Loading...
Exhibit A-1 Implementation Statement of Work with Exigis, LLC EXHIBIT A-1 Implementation Statement of Work This Exhibit A-1, Implementation Statement of Work ("SOW") is applicable to the Software and Services described in the Master Customer Agreement ("MCA") and Exhibit A, Statement of Services ("SOS") dated June , 2018 by and between Exigis, LLC., a New York Limited Liability Company of 12 East 46th Street 6E, New York, NY 10017 ("Exigis") and the City of Miami Beach, FL("the City") located at 1700 Convention Center Drive Miami Beach, FL 33139 ("Customer"). The purpose of the SOW is to define the services and deliverables to be completed for the successful implementation of the RiskWorks rm.Compliance solution. Capitalized terms used in this SOW have the same meaning as set forth in the MCA unless otherwise defined herein. 1. Definitions 1.1. "Contract Types"shall mean City defined standard evaluation criteria (e.g. product lines, limit amounts, carrier rating, etc.) used by Exigis to measure a Third Party's compliance with specified minimums. 1.2. "Compliant" shall mean the insurance status given to those Third Parties designated by the City as meeting the City's criteria for valid and in-force insurance coverage prior to the implementation of the RiskWorks rm.Compliance solution. 1.3. "Deliverables" shall mean the documents, materials, activities, and/or work output identified in the Project Deliverables and Project Delivery Dates section of this Statement of Work ("SOW"). 1.4. "Insurance Information" shall mean the insurance status and insurance policy details relating to a third party, as collected and maintained by the City prior to the implementation of the RiskWorks rm.Compliance solution. 1.5. "Non-Compliant" shall mean the insurance status given to those Third Parties designated by the City as missing one or more elements of the City's criteria for valid and in-force insurance coverage prior to the implementation of the RiskWorks rm.Compliance solution. 1.6. "Project Delivery Date" shall mean the date on which the specified deliverable shall be completed. 1.7. "Standard Data File Templates" shall mean the files prepared by Exigis which establish the preferred structure and format of information required to be supplied for the configuration of the RiskWorks rm.Compliance system. Exigis,LLC.Exhibit A-1 Implementation Scope of Work("SOW") Page 1 of 4 City of Miami Beach,FL 1.8. "Third Parties"shall mean vendors, contractors, and others doing business with the City who, as a result of their work,are required to supply the City with proof of insurance coverage. 2. General Information 2.1. System Overview.The Statement of Services ("SOS") provides a description of the RiskWorks structure and major system components to be implemented. 2.2. Assumptions and Constraints. The following assumptions and constraints apply to the implementation of the RiskWorks rm.Compliance solution for the City: 2.2.1.City shall designate at minimum, one (1) City representative, to coordinate with Exigis during the Implementation phase. 2.2.2.City shall provide required data, as outlined below, to Exigis in a usable format; Excel, CSV, or PDF Image files as outlined in Section 3.3 of this SOW. Both parties understand and acknowledge that any delays with regards to supplying critical data elements defined below will result in a delayed project timeline. The following data elements will be required to commence and complete implementation: 2.2.2.1. List of active Third Parties doing business for the City, requiring insurance verification and monitoring within the Exigis system. 2.2.2.2. A minimum of one (1) method of contact for each active Third Party; email address or US mail address. 2.2.2.3. One (1) standard Contract Type, or set of evaluation criteria, for each active Third Party requiring insurance verification and monitoring within the Exigis system. 2.2.2.4. List of the City's standard Contract Types, containing defined standard evaluation criteria to be used by Exigis to measure a Third Party's compliance with specified minimum requirements. 2.2.2.5. Current Insurance Information for each active third party; including a single Insurance Status (Compliant or Non-Compliant) for each Third Party and an expiration date for each active policy requiring insurance monitoring and tracking. 2.2.3.Data files shall be provided in a format similar to Exigis' Standard Data File Templates. Significant deviations in structure or major complexities present in the data provided by the City may result in a modified timeline for delivery of services. 2.2.4.Failure by the City to meet any City assigned Project Delivery Date included in this SOW Exigis,LLC.Exhibit A-1 Implementation Scope of Work("SOW") Page 2 of 4 City of Miami Beach,FL will require Exigis to reschedule project tasks and will result in a modified timeline for delivery of services. 2.2.5.Any amendments, change requests, or material deviations to the scope outlined in the Statement of Services will require Exigis to reschedule project tasks, adjust Project Delivery Dates, and provide a modified timeline for the delivery of services. 3. Project Timeline and Deliverables 3.1. Responsibility of Tasks. Both Exigis and the City shall be responsible for performing a variety of tasks necessary to achieve the Deliverables and Project Delivery Dates specified in the table below. Exigis and the City shall communicate and coordinate to support the planning and execution required to complete the Implementation of the RiskWorks rm.Compliance solution. 3.2. Project Deliverables and Project Delivery Dates. The table below outlines key deliverables required for the successful implementation of the RiskWorks rm.Compliance solution: Responsible Estimated ft Deliverable Description of Task Delivery Date Party Timeframe Documentation of Business major software Within two 1 Requirements configuration Exigis (2) To Be Documentation components and City Business Determined specific requirements Days Written approval of Within two Configuration Business Requirements (2) To Be 2 Specification City Documentation business Determined Approval provided to Exigis days Configuration of City specific software Within ten requirements as 3 System outlined in SOS and Exigis (10) To Be Configuration accompanying business Determined Business Requirements days Document Formal regression testing in a development Within five 4 Quality environment designed Exi is (5) To Be Assurance to confirm g business Determined functionality of all days software components and adherence with Exigis,LLC.Exhibit A-1 Implementation Scope of Work("SOW") Page 3 of 4 City of Miami Beach,FL project requirements User specific login and password information Within one Access to provided to allow the (1) To Be S Software City to access and Exigis business Determined review configured day Software solution Written approval of Within two 6 User Acceptance delivered Software City (2) To Be solution provided to business Determined Exigis days • Web-based training sessions performed by Within two 7 Training Exigis for the purpose Exigis (2) To Be of acclimating City business Determined users to the Exigis days system Generation of the Within two initial set of 8 Introductory notifications from the Exigis (2) To Be Notices RiskWorks business Determined rm.Compliance system days 3.3. Adjustment of Delivery Dates for Manual Data Entry and Review. If the City is unable to provide current Insurance Information for each active Third Party in Excel or CSV format, Exigis can perform Onetime Manual Data Entry and Review of Certificates of Insurance as outlined in the SOS.Certificates of Insurance shall be provided as PDF files. If the City elects to activate this ancillary service option, the fees specified in the SOS shall apply and the Project Delivery Date for 'Introductory Notices', as defined in Section 3 of this SOW shall be extended by up to fourteen(14) business days. Exigis,LLC.Exhibit A-1 Implementation Scope of Work("SOW") Page 4 of 4 City of Miami Beach,FL