Resolution 2019-30689 RESOLUTION NO. 2019-30689
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE
CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE
RECOMMENDATIONS OF THE FINANCE AND CITYWIDE PROJECTS
COMMITTEE AND AUTHORIZING THE USE OF PARKING
DEPARTMENT YEAR-END SURPLUS FUNDS TO FUND THE ANNUAL
INCREMENTAL OPERATIONS AND MAINTENANCE COSTS OF THE
PROPOSED INTELLIGENT TRANSPORTATION SYSTEM PROJECT
(PROJECT); AUTHORIZING THE EXTENSION OF THE TROLLEY
ADVERTISING PILOT TO GENERATE REVENUES TO REDUCE THE
AMOUNT OF PARKING SURPLUS FUNDS NEEDED; AND, IN THE
LONGER TERM, AUTHORIZING THE USE OF FUTURE REVENUES
FROM THE CONVENTION CENTER HOTEL GUARANTEED RENT TO
FUND THE PROJECT.
WHEREAS, since 2014, the City of Miami Beach has been providing Traffic
Monitoring and Management Services for 14 hours a day, 365 days a year,, as part of a
citywide program intended to reduce congestion, improve incident management, and
improve traffic flow through construction zone management and special event traffic
management along the City's principal corridors; and
WHEREAS, the existing program consists of the deployment of temporary traffic
monitoring cameras, travel-time data collectors, and portable Digital Message Signs
strategically placed throughout the City to monitor real-time traffic conditions, inform
motorists, and deploy mitigation strategies along the following corridors:
• MacArthur Causeway
• 5th Street
• Washington Avenue
• Collins Avenue — 5th Street to 63rd Street
• Alton Road
• 17th Street
• 41st Street
• Julia Tuttle Causeway
• Indian Creek Drive
• 63rd Street
• 71st Street— Indian Creek Drive to Collins Avenue; and
WHEREAS, in comparison to pre-existing conditions, the Traffic Monitoring and
Management Program has resulted in an average travel-time improvement of 22%
along the monitored corridors; and
WHEREAS, for Fiscal Year 2018/19, the cost of the Traffic Monitoring and
Management Service is $499,000, excluding salaries of City staff who assist in the
operation and management of the program; and
WHEREAS, parallel to this effort, the City of Miami Beach has been working in
the development of an Intelligent Transportation System/Smart Parking System
(ITS/SPS) Project, which proposes utilizing advanced technology to improve traffic flow,
parking efficiency, and provide real-time traffic information to the motoring public; and
WHEREAS, In addition to the existing corridors currently managed, the ITS
Project includes the following corridors:
• Meridian Avenue
• Dade Boulevard
• West Avenue
• Harding Avenue/Abbott Avenue
• Collins Avenue — 63rd Street to City Limits
• 71st Street/Normandy Drive — Indian Creek Drive to City Limits; and
WHEREAS, further, even on existing corridors, the more robust ITS Project will
provide increased camera coverage, improved data processing, and improved
messaging to motorists; and
WHEREAS, federal standards in the Manual On Uniform Traffic Control Devices
(MUTCD) specify that crosswalks at signalized intersections must be equipped with
pedestrian signals; and
WHEREAS, the SPS system will display information on parking availability in
garages via digital message signs located outside City-owned garages and some
parking lots, and on digital message signs throughout the City during high impact
periods; and
WHEREAS, the ITS/SPS Project is anticipated to improve travel-times by an
average of 13% in addition to the 22% improvement currently achieved by the existing
Traffic Monitoring and Management Program (i.e., an overall improvement of 35% in
travel-time over pre-existing conditions) and significantly improve the ability to gather
data and make decisions to improve traffic flow on a real-time basis from the Traffic
Management Center; and
WHEREAS, at its July 13, 2016 meeting, the City Commission directed staff to
proceed with the ITS/SPS Project and issue a Request for Proposals (RFP) for Design,
Build, Operation, and Maintenance (DBOM) Services; and
WHEREAS, in December 2017, the City commenced negotiations with the
selected firm, Transcore ITS, LLC ("Transcore"); and
WHEREAS, as of November 2018, the City has finalized negotiations with
Transcore and the Administration is ready to execute a DBOM contract with Transcore
that includes 6 Phases; and
WHEREAS, the adopted FY 2018/19 Transportation Department Operating
Budget includes funding in the amount of $600,000 for the ongoing Traffic Monitoring
and Management Services, which is sufficient to cover the current contract as well as
cover Phases 1 and 2 under the new contract in the summer, if the notice to proceed is
given in January 2019; and
WHEREAS, the total cost for operations and maintenance for all six (6) Phases
is $2,018,000 annually; however, a reduction in operating hours has been explored
based on an analysis of travel-times and incidents experienced in the current Traffic
Monitoring and Management Services; and
WHEREAS, under the reduced service scenario, the cost for operations and
maintenance of the ITS portion of the project would be $1,638,298; and
WHEREAS, the Parking Fund is anticipated to generate approximately $6.04
million per year or revenues in excess of expenditures in FY 2019 with the recent fee
increases; and
WHEREAS, at the end of FY 2018, $1.166 million was transferred to the General
Fund; and
WHEREAS, assuming that the Plan to eliminate the General Fund contribution is
followed, this would leave $1.519 million in annual surplus available for other uses
including ITS; and
WHEREAS, given that the additional transfer of $1,037,000 from the Parking
Fund would significantly reduce the potential use of surplus funds for other parking
purposes, the Administration has recommended that the Trolley Advertising pilot be
extended, and that some or all of the $500,000 in projected Trolley advertising revenues
be used for Transportation, thus significantly reducing the amount of funds needed from
the Parking Fund; and
WHEREAS, at the December 14, 2018 Finance and Citywide Projects
Committee (FCWPC) meeting, the Administration recommended the above strategy to
fund the annual operation and maintenance costs of the ITS portion of the ITS/SPS
Project and the FCWPC endorsed the recommendation; and
WHEREAS, in the longer term, the FCWPC recommended using future revenues
from the Convention Center Hotel guaranteed rent; and
WHEREAS, in November 2018, Miami Beach voters approved, via referendum,
the construction of a Convention Center Hotel and, further, that the City adopt an
ordinance to dedicate the Hotel's guaranteed rent payments to enhance funding in
equal portions annually for stormwater projects, traffic reduction measures, and
education; and
WHEREAS, given that the Convention Center Hotel is anticipated to open in
2022, and funding for the operations and maintenance of the ITS portion of the ITS/SPS
Project would be needed as early as FY 2020/21, the additional parking funds may only
be needed for 2 years if this strategy is followed.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City
Commission hereby accept the recommendations of the Finance and Citywide Projects
Committee and authorize the use of Parking Department Year-End Surplus funds to
fund the annual incremental operations and maintenance costs of the proposed
Intelligent Transportation System Project; authorize the extension of the Trolley
Advertising Pilot to generate revenues to reduce the amount of parking surplus funds
needed; and, in the longer term, authorize the use of future revenues from the
Convention Center Hotel guaranteed rent to fund the Project.
PASSED and ADOPTED this 4,.day of 3u , 2019.
ATTEST:
Dan Gelber, Mayor
y341qR ael E. Granado, Citlerk ,simmuu,„1
APPROVED AS TO
�� .S -�s",, FORM & LANGUAGE
��4 &FOR EXECUTION
-\<-..-4;*:).\.'1<:>10;;•-
'•1
'•;--37-75ci:(.
City•Attomeyc.(—- Date
� ` ORATED.
• .....rr: \c- i
1 26 yy
Resolutions - R7 K
MIAMI BEACH
COMMISSION MEMORANDUM
TO: Honorable Mayor and Members of the City Commission
FROM: Jimmy L. Morales, City Manager
DATE: January 16, 2019
SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF
MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE
FINANCE AND CITYWIDE PROJECTS COMMITTEE TO ENDORSE THE
FUNDING STRATEGY TO USE PARKING DEPARTMENT YEAR-END
SURPLUS FUNDS TO FUND THE ANNUAL INCREMENTAL OPERATIONS
AND MAINTENANCE COSTS OF THE PROPOSED INTELLIGENT
TRANSPORTATION SYSTEM AND AUTHORIZING THE EXTENSION OF THE
TROLLEY ADVERTISING PILOT TO GENERATE REVENUES THAT REDUCE
THE AMOUNT OF PARKING SURPLUS FUNDS NEEDED.
RECOMMENDATION
The Administration recommends that the Mayor and City Commission accept the recommendation
of the Finance and Citywide Projects Committee (FCWPC) and endorse the funding
strategy, consisting of extending the trolley advertising pilot and allocating those revenues along
with Parking Funds to fund the annual operations and maintenance costs of the Intelligent
Transportation System (ITS) portion of the ITS/Smart Parking System (SPS) Project.
BACKGROUND
Since 2014, the City of Miami Beach has been providing Traffic Monitoring and Management Services
as part of a citywide program intended to reduce congestion, improve incident management, and improve
traffic flow through construction zone management and special event traffic management along its
principal corridors for 14 hours a day, 365 days a year. The service hours are extended during four (4)
major special events per year.
The existing program consists of the deployment of temporary traffic monitoring cameras, travel time
data collectors, and portable Digital Message Signs strategically placed throughout the City to monitor
real-time traffic conditions, inform motorists, and deploy mitigation strategies along the following
corridors:
• MacArthur Causeway
• 5th Street
• Washington Avenue
• Collins Avenue—5th Street to 63rd Street
Page 1172 of 1648
• Alton Road
• 17th Street
• 41st Street
• Julia Tuttle Causeway
• Indian Creek Drive
• 63rd Street
• 71st Street— Indian Creek Drive to Collins Avenue
These services are performed by a contractor under supervision of City Transportation Department staff
in addition to other strategies such as traffic text alerts, Traffic Congestion Specialists and a City Traffic
Engineer with access to the County's traffic signal timing system to monitor and modify signal timing on a
real-time basis to mitigate congestion.
The Traffic Monitoring and Management Program has resulted in significant improvements to the
operation of the City's roadway network. In comparison to pre-existing conditions, the Traffic
Monitoring and Management Program has resulted in an average travel time improvement of 22%
along the monitored corridors. For Fiscal Year 2018/19, the cost of the Traffic Monitoring and
Management Service is $499,000, excluding salaries of City staff who assist in the operation and
management of the program.
In parallel to this effort, the City's Transportation Department has been working on a comprehensive
Intelligent Transportation System(ITS)and Smart Parking System(SPS) Project since 2015.
The City of Miami Beach ITS/SPS Project proposes to utilize advanced technology to improve traffic
flow, parking efficiency, and provide real-time traffic information to the motoring public. The project
elements are described in Attachment A.
In addition to the existing corridors currently managed, the ITS Project includes the following corridors:
• Meridian Avenue
• West Avenue
• Harding Avenue/Abbott Avenue
• Collins Avenue—63rd Street to City Limits
• 71st Street/Normandy Drive— Indian Creek Drive to City Limits
Further, even on existing corridors, the more robust ITS Project will provide increased camera coverage,
improved data processing, and improved messaging to motorists. These improvements will enhance the
City's ability to manage traffic and accurately inform motorists of traffic and parking conditions.
Finally the SPS system will display information on parking availability in garages via digital
message signs located outside City-owned garages and some parking lots, and on digital message signs
throughout the City during high impact periods.
It is worth highlighting that all the above-ground technology proposed in the ITS/SPS Project will
be aesthetic and contextual to Miami Beach. With the implementation of the ITS/SPS Project, the driver
will experience improved travel times and be provided clear, real-time information on parking and traffic
conditions.
The ITS/SPS Project is anticipated to improve travel times by an average of 13% in addition to
the 22% improvement currently achieved by the existing Traffic Monitoring and Management
Page 1173 of 1648
Program (i.e.. an overall improvement of 35% in travel time over pre-existing conditions) and
significantly improve the ability to gather data and make decisions to improve traffic flow on a
real-time basis from the Traffic Management Center(see below) .
The technology proposed will be able to adjust to roadway incidents, such as accidents, emergency
construction or lane closures, bridge closures, special events, and other incidents that impact traffic flow.
The implementation of the proposed technology will also reduce the number of police officers needed for
traffic control, reduce congestion, reduce gasoline consumption, and reduce greenhouse gas emissions.
The travel time savings, incident clearance, and environmental benefits will be monetized on a monthly
basis to show benefits to the City.
Traffic Management Center
As part of the ITS and SPS project, a Traffic Management Center (TMC) will be implemented and
staffed with traffic operators to monitor traffic conditions and deploy traffic management initiatives as
needed. All the aforementioned devices will communicate with the TMC where data will be compiled,
analyzed, and utilized for real-time decision making on traffic mitigation strategies, traffic routing, signal
timing modifications, and incident management. The TMC for the City's ITS/SPS Project will be
located within the FDOT's District VI Sunguide Center. This co-location of the TMC will not only
represent savings to the City's ITS/SPS Project, but will also improve the coordination and
communication between both agencies to benefit the traffic flow in the region.
Project Phasing
As part of the Project Plan, the ITS/SPS Project was divided into six (6) phases based on the
importance of the corridor to the roadway network (Attachment A). The project phases are described
below.
Phase:
1. MacArthur Causeway, Alton Road (5th Street to Julia Tuttle Causeway), Julia Tuttle
Causeway, 17th Street (Alton Road to Washington Avenue), Dade Boulevard (Alton Road to
Washington Avenue)
2. 5th Street, 41st Street, Washington Avenue
3. Collins Avenue (23rd Street to 44th Street), Indian Creek Drive/Collins Avenue (44th Street to
City Limits), Alton Road (Julia Tuttle Cswy to 63rd Street), 63rd Street (Alton Road to Collins
Avenue)
4. Collins Avenue (5th Street to 23rd Street), Indian Creek Drive (26th Street to 44th Street)
5. Harding Avenue/Abbott Avenue
6. Meridian Avenue, West Avenue
The phasing is subject to the City's discretion.
Prior City Commission Action
At the June 10, 2016 Neighborhood/Community Affairs Committee (NCAC) meeting, staff presented the
ITS/SPS Project and received endorsement from the Committee. The recommendation from the NCAC
was presented at the July 13, 2016 City Commission meeting. At that meeting, the City Commission
accepted the NCAC recommendation and directed staff to proceed with the project and issue a Request
for Proposals (RFP)for Design, Build, Operation, and Maintenance (DBOM) Services.
Contract Negotiations
In December 2017, the City commenced negotiations with the selected firm (Transcore). Transportation
Department Staff, Procurement Department Staff, and the Program Manager (Kimley Horn) have held
Page 1174 of 1648
ten (10) meetings with Transcore. Over the past year, the City has been successful in lowering the
capital cost of Phases 1 and 2 by 43.1%. In addition, through the negotiation process, the operations
and maintenance for Phases 1 and 2 has been reduced by 10.3%. The operations for the ITS/SPS
Project would cover 16 hours per day, 365 days per year of service.
Current Funding Status
Since 2015, the Budget Department and Transportation Department have worked together to identify
capital and operating funds for this project. Capital funding for design and construction of all six (6)
phases were identified and approved as part of the Fiscal Year (FY) 2018/19 Capital Budget. The
capital cost of the ITS portion of the project (all 6 phases) is currently fully funded by Half-Cent Transit
Surtax/People's Transportation Plan (PTP) Funds (Fund 187 and Concurrency Mitigation Fund (Fund
158). The SPS portion of the project is funded by Parking Operations Fund (Fund 480).
Portions of Phases 1 and 2 of the ITS/SPS Project are anticipated to be completed in late FY 2019 and
all 6 phases should be completed by FY 2022/23
ANALYSIS
As of November 2018, the City has finalized negotiations with Transcore ITS LLC and the
Administration is ready to execute a DBOM contract with Transcore for Phases 1 and 2.
The operating cost for the SPS portion of the project is approximately $30,640 per year for
Phases 1 and 2 and $37,860 per year for full project implementation. These costs will be fully
funded by the Parking Fund. The adopted FY 2018/19 Transportation Department Operating
Budget includes funding in the amount of $600,000 for the ongoing Traffic Monitoring and
Management Services, sufficient to cover the current contract as well as cover Phases 1 and 2
under the new contract in the summer, if the notice to proceed is given in January 2019. The
negotiated cost for operations and maintenance of Phases 1 and 2 of the ITS portion of the
Project is $1,813,000 annually. The total cost for operations and maintenance for all six(6) phases
is $2,018,000 annually. A reduction in operating hours has also been explored based on an
analysis of travel times and incidents experienced in the current Traffic Monitoring and Management
Services. The reduced hours of operation is similar to the existing hours of traffic monitoring and
management but covers the additional corridors and enhancements to existing corridors described
previously. The Administration recommends the reduced service scenario at this time.
The table below depicts the estimated annual operations and maintenance costs for various
phases and scenarios of the ITS portion of the project:
16 Hours Per Day,365 Days Per
Base Negotiated Scenario Year, 5840 Hours
Operations and Maintenance Yearly Cost- Phases
1 and 2 $1,813,000.00
Total Operations and Maintenance Upon Full
Deployment(Phases 1-6) $2,018,800.00
Scenario for Reduced Service
14 Hours Per Day(Monday-
Friday)
12 Hours (Saturday)
Page 1175 of 1648
Service Hours 11 Hours (Sunday)
Service Hours Per Year 4836 Hours
Cost Per Year Under Reduced Scenario (Phases 1
and 2) $1,471,286.75
Cost Per Year Under Reduced Scenario(Phases 1-
6) $1,638,297.68
Note:Table does not include the cost for Operations and Maintenance for SPS
(approximately$30,640-$37,860 per year) as this cost will becovered by the Parking
Department.
Based on a Five (5) Year Transportation Operations Financial Forecast (Attachment B) prepared
by the Budget Department, the following table depicts the additional funding each year that would
be needed beyond the Transportation Department's Operating budget for the reduced service
scenario.
Fiscal Year (FY) Additional O&M Funding Required Per FY
FY 2019/20 $130,000.00
FY 2020/21 $1,037,000.00
FY 2021/22 $1,072,000.00
FY 2022/23 $1,106,000.00
FY 2023/24 $1,139,000.00
Note: FY 2019/20 reflects the impact of the $1.25M FDOT grant for the South Beach Trolley
As shown below, the Parking Fund is anticipated to generate approximately$6.04 million per year
or revenues in excess of expenditures in FY 2019. A minimum of $3 million per year is
recommended to be set aside for renewal and replacement needs for parking lots and garages,
and an additional $1.521 million is currently transferred to the Transportation budget each year from
the year end surplus. At the end of FY 2018, $1.166 million was transferred to the General Fund.
Assuming that the Plan to eliminate the General Fund contribution is followed, this would leave
$1.519 million in annual surplus available for other uses including ITS.
FY18
FY14 FY15 FY16 FY17 (OBPI FY19
estimated Adopted
as of Y/E)
Operating Revenues 40,534,422 42,850,715 52,253,637 47,489,549 48,583,000 50,696,000
Operating Expenditures* 32,603,266 33,208,823 41,248,202 43,270,595 44,170,000 44,653,800
Net Annual Operating Surplus 7,931,156 9,641,892 11,005,435 4,218,954 4,413,000 6,042,200
Given that the additional transfer of $1,037,000 from the Parking Fund would significantly reduce
the potential use of surplus funds for other parking purposes, the Administration would recommend
that the Trolley Advertising pilot be extended, and that some or all of the $500,000 in projected
advertising revenues be used for Transportation, thus significantly reducing the amount of funds
needed from the Parking Fund.
At the December 14, 2018 FCWPC meeting, the Administration recommended the above strategy
to fund the annual operation and maintenance costs of the ITS portion of the ITS/SPS Project.
Page 1176 of 1648
In the longer term, the FCWPC recommended using future revenues from the Convention Center
Hotel guaranteed rent. In November 2018, Miami Beach voters approved, via referendum, the
construction of a Convention Center Hotel and, further, that the City adopt an ordinance to dedicate
the Hotel's guaranteed rent payments to enhance funding in equal portions annually for stomiwater
projects, traffic reduction measures, and education. Given an anticipated minimum guaranteed rent
of $2,000,000 annually, the City would allocate approximately $667,000 to traffic reduction
measures. If these revenues were to be dedicated to the ITS portion of the ITS/SPS Project,
they would offset the funding contribution needed from the Parking Department. The Convention
Center Hotel is anticipated to open in 2022, and funding for the operations and maintenance of the
ITS portion of the ITS/S PS Project would be needed as early as FY 2020/21. Thus, the
additional parking funds may only be needed for 2 years if this strategy is followed.
KEY INTENDED OUTCOMES SUPPORTED
Ensure Comprehensive Mobility Addressing All Modes Throughout The City
Legislative Tracking
Transportation
ATTACHMENTS:
Description
❑ Presentation to FCWPC
❑ 5-Year Transportation Operations Financial Forecast
Page 1177 of 1648
(7\
trA .\\II\ A M Li B Z C
- ,tet ` PRESENTATION TO FINANCE AND CITYWIDE
w
i'1. . PROJECTS COMMITTEE
ANIN e
I
Ke . G . -- .----t '7--'77'7:''..-.''''' ,, -
,�~ ; ; 1 �, INTELLIGENT
i ° TRANSPORTATION
1/ / Am,
.7., ,„1,04:, y
______ . ... _. __ ._ . _ . _ ___ _ . ....
SYSTEM A N D
. : �,.,„ ,
, 1 'v.,,Y,
: , ,1 SMART PARKING
•
,,.,,,,, ,,,. .`_ •e ,,l ,� « SYSTEM PROJECT
t- imiweiii ., 0,„--.71.00---, ,,
_ .
r-- . t '+ d 4 hly N wr4,.
r f • 4 «ry' p
V
111.
I) ., ..,..4.•
. *
December 14, 2018
. .,\• . ,00000001e,
Or'''
Vir
' '•- Page 1178 of 1648
III H
■ ■ a
Cityof
Ii
;
Miami
1
i 11 d e
, ..... . ,. . 7i . ,. .„ _ . masiodirc4L-
,, .
Beach .._ i - -- -• . - ,
4;, • 2016 City of Miami Beach ;,...:_..
. ._ . .
•...„ _ ..„
...... ._ 4:•rtoti. _ ,, _. ,410.,..._ _Aar „____!. _,..,
r = v
_.._I
Community Satisfaction :�. r, ' - �' -•. Alt;4,-P., �� '.
Ana
Survey pat traffic + " " ' '
congestion and de raded • x t el��* T _
traffic flow as the number _ • i• ;;;J111.1"...a ~ ,.. . 1:1
•-111+ r,one
'ales
i one problem on resident's , ; ;; ; ....�t r. . ..�.- ..
r. t a1 1 *' Y
minds �I , •, �, , • "..r a;.
i �'', • "1 �,n11 i7
rr _
S j r
00.400
e _ f a .. ' 1 of /r'OW/r
• r :t +^ 'F"'-.4� 1 of yrs/
_Rage: ��� % r?,�t ,l,"".• , r %s,i
• en 14 [7) Program Management Services
!; Lit;`' '. - ;�•> w for an Intelligent Transportation Management System and Parking Management System
RFO 2015-115-JR
Prior. City C mmissi, n Action
• June 10, 2016: NCAC endorsed the project
• July 13, 2016: City Commission accepted the
recommendation of the NCAC and directed the
Administration to issue a Request for Proposal for Design,
Build, Operation, and Maintenance DBOM Services and
authorized City Manager and City Clerk to execute a
contract with the selected firm
Given the new members of the City Commission the
- project is being re-introduced and funding strategies
for future years are being presented to the FCWPC.
Page 1180 of 1648
��. _ ' Program Management Services
9 9
1� — 1 Y' – -- _ for an Intelligent Transportation Management System and Parking Management System
RFU 2015--,1;-JR
Current
Traffic Management
• Existing Traffic Monitoring and Management Effort
Equipment
• 25 Cameras
• 32 Travel Time Detectors
• 9 Construction Dynamic Message Signs (DMS)
Process
• Incident or congestion observed on the cameras or travel time
• Reported via email to Traffic Management Distribution List
• Coordination with Transportation Department, PSCD, Police
Department , and Communications Department
• Text Alert Issued
• In the case of lane closures: DMS are programmed remotely
• No travel time or parking capacity information is provided because of
fluctuation in that info gm ilol648
, .
. ,,
, ,,, 1 ,,'' '',, ,\ j 7,Y,--- ::.,':. ,1--'''___:, Program Management Services
' ' ' I " L ,4 11 ' --- '- 1, ,'\:,--',.' ' for an Intelligent Transportation Management System and Parking Management System
RFC)2015-115-JR
IriteIiigent N. ,
on Systems
• Cameras I • Travel Time Detection (Bluetooth)
7------- ,
• .
lir • salit---,4 . '....
111 . , '.. Ir'A.;:• ' ith 43:
, 1
1 111
F-5--
I ,
e.„.....
7---------,
41
• Vehicle Detection • Dynamic Message Signs (DMS)
-7-r-r . ...
.. ,
4`,,r:,,, ,.' ,., • .• -
c .
----
t.- .:: . r• • 4
7. r
-.-.._ . k 7 ''-'1*
/:
I
44;.
/
A- ,
' • .
ego--•"-•
,.,',tji„ ' .,.. ,.• , 107-4,e..,:.4,:c „ •
..--.4 ': ''' ' 3 '. . t
. . •
II k -1,- ,,-1 —r-
-.,
1
, ..
/.
• .'
'' dr Id V 414X. • • NO- i ..
, .. . . •• . ,•,,•,,,... . ._....... 1,. ,
ea
1
, •t.
-
-.•- : • 1648 . 1 , _., - -- -
Vim bill\\\I-inrn
•--;
:. ..... .
li 1 Program Management Services
iN i'i
_ i ‘,, ; 0 i II for an Intelligent Transportation Management System
.
.. _
. . .,
.. _,
and Parking
M
an
agement System
RFO 2015-115-JR
Traffic na ement Center (T ]c)
. .
,
,
,
;
• Co-Location at FDOT District 6 SunGuide TMC
. ,
• video Wall .
, . . ;
. ;
• .
, . .
• Management Software . ..
. . .
•
• •
.
,_•...., , ,...,AL
-.„„J....".m
•= -„, - ., k
i It .,..t_3-
..,-..:-_-_ • ...,,-_,•:,
;1:43- 13100,01 32:31:30 •
.7:L. , wear :3. • ,
.,-,. • ,' , - , . '. ' 4 .§-i.kj it, AT,,,
11111.' ' - . -4,- c.k..to,..v..,4,,,11 \....N.---„--. •-
..' .2..1 .. •,.-AMMENiNONIEJ: * • ..:' -
—-
-_.
\ ,.T.-TO -.,:s-. z.• ...MN,'" 3..
i'1 •..,.
--
;' ''''-41-7.f.7T'',7,- E,,'".,.2'72''''''..704.1'.• '-'4,..:' - .., . .- • ,r-r*1 H ,
itt-C...., I 'trNtt, ;Htl i't.'. t 7"_ — --- - ---- --. . . . , -......_M Ad:l NI NM-----•.
Ar ''_:-.....•g` •• .,.•v -:d• '• '''.' 1.1 ,„ _ __ ,, . :
.._ , - ,,,,,,,. ,..;,:-e•-- - ,-•77," ' ,,.:.. .,...• it r 71,Ei ,
.1•74,1/4 . . LitliiI ___ mall :_=--- : _ :,.,:•,,..,., ,... . •.- :
! i !I i ! i I i I !
• •.. . ,
"I'
\ I '1,-*.7: •"'•' ..:.,"''''- :-.•: •::!.-A _—
. _- '... ., .. ----- ' .•'f.,II:- __
r,;,.:::,-„-`1.,,..,.;..,...7Z•. •.'"1 .,••.../1.4 ,„.,-.:. - 113Z ..• . , . -......,.. ____ _ _ - -- - •=1'1'''''''" 1,•1,r1,..r1
a' :_:._, -,-, ..,...___•__.--"In•52?2_,.. • -.,• ••,,,.. rim, _______ ,2 .,, ..,,,,.,..)„ .,......„.,;4;./.:j
, <711,-...-,..._1,14. .1.
'.....•••..-.2.- -11-- . .
,.... =lc,_ _1=1. ..,.,3, 1 .,_2_... r.
--'''''',-. 1:3.4-111.01W.-4--•- •'''''' - ---,„ -:--• "V-, V,, ,,,,,,, .,,k - ,..) , 7-
- ,e,r,.‘"t....,• ,, 3..:.." -3, -. ,', 1__-:_. , ' -.• 4..k.,,A,, .:.,7,- Q' V.' I\ ki:-,_- -- - ,..+.'Y (....----;-",
-.''' --': .Za, 7,.--'`="--.-- ---...-•..* 0 71
'''',Pr,;',', •`"?' "', -.7---4''''' .10.• 1":"..___•:---‘11-'-'1....L,--, - -
'' ' i3 f-g.---.3z.- -.-,,,_ __•-- -,;,-
).,
.A • .3-‘i ..., - : ' .4
. i .!-.1 - ';',P711,7- - .1:2-7...s .-;;—i. •C‘,".-2..-.3. --__
. !
-...,-4-TF-,
- -,,
. ,
, • -- - ,
. _ --11 il 1-''"--‘,-•',-..'?-‘ %.• ..-,.., . ,,,.,... . 1- -„,, I. ''' — ___ • ...-I!' Al.
, .„.-' - . -N‘st ---- ..---7-4 ...1 ,1 —I 1,..r.,,,,,• iiii,,,.._..-s, c;',".--,r) ., ---...•-; • 1 - .. . -- ,•1
, ..'roso:"*.,---- '<1.0. -- ,-.--7-r'''74*-- ..;_,_31 ,Whz.' .'•:".--'.-',..- '•,....4;,..-,.,',,:„ ' .---71.a
._... .
!......-„,i---f-1.,,,..4:,,:rk6 ,c:
, • --
,,,,, ,, • . , . wirm- .
..._ ,.,,.• .__••• ... .,... . ,flii . t....------ z_
..f.... --- V• i,
f---- - /".---"----4 V.'''' ..,1 , , , .-•-••r-.••,..
t -- ,—•, lily ' ' 4',,' - - i.' --,, 1 ., ,
, •_, ,
p. ' ---• • - '4, ',‘''''.4:$:-,-: •b, • -,,_.. ..,• . ,.4.R...i-- I ,:,
(77...,
'"-e-v614'.- 5,ii.111,,e,'` -,' 1-• .k- ' .._,,-...;..--,.. I,' - _ . -
V , ,
ItimigatiA\I-Inrn
'Adair-' tr''', . A •', ‘ • 1 ---, r----= A, .-:----z i- - Program
' Jilk ' il' '•',' 1 ' '• •' ' • ."•\ ' I rManagement Services i
--- - __ i '_ -4-ic ,....---=--- L ,,:, :. . .1 --,i..---..'.. ,'.,,''--=-,.. ..1 for an Intelligent Transportation Management System and Parking Management System
RFO 2015-1'5-JR
Smart III
ng System (SPS)
• Capacity in lots: All lots over 35 spaces
• Available Parking Monitoring
• Displayed on DMS outside garages
, 7,-97,45-:zzisi -, .,. ,,..A ,,
1.1.77
, :440 :A . 11,,,,, ',..,'3, ,,,r;, 1 , ..•-:. ' ,, gt fil.:04.xt• „.•, '„,t 1.•-'01",:•;.:"•1*:
FAU , , ,, ,, , ,, ,
,, , ,1 I , , ........i,,,f , ,,,,- ,,,..6., ,,4.--- . k ,
i 4 .5,2.;:4-,-: , , .,.,. ._, , • ,, ......0 ...$41 0 14 A.. „Pr'f;
' 'a 'Of V IP' N• " '`.',
." I " - ' , 0,'f• 't' ,',‘: . • ;,•::4, .°2et,'.1,0
1 ,. ,' i ,,,, ,",f,,,,,,-;,:;,i ' ... ■ 1...43
,......... „i.,...„ i I i I 1 -i., ',11I.:,4,.:r'";;;1. --- — -"II , I:•:,,, wimmai DOWNTOWN PARKIN:
I • -. 4'
,_• 1: II I,ii il ' I ii 4 1 .4
..,....:4 •.:,,-;',„-:,—.-;:.::,, nu., .... '1 '4(' ''''....•?'S t 4'1)0 Convention Center K:.„.....3.:
;:'.:1•%,I,•;:Ii',•.:-Y,:',1 I t ••••••1
, 1 . • - _ .1 14 i .
I , -AFI " ,'-f(11,'1 II etia e 1:
4 c.4''1:2T,1!!. 1 '' : t .. I (:',7:
1, I 14 .%F;',,,•';',:;,:; ' 1 1 1 ..."1" Itis. .4 ...;" 4-1 425 4th/San Fernando LI; .
i ki o
Parking "
,-: ,-,1: ;--•-•;.F 1 I '1 '.,:7,,' -„- ,":1".• . II? ' '4W-I 33%:S.-
.,,..'1,,,.. , i,, 1 . . .-- kl . ' i GO SHARKS! 1.. •
Garage ii ,
_
.. I III „ .
. i ' , ,,,,,.., .
11110mit.st 111"ft- :14'144' .
.... , i
* ,, ',..-', :, • —,,- • ' a ' .4,,:,
_c_ •• - -PK-103 /
„...
,
_ _ ,
.
r . ,i , ,.,. ....
1 ,...., _
..,
ri it. .1 i
. .-_....
Page 1184 of 1648
IfirnbaxINAI-Inrn
_. • „\ 1., Program Management Services
'q / Lt U L d for an Intelligent Transportation Management System and Parking Management System
Project Phasing
Page 1185 of 1648
Viminu 1-11-wn
" 1 ' ° ` f-- ' Program Management Services
'' __ - ---_, , ' ‘ . L -. ' ",— ' : -- : " _ 'u for an Intelligent Transportation Management System and Parking Management System
RFC)2015 115-JR
Project Corridors
• 17th Street from Collins Avenue to
Dade Boulevard
r
• Dade Boulevard from Alton Road to
23rd Street i . /
'41 --11-68:-
• Alton Road from Julia Tuttle i i
Causeway to 17th Street
• Alton Road from 5th Street to 17th r'
Street /
/ j
ria Beach •
• Julia Tuttle Causeway from City = 3
Limits to Alton Road
- ;
• MacArthur Causeway from City
/
Limits to 5th Street/Alfon RoadL -
-
;
• W 41St Street From Alton Road to
Indian Creek Road
• 5th Street from Alton Road to Collins
Avenue
• Washington Avenue from 5th Street
to Dade-Boulevard Page 1186 of 1648
IlimInv�\1I-Inrn
.,-
„,.117..*-
I;\ ` 1 /` r.--- ''._,_. Program Management Services
�'v Ali I �t �'- �1 ',� ' I'� ��,`i
—" , t, ..-- -------- "" '1 I' `, i.--\.,—
�, ?! ' ` -=,, . for an Intelligent Transportation Management System and Parking Management System
RFC 2015-115-JR
Pr . JeHc;t C . . rrId . rs
Collins Avenue from North City
Limit to 5th Street 1
Indian Creek Drive from Collins
Avenue to 71St Street `
i
Alton Road from Indian Creek - -
Drive to Julia Tuttle Causeway I
Abbott Ave from City Limits to I
Collins Avenue I
NormandyDrive/ 71st Street I •
from Western CityLimits to 5th `
jf
Street/Alton Road f
r'' i r
West Avenue from 17th Street to ;i ,r,.
5th Street
f
Meridian Avenue from 17th Street7 I
to 5th Street •
1
i
Page 1187 of 1648
tliml \\\I-Inrn
Program Management Services
- _r'F._ J ! 'i for an Intelligent Transportation Management System and Parking Management System
RFC)2015- 5-JR
ITS/SPS
' r . Ject9.,/etaits
• Additional Corridors
• Meridian Avenue
• West Ave n u e
• Harding Avenue/Abbott Avenue
• Collins Avenue — 63rd Street to City Limits
• 71st Street/Normandy Drive — Indian Creek Drive to City
Limits
• Improvements to Existing Corridors
• 27 Additional Traffic Monitoring Cameras (High-Definition)
• Additional Travel Time Detector Devices and Volume Data
Collection Devices
• 27 Aesthetic High Definition Arterial Digital Message Signs
• 2 Causeway Full-Color Causeway DMS
• DMS at Parking Garages and 35 Parking Lots to show
Parking Capacity
• Traffic Management Center Co-Located with FDOT
SunGuide Cente' ge 1188 of 1648
!timbal:\‘‘
-s ,> 1 r-_ Program Management Services
�' —"' _ — a%' - for an Intelligent Transportation Management System and Parking Management System
RFO 2015-115-Jf
Funding Design a nstr�u�ct i
• Approved Funds
■ All Phases Funded (Phases 1 through 6)
• Funding Sources: County's Half-Cent Surtax, Concurrency
Mitigation Fund, Parking Operation Fund
• Preliminary Project Timeline
• Anticipated Project Completion Date: FY2022/2023
Page 1189 of 1648
VimininAN.I-Inrn
, ,,� ,' ;�_ Program Management Services
V �l L L=2/- \ h _ for an Intelligent Transportation Management System and Parking Management System
RFU 2015-115-JR
u
Fnd in ,.. Operations'_ n - . . _ Maintenance
• Approved Funds
■ $600,000 per Year Adopted in Transportation Funds
• Funding Strategy Based on 5-Year Projection of
Transportation Budget (Total Per Year)
Funding Required Per
Fiscal Year Year
Fiscal Year 2019-2020 $130,000.00
--- -------------- - ---------------- ----- -- -
Fiscal Year 2010-2021 $1,037,000.00
- - --- -- ---- -- ---- -- - ---- -- - --
- ------ -- -- - -- -- -- - -- -
Fiscal Year 2021-2022 1 $1,072,000.00
Fiscal Year 2022-2023 $1,106,000.00
Fiscal Year 2023-2024 $1,139,000.00
Note: Table does not include the cost for Operations and Maintenance for SPS (approximately $30,640-$37,860 per year) as this cost
was already being covered by the Parking Department.
FY 2019/20 reflects the impact of the $1.25M F14 FEECIegi-Sifigrifiii@South Beach Trolley
Ilim�w��\Ur rrt
i Program Management Services
it -''�' --7r� �� ��;f 1. �, /r i. i� 'I !� / ;, �I: it
1. _ =_ L for an Intelligent Transportation Management System and Parking Management System
REO 2015-1 15-JR
Performance Based C n gra l _
• Hours of Operation/Staffing
• Incident ResponseNalidation
• Equipment Accuracy (e.g. parking occupancy
validation)
• Equipment Availability/Spare Parts
• Subsystem Availability (i .e. uptime)
• Others
• Standard Operating Guidelines (SOG)
Development/Updates
• Meetings/Training (i.e. SunGuid " 4 Training)
• Preventative Maintenance
Page 1191 of 1648
Ilimlav'‘\I-Inrn
,� • 1;: ,� , _' __ _ Program Management Services
L ,' �- ` '' ::`=� i for an Intelligent Transportation Management System and Parking Management System
RFO 2015-1 15-JR
ParkingFunds
• FY2018-2019
• $3M Set Aside for Renewal and Replacement
• $1 .52M Transfer to Transportation Budget
• $1 . l7MTransferto General Fund
FY18 (OBPI FY19
{ / / r FY14 FY15 FY16 FY17 estimated
. ' as of Y/E) Adopted
f rr //��
Operating 40,534,422 42,850,715 52,253,637 47,489,549 48,583,000 50,696,000
Revenues
Operating 32,603,266 33,208,823 41,248,202 43,270,595 44,170,000 44,653,800
Expenditures*
Net Annual
Operating 7,931,156 9,641,892 11,005,435 4,218,954 4,413,000 6,042,200
Surplus
Assuming that the Plan to eliminate the General Fund contribution is followed,
this would leave $1 .519 million in annual surplus available for other uses
including ITS. Page 1192 of 1648
VimlonnUI-Inrn
I/ [ �` �,�� f !�� �_� ''"{1- r Program Management Services
" r — �` '� L 1k Jd �' �� i ���> `� for an Intelligent Transportation Management System and Parking Management System
RFC., 2015-115-JR
Ftecomn! 'E: ndations
• FY20 18-2019 : City budgeted a partial year of funding.
• Funding for each year is subject to budget appropriation
• Administration is seeking endorsement for on Funding
Strategy for future years before entering the contract
• Administration recommends that the Trolley Advertising
pilot be extended, and that some or all of the $500,000 in
projected advertising revenues be used for
Transportation
Page 1193 of 1648
VimIov\ti1L-Inrrn
` _ Program Management Services
' �� 'V '1 !J f�Gf ,�`1 L �i! � r v� �� ti for an Intelligent Transportation Management System and Parking Management System
•
RFC)2015-115-JR
Page 1194 of 1648
Ilim�an: \I-Inrn
CITY OF MIAMI BEACH
5 YEAR TRANSPORTATION OPERATIONS FINANCIAL FORECAST
AS OF 1 1/2 9/1 8
REVENUES: FY20 FY21 FY22 FY23 FY24
1%QUALITY OF LIFE RESORT TAX 5.0% 5.0% 2.0% 2.0% 2.0%
COUNTY HALF-CENT TRANSIT SURTAX(PTP) 4.0% 4.0% 4.0% 4.0% 4.0%
CONTRIBUTION FROM PARKING 0.0% 0.0% 0.0% 0.0% 0.0%
PY RETAINED EARNINGS -100.0% -100.0% -100.0% -100.0% -100.0%
TROLLEY ADVERTISING 0.0% 0.0% 0.0% 0.0% 0.0%
ALL OTHER 1.5% 1.5% 1.5% 1.5% 1.5%
FY19 Adop. FY20 Proj. FY21 Proj. _ FY22 Proj. FY23 Proj. FY24 Proj.
1%QUALITY OF LIFE RESORT TAX 8,653,000 9,085,000 9,539,0009,729,000 9,923,000 10,121,000
COUNTY HALF-CENT TRANSIT SURTAX(PTP) 3,876,000 4,031,000: 4,192,000 W 4,359,000 4,533,000 4,714,000
CONTRIBUTION FROM PARKING 1,521,000 1,521,000 1,521,000 1,521,000 1,521,000 1,521,000
RENT BUS SHELTERS 782,000 793,000 804,000 816,000 828,000` 840,000
PY RETAINED EARNINGS/FUND BALANCE 355,000 0 0 0 0 ' 0
ALL OTHER 140,000 142,000_ 144,000 146,000 148,000 150,000
TROLLEY ADVERTISING 0 0_ 0 0 0 0
TOTAL 15,327,000 1 5,572,000 16,200,000 1 6,571,000 16,953,000 17,346,000
EXPENDITURES: FY20 FY21 FY22 _ FY23 _ FY24
COLA 1.0% 1.0% 2,0% 2.0% 2,0%
PENSION COSTS-MBERP 4.4% 1.5% 2.0% _ 1.8% 1.5%
HEALTH&LIFE INSURANCE 10.0% 10.0% 10.0% 10.0% - 10.0%
MERIT 2.0% 2.0% 2.0% 2.0% 2.0%
OTHER BENEFITS 1.0% 1.0% 1.0% 1.0% 1.0%
TROLLEY OPERATIONS -4.3% 13.2% 2.0% 2.0% 2.0%
ITS OPERATIONS&MAINTENANCE 159.6% 13.0% 3.0% 3.0% 3.0%
ONE-TIME FEASIBILITY STUDIES -100.0% -100.0% -100.0% -100.0% . -100.0%
OTHER OPERATING 2.0% 2.0% 2.0% 2.0% 2.0%
INTERNAL SERVICES 2.0% 2.0% 2.0% 2.0% 2.0%
FY19 Adop, FY20 Proj. FY21 Proj. FY22 Proj. FY23 Proj. FY24 Proj.
SALARIES&WAGES 1,255,000 1,293,000 1,332,000 1,386,000 1,442,000 1,500,000
PENSION COSTS-MBERP 352,000 368,000 374,000 382,000 389,000 395,000
HEALTH&LIFE INSURANCE 153,000 169,000 186,000 205,000 226,000 249,000
OTHER BENEFITS 149,000 151,000 153,000 155,000 157,000 159,000
TROLLEY OPERATIONS&MAINTENANCE 12,104,000 11,582,000 13,109,000 13,372,000 13,640,000 13,913,000
INTELLIGENT TRANSP SYS(ITS)OPERATIONS&MAINTENANCE 590,000 1,502,000 1,697,000 1,748,000 1,801,000 1,856,000
ONE-TIME FEASIBILITY STUDIES 355,000 0 0 0 0 0
OTHER OPERATING 250,000 255,000 261,000 267,000 273,000 279,000
INTERNAL SVCS 119,000 122,000 125,000 128,000 131,000 134,000
TOTAL 15,327,000 15,442,000 17,237,000 17,643,000 18,059,000 18,485,000
FY1 9 Adop. FY20 Proj. FY21 Proj. FY22 Proj. FY23 Proj. FY24 Proj.
!OPERATING SURPLUS/GAP EACH YEAR 0 130,000 (1,037,000) (1,072,000) (1,106,000) (1,139,000)
Footnotes:
Revenues:
1%Quality of Life Resort Tax assumes Convention Center opening and 60%allocation of pverall revenues generated.
County Half-Cent Surtax(PTP)assumes annual growth of 4%based on FY17 to FY18 growth in revenue.
Contribution from Parking assumed to remain flat based on FY19 Adopted contribution of$1.521 million.
All Other revenue comprised of bus shelter revenue,interest,etc.
Expenditures:
COLA,Health&Life Insurance,Merit,Other Benefits,Other Operating,and Internal Services assumptions based on"Likely"scenario published in Proposed FY19 Operating Budget Book.
Pension assumptions based on actuarial MBERP forecast.
Trolley Operations reflects$500,000 FDOT grant award in FY19 for Middle Beach Trolley and$1.250M in FY20 for South Beach Trolley operations.Subsequent years assume grant not received.
ITS Operations for FY20&FY21 based on forecast provided by TrarRageo1ii Oifie1-64&s assume 2%increase in annual costs every year thereafter.
One-time Feasibility Studies expenditure in FY19 Adopted funded from use of prior year fund balance.