Loading...
Contract with Metro Express Inc. ca a r7/2S113 CONTRACT THIS IS A CONTRACT, by and between the City of Miami Beach, a municipal corporation of the State of Florida ("City"), and Metro Express Inc. ("Contractor"). W I T N E S S ET H, that Contractor and City, for the considerations hereinafter named, agree as follows: ARTICLE 1 SCOPE OF WORK Contractor hereby agrees to furnish all of the labor, materials, equipment, services and incidentals necessary to perform all of the Work described in the Contract Documents, including Exhibit D-Supplemental Terms and Conditions, and any Contractor Service Order issued to Contractor for any Project hereunder, and shall perform all Work in accordance with the requirements of the Contract Documents, for the following catagories: Concrete Curbside/Sidewalk Construction ARTICLE 2 CONTRACT TIME 2.1 This contract shall remain in effect for two (2) years from date of contract execution by the Mayor and City Clerk. The City of Miami Beach has the option to renew the contract, at the sole discretion of the City Manager, for three (3) renewal periods of one (1) year each. 2.2 Contractor shall commence the Work upon written notice to proceed in the form of a Purchase Order issued by the City, and a Contractor Service Order signed by either the City Manager or the Department Director ordering the Work , specifying the specific tasks to be performed by the Contractor for any Project. A separate Contractor Service Order shall be required prior to commencement of any Work on any Project. Contractor shall commence scheduling activities, permit applications and other preconstruction work within five (5) calendar days after receipt of Purchase Order, which date shall establish the Project Initiation Date. The Purchase Order will not be issued until Contractor's submission to City of all required documents (including but limited to: Payment and Performance Bonds, and Insurance Certificate) and after execution of the Contract by both parties. Contractor shall have no entitlement to perform (or be compensated for) any Work under this Agreement, unless such Work is authorized, at the City's sole discretion, by a Contractor Service Order. 2.2.1. The receipt of all necessary permits by Contractor and acceptance of the full progress schedule in accordance with technical specifications section, submittal schedule and schedule of values is a condition precedent to mobilize on any Project site and commence with physical construction of the work. ITB-2018-033-ND Page 1 2.3 Time is of the essence throughout this Contract. Unless otherwise specified in a Contractor Service Order, any project awarded to the Contractor pursuant to this Agreement shall be substantially completed within thirty (30) calendar days from the issuance of the City-approved Contractor Service Order ("Contractor Service Order") or accompanying Purchase Order (whichever is later), or as otherwise specified in the Contractor Service Order, and completed and ready for final payment in accordance with Article 4 within thirty (30) calendar days from the date determined by Consultant or the City as the date of Substantial Completion. 2.4 Unless otherwise specified in a Contractor Service Order for any particular Project, upon failure of Contractor to substantially complete the Work within the time specified for Substantial Completion in any Contractor Service Order, plus any approved time extensions, Contractor shall pay to City the sum of one hundred dollars ($100.00) for each calendar day of delay in achieving Substantial Completion. Contractor acknowledges and agrees that the foregoing amounts are not penalties but are liquidated damages to City for its inability to obtain full beneficial occupancy and/or use of the Project. Unless otherwise specified in a Contractor Service Order, liquidated damages are hereby fixed and agreed upon between the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by City as a consequence of such delay, and both parties desiring to obviate any question of dispute concerning the amount of said damages and the cost and effect of the failure of Contractor to complete the Contract on time. City is authorized to deduct liquidated damages from monies due to Contractor for the Work under this Contract or as much thereof as City may, in its sole discretion, deem just and reasonable. 2.5 Contractor shall be responsible for reimbursing City, in addition to liquidated damages, for all costs incurred by Consultant in administering the construction of the Project beyond the completion date specified above, plus approved time extensions. Consultant construction administration costs shall be pursuant to the contract between City and Consultant, a copy of which is available upon request of the Contract Administrator. All such costs shall be deducted from the monies due Contractor for performance of Work under this Contract by means of unilateral credit change orders issued by City as costs are incurred by Consultant and agreed to by City. ARTICLE 3 ASSIGNMENT OF WORK AND COMPENSATION 3.1 PUSH BUTTON AWARD When Work is identified by a City representative, the Contractor who provides all services needed and is the lowest for the project based on prices submitted in Appendix E, Cost Proposal Form, will be selected to complete the Work. 3.1.1 For projects with an estimated cost up to the amount specified in City Procedure PO16.02, Threshold Category 1 (currently $10,000 or as amended), ITB-2018-033-ND Page 2 the project/contract manager may select the contractor deemed to be best qualified. 3.1.2 For projects with an estimated cost exceeding the amount specified in City Procedure PO16.02, Threshold Category 1 (currently $10,000 or as amended), the project/contract manager shall solicit three quotes. Following the determination of the best quote, in the Department's Director sole discretion, a Contractor Service Order shall be executed for the project, , prior to issuing a Purchase Order. The City Manager's approval, along with a justification, is also required when the contractor offering the lowest cost is not selected. 3.1.3 For projects $50,000 or greater, the City Manager's approval is required and a Contractor Service Order shall be executed for the project. The City Manager's approval, along with a justification, is also required when the contractor offering the lowest cost is not selected. 3.1.4 Contractor shall be instructed to commence the Work by written instructions as further detailed in Section 2.2. Contractor shall commence scheduling activities, permit applications and other preconstruction work within five (5) calendar days after receipt of Purchase Order, which date shall establish the Project Initiation Date. 3.2 ADDITIONAL SERVICES The City anticipates that a significant portion of the projects awarded pursuant to any continuing services agreement resulting from this ITB shall be completed in accordance with the prices established through the ITB. The City recognizes that there may be instances when the need for services in addition to those stipulated herein shall arise to complement or complete a project awarded pursuant to the established line items. In those cases, the City may negotiate with the Contractor on a mutually agreeable price for the additional services based on available industry pricing. The approval of the City Manager shall be required for any additional services exceeding a project aggregate of $50,000. The following items may not be purchased as additional services: a. design services exceeding $35,000; b. electrical services exceeding $75,000; c. any non-contract construction work exceeding a cost of$300,000. 3.3 PERFORMANCE AND PAYMENT BOND The City will require a performance and payment bond for any project in excess of $200,000. Within ten (10) calendar days of City execution of the Contractor Service Order, Contractor shall furnish a Performance Bond and a Payment Bond containing all the provisions of the Performance Bond and Payment Bond attached hereto as forms 00710 and 00720. 3.3.1 Each Bond shall be in the amount of one hundred percent (100%) of the Contractor Service Order, guaranteeing to City the completion and performance of the work covered in such Contract as well as full payment of all suppliers, laborers, or subcontractors employed pursuant to this Project. The City may accept a Performance Bond and Payment Bond from a surety company which has twice the minimum surplus and capital required by the Florida Insurance Code at the time the invitation to bid is issued, if the surety company is otherwise ITB-2018-033-ND Page 3 in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a currently valid certificate of authority issued by the United States Department of the Treasury under Section 9304 to 9308 of Title 31 of the United States Code, as may be amended from time to time. The Certificate and Affidavit so certifying (Form 00722) should be submitted with the Bid Bond and also with the Performance Bond and Payment Bond. 3.3.2 Each Bond shall continue in effect for one year after Final Completion and acceptance of the work with liability equal to one hundred percent (100%) of the Contract sum, or an additional bond shall be conditioned that Contractor will, upon notification by City, correct any defective or faulty work or materials which appear within one year after Final Completion of the Contract. 3.3.3 Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time to time, Contractor shall ensure that the bond(s) referenced above shall be recorded in the public records of Miami-Dade County and provide City with evidence of such recording. 3.3.4 Alternate Form of Security: In lieu of a Performance Bond and a Payment Bond, Contractor may furnish alternate forms of security which may be in the form of cash, money order, certified check, cashier's check or unconditional letter of credit in the form attached hereto as Form 00735. Such alternate forms of security shall be subject to the prior approval of City and for same purpose and shall be subject to the same conditions as those applicable above and shall be held by City for one year after completion and acceptance of the Work. 3.4 QUALIFICATION OF SURETY 3.4.1. Each bond must be executed by a surety company of recognized standing, authorized to do business in the State of Florida as surety, having a resident agent in the State of Florida and having been in business with a record of successful continuous operation for at least five (5) years. 3.4.2. The surety company shall hold a current certificate of authority as acceptable surety on federal bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation set forth in the circular, in order to qualify, the net retention of the surety company shall not exceed the underwriting limitation in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with Treasury Circular 297, revised September 1, 1978 (31 DFR Section 223.10, Section 223.111). Further, the surety company shall provide City with evidence satisfactory to City, that such excess risk has been, protected in an acceptable manner. 3.4.3. The City will accept a surety bond from a company with a rating of B+ or better for bonds up to $2 million, provided, however, that if any surety company appears on the watch list that is published quarterly by Intercom of the Office of the Florida Insurance Commissioner, the City shall review and either accept or reject the surety company based on the financial information available to the City. ITB-2018-033-ND Page 4 A surety company that is rejected by the City may be substituted by the Bidder or proposer with a surety company acceptable to the City, only if the bid amount does not increase. The following sets forth, in general, the acceptable parameters for bonds: Policy- Financial holder's Size Amount of Bond Ratings Category 500,001 to 1,000,000 B+ Class I 1,000,001 to 2,000,000 B+ Class II 2,000,001 to 5,000,000 A Class III 5,000,001 to 10,000,000 A Class IV 10,000,001 to 25,000,000 A Class V 25,000,001 to 50,000,000 A Class VI 50,000,001 or more A Class VII 3.5. The City may accept a Bid Bond, Performance Bond and Payment Bond from a surety company that is in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a currently valid certificate of authority issued by the United States Department of the Treasury under Section 9304 to 9308 of Title 31 of the United States Code, as may be amended from time to time. The Certificate and Affidavit so certifying (Form 00722) should be submitted with the Bid Bond and also with the Performance Bond and Payment Bond. 3.6. More stringent requirements of any grantor agency are set forth within the Supplemental Conditions. If there are no more stringent requirements, the provisions of this section shall apply. 3.7 PROGRESS PAYMENTS Contractor may make Application for Payment for work completed during the Project at intervals of not more than once a month. Contractor's application shall show a complete breakdown of the Project components, the quantities completed and the amount due, together with such supporting evidence as may be required by Consultant. Contractor shall include, but same shall be limited to, at Consultant's discretion, with each Application for Payment, an updated progress schedule acceptable to Consultant as required by the Contract Documents and a release of liens and consent of surety relative to the work which is the subject of the Application. Each Application for Payment shall be submitted in triplicate to Consultant for approval. Upon submission of an acceptable updated progress schedule and the other documents required herein along with the application for payment, City shall make payment to Contractor with respect to approved Applications for Payment, less retainage as herein provided for and/or withholding of any other amounts pursuant to the Contract Documents, within twenty-five (25) days in accordance with Section 218.735 of the Florida Statutes. 3.8. At the City's discretion, if specified in a Contractor Service Order, ten percent (10%) of all monies earned by Contractor may be retained by City until Final Completion and acceptance by City in accordance with Article 4 hereof, except that after fifty percent (50%) of the Work has been completed, the Contract Administrator shall reduce the retainage to five percent (5%) of all monies previously earned and all monies earned thereafter. Any additional reduction in retainage shall be in the sole discretion of the City Manager or applicable Department Director provided that Contractor shall have no ITB-2018-033-ND Page 5 entitlement to a reduction. Any interest earned on retainage shall accrue to the benefit of City. All requests for retainage reduction in writing in a separate stand-alone document from monthly applications for payment. 3.9 City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 3.9.1 Defective work not remedied. 3.9.2 Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or City because of Contractor's performance. 3.9.3 Failure of Contractor to make payments properly to Subcontractors or for material or labor. 3.9.4 Damage to another contractor not remedied. 3.9.5 Liquidated damages and costs incurred by Consultant for extended construction administration. 3.9.6 Failure of Contractor to provide any and all documents required by the Contract Documents. When the above grounds are removed or resolved satisfactory to the Contract Administrator, payment shall be made in whole or in part. ARTICLE 4 ACCEPTANCE AND FINAL PAYMENT 4.1 Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance, City shall, within ten (10) calendar days, make an inspection thereof. If City and Contract Administrator find the Work acceptable, the requisite documents have been submitted and the requirements of the Contract Documents fully satisfied, and all conditions of the permits and regulatory agencies have been met, a final payment shall be made by the City. The acceptance of final payment shall constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the General Conditions and identified by Contractor as unsettled at the time of the application for final payment. ARTICLE 5 MISCELLANEOUS 5.1 A. The term "Contract Documents" as referenced herein shall include "Contract Documents" shall mean this Contract (together with all exhibits, addenda, Contractor Service Orders and written amendments issued thereto), and all Design Documents and Construction Documents. The Contract Documents shall also include, without limitation ITR-2018-033-ND Page 6 (together with all exhibits, addenda, and written amendments issued thereto), the Invitation to Bid (ITB), instructions to bidders, bid form, bid bond, surety payment bond and performance bond, Special Conditions, and Contractor's response to the ITB. The requirements of the Contract Documents, as such term is defined herein, are hereby incorporated by reference as if fully set forth herein. This Contract is part of, and incorporated in, the Contract Documents. Accordingly, all of the documents incorporated by the Contract Documents shall govern any Contractor Service Order issued under this Contract. B. The term "Work" as used herein shall mean all labor, materials, equipment, supplies, tools, machinery, utilities, fabrication, transportation, insurance, bonds, permits and conditions thereof, building code changes and government approvals, licenses, tests, quality assurance and/or quality control inspections and related certifications, surveys, studies, and other items, work and services that are necessary or appropriate for the total construction, installation, and functioning of the Project specified in any Contractor Service Order, together with all additional, collateral and incidental items, and work and services required for delivery of a completed, fully functional and functioning Project as set forth in the Contract Documents. 5.2 Where there is a conflict between any provision set forth within the Contract Documents and a more stringent provision elsewhere in the Contract Documents or under any applicable law, regulation, statute or code requirement which is applicable to this Project, the more stringent provision shall prevail and govern the performance of the Work. 5.3 Public Entity Crimes In accordance with the Public Crimes Act, Section 287.133, Florida Statutes, a person or affiliate who is a contractor, consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with the City, and may not transact any business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for category two purchases for a period of 36 months from the date of being placed on the convicted vendor list. Violation of this section by Contractor shall result in cancellation of the City purchase and may result in Contractor debarment. 5.4 Independent Contractor Contractor is an independent contractor under this Contract. Services provided by Contractor pursuant to this Contract shall be subject to the supervision of Contractor. In providing such services, neither Contractor nor its agents shall act as officers, employees, or agents of the City. This Contract shall not constitute or make the parties a partnership or joint venture. 5.5 Third Party Beneficiaries Neither Contractor nor City intends to directly or substantially benefit a third party by this Contract. Therefore, the parties agree that there are no third party beneficiaries to this ITB-2018-033-ND Page 7 Contract and that no third party shall be entitled to assert a claim against either of them based upon this Contract. The parties expressly acknowledge that it is not their intent to create any rights or obligations in any third person or entity under this Contract. 5.6 Notices Whenever either party desires to give notice to the other, such notice must be in writing, sent by certified United States Mail, postage prepaid, return receipt requested, or by hand-delivery with a request for a written receipt of acknowledgment of delivery, addressed to the party for whom it is intended at the place last specified. The place for giving notice shall remain the same as set forth herein until changed in writing in the manner provided in this section. For the present, the parties designate the following: For City: Matthew LePera City of Miami Beach Public Works Streets Department 1700 Convention Center Drive, 3rd Floor Miami Beach, Florida 33139 Phone:305-673-7000 ext. 6828 Email: matthewlepera(a)miamibeachfl.gov With copies to: City Attorney • City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 For Contractor: Metro Express Inc. 9442 NW 109 Street Medley, FL. 33178 Attn: Ernesto Feliciano Phone: 305-885-1330 E-mail: efi600(Eyahoo.com 5.7 Assignment and Performance Neither this Contract nor any interest herein shall be assigned, transferred, or encumbered by either party. In addition, Contractor shall not subcontract any portion of the work required by this Contract except as authorized by Section 23 of the General Conditions. Contractor represents that all persons delivering the services required by this Contract have the knowledge and skills, either by training, experience, education, or a combination thereof, to adequately and competently perform the duties, obligations, and services set forth in the Scope of Work and to provide and perform such services to City's satisfaction for the agreed compensation. ITB-2018-033-ND Page 8 Contractor shall perform its duties, obligations, and services under this Contract in a skillful and respectable manner. The quality of Contractor's performance and all interim and final product(s) provided to or on behalf of City shall be comparable to the best local and national standards. 5.8 Materiality and Waiver of Breach City and Contractor agree that each requirement, duty, and obligation set forth in these Contract Documents is substantial and important to the formation of this Contract and, therefore, is a material term hereof. City's failure to enforce any provision of this Contract shall not be deemed a waiver of such provision or modification of this Contract. A waiver of any breach of a provision of this Contract shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Contract. 5.9 Severance In the event a portion of this Contract is found by a court of competent jurisdiction to be invalid, the remaining provisions shall continue to be effective unless City or Contractor elects to terminate this Contract. An election to terminate this Contract based upon this provision shall be made within seven (7) days after the finding by the court becomes final. 5.10 Applicable Law and Venue This Contract shall be enforceable in Miami-Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein exclusive venue for the enforcement of same shall lie in Miami-Dade County, Florida. By entering into this Contract, Contractor and City hereby expressly waive any rights either party may have to a trial by jury of any civil litigation related to, or arising out of the Project. Contractor shall specifically bind all subcontractors to the provisions of this Contract. 5.11 Amendments No modification, amendment, or alteration in the terms or conditions contained herein shall be effective unless contained in a written document prepared with the same or similar formality as this Contract and executed by the City and Contractor. 5.12 Prior Agreements This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, and understandings applicable to the matters contained herein and the parties agree that there are no commitments, agreements or understandings concerning the subject matter of this Contract that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements, whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or ITB-2018-033-ND Page 9 conditions contained herein shall be effective unless set forth in writing in accordance with Section 5.11 above. 5.13 Indemnification Contractor shah indemnify and hold harmless City, its officers, agents, directors, and employees, from liabilities, damages, losses, and costs, including, but not limited to reasonable attorneys fees, to the extent caused by the negligence, recklessness or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of this Agreement. Except as specifically provided herein, this Agreement does not require Contractor to indemnify City, its employees, officers, directors, or agents from any liability, damage, loss, claim, action, or proceeding. These indemnifications shall survive the term of this Agreement. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Contractor shall, upon written notice from City, resist and defend such action or proceeding by counsel satisfactory to City. The indemnification provided above shall obligate Contractor to defend at its own expense to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at City's option, any and all claims of liability and all suits and actions of every name and description covered by Section 5.1 above which may be brought against City whether performed by Contractor, or persons employed or utilized by Contractor. 5.14 Inspection of Work Consultant and City shall at all times have access to the Work, and Contractor shall provide proper facilities for such access and for inspecting, measuring and testing. 5.14.1 Should the Contract Documents, Consultant's instructions, any laws, ordinances, or any public authority require any of the Work to be specially tested or approved, Contractor shall give Consultant timely notice of readiness of the Work for testing. If the testing or approval is to be made by an authority other than City, timely notice shall be given of the date fixed for such testing. Testing shall be made promptly, and, where practicable, at the source of supply. If any of the Work should be covered up without approval or consent of Consultant, it must, if required by Consultant, be uncovered for examination and properly restored at Contractor's expense. 5.14.2 Re-examination of any of the Work may be ordered by Consultant with prior written approval by the Contract Administrator, and if so ordered, the Work must be uncovered by Contractor. If such Work is found to be in accordance with the Contract Documents, City shall pay the cost of reexamination and replacement by means of a Change Order. If such Work is not in accordance with the Contract Documents, Contractor shall pay such cost. Inspectors shall have no authority to permit deviations from, or to relax any of the provisions of, the Contract Documents or to delay the Contract by failure to inspect the materials and work with reasonable promptness without the written permission or instruction of Consultant. ITB-2018-033-ND Page 10 The payment of any compensation, whatever may be its character or form, or the giving of any gratuity or the granting of any favor by Contractor to any inspector, directly or indirectly, is strictly prohibited, and any such act on the part of Contractor will constitute a breach of this Contract. 5.15 Termination Termination for Convenience. In addition to other rights the City may have at law and pursuant to the Contract Documents with respect to cancellation and termination of the Agreement, the City may, in its sole discretion, terminate for the City's convenience the performance of Work under this Agreement, in whole or in part, at any time upon written notice to the Contractor. The City shall effectuate such Termination for Convenience by delivering to the Contractor a Notice of Termination for Convenience, specifying the applicable scope and effective date of termination, which termination shall be deemed operative as of the effective date specified therein without any further written notices from the City required. Such Termination for Convenience shall not be deemed a breach of the Agreement, and may be issued by the City with or without cause. 5.15.1 Upon receipt of such Notice of Termination for Convenience from the City, and except as otherwise directed by the City, the Contractor shall immediately proceed with the following obligations, regardless of any delay in determining or adjusting any amounts due under this Section 5.15: i. Stop the Work specified as terminated in the Notice of Termination for Convenience; ii. Promptly notify all Subcontractors of such termination, cancel all contracts and purchase orders to the extent they relate to the Work terminated to the fullest extent possible and take such other actions as are necessary to minimize demobilization and termination costs for such cancellations; iii. Immediately deliver to the City all Project records, in their original/native electronic format (i.e. CAD, Word, Excel, etc.), any and all other unfinished documents, and any and all warranties and guaranties for Work, equipment or materials already installed or purchased; iv. If specifically directed by the City in writing, assign to the City all right, title and interest of Contractor under any contract, subcontract and/or purchase order, in which case the City shall have the right and obligation to settle or to pay any outstanding claims arising from said contracts, subcontracts or purchase orders; v. Place no further subcontracts or purchase orders for materials, services, or facilities, except as necessary to complete the portion of the Work not terminated (if any) under the Notice of Termination for Convenience; vi. As directed by the City, transfer title and deliver to the City (1) the fabricated and non-fabricated parts, Work in progress, completed ITB-2018-033-ND Page 11 Work, supplies and other material produced or required for the Work terminated; and (2) the completed or partially completed Project records that, if this Agreement had been completed, would be required to be furnished to the City; vii. Settle all outstanding liabilities and termination settlement proposals from the termination of any subcontracts or purchase orders, with the prior approval or ratification to the extent required by the City (if any); viii. Take any action that may be necessary, or that the City may direct, for the protection and preservation of the Project Site, including life safety and any property related to this Agreement that is in the Contractor's possession and in which the City has or may acquire an interest; and ix. Complete performance of the Work not terminated (if any). 5.15.2 Upon issuance of such Notice of Termination for Convenience, the Contractor shall only be entitled to payment for the Work satisfactorily performed up until the date of its receipt of such Notice of Termination for Convenience, but no later than the effective date specified therein. Payment for the Work satisfactorily performed shall be determined by the City in good faith, in accordance with the percent completion of the Work, less all amounts previously paid to the Contractor in approved Applications for Payment, the reasonable costs of demobilization and reasonable costs, if any, for canceling contracts and purchase orders with Subcontractors to the extent such costs are not reasonably avoidable by the Contractor. Contractor shall submit, for the City's review and consideration, a final termination payment proposal with substantiating documentation, including an updated Schedule of Values, within 30 days of the effective date of termination, unless extended in writing by the City upon request. Such termination amount shall be mutually agreed upon by the City and the Contractor and absent such agreement, the City shall, no less than fifteen (15) days prior to making final payment, provide the Contractor with written notice of the amount the City intends to pay to the Contractor. Such final payment so made to the Contractor shall be in full and final settlement for Work performed under this Agreement, except to the extent the Contractor disputes such amount in a written notice delivered to and received by the City prior to the City's tendering such final payment. 5.16 Termination of Agreement For Cause. The City, through the City Manager, may terminate this Agreement for cause, upon written notice to Contractor, in the event that the Contractor (1) violates any provision of this Agreement or performs same in bad faith; (2) unreasonably delays the performance of the Work or any portion thereof; or (3) does not perform the Work or any portion thereof in a timely and satisfactory manner. In the case of termination for cause by the City, the Contractor shall first be granted a fifteen (15) day cure period (commencing upon receipt of the initial written notice of default from the City). The following occurances shall be deemed sufficient grounds for termination for cause: ITB-2018-033-ND Page 12 5.16.1 Failing to make payments to Subcontractors or Suppliers for materials or labor in accordance with the respective Subcontracts and Purchase Orders; 5.16.2 Failing to perform any portion of the Work in a manner consistent with the requirements of the Contract Documents or within the time required therein; 5.16.3 Failing to perform the Work with sufficient manpower, workmen and equipment or with sufficient materials, with the effect of delaying the prosecution of the Work in accordance with the Project Schedule and/or delaying completion of any Work within the specified time; 5.16.4 Failing and/or refusing to remove, repair and/or replace any portion of the Work as may be rejected as defective or nonconforming with the terms and conditions of the Contract Documents; 5.16.5 A custodian, trustee or receiver is appointed for the Contractor, or the Contractor becomes insolvent or bankrupt, is generally not paying its debts as they become due or makes an assignment for the benefit of creditors, or the Contractor causes or suffers an order for relief to be entered with respect to it under applicable Federal bankruptcy law or applies for or consents to the appointment of a custodian, trustee or receiver for the Contractor, or bankruptcy, reorganization, arrangement or insolvency proceedings, or other proceedings for relief under any bankruptcy or similar law or laws for the relief of debtors, are instituted by or against the Contractor; 5.16.6 An indictment is issued against the Contractor; 5.16.7 Persistently disregarding laws, ordinances, or rules, regulations or orders of a public authority having jurisdiction; 5.16.8 Fraud, misrepresentation or material misstatement by Contractor in the course of obtaining this Agreement; 5.16.9 Failing to comply in any material respect with any of the terms of this Agreement or the other Contract Documents. Upon the issuance of a Notice of Termination for Cause, the Contractor shall: i. Immediately deliver to the City all Submittals and Project-related records in their original/native electronic format (i.e. CAD, Word, Excel, etc.), any and all other unfinished documents, and any and all warranties and guaranties for Work, equipment or materials already installed or purchased; ii. If specifically directed by the City in writing, assign to the City all right, title and interest of Contractor under any contract, subcontract and/or purchase order, in which case the City shall have the right and obligation to settle or to pay any outstanding claims arising from said contracts, subcontracts or purchase orders; ITB-2018-033-ND Page 13 iii. As directed by the City, transfer title and deliver to the City (1) the fabricated and non-fabricated parts, Work in progress, completed Work, supplies and other material produced or required for the Work terminated; and (2) the completed or partially completed Project records that, if this Agreement had been completed, would be required to be furnished to the City; and iv. Take any action that may be necessary, or that the City may direct, for the protection and preservation of the property related to this Agreement that is in the Contractor's possession and in which the City has or may acquire an interest. The rights and remedies of the City under this Section shall apply to all defaults that fail to be cured within the applicable cure period or are cured but in an untimely manner, and the City shall not be obligated to accept such late cure. The City reserves the right, in lieu of termination as set forth herein, to withhold any payments of money which may be due or become due to the Contractor until said defaults have been remedied. In no event shall Contractor be entitled to any compensation for anticipatory profits or consequential damages as a result of the discontinuance of any portion of the Work, or termination of this Contract. In the event it is determined, for any reason, that Contractor was not in default under the provisions of this Section, then the City's notice of termination for default shall automatically be treated as a termination for convenience, and the rights and obligations of the City and Contractor shall be the same as if the notice of termination had been issued pursuant to the termination for convenience clause contained in Section 5.15. The Contractor shall have no further recourse of any nature against the City for any wrongful termination. 5.17 Taxes Contractor shall pay all applicable sales, consumer, use and other taxes required by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. ITB-2018-033-ND Page 14 IN WITNESS WHEREOF, the parties have set their hands and seals the day and year first above written. ATTEST: THE CITY OF MIAMI BEACH /� i ) [ 4 R. „,/la City j �- � i 't,.or C \ iii< s '. r Ct '� On Pip Ea 7k' 3 Attest: sV'L, I ,ME 'O EXPRESS INC. Signnattuure/Secretary - Signature/President \.J_a1b N.\ic-,o b«e.s --ic::1' (to A . -1-ir sobcre.> Print Name Print Name APPROVED AS TO FORM &LANGUAGE &FOR EXECUTION I 1a_30- t& City y,8 Date ITB-2018-033-ND Page 15 EXHIBIT A CONTRACTOR SERVICE ORDER Contractor Service Order No. TO: PROJECT NAME: Project Name DATE: SCOPE OF SERVICES: Per attached proposal dated , to be considered part of this Agreement. Estimated calendar days to complete this work: Days Original Service Order Amount: $ Change Order_to Service Order Amount: (ALL CHANGE ORDERS MUST BE APPROVED IN WRITING $ BY THE CITY PRIOR TO THE WORK.) Total From Previous Change Orders to Service Orders: $ Fee for this Service Order is Lump Sum/Not to Exceed amount $ of: Total Agreement to Date: $ City's Project Administrator Date Department Director Date Contractor. Date (between $10,000-$50,000) City Manager Date (exceeding$50,000) ITB-2018-033-ND Page 16 MIAMI BEACH 00710 EXHIBIT B: FORM OF PERFORMANCE BOND BY THIS BOND, We , as Principal, hereinafter called Contractor , and , as Surety, are bound to the City of Miami Beach, Florida, as Obligee, hereinafter called City, in the amount of Dollars ($ ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: , awarded the day of , 20 , with City which Contract Documents are by reference incorporated herein and made a part hereof, and specifically include provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the "Contract"; THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the Contract between Contractor and City for construction of , the Contract being made a part of this Bond by reference, at the times and in the manner prescribed in the Contract; and 2. Pays City all losses, liquidated damages, expenses, costs and attorney's fees including appellate proceedings, that City sustains as a result of default by Contractor under the Contract; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract; then THIS BOND IS VOID, OTHERWISE IT REMAINS IN FULL FORCE AND EFFECT. Whenever Contractor shall be, and declared by City to be, in default under the Contract, City having performed City obligations thereunder, the Surety may promptly remedy the default, or shall promptly: 3.1. Complete the Project in accordance with the terms and conditions of the Contract Documents; or 3.2. Obtain a bid or bids for completing the Project in accordance with the terms and conditions of the Contract Documents, and upon determination by Surety of the lowest responsible Bidder, or, if City elects, upon determination by City and Surety jointly of the lowest responsible Bidder, arrange for a contract between such Bidder and City, and make available as work progresses (even though there should be a default or a succession of defaults under the Contract ITB-2018-033-ND Page 17 00710 FORM OF PERFORMANCE BOND (Continued) or Contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract Price; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the Contract Price," as used in this paragraph, shall mean the total amount payable by City to Contractor under the Contract and any amendments thereto, less the amount properly paid by City to Contractor. No right of action shall accrue on this bond to or for the use of any person or corporation other than City named herein. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes does not affect Surety's obligation under this Bond. Signed and sealed this day of , 20 WITNESSES: (Name of Corporation) Secretary By: (Signature) (CORPORATE SEAL) (Print Name and Title) IN THE PRESENCE OF: INSURANCE COMPANY: By: Agent and Attorney-in-Fact Address: (Street) (City/State/Zip Code) Telephone No.: ITB-2018-033-ND Page 18 00720 EXHIBIT C: FORM OF PAYMENT BOND BY THIS BOND, We , as Principal, hereinafter called Contractor , and , as Surety, are bound to the City of Miami Beach, Florida, as Obligee, hereinafter called City, in the amount of Dollars ($ ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: , awarded the day of , 20 , with City which Contract Documents are by reference incorporated herein and made a part hereof, and specifically include provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the "Contract' THE CONDITION OF THIS BOND is that if Contractor: 1. Pays City all losses, liquidated damages, expenses, costs and attorney's fees including appellate proceedings, that City sustains because of default by Contractor under the Contract; and 2. Promptly makes payments to all claimants as defined by Florida Statute 255.05(1) for all labor, materials and supplies used directly or indirectly by Contractor in the performance of the Contract; THEN CONTRACTOR'S OBLIGATION SHALL BE VOID; OTHERWISE, IT SHALL REMAIN IN FULL FORCE AND EFFECT SUBJECT, HOWEVER, TO THE FOLLOWING CONDITIONS: 2.1. A claimant, except a laborer, who is not in privity with Contractor and who has not received payment for its labor, materials, or supplies shall, within forty-five (45) days after beginning to furnish labor, materials, or supplies for the prosecution of the work, furnish to Contractor a notice that he intends to look to the bond for protection. 2.2. A claimant who is not in privity with Contractor and who has not received payment for its labor, materials, or supplies shall, within ninety (90) days after performance of the labor or after complete delivery of the materials or supplies, deliver to Contractor and to the Surety, written notice of the performance of the labor or delivery of the materials or supplies and of the nonpayment. 2.3. No action for the labor, materials, or supplies may be instituted against Contractor or the Surety unless the notices stated under the preceding conditions (2.1) and (2.2) have been given. [TB-2018-033-ND Page 19 00720 2.4. Any action under this Bond must be instituted in accordance with the Notice and Time Limitations provisions prescribed in Section 255.05(2), Florida Statutes. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes does not affect the Surety's obligation under this Bond. Signed and sealed this day of , 20 . Contractor ATTEST: (Name of Corporation) By: (Secretary) (Signature) (Corporate Seal) (Print Name and Title) day of , 20 . IN THE PRESENCE OF: INSURANCE COMPANY: By: Agent and Attorney-in-Fact Address: (Street) (City/State/Zip Code) Telephone No.: ITB-2018-033-ND Page 20 EXHIBIT D TO THE AGREEMENT FOR THE PURCHASE OF CONCRETE CURBING/SIDEWALK CONSTRUCTION, MILLING AND RESURFACING OF ASPHALT CONCRETE, AND STRIPING OF CITY STREETS AND PARKING LOTS PURSUANT TO ITB 2018-033-ND 1. Definitions: Whenever the following terms or pronouns in place of them appear in the Project Manual, the intent and meaning shall be interpreted as follows: 1.1 Bid: shall refer to any offer(s) submitted in response to this ITB. The terms "Bid" and "Bid Submittal" are used interchangeably. 1.2 Bidder: Any individual, firm, or corporation submitting a bid for this Project, acting directly or through a duly authorized representative. 1.3 Change Order: A written document ordering a change in the Contract Price or Contract Time or a material change. 1.4 City: The City (or Owner) shall mean the City of Miami Beach, a Florida municipal corporation, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, which is a party hereto and /or for which this Contract is to be performed. In all respects hereunder, City's performance is pursuant to City's position as the owner of a construction project. In the event City exercises its regulatory authority as a governmental body, the exercise of such regulatory authority and the enforcement of any rules, regulations, laws and ordinances shall be deemed to have occurred pursuant to City's regulatory authority as a governmental body and shall not be attributable in any manner to City as a party to this Contract. 1.5 City Commission: City Commission shall mean the governing and legislative body of the City. 1.6 City Manager: City Manager shall mean the Chief Administrative Officer of the City. 1.7 Contract: The part or section of the Contract Documents addressing some of the rights and duties of the parties hereto, including but not limited to contract time and liquidated damages. 1.8 Contract Documents: The official documents setting forth bidding information, requirements and contractual obligations for the project and includes the Contract, Invitation to Bid, Scope of Work, Instructions to Bidders, Supplements, Technical Specifications, Exhibits, Certificated, Closeout Forms, General Conditions, Supplementary Conditions, Plans, Drawings, Addenda, Award by the City Commission, Bonds, Notice of Award, Notices to Proceed, Purchase Order(s), Change Order(s), Field Order(s), Supplemental Instructions, and any additional documents the submission of which is required by the Project. 1.9 Contract Price: The original amount established in the Bid Submittal and award by the City, as may be amended by Change Order. ITB-2018-033-ND Page 21 1.10 Contractor: The person or entity with whom the City has contracted and who is responsible for the acceptable performance of the Work and for the payment of all legal debts pertaining to the Work. All references in the Contract Documents to third parties under contract or control of Contractor shall be deemed to be a reference to Contractor. 1.11 Department: The Public Works Department, or any other City department authorized to use any resulting agreement. 1.12 Field Order: A written order which orders minor changes in the Work but which does not involve a change in the Contract Price or Contract Time. 1.13 Notice(s) to Proceed: Written notice to Contractor authorizing the commencement of the activities identified in the notice or as described in the Contract Documents. 1.14 Plans and/or Drawings: The official graphic representations of this Project which are a part of the Contract Documents. 1.15 Responsible Bidder: An offeror who has the capability in all respects to perform fully the contract requirements, and the integrity and reliability which will assure good faith performance. 1.16 Responsive Bidder: A person or entity who has submitted a bid which conforms in all material respects to a solicitation. A bid or proposal of a Responsive Bidder must be submitted on the required forms, which contain all required information, signatures, notarizations, insurance, bonding, security, or other mandated requirements by the bid documents to be submitted at the time of bid opening. 1.17 Subcontractor: A person or entity having a direct contract with Contractor including one who furnishes material worked to a special design according to the Contract Documents, but does not include one who merely furnishes Materials not so worked. 1.18 Surety: The surety company or individual which is bound by the performance bond and payment bond with and for Contractor who is primarily liable, and which surety company or individual is responsible for Contractor's satisfactory performance of the work under the contract and for the payment of all debts pertaining thereto in accordance with Section 255.05, Florida Statutes. 1.19 Task Order: At the request of the City, the Contractor shall furnish a Task Order for any project under consideration. Each project shall have a project- specific Task Order. The Task Order shall be approved by a City representative. The Task Order shall stipulate the following: • Fixed Project Costs. Project Cost shall be based on plans and specifications provided by the City or field-verified measurements and shall be in accordance with contract unit prices and other pricing terms. • Additional Services. The City anticipates that a significant portion of the projects awarded pursuant to any continuing services agreement ITB-2018-033-ND Page 22 resulting from this ITB shall be completed in accordance with the prices established through the ITB. The City recognizes that there may be instances when the need for services in addition to those stipulated herein shall arise. In those cases, the City may negotiate with the Contractor on a mutually agreeable price for the additional services based on available industry pricing. The approval of the City Manager shall be required for any additional services exceeding a project aggregate of$50,000. • Total Project Cost. • Project Approach and Methodology. This shall include any necessary phasing, logistical requirements, etc. • Required Permits. • Project Duration. • Mobilization Plan. • Project Manager& Contact. 1.20 Work: The construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by Contractor to fulfill Contractor's obligations. The Work may constitute the whole or a part of the Project. 2. Personnel Requirements: Superintendent must have at least approximately five (5) years of experience in projects of similar design, scope, size and complexity. The Project Manager must have at least approximately five (5) years of experience in projects of similar design, scope, size and complexity. Project Manual: 2.1. The Project Manual includes any general or special Contract conditions or specifications attached hereto. 2.2. The Project Manual, along with all documents that make up and constitute the Contract Documents, shall be followed in strict accordance as to work, performance, material, and dimensions except when Consultant may authorize, in writing, an exception. 2.3. Dimensions given in figures are to hold preference over scaled measurements from the drawings; however, all discrepancies shall be resolved by Consultant. Contractor shall not proceed when in doubt as to any dimension or measurement, but shall seek clarification from Consultant. 2.4. Contractor shall be furnished three (3) copies, free of charge, of the Project Manual; two of which shall be preserved and always kept accessible to Consultant and Consultant's authorized representatives. Additional copies of the Project Manual may be obtained from City at the cost of reproduction. 3. Intention of City: It is the intent of City to describe in the Contract Documents a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents ITB-2018-033-ND Page 23 and in accordance with all codes and regulations governing construction of the Project. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied by Contractor whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals, or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or laws or regulations in effect at the time of opening of bids and Contractor shall comply therewith. City shall have no duties other than those duties and obligations expressly set forth within the Contract Documents. 4. Preliminary Matters: 4.1. Within five (5) calendar days prior to the pre-construction meeting, Contractor shall submit to Consultant, for Consultant's review and acceptance, a project schedule. CONTRACTOR agrees to attend weekly progress meetings and provide an updated (3) week look ahead schedule for review and discussion and monthly be prepared to discuss any: 1) Proposed changes to the Base Line schedule logic; 2) Explain and provide a narrative for reasons why logic changes should be made; 3) Update to individual subcontractor activities; and 4) Integration of changes into the schedule. The Project Schedule shall be the basis of the CONTRACTOR'S work and shall be complied with in all respects. If CONTRACTOR'S Work becomes more than (30) days behind schedule CONTRACTOR shall be required to submit a "Make-Up" schedule to PROGRAM MANAGER for review and acceptance that demonstrates "Catch Up" within thirty (3) days. CONTRACTOR shall provide, at CONTRACTOR'S cost, the necessary additional labor and or equipment necessary to make-up the lost time. Failure to provide a "Make-Up" schedule or vigorously follow the "Make-Up" schedule shall be reason to default CONTRACTOR. 4.1.1 After award but prior to the submission of the final progress schedule, CONSULTANT, Contract Administrator and CONTRACTOR shall meet with all utility owners and secure from them a schedule of utility relocation, provided, however, neither CONSULTANT nor CITY shall be responsible for the nonperformance by the utility owners. 4.1.2 A preliminary schedule of Shop Drawing submissions; and 4.1.3 In a lump sum contract or in a contract which includes lump sum bid items of Work, a preliminary schedule of values for all of the Work which will include quantities and prices of items aggregating the Contract Price and ITB-2018-033-ND Page 24 will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of work which will be confirmed in writing by Contractor at the time of submission. - Such prices shall be broken down to show labor, equipment, materials and overhead and profit. 4.1.4 After award but prior to the submission of the progress schedule, Consultant, Contract Administrator and Contractor shall meet with all utility owners and secure from them a schedule of utility relocation, provided, however, neither Consultant nor City shall be responsible for the nonperformance by the utility owners. 4.2. .At a time specified by Consultant but before Contractor starts the work at the Project site, a conference attended by Contractor, Consultant and others as deemed appropriate by Contract Administrator will be held to discuss the schedules to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work. 4.3. Within thirty-five (35) days from the Project Initiation Date set forth in the Notice to Proceed, a conference attended by Contractor, Consultant and others, as appropriate, will be held to finalize the schedules submitted. Within forty-five (45) days after the Project Initiation Date set forth in Notice to Proceed No. 1, the Contractor shall revise the original schedule submittal to address all review comments from the CPM review conference and resubmit for Consultant review. The finalized progress schedule will be accepted by Consultant only as providing an orderly progression of the Work to completion within the Contract Time, but such acceptance shall not constitute acceptance by City or Consultant of the means or methods of construction or of the sequencing or scheduling of the Work, and such acceptance will neither impose on Consultant or City responsibility for the progress or scheduling of the Work nor relieve Contractor from full responsibility therefore. The finalized schedule of Shop Drawing submissions must be acceptable to Consultant as providing a workable arrangement for processing the submissions. The finalized schedule of values must be acceptable to Consultant as to form and substance. 5. Performance Bond and Payment Bond: Within fifteen (15) calendar days of being notified of the award, Contractor shall furnish a Performance Bond and a Payment Bond containing all the provisions of the Performance Bond and Payment Bond attached hereto as forms 00710 and 00720. 5.1. Each Bond shall be in the amount of one hundred percent(100%) of the Contract Price guaranteeing to City the completion and performance of the work covered in such Contract as well as full payment of all suppliers, laborers, or subcontractors employed pursuant to this Project. Each Bond shall be with a surety company which is qualified pursuant to Article 5. IT8-2018-033-ND Page 25 5.2. Each Bond shall continue in effect for one year after Final Completion and acceptance of the work with liability equal to one hundred percent (100%) of the Contract sum, or an additional bond shall be conditioned that Contractor will, upon notification by City, correct any defective or faulty work or materials which appear within one year after Final Completion of the Contract. 5.3. Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time to time, Contractor shall ensure that the bond(s) referenced above shall be recorded in the public records of Miami-Dade County and provide City with evidence of such recording. 5.4. Alternate Form of Security: In lieu of a Performance Bond and a Payment Bond, Contractor may furnish alternate forms of security which may be in the form of cash, money order, certified check, cashier's check or unconditional letter of credit in the form attached hereto as Form 00735. Such alternate forms of security shall be subject to the prior approval of City and for same purpose and shall be subject to the same conditions as those applicable above and shall be held by City for one year after completion and acceptance of the Work. 6. Qualification of Surety 6.1. Performance Bonds and Payment Bonds for projects over Two Hundred Thousand Dollars ($200,000.00) : 6.1.1. Each bond must be executed by a surety company of recognized standing, authorized to do business in the State of Florida as surety, having a resident agent in the State of Florida and having been in business with a record of successful continuous operation for at least five (5) years. 6.1.2. The surety company shall hold a current certificate of authority as acceptable surety on federal bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation set forth in the circular, in order to qualify, the net retention of the surety company shall not exceed the underwriting limitation in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with Treasury Circular 297, revised September 1, 1978 (31 DFR Section 223.10, Section 223.111). Further, the surety company shall provide City with evidence satisfactory to City, that such excess risk has been protected in an acceptable manner. 7. Labor and Materials: 7.1. Unless otherwise provided herein, Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. ITB-2018-033-ND Page 26 7.2. Contractor shall at all times enforce strict discipline and good order among its employees and subcontractors at the Project site and shall not employ on the Project any unfit person or anyone not skilled in the work to which they are assigned. 8. Royalties and Patents: All fees, royalties, and claims for any invention, or pretended inventions, or patent of any article, material, arrangement, appliance, or method that may be used upon or in any manner be connected with the construction of the Work or appurtenances, are hereby included in the prices stipulated in this Contract for said work. 9. Weather: Extensions to the Contract Time for delays caused by the effects of inclement weather shall be submitted as a request for a change in the Contract Time pursuant to Article 35. These time extensions are justified only when rains or other inclement weather conditions or related adverse soil conditions prevent Contractor from productively performing controlling items of work identified on the accepted schedule or updates resulting in: (1) Contractor being unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or updates due to adverse weather conditions; or (2) Contractor must make major repairs to the Work damaged by weather. Providing the damage was not attributable to a failure to perform or neglect by Contractor, and providing that Contractor was unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or updates. 10. Permits, Licenses and Impact Fees: 10.1. Except as otherwise provided within the Supplemental Conditions, all permits and licenses required by federal, state or local laws, rules and regulations necessary for the prosecution of the Work undertaken by Contractor pursuant to this Contract shall be secured and paid for by Contractor. It is Contractor's responsibility to have and maintain appropriate Certificate(s) of Competency, valid for the Work to be performed and valid for the jurisdiction in which the Work is to be performed for all persons working on the Project for whom a Certificate of Competency is required. 10.2. Impact fees levied by the City and/or Miami-Dade County shall be paid by Contractor. Contractor shall be reimbursed only for the actual amount of the impact fee levied by the municipality as evidenced by an invoice or other acceptable documentation issued by the municipality. Reimbursement to Contractor in no event shall include profit or overhead of Contractor. 11. Resolution of Disputes: 11.1 To prevent all disputes and litigation, it is agreed by the parties hereto that Consultant shall decide all questions, claims, difficulties and disputes of whatever ITB-2018-033-ND page 27 nature which may arise relative to the technical interpretation of the Contract Documents and fulfillment of this Contract as to the character, quality, amount and value of any work done and materials furnished, or proposed to be done or furnished under or, by reason of, the Contract Documents and Consultant's estimates and decisions upon all claims, questions, difficulties and disputes shall be final and binding to the extent provided in Section 11.2. Any claim, question, difficulty or dispute which cannot be resolved by mutual agreement of City and Contractor shall be submitted to Consultant in writing within twenty-one (21) calendar days. Unless a different period of time is set forth herein, Consultant shall notify City and Contractor in writing of Consultant's decision within twenty- one (21) calendar days from the date of the submission of the claim, question, difficulty or dispute, unless Consultant requires additional time to gather information or allow the parties to provide additional information. AN non- technical administrative disputes shall be determined by the Contract Administrator pursuant to the time periods provided herein. During the pendency of any dispute and after a determination thereof, Contractor, Consultant and City shall act in good faith to mitigate any potential damages including utilization of construction schedule changes and alternate means of construction. 11.2 In the event the determination of a dispute under this Article is unacceptable to either party hereto, the party objecting to the determination must notify the other party in writing within ten (10) days of receipt of the written determination. The notice must state the basis of the objection and must be accompanied by a statement that any Contract Price adjustment claimed is the entire adjustment to which the objecting party has reason to believe it is entitled to as a result of the determination. Within sixty (60) days after Final Completion of the Work, the parties shall participate in mediation to address all objections to any determinations hereunder and to attempt to prevent litigation. The mediator shall be mutually agreed upon by the parties. Should any objection not be resolved in mediation, the parties retain all their legal rights and remedies provided under State law. A party objecting to a determination specifically waives all of its rights provided hereunder, including its rights and remedies under State law, if said party fails to comply in strict accordance with the requirements of this Article. 12. Superintendence and Supervision: 12.1. The orders of City are to be given through Consultant, which instructions are to be strictly and promptly followed in every case. Contractor shall keep on the Project during its progress, a full-time competent English speaking superintendent and any necessary assistants, all satisfactory to Consultant. The superintendent shall not be changed except with the written consent of Consultant, unless the superintendent proves to be unsatisfactory to Contractor and ceases to be in its employ. The superintendent shall represent Contractor and all directions given to the superintendent shall be as binding as if given to Contractor and will be confirmed in writing by Consultant upon the written request of Contractor. Contractor shall give efficient supervision to the Work, using its best skill and attention. 12.2. Daily, Contractor's superintendent shall record, at a minimum, the following information in a bound log: the day; date; weather conditions and how any weather condition affected progress of the Work; time of commencement of work ITB-2018-033-ND Page 28 for the day; the work being performed; materials, labor, personnel, equipment and subcontractors at the Project site; visitors to the Project site, including representatives of Consultant; regulatory representatives; any special or unusual conditions or occurrences encountered; and the time of termination of work for the day. All information shall be recorded in the daily log in ink. The daily log shall be kept on the Project site and shall be available at all times for inspection and copying by City and Consultant. 12.3. The Contract Administrator, Contractor and Consultant shall meet at least weekly or as determined by the Contract Administrator, during the course of the Work to review and agree upon the work performed to date and to establish the controlling items of work for the next two weeks. The Consultant shall publish, keep, and distribute minutes and any comments thereto of each such meeting. 12.4. If Contractor, in the course of prosecuting the Work, finds any discrepancy between the Contract Documents and the physical conditions of the locality, or any errors, omissions, or discrepancies in the Project Manual, it shall be Contractor's duty to immediately inform Consultant, in writing, and Consultant will promptly review the same. Any work done after such discovery, until authorized, will be done at Contractor's sole risk. 12.5. Contractor shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. 13. Contractor's Right to Stop Work or Terminate Contract: Should Consultant fail to review and approve or state in writing reasons for nonapproval of any Application for Payment within twenty (20) days after it is presented, or if City fails either to pay Contractor within thirty (30) days after presentation by Consultant of any sum certified by Consultant, or to notify Contractor and Consultant in writing of any objection to the Application for Payment, then Contractor may, give written notice to City and Consultant of such delay, neglect or default, specifying the same. If City or Consultant(where applicable), within a period of ten (10) calendar days after such notice shall not remedy the delay, neglect, or default upon which the notice is based, then Contractor may stop work or terminate this Contract and recover from City payment for all work executed and reasonable expenses sustained therein plus reasonable termination expenses. Any objection made by City to an Application for Payment shall be submitted to Consultant in accordance with the provisions of Article 11 hereof. 14. Assignment: Neither party hereto shall assign the Contract or any subcontract in whole or in part without the written consent of the other, nor shall Contractor assign any monies due or to become due to it hereunder, without the previous written consent of the Mayor and City Commission. 15. Differing Site Conditions: ITB-2018-033-ND Page 29 In the event that during the course of the Work Contractor encounters subsurface or concealed conditions at the Project site which differ materially from those shown on the Contract Documents and from those ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents; or unknown physical conditions of the Project site, of an unusual nature, which differ materially from that ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents, Contractor , without disturbing the conditions and before performing any work affected by such conditions, shall, within twenty-four (24) hours of their discovery, notify City and Consultant in writing of the existence of the aforesaid conditions. Consultant and City shall, within two (2) business days after receipt of Contractor's written notice, investigate the site conditions identified by Contractor. If, in the sole opinion of Consultant, the conditions do materially so differ and cause an increase or decrease in Contractor's cost of, or the time required for, the performance of any part of the Work, whether or not charged as a result of the conditions, Consultant shall recommend an equitable adjustment to the Contract Price, or the Contract Time, or both. If City and Contractor cannot agree on an adjustment in the Contract Price or Contract Time, the adjustment shall be referred to Consultant for determination in accordance with the provisions of Article 11. Should Consultant determine that the conditions of the Project site are not so materially different to justify a change in the terms of the Contract, Consultant shall so notify City and Contractor in writing, stating the reasons, and such determination shall be final and binding upon the parties hereto. No request by Contractor for an equitable adjustment to the Contract under this provision shall be allowed unless Contractor has given written notice in strict accordance with the provisions of this Article. No request for an equitable adjustment or change to the Contract Price or Contract Time for differing site conditions shall be allowed if made after the date certified by Consultant as the date of substantial completion. 16. Plans and Working Drawings: City, through Consultant, shall have the right to modify the details of the plans and specifications, to supplement the plans and specifications with additional plans, drawings or additional information as the Work proceeds, all of which shall be considered as part of the Project Manual. In case of disagreement between the written and graphic portions of the Project Manual, the written portion shall govern. 17. Contractor to Check Plans, Specifications and Data: Contractor shall verify all dimensions, quantities and details shown on the plans, specifications or other data received from Consultant, and shall notify Consultant of all errors, omissions and discrepancies found therein within three (3) calendar days of discovery. Contractor will not be allowed to take advantage of any error, omission or discrepancy, as full instructions will be furnished by Consultant. Contractor shall not be liable for damages resulting from errors, omissions or discrepancies in the Contract Documents unless Contractor recognized such error, omission or discrepancy and knowingly failed to report it to Consultant. ITB-2018-033-ND Page 30 18. Contractor's Responsibility for Damages and Accidents: 18.1. Contractor shall accept full responsibility for the Work against all loss or damage of whatsoever nature sustained until final acceptance by City, and shall promptly repair any damage done from any cause whatsoever, except as provided in Article 24. 18.2. Contractor shall be responsible for all materials, equipment and supplies pertaining to the Project. In the event any such materials, equipment and supplies are lost, stolen, damaged or destroyed prior to final acceptance by City, Contractor shall replace same without cost to City, except as provided in Article 24. 19. Warranty: Contractor warrants to Owner that all labor, materials and equipment furnished as part of the Services under this Agreement are of the type and quality required by the Contract Documents, new (unless otherwise required or permitted by the Contract Documents) and installed in a good and workmanlike manner and otherwise in accordance with the Contract Documents. Contractor further warrants that the Services will be free from defects due to defective materials or workmanship for a period of one (1) year following , the City's final acceptance of the Services. Should any defects develop during the one- year warranty period due to defective materials or workmanship, Contractor shall repair or replace all defective or deficient Services at Contractor's sole cost and expense. Should the Contractor fail to correct any deficiencies within thirty (30) days of written notice by the City to cure, the City may, at its option, correct the deficiencies and charge Contractor for the cost of such correction. Contractor agrees to pay such charges upon demand. This warranty is not limited by the provisions of Article 21 herein. 20. Supplementary Drawings: 20.1. When, in the opinion of Consultant, it becomes necessary to explain the Work to be done more fully, or to illustrate the Work further, or to show any changes which may be required, supplementary drawings, with specifications pertaining thereto, will be prepared by Consultant. 20.2. The supplementary drawings shall be binding upon Contractor with the same force as the Project Manual. Where such supplementary drawings require either less or more than the original quantities of work, appropriate adjustments shall be made by Change Order. 21. Defective Work: 21.1. Consultant shall have the authority to reject or disapprove work which Consultant finds to be defective. If required by Consultant, Contractor shall promptly either correct all defective work or remove such defective work and replace it with nondefective work. Contractor shall bear all direct, indirect and consequential costs of such removal or corrections including cost of testing laboratories and personnel. 21.2. Should Contractor fail or refuse to remove or correct any defective work or to make any necessary repairs in accordance with the requirements of the Contract ITB-2018-033-ND Page 31 Documents within the time indicated in writing by Consultant, City shall have the authority to cause the defective work to be removed or corrected, or make such repairs as may be necessary at Contractor's expense. Any expense incurred by City in making such removals, corrections or repairs, shall be paid for out of any monies due or which may become due to Contractor , or may be charged against the Performance Bond. In the event of failure of Contractor to make all necessary repairs promptly and fully, City may declare Contractor in default. 21.3. If, within one (1) year after the date of substantial completion or such longer period of time as may be prescribed by the terms of any applicable special warranty required by the Contract Documents, or by any specific provision of the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, Contractor , after receipt of written notice from City, shall promptly correct such defective or nonconforming Work within the time specified by City without cost to City, to do so. Nothing contained herein shall be construed to establish a period of limitation with respect to any other obligation which Contractor might have under the Contract Documents including but not limited to, Article 18 hereof and any claim regarding latent defects. 21.4. Failure to reject any defective work or material shall not in any way prevent later rejection when such defect is discovered, or obligate City to final acceptance. 22. Taxes Contractor shall pay all applicable sales, consumer, use and other taxes required by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. 23. Subcontracts: 23.1. Contractor shall not employ any subcontractor against whom City or Consultant may have a reasonable objection. Contractor shall not be required to employ any subcontractor against whom Contractor has a reasonable objection. 23.2. Contractor shall be fully responsible for all acts and omissions of its subcontractors and of persons directly or indirectly employed by its subcontractors and of persons for whose acts any of them may be liable to the same extent that Contractor is responsible for the acts and omissions of persons directly employed by it. Nothing in the Contract Documents shall create any contractual relationship between any subcontractor and City or any obligation on the part of City to pay or to see the payment of any monies due any subcontractor. City or Consultant may furnish to any subcontractor evidence of amounts paid to Contractor on account of specific work performed. 23.3. Contractor agrees to bind specifically every subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of City. 23.4. Contractor shall perform the Work with its own organization, amounting to not less than 70% percent of the Contract Price. ITB-2018-033-ND Page 32 24. Separate Contracts: 24.1. City reserves the right to let other contracts in connection with this Project. Contractor shall afford other persons reasonable opportunity for the introduction and storage of their materials and the execution of their work and shall properly connect and coordinate this Work with theirs. 24.2. If any part of Contractor's Work depends for proper execution or results upon the work of any other persons, Contractor shall inspect and promptly report to Consultant any defects in such work that render it unsuitable for such proper execution and results. Contractor's failure to so inspect and report shall constitute an acceptance of the other person's work as fit and proper for the reception of Contractor's Work, except as to defects which may develop in other contractor's work after the execution of Contractor's. 24.3. Contractor shall conduct its operations and take all reasonable steps to coordinate the prosecution of the Work so as to create no interference or impact on any other contractor on the site. Should such interference or impact occur, Contractor shall be liable to the affected contractor for the cost of such interference or impact. 24.4. To insure the proper execution of subsequent work, Contractor shall inspect the work already in place and shall at once report to Consultant any discrepancy between the executed work and the requirements of the Contract Documents. 25. Use of Completed Portions: 25.1. City shall have the right at its sole option to take possession of and use any completed or partially completed portions of the Project. Such possession and use shall not be deemed an acceptance of any of the Work not completed in accordance with the Contract Documents. If such possession and use increases the cost of or delays the Work, Contractor shall be entitled to reasonable extra compensation or reasonable extension of time or both, as recommended by Consultant and approved by City. 25.2. In the event City takes possession of any completed or partially completed portions of the Project, the following shall occur: 25.2.1. City shall give notice to Contractor in writing at least thirty (30) calendar days prior to City's intended occupancy of a designated area. 25.2.2. Contractor shall complete to the point of Substantial Completion the designated area and request inspection and issuance of a Certificate of Substantial Completion in the form attached hereto as 00925 from Consultant. 25.2.3. Upon Consultant's issuance of a Certificate of Substantial Completion, City will assume full responsibility for maintenance, utilities, subsequent damages of City and public, adjustment of insurance coverage's and start of warranty for the occupied area. ITB-2018-033-ND Page 33 25.2.4. Contractor shall complete all items noted on the Certificate of Substantial Completion within the time specified by Consultant on the Certificate of Substantial Completion, as soon as possible and request final inspection and final acceptance of the portion of the Work occupied. Upon completion of final inspection and receipt of an application for final payment, Consultant shall issue a Final Certificate of Payment relative to the occupied area. 25.2.5. If City finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion thereof, such occupancy or use shall not commence prior to a time mutually agreed upon by City and Contractor and to which the insurance company or companies providing the property insurance have consented by endorsement to the policy or policies. Insurance on the unoccupied or unused portion or portions shall not be canceled or lapsed on account of such partial occupancy or use. Consent of Contractor and of the insurance company or companies to such occupancy or use shall not be unreasonably withheld. 26. Lands for Work: 26.1. City shall provide, as may be indicated in the Contract Documents, the lands upon which the Work is to be performed, rights-of-way and easements for access thereto and such other lands as are designated by City or the use of Contractor. 26.2. Contractor shall provide, at Contractor's own expense and without liability to City, any additional land and access thereto that may be required for temporary construction facilities, or for storage of materials. Contractor shall furnish to City copies of written permission obtained by Contractor from the owners of such facilities. 27. Legal Restrictions and Traffic Provisions: Contractor shall conform to and obey all applicable laws, regulations, or ordinances with regard to labor employed, hours of work and Contractor's general operations. Contractor shall conduct its operations so as not to close any thoroughfare, nor interfere in any way with traffic on railway, highways, or water, without the prior written consent of the proper authorities. 28. Location and Damage to Existing Facilities, Equipment or Utilities: 28.1. As far as possible, all existing utility lines in the Project area have been shown on the plans. However, City does not guarantee that all lines are shown, or that the ones indicated are in their true location. It shall be the Contractor S responsibility to identify and locate all underground and overhead utility lines or equipment affecting or affected by the Project. No additional payment will be made to the Contractor because of discrepancies in actual and plan location of utilities, and damages suffered as a result thereof. 28.2. The Contractor shall notify each utility company involved at least ten (10) days prior to the start of construction to arrange for positive underground location, relocation or support of its utility where that utility may be in conflict with or ITB-2018-033-ND Page 34 endangered by the proposed construction. Relocation of water mains or other utilities for the convenience of the Contractor shall be paid by the Contractor. All charges by utility companies for temporary support of its utilities shall be paid for by the Contractor. All costs of permanent utility relocation to avoid conflict shall be the responsibility of the utility company involved. No additional payment will be made to the Contractor for utility relocations, whether or not said relocation is necessary to avoid conflict with other lines. 28.3. The Contractor shall schedule the work in such a manner that the work is not delayed by the utility providers relocating or supporting their utilities. The Contractor shall coordinate its activities with any and all public and private utility providers occupying the right-of-way. No compensation will be paid to the Contractor for any loss of time or delay. 28.4. All overhead, surface or underground structures and utilities encountered are to be carefully protected from injury or displacement. All damage to such structures is to be completely repaired within a reasonable time; needless delay will not be tolerated. The City reserves the right to remedy such damage by ordering outside parties to make such repairs at the expense of the Contractor. All such repairs made by the Contractor are to be made to the satisfaction of the utility owner. All damaged utilities must be replaced or fully repaired. All repairs are to be inspected by the utility owner prior to backfilling. 29. Value Engineering: Contractor may request substitution of materials, articles, pieces of equipment or any changes that reduce the Contract Price by making such request to Consultant in writing. Consultant will be the sole judge of acceptability, and no substitute will be ordered, installed, used or initiated without Consultant's prior written acceptance which will be evidenced by either a Change Order or an approved Shop Drawing. However, any substitution accepted by Consultant shall not result in any increase in the Contract Price or Contract Time. By making a request for substitution, Contractor agrees to pay directly to Consultant all Consultant's fees and charges related to Consultants review of the request for substitution, whether or not the request for substitution is accepted by Consultant. Any substitution submitted by Contractor must meet the form, fit, function and life cycle criteria of the item proposed to be replaced and there must be a net dollar savings including Consultant review fees and charges. If a substitution is approved, the net dollar savings shall be shared equally between Contractor and City and shall be processed as a deductive Change Order. City may require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute approved after award of the Contract. 30. Continuing the Work: Contractor shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with City, including disputes or disagreements concerning a request for a Change Order, a request for a change in the Contract Price or Contract Time. The Work shall not be delayed or postponed pending resolution of any disputes or disagreements. ITB-2018-033-ND Page 35 31. Changes in the Work or Terms of Contract Documents: 31.1. Without invalidating the Contract and without notice to any surety City reserves and shall have the right, from time to time to make such increases, decreases or other changes in the character or quantity of the Work as may be considered necessary or desirable to complete fully and acceptably the proposed construction in a satisfactory manner. Any extra or additional work within the scope of this Project must be accomplished by means of appropriate Field Orders and Supplemental Instructions or Change Orders. 31.2. Any changes to the terms of the Contract Documents must be contained in a written document, executed by the parties hereto, with the same formality and of equal dignity prior to the initiation of any work reflecting such change. This section shall not prohibit the issuance of Change Orders executed only by City as hereinafter provided. 32. Field Orders and Supplemental Instructions: 32.1. The Contract Administrator, through Consultant, shall have the right to approve and issue Field Orders setting forth written interpretations of the intent of the Contract Documents and ordering minor changes in Work execution, providing the Field Order involves no change in the Contract Price or the Contract Time. 32.2. Consultant shall have the right to approve and issue Supplemental Instructions setting forth written orders, instructions, or interpretations concerning the Contract Documents or its performance, provided such Supplemental Instructions involve no change in the Contract Price or the Contract Time. 33. Change Orders: 33.1. Changes in the quantity or character of the Work within the scope of the Project which are not properly the subject of Field Orders or Supplemental Instructions, including all changes resulting in changes in the Contract Price, or the Contract Time, shall be authorized only by Change Orders approved in advance and issued in accordance with the provisions of the City. 33.2. All changes to construction contracts which exceed the Commission-approved contingency must be approved in advance in accordance with the value of the Change Order or the calculated value of the time extension. All Change Orders with a value of $50,000 or more shall be approved in advance by the Mayor and City Commission. All Change Orders with a value of less than $50,000 shall be approved in advance by the City Manager or his designee. 33.3. In the event satisfactory adjustment cannot be reached for any item requiring a change in the Contract Price or Contract Time, and a Change Order has not been issued, City reserves the right at its sole option to either terminate the Contract as it applies to the items in question and make such arrangements as may be deemed necessary to complete the disputed work; or submit the matter in dispute to Consultant as set forth in Article 11 hereof. During the pendency of the dispute, and upon receipt of a Change Order approved by City, Contractor shall promptly proceed with the change in the Work involved and advise the Consultant and Contract Administrator in writing within seven (7) calendar days of Contractor's agreement or disagreement with the method, if any, provided in ITB-2018-033-ND Page 36 the Change Order for determining the proposed adjustment in the Contract Price or Contract Time. 33.4. On approval of any Contract change increasing the Contract Price, Contractor shall ensure that the performance bond and payment bond are increased so that each reflects the total Contract Price as increased. 33.5. Under circumstances determined necessary by City, Change Orders may be issued unilaterally by City. 34. Value of Chance Order Work: 34.1. The value of any work covered by a Change Order or of any claim for an increase or decrease in the Contract Price shall be determined in one of the following ways: 34.1.1. Where the work involved is covered by unit prices contained in the Contract Documents, by application of unit prices to the quantities of items involved. 34.1.2. By mutual acceptance of a lump sum which Contractor and City acknowledge contains a component for overhead and profit. 34.1.3. On the basis of the "cost of work," determined as provided in Sections 38.2 and 38.3, plus a Contractor's fee for overhead and profit which is determined as provided in Section 38.4. 34.2. The term "cost of work" means the sum of all direct costs necessarily incurred and paid by Contractor in the proper performance of the Work described in the Change Order. Except as otherwise may be agreed to in writing by City, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the costs itemized in Section 38.3. 34.2.1. Payroll costs for employees in the direct employ of Contractor in the performance of the work described in the Change Order under schedules of job classifications agreed upon by City and Contractor. Payroll costs for employees not employed full time on the work covered by the Change Order shall be apportioned on the basis of their time spent on the work. Payroll costs shall include, but not be limited to, salaries and wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' or workmen's compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay application thereto. Such employees shall include superintendents and foremen at the site. The expenses of performing the work after regular working hours, on Sunday or legal holidays, shall be included in the above to the extent authorized by City. 34.2.2. Cost of all materials and equipment furnished and incorporated in the work, including costs of transportation and storage thereof, and ITB-2018-033-ND Page 37 manufacturers' field services required in connection therewith. All cash discounts shall accrue to Contractor unless City deposits funds with Contractor with which to make payments, in which case the cash discounts shall accrue to City. All trade discounts, rebates and refunds, and all returns from sale of surplus materials and equipment shall accrue to City and Contractor shall make provisions so that they may be obtained. Rentals of all construction equipment and machinery and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City with the advice of Consultant and the costs of transportation, loading, unloading, installation, dismantling and removal thereof, all in accordance with the terms of said agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the work. 34.2.3. Payments made by Contractor to Subcontractors for work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from Subcontractors acceptable to Contractor and shall deliver such bids to City who will then determine, with the advice of Consultant, which bids will be accepted. If the Subcontract provides that the Subcontractor is to be paid on the basis of cost of the work plus a fee, the Subcontractor's cost of the work shall be determined in the same manner as Contractor 'S cost of the work. All Subcontractors shall be subject to the other provisions of the Contract Documents insofar as applicable. 34.2.4. Cost of special consultants, including, but not limited to, engineers, architects, testing laboratories, and surveyors employed for services specifically related to the performance of the work described in the Change Order. 34.2.5. Supplemental costs including the following: 34.2.5.1. The proportion of necessary transportation, travel and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the work except for local travel to and from the site of the work. 34.2.5.2. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools not owned by the workmen, which are consumed in the performance of the work, and cost less market value of such items used but not consumed which remains the property of Contractor . 34.2.5.3. Sales, use, or similar taxes related to the work, and for which Contractor is liable, imposed by any governmental authority. IT8-2018-033-ND Page 38 • 34.2.5.4. Deposits lost for causes other than Contractor's negligence; royalty payments and fees for permits and licenses. 34.2.5.5. The cost of utilities, fuel and sanitary facilities at the site. 34.2.5.6. Receipted minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the work. 34.2.5.7. Cost of premiums for additional bonds and insurance required because of changes in the work. 34.3. The term "cost of the work" shall not include any of the following: 34.3.1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnership and sole proprietorships), general managers, engineers, architects, estimators, lawyers, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks and other personnel employed by Contractor whether at the site or in its principal or a branch office for general administration of the work and not specifically included in the agreed- upon schedule of job classifications, all of which are to be considered administrative costs covered by Contractor's fee. 34.3.2. Expenses of Contractor's principal and branch offices other than Contractor's office at the site. 34.3.3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the work and charges against Contractor for delinquent payments. 34.3.4. Cost of premiums for all Bonds and for all insurance whether or not Contractor is required by the Contract Documents to purchase and maintain the same, except for additional bonds and insurance required because of changes in the work. 34.3.5. Costs due to the negligence or neglect of Contractor, any Subcontractors, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective work, disposal of materials or equipment wrongly supplied and making good any damage to property. 34.3.6. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in Section 38.2. 34.4. Contractor's fee allowed to Contractor for overhead and profit shall be determined as follows: 34.4.1. A mutually acceptable fixed fee or if none can be agreed upon, ITB-2018-033-ND Page 39 34.4.2. A fee based on the following percentages of the various portions of the cost of the work: 34.4.2.1. For costs incurred under Sections 38.2.1 and 38.2.2, Contractor's fee shall not exceed ten percent(10%). 34.4.2.2. For costs incurred under Section 38.2.3, Contractor's fee shall not exceed seven and one half percent (7.5%); and if a subcontract is on the basis of cost of the work plus a fee, the maximum allowable to the Subcontractor as a fee for overhead and profit shall not exceed ten percent(10%); and 34.4.2.3. No fee shall be payable on the basis of costs itemized under Sections 38.2.4 and 38.2.5, (except Section 38.2.5.3), and Section 38.3. 34.5. The amount of credit to be allowed by Contractor to City for any such change which results in a net decrease in cost, will be the amount of the actual net decrease. When both additions and credits are involved in any one change, the combined overhead and profit shall be figured on the basis of the net increase, if any, however, Contractor shall not be entitled to claim lost profits for any Work not performed. 34.6. Whenever the cost of any work is to be determined pursuant to Sections 38.2 and 38.3, Contractor will submit in a form acceptable to Consultant an itemized cost breakdown together with the supporting data. 34.7. Where the quantity of any item of the Work that is covered by a unit price is increased or decreased by more than twenty percent (20%) from the quantity of such work indicated in the Contract Documents, an appropriate Change Order shall be issued to adjust the unit price, if warranted. 34.8. Whenever a change in the Work is to be based on mutual acceptance of a lump sum, whether the amount is an addition, credit or no change-in-cost, Contractor shall submit an initial cost estimate acceptable to Consultant and Contract Administrator. 34.8.1. Breakdown shall list the quantities and unit prices for materials, labor, equipment and other items of cost. 34.8.2. Whenever a change involves Contractor and one or more Subcontractors and the change is an increase in the Contract Price, overhead and profit percentage for Contractor and each Subcontractor shall be itemized separately. 34.9. Each Change Order must state within the body of the Change Order whether it is based upon unit price, negotiated lump sum, or"cost of the work." ITB-2018-033-ND Page 40 • 35. Notification and Claim for Change of Contract Time or Contract Price: 35.1. Any claim for a change in the Contract Time or Contract Price shall be made by written notice by Contractor to the Contract Administrator and to Consultant within five (5) calendar days of the commencement of the event giving rise to the claim and stating the general nature and cause of the claim. Thereafter, within twenty (20) calendar days of the termination of the event giving rise to the claim, written notice of the extent of the claim with supporting information and documentation shall be provided unless Consultant allows an additional period of time to ascertain more accurate data in support of the claim and such notice shall be accompanied by Contractor's written notarized statement that the adjustment claimed is the entire adjustment to which the Contractor has reason to believe it is entitled as a result of the occurrence of said event. All claims for changes in the Contract Time or Contract Price shall be determined by Consultant in accordance with Article 10 hereof, if City and Contractor cannot otherwise agree. IT IS EXPRESSLY AND SPECIFICALLY AGREED THAT ANY AND ALL CLAIMS FOR CHANGES TO THE CONTRACT TIME OR CONTRACT PRICE SHALL BE WAIVED IF NOT SUBMITTED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THIS SECTION. 35.2. The Contract Time will be extended in an amount equal to time lost on critical Work items due to delays beyond the control of and through no fault or negligence of Contractor if a claim is made therefore as provided in Section 39.1. Such delays shall include, but not be limited to, acts or neglect by any separate contractor employed by City, fires, floods, labor disputes, epidemics, abnormal weather conditions or acts of God. 36. No Damages for Delay: No claim for damages or any claim, other than for an extension of time, shall be made or asserted against City by reason of any delays except as provided herein. Contractor shall not be entitled to an increase in the Contract Price or payment or compensation of any kind from City for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference or hindrance from any cause whatsoever, whether such delay, disruption, interference or hindrance be reasonable or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable; provided, however, that this provision shall not preclude recovery of damages by Contractor for actual delays due solely to fraud, bad faith or active interference on the part of City or its Consultant. Otherwise, Contractor shall be entitled only to extensions of the Contract Time as the sole and exclusive remedy for such resulting delay, in accordance with and to the extent specifically provided above. ITB-2018-033-ND Page 41 37. Excusable Delay; Compensable; Non-Compensable: 37.1 Excusable Delay. Delay which extends the completion of the Work and which is caused by circumstances beyond the control of Contractor or its subcontractors, suppliers or vendors is Excusable Delay. • Contractor is entitled to a time extension of the Contract Time for each day the Work is delayed due to Excusable Delay. Contractor shall document its claim for any time extension as provided in Article 35 hereof. Failure of Contractor to comply with Article 35 hereof as to any particular event of delay shall be deemed conclusively to constitute a waiver, abandonment or relinquishment of any and all claims resulting from that particular event of delay. Excusable Delay may be compensable or non-compensable: (a) Compensable Excusable Delay. Excusable Delay is compensable when (i) the delay extends the Contract Time, (ii) is caused by circumstances beyond the control of the Contractor or its subcontractors, suppliers or vendors, and (iii) is caused solely by fraud, bad faith or active interference on the part of City or its agents. In no event shall Contractor be compensated for interim delays which do not extend the Contract Time. Contractor shall be entitled to direct and indirect costs for Compensable Excusable Delay. Direct costs recoverable by Contractor shall be limited to the actual additional costs allowed pursuant to Article 33 hereof. City and Contractor recognize and agree that the amount of Contractor's precise actual indirect costs for delay in the performance and completion of the Work is impossible to determine as of the date of execution of the Contract Documents, and that proof of the precise amount will be difficult. Therefore, indirect costs recoverable by the Contractor shall be liquidated on a daily basis for each day the Contract Time is delayed due to a Compensable Excusable Delay. These liquidated indirect costs shall be paid to compensate Contractor for all indirect costs caused by a Compensable Excusable Delay and shall include, but not be limited to, all profit on indirect costs, home office overhead, acceleration, loss of earnings, loss of productivity, loss of bonding capacity, loss of opportunity and all other indirect costs incurred by Contractor. The amount of liquidated indirect costs recoverable shall be one hundred dollars ($100) per day for each calendar day the Contract is delayed due to a Compensable Excusable Delay. (b) Non-Compensable Excusable Delay. When Excusable Delay is (i) caused by circumstances beyond the control of Contractor, its subcontractors, suppliers and vendors, and is also caused by circumstances beyond the control of the City or Consultant, or (ii) is caused jointly or concurrently by Contractor or its subcontractors, suppliers or vendors and by the City or Consultant, then Contractor shall be entitled only to a time extension and no further compensation for the delay. IT8-2018-033-ND Page 42 38. Substantial Completion: When Contractor considers that the Work, or a portion thereof designated by City pursuant to Article 25 hereof, has reached Substantial Completion, Contractor shall so notify City and Consultant in writing. Consultant and City shall then promptly inspect the Work. When Consultant, on the basis of such an inspection, determines that the Work or designated portion thereof is substantially complete, it will then prepare a Certificate of Substantial Completion in the form attached hereto as Form 00925 which shall establish the Date of Substantial Completion; shall state the responsibilities of City and Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance; and shall list all Work yet to be completed to satisfy the requirements of the Contract Documents for Final Completion. The failure to include any items of corrective work on such list does not alter the responsibility of Contractor to complete ail of the Work in accordance with the Contract Documents. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to City through the Contract Administrator and Contractor for their written acceptance of the responsibilities assigned to them in such Certificate. 39. No Interest: Any monies not paid by City when claimed to be due to Contractor under this Agreement, including, but not limited to, any and all claims for contract damages of any type, shall not be subject to interest including, but not limited to prejudgment interest. However, the provisions of City's prompt payment ordinance, as such relates to timeliness of payment, and the provisions of Section 218.74(4), Florida Statutes (1989) as such relates to the payment of interest, shall apply to valid and proper invoices. 40. Shop Drawings: 40.1. Contractor shall submit Shop Drawings as required by the Technical Specifications. The purpose of the Shop Drawings is to show the suitability, efficiency, technique of manufacture, installation requirements, details of the item and evidence of its compliance or noncompliance with the Contract Documents. 40.2. Within thirty (20) calendar days after the Project Initiation Date specified in the Notice to Proceed, Contractor shall submit to Consultant a complete list of preliminary data on items for which Shop Drawings are to be submitted and shall identify the critical items. Approval of this list by Consultant shall in no way relieve Contractor from submitting complete Shop Drawings and providing materials, equipment, etc., fully in accordance with the Contract Documents. This procedure is required in order to expedite final approval of Shop Drawings. 40.3. After the approval of the list of items required in Section 44.2 above, Contractor shall promptly request Shop Drawings from the various manufacturers, fabricators, and suppliers. Contractor shall include all shop drawings and other submittals in its certification. ITB-2018-033-ND Page 43 40.4. Contractor shall thoroughly review and check the Shop Drawings and each and every copy shall show this approval thereon. 40.5. If the Shop Drawings show or indicate departures from the Contract requirements, Contractor shall make specific mention thereof in its letter of transmittal. Failure to point out such departures shall not relieve Contractor from its responsibility to comply with the Contract Documents. 40.6. Consultant shall review and approve Shop Drawings within seven (7) calendar days from the date received, unless said Drawings are rejected by Consultant for material reasons. Consultant's approval of Shop Drawings will be general and shall not relieve Contractor of responsibility for the accuracy of such Drawings, nor for the proper fitting and construction of the work, nor for the furnishing of materials or work required by the Contract Documents and not indicated on the Drawings. No work called for by Shop Drawings shall be performed until the said Drawings have been approved by Consultant. Approval shall not relieve Contractor from responsibility for errors or omissions of any sort on the Shop Drawings. 40.7. No approval will be given to partial submittals of Shop Drawings for items which interconnect and/or are interdependent where necessary to properly evaluate the design. It is Contractor's responsibility to assemble the Shop Drawings for all such interconnecting and/or interdependent items, check them and then make one submittal to Consultant along with its comments as to compliance, noncompliance, or features requiring special attention. 40.8. If catalog sheets or prints of manufacturers' standard drawings are submitted as Shop Drawings, any additional information or changes on such drawings shall be typewritten or lettered in ink. 40.9. Contractor shall submit the number of copies required by Consultant. Resubmissions of Shop Drawings shall be made in the same quantity until final approval is obtained. 40.10. Contractor shall keep one set of Shop Drawings marked with Consultant's approval at the job site at all times. 41. Field Layout of the Work and Record Drawings: 41.1. The entire responsibility for establishing and maintaining line and grade in the field lies with Contractor. Contractor shall maintain an accurate and precise record of the location and elevation of all pipe lines, conduits, structures, maintenance access structures, handholes, fittings and the like and shall prepare record or "as-built" drawings of the same which are sealed by a Professional Surveyor. Contractor shall deliver these records in good order to Consultant as the Work is completed. The cost of all such field layout and recording work is included in the prices bid for the appropriate items. All record drawings shall be made on reproducible paper and shall be delivered to Consultant prior to, and as a condition of, final payment. ITB-2018-033-ND Page 44 41.2. Contractor shall maintain in a safe place at the Project site one record copy of all Drawings, Plans, Specifications, Addenda, written amendments, Change Orders, Field Orders and written interpretations and clarifications in good order and annotated to show all changes made during construction. These record documents together with all approved samples and a counterpart of all approved Shop Drawings shall be available at all times to Consultant for reference. Upon Final Completion of the Project and prior to Final Payment, these record documents, samples and Shop Drawings shall be delivered to the Contract Administrator. 41.3. Prior to, and as a condition precedent to Final Payment, Contractor shall submit to City, Contractor's record drawings or as-built drawings acceptable to Consultant. 42. Safety and Protection: 42.1. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Project. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 42.1.1. All employees on the work site and other persons who may be affected thereby; 42.1.2. All the work and all materials or equipment to be incorporated therein, whether in storage on or off the Project site; and 42.1.3. Other property at the Project site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 42.2. Contractor shall comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and utilities when prosecution of the work may affect them. All damage, injury or loss to any property referred to in Sections 46.1.2 and 46.1.3 above, caused directly or indirectly, in whole or in part, by Contractor , any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, shall be remedied by Contractor . Contractor's duties and responsibilities for the safety and protection of the work shall continue until such time as all the Work is completed and Consultant has issued a notice to City and Contractor that the Work is acceptable except as otherwise provided in Article 24 hereof. 42.3. Contractor shall designate a responsible member of its organization at the Work site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to City. I1B-2018-033-ND Page 45 43. Final Bill of Materials: Contractor shall be required to submit to City and Consultant a final bill of materials with unit costs for each bid item for supply of materials in place. This shall be an itemized list of all materials with a unit cost for each material and the total shall agree with unit costs established for each Contract item. A Final Certificate for Payment cannot be issued by Consultant until Contractor submits the final bill of materials and Consultant verifies the accuracy of the units of Work. 44. Payment by City for Tests: Except when otherwise specified in the Contract Documents, the expense of all tests requested by Consultant shall be borne by City and performed by a testing firm chosen by Consultant. For road construction projects the procedure for making tests required by Consultant will be in conformance with the most recent edition of the State of Florida, Department of Transportation Standard Specifications for Road and Bridge Construction. The cost of any required test which Contractor fails shall be paid for by Contractor. 45. Project Sign: Any requirements for a project sign shall be paid by the Contractor as specified by City Guidelines. 46. Hurricane Precautions: 46.1. During such periods of time as are designated by the United States Weather Bureau as being a hurricane warning or alert, the Contractor, at no cost to the City, shall take all precautions necessary to secure the Project site in response to all threatened storm events, regardless of whether the City or Consultant has given notice of same. 46.2. - Compliance with any specific hurricane warning or alert precautions will not constitute additional work. 46.3. Additional work relating to hurricane warning or alert at the Project site will be addressed by a Change Order in accordance with Section 33, General Conditions. 46.4. Suspension of the Work caused by a threatened or actual storm event, regardless of whether the City has directed such suspension, will entitle the Contractor to additional Contract Time as noncompensable, excusable delay, and shall not give rise to a claim for compensable delay. 47. Cleaning Up; City's Right to Clean Up: Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its operations. At the completion of the Project, Contractor shall remove all its waste materials and rubbish from and about the Project as well as its tools, construction equipment, machinery and surplus materials. If Contractor fails to clean up during the prosecution of the Work or at the completion of the Work, City may do so and the cost thereof shall be charged to Contractor. If a dispute arises between Contractor and separate contractors as to their responsibility for cleaning up, City may clean up and charge the cost thereof to the contractors responsible therefore as Consultant shall determine to be just. ITB-20113-033-ND Page 46 48. Removal of Equipment: In case of termination of this Contract before completion for any cause whatever, Contractor, if notified to do so by City, shall promptly remove any part or all of Contractor's equipment and supplies from the property of City, failing which City shall have the right to remove such equipment and supplies at the expense of Contractor. 49. Nondiscrimination, Equal Employment Opportunity, and Americans with Disabilities Act: 1. Contractor shall not unlawfully discriminate against any person in its operations and activities or in its use or expenditure of funds in fulfilling its obligations under this Agreement. Contractor shall affirmatively comply with all applicable provisions of the Americans with Disabilities Act (ADA) in the course of providing any services funded by City, including Titles I and II of the ADA (regarding nondiscrimination on the basis of disability), and all applicable regulations, guidelines, and standards. In addition, Contractor shall take affirmative steps to ensure nondiscrimination in employment against disabled persons. Contractor's decisions regarding the delivery of services under this Agreement shall be made without regard to or consideration of race, age, religion, color, gender, sexual orientation, national origin, marital status, physical or mental disability, political affiliation, or any other factor which cannot be lawfully used as a basis for service detivery.Contractor shall not engage in or commit any discriminatory practice in violation of City of Miami Beach Ordinance No 92.2824 in performing any services pursuant to this Agreement. 2. NON-DISCRIMINATION. The Proposer certifies that it is in compliance with the non- discrimination clause contained in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to equal employment opportunity for all persons without regard to race, color, religion, sex or national origin. In accordance with the City's Human Rights Ordinance, codified in Chapter 62 of the City Code, Proposer shall prohibit discrimination by reason of race, color, national origin, religion, sex, intersexuality, gender identity, sexual orientation, marital and familial status, and age or disability. 50. Proiect Records: City shall have the right to inspect and copy, at City's expense, the books and records and accounts of Contractor which relate in any way to the Project, and to any claim for additional compensation made by Contractor, and to conduct an audit of the financial and accounting records of Contractor which relate to the Project and to any claim for additional compensation made by Contractor. Contractor shall retain and make available to City all such books and records and accounts, financial or otherwise, which relate to the Project and to any claim for a period of three (3) years following Final Completion of the Project. During the Project and the three (3) year period following Final Completion of the Project, Contractor shall provide City access to its books and records upon seventy-two (72) hours written notice. ITB-2018-033-ND Page 47 51. Performance Evaluations: An interim performance evaluation of the successful Contractor may be submitted by the Contract Administrator during construction of the Project. A final performance evaluation shall be submitted when the Request for Final Payment to the construction contractor is forwarded for approval. In either situation, the completed evaluation(s) shall be forwarded to the City's Procurement Director who shall provide a copy to the successful Contractor. Said evaluation(s) may be used by the City as a factor in considering the responsibility of the successful Contractor for future bids with the City. 52. Occupational Health and Safety: In compliance with Chapter 442, Florida Statutes, any toxic substance listed in Section 38F-41.03 of the Florida Administrative Code delivered as a result of this bid must be accompanied by a Material Safety Data Sheet (MSDS) which may be obtained from the manufacturer. The MSDS must include the following information: a. The chemical name and the common name of the toxic substance. b. The hazards or other risks in the use of the toxic substance, including: i. The potential for fire, explosion, corrosion, and reaction; ii. The known acute and chronic health effects of risks from exposure, including the medical conditions which are generally recognized as being aggravated by exposure to the toxic substance; and iii. The primary routes of entry and symptoms of overexposure. c. The proper precautions, handling practices, necessary personal protective equipment, and other safety precautions in the use of or exposure to the toxic substances, including appropriate emergency treatment in case of overexposure. d. The emergency procedure for spills, fire, disposal, and first aid. e. A description in lay terms of the known specific potential health risks posed by the toxic substance intended to alert any person reading this information. f. The year and month, if available, that the information was compiled and the name, address, and emergency telephone number of the manufacturer responsible for preparing the information. 53. Environmental Regulations: The City reserves the right to consider a Bidder's history of citations and/or violations of environmental regulations in investigating a Bidder's responsibility, and further reserves the right to declare a Bidder not responsible if the history of violations warrant such determination in the opinion of the City. Bidder shall submit with its Bid, a complete history of all citations and/or violations, notices and dispositions thereof. The nonsubmission of any such documentation shall be deemed to be an affirmation by the Bidder that there are no citations or violations. Bidder shall notify the City immediately of ITB-2018-033-ND Page 48 notice of any citation or violation which Bidder may receive after the Bid opening date and during the time of performance of any contract awarded to it. 54. "Or Equal" Clause: Whenever a material, article or piece of equipment is identified in the Contract Documents including plans and specifications by reference to manufacturers' or vendors' names, trade names, catalog numbers, or otherwise, City, through Consultant, will have made its best efforts to name at least three (3) such references. Any such reference is intended merely to establish a standard; and, unless it is followed by the words "no substitution is permitted" because of form, fit, function and quality, any material, article, or equipment of other manufacturers and vendors which will perform or serve the requirements of the general design will be considered equally acceptable provided the materials, article or equipment so proposed is, in the sole opinion of Consultant, equal in substance, quality and function. ANY REQUESTS FOR SUBSTITUTION MUST BE MADE TO THE CITY'S PROCUREMENT DIRECTOR, WHO SHALL FORWARD SAME TO CONSULTANT. ITB-2018-033-ND Page 49 ATTACHMENT A RESOLUTION COMMISSION ITEMS AND COMMISSION MEMORANDUM Coversheet Page 1 of 2 Competitive Bid Reports-C2 E MIAMI BEACH COMMISSION MEMORANDUM TO Honorable Mayor and Members of the City Commission FROM: Jimmy L.Morales,City Manager DATE: July 25,2018 SUBJECT:REQUEST FOR APPROVAL TO AWARD A CONTRACT PURSUANT TO INVITATION TO BID (ITB) NO. 2018-033-ND FOR THE PURCHASE OF CONCRETE CURBING/SIDEWALK CONSTRUCTION, MILLING AND RESURFACING OF ASPHALT CONCRETE,AND STRIPING OF CITY STREETS AND PARKING LOTS. RECOMMENDATION The Administration recommends that the Mayor and City Commission of the City of Miami Beach, Florida approve the City Manager's recommendation pertaining to bids received, pursuant to ITB 2018-033-ND for the Purchase of Concrete Curbing/Sidewalk Construction. Milling and Resurfadng of Asphalt Concrete, and Striping of City Streets and Parking Lots ANALYSIS In order to establish a contract for the purchase of concrete curbing sidewalk construction, asphaltic concrete/related materials, and the striping of city streets and parking lots, on April 13, 2018, the City issued an Invitation to Bid 2018-033-ND (the "ITB"). The purpose of the ITB is to establish a push button contract, by means of sealed bids, for the purchase of concrete curbing sidewalk construction, milling and resurfacing of asphalt concrete, and striping of City streets and parking lots. The City intends to pre-qualify multiple contractors to be eligible for future work. The purpose of this ITB is to establish fixed unit pricing for a wide range of items or services that may be required for future work. When a specific scope of work is required, the requesting department will select the vendor that has provided the lowest cost based on the unit prices established pursuant to the ITB. These types of contracts are used extensively by transportation authorities counties and municipalities to assure that required work is being expedited while assuring the lowest overall cost for the projects. ITB PROCESS The ITB was issued on April 13, 2018, with bid opening date of May 14, 2018. The Procurement Department issued bid notices to 347 companies utilizing www.publicpurchase.com website. 38 prospective bidders accessed the advertised solicitation. The notices resulted in the receipt of three (3) responses from: CEEPCO Contracting, LLC. ("CEEPCO"), Metro Express, Inc. ("Metro Express"), and Team Contracting, Inc. ("Team Contracting'). See tabulation sheet (Attachment A). In its due diligence, the Procurement Department found that CEEPCO, Metro Express, and Team Contracting met the requirements of the ITB, including: Concrete Curbing/Sidewalk Construction and Milling and Resurfacing of Asphalt Concrete - Prospective Bidder must be a State of Florida Certified or a Miami Dade County Licensed General Contractor. Striping of City Streets and Parking Lots - Prospective Bidder must be a State of Florida Certified or a Miami Dade County Licensed General Contractor or Miami Dade County Licensed Paving Engineer. The three (3) bidders have been deemed responsive to the ITB requirements. A brief description of each proposer follows. Metro Express is an incumbent on the City's current contract for asphalt-related materials and milling and resurfacing of asphalt concrete services. To date the Public Works Department views its workmanship to be excellent. Team Contracting is an incumbent on the City's current contract for concrete curbing/sidewalk construction https://miam ibeach.novusagenda.com/agendapublic/CoverSheet.aspx?Iteml... 7/24/2018 Coversheet Page 2 of 2 services to the City. To date the Public Works Department is satisfied with the service being provided. CEEPCO Contracting, LLC. Is a design-build minority owned consulting firm that provides high quality technical support and services to private and commercial organizations as well as government agencies. References indicate satisfaction with services provided. CONCLUSION As previously stated, award of the ITB will establish a pool of prequalified firms that have submitted fixed unit pricing for a wide range of items or services that may be required for future work. While the actual lowest bidder may vary by item, when a specific project is to be undertaken, staff will utilize the total of the unit prices submitted by each bidder for the required areas of work to identify the overall lowest total cost contract for the project. These types of contracts, known as push button contracts, are common in the industry and used extensively by agencies such as the Florida Department of Transportation. They are innovative ways to expedite work while assuring the City is benefiting from pricing established through competitive solicitations. Therefore, after reviewing the bids received and the evaluation of staff, I recommend that the Mayor and City Commission of the City of Miami Beach, Florida, approve the award of a contract, pursuant ITB 2018-033-ND, to CEEPCO Contracting. LLC., Metro Express, Inc., and Team Contracting, Inc., as responsive, responsible bidders to the ITB; and further authorize the Mayor and City Clerk to execute the contracts. KEY INTENDED OUTCOMES SUPPORTED Build And Maintain Priority Infrastructure With Full Accountability FINANCIAL INFORMATION Grant funding will not be utilized for this project. Amount 1 $50,000 Account 1 425-0410-000343-29-421-513-00-00-00 Amount 2 $50,000 Account 2 425-0420-000342-29413-513-00-00-00 Amount 3 5145,000 Account 3 011-0840-000325-29-403-521-00-00-00 Amount4 $143806 Account 187-0810-061357-00-010-530-00-00-00- 26700 Amount 5 $248,047 Account 5 187-0815-061357-00-410-530-00-00-00- 29810 Total $636,853 Legislative Tracking Public Works/Procurement ATTACHMENTS: Description o Attachment A https://miam ibeach.novusagenda.cora/agendapublic/CoverSheet.aspx?Iteral... 7/24/2018 • A TTA CH M ENT A CEEPCO Contracting,LLC I Metre Express,Inc. I Team Contracting,Inc CONCRETE CURBING SIDEWALK CONSTRUCTION Total Total Total hen Description Quanthy UM unit Cow (Gowan_X_ ntiI_Cost) Unit Con (Ouamlry Unit_Cost) unit Cort (Ouannty_Xj nit_Cos9 I Remove and Replace 4"Concrete Sidewalk 3,000 SF $6.00 513.000 00 $4.50„ S13.590.00 57.50 $22.800.00 Remove and Replace 4'Concrete Snew3'k with additional equipment no dump ruck 3,000 SF 8675 520,250.00 3475 $1425000 $7.10 621 30000 2 ormntalrer may be used) + 3 Remove aid Replace 6"Oaxrete Sidewalk 3.000 SF $675 $2025000 $5.10, $15,300.00 $7.60 522.500.00 Remove and Reda;e o'Concrete Sidewalk +nth addition equipment(where no dump Kick 3.000 SF $725 52.750.00 $545 $1035.00 57.10 $2'.30a0a a air container may be used) 4 5 Remove and S Replace 24' 'Cut8 Gutter 1.000 LF 523.50 32350000 $17.50,. 517500.0 $3500 $35.50.00 6 Remove and Replace 35002'Cut 8 Gutter 1.003 LF $24.00 $24.0000.00 $21.50 $21,50000 $35.00 $3501000 7 Remove and Replan TOY'Curb 1.000 LF $20.50 520.40000 $13.00 / S13,000.00 $16.00 $16.000.00 Can in Place Amencan OisabiliesAct 1ADE 40 Eq $30000 e Mats Yellow/Gray $12000.00 5390.000. $1203.00 523000 58,660.90 g Surface Apdied ADA Mats YelbwiG2y 40 EA $25.00 510000.00 $300.00, $1203.00 $1060143 $6,400.00 10 Consfct 4"Concrete Sidewalk 3,000 SF $5.70 51710.00 $4.50 / $13500.00 $6.80 320.40)03 Construct 4'Concrete Sidewalk wtd aldlAona equipment lwdere no dump buck or container 3.000 SF $6.00 $16,60000 $4.50 $ 513500.00 $6.70 520,100.00 II may 00 used) 12 Constructs Concrete Sidewalk 3.000 SF $6.50 $19500.00 $al0 a 515,300.00 5670 82010000 Conslmot 5'Concrete Sidewalk with adilional equipment(where no dump Puck or rontSner 3.000 SF $695 52035000 55.45' $16350.00 57.30 521.900.00 13 may beused) 14 Const 18'Cut 8 Gutter 3,000 LF $19.50 $50.:00.00 51703 551.000.00 310.00 530.660.00 15 Zonstruct 24'Cut a Gutter 3203 LF $22.50 $67500.03 $19.00/ 553000.00 51600 548.000.000 16 Constant 30'Curb 4GuMr 3,05 LF $2253 557503.00 821.00./ $63,003.0) $1800 $51,053.03 17 Construct 6"xir Concrete Cut 3,0000 LF $195 $55,500.00 51300/ $39 MOO $10.00 530.0000.00 18 Construct Pedestrian Ramp 12 EA $400.00 $4.@500 52.53.04 $5000.00 $I,50.00 $18.000.0) Upcharge for Extra Strength Concrete 4,000 19 0001.010 OF 8040 5400.00 $1.50/ 81,50000 $1.00 51.000.00 p Addition of Miami Seah Red Candng Mi&Nre 4,000 CV 315.00 $6905.00 $2001 $8.0010.00 $5.00 $10.103.03 21 Pavement ResMadon 3,000 5F $2.50 17500.00 $5.00 / $15,000.00 54.00 $12000.00 22 Fumisn and install New flavors 1,05 SF $9.50 $9500.00 $6.00' $605.00 51100 311.01000 21 Remove and Reset Existing Pavers 1.000 SF 54.25 54.25100 53.0/ $3003100 $11.00 511.000.00 24 Furnish and Instal l'Meter Box 50 FA 520,53 $1,02500 $20.001 5111,0.13.3 5583.00 $34,009.00 25 Famish and Install 15"Meter Son 50 EA $4250 $2,125.00 $25.007 $12504100 $8000.03 500.0.00.00 26 Furnish and install 7 Meter Box 50 EA 122&00 $11,25000 5300.09/ $15,000.00 $78000 539,0300 27 Furnish and Install 3'Meter 320 50 EA $275.3 $13150.00 5500.00 $25000.00 $1,23.00 500,00000 18 Furnish aid Install Sewer Clea Out Box 50 EA $32500 $16201.00 $50.00 515,( ..00 $600.00 55,000.5 29 Fumisn and Install Electrical Box 10 EA 527500 52.750.00 $30000 / $3000.5 5700.00 $730.00 x Install Hand Rails 100 LF $4.50 1450.00 1300 156000.00 $100.00 $10.00000 31 Remove and Replace Existing Pavers 1,000 SF $13.50 113500.00 $3.50 s/ 53500.00 $11.00 511,00000 ATTACHMENT A CEEPCO Cmtractng,LLC I Metro Express.Inc. I Team Cmtaang,Inc. MILLING 8 RESURFACING OF ASPHALT CONCRETE Total Total Iota/ kern Description Quantity UM Unit Cost (91uanbty_x_unil_Cosp Unit Cost (Quanby_x Unit_Cosp Unit Cost (Quaiiyj Unit_Cosg 32 Rework Umerock Base J-3 Inches 25,000 CY $18.40 $460.00100 $11.001 5275000.00 No Bid Na Bid 53 Remove and replace S nch Lmemck base 25,000 CY $25.00 4615,000.e0 $12.0G"I 5300,OLG.00 No Bid No BN 34 New Limercck 9lnch base 25.300 CY 2200 $55010000 $15.00 S3251003.00 No Bid No Bid 35 Roads-0.003 Tons Leveling Course 1.000 TN 511600 5176.003➢9 $140.00 5140,00000 No Bio No 34 36 Roads-200 Tons Levelmq Course 1,000 TN $116.00 $116,00.30 5140.00 $140000.00 No Bid No Bid 31 ntersections-0-200 Tons eveling Course 500 TN 3116.00 553.000 00 $14600 $1000000 No Bid No Sid 35 Intersections-200-r Tons Leveling Course 500 TN $1 mix $58. .eo $140.00 570.03000 No did No Bid 39 PICOT Tape III-Asphalt Concrete 12,4009 TN $116.00 51.392,003.00 SI 50.00 51.800.1)00.00 No Bid No Bid 40 Adjust Manhole ablor Valve Boxes 50 EA 31,60C.00 $80,000.00 $75.00 $8,150.00 No Bid No Bid Si Adjust Manhole 50 EA stektoo $80903.00 $33.00 SI0000.03 No Bid No Bid 42 Redixe Manhole Rim and Cover 50 EA $4,500,00 $225,00000 $20000 SI 0,000000 No Bid No 3.1 43 Adjust Valve Boxes 50 EA $215.00 $1375300 5175.00 $9.79.00 No Bid No Bid 44 Retlace Valve Box CmMRlser 50 EA $590.00 52.5x.00 $11503 $8)5000 No Bid No Bid 45 Replace Traffic Loops(d68loops) 10 E1 $61500 $6,793.00 $100.000.130I $1.003.000.00 No 900 No Bd Saw Cuffing&PermanentalB PakM1ing gatBase d Roller Cpmpytion-f'Removal 200,000 LF $5.9 511[0.00030 7050 $900.X'0.0 No Bid No Bid as Saw Cutting B Permanent Patching n/Base d 200200.000IF $5.50 $1,ICO.Ofq.00 46.9 61 Roller Compallon-Y Removal B Patching ✓ $1.300.000.00 No3id No Rd 4s Milling Existing Asphalt Concrete-1'Cut 1$200 SY $1350 516200000 $120 A. $21,600.00 No Bid No Bid 49 Milling Eristwg Asphalt Concrete-P'Cul 12.000 5Y $14.50 5114,000.00 32.508 333.300.00 No Bid No 3d 50 6Ailiing Exiadng Asphalt Concrete-3'Cut 12000 SY 515.50 $186,0000J $3.00 / $46,800.00 No Bid No Bid 51 Milling Esling Pannell Concrete-4'Cul 12.000 SY 366.50 SI98000.CD $4.25 I $51,000.00 No Bid No Bid STRIPING OF CITY STREETS No Bid Na Bid 52 Themoplastic 4'Solid Ye4bwtMiite 5.280 LF $150 $13.480.00 $075 ' 53960:93 No Bid 'k Bid 53 4'Solid YellowiwN@Pant 5280 LF $3.50 5184x.00 30.75 $3,330.00 No Bid No Bid 54 Themoplastc 4'Skip Whne 5,200 L= $39 $18480.00 $1.00 $5280.00 No Bid No Bid 55 Thernoplashc 4'Skip Yellow 5.280 LF $1550 $18480.00 $1.00 $5,260.00 No Bid No Bid 56 4'Slop YeNWwWlh4ile Paint 5,260 LF $250 513210.00 $0.40 $2,112.00 No Bid No Bid 51 Themoplaadc 6'Solid White 5,280 IF $150 $10,480.00 $1.20 $6.336.00 No Bid No Bid 55 Rampplaspc 6'Solid Yellow 5,280 LF $150 $18480.00 $1.20 $6.33600 No Rid No Bid so 6'Soli YelbwrWhite Pant 5,260 t$ $29 51120000 50.50 $26440.00 No Bid No Rid 600 Themoplasoc 6'Skip While 5.250 IF $3.50 $10.480.00 51.20 $6136.00 No Bid No Bid 61 Themcplsstic 6"Skip Yellow 5,080 LF $150 518.480 00 51.20 56.336.00 No BN No Bid 62 6'Skip YNlowJATlle Paint 5,280 IF $250 $11200 00 $0.50 $2,340.00 No did Na Bid 63 Themoplaztc 8'Solid White 5,280 LF $3.9 $1848a00 51.00 $8,148,00 No Bid Na Bid 64 Themoplastic 8'Solid Yellow 5,280 LF $150 $18480.00 $1.65 $8112.0 No Bid No Bid 65 8"Solid Yellow/White Paint 5,280 LF 52.9 513230.00 $110 $5.808.00 No Bid No Bid 66 Tlemoplasoc lY Solid While 5,280 LF $3.50 SI 8.480.00 $200 $10.560.00 No Bid No Bid 67 Temcplashc 17 Solid Yellow 5.280 LF 5150 $18,480.00 $2.00 $10,560.00 No Bid No Bid 66 12"Solid YNWWIWhite Paint 5,280 LF $29 $13,2).X' $0.90 $475200 No Bid No Rd 69 ThemodasSC IT Solid White 5,200 IF 5350 $16480.00 5260 $13126.00 No Bid No Bid 70 Themoplasbic lB'Solid Yellow 5.280 LF 53.50 516,48600 $269 $13,72800 No Bid No Bid 71 18'Solid YNIow,Ihi Pahl 5280 LF USC $13.200.00 5120 $6.336.00 No Bid No Bid 12 Thenwgastic 24'Solid White 5,280 LI $150 SI8480 00 5190 $20,592.00 No Bid No Bid 73 'hemoplasoc 24"Solid Yellow 5280 LF 5350 51848000 4190 520592.00 No Bid No Rid ATTACHMENT A CEEPCO Contacting,LLC Metro Express,Inc. Team Contracting,Inc. Total Total Total Mem Description Quantiy UN Unit Cop ICuareiy XUmLCwq unit Cost (Oumdy_X Unlit_Cost) unit Cost (Ouanlay X Unit)CaU 74 24'Sdid YellowAhile Paint 5.230 LF $250 313.20000 6110 3/6,363 DO No Bid No Bio 75 RPMs(Road Reflector, 500 FA 5650 33,25100 55.09 $250)00 No Bid No Bid Themmgasuc Arrows 14'(Std.MDC B FWOT 76 Specs) 50 FA 530.90 51.545.00 390.00 No NO Bitl No Bid Arrows II'(Sr.MDC&FOOT Soecsi Philo 50 EA 59.$0 313(300 11 Paint $40.00 52,00050 No 316 No Bid 88 Thermoplastic Handicap Logo&Bile Stripe 5 EA $400.00 52,000'0.00 3200.00 11000.00 No Bid NoBP ry Handicap Logo 8 BM1e Snipe Paint 5 EA $32500 5'.52500 5110.00 5550.00 No Bid No Bq Removal of ALL SRWg Thermo SNIP'S 30 pnrmblesO 1000 SF 53.00 53.500,00 59.0040.000.5 No Bid NO BW 81 Bicycle Pavement MaMing 50 EA $50.90 32.545.00 5175.00 38750.00 NO Bid No Bid B2 Thermoplastic Messages 50 EA 59).90 52.545.00 $275.00 SI 375640 No Bid No Bid 83 Paint Messages 50 LA 35090 $2.545.00 5120.00 $6400.00 No Bid No Bid 84 elnstallaton of New Traffic Sign to EA 53550.00 5350000 5275.00 32]50.00 No Bid No Oo STRIPING OF PARKING LOTS 85 Thermoolastic Stno Bars 52'WIC) 150 LP 53.00 5'.20,03 $150 5525.00 No BP No BN 86 Stop Bas(12'elide(White Pain 100 LF $4.50 467500 $1.50 3225.00 No Bid No Bid Thermoprste ARONs IP(SM.MDC 8 FDOT 87 Sceosl 50 FA 550.90 51.54500 5915 54.600.00 No Bid No BN Arrows I4"(SM.MDC 8 FOOT Specs(White 86 Paint 50 EA 527.50 51375.00 $40.00 52.000.00 No Bid No Bid 89 Thermoplastic Cross Hashing It2) 200 LF $7.50 31500.00 5225 $450.80 No Bq NO Sid 90 Cross Hatching Or;White Paint 200 LA 54.50 5900.00 $0.90 5180.00 No Bid No Bid 91 Themopastic Handicap Logo&Blue Stripe 30 EA $350.00 510503.00 5200.00 $6,00100 No Bid NO Bid 92 Handicap Logo&Blue Since Pant 30 EA $315.00 59450.00 $11000 $3.300.00 No Bid No Bb 93 Tnermepauc Disable Cross Hotting 14 I60 EA 35250 38400.00 $100.00 amour) No Bid No Bid 94 Disable Cross Habiting(4")PSnt 160 FA $27.50 54,400.00 9500 512,00000 No B1O No Bid 95 Wheel Stop Installation 200 EA $31.50 $)500.00 525.00 5500000 No Bid No Bid 96 Installation of New franc Sign 10 EA 5325.00 33.25000 59500 52.750.00 No Bid No Bid ATTACHMENT B INVITATION TO BID (ITB) AND ADDENDUMS MI AMI B EAC HProcurement Department 1755 Meridian Ave.. 3rd Floor, Miami Beach, Florida 33139 www,m i a m i be ach f 1.g o v ADDENDUM NO, 1 INVITATION TO BID NO.2018-033-ND FOR THE PURCHASE OF CONCRETE CURBING/SIDEWALK CONSTRUCTION, MILLING AND RESURFACING OF ASPHALT CONCRETE,AND STRIPING OF CITY STREETS AND PARKING LOTS(the ITB) May 7,2018 This Addendum to the above-referenced ITB is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only (deletions are shown by stnkethrough and additions are underlined), I. ITB DUE DATE AND TIME. The deadline for receipt of submittals is extended until 3:00 p.m., Monday, May 14. 2018 at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3b Floor Miami Beach, Florida 33139 Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow for traffic or other delays for which the Proposer is solely responsible. IL REVISION: Delete in its entirety reference to the cost of law enforcement officers being provided as a pass-through cost only (Section 1.5.8.4, on page 39 of the ITS, Section 2.1.16.4, on page 52 of the ITB, and Section 2.2.4.3 on page 56 of the ITS). III. REVISION: Delete Appendix E, Cost Proposal Form, on page 61-64 of the ITB, in its entirety and Replace with Revised Appendix E, Cost Proposal Form, attached hereto as Exhibit A. THE REVISED COST PROPOSAL FORM IS REQUIRED TO BE SUBMITTED WITH THE PROPOSAL. FAILURE TO SUBMIT THE REVISED COST PROPOSAL FORM WITH THE PROPOSAL SHALL DEEM PROPOSER NON-RESPONSIVE. IV, ATTACHMENTS. Exhibit A:Revised Appendix E, Cost Proposal Form. V. RESPONSES TO QUESTIONS RECEIVED. 01: Does the city have any provisions for contract price adjustments in the event of price escalations for concrete and steel? Al: Please refer to Appendix D,Special Conditions,2.1 Option to Renew with Price Adjustment. Q2: Different municipalities with similar contracts include a mobilization line item for concrete work. It has been brought to my attention that numerous city departments utilize the concrete sidewalk contract to either replace small amounts of sidewalk flags or install site furnishing pads that are 2 cubic yards or less. Would the city consider including a mobilization line item for such occurrences? A2: The unit cost provided by the bidder in Appendix E,Cost Proposal Form, should include all labor, material,equipment, supervision, mobilization and demobilization costs. ITB No.2018-033-ND Addendum#1 • 5/7/2018 MIAMIB EACHProcurement Department 1755 Meridian Ave, 3ro Floor, Miami Beach, Florida 33139 wwwmiamibeachfl.gov Q3: Will the City be awarding contractors by bid group or individual line items? A3: Following the review of bids and application of vendor preferences, the lowest responsive, responsible bidder(s) meeting all terms, conditions, and specifications of the ITS will be recommended for award by item, bid group, or for the entirety of all bid Items, as deemed In the best interest of the City. Q4: Will sign and sealed shop drawings be required for railings? A4: Signed and sealed shop drawings will be required for railings. Q5, Will certified MOT plans be reimbursed? A5: Please refer to Section IL of this addendum. The unit cost per line item shall include all labor, material, equipment, supervision, mobilization and demobilization costs, maintenance of traffic including off duty police officers, If necessary, and transportation necessary for concrete • curbing/sidewalk construction on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RataelGranado@miamibeachfl.gov Contact: Telephone: Email: • Natalia Delgado 305-673-7000 ext. 6263 nataliadelgado(Dmiamibeachfl,gov Proposers are reminded to acknowledge receipt of this addendum as part of your ITS submission. Potential proposers that have elected not to submit a response to the ITB are requested to complete and return the "Notice to Prospective Bidders" questio naire with the reason(s)for not submitting a proposal. Si eel ' "`C / ' Al Den' P ocure t Director PLEASE BE REMINDED THAT THE REVISED COST PROPOSAL FORM IS REQUIRED TO BE SUBMITTED WITH THE PROPOSAL. ITB No. 2018-033-ND Addendum#1 5/7/2018 , MIAMI B EACHProcurement Department 1755 Meridian Ave, 3rd Floor, Miami Beach, Florida 33139 www,miamibeachh.gov REVISED APPENDIX E COST PROPOSAL FORM Failure to submit Appendix E,Cost Proposal Form,in its entirety and fully executed by the deadline established for the receipt of proposals will result in proposal being deemed nonresponsive and being rejected. Bidder affirms that the prices stated on the proposal price form below represents the entire cost of the items in full accordance with the requirements of this ITB, inclusive of its terms, conditions, specifications and other requirements stated herein, and that no claim will be made on account of any increase in wage scales, material prices, delivery delays, taxes, insurance, cost indexes or any other unless a cost escalation provision is allowed herein and has been exercised by the City Manager in advance. The Cost Proposal Form (Appendix E) shall be completed mechanically or, if manually, in ink. Cost Proposal Forms (Appendix E)completed in pencil shall be deemed non-responsive. All corrections on the Cost Proposal Form (Appendix E) shall be initialed. Tote Item Description I Quantity UIM Unit Cost Quantity x_umt Cost) CONCRETE CURBING/SIDEWALK CONSTRUCTION-Contractor proposes to furnish all labor,material,equipment,supervision, mobilization and demobilization costs, maintenance of traffic including off duty police officers, if necessary, and transportation necessary for concrete curbing/sidewalk construction on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. 1 Remove and Replace 4'Concrete Sidewalk 3,000 SF i $ $ Remove and Replace 4'Concrete Sidewalk ' with additional equipment(where no dump 2 truck or container may be used) 3,000 SF $ $ 3 Remove and Replace 6"Concrete Sidewalk 13,000 SF $ $ Remove and Replace 6"Concrete Sidewalk ' with additional equipment(where no dump 4 truck or container may be used) • 3,000 SF $ $ 5 Remove and Replace 24"-30'Curb&Gutter 1,000 LF $ $ 6 Remove and Replace 36"-42'Curb&Gutter . 1,000 LF $ $ 7 Remove and Replace 6"x12"Curb 1,000 LF $ $ • Cast in Place American Disabilities Act(ADA) 8 Mats Yellow/Gray 40 EA $ $ 9 Surface Applied ADA Mats Yellow/Gray 40 EA $ $ 10 Construct 4'Concrete Sidewalk 3,000 SF $ $ Construct 4"Concrete Sidewalk wilts additional equipment(where no dump truck or 11 container may be used) 3,000 I SF $ $ 12 Construct 6"Concrete Sidewalk 3,000 SF $ $ Construct 6"Concrete Sidewalk with additional equipment(where no dump truck or 13 container may be used) 3,000 SF $ $ 14 Construct 18'Curb&Gutter 3,000 LF $ $ 15 Construct 24'Curb&Gutter 3,000 LF $ $ 16 Construct 30"Curb&Gutter 3,000 LF $ $ 17 Construct 65(12"Concrete Curb 3,000 LF $ $ 18 Construct Pedestrian Ramp 12 EA $ I $ Upcharge for Extra Strength Concrete(4,000 19 psi) 1,000 CF $ $ ITB No.2018-033-ND Addendum#1 5/2/2018 M I AMI B EAC HProcurement Department 1755 Meridian Ave, 3'h Floor, Miami Beach, Florida 33139 www.miam i beachfl.gov 20 I Addition of Miami Beach Red Coloring Mixture 4"000 CY I $ $ 21 Pavement Restoration 3,000 SF $ $ 22 Furnish and Install New Pavers 1,000 I SF $ $ 23 Remove and Reset Existing Pavers 1,000 SF $ $ 24 Furnish and Install 1"Meter Box 50 EA $ $ 25 Furnish and Install 1 5°Meter Bcx 50 EA ' $ $ ' 26 Furnish and Install Z Meter Box 50 EA $ $ 27 Furnish and Install 3'Meter Box 50 EA $ $ 28 Furnish and Install Sewer Clean Out Box 50 EA $ $ 29 Furrish and Install Electrical Box 10 EA $ $ 30 Install Hand Rails 100 r LF $ $ 31 Remove and Replace Exisdn• Pavers 1,000 SF $ 1 $ Total Item Description Quantity UI M Unit Cost (Quantity x Unit Cost) MILLING 8 RESURFACING OF ASPHALT CONCRETE - Contractor proposes to furnish all labor, material, equipment, supervision, mobilization and demobilization costs, maintenance of traffic including off duty police officers, if necessary, and transportation necessary to mill and resurface asphalt concrete on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. 32 Rework Limerock Base+/-3 inches 25,000 CY $ $ 33 Remove and replace 8 Inch Limerock base 25,00C CY $ $ 34 New Limerock 8 inch base 25,000 CY $ $ 35 Roads-0-200 Tons Leveling Course 1,000 TN $ $ ' 36 Roads—200+Tons Leveling Course 1,000 TN $ $ 37 Intersections—0—200 Tons Leveling Course 500 TN $ $ 38 Intersections-200+Tons Leveling Course 500 TN $ $ 39 FDOT Type III-Asphalt Concrete 12,000 TN $ $ 40 Adjust Manhole and/or Valve Boxes 50 EA $ $ 41 Adjust Manhole 50 EA $ $ 42 Replace Manhole Rim and Cover . 50 EA. $ $ 43 Adjust Valve Boxes 50 EA $ $ 44 Replace Valve Box Cover/Riser 50 i EA $ $ 45 Replace Traffic Loops(4,6,8 loops) 10 EA $ $ Saw Cutting&Permanent Patching w/Base& 46 Roller Compaction-1"Removal&Patching 200,000 ' LF $ $ Saw Cutting&Permanent Patching w/Base& 47 Roller Compaction—2"Removal&Patching 200,000 LF $ $ 48 _ MIIGng Existing Asphalt Concrete—1'Cut 12,000 1 SY $ $ 49 Milling Existing Asphalt Concrete—2"Cut 12,000 I SY $ $ 50 Milling Existing Asphalt Concrete—3"Cut 12,000 SY $ $ 51 Milling Existing Asphalt Concrete—4'Cut 12,000 1 SY $ , $ Total Item Description ' Quantity U I M Unit Cost Quantity x_unit Cost) STRIPING OF CITY STREETS - Contractor proposes to furnish all labor, material, equipment, supervision, mobilization and demobilization costs, maintenance of traffic Including off duty police officers, if necessary, and transportation necessary to stripe streets on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. 52 Themoplastic 4'Solid Yellow/White 1 5,280 LF $ I $ I ITB No.2018-033-ND Addendum#1 5/2/2018 • MIAMI B EACHProcurement Department 1755 Meridian Ave, 3rd Floor, Miami Beach, Florida 33139 wwWv.miamibeachfl.gov 53 J 4"Solid°ellpw/White Paint 5,280 I LF $ $ 54 Themoplastic 4"Stp White 5,280 LF $ • $ 55 Themoplastic 4"Skip Yellow 5,280 LF $ $ 56 4"Skip Yellow/White Paint 5,280 LF $ $ 57 Themoplastic 6"Solid White 5,200 LF $ $ i 58 Themoplastic 6"Solid Yellow 5,280 LF • $ $ 59 6°Solid Yellow/White Paint 5,280 LF $ $ 60 Themoplastic 6"Skip White 5,200 LF $ $ 81 Themoplastic 6°Skip Yellow 5,280 LF $ $ 62 6"Skip Yellow/White Paint 5,280 LF $ $ 63 Themoplastic 8'Solid White 5,280 LF $ $ 64 Themoplastic 8"Solid Yellow 5,200 LF $ $ 65 8"Solid Yellow/White Paint 5,280 LF $ $ 66 Themoplastic 12"Solid White 5,280 LF $ $ 67 Themoplastic 12"Solid Yellow 5.200 LF $ $ 68 12'Solid Yellow/White Paint 5,280 LF $ $ 69 ' Themoplastic 18"Solid While 5,280 LF $ i $ 70 Themoplastic 18"Solid Yellow 5,280 LF $ I $ 71 18"Solid Yellow/White Paint 5,280 LF $ I $ 72 Themopiastic 24°Solid White 5,280 LF $ $ 73 Themoolastic 24"Solid Yellow 5,280 LF $ $ 74 24"Solid Yellow,M/hite Paint 5,280 LF $ $ . 75 RPMs(Road Reflector) 500 EA $ j $ Thermoplastic Arrows 14"(Std.MDC&FDOT 76 Specs( 50 1 EA , $ $ Arrows 14"(Std.MDC&FDOT Specs)White 77 Paint 50 EA $ $ 78 Thermoplastic Handicap Logo&Blue Stripe 5 EA $ $ 79 Handicap Logo&Blue Stripe Paint 5 EA $ $ Removal of ALL Existing Thermo Striping 80 (hydroblast) 1,000 SF $ $ 81 Bicycle Pavement Marking 50 EA $ C $ 82 Thermoplastic Messages 50 EA $ $ 83 Paint Messages 50 EA $ • $ 84 Installation of New Traffic Si•n 10 EA $ $ Total Item Description I Quantity UIM Unit Cost (quantity X Unit cost) STRIPING OF PARKING LOTS • Contractor proposes to Farnish all labor, material, equipment, supervision, mobilization and demobilization costs, maintenance of traffic including off duty police officers, if necessary, and transportation necessary to stripe parking lots on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. 85 Thermoplastic Stop Bars(12"Wide) 150 LF $ $ 86 Stop Bars(12"Wide)White Paint 150 LF $ $ Thermoplastic Arrows 14"(Std.MDC&FDOT 87 Specs) 50 EA $ $ Arrows 14'(Std, MDC&FDOT Specs)White 88 Paint 50 EA $ $ ITB No.2018-033-ND Addendum#1 5/2/2018 MIAMI B EACH Procurement Department 1755 Meridian Ave, 3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov 89 Thermoplastic Cross Hatching(12"1 200 LF $ $ 90 Cross Hatching(12")White Paint 200 LF $ : $ 91 Thermoplastic Handicap Logo&Blue Stripe 30 EA $ $ 92 Handicap Logo&Blue Stripe Paint 30 EA $ $ _ 93 Thermoplastic Disable Cross Hatching(41 160 EA $ $ 94 Disable Cross Hatching(4")Paint • 16C EA $ $ �� 95 Wheel Stop Installation 200 EA $ $ 96 Installation of New Traffic Sign 10 F EA $ $ Bidder's Affirmation Company: Authorized Representative: Address: Telephone: Email: Authorized Representative's Signature: The remainder of this page was left intentionally blank. • ITS No. 2018-033-ND Addendum#1 5/2/2018 L': BEACH INVITATION TO BID ( ITB ) FOR THE PURCHASE OF CONCRETE CURBING/SIDEWALK CONSTRUCTION, MILLING AND RESURFACING OF ASPHALT CONCRETE, AND STRIPING OF CITY STREETS AND PARKING LOTS 2018-033-ND BID ISSUANCE DATE: APRIL 13, 2018 BID DUE: MAY 10, 2018 @ 3:00 PM ISSUED BY: BEACH NATALIA DELGADO, PROCUREMENT CONTRACTING OFFICER I PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3r° Floor, Miami Beach, FL 33139 305.673.7000 x62631 nataliadegado(Bmiamibeachfl.gov I www.miamibeachfl.gov '.' BEACH TABLE OF CONTENTS SOLICITATION SECTIONS: PAGE 0100 DEFINITIONS 3 0200 INSTRUCTIONS TO BIDDERS & GENERAL CONDITIONS 5 0300 BID SUBMITTAL INSTRUCTIONS & FORMAT 17 APPENDICES: APPENDIX A PROPOSAL CERTIFICATON, QUESTIONNAIRE AND AFFIDAVITS v APPENDIX B "NO BID" FORM APPENDIX C MINIMUM REQUIREMENTS & SPECIFICATIONS APPENDIX D SPECIAL CONDITIONS APPENDIX E COST PROPOSAL FORM APPENDIX F INSURANCE REQUIREMENTS APPENDIX G SAMPLE CONTRACT ITB 2018-033-ND 2 .'' BEACH 0100 DEFINITIONS: 1. Definitions: Whenever the following terms or pronouns in place of them appear in the Project Manual, the intent and meaning shall be interpreted as follows: 1.1 Bid: shall refer to any offer(s) submitted in response to this ITB. The terms "Bid" and "Bid Submittal" are used interchangeably. 1.2 Bidder: Any individual, firm, or corporation submitting a bid for this Project, acting directly or through a duly authorized representative. 1.3 Change Order: A written document ordering a change in the Contract Price or Contract Time or a material change. 1.4 City: The City (or Owner) shall mean the City of Miami Beach, a Florida municipal corporation, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, which is a party hereto and /or for which this Contract is to be performed. In all respects hereunder, City's performance is pursuant to City's position as the owner of a construction project. In the event City exercises its regulatory authority as a governmental body, the exercise of such regulatory authority and the enforcement of any rules, regulations, laws and ordinances shall be deemed to have occurred pursuant to City's regulatory authority as a governmental body and shall not be attributable in any manner to City as a party to this Contract. 1.5 City Commission: City Commission shall mean the governing and legislative body of the City. 1.6 City Manager: City Manager shall mean the Chief Administrative Officer of the City. 1.7 Contract: The part or section of the Contract Documents addressing some of the rights and duties of the parties hereto, including but not limited to contract time and liquidated damages. 1.8 Contract Documents: The official documents setting forth bidding information, requirements and contractual obligations for the project and includes the Contract, Invitation to Bid. Scope of Work, Instructions to Bidders, Supplements, Technical Specifications, Exhibits, Certificated, Closeout Forms, General Conditions, Supplementary Conditions, Plans, Drawings, Addenda, Award by the City Commission, Bonds, Notice of Award, Notices to Proceed, Purchase Order(s), Change Order(s), Field Order(s), Supplemental Instructions, and any additional documents the submission of which is required by the Project. 1.9 Contract Price: The original amount established in the Bid Submittal and award by the City, as may be amended by Change Order. 1.10 Contractor: The person or entity with whom the City has contracted and who is responsible for the acceptable performance of the Work and for the payment of all legal debts pertaining to the Work. 1.11 Department: The Public Works Department, or any other City department authorized to use any resulting agreement. 1.12 Field Order: A written order which orders minor changes in the Work but which does not involve a change in the Contract Price or Contract Time. ITB 2018-033-ND 3 • .' BEACH 1.13 Notice(s) to Proceed: Written notice to Contractor authorizing the commencement of the activities identified in the notice or as described in the Contract Documents. 1.14 Plans and/or Drawings: The official graphic representations of this Project which are a part of the Contract Documents. 1.15 Responsible Bidder: An offeror who has the capability in all respects to perform fully the contract requirements, and the integrity and reliability which will assure good faith performance. 1.16 Responsive Bidder: A person or entity who has submitted a bid which conforms in all material respects to a solicitation. A bid or proposal of a Responsive Bidder must be submitted on the required forms, which contain all required information, signatures, notarizations, insurance, bonding, security, or other mandated requirements by the bid documents to be submitted at the time of bid opening. 1.17 Subcontractor: A person or entity having a direct contract with Contractor including one who furnishes material worked to a special design according to the Contract Documents, but does not include one who merely furnishes Materials not so worked. 1.18 Surety: The surety company or individual which is bound by the performance bond and payment bond with and for Contractor who is primarily liable, and which surety company or individual is responsible for Contractor's satisfactory performance of the work under the contract and for the payment of all debts pertaining thereto in accordance with Section 255.05, Florida Statutes. 1.19 Task Order: At the request of the City, the Contractor shall furnish a Task Order for any project under consideration. Each project shall have a project-specific Task Order. The Task Order shall be approved by a City representative. The Task Order shall stipulate the following: • Fixed Project Costs, Project Cost shall be based on plans and specifications provided by the City or field-verified measurements and shall be in accordance with contract unit prices and other pricing terms. • Additional Services. The City anticipates that a significant portion of the projects awarded pursuant to any continuing services agreement resulting from this ITB shall be completed in accordance with the prices established through the ITB. The City recognizes that there may be instances when the need for services in addition to those stipulated herein shall arise. In those cases, the City may negotiate with the Contractor on a mutually agreeable price for the additional services based on available industry pricing. The approval of the City Manager shall be required for any additional services exceeding a project aggregate of$50,000. • Total Project Cost. • Project Approach and Methodology. This shall include any necessary phasing, logistical requirements, etc. • Required Permits. • Project Duration. • Mobilization Plan. • Project Manager& Contact. 1.20 Work: The construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by Contractor to fulfill Contractor's obligations. The Work may constitute the whole or a part of the Project. ITB 2018-033-ND 4 BEACH SECTION 0200 INSTRUCTIONS TO BIDDERS 1.GENERAL. This Invitation to Bid (ITB) is issued by the City of Miami Beach, Florida (the 'City"), as the means for prospective Proposers to submit their qualifications, proposed scopes of work and cost proposals (the "bid") to the City for the City's consideration as an option in achieving the required scope of services and requirements as noted herein. All documents released in connection with this solicitation, including all appendixes and addenda, whether included herein or released under separate cover, comprise the solicitation, and are complementary to one another and together establish the complete terms, conditions and obligations of the Proposers and, subsequently, the successful Bidders(s) (the"contractor[sl") if this ITB results in an award. The City utilizes PublicPurchase (www.oublicourchase.com) for automatic notification of competitive solicitation opportunities and document fulfillment, including the issuance of any addendum to this ITB. Any prospective Bidder who has received this ITS by any means other than through PublicPurchase must register immediately with PublicPurchase to assure it receives any addendum issued to this ITB. Failure to receive an addendum may result in disqualification of proposal submitted. 2. PURPOSE. The City currently has a contract for concrete curbing/sidewalk construction and a contract for milling and resurfacing of asphalt concrete and striping of City roads and parking lots. In order to seek replacement contracts, the City is seeking to establish a push-button contract, by means of sealed bids, for the purchase of concrete curbing sidewalk construction, milling and resurfacing of asphalt concrete, and the striping of city streets and parking lots, as specified herein. 3. SOLICITATION TIMETABLE.The tentative schedule for this solicitation is as follows: ITB Issued April 13, 2018 Pre-Bid Meeting April 23,2018 @ 2:00 p.m. (ET) Deadline for Receipt of Questions April 30, 2018 Responses Due May 10, 2018 @ 3:00 p.m.(ET) Tentative Commission Approval Authorizing Award TBD 4. PROCUREMENT CONTACT. Any questions or clarifications concerning this solicitation shall be submitted to the Procurement Contact noted below: Proarement Contact. Telephone: Email. Natalia Del•ado 305-673-7000 x6263 nataliadel•ado• miamibeachfl.•ov additionally. the City Clerk is to be copied on all communications via e-mail at: RafaelGranado • miamibeach0.•ov: or via facsimile: 786-3944188. The Bid title/number shall be referenced on all correspondence. All questions or requests for clarification must be received no later than ten (10) calendar days prior to the date proposals are due as scheduled in Section 0200-3. All responses to questions/clarifications will be sent to all prospective Proposers in the form of an addendum. ITB 2018-033-ND 5 BEACH 5. PRE-BID MEETING OR SITE VISIT(S). Only if deemed necessary by the City, a pre-bid meeting or site visit(s) maybe scheduled. A Pre-Bid conference will be held as scheduled in Solicitation Timeline above at the following address: City of Miami Beach Procurement Department Conference Room 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Attendance (in person or via telephone) is encouraged and recommended as a source of information, but is not mandatory. Proposers interested in participating in the Pre-Bid Submission Meeting via telephone must follow these steps: (1) Dial the TELEPHONE NUMBER: 1-888-270-9936 (Toll-free North America) (2) Enter the MEETING NUMBER: 9415468 Proposers who are interested in participating via telephone should send an e-mail to the contact person listed in this ITB expressing their intent to participate via telephone. 6. PRE-BID INTERPRETATIONS. Oral information or responses to questions received by prospective Bidders are not binding on the City and will be without legal effect, including any information received at pre-bid meeting or site visit(s). Only questions answered by written addenda will be binding and may supersede terms noted in this solicitation.Addendum will be released through PublicPurchase, 7. CONE OF SILENCE. Pursuant to Section 2-486 of the City Code, all procurement solicitations once advertised and until an award recommendation has been forwarded to the City Commission by the City Manager are under the "Cone of Silence." The Cone of Silence ordinance is available at httpJ/library.municode.com/index.aspx?clientlD=13097&statelD=9&statename=Florida. Any communication or inquiry in reference to this solicitation with any City employee or City official is strictly prohibited with the of exception communications with the Procurement Director, or his/her administrative staff responsible for administering the procurement process for this solicitation providing said communication is limited to matters of process or procedure regarding the solicitation. Communications regarding this solicitation are to be submitted in writing to the Procurement Contact named herein with a copy to the City Clerk at rafaelgranado@miamibeachfl.gov. 8. SPECIAL NOTICES. You are hereby advised that this solicitation is subject to the following ordinances/resolutions, which may be found on the City Of Miami Beach website: http:/lwww.m iamibeachflcov/city-hall/procurement/procurement-related-o rd inance-and-procedures/ CONE OF SILENCE CITY CODE SECTION 2-486 PROTEST PROCEDURES CITY CODE SECTION 2-371 DEBARMENT PROCEEDINGS CITY CODE SECTIONS 2397 THROUGH 2485.3 LOBBYIST REGISTRATION AND DISCLOSURE OF FEES CITY CODE SECTIONS 2-481 THROUGH 2-406 CAMPAIGN CONTRIBUTIONS BY VENDORS . CITY CODE SECTION 2-487 CAMPAIGN CONTRIBUTIONS BY LOBBYISTS ON PROCUREMENT ISSUES CITY CODE SECTION 2-488 REQUIREMENT FOR CITY CONTRACTORS TO PROVIDE EQUAL BENEFITS FOR DOMESTIC PARTNERS CITY CODE SECTION 2-373 • LIVING WAGE REQUIREMENT CITY CODE SECTIONS 2-407 THROUGH 2-410 ITB 2018-033—ND 6 • PREFERENCE FOR FLORIDA SMALL BUSINESSES OWNED AND CONTROLLED BY VETERANS AND TO STATE-CERTIFIED SERVICE- DISABLED VETERAN BUSINESS ENTERPRISES CITY CODE SECTION 2-374 • FALSE CLAIMS ORDINANCE CITY CODE SECTION 70-300 • ACCEPTANCE OF GIFTS,FAVORS 8 SERVICES CITY CODE SECTION 2449 9. EXAMINATION OF SOLICITATION DOCUMENTS AND SITE: It is the responsibility of each Bidder, before submitting a Bid, to: • Examine the solicitation thoroughly. • Visit the site or structure, as applicable, to become familiar with conditions that may affect costs, progress, performance or furnishing of the Work. • Take into account federal, state and local (City and Miami-Dade County) laws, regulations, permits, and ordinances that may affect costs, progress, performance, furnishing of the Work,or award. • Study and carefully correlate Bidder's observations with the solicitation. • Notify the Procurement Director of all conflicts, errors or discrepancies in the solicitation of which Bidder knows or reasonably should have known. • The submission of a Bid shall constitute an incontrovertible representation by Bidder that Bidder has complied with the above requirements and that without exception, the Bid is premised upon performing and furnishing the Work required by the solicitation and that the solicitation documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 10. POSTPONEMENT OF DUE DATE FOR RECEIPT OF BIDS. The City reserves the right to postpone the deadline for submittal of bids and will make a reasonable effort to give at least three (3) calendar days written notice of any such postponement to all prospective Bidders through PublicPurchase. 11. PROTESTS. Protests concerning the specifications, requirements, and/or terms; or protests after the bid due date in accordance with City Code Section 2-371, which establishes procedures for protested proposals and proposed awards. Protests not submitted in a timely manner pursuant to the requirements of City Code Section 2.371 shall be barred. 12. JOINT VENTURES. Joint Ventures are not allowed. Proposals shall be submitted only by the prime contractor who will serve as the CMR. The City will only contract with the prime contractor who will serve as the CMR. Proposals may, however, identify other sub-contractors or sub-consultants to the prime Proposer who may serve as team members. 13. VETERAN BUSINESS ENTERPRISES PREFERENCE. Pursuant to City of Miami Beach Ordinance No. 2011- 3748, the City shall give a preference to a responsive and responsible bidder which is a small business concern owned and controlled by a veteran(s)or which is a service-disabled veteran business enterprise, and which is within five percent (5%) of the lowest and best bidder, by providing such bidder an opportunity of providing said goods or contractual services for the lowest responsive bid amount. Whenever, as a result of the foregoing preference, the adjusted prices of two (2) or more bidders which are a small business concern owned and controlled by a veteran(s) or a service-disabled veteran business enterprise constitute the lowest bid pursuant to an ITB or oral or written request for quotation, and such bids are responsive, responsible and otherwise equal with respect to quality and service, then the award shall be made to the service-disabled veteran business enterprise. 14. CONTRACT PRICE. Bid Price is to include the furnishing of all labor, materials, equipment including tools, services, permit fees, applicable taxes, overhead and profit for the completion of the Work except as may be otherwise expressly provided in the solicitation. ITB 2018-033-ND 7 BEACH 15. METHOD OF AWARD. Following the review of bids and application of vendor preferences, the lowest responsive, responsible bidder(s) meeting all terms, conditions, and specifications of the ITB will be recommended for award by bid item, bid group, or for the entirety of all bid items, as deemed in the best interest of the City, to the City Manager for his consideration. After considering the staff recommendation for award, the City Manager shall exercise his due diligence and recommend to the Mayor and City Commission the bid that the City Manager deems to be in the best interest of the City. The City Commission shall consider the City Manager's recommendation(s)and, may approve or reject the City Manager's recommendation(s). The City Commission may also reject all bids received. In determining the lowest and best bidder, and in addition to price, Section 2-369 of the City Code provides that the City may consider the following: • The ability, capacity and skill of the bidder to perform the Contract. • Whether the bidder can perform the Contract within the time specified, without delay or interference. • The character, integrity, reputation,judgment,experience and efficiency of the bidder. • The quality of performance of previous contracts. • The previous and existing compliance by the bidder with laws and ordinances relating to the Contract. Qualified Contractor Pool: The City Manager may, in his sole discretion, recommend one or more responsive, responsible bidders for award for the purpose of creating a pool of qualified contractors from which the City may seek quotes for specific projects in accordance with the specific items or unit prices awarded pursuant to this ITB. The contractor offering the lowest overall project cost, as well as meeting other project and timeline requirements will be awarded the project through the release of a Purchase Order. 16. MULTIPLE AWARD. The City may award two or more vendors (primary, secondary, tertiary, or higher), as available, by line item, by group or in its entirety, beginning with lowest, responsive, responsible bidder (primary), followed by the second lowest, responsive, responsible bidder (secondary), and continuing with other responsive, responsible bidders in order of next best cost. The City will endeavor to utilize vendors in order of award. However, the City may utilize other vendors in the event that 1) a contract vendor is not or is unable to be in compliance with any contract or delivery requirement; 2) it is in the best interest of the City to do so regardless of reason. 17. BINDING CONTRACT. The signed bid shall be considered an offer on the part of the bidder, which offer shall be deemed accepted upon award of the bid by the City Commission. The City Commission's selection or approval of the City Manager's recommendation shall constitute a binding Contract between the City and the awarded bidder(s). The Contract shall include the solicitation, any and all addenda issued by the City and the Bid Proposal submitted the by bidder. In any discrepancy between the documents, the order of preference shall be as follows: 1)Addendum in reverse order of release; 2) Solicitation; 3) Bid Proposal. In case of default on the part of the successful bidder, the City may procure the items or services from other sources and hold the bidder responsible for any excess cost occasioned or incurred thereby. 18. VOLUME OF WORK TO BE RECEIVED BY CONTRACTOR. It is the intent of the City to purchase the goods and services specifically listed in this solicitation from the contractor. However, the City reserves the right to purchase any goods or services awarded from state or other governmental contract, or on an as-needed basis through the City's spot market purchase provisions. 19. GENERAL TERMS AND CONDITIONS. It is the responsibility of the Bidder to become thoroughly familiar with the Bid requirements, terms and conditions of this solicitation. Ignorance by the Bidder of conditions that exist or that may exist will not be accepted as a basis for varying the requirements of the City, or the compensation to be paid to the Bidder. ITB 2018-033-ND 8 :' ' BEACH 20. ACCEPTANCE OR REJECTION OF BIDS. The City reserves the right to reject any or all bids prior to award. Reasonable efforts will be made to either award the Contract or reject all bids within one-hundred twenty (120) calendar days after bid opening date. A Bidder may not withdraw its bid unilaterally nor change the Contract Price before the expiration of one hundred and twenty (120) calendar days from the date of bid opening. A Bidder may withdraw its bid after the expiration of one hundred twenty (120) calendar days from the date of bid opening by delivering written notice of withdrawal to the Procurement Department prior to award of the Bid by the Mayor and City Commission. 21. ALTERNATE RESPONSES MAY BE CONSIDERED. The City may consider one (1) alternate response from the same Bidder for the same formal solicitation; provided, that the alternate response offers a different product that meets or exceeds the formal solicitation requirements. In order for the City to consider an alternate response, the Bidder shall complete a separate Price Sheet form and shall mark "Alternate Response'. Alternate response shall be placed in the same response. This provision only applies to formal solicitations for the procurement of goods, services, items, equipment, materials, and/or supplies. 22.AMERICAN WITH DISABILITIES ACT. To request this material in accessible format, sign language interpreters, information on access for persons with disabilities, and/or any accommodation to review any document or participate in any city-sponsored proceeding, please contact 305-604-2489 (voice), 305-673-7524 (fax) or 305-673-7218 (TTY) five days in advance to initiate your request. TTY users may also call 711 (Florida Relay Service). 23. NON-DISCRIMINATION. The bidder certifies that it is in compliance with the non-discrimination clause contained in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to equal employment opportunity for all persons without regard to race, color, religion, sex or national origin. In accordance with the City's Human Rights Ordinance, codified in Chapter 62 of the City Code, Proposer shall prohibit discrimination by reason of race, color, national origin, religion, sex, intersexuality, gender identity, sexual orientation, marital and familial status, and age or disability, 24. ASSIGNMENT. The successful bidder shall not assign, transfer, convey, sublet or otherwise dispose of the contract, including any or all of its right, title or interest therein, or his/her or its power to execute such contract, to any person, company or corporation, without the prior written consent of the City. 25. AUDIT RIGHTS AND RECORDS RETENTION. The Successful Bidder agrees to provide access at all reasonable times to the City, or to any of its duly authorized representatives, to any books, documents, papers and records of Contractor which are directly pertinent to this formal solicitation, for the purpose of audit, examination, excerpts, and transcriptions. The Successful Bidder shall maintain and retain any and all of the books, documents, papers and records pertinent to the Contract for three (3) years after the City makes final payment and all other pending matters are closed. Contractor's failure to or refusal to comply with this condition shall result in the immediate cancellation of this contract by the City. 26. BID BONDS, PERFORMANCE BONDS, CERTIFICATES OF INSURANCE. Bid Bonds, when required, shall be submitted with the bid in the amount specified in the Special Conditions. After acceptance of the bid, the City will notify the successful bidder to submit a performance bond and certificate of insurance in the amount specified in the Special Conditions. 27. BILLING INSTRUCTIONS. Invoices, unless otherwise indicated, must show purchase order numbers and shall be submitted to the ordering City department. 28. CANCELLATION. In the event any of the provisions of this Bid are violated by the bidder, the City shall give written notice to the bidder stating such deficiencies and, unless such deficiencies are corrected within ten (10) ITB 2018-033-ND 9 MIAMI B EACHProcurementDepartment 1755 Meridian Ave, 3b Floor, Miami Beach, Ronda 33139 www.miamibeachf,gov EXHIBIT A Revised Cost Proposal Form THE REVISED COST PROPOSAL FORM IS REQUIRED TO BE SUBMITTED WITH THE PROPOSA • • ITB No. 2018-033-ND Addendum#1 5/2/2018 BEACH calendar calendar days from the date of the City's notice, the City, through its City Manager, may declare the contract in default and terminate same, without further notice required to the bidder. Notwithstanding the preceding, the City, through its City Manager, also reserves the right to terminate the contract at any time and for any reason, without cause and for convenience, and without any monetary liability to the City, upon the giving of thirty (30) days prior written notice to the bidder. 29. CITY'S RIGHT TO WAIVE OR REJECT BIDS. The City Commission reserves the right to waive any informalities or irregularities in this Bid; or to reject all bids, or any part of any bid, as it deems necessary and in the best interest of the City of Miami Beach. 30. CLARIFICATION AND ADDENDA TO BID SPECIFICATIONS. If a bidder is in doubt as to the true meaning of the Bid specifications, or other Bid documents, or any part thereof, the bidder must submit to the City, at least seven (7)calendar days prior to the scheduled Bid opening date, a request for clarification. Any interpretation of the Bid, including, without limitation, responses to questions and request for clarification(s) from bidders, will be made only by Addendum duly issued by the City. In the event of conflict with the original specifications, the Addendum shall supersede such specifications, to the extent specified. Subsequent Addendum shall govern over prior Addendum only to the extent specified. The bidder shall be required to acknowledge receipt of any and all Addendum, and filling in and signing in the spaces provided in section Appendix A, No. 14 Acknowledgement of Addendum. Failure to acknowledge Addendum may deem a bid non-responsive. The City will not be responsible for explanations, interpretations, or answers to questions made verbally or in writing by any City representative, unless issued by the City via formal written Addendum to this Bid. Any questions or clarifications concerning the Bid shall be submitted in writing to the Procurement Department, 1755 Meridian Avenue, 31 Floor, Miami Beach, FL 33139 with a copy to the City Clerk. 31. COLLUSION. Where two (2) or more related parties each submit a bid or bids for any contract, such bids or bids shall be presumed to be collusive. The foregoing presumption may be rebutted by presentation of evidence as to the extent of ownership, control and management of such related parties in the preparation and submittal of such bid or bids. °Related parties"means bidders or the principals thereof which have a direct or indirect ownership interest in another bidder for the same contract, or in which a parent company or the principals thereof of one (1)bidder have a direct or indirect ownership interest in another bidder for the same contract. Bid or bids found to be collusive shall be rejected. Bidders who have been found to have engaged in collusion may also be suspended or debarred, and any contract resulting from collusive bidding may be terminated for cause. 32. CONDITION AND PACKAGING. Bidder guarantees items offered and delivered to be the current standard production model at time of bid and shall offer expiration dating of at least one year or later. Bidder also guarantees items offered and delivered to be new, unused, and free from any and all defects in material, packaging and workmanship and agrees to replace defective items promptly at no charge to the City of Miami Beach, for the manufacturers standard warranty but in no case for a period of less than 12 months from date of acceptance. All containers shall be suitable for storage or shipment, and all prices shall include standard commercial packaging. 33. CONTRACT EXTENSION. The City reserves the right to require the Contractor to extend contract past the stated termination date for a period of up to 120 days in the event that a subsequent contract has not yet been awarded. Additional extensions past the 120 days may occur as needed by the City and as mutually agreed upon by the City and the contractor. ITB 2018-033-ND 10 BEACH 34. DELIVERY. Unless actual date of delivery is specified (or if specified delivery cannot be met), show number of days (in calendar days) required to make delivery after receipt of purchase order, in space provided, Delivery time may become a basis for making an award. Delivery shall be within the normal working hours of the City using Department, Monday through Friday, excluding holidays. Receiving hours are Monday through Friday. excluding holidays, from 8:30 A.M. to 4:00 P.M. 35. DELIVERY TIME. Bidders shall specify in the attached Bid Form, the guaranteed delivery time(in calendar days) for each item. It must be a firm delivery time; no ranges(For example, 12-14 days)will be accepted. 36. DEMONSTRATION OF COMPETENCY. A. Pre-award inspection of the bidders facility may be made prior to the award of contract. B. Bids will only be considered from firms which are regulady engaged in the business of providing the goods and/or services as described in this Bid. C. Bidders must be able to demonstrate a good record of performance for a reasonable period of time, and have sufficient financial capacity, equipment, and organization to ensure that they can satisfactorily perform the services if awarded a contract under the terms and conditions of this Bid. D. the terms "equipment and organizationTM, as used herein shall, be construed to mean a fully equipped and well established company in line with the best business practices in the industry, and as determined by the City of Miami Beach. E. The City may consider any evidence available regarding the financial, technical, and other qualifications and abilities of a bidder, including past performance (experience), in making an award that is in the best interest of the City. F. The City may require bidders to show proof that they have been designated as authorized representatives of a manufacturer or supplier, which is the actual source of supply, In these instances, the City may also require material information from the source of supply regarding the quality, packaging, and characteristics of the products to be supply to the City. Any material conflicts between information provided by the source of supply and the information contained in the bidders bid may render the bid non-responsive. G. The City may, during the period that the contract between the City and the successful bidder is in force, review the successful bidders record of performance to ensure that the bidder is continuing to provide sufficient financial support, equipment, and organization as prescribed in this bid. Irrespective of the bidder's performance on contracts awarded to it by the City, the City may place said contracts on probationary status and implement termination procedures if the City determines that the successful bidder no longer possesses the financial support, equipment, and organization which would have been necessary during the bid evaluation period in order to comply with the demonstration of competency required under this subsection. 37. DISPUTES. In the event of a conflict between the Bid documents, the order of priority of the documents shall be as follows: A. Any contract or agreement resulting from the award of this Bid; then B. Addendum issued for this Bid, with the latest Addendum taking precedence; then C. The Bid; then D. The bidder's bid in response to the Bid. In case of any doubt or difference of opinion as to the items and/or services (as the case may be) to be furnished hereunder, the decision of the City shall be final and binding on all parties. 38. DEFAULT. Failure or refusal of a bidder to execute a contract upon award, or withdrawal of a bid before such award is made, may result in forfeiture of that portion of any bid surety required as liquidated damages incurred by the City thereby; or, where surety is not required, failure to execute a contract as described above may be grounds for removing the bidder from the City's bidders list. ITS 2018-033-ND 11 1,77. BEACH 39. EQUIVALENTS. If a bidder offers makes of equipment or brands of supplies other than those specified in the Bid specifications, he must so indicate in his bid. Specific article(s) of equipment/supplies shall conform in quality, design and construction with all published claims of the manufacturer. The bidder shall indicate in the Bid Form the manufacturer's name and number if bidding other than the specified brands, and shall indicate ANY deviation from the specifications as listed in the Bid. Other than specified items offered requires complete descriptive technical literature marked to indicate detailed conformance with specifications, and MUST BE INCLUDED WITH THE BID. NO BIDS WILL BE CONSIDERED WITHOUT THIS INFORMATION. THE CITY SHALL BE THE SOLE JUDGE OF EQUALITY AND ITS DECISION SHALL BE FINAL. Note as to Brand Names: Catalog numbers, manufacturers' and brand names, when listed, are informational guides as to a standard of acceptable product quality level only and should not be construed as an endorsement or a product limitation of recognized and legitimate manufacturers. Bidders shall formally substantiate and verify that product(s) offered conform with or exceed quality as listed in the specifications. 40. ELIMINATION FROM CONSIDERATION. This bid shall not be awarded to any person or firm who is in arrears to the City upon any debt, taxes, or contracts which are defaulted as surety or otherwise upon any obligation to the City. 41. EMERGENCY RESPONSE PRIORITY. It is hereby made a part of this solicitation that before, during, and after a public emergency, disaster, hurricane, tornado, flood, or other acts of force majeure that the City of Miami Beach, Florida shall receive a "First Priority" for any goods and services covered under any award resulting from this solicitation, including balance of line items as applicable. It is vital and imperative that the majority of citizens are protected from any emergency situation that threatens public health and safety, as determined by the City. By virtue of submitting a response to this solicitation, vendor agrees to provide all award-related goods and services to the City on a"first priority" under the emergency conditions noted above. 42.ESTIMATED QUANTITIES. Estimated quantities or estimated dollars, if provided, are for City guidance only. No guarantee is expressed or implied as to quantities or dollars that will be used during the contract period. The City is not obligated to place any order for a given amount subsequent to the award of this Bid. Estimates are based upon the City's actual needs and/or usage during a previous contract period. The City may use said estimates for purposes of determining whether the low bidder meets specifications. 43. EXCEPTIONS TO BID. Bidders are strongly encouraged to thoroughly review the specifications and all conditions set forth in this Bid. Bidders who fail to satisfy the requirements in this Bid, may be deemed non- responsive and receive no further consideration. Should your proposed bid not be able to meet one (1) or more of the requirements set forth in this Bid and you are proposing alternatives and/or exceptions to said requirements, you must notify the Procurement Office, in writing, at least five(5) days prior to the deadline for submission of bids. The City reserves the right to revise the scope of services via Addendum prior to the deadline for receipt of bids. 44. FACILITIES. The City, through its City Manager or his/her authorized designee, reserves the right to inspect the bidder's facilities at any time, upon reasonable prior written or verbal notice. 45. FLORIDA PUBLIC RECORDS LAW. Bidders are hereby notified that all Bid including, without limitation, any and all information and documentation submitted therewith, are exempt from public records requirements under Section 119.07(1), Florida Statutes, and s. 24(a), Art. 1 of the State Constitution until such time as the City provides notice of an intended decision or until thirty (30) days after opening of the bids, whichever is earlier. Additionally, Contractor agrees to be in full compliance with Florida Statute 119.0701 including, but not limited to, agreement to (a) Keep and maintain public records that ordinarily and necessarily would be required by the public agency in ITB 2018-033-ND 12 BEACH order to perform the services; (b) provide the public with access to public records on the same terms and conditions that the public agency would provide the records and at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law; (c) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law; (d) Meet all requirements for retaining public records and transfer, at no cost, to the public agency all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the public agency in a format that is compatible with the information technology systems of the public agency. 46. F.O.B. DESTINATION. Unless otherwise specified in the Formal Solicitation, all prices quoted/proposed by the bidder must be F.O.B. DESTINATION, inside delivery, with all delivery costs and charges included in the bid price, unless otherwise specified in this Formal Solicitation. Failure to do so may be cause for rejection of bid. 47. GRATUITIES. Bidders shall not offer any gratuities, favors, or anything of monetary value to any official, employee, contractor, or agent of the City, for the purpose of influencing consideration of this Bid. 48. INDEMNIFICATION. The successful Bidder shall indemnify and hold harmless the City and its officers, employees, agents and instrumentalities from any and all liability, losses or damages, including attorney's fees and costs of defense, which the City or its officers, employees, agents or instrumentalities may incur as a result of claims, demands, suits, causes of actions or proceedings of any kind or nature arising out of, relating to or resulting from the performance of the agreement by the successful Bidder or its employees, agents, servants, partners, principals or subcontractors. The successful Bidder shall pay all claims and losses in connection therewith, and shall investigate and defend all claims, suits or actions of any kind or nature in the name of the City, where applicable, including appellate proceedings, and shall pay all costs, judgments, and attorney's fees which may be incurred thereon. The successful Bidder expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by the successful Bidder shall in no way limit the responsibility to indemnify, keep and save harmless and defend the City or its officers, employees, agents and instrumentalities as herein provided. The above indemnification provisions shall survive the expiration or termination of this Agreement. 49. INSPECTION, ACCEPTANCE & TITLE. Inspection and acceptance will be at destination, unless otherwise provided. Title to (or risk of loss or damage to) all items shall be the responsibility of the successful bidder until acceptance by the City, unless loss or damage results from the gross negligence or willful misconduct of the City. If any equipment or supplies supplied to the City are found to be defective, or do not conform to the specifications, the City reserves the right to cancel the order upon written notice to the seller, and return the product, at the bidder's expense. 50. LAWS, PERMITS AND REGULATIONS.The bidder shall obtain and pay for all licenses, permits, and inspection fees required under the contract; and shall comply with all Applicable Laws. 51. LEGAL REQUIREMENTS. The bidder shall be required to comply with all federal, State of Florida, Miami-Dade County, and City of Miami Beach codes, laws, ordinances, and/or rules and regulations that in any manner affect the items covered herein (collectively, Applicable Laws). Lack of knowledge or ignorance by the bidder with/of Applicable Laws will in no way be a cause for relief from responsibility. 52. LIABILITY, INSURANCE, LICENSES AND PERMITS, Where bidders are required to enter or go on to City of Miami Beach property to deliver materials or perform work or services as a result of the Bid, the bidder will assume the full duty, obligation and expense of obtaining all necessary licenses, permits, and insurance, and assure all work complies with all Applicable Laws. The bidder shall be liable for any damages or loss to the City occasioned by ITB 2018-033-ND 13 •A' BEACH negligence of the bidder, or his/her officers, employees, contractors, and/or agents, for failure to comply with Applicable Laws. 53. MANNER OF PERFORMANCE. Bidder agrees to perform its duties and obligations in a professional manner and in accordance with all applicable Local. State, County, and Federal laws, rules, regulations and codes. Bidder agrees that the services provided shall be provided by employees that are educated, trained, experienced, certified, and licensed in all areas encompassed within their designated duties. Bidder agrees to furnish to the City any and all documentation, certification, authorization, license, permit, or registration currently required by applicable laws, rules, and regulations. Bidder further certifies that it and its employees will keep all licenses, permits, registrations, authorizations, or certifications required by applicable laws or regulations in full force and effect during the term of this contract. Failure of bidder to comply with this paragraph shall constitute a material breach of this contract. 54. MISTAKES. Bidders are expected to examine the specifications, delivery schedules, bid prices, and extensions, and all instructions pertaining to supplies and services. Failure to do so will be at the bidder's risk and may result in the bid being non-responsive. 55. MODIFICATION/WITHDRAWALS OF BIDS. A bidder may submit a modified bid to replace all or any portion of a previously submitted bid up until the bid due date and time, Modifications received after the bid due date and time will NOT be considered. Bids shall be irrevocable until contract award unless withdrawn in writing prior to the bid due date or after expiration of 120 calendar days from the opening of bids without a contract award. Letters of withdrawal received after the bid due date and before said expiration date and letters of withdrawal received after contract award will NOT be considered. 56. NON-CONFORMANCE TO CONTRACT CONDITIONS. Items may be tested for compliance with specifications, Items delivered, not conforming to specifications, may be rejected and returned at the bidders expense. These items, as well as items not delivered as per delivery date in bid and/or purchase order, may be purchased by the City, at its discretion,on the open market. Any increase in cost may be charged against the bidder. Any violation of these stipulations may also result in the bidders name being removed from the City's vendor list. 57. OPTIONAL CONTRACT USAGE. When the successful bidder(s) is in agreement, other units of government or non-profit agencies may participate in purchases pursuant to the award of this contract at the option of the unit of government or non-profit agency. 58. OSHA. The bidder warrants to the City that any work, services, supplies, materials or equipment supplied pursuant to this Bid shall conform in all respects to the standards set forth in the Occupational Safety and Health Act of 1970, as amended, and the failure to comply with this condition will be deemed breach of contract. Any fines levied because of inadequacies to comply with this condition shall be borne solely by the bidder. 59. PATENTS& ROYALTIES. The bidder shall indemnify and save harmless the City of Miami Beach, Florida, and its officers, employees, contractors, and/or agents, from liability of any nature or kind, including cost and expenses for, or on account of, any copyrighted, patented, or unpatented invention, process, or article manufactured or used in the performance of the contract, including its use by the City of Miami Beach, Florida. If the bidder uses any design, device or materials covered by letters, patent, or copyright, it is mutually understood and agreed, without exception, that the bid prices shall include all royalties or cost arising from the use of such design, device, or materials in any way involved in the work. 60. PAYMENT. Payment will be made by the City after the items have been received, inspected, and found to comply with Bid specifications, free of damage or defect, and propedy invoiced. ITB 2018-033-ND 14 61. PRICES QUOTED. Prices quoted shall remain firm and fixed during the duration of the contract. In completing the bid form, state both unit price and extended total, when requested. Prices must be stated in units of quantity specified in the bidding specifications. In case of discrepancy in computing the amount of the bid, the UNIT PRICE quoted will govern. All prices must be F.O.B. destination, freight prepaid (unless otherwise stated in Special Conditions). The Bidder may offer cash discounts for prompt payments; however, such discounts will not be considered in determining the lowest price during bid evaluation. Bidders are requested to provide prompt payment terms in the space provided on the Bid submittal signature page of the solicitation. Award, if made, will be in accordance with terms and conditions stated herein. Each item must be bid separately, and no attempt is to be made to tie any item or items in with any other item or items. Cash or quantity discounts offered will not be a consideration in determination of award of bid(s). 62. PRODUCT INFORMATION. Product literature, specifications, and technical information, including Manufacturer's Safety Data Sheets (MSDS) should be provided with this bid as an attachment to the "BID FORM". However, in all cases must be provided within five (5) calendar days upon request from Purchasing Agent. 63. REASONABLE ACCOMMODATION. In accordance with Title II of the Americans with Disabilities Act, any person requiring an accommodation at the Bid opening because of a disability must contact the Procurement Division. 64. SAMPLES. Bids submitted as an "equal" product must be accompanied with detailed specifications. Samples of items, when required, must be furnished free of expense and, if not destroyed, will, upon request, be returned at the bidder's expense. Bidders will be responsible for the removal of all samples furnished within (30) days after bid opening. All samples will be disposed of after thirty (30) days. Each individual sample must be labeled with the bidders name. Failure of the bidder to either deliver required samples, or to clearly identify samples may be reason for rejection of the bid. Unless otherwise indicated, samples should be delivered to the Procurement Department, 1755 Meridian Avenue, 3rd Floor, Miami Beach, FL 33139. 65. SPECIAL CONDITIONS. Any and all Special Conditions that may vary from these General Terms and Conditions shall have precedence. 66. SPOT MARKET PURCHASES. It is the intent of the City to purchase the items specifically listed in this Bid from the successful bidder. However, the City reserves the right to purchase the items from state or other governmental contract, or on an as-needed basis through the City's spot market purchase provisions. 67. SUBSTITUTIONS. After award of contract, the City WILL NOT accept substitute shipments of any kind, without previous written approval. The bidder is expected to furnish the brand quoted in its bid. Any substitute shipments will be returned at the bidders expense. 68.TAXES. The City of Miami Beach is exempt from all Federal Excise and State taxes. 69. TIE BIDS. In accordance with Florida Statues Section 287.087, regarding identical tie bids, preference will be given to bidders certifying that they have implemented a drug free work place program. A certification form will be required. In the event of a continued tie between two or more bidders after consideration of the drug free workplace program, the City's Local Preference and Veteran Preference ordinances will dictate the manner by which a tie is to be resolved. In the event of a continued tie after the Local and Veteran Preference ordinances have been applied or the tie exists between bidders that are not Local or Veteran, the breaking of the tie shall be at the City Manager's discretion, which will make a recommendation for award to the City Commission. 70. TERMINATION FOR DEFAULT. If the successful bidder shall fail to fulfill in a timely manner, or otherwise ITB 2018-033-ND IS BEACH violate, any of the covenants, agreements, or stipulations material to the Bid and/or the contract entered into with the City pursuant thereto, the City shall thereupon have the right to terminate the work and/or services then remaining to be performed by giving written notice to the bidder of such termination, which shall become effective upon receipt by the bidder of the written termination notice. In that event, the City shall compensate the successful bidder in accordance with the term of the contract for all work and/or services satisfactorily performed by the bidder prior to termination, net of any costs incurred by the City as a consequence of the default. Notwithstanding the above, the successful bidder shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of the contract by the bidder, and the City may reasonably withhold payments to the successful bidder for the purposes of set off until such time as the exact amount of damages due the City from the successful bidder is determined, The City may, at its discretion, provide reasonable "cure period"for any contractual violation prior to termination of the contract; should the successful bidder fail to take the corrective action specified in the City's notice of default within the allotted cure period, then the City may proceed to terminate the contract for cause in accordance with this subsection 1.57. 71. TERMINATION FOR CONVENIENCE OF CITY. The City may, for its convenience, terminate the work and/or services then remaining to be performed, at any time, by giving written notice to the successful bidder of such termination, which shall become effective thirty(30) days following receipt by bidder of such notice. In that event, all finished or unfinished documents and other materials shall be properly delivered to the City. If the contract is terminated by the City as provided in this subsection, the City shall compensate the successful bidder in accordance with the terms of the contract for all and without cause and/or any resulting liability to the City, work and/or services actually performed by the successful bidder, and shall also compensate the bidder for its reasonable direct costs in assembling and delivering to City all documents. No compensation shall be due to the successful bidder for any profits that the successful bidder expected to earn on the balanced of the contract. Such payments shall be the total extent of the City's liability to the successful bidder upon a termination as provided for in this subsection. 72. UNDERWRITERS' LABORATORIES. Unless otherwise stipulated in the Bid, all manufactured items and fabricated assemblies shall be U.L. listed or re-examination listing where such has been established by U.L. for the item(s)offered and furnished. 73. ADDITIONAL SERVICES. Although this solicitation and resultant contract identifies specific goods, services or facilities ("items"), it is hereby agreed and understood that the City, through the approval of the Department and Procurement Directors (for additional items up to $50,000) or the City Manager (for additional items greater than $50,000), may require additional items to be added to the Contract which are required to complete the work. When additional items are required to be added to the Contract, awarded vendor(s), as applicable to the item being requested, under this contract may be invited to submit price quote(s) for these additional requirements. If these quote(s) are determined to be fair and reasonable, then the additional work will be awarded to the current contract vendor(s) that offers the lowest acceptable pricing. The additional items shall be added to this contract by through a Purchase Order(or Change Order if Purchase Order already exists). In some cases, the City may deem it necessary to add additional items through a formal amendment to the Contract, to be approved by the City Manager. The City may determine to obtain price quotes for the additional items from other vendors in the event that fair and reasonable pricing is not obtained from the current contract vendors, or for other reasons at the City's discretion. ITB 2018-033-ND 16 BEACH SECTION 0300 PROPOSAL SUBMITTAL INSTRUCTIONS AND FORMAT 1. SEALED BIDS. One original Bid Proposal (preferably in 3-ring binder) must be submitted in an opaque, sealed envelope or container on or before the due date established for the receipt of bids. Additionally, three (3) bound copies and one (1) electronic format (CD or USB format) are to be submitted, with the original submission or within two (2) days of request by the City. The following information should be cleady marked on the face of the envelope or container in which the bid is submitted: Bid Number, Bid Title, Bidders Name, Bidder Return Address. Bids received electronically, either through email or facsimile, are not acceptable and will be rejected. 2. BID PROPOSAL. The Bid Proposal is to include the following: • TAB 1 — Cost Proposal Form (Appendix E). The Cost Proposal Form (Appendix E) shall be completed mechanically or, if manually, in ink. Cost Proposal Forms submitted in pencil shall be deemed non- responsive.All corrections on the Cost Proposal Form shall be initialed. FAILURE TO SUBMIT THE MOST RECENT COST PROPOSAL FORM (EITHER INCLUDED IN THE ORIGINAL ITB OR RELEASED VIA AN ADDENDUM) MAY RESULT IN BID BEING DEEMED NOT RESPONSIVE AND NOT BEING FURTHER CONSIDERED. • TAB 2• Bid Certification, Questionnaire and Affidavits(Appendix A). The City reserves the right to request any documentation omitted,with exception of the Cost Proposal Form (Appendix E), Proposal Certification, Questionnaire&Requirements Affidavit (Appendix A), and Bid Bond (if applicable). Bid Submittals received that do not include the Cost Proposal Form, completed as required and fully executed, or Bid Bond (if applicable) shall be deemed non-responsive. Bidder must submit any omitted documentation within three(3)calendar days upon request from the City, or the bid may be deemed non-responsive. Non-responsive bid packages will receive no further consideration. 3. LATE BIDS. Bid Proposals are to be received on or before the due date established herein for the receipt of Bids. Any Bid received after the deadline established for receipt of proposals will be considered late and not be accepted or will be returned to Proposer unopened. The City does not accept responsibility for any delays, natural or otherwise. ITB 2018-033-ND 17 APPENDIX A /\ /\ , '/ / , / v� Proposal Certification , Questionnaire & Requirements Affidavit ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 ITB 2018-033-ND 18 Solicitation No: Solicitation Title: 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots Procurement Conran: Tet. Email. Natalia Delgado 305-673-7000 x6263 nataliadelgado@miamibeachfl.gov PROPOSAL CERTIFICATION, QUESTIONNAIRE& REQUIREMENTS AFFIDAVIT Purpose: The purpose of this Proposal Certification, Questionnaire and Requirements Affidavit Form is to inform prospective Proposers of certain solicitation and contractual requirements, and to collect necessary information from Proposers in order that certain portions of responsiveness, responsibility and other determining factors and compliance with requirements may be evaluated. This Proposal Certification, Questionnaire and Requirements Affidavit Form is a REQUIRED FORM that must be submitted fully completed and executed. 1. General Proposer Information. FIRM NAME NO.OF YEARS IN BUSINESS. NO.OF YEARS IN BUSINESS LOCALLY: NO.OF EMPLOYEES: OTHER NAME(S)PROPOSER HAS OPERATED UNDER IN THE LAST 10 YEARS. FIRM PRIMARY ADDRESS)HEADOUARTERS7. CITY STATE: ZIP CODE. TELEPHONE N0.' TOLL FREE NO.: FAX NO.: FIRM LOCAL ADDRESS. CITY STATE ZIP CODE. PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT. ACCOUNT REP TELEPHONE NO.: ACCOUNT REP TOLL FREE NO.: ACCOUNT REP EMAIL: FEDERAL TAX IDENTIFICATION NO.. The City reserves the dght to seek additional information from Proposer or other source(s), including but not limited to: any firm or principal information, applicable licensure, resumes of relevant individuals,client information,financial information,or any information the City deems necessary to evaluate the capacity of the Proposer to perform in accordance with contract requirements. ITB 2018-033—ND 19 1. Veteran Owned Business.Is Proposer claiming a veteran owned business status? YES NO SUBMITTAL REQUIREMENT: Proposers claiming veteran owned business status shall submit a documentation proving that firm is certified as a veteran-owned business or a service-disabled veteran owned business by the Slate of Florida or United Slates federal government,as required pursuant to ordinance 2011-3748. 2. Financial Capacity, When requested by the City, each Proposer shall arrange for Dun & Bradstreet to submit a Supplier Qualification Report(SCR)directly to the Procurement Contact named herein. No proposal will be considered without receipt, by the City, of the SCR directly from Dun & Bradstreet. The cost of the preparation of the SQR shall be the responsibility of the Proposer,The Proposer shall request the SQR report from D&B at: https:llsupplierportal.dnb.comlwebapplwcsfstoresiservletSup of ierPortal?storeld=11696 Proposers are responsible for the accuracy of the information contained in its SQR. It is highly recommended that each Proposer review the information contained in its SQR for accuracy prior to submittal to the City and as early as possible in the solicitation process. For assistance with any portion of the SQR submittal process, contact Dun & Bradstreet at 600-024-2495. SUBMITTAL REQUIREMENT: Proposer shall request that Dun & Bradstreet submit its Supplier Qualifier Report directly to the City.with bid or within three(3)days of request. 3. Conflict Of Interest All Proposers must disclose, in their Proposal,the name(s)of any officer,director, agent,or immediate family member(spouse, parent, sibling. and child) who is also an employee of the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns, either directly or indirectly, an interest of ten (10%) percent or more in the Proposer entity or any of its affiliates. SUBMITTAL REQUIREMENT: Proposers must disclose the name(s)of any officer, director, agent, or immediate family member (spouse, parent,sibling, and child)who is also an employee of the City of Miami Beach, Proposers must also disclose the name of any City employee who owns, either directly or indirectly, an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates. 4. References&Past Performance.Proposer shall submit at least three(3)references for whom the Proposer has completed work similar in size and nature as the work referenced in solicitation. SUBMITTAL REQUIREMENT: For each reference submitted, the following information is required: I) Firm Name, 2) Contact Individual Name&Title,3)Address,4)Telephone,5)Contact's Email and 6)Narrative on Scope of Services Provided. 5. Suspension,Debarment or Contract Cancellation.Has Proposer ever been debarred,suspended or other legal violation,or had a contract cancelled due to non- erformance by an ublic sector agency? YES NO SUBMITTAL REQUIREMENT: If answer to above is "YES.' Proposer shall submit a statement detailing the reasons that led to action(s). 6. Vendor Campaign Contributions. Proposers are expected to be or become familiar with, the City's Campaign Finance Reform laws, as codified in Sections 2-487 through 2-490 of the City Code. Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Campaign Finance Reform laws are complied with,and shall be subject to any and all sanctions, as prescribed therein,including disqualification of their Proposals,in the event of such non-compliance. SUBMITTAL REQUIREMENT: Submit the names of all individuals or entities (including your sub-consultants)with a controlling financial interest as defined in solicitation. For each individual or entity with a controlling financial interest indicate whether or not each individual or entity has contributed to the campaign either directly or indirectly, of a candidate who has been elected to the office of Mayor or City Commissioner for the City of Miami Beach. 7. Code of Business Ethics. Pursuant to City Resolution No.2000-23879, each person or entity that seeks to do business with the City shall adopt a Code of Business Ethics ("Code") and submit that Code to the Procurement Department with its proposal/response or within five(5)days upon receipt of request, The Code shall, at a minimum, require the Proposer,to comply with all applicable governmental rules and regulations including, among others, the conflict of interest, lobbying and ethics provision of the City of Miami Beach and Miami Dade County. ITB 2018-033—ND 20 SUBMITTAL REQUIREMENT: Proposer shall submit firm's Code of Business Ethics, In lieu of submitting Code of Business Ethics,Proposer may submit a statement indicating that it will adopt,as required in the ordinance, the City of Miami Beach Code of Ethics,available at hlto:/lwmw.miamibeachflgovlciN-hall/orocurement/orocurement-related-ordinance-and-orocedures/ 8. • E"ective January 1, 2018, cov^•ed-emp'^yecs must•he pad a livh^g ••-g^ rate of no less than$11.62 per he••with benefits, health^^re-benefit^e'at leact$222 por h^ur--e•^I'i g age rate of no le—1 a'3+519 in bog,^u4•^v e^,hex-wv beaefns of L^ '{^s. lotwthstandr^ the ecedinse anna c^e4 t -- . •, _ - s-,--..,. Y co x^,c,..,,., n 9 W g alkNex shall exc^eA 1preop -nnt{d%).Tpe-r''ty^^y al-e,'q the Cityc e'e^I•e^'^compliar a pert,LCP T-+eke•(LC°Tracker.^el). 9. Equal Benefits for Employees with Spouses and Employees with Domestic Partners. When awarding competitively solicited contracts valued at over$100000 whose contractors maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks,the Equal Benefits for Domestic Partners Ordinance 2005-3494 requires certain contractors doing business with the City of Miami Beach, who are awarded a contract pursuant to competitive proposals, to provide"Equal Benefits'to their employees with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a Contractor who work within the City limits of the City of Miami Beach,Florida;and the Contractor's employees located in the United States, but outside of the City of Miami Beach limits, who are directly performing work on the contract within the City of Miami Beach, A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of employees^ YES NO B. Does your company provide or offer access to any benefits to employees with(same or opposite sex)domestic partners*or to domestic partners of employees? YES NO C. Please check all benefits that apply to your answers above and list in the "other" section any additional benefits not already specified. Note: some benefits are provided to employees because they have a spouse or domestic partner, such as bereavement leave',other benefits are provided directly to the spouse or domestic partner,such as medical insurance. BENEFIT Finn Provides for Firm Provides for Firm does not Employees with Employees with Provide Benefit Spouses I. Domestic Partners Health Sick Leave Family Medical Leave Bereavement Leave ITB 2018-033-ND 21 If Proposer cannot offer a benefit to domestic partners because of reasons outside your control, (e.g., there are no insurance providers in your area willing to offer domestic partner coverage) you may be eligible for Reasonable Measures compliance. To comply on this basis, you must agree to pay a cash equivalent and submit a completed Reasonable Measures Application (attached)with all necessary documentation.Your Reasonable Measures Application will be reviewed for consideration by the City Manager, or his designee. Approval is not guaranteed and the City Manager's decision is final. Further information on the Equal Benefits requirement is available at htto/hwwwmiamibeach0.gov/city-hall/procurement/crocu rement-related-ordinance-and- procedures/ 10. Public Entity Crimes.Section 287.133(2)(a), Florida Statutes, as currently enacted or as amended from time to time,states that a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal, bid,or reply on a contract to provide any goods or services to a public entity; may not submit a proposal,bid, or reply on a contract with a public entity for the construction or repair of a public building or public work;may not submit proposals,bids,or replies on leases of real property to a public entity;may not be awarded or perform work as a contractor,supplier,subcontractor,or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in s.287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendor list. SUBMITTAL REQUIREMENT:No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees with the requirements of Section 287.133,Florida Statutes,and certifies it has not been placed on convicted vendor list. 11. Non-Discrimination.Pursuant to City Ordinance No.2016-3990,the City shall not enter into a contract with a business unless the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a)of the City Code,including the blacklisting, divesting from,or otherwise refusing to deal with a person or entity when such action is based on race,color, national origin,religion,sex,intersexuality,gender identity,sexual orientation,marital or familial status,age ordisability. SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document Proposer agrees it is and shall remain in full compliance wit Section 2-375 of the City of Miami Beach City Code. 12. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi. Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida, prohibits official City travel to the states of North Carolina and Mississippi, as well as the purchase of goods or services sourced in North Carolina and Mississippi. Proposer shall agree that no travel shall occur on behalf of the City to North Carolina or Mississippi, nor shall any product or services it provides to the City be sourced from these states. SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees it is and shall remain in full compliance with Resolution 2016-29375. 13. Fair Chance Requirement.Pursuant to Section 2-376 of the City Code,the City shall not enter into any contract resulting from a competitive solicitation, unless the proposer certifies in writing that the business has adopted and employs written policies, practices. and standards that are consistent with the City's Fair Chance Ordinance, set forth in Article V of Chapter 62 of the City Code ("Fair Chance Ordinance"), and which, among other things, (i) prohibits City contractors, as an employer, from inquiring about an applicant's criminal history until the applicant is given a conditional offer of employment; (ii) prohibits advertising of employment positions with a statement that an individual with a criminal record may not apply for the position, and (iii)prohibits placing a statement on an employment application that a person with a criminal record may not apply for the position. SUBMITTAL REQUIREMENT:No additional submittal is required at this time.By virtue of executing this affidavit,Proposer certifies that it has adopted policies,practices and standards consistent with the City's Fair Chance Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon request. Proposer further agrees that any breach of the representations made herein shall constitute a material breach of contract,and shall entitle the City to the immediate termination for cause of the agreement.in addition to any damages that may be available at law and in equity. 14. Acknowledgement of Addendum. After issuance of solicitation, the City may release one or more addendum to the solicitation which may provide additional information to Proposers or alter solicitation requirements. The City will strive to reach every Proposer having received solicitation through the City's e-procurement system, PublicPurchase.com. However, Proposers are solely responsible for assuring they have received any and all addendum issued pursuant to solicitation.This Acknowledgement of Addendum section certifies that the Proposer has received all addendum released by the City pursuant to this solicitation. Failure to obtain and acknowledge receipt of all addenda may result in proposal disqualification. ITB 2018-033-ND 22 Initial to Confirm Inibal to Confirm Initial to Confirm Receipt Receipt Receipt Addendum 1 Addendum 6 Addendum 11 Addendum 2 Addendum 7 Addendum 12 Addendum 3 Addendum 8 Addendum 13 I Addendum 4 Addendum 9 Addendum 14 Addendum 5 Addendum 10 Addendum 15 If additional confirmation of addendum is required,submit under separate cover. The remainder of this page was left intentionally blank. ITS 2018-033—ND 23 The solicitation referenced herein is being furnished to the recipient by the City of Miami Beach (the "City")for the redpient's convenience. Any action taken by the City in response to Proposals made pursuant to this solicitation, or in making any award,or in failing or refusing to make any award pursuant to such Proposals, or in cancelling awards,or in withdrawing or cancelling this solicitation, either before or after issuance of an award,shall be without any liability or obligation on the part of the City. In its sale discretion, the City may withdraw the solicitation either before or after receiving proposals. may accept or reject proposals, and may accept proposals which deviate from the solicitation, as it deems appropriate and in its best interest. In its sole discretion.the City may determine the qualifications and acceptability of any party or parties submitting Proposals in response to this solicitation. Following submission of a Bid or Proposal, the applicant agrees to deliver such further details. information and assurances, including financial and disclosure data, relating to the Proposal and the applicant including, without limitation, the applicant's affiliates, officers, directors.shareholders,partners and employees. as requested by the City in its discretion. The information contained herein is provided solely for the convenience of prospective Proposers. It is the responsibility of the recipient to assure itself that information contained herein is accurate and complete.The City does not provide any assurances as to the accuracy of any information in this solicitation. Any reliance on these contents, or on any permitted communications with City officials,shall be at the recipients own risk. Proposers should rely exclusively on their own investigations, interpretations, and analyses.The solicitation is being provided by the City without any warranty or representation.express or implied. as to its content, its accuracy,or its completeness.No warranty or representation is made by the City or its agents that any Proposal conforming to these requirements will be selected for consideration.negotiation,or approval. The City shall have no obligation or liability with respect to this solicitation,the selection and the award process,or whether any award will be made.Any recipient of this solicitation who responds hereto fully acknowledges all the provisions of this Disclosure and Disclaimer,is totally relying on this Disclosure and Disclaimer, and agrees to be bound by the terms hereof.Any Proposals submitted to the City pursuant to this solicitation are submitted at the sole risk and responsibility of the party submitting such Proposal. This solicitation is made subject to correction of errors, omissions.or withdrawal from the market without notice. Information is for guidance only,and does not constitute all or any part of an agreement. The City and all Proposers will be bound only as, if and when a Proposal (or Proposals), as same may be modified, and the applicable definitive agreements pertaining thereto, are approved and executed by the parties, and then only pursuant to the terms of the definitive agreements executed among the parties. Any response to this solicitation may be accepted or rejected by the City for any reason,or for no reason,without any resultant liability to the City. The City is governed by the Government-in-the-Sunshine Law,and all Proposals and supporting documents shall be subject to disclosure as required by such law. All Proposals shall be submitted in sealed proposal form and shall remain confidential to the extent permitted by Florida Statutes, until the date and time selected for opening the responses.At that time, all documents received by the City shall become public records. Proposers are expected to make all disclosures and declarations as requested in this solicitation, By submission of a Proposal,the Proposer acknowledges and agrees that the City has the right to make any inquiry or investigation it deems appropriate to substantiate or supplement information contained in the Proposal,and authorizes the release to the City of any and all information sought in such inquiry or investigation. Each Proposer certifies that the information contained in the Proposal is true, accurate and complete. to the best of its knowledge, information,and belief. Notwithstanding the foregoing or anything contained in the solicitation, all Proposers agree that in the event of a final unappealable judgment by a court of competent jurisdiction which imposes on the City any liability arising out of this solicitation, or any response thereto, or any action or inaction by the City with respect thereto,such liability shall be limited to$10,000.00 as agreed-upon and liquidated damages.The previous sentence, however. shall not be construed to circumvent any of the other provisions of this Disclosure and Disclaimer which imposes no liability on the City. In the event of any differences in language between this Disclosure and Disclaimer and the balance of the solicitation,it is understood that the provisions of this Disclosure and Disclaimer shall always govern. The solicitation and any disputes arising from the solicitation shall be governed by and construed in accordance with the laws of the State of Florida. ITB 2018-033—ND 24 PROPOSER CERTIFICATION I hereby certify that: I, as an authorized agent of the Proposer, am submitting the following information as my firm's proposal; Proposer agrees to complete and unconditional acceptance of the terms and conditions of this document, inclusive of this solicitation, all attachments, exhibits and appendices and the contents of any Addenda released hereto, and the Disclosure and Disclaimer Statement; Proposer agrees to be bound to any and all specifications, terms and conditions contained in the solicitation, and any released Addenda and understand that the following are requirements of this solicitation and failure to comply will result in disqualification of proposal submitted: Proposer has not divulged. discussed, or compared the proposal with other Proposers and has not colluded with any other Proposer or party to any other proposal; Proposer acknowledges that all information contained herein is part of the public domain as defined by the State of Florida Sunshine and Public Records Laws; all responses, data and information contained in this proposal, inclusive of the Proposal Certification, Questionnaire and Requirements Affidavit are true and accurate. Name of Proposers Authorized Representative: Title of Proposers Aumonzed Representative: Signature of Proposers Authorized Representative: Date. State of ) On this day of 20_,personally appeared before me who County of ) stated that (s)he is the of , a corporation, and that the instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said instrument to be its voluntary act and deed. Before me: Notary Public for the of My Commission Expires: ITB 2018-033—ND 25 APPENDIX B � /=t J \ j1 I ) .,a .� " No Bid " Form ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Note: It is important for those vendors who have received notification of this solicitation but have decided not to respond, to complete and submit the attached "Statement of No Bid." The "Statement of No Bid" provides the City with information on how to improve the solicitation process. Failure to submit a `Statement of No Bid" may result in not being notified of future solicitations by the City. ITB 2018-033-ND 26 Statement of No Bid WE HAVE ELECTED NOT TO SUBMIT A PROPOSAL AT THIS TIME FOR REASON(S) CHECKED AND/OR INDICATED BELOW: Workload does not allow us to proposal _Insufficient time to respond _Specifications unclear or too restrictive Unable to meet specifications _Unable to meet service requirements Unable to meet insurance requirements Do not offer this product/service _OTHER. (Please specify) We do_do not_want to be retained on your mailing list for future proposals of this type product and/or service. Signature: Title: Legal Company Name: Note: Failure to respond, either by submitting a proposal or this completed form, may result in your company being removed from our vendors list. PLEASE RETURN TO: CITY OF MIAMI BEACH PROCUREMENT DEPARTMENT ATTN: Natalia Delgado, Procurement Contracting Officer I PROPOSAL #2018-033-ND 1755 MERIDIAN AVENUE, 3RD FLOOR MIAMI BEACH, FL 33139 ITB 2018-033-ND 27 APPENDIX C '\ I A A 1\ I 11, )7 \ t Minimum Requirements & Specifications ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 ITB 2018-033-ND 28 Cl. Minimum Eligibility Requirements. The Minimum Eligibility Requirements for this solicitation are listed below. Proposers that to comply with the minimum requirements shall be deemed non- responsive and shall not have its bid considered. Concrete Curbing/Sidewalk Construction and Milling and Resurfacing of Asphalt Concrete 1. Prospective Bidder must be a State of Florida Certified or a Miami Dade County Licensed General Contractor. Striping of City Streets and Parking Lots 1. Prospective Bidder must be a State of Florida Certified or a Miami Dade County Licensed General Contractor or Miami Dade County Licensed Paving Engineer. C2. Statement of Work Required. The work specified in this bid consists of furnishing all labor, machinery, tools, means of transportation, mobilization, demobilization, maintenance of traffic (MOT), supplies, equipment, materials, services necessary for concrete/curbing and sidewalk construction, milling and resurfacing of asphalt concrete, and the striping of City streets and parking lots, in accordance with the bid documents. 1.1 Roadmap for Contractor Selection. When Work is identified by a City representative, the Contractor who provides all services needed and is the lowest for the project based on prices submitted in Appendix E, Cost Proposal Form, will be selected to complete the Work. 1.2 Project Task Order. Prior to the issuance of a Purchase Order, which is required for the commencement of work, the Contractor shall provide a Task Order for any specific project being considered by the Department. No work may commence until the Task Order is approved by the Department and accompanied by a Purchase Order. 1.3 Additional Services or Change Orders. The City anticipates that a significant portion of the projects awarded pursuant to any continuing services agreement resulting from this ITB shall be completed in accordance with the prices established through the ITB. The City recognizes that there may be instances when the need for services in addition to those stipulated herein shall arise to complement or complete a project awarded pursuant to the established line items. In those cases, the City may negotiate with the Contractor on a mutually agreeable price for the additional services based on available industry pricing. The approval of the City Manager shall be required for any additional services exceeding a project aggregate of $50,000. The following items may not be purchased as additional services: a.design services exceeding $35,000; b. electrical services exceeding $75,000; c. any non-contract construction work exceeding a cost of$300,000. ITB 2018-033-ND 29 C3. Minimum specifications: 1.1 Scope of Work for Concrete Curbing/Sidewalk Construction The applicable portions of the Miami Beach Public Works Manual and the Standard Specifications for Road and Bridge Construction of the Florida Department of Transportation, 2018 Edition, and its supplements, as amended, shall establish the minimum standard for all work performed as a result of this ITB and shall be further supplemented and amended by the General Specifications and Special Provisions contained herein. Wheelchair curb ramps shall be constructed to be in full compliance with all Americans with Disabilities Act Accessibility Guidelines standards and Florida Accessibility Code standards, as well as any other required and relevant standards. 1.2 Technical Specification The Contractor shall provide all supervision, labor, materials (including forming), maintenance of traffic and equipment required to complete the work, at a site or sites designated by the City. All work shall be completed in accordance with the Miami Beach Public Works Manual unless stated otherwise. The Public Works Manual can be found on the City's website at http//m iami beach fi.gov/publicworksleng ineering/ 1.2.1 Concrete Sidewalk (4" thick) outside of driveways per Miami Beach Public Works Manual. 1.2.2 Concrete Sidewalk or Driveway (6" thick): with WWF 6" x 6" x 10 10G through driveways per Miami Beach Public Works. 1.2.3 Removal and replacement of existing curb and gutter and or sidewalks. These items include removal of existing concrete and disposal of materials to legal sites provided by the Contractor. 1.2.4 Concrete curb and gutter/valley gutters shall be installed using #5 reinforcing steel rods and compacted limerock base per Miami Beach Public Works Manual. 1.2.5 Construction of pedestrian ramps shall be in accordance with the City of Miami Beach Detail, Pedestrian Ramps in Public Right-of-Way. It shall include the cost of removal of existing sidewalk and the preparation of the base as described herein. 1.2.6 Extra Strength Concrete (4,000 psi): All cement concrete mix items shall be FDOT approved Portland Cement Concrete Type I having a minimum 28 day compressive strength of 3,000 psi, unless 4,000 psi Portland Cement Concrete is. specified. This item has been established to compensate the bidder for the difference in cost of utilizing this higher strength concrete. When 4,000 psi concrete is specified, the Contractor shall be paid the Contract ITS 2018-033-ND 30 unit price bid for sidewalk or curb and gutter, as appropriate, and shall also be paid the contract unit price bid for 4,000 psi concrete. The quantity to be paid for shall be the actual volume, in cubic yards, of 4,000 psi concrete in place and accepted. 1.2.7 Colored Concrete Sidewalks and Ramps: All concrete used in the replacement or construction of sidewalks and pedestrian ramps shall be of Color Concrete mix as specified below unless directed otherwise by the Street Superintendent or City Engineer. Where quantities of concrete to be used in one pour is equal to or more than three cubic yards, an integral colored concrete mix shall be used. The dust- on/dry-shake coloring shall be allowed only when the total concrete quantity in one work order is less than three cubic yards or if directed by the City Engineer or his representative: Integral Color Concrete Mix Design: Design mix to provide normal weight, regular or air-entrained pump mix concrete with a minimum of 470 lbs. of Portland cement to achieve 3,000 psi or more 28 day compressive strength. Mix Chromix® ML Admixtures Custom Color Designation: Miami Beach Red IV V073-20, as manufactured by L.M. Scofield Company, Douglasville, GA, 800-800-9900. 1.2.8 All concrete to be furnished must meet the South Florida Building Code requirements. 1.2.9 Partially hardened or re-tempered concrete shall not be acceptable. 1.2.10 Bidders are Encouraged to Use Green Friendly Materials for Cement 8 Concrete • Coal fly ash • Ground Granulated Blast Furnace Slag (GGBF) • Cenospheres • Silica Fumes It is recommended that the Contractor use coal fly ash, ground granulated blast furnace (GGBF) slag, cenospheres and silica fumes are recovered materials that are readily available in some areas for use as ingredients in cement or concrete. Coal fly ash is a byproduct of coal burning at electric utility plants. Slag is a byproduct of iron blast furnaces. The slag is ground into granules finer than Portland cement and can be used as an ingredient in concrete. Cenospheres are small, inert, lightweight, hollow, glass spheres that are a component of coal fly ash. They can be added to cement to produce a specialty, high performance concrete. Silica fume is a waste material recovered from alloyed metal production. It can also be added to cement to produce a high performance concrete. Environmental Protection Agency(EPA) Standards to follow: • Replacement rates of coal fly ash for cement in the production of blended cement generally do not exceed 20-30 percent, although coal fly ash blended cements may range from 0-40 percent coal fly ash by weight, according to ASTM C 595 for cement Types IP and I(PM). Fifteen percent is a more accepted rate ITS 2018-033-ND 31 when coal fly ash is used as a partial cement replacement as an admixture in concrete. • According to ASTM C 595, ground granulated blast furnace (GGBF) slag may replace up to 70 percent of the Portland cement in some concrete mixtures. Most GGBF slag concrete mixtures contain between 25 and 50 percent GGBF slag by weight. EPA recommends that procuring agencies refer, at a minimum, to ASTM C 595 for the GGBF slag content appropriate for the intended use of the cement and concrete. • According to industry sources, cement and concrete containing cenospheres typically contains a minimum of 10 percent cenospheres (by volume). • According to industry sources, cement and concrete containing silica fume typically contains silica fume that constitutes 5-10 percent of cementitious material on a dry weight basis. ASTM C 595: This specification pertains to blended hydraulic cements for both general and special applications, using slag or pozzolan, or both, with portland cement or portland cement clinker or slag with lime. These cements are classified into two types: Type IS which is portland blast-furnace slag cement and Type IP which is portland-pozzolan cement. They can also be described according to air- entraining, moderate sulfate resistance, moderate heat of hydration, high sulfate resistance, or low heat of hydration properties. The cement shall conform to the chemical requirements prescribed. In addition, the cement shall undergo different tests to determine the following properties: chemical analysis. fineness by sieving, fineness by air-permeability, autoclave expansion, time of setting, air content of mortar, compressive strength, heat of hydration, normal consistency, specific gravity, water requirement, mortar expansions of blended cement and pozzolan, drying shrinkage, activity index with portland cement, and sulfate resistance. Recommended Specifications for Cement and Concrete Containing Recovered Materials Cement Specifications Concrete Specifications ASTM C 595. "Standard Specification for Blended ASTM C 618, "Standard Specification for Fly Ash and Hydraulic Cements." Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete." ASTM C 150, 'Standard Specification for Portland ASTM C 311,'Standard Methods of Sampling and Cement.' Testing Fly Ash and Natural Pozzolans for Use as a Mineral Admixture in Portland Cement Concrete.' ASTM C 989,'Ground Granulated Blast-Furnace Slag for Use in Concrete Mortars." AASHTO M 302,'Ground Granulated Blast-Furnace AASHTO M 240,'Blended Hydraulic Cements." Slag for Use in Concrete and Mortars.' American Concrete Institute Standard Practice ACI 226.R1,'Ground Granulated Blast-Furnace Slag as a Cementitious Constituent in Concrete.' Please refer to https:llwww.astm.orpl ITB 2018-033-ND 32 1.2.11 Concrete Pavers: Install or remove and replace existing concrete pavers in roadways or pedestrian walkways. This may include compacted subgrade, concrete cast in place edge restraints 6" 3,000 psi concrete slab, and a minimum of 1 'A"sand leveling course. 1.2.12 Utility Boxes: Removal and installation of utility boxes. All materials, including utility boxes shall be supplied by the Contractor. Installation will include removal of dirt to expose meter and 4" thick pea rock base underneath meter. Install City provided utility box in 6" concrete collar. Utility boxes should be supported at the base by brick or other method. Contractor must use the same utility boxes that are used by the City. Brand and part numbers are provided below: 1" Meter box flared wall, CDR P/N WB00-1118-12 or equal Solid cover to read "water, CDR P/N WC00-1118-02 or equal 1.5"Meter box flared wall, CDR P/N WBOO-1324-12 or equal Solid cover to read "water', CDR P/N WCO2-1324-02 or equal 2" Meter box flared wall, CDR P/N WB00-1730-12 or equal Solid cover to read"water, CDR PIN WC00-1730-02 or equal 3"Meter box flared wall, CDR P/N W802-2436-18 or equal Solid cover to read "water', CDR P/N WCO2-2436-03 or equal Clean out sewer box traffic rated, CDR P/N WB04-1015-H20 or equal Solid cover to read "sewer' bolt down, CDR P/N WC04-1015-02-45LPS or equal Electrical boxes will have covers that read"electrical" 1.2.13 Fabricate and install hand rails according to ADA specifications. Hand rails will be typically made of 2"in diameter aluminum, core drilled, and grouted at the edge of sidewalk/ramp. 1.2.14 Restoration and dressing of all replaced surfaces shall be accomplished by removal of all forms of broken concrete, rock and other debris and backfilling all abutting areas to the new concrete with proper soil and sod. 1.2.15 All areas of removal are to be done in a careful manner so as not to cause damage to abutting concrete surface. Saw cutting may be needed to prevent additional damage. Contractor has to protect monuments, survey pipes metal castings, etc. encountered in the replacement or new work area, and shall make any necessary adjustments of these items so as to conform to the finish grade of his work. Contractor shall be responsible for restoring sidewalk anchors, flags, etc., which may be encountered, such as hurricane shutter fasteners in commercial areas. Contractor shall be responsible for protecting, in a satisfactory manner to the Street Superintendent, any roof drainage pipe encountered in the area of removal and replacement. ITB 2018-033-ND 33 Cold joint or a solid plate will be required for every 40 L.F. to 60 L.F. of work. Expansion material may be called for as directed by the Engineer. All areas removed by the Contractor are to be replaced and restored within two days of removal and shall be properly barricaded by the Contractor in the interim time. 1.2.16 Pavement Restoration Abutting Restored Areas: Asphalt will be saw cut as directed by the Street Superintendent or authorized representative. All cuts will be parallel to the curb line. Areas void of limerock will be filled with limerock and compacted to required density as directed by the Superintendent. A minimum 2" hot mix asphalt (as directed by the City) is to be used to complete restoration and will be compacted by use of roller or vibratory plate. Finished surface to be free of ridges or valleys and imperfections that may cause the surface to hold water or create a tripping hazard. All work is to be inspected and accepted by the Street Superintendent or his representative prior to payment. Upon receipt of a Work Order, the Contractor shall commence work upon the site(s) within seven (7) calendar days, and continue such work in an expeditious manner to a conclusion acceptable to the Engineer. 1.3 Control of the Work 1.3.1 Inspectors: Inspectors employed by the City shall be authorized to inspect all work done and materials furnished. Such inspection may extend to all or any part of the Work and to the preparation or manufacture of the materials to be used. An inspector may be stationed at the worksite to report to the Engineer as to the progress of the Work and the manner in which it is being performed; also to report whenever it appears that the materials furnished and work performed by the Contractor fail to fulfill the requirements of the Specifications and Contract, and to call to the attention of the Contractor any such failure or other infringements. Such inspection, however, shall not relieve the Contractor from any obligation to perform all the Work strictly in accordance with the requirements of the Specifications. In case of any dispute arising between the Contractor and the inspector as to material furnished or the manner of performing the Work, the inspector shall have the authority to reject materials or suspend the Work until the question at issue can be referred to and decided by the Engineer. The inspector shall perform such other duties as are assigned to him. He shall not be authorized to revoke, alter, enlarge, relax, or release any requirements of these Specifications, approve or accept any portion of work, nor issue instructions contrary to the Plans and Specifications. The inspector shall in no case act as foreman or perform other duties for the Contractor, nor interfere with the management of the Work by the latter. Any advice which the inspector may give the Contractor shall in no way be construed as binding the Engineer in any way, nor releasing the Contractor from fulfillment of the terms of the Contract. Ordinarily one inspector will be employed by the City for each section of the Work under Contract; but if, on account of any apparent disregard of these Specifications, additional inspectors shall be required, they will be employed by the City at the rate of $150.00 per diem each, and the cost of same charged to the Contractor and deducted from the final payment. ITS 2018-033-ND 34 1.3.2 Inspection: The Contractor shall provide the Engineer with for the information to ascertain whether or not the work performed and materials used are in accordance with the requirements and intent of the Specifications and Contract. If the Engineer requests it, the Contractor shall at any time before final acceptance of the Work remove or uncover such portions of the finished Work as may be directed. After examination the Contractor shall restore said portions of the Work to the standard required by the Specifications. Should the Work thus exposed or examined prove acceptable, the uncovering or removing, and the replacing of the covering or making good of the parts removed, shall be paid for as "Extra Work," but should the work so exposed or examined prove unacceptable, the uncovering or removing and the replacing of the covering or making good of the parts removed, shall be at the Contractor's expense. No Work shall be done nor materials used without suitable supervision or inspection by the Engineer or his representative. Failure to reject any defective Work or material shall not in any way prevent later rejection when such defect be discovered, or obligate the City to final acceptance. 1.3.3 Failure to Remove and Renew Defective Materials and Work: Should the Contractor fail or refuse to remove and renew any defective materials used or Work performed, or to make any necessary repairs in an acceptable manner and in accordance with the requirements of these Specifications within the time indicated in writing, the Engineer shall have the authority to cause the unacceptable or defective materials or Work to be removed and renewed, or such repairs as may be necessary, to be made at the Contractors expense. Any expense incurred by the City in making these removals, renewals or repairs, which the Contractor has failed or refused to make, shall be paid for out of any monies due or which may become due to the Contractor or may be charged against the "Contract Bond" deposited; and continued failure or refusal on the part of the Contractor to make any or all necessary repairs promptly, fully, and in an acceptable manner shall be sufficient cause for the City, at its option, to purchase materials, tools, and equipment and employ labor or contract with any other individual, firm, or corporation to perform the Work. All costs and expenses incurred thereby shall be charged against the defaulting Contractor and the amount thereof deducted from any monies due or which may become due, or shall be charged against the "Contract Bond" deposited. Any work performed, as described in this paragraph, shall not relieve the Contractor in any way from his responsibility for the Work performed by him. 1.3.4 Final Inspection: Whenever the Work provided and contemplated by the Contractor shall have been satisfactorily completed and the final cleaning up performed, the Engineer shall within ten (10) days, unless otherwise provided, make the final inspection. ITB 2018-033-ND 35 1.4 Control of Material 1.4.1 Source of Supply and Quality of Materials: At the option of the Engineer the source of supply for each of the materials shall be approved by the Engineer before the delivery is started. Representative preliminary samples of the character and quality described shall be submitted by the Contractor or producer for examination and tested in accordance with the methods referred to under Samples and Tests, Section 1.4.2, below. Only materials conforming to the requirements of these Specifications and approved by the Engineer shall be used in the Work. All materials proposed to be used may be inspected or tested at any time during their preparation and use. If, after trial, it is found that sources of supply which have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall furnish approved material from other approved sources. No material which after approval has in any way become unfit for use shall be used in the Work. 1.4.2 Samples and Tests: For the purpose of assisting his judgment, the Engineer may require any or all materials to be subject to test by means of samples or otherwise, as he may determine. The Contractor shall afford such facilities as the Engineer may require for collecting and forwarding samples and shall not make use of or incorporate in the Work any material represented by the samples until the tests have been made and the materials found in accordance with the requirements of the Specifications and are acceptable. The Contractor in all cases shall furnish and deliver the required samples without charge. Samples shall be furnished sufficiently in advance so that the results of the required tests may be secured prior to the incorporation of the material in the Work. The manner of collecting and testing samples, as well as all apparatus and equipment used for this purpose, shall conform to the A.S.T.M. Current Standards or Tentative Standards, as the case may be, insofar as these are applicable- unless specifically stated otherwise. 1.4.3 Storage of Materials: Materials shall be stored so as to insure their preservation and quality and fitness for the Work, and shall be so located as to facilitate prompt inspection. Materials improperly stored may be rejected without testing. 1.4.4 Defective Materials: All materials not conforming to the requirements of these Specifications shall be considered as defective and all such materials, whether in place or not, shall be rejected and shall be removed immediately from the site of the Work, unless otherwise permitted by the Engineer. No rejected material, the defects of which have been subsequently corrected, shall be used until approval has been given. Upon failure on the part of the Contractor to comply with any order from the Engineer made under the provisions of this article, the Engineer shall have authority to remove and replace defective material and to deduct the cost of removal and replacement from any monies due or which may become due to the Contractor. ITB 2018-033-ND 36 1.5 Legal Relations and Responsibility to the Public 1.5.1 Permits, Licenses, & Occupational Licenses: The Contractor shall procure all permits and licenses as required. There will be no charge for the construction permits issued by the City of Miami Beach. The Contractor shall also give all notices necessary and incident to the due and lawful prosecution of the Work. 1.5.2 Right of Way: In cases where the Work is done on private property the City guarantees the Contractor the right-of-way for the construction of the Work, but the Contractor must take all precautions not to inconvenience the tenant or property owner any more than necessary. The right is reserved to omit any sections of the Work which depend upon a right-of-way grant in case such right-of-way is denied by the City. The Contractor shall have no claims for damage due to delay by the City in furnishing necessary right-of-way, but should any such delay occur the Contractor shall be entitled to such extension of time for the completion of his Contract as may be determined by the City to be reasonable. In case of damage to the Work on account of work so done, the Engineer may direct the Contractor to make the necessary repairs, and payment for such repairs will be made as provided under "Extra Work." Should the Contractor refuse or neglect to make the said repairs within the time specified, the Engineer shall have the authority to cause such repairs to be made, in which case the Contractor shall not be relieved in any way from his responsibility for the Work performed by him. 1.5.3 Restoration of Surfaces Opened by Permit: Any individual, firm, or corporation wishing to make an opening in the street must secure a permit from, and will be required to deposit security with, the Engineer, in a suitable amount to cover the cost of making the necessary repairs, and the Contractor shall not allow any person or persons to make an opening unless a duly authorized permit from the City is presented. The right is reserved to lay in the street or to repair any sewer, drain, conduit, main, or service pipe or their accessories at any time before the completion of the Work. The Contractor is to exercise such supervision thereof as will protect him against defects in the finished Work. In case of damage to the Work on account of work so done, the Engineer may direct the Contractor to make the necessary repairs, and payment for such repairs will be made as provided under 'Extra Work." Should the Contractor refuse or neglect to make the said repairs within the time specified, the Engineer shall have the authority to cause such repairs to be made, in which case the Contractor shall not be relieved in any way from his responsibility for the Work performed by him. 1.5.4 Sanitary Provisions: Contractor shall provide and maintain at his own expense, in a sanitary condition, such accommodations for the use of his employees as is ITB 2018-033-ND 37 necessary to comply with the requirements and regulations of State and County Boards of Health. He shall commit no public nuisance. 1.5.5 Public Convenience and Safety: Contractor shall conduct the Work so as to insure the least obstruction to traffic practicable, and shall provide for the convenience of the general public and of residents along and adjacent to the Work in a manner satisfactory to the Engineer. Materials and equipment stored at the worksite shall be done so as to cause as little obstruction to the public as possible and shall be lighted and barricaded as hereinafter provided. 1.5.6 Closing Streets: Streets shall not be closed except when and where directed by the Engineer. Whenever the street is not closed, the Work must be conducted so that there shall at all times be a safe passageway for traffic. Whenever it is necessary to divert traffic from any part of the Work, the Contractor shall provide and maintain a passable driveway as directed by the Engineer. Suitable barricades, danger warnings, detour signs, etc., as hereinafter provided, shall be maintained by the Contractor in all cases and the Engineer's office and the Fire Department shall immediately be notified by telephone or otherwise upon the closing and/or opening of each street or section thereof. 1.5.7 Barricades, Warnings, and Detour Signs: The Contractor shall provide, erect, and maintain, at his own expense, barricades, danger warnings, and detour signs whenever they may be necessary. He shall place sufficient lights on and/or near the Work and keep them burning from twilight to sunrise; shall erect suitable barricades, railings, fences, and/or other protection about the Work; provide all watchmen by day or night and take all other precautions that may be necessary; shall maintain proper guards and lights for the prevention of accidents upon materials, supplies, and equipment, and take all other precautions that may be necessary for the proper protection of the Work and public convenience and safety. Streets closed to traffic shall be protected by effective barricades on which shall be placed acceptable warning signs. The Contractor shall provide and maintain acceptable warning and detour signs at all closures, intersections, and along the detour routes, directing the traffic around the closed portion or portions of the Work, so that the temporary detour route or routes shall be indicated clearly throughout its or their entire length. 1.5.8 Maintenance of Traffic 1.5.8.1 Work shall be conducted in such a manner that all streets shall be open to traffic at night. Approved and sufficient barricades, signs and lighting shall be maintained at all times for the safety of the public and traffic, and to insure that no traffic will pass over the placed material until the material is cured. ITS 2018-033-ND 38 1.5.8.2 Work areas must be barricaded by the Contractor 24 hours prior to commencement of the work. 1.5.8.3 It will be the responsibility of the Contractor to provide all barricades, signs. and lighting in accordance with the above stated requirements. The Contractor shall be responsible for providing an off duty police officer, if necessary to complete the job. 1.5.8.4 The cost of law enforcement officers will be provided as a pass-through cost only. 1.5.9 Fire Hydrants, Gutters, Etc.: Fire hydrants on or adjacent to the Work shall be kept accessible to the fire apparatus at all times and no material or obstructions shall be placed within ten (10) feet of any such hydrant. Adjacent premises must be given access as far as practicable, and obstruction of sewer inlets, gutters, and ditches will not be permitted. 1.5.10 Use of Explosives: The use of explosives will not be permitted without the written permission of the City Engineer and a permit issued by the Chief of the Fire Department. Where such permission for the use of explosives is obtained the Contractor shall use the utmost care so as not to endanger life or property. All explosives shall be stored in a secure manner, and all such storage places shall be marked clearly, "DANGEROUS EXPLOSIVES," and shall be in the care of competent individual. 1.5.11 Preservation of Property: The Contractor shall preserve from danger all property along the line of Work, the removal or destruction of which is not called for by the Plans. This applies to public utilities, trees, lawns, buildings, fences, bridges, pavements, and other structures, monuments, pipe, underground structures, etc., and wherever such property is damaged due to the activities of the Contractor it shall be immediately restored to its original condition by the Contractor and at his own expense. The Contractor shall give due notice to any department or public service corporation controlling manholes, valve jackets, meter boxes, street monuments, etc., prior to adjusting them to grade, and shall be held strictly liable to the City if any such appliances are covered up during the construction of the Work. In such case of failure on the part of the Contractor to restore any such property, or make good any damage or injury thereto, the Engineer may, upon forty-eight hours'notice, proceed to repair, rebuild,or otherwise restore such property as may be deemed necessary and the cost thereof will be deducted from any monies due or which may become due to the Contractor under this Contract. Nothing in this clause shad prevent the Contractor from receiving proper compensation for the removal or replacement of any public or private property when same is made necessary by alteration of grade or alignment, and such work is authorized by the Engineer, provided that such property has not been damaged through fault of the Contractor, his employees, or agents. ITB 2018-033-ND 39 1.5.12 Responsibility for Damage: The Contractor shall indemnify and hold harmless the City, agents, and employees from all suits, actions, or claims of any character, name, and description brought for, or on account of, any injuries or damages received or sustained by any person, persons, or property by or from the said Contractor, or by, or in consequence of, any neglect in safeguarding the Work, or through the use of unacceptable materials in the construction of the improvement, or by, or on account of any act of omission, neglect, or misconduct of the said Contractor, or by, or on account of, any claims or amounts recovered for any infringement of patent, trademark, or copyright, or from any claims or amounts arising or recovered under the "Workmen's Compensation Law"or any other laws, by-laws, ordinance, order or decree, and so much of the money due the said Contractor under and by virtue of his Contract as shall be considered necessary by the Engineer may be retained for the use of the City, or in case no money is due, his surety shall be held until such suit or suits, action or actions, claim or claims, for injuries or damages, as aforesaid, shall have been settled and suitable evidence to that effect furnished to the Engineer. The Contractor guarantees the payment of all just claims for materials, supplies, tools, labor, and other just claims against him or any subcontractor in connection with this Contract and his bonds will not be released by final acceptance and payment by the City unless all such claims are paid or released. 1.5.13 Contractor Responsibility for Work: Until acceptance of the Work by the Department it shall be under the charge and care of the Contractor and he shall take every necessary precaution against injury or damage to any part thereof by the action of the elements or from any other cause whatsoever arising from the execution or from the non execution of the Work. The Contractor shall rebuild, repair, restore, and make good, at his own expense, all injuries or damages to any portion of the Work occasioned by any of the above causes before its completion and acceptance except such ordinary wear and tear as may be due to use on sections opened for service, as hereinafter provided. 1.5.14 Opening of Section of Work for Service: Whenever, in the opinion of the Engineer, any portion of the Work is in acceptable condition for use it shall be opened for service as may be directed and such opening shall not be held to be in any way an acceptance of the Work or any part of it or as a waiver of any provisions of these Specifications and Contract. Necessary repairs or renewals made on any section of the Work due to its being opened for use under instructions from the Engineer, to defective materials or work, or to natural causes other than ordinary wear and tear, pending completion and acceptance of the Work, shall be performed at the expense of the Contractor. 1.5.15 No Waiver of Legal Rights: The City reserves the right, should an error be discovered in the partial or final estimates, or should conclusive proofs of defective work or materials used by or on the part of the Contractor be discovered after the final payment has been made, to claim and recover by process of law such sums as may be sufficient to correct the error or make good the defects in the work and materials. ITB 2018-033-ND 40 1.5.16 Liabilities and Duties of Contractor Not Limited: The mention of any specific duty or liability upon the Contractor in any part of the Specifications shall not be construed as a limitation or restriction upon general liability or duty imposed upon the Contractor by the Specifications, said reference to any specific duty or liability being for purposes of explanation only. No waiver of any breach of the Contract shall constitute a waiver of any subsequent breach of any part thereof, nor of the Contract. 1,6 Prosecution and Progress 1.6.1 Subletting or Assigning Contracts: The Contractor will not be permitted to sublet, assign, sell, transfer, or otherwise dispose of the Contract or any portion thereof, or of his right, title, or interest therein to any individual, firm, or corporation without the written consent of the City. In case such approval is given, the Contractor must file with the Engineer copies of all sub-contracts. No sub-contracts or transfer of Contract shall in any case release the Contractor of his liability under this Contract and Bond. 1.6.2 Progress of Work: It is understood and agreed that the Contractor shall commence work no later than the time limit for beginning as set forth in the attached Proposal, and shall provide an adequate force of labor and equipment to prosecute the Work at as many different points as may be deemed necessary by the Engineer so as to insure the completion of the same within the time limit for completion as set forth in the attached Proposal or Contract, except that where the Contractor has more than one uncompleted Contract with the City, he is not to commence another Contract nor place materials on the streets thereof without the consent of the Engineer. 1.6.3 Limitations of Operations: The work is to be confined, at any one time, to an area not to exceed 1,500 feet in length; and while the work is actually going on, as much as half this length may be barricaded to entirely exclude traffic, but not over half; nor will two consecutive street intersections be allowed to be entirely closed to exclude traffic except by written consent of the Engineer. Street traffic is not to be needlessly obstructed and no street is to be opened to traffic until the Engineer gives his consent. The Contractor may erect or maintain along the lines of his work such tool boxes, sheds, storehouses, or other buildings as may be necessary, provided such structures do not interfere with the reasonable use of the streets or sidewalks. The size, location, and construction of these must be subject to the approval of the Engineer. The Contractor hereby agrees to arrange his work and dispose his materials so as not to interfere with the operations of other contractors engaged upon adjacent work and to join his work to that of others in a proper manner in accordance with the spirit of the Plans and Specifications, and to perform his work in the proper sequence in relation to that of other Contractors, all as may be directed by the Engineer. ITB 2018-033-ND 41 Each Contractor shall be held responsible for any damage done by him or his agents to the work performed by another Contractor. Each Contractor shall so conduct his operations and maintain the Work in such condition that adequate drainage shall be in effect at all times. 1.6.4 Character of Workmen and Equipment: The Contractor shall employ such superintendents, foremen, and workmen as are careful and competent. Whenever the Engineer shall determine that any person employed by the Contractor is, in his opinion, incompetent, unfaithful, disorderly, or insubordinate such person shall, upon notice, be discharged from the Work and shall not again be employed on it except with written consent of the Engineer. All workmen must have sufficient skill and experience to properly perform the work assigned them. All workmen engaged on special work or skilled work, or in any trade, shall have had sufficient experience in such work to properly and satisfactorily perform it and to operate the equipment involved, and shall make due and proper effort to execute the Work in the manner prescribed in these Specifications. Otherwise the Engineer may take action as above prescribed. Should the Contractor fail to remove such person or persons, or fail to furnish suitable or sufficient machinery, equipment, or force for the proper prosecution of the Work, the Engineer may withhold all estimates which are or may become due, or may suspend the Work until such orders are complied with. The equipment used on any portion of the Work shall be such that no injury to the roadway, adjacent property, or other highways will result from its use; and no item of machinery or equipment, after once being place on the Work, shall be removed without the consent of the Engineer. 1.6.5 Temporary Suspension of Work: The City or Engineer shall have the authority to suspend the Work wholly or in part for such period or periods as may be deemed necessary due to unsuitable weather or such other conditions as are considered unfavorable for the suitable prosecution of the Work, or for such time as is necessary due to the failure on the part of the Contractor to carry out orders given or perform any or all provisions of the Contract. If it should become necessary to stop work for an indefinite period, the Contractor shall store all materials in such manner that they will not obstructor impede the traveling public unnecessarily, nor become damaged in any way, and he shall take every reasonable precaution to prevent damage or deterioration of the work performed; provide suitable drainage of the roadway by opening ditches, shoulder drains, etc., and erect temporary structures where directed. The Contractor shall not suspend the Work and shall not remove any equipment, tools, lumber, or other materials without the written permission of the Engineer. No allowance of any kind will be made for such suspension of work except an equivalent extension of time for completion of the Contract. ITB 2018-033-ND 0.2 1.6.6 Computation of Contract Time for Completion of the Work: Contractor shall perform fully, entirely, and in accordance with these Specifications the Work contracted for within the specified time stated in the attached Proposal. In adjusting the contract time for the completion of the Work, the length of time expressed in days, during which the prosecution of the Work has been delayed in consequence of any suspension of work ordered by the Engineer, or omission of the City and not by any fault of the Contractor, shall be added to the contract time as set forth in the attached Proposal, all of which shall be determined by the Engineer, and whose determination shall be binding and conclusive upon both parties to the Contract. If the satisfactory execution and completion of the Contract, shall require work or material in greater value than set forth in the Contract, then the Contract time shall be increased in the same ratio as the additional value bears to the original value contracted for. No allowance shall be made for delay or suspension of the prosecution of the work due to fault or negligence of the Contractor. No claim for damages shall be made or allowed on account of delay or postponement occasioned by the precedence of other contracts which may be either let or executed before the execution of the Contract, or on account of the streets or structures adjacent to the Work not being in the condition contemplated by the parties at the time of making the Contract, or on account of delay in the removal of obstructions; but if the Contractor shall be delayed in the performance of his work by reason of the streets or structures adjacent to the Work not being in condition contemplated, or on account of delay in the removal of obstructions, or by reason of the Work or any part thereof being suspended on account of other contracts, or for any other reason, such allowance of time will be made as the Engineer shall deem reasonable. 1.6.7 Failure to Complete the Work on Time: The Work to be done under this Contract is to be begun on or before the date set forth in the attached Proposal, and shall be prosecuted with proper dispatch towards completion to the satisfaction of the Engineer, and is to be fully completed within the time limit set forth in the attached Proposal, and it is understood and agreed that the time limit for the completion of said Work is of the essence of the Contract, and should the Contractor fail to complete the Work on or before the date specified it is agreed that for each calendar day that any work shall remain uncompleted, after the time specified in the attached Proposal, with any extension of time which may be allowed by the Engineer for the completion of the Work provided for in these Plans, Specifications, Special Provisions, and Contract, the sum per day given in the following schedule shall be deducted from the monies due to the Contractor, not as a penalty but as liquidated damages and added expense for supervision on each Contract. The Contractor shall take into account all contingent work which has to be done by other parties, arising from any cause whatsoever, and shall not plead his want of knowledge of said contingent work as an excuse for delay in his work or for its non-performance. ITB 2018-033-ND 43 Nothing in this clause shall be construed as limiting the right of the City to declare the Contract forfeited, to take over the Work, or to claim damages for the failure of the Contractor to abide by each and every one of the terms of this Contract as set forth and provided for in the General Provisions, Special Provisions, and Specifications herein contained. 1.6.8 Annulment of Contract: If the Contractor fails to begin the Work under Contract within the time specified, or fails to perform the Work with sufficient workmen and equipment or with sufficient materials to insure the prompt completion of said Work, or shall perform the Work unsuitably, or shall neglect or refuse to remove materials or perform anew such work as shall be rejected as defective and unsuitable, or shall discontinue the prosecution of the Work, or if the Contractor shall become insolvent or be declared bankrupt, or commit any act of bankruptcy or insolvency, or allow any final judgment to stand against him unsatisfied for a period of forty eight (48) hours, or shall make an assignment for the benefit of creditors, or from any other cause whatsoever shall not carry on the Work in an acceptable manner, the Engineer may give notice in writing to the Contractor and his Surety of such delay, neglect, or default, specifying the same, and if the Contractor, within a period of ten (10) days after such notice shall not proceed in accordance therewith, then the City shall upon written certificate from the Engineer of the fact of such delay, neglect, or default and the Contractor's failure to comply with such notice, have full power and authority, without violating the Contract, to take the prosecution of the work out of the hands of said Contractor, to appropriate or use any or all materials and equipment on the ground as may be suitable and acceptable and may enter into an agreement for the completion of said Contract according to the terms and provisions thereof, or use such other methods as in its opinion shall seem advisable for the completion of said Contract in an acceptable manner. All costs and charges incurred by the City, together with the costs of completing the Work under contract, shall be deducted from any monies due or which may become due to said Contractor. In case the expense shall exceed the sum which would have been payable under the Contract, then the Contractor and the Surety shall be liable and shall pay to the City the amount of said excess. 1.6.9 Termination of Contractor's Responsibility: This Contract will be considered complete when all Work has been completed, final inspection made, and the Work accepted by the Department as hereinafter provided. The Contractor will then be released from further obligation except as set forth in his bond. 1.7 Measurement and Payment Acceptance and Final Payment: Whenever the improvement provided for under this Contract shall have been completely performed on the part of the Contractor, and all parts of the Work have been approved by the Engineer according to the Contract, and all trash, debris, equipment, and other things used in the construction removed from the site of the construction and from the adjoining land, ITB 2018-033-ND 44 the Engineer, after final inspection as provided herein, shall certify such fact to the Department in writing, recommending the acceptance of the Work. Upon acceptance of the Work by the Department, a final estimate showing the value of the Work will be prepared by the Engineer as soon as the necessary measurements and computations can be made. All prior certificates or estimates upon which payments have been made being approximate only and subject,to correction in the final estimate. The amount of the Final estimate, less any sums that may have been deducted or retained under the provisions of this Contract, will be paid to the Contractor within thirty (30) days after the Final estimate has been approved by the Department, provided that the Contractor has furnished to the City, a sworn affidavit to the effect that all bills are paid and no suits are pending in connection with the Work done under this Contract. Upon this final payment the City is to be released from all liability whatever growing out of this Contract. 1.8 Special Provisions 1.8.1 Protection to Public: The Contractor shall erect and maintain barricades and warning signs to protect the public during the course of the work. The Contractor shall take every precaution to protect the abutting properties and minimize the possibility of damage to same. Contractor shall be liable for restoration of all property including City property. 1.6.2 Permits: The Contractor shall procure all permits and licenses as required; however, there will be no charge for the construction permits issued by the City of Miami Beach. 1.8.3 Conflict between Special Provisions and General Provisions: In case of conflict between the requirements of Special Provisions and General Provisions, the requirements of the Special Provisions will prevail. 1.8.4 Limitations of Operations: No work shall be accomplished on Saturdays and Sundays. No work shall take place between the hours of 6:00 p.m. and 7:00 a.m.; however, the Contractor may take necessary precautions to protect work already accomplished. For any work that the contractor finds necessary to provide during the above days and times, the Contractor must obtain written authorization from the Public Works or Parking Dept. Director, or designated Representative. 2.1 Scope of Work for Milling and Resurfacing of Asphalt Concrete 2.1.1 Reworking Limerock Base: Rework (or rework and widen) the existing rock base, by adding new limerock material as required. Meet the limerock material requirements as specified by the Florida Department of Transportation (FDOT) standards. The contractor may use limerock of either Miami Oolite or Ocala Formation but only use limerock of one formation on any contract. Limerock base ITB 2018-033-ND 45 material shall be compacted to a density of no less than 98% of maximum dry density as determined by AASHTO-T180 under all paved areas. 2.1.2 Preparing Surface: Prior to the application of the surface course, all loose material, dust, dirt and all foreign material which might prevent proper bond with the existing surface shall be removed to the full width of the treatment by means of revolving brooms or approved mechanical sweeper, supplemented by hand sweeping if required. 2.1.3 Tack Coat: Tack coat shall be Grade RS-2 in accordance with the current Specifications of the Florida Department of Transportation and shall be heated to such consistency that it can be pumped. It shall then be applied to the cleaned, patched and dry surface from an approved pressure distributor, by means of a hand hose. The tack coat shall be applied in a cobweb design in an amount sufficient to properly insure adhesion and obviate slipping. Precaution shall be taken to prevent an excess of tack coat which might form pools. 2.1.4 Asphaltic Wearing Surface: The material used shall comply with the requirements of FDOT Type IN Asphalt Concrete for Road and Bridge Construction. 2.1.5 Placing Mixture: The mixture shall be laid only where the surface to be covered is dry and only when weather conditions, have been determined to be acceptable by the assigned City of Miami Beach Engineer. - 2.1.5.1 Upon arrival, the mixture shall be dumped into the approved mechanical spreader, and immediately spread and struck off to the full width required, and to such appropriate loose depth that when the Work is completed the weight of mixture or thickness required per square yard will be secured. When waived by the Special Provisions, the mechanical equipment may be omitted and spreading accomplished by hand as hereinafter provided. The mixture shall be laid in strips in such a manner as to provide for passage of traffic. 2.1.5.2 Before any rolling is started, the finished surface struck by the machine shall be checked, any inequalities adjusted, and all "drippings", (i.e. fat sandy accumulations from the screed, and all fat spots from any source) shall be removed and replaced with satisfactory material. 2.1.5.3 When machine finishing is used, an excess amount of mixture shall be carried ahead of the screed at all times. Hand raking shall be done behind the machine as required and straight edging and back patching shall be done after initial compression has been obtained and while the material is still hot. 2.1.5.4 When hand spreading is permitted or when, in the opinion of the Engineer because of any project conditioning it becomes necessary to spread by hand, it shall then be immediately distributed into place by means of suitable shovels and ITB 2018-033-ND 46 other tools and spread with rakes in a uniformly loose layer of such depth as will result in a completed course of thickness required. The loose materials shall then be compacted with rollers or tamps. Hand work will be paid for at the unit price per ton as indicated in the Proposal. 2.1.5.5 Under no consideration shall mixture be laid wet, when rain is falling or when there is water omthe base.The City of Miami Beach Engineer will determine if the mixture is acceptable, and if the base is suitable. 2.1.5.6 No skin patching shall be done, and when a depression is to be corrected while the mixture is hot, the surface shall be well scarified before the addition of fresh mixture. If irregularities occur greater than the limits herein specified, and are not corrected while the mixture is still hot, the irregularities shall be cut out the full depth of the pavement and replaced with fresh mixture. 2.1.6 Compacting Mixture: 2.1.6.1 After spreading as specified, the mixture shall be compacted with rollers as hereinbefore specified. The rolling shall be done in the following sequence with equipment as shown. 2.1.6.2 Seal rolling, using tandem steel rollers weighing 5 to 12 tons, and following as close behind to the spreader as is possible without pick-up, undue displacement or blistering of the material. 2.1.6.3 Rolling with self-propelled pneumatic-tired rollers,following as close behind to the seal rolling as the mix will permit. The roller shall cover every portion of the surface with at least six (6) passes. (Note: This rolling is not required for asphaltic concrete binder courses). 2.1.6.4 Final rolling with the 8 to 12 ton tandem steel roller to be done after the seal rolling and pneumatic-tired rolling are complete, but before the pavement temperature has dropped below 140° F. This rolling shall be continued until all roller marks and tire marks have been eliminated. 2.1.7 ManholesNalve Boxes: Adjust manholes and/or valve boxes by raising castings method. Final grade will be supplied by City surveyor. 2.1.6 Traffic Loops: Replace 4, 6, and 8 loops, as required. 2.1.9 Asphaltic Concrete Patch Work: 2.1.9.1 Areas to be patched will be a minimum of 100 sq. ft. and will be ready for tack coat and surface course. 2.1.9.2 Saw Cutting and Patching: Areas to be patched must be saw cut and squared off as directed by City representative(minimum of 100 sq. ft.). Asphalt to ITB 2018-033-ND 47 be removed down to lime rock base; base to be recompacted, either by roller or vibratory tamper. Area will then be tack coated and surface course applied and compacted. 2.1.10 Milling of Existing Asphalt Pavement: 2.1.10.1 Description: The work specified in this Section consists of removing existing asphaltic concrete pavement by milling to improve the rideability of the finished pavement,to lower the finished grade adjacent to the existing curb prior to resurfacing, or to completely remove existing pavement. 2.1.10.2 When milling to improve rideability, an average depth of cut will be specified in the Plans. 2.1.10.3 Unless otherwise specified, the disposal of the milled material becomes the property of the Contractor. 2.1.11 Equipment: 2.1.11.1 The milling machine shall be capable of maintaining a depth of cut and cross slope that will achieve the results specified in the Plans and Specifications. The overall length of the machine (out to out measurement excluding the conveyor) shall be a minimum of 18 feet. The minimum cutting width shall be 6 feet. 2.1.11.2 The milling machine shall be equipped with a built-in automatic grade control system that can control the transverse slope and the longitudinal profile to produce the specified results. 2.1.11.3 Any commercially manufactured milling machine meeting the above requirements will be approved to start the project. If it becomes evident after milling has started that the milling machine cannot consistently produce the specified results,the milling machine will be rejected for further use. 2.1.11.4 When milling to lower the grade adjacent to existing curb or other areas where it is impractical to use the above described equipment, the use of a smaller milling machine will be pemlitted. 2.1.11.5 The milling machine shall be equipped with means to effectively limit the amount of dust escaping the removal operation. 2.1.11.6 For complete pavement removal, the use of alternate removal and crushing equipment, in lieu of the equipment specified above, may be approved by the Engineer. 2.1.12 Construction: 2.1.12.1 When milling to improve rideability, the existing pavement shall be ITB 2018-033-ND 48 removed to the average depth specified in the Plans, in a manner that will restore the pavement surface to a uniform cross section and longitudinal profile. The Engineer may require the use of a string line to ensure maintaining the proper alignment. 2.1.12.2 The longitudinal profile of the milled surface shall be established on the side of the cut nearest the centerline of the road. The cross slope of the milled surface shall be established by a second sensing device near the outside edge of the cut or by an automatic cross slope control mechanism. The Plans may waive the requirement for automatic grade or cross slope controls where the situation warrants such action. 2.1.12.3 The Contractor may elect to make multiple cuts to achieve the required pavement configuration or depth of cut. 2.1.12.4 The milling machine shall be operated to effectively minimize the amount of dust being emitted from the machine. Pre wetting of the pavement may be required. 2.1.12.5 If traffic is to be maintained on the milled surface prior to the placement of the new asphaltic concrete, the pattern of striations shall be such as to produce an acceptable riding surface. The Engineer will control the traveling speed of the milling machine to produce a texture that will provide an acceptable riding surface. 2.1.12.6 Prior to opening an area which has been milled to traffic, temporary • striping should be placed and the pavement shall be thoroughly swept with a power broom or other approved equipment to remove to the greatest extent practicable, fine material which will dust under traffic. This operation shall be conducted in a manner so as to minimize the potential for creation of a traffic hazard and to minimize air pollution. 2.1.12.7 Sweeping of the milled surface with a power broom will be required prior to placing asphaltic concrete. 2.1.12.8 In urban and other sensitive areas where dust would cause a serious problem, the Contractor shall use a street sweeper (using water) or other equipment capable of removing and controlling dust. Approval of the use of such equipment is contingent upon its demonstrated ability to do the Work. 2.1.12.9 To prevent, to the greatest extent practicable, the infiltration of milled material into the storm sewer system when the milling operation is within the limits of, and adjacent to a municipal curb and gutter or a closed drainage system, the sweeping operation shall be performed immediately after the milling operations or as directed by the Engineer. 2.1.12.10 This operation shall also include the thorough removal of all milled material from the gutter in such a manner as to protect the curb from damage and ITB 2018-033-ND 49 to prevent the material being swept into the inlet openings or inlet grates. The equipment and methods utilized to sweep the gutter shall be approved prior to beginning and may be changed or revised to achieve the desired results as directed by the Engineer. 2.1.13 Milled Surface: 2.1.13.1The milled surface shall have a reasonably uniform texture and shall be within 1/4 inch of a true profile grade and shall have no deviation in excess of 114 inch from a straightedge applied to the pavement perpendicular to the centerline. The variation of the longitudinal joint between multiple cut areas shall not exceed 1/4 inch. Areas varying from a true surface in excess of the above stated tolerance may be accepted without correction if the City's Engineer determines that they were caused by a pre-existing condition which could not have reasonably been corrected by the milling operations. Any unsuitable texture or profile, as determined by the City's Engineer, shall be corrected by the Contractor at no additional compensation. 2.1.13.2The City's Engineer may require remilling of any areas where a surface lamination causes a non-uniform texture to occur. 2.1.14 Basis of Payment: 2.1.14.1 The quantity shall be paid for at the Contract unit price for Milling Existing Asphalt Pavement. 2.1.14.2The price and payment for Milling Existing Asphalt Pavement shall be full compensation for all work specified in this section, including hauling off and stockpiling or otherwise disposing of the milled material. 2.1.15 Legal Relations and Responsibility to the Public 2.1.15.1 Permits, Licenses, & Occupational Licenses: The Contractor shall procure all permits and licenses as required. There will be no charge for the construction permits issued by the City of Miami Beach. The Contractor shall also give all notices necessary and incident to the due and lawful prosecution of the Work. 2.1.15.2 Right of Way: In cases where the Work is done on private property the City guarantees the Contractor the right-of-way for the construction of the Work, but the Contractor must take all precautions not to inconvenience the tenant or property owner any more than necessary. The right is reserved to omit any sections of the Work which depend upon a right-of-way grant in case such right-of-way is denied by the City. The Contractor shall have no claims for damage due to delay by the City in furnishing necessary right-of-way, but should any such delay occur the Contractor ITB 2018-033-ND 50 shall be entitled to such extension of time for the completion of his Contract as may be determined by the City to be reasonable. In case of damage to the Work on account of work so done, the Engineer may direct the Contractor to make the necessary repairs, and payment for such repairs will be made as provided under "Extra Work." Should the Contractor refuse or neglect to make the said repairs within the time specified, the Engineer shall have the authority to cause such repairs to be made, in which case the Contractor shall not be relieved in any way from his responsibility for the Work performed by him. 2.1.15.3 Restoration of Surfaces Opened by Permit: Any individual, firm, or corporation wishing to make an opening in the street must secure a permit from, and will be required to deposit security with, the Engineer, in a suitable amount to cover the cost of making the necessary repairs, and the Contractor shall not allow any person or persons to make an opening unless a duly authorized permit from the City is presented. The right is reserved to lay in the street or to repair any sewer, drain, conduit, main, or service pipe or their accessories at any time before the completion of the Work. The Contractor is to exercise such supervision thereof as will protect him against defects in the finished Work. In case of damage to the Work on account of work so done, the Engineer may direct the Contractor to make the necessary repairs, and payment for such repairs will be made as provided under 'Extra Work." Should the Contractor refuse or neglect to make the said repairs within the time specified, the Engineer shall have the authority to cause such repairs to be made, in which case the Contractor shall not be relieved in any way from his responsibility for the Work performed by him. 2.1.15.4 Sanitary Provisions: Contractor shall provide and maintain at his own expense, in a sanitary condition, such accommodations for the use of his employees as is necessary to comply with the requirements and regulations of State and County Boards of Health. He shall commit no public nuisance. 2.1.15.5 Public Convenience and Safety: Contractor shall conduct the Work so as to insure the least obstruction to traffic practicable, and shall provide for the convenience of the general public and of residents along and adjacent to the Work in a manner satisfactory to the Engineer. Materials and equipment stored at the worksite shall be done so as to cause as little obstruction to the public as possible and shall be lighted and barricaded as hereinafter provided. 2.1.15.6 Closing Streets: Streets shah not be closed except when and where directed by the Engineer. Whenever the street is not closed, the Work must be conducted so that there shall at all times be a safe passageway for traffic. Whenever it is necessary to divert traffic from any part of the Work, the Contractor shall provide and maintain a passable driveway as directed by the Engineer. ITB 2018-033-ND 51 Suitable barricades, danger warnings, detour signs. etc., as hereinafter provided, shall be maintained by the Contractor in all cases and the Engineer's office and the Fire Department shall immediately be notified by telephone or otherwise upon the closing and/or opening of each street or section thereof, 2.1.15.7 Barricades,Warnings,and Detour Signs: The Contractor shall provide, erect, and maintain, at his own expense, barricades, danger warnings, and detour signs whenever they may be necessary. He shall place sufficient lights on and/or near the Work and keep them burning from twilight to sunrise; shall erect suitable barricades, railings, fences, and/or other protection about the Work; provide all watchmen by day or night and take all other precautions that may be necessary; shall maintain proper guards and lights for the prevention of accidents upon materials, supplies, and equipment, and take all other precautions that may be necessary for the proper protection of the Work and public convenience and safety. Streets closed to traffic shall be protected by effective barricades on which shall be placed acceptable warning signs. The Contractor shall provide and maintain acceptable warning and detour signs at all closures, intersections, and along the detour routes, directing the traffic around the closed portion or portions of the Work, so that the temporary detour route or routes shall be indicated dearly throughout its or their entire length. 2.1.16 Maintenance of Traffic: 2.1.16.1 Work shall be conducted in such a manner that all streets shall be open to traffic at night. Approved MOT with sufficient barricades, signs and lighting shall be maintained at all times for the safety of the public and traffic, and to insure that no traffic will pass over the placed material for at least one (1) hour after it is spread. 2.1.16.2 Areas to be paved must be barricaded by the Contractor 24 hours prior to commencement of the work. 2.1.16.3 It will be the responsibility of the Contractor to provide the MOT for the work including all barricades, signs, and lighting in accordance with the above stated requirements. The Contractor shall be responsible for providing an off-duty police officer, if necessary to complete job. 2.1.16.4The cost of law enforcement officers will be provided as a pass-through cost only. 2.1.17 Mobilization and Demobilization: It will be the responsibility of the Contractor to cover all costs associated with mobilization and demobilization for the duration of the project. ITB 2018-033-ND 52 2.1.18 Temporary Striping: Contractor must apply temporary striping to all resurfaced roads immediately after the asphalt has cooled enough to support striping. 2.1.19 Contractor must complete the Work requested within the time specified in the Task Order. 2.2 Scope of Work for the Striping of City Streets and Parking Lots All striping must meet Miami-Dade County and Florida Department of Transportation specifications. Contractor must provide a copy of the current Miami-Dade County and Florida Department of Transportation striping specifications upon request from the City's Procurement Division. 2.2.1 Striping of City Streets: 2.2.1.1. Thermoplastic, 4" Solid Yellow NVhite 2.2.1.2. Thermoplastic, 4" Skip Yellow/White 2.2.1.3. Thermoplastic, 6" Solid Yellow NVhite 2.2.1.4. Thermoplastic, 6" Skip Yellow NVhite 2.2.1.5. Thermoplastic, 8" Solid YellowNVhite 2.2.1.6.Thermoplastic, 12" Solid YellowlWhite 2.2.1.7.Thermoplastic, 18" Solid Yellow/White 2.2.1.8. Thermoplastic, 24" Solid YellowlWhite 2.2.1.9. 4" Solid Yellow/White Paint 2.2.1.10.4" Skip Yellow NVhite Paint 2.2.1.11.6" Solid Yellow/White Paint 2.2.1.12.6"Skip Yellow NVhite Paint 2.2.1.13. 8" Solid Yellow/White Paint 2.2.1.14. 12" Solid Yellow/White Paint 2.2.1.15. 18" Solid Yellow NVhite Paint 2.2.1.16. 24" Solid YellowlWhite Paint 2.2.1.17. RPMs(Road Reflector) 2.2.1.18.Thermoplastic Arrows 14"(Std. MDC & FDOT Specs) 2.1.1.19.Arrows 14" (Std. MDC & FDOT Specs) White Paint 2.2.1.20. Handicap Logo& Blue Stripe 2.2.1.21. Removal of Existing Thermo Striping (hydroblast) 2.2.1.22. Bicycle Pavement Markings 2.2.1.23.Thermoplastic Messages 2.2.1.24. Paint Messages 2.2.1.25 Installation of New Traffic Sign 2.2.2 Striping City Parking Lots: 2.2.2.1. Total Lots: 50 each.Average Lot Size: 1,425 LF 2.2.2.2. Colors: YellowlWhite 2.2.2.3. The City will provide a Survey and Lay-out for each Lot. 2.2.2.4. Stop Bars (12"Wide) 2.2.2.5.Thermoplastic Arrows 14"(Std. MDC& FDOT Specs) ITB 2018-033-ND 53 2.2.2.6.Arrows 14" (Std. MDC &FDOT Specs)White Paint 2.2.2.7. Cross Hatching (12") 2.2.2.8. Handicap Logo&Blue Stripe(parking space) 2.2.2.9. Wheel Stop Installation 2.2.2.10. Disable Cross Hatching (4") 2.2.2.11 Installation of New Traffic Sign 2.2.3 Legal Relations and Responsibility to the Public 2.2.3.1 Permits, Licenses, & Occupational Licenses: The Contractor shall procure all permits and licenses as required. There will be no charge for the construction permits issued by the City of Miami Beach. The Contractor shall also give all notices necessary and incident to the due and lawful prosecution of the Work. 2.2.3.2 Right of Way: In cases where the Work is done on private property the City guarantees the Contractor the right-of-way for the construction of the Work, but the Contractor must take all precautions not to inconvenience the tenant or property owner any more than necessary. The right is reserved to omit any sections of the Work which depend upon a right-of-way grant in case such right-of-way is denied by the City. The Contractor shall have no claims for damage due to delay by the City in furnishing necessary right-of-way, but should any such delay occur the Contractor shall be entitled to such extension of time for the completion of his Contract as may be determined by the City to be reasonable. In case of damage to the Work on account of work so done, the Engineer may direct the Contractor to make the necessary repairs, and payment for such repairs will be made as provided under "Extra Work." Should the Contractor refuse or neglect to make the said repairs within the time specified, the Engineer shall have the authority to cause such repairs to be made, in which case the Contractor shall not be relieved in any way from his responsibility for the Work performed by him. 2.2.3.3 Restoration of Surfaces Opened by Permit: Any individual, firm, or corporation wishing to make an opening in the street must secure a permit from, and will be required to deposit security with, the Engineer, in a suitable amount to cover the cost of making the necessary repairs, and the Contractor shall not allow any person or persons to make an opening unless a duly authorized permit from the City is presented. The right is reserved to lay in the street or to repair any sewer, drain, conduit, main, or service pipe or their accessories at any time before the completion of the Work. The Contractor is to exercise such supervision thereof as will protect him against defects in the finished Work. In case of damage to the Work on account of work so done, the Engineer may ITB 2018-033-ND 54 direct the Contractor to make the necessary repairs, and payment for such repairs will be made as provided under "Extra Work." Should the Contractor refuse or neglect to make the said repairs within the time specified, the Engineer shall have the authority to cause such repairs to be made, in which case the Contractor shall not be relieved in any way from his responsibility for the Work performed by him. 2.2.3.4 Sanitary Provisions: Contractor shall provide and maintain at his own expense, in a sanitary condition, such accommodations for the use of his employees as is necessary to comply with the requirements and regulations of State and County Boards of Health. He shall commit no public nuisance. 2.2.3.5 Public Convenience and Safety: Contractor shall conduct the Work so as to insure the least obstruction to traffic practicable, and shall provide for the convenience of the general public and of residents along and adjacent to the Work in a manner satisfactory to the Engineer. Materials and equipment stored at the worksite shall be done so as to cause as little obstruction to the public as possible and shall be lighted and barricaded as hereinafter provided. 2.2.3.6 Closing Streets: Streets shall not be closed except when and where directed by the Engineer. Whenever the street is not closed, the Work must be conducted so that there shall at all times be a safe passageway for traffic. Whenever it is necessary to divert traffic from any part of the Work, the Contractor shall provide and maintain a passable driveway as directed by the Engineer. • Suitable barricades, danger warnings, detour signs, etc., as hereinafter provided, shall be maintained by the Contractor in all cases and the Engineer's office and the Fire Department shall immediately be notified by telephone or otherwise upon the closing and/or opening of each street or section thereof. 2.2.3.7 Barricades,Warnings, and Detour Signs: The Contractor shall provide, erect, and maintain, at his own expense, barricades, danger warnings, and detour signs whenever they may be necessary. He shall place sufficient lights on and/or near the Work and keep them burning from twilight to sunrise; shall erect suitable barricades, railings, fences, and/or other protection about the Work; provide all watchmen by day or night and take all other precautions that may be necessary; shall maintain proper guards and lights for the prevention of accidents upon materials, supplies, and equipment, and take all other precautions that may be necessary for the proper protection of the Work and public convenience and safety. Streets closed to traffic shall be protected by effective barricades on which shall be placed acceptable warning signs. The Contractor shall provide and maintain acceptable warning and detour signs at all closures, intersections, and along the detour routes, directing the traffic around the closed portion or portions of the Work, so that the temporary detour route or routes shall be indicated clearly ITB 2018-033-ND 55 throughout its or their entire length. 2.2.4 Maintenance of Traffic: 2.2.4.1 Work should be conducted in such a manner that all streets shall be open to traffic at night. Approved MOT with sufficient barricades, signs and lighting shall be maintained at all times for the safety of the public and traffic, and to insure that no traffic will pass over the placed material until it has properly cured. 2.2.4.2 It will be the responsibility of the Contractor to provide proper MOT including all barricades, skins, and lighting in accordance with the above stated requirements. The Contractor shall be responsible for providing an off-duty police officer, if necessary to complete job. 2.2.4.3 The cost of law enforcement officers will be provided as a pass-through cost only. 2.2.5 Mobilization and Demobilization: It will be the responsibility of the Contractor to cover all costs associated with mobilization and demobilization for the duration of the project. 2.2.6 Temporary Striping: Contractor must apply temporary striping to all resurfaced roads immediately after the asphalt has cooled enough to support striping. 2.2.7 Contractor must complete the Work requested within the time specified in the Task Order. The remainder of this page was left intentionally blank. ITB 2018-033-ND S6 APPENDIX D Special Conditions ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 ITB 2018-033-ND 57 1. TERM OF CONTRACT: This contract shall remain in effect for two (2) years from date of contract execution by the Mayor and City Clerk. The City of Miami Beach has the option to renew the contract at the sole discretion of the City Manager for an additional three(3), one(1) year periods, on a year-to-year basis. Renewal of the contract is a City of Miami Beach prerogative, not a right of the Contractor. Such option will be exercised, if at all, only when it is in the best interest of the City of Miami Beach. In the event that the contract is held over beyond the term herein provided it shall only be from a month-to-month basis only and shall not constitute an implied renewal of the contract. Said month to month extension shall be upon the same terms of the contract and at the compensation and payment provided herein, and shall not exceed six (6) months. 2. PRICES SHALL BE FIXED AND FIRM FOR TERM OF CONTRACT: If the bidder is awarded a contract under this bid solicitation, the prices quoted by the bidder on the Bid Form shall remain fixed and firm during the two (2) year term of this contract; provided, however, that the bidder may offer incentive discounts from this fixed price to the City at any time during the contractual term. 2.1 OPTION TO RENEW WITH PRICE ADJUSTMENT: The contract could be extended for an additional three (3), one(1) year terms, on a year to year basis, at the sole discretion of the City Manager. Prior to completion of each exercised contract term, the City may consider an adjustment to price based on Consumer Price Index increase. Change shall not be more than the percentage increase or decrease in the Consumer Price Index CR-U (all urban areas) computed 60 days prior to the anniversary date of the contract. It is the vendor's responsibility to request any pricing adjustment under this provision. For any adjustment to commence on the first day of any exercised option period, the vendor's request for adjustment should be submitted 60 days prior to expiration of the then current contract term. The vendor adjustment request must clearly substantiate the requested increase. If no adjustment request is received from the vendor, the City will assume that the vendor has agreed that the optional term may be exercised without pricing adjustment. Any adjustment request received after the commencement of a new option period may not be considered. 3. LIQUIDATED DAMAGES: Failure to complete work orders as agreed to when the work is assigned may result in the successful Bidder being assessed the additional cost incurred by the City (liquidated damages)for any and all costs associated with the service performed by a secondary vendor. 4. BIDDER QUALIFICATIONS: In order for bids to be considered, bidders must submit with their bid, evidence that they are qualified to satisfactorily perform the specified work. Evidence shall include all information necessary to certify that the bidder: maintains a permanent place of business; has technical knowledge and practical experience in the type of work specified in the Scope of Work; has available the organization and qualified manpower ITB 2018-033-ND 58 to do the work; has adequate financial status to meet the financial obligations incident to the work; has not had just or proper claims pending against him or his work; and has provided the Work materials and services as described in these bid specifications. The evidence will consist of listing of work that has been provided to public and private sector clients, i.e. nature of WORK within at a minimum, the last three (3) years. 5. CUSTOMER SERVICE: Excellent customer service is the standard of the City of Miami Beach. As contract employees of the City, all employees will be required to adhere to the City's "Service Excellence" standards and expected to conduct themselves in a professional, courteous and ethical manner in all situations. The successful bidder's employees must work as a cooperative team of well-trained professionals, and must serve the public with dignity and respect. All business transactions with the City will be conducted with honesty, integrity, and dedication. 6. WARRANTY: The successful bidder will be required to warranty all work performed. Warranty shall be provided in detail, upon request. PLEASE REFER TO SAMPLE CONTRACT, APPENDIX G, FOR OTHER APPLICABLE CONDITIONS. The remainder of this page was leftintentionally blank. ITB 2018-033-ND 59 APPENDIX E 1 , �' I 1.=_1 _ 1 J Cost Proposal Form ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 ITB 2018-033-ND 60 APPENDIX E COST PROPOSAL FORM Failure to submit Appendix E,Cost Proposal Form,in its entirety and fully executed by the deadline established for the receipt of proposals will result in proposal being deemed non-responsive and being rejected. Bidder affirms that the prices stated on the proposal price form below represents the entire cost of the items in full accordance with the requirements of this ITB, inclusive of its terms, conditions, specifications and other requirements stated herein, and that no claim will be made on account of any increase in wage scales, material prices, delivery delays, taxes, insurance, cost indexes or any other unless a cost escalation provision is allowed herein and has been exercised by the City Manager in advance. The Cost Proposal Form (Appendix E) shall be completed mechanically or, if manually, in ink. Cost Proposal Forms (Appendix E) completed in pencil shall be deemed non-responsive. All corrections on the Cost Proposal Form (Appendix E) shall be initialed. Total Item Description Quantity UIM Unit Cost 10uantity_XL nit Cosq CONCRETE CURBING/SIDEWALK CONSTRUCTION-Contractor proposes to furnish all labor,material,equipment,supervision, mobilization and demobilization costs, maintenance of traffic including off duty police officers. if necessary, and transportation necessary for concrete curbing/sidewalk construction on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. 1 Remove and Replace 4'Concrete Sidewalk 3.000 SF $ $ Remove and Replace 4'Concrete Sidewalk with additional equipment(where no dump 2 truck or container may be used) 3.000 SF $ $ 3 Remove and Replace 6"Concrete Sidewalk 3.000 SF $ $ Remove and Replace 6"Concrete Sidewalk with additional equipment(where no dump 4 truck or container may be used) 3 000 SF $ $ 5 Remove and Replace 24"-30"Curb&Gutter 1,000 LF $ $ 6 Remove and Replace 36%42"Curb&Gutter 1,000 LF $ $ 7 Remove and Replace 6"x12"Curb 1,000 LF $ $ Cast in Place American Disabilities Act(ADA) 8 Mats Yellow/Gray 40 EA $ $ 9 Surface Applied ADA Mats Yellow/Gray 40 EA $ $ 10 Construct 4"Concrete Sidewalk 3.000 SF $ $ Construct 4"Concrete Sidewalk with additional equipment(where no dump truck or 11 container may be used) 3.000 SF $ $ 12 Construct 6"Concrete Sidewalk 3,000 SF S $ Construct 6'Concrete Sidewalk with addidonal equipment(where no dump truck or 13 container may be used) 3,000 SF $ $ 14 Construct 18"Curb&Gutter 3,000 LF $ $ 15 Construct 24"Curb&Gutter 3,000 LF $ 16 Construct 30"Curb&Gutter 3,000 LF $ $ 17 Construct 6'x12"Concrete Curb 3,000 LF $ $ 18 Construct Pedestrian Ramp 12 EA $ Upcharge for Extra Strength Concrete(4,000 19 psi) 1,000 CF S $ 20 Addition of Miami Beach Red Coloring Mixture 4,000 CY $ $ ITB 2018-033-ND 61 21 Pavement Restoration 3,000 SF $ $ 22 Furnish and Install New Pavers 1,000 SF $ _ $ 23 Remove and Reset Existing Pavers 1.000 SF $ $ 24 Furnish and Install 1"Meter Box 50 EA $ $ 25 Furnish and Install 1 .S Meter Box 50 EA $ $ 26 Furnish and Install 2"Meter Box 50 EA $ $ 27 Furnish and Install 3"Meter Box 50 EA $ $ 28 Furnish and Install Sewer Clean Out Box 50 EA $ $ 29 Furnish and Install Electrical Box 10 EA $ $ 30 Install Hand Rails 100 LF $ $ 31 Remove and Replace Existin• Pavers 1,000 SF $ $ Total Item Description Quantity UI M Unit Cost leuantiry_M Unit_Casq MILLING 8 RESURFACING OF ASPHALT CONCRETE - Contractor proposes to furnish all labor, material, equipment, supervision, mobilization and demobilization costs, maintenance of traffic including off duty police officers, if necessary, and transportation necessary to mill and resurface asphalt concrete on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. 33 Rework Limerock Base+I-3 inches 25,000 CY $ $ 34 Remove and replace 8 inch Limerock base 25,000 CY $ $ 35 New Limerock 8 inch base 25,000 CY $ $ 36 Roads-0-200 Tons Leveling Course 1.000 TN $ $ 37 Roads-200+Tons Leveling Course 1,000 TN $ $ 38 Intersections-0-200 Tons Leveling Course 500 TN $ $ 39 Intersections-200+Tons Leveling Course 500 TN $ $ 40 FOOT Type Ill-Asphalt Concrete 12,000 TN $ S 41 Adjust Manhole and/or Valve Boxes 5D EA $ S 42 Adjust Manhole 50 EA $ $ • 43 Replace Manhole Rim and Cover 50 EA $ $ 44 Adjust Valve Boxes 50 EA $ $ 45 Replace Valve Box Cover/Riser 50 EA $ $ 46 Replace Traffic Loops(4,6,8 loops) 10 EA $ $ Saw Cutting&Permanent Patching w/Base& 47 Roller Compaction-1"Removal&Patching 200,000 LF $ 5 Saw Cutting&Permanent Patching wl Base& 48 Roller Compaction-2"Removal&Patchinq 200.000 LF $ $ 49 Milling Existing Asphalt Concrete-1"Cut 12000 SY $ $ 50 Milling Existing Asphalt Concrete-2"Cut 12,000 SY $ $ 51 Milling Existing Asphalt Concrete-3"Cut 12.000 SY $ $ 52 Milling Existing Asphalt Concrete-4"Cut 12.000 SY $ $ Tot/ Item Description Quantity U I M Unit Cost louantity_x snit Cost) STRIPING OF CITY STREETS • Contractor proposes to furnish all labor, material, equipment, supervision, mobilization and demobilization costs, maintenance of traffic including off duty police officers, if necessary, and transportation necessary to stripe streets on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. 54 Themoplastic 4'Solid Yellow/White 5,280 LF $ 55 4"Solid Yellow/White Paint 5,280 LF $ I SS ITB 2018-033-ND 62 56 Themoplastic 4"Skip White 5,280 LF 1 $ $ 57 Themoplastic 4'Skip Yellow 5,280 LF 5 $ 58 4"Skip Yellow/White Faint 5,280 LF 5 $ 59 Themoplastic 6'Solid White 5,280 LF $ $ 60 Themoplastic 6"Solid Yellow 5,280 LF $ $ 61 6'Solid YellawMNhite Paint 5,280 LF $ $ 62 Themoplastic 6'Skip White 5,280 LF 5 $ 63 Themoplastic 6"Skip Yellow 5,280 LF $ $ 64 6"Skip Yellow/White Paint 5,280 LF 5 $ 65 Themoplastic 8'Solid White 5,280 LF S $ 66 Themoplastic 8'Solid Yellow 5,280 LF $ $ 67 8"Solid Yellowhvhite Paint 5,280 LF $ $ 68 Themoplastic 12'Solid White 5,280 LF $ $ 69 Themoplastic 12"Solid Yellow 5,280 LF $ $ 70 12"Solid YellowMNhite Paint 5,280 LF $ $ 71 Themoplastic 18'Solid White 5,280 LF $ S 72 Themoplastic 18"Solid Yellow 5,280 LF $ $ 73 18"Solid YellowNVhite Paint 5,280 LF $ $ 74 Themoplastic 24'Solid White 5,280 LF $ $ 75 Themoplastic 24"Solid Yellow 5.280 LF $ $ 76 24"Solid Yellowiwhite Paint 5,280 LF $ S 77 RPMs(Road Reflector) 500 EA $ $ Thermoplastic Arrows 14"(Std.MDC&FDOT 78 Specs) 50 EA $ $ Arrows 14'(Std.MDC&FDOT Specs)White 79 Paint 50 EA $ $ 80 Thermoplastic Handicap Logo&Blue Stripe 5 EA $ $ 81 Handicap Logo&Blue Stripe Paint 5 EA $ $ Removal of ALL Existing Thermo Striping 82 (hydroblast) 1000 SF $ $ 83 Bicycle Pavement Marking 50 EA 5 S 84 Thermoplastic Messages 50 EA $ $ 85 Paint Messages 50 EA $ $ 86 Installation of New Traffic Si•n 10 EA $ $ Total Item Description Quantity U I M Unit Cost iouantry_x_Lnir_cosp STRIPING OF PARKING LOTS • Contractor proposes to furnish all labor, material, equipment, supervision, mobilization and demobilization costs, maintenance of traffic including off duty police officers. if necessary, and transportation necessary to stripe parking lots on an as-needed basis for the City of Miami Beach in accordance with the bid specifications. 87 Thermoplastic Slop Bars(12'Wide) 150 LF $ $ 88 Stop Bars(12'Wide)White Paint 150 LF $ $ Thermoplastic Arrows 14'(Std.MDC&FOOT 89 Specs) 50 EA $ S Arrows 14'(Std.MDC&FDOT Specs)White 90 Paint 50 EA 5 $ 91 Thermoplastic Cross Hatching(12") 200 LF $ 5 ITB 2018-033—ND 63 I 92 Crass Hatching(12')White Paint 200 LF $ $ 93 Thermoplastic Handicap Logo&Blue Stripe 30 EA $ $ 94 Handicap Logo 8 Blue Stripe Paint 30 EA $ $ 95 r Thermoplastic Disable Cross Hatching(4") 160 EA $ $ 96 Disable Cross Hatching(4')Paint 160 EA $ $ 97 Wheel Stop Installation 200 EA $ $ 98 Installation of New Traffic Sign 10 EA $ $ Bidders Affirmation Company: Authorized Representative: Address: Telephone: Email: Authorized Representative's Signature: The remainder of this page was left intentionally blank. ITB 2018-033—ND 64 APPENDIX F \ /� ' i 1 4 Insurance Requirements ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction , Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3'd Floor Miami Beach, Florida 33139 ITB 2018-033-ND 65 MIAMI BEACH INSURANCE REQUIREMENTS This document sets forth the minimum levels of insurance that the contractor is required to maintain throughout the term of the contract and any renewal periods. XXX 1. Workers' Compensation and Employer's Liability per the Statutory limits of the state of Florida. XXX 2. Comprehensive General Liability (occurrence form), limits of liability $ 1,000,000.00 per occurrence for bodily injury property damage to include Premises/ Operations; Products, Completed Operations and Contractual Liability. Contractual Liability and Contractual Indemnity (Hold harmless endorsement exactly as written in "insurance requirements"of specifications). XXX 3. Automobile Liability - $1,000,000 each occurrence - owned/non-owned/hired automobiles included. 4, Excess Liability- $ .00 per occurrence to follow the primary coverages. XXX 5. The City must be named as and additional insured on the liability policies; and it must be stated on the certificate. 6. Other Insurance as indicated: _Builders Risk completed value $ .00 Liquor Liability $ .00 _Fire Legal Liability $ .00 _Protection and Indemnity $ .00 _Employee Dishonesty Bond $ .00 Other $ .00 XXX 7. Thirty(30)days written cancellation notice required. XXX 8. Best's guide rating B+:VI or better, latest edition. XXX 9. The certificate must state the proposal number and title The City of Miami Beach is self-insured. Any and all claim payments made from self- insurance are subject to the limits and provisions of Florida Statute 768.28, the Florida Constitution, and any other applicable Statutes. ITS 2018-033-ND 66 APPENDIX G Sample Contract ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 ITB 2018-033-ND 67 CONTRACT THIS IS A CONTRACT, by and between the City of Miami Beach, a municipal corporation of the State of Florida ("City"), and (Vendor Name). ("Contractor"). WI T N E S S E T H, that Contractor and City, for the considerations hereinafter named, agree as follows: ARTICLE 1 SCOPE OF WORK Contractor hereby agrees to furnish all of the labor, materials, equipment, services and incidentals necessary to perform all of the Work described in the Contract Documents, including Exhibit D-Supplemental Terms and Conditions, and any Contractor Service Order issued to Contractor for any Project hereunder, and shall perform all Work in accordance with the requirements of the Contract Documents, for the following catagories: Roofing Contractor ARTICLE 2 CONTRACT TIME 2.1 This contract shall remain in effect for three (3) years from date of contract execution by the Mayor and City Clerk. The City of Miami Beach has the option to renew the contract, at the sole discretion of the City Manager, for two (2) renewal periods of one (1) year each. 2.2 Contractor shall commence the Work upon written notice to proceed in the form of a Purchase Order issued by the City, and a Contractor Service Order signed by either the City Manager or the Department Director ordering the Work , specifying the specific tasks to be performed by the Contractor for any Project. A separate Contractor Service Order shall be required prior to commencement of any Work on any Project. Contractor shall commence scheduling activities, permit applications and other preconstruction work within five (5) calendar days after receipt of Purchase Order, which date shall establish the Project Initiation Date. The Purchase Order will not be issued until Contractor's submission to City of all required documents (including but limited to: Payment and Performance Bonds, and Insurance Certificate) and after execution of the Contract by both parties. Contractor shall have no entitlement to perform (or be compensated for) any Work under this Agreement, unless such Work is authorized, at the City's sole discretion, by a Contractor Service Order. 2.2.1. The receipt of all necessary permits by Contractor and acceptance of the full progress schedule in accordance with technical specifications section, submittal schedule and schedule of values is a condition precedent to the issuance of a Purchase Order to mobilize on any Project site and commence 68 with physical construction of the Work. 2.3 Time is of the essence throughout this Contract. Unless otherwise specified in a Contractor Service Order, any project awarded to the Contractor pursuant to this Agreement shall be substantially completed within thirty (30) calendar days from the issuance of the City-approved Contractor Service Order ("Contractor Service Order") or accompanying Purchase Order (whichever is later), or as otherwise specified in the Contractor Service Order, and completed and ready for final payment in accordance with Article 5 within thirty (30) calendar days from the date determined by Consultant or the City as the date of Substantial Completion. 2.4 Unless otherwise specified in a Contractor Service Order for any particular Project, upon failure of Contractor to substantially complete the Work within the time specified for Substantial Completion in any Contractor Service Order, plus any approved time extensions, Contractor shall pay to City the sum of one hundred dollars ($100.00) for each calendar day of delay in achieving Substantial Completion. Contractor acknowledges and agrees that the foregoing amounts are not penalties but are liquidated damages to City for its inability to obtain full beneficial occupancy and/or use of the Project. Unless otherwise specified in a Contractor Service Order, liquidated damages are hereby fixed and agreed upon between the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by City as a consequence of such delay, and both parties desiring to obviate any question of dispute concerning the amount of said damages and the cost and effect of the failure of Contractor to complete the Contract on time. 2.4 City is authorized to deduct liquidated damages from monies due to Contractor for the Work under this Contract or as much thereof as City may, in its sole discretion, deem just and reasonable. 2.5 Contractor shall be responsible for reimbursing City, in addition to liquidated damages, for all costs incurred by Consultant in administering the construction of the Project beyond the completion date specified above, plus approved time extensions. Consultant construction administration costs shall be pursuant to the contract between City and Consultant, a copy of which is available upon request of the Contract Administrator. All such costs shall be deducted from the monies due Contractor for performance of Work under this Contract by means of unilateral credit change orders issued by City as costs are incurred by Consultant and agreed to by City. ARTICLE 3 ASSIGNMENT OF WORK In consideration of the Work to be provided hereunder, Contractor shall be compensated on Time and Material basis or as a Lump Sum basis, as specified in the Contractor Service Order. 69 3.1 TIME AND MATERIAL BASIS The City may award work on a time and materials basis in accordance with hourly rates offered. The Project Manager shall select the contractor deemed to be best qualified for the project. In doing so, the criteria specified in Section 2-369 of the City Code may be considered. In the event that the contractor with the lowest cost is not selected, the reason(s) shall be documented on the purchase requisition. 3.1.1 For parts and materials ordered under this option, vendors shall provide quotes or invoice, as determined by the Contract Manager, based on the cost of parts and materials plus the agreed to mark-up. In determining cost of materials to which the mark-up may be applied, the contracting officer may require the vendor to provide actual cost of parts and materials (i.e. contractor's invoice, MSRP, etc.), 3.2 LUMP SUM BASIS In lieu of a time and materials order, the project/contract manager may request quotes from contractors authorized to participate in the Pre-Qualified Bidder Pool. Responsive, responsible bidders (awarded or not) are eligible to participate in the Pre-Qualified Bidder Pool, at the discretion of the bidder and as indicated on the Cost Proposal Form at the time of submission. At its own expense, the contractor shall visit the site and prepare a lump sum detailed quotation (inclusive of all labor, materials, and all other costs. Each quote prepared by the contractor shall include an acceptable description of the nature, extent and character of the work required, as well as performance and delivery schedules. In the alternative, project managers may require an itemized breakdown of the lump sum amounts. 3.2.1 For projects with an estimated cost up to the amount specified In City Procedure PO16.02, Threshold Category 1 (currently$10,000 or as amended), the project/contract manager may select the contractor deemed to be best qualified. 3.2.2 For projects with an estimated cost exceeding the amount specified in City Procedure PO16.02, Threshold Category 1 (currently $10,000 or as amended), the project/contract manager shall solicit three quotes. Following the determination of the best quote, in the Department's Director sole discretion, a Contractor Service Order shall be executed for the project, (see section 5.3), prior to issuing a Purchase Order. The City Manager's approval, along with a justification, is also required when the contractor offering the lowest cost is not selected. 3.2.3 For projects $50,000 or greater, the City Manager's approval is required and a Contractor Service Order shall be executed for the project. The City Manager's approval, along with a justification, is also required when the contractor offering the lowest cost is not selected. 3.2.4 Contractor shall be instructed to commence the Work by written instructionsas further detailed in Section 3.3. Contractor shall commence scheduling activities, permit applications and other preconstruction work within five (5) 70 calendar days after receipt of Purchase Order, which date shall establish the Project Initiation Date. 3.3 PERFORMANCE AND PAYMENT BOND The City will require a performance and payment bond for any project in excess of $200,000. Within ten (10) calendar days of City execution of the Contractor Service Order, Contractor shall furnish a Performance Bond and a Payment Bond containing all the provisions of the Performance Bond and Payment Bond attached hereto as forms 00710 and 00720. 3.3.1 Each Bond shall be in the amount of one hundred percent (100%) of the Contractor Service Order, guaranteeing to City the completion and performance of the work covered in such Contract as well as full payment of all suppliers, laborers, or subcontractors employed pursuant to this Project. The City may accept a Performance Bond and Payment Bond from a surety company which has twice the minimum surplus and capital required by the Florida Insurance Code at the time the invitation to bid is issued, if the surety company is otherwise in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a currently valid certificate of authority issued by the United States Department of the Treasury under Section 9304 to 9308 of Title 31 of the United States Code, as may be amended from time to time. The Certificate and Affidavit so certifying (Form 00722) should be submitted with the Bid Bond and also with the Performance Bond and Payment Bond. 3.3.2 Each Bond shall continue in effect for one year after Final Completion and acceptance of the work with liability equal to one hundred percent (100%) of the Contract sum, or an additional bond shall be conditioned that Contractor will, upon notification by City, correct any defective or faulty work or materials which appear within one year after Final Completion of the Contract. 3.3.3 Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time to time, Contractor shall ensure that the bond(s) referenced above shall be recorded in the public records of Miami-Dade County and provide City with evidence of such recording. ARTICLE 3 PROGRESS PAYMENTS 3.0 Contractor may make Application for Payment for work completed during the Project at intervals of not more than once a month. Contractor's application shall show a complete breakdown of the Project components, the quantities completed and the amount due, 71 together with such supporting evidence as may be required by Consultant. Contractor shall include, but same shall be limited to, at Consultant's discretion, with each Application for Payment, an updated progress schedule acceptable to Consultant as required by the Contract Documents and a release of liens and consent of surety relative to the work which is the subject of the Application. Each Application for Payment shall be submitted in triplicate to Consultant for approval. Upon submission of an acceptable updated progress schedule and the other documents required herein along with the application for payment, City shall make payment to Contractor with respect to approved Applications for Payment, less retainage as herein provided for and/or withholding of any other amounts pursuant to the Contract Documents, within twenty-five (25) days in accordance with Section 218.735 of the Florida Statutes. 3.1 At the City's discretion, if specified in a Contractor Service Order, ten percent (10%) of all monies earned by Contractor may be retained by City until Final Completion and acceptance by City in accordance with Article 5 hereof, except that after fifty percent (50%) of the Work has been completed, the Contract Administrator shall reduce the retainage to five percent (5%) of all monies previously earned and all monies earned thereafter. Any additional reduction in retainage shall be in the sole discretion of the City Manager or applicable Department Director provided that Contractor shall have no entitlement to a reduction. Any interest earned on retainage shall accrue to the benefit of City. All requests for retainage reduction in writing in a separate stand-alone document from monthly applications for payment. 3.2 City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 3.2.1 Defective work not remedied. 3.2.2 Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or City because of Contractor's performance. 3.2.3 Failure of Contractor to make payments properly to Subcontractors or for material or labor. 3.2.4 Damage to another contractor not remedied. 3.2.5 Liquidated damages and costs incurred by Consultant for extended construction administration. 4.3.6 Failure of Contractor to provide any and all documents required by the Contract Documents. When the above grounds are removed or resolved satisfactory to the Contract Administrator, payment shall be made in whole or in part. ARTICLE 4 ACCEPTANCE AND FINAL PAYMENT 4.1 Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance. City shall, within ten (10) calendar days, make an inspection thereof. If 72 City and Contract Administrator find the Work acceptable, the requisite documents have been submitted and the requirements of the Contract Documents fully satisfied, and all conditions of the permits and regulatory agencies have been met, a final payment shall be made by the City. The acceptance of final payment shall constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the General Conditions and identified by Contractor as unsettled at the time of the application for final payment. ARTICLE 5 MISCELLANEOUS 5.1 A. The term "Contract Documents' as referenced herein shall include "Contract Documents' shall mean this Contract (together with all exhibits, addenda, Contractor Service Orders and written amendments issued thereto), and all Design Documents and Construction Documents. The Contract Documents shall also include, without limitation (together with all exhibits, addenda, and written amendments issued thereto), the Invitation to Bid (ITB), instructions to bidders, bid form, bid bond, surety payment bond and performance bond, Special Conditions, and Contractor's response to the ITB. The requirements of the Contract Documents, as such term is defined herein, are hereby incorporated by reference as if fully set forth herein. This Contract is part of, and incorporated in, the Contract Documents. Accordingly, all of the documents incorporated by the Contract Documents shall govern any Contractor Service Order issued under this Contract. B. The term "Work" as used herein shall mean all labor, materials, equipment, supplies, tools, machinery, utilities, fabrication, transportation, insurance, bonds, permits and conditions thereof, building code changes and government approvals, licenses, tests, quality assurance and/or quality control inspections and related certifications, surveys, studies, and other items, work and services that are necessary or appropriate for the total construction, installation, and functioning of the Project specified in any Contractor Service Order, together with all additional, collateral and incidental items, and work and services required for delivery of a completed, fully functional and functioning Project as set forth in the Contract Documents. 5.2 Where there is a conflict between any provision set forth within the Contract Documents and a more stringent provision elsewhere in the Contract Documents or under any applicable law, regulation, statute or code requirement which is applicable to this Project, the more stringent provision shall prevail and govern the performance of the Work. 6.3 Public Entity Crimes In accordance with the Public Crimes Act, Section 287.133, Florida Statutes, a person or affiliate who is a contractor, consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or 73 perform work as a contractor, supplier, subcontractor, or consultant under a contract with the City, and may not transact any business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for category two purchases for a period of 36 months from the date of being placed on the convicted vendor list. Violation of this section by Contractor shall result in cancellation of the City purchase and may result in Contractor debarment. 6.4 Independent Contractor Contractor is an independent contractor under this Contract. Services provided by Contractor pursuant to this Contract shall be subject to the supervision of Contractor. In providing such services, neither Contractor nor its agents shall act as officers, employees, or agents of the City. This Contract shall not constitute or make the parties a partnership or joint venture. 6.5 Third Party Beneficiaries Neither Contractor nor City intends to directly or substantially benefit a third party by this Contract. Therefore, the parties agree that there are no third party beneficiaries to this Contract and that no third party shall be entitled to assert a claim against either of them based upon this Contract. The parties expressly acknowledge that it is not their intent to create any rights or obligations in any third person or entity under this Contract. 6.6 Notices Whenever either party desires to give notice to the other, such notice must be in writing, sent by certified United States Mail, postage prepaid, return receipt requested, or by hand-delivery with a request for a written receipt of acknowledgment of delivery, addressed to the party for whom it is intended at the place last specified. The place for giving notice shall remain the same as set forth herein until changed in writing in the manner provided in this section. For the present, the parties designate the following: For City: PROCUREMENT DEPARTMENT 1755 Meridian Avenue Miami Beach, Florida 33139 Attn: Alex Denis, Director With copies to: City Attorney City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 74 For Contractor: VENDOR NAME ADDRESS ADDRESS Attn: Phone: Email: 6.7 Assignment and Performance Neither this Contract nor any interest herein shall be assigned, transferred, or encumbered by either party. In addition, Contractor shall not subcontract any portion of the work required by this Contract except as authorized by Section 27 of the General Conditions. Contractor represents that all persons delivering the services required by this Contract have the knowledge and skills, either by training, experience, education, or a combination thereof, to adequately and competently perform the duties, obligations, and services set forth in the Scope of Work and to provide and perform such services to City's satisfaction for the agreed compensation. Contractor shall perform its duties, obligations, and services under this Contract in a skillful and respectable manner. The quality of Contractor's performance and all interim and final product(s) provided to or on behalf of City shall be comparable to the best local and national standards. 6.8 Materiality and Waiver of Breach City and Contractor agree that each requirement, duty, and obligation set forth in these Contract Documents is substantial and important to the formation of this Contract and, therefore, is a material term hereof. City's failure to enforce any provision of this Contract shall not be deemed a waiver of such provision or modification of this Contract. A waiver of any breach of a provision of this Contract shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Contract. 6.9 Severance In the event a portion of this Contract is found by a court of competent jurisdiction to be invalid, the remaining provisions shall continue to be effective unless City or Contractor elects to terminate this Contract. An election to terminate this Contract based upon this provision shall be made within seven (7) days after the finding by the court becomes final. 6.10 Applicable Law and Venue This Contract shall be enforceable in Miami-Dade County, Florida, and if legal action is 75 necessary by either party with respect to the enforcement of any or all of the terms or conditions herein exclusive venue for the enforcement of same shall lie in Miami-Dade County, Florida. By entering into this Contract, Contractor and City hereby expressly waive any rights either party may have to a trial by jury of any civil litigation related to, or arising out of the Project. Contractor shall specifically bind all subcontractors to the provisions of this Contract. 6.11 Amendments No modification, amendment, or alteration in the terms or conditions contained herein shall be effective unless contained in a written document prepared with the same or similar formality as this Contract and executed by the City and Contractor. 6.12 Prior Agreements This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, and understandings applicable to the matters contained herein and the parties agree that there are no commitments, agreements or understandings concerning the subject matter of this Contract that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements, whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless set forth in writing in accordance with Section 6.11 above. 6.13 Indemnification Contractor shall indemnify and hold harmless City, its officers, agents, directors, and employees, from liabilities, damages, losses, and costs, including, but not limited to reasonable attorney's fees, to the extent caused by the negligence, recklessness or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of this Agreement. Except as specifically provided herein, this Agreement does not require Contractor to indemnify City, its employees, officers, directors, or agents from any liability, damage, loss, claim, action, or proceeding. These indemnifications shall survive the term of this Agreement. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Contractor shall, upon written notice from City, resist and defend such action or proceeding by counsel satisfactory to City. The indemnification provided above shall obligate Contractor to defend at its own expense to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at City's option, any and all claims of liability and all suits and actions of every name and description covered by Section 6.1 above which may be brought against City whether performed by Contractor , or persons employed or utilized by Contractor. 6.14 Inspection of Work Consultant and City shall at all times have access to the Work, and Contractor shall provide proper facilities for such access and for inspecting, measuring and testing. 76 6.14.1 Should the Contract Documents, Consultants instructions, any laws, ordinances, or any public authority require any of the Work to be specially tested or approved, Contractor shall give Consultant timely notice of readiness of the Work for testing. If the testing or approval is to be made by an authority other than City, timely notice shall be given of the date fixed for such testing. Testing shall be made promptly, and, where practicable, at the source of supply. If any of the Work should be covered up without approval or consent of Consultant, it must, if required by Consultant, be uncovered for examination and properly restored at Contractor's expense. 6.14.2 Re-examination of any of the Work may be ordered by Consultant with prior written approval by the Contract Administrator, and if so ordered, the Work must be uncovered by Contractor. If such Work is found to be in accordance with the Contract Documents, City shall pay the cost of reexamination and replacement by means of a Change Order. If such Work is not in accordance with the Contract Documents, Contractor shall pay such cost. Inspectors shall have no authority to permit deviations from, or to relax any of the provisions of, the Contract Documents or to delay the Contract by failure to inspect the materials and work with reasonable promptness without the written permission or instruction of Consultant. The payment of any compensation, whatever may be its character or form, or the giving of any gratuity or the granting of any favor by Contractor to any inspector, directly or indirectly, is strictly prohibited, and any such act on the part of Contractor will constitute a breach of this Contract. 6.15 Termination Termination for Convenience. In addition to other rights the City may have at law and pursuant to the Contract Documents with respect to cancellation and termination of the Agreement, the City may, in its sole discretion, terminate for the City's convenience the performance of Work under this Agreement, in whole or in part, at any time upon written notice to the Contractor. The City shall effectuate such Termination for Convenience by delivering to the Contractor a Notice of Termination for Convenience, specifying the applicable scope and effective date of termination, which termination shall be deemed operative as of the effective date specified therein without any further written notices from the City required. Such Termination for Convenience shall not be deemed a breach of the Agreement, and may be issued by the City with or without cause. 6.15.1 Upon receipt of such Notice of Termination for Convenience from the City, and except as otherwise directed by the City, the Contractor shall immediately proceed with the following obligations, regardless of any delay in determining or adjusting any amounts due under this Section 6.15: i. Stop the Work specified as terminated in the Notice of Termination for Convenience; ii. Promptly notify all Subcontractors of such termination, cancel all contracts and purchase orders to the extent they relate to the Work 77 terminated to the fullest extent possible and take such other actions as are necessary to minimize demobilization and termination costs for such cancellations; iii. Immediately deliver to the City all Project records, in their original/native electronic format (i.e. CAD, Word, Excel, etc.), any and all other unfinished documents, and any and all warranties and guaranties for Work, equipment or materials already installed or purchased; iv. If specifically directed by the City in writing, assign to the City all right, title and interest of Contractor under any contract, subcontract and/or purchase order, in which case the City shall have the right and obligation to settle or to pay any outstanding claims arising from said contracts, subcontracts or purchase orders; v. Place no further subcontracts or purchase orders for materials, services, or facilities, except as necessary to complete the portion of the Work not terminated (if any) under the Notice of Termination for Convenience; vi. As directed by the City, transfer title and deliver to the City (1) the fabricated and non-fabricated parts, Work in progress, completed Work, supplies and other material produced or required for the Work terminated; and (2) the completed or partially completed Project records that, if this Agreement had been completed, would be required to be furnished to the City; vii.-Settle all outstanding liabilities and termination settlement proposals from the termination of any subcontracts or purchase orders, with the prior approval or ratification to the extent required by the City(if any); viii. Take any action that may be necessary, or that the City may direct, for the protection and preservation of the Project Site, including life safety and any property related to this Agreement that is in the Contractor's possession and in which the City has or may acquire an interest; and ix. Complete performance of the Work not terminated (if any). 6.15.2 Upon issuance of such Notice of Termination for Convenience, the Contractor shall only be entitled to payment for the Work satisfactorily performed up until the date of its receipt of such Notice of Termination for Convenience, but no later than the effective date specified therein. Payment for the Work satisfactorily performed shall be determined by the City in good faith, in accordance with the percent completion of the Work, less all amounts previously paid to the Contractor in approved Applications for Payment, the reasonable costs of demobilization and reasonable costs, if any, for canceling contracts and purchase orders with Subcontractors to the extent such costs are not reasonably avoidable by the Contractor. Contractor shall submit, for the City's review and consideration, a final 78 termination payment proposal with substantiating documentation, including an updated Schedule of Values, within 30 days of the effective date of termination, unless extended in writing by the City upon request. Such termination amount shall be mutually agreed upon by the City and the Contractor and absent such agreement, the City shall, no less than fifteen (15) days prior to making final payment, provide the Contractor with written notice of the amount the City intends to pay to the Contractor. Such final payment so made to the Contractor shall be in full and final settlement for Work performed under this Agreement, except to the extent the Contractor disputes such amount in a written notice delivered to and received by the City prior to the City's tendering such final payment. 6.16. Termination of Agreement For Cause. The City, through the City Manager, may terminate this Agreement for cause, upon written notice to Contractor, in the event that the Contractor(1) violates any provision of this Agreement or performs same in bad faith; (2) unreasonably delays the performance of the Work or any portion thereof; or (3) does not perform the Work or any portion thereof in a timely and satisfactory manner. In the case of termination for cause by the City, the Contractor shall first be granted a fifteen (15) day cure period (commencing upon receipt of the initial written notice of default from the City). The following occurances shall be deemed sufficient grounds for termination for cause: 6.16.1. Failing to make payments to Subcontractors or Suppliers for materials or labor in accordance with the respective Subcontracts and Purchase Orders: 6.16.2. Failing to perform any portion of the Work in a manner consistent with the requirements of the Contract Documents or within the time required therein; 6.16.3. Failing to perform the Work with sufficient manpower, workmen and equipment or with sufficient materials, with the effect of delaying the prosecution of the Work in accordance with the Project Schedule and/or delaying completion of any Work within the specified time; 6.16.4. Failing and/or refusing to remove, repair and/or replace any portion of the Work as may be rejected as defective or nonconforming with the terms and conditions of the Contract Documents; 6.16.5.A custodian, trustee or receiver is appointed for the Contractor, or the Contractor becomes insolvent or bankrupt, is generally not paying its debts as they become due or makes an assignment for the benefit of creditors, or the Contractor causes or suffers an order for relief to be entered with respect to it under applicable Federal bankruptcy law or applies for or consents to the appointment of a custodian, trustee or receiver for the Contractor, or bankruptcy, reorganization, arrangement or insolvency proceedings, or other proceedings for relief under any bankruptcy or similar law or laws for the relief of debtors, are instituted by or against the Contractor; 6.16.6.An indictment is issued against the Contractor; 79 6.16.7. Persistently disregarding laws, ordinances, or rules, regulations or orders of a public authority having jurisdiction; 6.16.8. Fraud, misrepresentation or material misstatement by Contractor in the course of obtaining this Agreement; 6.16.9. Failing to comply in any material respect with any of the terms of this Agreement or the other Contract Documents. Upon the issuance of a Notice of Termination for Cause,the Contractor shall: i. Immediately deliver to the City all Submittals and Project-related records in their original/native electronic format (i.e. CAD, Word, Excel, etc.), any and all other unfinished documents, and any and all warranties and guaranties for Work, equipment or materials already installed or purchased; H. If specifically directed by the City in writing, assign to the City all right, title and interest of Contractor under any contract, subcontract and/or purchase order, in which case the City shall have the right and obligation to settle or to pay any outstanding claims arising from said contracts, subcontracts or purchase orders; As directed by the City, transfer title and deliver to the City (1) the fabricated and non-fabricated parts, Work in progress, completed Work, supplies and other material produced or required for the Work terminated; and (2) the completed or partially completed Project records that, if this Agreement had been completed,would be required to be furnished to the City; and iv. Take any action that may be necessary, or that the City may direct, for the protection and preservation of the property related to this Agreement that is in the Contractor's possession and in which the City has or may acquire an interest. The rights and remedies of the City under this Section shall apply tcrall defaults that fail to be cured within the applicable cure period or are cured but in an untimely manner,and the City shall not be obligated to accept such late cure. The City reserves the right, in lieu of termination as set forth herein, to withhold any payments of money which may be due or become due to the Contractor until said defaults have been remedied. In no event shall Contractor be entitled to any compensation for anticipatory profits or consequential damages as a result of the discontinuance of any portion of the Work, or termination of this Contract. In the event it is determined,for any reason,that Contractor was not in default under the provisions of this Section,then the City's notice of termination for default shall automatically be treated as a termination for convenience,and the rights and obligations of the City and Contractor shall be the same as if the notice of termination had been issued pursuant to the termination for convenience clause contained in Section 6.15. The Contractor shall have no further recourse of any nature against the City for any wrongful termination. 6.17 Taxes 80 Contractor shall pay all applicable sales, consumer, use and other taxes required by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. [Remainder of Page Intentionally Left Blank] 81 IN WITNESS WHEREOF, the parties have set their hands and seals the day and year first above written. ATTEST: THE CITY OF MIAMI BEACH City Clerk Mayor Attest: VENDOR NAME Signature/Secretary Signature/President Print Name Print Name 82 EXHIBIT A CONTRACTOR SERVICE ORDER Contractor Service Order No. TO: PROJECT NAME: Prosect Name DATE: SCOPE OF SERVICES: Per attached proposal dated , to be considered part of this Agreement. Estimated calendar days to complete this work: Days Original Service Order Amount: $ Change Order_to Service Order Amount: (ALL CHANGE ORDERS MUST BE APPROVED IN WRITING $ BY THE CITY PRIOR TO THE WORK.) Total From Previous Change Orders to Service Orders: Fee for this Service Order is Lump Sum/Not to Exceed amount of: Total Agreement to Date: $ City's Project Administrator Date Department Director Date Contractor. Date (between $10,000-$50,000) City Manager Date (exceeding$50,000) 83 MIAMI BEACH 00710 EXHIBIT B: FORM OF PERFORMANCE BOND BY THIS BOND, We , as Principal, hereinafter called Contractor , and , as Surety, are bound to the City of Miami Beach, Florida, as Obligee, hereinafter called City, in the amount of Dollars ($ ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: , awarded the day of , 20 , with City which Contract Documents are by reference incorporated herein and made a part hereof, and specifically include provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the "Contract"; THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the Contract between Contractor and City for construction of , the Contract being made a part of this Bond by reference, at the times and in the manner prescribed in the Contract; and 2. Pays City all losses, liquidated damages, expenses, costs and attorney's fees including appellate proceedings, that City sustains as a result of default by Contractor under the Contract; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract; then THIS BOND IS VOID, OTHERWISE IT REMAINS IN FULL FORCE AND EFFECT. Whenever Contractor shall be, and declared by City to be, in default under the Contract, City having performed City obligations thereunder, the Surety may promptly remedy the default, or shall promptly: 3.1. Complete the Project in accordance with the terms and conditions of the Contract Documents; or 3.2. Obtain a bid or bids for completing the Project in accordance with the terms and conditions of the Contract Documents, and upon determination by Surety of the lowest responsible Bidder, or, if City elects, upon determination by City and Surety jointly of the lowest responsible Bidder, arrange for a contract between such Bidder and City, and make available as work progresses (even though there should be a default or a succession of defaults under the Contract 84 00710 FORM OF PERFORMANCE BOND (Continued) or Contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract Price; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term "balance of the Contract Price," as used in this paragraph, shall mean the total amount payable by City to Contractor under the Contract and any amendments thereto, less the amount properly paid by City to Contractor. No right of action shall accrue on this bond to or for the use of any person or corporation other than City named herein. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes does not affect Surety's obligation under this Bond. Signed and sealed this day of , 20 WITNESSES: (Name of Corporation) Secretary By: (Signature) (CORPORATE SEAL) • (Print Name and Title) IN THE PRESENCE OF: INSURANCE COMPANY: By: Agent and Attorney-in-Fact Address: (Street) (City/State/Zip Code) Telephone No.: 85 00720 EXHIBIT C: FORM OF PAYMENT BOND BY THIS BOND, We , as Principal, hereinafter called Contractor, and , as Surety, are bound to the City of Miami Beach, Florida, as Obligee, hereinafter called City, in the amount of Dollars ($ ) for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally. WHEREAS, Contractor has by written agreement entered into a Contract, Bid/Contract No.: , awarded the day of , 20 , with City which Contract Documents are by reference incorporated herein and made a part hereof, and specifically include provision for liquidated damages, and other damages identified, and for the purposes of this Bond are hereafter referred to as the "Contract` THE CONDITION OF THIS BOND is that if Contractor: 1. Pays City all losses, liquidated damages, expenses, costs and attorney's fees including appellate proceedings, that City sustains because of default by Contractor under the Contract; and 2. Promptly makes payments to all claimants as defined by Florida Statute 255.05(1) for all labor, materials and supplies used directly or indirectly by Contractor in the performance of the Contract; THEN CONTRACTORS OBLIGATION SHALL BE VOID; OTHERWISE, IT SHALL REMAIN IN FULL FORCE AND EFFECT SUBJECT, HOWEVER, TO THE FOLLOWING CONDITIONS: 2.1. A claimant, except a laborer, who is not in privity with Contractor and who has not received payment for its labor, materials, or supplies shall, within forty-five (45) days after beginning to furnish labor, materials, or supplies for the prosecution of the work, furnish to Contractor a notice that he intends to look to the bond for protection. 2.2. A claimant who is not in privity with Contractor and who has not received payment for its labor, materials, or supplies shall, within ninety (90) days after performance of the labor or after complete delivery of the materials or supplies, deliver to Contractor and to the Surety, written notice of the performance of the labor or delivery of the materials or supplies and of the nonpayment. 2.3. No action for the labor, materials, or supplies may be instituted against Contractor or the Surety unless the notices stated under the pre conditions (2.1)and (2.2) have been given. 00720 2.4. Any action under this Bond must be instituted in accordance with the Notice 86 and Time Limitations provisions prescribed in Section 255.05(2), Florida Statutes. The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and compliance or noncompliance with any formalities connected with the Contract or the changes does not affect the Surety's obligation under this Bond. Signed and sealed this day of . 20 Contractor ATTEST: (Name of Corporation) By: (Secretary) (Signature) (Corporate Seal) (Print Name and Title) day of , 20 IN THE PRESENCE OF: INSURANCE COMPANY: By: Agent and Attorney-in-Fact Address: (Street) (City/State/Zip Code) Telephone No.: 87 EXHIBIT D TO THE AGREEMENT FOR THE PURCHASE OF CONCRETE CURBING/SIDEWALK CONSTRUCTION, MILLING AND RESURFACING OF ASPHALT CONCRETE, AND STRIPING OF CITY STREETS AND PARKING LOTS PURSUANT TO ITB 2018-033-ND 1. Definitions: Whenever the following terms or pronouns in place of them appear in the Project Manual, the intent and meaning shall be interpreted as follows: 1.21 Bid: shall refer to any offer(s) submitted in response to this ITB. The terms "Bid" and "Bid Submittal" are used interchangeably. 1.22 Bidder: Any individual, firm, or corporation submitting a bid for this Project, acting directly or through a duly authorized representative. 1.23 Change Order: A written document ordering a change in the Contract Price or Contract Time or a material change. 1.24 City: The City (or Owner) shall mean the City of Miami Beach, a Florida municipal corporation, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, which is a party hereto and /or for which this Contract is to be performed. In all respects hereunder, City's performance is pursuant to City's position as the owner of a construction project. In the event City exercises its regulatory authority as a governmental body, the exercise of such regulatory authority and the enforcement of any rules, regulations, laws and ordinances shall be deemed to have occurred pursuant to City's regulatory authority as a governmental body and shall not be attributable in any manner to City as a party to this Contract. 1.25 City Commission: City Commission shall mean the governing and legislative body of the City. 1.26 City Manager: City Manager shall mean the Chief Administrative Officer of the City. 1.27 Contract: The part or section of the Contract Documents addressing some of the rights and duties of the parties hereto, including but not limited to contract time and liquidated damages. 1.28 Contract Documents: The official documents setting forth bidding information, requirements and contractual obligations for the project and includes the Contract, Invitation to Bid, Scope of Work, Instructions to Bidders, Supplements, Technical Specifications, Exhibits, Certificated, Closeout Forms, General Conditions, Supplementary Conditions, Plans, Drawings, Addenda, Award by the City Commission, Bonds, Notice of Award, Notices to Proceed, Purchase Order(s), Change Order(s), Field Order(s), Supplemental Instructions, and any additional documents the submission of which is required by the Project. 1.29 Contract Price: The original amount established in the Bid Submittal and award by the City, as may be amended by Change Order. 88 1.30 Contractor: The person or entity with whom the City has contracted and who is responsible for the acceptable performance of the Work and for the payment of all legal debts pertaining to the Work. All references in the Contract Documents to third. parties under contract or control of Contractor shall be deemed to be a reference to Contractor. 1.31 Department: The Public Works Department, or any other City department authorized to use any resulting agreement. 1.32 Field Order: A written order which orders minor changes in the Work but which does not involve a change in the Contract Price or Contract Time. 1.33 Notice(s) to Proceed: Written notice to Contractor authorizing the commencement of the activities identified in the notice or as described in the Contract Documents. 1.34 Plans and/or Drawings: The official graphic representations of this Project which are a part of the Contract Documents. 1.35 Responsible Bidder: An offeror who has the capability in all respects to perform fully the contract requirements, and the integrity and reliability which will assure good faith performance. 1.36 Responsive Bidder: A person or entity who has submitted a bid which conforms in all material respects to a solicitation. A bid or proposal of a Responsive Bidder must be submitted on the required forms, which contain all required information, signatures, notarizations, insurance, bonding, security, or other mandated requirements by the bid documents to be submitted at the time of bid opening. 1.37 Subcontractor: A person or entity having a direct contract with Contractor including one who furnishes material worked to a special design according to the Contract Documents, but does not include one who merely furnishes Materials not so worked. 1.38 Surety: The surety company or individual which is bound by the performance bond and payment bond with and for Contractor who is primarily liable, and which surety company or individual is responsible for Contractor's satisfactory performance of the work under the contract and for the payment of all debts pertaining thereto in accordance with Section 255.05, Florida Statutes. 1.39 Task Order: At the request of the City, the Contractor shall furnish a Task Order for any project under consideration. Each project shall have a project-specific Task Order. The Task Order shall be approved by a City representative. The Task Order shall stipulate the following: • Fixed Proiect Costs. Project Cost shall be based on plans and specifications provided by the City or field-verified measurements and shall be in accordance with contract unit prices and other pricing terms. • Additional Services. The City anticipates that a significant portion of the projects awarded pursuant to any continuing services agreement resulting 89 from this ITB shall be completed in accordance with the prices established through the ITB. The City recognizes that there may be instances when the need for services in addition to those stipulated herein shall arise. In those cases, the City may negotiate with the Contractor on a mutually agreeable price for the additional services based on available industry pricing. The approval of the City Manager shall be required for any additional services exceeding a project aggregate of$50,000. • Total Proiect Cost. • Proiect Approach and Methodology. This shall include any necessary phasing, logistical requirements, etc. • Required Permits. • Proiect Duration. • Mobilization Plan. • Project Manager& Contact. 1.40 Work: The construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by Contractor to fulfill Contractor's obligations. The Work may constitute the whole or a part of the Project. 2. Personnel Requirements: Superintendent must have at least approximately five (5) years of experience in projects of similar design, scope, size and complexity. The Project Manager must have at least approximately five (5) years of experience in projects of similar design, scope, size and complexity. 2. Project Manual: 2.1. The Project Manual includes any general or special Contract conditions or specifications attached hereto. 22. The Project Manual, along with all documents that make up and constitute the Contract Documents, shall be followed in strict accordance as to work, performance, material, and dimensions except when Consultant may authorize, in writing, an exception. 2.3. Dimensions given in figures are to hold preference over scaled measurements from the drawings; however, all discrepancies shall be resolved by Consultant. Contractor shall not proceed when in doubt as to any dimension or measurement, but shall seek clarification from Consultant. 2.4. Contractor shall be furnished three (3) copies, free of charge, of the Project Manual; two of which shah be preserved and always kept accessible to Consultant and Consultant's authorized representatives. Additional copies of the Project Manual may be obtained from City at the cost of reproduction. 3. Intention of City: It is the intent of City to describe in the Contract Documents a functionally complete 90 Project (or part thereof) to be constructed in accordance with the Contract Documents and in accordance with all codes and regulations governing construction of the Project. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied by Contractor whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals, or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or laws or regulations in effect at the time of opening of bids and Contractor shall comply therewith. City shall have no duties other than those duties and obligations expressly set forth within the Contract Documents. 4. Preliminary Matters: 4.1. Within five (5) calendar days prior to the pre-construction meeting described in Section 3.2, Contractor shall submit to Consultant, for Consultant's review and acceptance, a project schedule. CONTRACTOR agrees to attend weekly progress meetings and provide an updated (3) week look ahead schedule for review and discussion and monthly be prepared to discuss any: 1) Proposed changes to the Base Line schedule logic; 2) Explain and provide a narrative for reasons why logic changes should be made; 3) Update to individual subcontractor activities; and 4) Integration of changes into the schedule. The Project Schedule shall be the basis of the CONTRACTOR'S work and shall be complied with in all respects. If CONTRACTOR'S Work becomes more than (30) days behind schedule CONTRACTOR shall be required to submit a "Make-Up" schedule to PROGRAM MANAGER for review and acceptance that demonstrates "Catch Up" within thirty (3) days. CONTRACTOR shall provide, at CONTRACTOR'S cost, the necessary additional labor and or equipment necessary to make-up the lost time. Failure to provide a "Make-UV schedule or vigorously follow the "Make-Up" schedule shall be reason to default CONTRACTOR. 4.1.1 After award but prior to the submission of the final progress schedule, CONSULTANT, Contract Administrator and CONTRACTOR shall meet with all utility owners and secure from them a schedule of utility relocation, provided, however, neither CONSULTANT nor CITY shall be responsible for the nonperformance by the utility owners. 4.1.2 A preliminary schedule of Shop Drawing submissions; and 4.1.3 In a lump sum contractor in a contract which includes lump sum bid items of Work, a preliminary schedule of values for all of the Work which will 91 include quantities and prices of items aggregating the Contract Price and will subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of work which will be confirmed in writing by Contractor at the time of submission. ® Such prices shall be broken down to show labor, equipment, materials and overhead and profit. 41.4 After award but prior to the submission of the progress schedule, Consultant, Contract Administrator and Contractor shall meet with all utility owners and secure from them a schedule of utility relocation, provided, however, neither Consultant nor City shall be responsible for the nonperformance by the utility owners. 4.2. At a time specified by Consultant but before Contractor starts the work at the Project site, a conference attended by Contractor. Consultant and others as deemed appropriate by Contract Administrator will be held to discuss the schedules to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work. 4.3. Within thirty-five (35) days from the Project Initiation Date set forth in the Notice to Proceed, a conference attended by Contractor, Consultant and others, as appropriate, will be held to finalize the schedules submitted. Within forty-five (45) days after the Project Initiation Date set forth in Notice to Proceed No. 1, the Contractor shall revise the original schedule submittal to address all review comments from the CPM review conference and resubmit for Consultant review. The finalized progress schedule will be accepted by Consultant only as providing an orderly progression of the Work to completion within the Contract Time, but such acceptance shall not constitute acceptance by City or Consultant of the means or methods of construction or of the sequencing or scheduling of the Work, and such acceptance will neither impose on Consultant or City responsibility for the progress or scheduling of the Work nor relieve Contractor from full responsibility therefore. The finalized schedule of Shop Drawing submissions must be acceptable to Consultant as providing a workable arrangement for processing the submissions. The finalized schedule of values must be acceptable to Consultant as to form and substance. 5. Performance Bond and Payment Bond: Within fifteen (15) calendar days of being notified of the award, Contractor shall furnish a Performance Bond and a Payment Bond containing all the provisions of the Performance Bond and Payment Bond attached hereto as forms 00710 and 00720. 5.1. Each Bond shall be in the amount of one hundred percent(100%) of the Contract Price guaranteeing to City the completion and performance of the work covered in such Contract as well as full payment of all suppliers, laborers, or subcontractors employed pursuant to this Project. Each Bond shall be with a surety company which is qualified pursuant to Article 5. 92 5.2. Each Bond shall continue in effect for one year after Final Completion and acceptance of the work with liability equal to one hundred percent (100%) of the Contract sum, or an additional bond shall be conditioned that Contractor will, upon notification by City, correct any defective or faulty work or materials which appear within one year after Final Completion of the Contract. 5.3. Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time to time, Contractor shall ensure that the bond(s) referenced above shall be recorded in the public records of Miami-Dade County and provide City with evidence of such recording. 5.4. Alternate Form of Security: In lieu of a Performance Bond and a Payment Bond, Contractor may furnish alternate forms of security which may be in the form of cash, money order, certified check, cashier's check or unconditional letter of credit in the form attached hereto as Form 00735. Such alternate forms of security shall be subject to the prior approval of City and for same purpose and shall be subject to the same conditions as those applicable above and shall be held by City for one year after completion and acceptance of the Work. 6. Qualification of Surety 6.1. Performance Bonds and Payment Bonds for projects over Two Hundred Thousand Dollars($200,000.00) : 6.1.1. Each bond must be executed by a surety company of recognized standing, authorized to do business in the State of Florida as surety, having a resident agent in the State of Florida and having been in business with a record of successful continuous operation for at least five (5) years. 6.1.2. The surety company shall hold a current certificate of authority as acceptable surety on federal bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation set forth in the circular, in order to qualify, the net retention of the surety company shall not exceed the underwriting limitation in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with Treasury Circular 297, revised September 1, 1978 (31 DFR Section 223.10, Section 223.111). Further, the surety company shall provide City with evidence satisfactory to City, that such excess risk has been protected in an acceptable manner. 9. Labor and Materials: 9.1. Unless otherwise provided herein, Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be 93 incorporated in the Work. 9.2. Contractor shall at all times enforce strict discipline and good order among its employees and subcontractors at the Project site and shall not employ on the Project any unfit person or anyone not skilled in the work to which they are assigned. 10. Royalties and Patents: All fees, royalties, and claims for any invention, or pretended inventions, or patent of any article, material, arrangement, appliance, or method that may be used upon or in any manner be connected with the construction of the Work or appurtenances, are hereby included in the prices stipulated in this Contract for said work. 11. Weather: Extensions to the Contract Time for delays caused by the effects of inclement weather shall be submitted as a request for a change in the Contract Time pursuant to Article 40. These time extensions are justified only when rains or other inclement weather conditions or related adverse soil conditions prevent Contractor from productively performing controlling items of work identified on the accepted schedule or updates resulting in: (1) Contractor being unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or updates due to adverse weather conditions; or (2) Contractor must make major repairs to the Work damaged by weather. Providing the damage was not attributable to a failure to perform or neglect by Contractor, and providing that Contractor was unable to work at least fifty percent (50%) of the normal workday on controlling items of work identified on the accepted schedule or updates. 12. Permits, Licenses and Impact Fees: 12.1. Except as otherwise provided within the Supplemental Conditions, all permits and licenses required by federal, state or local laws, rules and regulations necessary for the prosecution of the Work undertaken by Contractor pursuant to this Contract shall be secured and paid for by Contractor. It is Contractor's responsibility to have and maintain appropriate Certificate(s) of Competency, valid for the Work to be performed and valid for the jurisdiction in which the Work is to be performed for all persons working on the Project for whom a Certificate of Competency is required. 12.2. Impact fees levied by the City and/or Miami-Dade County shall be paid by Contractor. Contractor shall be reimbursed only for the actual amount of the impact fee levied by the municipality as evidenced by an invoice or other acceptable documentation issued by the municipality. Reimbursement to Contractor in no event shall include profit or overhead of Contractor. 13. Resolution of Disputes: 13.1 To prevent all disputes and litigation, it is agreed by the parties hereto that 94 Consultant shall decide all questions, claims, difficulties and disputes of whatever nature which may arise relative to the technical interpretation of the Contract Documents and fulfillment of this Contract as to the character, quality, amount and value of any work done and materials furnished, or proposed to be done or furnished under or, by reason of, the Contract Documents and Consultants estimates and decisions upon all claims, questions, difficulties and disputes shall be final and binding to the extent provided in Section 12.2. Any claim, question, difficulty or dispute which cannot be resolved by mutual agreement of City and Contractor shall be submitted to Consultant in writing within twenty-one (21) calendar days. Unless a different period of time is set forth herein, Consultant shall notify City and Contractor in writing of Consultant's decision within twenty- one (21) calendar days from the date of the submission of the claim, question, difficulty or dispute, unless Consultant requires additional time to gather information or allow the parties to provide additional information. All non- technical administrative disputes shall be determined by the Contract Administrator pursuant to the time periods provided herein. During the pendency of any dispute and after a determination thereof, Contractor, Consultant and City shall act in good faith to mitigate any potential damages including utilization of construction schedule changes and alternate means of construction. 13.2 In the event the determination of a dispute under this Article is unacceptable to either party hereto, the party objecting to the determination must notify the other party in writing within ten (10) days of receipt of the written determination. The notice must state the basis of the objection and must be accompanied by a statement that any Contract Price adjustment claimed is the entire adjustment to which the objecting party has reason to believe it is entitled to as a result of the determination. Within sixty (60) days after Final Completion of the Work, the parties shall participate in mediation to address all objections to any determinations hereunder and to attempt to prevent litigation. The mediator shall be mutually agreed upon by the parties. Should any objection not be resolved in mediation, the parties retain all their legal rights and remedies provided under State law. A party objecting to a determination specifically waives all of its rights provided hereunder, including its rights and remedies under State law, if said party fails to comply in strict accordance with the requirements of this Article. 15. Superintendence and Supervision: 15.1. The orders of City are to be given through Consultant, which instructions are to be strictly and promptly followed in every case. Contractor shall keep on the Project during its progress, a full-time competent English speaking superintendent and any necessary assistants, all satisfactory to Consultant. The superintendent shall not be changed except with the written consent of Consultant, unless the superintendent proves to be unsatisfactory to Contractor and ceases to be in its employ. The superintendent shall represent Contractor and all directions given to the superintendent shall be as binding as if given to Contractor and will be confirmed in writing by Consultant upon the written request of Contractor. Contractor shall give efficient supervision to the Work, using its best skill and attention. 15.2. Daily, Contractor's superintendent shall record, at a minimum, the following 95 information in a bound log: the day; date; weather conditions and how any weather condition affected progress of the Work; time of commencement of work for the day; the work being performed; materials, labor, personnel, equipment and subcontractors at the Project site; visitors to the Project site, including representatives of Consultant; regulatory representatives; any special or unusual conditions or occurrences encountered; and the time of termination of work for the day. All information shall be recorded in the daily log in ink. The daily log shall be kept on the Project site and shall be available at all times for inspection and copying by City and Consultant. 15.3. The Contract Administrator, Contractor and Consultant shall meet at least weekly or as determined by the Contract Administrator, during the course of the Work to review and agree upon the work performed to date and to establish the controlling items of work for the next two weeks. The Consultant shall publish, keep, and distribute minutes and any comments thereto of each such meeting. 15.4. If Contractor, in the course of prosecuting the Work, finds any discrepancy between the Contract Documents and the physical conditions of the locality, or any errors, omissions, or discrepancies in the Project Manual, it shall be Contractor's duty to immediately inform Consultant, in writing, and Consultant will promptly review the same. Any work done after such discovery, until authorized, will be done at Contractor's sole risk. 15.5. Contractor shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. 17. Contractor's Right to Stop Work or Terminate Contract: Should Consultant fail to review and approve or state in writing reasons for nonapproval of any Application for Payment within twenty (20)days after it is presented, or if City fails either to pay Contractor within thirty (30) days after presentation by Consultant of any sum certified by Consultant, or to notify Contractor and Consultant in writing of any objection to the Application for Payment, then Contractor may, give written notice to City and Consultant of such delay, neglect or default, specifying the same. If City or Consultant(where applicable), within a period of ten (10) calendar days after such notice shall not remedy the delay, neglect, or default upon which the notice is based, then Contractor may stop work or terminate this Contract and recover from City payment for all work executed and reasonable expenses sustained therein plus reasonable termination expenses. Any objection made by City to an Application for Payment shall be submitted to Consultant in accordance with the provisions of Article 12 hereof. 18. Assignment: Neither party hereto shall assign the Contract or any subcontract in whole or in part without the written consent of the other, nor shall Contractor assign any monies due or to become due to it hereunder, without the previous written consent of the Mayor and City Commission. 96 20. Differing Site Conditions: In the event that during the course of the Work Contractor encounters subsurface or concealed conditions at the Project site which differ materially from those shown on the Contract Documents and from those ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents; or unknown physical conditions of the Project site, of an unusual nature, which differ materially from that ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents, Contractor , without disturbing the conditions and before performing any work affected by such conditions, shall, within twenty-four (24) hours of their discovery, notify City and Consultant in writing of the existence of the aforesaid conditions. Consultant and City shall, within two (2) business days after receipt of Contractor's written notice, investigate the site conditions identified by Contractor. If, in the sole opinion of Consultant, the conditions do materially so differ and cause an increase or decrease in Contractor's cost of, or the time required for, the performance of any part of the Work, whether or not charged as a result of the conditions, Consultant shall recommend an equitable adjustment to the Contract Price, or the Contract Time, or both. If City and Contractor cannot agree on an adjustment in the Contract Price or Contract Time, the adjustment shall be referred to Consultant for determination in accordance with the provisions of Article 12. Should Consultant determine that the conditions of the Project site are not so materially different to justify a change in the terms of the Contract, Consultant shall so notify City and Contractor in writing, stating the reasons, and such determination shall be final and binding upon the parties hereto. No request by Contractor for an equitable adjustment to the Contract under this provision shall be allowed unless Contractor has given written notice in strict accordance with the provisions of this Article. No request for an equitable adjustment or change to the Contract Price or Contract Time for differing site conditions shall be allowed if made after the date certified by Consultant as the date of substantial completion. 21. Plans and Working Drawings: City, through Consultant, shall have the right to modify the details of the plans and specifications, to supplement the plans and specifications with additional plans, drawings or additional information as the Work proceeds, all of which shall be considered as part of the Project Manual. In case of disagreement between the written and graphic portions of the Project Manual, the written portion shall govern. 22. Contractor to Check Plans. Specifications and Data: Contractor shall verify all dimensions, quantities and details shown on the plans, specifications or other data received from Consultant, and shall notify Consultant of all errors, omissions and discrepancies found therein within three (3) calendar days of discovery. Contractor will not be allowed to take advantage of any error, omission or discrepancy, as full instructions will be furnished by Consultant. Contractor shall not be liable for damages resulting from errors, omissions or discrepancies in the Contract Documents unless Contractor recognized such error, omission or discrepancy and knowingly failed to report it to Consultant. 97 23. Contractor's Responsibility for Damages and Accidents: 23.1. Contractor shall accept full responsibility for the Work against all loss or damage of whatsoever nature sustained until final acceptance by City, and shall promptly repair any damage done from any cause whatsoever, except as provided in Article 29. 23.2. Contractor shall be responsible for all materials, equipment and supplies pertaining to the Project. In the event any such materials, equipment and supplies are lost, stolen, damaged or destroyed prior to final acceptance by City, Contractor shall replace same without cost to City, except as provided in Article 29. 24. Warranty: Contractor warrants to City that all materials and equipment furnished under this Contract will be new unless otherwise specified and that all of the Work will be of good quality, free from faults and defects and in conformance with the Contract Documents. All work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. If required by Consultant, Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by the provisions of Article 25 herein. 25. Supplementary Drawings: 25.1. When, in the opinion of Consultant, it becomes necessary to explain the Work to be done more fully, or to illustrate the Work further, or to show any changes which may be required, supplementary drawings, with specifications pertaining thereto,will be prepared by Consultant. 25.2. The supplementary drawings shall be binding upon Contractor with the same force as the Project Manual. Where such supplementary drawings require either lessor more than the original quantities of work, appropriate adjustments shall be made by Change Order. 26. Defective Work: 26.1. Consultant shall have the authority to reject or disapprove work which Consultant finds to be defective. If required by Consultant, Contractor shall promptly either correct all defective work or remove such defective work and replace it with nondefective work. Contractor shall bear all direct, indirect and consequential costs of such removal or corrections including cost of testing laboratories and personnel. 26.2. Should Contractor fail or refuse to remove or correct any defective work or to make any necessary repairs in accordance with the requirements of the Contract Documents within the time indicated in writing by Consultant, City shall have the authority to cause the defective work to be removed or corrected, or make such repairs as may be necessary at Contractor's expense. Any expense incurred by City in making such removals, corrections or repairs, shall be paid for out of any monies due or which may become due to Contractor , or may be charged against the Performance Bond. In the event of failure of Contractor to make all necessary repairs promptly and fully, City may declare Contractor in default. 98 26.3. If, within one (1) year after the date of substantial completion or such longer period of time as may be prescribed by the terms of any applicable special warranty required by the Contract Documents, or by any specific provision of the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, Contractor , after receipt of written notice from City, shall promptly correct such defective or nonconforming Work within the time specified by City without cost to City, to do so. Nothing contained herein shall be construed to establish a period of limitation with respect to any other obligation which Contractor might have under the Contract Documents including but not limited to, Article 23 hereof and any claim regarding latent defects. 26.4. Failure to reject any defective work or material shall not in any way prevent later rejection when such defect is discovered, or obligate City to final acceptance. 27. Taxes Contractor shall pay all applicable sales, consumer, use and other taxes required by law. Contractor is responsible for reviewing the pertinent state statutes involving state taxes and complying with all requirements. 28. Subcontracts: 28.1. Contractor shall not employ any subcontractor against whom City or Consultant may have a reasonable objection. Contractor shall not be required to employ any subcontractor against whom Contractor has a reasonable objection. 28.2. Contractor shall be fully responsible for all acts and omissions of its subcontractors and of persons directly or indirectly employed by its subcontractors and of persons for whose acts any of them may be liable to the same extent that Contractor is responsible for the acts and omissions of persons directly employed by it. Nothing in the Contract Documents shall create any contractual relationship between any subcontractor and City or any obligation on the part of City to pay or to see the payment of any monies due any subcontractor. City or Consultant may furnish to any subcontractor evidence of amounts paid to Contractor on account of specific work performed. 28.3 Contractor agrees to bind specifically every subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of City. 28.4. Contractor shall perform the Work with its own organization, amounting to not less than 70% percent of the Contract Price. 29. Separate Contracts: 29.1. City reserves the right to let other contracts in connection with this Project. Contractor shall afford other persons reasonable opportunity for the introduction and storage of their materials and the execution of their work and shall properly connect and coordinate this Work with theirs. 99 29.2. If any part of Contractor's Work depends for proper execution or results upon the work of any other persons, Contractor shall inspect and promptly report to Consultant any defects in such work that render it unsuitable for such proper execution and results. Contractor's failure to so inspect and report shall constitute an acceptance of the other person's work as fit and proper for the reception of Contractor's Work, except as to defects which may develop in other contractors work after the execution of Contractors. 29.3. Contractor shall conduct its operations and take all reasonable steps to coordinate the prosecution of the Work so as to create no interference or impact on any other contractor on the site. Should such interference or impact occur, Contractor shall be liable to the affected contractor for the cost of such interference or impact. 29.4. To insure the proper execution of subsequent work, Contractor shall inspect the work already in place and shall at once report to Consultant any discrepancy between the executed work and the requirements of the Contract Documents. 30. Use of Completed Portions: 30.1. City shall have the right at its sole option to take possession of and use any completed or partially completed portions of the Project. Such possession and use shall not be deemed an acceptance of any of the Work not completed in accordance with the Contract Documents. If such possession and use increases the cost of or delays the Work, Contractor shall be entitled to reasonable extra compensation or reasonable extension of time or both, as recommended by Consultant and approved by City. 30.2. In the event City takes possession of any completed or partially completed portions of the Project, the following shall occur: 30.2.1. City shall give notice to Contractor in writing at least thirty (30) calendar days prior to City's intended occupancy of a designated area. 30.2.2. Contractor shall complete to the point of Substantial Completion the designated area and request inspection and issuance of a Certificate of Substantial Completion in the form attached hereto as 00925 from Consultant. 30.2.3. Upon Consultant's issuance of a Certificate of Substantial Completion, City will assume full responsibility for maintenance, utilities, subsequent damages of City and public, adjustment of insurance coverage's and start of warranty for the occupied area. 30.2.4. Contractor shall complete all items noted on the Certificate of Substantial Completion within the time specified by Consultant on the Certificate of Substantial Completion, as soon as possible and request final inspection and final acceptance of the portion of the Work occupied. Upon completion of final inspection and receipt of an application for final payment, Consultant shall issue a Final 100 Certificate of Payment relative to the occupied area. 30.2.5. If City finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion thereof, such occupancy or use shall not commence prior to a time mutually agreed upon by City and Contractor and to which the insurance company or companies providing the property insurance have consented by endorsement to the policy or policies. Insurance on the unoccupied or unused portion or portions shall not be canceled or lapsed on account of such partial occupancy or use. Consent of Contractor and of the insurance company or companies to such occupancy or use shall not be unreasonably withheld. 31. Lands for Work: 31.1. City shall provide, as may be indicated in the Contract Documents, the lands upon which the Work is to be performed, rights-of-way and easements for access thereto and such other lands as are designated by City or the use of Contractor. 31.2. Contractor shall provide, at Contractor's own expense and without liability to City, any additional land and access thereto that may be required for temporary construction facilities, or for storage of materials. Contractor shall furnish to City copies of written permission obtained by Contractor from the owners of such facilities. 32. Legal Restrictions and Traffic Provisions: Contractor shall conform to and obey all applicable laws, regulations, or ordinances with regard to labor employed, hours of work and Contractor's general operations. Contractor shall conduct its operations so as not to close any thoroughfare, nor interfere in any way with traffic on railway, highways, or water, without the prior written consent of the proper authorities. 33. Location and Damage to Existing Facilities, Equipment or Utilities: 33.1. As far as possible, all existing utility lines in the Project area have been shown on the plans. However, City does not guarantee that all lines are shown, or that the ones indicated are in their true location. It shall be the Contractor LS responsibility to identify and locate all underground and overhead utility lines or equipment affecting or affected by the Project. No additional payment will be made to the Contractor because of discrepancies in actual and plan location of utilities, and damages suffered as a result thereof. 33.2. The Contractor shall notify each utility company involved at least ten (10) days prior to the start of construction to arrange for positive underground location, relocation or support of its utility where that utility may be in conflict with or endangered by the proposed construction. Relocation of water mains or other utilities for the convenience of the Contractor shall be paid by the Contractor. All charges by utility companies for temporary support of its utilities shall be paid for by the Contractor. All costs of permanent utility relocation to avoid conflict shall be the responsibility of the utility company involved. No additional payment will be made to the Contractor for utility relocations, whether or not said relocation is necessary to avoid conflict with other lines. lot 33.3. The Contractor shall schedule the work in such a manner that the work is not delayed by the utility providers relocating or supporting their utilities. The Contractor shall coordinate its activities with any and all public and private utility providers occupying the right-of-way. No compensation will be paid to the Contractor for any loss of time or delay. 33.4. All overhead, surface or underground structures and utilities encountered are to be carefully protected from injury or displacement. All damage to such structures is to be completely repaired within a reasonable time; needless delay will not be tolerated. The City reserves the right to remedy such damage by ordering outside parties to make such repairs at the expense of the Contractor. All such repairs made by the Contractor are to be made to the satisfaction of the utility owner. All damaged utilities must be replaced or fully repaired. All repairs are to be inspected by the utility owner prior to backfilling. 34. Value Engineering: Contractor may request substitution of materials, articles, pieces of equipment or any changes that reduce the Contract Price by making such request to Consultant in writing. Consultant will be the sole judge of acceptability, and no substitute will be ordered, installed, used or initiated without Consultant's prior written acceptance which will be evidenced by either a Change Order or an approved Shop Drawing. However, any substitution accepted by Consultant shall not result in any increase in the Contract Price or Contract Time. By making a request for substitution, Contractor agrees to pay directly to Consultant all Consultants fees and charges related to Consultant's review of the request for substitution, whether or not the request for substitution is accepted by Consultant. Any substitution submitted by Contractor must meet the form, fit, function and life cycle criteria of the item proposed to be replaced and there must be a net dollar savings including Consultant review fees and charges. If a substitution is approved, the net dollar savings shall be shared equally between Contractor and City and shall be processed as a deductive Change Order. City may require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute approved after award of the Contract. 35. Continuing the Work: Contractor shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with City, including disputes or disagreements concerning a request for a Change Order, a request for a change in the Contract Price or Contract Time. The Work shall not be delayed or postponed pending resolution of any disputes or disagreements. 36. Changes in the Work or Terms of Contract Documents: 36.1. Without invalidating the Contract and without notice to any surety City reserves and shall have the right, from time to time to make such increases, decreases or other changes in the character or quantity of the Work as may be considered necessary or desirable to complete fully and acceptably the proposed construction in a satisfactory manner. Any extra or additional work within the scope of this Project must be accomplished by means of appropriate Field Orders and Supplemental Instructions or Change Orders. 102 36.2. Any changes to the terms of the Contract Documents must be contained in a written document, executed by the parties hereto, with the same formality and of equal dignity prior to the initiation of any work reflecting such change. This section shall not prohibit the issuance of Change Orders executed only by City as hereinafter provided. 37. Field Orders and Supplemental Instructions: 37.1. The Contract Administrator, through Consultant, shall have the right to approve and issue Field Orders setting forth written interpretations of the intent of the Contract Documents and ordering minor changes in Work execution, providing the Field Order involves no change in the Contract Price or the Contract Time. 37.2. Consultant shall have the right to approve and issue Supplemental Instructions setting forth written orders, instructions, or interpretations concerning the Contract Documents or its performance, provided such Supplemental Instructions involve no change in the Contract Price or the Contract Time. 38. Change Orders: 38.1. Changes in the quantity or character of the Work within the scope of the Project which are not properly the subject of Field Orders or Supplemental Instructions, including all changes resulting in changes in the Contract Price, or the Contract Time, shall be authorized only by Change Orders approved in advance and issued in accordance with the provisions of the City. 38.2. All changes to construction contracts which exceed the Commission-approved contingency must be approved in advance in accordance with the value of the Change Order or the calculated value of the time extension. All Change Orders with a value of $25,000 or more shall be approved in advance by the Mayor and City Commission. All Change Orders with a value of less than $25,000 shall be approved in advance by the City Manager or his designee. 38.3. In the event satisfactory adjustment cannot be reached for any item requiring a change in the Contract Price or Contract Time, and a Change Order has not been issued, City reserves the right at its sole option to either terminate the Contract as it applies to the items in question and make such arrangements as may be deemed necessary to complete the disputed work; or submit the matter in dispute to Consultant as set forth in Article 12 hereof. During the pendency of the dispute, and upon receipt of a Change Order approved by City, Contractor shall promptly proceed with the change in the Work involved and advise the Consultant and Contract Administrator in writing within seven (7) calendar days of Contractor's agreement or disagreement with the method, if any, provided in the Change Order for determining the proposed adjustment in the Contract Price or Contract Time. 38.4. On approval of any Contract change increasing the Contract Price, Contractor shall ensure that the performance bond and payment bond are increased so that each reflects the total Contract Price as increased. 38.5. Under circumstances determined necessary by City, Change Orders may be issued unilaterally by City. 39. Value of Change Order Work: 103 39.1. The value of any work covered by a Change Order or of any claim for an increase or decrease in the Contract Price shall be determined in one of the following ways: 39.1.1. Where the work involved is covered by unit prices contained in the Contract Documents, by application of unit prices to the quantifies of items involved. 39.1.2. By mutual acceptance of a lump sum which Contractor and City acknowledge contains a component for overhead and profit. 39.1.3. On the basis of the "cost of work,"determined as provided in Sections 38.2 and 38.3, plus a Contractor's fee for overhead and profit which is determined as provided in Section 38.4. 39.2. The term "cost of work" means the sum of all direct costs necessarily incurred and paid by Contractor in the proper performance of the Work described in the Change Order. Except as otherwise may be agreed to in writing by City, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the costs itemized in Section 38.3. 39.2.1. Payroll costs for employees in the direct employ of Contractor in the performance of the work described in the Change Order under schedules of job classifications agreed upon by City and Contractor. Payroll costs for employees not employed full time on the work covered by the Change Order shall be apportioned on the basis of their time spent on the work. Payroll costs shall include, but not be limited to, salaries and wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' or workmen's compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay application thereto. Such employees shall include superintendents and foremen at the site. The expenses of performing the work after regular working hours, on Sunday or legal holidays, shall be included in the above to the extent authorized by City. 39.2.2. Cost of all materials and equipment furnished and incorporated in the work, including costs of transportation and storage thereof, and manufacturers' field services required in connection therewith. All cash discounts shall accrue to Contractor unless City deposits funds with Contractor with which to make payments, in which case the cash discounts shall accrue to City. All trade discounts, rebates and refunds, and all returns from sale of surplus materials and equipment shall accrue to City and Contractor shall make provisions so that they may be obtained. Rentals of all construction equipment and machinery and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City with the advice of Consultant and the costs of transportation, loading, unloading, installation, dismantling and removal thereof, all in accordance with the terms of said agreements. The rental of any 104 • such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the work. 39.2.3. Payments made by Contractor to Subcontractors for work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from Subcontractors acceptable to Contractor and shall deliver such bids to City who will then determine, with the advice of Consultant, which bids will be accepted. If the Subcontract provides that the Subcontractor is to be paid on the basis of cost of the work plus a fee, the Subcontractors cost of the work shall be determined in the same manner as Contractor 'S cost of the work. All Subcontractors shall be subject to the other provisions of the Contract Documents insofar as applicable. 39.2.4. Cost of special consultants, including, but not limited to, engineers, architects, testing laboratories, and surveyors employed for services specifically related to the performance of the work described in the Change Order. 39.2.5. Supplemental costs including the following: 39.2.5.1. The proportion of necessary transportation, travel and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the work except for local travel to and from the site of the work. 39.2.5.2. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools not owned by the workmen, which are consumed in the performance of the work, and cost less market value of such items used but not consumed which remains the property of Contractor. 39.2.5.3. Sales, use, or similar taxes related to the work, and for which Contractor is liable, imposed by any governmental authority. 39.2.5.4. Deposits lost for causes other than Contractor's negligence; royalty payments and fees for permits and licenses. 39.2.5.5. The cost of utilities, fuel and sanitary facilities at the site. 39.2.5.6. Receipted minor expenses such as telegrams, long distance telephone calls, telephone service at the site, expressage and similar petty cash items in connection with the work. 39.2.5.7. Cost of premiums for additional bonds and insurance required because of changes in the work. 105 39.3. The term "cost of the work" shall not include any of the following: 39.3.1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnership and sole proprietorships), general managers, engineers, architects, estimators, lawyers, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks and other personnel employed by Contractor whether at the site or in its principal or a branch office for general administration of the work and not specifically included in the agreed- upon schedule of job classifications, all of which are to be considered administrative costs covered by Contractor's fee. 39.3.2. Expenses of Contractor's principal and branch offices other than Contractor's office at the site. 39.3.3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the work and charges against Contractor for delinquent payments. 39.3.4. Cost of premiums for all Bonds and for all insurance whether or not Contractor is required by the Contract Documents to purchase and maintain the same, except for additional bonds and insurance required because of changes in the work. 39.3.5. Costs due to the negligence or neglect of Contractor, any Subcontractors, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective work, disposal of materials or equipment wrongly supplied and making good any damage to property. 39.3.6. Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in Section 38.2. 39.4. Contractor's fee allowed to Contractor for overhead and profit shall be determined as follows: 39.4.1.A mutually acceptable fixed fee or if none can be agreed upon, 39.4.2.A fee based on the following percentages of the various portions of the cost of the work: 39.4.2.1. For costs incurred under Sections 38.2.1 and 38.2.2, Contractor's fee shall not exceed ten percent(10%). 39.4.2.2. For costs incurred under Section 38.2.3, Contractor's fee shall not exceed seven and one half percent (7.5%); and if a subcontract is on the basis of cost of the work plus a fee, the maximum allowable to the Subcontractor as a fee for overhead and profit shall not exceed ten percent(10%); and 106 39.4.2.3. No fee shall be payable on the basis of costs itemized under Sections 38.2.4 and 38.2.5, (except Section 38.2.5.3), and Section 38.3. 39.5. The amount of credit to be allowed by Contractor to City for any such change which results in a net decrease in cost, will be the amount of the actual net decrease. When both additions and credits are involved in any one change, the combined overhead and profit shall be figured on the basis of the net increase, if any, however, Contractor shall not be entitled to claim lost profits for any Work not performed. 39.6. Whenever the cost of any work is to be determined pursuant to Sections 38.2 and 38.3, Contractor will submit in a form acceptable to Consultant an itemized cost breakdown together with the supporting data. 39.7. Where the quantity of any item of the Work that is covered by a unit price is increased or decreased by more than twenty percent (20%) from the quantity of such work indicated in the Contract Documents, an appropriate Change Order shall be issued to adjust the unit price, if warranted. 39.8. Whenever a change in the Work is to be based on mutual acceptance of a lump sum, whether the amount is an addition, credit or no change-in-cost, Contractor shall submit an initial cost estimate acceptable to Consultant and Contract Administrator. 39.8.1. Breakdown shall list the quantities and unit prices for materials, labor, equipment and other items of cost. 39.8.2. Whenever a change involves Contractor and one or more Subcontractors and the change is an increase in the Contract Price, overhead and profit percentage for Contractor and each Subcontractor shall be itemized separately. 39.9. Each Change Order must state within the body of the Change Order whether it is based upon unit price, negotiated lump sum, or"cost of the work." 40. Notification and Claim for Change of Contract Time or Contract Price: 40.1. Any claim for a change in the Contract Time or Contract Price shall be made by written notice by Contractor to the Contract Administrator and to Consultant within five (5) calendar days of the commencement of the event giving rise to the claim and stating the general nature and cause of the claim. Thereafter, within twenty (20) calendar days of the termination of the event giving rise to the claim, written notice of the extent of the claim with supporting information and documentation shall be provided unless Consultant allows an additional period of time to ascertain more accurate data in support of the claim and such notice shall be accompanied by Contractor's written notarized statement that the adjustment claimed is the entire adjustment to which the Contractor has reason to believe it is entitled as a result of the occurrence of said event. All claims for changes in the Contract Time or Contract Price shall be determined by Consultant in 107 accordance with Article 12 hereof, if City and Contractor cannot otherwise agree. IT IS EXPRESSLY AND SPECIFICALLY AGREED THAT ANY AND ALL CLAIMS FOR CHANGES TO THE CONTRACT TIME OR CONTRACT PRICE SHALL BE WAIVED IF NOT SUBMITTED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THIS SECTION. 40.2. The Contract Time will be extended in an amount equal to time lost on critical Work items due to delays beyond the control of and through no fault or negligence of Contractor if a claim is made therefore as provided in Section 39.1. Such delays shall include, but not be limited to, acts or neglect by any separate contractor employed by City, fires, floods, labor disputes, epidemics, abnormal weather conditions or acts of God. 41. No Damages for Delay: No claim for damages or any claim, other than for an extension of time, shall be made or asserted against City by reason of any delays except as provided herein. Contractor shall not be entitled to an increase in the Contract Price or payment or compensation of any kind from City for direct, indirect, consequential, impact or other costs, expenses or damages, including but not limited to costs of acceleration or inefficiency, arising because of delay, disruption, interference or hindrance from any cause whatsoever, whether such delay, disruption, interference or hindrance be reasonable or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable; provided, however, that this provision shall not preclude recovery of damages by Contractor for actual delays due solely to fraud, bad faith or active interference on the part of City or its Consultant. Otherwise, Contractor shall be entitled only to extensions of the Contract Time as the sole and exclusive remedy for such resulting delay, in accordance with and to the extent specifically provided above. 42. Excusable Delay: Compensable; Non-Compensable: 42.1 Excusable Delay. Delay which extends the completion of the Work and which is caused by circumstances beyond the control of Contractor or its subcontractors, suppliers or vendors is Excusable Delay. Contractor is entitled to a time extension of the Contract Time for each day the Work is delayed due to Excusable Delay. Contractor shall document its claim for any time extension as provided in Article 39 hereof. Failure of Contractor to comply with Article 39 hereof as to any particular event of delay shall be deemed conclusively to constitute a waiver, abandonment or relinquishment of any and all claims resulting from that particular event of delay. Excusable Delay may be compensable or non-compensable: (a) Compensable Excusable Delay. Excusable Delay is compensable when (i) the delay extends the Contract Time, (ii) is caused by circumstances beyond the control of the Contractor or its subcontractors, suppliers or vendors, and (iii) is caused solely by fraud, bad faith or active interference on the part of City or its agents. In no event shall Contractor be 108 compensated for interim delays which do not extend the Contract Time. Contractor shall be entitled to direct and indirect costs for Compensable Excusable Delay. Direct costs recoverable by Contractor shah be limited to the actual additional costs allowed pursuant to Article 38 hereof. City and Contractor recognize and agree that the amount of Contractor's precise actual indirect costs for delay in the performance and completion of the Work is impossible to determine as of the date of execution of the Contract Documents, and that proof of the precise amount will be difficult. Therefore, indirect costs recoverable by the Contractor shall be liquidated on a daily basis for each day the Contract Time is delayed due to a Compensable Excusable Delay. These liquidated indirect costs shall be paid to compensate Contractor for all indirect costs caused by a Compensable Excusable Delay and shall include, but not be limited to, all profit on indirect costs, home office overhead, acceleration, loss of earnings, loss of productivity, loss of bonding capacity, loss of opportunity and all other indirect costs incurred by Contractor. The amount of liquidated indirect costs recoverable shall be one hundred dollars ($100) per day for each calendar day the Contract is delayed due to a Compensable Excusable Delay. (b) Non-Compensable Excusable Delay. When Excusable Delay is (i) caused by circumstances beyond the control of Contractor, its subcontractors, suppliers and vendors, and is also caused by circumstances beyond the control of the City or Consultant, or (ii) is caused jointly or concurrently by Contractor or its subcontractors, suppliers or vendors and by the City or Consultant, then Contractor shall be entitled only to a time extension and no further compensation for the delay. 43. Substantial Completion: When Contractor considers that the Work, or a portion thereof designated by City pursuant to Article 29 hereof, has reached Substantial Completion, Contractor shall so notify City and Consultant in writing. Consultant and City shall then promptly inspect the Work. When Consultant, on the basis of such an inspection, determines that the Work or designated portion thereof is substantially complete, it will then prepare a Certificate of Substantial Completion in the form attached hereto as Form 00925 which shall establish the Date of Substantial Completion; shall state the responsibilities of City and Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance; and shall list all Work yet to be completed to satisfy the requirements of the Contract Documents for Final Completion. The failure to include any items of corrective work on such list does not alter the responsibility of Contractor to complete all of the Work in accordance with the Contract Documents. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to City through the Contract Administrator and Contractor for their written acceptance of the responsibilities assigned to them in such Certificate. 44. No Interest: 109 Any monies not paid by City when claimed to be due to Contractor under this Agreement, including, but not limited to, any and all claims for contract damages of any type, shall not be subject to interest including, but not limited to prejudgment interest. However, the provisions of City's prompt payment ordinance, as such relates to timeliness of payment, and the provisions of Section 218.74(4), Florida Statutes (1989) as such relates to the payment of interest, shall apply to valid and proper invoices. 45. Shop Drawings: 45.1. Contractor shall submit Shop Drawings as required by the Technical Specifications. The purpose of the Shop Drawings is to show the suitability, efficiency, technique of manufacture, installation requirements, details of the item and evidence of its compliance or noncompliance with the Contract Documents. 45.2. Within thirty (20) calendar days after the Project Initiation Date specified in the Notice to Proceed, Contractor shall submit to Consultant a complete list of preliminary data on items for which Shop Drawings are to be submitted and shall identify the critical items. Approval of this list by Consultant shall in no way relieve Contractor from submitting complete Shop Drawings and providing materials, equipment, etc., fully in accordance with the Contract Documents. This procedure is required in order to expedite final approval of Shop Drawings. 45.3. After the approval of the list of items required in Section 44.2 above, Contractor shall promptly request Shop Drawings from the various manufacturers, fabricators, and suppliers. Contractor shall include all shop drawings and other submittals in its certification. 45.4. Contractor shall thoroughly review and check the Shop Drawings and each and every copy shall show this approval thereon. 45.5. If the Shop Drawings show or indicate departures from the Contract requirements, Contractor shall make specific mention thereof in its letter of transmittal. Failure to point out such departures shall not relieve Contractor from its responsibility to comply with the Contract Documents. 45.6. Consultant shall review and approve Shop Drawings within seven (7) calendar days from the date received, unless said Drawings are rejected by Consultant for material reasons. Consultant's approval of Shop Drawings will be general and shall not relieve Contractor of responsibility for the accuracy of such Drawings, nor for the proper fitting and construction of the work, nor for the furnishing of materials or work required by the Contract Documents and not indicated on the Drawings. No work called for by Shop Drawings shall be performed until the said Drawings have been approved by Consultant. Approval shall not relieve Contractor from responsibility for errors or omissions of any sort on the Shop Drawings. 45.7. No approval will be given to partial submittals of Shop Drawings for items which interconnect and/or are interdependent where necessary to properly evaluate the design. It is Contractor's responsibility to assemble the Shop Drawings for 110 all such interconnecting and/or interdependent items, check them and then make one submittal to Consultant along with its comments as to compliance, noncompliance, or features requiring special attention. 45.8. If catalog sheets or prints of manufacturers' standard drawings are submitted as Shop Drawings, any additional information or changes on such drawings shall be typewritten or lettered in ink. 45.9. Contractor shall submit the number of copies required by Consultant. Resubmissions of Shop Drawings shall be made in the same quantity until final approval is obtained. 45.10. Contractor shall keep one set of Shop Drawings marked with Consultant's approval at the job site at all times. 46. Field Layout of the Work and Record Drawings: 46.1. The entire responsibility for establishing and maintaining line and grade in the field lies with Contractor. Contractor shall maintain an accurate and precise record of the location and elevation of all pipe lines, conduits, structures, maintenance access structures, handholes, fittings and the like and shall prepare record or "as-built" drawings of the same which are sealed by a Professional Surveyor. Contractor shall deliver these records in good order to Consultant as the Work is completed. The cost of all such field layout and recording work is included in the prices bid for the appropriate items. All record drawings shall be made on reproducible paper and shall be delivered to Consultant prior to, and as a condition of, final payment. 46.2. Contractor shall maintain in a safe place at the Project site one record copy of all Drawings, Plans, Specifications, Addenda, written amendments, Change Orders, Field Orders and written interpretations and clarifications in good order and annotated to show all changes made during construction. These record documents together with all approved samples and a counterpart of all approved Shop Drawings shall be available at all times to Consultant for reference. Upon Final Completion of the Project and prior to Final Payment, these record documents, samples and Shop Drawings shall be delivered to the Contract Administrator. 46.3. Prior to, and as a condition precedent to Final Payment, Contractor shall submit to City, Contractor's record drawings or as-built drawings acceptable to Consultant. 47. Safety and Protection: 47.1. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Project. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 47.1.1. All employees on the work site and other persons who may be affected thereby: IIl 47.1.2. All the work and all materials or equipment to be incorporated therein. whether in storage on or off the Project site; and 47.1.3. Other property at the Project site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 47.2. Contractor shall comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and utilities when prosecution of the work may affect them. All damage, injury or loss to any property referred to in Sections 46.1.2 and 46.1.3 above, caused directly or indirectly, in whole or in part, by Contractor , any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, shall be remedied by Contractor . Contractor's duties and responsibilities for the safety and protection of the work shall continue until such time as all the Work is completed and Consultant has issued a notice to City and Contractor that the Work is acceptable except as otherwise provided in Article 29 hereof. 47.3. Contractor shall designate a responsible member of its organization at the Work site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to City. 48. Final Bill of Materials: Contractor shall be required to submit to City and Consultant a final bill of materials with unit costs for each bid item for supply of materials in place. This shall be an itemized list of all materials with a unit cost for each material and the total shall agree with unit costs established for each Contract item. A Final Certificate for Payment cannot be issued by Consultant until Contractor submits the final bill of materials and Consultant verifies the accuracy of the units of Work. 49. Payment by City for Tests: Except when otherwise specified in the Contract Documents, the expense of all tests requested by Consultant shall be borne by City and performed by a testing firm chosen by Consultant. For road construction projects the procedure for making tests required by Consultant will be in conformance with the most recent edition of the State of Florida, Department of Transportation Standard Specifications for Road and Bridge Construction. The cost of any required test which Contractor fails shall be paid for by Contractor. 50. Project Sign: Any requirements for a project sign shall be paid by the Contractor as specified by City Guidelines'. 51. Hurricane Precautions: 51.1. During such periods of time as are designated by the United States Weather Bureau as being a hurricane warning or alert, the Contractor, at no cost to the City, shall take all precautions necessary to secure the Project site in response to all threatened storm events, regardless of whether the City or Consultant has 112 given notice of same. 51.2. Compliance with any specific hurricane warning or alert precautions will not constitute additional work. 51.3. Additional work relating to hurricane warning or alert at the Project site will be addressed by a Change Order in accordance with Section 37, General Conditions. 51.4. Suspension of the Work caused by a threatened or actual storm event, regardless of whether the City has directed such suspension, will entitle the Contractor to additional Contract Time as noncompensable, excusable delay, and shall not give rise to a claim for compensable delay. 52. Cleaning Up; City's Right to Clean Up: Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its operations. At the completion of the Project, Contractor shall remove all its waste materials and rubbish from and about the Project as well as its tools, construction equipment, machinery and surplus materials. If Contractor fails to dean up during the prosecution of the Work or at the completion of the Work, City may do so and the cost thereof shall be charged to Contractor. If a dispute arises between Contractor and separate contractors as to their responsibility for cleaning up, City may clean up and charge the cost thereof to the contractors responsible therefore as Consultant shall determine to be just. 53. Removal of Equipment: In case of termination of this Contract before completion for any cause whatever, Contractor, if notified to do so by City, shall promptly remove any part or all of Contractor's equipment and supplies from the property of City, failing which City shall have the right to remove such equipment and supplies at the expense of Contractor. 54. Nondiscrimination, Equal Employment Opportunity, and Americans with Disabilities Act: 1. Contractor shall not unlawfully discriminate against any person in its operations and activities or in its use or expenditure of funds in fulfilling its obligations under this Agreement. Contractor shall affirmatively comply with all applicable provisions of the Americans with Disabilities Act (ADA) in the course of providing any services funded by City, including Titles I and II of the ADA (regarding nondiscrimination on the basis of disability), and all applicable regulations, guidelines, and standards. In addition, Contractor shall take affirmative steps to ensure nondiscrimination in employment against disabled persons. Contractor's decisions regarding the delivery of services under this Agreement shall be made without regard to or consideration of race, age, religion, color, gender, sexual orientation, national origin, marital status, physical or mental disability, political affiliation, or any other factor which cannot be lawfully used as a basis for service delivery.Contractor shall not engage in or commit any discriminatory practice in violation of City of Miami Beach Ordinance No 92.2824 in performing any services pursuant to this Agreement. 113 2. NON-DISCRIMINATION. The Proposer certifies that it is in compliance with the non- discrimination clause contained in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to equal employment opportunity for all persons without regard to race, color, 'religion, sex or national origin. In accordance with the City's Human Rights Ordinance. codified in Chapter 62 of the City Code, Proposer shall prohibit discrimination by reason of race, color, national origin, religion, sex, intersexuality, gender identity, sexual orientation, marital and familial status, and age or disability. 55. Project Records: City shall have the right to inspect and copy, at City's expense, the books and records and accounts of Contractor which relate in any way to the Project, and to any claim for additional compensation made by Contractor, and to conduct an audit of the financial and accounting records of Contractor which relate to the Project and to any claim for additional compensation made by Contractor. Contractor shall retain and make available to City all such books and records and accounts, financial or otherwise, which relate to the Project and to any claim for a period of three (3) years following Final Completion of the Project. During the Project and the three (3) year period following Final Completion of the Project, Contractor shall provide City access to its books and records upon seventy-two (72) hours written notice. 56. Performance Evaluations: An interim performance evaluation of the successful Contractor may be submitted by the Contract Administrator during construction of the Project. A final performance evaluation shall be submitted when the Request for Final Payment to the construction contractor is forwarded for approval. In either situation, the completed evaluation(s) shall be forwarded to the City's Procurement Director who shall provide a copy to the successful Contractor. Said evaluation(s) may be used by the City as a factor in considering the responsibility of the successful Contractor for future bids with the City. 57. Occupational Health and Safety: In compliance with Chapter 442, Florida Statutes, any toxic substance listed in Section 38F-41.03 of the Florida Administrative Code delivered as a result of this bid must be accompanied by a Material Safety Data Sheet (MSDS) which may be obtained from the manufacturer. The MSDS must include the following information: a. The chemical name and the common name of the toxic substance. b. The hazards or other risks in the use of the toxic substance, including: i. The potential for fire, explosion, corrosion, and reaction; ii. The known acute and chronic health effects of risks from exposure, including the medical conditions which are generally recognized as being aggravated by exposure to the toxic substance; and iii. The primary routes of entry and symptoms of overexposure. 114 c. The proper precautions, handling practices, necessary personal protective equipment, and other safety precautions in the use of or exposure to the toxic substances, including appropriate emergency treatment in case of overexposure. d. The emergency procedure for spills, fire, disposal, and first aid. e. A description in lay terms of the known specific potential health risks posed by the toxic substance intended to alert any person reading this information. f. The year and month, if available, that the information was compiled and the name, address, and emergency telephone number of the manufacturer responsible for preparing the information. 58. Environmental Regulations: The City reserves the right to consider a Bidder's history of citations and/or violations of environmental regulations in investigating a Bidder's responsibility, and further reserves the right to declare a Bidder not responsible if the history of violations warrant such determination in the opinion of the City. Bidder shall submit with its Bid, a complete history of all citations and/or violations, notices and dispositions thereof. The nonsubmission of any such documentation shall be deemed to be an affirmation by the Bidder that there are no citations or violations. Bidder shall notify the City immediately of notice of any citation or violation which Bidder may receive after the Bid opening date and during the time of performance of any contract awarded to it. 59. "Or Equal" Clause: Whenever a material, article or piece of equipment is identified in the Contract Documents including plans and specifications by reference to manufacturers' or vendors' names, trade names, catalog numbers, or otherwise, City, through Consultant, will have made its best efforts to name at least three (3) such references. Any such reference is intended merely to establish a standard; and, unless it is followed by the words "no substitution is permitted" because of form, fit, function and quality, any material, article, or equipment of other manufacturers and vendors which will perform or serve the requirements of the general design will be considered equally acceptable provided the materials, article or equipment so proposed is, in the sole opinion of Consultant, equal in substance, quality and function. ANY REQUESTS FOR SUBSTITUTION MUST BE MADE TO THE CITY'S PROCUREMENT DIRECTOR, WHO SHALL FORWARD SAME TO CONSULTANT. 115 ATTACHMENT C CONSULTANTS RESPONSE TO THE (ITB) Detail by FEI/EIN Number Page 1 of 2 D oepanmenl of State r Division m Corporations / Search Records / Detail Bo Document Number/ Detail by FEI/EIN Number Florida Profit Corporation METRO EXPRESS, INC. Filing Information Document Number P96000096781 FEI/EIN Number 65-0711071 Date Filed 11/21/1996 State FL Status ACTIVE Principal Address 9442 N.W. 109 ST MEDLEY, FL 33178 Changed. 02/16/2010 Mailing Address 9442 NW. 109 ST MEDLEY, FL 33178 Changed.02/16/2010 Registered Agent Name&Address TRASOBARES, DELIO A 9442 N.W. 109 ST MEDLEY, FL 33178 Address Changed:02/16/2010 Officer/Director Detail Name&Address Title P TRASOBARES, DELIO A 9442 N.W. 109 ST MEDLEY, FL 33178 Title S TRASOBARES, DELIO A 9442 N.W. 109 ST MEDLEY, FL 33178 http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetai I?inq... 7/25/2018 Detail by FEI/EIN Number Page 2 of 2 Title T DANIEL,TRASOBARES 9442 N W. 109 ST MEDLEY, FL 33178 Annual Reports Report Year Filed Date 2016 01/25/2016 2017 01/06/2017 2018 01/16/2018 Document Images 0916/2018—ANNUAL REPORT View image in PDF format 0'10612017 -ANNUAL REPORT View image in PDF formal 01e25,2016 ANNUAL REPORT View Image in POF formal 01/06/2015 ANNUAL REPORT View image in PDF format OUl 3/2014 ANNUAL REPORT View image in PDF format 01'1812013 ANNUAL REPORT View image in PDF formal 01/0412012—ANNUAL REPORT View image in POI formal 01/06/2011—ANNUAL REPORT View image in PDF format 02/162010—ANNUAL REPORT View image in PDF format 03111,2009 -ANNUAL REPORT View image in POF format 01/04/2000—ANNUAL REPORT View image in PDF format 02/02/2007—ANNUAL REPORT Viewimage in PDF format 0'/10/2006—ANNUAL REPORT View image in PDF formal 0110412005—ANNUAL REPORT View image in PDF formal 01,09/2004 ANNUAL REPORT View image in PDF fonr.at 01109/2003—ANNUAL REPORT View image in PDF format 01/142002—ANNUAL REPORT View image In POE ormal 01,25/2001—ANNUAL REPORT View image in PDF format 01/142000—ANNUAL REPORT View image in PDF format 03/0211999—ANNUAL REPORT View Image In POF format 01/28/1998—ANNUAL REPORT View image In PDF format 02/26/1997—ANNUAL REPORT View image in PDF format 1921,1996—DOCUMENTS PRIOR TO 1097 View image in POF formal http://searc h.sunbiz.org/Inqu iry/CorporationSearc h/S earchResu ltDetai l?inq... 7/25/2018 A,,I BEACH SECTION 0300 PROPOSAL SUBMITTAL INSTRUCTIONS AND FORMAT 1. SEALED BIDS. One original Bid Proposal (preferably in 3-ring binder) must be submitted in an opaque, sealed envelope or container on or before the due date established for the receipt of bids. Additionally, three (3) bound copies and one(1) electronic format(CO or USB format) are to be submitted,with the original submission or within two(2) days of request by the City. The following information should be clearly marked on the face of the envelope or container in which the bid is submitted; Bid Number, Bid Title, Bidders Name, Bidder Return Address. Bids received electronically,either through email or facsimile, are not acceptable and will be rejected. 2.BID PROPOSAL The Bid Proposal is to include the folbwing: • TAB 1 — Cost Proposal Form (Appendix E). The Cost Proposal Form (Appendix E) shall be completed mechanically or, tt manually, in ink. Cost Proposal Forms submitted in pencil shall be deemed non- responsive.All corrections on the Cost Proposal Form shall be initialed. FAILURE TO SUBMIT THE MOST RECENT COST PROPOSAL FORM (EITHER INCLUDED IN THE ORIGINAL ITS OR RELEASED VIA AN ADDENDUM' MAY RESULT IN DID BEING DEEMED NOT RESPONSNE AND NOT BEING FURTHER CONSIDERED. • TAB 2 Bid Certification,Questionnaire and Affidavits(Appendix A). The City reserves the right to request any documentation omitted,with exception of the Cost Proposal Form (Appendix E),Proposal Certification,Questionnaire&Requirements Affidavit(Appendix A),and Bid Bond(if applicable). Bid Submittals received that do not include the Cost Proposal Form, completed as required and fully executed, or Bid Bond (0 applicable) shall be deemed non-responsive. Bidder must submit any omitted documentation within three(31 calendar days upon request from the City,or the bid may be deemed non-responsive. Non-responsive bid packages will receive no further consideration. 3.LATE BIDS.Bid Proposals are to be received on or before the due date established herein for the receipt of Bids. Any Bid received after the deadline established for receipt of proposals will be considered late and not be accepted or will be returned to Proposer unopened. The City does not accept responsibility for any delays, natural or otherwise. ITB 2018-033-ND 17 APPENDIX A Proposal Certification , Questionnaire & Requirements Affidavit ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 ITB 2018-033-ND 18 Sdkbl*NA adMake NE 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete,and Striping of City Streets and Parking Lots ProoaamentCMtat Td: Emal: Natalia Delgado 305673-7000 x6263 nataliadelgadothmiamibeach8.gov PROPOSAL CERTIFICATION,QUESTIONNAIRE&REQUIREMENTS AFFIDAVIT Purpose: The purpose of this Proposal Certification, Questionnaire and Requirements Affidavit Form is to Inform prospective Proposers of certain solicitation and contractual requirements, and to collect necessary information from Proposers in order that certain portions of responsiveness, responsibility and other determining factors and compliance with requirements may be evaluated. This Proposal Certification, Questionnaire and Requirements Affidavit Form is a REQUIRED FORM that must be submitted fully completed and executed. 1. General Proposer Information. FIRM NAAE: MC4,0 FR Ors.t3 S..4 • NO,OF YEARS IN BUSINESS: NO.CF YEARS IN RUSwESS LOCALLY: NO.CF EMPLOYEES'. 22 -f22.Ewt 7t- OTNERNAME(S)PROPOSER HASOPERATED UNDER IN THE LAST 10 YEARS: FM PRIMARY ADDRESS(HEADQUARTERS): 8442 N W 10 W-14 Sr cnP Hadley STATE: FL zvC ; 33118 TELEPHONE NO.: 3os- 83r 1310 TOLL FREE NO.: • FAX NO.: 0 S 132') FIRM Lace AnEREss: 4 9 N2 -+ v 0 S'"v nr^e.a.T CITY, Med IF.y STATE: L ZIP : DOE .]317 8 PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT: 6..7.4e2 rQ re ite/eND ACCONT REP TELEPHONE NO: ,JoS'883-' 135J ACCOUNT REP TCU.FREE NO.: ACCOUNT PEP MEL .C o m g f�600 e- .� a>``,oa FEDERAL TM CERTIFICATION NO: GS- 071 I O7 The City reserves the right to seek additional information from Proposer or other source(s),including but not tinted to:any fmm or pnndpal information, amicable Ikansure,resumes of relevant indhiduab.diets inio mabon,financial information,or any inWmabon the City deems necessary b evaluate the capacity of the Proposer to perform in accordance kWh contract requires. ITB 2018-033-ND 19 1. Veteran Owned Business.Is Proposer daring a veteran oared business stabs? 'ES "zL NO SUBMITTAL REQUEEMENT:Proposers claiming veteran owned business status shall mist a donmenlation proving that firm Is certified as a veteran-waned busiiess or a servkedlsh ed veteran caned business by the State of Florida or United States federal goverment as required pursuant to anllnerhce 2011.3748. 2.-' Financial Capacity. When requested by the City, each Proposer shal wage for Dun & Bradstreet to submit a Supplier Ouse ficaton Report(SUR)directly to the Procurement Contact named herein.No proposal x411 be considered without receipt by the City, of the SUR directly torn Dun &Bradstreet. The cost of the preparation of the SOR shal be the responsibility of the Proposer.The Proposer shall request the SUR repot from D&B at hrerellsurrollemaithrthb.serithrebearecsistoresIservilenumelerPortaffistorelds11594 Proposers are responsible for the accuracy of the Information contained in Its SUR It's highly recommended that each Proposer review the Information contained In Its SUR for accuracy prior to submittal to the City ad a early as possible In the solklfetlon process.For assistance with any podkn of the SCR submittal process,contact Dun&Bradstreet et 800.4242496. SUBMITTAL REQUIREMENT: Proposer shall request that Dun & Bradstreet submit its Supplier Doak!Report directly to the City,ath hid orwithin three(3)days of request 3. / Conflict Of Interest All Proposers must dsdae,in their Proposal,the name(s)of any officer,rbrecor,agent,or Immediate family member(spouse,parent sibling, and child)who is also an employee of the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns,either directly or indirectly, an interest of ten(10%) percent or more in the Proposer entity or any of its affiliates. SUBMITTAL REQUIREMENT: Proposers must disdme the name(s)of any officer,director, agent or immediate famry member (spouse,parent,stung,and child)who is also an employee of the City of Miami Beach. Proposers must also disclose the name of any City employee who owns,ether directly a Indirectly, en retest of ten 110%)percent or more it the Proposer entity or any of its affiliates. 4. References&Past Performance.Proposer shall submt at last three(3)references for whom the Proposer has completed work similar it size and nature as the work referenced in solicitation SUBMITTAL REQUIREMENT: For each reference submited,the following Informatlah is required: 1) Firm Name, 2) Contact Individual Name&Title,3)Address,4)Telephone,5)Contact's Email and 6)Narrative on Scope of Services Provided. 5. I Suspension,Debarment or Contract Coalition.Has Proposer ever been debated,suspended or other legal violatkn,or had a contract cancelled due to ronitormance by natio sector agency? YES Y NO SUBMITTAL REQUIREMENT: If answer to above is'YES,Proposer shall submit a statement deleting the reasons that led to action(s). 6. / Vendor Campaign Contributors. Proposers are encoded to be or beans familiar with the Cry's Capita Finance Reform laws, as codified in Sedan 2-487 through 2-490 of the City Code. Prepoars shall be safely responsible ler ensuring that all applicable pevisims of the City's Campagn Finance Reform laws am complied with,and that be subject to any and all sanctions, as prescribed therein,including disqualification of their Proposals,in the event of such non-compliance. SUBMITTAL REQUIREMENT: Submit the names of all individuals or entlies(including your sub-consultants)with a controlling financial Interest as defined In solicitation.For each individual or entity with a controlling financial interest Indicate whether or not each individual or entity has contributed to the campaign either drecdy or indirectly.of a candidate who has been elected to the office of Mayor or City Commissioner ler the City of Miami Beach. 7. i Code of Business Ethics.Pursuant to City Resolution No.2000-23679,each person a entity that seeks to do business wih the City shall adopt a Code of Business Ethiaa ('Code') and submit that Code to the Procurement Department with its proposalhesponse or within five(5)days upon receipt of request.The Cade shag,at a minimum,requie the Proposer,to comply wt SI applicable governmental rules and regulations including. among others, the conflict of interest baying and ethics provision of the City of Miami Beach and Miami Dade County, ITB 2018-O33-ND 20 SUBMITTAL REQUIREMENT: Proposer shat submit ferns Code of Business Ethics. In lieu of submitting Code of 8usiress Ethics,Proposer may whom a statement indicating that It Si adopt,as required in the ordinance.Me City of Miami Beach Code of Ethics.available al hitt:lowseemumibeadl0.oovlcM-IwlUpmcuremenhbrocurement-related-on9nance-and-oroceduresl benefit .. . benefits, _ ... bandit 9. Equal Benefits for Employees with Spouses and Employer with Domestic Partners.When awarding cempettively solicited contracts valued at over 3100,000 whose contractors maintain 51 or more fou lime employees on their payrolls during 20 a mon calendar work weeks,the Equal Benefits(or Domestic Pahxrs Ordinance 2005-3494 requires certain contraSn doing business with the City of Miami Beach,who are awarded a contact pursuant to competitive proposals,to provide*Equal Benefits'to their employees with domestic partners, as they provide to employees*4h spouses. The Ordinance applies to ail employees of a Contractor who work within Me City limits of the City of Miami Beach,Eked.and the Contractors employees located Si the United Slates, but outside of Me City of Miami Beach limas,who are directly performing work on the contract within the City of Miami Beach. A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of employees? YES EMI NO B. Does your company provide or offer access to any benefits to employees with(same or opposite sex)domestic partners*or to domestic partners of employees? }( YES MI NO C. Please check all benefits that apply to your answers above and list in the "other section any additional benefits not already specified. Note:some benefits are provided to employees because they have a spouse or domerc partner,such as bereavement leave:other benefits are provided direly to the spouse or danestic partner,such as medical insurance. BENEFIT Finn Provides for Finn Provides for Firm does not Employer with Employees with Provide Benefit Spouses Dcrnestic Partners Neale ✓ Sick Leave ✓/ Family Medical Leave ✓ ?amassment Leave lit 2018-033-NO 21 If Proposer cannot offer a benefit to domestic partners because of reasons outside your control, (e.g.,there are no ireurance providers n your area Willing to offer domestic partner coverage)you may be eligible for Reasonable Measures toughens.To comply on this bail you must agree to pay a ash equivalent and submit a completed Reasonable Measures Applia8on (attached)with all necessary documentation.Your Reasons Measures Appfation wM be reviewed for consideration by the City Manager,or his designee.Approval is not guaranteed and the City Managers decision is final. Fuller information on the Equal Benefits requirement is available at htfo:llwwImiamipesdMAovldry-haltlbrocurementrdOGuenvnt-relatedadinant;e-and- proceduresi 10. / Public Entity Crimes.Section 287.133(2)(a).Florida Statutes,as currently enacted a as amended from time to time,stall that a person or affiliate who has been placed on the convicted vendor IS following a conviction fa a public way mime may not submit a proposal,bid,or reply on a combed to provide any goods or sellas to a pubic eery;may not submit a proposal,bid,or reply on a contract with a pudic entity for the mnstruction or repair of a public building or pudic work;may not submit proposals,bids,or repfas on leases of real property to a public entity;may not be awarded a perform work as a cemrddor,suppler.subcontractor.or constAnnt under a contract with any public miry;and may not transact business with any public entity In excess of the threshold amount provided in s.287.017 for CATEGORY TWO M a period of 36 months following he dale of being placed on he convicted vendor list. SUBMITTAL REQUIREMENT:No additional submittal Is required.By virtue of executing the affidavit doamem, Proposer agrees with the requirements of Section 287.133,Florida Statutes,and certifies 4 has not been placed on convicted vendor list 11. j Non-Bsalminaecn.Pursuant to City Ordinance No.201E 3900,the City shall not enter into a canbad with a business unless the business represents that it does not and viii not engage in a boycott as defined in Section 2.375(a)of the City Code,Including he bladdisbng,diveshg from,or otherwise refusing to deal with a person or entity when such action is based on race.color,national orlon,reigion,sats Intersexuality,gender identity,sexual orientation,marital or familial status,age or disabiity. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit documerd,Proposer agrees it is and shal remain in MI mmdiamce with Section 2-375 of the City of Miami Beach City Code. 12. Moratorium on Travel to and the Purchase at Goods or Services from Nome Carolina and MWtufppi. Pursuant to Resolution 2016-29376. the City of Miami Beach. Florida prohibits official City travel to the states of North Carbine and Mlaslasippl.as well as the purchase of goods or services sauced in Not Carotta and Mississippi. Proposer shall agree that no travel shall occur on behalf of the City to Nat Carolina or Mississippi,nor shall any product or service it provides to the City be soacaiad from these stales. SUBMITTAL REQUIREMENT:No additional srbmiftal is required.By dine of executing this affidavit document,Proposer agrees itis and shag remain in kill amphoras with Resolution 2016.29375. 13� Fair Chance Requirement.Pursuant to Section 2.376 of tie City Code the City shat not enter into any contract resulting from a competitive solicitation, unless the pmpour certifies in wining that the business has adopted and employs written aides, prectes,and standards that are consistent with the Ciys Far Chance Ordnance set forth in Article V of Chapter 62 of he City Code ('Fair Chance Ordinance'), and which, among other things. (i)prohibits City contractors, as an employer.from inquiring about an applicant's criminal history until the applicant is given a conditional offer of employment (ii) prohibits advertising of employment positions with a statement that an individual wih a criminal record may not apply for the posi6M,and(ii)prohibits plating a statement on an employment applbMdn that a person with a criminal record may not apply for the position. SUBMITTAL REQUIREMENT:No additions submittal S required at this lime.By virtue of executing this affidavit Proposer certifies that it has adopted policies,practices and standards consistent with the Citys Fair Chance Ordinance, Proposer agrees to provide the City with supporting documentation evidencing m compliance upon request Proposer further agrees that any breech of the representations made herein shall cadfbde a material breach of contract,and shat enlile the City to he immediate termination for cause of the agaement,in addition to any damages that may be available at law aid in equity. 14. Acknowledgement of Addendum. Alter issuance of solicitation,the City may release one a more addendum to the solicitation which may provide additional lolamelon to Proposers or alter solicitation requirements. The City will strive to reach every Proposer having received solicitation trough the Ciys e-procurement system, PublIcPurhase.am. However. Proposers are solely responsible for assuring they have received any and all addendum issued pursuant to solicitation.This Adcrawiedgement of Addendum section certifies that the Proposer has received an addendum released by the City pursuant to his soicin8on.Failure to obtain and acknowledge receipt of MI addenda may result in proposal disquatttaaon. ITB 2018-033-ND 22 NW b Coen; FlA b Calm Imir to Canem Root a% Addendum I Addendum 6 Addendum 11 Addendum 2 Addendum 7 Addendum 12 Addendum 3 Addendum 8 Addendum 13 Addendum 4 Addendum 9 Addendum 14 Addendum 5 Addendum 10 Addendum 15 If additional confirmation of addendum a required,submit under separate Dover. The remainder of this pane was left Intentionally blank ITB 2018-033-ND 23 The solidlathn referenced herein is being furnished to the recipient by the City of Ngani Beach(ter'City')for the recipient's convenience. My action taken by the City in response to Proposals made pursuant to this SOidIaSn,or in making any award,or in failing or refusing to make any award pursuant to such Proposals,or in cancelling awards. or in W7draMng a cancetfing this solicitation,outer before a after issuance of an award,shall be without any liability of obligation on the part of the City. In is sole discretion,the City may withdraw the solicitation either before or after receiving proposals,may accept a reject proposals,and may accept proposals which deviate from the splictata',as it deems appropriate and in as best interest.In its sole disaetion,the City may determine the qualifications and acceptability of any parry a parties submitting Proposals in response to this solicitation. Following submission of a Bid or Proposal, the applicant agrees to cleaver such further details. information and assurances, including financial and *closure date, relating to the Proposal and the applicant including, without limitation, the applcanfs affiliates, officers, directors,shareholders.partners and employees,as requested by the City in its discretion. The infatuation comaned herein is provided solely fa the convenience of prospectus Proposers. It is the responsibikty of the redolent to assure itself that information contained herein is accurate and complete.The Cid does not provide any assurances as to the wormy of any information n this solicitation. My reliance on these canteens,or on any permitted communications with City officials.shat be at the recipients awn risk,Proposers should rely exclusively on their own investigations.interpretations,and anayse&The station is being provided by the city without any warranty or representation,express a implied,as to its content,its accuracy,a its completeness.No warranty or representation is made by the City or is agents that any Proposal conforming to these requirements will be selected for consideration,negotiator,or approval. The City shall have no obligation or liability vwth respect to this solicitation,the selection and the award process,a whether any award will be made.My recipient of this sanitation win responds hereto Nty acknowledges al the provisions of this Disclosure and Dlsdalmer,is rot* relying on this Disclosure and Disclaimer,and agrees to be bound by the terms hereof.My Proposals submitted to the Civ pursuant to this solicitation are submitted at the sole risk and responsibility of the party submitting such Proposal. This solicitation is made subject to correction of errors,antssions.or withdrawal from the market without notice.Informations for guidance only,and does not constitute al or any pat of an agreement. Toni City and all Proposers will be bard only as, if and when a Proposal (a Proposals), as same may be modified, and the applicable definitive agreements pertaining thereto, are approved and executed by the parses, and then only pursuant to the terms of the definitive agreements executed among the partes.My response la this solicitation may be accepted or rejected by the City for any reason,or for no reason,without any resultant lability to the City. The City is governed by the Govemment•n-the-Sunstine Lay,and al Proposals and supporting documents shall be subject to disclosure as required by such law, Al Proposals shall be submitted In sealed proposal form and shall roman confidential to the extent permitted by Florida Stables,unci the date and time selected for opening the responses.At that time,all documents received by the City shay become public reams. Proposers are expected to make at disclosures and declarations as requited in this sanitation.By subnasion of a Proposal,the Proposer arlcnowledges and agrees that the City has the right to make any inquiry or investigation a deems appropriate to substantiate or supplement inlormation contained in the Proposal,and auledzes tie release to the City of any and al ihfonnaton sought in such inquiry or investigation. Each Proposer certifies that the information contained In the Proposal is true, accurate and complete, to the best of is knowledge, information,and belief. ����� Notwithstanding the foregoing or anything contained In the solicitation,all Proposers agree that n the event of a final u na9ipe^�^.1J.judgment by a court of competent junsacfmn which imposes on the City any liability arlsing out Of this sonctadon,or any response thereto,or any action or radion by the City with respect thereto,such lability shat be limited to$10,000.00 as agreed-upon and liquidated damages.The previous sentence, however, shall not be construed to circumvent any of the other provisions of this Disclosure and Disclaimer which imposes*liability on the Cty. In the event of any differences n language between this Disclosure and Disclaimer and the Mance of the sdictation,it is understood that the provisions of this Disclosure and Disclaimer shall always govern.The sondtation aid any disputes wising from the solicitation shall be governed by and construed ii accordance with the laws of the State of Florida. 1113 2018-033-ND 24 I hereby certify that; I, as an authorized agent of the Proposer, am submitting the following information as my firms proposal; Proposer agrees to complete and unconditional acceptance of the terms and conditions of this document, inclusive of this solicitation,all attachments,exhibits and appendices and the contents of any Addenda released hereto, and the Disclosure and Disclaimer Statement; Proposer agrees to be bound to any and all specifications, terms and conditions contained in the solicitation, and any released Addenda and understand that the following am requirements of this solicitation and failure to comply will result in disqualification of proposal submitted; Proposer has not divulged, discussed,or compared the proposal with other Proposers and has not colluded with any other Proposer or party to any other proposal; Proposer acknowledges that all information contained heron is part of the public domain as defined by the State of Florida Sunshine and Public Records Laws; all responses,data and information contained in this proposal, inclusive of the Pro.. al Certification,Duasttonnare and -: uirements Affidavit are hue and accurate. Nene of Prepays,Allotted Reeeasaey,9: rile d Proems"Auwufea Repwed^.. �. .J CJ ft? ifc-/:c:q.vu 7 rc ,cr Ma...g•r Seeded al PrepodiAlsered P(1pmmmSe: Dec ) st8 Stated FL ) Ont isr i day of Ma. 2oic personalq appeared before me{inr • io County of „etee,.\-n.t. ) stated that (s)he is the Q. of Serfaistiry a corporation,and that the Instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said instrument to be its voluntary act and deed, re me; ic r the of My mission Wren u1• Eddie Panda aaeaal Ayecan ew.o' tem Mplr$22 Ma3 ITB 2018-033-ND 25 REFERENCES City of Miami Beach Olga Sanchez,E.I.,LEED AP,Capital Projects Coordinator 777 17 Street Suite 300,Miami Beach, FL 33139 Ph.: 305-673-7000 x 2567/Fax: 786-394.5359/Cell: 786-367-7253 glgasor-hez@miamibeachfl_gov • Scope of Work Provided: Drainage, Landscaping, Irrigation, Water Main, HardScape, Milling and resurfacing,Striping City of Miami David Adato, P.E.,Construction Manager City of Miami—Capital Improvements Program Miami Riverside Center 444 SW 21a Ave.,8th Floor Miami, FL 33130 Ph.: 305-416-1899/Cell: 786-376-4391 dddatoopmiamgov.com • Scope of Work Provided: Drainage,Water Main, HardScape, Milling and Resurfacing,Striping, Town of Medley Jorge Corzo,Town Engineer 7777 NW 72"e Ave. Medley, FL 33166 Ph.! 305-887-9541 icor zratowno f me d l ev.com Scope of Work Provided: Drainage,Landscaping, Irrigation,Water Main, Hardscape, Milling and Resurfacing, Striping and Add-A- Pave Install. City of Miami Peach Mattew Lepera, Public Works/Civil Engineer 451 Dade Blvd. Miami Beach, FL 33139 Ph.: 305-673-7000 matthewlepera@miamiheachfl.gov Scope of Work Provided: • Milling and Resurfacing. MIAMI BEACHProcurement Department 1755 Meridian Ave,30 Floor, Miami Beach,Florida 33139 www.miamibeachfl.gov EXHIBIT A Revised Cost Proposal Form THE REVISED COST PROPOSAL FORM IS REQUIRED TO BE SUBMITTED WITH THE PROPOSAL ITS No.2018-033-ND Addendum#1 :1212018 II • MIAMI B EAC HProcurement Department 1755 Meridian Ave,3u Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov REVISED APPENDIX E COST PROPOSAL FORM TIn - ,c sub,n , iucrn.Inc E Cat Prnpon ii Form. in its cnmuty sad dully executed by the deo11 eo ect.:bllshed for the rnc¢ipt of proposols,...,,DI fe5cut in proposal 6vir4 deemed nmi•mcpe cive:nt beim rnlecteri Bidder affirms that the prices stated on the proposal price form below represents the entire cost of the Items in full accordance with the requirements of this ITS, inclusive of its terms, conditions, specifications and other requirements stated herein, and that no claim will be made on account of any increase In wage scales, material prices, delivery delays,taxes,insurance,cost indexes or any other unless a cost escalation provision is allowed herein and has been exercised by the City Manager in advance. The Cost Proposal Form (Appendix E)shall be completed mechanically or,if manually, in ink, Cost Proposal Forms(Appendix E)completed in pencil shall be deemed nonresponsive. All corrections on the Cost Proposal Form(Appendix E)shall be initialed, nV: Ile Getauplv;,; Oaa„Ii1J t.Cosl CONCRETE CUREINOISIDEWALK CONSTRUCTION-Contractor proposes to punish all labor,matedat equipment supervision, mobilization and demobilization costs, maintenance of traffic including of duty police officers, if necessary, and transpodeern necessary for concrete curbing/sidewalk construction on en as•needed bests tar the City of Miami Beach In accordance wit the bid epedacations. 1 Remove and Replace 4'Concrete Sidewalk 3000 SF $ y.,ro I i s too.o0 Remove and Replace 4'Concrete Sdwak with additional equipment(where no dump 2 duck or container may be used) 3,000 I SF $ 'i.7r $ IV, Z$o.00 3 Remove and Replacer'Concrete Sidewalk 3,000 SF ,$ r. eo $ ir3ao.00 Remove and Replace 6"Concrete Sidewalk with addldonai equipment(where no dump 4 truck or container may be used) 3,000 SF $ SVS $ ib.3ro.00 5 Remove and Replace 24'-30'Curb8 Gutter. 1,000 LF $ n-ro $ /7,4-0,2.00 8 Remove and Replace 36'-42'Curb&Gutter 1,000 LF $ 2-1 SO $ 21 4-00.0 0 7 Remove and Replace 8'x12•Curb 11,000 LF _$ 13 00 $ /13, eou.0 0 • Cast in Race American Disabilities Act(ADA) 8 Mate Yellow/Grey 40 EA 1 Soo•00 $ rz 000.co 9 Surface Armed ADA Mats Yellow/Grey 40 EA $ Soo•00 $ ie,000.00 10 Conine,4'Concrete Sidewalk 3,000 SF I $ •r.do $ I s,roo.00 Construct 4'Concrete Sidewalk with additional equipment(where no dump ruck or 11 canteiner may be used) T 3,000 SF $ y_ro $ t3,roo.00 12 Construct 6"Concrete Sidewek 0,000 SF $ S..ro $ It 2oo.00 Construct.6'Concrete Mew*with add6oM equlpment(where no dump ruck or 13 container may be used) 3.000 SF $ c. Yr $ /6, aro.ors 14 ConsWdIB'Curb&Gutter 3,000 IS $ fl-oo $ Sr rnc.00 15 Construct 24'Curb&Gutter 3,000 LF $ rw. oc $ $ 7 ay.°a 16 Construct30'Curb&Gutter 3,000 LF $ 24.0r) $ 63, osu.00 17 Canstud61x12'Concrete Curb 3,000 LF $ 13.00 $ 2e 000.00 18 Construct Pedestrian Ramp 12 EA $ 2 .roo.00 _ $ 301000.00 Upcherge for Eche Strength Concrete(4000 19 psi) 1000 CF 1 $ I-To $ r.roo.00 • ITE No.2018-033-ND . Addendum#1 522018 MIAMI B EAC HProcurement Department 1755 Meridian Ave,3d Floor, Miami Beach,Florida 33139 vimi.miamibeachfl.gov 20 Addition of Miami Beach Red Coloring Mixture 4,000 CY S 2 .00 $ R .000.DO 21 Pavement Restoration 3,000 SF $- s.00 $ rS 000.00 22 Furnish and Install New Pavers 1,000 SF $ 4.00 $ 6- o oo.0 0 23 Remove and Reset Existing Pavers 1,000 SF $ 2.Oo S 9 000.00 24 Furnish and Install 1'Meter Pox 50 EA $ zoo.oo 8 /0,000.00 25 Furnish and Install 1 .5'Meter Box 50 • EA $ 2so.4o $ rx TO 0 28 Futnhh and Install 2'Motor Box 50 EA $ 3co.o0 $ /S, 0017.00 27 Furnish end Install 3'Meter Box 50 EA $ so o.00 $ z.r 000.0 0 28 Furnish and Install Sewer Clean Out Box 50 EA $ J0o.00 I / St 000.00 29 Furnish and Install Electrical Box 10 EA $ 300.00 $ 3 Don. 00 • 30 Install Hand Rails 100 LF I 600 0 $ 6, 0 oo.00 31 Removeand Re-lace Exist t Pavers 1 000 SF $ 3 .S0 $ 3.Mo.00 T, I. Irma 1caaipunr 7icnml J]L1 U.ii C:-cr - MILLING & RESURFACING OF ASPHALT CONCRETE - Contractor proposes to furnish all labor, material, equipment supervision, mobilization end demobilization mists, maintenance of traffic Including off duty police officers, if necessary, and transportation necessary to mil and resurface asphalt concrete on an as-needed basis for Me City of Miami Beach In accordance with the hid apexification. 32 Rowed LlmeroMEase+l-3Inches 25,000 CY $ 11 .00 $ 27S,000.0o 33 Remove and replace B inch LlmerocK base 25.000 CY $ 12.on $ Soo 000.oO 34 New Umerocx a inch base 25,000 CY $ r.r.o o $ 3-vs 000.00 '� 35 Roads-0.200 Tons Leveling Course 1,000 TN $ rvo.o¢ $ tiro coo.00 36 Roads-200+Tons Leveling Course 1,000 TN $ 1'10.0 o $ /Yo 000.00 • 37 Intersections-0-200 Tons Leveling Course 500 - TN $ rvo -oo $ 20t 000.00 38 Intersections-200+Tons Leveling Course 500 TN $ 140.00 $ 7o 000.oC 39 FDOT Type III-Richert Concrete 12,000 TN $ 1 So.00 $ / goo 000.O0 40 Adjust Manhole and%or Valve Poxes 50 EA I $ 11 S,00 $ R.yro.00 41 Adjust Manacle 50 EA $ 7pp.017 $ .o,oao.00 42 Replace Manhole Rim and Cover 50 EA. $ Joo.00 $ to 000.00 43 Adjust Valve Boxes 50 FA $ r-rs.00 $ 9, ,so.o0 44 Regace Valve Box Cover/Meer 50 EA $ r 1 s. o o $ , o.o o 45 Replace Traffic Loops(4,6.81oops1 10 FA $ to ons.co $ .no 000.00 Saw Cutting&Permanent Patching w/Base& 46 Roller Compaction-1'Removal&Patching 200,000 LF $ Ne.So S 9o0000-00 SawCuffing&Permanent Patching wl Base 8 47 Ratter Compaction-2'Removal 8PMchHp 200,000 LF $ 6.So $ i Soo 000.00 48 Mine Existing Asphalt Concrete-1'Cut 12,000 SY $ I . 0o $ zr Aoo•oo 49 _ Milling Existing Asphalt Concrete-2'Cut 12,000 BY $ 2.So $ ao 000.00 50 Maing Existing Asphalt Concrete-3'Cut 12,000 SY $ Z- 90 $ 9k Aoo.00 51 MBI ExiaBn at Concrete-4'Cut 12,000 SY $ .zS $ S/ 000.00 STRIPING OF CRY STREETS• Contracts proposes to famish all labor, malarial, equipment supervision, nadfizeton and demobilization costs, maintenance of traffic Indudng o8 duly police officers, If necessary,and transportation necessary to stripe streets on an as-needed basis for the City of Miami Beads In amordance Alm bid apexification. 52 I Themaplestic4'Solid Yellow/While 15,280 I LF I $ I.'7S I $ 3,960.0o ITB No.2018-033-ND • Addendum#1 5/2J20i8 M I A k ^Y/ ,IBE C H Procurement Department 1755 Meridian Ave,3d Floor,Miami Beach, Florida 33139 www.mlamlbeachfl.gov • 53 4'Solid YellowMbite Paint 5,280 LF $ •7S $ 3.960.00 54 Themoplesdc 4'Skip Write 5280 LF 8 I.00 $ S 2-ao.00 55 Themoplastic 4'Skip Yellow 5280 LF $ 1.oo $ s- 2 80.0 0 56 4'Skip Yellow/White Pahl 5,280 IF $ .go $ a r I z•00 57 Themoplesfic 6'Solid White 5,280 IF $ 1. 2 Ea $ 6,236.0o 58 Themoplesao6'Solid Yellow 5,260 LF $ 1 .zo $ 4,234.60 59 6'Solid Yellow/white Paint5,250 LF $ . S0 $ z 640.o° 60 Thor 6'Skip Wide 5,280 LF $ 1 . 20 $ 6,316.00 81 Themories&6'Skip Yellow 5,280 LF $ i -z, $ 4,336.00 62 6'Skip YeIbwMblle Paint 5280 LF $ . So $ 2,4 00.0 0 63 Themaplastic8"Solid While 5280 LF $ 1 .6o $ B, test. oQ.• 64 Themoplastic 8'Solid Yellow - 5,280 IF $ I As $ .4 7rz.o0 65 8'Sokd Yellow/Wilts Paint 5,280 LF 5 i . to 3 Bo Elmo 66 Themaplestic 12'Solid White 5280 LF $ 2.00 $ e0 no.60 67 Themopiasticl2'Solid Yellow 5,260 LF $ 2.00 $ /04-60.00 68 1P Solid Yellow/Rite Paint 5,280 LF $ • 40 $ 73-2.00 69 Themoplasdc 18'Solid White 5260 LF $ 2. 60 $ 13 7 3.8.00 70 Themopleslic 18'Solid Yellow 5.260 LF $ z .40 $ f 3, 728.0 0 71 18'Solid YellovoWhite Paint 5,290 LF $ t . zo $ c}3 6.00 72 Themoplasfic 24'Solid While 5280 LE $ 3 . 90 $ z3. 692.00 73 Themoplasbc 24'Solid Yellow 5280 IF $ 3 •qt.) $ 20 5457..0 0 74 24'Solid Yellow:White Pant 5280 IF $ A.to $ /e 3,49.0o 75 RPMs(Road Reflector) 500 EA $ s.00 $ 2 roo•vD ThennegaSOS Mows 14'(Std,MDC&FDOT 76 Specs) 50 EA $ 010.00 $ Hiro0.00 Arrows 14"(Std.MDC&FOOT Specs)White 77 Paint 50 EA 3 40 .00 $ 2 000.00 78 Them epasUc Handicap Logo&Blue Stripe 5 EA $ 700.00 $ i. oo0.00 79 Handicap Logo&Blue Stripe Paint 5 EA $ no.00 $ Sro.oo Removal of ALL Existing Thermo Striping 80 (hydroblesq • 1,000 . _ SF $ 8 .00 $ A 000.00 81 Bicycle Pavement Marking 50 EA $ i 76.00 $ R 1.5-o-00 92 Therm99plastIc Messages 50 EA 3 » S.00 $ r3, 73-0.00 83 Paint Messages 50 EA 5 iao .00 $ b, 000.0o 84 Installation of New Traffic 'tri 10 EA $ 274-.Oo $ 2 7s0.100 in. . STRIPING OF PARKING LOTS •Contractor proposes to furnish all labor, matedS,equipment supervision, mobilization and demobilization coats,maintenance of traffic including of duty police officers,if necessary,end transportation neceasery to shipe parking lob on an as-needed basis for the City of Miami Beach in accordance with the bid specifications, 85 Thermoplastic Slop Bars 112'Wide) 160 LF $ 3 .to $ 5723-.oO 88 Stop Bars(12'Wide)White Paint 150 LF I 1 . to S zzr.00 . Thermoplastic Arrows 14'(Std.MDC&FOOT 87 Specs) 50 EA ,l O0.00 $ .9, roo.00 Arrows 14'(Std.MDC&FOOT Specs)White 88 Paint 50 EA $ 4 0.0 0 $ z o oo.OD ITB No.2018-033-NO Addendum#1 5/2/2018 ' MIAMI BEACHProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachf.gov 89 Thermoplastic Cross Hawing(121 200 LF $ 2 . z S $ tiro.o 0 90 Cross HaldUng(127 YAM Paint 200 LF $ , 94o $ /B o.O Q 91 Thermoplastic Handicap Logo&Blue Stripe 30 FA $ zoo .o o $ 6. 000.00 _ 92 Handicap Logo&Blue Strife Pant 30 EA $ oo $ 3,200.00 93 ThBnnoga$IC Disable Cross Hatching(4') 160 EA $ 'oo . o a $ i0 0 00,00 94 Disable Cross Hatching(4')Paint 180 EA $ 75-.00 $ Iz, ooe.0o 95 Wheel Slop Installation 200 EA 3 3-5-. 00 $ $ 000.00 96 . Installation of New Traffic Sign 10 EA $ z 75-.00 3 z,sso.o0 • Birlrler'S Aifhnutiuo dempery: MK-O 6x Pre++ Zd AUIhWN aeprnmhfV9: ['IC,. D Addmis: 9Yk12- do 0T4 ATrm7 Mrf/iyy_fl 33 old 1Wplere: 3 0 r-99,r- /130 EmM: et.6o0 U' b0.1,c0•GOn. AutSda.prwe itte%SCmhot • The remainder alibis page was left Intentionally blank. • ITS No.2016-033410 Addendum#1 5/2/2018 Procurement rtment MIAMI BE AC H1755 Meridian Ave, 3 d Floor,Miami Beach,Floridada33139 w Ntmiamibeach6.gov ADDENDUM NO.1 INVITATION TO BID NO.2018-033-ND FOR THE PURCHASE OF CONCRETE CURBING/SIDEWALK CONSTRUCTION, MILLING AND RESURFACING OF ASPHALT CONCRETE,AND STRIPING OF CITY STREETS AND PARKING LOTS(the ITS) May 7,2018 This Addendum to the above-referenced ITS is tissued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The ITB is amended in the following particulars only(deletions are shownby stdkethrough and additions are underlined). • I. ITS DUE DATE AND TIME. The deadline for receipt.of submittals Is extended until 3:00 p.m.. Monday,May 14 2018,at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue,3"Floor -Miami Beach,Beach,Florida 33139 Late submittals will not be accepted. Proposers ere cautioned to pan sufficient time to allow for Paffic or other. delays for which the Proposer Is solely responsible. II. REVISION: Delete In its entirety reference to the cost of law enforcement officers being provided es a pass-through cost only(Section 1.5.8.4, on page 39 of the ITS, Section 21.16.4, on page 52 of the ITS,and Section 2.2.4.3 on page 56 of the ITS). W. REVISION:Delete Appendix E,Cost Proposal Form,on page 61-64 of the ITB,In its entirety and Replace with Revised Appendix E,Cost.Proposal Foran,attached hereto as Exhibit A. THE REVISED.COST PROPOSAL FORM IS REQUIRED TO BE SUBMITTED WITH THE PROPOSAL FAILURE TO SUBMIT THE REVISED COST PROPOSAL FORM WITH THE PROPOSAL SHALL DEEM PROPOSER NON-RESPONSIVE. IV. ATTACHMENTS. Exhibit A:Revised Appendix E,Cost Proposal Form. V. RESPONSES TO QUESTIONS RECEIVED. 01: Does the city have any provisions for contract price adjustments in the event of price escalations for concrete and steel? • Al: Please refer to Appendix D,Special Conditions,2.1Option to Renew with.Price Adjustment. Q2: Different municipalities with similar contracts Include a mobilization line item for concrete work. It has been brought to my attention that numerous city departments utilize the concrete sidewalk contract to either replace small amountsof sidewalk flags or install site furnishing pads that are 2 cubic yards or less, Would the city consider Including a mobiization line Item for such occurrences? A2: The unit cost provided by the bidder in Appendix E Cost Proposal Form,should include all labor, material,equipment,supervision,mobilization and demobilization costs. ITS No.2018-033-ND Addendum#1 5/7/2018 MIAMI B EACHProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach,Florida 33139 www.miamibeachfl.gov Q3: Will the City be awarding contractors by bid group or individual line Items? A3: Following the review of bids and application of vendor preferences, the lowest responsive, responsible bldder(s) meeting all terms, conditions, and specifications of the ITB wilt be recommended for sward by Item,bid group,or for the entirety of all bid Items,as deemed in the best Interest of the City. Q4: - MI sign and sealed shop drawings be required for railings? A4: Signed and sealed shop drawings will be required for railings. , Q5: Will certified MOT plans be reimbursed? A5: Please refer to Section II. of this addendum. The unit cost per line item shall Include all labor, material, equipment, supervision, mobilization and demobilization costs, maintenance of traffic Including off duty police officers, If necessary, and transportation necessary for concrete curbinglsldewalk construction on an as-needed basis for the City of Miami Beach In accordance with the bid specifications. • Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below,with a copy to the City Clerk's Office at RafaelGranado@miamibeachttgov Contact Telephone: Email: Natalia Delgado 305-673-7000 ext 6263 natailadeloadoemiemibeachfl.aov Proposers are reminded to acknowledge receipt of this addendum as part of your ITB submission. Polenhal proposers that have elected not to submit a response to the ITB are requested to complete and return the'Notice to Prospective Bidders' questio naire with the reason(s)for not submitting a proposal, SI 1 , ^ AI Den' 1pv,/`l,_/-~ P re Director PLEASE BE REMINDED THAT THE REVISED COST PROPOSAL FORM IS REQUIRED TO BE SUBMIT TED WITH THE PROPOSAL • • it ITH No.2018-033-ND - Addendum#1 5/7/2018 BID BOND Travelers Casualty and Surety Company of America Hartford, CT 06183 CONTRACTOR: SURETY: (Name, legal status and address) (Name.legal status and principal place of business) Metro Express,Inc. Trivden Casualty and Surety Company of America 9442 NW 109th Street,Ste. 100 2420 Lakemont Avenue, 2nd Floor Medley,FL 33178 Orlando,FL 32814 OWNER: (Name, legal status and address) City of Miami Beach 1755 Meridian Ave.,3rd Floor Miami Beach,FL 33139 BOND AMOUNT: 5%(Five Percent of Amount Bid) PROJECT: (Name,location or address,and Project number, !f any) For the purchase of Concrete Corning/Sidewalk Construction,Milling and Resurfacing of Asphalt Concrete and Striping of City Streets and Parldng Lots ITB No.2018433-ND The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves,their heirs,executors,administrators,successors and assigns,jointly and severally,as provided herein. The conditions of this Bond arc such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents,or within such time period as may be agreed to by the Owner and Contractor,and the Contractor either(I)enters into a contract with the Owner in accordance with the terms of such bid,and gives such bond or bonds as may be specified in the bidding or Contract Documents,with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid,then this obligation shall be null and void,otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents,and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty(60)days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall he deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein.When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. The Company execution this bond vouches that this document conforms to American institute of Architects Document A310,2010 edition • Signed and sealed this 10th day of May 7 2018 Metro Express,Inc.C // "OA:. (Seal) r�:. A.T r.s OL.i) Iec);t9.w.'L (Wrines.) (Title) Trace n uuJ t sodeveryCo i any of Amides ', I1fVII ar (Sur tchael A.Bonet ( � (Seal) Attorney-I.'Fact&Florida Resident Agent 'Messpk/44/ 6 • Oa (Title) LEThe Company executing this bond vouches that this document conforms to American Institute or Architects Document A010,2010 2 edition WAfwW u.TI IIS POWER OF All DISNEY IS INVALID WITHOUT IHE RED BORDER + POWER OF ATTORNEY TRAVELERS J Farmington Casually Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc, Travelers Casualty and Sully Company of America St.Pad Fitt and Marine Insurance Cucnpany tinned Stairs Fidelity and Guaranty Company St.Paul Guardian InwpTOPe Company Attorney-In Pact No. 132508 Gmireale No. 007326809 KNOW ALL MEN BY THFSE PRESENTS teat Farmington Casualty Company,St. Paul Fire and Murine Insuranec Company,St. Paul Guardian Montanan Company,Si.Paul Mercury Incurantt Company.Travelers Casualty and Surety Company.Travelers Casualty and Surety company of America,and United Suite. Fidelity mid Guaranty Company arc corporations duly organized under the laws of the Sure of Connecticut.shut Fidelity and Guaranty Romance Company is a corprarion duly organized under the laws of me.State of Iowa,and that Fidelity ann Guaranty Insurance Underwriter:.Ise..is a corporation duly organized under the laws of the Slate of Wixconxin(herein collcctivdy called the"Companies"),and that the Companies do hereby make,cunstitute and appoint Michael A.Bonet,and Roy V.Fabry of the City of Miami .-.State of Florida _,their true and lawful Atmrncy(s)-in.Faot, each in their separate capacity if more than one n named above.to sign.execute,Foal and acknowledge any and all bonds.recognizan:es.cvmditiotal undertakings and other wntingM obligatory in me nature thereof on behalf of the Companies in their business of gnmamecing the fidelity of persons,guaranteeing the perfonnanen of contracts and executing or guaranteeing bonds and nadeeakings required or permitted in any ,tions or paeedings allowed by law. IN WITNESS WHEREON,the Companies have caused tiffs inurement be sign d and tie r cotjmatc scab to be.hereto affixed,Was__. - Bth. day of August _ , 2017 _ Farmington Casualty CompanJ ..r - St.Pad Mercury Insurance Company Fidelity and GaarnniylthpmnteComPaa7,' Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Lod rwritmv Inc Oaveters Casualty and Surety Company of America St.Pam Fire and Marine Insurance Company United Stites Fidelity and Guaranty Company St.Paul Guardian Insurance Company Flu ra. I man . f . 44 9 On �' asAL1 88L mm �' State of Connecticut By ^f+i '/�'/ City of Hartford o. Rolm%L.Raney.Senior Vice PrcMdent On this Wm 8th day of August _ 2017 ,bctorc me per,o'udly appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company,Fidel try and Onaranty Insurance Underwriter,.Inc..St.Raul Fire and Marine Insurance Company.Sit.Paul Guardian lusammce Company,S.Paul Mercury lniumnce Company:Premiers iers Casualty and Surety Company.Town-leis Connally and Surely Company of America,and United States Fidelity and Clammy Company,and that M.o such.being authorized so to do,executed the foregoing instrument for the purposes Umtata contained by signing on behalf of the//he/corporations by himself as a duly authorized officer. rI In Witness Whereof,I hereunto set my hand and official weal. a7 QIP C My ConmdsMion expires the 30th day of June.21121. ♦ /(p * Made C.Tareatilt,Notary Public 58440-5-16 Printed in U.S A. WARNING:THIS POWER OF ATTORNEY IS INVALID WRHDUT THE RED BORDER ATTACHMENT D INSURANCE REQUIREMENTS APPENDIX F 1 ; .,� ) _ j1 � y Insurance Requirements ITB 2018-033-ND For the Purchase of Concrete Curbing/Sidewalk Construction, Milling and Resurfacing of Asphalt Concrete, and Striping of City Streets and Parking Lots PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 ITB 2018-033-ND 65 MIAMI BEACH INSURANCE REQUIREMENTS This document sets forth the minimum levels of insurance that the contractor is required to maintain throughout the term of the contract and any renewal periods. XXX 1. Workers' Compensation and Employer's Liability per the Statutory limits of the state of Florida. XXX 2. Comprehensive General Liability (occurrence form), limits of liability $ 1,000,000.00 per occurrence for bodily injury property damage to include Premises/ Operations; Products, Completed Operations and Contractual Liability. Contractual Liability and Contractual Indemnity (Hold harmless endorsement exactly as written in "insurance requirements' of specifications). XXX3. Automobile Liability - $1,000,000 each occurrence - owned/non-owned/hired automobiles included. 4. Excess Liability- $ .00 per occurrence to follow the primary coverages. XXX 5. The City must be named as and additional insured on the liability policies; and it must be stated on the certificate. 6. Other Insurance as indicated: _Builders Risk completed value $ .00 Liquor Liability $ .00 Fire Legal Liability $ .00 _Protection and Indemnity $ .00 Employee Dishonesty Bond $ .00 _Other $ .00 XXX 7, Thirty(30)days written cancellation notice required. XXX 8. Best's guide rating B+:VI or better, latest edition. XXX 9. The certificate must state the proposal number and title The City of Miami Beach is self-insured. Any and all claim payments made from self- insurance are subject to the limits and provisions of Florida Statute 768.28, the Florida Constitution, and any other applicable Statutes. ITB 2018-033-ND 66