Resolution 2018-30478 RESOLUTION NO. 2018-30478 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 9 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (NE) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND WOLFBERG/ALVAREZ AND PARTNERS, INC., FOR ADDITIONAL ARCHITECTURAL PROFESSIONAL SERVICES FOR THE FLAMINGO PARK PROJECT; IN THE NEGOTIATED NOT- TO-EXCEED AMOUNT OF $71,200; WITH PREVIOUSLY APPROPRIATED FUNDING. WHEREAS, on September 05, 2007, pursuant to Request for Qualifications (RFQ) No. 15-06/07, the Mayor and City Commission adopted Resolution No. 2007-26609 approving and authorizing the Mayor and City Clerk to execute an Agreement with Wolfberg / Alvarez and Partners, Inc., for Professional Architecture and Engineering Services for the Flamingo Park Project (the Agreement); and WHEREAS, the Agreement provides for the architectural, engineering, master planning, landscape architecture and surveying, as necessary for the Flamingo Park Project and includes the development of the Master Plan Concept; and the design, bidding and award services, and construction administration of the Tennis Center; and WHEREAS, the Agreement was executed for a not-to-exceed amount of $443,000; and WHEREAS, on July 14, 2010, the City Commission adopted Resolution No. 2010- 27427, approving Amendment No.1 to the Agreement, in the amount of $77,720, for the provision of additional architectural and engineering services associated with revisions to the Master Plan and Tennis Center; and WHEREAS, on March 20, 2012, Amendment No. 2 was executed by the City in the amount of $1,528, for the provision of additional architectural and engineering services associated with the relocation of the FPL transformer to the south side of the Tennis Center and associated revisions to the electrical room; and WHEREAS, on October 2, 2012, Amendment No. 3 was executed by the City in the amount of $2,902, for the provision of additional architectural and engineering services associated with the partial re-design of the Tennis Center building structure due to an unforeseen existing underground utility duct bank; and WHEREAS, on August 15, 2013, Amendment No. 4 was executed by the City in the amount of $2,016, for the provision of additional architectural engineering services associated with the design of the structural support of the ornamental sphere to be installed in the landscape planter on the west side of the Tennis Center building; and WHEREAS, on January 15, 2014, the City Commission adopted Resolution No. 2014- 28449, approving Amendment No.5 in the amount of $403,261, for additional architectural and engineering services associated with the planning, bidding and construction phase services of the remaining Park improvements, which consist of a community garden, baseball field renovation, historic lodge renovation, new park entrance, enhanced pedestrian/bike paths, new interactive water feature, teenage activity, lighting enhancement, signage, drainage, landscaping and irrigation; and WHEREAS, on April 23, 2015, Amendment No. 6 was executed by the City in the amount of $14,732, for the provision of additional architectural and engineering services associated with scope modifications to the Master Plan concept that include an outdoor fitness cluster, the replacement of the community garden with a butterfly garden, the relocation of the new restroom facility, and upgrades to all playing fields (sod, drainage and irrigation); and WHEREAS, on July 14, 2015, Amendment No. 7 was executed by the City in the amount of $15,090, for the provision of additional architectural and engineering services associated with professional design services to renovate the existing soccer field, including replacing existing sod with synthetic turf and site drainage in and around the field; and WHEREAS, on December 14, 2016, the City Commission adopted Resolution No. 2016-29672, approving Amendment No. 8 in the amount of $231,269, for the provision of additional architectural and engineering services that included updated phases for construction completion, revised construction cost estimates; the design, bidding and construction administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court Building and the eight (8) existing outdoor courts; and the renovation of the softball field with new lighting, new benches and dug out, and a synthetic turf playing field with associated site drainage; and WHEREAS, Amendment No. 9 to the Agreement is for additional architectural and engineering services associated with additional scope to the Master Plan concept which include: 1) Revisions associated to the relocation of the existing IT Room currently located inside the soon to be renovated Historic Lodge. Due to the importance the IT Room serves to the Flamingo Park, in collaboration with Parks and Recreation, IT Department and the Design Team, it was decided as best option to relocate the IT Room to a separate location outside the Historic Lodge; 2) Phase I plan revisions due to Hurricane Irma tree damages; 3) Baseball field guy wires relocation due to the unforeseen conflict with the renovation design of ADA ramps; 4) Separation of the softball field plans from Phase I in order for the softball field to become a "stand-alone" project; and 5) Preparation of a new specific purpose and topographic survey for Flamingo Park in order to comply with Building Department's comments to provide an updated survey, in the amount of$71,200; and WHEREAS, the proposal from Consultant was reviewed and found to be fair and reasonable and commensurate with industry standards; and WHEREAS, this Amendment No. 9 to the Agreement will revise the total contract sum to the not-to-exceed total amount of$1,262,718. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission approve and authorize the Mayor and City Clerk to execute Amendment No. 9 to the Professional Architectural and Engineering (NE) Services Agreement between the City of Miami Beach, Florida and Wolfberg/Alvarez and Partners, Inc., for additional architectural professional services for the Flamingo Park Project; in the negotiated not-to-exceed amount of $71,200; with previously appropriated funding. v. PASSED and ADOPTED this /0Z .4't N'i,•- ,re 2018. /PO........: .I : --. 4,1„{{1.,, re' -: - 1 MAYOR ATTEST: ' -c K —=U 4' APPROVED AS TO 7--Ai /1 If * INCORE ORATED" FORM LANGUAGE RAFAEL . GRANADO,'CITY CLERK a.77\.. ? //'5--.7 & FOR&EXECUGUATION ` , CH 26;;" JLat, - 4 - (9 City An ori; k Date Resolutions - C7 AE MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: September 12, 2018 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 9 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (NE) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND WOLFBERG/ALVAREZ AND PARTNERS, INC., FOR ADDITIONAL ARCHITECTURAL PROFESSIONAL SERVICES FOR THE FLAMINGO PARK PROJECT; IN THE NEGOTIATED NOT- TO-EXCEED AMOUNT OF $71,200; WITH PREVIOUSLY APPROPRIATED FUNDING. RECOMMENDATION The Administration recommends that the City Commission approve the resolution. ANALYSIS On September 5, 2007, pursuant to Request for Qualifications (RFQ) No. 15-06/07, the Mayor and City Comrrission adopted Resolution No. 2007-26609 approving and authorizing the Mayor and City Clerk to execute an Agreement with Wolfberg/Alvarez and Partners, Inc. (Consultant), for the Flamingo Park Project. The scope included architectural, engineering, master planning, landscape architecture and surveying, as necessary for the Project, including development of the Master Plan Concept; and the design, bidding and award services, and construction administration of the Tennis Center. Amendments No.'s 1 through 4 included additional architectural and engineering services associated with changes to the scope and the design of the Tennis Center Project in a total amount of$84,166. On January 15, 2014, the City Commission adopted Resolution No. 2014-28449, approving the Mayor and City Clerk to execute Amendment No. 5 for a total amount of$403,261. This Amendment provided for the planning, design, bidding and construction phase services of the remaining Park improvements. On April 23, 2015, Amendment No. 6 was executed by the City, for a total amount of $14,732. This amendment provided for scope modifications to the Master Plan concept that included an outdoor fitness cluster, the replacement of the community garden with a butterfly garden, the relocation of the new restroom facility and upgrades to all playing fields, inclusive of sod, drainage and irrigation. On July 14, 2015, Amendment No. 7 was approved by the City, for a total amount of $15,090 for additional design services associated with the renovation of the existing soccer field, including Page 724 of 1802 replacing existing sod with synthetic turf and site drainage in and around the field. On December 14, 2016, the City Commission adopted Resolution No. 2016-29672, approving Amendment No. 8 in the amount of $231,269, for the provision of additional architectural and engineering services that included updated phases for construction completion, revised construction cost estimates; the design, bidding and construction administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court Building and the eight (8) existing outdoor courts; and the renovation of the softball field with new lighting, new benches and dug out, and a synthetic turf playing field with associated site drainage. The City requested a proposal from Wolberg/Alvarez and Partners for the provision of professional services associated with additional scope to the Master Plan concept as defined in Amendment No. 9 (Attachment A). The Consultant will be providing additional architectural and engineering services which include: 1) Revisions associated to the relocation of the existing IT Room currently located inside the soon to be renovated Historic Lodge. Due to the importance the IT Room serves to the Flamingo Park, in collaboration with Parks and Recreation, IT Department and the Design Team, it was decided as best option to relocate the IT Room to a separate location outside the Historic Lodge. 2) Phase I plan revisions due to Hurricane Irma tree damages. 3) Baseball field guy wires relocation due to the unforeseen conflict with the renovation design of ADA ramps. 4) Separation of the softball field plans from Phase I in order for the softball field to become a "stand-alone" project. 5) Preparation of a new specific purpose and topographic survey for Flamingo Park in order to comply with Building Department's comments to provide an updated survey. Wolfberg/Alvarez and Partners presented the City with a fee proposal for the additional professional services. Staff negotiated and reached an agreement in the not-to-exceed amount of $71,200. The negotiated fee is con.nensurate with the level of improvements contemplated in the scope of services for this project. This Amendment No. 9 will revise the total not-to-exceed contract sum to$1,262,718. CONCLUSION The Administration recommends that the City Commission approve the resolution. Amount 1 $71,200 Account 1 SB Quality of Life Resort Tax- 305-0820- 061357-00-410-546-00-00-00-23200 Legislative Tracking Capital Improvement Projects ATTACHMENTS; Description o Attachment A o Resolution.FA Page 725 of 1802 Exhibit A AMENDMENT NO. 9 TO THE PROFESSIONAL ARCHITECTURAL AND ENGINEERING (NE) SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND WOLFBERG/ALVAREZ AND PARTNERS, INC. DATED MARCH 27'", 2008, FOR THE PROVISION OF ADDITIONAL PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR THE FLAMINGO PARK PROJECT INTHE AMOUNT OF $71,200 This Amendment No. 9 to the Agreement made and entered this_day of , 2018, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and WOLFBERG/ALVAREZ AND PARTNERS, INC., a Florida corporation, having its offices at 75 Valencia Avenue, Suite 1050, Coral Gables, FL 33134 (hereinafter referred to as Consultant). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 15-06/07, the Mayor and City Commission adopted Resolution No. 2007-26609 on September 05, 2007, approving and authorizing the Mayor and City Clerk to execute an Agreement with Wolfberg / Alvarez and Partners, Inc., for Professional Architecture and Engineering Services for the Flamingo Park Project(the Agreement); and WHEREAS, the Agreement provides for the architectural, engineering, master planning, landscape architecture and surveying, as necessary for the Project and includes the development of the Master Plan Concept; and the design, bidding and award services, and construction administration of the Tennis Center; and WHEREAS, the Agreement was executed for a not-to-exceed amount of $443,000; and WHEREAS, on July 14, 2010, the City Commission adopted Resolution No. 2010- 27427, approving Amendment No.1 to the Agreement, in the amount of $77,720, for the provision of additional architectural and engineering services associated with revisions to the Master Plan and Tennis Center; and WHEREAS, Amendment No. 2 was executed by the City on March 20, 2012, in the amount of $1,528, for the provision of additional architectural and engineering services associated with the relocation of the FPL transformer to the south side of the Tennis Center and associated revisions to the electrical room; and WHEREAS, Amendment No. 3 was executed by the City on October 2, 2012, in the amount of $2,902, for the provision of additional architectural and engineering services associated with the partial re-design of the Tennis Center building structure due to an unforeseen existing underground utility duct bank; and Page 1 of 6 Wolfberg/ANorez and Partners,Inc.,Amendment Na.9 Page 726 of 1802 Exhibit A WHEREAS, Amendment No. 4 was executed by the City on August 15, 2013, in the amount of $2,016, for the provision of additional architectural engineering services associated with the design of the structural support of the ornamental sphere to be installed in the landscape planter on the west side of the Tennis Center building; and WHEREAS, on January 15, 2014, the City Commission adopted Resolution No. 2014- 28449, approving Amendment No.5 in the amount of $403,261, for additional architectural and engineering services associated with the planning, bidding and construction phase services of the remaining Park improvements, which consist of a community garden, baseball field renovation, historic lodge renovation, new park entrance, enhanced pedestrian/bike paths, new interactive water feature, teenage activity, lighting enhancement, signage, drainage, landscaping and irrigation; and WHEREAS, Amendment No. 6 was executed by the City on April 23, 2015, in the amount of $14,732, for the provision of additional architectural and engineering services associated with scope modifications to the Master Plan concept that include an outdoor fitness cluster, the replacement of the community garden with a butterfly garden, the relocation of the new restroom facility, and upgrades to all playing fields (sod, drainage and irrigation); and WHEREAS, Amendment No. 7 was executed by the City on July 14, 2015, in the amount of $15,090, for the provision of additional architectural and engineering services associated with professional design services to renovate the existing soccer field, including replacing existing sod with synthetic turf and site drainage in and around the field; and WHEREAS, on December 14, 2016, the City Commission adopted Resolution No. 2016-29672, approving Amendment No. 8 in the amount of $231,269, for the provision of additional architectural and engineering services that included updated phases for construction completion, revised construction cost estimates; the design, bidding and construction administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court Building and the eight (8) existing outdoor courts; and the renovation of the softball field with new lighting, new benches and dug out, and a synthetic turf playing field with associated site drainage; and WHEREAS, Amendment No. 9 to the Agreement is for additional architectural and engineering services associated with additional scope to the Master Plan concept which include: 1) Revisions associated to the relocation of the existing IT Room currently located inside the soon to be renovated Historic Lodge. Due to the importance the IT Room serves to the Flamingo Park, in collaboration with Parks and Recreation, IT Department and the Design Team, it was decided as best option to relocate the IT Room to a separate location outside the Historic Lodge. 2) Phase I plan revisions due to Hurricane Irma tree damages. 3) Baseball field guy wires relocation due to the unforeseen conflict with the renovation design of ADA ramps. 4) Separation of the softball field plans from Phase I in order for the softball field to become a "stand-alone" project. 5) Preparation of a new specific purpose and topographic survey for Flamingo Park in order to comply with Building Department's comments to provide an updated survey, in the amount of$71,200; and WHEREAS, the proposal from Consultant was reviewed and found to be fair and reasonable; and Paget of Wolfberg/Alvarez and Partners,Inc,Amendment No.9 Page 727 of 1802 Exhibit A WHEREAS, this Amendment No. 9 to the Agreement will revise the total contract sum to the not-to-exceed total amount of$1,262,718. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS The above recitals are true and correct and are incorporated as a part of this Amendment No.9. 2. MODIFICATIONS The Agreement is amended as defined in Schedule "A-9", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No. 9. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 9 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY OF MIAMI BEACH, FLORIDA Rafael E. Granado, Dan Gelber City Clerk Mayor ATTEST: DESIGN/BUILDER: WOLFBERG/ALVAREZ AND PARTNERS, INC. Secretary President Print Name Print Name Attachment: Exhibit A-1 Page3 of6 Wollfberg/Alvarer and Partners,Inc,Amendment No.9 Page 728 of 1802 Exhibit A SCHEDULE "A- 9" SCOPE OF SERVICES Schedule "A" entitled, "Scope of Services", is amended as follows: Add the following under Task 5—ADDITIONAL SERVICES Task 5.8 -Additional Design Services: The scope of services included herein is as follows: • Existing IT Room Relocation Revisions Provide architectural and engineering services associated with the relocation of existing IT Room from Historic Lodge to Shed east of basketball courts, which consists of removal of existing louvers and door, installation of new hollow metal door, new ductless mini split unit, new card reader access control, new 110V quad outlet, two (2) L630 twist lock 220V and new exterior light fixture. Perform site visiUmeeting. • Phase 1 Revisions Provide architectural and engineering services associated with revisions to walkways design as a result of tree loss due to Hurricane Irma, including relocation of light poles/fixtures and new photometric study, removal of estate fencing west of Butterfly Garden and Outdoor fitness Center along Michigan Avenue. Modify landscaping and irrigation design. Attend meeting with City and staff to review field conditions resulting from Hurricane Irma. • Baseball Field Guy Wires Relocation Provide architectural and engineering services associated with the relocation of two (2) existing tension wires supporting the back-screen as required to accommodate ADA ramps introduced to comply with FBC-ADA. • Separate Package for Softball Field Prepare construction documents and permitting services for softball field as a "stand- alone" project. • Survey Prepare a new specific purpose and topographic survey for the Flamingo Park. Please refer to the attached spreadsheet for breakdown of anticipated effort. WA proposes to perform the above-noted services for a not-to-exceed fee of$71,200. PAYMENT AND COMPENSATION The total fee proposed for this Scope of Work is a not-to-exceed amount of $71,200 (refer to Exhibit A-9 attached herein). Pages of Wollberg/ANarez and Partners,Inc.,Amendment No.9 Page 729 of 1802 Exhibit A • Original Agreement amount$443,000. - Amendment No. 1: For the provision of additional architectural and engineering services associated with revisions to the master plan and tennis center in the amount of$77,720. • Amendment No. 2: For the provision of additional architectural and engineering services associated with the Tennis Center and the relocation of the proposed FPL transformer and associated revisions to the electrical room in the amount of $1,528. - Amendment No. 3: For the partial re-design of the Tennis Center budding structure due to an unforeseen existing underground utility duct bank in the amount of$2,902. • Amendment No. 4: For additional architectural and engineering services associated with the design of the structural support of the ornamental sphere to be installed in the landscape planter on the west side of the Tennis Center building in the amount of$2,016. - Amendment No. 5: For additional architectural and engineering services associated with the planning and design of the remaining park wide improvements, which include a community garden, baseball field renovation, historic lodge renovation, new park entrance, enhanced pedestrian/bike paths, new interactive water feature, lighting enhancement, signage, drainage, landscaping and irrigation, in the amount of$403,261. • Amendment No. 6: For additional architectural and engineering services associated with additional revisions to the Master Plan, in the amount of $14,732. - Amendment No. 7: For additional architectural and engineering services associated with the design renovation of the existing soccer field, including replacing existing sod with synthetic turf and site drainage in and around the field, in the amount of$15,090. - Amendment No. 8: For additional architectural and engineering services that include updated phases for construction completion, revised construction cost estimates; the design, bidding and construction administration of the renovation of the Robert C. Hass Handball Court Building, the Joe Rubin Handball Court Building and the eight (8) existing outdoor courts; and the renovation of the softball field with new lighting, new benches and dug out, and a synthetic turf playing field with associated site drainage, in the amount of$231,269. - Amendment No. 9 to the Agreement is for additional architectural and engineering services associated with additional scope to the Master Plan concept which include: 1) Revisions associated to the relocation of the existing IT Room currently located inside the soon to be renovated Historic Lodge. Due to the importance the IT Room serves to the Flamingo Park, in collaboration with Parks and Recreation, IT Department and the Design Team, it was decided as best option to relocate the IT Room to a separate location outside the Historic Lodge. 2) Phase I plan revisions due to Hurricane Irma tree damages. 3) Page 5 06 wolfberg/Alvarez and Partners,Inc.,Amendment No.9 Page 730 of 1802 Exhibit A Baseball field guy wires relocation due to the unforeseen conflict with the renovation design of ADA ramps. 4) Separation of the softball field plans from Phase I in order for the softball field to become a "stand-alone" project. 5) Preparation of a new specific purpose and topographic survey for Flamingo Park in order to comply with Building Department's comments to provide a survey less than one year old, in the amount of$71,200; and - Revised Agreement amount$1,262,718. Page 6 of Wolfberg/Ahmrez and Partners,Inc.,Amendment No.9 Page 731 of 1802 I I i eV 0i+ E n, Im V_ r. al �.z n La:G l h gF Ltl itll5+ WOLFBERGALVAREZ&PARTNERS a r liq � n August 23, 2018 via Email: DanielCevallos(cLmiamibeachf.gov REVISED—May 10,2018 REVISED—August 23,2018 Mr. Daniel F. Cevallos Capital Projects Coordinator City of Miami Beach Capital Improvements Projects Office 1701 Meridian Avenue, Suite 300 Miami Beach,FL 33139 RE: Flamingo Park WA Project No.: 2801000 Subj: Proposal for Additional Services Dear Mr. Cevallos: Pursuant to the revisions and scope of services that have been recently requested by the City for the above- noted project, following is our proposal for the noted specific tasks: The scope of services herein is as follows: • Existing IT Room Relocation Relocate existing IT Room from Historic Lodge to "Shed" located east of basketball courts, as requested by Frank Quintana. - Site visit/meeting with City staff - Remove existing louvers and door. - Install new hollow metal door/frame. - Install new ductless mini-split A/C. - Install new card reader access control. - Install new 110V quad outlet, two (2) L630 twist lock 220 V and new exterior light. - Services assume adequate power is available to accommodate new load. • Phase I Revisions - Attend meeting with City staff to review field conditions resulting from Hurricane Irma. - Revise walkway design as a result of tree loss due to Hurricane Irma. Relocate light fixtures and generate new photometry study. - Remove estate fencing west of Butterfly Garden and Outdoor Fitness Center along Michigan Avenue. - Modify landscaping and irrigation design as performed by O'Leary-Richards. WOLFBERGALVAREZ.COM Page 732 of 1802 Mr. Daniel F. Cevallos Flamingo Park WA Project No. 2801000 April 23,2018 REVISED—August 23,2018 Page 2 of 3 • Baseball Field Guy Wire Relocation - Relocate two(2)existing tension wires supporting the back-screen as required to accommodate ADA ramps introduced to comply with FBC-ADA. The original scope of services did not include relocating these guy wires as the location of the ramp was unknown. - The structural services will be provided by BNI. • Separate Package for Softball Field - Prepare construction documents for softball field as a"stand-alone"project. - Permitting services for stand-alone project. • Survey - Prepare topo survey for central portion of park with elevations and tree locations tied to boundary line as requested directly by the City and provided by Schwebke-Shiskin & Associates. • Survey - As requested by the City, proposals for a new specific purpose and topographic survey for the Flamingo Park site was solicited from three different surveying companies: J. Bonfill & Associates, Maser Consulting & Biscayne Engineering. The lowest fee proposal was J. Bonfill & Associates for $27,610.00 (See attached the proposal and a detailed scope of work to be performed) Please refer to the attached spreadsheet for breakdown of required effort. WA proposes to perform the above-noted services for a stipulated fee of$71,200.00. I trust the proposed satisfies your request. Should it be necessary,please feel free to contact us. Sincerely, Marcel R. Morlote, R.A. President Attachment cc: Jose Luis Fortuno-WA WOLFBERGALVARELCOM a - Page 733 of 1802 Mr. Daniel F. Cevallos Flamingo Park WA Project No. 2801000 April 23,2018 REVISED—August 23,2018 Page 3 of 3 WOLFBERGALVAREZODM Page 734 of 1802 a s, 1 a a a iS8 8A -.ato Smolt gj i S--u,-,-,„ S t 2 .omen s .a.e....a . s R 0 a a da " 3 w o• 8g e........ . a ......... . a 480 O.- wm s. g a _ ave:a..ee. A ..o.00.ee . 8 cuE0FOh wZzo 5E 888 8)O5F c • a • s s o u• 39 .... . a .....veva . z eg € 8 a a a 1 . f tl 8 5 z e ¢ @e a e 2 CE F, ' a ti8s ai 'Ill & a 5 n g ailif ilikli E 1S81s e'sr �IIlg ;33 a a d VI i X pc Page 735 of 1802 S 8 888888888 g a 888808$0888 S se ''Rn Seaa -adaaa888P.d 0 vvvvvavoe e - vvv.....--v v v ---- --- v - : ------vvvvv v e R A -.------- o 0000vaeevee o i. 'm vaeveevoo a oa-00000vee s LU 0 L6 M CO ao tai- 8 8 a v0000000o e a a aaa-aaaaaae mmszw maga :LL m a000a000e e e al o e°o a oo=o e e e ---------- r. F Ue. s iF Fd i p Et p 8n ¢ ii °` F Ili 3 eF F nil il € AF Y `FRRF re �`e ggk[E$z i a 5 E an gE w E 2 G $ E h a dad FB a ¢ 9. : 1 ;: ; ] Y 8F8o & a ¢i,Q€E a gc 'lip s C; V' ^ LU▪n 'o• 1' a Page 736 of 1802 % R 8 S i S'888e eoA y e 8 8$8%888%8%8 o 8 38 8. 3 $388aSS2S2S 3 o p a O kea-aeeeeevee e e eeeeeeeeee aee masse see p vv=Rvmv^vv v p a veeevveeeev ao 8 w 0 U/ O vvvvvvvvvv v v 8 eeeevvv veva v 8 ILI LI m'gm0 m6 .x � % 8,3, -vv�vaavem e R „ vvvvovvvvev v a Wi2ugow Nogg °u F O 2 ..-ane evev. v vvvvvvvvvvv v e 8 6 oO El 3 n . E3 E2 li OIS 3 ge= gg R P£x St S is 1 tn y Fga91 1 n2 $ g d w 4 F3 all; £�€ e 1g2 grs i gg S {e{ 3 2 Q1g ez e g ,£i; s,' WE t yam € g WE°Ft3%i a 9a3 :1 s € ?:5 A jh i — `sagg8lAzg^ I i O'Leary Richards Design Associates, January 15,2018 Inc. Lid c pe#Ail enure&Planning Mr.Marcel Morlote,AIA Sr.Vice President Wolfberg Alvarez&Partners 75 Valencia Avenue,Suite 1050 Coral Gables, FL 33134 Re: Landscape Architectural Services for: Flamingo Park Ph.1-Additional Services 1200 Meridian Avenue Miami Beach, Florida 33139 Dear Marcel: Pursuant to your request, O'Leary Richards Design Associates, Inc. proposes to provide additional landscape architectural services for the above referenced project. The basic professional services to be included are as follows: A) Site visit to document existing trees removed as a result of Hurricane Irma. B) Meeting with City staff to review changes as a result of Hurricane Irma. C) Revise Existing Tree Inventory Plans, Landscape Plans and Irrigation Plans to reflect revisions to site plan and tree loss as a result of Hurricane Irma for Phases 1&2. D) Provide new irrigation pump design to replace existing pump north of pool complex that is inoperable. El Research irrigation smart controller with wireless connectivity and make recommendation to Parks&Recreation Department for review. Our Lump Sum Fee for these professional services will be Eight Thousand Nine-Hundred Dollars and 00/100($8,900.00). The work shall be performed in accordance with the terms and conditions of the basic services agreement between O'Leary Richards Design Associates, Inc. and Wolfberg Alvarez & Partners, Inc.dated September 12,2016. If the proposed work and fees contained herein are agreeable with you, please sign the enclosed copy of this letter and return same to our office. Should you have any questions regarding the above,please do not hesitate to call. Very truly yours, $ �. r Kathryn O'Leary Richards,ASIA Accepted: By: _ By: Oak Plaza Professional Center Kathryn O'Leary Richards,ASIA Mr. Marcel Morlote,AIA 8525SW lard Street,Suite C-n President Sr.Vice President Miami,Florida 33156 O'Leary Richards Design Associates,Inc. Wolfberg Alvarez&Partners Phone:305596.6628 Fax:305.596.9160 LC#26000195 Date: Date: Mesmer of American Society of ndscape Architects Page 738 of 1802 PJ •buildingstrength STRUCTURAL F 0IN F ° ` Fee Proposal for Structural Engineering Services Date January 19,2018 Reference Flamingo Park Guy Wires Miami Beach,FL BNI Job#16M97.01 To Wolf berg Alvarez 75 Valencia Ave.,Suite 1050 Attention Mr.Jose Luis Fortuno,RA.,NCARB Coral Gables,Florida 33134 Project Architect Prolect Description The two tension wires,helping to laterally support the vertical poles for the foul ball baseball net,require relocation due to a proposed new ramp,on both sides of the bleachers. We have presented a concept for bringing the support wires all the way back,over the proposed stairs,and connect them to a vertical post with a brace. Scope of Seri/Ices Basic Services includes the design and detailing of the wire replacement system with the concepts developed and to provide drawings and calculations as required for permitting bidding and construction. Basic Services Fee We propose to provide the described Basic Services for the Lump Sum Fee of Three Thousand Six Hundred Dollars ($3,600.00). Reimbufsables Reimbursable expenses shall be Invoiced at cost. Offered by: BLISS&NYITRAY,INC. Accepted by: WOLFBERG ALVAREZ 5 .07449— January 19,2018 (Signature) LI (Date) (Signature) (Date) William Caycedo/Principal (Printed Name/title) (Printed Name/title) If acceptable,please sign and return this Agreement,which Includes the following Terms and Conditions. 800 Douglas Road. Suite 300 I Coral Gables, Florida 33134 I PHONE 305-442-7086 FAX 866-832-5291 www.bniengineers.com Miami I Tallahassee I West Palm Beach Page 739 of 1802 •buildingstrength Terms and Conditions Project: Flamingo Pk Guy Wire Relocation Page: 2 of 2 Date: January 19,2018 1. Standardof Care: BNI will endeavor to perform services In a manner consistent with the degree of care and skill ordinarily exercised by members of our profession currently practicing In the same locality under similar conditions. No other representation,warranty or guarantee is made,Included or intended as to our professional services. 2. Seryices Excluded' A. Inspection of the work or site visits 3. Additional Services: Services beyond those outlined under basic services. including but not limited to an increase In the scope of the project, revisions,construction errors,inspections and additional site visits will be provided for an additional negotiated lump sum fee or performed on an hourly basis at the rates Indicated below.BNI will provide additional services upon written authorization by the Client. 4. Hourly Billing Rates Principal $225/Hour CAD Manager $115/Hour Project Manager $175/Hour CAD Operator $85/Hour Project Engineer $150/Hour Administrative Assistant $65/Hour Engineer $120/Hour 5. Provisions Related to Payment. A. Reimbursable Expenses are in addition to compensation for Basic and Additional Services and Include expenses incurred by 6Nl,employees and subconsultants In the interest of the Project,such as expedited delivery and printing other than for BNI.Reimbursable expenses and Additional Services will be billed monthly as they are incurred. B.BNI shall invoice Client by phase when completed C. Client agrees to pay each invoice within thirty(30)days of receipt of payment from Client's client.Late payments will be charged interest at the rate of 1.5%per month and we reserve the right to stop work and withhold documents. 6. Contractor Means and Methods: BNI has no control over and shall not be responsible for construction means,methods,techniques,sequences, procedures,or safety precautions and procedures,since these are solely the Contractor's responsibility. BM shall not have control over acts or omissions of the Contractor,subcontractors,their agents or employees or other persons performing portions of the work. 7. Mediation: The Client and BNI agree that all disputes between them arising out of or relating to this Agreement or the Project shall be submitted to formal mediation unless the parties mutually agree otherwise.Anything contained In any other contract document notwithstanding,BNI shall not be bound by any provision requiring arbitration of disputes or controversies arising out of BNI's work. 8. Applicable Law: This Agreement shall be governed by the laws of the State of Florida. 9. Aydgns: Neither the Client nor BM may delegate,assign,sublet or transfer their duties or interest in this Agreement without the written consent of the other party. 10. Third Parties; Nothing contained in this Agreement shall create a contractual relationship with or a cause of action In favor of a third party against either the Client or BNI. 11. Severability; In the event any of the provisions of these General Provisions should be found to be unenforceable, it shall be stricken and the remaining provisions shall be enforceable. 12. Termination of Servlre% This Agreement may be terminated upon 10 days written notice by either party should the other fail to perform its obligations hereunder. In the event of termination,the Client shall pay BNI for all services rendered to the date of termination,all reimbursable expenses,and reasonable termination expenses. www.bniengineers.com Miami I Tallahassee I West Palm Beach Page 740 of 1802 SCHWEBKE-SHISKIN 8 ASSOCIATES,INC. 3240 CORPORATE WAY MIRAMAR,FL 33025 (954)435-7010 accounting@shiskin.com INVOICE BILL TO INVOICE# 208325 MIAMI BEACH,CITY OF DATE 05/09/2010 CAPITAL IMPROVEMENT PROJECT WE DATE 06/08/2018 1700 CONVENTION CENTER DRIVE TERMS Nei 30 MIAMI BEACH,FL 33139 USA ACTIVITY AMOUNT Charges Survey 2,775.00 DATE ORDERED: MARCH 07,2018 ORDERED BY: DANIEL CEVALLOS ORDER TAKEN BY: MARK S.JOHNSON INVOICE NO: 208325 RE: FLAMINGO PARK TOPO SURVEY FOR CENTRAL PORTION OF PARK WITH ELEVATIONS AND TREE LOCATIONS TIED TO BOUNDARY LINE. (FOLLOW AERIAL FOR LIMITS) SURVEY CREW: 37 HOURS @$150.00 a $5,550.00 $5,550.00-TOTAL $2,775.00-50%COURTESY REDUCTION $2,775.00-TOTAL AMOUNT DUE BALANCE DUE $2,775.00 Page 741 of 1802 O'Leary Richards Design Associates, Inc. Landscape Architecture x Planning May 17,2018 Mr. Marcel Morlote,AIA Sr.Vice President Wolfberg Alvarez& Partners 3225 Aviation Avenue,Suite 400 Coconut Grove,FL 33133 Re: Landscape Architectural Services for: Flamingo Park—Softball Field Stand-Alone Project 1200 Meridian Avenue Miami Beach, Florida 33139 Dear Marcel: O'Leary Richards Design Associates, Inc./ORDA (Firm) is pleased to provide Wolfberg Alvarez & Partners/WA (Client), with the following proposal for professional Landscape Architectural Services pertaining to the above-referenced project. Attached you will find Exhibit 'A' dated 5/16/18 describing the limit of work for this project. The basic professional services are as follows: A) Prepare landscape and irrigation construction documents for stand-alone project within limit of work shown in Exhibit'A'. B) Assist WA by incorporating permitting agency's review comments and re- issuing drawings as revisions for final sign-offs by the agencies and departments having jurisdiction. It is understood that the Client shall be solely handling the effort associated with the permitting process through the required permitting agencies. C) Respond to bidder inquires. D) Review shop drawing submittals. E) Respond to RFI's submitted by contractor. F) Perform a maximum of(3)site observations during construction to review the progress of the landscape and irrigation installation. Our Lump Sum fee for the basic professional services will be a total of Six Thousand Five-Hundred Dollars and 00/100($6,500.00). The work shall be performed in accordance with the terms and conditions of the Phase 2 basic services agreement between O'Leary Richards Design Associates, Inc. and Wolfberg Alvarez&Partners,Inc. dated August 23, 2017. Oak Plaza Professional Center 8525 SW 92nd Street,Suite C-u Miami,Florida 33156 Phone:305.596.6628 Fax:305.596.9160 LC#26000195 Member of the American SodeborLandscape Architects Page 742 of 1802 Mr. Marcel Morlote,AIA Flamingo Park Page 2 Acceptance If the proposed work and fees contained herein are agreeable with you, please sign the enclosed copy of this letter and return same to our office. Looking forward to working with you on this project, I am Very truly yours, till / Kathryn O'Leary Richards, PLA,ASLA, LEED GA President O'Leary Richards Design Associates, Inc. Accepted: By: By: Kathryn O'Leary Richards,ASLA Mr. Marcel Morlote,AIA President Sr.Vice President O'Leary Richards Design Associates,Inc. Wolfberg Alvarez&Partners Date: Date: Page 743 of 1802 • �/ pe<v 1 / i l i� /� ice.+ e L O � o I ; -e y d . 0 _ t C.4,71Z0 Orrye I a s hi # N. 01 — . . p \' ;A - iai -^ i 41 I: a `,: I. ,4 I dis: } `t a �- k .---r- --r 4-va- NvOH3 e„L ,o Page 744 of 1802 I J . BONFILL & ASSOCIATES Architects Land Surveyors & Mappers • � ( ` Civil Engineers i �hF Amended August 22, 2018 Wolfberg Alvarez&Partners 75 Valencia Avenue Suite 1050 Coral Gables, FL 33134 Attn. Jorge Maldonado Director Civil Engineering/J Fortuna In reference to:Flamingo Park 1200 Meridian Avenue, Miami Beach,FL.Folio 02-3234-000-0050 Dear Mr. Fortuno: Pursuant to your request regarding a fee estimate for surveying and mapping services for the above referenced project, the following amended proposal for same is hereby submitted for your consideration: Scope of Services: Specific Purpose and Topographic Survey of approximate 31.47 acres including ROW • Extend up to the near edge of paved road on Meridian Ave. • Extend up to the near edge of the paved road(valley gutter)of Michigan Ave. • Include 100 linear feet of sidewalk on the north side of 11th Street at Jefferson Ave. • The survey shall include the same level of information as the attached drawing received from client 1/16/18 including the frequency of the grade elevations shown at 20' intervals. In areas where the attached drawing does not show the elevations at 20' intervals, the elevations shall be at no less than 40' intervals. The survey shall also include the following: • Locate structures, fences, paved areas, curbs, water meters, backflow preventers, and all other significant aboveground features. • Location of poles and overhead power lines. • Location of manholes and catch basins including rim/grate, bottom elevations, and size, material and invert elevations for all pipes. • Indicate graphically on the drawing pipe direction from catch basins and manholes. • Locate existing trees indicating common names,canopy,trunk&height If trees are not identifiable by our surveying crew,owner is responsible for consulting with a botanist or a tree expert for species identification. • Elevations at edge of pavement, top of curb, back of sidewalk at 40'intervals(except as noted otherwise)and any additional low and high point elevations that may exist between the intervals and at transitions such as driveways, ramps, etc. The elevations at the adjacent rights-of way shall start at the edge of pavement(lip of gutter). • Finished floor elevations of buildings. • Topographic survey drawing at 1"=20'scale.Survey shall contain all the information gathered in the field. • JBA will submit ten (10)signed and sealed copies of the survey plans along with one PDF and one AutoCAD file on electronic media. Time of Completion: JBA estimates 20-25 working days'weather permitting and after NTP This proposal assumes site access is available and work can be performed between the hours of 8:00 AM and 5:00 PM Monday through Friday. Qualifications: 1. Rule of Law:All field and office efforts in connection with this project will be performed in strict accordance with the applicable provisions of the"Standards of Practice for Land Surveying in the State of Florida", pursuant to Rule 5J-17 Florida Administrative Code. 2. Requests for service not specifically enumerated in this Letter of Proposal will be addressed via separate response if so required. 3. All survey work to be done in U.S.feet. 7100 SW 99'r Avenue • Suite 104 • Miami. Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3390a6eK 4 bf3@o2 www.jbonfill.com J BONFILL & ASSOCIATES A r c h i t e cwt s Land n d Surveyors & Mappers •:`O ��i,� Civil Engineers 4. Client will provide access to the property.Scope of work is restricted to the area as per instructions. 5. Elevation information to be specified by client prior to commencing the field work. 6. If unable to open a catch basin JBA will notify immediately City of Miami Beach is responsible to open it. 7. If due to traffic conditions additional MOT is required and is beyond the capability of our standard MOT operations JBA will notify client and provide additional fees for the MOT operation. Fees for Specific Purpose and Topographic Survey Surveying crew 128 Hours @ $140.00 per Hour $17,920.00 Registered Surveyor and Mapper 16 Hours @ $150.00 per Hour $2,400.00 CADD/Surveyor Technician 80 Hours @ $90.00 per Hour $7,200.00 Clerical office 2 Hours @ $45.00 per hour $90.00 Total amount $27,610.00 Payment Terms JBA will invoice upon completion of job. Payment is due not later than 5 days after consultant receives payment from the City of Miami Beach. Payment is not contingent on payment from a third party unless other written agreements or guarantees are agreed to by both parties and attached hereto. No waiver shall be construed as a modification or amendment to these payment terms unless expressly stated in writing by J. Benfill 8 Associates, Inc. Should at any time during the project the Client find it necessary to discontinue the services described above. or if the parties mutually decide to terminate this contract, the Client will compensate J. Bonfill and Associates, Inc. on an hourly basis for the percentage of work completed plus reimbursable expenses. Lump Sum Fees are fixed for a period of three months from the date of this proposal. If the work has not been initiated within this three-month period,J. Bonfill and Associates, Inc. reserves the right to terminate or renegotiate this proposal. In the event either party is forced to seek legal advice or representation to enforce any of the provisions of this agreement,then the prevailing party shall be entitled to an award of reasonable attorneys fees and costs, including fees and costs for court ordered mediation and/or fees and costs on appeal in Miami Dade County, Florida. By acceptance of this proposal,the signing person represents and warrants to The Surveyor,that it is authorized to enter and accept the proposal on behalf of and binds Wolfberg Alvarez and Partners. If acceptable, a space is provided for an authorized signature.We will consider the return of the signed original letter as our legal contract and Notice to Proceed. By signing below. I APPROVE AND ACCEPT this letter as a legal contract and read and agree to the payment terms as set forth above. By: Date: (Authorized Signature) Title: (Typed or printed name) On behalf of J. Bonfill 8 Associates, Inc., I thank you for this opportunity to present this proposal for your consideration and look forward to your favorable response. In the interim,if there is anything we can do to be of service in this or any other matter,please do not hesitate to call me directly at 305.598.8383. Sincerely yours, Marilyn Bonfill Sarasola Managing Director - . »w..•scrm« :.a w:"M,.y,xi .Ya^ix..x1°saET.,, 7100 SW 991h Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • L8339�ageC746bt 02 www.jbonfill.com