Loading...
LTC 522-2018 Private construction at the Icon Condominium (450 Alton Road)requiring lane closures on SRA1A-Macarthur Causeway EastboundMIAMI BEACH OFFICE OF THE CITY MAI\.IAr::I=D LETTER TO COMMISSION LTC# 522-2018 TO: Mayor Dan Gelber and Members oft e City Commissi n FROM: Jimmy L. Morales, City Manager DATE: September 28, 2018 SUBJECT: PRIVATE CONSTRUCTION AT THE ICON CONDOMINIUM (450 ALTON ROAD) REQUIRING LANE CLOSURES ON SRA1AIMACARTHUR CAUSEWAY EASTBOUND The purpose of this Letter to Commission (LTC) is to provide information on a proposed private construction by the Icon Condominium at 450 Alton Road which will require lane closures on SRA1A/MacArthur Causeway eastbound. The City of Miami Beach received a Lane Closure Request Application for the MacArthur Causeway Eastbound for landscaping work to be performed on the pool deck of the Icon Condominium located at 450 Alton Road. The scope of the work includes setting up a hydraulic crane on eastbound MacArthur Causeway to lift trees and landscape materials to the Icon pool deck. The Maintenance of Traffic (MOT) Plan for the work proposes to close two (2) eastbound lanes (eastbound right turn lane and center lane). The City has confirmed that two (2) eastbound lanes are required due to the size of the crane and outriggers required to perform this work. City staff has worked with the contractor to explore the possibility of placing the crane on Alton Road south of 51h Street; however, the location of the pool deck with respect to the Icon building would not allow the work to be performed from Alton Road. The closures are proposed to occur from Sunday nights to Thursday nights from 10:00 PM to 5:00 AM during the following dates: • September 30, 2018 to October 3, 2018 October 7, 2018 to October 10, 2018 The crane will be removed and all eastbound lanes will be opened by 5:00AM each day. It is important to note that adjacent to this location and concurrent with the above work, the Florida Department of Transportation (FOOT) is continuing its bridge rehabilitation project for the MacArthur Causeway East Bridge. Currently, the FOOT work requires the continuous closure of one (1) westbound lane. Please do not hesitate to contact me if you have any questions. Attachment: Icon Condominium (450 Alton Road) Maintenance of Traffic (MOT) Plan. ~ JLM/KGB/JRG/JFD/DM F:ITRANI$ALLIL TCIL TC -PRIVATE CONSTRUCTION ON 450 ALTON ROAD IMPACTING MACARTHUR CAUSEWAY FINAL.DOCX 450 Alton Road 45DAitonRd Miami Beach, n 33139 OUliJl.E fASlBIIIm LAII t SIIEWAUC llOStlE ON MacArtllur cuaway & PEDESliiiAN IIET. MOT PlAN r·lilllmll: 6/8/18 Iiiii ---PEDESTRIANPATH .. ROADSICN • WORIZK • RUADalfll ARROW BOARD SPF.F.O liMIT ON: M.acAtth11r Cau~way Dr IS 45 MPII Thio Cer1if10o lhal Carloo A. C... Jr. ttu~aFkWida~oeT~ ~~oi TrdM:(MOf}AdvMCtel C. .... fteale. 81$5 fOO't'Prowickfa 37 An5A I"NM; ~-17Dt 11-.. P ... -Ilo.IOG ... --.."' lll!lllllllllllllll ~ 'I· •• ~ ( --~ ~ ) ~ N SHAlL INSTAll Alii MUll AIN TR.VfJ: CONilltlt IIVI:ES IN AJ:CaANCE Mlllll fllllllftlfJ STi\-.llll31.A11ST Elll-SIJLBT II TIIAfn: MAMENANCE AIIIJ ~A!U\' Pfl8VISIDNS. NDTE: mtE ITAMJAIII •ns lUI APPLY M n. ml PW1 NIIT II SCAI.l