where we are noW
The Study is comprised of the following three (3) elements:
1) Analyze the existing neighborhood conditions and potential impacts of currently approved and proposed future development
projects and within the Study area;
2) Analyze and propose right-of-way and public space improvements within the Study with an emphasis on enhanced pedestrian
experience and connectivity;
3) Provide a limited public outreach program, as outlined in the scope of work, to receive public input and identify community needs.
initial meeting with client to coordinate schedules + deliverables
[April 19th - completed]
Working group meetings:
1st meeting: Listen (“what are the issues”)
[June 12th - completed]
2nd meeting: Feedback (“this is what we heard”)
– i.e. draft urban design plan
[July 11th - completed]
3rd meeting: Recommendations (“this is what we recommend”)
– i.e. final urban design plan
[AUgUst 29tH - completed]
city commission meeting to present the final urBan design plan.
[anticipated october 17, 2018];
individual follow-up meetings with the city Planning,
economic Development and Public Works departments
individual meetings with representatives of city owned
properties located within the study area
individual meetings with city elected officials
meetings with other consultant teams
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 3garcia-pons+associates
The Study is comprised of the following three (3) elements:
1) Analyze the existing neighborhood conditions and potential impacts of currently approved and proposed future development
projects and within the Study area;
2) Analyze and propose right-of-way and public space improvements within the Study with an emphasis on enhanced pedestrian
experience and connectivity;
3) Provide a limited public outreach program, as outlined in the scope of work, to receive public input and identify community needs.
june 12th
june 20th
june 20th
june 20th
june 29th
june 29th
JULy 11tH
JULy 19tH
JULy 19tH
aug 29th
oct 17th
- Working group 1
- Parks & recreation
- Planning
- Bandshell
- cip
- transportation & parking
- WoRKing gRoUP 2
- tRAnsPoRtAtion
- noRtH sHoRe yoUtH centeR
- working group 3
- city commission
WHAt We HeARD
Meeting SUMMarieS:
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 4garcia-pons+associates
WHAt We HeARD
working group 1 MEETING summary
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 5garcia-pons+associates
WHAt We HeARD
working group 2 MEETING summary
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 8garcia-pons+associates
oceAn teRRAce neigHBoRHooD
39
8
5
2
1
6
7
ocean terrace
72nd Street*
73rd Street*
tatUM WaterWaY
Shared USe Path*
LibrarY & ParKing Lot
bYron aVenUe*
coLLinS aVenUe
nSYc to bandSheLL
1
2
6
3
9
8
7
4
5
10
PROPOSED CONNECTIONS + ONGOING CITY INITIATIVES*
10
4
74th Street
75th Street
5
6
* ongoing citY initiatiVeS
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 9garcia-pons+associates
oceAn teRRAce neigHBoRHooD
3
2
1
PROPOSED CONNECTIONS
4
* ongoing citY initiatiVeS
ocean terrace
72nd Street*
73rd Street*
tatUM WaterWaY
Shared USe Path*
LibrarY & ParKing Lot
bYron aVenUe*
coLLinS aVenUe
nSYc to bandSheLL
1
2
3
4
74th Street
75th Street
5
6
6
5
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 10garcia-pons+associates
oceAn teRRAce neigHBoRHooD
| ocean terrace [PROPOSED CONNECTION]1
75th street
76th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
by
r
o
n
a
v
e
n
u
e
by
ro
n
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
w
a
y
n
e
a
v
e
n
u
e
b
o
n
i
t
a
d
r
b
a
y
d
r
i
v
e
normandy drive
71 st str
e
e
t
i
n
d
i
a
n
c
r
e
e
k
d
r
g
a
r
y
a
v
e
n
u
e
bruce street
b
i
s
c
a
y
n
e
b
a
y
t A t U m W
A
te RW
A
y
oc
e
a
n
t
e
r
r
a
c
e
at
l
a
n
t
i
c
o
c
e
a
n
77th street
74th street
73rd street
72nd street
71st street
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
77th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
71st street
by
r
o
n
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 11garcia-pons+associates
| oceAn teRRAce
NOBE MASTER PLAN [ADOPTED]
20’
110 ’
Existing Conditions
The existing condition of Ocean
Terrace is one with angled parking on
both sides of the street, few shade
trees and a very wide pavement area
to cross.
15’18’19’14’18’13’13’
110 ’
varies
62’
Shared Space
Designed as a curbless shared space,
Ocean Terrace can become an elegant
public space in Miami Beach. The
pavement design can subtly indicate
primarily pedestrian space from
space that cars may occupy. At certain
key times, such as during festivals and
street fairs, the street can be closed
to cars completely with simple metal
bollards.
What is key is that Ocean Terrace
remain a street accessible to all with
vehicular access, ample parking,
bicycle lanes, sidewalks, and transit
access. Residents will still need to
maintain access to parking entrances
located on Ocean Terrace.
PL PL
PL PL
N
N
Ocean Terrace
Chapter 2 | Five Big Ideas [2.39]DRAFT DRAFT
20’
110 ’
Existing Conditions
The existing condition of Ocean
Terrace is one with angled parking on
both sides of the street, few shade
trees and a very wide pavement area
to cross.
15’18’19’14’18’13’13’
110 ’
varies
62’
Shared Space
Designed as a curbless shared space,
Ocean Terrace can become an elegant
public space in Miami Beach. The
pavement design can subtly indicate
primarily pedestrian space from
space that cars may occupy. At certain
key times, such as during festivals and
street fairs, the street can be closed
to cars completely with simple metal
bollards.
What is key is that Ocean Terrace
remain a street accessible to all with
vehicular access, ample parking,
bicycle lanes, sidewalks, and transit
access. Residents will still need to
maintain access to parking entrances
located on Ocean Terrace.
PL PL
PL PL
N
N
Ocean Terrace
Chapter 2 | Five Big Ideas [2.39]DRAFT DRAFT
O
c
e
a
n
T
e
r
r
a
c
e
73rd Street
74th Street
75th Street
C
o
l
l
i
n
s
A
v
e
n
u
e
Manolo’s Sazon
Roni’s by
the Ocean
Walgreens Venetian
Nail Spa
Burgers &
ShakesCVS
Bank of
America
Christal
Food Store
Aromi
Days Inn
This map serves to illustrate how the front of buildings
should face the street. When fronts face fronts the
streetscapes become more active. This could serve to
enhance east to west connectivity from Biscayne Bay
to the Atlantic Ocean.
“Fronts face fronts”
East-West Connections N
Chapter 2 | Five Big Ideas [2.11]DRAFT DRAFTfroM Nobe MAster PlAN 2016
1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 12garcia-pons+associates
STREETSCAPE CONDITIONS [EXISTING]
oceAn teRRAce + 73RD stReet [LooKing noRtH]
oceAn teRRAce + BeAcHWALK [LooKing noRtH]
oceAn teRRAce + 74tH stReet PLAZA [LooKing noRtH]
oc
e
a
n
t
e
r
r
a
c
e
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 14garcia-pons+associates
inspiration IMAGES [CURVILINEAR]
OCEAN TERRACE MIAMI BEACH 2016
66 \
PRELIMINARY MASTER PLAN DOCUMENTATION
SCHEME A \ CONCEPT [REVISED]
OCEAN TERRACE MIAMI BEACH 2016
69 \
PRELIMINARY MASTER PLAN DOCUMENTATION
SCHEME A \ CONCEPT IMAGERY [REVISED]
OCEAN TERRACE MIAMI BEACH 2016
69 \
PRELIMINARY MASTER PLAN DOCUMENTATION
SCHEME A \ CONCEPT IMAGERY [REVISED]
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 13garcia-pons+associates
PeDestrIAN orIeNteD shAreD street
oc
e
a
n
t
e
r
r
a
c
e
STREETSCAPE CONDITIONS [PROPOSED]
| oceAn teRRAce1
PoteNtIAl PArKING IMPAct
eXiSting: +/- 70 SPaceS (diagonaL)
ProPoSed: +/- 6 SPaceS (diSabLed)
diSPLaceMent oF +/- 64 SPaceS to PotentiaL
75th Street MiXed-USe, ParKing StrUctUre
PoteNtIAl tree cANoPY IMPAct
eXiSting: +/- 37 PaLMS
ProPoSed: > +/- 75 PaLMS & treeS
PotentiaL doUbLing oF tree canoPY
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 15garcia-pons+associates
STREETSCAPE IMPROVEMENTS [PROPOSED]
public drop-off areas PLAZA W/ Dining teRRAces miXeD Use PARKing stRUctURe
cLoseABLe stReet cLoseABLe stReet
PeDestrIAN orIeNteD shAreD street
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 16garcia-pons+associates
@ 73RD STREET [PROPOSED]
public drop-off areas st tRoPeZ PARKing Access cLoseABLe stReetvolleyball courts
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 17garcia-pons+associates
@ 74TH STREET [PROPOSED]
shade structures Dining teRRAcesboardwalk elements public PLAZA “shared” roadway
[vehicles, people, trolley, etc]
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 18garcia-pons+associates
@ 75TH STREET [PROPOSED]
cLoseABLe stReet playgroundshared VeHicLe
DRoP-oFF
miXeD Use
PARKing stRUctURe
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 19garcia-pons+associates
OCEAN TERRACE MIAMI BEACH 2016
72 \180FT12060300
PRELIMINARY MASTER PLAN DOCUMENTATION
SCHEME A \ SECTION
WEST - EAST SECTION [PROPOSED]
Dining teRRAces landscape boardwalk elements dunes beachpublic PLAZA
“shared” roadway
[vehicles, people, trolley, etc]
sectIoN @ oceAN terrAce
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 20garcia-pons+associates
WEST - EAST SECTION [PROPOSED]
OCEAN TERRACE MIAMI BEACH 2016
68 \180FT12060300
PRELIMINARY MASTER PLAN DOCUMENTATION
SCHEME A \ SECTION
dunescloseable streetdining terraces boardwalk elements shade structures beach
sectIoN @ 74th street PlAZA
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 21garcia-pons+associates
VISUALIZATION @ 73RD STREET LOOKING WEST [PROPOSED]
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 22garcia-pons+associates
VISUALIZATION @ 73RD STREET LOOKING NORTH [PROPOSED]
| oceAn teRRAce1
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 23garcia-pons+associates
75th street
76th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
by
r
o
n
a
v
e
n
u
e
by
ro
n
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
w
a
y
n
e
a
v
e
n
u
e
b
o
n
i
t
a
d
r
b
a
y
d
r
i
v
e
normandy drive
71 st str
e
e
t
i
n
d
i
a
n
c
r
e
e
k
d
r
g
a
r
y
a
v
e
n
u
e
bruce street
b
i
s
c
a
y
n
e
b
a
y
t A t U m W
A
te RW
A
y
oc
e
a
n
t
e
r
r
a
c
e
at
l
a
n
t
i
c
o
c
e
a
n
77th street
74th street
73rd street
72nd street
71st street
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
77th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
71st street
by
r
o
n
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
oceAn teRRAce neigHBoRHooD
| LIBRARY + 75TH STREET PARKING LOT [PROPOSED CONNECTION] 2
2
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 24garcia-pons+associates
STREETSCAPE CONDITIONS @ 75TH STREET LOT [EXISTING]
LiBRARy [LooKing eAst]
oceAn teRRAce + 75tH stReet [LooKing West] LiBRARy + 75tH stReet [LooKing eAst]
| LiBRARy + 75tH stReet PARKing Lot
coLLins AVenUe + 76tH stReet LiBRARy [LooKing eAst]
75tH stReet + coLLins AVenUe [LooKing eAst]
2
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 25garcia-pons+associates
North Shore Branch Library
One of the key recommendations made by North
Beach stakeholders who participated in the Mayor’s
Blue Ribbon Panel on North Beach in 2014 and
2015 was to “Relocate the library from its current
location at 7501 Collins Avenue, to a more centrally-
located and modern site in the Town Center” (cited
from North Beach Revitalization Summary Report,
November 20, 2014).
A couple of questions arise: Where should the library
be relocated ? What should happen with the current
library site?
Relocating the Library
The North Shore library’s proximity to the beach
makes this public asset unique, as it is the only facility
of its type located in such a desirable location, steps
from the beach. However, one of the complaints
about the current library facility is that it is out-
dated and does not meet the functions or have the
selection of books that one finds at larger regional
facilities like the Miami Beach Regional Library in
South Beach.
Town centers should host City offices, banks, post
offices, and other public services. These types of
institutions, both public and private, give a “center”
its primacy. North Beach’s post office is currently
located on 71st Street across from the Byron Carlyle
Theater. If the Byron Carlyle Theater is one day to
be redesigned, one of its potential new uses could
be the creation of a ‘21st Century library’ that could
consist of a media center and community space that
would provide Wifi access and computers that could
be used by local residents to access the Miami-Dade
County Library System’s Online database.
Re-purposing the Current Library Site
It is important to note that the library site is a public
facility owned by the City and that a portion of the
current library is within the Coastal Construction
Line. This line makes it difficult, if not impossible, for
any buildings larger than the current footprint to be
built. Any new uses would likely to be smaller in size.
New buildings on the Coastal Construction Line are
intended to have a lighter environmental footprint
than what they replace.
New public uses could include outdoor dining
under a public pavilion. South Point Park in South
Beach includes a popular coffee and non-alcoholic
frozen drink concession alongside a space that can
be rented by members of the public for events.
Similar low impact, community-serving, City-owned
opportunities should be investigated.
Another public use to explore is an Ocean Rescue
Station. The City of Miami Beach Ocean Rescue
Division provides for the safe swimming and beach
protection to all Miami Beach residents, visitors and
tourists in designated areas. The responsibilities of
Ocean Lifeguards include accident and drowning
prevention, public education, citizen assist, search
and recovery of lost children, basic life support, and
swimmer rescues.
The Miami Beach Ocean Rescue Headquarters is
located at 1001 Ocean Drive in South Beach. Ocean
Rescue has three sub-stations located at South
Pointe Park, 53rd Street and Collins Avenue and 79th
Street and Collins Avenue.
The plan recommends establishing an advisory
group to explore the possibilities for relocating
the Library to the Town Center and re-purposing
its current location for either public concessions,
Ocean Rescue, a combination of the two, or some
other appropriate use.
North Beach Master Plan Report | August 30 [2.78]DRAFT
North Beach stakeholders would like to see the North Shore Library located at 7501 Collins Avenue relocated closer to the Town Center
Source: Google Earth
Recommendations
West Lots
• Make landscape and streetscape improvements on
the West Lots.
• Issue a Request for Proposals to assess what the
private market would be willing to build in the
West Lots in accordance with plan principals.
North Shore Library
• Establish an advisory group to explore the
possibilities for relocating the Library and re-
purposing its current location.
Chapter 2 | Five Big Ideas [2.79]DRAFT DRAFT
NOBE MASTER PLAN [ADOPTED]
| LiBRARy + 75tH stReet PARKing Lot 2
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 26garcia-pons+associates
STRUCTURED PARKING OPTION [PROPOSED]
90FT60300
• LibrarY bUiLding With PLaZa Fronting coLLinS aVenUe
• three-baY SUrFace ParKing LotbetWeen LibrarY and beach
(+/-108 eXiSting ParKing SPaceS)
• reLocate LibrarY USe to 72nd Street ProJect (ongoing citY iinitiatiVe)
• Maintain ParKing at thiS Location (to incLUde diSPLaced ocean terrace ParKing)
• rePLace eXiSting bUiLding and SUrFace ParKing Lot With a neW StrUctUred ParKing decK
(+/-240 PotentiaL ParKing SPaceS)
• ProVide neW groUnd FLoor retaiL aLong coLLinS aVe and 75th Street
• ProVide neW beach PatroL oFFiceS and PerhaPS beach Maintenance FaciLitieS
• ProVide integrated deSign connection betWeen aLtoS deL Mar ParK and ocean terrace
ProPoseD eXIstING
eXisting cVs
sURFAce PARKing Lot
| LiBRARy + 75tH stReet PARKing Lot 2
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 27garcia-pons+associates
oceAn teRRAce neigHBoRHooD
| COLLINS AVE - BTWN 72ND AND 75TH STREETS [PROPOSED CONNECTION]3
3
75th street
76th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
by
r
o
n
a
v
e
n
u
e
by
ro
n
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
w
a
y
n
e
a
v
e
n
u
e
b
o
n
i
t
a
d
r
b
a
y
d
r
i
v
e
normandy drive
71 st str
e
e
t
i
n
d
i
a
n
c
r
e
e
k
d
r
g
a
r
y
a
v
e
n
u
e
bruce street
b
i
s
c
a
y
n
e
b
a
y
t A t U m W
A
te RW
A
y
oc
e
a
n
t
e
r
r
a
c
e
at
l
a
n
t
i
c
o
c
e
a
n
77th street
74th street
73rd street
72nd street
71st street
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
77th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
71st street
by
r
o
n
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 28garcia-pons+associates
| coLLins AVe - BtWn 72nD AnD 75tH stReets
STREETSCAPE CONDITIONS [EXISTING]
3
coLLins AVenUe + BAnDsHeLL [LooKing noRtHeAst]
coLLins AVenUe + BAnDsHeLL [LooKing noRtH]
73RD stReet + coLLins AVenUe inteRsection
[LooKing noRtH]
75tH stReet + coLLins AVenUe [LooKing eAst] coLLins AVenUe +77tH stReet [LooKing soUtH]
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 29garcia-pons+associates
MIAMI BEACH INTERMODAL HUB OPTION [ONGOING CITY INITIATIVE]
Collins Avenue
B
U
S
A
N
D
B
I
K
E
O
N
L
Y
B US
AND
BIKE
ONLY
48‘
10’11 ’10’6’6’3’
60’
3’11 ’
48’
11 ’11 ’6’8’6’11 ’7’
60’
48’
3’3’6’6’10’11 ’
60’
BUS
ONLY
B
U
S
O
N
L
Y
10’11 ’
40’
1 10’10’10’8’
60’
BUS
ONLY
10’11 ’’
Collins Avenue at 85th Street
Existing Conditions
Collins Avenue at 85th Street
Two-Way Travel On- Street Parking
Dedicated Transit
Collins Avenue at 71st Street
Two Way Travel & Dedicated Transit
Collins Avenue at 71st Street
Two-Way Travel & Dedicated Transit
N N
PL PL PL PL
N
PL PL PL PL
NN
North Beach Master Plan Report | August 30 [2.38]DRAFT
froM Nobe MAster PlAN 2016
Miami Beach Intermodal Hubs Feasibility Study
Page | 40
Figure 14. Alternative A Site
Name: Harding Avenue/Collins Avenue Split Configuration (existing layout)
Aerial and Street View:
Description: This alternative would
improve the existing pair of transit stops on
Collins and Abbott Avenues by adding bus
bays and enhanced station amenities at
station locations. This split configuration is
due to the directional transit routings on the
one-way pair of streets. This layout would
support the Plan NOBE street proposals,
the new Town Center District, the potential Ocean Terrace redevelopment, and the potential
Skate Park and parking garage complex, if it comes to fruition on the 72nd/73rd Street site. North
Beach residents north of 73rd Street have the lowest car ownership and highest transit ridership
in Miami Beach, and the potential intermodal center would assist in their daily commute and
improve their quality of life. The increased density to the north (Ocean Terrace) and south (Town
Center District) would make the 72nd/73rd Street area more of a focal point through increased use
of its recreational amenities and connections to buses running north and south to the employment
and entertainment centers in Aventura and South Beach. Potential garage development at the
existing surface parking lot could accommodate commuter parking. Potential Skate Park
development at the site would not be precluded by the intermodal center development as
described in this option.
The advantages and disadvantages of the Alternative A site are as follows:
Advantages:
73rd Street
72nd Street
Northbound
Southbound
•Familiar to users.
•No conflicting land use frontages.
•No deviation of routes needed.
•Highly visible location.
•All transit routes pass by both stops.
•Room for larger station area with bicycle
racks.
•Adjacent to potential parking garage.
•No right-of-way acquisition needed.
•Bus bays can be expanded.
froM MIAMI be Ach INter Mo DAl hUbs feAsIbIlItY stUDY 2018
STATUS: PENDING COMMUNITY + COMMITTEE REVIEW
| coLLins AVe - BtWn 72nD AnD 75tH stReets 3
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 30garcia-pons+associates
POTENTIAL character imagery
| coLLins AVe - BtWn 72nD AnD 75tH stReets 3
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 31garcia-pons+associates
POTENTIAL character imagery
| coLLins AVe - BtWn 72nD AnD 75tH stReets 3
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 32garcia-pons+associates
75th street
76th street
by
ro
n
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
w
a
y
n
e
a
v
e
n
u
e
b
o
n
i
t
a
d
r
b
a
y
d
r
i
v
e
normandy drive
71 st str
e
e
t
i
n
d
i
a
n
c
r
e
e
k
d
r
g
a
r
y
a
v
e
n
u
e
raymond st
bruce street
b
i
s
c
a
y
n
e
b
a
y
t A t U m W
A
te RW
A
y
oc
e
a
n
t
e
r
r
a
c
e
at
l
a
n
t
i
c
o
c
e
a
n
77th street
74th street
73rd street
72nd street
71st street
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
77th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
71st street
by
r
o
n
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
oceAn teRRAce neigHBoRHooD
| YOUTH CENTER TO BANDSHELL [PROPOSED CONNECTION]4
4
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 33garcia-pons+associates
72nD stReet Lot + Harding [LooKing noRtH] collins + 72nD stReet [LooKing noRtH]
72nD stReet Lot + ABBot [LooKing West] 73RD stReet + 72nD stReet Lot entRAnce [LooKing soUtH]
| yoUtH centeR to BAnDsHeLL
STREETSCAPE CONDITIONS [EXISTING]
4
72nD stReet Lot + Harding [LooKing West]
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 35garcia-pons+associates
Mid-term Improvements
In the near future, on-demand car sharing and transit
use are anticipated to increase. A balanced mix of
transportation options, including efficient buses,
a connected bike network, walkable streets and a
connected street network for cars will further decrease
the need for abundant parking at all hours. Self-driving
vehicles may also further change the mobility needs of
the community.
A parking strategy that accommodates current and
future demand should be developed. The plan should
balance on-street and off-street options, and provide
for easy access and efficient use of space. The City
can also require new development projects to prepare
and implement a transportation demand management
plan to reduce parking demand and greenhouse gas
72 nd Street
Coll
i
n
s
A
v
e
n
u
e
a
b
e
f
h
emissions. These development standards and rules
can reduce Vehicle Miles Traveled (VMT) and promote
transit, car sharing, bicycle parking, and other VMT-
reduction strategies.
As mobility options improve, and fewer parking spaces
are required, the remaining spaces can be converted into
additional green space, creating a complete public space
within the Town Center. With improved pedestrian,
cyclist, and trolley/transit facilities, on-street parking,
smaller surface lots will provide ample parking options
to meet existing demand, while encouraging foot traffic.
A bus transfer station could also be created using a small
footprint within the parking lot. Such a facility could
further encourage the use of mass transit over cars.
Mid-term Improvements
North Beach Master Plan Report | August 30 [2.70]DRAFT
73 rd Street
Ab
b
o
t
t
A
v
e
n
u
e
General Recommendations
Commercial kiosks activate the public space
An all-wheels skate park offers an amenity
to the neighborhood
A recreational field can be used for a variety
of sports including soccer
A civic use such as a library, community
center or other, further builds on the public
uses on the adjacent blocks
Green space serving the surrounding
businesses and residences
Compatible new buildings face the street
and locates parking in the rear
Street trees enhance the pedestrian
environment
Convert Collins Avenue to two-way traffic;
include a dedicated bus lane and on-street
parking
a
b
c
c
d
d
e
f
g
hg
Coll
i
n
s
A
v
e
n
u
e
72 nd Street
73 rd Street
Long-term possibilities
Long-term
Possibilities
Someday, the city might
also consider the option of
constructing a mixed-use parking
garage, with retail, commercial,
and office or residential units
lining the garage on all sides. The
scenario illustrated here holds
open the option of building a
public parking garage as a last
resort, in the distant future,
should it ever actually prove
necessary.
N
N
Chapter 2 | Five Big Ideas [2.71]DRAFT DRAFT
PLAN nobe [ADOPTED]
| yoUtH centeR to BAnDsHeLL4
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 36garcia-pons+associates
A B
C D
72nd street municipal complex feasibility study [ONGOING CITY INITIATIVE]
| yoUtH centeR to BAnDsHeLL4
STATUS: IN COMMITTEE REVIEW
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 37garcia-pons+associates
PROPOSED STREETSCAPE CONDITIONS
miXeD Use
PARKing stRUctURe
[ongoing city initiAtiVe]
[ongoing city initiAtiVe]
mULti-Use FieLD PLAygRoUnD
| yoUtH centeR to BAnDsHeLL4
[ongoing city initiAtiVe]
integRAteD stReetscAPe +
ALL WHeeLs PARK oR PLAZA
[PRoPoseD connection]
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 38garcia-pons+associates
POTENTIAL character imagery | MULTI-USE FIELD + PLAYGROUND
[ongoing city initiAtiVe]
mULti-Use FieLD
[ongoing city initiAtiVe]
integRAteD stReetscAPe +
ALL WHeeLs PARK oR PLAZA
| yoUtH centeR to BAnDsHeLL4
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 39garcia-pons+associates
POTENTIAL character imagery | PLAZA
miXeD-Use
PARKing stRUctURe
[ongoing city initiAtiVe]
integRAteD stReetscAPe +
ALL WHeeLs PARK oR PLAZA
[ongoing city initiAtiVe]
| yoUtH centeR to BAnDsHeLL4
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 40garcia-pons+associates
eXIstING ProPoseD
VISUALIZATION @ COLLINS & 72ND LOOKING NORTH [PROPOSED]
| yoUtH centeR to BAnDsHeLL4
[ongoing city initiAtiVe]
integRAteD stReetscAPe +
PARK / PLAZA imPRoVements
oceAn teRRAce neigHBoRHooD
[PRoPoseD connection]
cRossWALK + RoADWAy
HARDscAPe imPRoVements
[PRoPoseD connection]
HARDscAPe imPRoVements
[mUst Be cooRDinAteD WitH fdot][mUst Be cooRDinAteD WitH fdot]
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 41garcia-pons+associates
oceAn teRRAce neigHBoRHooD
| 74th STREET [PROPOSED CONNECTION]
5
75th street
76th street
by
ro
n
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
w
a
y
n
e
a
v
e
n
u
e
b
o
n
i
t
a
d
r
b
a
y
d
r
i
v
e
normandy drive
71 st str
e
e
t
i
n
d
i
a
n
c
r
e
e
k
d
r
g
a
r
y
a
v
e
n
u
e
raymond st
bruce street
b
i
s
c
a
y
n
e
b
a
y
t A t U m W
A
te RW
A
y
oc
e
a
n
t
e
r
r
a
c
e
at
l
a
n
t
i
c
o
c
e
a
n
77th street
74th street
73rd street
72nd street
71st street
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
77th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
71st street
by
r
o
n
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
5
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 42garcia-pons+associates
74tH stReet + cARLyLe AVenUe [LooKing West]
STREETSCAPE CONDITIONS [EXISTING]
74tH stReet + Lot ALLey [LooKing West]
74tH stReet + ByRon AVenUe [LooKing eAst]
74tH stReet + ByRon AVenUe [LooKing West]
74tH stReet + cARLyLe AVenUe [LooKing West]
| 74th stReet
74tH street
5
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 43garcia-pons+associates
74tH street
STREETSCAPE IMPROVEMENTS [CONCEPT]
| 74th stReet5
PoteNtIAl PArKING IMPAct
eXiSting: +/- 33 SPaceS (ParaLLeL)
+/- 53 SPaceS (diagonaL)
ProPoSed: +/- 66 SPaceS (ParaLLeL)
PotentiaL redUction oF +/- 20 SPaceS
PoteNtIAl tree cANoPY IMPAct
eXiSting: +/- 0 Street treeS
ProPoSed: +/- 40 Street treeS
PotentiaL increa Se oF +/- 40 treeS
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 44garcia-pons+associates
75tH stReet + DicKens AVenUe [LooKing eAst]
75tH stReet + DicKens AVenUe [LooKing eAst]
75tH stReet + ByRon AVenUe [LooKing eAst]
STREETSCAPE CONDITIONS [EXISTING]
75tH street
| 75th stReet6
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 45garcia-pons+associates
75tH street
STREETSCAPE IMPROVEMENTS [CONCEPT]
| 75th stReet6
PoteNtIAl PArKING IMPAct
no change in ParKing SPaceS
PoteNtIAl tree cANoPY IMPAct
eXiSting: +/- 0 Street treeS
ProPoSed: +/- 48 Street treeS
PotentiaL increa Se oF +/- 48 treeS
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 46garcia-pons+associates
oceAn teRRAce neigHBoRHooD
75th street
76th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
by
r
o
n
a
v
e
n
u
e
by
ro
n
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
w
a
y
n
e
a
v
e
n
u
e
b
o
n
i
t
a
d
r
b
a
y
d
r
i
v
e
normandy drive
71 st str
e
e
t
i
n
d
i
a
n
c
r
e
e
k
d
r
g
a
r
y
a
v
e
n
u
e
raymond st
bruce street
b
i
s
c
a
y
n
e
b
a
y
t A t U m W
A
te RW
A
y
oc
e
a
n
t
e
r
r
a
c
e
at
l
a
n
t
i
c
o
c
e
a
n
77th street
74th street
73rd street
72nd street
71st street
ca
r
l
y
l
e
a
v
e
n
u
e
di
c
k
e
n
s
a
v
e
n
u
e
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
77th street
co
l
l
i
n
s
a
v
e
n
u
e
ha
r
d
i
n
g
a
v
e
n
u
e
ab
b
o
t
t
a
v
e
n
u
e
71st street
by
r
o
n
a
v
e
n
u
e
ca
r
l
y
l
e
a
v
e
n
u
e
7
8
9
ONGOING CITY INITIATIVES*
10
ocean terrace
72nd Street*
73rd Street*
tatUM WaterWaY
Shared USe Path*
LibrarY & ParKing Lot
bYron aVenUe*
coLLinS aVenUe
nSYc to bandSheLL
9
8
7
10
74th Street
75th Street
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 60garcia-pons+associates
oceAn teRRAce RecommenDAtions
VISUALIZATION OF OCEAN TERRACE NEIGHBORHOOD
OCEAN TERRACE NORTH MIAMI BEACH 2018 PREPARED BY
TROPICAL ALCHEMY 61garcia-pons+associates
than K YoU!
coorDINAtIoN AMoNGst cItY of MIAMI beAch PlANNING, hIstorIc PreserVAtIoN, PArKING, & trANsPortAtIoN DePArtMeNts
AND the florIDA DePArtMeNt of trANsPortAtIoN
NeXt stePs