran Construction
c/o Henry Louden
President
420 Lincoln Road, M-1
Miami Beach, Florida 33139
(305) 673-5427 Ext. 121 & 125
3a. Note:
The contractor shall keep a copy of this permit document together with a copy of the
approved set of drawings on site at all time during construction.
Sheet 2
SPECIAL CONDITIONS
1. This Permit is issued for disposal of excess stormwater runoff only after that portion of the runoff
containing the majority of pollutants has been fully restrained on-site, and may be rescinded if a
detrimental effect is found on the receiving water body for reasons of malfunction, inadequate
maintenance or other reasons. Therefore, in order to maintain this permit active, the Permittee is
required to provide regular maintenance and must submit to this office, on a yearly basis, a
certification that the system has been maintained and is operating efficiently.
2. In addition, the Permittee hereby agrees to allow access to the site to staff personnel of the
Department of Environmental Resources Management, if so required for inspection, at any time
after the completion ofthe job and the closing of this permit.
3. The Permittee shall be responsible to establish adequate measures and control during construction
. to ensure that sedimentation and/or turbidity problems shall not impact adjacent site, public right-
of-ways and their drainage facilities. Said measures shall be used also to prevent siltation of the
constructed drainage system during site development.
4. Silt Screens, hay bales or other such sediment control measures shall be utilized during
construction. The selected sediment control measures shall be utilized landward of the Biscayne
Bay. All areas shall be stabilized and vegetated immediately after construction to prevent erosion
into the Biscayne Bay.
Sheet 2A
:
5. Agreed Time Limit:
From date of completing permit documents to date of
beginning of work: 180 days
6. Agreed Number of Calendar Davs:
Between completion of permit documents and completion of
work: 365 days.
7. Permit Value and Amount of Performance Bond Required:
(The sum of the items of cost listed in Paragraph 8 must conform with Section 24-58.5(3) of
the Miami-Dade County Code): Waived
8. Ouantities of Work to be Done and Estimated Cost:
$131,750.00
9. Pre-Work Conference:
. No work under this Permit may be commenced until a prework conference has been held between
the Permittee, the Contractor and the Water Control Engineer, together with representatives from
any other governmental agencies, utility companies or property owners whose interests may be
affected by the work.
10. Survevs and Control of Work:
The Permittee shall furnish at his expense all survey information required for proper control of the
work. For excavation work, such as canals, this will include cross-sections to be made every ten
days during the period of when the work is in progress, unless otherwise specified by the Water
Control Engineer. Cross sections and other as-built drawings shall be prepared in accordance with
good engineering practice and certified as correct by a registered engineer.
11. Supervision and Inspection:
Dade County will appoint such inspectors as are needed to supervise the execution of the work
contemplated under this Permit Agreement. The inspector's duties and functions are purely
supervisory and their decisions are to be binding only in the absence of the Water Control
Engineer, and shall be subject to his review. When in the judgment of the inspectors the
performance of the work is not in accordance with the requirements of this permit agreement, they
shall have the power to stop the work, including all related site development work, which shall not
be resumed until the Water Control Engineer has rendered his decision upon the matter in dispute.
Sheet 3
'.
Any work found not in accordance with permit requirements must be corrected before the
Permittee may resume any other part of the work. Delay in completion of the work due to this
cause will be considered an acceptable reason for extension of time only when in the opinion of the
Water Control Engineer such delay was due to causes beyond the control of the Permittee or
Contractor, or that such delay will not handicap or interfere with the Water Control Program of
Miami-Dade County. .
12. Excessive Noise:
Upon bona fide complaints of residents in the vicinity of the work concerning excessive noise,
Dade County reserves the right to impose the requirement that no work be done on Sunday or any
day between the hours of 11 :00 p.m. and 7:00 a.m. except such work as is necessary for the proper
care and protection of the work already performed.
13. Alterations. Relocations and Incidental Work:
All alterations, relocations and other incidental work including utility adjustments that may be
required to carry out the purpose and intent of this Permit Agreement shall be performed at the
. Permittee's expense after approval by the Water Control Engineer.
14. Maintenance and Flow for Drainage:
It is agreed that the first priority in the Permittee's development program will be given to provision
of adequate drainage connections through the property. The Contractor shall conduct his
operations in a manner that will insure that the primary purpose of drainage is served at all times.
Temporary construction or blockage of channels for construction purposes will be allowed only
upon express permission by the Water Control Engineer, and must be removed immediately upon
his demand.
15. Turbiditv Control:
All engineering drawings submitted for either a Class II or Class III Permit involving construction
activities in or along the banks of any surface body of water, shall show turbidity control device
outlined on the permit plan set. Turbidity barriers shall be installed in-place before the
commencement of work. The latter shall include both exploratory work and actual work. In order
to minimize inadvertent collapse of barrier structure, barrier sheathing shall also be anchored along
the bottom hem with a weighted chain-like device. At all times, the turbidity barrier device shall
be maintained in a proper functional position during the entire construction phase.
Sheet 4
16. The Pemlittee or Contractor shall be responsible for securing any and all permits not included
within item #16 which may be required in connection with the Class II or III Permit. The issuance
of this permit does not relieve the Contractor or Permittee from above responsibility.
17. Agencies other than the Department of Environmental Resources Management from which
approval may be necessary (as checked):
South Florida Water Management District, for any use of District Right-of-Way.
Dade County Fire Department, for use of explosives.
Dade County Public Works Department, Highway Division, for approval of bridge
construction plans. .
Florida State Department, Highway Division, for approval of bridge construction plans.
Florida State Department of Transportation District Office, Miami, for work within SRD
Right-of-Way.
Dade County Public Works Department, Permit Section, for construction permit to install
structures (bridge, culvert, catch basin, storm drain, etc.) within canal road Right-of-Way and
on-site.
Dade County Building & Zoning Department, for permit to install on private property only,
bulkheads, retaining walls, piers, docks and boatslips incidental to the principal work covered
by this Permit Agreement, and for clearing, leveling, grading, excavating and filling on said
property.
Recommended:
IN WITNESS WHEREOF the said DADE COUNTY, FLORIDA has caused this Permit Agreement to
be executed in its name by the Director of Environmental Resources Management and Contractor and
Permittee have caused this Permit Agreement to be executed in their names.
WHEN THE CONTRACTOR IS AN INDIVIDUAL OR PARTNERSHIP
Signed, Sealed and Delivered in the Presence of:
Witnesses
Contractor
SIGN
DATE
Sheet 5
/
.
A CORPORATION
WHEN THE CON
Secretary
1e!c# MH~7;l:/lC71()W\ /NC!..
(Correct Name of Co oratio) -
DATE
LOv Jen
(AFFIX CORPORATE SEAL)
WHEN THE PERMITTEE IS AN INDIVIDUAL OR PARTNERSHIP
Signed, Sealed and Delivered in the Presence of:
Witnesses
Owner
SIGN
DATE
:u~tP:rRPORATION
ROBERT PARCHER, CITY CLERK
DATE Q./S ( ~ ~.
BY
F ED H.BECKMANN,
(AFFIX CORPORATE SEAL)
DADE COUNTY DEPARTMENT OF ENVIRONMENTAL RESOUltCES MANAGEMENT
DATE
BY
Antonio Cotarelo, P.E., Chief
Water Management Division,
for Director, Environmental
Resources Management
THE ISSUANCE OF THIS PERMIT DOES NOT RELIEVE THE OWNER AND/OR
CONTRACTOR FROM OBTAINING ALL REQUIRED FEDERAL, STATE AND LOCAL
PERMITS.