Amendment No. 1 to the Contract with HB Hoffman, LLC aon- .z 98os AMENDMENT NO. 1 TO THE CONTRACT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND HB HOFFMAN, LLC., dated January 15, 2016 This Amendment No. 1 (Amendment)is made and entered into this 1.3 day of Zoe , 2017 (Effective Date), by and between the City of Miami Beach, Florida, a municipal corporation organized and existing under the laws of the State of Florida("City"), and HB Hoffman, LLC., a Florida companyAimited liability company, (`HB Hoffman" or "Contractor"), and hereby amends the Contract dated January 15, 2016 between the City and the HB Hoffman, as follows: RECITALS WHEREAS, on December 9, 2015, the Mayor and City Commission approved the award of Invitation to Bid ("ITB") No. 2015-182-JR for City Hall Heating, Ventilation and Air Conditioning(HVAC)8 Variable Frequency Drive(VFD) Replacement; and WHEREAS, on January 15, 2016, the City and HB Hoffman executed the Contract with respect to the ITB 2015-182-JR (the Contract), which services include City Hall HVAC and VFD replacement; WHEREAS, on April 26, 2017, the Mayor and City Commission adopted Resolution No. 2017-, Ba; approving additional work to the Contract, to include coating of coil, additional duct heaters far AHU-4 and AHU-7, additional mobilization equipment (including relocation of crane to Convention Center Drive), and replacement of damaged turning vanes for AHU-11,for an amount not to exceed$59,769.00. NOW THEREFORE, in consideration of the mutual promises and conditions contained herein, and other good and valuable consideration, the sufficiency of which is hereby acknowledged, the City and Consultant hereby agree to amend the Agreement as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as part of this Amendment. 2. MODIFICATIONS. a. Contractor agrees to perform the additional work specified in Exhibit 1 attached hereto, for the amounts specified herein, which shall include, at a minimum, coating of all coils relating to the HVAC units, additional duct heaters for AHU-4 and AHU-7, additional mobilization equipment (including relocation of crane to Convention Center Drive), and replacement of damaged turning vanes for AHU-11. b. The total amount for all work related to the services identified in Exhibit 1 hereto shall not exceed the maximum amount of$59,769. All work shall be billed in accordance with the Contract terms. 3. RATIFICATION Except as amended herein, all other terms and conditions of the Contract shall remain unchanged and in full force and effect In the event there is a conflict between the provisions of this Amendment and the Contract, the provisions of this Amendment shall govern. S. RATIFICATION. Except as amended herein, all other terms and conditions of the Contract shall remain unchanged and in full force and effect. In the event there is a conflict between the provisions of this Amendment and the Contract the provisions of this Amendment shall govern. IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed by their appropriate officials, as of the date first entered above. FOR CITY: - 1:77-Th,,CITY OF MIAMI BEACH, FLORIDA ATTEST: O <. • By: * 'CORP ORATE R ael E.Gr nado, City +eglt_. .Y�Leviner MaYor /m Y ky air*/4. fr� � ,Q...<::'::..•,�o 13fL6er Vice- i-ir u5ei,- 6A}J+ �CN26"f Date Date FOR HB HOFFFMAN,LLC: ATTEST: (n • By: ,j e ry ManagerlMember PnntNarrk ut, // �a4t.- p na.b. t.1S ` L Print Name ( / II Date' Date APPROVED AS TO FORM&LANGUAGE &FOR EXECUTION 0 4 -twill a...., Rs", or TIMELY SE WITH VISION ANOD INTEGRITY HB Hoffman, LLC Plumbing-A/C-Mechanical Ioway.RBRoffmanLLCcons April 3, 2017 City of Miami Beach 1755 Meridian Ave, 3`d Floor Miami Beach,FL 33139 Attn: Jorge Guanchez Subject: Amendment#1 —Addition to Contract ITS 2015-182-tR Jorge, The original contract amount for the Miami Beach City Hall HVAC and VFD Replacement has to be increased due to the necessary unforeseen additional work. —LUVATA AIR HANDLING UNIT AND COIL COATING 527,852.00 —ELECTRIC DUCT HEATERS FOR AHU-4 AND AHU-7 523,817.00 —RE LOCATION OF CRANE TO CONVENTION CENTER DRIVE 55,000.00 —REPLACE TURNING VANES IN AHU-I I DUCTWORK 53,100.00 TOTAL $59,769.00 Thank you, Kara Hoffman Bays President HB Hoffman, LLC 1340.38 Stirling Road Dania Beach,FL 33004 (954)362-7325 (954)362-7327 fax www.HBHoffmanLLC.cotn NB Ho flown,LLC-Proposal DATE Description of Bid: CP K1-Coll and Cabinet Coating(e1539) Sine Change Propose! I. MATERIAL&EQUIPMENT COST A Piping Material(sea attached) $2,395.00 B Field Administrative Material Cost(see attached) $0.00 C Equpnaa(seeattached Carrier audition,) $13,780.00 D. Renals(see attached) 5000 S16.175 00 E.Saes Tan % $0.00 F. Delivery Expense l Trucking $450.00 TOTAL MATERIAL 8 EQUIPMENT $16.625.00 II. LABOR COST 3g FXTFNSION A GENERAL FOREMAN(HVAC) 0 526.72 $0.00 B FOREMEN(FNAC) 2] $26.72 $615.00 C JOURNEYMEN(HVAC.None) 115 $26.72 $3,073.00 D JOURNEYMEN(HVAC-Retrid) 0 $0.00 $0 00 E. JCURNEYMEN(HVAC) 0 $0.00 $0.00 TOTAL LABOR 53.688.00 III. MISCELLANEOUS JOB COST A Consumables $111.00 B. Additional Warranty $200.00 C. Mauna Harding 5184.00 O Clean-Up $148.00 E Snail Tccls $111.00 F Safety $92.00 TOTAL MISCELLANEOUS JOB COST $846.00 N. FIELD ADMINISTRATIVE LABOR COST(as attached) $0.00 TOTAL COSTS n-1t $27,159.00 V. COH7R4 CTOR PERFORMED OHP #17585 VI.SUBCONTRACTOR COST A Sheet Metal $0.00 a Comma $0.00 c lneaamn SO:oo D. Teat&Balance $000 E EngrseenN $0.00 F Second $0.00 O Parsing 53.00000 R Oxer 50.00 $3.000.00 VILE Sudminctot SaIety Cast £6000 TOTAL SUBCONTRACTOR COST $3,060.00 VIII. SUBCONTRACTOR PERFORMED OWP $459.00 IX. Llamas/Permits $0.00 X. TOTAL ITEMS 9-DO $27857,85 Bond Coe $0.00 BID TOTAL: $2785200 SA , Cy 4 HS Hoffman,LLC.Proposal (Description of Change: CP 12EIecvlc Duct Heaton AMU 44M 7 SJur-os PROPOSAL SUMMARY I. MATERIAL&EQUIPMENT COST A Won. eleaM1 52,890.00 8. MAW AJmciewure Mateo)Coll Cm itto Mal $2,100.00 Q EloPM4n1 Uae aRVJ1Wl 33,18200 D Rinds Nis e8a0•0 S0.00 $7,97204 E Bab Tex F, DeIheT Exposes/Truokeg 53580 5350.00 TOTAL MATERIAL&EQUIPMENT 111.180.04 II. LABOR COST H1(1 RATE EXTENSION A GENERAL FOREMAN(HVAC) 0 50.00 50.00 II FOREMEN(HVAC) 2a 529.30 $586.00 C. JOURNEYMEN(INAC-IM) @ $28.72 $1.161.00 D. .OURNEYMENIINAC-SM) 5¢ S213 72 $1,034.00 E, JOURNEYMEN(NVACI 0 $0.00 $0.00 TOTAL LABOR 53.401.00 III. MISCELLANEOUS JOB COST A Cersunmmns 510200 B warranty $27816 C Mmmhl Hwang $189.00 o Cieem.Ua E Small Tools $136.00 F Salm), 102.00 185 00 TOTAL MISCELLANEOUS JOB COST 5872.18 N. FIELD ADMINISTRATIVE LABOR COST)see*BtPMU) 50.00 TOTAL COSTS(•M 512,157.20 V.:CONTRACTOR PERFORMED OHP $1.17298 VI. SUBCONTRACTOR COST A 3Me1 Mae .:$0.03 S Centrah 00 _...40.03 C. Investen ^.S1,2W:00 0. Toe )Yana 1003 E.Ece mcm-Stryker $8.821,00 $7,918.00 I, E. SUMenbaclar Saley Cee $154]2 TOTAL SUBCONTRACTOR COST 58.07432 VIE, SUBCONTRACTOR PERFORMED OHM $40332 qq IX. Lanae 1 Pernik, ( 1- 1212.44 (/ S. TOTAL ITEMS fl dib S23.110.15 len cast 50.00 TOTAL BID 123,017.00 143141 T/MELYS E W/7N Vision / l - AND V7INCEantrrITH `l HB Hoffman, LLC Plumbing-A/C-Mechanical www.NRHoMmanLLCcon, City of Miami Beach October 24,2016 1245 Michigan Ave. Miami Beach,FL Attn: Mr.Jorge Guanchez Ref: MBCH HVAC and VFD Replacement Sub: CP#4-Crane Jorge, Please find attached itemized crane quotes,which represents the Increase in cost for a 200 ton Crane due to the City of Miami Beach directing the new location of the crane for the installation of AHU-11. Total amount of change ADD: $5,000.00 Cla rifkation/Notes/Smpe: New 200 ton crane pricing 8/22/16 58,610.00 Additional Set-Up $800.00 Overhead&Profit $378.00 Old 120 crane pricing 5/24/16 44,788.00 TOTAL ADD: $5,000.00 We are not proceeding with-this change until we are given authorization. Sincerely, Gary M.Bays VP Operations HB Hoffman,LLC cc: KB, BF 41539 3340-38 Stirling Road Oania Beach,FL 33004 . _(954)362-7325. (954)362-7327 fax www.HBHoffinanLLCcom ST TIME!.r SERVICE WITH VISION AND INTEGRITY HS Hoffman LLC Phrnrb/ng-4C-Mrchanlca/ www.HBRonmanLLCcom City of Miami Beach October 24,2016 1245 Michigan Ave. Miami Beach,FL Attn: Mr.Jorge Guanchez Ref: MBCH HVAC and VFD Replacement Sub: CP#5—Remove and Replace Turning Vanes,AHU-11 Jorge, The below is the additional cost for the removal and replacement of damaged turning vanes in the 42"elbow on AHU-11 supply air ductwork. Total amount of change ADD: $3,100.00 We are not proceeding with this change until we are given authorization. Sincerely, Gary M.Bays VP Operations HB Hoffman,Lit cc: KB, BF#1539 1340-3a Stirling Road Dania Beach,FL 33004 (954)362-7325 1954)362-7327 fax . -. www.HBHoffmanLLC.rum Resolutions-C7 F MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: April 26,2017 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY OF MANAGER, APPROVING AMENDMENT NO. 1 TO INVITATION TO BID (ITB) NO. 2015-182-JR FOR CITY HALL HEATING, VENTILATION AND AIR CONDITIONING (HVAC) S VARIABLE FREQUENCY DRIVE (VFD)REPLACEMENT RECOMMFNDATION Adopt the Resolution. ANALYSIS The Heating, Ventilation, and Air Conditioning(HVAC)units at City Hall have reached the end of their useful life and require replacement in order to accurately control the temperature and humidity at City Hall. In 2015, the City competitively solicited proposals for the HVAC replacement work through ITB No. 2015-182-JR, and on December 9. 2015, the City Commission awarded a contract to HB Hoffman, LLC. the lowest responsive bidder. Through the Citys above-referenced contract with HB Hoffma, LLC., the city is in the process of replacing nine (9) HVAC units at City Hall, and installing new Variable Frequency Drive (VFD) and smoke detectors. The City has encountered unforeseen conditions related to the replacement of the nine (9) HVAC units at City Hall, and has requested that HB Ifoffman, LLC perform additional work. including the coating of the coils, the addition of duct heaters for AHU-4 and AHU-7,additional mobilization equipment (including relocation of crane to Convention Center Drive) and replacement of damaged turning vanes on AHU-11,in the amount not-to-exceed 559,769. CONCLUSION The Administration recommends that the Mayor and City Commission of the City of Miami Beach approve Amendment No. 1 to the contact between tie City and HB Hoffman, LLC, pursuant to Invitation to BID (ITB)No.2015-182-JR,for City Hal Heating,Ventilation and Air- Conditioning (HVAC) 8, Violable Frequency Drive (VFD) Replacement, with sad Amendment No. 1 in the amount not-to-exceed $59,769.00 for additional work related to coaling of coils, addition of certain duct heaters,additional mobilization equpmen t,including relocation of crane to Convention Center Drive,and replacement of certain danaged Ming vanes. Page 382 of 1596 KEY INTENDED OUTCOMES SUPPORTED Build And Maintain Priority Infrastructure With Full Accountability Amount 1 $228,963 Account 1 125-6309-000674 Amount 2 $87,455 Account 2 125-6317-000674 Amount 3 $59,769 Account 3 1256309-000674 Total $376187 J ealslative Tracking Property Management ATTACHMENTq- Description o Executed Contract between CMB 8 HB Hoffman, LLC. o Resolution HB Hoffrran a HB Hoffman Amendrrent No 1 o HB Hoffman supporting documents Page 383 of 1598