Loading...
Resolution 2018-30519 RESOLUTION NO. 2018-30519 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING AND AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AMENDMENT NO. 5 TO THE DESIGN-BUILD AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA, AND LANZO CONSTRUCTION CO., FLORIDA, FOR DESIGN-BUILD SERVICES FOR NEIGHBORHOOD NO. 13: PALM AND HIBISCUS ISLANDS RIGHT-OF-WAY INFRASTRUCTURE IMPROVEMENTS; THE AMENDMENT INCLUDES ADDITIONAL DESIGN SERVICES AND CONSTRUCTION ASSOCIATED WITH NEW DRAINAGE POLICY; FOR INSTALLATION OF ADDITIONAL DRAINS IN PRIVATE PROPERTIES WITH FINISH FLOOR ELEVATION LESS THAN THE CROWN OF THE ROAD, IN THE AMOUNT OF $775,000, PLUS AN OWNER'S CONTINGENCY IN THE AMOUNT OF $77,500, FOR THE TOTAL NOT-TO-EXCEED AMOUNT OF $852,500, SUBJECT TO FY 18/19 CAPITAL BUDGET AMENDMENT. WHEREAS, on July 17, 2013, the Mayor and City Commission approved negotiations with Lanzo Construction Co., Florida (Lanzo) pursuant to Request for Qualifications (RFQ) No. 251- 2013TC, for Design-Build Services for Neighborhood No. 13: Palm and Hibiscus Islands Right- of-Way Infrastructure Improvement Project; and WHEREAS, on February 12, 2014, the Mayor and City Commission approved the recommendation by the Mayor's Blue Ribbon Panel on Flooding and Sea Level Rise and the Flooding Mitigation Committee to amend the City's Stormwater Management Master Plan by modifying the design criteria for the tailwater elevation and adopted an elevation of 2.7 ft-NAVD for all tidal boundary conditions; and WHEREAS, the City's Public Works Department (PWD) requested to implement the enhanced stormwater system criteria ; and WHEREAS, on September 18, 2014, the City negotiated Design and Pre-Construction Services (Phase 1) with Lanzo, in the lump sum amount of $599,464, based on the Design Criteria Package (DCP) included in the original solicitation; and WHEREAS, on November 19, 2014, the Mayor and City Commission adopted Resolution No. 2015-28852 approving Amendment No.1 in the amount of $251,016, which included additional design services, associated with the adopted enhanced stormwater criteria, bringing the total contract amount to $850,480; and WHEREAS,on October 14, 2015,the Mayor and City Commission adopted Resolution No. 2015-29178 approving Amendment No.2 in the amount of $73,240, incorporating additional design services required to meet the revised City Landscape ordinance, comments from the Home Owners Association and the Fire and Public Works Department's changes in the criteria related to the placement of Florida Power and Light (FPL) transformers within City's Right-of-Way; and WHEREAS, on December 9, 2015, the Mayor and City Commission adopted Resolution No. 2015-29643 approving Amendment No.3 for Phase 2 -construction services for the Palm and Hibiscus Islands Right of Way Infrastructure Improvement Project in the Guaranteed Maximum Price (GMP) of $36,500,000, plus a $2 million owner's contingency ; and WHEREAS, on July 21, 2016 Change Order No.1 in the amount of$313,905.06 was issued from the approved contingency funds for additional watermain installation and to supply and maintain temporary pumps to mitigate king tides on Palm and Hibiscus Islands and WHEREAS, on April 26, 2017, the Mayor and City Commission adopted Resolution No. 2017-29840, reaffirming a commitment to the design and implementation of a stormwater system with sufficient capacity to handle both public and private stormwater runoff into the City's system and directed the administration to develop a policy and engineering solution for private property owners to connect to the City's municipal stormwater system; and WHEREAS, as a result of the Commission's directive (Resolution No. 2017-29840) and in order to accommodate the new elevated roads in the Palm and Hibiscus neighborhood, on April 4, 2018, the Public Works Department directed the implementation of a new drainage policy for this project; and WHEREAS, the new drainage policy requires that any property with a Finish Floor Elevation (FFE) at or below the new crown of the road may receive a yard drain/catch basin inside the private property and associated harmonization. The property owners must execute a license agreement with the City allowing access to their property for the installation of the drain, harmonization and any other required work ; and WHEREAS, on July 25, 2018, the Mayor and City Commission adopted Resolution No. 2018-30444 authorizing the City Manager to negotiate and execute Amendment No.4 in the not-to-exceed amount of $1,951,208, plus a $195,121 owner's contingency for the Design, Permitting and Installation of Auxiliary Power Generators for the three(3)Stormwater Pumps Stations on Palm and Hibiscus Islands. WHEREAS, Staff negotiated Amendment No. 4 in the amount of$1,900,000; and WHEREAS, the Administration has negotiated and is processing Change Order No. 2 in the amount of$686,094.94 for work associated with additional services related to the force main replacement; additional water main valves; relocation of stormwater pipe to salvage existing trees; installation of five (5) additional water meters; relocation of two (2) fire hydrants; inspection and cleaning of existing outfalls; installation of empty conduits for future utilities undergrounding; additional temporary pavement; Hurricane Irma impacts; associated general conditions and other miscellaneous work; and WHEREAS, Change Order No. 2 also accounted for credits related to scope of work reductions in street lighting, speed tables and road width reduction along North and South Coconut Lanes and is being funded through the contract's current contingency; and WHEREAS, this Amendment No. 5 will include additional design, permitting and construction services associated with the new drainage policy; the work includes installation of a yard drain and connection to the City's drainage system,the work includes harmonization and restoration within the private property to its original or better condition; and WHEREAS, the Design-Builder submitted a proposal in the not to exceed amount of $775,000, which includes, $675,000 for the implementation of the new drainage policy(including: Cost of the Work, General Conditions Lump Sum Costs, General Allowance, and Design-Builder's Fee), and a Specific Allowance in the amount of$100,000 for certain required tasks, which level of effort is unknown and approval of a 10% owner's contingency in the amount of$77,500; and WHEREAS, this Amendment No. 5 in the amount of $775,000, will revise the total contract in the not to exceed amount of$40,175,000; and WHEREAS, on October 17, 2018, the Mayor and City Commission approved the execution of Amendment No. 5. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission approve and authorize the Mayor and City Clerk to execute Amendment No. 5 to the Design-Build Agreement between the City of Miami Beach, Florida, and Lanzo Construction Co., Florida, for Design-Build services for Neighborhood No. 13: Palm and Hibiscus Islands Right-of-Way Infrastructure Improvements; the amendment includes additional design services and construction associated with new drainage policy; installation of additional drains in private properties with finish floor elevation less than the crown of the road, in the amount of $775,000, plus an owner's contingency in the amount of $77,500, for the total not-to-exceed amount of $852,500, subject to FY 18/19 Capital Budget Amendment. PASSED and ADOPTED this )T day of OCI-o be( , 2018. Dan Gelber,'Tarr ATTEST: APPROVED AS TO �CSh�6�k FORM &LANGUAGE Rafael E. Granada, City Clerk' &FOR EXECUTION ... .E./qN r IN R Io4 ti C r ,.