Loading...
Amendment No. 37 to the Agreement with Fentress Architects in the amount of $50,320 ,;1-0/1i-0U:635 AMENDMENT NO.37 DUPLICATE ORIGINAL TO THE AGREEMENT BETWEEN of THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF$50,320 This Amendment No. 37 to the Agreement made and enteredthis2-i day of S , 2018, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as"Consultant" or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90% completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of $179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of $76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of $2,442,400 (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of$3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project(part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required of the Architect- 1 Engineer for the Project, in the total amount of$15,156,359 (part of Resolution No. 2015-28925); and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of$36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19th Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of$111,338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270; and WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of $49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$112,649; and WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291; and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark Construction, in the amount of$96,710; and WHEREAS, on December 20, 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions (RFIs), construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work, in the amount of$80,330; and WHEREAS, on December 20, 2016, Amendment No. 22 was executed for revisions to the construction documents as needed for artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program, in the amount of$17,121; and WHEREAS, on December 20, 2016, Amendment No. 23 was executed for additional structural engineering services due to non-conformances by Clark Construction, in the amount of$10,000; and 2 WHEREAS, on January 18, 2017, Amendment No. 24 was executed for additional design, permitting and construction administration services related to a new sanitary sewer lateral for the Carl Fisher Clubhouse, in the amount of$18,625; and WHEREAS, on May 5, 2017, Amendment No. 25 was executed for revisicns to the signage package, in the amount of$12,030; and WHEREAS, on May 5, 2017, Amendment No. 26 was executed for additional reviews of structural submittals and for design revisions associated with non-conforming field conditions, funded from a deductive change order to the Agreement with Clark Construction, in the amount of$15,580; and WHEREAS, on May 5, 2017, Amendment No. 27 was executed for design services to incorporate a new vertical circulation connection between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2, in the amount of 124,240, as approved by the City Commission on April 26, 2017 (Agenda Item R7T); and WHEREAS, on June 30, 2017, Amendment No. 28 was executed for design revisions associated with the relocation of the 19th Street pump station, in the amount of$2,585; and WHEREAS, on August 15, 2017, Amendment No. 29.was executed for design solutions for contractor- requested items related to closing non-conforming conditions related to RFI 3251, and for additional reviews of structural submittals, funded from a deductive change order to the Agreement with Clark Construction, in the amount of$30,875 ; and WHEREAS, on August 18, 2017, Amendment No. 30 was executed for additional services associated with revisions to the P-Lot Park design, as approved by the City Commission on July 26, 2017, in the amount of 349,076; and WHEREAS, on September 18, 2017, Amendment No. 31 was executed for revisions to the construction documents as needed for artwork installations by Joseph Kosuth, selected as part of the Art in Public Places Program, in the amount of$14,570; and WHEREAS, on September 18, 2017, Amendment No. 32 was executed for revisions to the construction documents approved in Amendment No. 27, to accommodate the construction that progressed during the delayed issuance of the package due to extended negotiations with Art Basel, in the amount of$11,430; and WHEREAS, on September 19, 2017, Amendment No. 33 was executed for drainage revisions associated with keeping the existing culvert that crosses the P-Lot in lieu of removal, as requested by Public Works, due to the postponement of the 17th Street drainage improvements, in the amount of $11,985, and for revisions to the southwest corner rendering in the amount of$1,350; and WHEREAS, on December 15, 2015, Amendment No. 34 was executed for additional reviews of structural submittals, and for design solutions for contractor-requested items related to closing non-conforming conditions, in the amount of$50,785, to be funded from a deductive change order to the Agreement with Clark Construction; and WHEREAS, on December 15, 2017, Amendment No. 35 was executed for design revisions to the 21st Street Park as a result of the pump station installation and changes required for AIPP installations in the amount of $43,788, and for design solutions for the repair to the existing culvert which collapsed duringinstallation of the new culvert, in the amount of$4,840; and WHEREAS, August 6, 2018, Amendment No. 36 was executed for 19th Street revisions as a result of pump station relocation, and additional construction administration services through November 30, 2018, in the amount of $136,408; and WHEREAS, this Amendment No. 37 is for design revisions to 21st Street Park associated with retaining existing mahoganies and de-scoping sitework around Carl Fisher.Clubhouse and Pump Station; reconciliation of relocated trees and associated design revisions to 21st Park; 19th Street revisions as a result of the Holocaust Memorial's request to keep the existing stone cladded knee wall. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 3 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment.No, 37 MODIFICATIONS. The Agreement is amended as provided in Appendix I'A-37", attached herein, • 3. OTHER PROVISIONS. AO other provisions of the Agreement, as amended, are unchanged and in full force and effect, 4. RATIFICATION. , „ The City and.Consultant ratify the terms of the•Agreement, as amended by this Amendment No.37. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 37 to be executed in their names by their duly authorized officials as of the date first set forth above. ATTEST: CITY ,i,F MIAMI :4 ACH c eLt Rafael Or nado Jim L Mora1. City Clerk City ii,znager I. N T: p CON 'ULTANT; AtE 'tc! ''i A RC ir ill E --",),t2 --•-________ telpg-... PSignature, , Signature Ali 4 if_...1, I i: b.". 1 IN Id- , dit-g-7-15 ZD kictrLs5 _ _ Print Name/Title --;.)c- .116'5 t-- Print Name/Title pre5 eckeill-cl__ _.66, ,. ( -NI --\\\\ 8 4-.-ei ill :),......... ........:.-.1.0 1 , -.:.'; '''"'-`41,1•',ios 0 1''..'...%:1'. #0 • APPROVED AS TO *1:.INCORP ORATED1 * 0 FORM &LANGUAGE 7 % & FOR EXECUTiON 1 ...' •/:4 4;14'.•.......•••1;:\C6, 9\ i r) 1 Pl(i7 (1% 4441 PM 26 ' w k.a A — . . IIII -vmsuw. l'. City Attorney f Date 4 Appendix"A-37" 1. SCOPE OF SERVICES a) 21st St Park redesign as a result of retaining existing mahoganies, and de-scoping the sitework around Carl Fisher Clubhouse and pump station due to timing of Carl Fisher Clubhouse Project: refer to attached proposal dated August 16, 2018. b) Tree Reconciliation and associated landscape design changes at 21st Park: refer to attached proposal dated August 22, 2018. c) 19th Street Revisions as a result of retaining existing knee wall adjacent to Holocaust Memorial: refer to attached proposal dated August 24, 2018. 2. PAYMENT AND COMPENSATION 21st Park revisions and descope: $24,725 Tree reconciliation: $12,300 19th Street Revisions: $13,295 Total: $50,320 5 AGREEMENT TOTAL Added Project Contingency Scope Total Original Agreement $10,967,200 $1,096,720 $12,063,920 Amendment-Reso 2015-28925 (5,6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment6 $ (3,129,259) $(3,129,259) Amendment 8 $15,156,359' $15,156,359 Contingency reduction $ (96,720) $ (96,720): Total $25,436,700 $1,000,000 $26,436,700 Amendment 2-Civil $ 41,079 Amendment 3- BalIrm change $ 179,982 . Amendment 4-Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 Amendment9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11-Event Plans $ 36,875 Amendment 12-Stormwater Revisions $ 34,073 Amendment 13-Smoke Control Removal $ 173,790 Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading ; $ 22,520 $ 88,818 • • Amendment 16-Culvert and Cony Ctr Dr redesign • $ 70,270 Amendment 17-GMP Reconciliation-add'I $ 49,360 Amendment 18-Additional Site Visits $ 112,649 Amendment 19-East Bridge Retention $ 220,291 Amendment 20-Steel submittals and Truss loading analysis $ 96,710 Amendment 21-Cameras,vaults, RFIs, kitchen,transition slab $ 80,330 Amendment 22-AIPP(Morris,Ackermann&Harvey) $ 17,121 • Amendment 23-NCRs* $ 10,000. Amendment 24-Sanitary Sewer Lateral -Carl Fisher Clubhouse $ 18,625 Amendment 25-Signage Package Revisions $ 12,030 Amendment 26-Structural submittals&NCRs $ 15,580 Amendment 27- Exhibit hall/Ballroom Vertical Circulation $ 124,240 • Amendment 28-19th Street Pump Station Relocation $ 2,585 Amendment 29-RFI 3251&Structural Submittals $ 30,875 Amendment 30-P-Lot Park Revision $ 349,076 Amendment 31-AIPP (Joseph Kosuth) $ 14,570 , Amendment 32-Exhibit Hall/Ballroom Vertical Circulation rev . $ 11,430 Amendment 33-Plot culvert and rendering $ 13,335 Amendment 34-Structural Submittals&/NCRs $ 50,785 Amendment 35-21st St Park Rev&Culvert repair $ 48,628 Amendment 36- 19th St and CA Services $ 136,408 Amendment 37-21st Park,Tree Reconc, 19th St . $ 50,320 Total $25,436,700 $1,000,000 , $1,773,035 $28,209,735 1. Amendments 14, 18,20,23,26,29 and 34 totaling $465,598,funded from Clark's contract via deductive change orders. 2. Amendments 22&31 totaling$31,691 funded from AIPP fund.. 7 , . Ativilt7.411:71aftil. olitoo..vni1/45f. r,,,..A .,..,,,, ,-4 4FENTRESS : 1 IN cotax,RAN14,Ato: taw: •,:.,,,, ,-,,E :,,,,...' ;1,. asip.A.4.msgmor4,,x . lentreassecitOcis oat lune 6,2018 August 16,2018 Revised Mr„Jimmy:Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th floor Miami,Beach,fl.,33.1.3 Re: Miami Beach:Convention Center RenovatiOn scaution No,2014-28538 Proposal 60—2111 Street Park Deseope Project 20140021,00 A54 Dear Mr.Morales;. ' This proposal is to provide:additional design services and design package associated With the City'SreqUeSt.to deseope a portion of the 2.1:"Street Park ebitiponents,as shown by the attached exhibit from the current contract with.Clark. Construction,The.removed scope to be Performed.by*another design team and contractor,apart froth this contract: The City would also like to revise landscape and hardseapc„.electrical and civil design,to'facilitate this split in Scope. This scope also includes revisions required to preserve mahogany trees along Collins Canal that were previously determitiedttibo removed.Below is Our understanding Of.the scopC of sice$.11eccSsaryi $COPEOFSERPICEE. 1. 21'7 Street Descope: ' - - - a.: Develop a descope change directive package forte removal of scope to be isseed to Clark Construction.. , 1) The work within the descopeboundary is as follows; a) Remove all landscape l'hardscape/finishes/:eqUipMent scope Within beittidary.fitie; 1)) complete all demolition shown.an Current Plani.Within boundary,. c) Provide silt fence.or.filtrexx sediment control at boundary line,per.cletaiiSC2 on'siva: C2,1 7; d) Provide 6'chain link couslmetintf fence wl.l.h.dust,5crce11,WIPP as alternate1.; e) Complete all underground sewer,sanitaryandelectrical utilities shown Within'boundaryline., Light pole bases,and power to baSes,to he installeciwithin boundary line Light pole bases, Within boundary to be deliVered to the City for'future installation by others; , 1) Do 4ot perform any irrigation work within boundary line; g) Area within,boundary line to be finished to rough grade elevation as shown in plans, h) no not installleFisoll/: oil amendments./planting soils•Within boundary line; i) Newahovegradc Work not in Contract. 2 ,Retaining Mahogany Trees: a. Revisions requested to the'21st Street Park that remain in Clark Constructions scope of Work including the fellowing;' 1) :Landseape revisions required for preservation of existing mahogany trees at Collins Canal 2) Reconfiguration of bike path and pile wall to acconumidate existing mahogany trees; 3) Revisions to gradingto accommodate-revised bike path configuration. INFORAIATION TO:BE PROVIDED BT TRECITY 1, !R.1 fleisenbettle drawing.package for coordination; 1 As-built documents for the 2P1 lift Station andasSeciated:equipment 0 g# ri c; LA Sr. t(,)14- $11 i 42.1. Op,..3gdyi- 1 bel)siBT. . . . Mr.Jinimy Morales,City Manager City Manager's Office City of Miami Beach Proposal 60—21g Street descope and rescope August 16,201.8 Page 2 .SCHEDULE Design documentation .5 weeks- QA and CCD finalization 2 week TOTAL 7 weeks EXCLUSIONS I. Design,engineering and detailing of the Washingtou Avenue Pump Station el mentS as issued byPublic Works are not included in this proposed Value. Coordination with components within the park is included, 2,, Rescope of removed scope stated above including participation of submittals,bidder's questions, contractor's requestsfor information and other project communications will be by the Carl Fisher Clubhouse architect and is not included in this proposal PEE Fees for ull base services will be a total proposed lump sum amount orr*enty-Four Thousand Seven Hundred and Twenty-Five*Dollars(S24,725,00).Expense oSts for'p,rinting,telephone,delivery,and travel included intheluMp Sum portion of this fee. Billings for these services will be invoiced under the heading#20140021.004,A59. Attached is the'breakdown of hours'and associated fee for this additional effort Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated. Please feel free to contact me with any thrther questions or continents you may have. if the foreaoing,correctly states your understanding,please prepare a contract amendment for our,execution.We are ery ItappY to be of serVice tothe City and continue our successful relationship. Sincerely. Fentress Architects / . •ohn Kudrcki,.AIA,LEE a' A B +C Principal anal: Design Fee Summary dated A ugtist 16,2018 Descopel3oundary sketch dated February 1.5,2018 a: Maria Flernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Jones Lang LaSalle Hotels&HoSpitality Group Steven DiBarfolo,Karen DCS1101,ffill International,Inc. DaVid Burkey, Anne Ma•leely,Tenni Gee,Fentress Architects gist St Park Descope Project: Miami Beach Convention Center Renovation &Expansion :8113118, • Firm !'•aa,m]n! ..,gg,,],],], ..Aum,,mmomm, Discipline Firm Name • !!EmeglimmulFeeamommagi Number MogigoolismogoommiTiimmiii: Architecture Fentress Architects . 11 11111,0,1111,07.450).. Architecture Arquitedtcoica 4 111,111.111,11.1111,04): Fire/Life SafetylCode Consuiting.Jensen Hughes . 13 11,01111011111,151$4.. CMlJUtility Engineering Kiniley-Horn C510 10 Landscape West 8 7 UNVIESEPRIBMINIS7424' Structural Engineering Wallace 8 1 111111 ISM Oil : Vertical Transportation Lerch Bates. 12 61,21.116,11111,113# Plumb,Mech,Pee,Lighting ME Engineers , . 14-18. EIBERMIONEIN:33140' IT,Security,AV,Acoustics . DL Adams 20 gullignalliglatSO Food Service Caruso • 25 1111111111111111011, laraphics.and Signage TKO 28 1,11.1111011111111•0', Perking Consultation Waker Parking.' 29 • kilgalinnentaiiMMAI-: Design Fees(Lump Sure) $24,725 Expenses OI spy Total Total opouppoup424g25. 21st St Park Descope Fentress Architects.. nttdit,pgidussmop000ppoimigqfpwoiwpppoummocm.00imagemusioggmigtmgsompmgppgoiiinmg Job Title Hourly Rate Hours Extension 340tatfrigOgOtA*bt:VCOOriliOatititilut4*e4i4lfilFgFSMMEEi,'MigiiViMigmciNEREENg,ANVggmillsmp;B Architect.11". $175A0 40 $74000,00 Architect $150.00 0 $0.00 "mem Araiteet. $140.00 .0' $000 John K. drycki $225.00 2 $450.00 Totals this activity: Hours 42.0 $7,450.00 Total,Sub 1 42.0 $7,450.00 :Hours Total 42.0 51,450.00 • 21st Street Park Pump and StOm Wall Redesign. K.itley- :orn&.Associate • s curs 21st Street.Park Pump and SSe t Wa11 Redesign Hourly Rate hours Extension `X;A l 1- 50OPl PLsANS R, VISIOl' a&5PQRDIN41ION F...... Principal $280:00 0t} $0.00 Se►niorProfessional $200.00 0.5 $100.00 Professional $120.00 .4=0 $480.07. Analyst/Junior Professional• $:105:00 14.0 $1,470.00 Senior Technical Support• $125.00 0,Q $0.00 Technical Support. .$105.00 18;0 $1,890.00 Support Staff $82.50 0.0 $0.00 Totals this activity; Hours 36.5 .$31,940.00 Principal $280.00 0.0 $0;00 Senior Professional: $200.00 6.10 $1,200,00 Professional, $120.09 12,0, , 1,440.00 ' 4nalyst<JuniorProfessional 8105,00 1.6.0 51,680.00 Senior Technical Support. $125.00 0,0 $0.00. •Technical Support $105:00 18.0• Si:890:00 Support Staff $82.5° 0,,0• 50.00 Totals this,activity: Hours 52.0 .. ., $6 210;00 Principal. $280.00. 0.0, :$0.00 Senior P.ro.fessionni $200.00 0.0 $0.00 Professional $:120.00 0.0 $0.0€2 Analyrst/Junior P.ro,fessional $10:5:00 0.0• $0.00 Senior Technical Support: •$125.09: 0,0. 50,00 Technical Support $1.05.00 0.:(1 $0,00 Support Staff • $82::;50 •0.0 $0.00 Totals this activity:. Hours 0.0 $0:00 • • hours Total $8,5 .$1.0,:150.00I • 21st St Park Deseape West 8.: liGursJob Title Hourly..Rat e HOurs extension Design Director $375.00 0.0 $0.00 Principal/Director $25000 0.o• Project Directnr- $18500 3.0, $55500 Project Manager $165,00 19.0 $3,135,00 Landscape Designer $1.15 00 120 $1,38000: StaffDesigner $85>00 0.0 $0.00 Administrative $85.00 $255.00 Totals this activity; Hours 37M •$5,325.00 Hours Total 37M. $5,325.00 Irrigation.Subcontractor- $1,800.00 $7425.00 .21st St Park escope M-E Engineers Job Title Hourly flat fours Extension Task 22, learn al ga c r n Principal $200..00 2.0 $400.00. Associate $160.00 15.0 ' $x400.00 Project Manager $140.00 0.0 $0.00 Designer $110.00. 0.0 •$0.00 CAD Operator $95.00 12:0 $1,140.00. Administrative Staff. $80.00 0.0 $0.00• Totals this activity; Hours 29.0 . $3,940.00: Sufi 2 29.0 •53 940.00 f:oursTotal 210 $3;940.00 -------""..- k 'N. 4, ,7 Oif 1. ;$ q ...91 $ ,.' ,f Al, • la af.-,,,......,..,,,,,,......,..."...,,,,,,,,,,,,,,,,,,.,,,—,,,,--.....-1.,...t. "I of Xi .. t/ -T,j;Wa4;`Itl,A \•::I;1,,:---,:s'i , 3...,,Ft-77....,.-- -..:--:. '' - ' . .*iii'..:?::-:ii .i.:i::ii.:: ::ii:T: it1't ..,.., ,-,-,--,4, , .1.A0:44414,41,„. - - .• • . . .`,4,,.... / ........,..„_....„...„„.......,.........,.......... .,,, --s ..0 •,.., - = nvo.otAwoi., -,4,,,,..- • -.-,---pe < ,' ,4,,,1-'7,i's" :•..-7,', . \,::.:•:•:•:.:.:,....Y.,:,:.:.:,:":•:,',X,>:...':.....^:,`:':-",:':`:<.`:......,.`:..."...:.:',..:.::;,. ;\$..$4t‘ X*A It-- , ,s ,..,;\ r,,,„,..„0„,,,„,,,,,,, ..- .,,,,, ,:„,, ,i....,:m—,,,,,,,,,,,,"-.,„..-.;,,,,,,,, . , , ,\\,‘ ':,:,,, 0 ';::it;.• ,,,;ci..-46.400'':";',:,),1, *,..., \ -4.------'-',,,,:,,,,*<:•Z•:....:,...-......:»:::*:;-;:::-'4,L,- , \ , „,,, ---- ,:-....,. . 4, \ 4.,• \ ,-,-A, -r , • .ift,..... ,. .. . . . . . ... r.,. .—. -z.,3:f";,, s,41,,,%s.,',...,,;-, , --,, ,t., ,' .,.1..m,,,,,,,,,,„,„,„.,./..,,,,,,„. :•:--,-. ,..--•••.-...--.....•.-.-.... ,,,,, .- ,,,7 `,11,:..r.,-7,."A,-, ii,0 V4V,,,gt,k4V'eMY.V:\trw's? - ,...".'.`-',-„x„. • • , .? 0 „ ,..,..„,,,-;-„,:,,,,,, .,,,,,,,i,.. itufilttrAttO4W14,— r-- e ” `..",' ‘• • - ..........'-7 i ..t.i,._5 .,,r+PS,t'A,A14:61,f4; ••-\ '.* l':":`.`.'.".":kik'•7 -Y''tek lit -,i-.4f '7'7'`'' e,,,..r.,"4.114%,14V, tep -C.- • „P. . . .. .-,,-,,, ,, ...,, ... 'li \ '-,,, ,.. .-..,,,• ,7,,,,,,,-** ,..--,,,...“.--,7-,--;.-4.,„,,- 't- ..),... -...'••.....-.--,.-„.• " - 7 -.....-............,,,,,\\ ‘ lik„:11, A ii-4','`. ''','" ,II,:-:-:.°:.:'"'- ' ,''.. • • \ , - • - .*.-`.*,'.'.•....•..i -. \ \ :.3 ... - k• df. , , . . ... . - . . . ... . . , \\ .k Is • ,, ''''-----....---1 . •7;.;.,:i. '',.';; ''':%.•_-,,„..tle.il iff ) '111P' ;---;-:•-1,, 1. \'':5-...:::.;:i i • ..,. , , . •t„,, •e„7-- --,,,,,,,„ -,,,.... A \\\\\\ ce.......‘,"- - \\)„,, ' - , ,r,e,,e's•••.„ [ 4, III.. ,,..,..,,-;",,,. r.C.,^e„,.,,.,*.,,,?e,:•:i.:51,',1,, '''7'''''' et' ''''''''':::7,7...;:z.,:.,'""::,"52• :,"9- ) (3 -------- „,.....„, ,,. .,,,.....— - -.-':,,,,t, ,,, ,... iirte.,4E , / 3 "1st Street Park De-ScoPe ' ' •''- ,..*-:"..---',•-4:-,,ix..;.., '"'-i:,--% c_- ;-..:1,..:,..:,.'.1' '''''''.''.' --'-*“.--- •; 1 2 2115/ 018 • :,......,,,,-•':-!:%,:i.,:t•t-.ATA- _:,..„, ,,,, .6'..,0. . . -:titiogamistrov . ,,,wagit.,Alesewitskl,, 1110410141,14 winqql.i.aimemaismi,N, tkaaiasMion,*%Lizit itgeip."fingfir41* !latliaillatatal • lialpa.$. :Anttpaltoi.6901. „Atignst 22,20143. • ••;l1W Jimmy Mork ,City Manager City Manitger's,Ciffice City of Miami Beach 1700 cortventionCenterprive 4111:Mot Mint*.fieaciti.„13,:3;419 : Re: Miatti113eacit Conventiohfenter Renovation Resoltition•NO:201zk28531). Propot4l 0-,..21:•''''•$treet Partrtreelteentieilietion anatksigti • ' . Project 2014002f..001,A60.- (1)40.t Mi..Morp:10$•:, , .. T.hiproposal is to provide additional design services pursuant to:the City s te4tieSt to revise the landscape We: •quantities and species-0 accorniniadate•existingtreeS that were to be Olncat01..ancl have. .inctI...1-409n1 .anaynilabk, , . A. •RECONCtuATION,OV'RELOCATal TREES This scope at work:itieludei,deterniihing the status of relocated plant material, -determining-how the relocated. material, effects tree• canopy- .Stittare footage . re4iirernents:,and.determining.the tree.catiopy-siVare.:fOotage of our entrant:desigh,.1,,aaks•for thiS:phose:of.. WOrk:its dindat 4 Cdordinate with Hill International,:,Fentress,West Clarkand the City 0 fVB.;- *. Itevient,nfatoiral,..provido by Clark and suhetiatraptcra to.dtftrnilite teloented-•ticestatOses; ReVieW•roaterial provided h the Cit3,.'i8.thOti$t.0.deterntitte::•itelOcated:tree•;Statnses:, . . . .: C,dittpate ReloCatedlleee:$tatoste$pros ided by the City AitiaWi*nd Chu. L•Avi*the•perinitted.:Trea DiSpositipi1Plans;. . Deterttdne„„squ4re'filo:rage of relocated trees not agovved.by the:arborist; Determine square:kJOtago-Of Current:design.; . .. .. . -4,• COtnintinieatellodings•through writing:40d:graphies tø the City or Miall'4144047,. - • N.1001044,K :Ortfyt,-9.).tmeeting thy phone)with.feito$$.,wott.City of Miainf:mnich:and the city ,,Vbori4to teView,findings.Additional irtectinga*:preparatien•of add itionattnaterials.requested by the City beyond 00 deliverables noted abcaici:arc-not included in this•Scope•andwill be wooded tis an add itinnitathint, • . . ... . . , . •:,t+,• STRATEgre. REDESIGN OF 21ST PARK LANDSCAPE-1714. .ot(pe it!sf.'1441( includes fp/WO '0;. . .,. planting/iiigation design at 21 Parkin.order to locate reloented traosanapotentially.ad4morn i17.e..-;'s to the she tO atitieVe•the tetittired:Canopyltiate fontage„:;T4,stik fathig.iphoge.ofWork-hiciode i,- Cootiihate with the Design 1:Cital.and the City to :how best to provide the:neee4ny,tree. • canopy square ;for tite.project Octirand thorot4h.direction.::040.be,ptowded to the Design Team:hy the city.; - Review..photos atilt relocated plant material, .. .t., •Stady•noinns.r.6t tbtpla0doiolit:-.0rtN tokiola trees within the•existinglandseape . . •:* !Stodyistir*plAnithig:!a4.4.determinetradjtishrients:are.necog.>4ry.dnoitn"filn Additional nrittinndified :treeldeationS; . . •;.. Provitio written:report and#aphies that mm at new design's total canape square footage: .• i',eeiew••iraftie.4011:gi)options with the Design leant anc1•01. (iIy..; . . • * Prot ide a plan indurating tree disposition#,,and species of each tree.to he ... ... . . . 14$4.by'thercolto(lor•during installation, , Update the ..Planting:;Nita, Schedule, 'Tree'Disposition flank, and:Tree.DinnOilitio!Table,anti • ..• • IrtigatiOn•Plan-S'foit..mq4irmi:silbtnitiiiK.eltSiot.ann tnokOngh direction will be pros .0 ti•.th:',000gfi .. . . ,.. .. teattt.by the City•Ngaraint:so bioipi 4gd5..004 r'egoitototit.. R:Ell: ac. :L.A. SN 1:0 1-.1. .” 1 4 2:1 F,.3:.i''',:?4 0 W.:?)y. 1 ci,i.b., :.t. '::., *4,1..1 2-:,2,;,0):#4 Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 65—21St Street Park Tree Reconciliation August 6,2018 Page 2 • Meetings: i. One(1)meeting(by phone)with Fentress,West 8 and the City of Miami Beach to review planting redesign options; ii. One(1)meeting (by phone)with Fentress, West 8 and the City of Miami Beach and the City Arborist to review final design; iii. Additional meetings or preparation of additional materials requested by the City beyond the deliverables noted above, are not included in this scope and will be provided as an additional service. INFORMATION TO BE PROVIDED BY THE CITY 1. RJ Heisenbottle drawing package for coordination. 2. As-built documents for the 21"lift station and associated equipment. SCHEDULE Design documentation 4 weeks OA and CCD finalization 1 week TOTAL 5 weeks FEE Fees for all base services will be a total proposed lump sum amount of Twelve Thousand Three Hundred Dollars ($12,300.00).Expense costs for printing,telephone,delivery,and travel are included in the lump sum portion of this fee. Billings for these services will be invoiced under the heading#20140021.001,A60. Attached is the breakdown of hours and associated fee for this additional effort. Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated. Please feel free to contact me with any further questions or comments you may have. If the foregoing correctly states your understanding,please prepare a contract amendment for our execution.We are very happy to be of service to the City and continue our successful relationship. Sincerely, Fentress Architects Jin Kudrycki,AIA,LEE BD+C Principal enol: Design Fee Summary dated August 22,2018 c: Maria Hernandez,Thais Vieira,City of Miami Beach Jeff Sachs,Jones Lang LaSalle Hotels&Hospitality Group Steven DiBartolo,Karen Deshon,Hill International,Inc. David Burkey,Anne McNeely,Jenni Gee,Fentress Architects Project: 21st St pat* Tree.Retortciliption Miami Beach conVentien center Renovation Expansion. 8122/18 Park Redesi*n • .. : • Piscipiine Firm Name Firm Fee " •:" ! Number ;•• •• • . Architecture Fentress Architects . 1 Architecture ArqUitecteniee 4 11111111111111,I111111164 Fire/Life SafetylCode Consulting.Jensen Hughes . . 13 11.116,13,11,31121$0, Civil/Utility Engineering .. •KirrileytHern. • 8 111111111111111.12111,W# Landscape :'West 8 7. Structural Engineering . .1-Wallace • 8 21,111,1111111,111161110401 Vertical Transportation Lerch Bates 12 1111.1111111111E5101$4 Plumb,4%01%.glec,Lighting ME-Engineett. 1418. 1111•11114,161111= IT,Security i AV,Acoustics OL Adams: • • '20 immememeemeeikeeogikitiiiKt Food Service Caruso '25, .iaNkniBMINERNASOI, Graphics and Signage TKD 28 Parking Consultation Walker Perking. 11111111111111111111111111111% Design Fees(Lump Suit). $12,300 7Experises .7". • = • Q% • $.0\E' 4r • ••••• • • • Total. : Total • • 21st St Park Tree Reconciliation Fentress Architects Hou s - , •, .. • • : :. Job Title Hourly Rate Hours Extension Task • Architect III $175.00 1 $175.00 Architect II $150.00 0 $0.00 Intern Architect II $110.00 0 $0.00 John Kudrycki $225.00 1 $225.00 Totals this activity: Hours 2.0 $400.00 • Total,Sub 1 2.0 $400.00 Hours Total 2.0 $400.00 • 21st St Park Tree Relocation Miami Beach Convention Center Fentress Project No:20140021 August 22,2018 Page.2 of 3 21st St Park Tree Reconciliation West 8 ours . . Job Title Hourly Rate Hours Extension 3 Landscape Design Task A Waslungto Ave Planting,Area'R+ a gu x Design Director $375.00 0.0 $0.00 Principal/Director $250.00 8.0 $2,000.00 Project Director $185.00 0.0 $0.00 Project Manager $165.00 60.0 $9,900.00 Landscape Designer $115.00 0.0 $0.00 Staff Designer $85.00 0.0 $0.00 Administrative $85.00 0.0 $0.00 Totals this activity: Hours 68.0 $11,900.00 Hours Total 68.0 $11,900.00 Irrigation Subcontractor $0.00 $11,900.00 21st St Park Tree Relocation Miami Beach Convention Center Fentress Project No:20140021 August 22,2018 Page 3 of 3 • K,At . ,towfikrk'sW 1>Awii*,tg„,n,a4 tiPtifte** *KolabwkitAt IFENTOESS111 towistaits AgNisttionlioi: to ottp„.4p.ifernxt3,:pom August 24,201 g: Mr.Jimmy Morales,City Manager City.Managers Office, Citylif Miami Death • [760 opirtvefitioi Center Drive 4th Floor Mini:III:13 each,FL 33t39 Re. Miami Beael)Convention Center Renovation Resolution No.201 4-:213538 propos00-19°Street Redesign Proposal l Project 20140021,001A01 • Dear Mr.'Morale : This Proposal:is to provide additional design services requiredpursuant to the City's:request to provide the listed: :reviSiOns heloW to the 194:Streetrotitlwity,betweenCouventionCenter Drive and Meridian Blvd.: . , • SCOPE OPSER 1. General: a, Between Meridian Ave and STA 21+00,-workintz with the Civil EMtineer•Kintley4loru, the. Design Teatn.will redesign tht. north.side of 19th Street to transition the roadway pavement to Man* existing elevations at STA'20480 Where the holocaust Memorial sidewalk ties to the: lioloeintstMenimial parking lot. Between:STA;20+80 and 21,1-0(),.the pesian Team will modtly plans to remove ettib and propose ti type F end):that Will tie:into existing ettehing; . . ii :$,.:25 and the pipectUinecting to S-2:4 will be:removed from civil:plat:AS:andthe e'xisting: cud)inlet at this location will remainWirfthetOnnection to the egistina.System that runs along Meridian Ave, iii. The redesign apprpaeh•to match oisting conditions is to iiVoid:ehanging the profile along the PGL L I (north Side),to avoid future recOnstructibn.of median,thus utilizing steeper cross slopes between:STA 20'40 and 21+00..Theinitial intent Will beto avoid changing the ntnss slope along the thrOngh lane.and Utilizing steeper cross slopes in the stripped, Mat area. iv. The pion0e4 curb ramp on the northeast*quadrant will also hCrettioVed from the Civil . Engineer's projeetliniits,Ihe City acknoWledges the ADA npu,ccruplioucc.cfAbis curb ramp and plans on upgrading this area the future:proleet along Merithatt„Avenne. The tiort.hee# corner of Meridian and 19th.Street.has a drop curb at the return.and appears to be handicap UeeesSible,l,mt withotittrtniented demeintat. .tP4. L A “. fQ14 I 4,2 f 00. . Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach Proposal 66—19th Street Redesign Proposal August 24,2018 Page 2 b. Between STA 21+00 and 22+50,the proposed design as shown in plans will be constructed. i. The current design has a difference in elevation between the proposed back of curb and the existing elevations at the parking lot that varies from 4"to 12". The original design intent was to provide elevations for the consultants who would be re-grading the parking lot, due to the pump station project. Since then, the pump station location has changed and the parking lot grading is to remain as-is. ii. The Design Team's proposed alternative to match the existing elevations was to redesign the area to match existing curb along the parking lot,by modifying the profile along the PGL LT.The City did not entertain this alternative due to the throw-away,once Meridian Avenue gets raised. iii. The final agreed solution proposes to harmonize about two feet within the Holocaust Memorial Parking lot.This work will be designed by the City's In-House and the Design Team's Civil Engineer's project limits will continue to be the back of curb at the Holocaust Memorial Parking lot. The City will be responsible to address any drainage issues within the parking lot that may be caused by the higher curbing that prevents storm water to flow towards the road.Based on the existing parking lot grading,the parking lot drains towards 19th Street and it has a slight pitch towards southwest corner of the lot. The top of the curb between station 20+80 and 21+00 will be either flush with the parking lot asphalt so drainage continues flowing in that direction or provided with a drop curb if the top of the curb is higher than the parking. iv. The Civil Engineer will provide updated striping plans to remove the on-street parking between STAs 21+00 and 22+40.This area will be striped out with chevrons(5 spaces) and parking will be prohibited due to the lack of sidewalk adjacent to the curb. SCHEDULE • Design Task 1: 2 weeks after Notice to Proceed EXCLUSIONS 1. Design services beyond the project completion and project boundaries. FEE Fees for all base services will be a total proposed lump sum amount of Thirteen Thousand Two Hundred Ninety-Five Dollars($13,295). Expense costs for printing,telephone,delivery,and travel are included in the lump sum portion of this fee.Billings for these services will be invoiced under the heading#20140021.001,A61. Attached is the breakdown of hours and associated fee for this additional effort.Your assistance in facilitating the request of this additional effort as a modification to our contract is appreciated.Please feel free to contact me with any further questions or comments you may have. Mr.Jimmy.Mor .le.,.city.:Mana cr. City Matttigtr'.s Office 'City ofMiam Ecach: proposal 66—19th.th Sheet fi;.Rdesign Proposal August24,20,,1$ Page [Hie foregoing correctly states:your uiid:rstanding,please Prepare a contract amendment tor.our e*cutiont.,We are very happy to he of service tet t e City°and continue our successful relationship.. Sittccrely. • B•entrees Architects • • • hit1Cudrycki, . i. C': Principal ene:l. Design ° inn rye dated August' . •201.8. Mttria l lereia.ndez, Thais Viuira,:City ofMianii Beach kit Sachs,Junes Land LaSalle hotels&1-tospitahty Group Steven DiBar(olo Karen UeshOn.bill;ittterttation l;Inc. [avid Burkey.:Anne McNeely Tertta.i.Cee,]entress Arch.iteets Project: 19th Street Redesign Miami each Convention Center Renovation&Expansion 8/2311$ • Discipline Firm Name Firm FeeiIiiniiMagRE Number Architecture Fentress Architects glaninuoiliiipinigNOSES345: Architecture Argultectoni ea 4 1,1,19111,6122,i189.!! Fire/Life Safety/Code Consulting Jensen Hughes 13 ClvdiUtility Erigineerin (Lump St Kimley-Horn 6 1,111211,,PRE110512;95Q•. Landscape West 8 7 1,811,91011111110:#;' Structural Engineering Wallace. 8 '•Vertical Transportation Lerch Bates . . 12 Mach,Etec,Lighting ME Engineers 14-18 111111,11.1161fitillillia IT,Security,AV,Acoustics. DL Adams 20 11211111111111,111130. •Food Service Caruso 25 11,11111412,11,1 Traffic Corradino 27 Lliall221,1101111110: Graphics and.Signage TKD Amisgellinalliginagolik44.• Parking Consultation Walker Parking 29 ..1.41111111,11,501211100i• Cost Estimate PLO r 35 121111,111,11111,11ME Design Fees(Lump Sum) 513,295 • Expenses • 0% $0 Total Total tionukomages$1.gAgA., Fentress Architects Job Tftle Hourly Rate Hours Extension • ' , Architect 111 $200.00 0 $0.00 John Kudrycki $225.00 1 $225.00 Administrative $120.00 I $120.00 Totals this activity: Hours 2.0 $345.00 Total,Sub 1 2.0 $345.00 Hoorn Total 2.0 $345.00 • Miami Beach Coavention.Canter Faties Project No,20140021 1Z0.0t Or,:9N.loia4d.$:$6410.6.1 • iup.goguotiltpa0oai IttmitAi s, 6(1,70i6I1.$: 0°171-1.. .putts dpini • • 01,11 . . S40011 s#.0. prj, 60 057,” .0418 pciddrt8' oaocrEs tr.0.€! '0050:1$ poticips[1.t .!•uttoti-1 00.76$ O0 09`5Z1-$. 14NdrigIttpittltipoi itol.trn owOOVVS D'Ot 00:'0901, -0-0t ,9079t,1$ plitOSSDJOId: 00 002$ 1b.t• 00'00Z letiqetid.3.9ttlas 0Y0S• 00 00'.08z$ • • • Oiigionsiiiiiiiiiiimmiiiingiammwasemoolitig5istaingengigAmmliffgo!a4000 *AlifiaNtiqgqii ofsuaisq, 04-iquit(non.. 01414,..c194* LUWII • 04.0130-$.$v-ti 4401-4401tunt • ,z •