R9 VCity of Miami Beach Commission Meeting January 16, 2019 2 FDOT DESIGN PROJECT MANAGER Maria I. Perdomo, PE MDX PROJECT MANAGER Claudio Diaferia, PE CONTRACTOR Archer Western - de Moya Group Joint Venture SENIOR COMMUNITY OUTREACH SPECIALIST Oscar Gonzalez CEI SENIOR PROJECT ENGINEER Mark Croft, PE FDOT CONSTRUCTION PROJECT MANAGER Jaqueline Sequeira, PE PROJECT TEAM OWNER’S REPRESENTATIVE PROJECT MANAGER William Detwiler, PE TIMELINE Project Development & Environment (PD&E) I-395 Record of Decision SR 836 FHWA Approval- Categorical Exclusion Type 2 Concept Plans and Request for Proposal Development I-395 and SR 836 Design Change Re-evaluation Signed Design-Build Project Advertisement Letting Final Award Notice to Proceed (NTP) 3 1992 – 2010 2010 2013 2011 – 2016 07/2015 02/2016 04/2017 04/2018 07/2018 PROJECT INFORMATION 4 •Partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX) •Construction Cost: $802 million o FDOT: $616 million o MDX: $186 million •Anticipated Completion: Fall 2023* * Schedule subject to change due to weather or other unforeseen circumstances SR 836 IMPROVEMENTS I-95 CONCRETE PAVEMENT RECONSTRUCTION I-395 RECONSTRUCTION ENHANCEMENTS N PROJECT MAP 5 Consists of three major projects to be constructed concurrently to minimize impacts to the public: •I-395 from I-95 to MacArthur Causeway Bridge •SR 836 from West of NW 17 Ave to Midtown Interchange •I-95 Pavement Reconstruction from NW 8 St to NW 29 St SR 836 ENHANCEMENTS MIDTOWN INTERCHANGE ENHANCEMENTS I-395 ENHANCEMENTS PROPOSED FEATURES UNDER I-395 I-95 ENHANCEMENTS 6 7 SR 836 ENHANCEMENTS/DOUBLE-DECKING EXISTING TYPICAL SECTION NEW TYPICAL SECTION SR 836 Local/I-95 Access SR 836 Mainline 8 SR 836 ENHANCEMENTS/DOUBLE-DECKING N I-395 Mainline •Limits: West of NW 17 Avenue to the SR 836/I-95/I-395 Midtown Interchange •Add capacity to SR 836 and improve flow of traffic •Double-decked SR 836 section provides a direct connection to/from I-395, PortMiami Tunnel and Miami Beach that bypasses traffic entering and exiting local roads and I-95 NW 1 7 A v e SR 836 Mainline SR 836 Local/I-95 Access MIDTOWN INTERCHANGE ENHANCEMENTS 9 N 2 Extend Auxiliary Lane on northbound I-95 to receive additional ramp lane 2 SR 836 Mainline I-395 Mainline Double-decker maintains separation of thru traffic and local traffic through the interchange 3 3 Additional lane on the SR 836 EB to I-95 NB ramp to improve flow of traffic 1 1 10 •Reconstructing I-395 from the Midtown Interchange to the MacArthur Causeway Bridge •Improving capacity and safety by separating local and I-95 ramps from through traffic •Building a new Signature Bridge over NE 2 Avenue and Biscayne Boulevard •Facilitates evacuations of the City of Miami Beach when necessary I-395 ENHANCEMENTS NE 13 St N I-395 Mainline Signature Bridge 11 I-395 ENHANCEMENTS/SIGNATURE BRIDGE RFP Length Requirement – 650 ft Existing condition - NE 1 Avenue looking west. 12 Increased vertical clearance will allow more light into the areas under the bridge I-395 ENHANCEMENTS/PROPOSED FEATURES UNDER I-395 2 2 4 4 6 6 1 1 3 3 5 5 13 Under-deck and other light fixtures will provide ample lighting. I-395 ENHANCEMENTS/PROPOSED FEATURES UNDER I-395 TURNING NIGHT INTO DAY 14 •Limits: NW 8 Street to NW 29 Street •Pavement replacement will enhance rideability •Extension of auxiliary lane from NW 17 Street to NW 29 Street will improve the flow of traffic on the widened eastbound SR 83 6 and westbound I-395 ramps to northbound I-95 •New connector ramp from southbound I-95 to westbound SR 836 will enhance the flow of traffic and reduce weaving movements I-95 ENHANCEMENTS N N W 1 7 S t N W 2 9 S t * This schedule does not reflect days added to the contract for holidays, weather days or special events CONSTRUCTION Project is a Design-Build – Design plans underway Preliminary construction activities have begun with major construction anticipated to begin March/April 2019 Construction will be done in phases to minimize construction impacts to the public Vibration monitoring equipment will be utilized during drilled shaft/pile driving operations 15 16 CONSTRUCTION MILESTONES N Improve operations on NB I-95 by extending auxiliary lane Open Communal Areas under I-395/Complete Project MAINTENANCE OF TRAFFIC (MOT)/HOURS I-395 SPECIFIC Mainline Nightly Closures • 10 pm to 5:30 am Sunday thru Thursday • 1 am to 7 am Saturday and Sunday SR 836 SPECIFIC Mainline Nightly Closures • 8 pm to 5:30 am Sunday thru Thursday • 8:30 pm to 9 am Friday • 8:30 pm to 11 am Saturday I-95 SPECIFIC Mainline Nightly Closures • 9 pm to 5:30 am Sunday thru Thursday RAMPS​ • 10 pm to 6:30 am Sunday thru Thursday​ • 11 pm to 7 am Friday and Saturday​ SPECIAL NOTES: •Special events will be taken into account when scheduling closures •Hours noted above are for single lane closures, multi-lane closure will occur later •Weekend lane closures will be permitted on I-95 from 11 p.m. on Friday to 5:30 a.m. on Monday •The contract documents allows for weekend closures on certain ramps 17 I-395 maintenance of traffic and schedule under review. Initial bridge foundation work on I-395 will begin in March/April and will mainly be done outside of I-395 mainline travel lanes within FDOT ROW. Open temporary, single lane westbound I-395 ramp to northbound I-95 in the summer of 2019 to construct new ramp (estimated duration 18-20 months). Closures on mainline I-395 to be done during off peak hours. Team will coordinate with City Communications, Public Works, Transportation, CIP and other Departments as needed. Portable message signs to be placed well ahead of closures to provide advanced notification. Message signs will be placed within City limits along Alton Road and 5 Street. 18 MAINTENANCE OF TRAFFIC - I-395 SPECIFIC •Provide drivers with real-time travel information; •Encourage motorists to take alternate routes; •Clear incidents more quickly, thereby reducing secondary incidents; and •Make work zones safer for highway workers and motorists. Smart Work Zone Management System (SWZMS) - The project will implement a SWZMS that will utilize Intelligent Transportation System (ITS) Devices such as traffic cameras, data collection devices and portable message signs to: TRAFFIC MANAGEMENT SYSTEM UPCOMING ACTIVITIES - SIX MONTH LOOK-AHEAD 20 Utility relocations Surveying and Geotechnical Exploration-Test piles Continue to develop roadway and bridge plans Construction along I-95 in the median and begin concrete replacement Preparing SR 836 for double-decking Construction of the I-395 bridge foundations UPCOMING ACTIVITIES - PROPOSED TEST PILE SITES 21 22 COMMUNITY OUTREACH PROJECT WEBSITE •www.i-395miami.com •Sign-up for project alerts/updates Lane Closure information Upcoming construction activities Presentations •Calendar of events OUTREACH OFFICE IN THE OVERTOWN COMMUNITY •1035 NW 3 Avenue, Miami, Florida 33136 STAKEHOLDER MEETINGS •Next Stakeholder Meeting on January 28, 2019, at MDX Headquarters •Ongoing individual stakeholder meetings and presentations 786-280-0983 OGonzalez@mrgmiami.com Contact: Oscar Gonzalez www.i-395miami.com 23