Resolution 2018-30414RESOLUTION NO. 2018 -30414 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE AMENDMENT NO. 3 TO THE DESIGN /BUILD AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND RIC -MAN CONSTRUCTION, INC. FOR THE STORMWATER PUMP STATION ON 19TH STREET BETWEEN CONVENTION CENTER DRIVE AND MERIDIAN AVENUE PROJECT; SAID AMENDMENT NO. 3 PROVIDING FOR THE DESIGN AND CONSTRUCTION OF THE SEA WALL ALONG THE COLLINS CANAL IN THE VICINITY OF THE CARL FISHER CLUBHOUSE, TO REPLACE THE EXISTING DILAPIDATED SEA WALL, AS PART OF THE STORMWATER PUMP STATION IMPROVEMENTS FOR THE CONVENTION CENTER, IN AN AMOUNT NOT TO EXCEED $593,000, PLUS OWNER'S CONTINGENCY IN THE AMOUNT OF $59,300, FOR A TOTAL AMOUNT OF $652,300; WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, on January 17, 2017 the City entered into a Design /Build Agreement with Ric -Man Construction, Inc. (Ric -Man) to develop, design, and construct the Stormwater Pump Station on 19th Street between Convention Center Drive and Meridian Avenue in the amount of $6,332,389.80; and WHEREAS, on February 9, 2018, Amendment No. 1, to the Design /Build Agreement was executed for $630,013.00, as adopted by the City Commission under Resolution No. 2017- 30020, to incorporate a permanent emergency generator as part of the Project; and WHEREAS, Amendment No. 1 revised the total contract amount to $6,962,402.80; and WHEREAS, on March 23, 2018, Amendment No. 2 to the Design /Build Agreement was executed for $387,124.00, plus $38,712.00 owner's contingency, as adopted by the City Commission under Resolution No. 2018- 30220, to proceed with the design and construction of the improvements for the extension of the Botanical Garden north of its current border and up to the swale along the Collins Canal; and WHEREAS, Amendment No. 2 revised the total contract amount to a not -to- exceed total of $7,388,238.80; and WHEREAS, proposed Amendment No. 3 will provide for the design and construction of a portion of the sea wall in the vicinity of the Carl Fisher Club House, in order to replace the existing dilapidated sea wall, complete the seawall system for the Convention Center project, and will facilitate the City with proceeding with the Carl Fisher Club House renovations; and WHEREAS, the duration of this work is 136 days, which is expected to be concurrent with the remaining duration of the work on the 19th Street Pump Station Project; and WHEREAS, this Amendment No. 3, in the amount of $593,000, plus $59,300.00 Owner's Contingency, will revise the total contract amount to a not -to- exceed total of $8,040,538.80; and WHEREAS, as part of the 2015/16 Capital Budget adoption, the Convention Center - Collins Canal Seawall was funded through Resolution No. 2014 - 28836. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission approve and authorize the City Manager to negotiate and execute Amendment No. 3 to the Design /Build Agreement between the City of Miami Beach, Florida, and Ric -Man Construction, Inc. for the stormwater pump station on 19th Street between Convention Center Drive and Meridian Avenue Project; said Amendment No. 3 providing for the design and construction of the sea wall along the Collins Canal in the vicinity of the Carl Fisher ClubHouse, to replace the existing dilapidated sea wall, as part of the stormwater pump station improvements for the Convention Center, in an amount not to exceed $593,000, plus owner's contingency in the amount of $59,300, for a total amount of $652,300; with previously appropriated funding. PASSED and ADOPTED this 5 day of J /4/G ATTEST. R AEL . GRANAD , CITY CLERK , 2018. DAN GELB `_ MAYOR APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION ity Attorney Date ,K /VijAI\A BEACH Resolutions - C7 AF COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: July 25, 2018 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE AMENDMENT NO. 3 TO THE DESIGN /BUILD AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND RIC -MAN CONSTRUCTION, INC. FOR THE STORMWATER PUMP STATION ON 19TH STREET BETWEEN CONVENTION CENTER DRIVE AND MERIDIAN AVENUE PROJECT; SAID AMENDMENT NO. 3 PROVIDING FOR THE DESIGN AND CONSTRUCTION OF THE SEA WALL ALONG THE COLLINS CANAL IN THE VICINITY OF THE CARL FISHER CLUBHOUSE, TO REPLACE THE EXISTING DILAPIDATED SEA WALL, AS PART OF THE STORMWATER PUMP STATION IMPROVEMENTS FOR THE CONVENTION CENTER, IN AN AMOUNT NOT TO EXCEED $593,000, PLUS OWNER'S CONTINGENCY IN THE AMOUNT OF $59,300, FOR A TOTAL AMOUNT OF $652,300; WITH PREVIOUSLY APPROPRIATED FUNDING. RECOMMENDATION The Administration recommends adopting the Resolution. ANALYSIS On January 17, 2017 the City entered into a Design /Build Agreement with RicMan Construction, Inc. (Ric -Man) to develop, design, and construct the Stormwater Pump Station on 19th Street between Convention Center Drive and Meridian Avenue in the amount of $6,332,389.80. On February 9, 2018, Amendment No. 1 to the Design /Build Agreement was executed for $630,013.00 as adopted by the City Commission under Resolution 2017 - 30020, to incorporate a permanent emergency generator as part of the Project. This Amendment No. 1 revised the total contract amount to $6,962,402.80. On March 23, 2018, Amendment No. 2 to the Design /Build Agreement was executed for $387,124.00, plus $38,712.00 owner's contingency, as adopted by the City Commission under Resolution 2018 - 30220, to proceed with the design and construction of the improvements for the extension of the Botanical Garden north of its current border and up to the swale along the Collins Canal. This Amendment No. 2 revised the total contract amount to a not -to- exceed total of $7,388,238.80. This Amendment will provide for the design and construction of a portion of the sea wall in the vicinity of the Carl Fisher Club House, in order to replace the existing dilapidated sea wall, complete the Page 722 of 1464 seawall system for the Convention Center project, and to proceed with the Carl Fisher Club House renovations. The duration of this work is 136 days, which is expected to be concurrent with the remaining duration of the work on the 19th Street Pump Station Project. This Amendment No. 3, in the amount of $593,000, plus $59,300.00 Owner's Contingency, will revise the total contract amount to a not -to- exceed total of $8,040,538.80. CONCLUSION The Administration recommends adopting the Resolution. Amount 1 $593,000 Account 1 South Pointe Capital - 389- 0810- 069357 -00- 410- 000- 00 -00 -00 -28790 - (Construction) Amount 2 $59,300 Account 2 South Pointe Capital - 389 -0810- 069357 -00- 410- 000- 00 -00 -00 -28790 - (Contingency) Total $652,300 Legislative Tracking Capital Improvement Projects ATTACHMENTS: Description D AttachmentA - Ric Man Proposal D Resolution Page 723 of 1464 3100SW150, Street Deerfield Beach, Florida 33442 OffiCe;(954)426-1271 F3x:(454)426-1276 Att8chrnent A, City of Miami Beach Capital Improvement Projects 0O5Ce 1700 Convention Center Drive Miami Beach, FL 33139 Attn: Jorge Rodriguez July 5,2Ol8 Sent Via E-Mail RE; Design/Build Services for Stormwater Pump Station on 19th Street Between Convention Center Drive and Meridian Avenue (Phase 11) Subject: Carl Fisher House Sea Wall Dear Jorge Pursuant to Ric-Man Construction FL, Inc (RMCF) email dated June 21, 2018 and the clarification notes provided by the City on July 5, 201.8 please accept our offer of $593,000 to design, permit and construct the Carl Fisher Seawall project. Please be advised that design and permitting will require 60d�6�N���p���d7d additional days to construct for abnta[136udeodar day duro 'n.As such, unless NTPboprovided by July 13, 2018 the current contract completion date of November 24, 2018 will have to be extended, accordingly. Please co tact me ifyoti require any additional information, Sin R, FiSCher, COO Ric-Man Construction PL, lnc CC: John khan SabrioaBagl&eri Attachments; • KMCFinidal proposal dated 6/21/18 ▪ CMS e mail dated 7/5/18- clarifications RIC-MAN CONSTRUCTION Pcourux, INC. 'Page 724of1484 TASK ORDER: DESIGN SERVICES FOR CARL FISHER SEAWALL EXTENSION MIAMI BEACH, FLORIDA Jun- 20 2018 Prepared By: %.% 7650 Corporate Center Drive Suite 300 Miami, FL 33126 Page 725 of 1464 Table of Contents 1.0 FRIME AGREEMENT TERMS AND CONDITIONS 2.0 PROJECT UNDERSTANDING 3 3.0 SCOPE OF WORK AND DELIVERABLES 3 TASK 1' STRUCTURAL ENGINEERING SERVICES 3 3 TAS}< 2- TREE MTJGATION PLANS & TREE PERMITTING 4 TASK 3. SEAWALL PERMITTING TASK 4' LIMITED CONSTRUCTION SUPPORT SERV|C8 4 4.0 S{�HEDULE{�F|K4PLEK�ENTAT{QN � 5 5.0 INVOICING 5 6.0 COMPENSATION 5 7.0 ASSUMPTIONS 6 6 List of Attachments 1. Prime Agreement 2. Project Location and Documents Received 3. Conceptual Structural Sketches Page 726 of 1464 Design Srvices for Car Fisher Seawall Extension Miami Beach, Florida 1'0 PRIME AGREEMENT TERMS AND CONDmONS Excepi as noted below or where n their appllcation the context clearly requires otherwise, all the terrns and conditions of the Prirne Agreement including all exhibits and amendments thereto and other documerits incorporated by reference therein including the DBA 000urnents as defined n the Prime Agreement, (collectively, the "Prime Agreement Terms and Conditions') are incorporated herein and niade a pari hereof for a purposes, In the event of any conflicts or ambiguities between or among provisions of this Contract, the Y eprovia/ontho!impoaaathemoFostdnQun|npqu/naAontnnRKhe[padyehmUtakepreceden oe' In Tne8ven|0faDyoonfl|ctsVrambigudienhetVaeD<h/GToskOnjeraOdthephmaAorn*n*ni |mnnsandCondiMnno,1h8PMmeAgreementTernGandCond/dpnuoha|!takep»eoednn»»' exomptthotmUFodgnsUy'mondetedh3rmoshaUoo0tro/overanyoonfiict|ngpr0vieia. 2.0 PROJECT UNDERSTANDING Ric-Man Construction Florida, inc. ("Client" and/or �MC") has requested for VVSP USA � (Eng|nee�'eOd�r`�Sp') toP��em�o��e|�ni��g$em|��s�r�e��c�Rlden� cfe|seawaUextension a�ng Dade Boulevard, East engineering services as Carl Fisher Club Renovations ('p of '''`'' �« and mitigation of impacted trees, including seven (7) black mangroves; permitting services for the City of Miami Beach Building Permit, City of Miami Beach Tree Permit revision, Miami-Dade County DERM Class I Permit, Environmental Resource Permit, and Department of the Army Permit. Refer to Attachment 2 for project location and information received from Client. |t/auDdestoodt hat thefo|kownoahaUbn pro YdadbyCL|ENT' 1, (]hgna|de i nph$ns -con$t0tted por|onofnem'' seawall ` �oU (easxofproposed extension) 2. As`bu|/is drawings/shop drawings for constructed portion of new seawall Aaa8lof � proposed extension) ` 3. [5e{tachnica/Eng|n/edn Rnpor assOc|aedw/Kh the oonsbn(�edportonofnevxammomaU (east mfpropongdexen -n) 4. TgpoQnaph|nou/voyhn CAO' nm( 3.0 SCOPE OF WORK AND DEL [ES TASK 01 -- STRUCTURAL ENGiNEEJNG SERVICES WSP shall prepare structural construction documents and structural calculations for the proposed seawall extension consisting Df approximately �O'�o[ seawall Vv�htop of�p elevation ofb7Oft NAVD;approXiU�atah/8O-�of seawall with |M~ -r0|okab,a1e|evat|nn2Ov NAVD� to ^ - stairs by others; t0o'2\vv|ngwaUa`approxi^`~w approximately rip-rap /r -' otc��n8otho Pr�eC�/n�orhz/�Y� h� eDt3forconceptual '�—`~ �'/'v '�//m«vna/«a�����\e�Uof ^ (refer Attachment Stru(#una|desiQn). WSP shalt provide: u One M\PDFof structural plans 0 On (1) PDF of structural coiouIation 0 Attend two (2) coordination meetings Page 727 of 1464 Design Services for Carl Fisher Seawall Extension Miami Beach, Florida 100Deliverables: WSP shall provide: * Responses to one (1) round of 60% commerlts from Client • Responses to one (1) round of 60% cornments from City • Three (3) signed/sealed sets of structural plans ^ Three (3) signed/sealed sets of structuraj catculations ° Attend two (2) coordlnation meetings TASK 02— TREE MTlGATlON PLANS & TREE PERMrrrJNc Inforrnation provided by Client (refer to Attachment 2), , identifies seven (7)black mangroves Vvau roquidngnanoYo|andpolentia|nitigaUon. However, based ona site visit "//0/2O/2O18 ' a tot e| of thirteen (13) trees were identified as potentially being impacted by the proposed seawall extension, including one (1)sea grape, possible three (3) posslble white mangroves, one (1) sabal paim, and the ~�=r idenw'ov sevan(7'ulaoxnan0rOvea.anneof vbkhmaybw white mangroves, WSP's sub consultant (Miller L��o�U��e�e�|���m��O����C��M�mi 8eaohbenpennhsub.��|�n-~' submittal ~ submittal, =vvu �u for remova of red/white site Inventory and analysis; preparation of tree disposition plan; preparation of mitigation plan; preparation of forms/documents associated with City of Miami Beach Tree Permit and submittal to City of Miami Beach (CMB) Urban Forestry Division; preparation of forms/documents associated with RER-DERM Class I Permit for rernoval of white/red mangroves, Assocjated permit fees, mitigation fees or bond fees ere not included, WSP'e, sub consujtarit shall provide s One (1)PDFof tree disposition plan and r00oeUonplan m Attend one M\ coordination nn8sdinA(|andn -amnohitmnt) Deliverables: WSP's sub consultanf shall provide: m Throe (3) signed/sealetj sets of tree disposition plan and mHiostkoUplan 0 Pnepo�tinMand Vubr�|Ua/ofhewpernV application and $Up`d|ngdo0onoentmto[|K4B Urban Forestry Division '`' P,eparat>onof supporting documents for red/white mangrove na0oVa| for DE���� Class | Permit ' * Attend one /1\ coordination meeting U@ndmoopearchitect) ^ Odok8/mand electronic cOp�sof� �adpernb TASK O3— SEAWALL PERMITTING VV8P shall prepare and submit the permit apoUcatoUoand suPVo�VgdocUnnand8Uonn$gHin:dto secure the fb|k`vvingpermits aGGmcbtedVYKh'the cns�ucUnn— the seawall extension: v Miami-Dade RER4]E[9K4 Class |Permit US Army Co rps of Engineers (USACOE) . Department of the Army Permit FOEP o r8FVMDE nVi nnno�n s/Fn$OurogPenn|1tagenoyhav/Mwjurisdiction tohe ^ determined) City uf Miami Beach (CMB) Building Department Permit 4 Page 728 of 1464 Desiqri Services for CarI Fisher SeawaU Extension Miami Beach, Florida Associated permit fees, mitigation feas or bond fees are not included. Deliverables for Miami-Dade MEM-WERx Class |Permit: * Attend pre-application meeting with RER-OERK4 Coastal Resources Section � Submittal ofpermit application and four (4)ai0no�sea}ed plans (oRER4}ERyWCoastal ResouroasBeolionfor(�|eos/Pormk ` ' Address up to two (2) requests for additional information from RER-DERM Coastal Resources Section Originals and oloctronic copies of issued permit Deliverables for [SAt](]E Department of the A(myP8rnlit; 0 Electronic submittal of perrnit application and signed/sealed plans to USACOE for Department of the Arrny Permjt * Address up to twa (2) requests for additional Information from U8/\C[)G " Originals and electronic copies of Issued permit Deliverable mrFDEporSFV/yNDEnvironFnemtaURauource P RP): ^ AUWnUpMs+$pp|�atiOnr�aeUngwith F[}EF8rSFVVyND---~~~~ o Electronic submittal of permit application and signed/sealed plans to FDEP or SFVVMD for ERP " Address up to two (2) requests for additional information from FDEP or SFWMD ° Originafs and electronjc copies of Issued perrnit Deliverables for CMB Building Department Pe/Tn|t: m Submittal of permit application end four (4\n` " ned/oe��edpdaDs to CMBBuUdk\Q Depa�n�eFdfor 8uUdingPmnnK ` ' * Address up to two (2) requests for additional information from CMB Building Department ^ Originals and electronic copies of issuod permlt TASK Q4— LIMITED CONSTRUCTION SUPPORT SERVICES WSP shat provide UmitgdcoRstnJotiOn support services which will nc'lude responses to requests roquosts for informtior, (RFI); review and approval of shop drawlngs; and as-built certification. vVSP shall provide: w Address up to three (3) RFIs * Review pf sea wall pile shop drawings /uptu2nav|ews) Rev�wofsea wmUmdUngshop dnawk 'G(up t#2reY�` reviews) e Review of sea wall as-builts (up to 2 reviews) and as-built certification 4.0 SCHEDULE OF IMPLEMENTATION VVSP shall start immediately upon receipt of a wri Notice kJ Proceed (NTP) Preparation cf necessary documents hall take ` '� NTP, 6.0 INVOICING Invoicing shall be as per WSP USA Inc Professlonal l Service Agreement. Page 729 of 1464 7.0 ASSUMPTIONS Thls scope of work and deliverables are based an the foflowing assumptions: ° VSP8haUinp|enentanin1nn1eUQVo0 »A8Gunanu e / Quality Control (OA /QC) pro man* to ensure proper adherence to applicable standards. If a geotechnical report associated with the newl ^comsboctedsea=gUon^mbei8no{ provided d ~� .^� O|hantOe$bechO|ca|dahu nmcessagfor design will be retrieved from the Engineering Street Stormwater Pump Station project, dated January 24, 2017, Permitting services included in this scope of work are only for the permits identified in the WSP does not guarantee the acquisition of permits because many factors are outside of All DBIA assumptions as part of the Prime Agreement remain in effect. In executing this Task Order to the Prime Agreement, Client and WSP each individually represents that it has the necessary financial resources to fulfill its obligations under this Agreement, and each has the necessary corporate approvals to execute this Amendmont, and perform the Services described herein, D DESIGN CONSULTANT: (Name of Design-Builder) (Name of Design Consultant) _~_~~ WSP USA INC, (Signature) Michael Fischer (Printed Name) (Printed Name) COO $o Date/ Page 730 of 1464 6 ATTACHMENT Proj Location nd ocuments Received Page 731 of 1464 :h E at SEAWALL $q AS PART OF — PUMP STATION PROJECT PROPOSED - CONTINU ON OF SEAW L FISHER SAIR - SE WALL / ENWALLS AS PART Or SCOPE OF 'ORK 6y4 M NEA, 2 9N 10 BH ?E0 EXISTING SEAWALL TO REMAIN ,roVALI a« Page 732 of 1464 » 0 avt= m! ATTACHMENT 3. onceptual Structural Sketches Page 733 of 1464 fEXIS f SEAWALL UUILTAS PART OF- POMP STATION 1�.J w r PROPOSED CONTINUATION OF SEAWALL CARL FISHER STAIRS E WALL ( STEMWAL:LS AS PART OF SCOPE OF WORK 1 W41-4. LeaJlrm a I) ` (gt) EXISTING,�� SEAWALL TO REMAIN Page 734 of 1464 Walt 70r e4+1 1 • roP., t r rS 5'of e?"•47) 61' Z7k9 0,..■ (34P 4er, r; c4,00-4. et. . 04,e /0".e' 13A rrego> ("n19 CA-A.144.- E44\44.7.'") Page 735 of 1464 I/- jo? 0/1 Oft", / ex e .S.7,9 X4,77672.eP ce. 6 Pie IteL, 7 K/4..a 9, o' • egivatior.,/ P aof +Mal- ' nowankmikemoodr. ..au ***ma, areaa...me.arnaa...awarolaa....pti °,1 41* Page 736 of 1464 1A,c qAt..-16 WirJa YiktA, re' to-P, eJ eiLey, 67, Page 737 of 1464