Loading...
453-2003 RDA ResoRESOLUTION NO. 453-2003 A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE REDEVELOPMENT AGENCY OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING FUNDS, IN THE AMOUNT OF $5'10,000, FROM THE REDEVELOPMENT AGENCY (RDA), TAX INCREMENT 1998 BONDS, SERIES B, FOR THE CONSTRUCTION OF THE CITY OF MIAMI BEACH REGIONAL LIBRARY STREETSCAPE AND THE COMPLETION OF THE STREETSCAPE AROUND THE MIAMI CITY BALLET; SAID FUNDS TO BE USED FOR A CHANGE ORDER TO THE CONTRACT BETWEEN THE TOWER GROUP AND THE CITY OF MIAMI BEACH, FOR THE CONSTRUCTION OF THE REGIONAL LIBRARY. WHEREAS, on September 23, 1998, the Mayor and City Commission adopted Resolution No. 98-2904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A. M. Stern Architects (Stern) for the architectural and engineering design of a Regional Library, a 400-space Parking Garage and Park and Streetscape Improvements in the area surrounding Collins Park; and WHEREAS, on November 2, 2001, the Regional Library documents were advertised for bid and six bids were received on December 19, 2001; and WHEREAS, on April 10, 2002, the City Administration recommended the Tower Group for award of the construction contract for the Project and the Mayor and City Commission approved the recommendation and adopted a Resolution awarding the contract to the Tower Group; and WHEREAS, the City has obtained several proposals for the construction of the streetscape areas surrounding the Library including the remaining areas around the Miami City Ballet not completed when the Bass Museum and the Ballet building were constructed; and WHEREAS, Homestead Concrete & Drainage, is the lowest of those received, including the proposal received from The Tower Group to self-perform the work and what appears to be a lower bid from Downrite Engineering and Development Corporation, but which bid does not cover the entire area of proposed work; and WHEREAS, the proposal recommended by the City Administration for the construction of the streetscape surrounding the Library and the Miami City Ballet is for $510,000, and is proposed to be issued as a change order to the contract between the City and The Tower Group for construction of the Regional Library; and WHEREAS, this approach has additional advantages in that it allows continuity in the construction of the streetscape in unison with the construction of the Library building and makes the Tower Group responsible for the installations and for coordinating both projects, as well as for the schedule of completion; and WHEREAS, the amount proposed and accepted by the City Administration is consistent with the costs previously paid for the areas around the Bass Museum and Miami City Ballet, and is competitive for this type of installation; and WHEREAS, on the basis of the design requirements, the need to complete the streetscape installations for the Regional Library, and the need to maintain consistency throughout the Collins Park Cultural Center, the Executive Director concurs with the City Administration and recommends that the chairman and members of the RDA appropriate funding for same, in the amount of $510,000, to be funded from City Center Redevelopment Agency funds. NOW THEREFORE, BE IT DULY RESOLVED BY THE CHAIRMAN AND MEMBERS OF THE REDEVELOPEMENT AGENCY OF THE CITY OF MIAMI BEACH, FL., that the Chairman and Members herein, appropriate funds, in the amount of $510,000, from the Redevelopment Agency (RDA), Tax Increment 1998 Bonds, Series B, for the construction of the City of Miami Beach Regional Library Streetscape and the completion of the Streetscape around the Miami City Ballet; said funds to be used for a change order to the contract between The Tower Group and the City of Miami Beach for the construction of the Regional Library. PASSED and ADOPTED this ATTEST: CITY CLERK T:~AGENDA~2003~nay2103\regular~Streetscape Resolution RDA.doc AYOR APPROVED AS TO FORM & LANC~IAG~ & FOi I CITY OF MIAMI BEACH REDEVELOPMENT AGENCY ITEM SUMMARY Condensed Title: A Resolution of the Chairman and Members of the Redevelopment Agency of the City of Miami Beach, Florida, approving an appropriation, in the amount of $510,000, for a change order to the Tower Group, for the streetscape installations surrounding the Regional Library Project. Issue: Shall an appropriation, in the amount of $510,000, be approved for a change order to the Tower Group to do the construction of the streetscape installations around the Regional Library? Item Summary/Recommendation: The City has obtained several proposals for the construction of the streetscape areas surrounding the Library and also to complete the installations around the Miami City Ballet not installed when the Bass Museum and the Ballet building were completed. By constructing these areas now, the streetscape installations surrounding the three principal buildings in the Collins Park Cultural Center will be completed and only those areas related to the Collins Park project will be remaining. The proposal recommended by staff for the construction of the streetscape surrounding the Library and the Miami City Ballet is for $510,000 and will be issued as a change order to the Tower Group. Staff has recommended this approach because it allows continuity in the construction of the streetscape in unison with the construction of the Library building. This approach also makes the Tower Group responsible for the installations and for coordinating both projects as well as for the schedule of completion. The streetscape project consists of the installation of new sidewalks, landscaping, irrigation, lighting and electrical installations, and street fumiture such as benches, trash receptacles and bicycle racks. The installations will be the same as those completed around the Bass Museum area and the portion in front of the Miami City Ballet building and will maintain the consistency and continuity of the Stern design for the complete Collins Park Cultural Center area. The amount proposed and accepted by staff is consistent with the costs previously paid for the areas around the Bass Museum and Miami City Ballet and are competitive for this type of installation. On the basis of the design requirements, the needs to complete the streetscape installations for the Regional Library, and the need to maintain consistency throughout the Collins Park Cultural Center, the Administration recommends approval of the appropriation and a change order to the Tower Group, in the amount of $510,000, to be funded from City Center Redevelopment Agency Advisory Board Recommendation: The Construction sub-committee of the Cultural Center Oversight Committee has recommended award. Financial Information: Amount to be expended: Funds: $510,000 RDA City Center Redevelopment Funds Finance Dept. ~,~ $510,000 City Clerk's Office Legislative Tracking: I Jorge E. Chartrand Si n-Offs: PDW AGENDA ITEM DATE CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 REDEVELOPMENT AGENCY MEMORANDUM TO: FROM: Chairman and Members of the l~ami Beach Redevelopment Agency Jorge M. Gonzalez~L~_ E)ecutive Director DATE: May 21, 2003 SUBJECT: A RESOLUTION OF THE CHAIRMAN AND MEMBERS OF THE REDEVELOPMENT AGENCY OF THE CITY OF MIAMI BEACH, FLORIDA, APPROPRIATING FUNDS, IN THE AMOUNT OF $510,000, FROM THE REDEVELOPMENT AGENCY (RDA), TAX INCREMENT 1998 BONDS, SERIES B, FOR THE CONSTRUCTION OF THE CITY OF MIAMI BEACH REGIONAL LIBRARY STREETSCAPE AND THE COMPLETION OF THE STREETSCAPE AROUND THE MIAMI CITY BALLET; FUNDS TO BE USED FOR A CHANGE ORDER TO THE TOWER GROUP CONTRACT FOR THE CONSTRUCTION OF THE REGIONAL LIBRARY. ADMINISTRATION RECOMMENDATION: Adopt the Resolution. FUNDING: Funding is available from the Redevelopment Agency (RDA). ANALYSIS: On September 23, 1998, the Mayor and City Commission adopted Resolution No. 98-22904, authorizing the Mayor and City Clerk to execute an Agreement with the firm of Robert A. M. Stem Architects (Stem) for the architectural and engineering design of a Regional Library, a 400-space Parking Garage and Park and Streetscape Improvements in the area surrounding Collins Park. On November 2, 2001, the Regional Library documents were advertised for bid. Six bids were received on December 19, 2001. An Evaluation Committee reviewed the three lowest proposals, which were within the budget constraints of the Project. The Project at that time did not include the Parking Garage but two surface parking lots instead. The evaluation consisted of checking on the submitted schedule of values and comparing it against the project estimates as well as the references, financial status and other criteda showing the quality and ability of the bidders. After extensive reviews, site visits and discussions with the Committee, the City Commission, and Stern staff, the Administration recommended the Tower Group for award of the construction contract for the Project. On April 10, 2002, the Mayor and City Commission approved the recommendation and adopted a Resolution awarding the contract to the Tower Group. The Tower Group has performed very well on the Project and is nearing completion of the intedor and exterior work. Due to the continued quality performance of The Tower Group, staff is recommending that a Change Order be approved to The Tower Group to construct the adjacent streetscape previously designed by Stem pursuant to their Agreement. This would provide the Library project and its surroundings with a "finished" look and would relieve the necessity of having RedevelopmentAgencyMemorandum May 21, 2003 Reg~nalL~rary Page 2 to return to the Library site at a later date to commence construction of the sidewalk. It should be noted that this request for Change Order falls into the category of an "Owner's Request" for additional work. The current Library project does not have the proposed streetscape work within its scope as at the time the work was bid, the plan was to have the streetscape constructed by either an independent contractor or by the contractor that would construct the proposed Collins Park renovations. Based on the current timing for the Collins Park construction (estimated for FY 2005), the logistical challenges of bringing a second contractor to the site immediately following the library completion, the potential disruption to the Cultural Campus operations of maintaining the separation of the Library and the Streetscape projects, and the quality work of The Tower Group, it is in the City's interest to add this work to the current Regional Library Project. As an alternative, and although staff does not believe there is an appreciable advantage to doing so, the proposed Change Order work could be done by a separate contractor, or with the Collins Park Project as it is not a necessary component of the Regional Library project. It simply makes sense to perform this previously planned work now. By constructing these areas now, the streetscape installations surrounding the three principal buildings in the Collins Park Cultural Center will be completed and only those areas related to the Collins Park proper will be remaining. An amendment to the Stern Agreement for the park portion of the Cultural Center Project is currently being negotiated with Stern by the Administration and a recommendation for approval will be submitted to the Mayor and City Commission at an upcoming Commission meeting. The City has obtained several proposals for the construction of the streetscape areas surrounding the Library including the remaining areas around the Miami City Ballet not completed when the Bass Museum and the Ballet building were constructed. The chosen proposal from Homestead Concrete & Drainage, is the lowest of those received, including the proposal received from The Tower Group to self-perform the work (although there appears to a be a lower bid from Downrite Engineering and Development Corporation, this bid does not cover the entire area of proposed work). The Tower Group has agreed to utilize Homestead as a sub-contractor and to coordinate the work. Finally, Homestead was the contractor that completed the first phase of the streetscape work around the Bass Museum of Art and a portion of the Miami Ballet. The proposal recommended by staff for the construction of the streetscape surrounding the Library and the Miami City Ballet is for $510,000 and is proposed to be issued as a change order to The Tower Group. Additional advantages to this approach are that it allows continuity in the construction of the streetscape in unison with the construction of the Library building. This approach also makes the Tower Group responsible for the installations and for coordinating both projects as well as for the schedule of completion. The streetscape project consists of the installation of new sidewalks, landscaping, irrigation, lighting and electrical installations, and street furniture such as benches, trash receptacles and bicycle racks. The installations will be the same as those completed around the Bass Museum area and the portion in front of the Miami City Ballet building and will maintain the consistency and continuity of the Stern design for the complete Collins Park Cultural Center area. The amount proposed and accepted by staff is consistent with the costs previously paid for the areas around the Bass Museum and Miami City Ballet and are competitive for this type of installation. The Administration reminds the Mayor and City Commission that the previously approved Stern Master Plan and design for the area, distinguishes the Cultural Center by having Redevelopment Agency Memorandum May 21, 2003 Regional Library Page 3 specialty lighting and furniture which will be incorporated into the design of the Collins Park. The design also includes a special pattern for the sidewalks which is distinctive from other sidewalk patterns in the City and is more costly to install. On the basis of the design requirements, the needs to complete the streetscape installations for the Regional Library, and the need to maintain consistency throughout the Collins Park Cultural Center, the Administration recommends approval of the change order to the Tower Group, in the amount of $510,000, to be funded from City Center Redevelopment Agency funds. T:~GENDA~003~may2103~regular~-ibrary Streetscape Apropdation RDA.doc Doc. Control: 110.4.1 May15,2003 Via Fax (305) 674-4851 Mr. Greg Nicolay, Project Manager THE TOWER GROUP 300 23'd Street Miami Beach, Florida 33139 Re: Miami Beach Regional Library: Change Order Request No.33-Streetscape Proposal (Revised 5/9/03) Dear Mr. Nicolay: We have completed our review of Change Order Request No.33, dated May 5, 2003 submitted by The Tower Group for the Streetscape Improvements work. We find the proposed scope of work and dollar amount acceptable. A Change Order will be issued for this work to increase The Tower Group's Contract amount by $ 509,953.00. We would also like to address The Tower Group's contract modifications requested as part of the above mentioned COR as follows: COR Item No.I-URS Response: We are willing to recommend a time extension to the contract, provided the contractor submits sufficient documentation to justify the time extension request for our review and evaluation. The documentation should include but not be limited to an acceptable revised construction schedule incorporating the new work activities to show the actual impact on the remaining work. COR Item No.2-URS Response: All communications will be done in accordance with the contract documents for this project. COR Item No.3-URS Response: Any requests for retainage reduction shall be done in accordance with Article 4, Paragraph 4.2 of the contract agreement between the City of Miami Beach and The Tower Group. COR Item No.4-URS Response: We are willing to recommend a time extension to the contract, provided the contractor submits sufficient documentation to justify the time extension request for our review and evaluation. The documentation should include but not be limited to an acceptable revised construction schedule incorporating the new work activities to show the actual impact on the remaining work. COR Item No.5- URS Response: Payments for this work will be in accordance with the terms and conditions of the contract documents for this project. COR Item No.6-URS Response: It is extremely important to the City of Miami Beach to deliver the new facility, including the new streetscape improvements, on time. Cont. - 05/15/03 Letter to Greg Nicolay Miami Beach Regional Librar7 Change Order Request No.33 Therefore, we are ready to issue a Change Order to commence this work immediately. We urge The Tower Group to provide the information requested as part of our responses to Items No.1 and No.4 as soon as possible. Please proceed accordingly. Should you have any questions or require additional information please do not hesitate to contact me. Sincerely, URS Corporation P~'oject Manager CC: J. Chartrand, City of Miami Beach-tiP J. Borrelli, Borrelli & Associates The Tower Group 300 23rd Street Miami Beach, FL 33139 Phone: 305-674-4881 Fax: 305-674-4851 CHANGE ORDER REQUEST No. 00033 TITLE: Streescape Additional Scope Of Work PROJEC'~: Miami Beach Regional Library TO: , At~: Juan Poleo URS Corporation 700 S. Royal Poinciana Blvd ~-' Suite 1000 Miami Springs, FL 33166 Phone: 305-884-8900 Fax: 305-884-2665 DATE: 5/9/2003 JOB: 0207 CONTRACT NO: RE: COR To: URS From: TTG Number: 00033 ~i~'S~.Y~o'~ o ~oPos '~. ...... ;'~' ' ....... .:,.'. ,~.' ,~...",..-':. ,., .:.~,. ~..:' .,,~.:...:~,,~,-. ':.~' '...,~ ::...,,. ,::. : ... i' Styeetscapc Additional Scope Of Work: Scope of work pursuant to plans and specifications prepared by Borrelli & Associates dated ~'une 28, 2002 and attached proposal fiom CMB selected subcon~xactor Homestead Concrete & Drainage, Inc. Th~ Proposal shall include the following modifications to the Owner Contractor agreement between The Tower Gxoup, Inc. and The City Of Miarni Beach 1) The su'eetscape specified light f~xtures are a long lead item, portions of which are an imported item from Europe. Dehvery and installation of said fixtures shall be completed between the substantial cornpletion and fmal completion dates noted below. Every effort w~ll be made to have said fixtures installed by the substantial completion date. 2) All commumcations between the assigned subcontractor ( Homestead Concrete & Drainage, Inc.) shall b~ directly w~th Thc City of Miami Beach and or thier Consultants URS Corp, and or Borrelli & Associates. The Tower Group, Inc. shall be copied on ali correspondence, 3) Retainage reductions for the Libray portion oft.he work shall be based on completion dates for said work and ia no form or manaer be fled to the actual completion dates of the additional streescape work. In the event &late completion by the assigned streescape subcontractor, any liquidated damages attributable to the subcontractor shall be paid for by the subcontxactor. 4) Time duration for substaneial completion of the base contract duration shall be modified fi'om July 10, 2003 to August 22, 2003, fi.hal completion shall be September 12, 2003. 5) Payments to the assigned subcon~'actor shall be contingent upon written approvall of said subcontractors installed work to date by the City of Miami Beach sad or their CONSULTANTS. 6) No work will proceed until a Change Order Is Executed. oo001 Srr~t~cape scope of work 1.000 L3 $457,358.00 000% $0.0~ $457,358.0C pursuant to plar~ and specie, cations prepared by Botretli & A~sociates 00002 '['rG Bond (~ 2% 1.000 % $9,147.00 0.00% $0.00 00003 TrG Insurance ~ 2% 1.000 % $9,147.00 0.00% $0.00 $9,147.00 00004 CrC O&P (~ 7.5% 1.000 % $34,301.00 0.00% S000 $34,301.00 APPROVAL: ~ .~,~3regoryJ. N~colay RA Date:~O~f//~ By: Date: Juan Poleo · -The Tower Group 300 23rd Street Miami Brach, FL 33139 Phone: 305-674-4881 Fax: 305-674-4851 CHANGE ORDER REQUEST No. 00033 TITLE: Streescape Additional Scope Of Work DATE: 5/9/2003 PROJECT: Miami Beach Regional Library JOB: 0207 TO: ' Attn: JuanPoleo CONTRACT NO: UPS Corporation (~700 S. Royal Poinciana Blvd Suite 1000 Miami Springs, FL 33166 Phone: 305°884-8900 Fax: 305-884-2665 RE: COR To: URS From: TTG Number: 00033 · ~..!'!i, .:; ::I ':;",,":7 7.11:- . : ...... I~.::. : · . :7.:: '. ::'~' ': .i)~si~o~!O~ . Unit Cost: $509,953.00 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 Total: $509,953.00 APPROVAL:~ B y: ~ regory J. Ni olay, RA Date: By: Date: Juan Poleo HOMESTEAD CONCRETE & DRAINAGE, INC. P.O. Box 1273 Homestead, FL 33090 Phone (305)248-9649 Fax (305)248-9650 DATE: 4-8-03 FAX COVER TO: PHONE: FAX: ATTENTION: FROM: PROJECT: UR$ CORPORATION 3O5.-884-89O0 305-884-2665 JUAN A. POLEO GABRIEL HERNANDEZ MIAMI BEACH CULTURAL CAMPUS ENCLOSED: COPY OF PROPOSAL FOR ABOVE STATED PROJECT ENCLOSED ARE THE UPDATED PRICES FOR THE PRIORITY #1 PORTION. IF YOU HAVE ANY QUESTIONS GIVE ME A CALL. THANK YOU GABRIEL HERNANDEZ ESTIMATOR HOMESTEAD CONCRETE & DRAINAGE, INC. PROJECT NAME MIAMI BEACH CULTUIL~L CAMPUS 23 RD STREET AND COLLINS AVENUE OWNER: CITY OF MIAMI BEACH Liberty Avenue & 22 Street Miami Beach, FI. 33139 PROJECT MANAGER: URS CORPORATION 700 Royal Ponciana Blvd. Miam, FI. 33166 Homestead Concrete P.O. Box 1273 Homestead,FI 33090 Phone (305) 248-964g Fsx (305) 248-9650 Architect/Engineer HJ Roes and ASsociates (305) 567-1898 Gancedo Technologies, Inc. 601 S.W. 57 Ave. Suite "F" Miami, FI. 33144 Phone' (305) 265-1984 Fax (305) 269-8283 P.O. Box 12'73 H'omc,~M~ ,FL 33090 Phen~ (305)248-96~ Fmc (305)248-9650 HOMESTEAD CONCRETE & DI~INAGE, INC. Gancedo Technologies; Inc. . .': ./. L:' :..i ':.?. !:~'/JL. '.'. Ganc~lo T~hnolo$ies. " PROJECt: MIAIVfl BEACH CULTURAL CAMPUS 23RD STREET AND COLLINS AVI~NUE OWNER: CITY OF MIAMI BEACH PROPOSAL SCOPE OF WORK: FURNJSH ALL SUPERVISION, LABOR, MATERIALS AND EQUIPMENT TO COMPLETE: THE ELECTRICAL, DEMOLITION, LANDSCAPE AND HARDSCAPE AS PER THE FOLLOWING PLANS ENCOMPASSED: LI.7, Ll.g, I.,3. I, L3.2, LO. I, L4.2. L4.3, LS. I, L5.3. C1.7, CI ,$. El.7. El.I, E2. I, E2.2 PLANS DA'I'JNG TO 6-28.02' · .. INCLUDING BUT NOT LIMFFED TO: 4" COLORED CONCRETE PAVEbO~NT TEX'IURED WITH ~D~TA~ON3 ~R TILE. 6' ~ CONC~ I~ PAVEMENT TEX~ ~ SLIP JOlT AND INDENTA~ON5 ~MOV~ OF EXIS~NG SIDEWALK AND CU~ A~ INST~ON OF ~LOR~ CON~E ~ ~D OU l I ~g CONC~ HANDICAP ~PS AS P~ P~N$ AND SPECIFICA~S. REMOVABLE BOLLA~S AS PER ~A~S ( IN~UD~ EASE ~D CAP). 6' B~C~$ ~ P~ DETA~S ( INCLUDES 4 ~CHOR BOL~ WlT~ TA~ PR~F ~) ~2 G~ON T~SH ~ACLE ( INCLUDES I ANCHOR BOLT ~ TAMPER PR~F ASPH~T R~AIR FOR ~E ELEC~IC~ ~D D~L~ON WORK MI8C~LA~S ~T~AL SUCH AS ~AN$ION lO--AND JO~ A~ ~NFOR~NO MA~S ( WWM 6X6 10Xl 0, ~BAR ~C.) ~OV~ AND HAUL OFF OF E~S~G SIDEW~K AND CU~ AND GII~ER ALL LAND$C~E AND I~GA~ON ]~MS AS P~ PLANS AND $~ICA~S. ELECTRICAL SCOPE OF WORK Furnish ,,ti labor, equipmenk su~rvision, ~d materials for the electrical system as por plans El.7, El.B, E2. l, E2.2 md de,~d 12.22.1999 in~ludin~ bul not limited Io: Comld~;~e und=rfrouml sysmm for s~eet bgbtimt includin~ conduits, wires m~l pull boxcs. W/ms.nd ~znnin~tiofl ~or pull boxes and lights Fottur¢~. Li~Is ~xtu~cs insmllnt/oe s~l termination. Lights fixmret anchor bases ~cl t~rminaliom. Tr~chb~ ami back~JJi~8. New ekcffical service for prioriP/phase 002 including llghtir~8 control. New m~in feeder fro' I~e above service. (street crossinB) Rental Equipment. Asphal~ repair. Permlt fees. AS built drawings. Perfomnm:e bond fee not ineludcd. Prevnlins wases included. PERFORMANCE BOND NOT INCLUDED ~w mT~:P~ ~AA~ 88 'Jd~ . p : 'ON BNOHd ~9~NI~O ~ BIB~DNI]3 ~31SBWOH : wo~ 700 & Royal Poinciana ~BlwL Suite 1000 Miami Springs, FL 33266 305 884 8900 Tel 305 884 2665 Ic,,r Corporation Fax ~Number: (~ Charge IN'o: No. ofPages: ..~ Subject: This message is intended only for use of the individual or entity to which it is addressed, and may contain information that is privileged, confidential, and exempt from disclosure under applicable law. If the reader of the message is not the intended recipient, or the employee or agent responsible for delivering the message, you are hereby notified that any dissemination, distribution or copying of the communication is strictly orohibifed. If you have received this communication in error, olease notify us immediately bv teteohone and return the orioinal The Tower Group 300 23rd S~reet Miami Eeach, FL 33139 Phone: 305-674-488 I Faa: 305-674-4851 CHANGE ORDER REQUEST No. 00014 T1TLE: Sidewalk Renovation Proposal PROJECT: Miami Beach Regional Library TO: Attn: Juan Poleo URS Corporation 700 S. Royal Poinciana Blvd Suite 1000 Miami Springs, FL 33166 Phone: 305-884-8900 Fax: 305-884-2665 RE: COR To: U-RS From:TrG DATE: 11/20/2002 JOB: 0207 CONTRACT NO: 12 Number: 00014 As requested prepared by Boffelli & Associates as follows: L1.7 6/28/02 L1.8 6/28/02 L3. ! 6/28/02 L3.2 6/28/02 L4.1 6/28/02 L4.2 6/28/02 L4.3 6/28/02 L4.4 6/28/02 L5.1 6/28/02 L5.3 6/28/02 El.7 12/22/99 El.8 12/22/99 E2.1 12/22/99 E2.2 12/22/99 C1.7 11/30/99 C1.8 11/30/99 find herewith attached The Tower Group, Inc. proposal for the street scape work pursuant to plans and specification December 24th, 2002 update: See attached breakdown as requested in the designated work areas described in the URS RFP 1.0 Total scope o£wo~k 1.000 LS $761,173.59 0.00~ $0.00 APPROVAL: $761,173.59 By: Date: Gregory J. Nicolay RA By: Date: Juan Poleo This requested change proposal pursuant to specification section 01250 Part 1.4. D is valid for 90 days after such time the proposal is null & void. The propsed work included with this proposal will require a time extension to The Tower Group, Inc. base contract t/me. The required time extension can be determined based on an owners acceptance date of this proposal relative to the remaining duration of the base contract allowable time. The Tower Group 300 2~rd S({eet Miami Beach, FL 33139 Phone: 305-674-488 I Fax: 305-674-4851 CHANGE ORDER REQUEST No. 00014 TITLE: Sidewalk Renovation Proposal DATE: 11/20/2002 PROJECT: Miami Beach Regional Library JOB: 0207 TO: Attn: Juan Poleo CONTRACT NO: 12 URS Corporation 700 S. Royal Poinciana Blvd Suite 1000 Miami Springs, FL 33166 Phone: 305-884-8900 Fax: 305-884-2665 RE: COR To: URS From:TTG Number: 00014 DESCRIPTION OF PROPOSAL. i . ':: : .i Item ' D~riPfi6n ~ ~. :Stocl~ i 1 1 See atlached breakdoura area 0 0 $0.00 0.00% $0.00 $0.00 7-1.1 1.2 See attachod breakdown area 0 0 $0.00 0.00% $0.00 $O00 7-1.2 1.3 S~ attaci'~d breakdown area 8 0 0 $0.00 0.00% $0.00 $0.00 Unit Cost: $761,173.59 Unit Tax: $0.00 Lump Sum: $0.00 Lump Tax: $0.00 Total: $761,173.59 APPROVAL: By: Date: Gregory J. Nicolay RA By: Date: Juan Poleo 82/'84/2083 14:46 3052325386 DOWNRITE ENGINEERING PAGE 02 D0wnrite Engineering & Development Corporation 14238 SOUTHWEST 136 STREET, MIAMI, FLORIDA 33186 · PHONE: {30§) 232-2340 - FAX; [305) 232-5386 PROPOSAL p p t~ I TED T ;t ou[r, / .ANDY E UES s,~ SW 148TH AVENUE REVISED 12-12-02 954-476-3200 !~^~t FAX 954474-.3111 . --'[ - 07-Nov-02 Paae 1 of 5 Collins Avenue & 23rd Strret, Miami Beach, FL. DEMO: AREA 7 I 1.1 QUANTITY U/M DESCRIPTION UNIT PRICE EXTENSION 7,200 SF Remove & Haul Off Existing Sidewalk 720 LF Remove & Haul Off Existing Curb & Guffer 738 LF Sawcut Existing Asphalt 164 SY Remove & Haul Off Existing Asphalt 1 L,~ M.O.T. - Traffic Control (For All Work) 3.00 / SF $ 21,800,00 28.00 / LF $ 20,160.00 3.00 / LF $ 2,214,00 10.00 I SY $ 1,64000 5,000,00 / LS $ 5,000.00 SUBTOTAL: $ 50,814.00 PAVEMENT: AREA 7 / 1.1 QUANTITY U/I~,I DESCRIPTION 164 SY 1½" S-1 I Lift (Patch ~ Curb 2' Wide Only) UNIT PRJCE EXTENSION 25.00 / SY $ 4,100.00 SUBTOTAL: $ 4,100.00 CONCRETE: AREA 7 / 1.1 QUANTITY UIM DESCRIPTION 678 LF 24" Curb & Gutter 42 LF 2¢'Valley Gutter 1 LS Remedial Work for Curb Base Using Concrete 1 L,~; Asphalt Base Repair Along Curb Using Conc. UNIT PRICE EXTENSION 16,00 / LF $ 10,848.00 16.00 / LF $ 67200 5,000.00 / LS $ 5,000.00 3,000.00 / LS $ 3,000.00 SUBTOTAL: $ 1g,520.00 PAVEMENT MARKINGS: [THERMO) AREA 7 / 1.1 QUANTITY U/M DESCRIPTION 75 EA Preformed Crosswalk Stripes 10' Lg. - Less Than 2' Wide UNIT PRICE EXTENSION $ 162.00 / EA $ 12,150.00 SUBTOTAL: $ 12,1.50.00 Respectfully submitted, Downrlte Engineering & Development Corporation 8y Downrite Engineering & Development Corporation 14238 SOUTHWEST 136 STREET. MIAMi, FLORIOA 33186 . PHONE: (305) 232-2340 ' FAX: [305) 232-5386 PROPOSAL GROUP / RANO¥ SGUES s7~5 SW 148TH AVENUE D~ti~, ~I;~I~IDA 33325 954-476-3200 ~^~'hlAMI BEACH CULTURAL CAMPUS FAX g54-474-3111 ~1 07-Nov J32 2? s DEMO: AREA7 / 1.2 QUANTITY UIM DESCRIPTION UNIT PRICE 4,400 S; Remove & Haul Off Existing Sidewalk $ 440 Li-- Remove & Haul Off Existing Curb & Gutter $ 451 LI: Sawcut Existing Asphalt $ 100 SY Remove & Haul O~/Existing Asphalt $ 1 LS M.O.T. - Traffic Control (For All Work) $ 3.00 / SF $ 28.00 / LF $ 3.00 / LF 10.00 / SY $ 3,00000 / LS $ SUBTOTAL: $ EXTENSION 13,20000 12,320 oo 1,353 oo 1,000.00 3,000.00 30,873.00 PAVEMENT: AREA 7 / 1.2 QUANTITY U/M DESCRIPTION 100 S'Y 1¼"S-1 1Lift (Patch (~ Curb 2' Wide OnlY) UNIT PRICE $ 25,00 / SY SUBTOTAL: EXTENSION $ 2,500 O0 $ 2,5oo,oo CONCRETE: AREA 7 / 1.2 QU&NT/I'Y U/M DESCRIPTION 414 LI-- 24" Curb & Gutter 26 L]= 24" Valley Gutter 1 L',5 Remedial Work for Curb Base Using Concrete 1 L:S Asphalt Base Repair Along Curb Using Cenc. UNIT pI~IC E EXTENSION 16.00 / LF $ 6,624 O0 1600 / LF $ 41600 3,00000 / LS $ 3,00000 1,800 00 / LS $ 1,800.00 SUBTOTAL: $ 11,840.00 PAVEMENT MARKINGS: (THERMO) AREA 7 t 1.2 QUAN~'ITY UIM DESCNIPTION 116 EA Preformed Crosswalk Stripes 10' Lc. - Less Than 2' Wide BY UNIT PRICE EXTENEION 16200 / EA $ 18,79200 SUBTOTAL: $ 18.792.00 Respectfully submitted, Downrite' Engineering & Development Corporation Downrite Engineering & Development Corporation 14238 SOUTHWEST 138 STREET. MIAMI, FLORIDA 33186 · PHONE: (305) 232.234.0 - FAX: [305) 232-5386 PROPOSAL < ROU. / ND¥ E UES "'~5 SW 148TH AVENUE D~VI[[*, ~L~ORIDA 3332S 954.-476-3200 - lJ~" "^~IIAMI BEACH CULTURAL CAMPUS / ,, ~FAX954-474-3,,'I, 07.Nov~2 Pa~e 3 of 5 DEMO: AREA 8 QUANTITY U/M O£S(=RIPTION UNIT PRJCE EXTENSION 5.600 SF Remove & Haul Off Existing Sidewalk $ 3.00 560 LF Remove & Haul Off Existing Curb & Gutter $ 28.00 573 LF Sawcut Existing Asphalt $ 3.00 128 SY Remove & Haul Off Existing Asphalt $ 10.00 1 LS M.O T. - Traffic Control {For All Work) $ 4,000.00 SUBTOTAL: SF $ 16,800 00 LF $ 15,680 00 LF $ 1,719 00 SY $ 1.280 00 LS $ 4.000 00 $ 3g,479.00 PAVEMENT: AREA 8 QUANTITY UIM DESCRIPTION 128 SY 1 ¼" S-1 I L~ff (Patch ~;! Curb 2' Wide Only) UNIT PR. ICE $ 2500 SUBTOTAL: SY EXTENSION $ 3.200.00 $ 3,200.0o CONCRETE: AREA 8 QUANTITY U/M DESCRIPTION 528 LF 24" Curb & Gutter 32 LF 24" Valley Gutler 1 L',~ Remedial Work for Curb Base Using Concrete 1 U~ Asphal~ Base Repair Along Curb Using Conc UNIT PRICE 16.00 16.00 4,000.00 2,400.00 SUBTOTAL: EXTENSION LF $ 8,448.00 LF $ 512 O0 LS $ 4,000.00 LS $ 2,400.00 $ 15,360.00 PAVEMENT MARKINGS: (THERMO) AREA 8 QUANTITY U/M DESCRIPTION 70 EA Preformed Crosswalk Stripes 10' Lg - Less Than 2' Wide By UNIT PRICE EXTENSION $ 162.00 EA $ 11.340 O0 SUBTOTAL: S 11,340.O0 Respectfully submitted, Dow n rite 'Englnee ri n g & Development Corporation ay Downrite Engineering & Development Corporation 14238 SOUTHWEST 136 STREET, MIAMI, FLORIDA 33~86 · PHONE: ,1305) 232-2340 * FAX: f305) 232-5386 PROPOSAL 954-476-3200 s,,~)~ SW 148TH AVENUE MIAMI.BEACH CULTURAL CAMPUS c.~DAVi~_.FLORiDA~S~^~.z~ 33325 , [ FAX 954~174-3111 , Pa~e 4 of 5 SUMMARY: AREA 7 / 1.1 07-Nov~2 DEMO: AREA 7/1.1 PAVEMENT: AREA 7 I 1.1 CONCRETE: AREA 7 / 1.1 PAVEMENT MARKINGS: (THERMO) AREA 7 11.1 SURVEY: AREA 7 I 1.1 $ 50,§14.00 $ 4,100.00 $ 19,520.00 $ 12,150.00 $ 415.00 SUB-TOTAL AREA 7 / 1,1: $ 86,799.00 SUMMARY: AREA 7 / 1.2 DEMO: AREA 7 / 1.2 PAVEMENT: AREA 7 11.2 CONCRETE: AREA 7 I 1.2 PAVEMENT MARKINGS: (7HERMO) AREA 7 I 1,2 SURVEY: AREA 7 / 1.2 30,873,00 2,500,00 1,840.00 8,792.00 250.00 SUB-TOTAL AREA 7 / 1.2: "S 64,255.00 SUMMARY: AREA 8 DEMO: AREA 8 PAVEMENT: AREA 8 CONCRETE: AREA 8 PAVEMENT MARKINGS: (THERMO) AREA 8 SURVEY: AREA 8 39,479.00 3,200.00 5,360.00 1,340.00 335.00 SUB-TOTAL AREAS: $ 69,714.00 TOTAL COST THIS PROPOSAL: $ 220~.768.00 Respectfully submitted, Downrtte Engineering & Development Corporation Downrite Engineering & Development Corporation 14238 9OUTHWEST 136 STREET, MIAMI, FLORIDA 33186 · PHONE: .:305) 232-2340 · FAX: I305) 232-5366 PROPOSAL RANDY EC3UES s,~ SW 148TH AVENUE ~'~,~,~) i ~ ," ~:'l.z~ ~ ~ ~A 33325 JoB ~u[VIIAMI BEACH CULTURAL CAMPUS FAX g54-.474~,11 . 07-Nov-D2 Page 5 of 5 Plans by Robert A. M. Stern Architects, Inc Sheets L1.7, L1.8, dated 6-28-02. Sh,.,ets L51 and L52, dated 6-28.02 NOTES: 2 3 4 5 Permff Costs, bon~a, densities, proctors, impact fees, Not Included Removal or hauling of trash, debris hazardous materials, etc., Not Included. Adjust, remove, relocate existing utilities, Not Included, Fences, walls, gates, OVH. protection, utility pro~ection, not included. Only work included in this proposal is 261 crosswalks, all additional pavement marking not included, Proposa~ phased out per clients request. EGH F ~HOME-~ESTIMATINC;\0DRE & DEVELOPMENT - DIDSt[MIAMI SEACH CULTURAL CAMPUS - TOWER - REVISED 12-12~02 xlsJMAtN Respectfully submitted, Downrlte Engineering Development Corporation