Amendment No. 38 with Fentress Architects with $261,445 640/ y-ocn521 DUPLICATE ORIGINAL AMENDMENT NO.38 / of TO THE AGREEMENT BETWEEN THE CITY OF MIAMI BEACH, FLORIDA AND FENTRESS ARCHITECTS, DATED MAY 14, 2014, FOR DESIGN CRITERIA PROFESSIONAL SERVICES FOR THE MIAMI BEACH CONVENTION CENTER RENOVATION PROJECT, IN THE AMOUNT OF$261;445 This Amendment No. 38 to the Agreement made and entered this_day of , 2018, by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida (hereinafter referred to as City), having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida 33139, and FENTRESS ARCHITECTS, a Colorado corporation, having its offices at 421 Broadway, Denver, Colorado (hereinafter referred to as"Consultant" or"Architect-Engineer"). RECITALS WHEREAS, pursuant to Request for Qualifications (RFQ) No. 2014-142ME, the Mayor and City Commission adopted Resolution No. 2014-28538 on April 9, 2014, approving and authorizing the Mayor and City Clerk to execute an Agreement with Fentress Architects for Design Criteria Professional Services for the Miami Beach Convention Center Renovation Project(the"Agreement"); and WHEREAS, the Agreement was executed for a lump sum amount of $10,967,200 including reimbursable expenses; and WHEREAS, on December 8, 2014, Amendment No. 1 was executed for correction to Task 3 - Design Development and Design Criteria Package Services, requiring 30% completion level for low voltage systems in lieu of 90%completion; and WHEREAS, on December 8, 2014, Amendment No. 2 was executed for supplemental civil engineering services in the amount of$41,079; and WHEREAS, on December 8, 2014, Amendment No. 3 was executed for additional services to revise the quantity, sizes and configurations of the main ballroom, junior ballrooms, and meeting rooms, in the amount of $179,982; and WHEREAS, on January 21, 2015, Amendment No. 4 was executed for a regional stormwater pump station location analysis, and for the development of a 3D animation and custom website for the Project in the amount of $76,605; and WHEREAS, on February 11, 2015, the City Commission authorized Resolution No.. 2015-28925, authorizing an additional lump sum amount of $14,469,500, for the purpose of retaining Fentress to complete all design and construction administration services for the Project; and WHEREAS, on March 31, 2015, Amendment No. 5 was executed for the completion of design development documents and preparation of Bid Package 1, in the amount of $2,442,400 (part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 6 was executed for a deductive adjustment to the Agreement in the total amount of$3,129,259, to delete the remaining Tasks 4, 5 and 6 of the Scope of Services set forth in Schedule A of the Agreement, as such tasks are no longer applicable and shall be superseded by a subsequent amendment with regard to the construction documentation and administration services required for the Project(part of Resolution No. 2015-28925); and WHEREAS, on May 28, 2015, Amendment No. 7 was executed for Additional Services relating to wind loading and micro-climate services, in the amount of$117,200; WHEREAS, on May 28, 2015, Amendment No. 8 was executed to retain Fentress Architects to serve as Architect of Record for the Project, to clarify requirements with regard to Design Development, and to provide for completion of Construction Documents and all construction administration services required of the Architect- 1 c 7 Engineer• for._the.Project, in the total amount of$15,156,359 (part of Resolution No. 2015-28925); and WHEREAS, on August 14, 2015, Amendment No. 9 was executed for the provision of Commissioning Services, in the total amount of$302,876; and WHEREAS, on October 27, 2015, Amendment No. 10 was executed for a parapet design analysis and consultation services to reduce the applicable wind pressures on the curtain wall for potential construction cost reductions, in the amount of$15,000; and WHEREAS, on December 4, 2015, Amendment No. 11 was executed for the preparation of event plans background drawings to be used by event planners during construction, in the amount of$36,875; and WHEREAS, on March 29, 2016, Amendment No. 12 was executed for stormwater design revisions related to Public Works Department's pump stations design, in the amount of$34,073; and WHEREAS, on May 31, 2016, Amendment No. 13 was executed for design changes associated with the removal of the smoke control system, in the amount of$173,790; and WHEREAS, on June 10, 2016, Amendment No. 14 was executed for additional site visits by members of the design team for a weekly presence through July 28, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$148,999; and WHEREAS, on July 18, 2016, Amendment No. 15 was executed for design changes associated with raising 18th Street, 19th Street and Convention Center Drive, requested by Public Works to allow the raising of Meridian Avenue and 17th Street in the future, in the amount of$111",338; and WHEREAS, on August 26, 2016 Amendment No. 16 was executed for the addition of a 72" storm culvert to serve as a temporary bypass until the new culvert on 17th Street is completed by Public Works; and for the redesign of Convention Center Drive between 17th and 18th Streets due to the postponement of the Convention Center Hotel Project, in the amount of$70,270; and WHEREAS, on September 7, 2016, Amendment No. 17 was executed for GMP cost reconciliation services beyond what was originally contemplated in the basic construction administration services, in the amount of $49,360; and WHEREAS, on September 7, 2016, Amendment No. 18 was executed for additional site visits by members of the design team for a weekly presence through approximately September 30, 2016, and for the implementation of alternative designs requested by the Construction Manager, in the amount of$112,649; and WHEREAS, on October 24, 2016, Amendment No. 19 was executed for design changes associated with retaining the east half of the existing exhibit hall bridge to provide more flexibility in egress travel distances of show layouts, in the amount of 220,291; and WHEREAS, on November 16, 2016, Amendment No. 20 was executed for additional reviews of steel submittals and for revisions of levels two and five truss loading for temporary conditions for Art Basel 2016; this Amendment is to be funded from a deductive change order to the Agreement with Clark Construction, in the amount of$96,710; and WHEREAS, on December 20, 2016, Amendment No. 21 was executed for additional design services associated with the incorporation of additional security cameras, revisions to vaults requested by FPL, additional structural engineering resulting from unforeseen site conditions (RF1s), construction details for the temporary transition slab required for Art Basel 2016, and renovation of the east kitchen not included in the original scope of work, in the amount of$80,330; and WHEREAS, on December 20, 2016, Amendment No. 22 was executed for revisions to the construction documents as needed for artwork installations by Sarah Moris, Franz Ackermann and Ellen Harvey, selected as part of the Art in Public Places Program, in the amount of$17,121; and WHEREAS, on December 20, 2016, Amendment No. 23 was executed for additional structural engineering services due to non-conformances by Clark Construction, in the amount of$10,000; and 2 WHEREAS, on January 18, 2017, Amendment No. 24 was executed for additional design, permitting and construction administration services related to a new sanitary sewer lateral for the Carl Fisher Clubhouse, in the amount of$18,625; and WHEREAS, on May 5, 2017, Amendment No. 25 was executed for revisions to the signage package, in the amount of$12,030; and WHEREAS, on May 5, 2017, Amendment No. 26 was executed for additional reviews of structural submittals and for design revisions associated with non-conforming field conditions, funded from a deductive change order to the Agreement with Clark Construction, in the amount of$15,580; and WHEREAS, on May 5, 2017, Amendment No. 27 was executed for design services to incorporate a new vertical circulation connection between the north side of the Exhibit Hall D and the Grand Ballroom on Level 2, in the amount of 124,240, as approved by the City Commission on April 26, 2017 (Agenda Item R7T); and WHEREAS, on June 30, 2017, Amendment No. 28 was executed for design revisions associated with the relocation of the 19th Street pump station, in the amount of$2,585; and WHEREAS, on August 15, 2017, Amendment No. 29 was executed for design solutions for contractor- requested items related to closing non-conforming conditions related to RFI 3251, and for additional reviews of structural submittals, funded from a deductive change order to the Agreement with Clark Construction, in the amount of$30,875 ; and WHEREAS, on August 18, 2017, Amendment No. 30 was executed for additional services associated with revisions to the P-Lot Park design, as approved by the City Commission on July 26, 2017, in the amount of 349,076; and WHEREAS, on September 18, 2017, Amendment No. 31 was executed for revisions to the construction documents as needed for artwork installations by Joseph Kosuth, selected as part of the Art in Public Places Program, in the amount of$14,570; and WHEREAS, on September 18, 2017, Amendment No. 32 was.executed for revisions to the construction documents approved in Amendment No. 27, to accommodate the construction that progressed during the delayed issuance of the package due to extended negotiations with Art Basel, in the amount of$11,430; and WHEREAS, on September 19, 2017, Amendment No. 33 was executed for drainage revisions associated withkeeping the existing culvert that crosses the P-Lot in lieu of removal, as requested by Public Works, due to the postponement of the 17th Street drainage improvements, in the amount of $11,985, and for revisions to the southwest corner rendering in the amount of$1,350; and WHEREAS, on December 15, 2015, Amendment No. 34 was executed for additional reviews of structural submittals, and for design solutions for contractor-requested items related to closing non-conforming conditions, in the amount of$50,785, to be funded from a deductive change order to the Agreement with Clark Construction; and WHEREAS, on December 15, 2017, Amendment No. 35 was executed for design revisions to the 21st Street Park as a result of the pump station installation and changes required for AIPP installations in the amount of $43,788, and for design solutions for the repair to the existing culvert which collapsed during installation of the new culvert, in the amount of$4,840; and WHEREAS, on August 6, 2018, Amendment No. 36 was executed for 19th Street revisions as a result of pump station relocation, and additional construction administration services through November 30, 2018, in the amount of$136,408; and WHEREAS, Amendment No. 37, shall be executed concurrently with this Amendment No. 38, for design revisions to 21St Street Park associated with retaining existing mahoganies and de-scoping sitework around Carl Fisher Clubhouse and Pump Station; reconciliation of relocated trees and associated design revisions to 21st Park; 19th Street revisions as a result of the Holocaust Memorial's request to keep the existing stone cladded knee wall; and WHEREAS, this Amendment No. 38 is for the development of a stand-alone package for the P-Lot Park for a separate permit, structural footing design for events tent structures, and additional services for re-bidding and 3 construction administration. NOW, THEREFORE, the parties hereto, and in consideration of the mutual promises, covenants, agreements, terms, and conditions herein contained, and other good and valuable consideration, the respect and adequacy are hereby acknowledged, do agree as follows: 1. ABOVE RECITALS. The above recitals are true and correct and are incorporated as a part of this Amendment No. 38. 2. MODIFICATIONS. The Agreement is amended as provided in Appendix"A-38", attached herein. 3. OTHER PROVISIONS. All other provisions of the Agreement, as amended, are unchanged and in full force and effect. 4. RATIFICATION. The City and Consultant ratify the terms of the Agreement, as amended by this Amendment No.38. IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 38 to be executed in their names by their duly authorized officials as of the date first set f. h above. ATTEST: CITY F MIAMI = ACH / 9.11,_f tY limIlligli ► -1"....- Rafael Rafael Granado Jimm!L. Morale• City ClerkCity M:.nager ATTEST: ' CONS TANT: 14/ Si••nature: V Signature SP Id% ' d- -7.e_e_ .rgg (la Pn?-7 n- ‘16)5.5 rin Name tle /S5� Print Name/Title rS! II ' 1_CEO B\ „� APPROVED AS TO ttq� FORM & LANGUAGE .......,;\\ E,CJ 0 X44 & FOR EXECUTION jr<C'.... VA,...-....'.3' vj Ott— • q , ,i( D: to I ':INOORPORATE, 4.,„ , ...,,r0 city Attorney ate • V .•• Q) G , H ..• ,+11'RC -4 14\\ ,...-- 4 Appendix"A-38" 1. SCOPE OF SERVICES Refer to attached proposal dated August 31, 2018. 2. PAYMENT AND COMPENSATION Lump sum based on percentage completion of each task outlined below. Fentress KH West 8 ME Wallace Stand-Alone Package $ 86,785 $14,200 $ 4,820 $ 55,435 $ 1,520 $ 10,810 Bidding $ 35,480 $ 7,400 $ 7,100 $ 20,150 $ 830 $ - Permitting $ 6,500 $ 6,500 $ - $ - $ - $ - CA $ 94,280 $39,300 $20,490 $ 32,170 $ 1,040 $ 1,280 Irrigation $ 5,400 . $ - $ - $ 5,400 $ - Tent Footers (allowance) $ 10,000 $ - $ - $ - $ _ - $ 10,000 Expenses $ 23,000 $ 3,000 $ 12,000 $ 8,000 $ - Total $261,445 r$67,400 r$32,410 r$113,155 $ 3,390 $ 22,090 5 Project Contingency Added Total Scope Original Agreement $10,967,200 • $1,096,720 $12,063,920 Amendment-Reso 2015-28925 (5,6&8) Amendment 5 $ 2,442,400 $ 2,442,400 Amendment 6 $(3,129,259) $(3,129,259) Amendment 8 $15,156,359' $15,156,359 Contingency reduction $ (96,720) $ (96,720) Total $25,436,700 ' $1,000,000 $26,436,700 Amendment2-Civil $ 41,079 Amendment 3-Ballrm change $ 179,982 Amendment 4-Stormwater/website $ 76,605 Amendment 7-Wind study/roof survey $ 117,200 , Amendment9-Commissioning $ 302,876 Amendment 10-Parapet Analysis $ 15,000 Amendment 11-Event Plans $ 36,875 Amendment 12-StormwaterRevisions $ 34,073 . Amendment 13-Smoke Control Removal • $ 173,790 Amendment 14-Site Visits&Alternative Design $ - $ 148,999 Amendment 15-Streets Regrading $ 22,520 $ 88,818 • Amendment 16-Culvert and Cony Ctr Dr redesign $ 70,270 Amendment 17-GMP Reconciliation-add'I $ 49,360 Amendment 18-Additional Site Visits $ 112,649 Amendment 19-East Bridge Retention $ 220,291 • Amendment 20-Steel submittals and Truss loading analysis $ 96,710 Amendment 21-Cameras,vaults,RFIs,kitchen,transition slab $ 80,330 Amendment 22-AIPP (Morris,Ackermann&Harvey) • $ 17,121 Amendment 23-NCRs * $' 10,000 Amendment 24-Sanitary Sewer Lateral -Carl Fisher Clubhouse $ 18,625 Amendment 25-Signage Package Revisions $ 12,030 Amendment 26-Structural submittals&NCRs $ 15,580 Amendment 27-Exhibit hall/Ballroom Vertical Circulation $ 124,240 Amendment 28-19th Street Pump Station Relocation $ 2,585 Amendment 29-RFI 3251&Structural Submittals $ 30,875 Amendment 30-P-Lot Park Revision $ 349,076 Amendment 31-AIPP(Joseph Kosuth) $ 14,570 Amendment 32-Exhibit Hall/Ballroom Vertical Circulation rev $ 11,430 Amendment 33-Plot culvert and rendering $ 13,335 Amendment 34-Structural Submittals&/NCRs $ 50,785 Amendment 35-21st St Park Rev&Culvert repair $ 48,628 Amendment 36-19th St and CA Services $ 136,408 Amendment 37-21st Park,Tree Reconc, 19th St $ .50,320 Amendment 38-Plot Park Repackaging and CA services $ 261,445 • Total $25,436,700 $1,000,000 $2,034,480 $28,471,180 1. Amendments 14, 18,20,23,26,29 and 34 totaling $465,598,funded from Clark's contract via deductive change orders. 2. Amendments 22&31 totaling$31,691 funded from AIPP fund. 6 June 6,2018 August 22,2018 Revised August 31,2018 Revised Mr.Jimmy Morales,City Manager City Manager's Office City of Miami Beach 1700 Convention Center Drive 4th Floor Miami Beach,FL 33139 Re: Miami Beach Convention Center Renovation Resolution No.2014-28538 Proposal 61—P Lot Rescope Proposal Project 20140021.001 A56 Dear Mr.Morales: This proposal is to provide additional design services required pursuant to the City's request to procure the P Lot Park construction,through a design-bid-build procurement process,that is outside of the scope of the Convention Center Construction Manager. This will require repackaging the contract documents for a public bid for construction services, in order to redesign the park to accommodate Design Miami future events. The fee for this additional service is in addition to the previously authorized fee by the City of Miami Beach in Amendment 30. SCOPE OF SERVICES 1. General: a. Develop a package of stand-alone construction documents including drawings and specifications for the scope of work within the back of curb bounded by Convention Center Drive on the east, 19t Street to the north,Meridian Avenue to the west and 18`t'Street to the south; b. Participate in the bidding process with the following activities: 1) Pre-bid meeting attendance for West 8 and Kimley Horn 2) Respond to pre-bid requests for information. c. Permitting and approvals: 1) Submit Packages to Authorities Having Jurisdiction including: a) City of Miami Beach Building and Fire Departments; b) Public Works Department of the City of Miami Beach; c) South Florida Water Management District; d) Department of Regulatory and Economic Resources Wastewater Department. d. Contract Administration with new contractor: 1) Review Contractor submittals; 2) Respond to Contractor Requests for Information (Fee included only for differences from base contract); 3) Provide Site Observations; 4) Review Pay applications; 5) Participate in Project Closeout. e. This scope includes structural design for reinforced pavement sections of park walkways that will bear truck traffic. f. We have included an allowance of$10,000 for the design and contract administration of the fountains of the Design Miami tent. tttya.s tsaxtua, _'yaaD!Mal L N-,T\OE.ttV` pyxit rii .. tut`uttQrltsu talitt lit,uotts0 up3tI `01OU1 u ti tt ttati pprliI I3€'A u,tr. ,. srtti.T;`7apu1W.H t ; :t. is _0, s oz`i f I$o.i11VY pVp €zttttirrls dad uillsod gp t rtrclttttr 3 3dV.Oa'" "I IV'ty tptl tutt ..:S1.;)-.4411p111 ssa tt t t taxa t u011V1Patrtjssat605tr&O attittltrt?0 put"% :).atr 0)poo:,tasju aq tai(ttttt*q :tai: 111,:oAk•oath. a itwt1 031u a€puarrttt 1st rata andaid ascq•rd=>tttptt is apttrA attocsp1 15•{Ir%%itc a itrc a t;att1 I. :3MCt itui noA sftmanuip 4€6 su611011b>.460.r€tj u tr.r t situ 1pttitrOranJJ 1P;11,01,1'34:41d,'polutaaiddk 9.01:toD.4u:):01 uut t nJtputta t se oi.pn rr:ctttwpp 4 tra 1s a t, a.t a tme)9!pttJ u!;,ntt'rtiisse t1O k•txcr,to Iuuop pptt stat icgaq.3 patt3ra6ssit putt satiott:io-u tt p ttaiq;no sr patpc t ` c ' eftIc�Q tot# 14pt;<tt011140ptti 0.6ptitAt8p•ctitr tsaag.�aa:asattt,t0aisfittrlttEi eir, s.tttl,tirttcpl.tbd.utrtsdwn p&p Vit€papttjpuI aau tonuxt Pm.`A.tamto I1 aoi s1soa ZSttadN `(0.0"St's`[990 517.110a Ol.t;Mi€od p itputrt. ..mp t puestltltt,.i paxp"ttl t rrtt 3u tunotott mos-(knit po.sociQul 'rurt` a drat saptnotas asuq.jar 104 saa3 33.4 s tt jitt€1c1q 1 irtpd'.ptr tt €rtatduttl°r 1 0('r)td at;prto:4:$ 0:4,1 4;5 u540(3: .t. £ rOLS nJ '1.1144tp t, tt€fit a ts1p .tt;d 191' attl t€,,rs;t3 ;t attl It.:j;a€1ptt s attt t s,a pra tttoa 11€,0 atrtpntrrs . . Project:. P LotRS$dOpe -Miami Beach Convention Center Renovation&Expansion E031/1.8 ,:„. ,,,„ ,:,:„:„:„„:,:,,:,„„,„„„„:,. iliggParicRedel; ilu:!:::s:,,,; .....,„:„.:.,.....„...:„.,..„,.....,::.: .• Firm .30MMiggin'i'FF'w;, 'WN.iliN:M.V:t:11:N•' Discipline Firm Name . EmPem.,AgF-0.0 :,,ioy:,,,,.,iit,,::i8:o:11.A.. . Number Rip:5:1:fiipa:M,NalE.!:ienuggei!:!:,';!.ig' Architecture . Fentress Architects • 1 .' giggi1 ---Miiniggii$79;40,0' Architecture Arguitectonica 4 •IIIMINkiliginglitiniSiSk. Fire/Life Safety/Code Consulting „Jensen Hughes . • 13: .51,01011181,010gairt!, Civil/Utility Engineering.. . ',Kimley-Horri . ', 6 .1151111FRAIratIfgPli132:4115: Landscape West 8. . 7 lintIOR.iiRti!,,Milliig54,25355: 'StructUral Engineering ,Wallace Engineeting 8 IIII,E,'Oiil!!i!IIMR1,,1]11:il!1!11,511!i:IEII,MiNilli$2Z•955.• Vertical TranspOrtation Lerch Bates , . 12 1,8111111011$1141011116,1115g: Plumb,Mech,Elec,.Lightingg . ME EngineetS . 14-18 11111110!,•iiglil1,1 Iffigg'1.!:,:•tiia51,1„i3S5 IT,Security,AV,Acoustict. . DL Adams 20, t#21,11111.101111111S4 Food Service. Caruso ... 25 .11111NO11211$11111, Graphics and Signage TKD ., , 28 LigiiggiNIERMISMINNUI:# Parking Consultation: Walker Parking :Y 29. 11111111110,11112111051), . Design Fees(Lump Sub.°. $261,445 H. Total EldiggiRRINgig$201:;445,• Total '...'„ A4:00.-.1.91)004490 z3 !wt, ttt'00t`OL$ 0'.9 . ItlO I sanati 1,;00'069'14 91: Otl'c tooi ti3:1 u40 00'l)S' 0 00'011 : I r t P, tr.I;Itr 0070 (t: 00.(KI$ it•1N:Iattia 0000L'SI7S: •t0Z.: 0 't=L. : • tt.ti6atttr tt'00St`9 • , .. 079C Si n9tt 1 . r�xt - . . slt to .. 00'006. t. 00'-tt$. I i istt ugor X10'0$ 0. 00°€11 is It la.N.t0 aJV tvoull' cia:'0$ a 00`oE I :t a��ti s) dtt)00�iac z: 00' LIS ti'lt370014 xV'. asts�F ttttta 00'OUt°L 0'(It $410 011 ZSJIA i3U 51111111404, 00700S'1S' . 00"Si74$ i ipn helot 0(105 000 011 atr 51 t ej 4V Ilials:sj 0070$ 0 0II'0 1 II1 alai .t 90'0091;$: Z . 0o":cL i Elf PP111.lD:tV is ttt ts€ r 00100Z`PE 0')8 :te oK ;yiAtiat std 4Elo .: 00°006$ t :Oa:ZZS• tlaFftpn 1 tutto 08`05 0 0(101 tS It t0 at.y.PIV 01.140.1. 0I10 . O 0WQ5I5 IItootttl,.t . 00 OOk`l t$ L 00'5L I tit t0stag : :....r..,m,:',,.,.%;Rm•Ee:amweigi-a:,..,J,:i.gii,.!:11:;a:Eml,..i:!]!]i,ingin.gatrolmiimen:1:1.!itngiiiigooli•:;$•:5tilitt)iliff•Ati:eitit;;Iiitlii.:§t44.04titjt5Difi!fittii:00ity I°;s; 101 P Lot .00to10 : .itznie -.i orrt 4 socia es Hourly:Rate Hours ExtenNioo. l SK l Stand Alone.'ackp tix: Principal $:230.00 9:0 . • $9,€10 $eni.ot professional $200.00 2.0 $400,0. ProiessionaI $120:0 4.0 • $430.00: A;nai'sriJuniotP oi"essionaj. $1 5.00 8, $840,00 enior."f chnical Support $12500 2.0 $250.00: "llechuical Support _$.105,00 24.0 1c2€0.00 •Support$taff'. $82.50 .4,0 $330,00 . TattuI this s Luffy: Hours 44.8 $020.00. :Principal: :$280.99 0.0 $0.00'. : $•erri r Pr: fess on81' ' $209,00 2: $400.00:; 1''.rntessi€ital 120.00' 16:0 $L920,09 = rialyst itanicar tv:Pssi0ayal $105..00: 32.8• 3,360.00 1n70 Technical SuppOtt :$1, 2.0 $250.00• •Technic l•Support $105;90' 80 $840:09 support Staff: $8.150 4 0 X30.00 .11.7.41*this activity; flours . 04,9: $74.001.90 • tYASK4—C'O? l gliti011ttiall 50141#rnvigiiiiidry*4.60*fid(ONO)1111111111 Principal $288.00 04): $ .110 $r=nii r l eofessioit$ $20000 '.0 r $1,600:00 Prcit scion al.: $1.20.00 40.0 $4,800.00 .Analyst/Junior Proles kraal •$105.00 0.0 .88.400:00 Senior T .chnical.Support 5125.00 •10.0 $1,250.00 Techuic l:Support $105.101 36.0 $3..780.00 Support:Staff 882.50 : .tf $609.00 ' ot€l&this activity:foors, . 182:0 820,490,88 100,rs T0011. 290:11 32,41.0,001 P Lot eseoa. •741.40:::4c8.01 C..onventiou Center l entress l toject NO:2014€002 Page 3 of 6 August.:31 20€ , A Lot:I esc:t est job Tif.10 Hour19 rate 'flatus. E tension onstruct Drawings . Dcsi+.fin hector $375,09 4.01,500.00 rincipal`Direttttr $250.00 0,0 0:00' Project Director1.8.:.°+.1117 1 8,0: $3,330.00 Project iqptnago $165,00 150,0 24,750.00 i.:andscape Designer •5115.00 145.0 $16,675.0.10 Staff Designer $85.00 90:0 $7,650.010 Admititstranv $85..00 184 $1,'30;00. Totals this activity :urs 426.01 $5 .435.01 • ttl iPhas Desirn Tirector. $375.00 0.0 T$0,00 PrincipaVDirector • $250.00 2:0 8500.:00 Project Director •$185.00 19:0: $1,850.00 Project Ma ager $16500 80.0 13,200.00 Landscape Designer $115009 . 409 4.000.00 Staff Desigaer $85'...010 0.0 $0.00 • A rr nistrative: , $85',00 0.0 50:00 'totals tl is taetivierr: Hours .... 132.0 520,150.000 Design.D rector $375.90 0.0. .S000 Principali:;Director •$2.50.00 5.0 1,250.00 Project D.rector $.185.00 250 $4,625.00 •Project.Manager• $165.00 121€.0° •521,120.00 •Landscape•Desi tics $115:00 4. .0 $5075.00 Staff Designer $85.00.• - 0:0 50.00. Adaninis€ratise 885.00. 0.0 e0.00 `70tats this netivity: Ili flours 203,0 832,170.00 :ours TOOT 425.0 8107,755.001 Expenses 8 trtps.:at 1300• 512,000.00 irrigationSubcontractor $5,400.00 8125455.00 P 1 ut Rescope Mimi Bakh Convcnticn tenter Fonts e' Project:.Nu.30140902 i. Pttge: o16. tatttst 314201&2018. iktE i . ot)Tine. Hourly Rat Huurs fx.tettoion • x200:00 G.0' $1,200.00 Associate $1 00.00 00 :0,00': eject M Manager $140.00 0.0 '$0.00 Desi, tet 110„00 0.0, $0.00 D Operator .$9500 0.0 0.00 :,' dnaihistrative Staff $30:00. 4.4 '$320,00 "i't tti1s dais aetiv ty ITou.rs , 10:0: •,1,820.011 Principal 200.00 0 0 80.00 .Associate $160:00 4.d Pt jeer nnager. $140.00 0.0 $0,00'. Designer $4.10.00- 0:0 $0,00 C`AD11.eratc.r .$9 .00 2.0 $1990,00'. Administrative Staff $80;00- 0.0 r tnls tlii+;sr ti r k , Flours-. i.11 8830.00' Principal $200.00` 0 $40000', ssueiat 160.00 4 0 $640.00 rrojeet Manager • $140.00 0; $0.00 Designer . 110.00 0;0 • .80.00 CAD Operator $95.00 0.0 $0.000 Administrative.Staff $30.00 0.0 10,00- T01-111$this acti, ty: Hours . '.0 $1040.(11). Totalx SO•2 . .22:0 3,390:00 14 penses$trips '04006,0, 1.-10 Total 22:0. $1.),3311.4)0 P :rat 1 scrr,ise lia i aaela:C Onnyeiition Center Fentress ProJeet No 2014002;1 eigu,t 31,20:13 • V • t • T Lot sc )e etc Engies ler Icily Title F otcrly Rat Trooptcttsittu. • Principal $240,00 2.0. $56 .0 S&ni r Prot`essiunal $200..00 4.0 $800.0 Prof.ssionai, 130.00 2 t •$2,760.00 Ait.alyst/Jut for Pra:fkssioutli $105.00 23.0 $2,415.00 Senior Technical Suppe' $125.00 6.0 $750.00 Technical uppnrt: $105,00 32.0: $3,36{).00 Support Staff $$2.50 2,0 $1615.00 1'tttals this activity: Tsrtr X2,11' :.S10;810,00 Principal $280:00 0.0 0.00 Senior Professional $200,00. U) 52 0.00 Professional $120.00 2.0 $2 0.00 . tial'stil.urtior Professional 5.105,00 3.0 '$13,40,00 Sea for Technical Support S125,00 0.0 50.00 Technical.Suppolcf 5105,00 ►;0 $0,00 Support Staff S3240, 0.0. $00:00 ,Totals this activity. lata : I l.tl 51 11.00 Total,SuL 1. 92.0 $104810,00 "Cotal,Sub:2 11.0.• `lil,40.00 .11nivnncn i'o*T Yit•Ivz"ottriti€tiuus 10,(31)ll.ti0 tfoors.Totill ID . ._ 522,1)90.00