Loading...
LTC 502-2018 Historic Cty Hall Smoke Testing M ! AMI B EAC H City of Miami Beach, 1700 Convention Center Drive, Miami Beach FL 33139 LTC# 502-2018 LETTER TO COMMISSION TO: Mayor Dan Gelber and Members .' the City C. • mission FROM: Jimmy L. Morales, City Manager _i DATE: September 14, 2018 SUBJECT: Historic City Hall Smoke Testing The purpose of this Letter to Commission (LTC) is to provide the Mayor and Commission with information of the smoke testing at Historic City Hall, located at 1130 Washington Avenue. On Saturday, September 15, 2018, the Property Management Department will conduct a smoke test investigation at Historic City Hall in order to identify and confirm sewer integrity in the facility. The Department has discovered a breach to plumbing system and this test will identify leakage paths and areas with deficiencies. The test requires forcing non-toxic smoke-filled air through the sewer line. The pressurized smoke will travel through the main line and various connections to reveal problem areas. The smoke is harmless: consisting of a mist with large percentage of atmospheric moisture that allows it to be highly visible in low concentrations. The smoke will not leave odors and will dissipate rapidly after a few minutes. During this diagnosis, light and sound notifiers associated with fire alarm systems may be activated. Property Management will be working with the Fire Department during the course of the test. Testing is expected to continue through end of day. Operations and building systems will resume on Sunday, September 16, 2018. 4 IA � , JLM/MT/A M