Loading...
Agreement with Sol-Arch, Inc. le-305-31( AGREEMENT BETWEEN CITY OF MIAMI BEACH AND SOL-ARCH, INC. FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 2018-141-ND DISCIPLINE: ARCHITECTURE -GENERAL RESOLUTION NO. 2018-30534 TABLE OF CONTENTS DESCRIPTION PAGE ARTICLE 1. DEFINITIONS 1 ARTICLE 2. BASIC SERVICES 6 ARTICLE 3. THE CITY'S RESPONSIBILITIES 11 ARTICLE 4. RESPONSIBILITY FOR CONSTRUCTION COST 13 ARTICLE 5. ADDITIONAL SERVICES 15 ARTICLE 6. REIMBURSABLE EXPENSES 16 ARTICLE 7. COMPENSATION FOR SERVICES 17 ARTICLE 8. CONSULTANT'S ACCOUNTING AND OTHER RECORDS 18 ARTICLE 9. OWNERSHIP OF PROJECT DOCUMENTS 18 ARTICLE 10. TERMINATION OF AGREEMENT 19 ARTICLE 11. INSURANCE 20 ARTICLE 12. INDEMNIFICATION AND HOLD HARMLESS 21 ARTICLE 13. ERRORS AND OMISSIONS 21 ARTICLE 14. LIMITATION OF LIABILITY 22 ARTICLE 15. NOTICE 22 ARTICLE 16. MISCELLANEOUS PROVISIONS 23 SCHEDULES: SCHEDULE A Consultant Service Order 30 SCHEDULE B Consultant Compensation 31 SCHEDULE C Hourly Billing Rate Schedule 32 SCHEDULE D Approved Subconsultants 33 ATTACHMENTS: ATTACHMENT A Resolution & Commission Memorandum 34 ATTACHMENT B Request for Quailifications &Addendums 35 ATTACHMENT C Consultant's Response to the RFQ 36 ii AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND SOL-ARCH, INC. FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SPECIALIZED CATEGORIES ON AN "AS-NEEDED-BASIS" This Agreement made and entered into this 5- day of Tbri .ry , 20 1,7 , (Effective Date), by and between the CITY OF MIAMI BEACH, a municipal orporation existing under the laws of the State of Florida, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139, (hereinafter referred to as City), and Sol-Arch, Inc., a Florida corporation having its principal office at 6870 SW 80 Street, Miami , FL. 33143 (hereinafter referred to as Consultant). WITNESSETH: WHEREAS, on September 17, 2014, the Mayor and City Commission approved the issuance of Request for Qualifications No. 2018-141-ND for Professional Architectural and Engineering Services in Specialized Categories On An "As-Needed-Basis" (the RFQ); and • WHEREAS, the RFQ was intended to provide access to architectural and engineering firms in accordance with the Florida Consultant's Competitive Negotiation Act; and WHEREAS, on October 17, 2018, the City Commission approved Resolution No. 2018- 30534, respectively, authorizing the City to enter into negotiations with Sol-Arch, Inc., and, if successful, execute an agreement with the Consultant pursuant to the RFQ; and WHEREAS, City and the Consultant have negotiated the following agreement pursuant to the RFQ; and NOW THEREFORE, City and Consultant, in consideration of the mutual covenants and agreement herein contained, agree as follows: ARTICLE 1. DEFINITIONS 1.1 Definitions. The definitions included in this Section are not exhaustive of all definitions used in this Agreement. Additional terms may be defined in other Contract Documents. The following terms shall have the meanings specified herein unless otherwise stated herein: ADDITIONAL SERVICES: "Additional Services" shall mean those services, in addition to the Basic Services in this Agreement, as described in Article 5 and the Consultant Service Order, which the Consultant shall perform, at the City's option, and which must be duly authorized, in writing, by the Department Head, prior to commencement of same. APPLICABLE LAWS: "Applicable Laws" means all laws, statutes, codes (including, but not limited to, building codes), ordinances, rules, regulations, lawful orders and decrees of governmental authorities having jurisdiction over the Project, the Project Site or the Parties. BASE BID: "Base Bid" shall mean the elements contained in the Construction Documents recommended by the Consultant (and approved by the City) as being within the Construction Cost Budget. "Base Bid" shall not include additive alternates or deductive alternates. BASIC SERVICES: "Basic Services" shall include those services which Consultant shall perform in accordance with the terms of the Agreement, as described in Article 2 and the Consultant Service Order. Any Services not specifically enumerated as Additional Services (as defined herein) shall also be considered Basic Services. CITY (OR OWNER): The "City" shall mean the City of Miami Beach, a Florida municipal corporation having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139. In all respects hereunder, City's obligations and performance is pursuant to City's position as the owner of the Project acting in its proprietary capacity. In the event City exercises its regulatory authority as a governmental body including, but not limited to, its regulatory authority for code inspections and issuance of Building Department permits, Public Works Department permits, or other applicable permits within its jurisdiction, the exercise of such regulatory authority and the enforcement of any Applicable Laws shall be deemed to have occurred pursuant to City's regulatory authority as a governmental body and shall not be attributable in any manner to City as a Party to this Agreement. CITY COMMISSION: "City Commission" shall mean the governing and legislative body of the City. CITY MANAGER: The "City Manager" shall mean the chief administrative officer of the City. The City Manager shall also be construed to include any duly authorized representatives designated by the City Manager in writing, including the Project Administrator, with respect to any specific matter(s) concerning the Services and/or this Agreement (exclusive of those authorizations reserved to the City Commission under this Agreement, or to regulatory or administrative bodies having jurisdiction over the Project). CONSTRUCTION COST BUDGET: The "Construction Cost Budget" shall mean the amount budgeted and established by the City to provide for the cost of construction of the Work for the Project("Construction Cost"), as set forth in the Consultant Service Order. CONSTRUCTION DOCUMENTS: "Construction Documents" shall mean •the final (100% completed) plans, technical specifications, drawings, schematics, documents, and diagrams prepared by the Consultant pursuant to this Agreement, setting forth in detail the requirements for the construction of the Project. The Construction Documents shall set forth in full all details necessary to complete the construction of the Project in accordance with the Contract Documents. Construction Documents shall not be part of the Contract Documents, until (a) the Consultant has submitted completed Construction Documents to the City and (b) they have been reviewed and approved by the City and any agencies having jurisdiction in accordance with the procedures as otherwise provided by the Contract Documents. However, approval by the City shall not in any way be construed, interpreted and/or deemed to constitute a waiver or excuse Consultant's obligations to ensure the Construction Documents are constructible, in compliance with all Applicable Laws and in accordance with the Contract Documents. 2 CONSULTANT: The named entity on page 1 of this Agreement, the "Consultant" shall mean the qualified and properly professionally licensed design professional in the State of Florida and as otherwise required by any entities, agencies, boards, governmental authorities and/or any other professional organizations with jurisdiction governing the professional practice area for which the design professional has been engaged by City and who will perform (or cause to be performed through Subconsultants acceptable to the City) all architectural, design and engineering services required under this Agreement and/or Consultant Service Order and will serve as the "architect of record" and/or "engineer of record" for the Project. When the term "Consultant" is used in this Agreement it shall also be deemed to include any officers, employees, or agents of Consultants, and any other person or entity acting under the supervision, direction, or control of Consultant to provide any architectural, design, engineering or similar professional services with respect to a Project ("Subconsultants"). The Consultant shall not be replaced by any other entity, except as otherwise permitted in this Agreement. Further, any Subconsultant that may perform services on behalf of the Consultant shall be a qualified and properly professionally licensed design professional in the State of Florida and as otherwise required by any entities, agencies, boards, governmental authorities and/or any other professional organizations with jurisdiction governing the professional practice area for which the Subconsultant has been engaged by Consultant to perform professional design services in connection with the Project. The Subconsultants in Schedule "D", attached hereto, are hereby approved by the City Manager for the Project. CONSULTANT SERVICE ORDER: Consultant Service Order shall mean the work order issued by the City to Consultant (in substantial form as in Schedule A attached hereto), that specifically describes and delineates the particular Services (Basic Services and/or Additional Services) which will be required of Consultant for the Project. CONTRACT AMENDMENT: "Contract Amendment" shall mean a written modification to the Agreement approved by the City (as specified below) and executed between City and Consultant, covering changes, additions, or reductions in the terms of this Agreement including, without limitation, authorizing a change in the Project, or the method and manner of performance thereof, or an adjustment in the fee and/or completion dates. Contract Amendments shall be approved by the City Commission if they exceed fifty thousand dollars ($50,000.00). Even for Contract Amendments of fifty thousand dollars ($50,000.00) or less (or other such threshold contract amount as may be specified by the City of Miami Beach Procurement Ordinance), the City Manager reserves the right to seek and obtain concurrence of the City Commission for approval of any such Contract Amendment. CONTRACT DOCUMENTS: "Contract Documents" shall mean this Agreement (together with all exhibits, addenda, Consultant Service Orders and written amendments issued thereto), and all Design Documents and Construction Documents. The Contract Documents shall also include, without limitation (together with all exhibits, addenda, and written amendments issued thereto), the Invitation to Bid (ITB), instructions to bidders, bid form, bid bond, Design Criteria Package (if any), the Contract for Construction, surety payment and performance bonds, Conditions of the Contract for Construction (General, Supplementary, and other Conditions), Divisions 0-17 specifications, an approved Change Order(s), approved Construction Change Directive(s), and/or approved written order(s)for a minor change in the Work. CONTRACT FOR CONSTRUCTION: "Contract for Construction" shall mean the legally binding agreement between City and Contractor for performance of the Work covered in the Contract 3 Documents, including, without limitation, a general contractor, construction manager, design- builder or any other duly licensed construction contractor selected pursuant to any other procurement methodology available under Florida law. CONTRACTOR: "Contractor" shall . mean the individual or individuals, firm, company, corporation, joint venture, or other entity contracting with City for performance of the Work covered in the Contract Documents. DESIGN CRITERIA PACKAGE or DCP: "Design Criteria Package" means concise, performance-oriented drawings or specifications of a design-build Project, prepared for the purpose of furnishing sufficient information to permit design-build firms to prepare a bid or a response to a City request for proposal, or to permit the City to enter into a negotiated design- build contract. The Design Criteria Package must specify performance-based criteria for the design-build Project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. DESIGN DOCUMENTS: "Design Documents" means all plans, drawings specifications, schematics and all other documents which set forth in full the design of the Project and fix and describe in detail the size, configuration and character of the Project concerning all items of the Project necessary for the final preparation of the 100% completed, permitted Construction Documents in accordance with the requirements of the Contract Documents including, without limitation, all architectural and engineering elements as may be appropriate. Design Documents shall not be part of the Contract Documents, until (a) the Consultant has submitted completed Design Documents to the City and (b) they have been reviewed and approved by the City and agencies having jurisdiction in accordance with the procedures as provided by the Contract Documents. However, approval by the City shall not in any way be construed, interpreted and/or deemed to constitute a waiver or excuse Consultant's obligations to ensure the Design Documents are constructible, in compliance with all Applicable Laws and in accordance with the Contract Documents. FORCE MAJEURE: "Force Majeure" shall mean any delay occasioned by superior or irresistible force occasioned by violence in nature without the interference of human agency such as a hurricane, tornado, flood, loss caused by fire and other similar unavoidable casualties; or other causes beyond the City's or Consultant's control that are not due to any act, omission or negligence of either City or Consultant and, which have, or may be reasonably expected to have, a material adverse effect on the Project, or on the rights and obligations of City or Consultant under this Agreement and which, by the exercise of due diligence, such parties shall not have been able to avoid; provided, however, that inclement weather (except as noted above), the acts or omissions of Subconsultants, the Contractor and its sub-contractors, market conditions, labor conditions, construction industry price trends, and similar matters which normally impact on the construction process shall not be considered a Force Majeure. If the Consultant is delayed in performing any obligation under this Agreement due to a Force Majeure, the Consultant shall request a time extension from the Project Administrator within five (5) business days of said Force Majeure. Any time extension shall be subject to mutual agreement and shall not be cause for any claim by the Consultant for extra compensation, unless Additional Services are required and approved pursuant to Article 5 hereof. 4 PROJECT: The "Project" shall mean that certain City capital project described in the Consultant Service Order. Project Cost: The "Project Cost", shall mean the estimated total cost of the Project, as prepared and established by the City, including the estimated Construction Cost and Soft Costs. The Project Cost may, from time to time, be revised or adjusted by the City, in its sole discretion, to accommodate approved modifications or changes to the Project or scope of work. The estimated construction value shall be less than the amount established in Category 5, Section 287.017, Florida Statutes (currently $325,000 or as amended by law) or for a planning or study activity shall not exceed the amount established in Category 2, Section 287.017, Florida Statutes (currently $35,000 or as amended by law). Project Scope: The "Project Scope" shall mean the description of the Project, as described in the Consultant Service Order. PROJECT ADMINISTRATOR: The "Project Administrator" shall mean the individual designated by the City Manager who shall be the City's authorized representative to issue directives and notices on behalf of the City with respect to all matters concerning the Services of this Agreement (exclusive of those authorizations reserved to the City Manager or City Commission under this Agreement, or to regulatory or administrative bodies having jurisdiction over the Project). PROPOSAL DOCUMENTS: "Proposal Documents" shall mean the RFQ, together with all amendments or addenda thereto (if any), which is incorporated by reference to this Agreement and made a part hereof; provided, however, that in the event of an express conflict between the Proposal Documents and this Agreement, the Agreement shall prevail. Consultant's proposal in response to the RFQ is included for reference purposes only and shall not be incorporated as part of this Agreement, except with respect to Consultant's representations regarding the qualifications and experience of Consultant and its key personnel, its commitment to provide the key personnel listed therein, and its capability to perform and deliver the Services in accordance with this Agreement and consistent with the all representations made therein. SCHEDULES: "Schedules" shall mean the various schedules attached to this Agreement and referred to as follows: Schedule A— Consultant Service Order. Schedule B —Consultant Compensation. Schedule C — Hourly Billing Rate Schedule. Schedule D --Approved Subconsultants. SCOPE OF SERVICES: "Scope of Services" shall include the Project Scope, Basic Services, and any Additional Services (as approved by the City), all as described in Schedule "A" hereto. SERVICES: "Services" shall mean all services, work, and actions by the Consultant performed pursuant to or undertaken under this Agreement. SOFT COSTS: "Soft Costs" shall mean costs related to the Project other than Construction Cost including, without limitation, Consultant's Basic Services, Additional Services, surveys, 5 testing, general consultant, financing, permitting fees and other similar costs, as determined by the City, that are not considered as direct costs for the construction of the Project. STATEMENT OF PROBABLE CONSTRUCTION COST: The "Statement of Probable Construction Cost" shall mean the detailed estimate prepared by Consultant in Construction Standard Index (CSI) format or other format approved by the Project Administrator, which includes the Consultant's estimated total construction cost to the City of the Work for the Project (as established in the Contract Documents, as they may be amended from time to time). The Statement of Probable Construction Cost shall be in sufficient detail to identify the costs of each element of the Project and include a breakdown of the fees, general conditions and construction contingency for the Project. Costs shall be adjusted to the projected bid date to take into account anticipated price escalation. WORK: "Work" shall mean all labor, materials, equipment, supplies, tools, machinery, utilities, fabrication, transportation, insurance, bonds, permits and conditions thereof, building code changes and government approvals, licenses, tests, quality assurance and/or quality control inspections and related certifications, surveys, studies, and other items, work and services that are necessary or appropriate for the total construction, installation, and functioning of the Project, together with all additional, collateral and incidental items, and work and services required for delivery of a completed, fully functional and functioning Project as set forth in the Contract Documents. ARTICLE 2. BASIC SERVICES 2.1 The Consultant shall provide Basic Services for the Project, specifically described in the Consultant Service Order. Consultant acknowledges and agrees that this Agreement and the award of any work hereunder, is non-exclusive, and the City may, at its sole and absolute discretion, award similar services or work to other firms under contract with the City. No Consultant Service Order shall be issued to Consultant, and no work or Services shall be authorized under this Agreement, except at City's sole discretion. Consultant shall have no entitlement to perform any services hereunder, or to be compensated for any Services, unless set forth in a written Consultant Service Order. 2.2 The Services will be commenced by the Consultant upon receipt of a written Consultant Service Order signed by the Department Head. Consultant shall countersign the Consultant Service Order upon receipt and return the signed copy to the City. 2.3 As it relates to the Services and the Project, Consultant warrants and represents to the City that it is knowledgeable of and shall comply with all Applicable Laws. The Consultant agrees to comply with all Applicable Laws, whether now in effect or as may be amended or adopted from time to time, and shall further take into account all known pending changes to the foregoing of which it should reasonably be aware. 2.4 The Consultant warrants and represents to the City that all of the Services required under this Agreement shall be performed in accordance with the standard of care normally exercised in the design of comparable projects in South Florida. Consultant warrants and represents to the City that it is experienced, fully qualified, and properly licensed (pursuant to Applicable Laws) to perform the Services. Consultant warrants and represents to the City that it is responsible for the technical accuracy of the Services (including, without limitation, the Design Documents contemplated in Schedule "A" hereto). Consultant further warrants and represents 6 that the approved and permitted Construction Documents shall constitute a representation by Consultant to City that the Project, if constructed as required by the Contract Documents, will be fully functional, suitable and sufficient for its intended purposes. 2.5 The Consultant's Basic Services may consist of various tasks, including planning, design, bidding/award, preparation of a DCP, studies, construction administration, and Additional Services (as may be approved), all as further described in the Consultant Service Order; and shall also include any and all of Consultant's responsibilities and obligations with respect to the Project, as set forth in the General Conditions of the Contract for Construction. 2.6 RESPONSIBILITY FOR CLAIMS AND LIABILITIES: No action or omission by City shall waive or excuse Consultant's obligations under the Agreement and/or other Contract Documents and that Consultant shall remain fully liable for all work performed by Consultant including, without limitation, any design errors or omissions. Written decisions and/or approvals issued by the City shall not constitute nor be deemed a release of the responsibility and liability of the Consultant (or any Subconsultants), for the accuracy and competency of the Design Documents and Construction Documents, nor shall any City approval and/or decisions be deemed to be an assumption of such responsibility by the City for a defect, error or omission in the Design Documents and the Construction Documents. Moreover, neither the City's inspection, review, approval or acceptance of, nor payment for, any Services required under the Agreement shall be construed to relieve the Consultant (or any Subconsultant) of its obligations and responsibilities under the Agreement, nor constitute a waiver of any of the City's rights under the Agreement, or of any cause of action arising out of the performance of the Agreement. The Consultant shall be and remain liable to the City in accordance with Applicable Laws for all damages to City caused by any failure of the Consultant or to comply with the terms and conditions of the Agreement or by the Consultant's misconduct, unlawful acts, negligent acts, errors or omissions in the performance of the Agreement. 2.7 TIME: It is understood that time is of the essence in the completion of the Project and, in this respect, the parties agree as follows: 2.7.1 Term: The term of this Agreement shall commence upon execution by the City and Consultant, which shall be the Effective Date referred to on page 1 hereof, and shall be in effect for three (3) years ("Initial Term"), plus two (2), one (1) year renewal options, to be exercised at the sole discretion of the City Manager (Initial Term and any renewals shall be collectively referred to as the "Term"). Notwithstanding the preceding Term, Consultant shall adhere to any and all timelines and/or deadlines, as set forth in the Consultant Service Order, including the time for completion of the work and/or services for such Project(as set forth in the particular Consultant Service Order). 2.7.2 The Consultant shall perform the Services as expeditiously as is consistent with the standard of professional skill and care required by this Agreement, and the orderly progress of the Work. 2.7.3 Recognizing that the construction of other projects within the City may affect scheduling of the construction for the Project, the Consultant shall diligently coordinate performance of the Services with the City (through the Project Administrator) in order to provide for the safe, expeditious, economical and efficient completion of the Project, without negatively impacting concurrent work by others. The Consultant shall coordinate the Services with all of its Subconsultants, as well as other consultants, including, without limitation, City provided consultants (if any). 7 2.7.4 The Services shall be performed in a manner that shall conform to the Consultant Service Order. The Consultant may submit requests for an adjustment to the Consultant Service Order completion time, if made necessary because of undue delays resulting from untimely review taken by the City(or authorities having jurisdiction over the Project) to approve the Consultant's submissions, or any other portion of the Services requiring approval by the City (or other governmental authorities having jurisdiction over the Project). Consultant shall immediately provide the Project Administrator with written notice stating the reason for the particular delay; the requested adjustment (i.e. extension) to the Project Schedule; and a revised anticipated schedule of completion. Upon receipt and review of Consultant's request (and such other documentation as the Project Administrator may require), the Project Administrator may grant a reasonable extension of time for completion of the particular work involved, and authorize that the appropriate adjustment be made to the Project Schedule. The Project Administrator's approval (if granted) shall be in writing. 2.8 Consultant shall use its best efforts to maintain a constructive, professional, cooperative working relationship with the Project Administrator, Contractor, and any and all other individuals and/or firms that have been contracted, or otherwise retained, to perform work on the Project. 2.9 The Consultant shall perform its duties under this Agreement, and under a Consultant Service Order, in a competent, timely and professional manner, and shall be responsible to the City for any failure in its performance, except to the extent that acts or omissions by the City make such performance impossible. 2.10 The Consultant is responsible for the professional quality, technical accuracy, completeness, performance and coordination of all Services required under the Agreement and under the Consultant Service Order (including the services performed by Subconsultants), within the specified time period and specified cost. The Consultant shall perform the Services utilizing the skill, knowledge, and judgment ordinarily possessed and used by a proficient consulting with respect to the disciplines required for the performance of such Services in the State of Florida. The Consultant is responsible for, and shall represent to City that the Services conform to the City's requirements, the Contract Documents and all Applicable Laws. The Consultant shall be and remain liable to the City for all damages to the City caused by the Consultant's negligent acts or errors or omissions in the performance of the Services. In addition to all other rights and remedies which the City may have, the Consultant shall, at its expense, re-perform all or any portion of the Services to correct any deficiencies which result from the Consultant's failure to perform in accordance with the above standards. The Consultant shall also be liable for the replacement or repair of any defective materials and equipment and re-performance of any non-conforming construction work resulting from such deficient Services (i) for a period from the Effective Date of this Agreement, until twelve (12) months following final acceptance of the Work, (ii) or for the period of design liability required by applicable law, whichever is later. The Project Administrator shall notify the Consultant, in writing, of any deficiencies and shall approve the method and timing of the corrections. 2.10.1 The Consultant shall be responsible for deficient, defective Services and any resulting deficient, defective construction work re-performed within twelve (12) months following final acceptance and shall be subject to further re-performance, repair and replacement for twelve (12) months from the date of initial re-performance, not to exceed twenty-four months (24)from final acceptance. 8 2.11 The City shall have the right, at any time, in its sole and absolute discretion, to submit for review to other consultants (engaged by the City at its expense) any or all parts of the Services and the Consultant shall fully cooperate in such review(s). Whenever others are required to verify, review, or consider any Services performed by Consultant (including, without limitation, contractors, other design professionals, and/or other consultants retained by the City), the intent of such requirement is to enable the Consultant to receive input from others' professional expertise to identify any discrepancies, errors or omissions that are inconsistent with industry standards for design or construction of comparable projects; or which are inconsistent with Applicable Laws; or which are inconsistent with standards, decisions or approvals provided by the City under this Agreement. Consultant will use reasonable care and skill, in accordance and consistent with customary professional standards, in responding to items identified by other reviewers in accordance with this subsection. Consultant shall receive comments from reviewers, in writing, including, without limitation (and where applicable), via a set of marked-up drawings and specifications. Consultant shall address comments forwarded to it in a timely manner. The term "timely" shall be defined to mean as soon as possible under the circumstances, taking into account the timelines of the Project schedule. 2.11.1 The Consultant is advised that a performance evaluation of the Services rendered throughout this Agreement will be completed by the City and kept in the City's files for evaluation of future solicitations. 2.12 Consultant agrees that when any portion of the Services relates to a professional service which, under Florida Statutes, requires a license, certificate of authorization, or other form of legal entitlement to practice and/or perform such Service(s), it shall employ and/or retain only qualified duly licensed certified personnel to provide same. 2.13 Consultant agrees to designate, in writing, within five (5) calendar days after receiving a fully executed Consultant Service Order, a qualified licensed professional to serve as its project manager (hereinafter referred to as the "Project Manager"). The Project Manager shall be authorized and responsible to act on behalf of Consultant with respect to directing, coordinating and administrating all aspects of the Services. Consultant's Project Manager (as well as any replacement) shall be subject to the prior written approval of the City Manager or the Project Administrator. Replacement (including reassignment) of an approved Project Manager shall not be made without the prior written approval of the City Manager or his designee (i.e. the Project Administrator). 2.13.1 Consultant agrees, within fourteen (14) calendar days of receipt of written notice from the City Manager or the Project Administrator (which notice shall state the cause therefore), to promptly remove and replace a Project Manager, or any other personnel employed or otherwise retained by Consultant for the Project ( including, without limitation, any Subconsultants). 2.14 Consultant agrees not to divulge, furnish or make available to any third party(ies), any non-public information concerning the Services or the Project, without the prior written consent of the City Manager or the Project Administrator, unless such disclosure is incident to the proper performance of the Services; or the disclosure is required pursuant to Florida Public Records laws; or, in the course of judicial proceedings, where such information has been properly subpoenaed. Consultant shall also require Subconsultants to comply with this subsection. 2.15 The City and Consultant acknowledge that the Services, as described in the Agreement and the Consultant Service Order, do not delineate every detail and minor work task required to 9 be performed by Consultant to complete the work and/or services described and delineated under a Consultant Service Order issued to Consultant by the City for a particular Project. If, during the course of performing work, services and/or tasks on a particular Consultant Service Order, Consultant determines that work and/or services should be performed (to complete the Project delineated under such Order) which is, in the Consultant's reasonable opinion, outside the level of effort originally anticipated in the Consultant Service Order, then Consultant shall promptly notify the Project Administrator, in writing, and shall obtain the Project Administrator's written consent before proceeding with such work and/or services. If Consultant proceeds with any such additional work and/or services without obtaining the prior written consent of the Project Administrator, said work and/or services shall be deemed to be a Basic Service under this Agreement and shall also be deemed to be within the scope of services delineated in the Consultant Service Order (whether or not specifically addressed in the Scope of Services). Mere notice by Consultant to the Project Administrator shall not constitute authorization or approval by the City to perform such work. Performance of any such work and/or services by Consultant without the prior written consent of the Project Administrator shall be undertaken at Consultant's sole risk and liability. 2.16 Consultant shall establish, maintain, and categorize any and all Project documents and records pertinent to the Services and shall provide the City, upon request, with copies of any and all such documents and/or records. In addition, Consultant shall provide electronic document files to the City upon completion of the Project. 2.17 THE CITY HAS NO OBLIGATION TO ASSIST, FACILITATE AND/OR PERFORM IN ANY WAY THE CONSULTANT'S OBLIGATIONS UNDER THE AGREEMENT OR OTHER CONTRACT DOCUMENTS. THE CITY'S PARTICIPATION, FACILITATION AND/OR ASSISTANCE TO THE CONSULTANT SHALL BE AT ITS SOLE DISCRETION AND SHALL NOT, IN ANY WAY, BE CONSTRUED, INTERPRETED AND/OR CONSTITUTE AN ASSUMPTION BY THE CITY OF CONSULTANT'S OBLIGATIONS, A WAIVER OF CONSULTANT'S OBLIGATIONS AND/OR EXCUSE ANY BREACH BY CONSULTANT OF ITS OBLIGATIONS UNDER THE CONTRACT DOCUMENTS. THE PARTICIPATION IN THE PERFORMANCE OF ANY OF CONSULTANT'S OBLIGATIONS SHALL NOT PRECLUDE THE CITY FROM DECLARING CONSULTANT IN DEFAULT FOR CONSULTANT'S FAILURE TO PERFORM SUCH OBLIGATION, NOR SHALL IT LIMIT, IN ANY WAY, THE CITY'S RIGHTS AND REMEDIES IN CONNECTION THEREWITH. THE CONSULTANT EXPRESSLY ACKNOWLEDGES AND AGREES NOT TO RAISE OR ASSERT AS DEFENSE TO ANY CLAIM, ACTION, SUIT AND/OR OTHER PROCEEDING OF A SIMILAR NATURE, THE CITY'S PARTICIPATION, ASSISTANCE AND/OR FACILITATION IN THE PERFORMANCE OF CONSULTANT'S OBLIGATIONS. INCLUDING, WITHOUT LIMITATION, ASSISTING WITH OBTAINING PERMITS OR WITH COORDINATION WITH UTILITIES, OR OTHER MATTERS RELATED TO THE PROJECT. IN THE EVENT OF ANY CONFLICT BETWEEN THIS SECTION AND/OR ANY OTHER PROVISION OF THIS AGREEMENT OR OTHER CONTRACT DOCUMENTS, THIS SECTION SHALL GOVERN. 2.18 GREEN BUILDING STANDARDS: The Consultant shall comply with the requirements of Section 255.2575, Florida Statutes, and Chapter 100 of the City Code, as both may be amended from time to time, addressing applicable Leadership in Energy and Environmental Design (LEED) compliance requirements. 2.19 SUBCONSULTANTS: All services provided by Subconsultants shall be consistent with those commitments made by the Consultant in its Proposal and during the competitive solicitation selection process and interview. Such services shall be undertaken and performed 10 pursuant to appropriate written agreements between the Consultant and the Subconsultants, which shall contain provisions that preserve and protect the rights of the City under this Agreement. Nothing contained in this Agreement shall create any contractual relationship between the City and the Subconsultants. The Consultant shall not retain, add, or replace any Subconsultant without the prior written approval of the City Manager, in response to a written request from the Consultant stating the reasons for any proposed substitution. The Consultant shall cause the names of Subconsultants responsible for significant portions of the Services to be inserted on the plans and specifications. The Consultant shall be ultimately responsible for ensuring the Consultant's and all of its Subconsultants' compliance with the requirements of this Section and any other provision of the Agreement and/or Consultant Service Order. With respect to the performance of work by Subconsultants, the Consultant shall, in approving and accepting such work, ensure the professional quality, completeness, and coordination of the Subconsultant's work. The Consultant shall, upon the request of the City, submit to the City such documentation and information as the City reasonably requests to evidence the creation, standing, ownership and professional licensure of the Consultant (and Subconsultants), including organizational documents, operating agreements and professional licensure documentation, and copies of the Consultant's contracts with the Subconsultant with respect to the Project. However, the City's failure to request such documentation or evidence and/or failure to enforce in any way the terms and provisions of this Section, the Agreement and/or any other Consultant Service Order during the Project does not excuse, waive and/or condone in any way any noncompliance of the requirements set forth therein including, without limitation, the professional licensure requirements. Any approval of a Subconsultant by the City shall in no way shift from the Consultant to City the responsibility for the quality and acceptability of the services performed by the Subconsultant. Payment of Subconsultants shall be the sole responsibility of the Consultant, and shall not be cause for any increase in compensation to the Consultant for payment of the Services. ARTICLE 3. THE CITY'S RESPONSIBILITIES 3.1 The City Manager shall designate a Project Administrator, who shall be the City's authorized representative to act on City's behalf with respect to the City's responsibilities or matters requiring City's approval under the Contract Documents. The Project Administrator shall be authorized (without limitation) to transmit instructions, receive information, and interpret and define City policies and decisions with respect to the Services and the Project. The Project Administrator shall have full authority to require the Consultant to comply with the Contract Documents, provided, however, that any failure of the Project Administrator to identify any noncompliance, or to specifically direct or require compliance, shall in no way constitute a waiver of, or excuse, the Consultant's obligation to comply with the requirements of the Contract Documents. 3.2 The City shall make available to Consultant, for the convenience of the Consultant only, information that the City has in its possession pertinent to the Project. Consultant hereby agrees and acknowledges that, in making any such information available to Consultant, the City makes no express or implied certification, warranty, and/or representation as to the accuracy or completeness of such information and assumes no responsibility whatsoever with respect to, the sufficiency, completeness or accuracy of such information. The Consultant understands, 11 and hereby agrees and acknowledges, that it is obligated to verify to the extent it deems necessary all information furnished by the City, and that it is solely responsible for the accuracy and applicability of all such information used by Consultant. Such verification shall include, without limitation, visual examination of existing conditions in all locations encompassed by the Project, where such examination can be made without using destructive measures (i.e. excavation or demolition). Survey information shall be spot checked to the extent that Consultant has satisfied itself as to the reliability of the information. 3.3 At any time, in his/her sole discretion, the City Manager may furnish accounting, and insurance counseling services for the Project (including, without limitation, auditing services to verify the Consultant's applications for payment, or to ascertain that Consultant has properly remitted payment due to its Subconsultants or vendors). 3.4 If the City observes or otherwise becomes aware of any fault or defect in the Project, or non-conformance with the Contract Documents, the City, through the Project Administrator, shall give prompt written notice thereof to the Consultant. 3.5 The City, acting in its proprietary capacity as Owner and not in its regulatory capacity, shall render any administrative approvals and decisions required under this Agreement, in writing, as reasonably expeditious for the orderly progress of the Services and of the Work. 3.6 The City Commission shall be the final authority to do or to approve the following actions or conduct, by passage of an enabling resolution or amendment to this Agreement: 3.6.1 Except where otherwise expressly noted in the Agreement or the Contract Documents, the City Commission shall be the body to consider, comment upon, or approve any amendments or modifications to this Agreement. 3.6.2 The City Commission shall be the body to consider, comment upon, or approve any assignment, sale, transfer or subletting of this Agreement. Assignment and transfer shall be defined to also include sale of the majority of the stock of a corporate consultant. 3.6.3 The City Commission shall approve or consider all Contract Amendments that exceed the sum of fifty thousand dollars ($50,000.00) (or other such amount as may be specified by the City of Miami Beach Procurement Ordinance, as amended). 3.7 Except where otherwise expressly noted in this Agreement, the City Manager shall serve as the City's primary representative to whom administrative (proprietary) requests for decisions and approvals required hereunder by the City shall be made. Except where otherwise expressly noted in this Agreement or the Contract Documents, the City Manager shall issue decisions and authorizations which may include, without limitation, proprietary review, approval, or comment upon the schedules, plans, reports, estimates, contracts, and other documents submitted to the City by Consultant. 3.7.1 The City Manager shall have prior review and approval of the Project Manager (and any replacements) and of any Subconsultants (and any replacements). 3.7.2 The City Manager shall decide, and render administrative (proprietary) decisions on matters arising pursuant to this Agreement which are not otherwise expressly 12 provided for in this Agreement. In his/her discretion, the City Manager may also consult with the City Commission on such matters. 3.7.3 At the request of Consultant, the City Manager shall be authorized, but not required, to reallocate monies already budgeted toward payment of the Consultant; provided, however, that the Consultant's compensation (or other budgets established by this Agreement) may not be increased without the prior approval of the City Commission, which approval (if granted at all) shall be in its sole and reasonable discretion. 3.7.4 The City Manager may approve Contract Amendments which do not exceed the sum of fifty thousand dollars ($50,000.00) (or other such amount as may be specified by the City of Miami Beach Purchasing Ordinance, as amended); provided that no such amendments increase any of the budgets established by this Agreement. 3.7.5 The City Manager may, in his/her sole discretion, form a committee or committees, or inquire of, or consult with, persons for the purpose of receiving advice and recommendations relating to the exercise of the City's powers, duties, and responsibilities under this Agreement or the Contract Documents. 3.7.6 The City Manager shall be the City Commission's authorized representative with regard to acting on behalf of the City in the event of issuing any default notice(s) under this Agreement, and, should such default remain uncured, in terminating the Agreement (pursuant to and in accordance with Article 10 hereof). 3.8 The City's review, evaluation, or comment as to any documents prepared by or on behalf of the Consultant shall be solely for the purpose of the City's determining for its own satisfaction the suitability of the Project, or portions thereof, detailed in such documents for the purposes intended therefor by the City, and may not be relied upon in any way by the Consultant or any other third party as a substantive review thereof. ARTICLE 4. RESPONSIBILITY FOR CONSTRUCTION COST 4.1 The City shall establish a Construction Cost Budget for the Project, as set forth in the Consultant Service Order. Consultant shall design the Project so that the Construction Cost Budget for the Project is not exceeded. As part of the Basic Services, Consultant shall design and/or re-design the Project to the Construction Cost Budget in accordance with this Article 4, making all revisions necessary to maintain the Construction Cost Budget. Consultant shall attend meetings with the City to review and discuss cost estimates, cost-saving alternatives, and implementation or revision of the Design Documents and Construction Documents to address such items, as necessary to meet the established budget parameters set forth in the City Construction Budget. 4.2. Consultant shall provide and/or update the Statement of Probable Construction Cost at each stage of completion of the Design Documents and at completion of the Construction Documents, unless otherwise specified in the Consultant Service Order or other written directive of the Project Administrator. 4.2.1. At completion of the conceptual design (at such stage of completion of the Design Documents as may be specified by the Project Administrator), Consultant shall provide the City a Statement of Probable Construction Cost, which must include an estimated 13 Construction Cost for the Project within a range of plus or minus fifteen percent (+/-15%) of the Construction Cost Budget. If at the foregoing stage of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than fifteen percent (15%), then the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s) for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within fifteen percent (15%) of the City's Construction Budget. Upon obtaining City's approval of any proposed modifications, Consultant shall incorporate such modifications within the Design Documents as part of the Basic Services and at no additional cost to the City. 4.2.2. At the 30% and 60% completion of the Design Documents, Consultant shall update its Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus ten percent (+/-10%) of the Construction Cost Budget. If at the foregoing stages of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than ten percent (10%), the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s)for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within ten percent (10%) of the City's Construction Budget. Upon obtaining City's approval of any proposed modifications, Consultant shall incorporate such modifications within the Design Documents as part of the Basic Services and at no additional cost to the City. 4.2.3. At the 90% stage completion of the Design Documents and at completion of the Construction Documents, Consultant shall update its Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus five percent (+/-5%) of the Construction Cost Budget. If at the foregoing stages of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than five percent (5%), the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s) for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within five percent (5%) of the City's Construction Budget. Upon obtaining the City's approval, Consultant shall promptly modify the Design Documents or Construction Documents within the time period specified by the Project Administrator (which time period for completion shall not exceed ninety (90) days from the date Consultant is notified to re-design), as part of the Basic Services and at no additional cost to the City. 4.2.4. To ensure that the Construction Cost shall not exceed the City's Construction Budget, each Statement of Probable Construction Cost shall be in sufficient detail to identify the costs of each element and include a breakdown of the fees, general conditions and a reasonable and appropriate construction contingency. 4.3. Consultant shall certify and warrant to the City that the Statement of Probable Construction Cost and any update thereto, represents Consultant's best judgment of the Construction Cost for the Project as an experienced design professional familiar with the construction industry, provided, however, that Consultant cannot (and does not) guarantee that bids or negotiated prices will not vary from any estimates of Construction Cost or other cost evaluation(s) prepared (or otherwise provided) by Consultant. 14 4.4 If the lowest and best Base Bid exceeds the Consultant's final updated Statement of Probable Cost by more than ten percent (10%), the Project Administrator shall provide notice thereof to the Consultant, and the Consultant shall re-design the Project within the Project Scope, construction schedule, sequence of Work, or such other action, as deemed necessary, to reduce the Statement of Probable Construction Cost, and Consultant shall provide any required revisions to the Contract Documents (including, without limitation, the Construction Documents) within the time period specified by the Project Administrator (which time period for completion shall not exceed ninety (90) days from the date Consultant is notified to re-design), and shall provide re-bidding services, as many times as may be reasonably requested by the City, as part of the Basic Services and at no additional cost to the City, in order to bring any resulting, responsive and responsible bids within ten percent (10%) of the Consultant's final updated Statement of Probable Cost. 4.5. The Construction Cost Budget shall not be exceeded without fully justifiable, extraordinary, and unforeseen circumstances (such as Force Majeure) which are beyond the control of the parties. Any expenditure above this amount shall be subject to prior City Commission approval which, if granted at all, shall be at the sole and reasonable discretion of the City Commission. The City Commission shall have no obligation to approve an increase in the Construction Cost Budget and, if such Construction Cost Budget is exceeded, the City Commission may, at its sole and absolute discretion, terminate this Agreement (and the remaining Services) without any further liability to the City. 4.6. The City Commission may, at its sole and absolute discretion, and without relieving Consultant of its obligations under this Agreement to design the Project to the Construction Cost Budget as set forth in Sections 4.1 through 4.5 above, separately elect any of the following options: (1) approve an increase to the Construction Cost Budget; (2) reject all bids, and (at its option) authorize rebidding of the Project; (3) abandon the Project and terminate the remaining Services without any further liability to the City; (4) select as many deductive alternatives as may be necessary to bring the lowest and best bid within the Construction Cost Budget. • ARTICLE 5. ADDITIONAL SERVICES 5.1 Additional Services shall only be performed by Consultant following receipt of written authorization by the Project Administrator (which authorization must be obtained prior to commencement of any such additional work by Consultant). The written authorization shall contain a description of the Additional Services required; a lump sum to be negotiated at the time of the request for additional services or an hourly fee (in accordance with the rates in Schedule "B" hereto), with a "Not to Exceed" amount; Reimbursable Expenses (if any) with a "Not to Exceed" amount; the amended Construction Cost Budget (if applicable); the time required to complete the Additional Services; and an amended Project Schedule (if applicable). "Not to Exceed" shall mean the maximum cumulative hourly fees allowable (or, in the case of Reimbursable Expenses, the maximum cumulative expenses allowable), which the Consultant shall not exceed without further written authorization of the Project Administrator. The "Not to Exceed" amount is not a guaranteed maximum cost for the additional work requested (or, in the case of Reimbursables, for the expenses), and all costs applicable to same shall be verifiable through time sheets (and, for Reimbursables, expense reviews). 5.2 Additional Services include the following: 15 5.2.1 Appraisals: Investigation and creation of detailed appraisals and valuations of existing facilities, and surveys or inventories in connection with construction performed by City. 5.2.2. Unforeseen Conditions. Providing additional work relative to the Project which arises from subsequent circumstances and causes which could not reasonably have been foreseen at the time of the Consultant Service Order (excluding conditions determined by all prior studies available to Consultant and excluding circumstances and causes resulting from error, omission, inadvertence, or negligence of Consultant). 5.2.3. City-Requested Revisions to Construction Documents: Making revisions to Construction Documents resulting in or from City-requested changes in Scope of Work involving new program elements, when such revisions are inconsistent with written approvals or instructions previously given by City and/or are due to causes beyond the control of Consultant. 5.2.4 Expert Witness: Except insofar as the Consultant is required by legal process or subpoena to appear and give testimony, preparing to serve or serving as an expert witness in connection with any state or federal court action to which the Consultant is not a party in its own name, that is not instituted by the Consultant or in which the performance of the Consultant is not in issue. 5.2.5 Procurement: Assistance in connection with bid protests, re-bidding, or re- negotiating contracts (except for Contract Document revisions and re-bidding services required under Section 4.4 hereof, which shall be provided at no additional cost to City). 5.2.6. Models: Preparing professional perspectives, models or renderings in addition to those provided for in this Agreement except insofar as these are otherwise useful or necessary to the Consultant in the provision of Basic Services. 5.2.7. Threshold Inspection/Material Testing and Inspection: Providing threshold inspection services and material testing/special inspection services, provided that Consultant, as part of the Basic Services, shall report on the progress the Work, including any defects and deficiencies that may be observed in the Work. 5.2.8 Pre-Design Surveys & Testing: Environmental investigations and site evaluations, provided, however, that surveys of the existing structure required to complete as-built documentation are not additional services. 5.2.9 Geotechnical engineering. Providing geotechnical engineering services or site surveys. Except as specified herein, services that are required for completion of the Construction Documents shall be part of Consultant's Basic Services. ARTICLE 6. REIMBURSABLE EXPENSES 6.1 Reimbursable Expenses must be authorized, in advance, in writing, by the Project Administrator. Invoices or vouchers for Reimbursable Expenses shall be submitted to the Project Administrator (along with any supporting receipts and other back-up material requested by the Project Administrator). Consultant shall certify as to each such invoice and/or voucher 16 • that the amounts and items claimed as reimbursable are "true and correct and in accordance with the Agreement." Reimbursable Expenses may include, but not be limited to, the following: Cost of reproduction, courier, and postage and handling of drawings, plans, specifications, and other Project documents (excluding reproductions for the office use of the Consultant and its Subconsultants, and courier, postage and handling costs between the Consultant and its Subconsultants). Costs for reproduction and preparation of graphics for community workshops. Permit fees required by City of Miami Beach regulatory bodies having jurisdiction over the Project(i.e. City permit fees). ARTICLE 7. COMPENSATION FOR SERVICES 7.1 Consultant's "Lump Sum" or"Not to Exceed" fee for provision of the Services, or portions thereof, as may be set forth and described in the Consultant Service Order issued for a particular Project, shall be negotiated between the City and Consultant, and shall be set forth in the Consultant Service Order. 7.2 Payments for Services shall be made within forty-five (45) calendar days of receipt and approval of an acceptable invoice by the Project Administrator. Payments shall be made in proportion to the Services satisfactorily performed, so that the payments for Services never exceed the progress percentage noted in the Consultant's Progress Schedule (to be submitted with each invoice). No mark-up shall be allowed on subcontracted work. In addition to the invoice, the Consultant shall, for Hourly Rate authorizations, submit a progress report giving the percentage of completion of the Project and the total estimated fee to completion. 7.3 All Services shall be compensated in accordance with the hourly rates set forth in Schedule "C," attached hereto. Any request for payment of Additional Services shall be included with a Consultant payment request. No mark-up shall be allowed on Additional Services (whether sub-contracted or not). 7.4 Approved Reimbursable Expenses shall be paid in accordance with Article 6 hereto, up to the "Not to Exceed" Reimbursable allowance amount in the Consultant Service Order hereto. Any request for payment of Reimbursable Expenses shall also be included with Consultant's payment request. No mark-up shall be allowed on Reimbursable Expenses. 7.5 ESCALATION: The initial hourly rates shall remain constant for the Initial Term of the agreement. Ninety (90) days prior to expiration of the Initial Term, the City may consider an adjustment to the preceding year's unit costs for the subsequent year. Only request for increases based on a corresponding increase in the Consumer Price Index for All Urban Consumers; U.S. City average (1982-84=100), as established by the United States Bureau of Labor Statistics ("CPI"), or material adjustments to the scope or requirements of the RFQ by the City, including (but not limited to) living wage increases, will be considered. In the event that the City determines that the requested increase is unsubstantiated, the Consultant agrees to perform all duties at the current cost terms. 7.6 No retainage shall be made from the Consultant's compensation on account of sums withheld by the City on payments to Contractor. 17 7.7 METHOD OF BILLING AND PAYMENT. Consultant shall invoice the Project Administrator in a timely manner, but no more than once on a monthly basis. Invoices shall identify the nature and extent of the work performed; the total hours of work performed by employee category; and the respective hourly billing rate associated therewith. In the event Subconsultant work is used, the percentage of completion shall be identified. Invoices shall also itemize and summarize any Additional Services and/or Reimbursable Expenses. A copy of the written approval of the Project Administrator for the requested Additional Service(s) or Reimbursable Expense(s) shall accompany the invoice. 7.7.1 If requested, Consultant shall provide back-up for past and current invoices that records hours for all work (by employee category), and cost itemizations for Reimbursable Expenses (by category). ARTICLE 8. CONSULTANT'S ACCOUNTING AND OTHER RECORDS 8.1 All books, records (whether financial or otherwise), correspondence, technical documents, and any other records or documents related to the Services and/or Project will be available for examination and audit by the City Manager, or his/her authorized representatives, at Consultant's office (at the address designated in Article 15 ["Notices"]), during customary business hours. All such records shall be kept at least for a period of three (3) years after Consultant's completion of the Services. Incomplete or incorrect entries in such records and accounts relating personnel services and expenses may be grounds for City's disallowance of any fees or expenses based upon such entries. Consultant shall also bind its Subconsultants to the requirements of this Article and ensure compliance therewith ARTICLE 9. OWNERSHIP OF PROJECT DOCUMENTS 9.1 All notes, correspondence, documents, plans and specifications, designs, drawings, renderings, calculations, specifications, models, photographs, reports, surveys, investigations, and any other documents (whether completed or partially completed) and copyrights thereto for Services performed or produced in the performance of this Agreement, or related to the Project, whether in its native electronic form, paper or other hard copy medium or in electronic medium, except with respect to copyrighted standard details and designs owned by the Consultant or owned by a third party and licensed to the Consultant for use and reproduction, shall become the property of the City. Consultant shall deliver all such documents to the Project Administrator in their native electronic form, as required in the Consultant Service Order within thirty (30) days of completion of the Services (or within thirty (30) days of expiration or earlier termination of this Agreement as the case may be). However, the City may grant an exclusive license of the copyright to the Consultant for reusing and reproducing copyrighted materials or portions thereof as authorized by the City Manager in advance and in writing, In addition, the Consultant shall not disclose, release, or make available any document to any third party without prior written approval from the City Manager. The Consultant shall warrant to the City that it has been granted a license to use and reproduce any standard details and designs owned by a third party and used or reproduced by the Consultant in the performance of this Agreement. Nothing contained herein shall be deemed to exclude any document from Chapter 119, Florida Statutes. 9.2 The Consultant is permitted to reproduce copyrighted material described above subject to prior written approval of the City Manager. 18 9.3 At the City's option, the Consultant may be authorized, as an Additional Service, to adapt copyrighted material for additional or other work for the City; however, payment to the Consultant for such adaptations will be limited to an amount not greater than 50% of the original fee earned to adapt the original copyrighted material to a new site. 9.4 The City shall have the right to modify the Project or any components thereof without permission from the Consultant or without any additional compensation to the Consultant. The Consultant shall be released from any liability resulting from such modification. 9.5 The Consultant shall bind all Subconsultants to the Agreement requirements for re-use of plans and specifications. ARTICLE 10. TERMINATION OF AGREEMENT 10.1 TERMINATION FOR LACK OF FUNDS: The City is a governmental entity and is subject to the appropriation of funds by its legislative body in an amount sufficient to allow continuation of its performance in accordance with the terms and conditions of this Agreement. In the event there is a lack of adequate funding either for the Services or the Project (or both), the City may terminate this Agreement without further liability to the City. 10.2 TERMINATION FOR CAUSE: The City, through the City Manager, may terminate this Agreement for cause, upon written notice to Consultant, in the event that the Consultant (1) violates any provision of this Agreement or performs same in bad faith; (2) unreasonably delays the performance of the.Services or any portion thereof; or (3) does not perform the Services or any portion thereof in a timely and satisfactory manner. In the case of termination for cause by the City, the Consultant shall first be granted a thirty (30) day cure period (commencing upon receipt of the initial written notice of default from the City). 10.2.1 In the event this Agreement is terminated for cause by the City, the City, at its sole option and discretion, may take over the remaining Services and complete them by contracting with another consultant(s), or otherwise. The Consultant shall be liable to the City for any additional cost(s) incurred by the City due to such termination. "Additional Cost" is defined as the difference between the actual cost of completion of the Services, and the cost of completion of such Services had the Agreement not been terminated. 10.2.2 In the event of termination for cause by the City, the City shall only be obligated to pay Consultant for those Services satisfactorily performed and accepted prior to the date of termination (as such date is set forth in, or can be calculated from, the City's initial written default notice). Upon payment of any amount which may be due to Consultant pursuant to this subsection 10.2.2, the City shall have no further liability to Consultant. 10.2.3 As a condition precedent to release of any payment which may be due to Consultant under subsection 10.2.2, the Consultant shall promptly assemble and deliver to the Project Administrator any and all Project documents prepared (or caused to be prepared) by Consultant(including, without limitation, those referenced in subsection 9.1 hereof). The City shall not be responsible for any cost incurred by Consultant for assembly, copy, and/or delivery of Project documents pursuant to this subsection. 19 10.3 TERMINATION FOR CONVENIENCE: In addition to the City's right to terminate for cause, the City through the City Manager, may also terminate this Agreement, upon fourteen (14) days prior written notice to Consultant, for convenience, without cause, and without penalty, when (in its sole discretion) it deems such termination to be in the best interest of the City. In the event the City terminates the Agreement for convenience, Consultant shall be compensated for all Services satisfactorily performed and accepted up to the termination date (as set forth in the City's written notice), and for Consultant's costs in assembly and delivery to the Project Administrator of the Project documents (referenced in subsection 10.2.3 above). Upon payment of any amount which may be due to Consultant pursuant this subsection 10.3, the City shall have no further liability to Consultant. 10.4 TERMINATION BY CONSULTANT: The Consultant may only terminate this Agreement for cause, upon thirty (30) days prior written notice to the City, in the event that the City willfully violates any provisions of this Agreement or unreasonably delays payment of the Services or any portion thereof. In the event of a termination for cause by Consultant, the City shall pay Consultant for any Services satisfactorily performed and accepted up to the date of termination; provided, however, that the City shall first be granted a thirty (30) day cure period (commencing upon receipt of Consultant's initial written notice). 10.4.1 The Consultant shall have no right to terminate this Agreement for convenience. 10.5 IMPLEMENTATION OF TERMINATION: In the event of termination (whether for cause or for convenience), the Consultant shall immediately, upon receipt of the City's written notice of termination: (1) stop the performance of Services; (2) place no further orders or issue any other subcontracts, except for those which may have already been approved, in writing, by the Project Administrator; (3) terminate all existing orders and subcontracts; and (4) promptly assemble all Project documents (for delivery to the Project Administrator). ARTICLE 11. INSURANCE 11.1 At all times during the Term of this Agreement, Consultant shall maintain the following required insurance coverage in full force and effect. The Consultant shall not commence any work until satisfactory proof of all required insurance coverage has been furnished to the Project Administrator: (a) Workers' Compensation and Employer's Liability per the Statutory limits of the State of Florida. (b) Commercial General Liability on a comprehensive basis in an amount not less than $1,000,000 combined single limit per occurrence for bodily injury and property damage. (c) Automobile Liability Insurance covering all owned, non-owned and hired vehicles used in connection with the work, in an amount not less than $500,000 combined single limit per occurrence for bodily injury and property damage. (d) Professional Liability Insurance in an amount not less than $1,000,000 with the deductible per claim, if any, not to exceed 10% of the limit of liability. 11.2 The City must be named as and additional insured on the liability policies; and it must be stated on the certificate. 20 11.3 The Consultant must give the Project Administrator at least thirty (30) days prior written notice of cancellation or of substantial modifications in any required insurance coverage. All certificates and endorsements shall contain this requirement. 11.4 The insurance must be furnished by an insurance company rated A:V or better, or its equivalent, according to Bests' Guide Rating Book, and by insurance companies duly authorized to do business in the State of Florida, and countersigned by the company's Florida resident agent. 11.5 Consultant shall provide the Project Administrator with a certificate of insurance of all required insurance policies. The City reserves the right to require a certified copy of such policies, upon written request to Consultant. ARTICLE 12. INDEMNIFICATION AND HOLD HARMLESS 12.1 To the fullest extent permitted by Section 725.08, Florida Statutes, the Consultant shall indemnify and hold harmless the City and its officers, employees, agents, and instrumentalities, from liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Consultant and other persons employed or utilized by the Consultant in the performance of this Agreement. The Consultant shall pay all claims and losses in connection therewith and shall investigate and defend all. claims, suits, or actions of any kind or nature in the name of the City, where applicable, including appellate proceedings, and shall pay all costs, judgments, and attorney's fees which may issue thereon. Consultant expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by Consultant shall in no way limit its responsibility to indemnify, keep, and save harmless and defend the City or its officers, employees, agents, and instrumentalities as herein provided. 12.2 The Consultant agrees and recognizes that the City shall not be held liable or responsible for any claims which may result from any negligent, reckless, or intentionally wrongful actions, errors or omissions of the Consultant in which the City participated either through review or concurrence of the Consultant's actions. In reviewing, approving or rejecting any submissions by the Contractor, or other acts of the Consultant, the City in no way assumes or shares any responsibility or liability of the Consultant (including, without limitation its Subconsultants and/or any registered professionals (architects and/or engineers) under this Agreement). ARTICLE 13. ERRORS AND OMISSIONS 13.1 ERRORS AND OMISSIONS: It is specifically agreed that any construction changes categorized by the City as caused by an error, an omission, or any combination thereof in the Contract Documents that were prepared by the Consultant will constitute an additional cost to the City that would not have been incurred without the error. The damages to the City for errors, omissions or any combinations thereof shall be calculated as the total cost of any damages or incremental costs to the City resulting out of the errors or omissions by the Consultant, including, without limitation, the direct, indirect and/or consequential damages resulting from the Consultant's errors and/or omissions or any combination thereof. 21 Damages shall include delay damages caused by the error, omission, or any combination thereof. Should the Consultant disagree that all or part of such damages are the result of errors, omissions, or any combination thereof, the Consultant may appeal this determination, in writing, to the applicable Assistant City Manager. The Project Administrator's decision on all claims, questions and disputes shall be final, conclusive and binding upon the parties hereto unless such determination is clearly arbitrary or unreasonable. In the event that the Consultant does not agree with the decision of the Project Administrator, the Consultant shall present any such objections, in writing, to the City Manager. The Project Administrator and the Consultant shall abide by the decision of the City Manager. This paragraph does not constitute a waiver of any party's right to proceed in a court of competent jurisdiction after the above administrative remedies have been exhausted. ARTICLE 14. LIMITATION OF LIABILITY The City desires to enter into this Agreement only if in so doing the City can place a limit on its liability for any cause of action for money damages due to an alleged breach by the City of this Agreement, so that its liability for any such breach never exceeds the "not to exceed" amount of the fee paid to Consultant under this Agreement, less any amount(s) actually paid to Consultant hereunder. Consultant hereby expresses its willingness to enter into this Agreement, with Consultant's recovery from the City for any damages for action for breach of contract to be limited to Consultant's "not to exceed" fee under this Agreement, less any amount(s) actually paid by the City to the Consultant hereunder. Accordingly, and notwithstanding any other term or condition of this Agreement, Consultant hereby agrees that the City shall not be liable to Consultant for money damages due to an alleged breach by the City of this Agreement, in an amount in excess of the "not to exceed amount" of Consultant's fees under this Agreement, which amount shall be reduced by any amount(s) actually paid by the City to Consultant hereunder. Nothing contained in this subsection, or elsewhere in this Agreement, is in any way intended to be a waiver of the limitation placed upon City's liability, as set forth in Section 768.28, Florida Statutes. ARTICLE 15. NOTICE All written notices given to City by Consultant shall be addressed to: City Manager's Office City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Attn: Jimmy L. Morales, City Manager With a copy to: City Manager's Office City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Attn: Eric T. Carpenter, Assistant City Manager All written notices given to the Consultant from the City shall be addressed to: 22 Sol-Arch, Inc. 6780 SW 80 Street Miami, FL. 33143 Tel: (305) 740-0723 Fax: N/A Email: d(a�sol-arch.com Attn: Dulce Conde All notices mailed to either party shall be deemed to be sufficiently transmitted if sent by certified mail, return receipt requested. ARTICLE 16. MISCELLANEOUS PROVISIONS 16.1 VENUE: This Agreement shall be governed by, and construed in accordance with, the laws of the State of Florida, both substantive and remedial, without regard to principles of conflict of laws. The exclusive venue for any litigation arising out of this Agreement shall be Miami-Dade County, Florida, if in state court, and the U.S. District Court, Southern District of Florida, in federal court. BY ENTERING INTO THIS AGREEMENT, CONSULTANT AND CITY EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO, OR ARISING OUT OF, THIS AGREEMENT. 16.2 EQUAL OPPORTUNITY EMPLOYMENT GOALS: Consultant agrees that it will not discriminate against any employee or applicant for employment for work under this Agreement because of race, color, national origin, religion, sex, gender identity, sexual orientation, disability, marital or familial status, or age, and will take affirmative steps to ensure that applicants are employed and employees are treated during employment without regard to race, color, national origin, religion, sex, gender identity, sexual orientation, disability, marital or familial status, or age. • 16.3 PUBLIC ENTITY CRIMES ACT: In accordance with the Public Entity Crimes Act (Section 287.133, Florida Statutes), a person or affiliate who is a consultant, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not bid on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or subconsultant under a contract with the City, and may not transact business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for Category Two, for a period of 36 months from the date of being placed on the convicted vendor list. For violation of this subsection by Consultant, City shall have the right to terminate the Agreement without any liability to City, and pursue debarment of Consultant 16.4 NO CONTINGENT FEE: Consultant warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement, and that it has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Agreement. For the breach or violation of this subsection, City shall have the right to terminate the Agreement, without any liability or, at its discretion, to deduct from the contract price (or otherwise recover) the full amount of such fee, commission, percentage, gift, or consideration. 23 16.5 LAWS AND REGULATIONS: 16.5.1 The Consultant shall, during the Term of this Agreement, be governed by all Applicable Laws which may have a bearing on the Services involved in the Project. 16.5.2 Project Documents. In accordance with Section 119.07 (3) (ee), Florida Statutes, entitled "Inspection, Examination, and Duplication of Records; Exemptions," all building plans, blueprints, schematic drawings, and diagrams, including draft, preliminary, and final formats, are exempt from the provisions of Section 119.07(1), Florida Statutes (inspection and copying of public records), and s. 24(a), Article I of the State Constitution. Information made exempt by this paragraph, with prior written approval from the City Manager, may be disclosed to another entity to perform its duties and responsibilities; to a licensed architect, engineer, or contractor who is performing work on or related to the Project; or upon a showing of good cause before a court of competent jurisdiction. The entities or persons receiving such information shall maintain the exempt status of the information. 16.5.2.1 In addition to the requirements in this subsection 16.5.2, the Consultant agrees to abide by all applicable Federal, State, and City procedures, as may be amended from time to time, by which the documents are handled, copied, and distributed which may include, but is not limited to, each employee of Consultant and Subconsultants that will be involved in the Project being required to sign an agreement stating that they will not copy, duplicate, or distribute the documents unless authorized by the City Manager, in writing. 16.5.2.2 The Consultant and its Subconsultants agree in writing that the Project documents are to be kept and maintained in a secure location. 16.5.2.3 Each set of the Project documents are to be numbered and the whereabouts of the documents shall be tracked at all times. 16.5.2.4 A log is developed to track each set of documents logging in the date, time, and name of the individual(s) that work on or view the documents. 16.6 CORRECTIONS TO CONTRACT DOCUMENTS: The Consultant shall prepare, without added compensation, all necessary supplemental documents to correct errors, omissions, and/or ambiguities which may exist in the Contract Documents prepared by Consultant, including documents prepared by its Subconsultants. Compliance with this subsection shall not be construed to relieve the Consultant from any liability resulting from any such errors, omissions, and/or ambiguities in the Contract Documents and other documents or Services related thereto. 16.7 ASSIGNMENT: The Consultant shall not assign, transfer or convey this Agreement to any other person, firm, association or corporation, in whole or in part, without the prior written consent of the City Commission, which consent, if given at all, shall be at the Commission's sole 24 option and discretion. However, the Consultant will be permitted to cause portions of the Services to be performed by Subconsultants, subject to the prior written approval of the City Manager. 16.8 SUCCESSORS AND ASSIGNS: The Consultant and the City each binds himself/herself, his/her partners, successors, legal representatives and assigns to the other party of the Agreement and to the partners, successors, legal representatives, and assigns of such party in respect to all covenants of this Agreement. The Consultant shall afford the City (through the City Commission) the opportunity to approve or reject all proposed assignees, successors or other changes in the ownership structure and composition of the Consultant. Failure to do so constitutes a breach of this Agreement by the Consultant. 16.9 PROVISION OF ITEMS NECESSARY TO COMPLETE SERVICES: In the performance of the Services prescribed herein, it shall be the responsibility of the Consultant to provide all salaries, wages, materials, equipment, Subconsultants, and other purchased services, etc., as necessary to complete said Services. 16.10 INTENT OF AGREEMENT: 16.10.1 The intent of the Agreement is for the Consultant to provide design and other services, and to include all necessary items for the proper completion of such services for a fully functional Project which, when constructed in accordance with the design, will be able to be used by the City for its intended purpose. The Consultant shall perform, as Basic Services, such incidental work which may not be specifically referenced, as necessary to complete the Project. 16.10.2 This Agreement is for the benefit of the parties only and it does not grant rights to a third party beneficiary, to any person, nor does it authorize anyone not a party to the Agreement to maintain a suit for personal injuries, professional liability, or property damage pursuant to the terms or provisions of the Agreement. 16.10.3 No acceptance, order, payment, or certificate of or by the City, or its employees or agents, shall either stop the City from asserting any rights or operate as a waiver of any provisions hereof or of any power or right herein reserved to the City or of any rights to damages herein provided. 16.11 This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, or understandings applicable to the matters contained herein; and the parties agree that there are no commitments, agreements, or understandings concerning the subject matter of this Agreement that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless memorialized in written document approval and executed with the same formality and of equal dignity herewith. 25 IN WITNESS WHEREOF, the parties hereto have hereunto caused these presents to be signed in their names by their duly authorized officers and principals, attested by their respective witnesses and City Clerk on the day and year first hereinabove written. Attest CITY OF MIAMI BEACH: IA CITY712is7hI MAYOR w . t,- Attest SOL-ARCH, INC. Signature/Secretary S gnature/President Du I ce Conte Print Name vo, um% Print Name - .�4. APPROVED AS TO a :I dCORP ORATED: FORM &LANGUAGE &FOR EXECUTION 1/4 /-1261 \( /-1 T.Pn,‘ Or . (- 1- (7 �,`% City Attorney n1.{4 Date 26 • SCHEDULE A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND Sol-Arch, Inc. CONSULTANT SERVICE ORDER Service Order No. _for Consulting Services. TO: Sol-Arch, Inc. 6780 SW 8 Street Miami, FL. 33143 PROJECT NAME: Project Name DATE: Pursuant to the agreement between the City of Miami Beach and Consultant for PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS (RFQ 2018-141-ND) you are directed to provide the following services: SCOPE OF SERVICES: Per attached proposal dated , to be considered part of this Agreement. Estimated calendar days to complete this work: Days Original Service Order Amount: • $ Total From Previous Additional Service Orders: $ Fee for this Service Order is Lump Sum/Not to Exceed amount of: Total Agreement to Date': $ City's Project Date • Coordinator/Manager Assistant Director Date Consultant. Date Project Administrator-Director Date Section 287.055,Florida Statutes,commonly known as the Consultant's Competitive Negotiation Act(CCNA),is applicable to the selection of professional services consultants(architecture,professional engineering,landscape architecture,or registered surveying and mapping)by public agencies for projects valued up to the amount established in Category 5, Section 287.017,Florida Statutes(currently$325,000 or as amended by law)or for a planning or study activity valued up to the amount established in Category 2,Section 287.017,Florida Statutes(currently$35,000 or as amended by law). • 27 SCHEDULE B CONSULTANT COMPENSATION Schedule of Payments Planning Services * $XXXXXXXX Design Services* $XXXXXXXX Bidding and Award Services $XXXXXXXX Construction Administration ** $XXXXXXXX Reimbursable Allowance*** $XXXXXXXX Note*: These services will be paid lump sum based on percentage complete of each phase as identified in the individual tasks. Note**: Construction Administration will be paid on a monthly basis upon commencement of construction. In the event that, through no fault of the Consultant, Construction Administration services are required to be extended, which extension shall be subject to prior City approval, and what shall be at the City's sole discretion, the Consultant agrees to extend said services for$XXX)O(X, per month, for the duration required to complete the Project. Note***: The Reimbursable Allowance belongs to the City and must be approved in writing, in advance, by the Project Administrator. Unused portions will not be paid to the Consultant. 28 SCHEDULE C HOURLY BILLING RATE SCHEDULE Project Principal $172.50 Project Engineer(Coastal or $116.15 Other) Project Manager $138.00 Sr. Field Services Professional $116.15 Senior Civil Engineer $138.00 Field Services Professional $ 80.50 Civil Engineer $116.15 Threshold Inspector $138.00 Senior Electrical Engineer $138.00 Structural Special Inspector $109.25 Electrical Engineer $116.15 Technical Editor $ 74.75 Senior Mechanical Engineer $138.00 Senior GIS Specialist $116.15 Mechanical Engineer $116.15 GIS Specialist $ 86.25 Senior Structural Engineer $138.00 Staff Engineer/Geologist/Scientist $ 94.30 Structural Engineer $116.15 Landscape Designer $ 95.45 Senior Environmental Engineer $138.00 Planner $116.15 Environmental Engineer $116.15 Project Principal ( Structural Engineer) $172.50 Environmental Technician $ 74.75 Project Manager(Structural Engineer) $138.00 Environmental Specialist $ 63.25 CAD Technician (Structural) $ 63.25 Environmental Permit Specialist $ 63.25 Traffic Engineers $116.15 Project Scientist $120.75 Cost Estimator $ 74.75 Senior Surveyor $138.00 Specifications Writer $ 63.25 Surveyor $116.15 Construction Administrator/Manager $ 94.30 Surveyor Support Staff $ 69.00 Senior Project Manager $138.00 Senior Architect $138.00 MEP Project Engineer $138.00 Architect $116.15 Horticultural/maintenance Consultant $ 86.25 Senior Designer $138.00 Irrigation Engineer $ 94.30 Designer $ 95.45 Job Captain $ 92.00 Senior Urban Planner $138.00 Interior Designer $ 95.45 Senior CAD Technician $ 69.00 Principal/Director of Design $138.00 CAD Technician $ 63.25 Senior Landscape Architect $138.00 Landscape Architect $116.15 Clerical $ 40.25 Administrative Assistant $ 40.25 Survey Crew Party of2 $140.68 Survey Crew Party of 2 w/ GPS $168.51 Survey Crew Party of 3 $170.44 Survey Crew Party of 3 w/ GPS $197.01 Survey Crew Party of 4 $211.31 Survey Crew Party of 4 w/ GPS $250.13 Sr. Inspector(CEI) $103.50 Inspector(CEI, Field or Construction) $ 94'88 29 SCHEDULE D APPROVED SUBCONSULTANTS 30 ATTACHMENT A RESOLUTION, COMMISSION ITEM, AND COMMISSION MEMORANDUM 34 RESOLUTION NO. 2018-30534 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER PERTAINING TO THE RANKING OF PROPOSALS PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) NO. 2018-141-ND, FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH WILLIAM B. MEDELLIN ARCHITECT P.A., CSA CENTRAL, INC., SCHINDLER ARCHITECTS, INC., TSAO DESIGN GROUP, INCORPORATED, CPH, INC., SOL-ARCH, INC.,WILLIAM LANE ARCHITECT, INC., MOSS ARCHITECTURE AND DESIGN GROUP, INC., ALLEGUEZ ARCHITECTURE, INC., R.J. HEISENBOTTLE ARCHITECTS, AND P.A., VITALINI CORAZZINI, P.A., FOR THE DISCIPLINE OF GENERAL ARCHITECTURE; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SAVINO & MILLER DESIGN STUDIO, P.A., KEITH AND SCHNARS, P.A., CPH, INC., CURTIS & ROGERS DESIGN STUDIO, INC., CHEN-MOORE ASSOCIATES, AND MILLER, LEGG & ASSOCIATES, INC., FOR THE DISCIPLINE OF LANDSCAPE ARCHITECTURE; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SCHWEBKE-SHISKIN & ASSOCIATES, INC., CES CONSULTANTS, INC., CHEN-MOORE ASSOCIATES, 305 CONSULTING ENGINEERS, LLC, MILLER, LEGG & ASSOCIATES, INC., AND SRS ENGINEERING, INC., FOR THE DISCIPLINE OF CIVIL ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH E SCIENCES, INC., TERRACON CONSULTANTS, INC., EBS ENGINEERING, INC., AND CSA CENTRAL, INC., FOR THE DISCIPLINE OF ENVIRONMENTAL SERVICES AND TESTING ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH CSA . CENTRAL, INC., 3FM ENGINEERING, INC., AND UCI ENGINEERING INC., FOR THE DISCIPLINE OF MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH 305 CONSULTING ENGINEERS, LLC, EASTERN ENGINEERING GROUP COMPANY, CES CONSULTANTS, INC., MASTER CONSULTING ENGINEERS, INC., UCI ENGINEERING INC., AND DIAZ, CARRENO, SCOTT!-& PARTNERS, INC., FOR THE DISCIPLINE OF STRUCTURAL ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH TSAO DESIGN GROUP, INCORPORATED, AND MC DESIGNERS, INC., FOR THE DISCIPLINE OF INTERIOR DESIGN I SPACE PLANNING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SCHWEBKE-SHISKIN & ASSOCIATES, INC. FOR THE DISCIPLINE OF SURVEYING; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH EACH OF THE RECOMMENDED PROPOSERS UPON CONCLUSION OF SUCCESSFUL NEGOTIATIONS BY THE ADMINISTRATION. WHEREAS, on February 14, 2018, the City Commission approved the issuance of Request for Qualifications (RFQ) No. 2018-141-ND for Professional Architectural and Engineering Services for Capital Repair and Replacement Projects; and WHEREAS, Request for Qualifications No. 2018-141-ND (the "RFQ") was released on February 15, 2018; and WHEREAS, a voluntary pre-proposal meeting was held on February 27, 2018; and WHEREAS, on May 7, 2018, the City received thirty-seven (37) proposals; and WHEREAS, on February 26, 2018 the City Manager via Letter to Commission (LTC) No. 105-2018, appointed an Evaluation Committee (the "Committee"), consisting of the following individuals: Lily Alvarez, Construction Manager, Property Management Department, City of Miami Beach; Pilar Caurin, Construction Manager, Office of Capital Improvement Projects, City of Miami Beach; Elizabeth Estevez, Parks and Capital Projects Manager, Parks and Recreation Department, City of Miami Beach; and Francisco Garcia, Construction Manager, Property Management Department, City of Miami Beach;and WHEREAS, the Committee convened on August 6, 2018 to review and score the remaining proposals; and WHEREAS, the Committee was provided an overview of the project, information relative to the City's Cone of Silence Ordinance and the Government Sunshine Law, general information on the scope of services, and a copy of each proposal; and WHEREAS, the Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFQ; and WHEREAS, the Committee's ranking for the discipline of General Architecture was as follows: William B. Medellin Architect P.A., as the first ranked proposer; CSA Central, Inc., as the second ranked proposer; Schindler Architects, Inc. and TSAO Design Group, Incorporated, tied as the third ranked proposers; CPH, Inc., as the fifth ranked proposer; Sol-ARCH, Inc., as the sixth ranked proposer; William Lane Architect, Inc., as the seventh ranked proposer; Moss Architecture and Design Group, Inc., as the eighth ranked proposer; Alleguez Architecture, Inc., as the ninth ranked proposer; R.J. Heisenbottle Architects, and P.A., as the tenth ranked proposer; Vitalini Corazzini, P.A., as the eleventh ranked proposer; ArcBuilders and Group Incorporated, as the twelfth ranked proposer; Alejandro Pardo Architecture, Inc., as the thirteenth ranked proposer; and UCI Design, Inc., as the fourteenth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Landscape Architecture was as follows: Savino & Miller Design Studio, P.A., as the first ranked proposer; Keith and Schnars, P.A., as the second ranked proposer; CPH, Inc., as the third ranked proposer; Curtis & Rogers Design Studio, Inc., as the fourth ranked proposer; Chen-Moore Associates, as the fifth ranked proposer; Miller, Legg & Associates, Inc., as the sixth ranked proposer; Calvin, Giordano & Associates, Inc., as the seventh ranked proposer; and Landscape DE, LLC, as the eighth ranked;proposer; and WHEREAS, the Committee's ranking for the discipline of Civil Engineering was as follows: Schwebke-Shiskin & Associates, Inc., as the first ranked proposer; CES Consultants, Inc., as the second ranked proposer; Chen-Moore Associates, as the third ranked proposer; 305 Consulting Engineers, LLC, Miller, Legg &Associates, Inc., and SRS Engineering, Inc., tied as the fourth ranked proposers; CPH, Inc., as the seventh ranked proposer; and T.Y. Lin International, as the eighth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Environmental Services and Testing Engineering was as follows: E Sciences, Inc., as the first ranked proposer; Terracon Consultants, Inc., as the second ranked proposer; EBS Engineering, Inc., as the third ranked proposer; CSA Central, Inc., as the fourth ranked proposer; and Florida Technical Consultants, LLC, as the fifth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Mechanical, Electrical, and Plumbing Engineering was as follows: CSA Central, Inc. and Ross & Baruzzini, Inc., tied as the first ranked proposers; 3FM Engineering, Inc., as the third ranked proposer; and UCI Engineering Inc., as the fourth ranked proposer; and WHEREAS, subsequent to the evaluation of proposals, Ross & Baruzzini, Inc. submitted the a letter indicating that without local MEP resources it no longer wished to be considered for award; and WHEREAS, the Committee's ranking for the discipline of Structural Engineering was as follows: 305 Consulting Engineers, LLC'and Eastern Engineering Group Company, tied as the first ranked proposers; CES Consultants, Inc., as the third ranked proposer; Master Consulting Engineers, Inc., as the fourth ranked proposer; UCI Engineering Inc., as the fifth ranked proposer; and Diaz, Carreno, Scotti & Partners, Inc., as the sixth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Interior Design ! Space Planning was as follows: TSAO Design Group, Incorporated, as the first ranked proposer; and MC Designers, inc., as the second ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Surveying was follows: Schwebke-Shiskin&Associates, Inc., as the first ranked proposer; and WHEREAS, after reviewing all the submissions and the results of the evaluation process, the City Manager recommends that the Administration be authorized to enter into negotiations as follows: William B. Medellin Architect P.A., CSA Central, Inc., Schindler Architects, Inc., TSAO Design Group, Incorporated, CPH, Inc., Sol-ARCH, Inc., William Lane Architect, Inc., • Moss Architecture and Design Group, Inc. Alleguez Architecture, Inc., R.J. Heisenbottle Architects, and P.A., Vitalini Corazzini, P.A., for the discipline of General Architecture. Savino & Miller Design Studio, P.A., Keith and Schnars, P.A., CPH, Inc., Curtis& Rogers Design Studio, Inc., Chen-Moore Associates, and Miller, Legg &Associates, Inc., for the discipline of Landscape Architecture. • Schwebke-Shiskin & Associates, Inc., CES Consultants, Inc., Chen-Moore Associates, 305 Consulting Engineers, LLC, Miller, Legg & Associates, Inc., and SRS Engineering, Inc., for the discipline of Civil Engineering. E Sciences, Inc., Terracon Consultants, Inc., EBS Engineering, Inc., and CSA Central, Inc., for the discipline of Environmental Services and Testing Engineering. CSA Central, Inc., 3FM Engineering, Inc., and UCI Engineering Inc., for the discipline of Mechanical,Electrical, and Plumbing Engineering. 305 Consulting Engineers, .LLC, Eastern Engineering Group Company, CES Consultants, Inc., Master Consulting Engineers, Inc., UC1 Engineering Inc., and Diaz, Carreno, Scotti & Partners, Inc., for the discipline of Structural Engineering. TSAO Design Group, Incorporated, and MC Designers, Inc., for the discipline of Interior Design/Space Planning. Schwebke-Shiskin &Associates, Inc. for the discipline of Surveying. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager pertaining to the ranking of proposals pursuant to Request for Qualifications (RFQ) No. 2018-141-ND for Professional Architectural and Engineering Services for Capital Repair and Replacement Projects; authorizing the administration to enter into negotiations with William B. Medellin Architect P.A., CSA Central, Inc., Schindler Architects, Inc., TSAO Design Group, Incorporated, CPH, Inc., Sol- ARCH, Inc., William Lane Architect, Inc., Moss Architecture and Design Group, Inc., Alleguez Architecture, Inc., R.J. Heisenbottle Architects, and P.A., Vitalini Corazzini, P.A., for the discipline of General Architecture; ,authorizing the Administration to enter into negotiations with Savino & Miller Design Studio, P.A., Keith and Schnars, P.A., CPH, Inc., Curtis & Rogers Design Studio, Inc., Chen-Moore Associates, and Miller, Legg & Associates, Inc., for the discipline of Landscape Architecture; authorizing the Administration to enter into negotiations with Schwebke-Shiskin &Associates, Inc., CES Consultants, Inc., Chen-Moore Associates, 305 Consulting Engineers, LLC, Miller, Legg & Associates, Inc., and SRS Engineering, Inc., for the discipline of Civil Engineering; authorizing the Administration to enter into negotiations with E ' Sciences, Inc., Terracon Consultants, Inc., EBS Engineering, Inc., and CSA Central, Inc., for the discipline of Environmental Services And Testing Engineering; authorizing the Administration to enter into negotiations with CSA Central, Inc., 3FM Engineering, Inc., and UCI Engineering Inc., for the discipline of Mechanical, Electrical, ,And Plumbing Engineering; authorizing the Administration to enter into negotiations with 305 Consulting Engineers, LLC, Eastern Engineering Group Company, CES Consultants, Inc., Master Consulting Engineers, Inc., UGI Engineering Inc., and Diaz, Carreno, Scott' & Partners, Inc., for the discipline of Structural Engineering; authorizing the Administration to enter into negotiations with TSAO Design Group, Incorporated, and MC Designers, Inc., for the discipline of Interior Design ! Space Planning; authorizing the Administration to enter into negotiations with Schwebke-Shiskin & Associates, Inc. for the discipline of Surveying; and further authorizing the Mayor and City Clerk to execute an agreement with each of the recommended proposers upon conclusion of successful negotiations by the Administration. /�� / PASSED AND ADOPTED this /7 day of to OC1er 2018. ATTEST: 14/30/t RAF EL E. GRANADO, CITY CLER. DAN GELBER, MAYOR < ` F:\PURI\Solicitationsl201812018-141-N Q r1c�Er_ ItraNC5r. �s110-Award\RESO 2018-141-ND.doc ` `� � � APPROVED AS TO Y FORM &LANGUAGE &FOR EXECUTION * _INCORP1 'ORATED\* Cjt6La C 1-96 -f=.r City Attorney ,p,�.P Data rte. r`ti Resolutions-C7 P MIAMIBEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission • FROM: Jimmy L. Morales, City Manager DATE: October 17, 2018 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER PERTAINING TO THE RANKING OF PROPOSALS PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) NO. 2018-141-ND, FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH WILLIAM B. MEDELLIN ARCHITECT P.A., CSA CENTRAL, INC., SCHINDLER ARCHITECTS, INC., TSAO DESIGN GROUP, INCORPORATED, CPH, INC., SOL-ARCH, INC., WILLIAM LANE ARCHITECT, INC., MOSS ARCHITECTURE AND DESIGN GROUP, INC_, ALLEGUEZ ARCHITECTURE, INC., R.J. HEISENBOTTLE ARCHITECTS, AND P.A., VITALINI CORAZZINI, P.A., FOR THE DISCIPLINE OF GENERAL ARCHITECTURE; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SAVING & MILLER DESIGN STUDIO, RA, KEITH AND SCHNARS, P.A., CPH, :INC., CURTIS & ROGERS DESIGN STUDIO, INC., CHEN-MOORE ASSOCIATES, AND MILLER, LEGG & ASSOCIATES, INC., FOR THE DISCIPLINE OF LANDSCAPE ARCHITECTURE; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SCHWEBKE- SHISKIN & ASSOCIATES, INC., CES CONSULTANTS, INC., CHEN-MOORE ASSOCIATES, 305 CONSULTING ENGINEERS, LLC, MILLER, LEGG & ASSOCIATES, INC., AND SRS ENGINEERING, INC., FOR THE DISCIPLINE OF CIVIL ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH E SCIENCES, INC., TERRACON CONSULTANTS, INC., EBS ENGINEERING, INC., AND CSA CENTRAL, INC., FOR THE DISCIPLINE OF ENVIRONMENTAL SERVICES AND TESTING ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH CSA CENTRAL, INC., 3FM ENGINEERING, INC., AND UCI ENGINEERING INC., FOR THE DISCIPLINE OF MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH 305 CONSULTING ENGINEERS, LLC, EASTERN ENGINEERING GROUP COMPANY, CES CONSULTANTS, INC., MASTER CONSULTING ENGINEERS, INC., UCI ENGINEERING INC., AND DIAZ, CARRENO, SCOTT! & PARTNERS, INC., FOR THE DISCIPLINE OF STRUCTURAL ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH TSAO DESIGN GROUP, INCORPORATED, AND MC DESIGNERS, INC., FOR THE DISCIPLINE OF INTERIOR DESIGN / SPACE PLANNING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SCHWEBKE- SHISKIN & ASSOCIATES, INC. FOR THE DISCIPLINE OF SURVEYING; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN Page 436 of 1637 AGREEMENT WITH EACH OF THE RECOMMENDED PROPOSERS UPON CONCLUSION OF SUCCESSFUL NEGOTIATIONS BY THE ADMINISTRATION. RECOMMENDATION Adopt the Resolution ANALYSIS On September 28, 2004, through Resolution 2004-24697, the City Commission created the Capital Renewal and Replacement Program (the "CRR Program"). The intent of the CRR Program is to provide funding for proactive renewal and replacement of the City's facilities and the building systems within those facilities (e.g., HVAC, roofs, fire safety systems, etc). The CRR program is also used to execute small repairs, remodels or renovation projects, with total project budgets under $325,000. The average value of the current CRR projects is approximately $158,000, but can be as low as $25,000 or less. In addition to CRR projects, award(s) of this RFQ may also be used for other small projects. Section 287.055, Florida Statutes, commonly known as the Consultant's Competitive Negotiation Act (CCNA), is applicable to the selection of professional consultant services (architecture, professional engineering, landscape architecture, or registered surveying and mapping) by public agencies for projects valued up to the amount established in Category 5, Section 287.017, Florida Statutes (currently $325,000 or as amended by law) or for a planning or study activities valued up to the amount established in Category 2, Section 287.017, Florida Statutes (currently $35,000 or as amended by law). Even for projects below these thresholds,an architect or engineer is often required to develop construction documents for construction and permitting. Award of this RFQ will expedite the selection of architects and engineers as required for small projects. In order to maximize the cost effectiveness of small projects, through this RFQ the City sought to establish a pool of qualified architectural and engineering consultants interested in providing the City with professional services for small projects. The categories of work are, as further defined in Appendix C, Architecture — General, Architecture — Landscape Architecture, Engineering — Environmental Services and Testing, and Engineering — Mechanical, Electrical & Plumbing, Engineering—Structural. RFQ PROCESS On February 14, 2018,the City Commission approved to issue the Request for Qualifications (RFQ) No. 2018-141-ND for Professional Architectural and Engineering Services for Capital Repair and Replacement Projects. On February 15, 2018, the RFQ was issued. A voluntary pre-proposal conference to provide information to proposers submitting a response was held on February 27, 2018. Seven addenda were issued. The Procurement Department issued bid notices to 275 companies utilizing www.publicpurchase.com website. 263 prospective bidders accessed the advertised solicitation. RFQ responses were due and received on May 7, 2018. The City received proposals in response to the RFQ from the following 37 firms for a variety of categories as indicated in Attachment A: 305 Consulting Engineers, LLC 3FM Engineering, Inc. Alejandro Pardo Architecture, Inc. AlleguezArchitecture, Inc. ArcBuilders and Group Incorporated Page 437 of 1637 Calvin, Giordano&Associates, Inc. CES Consultants, Inc. Chen-Moore Associates CPH, Inc. CSA Central, Inc. Curtis & Rogers Design Studio, Inc. Diaz, Carreno, Scotti& Partners, Inc. E Sciences, Inc. Eastern Engineering Group Company EBS Engineering, Inc. Florida Technical Consultants, LLC Keith and Schnars, P.A. Landscape DE, LLC Master Consulting Engineers, Inc. MC Designers, Inc. Miller, Legg&Associates, Inc. Moss Architecture and Design Group, Inc. R.J. Heisenbottle Architects, P.A. Ross&Baruzzini, Inc. Savino&Miller Design Studio, P.A. Schindler Architects, Inc. Schwebke-Shiskin&Associates, Inc. Sol-ARCH, Inc. SRS Engineering, Inc. T.Y. Lin International Terracon Consultants, Inc. TSAO Design Group, Incorporated UCI Engineering Inc. UCI Engineering, Inc. D/B/A UCI Design, Inc. Vitalini Corazzini, P.A. William B. Medellin Architect P.A. William Lane Architect, Inc. On February 26, 2018, the City Manager appointed the Evaluation Committee via LTC # 105-2018. The Evaluation Committee convened on August 6, 2018, to consider proposals received. The Committee was comprised of Lily Alvarez, Construction Manager, Property Management Department, City of Miami Beach; Pilar-Caurin, Construction Manager, Office of Capital Improvement Projects, City of Miami Beach; Elizabeth Estevez, Capital Projects Manager, Parks and Recreation Department, City of Miami Beach; and Francisco Garcia, Construction Manager, Property Management Department, City of Miami Beach. The Committee was provided an overview of the project, information relative to the City's Cone of Silence Ordinance and the Government Sunshine Law. The Committee was also provided with general information on the scope of services and a copy of each proposal. The Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFQ. The evaluation process resulted in the ranking of proposers as indicated in Attachment A. Subsequent to the evaluation of proposals, Ross & Baruz ini, Inc. submitted the attached letter indicating that without local MEP resources it no longer wished to be considered for award. Due to the large number of responses, a summary of each top-ranked firm or the firm's proposal is available upon request. Page 438 of 1637 CONCLUSION After reviewing all the submissions and the results of the evaluation process, I note that the City is fortunate to have received a large number of responses to the RFQ. In determining the number of firms to award in each category,staff has recommended the number of firms believed to be necessary to complete the volume of work available for each category. Awarding too many firms in any given category would not be in the City's best interest as,an insufficient volume of projects may cause, the awarded firms to become disinterested and not provide the necessary level of service to the City. Therefore, I recommend that the Mayor and City Commission approve the Resolution authorizing the Administration to enter into negotiations as follows: William B. Medellin Architect P.A., CSA Central, Inc., Schindler Architects, Inc., TSAO Design Group, Incorporated, CPH, Inc., Sol-ARCH, Inc., William Lane Architect, Inc., Moss Architecture and Design Group, Inc., Alleguez Architecture, Inc., R.J. Heisenbottle Architects, and P.A., Vitalini Corazzini, P.A., for the discipline of General Architecture. Savino & Miller Design Studio, P.A., Keith and Schnars, P.A., CPH,`'Inc., Curtis & Rogers Design Studio, Inc., Chen-Moore Associates, and Miller, Legg & Associates, Inc., for the discipline of Landscape Architecture. Schwebke-Shiskin & Associates, Inc., CES Consultants, inc., Chen-Moore Associates, 305 Consulting Engineers, LLC, Miller, Legg & Associates, Inc., and SRS Engineering, Inc., for the discipline of Civil Engineering. E Sciences, Inc., Terracon Consultants, Inc., EBS Engineering, Inc., and CSA Central, Inc., for the discipline of Environmental Services and Testing Engineering. CSA Central, Inc., 3FM Engineering, Inc., and UCI Engineering Inc.,for the discipline of Mechanical, Electrical,and Plumbing Engineering. 305 Consulting Engineers, LLC, Eastern Engineering Group Company, CES Consultants, Inc., Master Consulting Engineers, Inc., UCI Engineering Inc., and Diaz, Carreno, Scotti & Partners, Inc., for the discipline of Structural Engineering. TSAO Design Group, Incorporated, and MC Designers, Inc., for the discipline of Interior Design / Space Planning. Schwebke-Shiskin &Associates, Inc.for the discipline of Surveying.,, and further authorize the Mayor and City Clerk to execute an agreement with each of the recommended proposers upon conclusion of successful negotiations by the Administration. KEY INTENDED OUTCOMES SUPPORTED Build And Maintain Priority Infrastructure With Full Accountability FINANCIAL INFORMATION The cost of the related services, determined upon successful negotiations, are subject to funds availability approved through the City's budgeting process. Legislative Tracking Property Management/Procurement Page 439 of 1637 ATTACHMENTS: Descript ion o Attachment A ❑ Ross and Barazzuni Letter D Resolution • Page 440 of 1637 ATTACHMENT A - ARCHITECTURE-GENERAL • RFQ1011.1U•ND PROFESSIONALto - ._. _--�- ! 1 AAGHIIEGIURALAND ENC9IEERBI6 Lil Alvarez 9 Pilar CaurinElizabeth Estevez I Y ° Francisco Garcia c 99 0 9 SERVICES FOR CAPITAL RENEWAL AND .Y Fir:: REPLACEMENT PROJECTS I W n A re ata rc Totals Qualitative Quantitative I Subtotal_ Qualitative ;Quantitative Subtotal j Qualitative Quantitative Quantitative Subtotal ative Subtotal •- ' I William 6.Medellin Architect -_-•--i— P.A. 96 0 96 1 95 - 0 95 4 92 0 92 3 100 0 100 11 9 1 CSA Central,Inc. _ ••, _ 96 - 0 96 1• 98 0 98 1 91 0 91 4 98 0 _ 96 5 11 2 SchtndlerAithitects.Inc. 95 0 95 6 _• 0 94 5 95 0 95 1 99 0 99 3 15 3 TSAO Design Group, - -- -•---' Incorporated 95 0 95 6 93 0 93 6 94 _ 0 94 2 _ _ 100 0 100 1 15 3 CPH,Inc. 96 0 96 1 97 0 97 3 . 84 0 84 9 ••99 0 _99 3 16 5 Sol-ARCH.Inc. 1 95 _ 0 95 6 98 0 99 _ 1_ 86 0 86 7 98 0 I 96 5 19 _ 6 WdliamLane ArchllectInc. 96 0 _96 - 1 87 0 87 10 90 0 90 5 93 0 93 11 277 Moss Architecture and Design I Group,Inc. 95 0 95 . .6 90 0 90 9- e6 0 86 7 97 0 97 8 29 9 ABeguezArchitecture.loc. 96 0 96 1 89 0 89 9 80 0 BD 11 94 0 94 9 30 9 R.J.Heisenbottle Architects, - -' - P A. 94 0 94 10 91 • 0 91 7 86 0 88 6 94 0 _ 94 9 32 10 Vitatini Corazzini,PA. 94 ••--0 - - 94 -10 82 _ 0 82 12 82 0 62 10 98 0 98 5 37 .1 11 Arc6rpuilders and Group '- -- -.'..-•.--- incorporated 94 0 94 10 64 .-•_- 0 84 11 75 0 1 75 14 84 0 84 12 47 12 Alejandro Pardo Arclalecturu, • • Inc. 93 0 j 93 13 80 0,_, 60 ,13 79 0 79 12 79 0 79 13 51 13 UCI Design,Inc. _._88 0 88 141 69 0 1 _._ 69 114 78 I 0 78 13 78 0 __, 78 14, 55 •14 :::.. _ • Prepur VC.ran.Paii a TMMeuwi#Ae Alyraw Pads ARNdttul&Ms. 0 0 .....t N01aa01.,..0c o , a NCOMeatc area Glau.ksapmawd a 0 GTS Inc _ 0 0 CSACwa la: 0 0 M,n Nelaanise and Oesise Gn..Ina. —•._0 —• 0 RJ Mciae00,0aannc..PA 0 0 j Sal...P.M.%I. 0 o • 96PRG1,K -•• •• •••- 0 0 MAO Demo Camp.IaoAA,51 0 0 , ICI Eng'eMMrg•Inn DMA VLIDeign.Inc. 0 � 0` 41uliai Caaow,PA. 0 0 wain 5410004.MlJ.roa Pw 0 0 - .......... WAaa lrANe1.101IIIC _ ...0 _�..��__•. FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. Page 441 of 1637 . I ATTACHMENT A ARCHITECTURE-LANDSCAPE . 0101ate140PROFESSibila - m :is - -. RF SERVICEmainS FOR cwrtµKRF�IEw a3D L9y Alvarez--- -oEKEIMEEIWIG `Y Pilaf Caurin Y Elizabeth Ebtevec Francisco Garcia 'c Low �c RERACEU RT PROJECTS c I :x Aggre oto -----•--- -------.. .. ..---..� ce - --.-. ..._-J 2 Tot la Qualitative Guanutailve Subtotal Qualitative Quantitative Subtotal Qualitative Quantitative Subtotal 1 Qualitative Quantitative Subtotal I Savino&Miller Design Studio. —•-- P A97 0 97 1 95 0 95 4 94 0 94 1 100 0 100 1 7 1 Keith and Schnars.P.A. -- 96 -96 0 96 3- 97 0 97 2 92 0 92 2 100T-'- '0 —. _-100 1 8 2 • CPH,Inc 96 ---`a 96 3: 97 0 97 . 2 66 0 86 6 100 0 t 100 • 1 1-2--r3 Curtis&Rogers Design Studio. •— Inc. 96 _ 0 _ 96 3 98 0 98 1 87 0 87 5 98 0 98 5 14 •4 _ Chen-Moore Associates - _ 97 0 97 1 ' 91 0 91 6 90 0 •90 4 98 0 1 98 •5 16 :5 • Miller.Legg 8 Assoaates.Inc. 95 0 956 _ 88 0 88 7 91 0 91 1 100 0 11 100 1 17 i 6 Calvin.Giordano 8 Associates. - - - - - • • Inc. 95 0 95 6. 92 •0 92 _5 __ 86 0 86 6 96 0 95 .7 24 7 Landscape DE,LLC 93 0 93 8 83 0 .33 - 8 BO 0 - 80 8 96 0 96 7-i 31 •8 .:.• .. ...OisuearYea'Jsi H..'•i'::'iii:ir:i::'i.: . /*vows, Vows.Pd.& T.i.i00aAmet.. Cert Cidaaa Aa.Oca.IR 0 0 . 000142eO.AaaOu.e --- 0 0. WM'a 0l0sis Deng.SO..0o 0 5 s:,au..d&roa.PA. 0 0 ladsoSieOO.LLO 0 0 Suw'sal 4 aapaa.irc o o _ Ssro0AhbDa40a0A0 P.A. 0 0 FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • • • Page 442 of 1637 - ATTACHMENT A ENGINEERING-CML -------.. .._ _. -- - - --- - ----...__...... _.. - ---- _ 9iQ Nibtat419 PROFESSIONAL -_,....._......_.—_. _ a 2 W i C LOW--. C SERVICES FOR COITAL EW ENGINEERING ain Uly Alvarez C Pilar CaurIn z Elizabeth Eslevez Y I Francisco Garcia REPLACEMENT PROJECTS c Aggregate g a a� --_ 2 Toilets a Qum lue0ve Quantitative Subtotal Qualitative . Quantitative Subtotal Qualitative j Quantitative Subtotal Qualitative L Quantitative Subtotal , SChwebke-Sbiekin 8 -_.....--------- ..- . ---- ------•- —-- -..-I Associates.Inc. 95 0 95 5 97 0 97 3' 95 0 95 1 100 0 100 2 11 1 CES Consultants.Inc. 97 0 97 2 95 0 55 4• 92 0 92 5 100 0 100 2 13 2 Chen-Moore Associates 97 0 97 2 91 0 91 7. 93 0 93 3 100 0 100 2 14 3 305 Consuhin9 Engineers.LLC 95 _ 5 ..,_ 100 1 84 5 89 8: 87 5 92 5 98 5 103 1 15 4 Miller.Legg 8 Associate*.Inc. 95 0 95 5 ' 94 0 94__. 5• 93 - 0 93 3 10D 0 100 2�_ 15 4 SRS Engineering,Inc. 95 0 95 5 98_ -0___98 __ 1- . 94 0 94 2 98 0 98 •7_ CPH.Inc. 94 015 4 94 8' ' 96 -- 0 98 _ 1---_- 91 0 91 7 100 0 100 2 18 7 r T Y.Lin lntemalonal 97 0 97 7 2- 92 0 92 6 -90 -_ 0 90 8 96 0 - 98 7--23.---.-6-- I Ft aw Y.s..hacinu ITdal Curd... an CamWgCrgn¢n.LLC 0 I $ CESCu,a.aaea Ye 0 I 0 Cart.eldeae Meuiea 0 0 , CEN.ler 0 0 Wu 1e016Haakwe.uc 0 0 - SOh,YtrSluYleSatoms.Ire 0 0 CRS Fewreq er e 0 . r.Y Loww,..e.J a a FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. i Page 443 of 1637 ATTACHMENT A ENGINEERING-ENVIRONMENTAL SERVICES AND TESTING I . ...._ Mg zoo-map venvESEINIAL co• • co ARCIMECTURN.AND ENODIEEMNO 2 ' Low Lily Alvarez E.• Pilar Caurin Francisco Garcia.S Elizabeth EsteveZ .S. SERVICES FORCARTAL NENEwALAND x x :2 = Aggregate :i. REPLACEMENT PROJECTS c7 cc os ce a . cc i Totals g Qualitative Quanlhativa Subtotal Qualitative Quantitative Subtotal Qualitative • Quantitative - Subtotal ' Qualitative QuanlitaUve Subtotal i ___. . . . - E Sciences.Inc. 96 0 96 1 95 0 95 i 2 96 0 86 1 100 0 100 1 A 1 Terraces Consultants,Inc 96 o 96 1 95 0 95 .2 88 Ts--' 1 ,—88 3 100 0 100 1 7 2 EBS Engineering,Inc. • 95 0 , 95 4 96 0 98 ;1 92 0 92 . 2 100 0 TOO 1 8 .3 -• CSA Central.Inc. 96 0 96 1 89 _ 0 es 1 4 . 67 0 87 4 100 0 100 1 10' .4 Florida Technical Consultants. ' LLC 94 0 94 5 82 0 82 i 5 82 5 94 0 94 s 20 5_ ,• 1:;,'"ef,...-:,,f,,F;•"f'jfik;;i4;ii;;&.i's:,••••:7',7/1,3''''.7,1% ' 004+0••• 010•0061 0004, TOW 0001,001.01 CSALts.4.1r/c 0 1 0 E Scnnus Mc / 0 ; 0 FIN Frgrea0g ire 0 I 0 ftns.rechl.C.Youttirac e.g 13 ! o 1.10•001C0000.•00 13 ! 0 FOR DISPLAY PURPOSES ONLY,FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • • Page 444 of 1637 _ - • • • • • • • ATTACHMENT A • • ENGINEERING-MECHANICAL,ELECTRICAL,AND PLUMBING REM 2a1t441JI0 PROFESSIONAL cm C4 ARCHITECTURAL AND ENGINEERING LIIy Alvarez Pilar Caurin Elizabeth EStennz a Francisco GarciaE Low SERVICES FOR CAPITAL RENEWAL AND Y y REPLACEMENT PROJECTS • m mc Aggregate rg rc .— tY2 Qualitative QuantnatNe Subtotal Qualitative I Quantitative Subtotal Qualitative I Quantitative Subtotal QuaataIIvu Quantitative Subtotal Totals CSA Central.Inc. 95 0 95 1 96 0 96 1 89 _ 0 _ 89 2 ' 100__- 0 100 1 5 ' 1 Ross&Baruzzinl.Inc. 95 0 95 1 95 0 95 2 92_ • _0 92 1 100 0 100 I 5 :3FM Engineering,Inc. 90 0 90 3 94 0 94 3 g8 ��— 0 --^88 3—• 98 0 ! 98 4 i 13— :3 • IUCI Engineering,Inc. 90 0 90 3 SO 0 90 4 88 0 86 4 . 99 0 j 99 _3 I 14 4 Warne VilMnl paint. Taam.nuwr. te 0 Ren 81.91, Gn9.rq_tnc e a FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • • • • • . r Page 445 of 1637 • • ATTACHMENT A ENGINEERING-STRUCTURAL RFQ 2018441418 PROFESSIONAL --- •• ---—.—•---- ARCRIIECrI1RLL aRRFIX"ti NEERalO Lily Alvarez ` • Pilar Ceurin ` Elizabeth Estevez a Francisco Garcia c Low SERVICESKR CAPITAL RENEWAL AND x .5 REPIACEYENTPROJECTS ` m C e A99regate ry�. (L' — _-_._ __._.._... .K _ K _... _-C Totals aI Qualitative Dural/M . SVDIoNI - - ��___.. Qualitative Quantitative Subtotal i Qualitative I Quantitative •Subtotal quaRutive� Quantitative Subtotal t 305 Consulting Engineers,LLC 95 5 100 1- 88 5 93 1 79 5 84 5 100 5 105 ' I 1 8 1 Eastern Engineering Group --- - Company 95 0 95 3 92 0 92 2 90 _ 0____ 90 1 100 0__ 100 2 8 1 CES Consubanls,Inc. B7 0 97 2 91 0 91 3 87 0 87 3 100 0 • 100 .2 J 10 3 / Naer Consulting Engineers, - —" -• - . '• d -'-- Inc. 95 0 95 3 84 0 84 5 89 0 89 2 . 980 98 .4 14 4 UCI Engineering.Inc. 94 _ 0 94 5 _._ 91 0 91 3. 87 0 87 3 94 0 9a 5lr 16 5:1 Diaz.Carreno,Scotti 8 ------ 1 Partners.Inc, 92 0 92 6 61 0 __81 _ 6 75 0 75 . 6 92 I 0 _ 92 8 1 24 '8 j 1.. - F1{` • :•:1roNY Vrwab aRom`Tablauc00..•. . p WS CC...0 bq+CNF.UCI I - CCS Caapnafi M. 0 , 0 1 nvr.Caro.Sr56169ay./.pq p p falon Frgrva.p Gm,Cana, C 0 uCJ Fawn,. Irc ----_'---" _ Mawr Commis,Care.a•IK •...••—•C 0 I . vs FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • • • • Page 446 of 1637 ATTACHMENT A INTERIOR DESIGN!SPACE PLANNING — _erre. __ ----- — — RW 2016141.N0 PROFESSIONAL , • I I ARCNITEDTURLLAND ENCINEEAWC a c Low m Lily Mame . Pilar Caurin ..n Elizabeth Estevez Francisco Garcia SERYICESFOR CAPITAL REIIFMAA AND Y e A re ate REPLACEMENT PROJECTS t 99 9 c e -----..—erre.. .__. ._.._.._.__ a 'tY _ tz — .. 4 Totals 12 Qualitative Quantitative SvtNOtal Qualltatle quanUlative J Subtotal I GoaCtativo I Quantitate" . Subtotal . Cualita0ve ; Quantitative f Subtotal � -- ._ - - 7SA0 Design Group, :- Incorporated 95 0 95 1 93 0 93 1 93 0 93 1 100 0 100 1 ' e t MC Qeogners,Inc. 1 93•• 0 93 2 87 0 87 2- 89 D 89 2 98 0 BB 2 1 8 I 2 .. . . .. erre ere •'.ii/:�?s::. �:i ri isi :i::�„OdiWdn yb .. -,../,::.-:" Prep., v.,nsnv Penn Ta.1nu..ataM. +re agiava,.,e. a 0 Thea Re.V1Goyt0rayaa:0 a 0 FOR DISPLAY PURPOSES ONLY,FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • r • Page 447 of 1637 ATTACHMENT A SURVEYING • • RF0.209.111•ND PROFESSIONAL ! .-. • . a ARCHITECTURAL ARO ENGINEERING �; m Low Lily = Pilar Caurin Y Elizabeth Estevez E Francisco Garcia c y A[Y SERVICES FORCAPRAL RENEWAL AND REPLACEMENT 1Nt AGER la i c • Aggregate C Totals I Qualitative Quantitative Subtotal Qualitativrr Quanta amie Subtotal Qualitative Quantitative Subtotal Qualitative Quantitative Subtotal Schwebke-Shiskin Associalz6_Inc.___. 95 0 95 1 98 D 98 1 95 0 95 1 100 0 100 .I 4 _ I.� • wo�.I vAaraesvwns Tanaio.,win rdah4ca_b AssnWes.Inc J p FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • • • Page 448 of 1637 Rossl3aruzzini 7200 NW 19`"Street,Suite 305 Miami,Florida 33126 305.477.8338 C October 2,2018 Ms.Natalia Delgado City of Miami Beach Procurement Department 1755 Meridian Avenue,3'Floor Miami Beach,Florida 33139 RE: RFQ 2018-141-ND,Professional Architectural and Engineering Services for Capital Renewal and Replacement Projects,Engineering-Mechanical,Electrical&Plumbing Dear Ms.Delgado and Members of the Selection Committee, This letter is a follow-up to our submission submitted to the City of Miami Beach on May 7 relative to On-Call Mechanical/Electrical/Plumbing (MEP) Engineering Services. We understand that Ross & Baruzzini is being considered as a candidate for award of the On-Call Contract. We wanted to inform the City of Miami Beach that our local resources have changed since we submitted our Proposal: • Our local office remains strong in the security,communications and technology disciplines and our firm will continue to offer these services form our local office. • We no longer have mechanical,electrical and plumbing(MEP)resources in our local office;but do have these resources within our headquarters in St.Louis. We remain interested in the contract relative to security,communications and technology focused projects;but without local MEP resources it may be in your best interest to consider firms with local MEP resources for projects that are MEP focused. We thought it best to inform the City of Miami Beach of this change in local resources since our submission and understand any ramifications-relative to selection of firms for the contract. Respectfully, Michael E.Shea,AlA r Senior Vice President,Government Market M:314.378.6082;mshea@rossbar.com Cc:Susan Dimond,Bill Overturf rassbar.com Page 449 of 1637 ATTACHMENT B REQUEST FOR QUALIFICATIONS (RFQ) &ADDENDUMS 35 MI /� /� I B EACH Procurement Department /`-�/ �/ ` 1755 Meridian Ave, 3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov • • ADDENDUM NO.7 • REQUEST FOR QUALIFICATIONS NO.2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS(the RFQ) April 18,2018 This Addendum to the above-referenced RFQ is issued-in response to questions from prospective proposers, or other clarifications and revisions issued by the City.The RFQ is amended in the following particulars only(deletions are shown by strikethrough and'additions are underlined), 1, RFQ DUE DATE AND TIME. The deadline for receipt of submittals is extended until 3:00 p.m., Monday, May 7,2018,at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow for traffic or other delays for which the Proposer is solely responsible, No further questions will be considered. 2. RESPONSES TO QUESTIONS RECEIVED. Q1: The answer to Q17 states that the City already has a pool of professional surveyors and.the City will . not consider adding this category to the list of services. Under the Revised Statement of Work Required —Exhibit B (Revised Exhibit C), Surveying has been listed as a category of work. Please clarify whether surveying is included as a category in this RFQ proposal or not. Al: Please refer to Addendum No. 5, Exhibit B: Revised Appendix C, Minimum Requirements &Specifications, surveying has been added to the categories of work. Any questions regarding this- Addendum .should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext. 6263 nataliadelgado@miamibeachfl.gov • Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission. Potential prop rs that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Pr sp c ive Bidders"questionnaire with the reason(s)for not submitting a proposal. Sin -ly, • • -�s Ivr`• Pro�ment Director RFQ No.2018-141-\ND Addendum#7 4/18/2018 1 J I V I ` I B E " C H Procurement Department 1755 Meridian , , Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM NO.6 REQUEST FOR QUALIFICATIONS NO.2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS(the RFQ) April 16,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The RFQ is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). 1. RFQ DUE DATE AND TIME. The deadline for receipt of submittals is extended until 3:00 p.m., Monday, April 30, 2018,at the following location: • City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 - i Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow for traffic or other delays for which the Proposer is solely responsible. No further•questions will be considered Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfLgov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext.6263 nataliadelgado@miamibeachfl.gov Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission: Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Pros ctive Bidders"questionnaire with the reason(s)for not submitting a proposal. 'n (ely, / A lex D. �' r H Procurement Director - I RFQ No.2018-141-ND Addendum#6 4/16/2018 V 1 I A/ Y 1 I B EAC HProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM NO.5 REQUEST FOR QUALIFICATIONS NO.2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS (the RFQ) April 13,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The RFQ is amended in the following particulars only (deletions are shown by strikethrough and additions are underlined). • 1. REVISION: Delete Section 0300, Submittal Instructions and Format,on page 12—13 of the RFQ, in its entirety and Replace with Revised Section 0300, Submittal Instructions and Format, attached hereto as Exhibit A. 2. REVISION: Delete Appendix C, Minimum Requirements & Specifications, on page 27—28 of the RFQ, in its • entirety and Replace with Revised Appendix C, Minimum Requirements & Specifications, attached here to as • Exhibit B. 3. ATTACHMENTS. Exhibit A: Revised Section 0300, Submittal Instructions and Format Exhibit B: Revised Appendix C, Minimum Requirements&Specifications 4. RESPONSES TO QUESTIONS RECEIVED. Q1: Could you please clarify what is needed for the three references? Do we need reference letters or just contact information? Al: As stipulated in Appendix A, Response Certification, Questionnaire & Requirements Affidavit, 3. References & Past Performance, for each reference submitted, the following information is required: 1) Firm Name, 2) Contact Individual Name & Title, 3) Address, 4) Telephone,5)Contact's Email and 6)Narrative on Scope of Services Provided. Q2: Do only,originals need to be in 3 ring binders or the 10 copies also? A2: As stipulated in Section 0300, Submittal Instructions and Format, 1. Sealed Responses, the City prefers that the original be in a 3-ring. Additionally,that the Proposer submit ten (10) bound copies and one(1)electronic format(CD or USB format). How the copies are bound is up to the proposer. Q3: Pg 13, Section 2.3.1 Audited Financial Statements in lieu of D&B SQR. Will a current (2017-2018) certification letter from FOOT suffice for Audited Financial Statements?or do you require the Audited Financial Statement itself as submitted to FDOT for Certification? A3: Please refer to Exhibit A: Revised Section 0300, Submittal Instructions and Format. Neither is requested at this time. RFQ No.2018-141-ND Addendum#5 4/13/2018 M f /��1A� J� I B EI4 (2 I-1Procurement Department / V 11755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov Q4: Are the proposing firms required to submit sub-consultants to address all the service areas identified on p. 28 of Appendix C? A4: Proposers may but are not required to submit proposals for all categories of work stated within the RFQ. Proposals must be limited to a single category of work. Those Proposers wishing to submit proposals for multiple categories of work must submit a separate proposal for each category. For example, if a Proposer wishes to submit a proposal • for Architecture-General AND for Engineering-Structural, the Proposer must submit a single • • proposal for Architecture-General and a separate and distinct proposal for Engineering- Structural. • Proposals are not to include sub-consultants at this time.Proposals shall only be submitted • for the areas of work that will be completed by the submitting firm. Q5: Under"Experience and Qualifications of the Firm", you have asked for an SF330. Then, under "Experience and Qualifications of the Team", you have asked, "A ,resume of each individual, including education, experience, and any other pertinent information, shall be included for each respondent team member to be assigned to this contract". The SF330 includes resumes. Are you looking for resumes to be included twice in two separate sections? • A5: Please refer to Exhibit A: Revised Section 0300,Submittal instructions and Format. Q6: Under"Experience and Qualifications of the Team", you are asking for "Project Experience: For each architect and engineer, include information for three (3) relevant projects, performed in the last five years, for public or private sector clients."Does"architect and engineer" refer to each individual • on the team,or rather to the firm as a whole? Projects are included in the SF330.Are you looking for • projects to be included twice in two separate sections? A6: See response to item Q5 above. • Q7: Do we have to submit info for both Tab 2 and Tab 3.or just Tab 2 since we are submitting as a firm ' and not as a Team? A7: See response to item Q4 above. Q8: In the RFQ, under the Format section, for Tab 2.2 (Qualifications of Proposing Firm), are we to use SF 330 section F to present this information? AB: See response to item Q5 above. Q9: We are a consulting engineer (Mechanical, Electrical, and Plumbing) firm, do we have to be listed under an architect in the proposal or can we submit our own proposal? A9: See response to item Q4 above. RFQ No.2018-141-ND Addendum#5 . 4/13/2018 1 V l I A! V I V EAC I tProcurement Department 1755 Meridian Ave,3rd Floor,Miami Beach, Florida 33139 www.miamibeachfl.gov Q10: Insurance Requirements-Are we required to carry Workers'Comp,General Liability, and Automobile Liability?We do carry the 1 M professional liability being an engineering firm. A10: Yes, the Consultant will need to maintain the minimum levels of insurance indicated in • Appendix D, Insurance Requirements. Q11: Could the City please clarify intent?"Teams"with the"Prime"being the discipline under which you • • are submitting or Single-discipline proposals with no sub-consultants included?or will both types of submittals be allowed in which case..is it up to the Proposer? Al1: See response to item Q4 above. Q12: Tab 2 Section 2.2 asks for client references,Tab 3 Section 3.1.1 also asks for client references, and item 3 of the Response Certification, Questionnaire & Requirements Affidavit also asks for • references. Can these references be the same? Al2: No, references requested under Appendix A and Tab 3 are for the firm. References • requested under Tab 4 are for the Proposer's individual team members (architects and engineers). • • Q13: Can the proposer include references from City of Miami Beach staff? A13: Yes,the proposer can include references from the City, providing they are specific to a project. • • Q14: Is there a preponderance of vertical or horizontal tasks anticipated from this contract? A14: The City anticipates there to be a preponderance of vertical tasks resulting from the award of this solicitation. Q15: While'we understand that the industry is generally called Architectural/Engineering Services, Page 27 item C2 lists categories being sought grouped categorically as either "Architecture" or "Engineering". In the case of, for example, "Architecture — Landscape", the fact that it is written where landscape is appended to architecture it could be misunderstood to read that a landscape architectural firm must be a sub or part of architectural team because of the way it is written. Please clarify that it is not the intent of the City to force landscape architecture services to be solely provided as a sub to an architectural prime, and instead landscape architectural services can be submitted independently. A15: See response to item Q4 above. Q16: "Engineering — Structural" is listed twice. Can the City clarify if one of those was intended to be "Engineering—Civil" A16: Please refer to Exhibit B: Revised Appendix C, Minimum Requirements & Specifications. • RFQ No.2018-141-ND Addendum#5 4/13/2018 M I ANS I B EACHProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov Q17: Does the City already have a pool of Professional Surveyors? If not, will the City consider adding this category to the list of services? A17: The City already has a pool of Professional Surveyors. Hence, the City will not consider adding this category to the list of services. Q18: Mechanical, Electrical and Plumbing services are'all grouped together, however there are many highly qualified firms that provide one and not all three of those services. Will the City consider `. breaking each of these out into separate categories? A18: See response to item Q16 above. Q19: If the City will not break-out Mechanical, Electrical and Plumbing services into separate categories, will the City clarify if a firm that does not provide all three services in-house will preclude them from being eligible to submit. A19: 'See response to item Q16 above. Q20: During the Pre-Proposal Conference it was stated that firms could submit individually or as a part of a team. Concerns were brought up by several of the participants and attendees that that structure would result in disadvantageous situations for the applicants. Seldom are projects, even the small ones,only the product of one sole discipline. Therefore, an applicant may be selected by the City as part of a 'pool', for example for.Landscape Architectural or Civil Engineering Services. If, for example, a project is then given to an Architect for a building renovation or annex that will also require landscape and civil work, and if that Architect's RFQ submittal included a Civil Engineer or Landscape Architect as a part of their 'team', then the contracted firm in the pool of qualified • consultants selected by the City will not see the benefits of having submitted to perform any necessary intersecting services required as a part of the scope for that specific building renovation project. We think that the option to submit independently or as a part of a team may result in (a) bulking-up all the RFQ responses that will be received by the City to include both prime and consultant services which will make the task of an apples-to-apples comparison by the evaluation committee very difficult — or it may.(b) dissuade qualified applicants from submitting altogether. because they have not formed the established relationships other 'teams' may have in place — ultimately reducing the options for qualified professionals available for the City to choose from and setting the City at a disadvantage. We would respectfully recommend that all responses be made solely for the primary in-house service offered and that the option to also submit as part of a team be eliminated. That way, each applicant will be solely evaluated based on that primary service they are providing. The City could request that each applicant could state what firms they have had past experiences with that provide what would be sub-consultant services in a new Tab 2.4 to be included in Page 13. The City could then clarify that as a project becomes available, it would be the City's responsibility to assemble the. project team solely from those within the pool. If a prime has a stated working relationship with another firm that is also in the pool, then the City could favorably select that second firm to be a part of the team, or not. Ultimately,this will be in the City's best interest because(a)it will ensure that all team-members have been properly vetted through the selection process, and (b) it will clarify the process to those of us responding to this RFQ. RFQ No.2018-141-ND Addendum#5 • 4113/2018 n IamM I B EAC Procurement Department 1755 Meridian , , Miami Beach, Florida 33139 www.miamibeachfl.gov Given the above, please confirm if it is still the intent of the City to allow submittals to be independently submitted as well as a part of a team, A20: See response to item Q4 above. Q21: We understood from the statements made during the Pre-Proposal Conference that, for ease and facility of review, all submittals for each different service category should be submitted as separate packages, independently. Therefore, 1 firm who submits for 3 different service categories will provide 3 separate submittals. We certainly understand the effectiveness of this request; we simply • want to confirm if our understanding is correct. A21: The City confirms that for ease and facility of review all submittals for each different service category must be submitted as separate packages,independently. Q22: Appendix A.What tab does the questionnaire affidavit fall under.Should Appendix A be a tab unto itself? A22: See response to item Q5 above. Q23: 2.3 Financial Capacity. Do we request D&B SQR after the bid opening upon notification from the City or do we have D&B send the SQR to the City now? A23: As stipulated in Section 0300, Submittal Instructions and Format, 4. Financial Capacity, Proposer shall arrange for Dun & Bradstreet to submit a Supplier Qualifier Report (SQR)within three (3)days of request by the City. Q24: The numbering under the Submittal Instructions and Format seems to be off starting on page 12.Will you be updating that? A24: See response to item Q5 above. Q25: Are you looking for teams or individual firms for each"category"? A25: See response to item Q4 above. Q26: Civil engineering is not listed but structural is listed twice. Please clarify. A26: See response to item Q16 above. Q27: Is the City of Miami Beach looking to award individual Agreements for each Discipline or only (1) Agreement with a Prime and Sub-consultants. Also, if it will only be(1)Agreement,who shall be the Prime? A27: Sub-consultants are not being considered at this time. The City of Miami Beach is looking to award individual agreements for each discipline. In the case were a firm is awarded various disciplines, one agreement will be executed and will indicate the various disciplines. RFQ No.2018-141-ND Addendum#5 4/13/2018 /\/\ 1 - I V ^ CProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachff.gov Q28: Would the City be able to provide a list of the firms that currently hold contracts and expiration date of those contracts? • A28: The City currently does not have a contract for professional architectural and engineering services for capital renewal and replacement projects. Q29: Is the Architectural and Engineering Services for this RFQ associated with the cost less than $325,000? A29: Yes, this RFQ is for professional architectural and engineering services for capital renewal and replacement projects usually expected to cost less than$325,000.. Q30: Page 27 lists Engineering -Structural as a category two times. Is another category of engineering required? A30: See response to item Q16 above. Q31: Please elaborate on the type of testing &inspection services required under the Master Agreement. A31: No testing or inspection services are required.See response to item Q16 above. Q32: Can a firm submit as a prime consultant&be a subconsultant on other firm's teams? A32: See response to item Q4 above. • Q33: Under which category(ies)does the following services fall under? • -Lab Testing -Soils&Geologic Studies, Foundations -Roofing Assessments, Replacements • -Testing &Inspection Services A33: See response to item Q16 above. Soils & Geologic Studies, Foundations falls under the Engineering — Environmental Services and Testing category. Roofing Assessments, Replacements falls under the Architecture—General category. Q34: Please provide information on what type of testing services are required for the Engineering- Environmental Services category. A34: Various, including, but not limited to: surveys for asbestos containing materials (or ACM);lead based materials,Asbestos/Lead Abatement, and indoor air monitoring services. . Q35: Please provide clarification as to what lab testing services are required under the Master Agreement. A35: The category for lab testing services was deleted from Appendix C, Minimum Requirements&Specifications. RFQ No.2018-141-ND Addendum#5 4/13/2018 MIAAAIBEACHProcurement Department 1755 Meridian Ave,3rd Floor,Miami Beach, Florida 33139 www.miamibeachfLgov Q36: Page 12, TAB 2 reads 1.3.Should this be part of TAB 1 or TAB 2? A36: See response to item Q5 above. Q37: Under "SECTION 0300/SUBMITTAL INSTRUCTIONS AND FORMAT", please clarify where APPENDIX A, B, D&E are to be placed in RFQ Submittal package. A37: See response to item Q22 above. Appendix B is to be submitted if the Proposer has elected not to submit a proposal. Hence, it is not mentioned in Section 0300, Submittal Instructions and Format. Appendix D and E are not to be included in the proposal. • Q38: Section 2.2(Qualifications of Proposing Firm) ask to submit information regarding experience on non-residential small projects, construction cost below 325,000. Is it possible to include private offices, retail, restaurants, city projects such as certifications, zoning consulting and private historical like Deering Estate or Woman's Club at Coconut Grove? A38: Yes, when submitting information regarding experience you can include private offices, retail, restaurants, city projects such as certifications, zoning consulting and private historical projects. Q39: For section 3.1.1 it seems to duplicate section 2.2.Are we to provide small projects in both sections?. ' and are the projects supposed to be individual experience, firm experience or subconsultant experience? A39: Tab 3, Section 3.1 Qualifications of Proposing Firm, requests firm's history and • relevant experience and proven track record of providing architecture or engineering • . services, preferably to public sector agencies, for non-residential small projects. Tab 4, • Section 4.1.1 Project Experience, requests the experience of the firm's individual team members on small projects as defined in Section 3.1. Proposals are not to include sub • - consultants at this time. Q40: Should the DUNS information required in Tab 2.3 be sent to you? A40: Not at this time. As stipulated in Section 0300, Submittal Instructions and Format, 4. Financial Capacity, Proposer shall arrange for Dun&Bradstreet to submit a Supplier Qualifier Report(SQR)within three(3)-days of request by the City. The Supplier Qualifier Report(SQR) • shall be sent via email to nataliadelgador;7a.miamibeachfl.gov. Q41: In Section C2. Statement of Work Required (Page 27 of RFQ), could the City please clarify what the scope of items are for the Engineering—Environmental Services and Testing category? A41: See response to item Q34 above. - Q42: We would like to know how we should structure the proposal in regards to Tab 2 (Page 12 of RFQ). Would the City like two tabs for#2, one in front of item 1.3 and one in front of item 2.1? • A42: See response to item Q5 above. RFQ No.2018-141-ND Addendum#5 4/13/2018 Procurement Department M I !�� Y EAC1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov Q43: Are there any subs which may be excluded from participating on teams, as they may be on existing contracts with the City? A43: See response to item Q36 above. Q44: We understand that °testing," as it relates to geotechnical, laboratory services, and/or building materials testing, is included in the"Environmental—Environmental Services and Testing"category. Is this correct? If no,then what categories.do each of the following services fall under? • Lab Testing • Soils&Geologic Studies, Foundations • Roofing Assessments, Replacements • Testing & Inspection Services A44: See response to item Q33 above. Q45: Can a firm submit as a prime consultant&be a subconsultant on other firm's teams? A45: See response to item Q32 above. • Q46: Page 27 lists "Engineering —Structural" as a category two times. Is another category of engineering required? A46: See response to item Q16 above. Q47: Who are the incumbents? A47: See response to item Q28 above. Q48: Page 12: Please confirm that the hard copy submittal requires tab label of"0400" or if it can be labeled as outlined in the Proposal format(Tab 1,Tab 2,etc.). A48: It is strongly recommended that the Proposals be organized and tabbed in accordance with Section 0300,Submittal Instructions and Format. Q49: Page 13: Please clarify minimum required small projects ofas minimum of three or five. A49: See response to item Q5 above. Q50: Page 13: Section 3.1.1. cites small projects as defined in 2.1. Please clarify that definition of small projects is per Section 2.2. A50: See response to item Q5 above. Q51: Where should we include Appendix A? A51: See response to item Q5 above. RFQ No.2018441-ND Addendum#5 4/13/2018 • M I A I E AC H Procurement Department 1755 Meridian Ave,3rd Floor, Miarni Beach, Florida 33139 www,miamibeachfl.gov Q52: Regarding the proposal format, noticed that you have Tab 2 twice. Should the second Tab 2 be • changed to Tab 3 and so on.. r A52: See response to item Q5 above. • Q53: Could you please make clarification in reference to the requested structure of the response. On tab 2, section 2.1 is requesting the use of Standard Form 330. On this form, it is a requirement to show 10 projects that show qualification of the firm and the key people involved (which is reflected in the matrix section G of the SF330). • A53: See response to item Q5 above. Q54: On the "Submittal Instructions and Format" proposed by Miami Beach, is the information to be included in Tab 2#2.2"Qualifications of Proposing Firm"the Form'330 Section E or Section F from • Form 330? Section E lists 5 relevant projects to be entered in that section while we are required to submit three (3) Section F "Example Projects" as per Tab 3 on the "Submittal Instructions and Format"proposed by Miami Beach. A54: Tab 3 Section 3.1 requests the Qualifications of the Proposing Firm. Form 330 Section E and F make reference to the key personnel and team. Q55: Regarding Form 330 Section F, I understand we need to submit three (3) small projectsrelevant to the category of work for this proposal/RFQ (Three (3) small projects are specified in Tab 3 on the "Submittal Instructions and Format" proposed by Miami Beach). Is Section F the same information that is specified to be included in Tab 3 on the "Submittal Instructions and Format" proposed by Miami Beach? If so,do I place a copy of those three(3)Section F example projects together with the Form 330 in Tab 2 and another copy of the Section F three(3)small projects in Tab 3 as well? A55: See response to item Q5 above. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext.6263 nataliadelgado@miamibeachfl.gov Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission, Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Prospective Bidders"questionnaire with the reason(s)for not submitting a proposal. Si ;rely, Al-x •curement Director • RFQ No.2018-141-ND • Addendum#5 4/13/2018 1y1\ I Al 1 I B EACHProcurement Department 1755 Meridian Ave,3rd Floor,Miami Beach, Florida 33139 www.miamibeachfl.gov Exhibit A Revised Section 0300, Submittal Instructions and Format • • RFQ No.2018-141-ND Addendum#5 4/13/2018 MIAMI BEACH SECTION 0300 SUBMITTAL INSTRUCTIONS AND FORMAT 1. SEALED RESPONSES. One original Proposal (preferably in 3-ring binder) must be submitted in an opaque, sealed envelope or container on or before the due date established for the receipt of proposals.Additionally,ten (10) , bound copies and one (1) electronic format (CD or USB format) are to be submitted. The following information should be clearly marked on the face of the envelope or container in which the proposal is submitted: solicitation • number, solicitation title, proposer name, proposer return address. Statement of Qualifications received electronically, either through email or facsimile, are not acceptable and will be rejected. 2. LATE BIDS. Statement of Qualifications is to be received on or before the due date established herein for the • receipt of Bids. Any Bid received after the deadline established for receipt of Statement of Qualifications will be considered late and not be accepted or will be returned to proposer unopened. The City does not accept responsibility for any delays, natural or otherwise. 3. STATEMENTS OF QUALIFICATIONS FORMAT. In order to maintain comparability, facilitate the review process and assist the Evaluation Committee in review of Statement of Qualifications, it is strongly recommended that Statement of Qualifications be organized and tabbed in accordance with the sections and manner specified below. Hard copy submittal should be tabbed as enumerated below and contain a table of contents with page references. Electronic copies should also be tabbed and contain a table of contents with page references. • TAB 1 Cover Letter&Table of Content 1.1 Cover Letter.The cover letter must be signed by a principal or agent able to the bind the firm and contain the following: (a) Prime Proposer. Include the name and location of the Prime Proposer, Primary Proposer's Representative • for the RFQ, Representative's Contact.Joint Ventures are not allowed under this RFQ. (b) Selected Category of Work. Proposer must indicate the category of work for which proposal is submitted. Categories of Work; include: Architecture — General; Architecture — Landscape; Engineering — Environmental; Engineering—Mechanical,Electrical&Plumbing; Engineering--Structural. • Proposers shall submit separate proposals for each category of work for which a proposal is • submitted. Example: a firm which provides general architecture and landscape architecture shall submit one proposal for Architecture—General and a separate and distinct proposal for Architecture—Landscape. 1.2 Response Certification, Questionnaire & Requirements Affidavit (Appendix A). Attach Appendix A fully completed and executed. TAB 2 j Minimum Requirements 2.1 Minimum Qualifications Requirements. Submit verifiable information documenting compliance with the minimum qualifications requirements established in Appendix C Minimum Requirements and Specifications, including • a) Architect / Engineerinq Firm. Provide copies that the firm is certified by the Florida Department of Business and Professional Regulation to do business in Florida. • b) Principle and Account Representatives. For the principle 'and account representative(s) submitted under Tab 2 below, submit copies that individuals are licensed by the Florida Department of Business and Professional Regulation to do business in Florida. Proposer should also submit copies of • architect/engineer license for all licensed firm employees. RFQ 2018-141-ND • MIAMI BEACH TAB 3 Experience&Qualifications of the Firm 3.1 Qualifications of Proposing Firm. Submit detailed information regarding.the firm's history and relevant experience and proven track record of providing architecture or engineering services, preferably to public sector agencies, for non-residential small projects (construction costs below $325,000 and planning/studies below $35,000), Submit at least three (3) small projects relevant to the category of work for which the proposal has been submitted, performed in the last five (5) years as evidence of requested experience, preferably to public sector agencies. For each small project submitted,the following is required: • project name, • project description (including cost/budget), • agency/client name, • agency/client contact, • contact telephone&email, • and year(s) and term of engagement. TAB 4 Experience&Qualifications of the Team 4.1 Qualifications of Proposer's Individual Team Members (Architects and Engineers). Provide an organizational chart which indicates, at a minimum,the principles of the firm, account representatives and individual team members to be assigned to any award by the City of Miami Beach pursuant to this RFQ. Include details on the role that each team member will play in providing the services detailed herein 'and each team members' qualifications. A resume of each individual, including education, experience, and any other pertinent information, shall be included for each respondent team member to be assigned to this contract. THIS SECTION IS NOT DIRECTED AT SUB-CONSULTANTS. SUB-CONSULTANTS ARE NOT TO BE SUBMITTED AT THIS TIME. • 4.1.1 Project Experience. For each architect and engineer (Firm's individual team members), include information for three (3) relevant projects, performed in the last five (5) years for public or private sector clients. Relevant projects shall include those projectssimilar in scope to those services listed in Appendix C. Submit at least three (3) small projects (as defined in Section 3.1 above) relevant to the category of work for which the proposal,has been submitted, performed in the last five (5) years as evidence of requested experience, preferably to public or private sector agencies. For each small project submitted,the following is required: • project name • project description, • 'agency/client name, • agency/client contact, • • contact telephone&email, • • and year(s) and term of engagement. • TAB 5 Required Forms . 5.1 Standard Form 330.The proposing firm shall submit a completed Standard From 330 (attached). No proposal will be considered without this required form. In addition to experience and qualifications considerations,the City may use this information to consider the firm's previous and current workload. 4. FINANCIAL CAPACITY. Within three (3) business days of request by the City, each Proposer shall arrange for • Dun & Bradstreet to submit a Supplier Qualification Report(SQR)directly to the Procurement Contact named herein. No proposal will be considered without receipt, by the City, of the SQR directly from Dun & Bradstreet. The cost of the preparation of the SQR shall be the responsibility of the Proposer. The Proposer shall request the SQR report RFQ 2018-141-ND • MIAMI BEACH from D&B at: • https://supelierportal.dnb.corn/webapp/wcs/stores/servlet/SupplierPortal?storeld=11696 • Proposers are responsible for the accuracy of the information contained in its SQR. It is highly recommended that each Proposer review the information contained in its SQR for accuracy prior to submittal to the City and as early as possible in the solicitation process. For assistance with any portion of the SQR submittal process,contact Dun &Bradstreet at 800-424-2495. • 5. ADDITIONAL INFORMATION OR CLARIFICATION. After proposal submittal, the City reserves the right to require additional information from Proposers (or Proposer team members or sub-consultants) to determine: qualifications (including, but not limited to, litigation history, regulatory action, or additional references); and financial capability (including, but not limited to, annual reviewed/audited financial statements with the auditors notes for each of their last two complete fiscal years). •• • • • • • • { RFQ 2018-141-ND h IA n I R E " C H Procurement Department 1755 Meridian , Floor, Miami Beach,Florida 33139 www.miamibeachfl.gov . Exhibit B Revised Appendix C, Minimum Requirements & Specifications • RFQ No.2018-141-ND Addendum#5 4/13/2018 Cl. Minimum Eligibility Requirements.The Minimum Eligibility Requirements for this solicitation ' are listed below. Proposer shall submit, with its proposal, the required submittal(s) documenting compliance with each minimum requirement. Proposers that fail.to include the required submittals with its proposal or fail to comply with minimum requirements shall be deemed non-responsive and shall not have its proposal considered. 1. Firms. Firms must be certified by the Florida Department of Business and Professional Regulation as architecture or engineering business, 2. Architects/Engineers. Architects and engineers must be licensed by the Florida Department of Business and Professional Regulation for their area of work. C2. Statement of Work Required. It is the intent of the City of Miami Beach to select multiple firms within each category that may be contacted on an "as-needed basis" during the term of the contract to submit consulting proposals on small projects whose estimated construction value is less than the amount established in Category 5, Section 287.017, Florida Statutes (currently $325,000 or as amended by law) or for a planning or study activity valued up to the amount established in Category 2, Section 287.017, Florida Statutes(currently$35,000 or as amended by law).. • The categories of work shall include: •Architecture—General 'Architecture—Landscape •Engineering—Environmental Services and Testing 'Engineering—Mechanical, Electrical &Plumbing •Engineering—Electrical •Engineering—Plumbing •Engineering-Mechanical •Engineering—Structural •Engineering—Civil •Interior Design/Space Planning •LEED Commissioning •Surveying The Administration will negotiate with a consultant(s)deemed to best qualified for the project based on an hourly rate (see Appendix E) or on a negotiated lump sum basis per project. If agreement is reached with the consultant for a specific project, a Consultant Service Order(CSO) will be issued, along with a Purchase Order(PO). No work is authorized, nor shall the City be liable for payment, until the CSO and PO are issued. The select consultant will be required to perform the architectural and engineering services in accordance with the Master Agreement(Appendix E) and the CSO.The highest professional standards shall be utilized for all work. RFQ 2018-141-ND 27 - i • I J The selected consultant will be required to; retain and be responsible for all sub-consultants necessary to achieve the assigned scope of work. Sub-consultants shall be included in the CSO. The City may reject the use of any sub-consultant. The services authorized under the resulting Master Agreement, include(but are not limited to): Acoustics,Noise Abatement • Fire Protection • Air Pollution Control • Heating;Ventilating;Air Conditioning • Auditoriums and Theaters • Interior Design;Space Planning • Automation;Controls;Instrumentation • Irrigation;Drainage • .Boundary Survey • Landscape Architecture • Codes;Standards;Ordinances • Lighting(Interior,Display,Theater,etc.) • Communications Systems;TV;Microwave • Lighting(Exterior,Streets,Memorials,Athletic Fields, • Conceptual Studies etc.) • Construction Administration • Plumbing and Piping Design • Cost Estimating • Recreation Facilities(Parks,Marinas,etc.) • Energy Conservation/Energy Sources • Rehabilitation, Remodel, Renovate (Buildings, • Electrical Structures,Facilities,etc.) • • General Environmental Services: • Safety Engineering;Accident Studies;OSHA Studies o Environmental Assessments • Security Systems;Intruder&Smoke Detection o Air and Water quality testing and • Soils&Geologic Studies;Foundations monitoring • Storage Tank Repair and Monitoring . o Environmental sustainability planning • Structural Design;Special Structures services • Surveying,Mapping,GIS,and other'services: o Environmental •support services to • Platting;Mapping;Flood Plain Studies achieve and maintain regulatory • Roofing Assessments,Replacements compliance • Swimming Pools • Contamination Assessment: • Topographical Survey o Environmental Site Assessments • Urban Renewals;Community Development o Oversee and coordinate remedlation • Value Analysis;Life-Cycling Costing project • Any other professional services normally considered o Preparation of sampling and remediation under the disciplines of architecture and engineering. plans and other related documents • Improve Building Performance o Other associated tasks related to • regulatory compliance • The selected architectural and/or engineering firms•will be responsible for reviewing all existing City of Miami Beach Zoning Ordinances and Building Codes, as well as any other applicable law or regulation. The teams will be responsible for incorporating all the above data into complete construction documents, including final working drawings, specifications, and bid documents necessary for the bidding and construction of the project, and in some instances, for construction management. The construction documents and drawings must comply with the City of Miami Beach with all applicable local,state and federal regulations. C3.Term of Contract:_It is expected that any resulting agreement shall be valid for a term of three (3) years'from effective date. The City Manager may approve two (2) additional one (1) year renewal periods based on satisfactory performance. /C4.Fee Standards: For determination of project fees the City will use the Design Professional Fee Guidelines for "Basic" Architectural and Engineering Services available at https://fo.stateil.us/docs/DMSAEFeeGuidedefin ition.asp RFQ 2018-141—ND 28 • M I A\/\/\ I B EAC (- Procurement Department i J 1755 Meridian Ave, 3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM NO.4 REQUEST FOR QUALIFICATIONS NO. 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS (the RFQ) April 11,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City, The RFQ is amended in the following particulars only(deletions .•• are shown by strikethrough and additions are underlined). 1, RFQ DUE DATE AND TIME. The deadline for receipt of submittals is extended until 3:00 p.m., Monday, April 23,2018,at the following location: r. City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow for traffic or other delays for which the Proposer is solely responsible. A FORTHCOMING ADDENDUM WILL CONTAIN RESPONSES TO QUESTIONS RECEIVED. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext.6263 nataliadelgado@miamibeachfl.gov Proposers are reminded to-acknowledge receipt of this addendum as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Pros ective Bidders"questionnaire with the reason(s)for not submitting a proposal • c ly, AxDes fu rocu ent Director RFQ No.2018-141-ND Addendum#3 4/11/2018 f . i MI /� ( BEi\CH Procurement Department !-1'n /�N , 1755Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM N0.3 REQUEST FOR QUALIFICATIONS NO,2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS(the RFQ) March 28,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The RFQ is amended in the following particulars only(deletions are shown by strikethrough and additions are underlined). 1. RFQ DUE DATE AND TIME. The deadline for receipt of submittals is extended until 3:00 p.m., Monday, April 16,2018,at the following location: •• City of Miami Beach , Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 . Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow ' for traffic or other delays for which the Proposer is solely responsible. A FORTHCOMING ADDENDUM WILL CONTAIN RESPONSES TO QUESTIONS RECEIVED. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov j Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext. 6263 nataliadelgado@miamibeachfl.gov ,j Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to , Prosp- 'i: Bidders"questionnaire with the reason(s)for not submitting a proposal. c:re ,,, 0 4�►t#i t{� 10-Aitroy:- is 0,4 ' o urement Director I RFQ No.2018-141-ND Addendum#3 3/28/2018 • /1 I /\ A I B EICProcurement Department 1 /"\ �/ j,,7 1700 Convention Center Drive, Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM NO.2 REQUEST FOR QUALIFICATIONS NO. 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS (the RFQ) March 6,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City.The RFQ is amended in the following particulars only. 1. ATTACHMENTS: • Exhibit A: Pre-Proposal Meeting Sign-In Sheet A FORTHCOMING ADDENDUM WILL CONTAIN RESPONSES TO QUESTIONS RECEIVED. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext.6263 nataliadelgado@miamibeachfl.gov Proposers are reminded to acknowledge receipt of this addendum,as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Prospective Bidders"questionnaire with the reason(s)for not submitting a proposal. 1i c•rely, Ale s•nis , Pr ement Director • RFQ No.2018-141-ND Addendum#2 3/6/2018 • MAI /\ n /� D E /� Procurement Department J �/ , P\ 1700 Convention Center Drive, Miami Beach, Florida 331'39 www.miamibeachfl,gov • Exhibit A Pre-Proposal Meeting Sign-In Sheet • RFQ No.2018-141-ND Addendum#2 3/6/2018 MIAMIBEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February.27,2018 TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS (.t 4i.�Narc 'ihptn ."YggS3SM u sx7.174,--L,.'"im,,ti $1111 t x r`"''';'••ss�,�t".<<�••lh�l1"Y�4CAFk,S3�Pw' xf �N',l'X itut..l • Natalia Delgado Procurement-C114B 305-673-7000 nataliadelgado@miamibeachfl.gov Ext.6263 e�c�aaar F _ 30S-1.73^ � -7000. a<l.41.940 x z99 ry VCunivFectr4 �,t,:v,,,. �1�ou 1, (2102 0Ed.Veckycie • / e.y, 3oyef aS 305-116 --- IC bcle`r KJo/Ple9KoxF300Z AA -Pd-e bbam,gmni. CeWL, 3D5-2oO- a�+"tavfz b01.1yoYli 52..Sl c� 1 O S q" 1\-k Qua Covnt.. ••-1 :3°5 _ 95(- / Rge- S Y1 e-Atld.f ei/1 WI v ti11=1 v1ov l-014,4uLa►.(AAA I D .�! f� J (B�) 5 90,iu-e Trou�o�scvGcr�c @ ,� r< 26a ,4, .'ara Y V ev • ur(/e,- !o-/9n/do Lo/`%L/n..corr7 4 ra O P3 S ti�etl j 'Volta° s ee'lAsNev(Ne .c,c c; csewt 3DC 1 MIAMIBEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018 TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS IP £ $ �.at ^� to rrT 14 �C � 4�+s 4, ..�a Amt w `,,•e °� a' �""` ,,,,i? I�I 1,F� , a , T#� ..( a s - tr: x ‘,',1,,,,,!,04 d > : o, « , m a 'Ri w, rxy.g ,,fw g r`L1' Avila i sa r t�,� 4 f"v,.�>r �' ft ," ao m ki< zi,,,d,.. it: tP t!... x .&�.a ��s . , igm a.�„ iii � V of Ci«vi i 43, A il,i . e ;,A Dg S 6-7,1 1r4E KS Ar►b A Rctt rrarS 51ia4RMI sI5717tcQLrg 55 11DD 1620Z-0.13S-0.1a.caM. -7-'8b-4 "51 7-0 b213 Ertliates ,044_ oI,koisIj Arn7o4 ,-$ 441-510iian!74b13-51.76.te » Gni L=t.,:)Q`( /vt� .. "0,4 Mood pr.o.clsr -1 p C,m�►ne2 a G►icJn/toowe.co,�n 7�r't�G2 �/�3 •A n F €�t� coo 7tnr6 IlJ ra' 9.52k Z -77,p A. -- 2 aoSCd.M`CGIVGLnf-CI t 5. cCIL lI 1cDf 1cabanA;cx19 ,dAiopenu:TY-coM 305'— II- int I n` Fo � S•t, t/ n �1aletna 1\1 Ikt AAiK1 c r2ut-coria. torn (q5¢)1/0'Irl gs 1--M1.-4rte-r \J, 4 ( hcszr ts; s 76,r-toc.eva11dtYfric.Cam A13}26-L 4cI t- 3M- E (1Mk&VE2 "ASA.) DES1GN (pewp 3056- 91> 5GE-DBE 'TSAL) DE5161u or- DE0 6 P.odc) 1Pz. @"TSAGD6S1GAJ.COA& ()Vi ra - t-D� SOL-A2GN {NG SOL.—AR-414, Inc_. 305740 0123 3os 746 on i 8 bQ SOL—p p-c-i.c oM •lail ??,N4';^ !40Q.akE Picho\ 16}-3 t°I-1352. e-'°-®gwoecknto4.ol .c.. .-r. fA e(tfiti ANtf 3o9•6I a5'Z2. 3p5r-66-` ikgc t6;,_eaa ecAiii• vtoT Gt_res til- `04, Nt Jul:4 4, �`tc •30 -?9?- r�s 4/2-3,2.- 2 b��sk a ,�. (. I MIAMIBEACH CITY OF MIAMI BEACH • PRE-SUBMITTAL MEETING • SIGN-IN SHEET DATE: February 27,2018 • TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR' CAPITAL RENEWAL AND REPLACEMENT PROJECTS IttIONV/11,0,, " � �4rL 9`yt CQ ' t r tI' * .�` a $�' . "`k 1 I `�aFh..�t 4 �t�a3'�m�i' � �: �')t �� � O�.0 � g pro �^S L" °� ; ,`. £ • ' 7 u� v ad �s ip' >. � 'ate' a� �d ''ikw �N itilij 1Tt:A ,•,till i6.' w G k kYr _ ,.w x Rpt,.,w_!cai...d. ' Kd ..{.> a. :..a' 3 :r� `� ,.iL m�., ;" , . 0.0.,.- c\ o )...e.,,",.. Cvv%Ae+Rc, Gorr— dcov-tvz40(4etvr-ne,�- —� fes-1 1G 205 96_3 ref/i 3oS�f63 J7�cr DoufnLs IhdrirS0.1 LQndsGafoe D �1l ! Do Ls-0 LA,ase,A pe DE caw. 30S 215 y(?3 __. 14 i i l."g.)1A ( ,v&i UJ ): ", t-„914,j -tYcln , 305,vm b' �,. = • al U ea,at,I l iavida,oe cover 7 7 `�. � A VQYO�A Aco : oar(- LLG 5D1i6D n,`�r . ko)rr 'rne0t4 .cc n\ CP1`75� s C, i 1 C,)D -. ` "1 N D(iF-2 A4L44-11 j -i5 �5,,' .�)sio4,32� Jcwcest# r 9L€{2. zkttrrs. . iLKf~R uzUN c� ��z�n 3x52744°005 3D527 -i1i7 Wc-�S e�hcorr' conn TE .�.r c e..oiv • 6-786) A50-6,Pc c1T-P7 g-1-1-C156 3 . L3UA5.3Atensr.c -r pGAZonJ, A-Gge�zjo J atrztze-til01 PR. Dc13 CocL2E►=x)5c044I.' ror-br- -c •'C-2gra acarr¢-�e.DVCs�-2e.dom �07� ahrZctue2 (3'"A �nihronrr)erltcc.) 54/-601 CI cAm.AC'c4, (40})896 IS39 102.2 cpylanrZ ttvc c &£.,v<(0nvne•114.1.42M tio'r g5 4-25Z00 c t NVl_. ,v61►i+cfrQ I - 303 - NV I L , gY1eVinCr1 @ya14v0.cU;y, � - MIAMIBEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018 TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS > 1s 1 � f i 1 y _ T�'� S j' A �' 2 Z ,.. � � ` v � 24 i i 4a ,ass.. : P�Sh� L '. 4 *i >y x a t s x ' r 1, Y T`) t F:a k4F AIS S l �� �� 4' �1. ' .:�� e% .v+s .',ninS''h�,.:iF.�y.� �.�fyt� �S�.,' YT+.,�l .. �47�i•,�Y»'.,� .�.k �� ,'� 8 { � F i �1f1 F M Wil3+ � � Y it>`.4S S .+� fid. Coi11 M ice( / CM 19(41*— ... 7-8S 014_ decoovorJ,. DA 4(000 S1��iJ k.--n-'6,-1-.tom` f�b�oc\ S 30s-lo(o-i Sb �loc� e`� In-gSSocfts.Ch 54--) q ririe. -Nu i5 Daksi5 fimsZerMu,,,J-49-5,taioe\-505-'zbz- 1i5Li VsG'-2Q uiS-OtAvfirtlinitiA A �(ctV. r - rSL-zg5•ls�l(i 5-7/'/-r3eg 1YILQ'�/ r Acl'L ,_/r tnr�z!-cam, en `lam b/ 9 ) lel, Jtz U)!n f,e t.l,2 (t.l�i,r.rm4 Eco 1 AE Adel ter,Qore- 30 -50 -c131 -30.c-4is-'3I,o nck ' .€-, �,1 I 30r-'4-1 s-,---H 5o GWY1GV; i 0 Qacck-eller.corn Ne4DA .1,-"M(ZA9LIAKS,f.nc(sAQht.r.Ar i i.(,..dSv t "°1" X05 .6418:5'1Ilo t.ToTERo O HA KS.N t;7 78So.22R•2o(a I A-t,.rv)4 Karn bf ' a✓ ill" cans(-`ms( st2C, • oJk ilmrnguibE ,,, (,,,ic@_ei,,rfc.•ecti.,t-viiip� -s iL 2gs7 Par14-2 &Carda ►`led,aA firiSKt(-top) 6/4. iuzzet.v9 Co. __ _ 305-3/S-!1213 ,,z4. Me d uvAa Q``,,ms 6Cb LC DN-g..-Cora TJoervoto ttC�Stk t px ! bps igicalir-t-1 (mc. SARA„ 0.A-vtiEro11DP vbou-co.,NE¢.6N•(...wM ,X 7103 PfP 1)0.7:0b v PrEKe I)—S(i.Tr1y', 446/4 o.+4C-,-Lai'! ''''''S'2°1-1 14/k ` i e A1 aSS ,b re-11-@Mass-arch,(Dm 305-7W/-663'7- .4{,_ __..,, ThO5sc1i, d e+[>s,',7/1 &T la, .per iii-1 4tal• -0331 utuAN N C>= P, VALI na a0alFt.accs^r-t,etas.Win' 4 . MIAMIBEACH I BEACH C CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018 TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS 04' !4 NG � l { CTDGG '4i " r gtf`,,,,,, , T„...,,„,,..7,,,1 „ , , ,,,„„,,.,,,,k, y i i , o O ”T 4 P ) STPKQVI) t1a satItr t, +� gi, ffIuti .O.:I 1> 6it.1nf., c:' ti2, Ylc act[, n.: rIt4t . „1" tX v ,.� ki t + In7 0� �4►l1e22��,0 � �Vt ,SARs skd► o . .. . 6 - , •tom ,it s �, P c ryk .� a4- , c. III► cm f ,dgil.n I i I\hmssare.Q,etykagya. te (4-e,v, _ „ ckecold 2 ( n_. C 2. _ . - sQA,„..tk... �Fc h,,,c -s, T.A . jj>> O(7VQ ecinstLjo .\...) .. y lik =i4._. ..) (---)___. ,F TAQSatl1,c 'iso, aTAIacl laelar4JE2_014kbiP.hqq 1 S ik1,12e.4-s C .e0A pia r- i2asict k_adfl-t_._rin • 2 MIAMIBEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018 TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS' ---d y Y,�i `"`GR 'wy�'"'"�"g �� I '� F'�` �h�d ' �*t"�, cdl'a�'���'iF� �,+" �$F�tr 5.wW ^kk� }�! ��S �`� I I P r 41E4 W4p"L 41 r'� " P 10 # " " 4f ,,o,,,, ,.,,:I.,i.„ "Vilt, :‘,t,' Iii l..,fid ;e O"" + .3OQG1-P� r:; 7&,-kaancuoa -. n c. PA on a SOCA a 4-e_ . I. lel-s ay-Ns.,J 4+Ci(i}-S- 1 caw ed IS ff 1.4.1/3‘..s Cc.h,-i-e e--s. 0.24n2In , 42...„ „_,, ..f'�,,,C,-S (1--- _ Saso n 4\- -tass4 s4Qc -s mea�ze_r, e t a Hca lk-e_c3 3 A /� I /\ j� Procurement Department 1 /�' �/ 1 . 1700 Convention Center Drive, Miami Beach, Florida 33139 www.miamibeachfl.gov • ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS NO. 2018-141-ND • PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS(the RFQ) February 26,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by.the City.The RFQ is amended in the following particulars only. • 1. REVISION: Section 0200— Instructions to Respondents & General Conditions, 5. Pre-Proposal Meeting or Site Visit(s) on page 4 of the RFQ, is hereby amended as follows. (deletions are shown by strikethrough and _ .. additions_are_undedin_ed).:__._._ .___ ___ _ . Only if deemed necessary by the City, a pre-proposal meeting or site visit(s)may be scheduled. A Pre-PROPOSAL conference will be held as scheduled in Anticipated RFQ Timetable section above at the following address: City of Miami Beach Procurement Department Conference Room 1755 Meridian Avenue,3rd Floor . Miami Beach,Florida 33139 Attendance (in person or via telephone) is encouraged and recommended as a source of information, but is not mandatory. Proposers Interested in participating.in the Pre-Proposal Submission Meeting via telephone must follow these steps: • (1) Dial the TELEPHONE NUMBER: 1-888-270-9936(Toll-free North America) (2) Enter the MEETING NUMBER: 1142614 9415468 Proposers who are interested in participating via telephone should send an e-mail to the contact person listed in this RFQ expressing their intent to participate via telephone. Any questions regarding this Addendum should be submitted in writing to the Procurement Management ' • Department to the attention of the individual named below, with a copy to the City Clerk's Office •at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext. 6263 .nataliadelgado@miamibeachfl.gov Proposers are reminded to acknowledge receipt 'of this addendum as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to • Prospective Bidders"questionnaire with the reason(s)for not submitting a proposal. •• ; ly, / /, ex De, ' PM 11 - ,ent Director RFQ No.2018-141-ND Addendum#1 2/26/2018 I REQUEST FOR QUALIFICATIONS ( RFQ ) PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS RFQ 2018-141-ND 11 RFQ ISSUANCE DATE: FEBRUARY 15, 2018 RESPONSES DUE: APRIL 2, 2018 @ 3:00 PM ISSUED BY: NATALIA DELGADO MIAMIBEACH . PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3RD Floor, Miami Beach, FL, 33139 305.673.74901 www.miamibeachfl.gov MIAMI BEACH TABLE OF CONTENTS SOLICITATION SECTIONS: PAGE 0100 NOT UTILIZED N/A 0200 INSTRUCTIONS TO RESPONDENTS &GENERAL CONDITIONS 3 0300 SUBMITTAL INSTRUCTIONS & FORMAT 12 0400 EVALUATION PROCESS 15 APPENDICES: PAGE APPENDIX A RESPONSE CERTI.FICATON, QUESTIONNAIRE AND AFFIDAVITS 17 APPENDIX B "NO BID" FORM 24 APPENDIX C MINIMUM REQUIREMENTS &SPECIFICATIONS 26 APPENDIX D INSURANCE REQUIREMENTS 29 • APPENDIX E SAMPLE CONTRACT • 31 APPENDIX F STANDARD FORM 330 62 RFQ 2018-141-ND 2 MIAMI BEACH SECTION 0200 INSTRUCTIONS TO RESPONDENTS&GENERAL CONDITIONS 1.GENERAL.This Request for Qualifications(RFQ)is issued by the City of Miami Beach, Florida (the"City"),as the means for prospective Proposer to submit their qualifications, proposed scopes of work and cost Proposals (the "proposal") to the City for the City's consideration as an option in achieving the required scope of services and requirements as noted herein. All documents released in connection with this solicitation, including all appendixes and addenda, whether included herein or released under separate cover, comprise the solicitation, and are complementary to one another and together establish the complete terms,conditions and obligations of the Proposer and,subsequently,the successful proposer(s)(the"contractor[s]") if this RFQ results in an award. The City utilizes PublicPurchase (www.Dublicourchase.com) for automatic notification of competitive solicitation opportunities and document fulfillment, including the issuance of any addendum to this RFQ. Any prospective proposer who has received this RFQ by any means other than through PublicPurchase must register immediately with PublicPurchase to assure it receives any addendum issued to this RFQ. Failure to receive an addendum may result indisqualification of proposal submitted. 2. PURPOSE. On September 28, 2004, through Resolution 2004-24697, the City Commission created the Capital Renewal and Replacement Program (the "CRR Program"). The intent of the CRR Program is to provide funding a proactive renewal and replacement of the City's facilities and the systems within those facilities (e.g., HVAC, roofs, fire safety systems, etc). The CRR is also used for approved for small repair, remodel or renovation projects,usually -expected to cost less than $325,000.The average value of the current CRR Projects is approximately$158,000,but can be as low as$25,000 or less. In addition to CRR projects, award(s)of this RFQ may also be used for other small projects. Section 287.055, Florida Statutes, commonly known as the Consultant's Competitive Negotiation Act (CCNA), is applicable to the selection of professional services consultants (architecture, professional engineering, landscape architecture, or registered surveying and mapping) by public agencies for projects valued up to the amount established in Category 5, Section 287.017, Florida Statutes (currently$325,000 or as amended by law) or for a planning or study activity valued up to the amount established in Category 2, Section 287.017, Florida Statutes (currently$35,000 or as amended by law). THEREFORE, CCNA IS NOT APPLICABLE TO THIS RFQ. In order to maximize the cost effectiveness of small projects, through this RFQ the City seeks to establish a pool of qualified architectural and engineering.consultants for those projects whose value is below the thresholds stipulated in CCNA. The categories of work are, asfurther defined inAppendix C, Architecture — General, Architecture — Landscape, Engineering — Environmental Services and Testing, Engineering — Mechanical, Electrical & Plumbing, Engineering—Structural. Because of the nature and size of the small projects being considered under this RFQ, the City desires to engage firms with sufficient experience in small projects. 3.SOLICITATION TIMETABLE.The tentative schedule for this solicitation is as follows: Solicitation Issued FEBRUARY 15, 20.18 Pre-Submittal Meeting FEBRUARY 27,2018 @ 10:00AM EST Deadline for Receipt of Questions MARCH 23,2018 @ 5:00 PM EST Responses Due . APRIL 2, 2018 @ 3:00 PM EST Evaluation Committee Review TBD RFQ• 2018-141-ND 3 MIAMI BEACH Proposer Presentations(if deemed necessary) TBD Tentative Commission Approval TBD 4. PROCUREMENT CONTACT.Any questions or clarifications concerning this solicitation shall be submitted to the Procurement Contact named herein, in writing, with a copy to the City Clerk's Office, Rafael E. Granado via e-mail: RafaelGranadoCa)miamibeachfl.gov ; or facsimile: 786-394-4188. The Bid title/number shall be referenced on all correspondence. All questions or requests for clarification must be received no later than ten (10) calendar days prior to the date Proposals are due as scheduled in Section 0200-3. All responses to questions/clarifications will be sent to all prospective Proposer in the form of an addendum. Procurement Contact: Telephone: Email: NATALIA DELGADO 305.673.7000 Ext.6263 NATALIADELGADO@MIAMIBEACHFL.GOV 5. PRE-PROPOSAL MEETING OR SITE VISIT(S). Only if deemed necessary by the City, a pre-proposal meeting or site visit(s) may be scheduled. A Pre-PROPOSAL conference will be held as scheduled in Anticipated RFQ Timetable section above at the following address: City of Miami Beach Procurement Department Conference Room 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Attendance (in person or via telephone) is encouraged and recommended as a source of information, but is not mandatory. Proposers interested in participating in the Pre-Proposal Submission Meeting via telephone must follow these steps: • (1) Dial the TELEPHONE NUMBER: 1-888-270-9936 (Toll-free North America) (2) Enter the MEETING NUMBER: 1142644 Proposers who are interested in participating via telephone should send an e-mail to the contact person listed in this RFQ expressing their intent to participate via telephone. 6. PRE-PROPOSAL INTERPRETATIONS. Oral information or responses to questions received by prospective Proposers are not binding on the City and will be without legal effect, including any information received at pre- submittal meeting or site visit(s). The City by means of Addenda will issue interpretations or written addenda clarifications considered necessary by the City in response to questions. Only questions answered by written addenda will be binding and may supersede terms noted in this solicitation. Addendum will be released through PublicPurchase. Any prospective proposer who has received this RFQ by any means other than through PublicPurchace must register immediately with PublicPurchase to assure it receives any addendum issued to this RFQ. Failure to receive an addendum may result in disqualification of proposal. Written questions should be received no later than the date outlined in the Anticipated RFQ Timetable section. 7. CONE OF SILENCE. This RFQ is subject to, and all proposers are expected to be or become familiar with, the City's Cone of Silence Requirements, as codified in Section 2-486 of the City Code. Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Cone of Silence are complied with, and shall be subject to any and all sanctions, as prescribed therein, including rendering their response voidable, in the event of RFQ 2018-141-ND . 4 MIAMI BEACH such non-compliance. Communications regarding this solicitation are to be submitted in writing to the Procurement Contact named herein with a copy to the City Clerk at rafaelgranado@miamibeachfl.gov 8. SPECIAL NOTICES. You are hereby advised that this solicitation is subject to the following ordinances/resolutions,which may be found on the City Of Miami Beach website: http://www.miamibeachfl.gov/city-hall/procurement/procurement-related-ordinance-and-procedures) • CONE OF SILENCE CITY CODE SECTION 2-486 • PROTEST PROCEDURES CITY CODE SECTION 2-371 • DEBARMENT PROCEEDINGS CITY CODE SECTIONS 2-397 THROUGH 2-485.3 • LOBBYIST REGISTRATION AND DISCLOSURE OF FEES CITY CODE SECTIONS 2-481 THROUGH 2-406 • CAMPAIGN CONTRIBUTIONS BY VENDORS CITY CODE SECTION 2-487 • CAMPAIGN CONTRIBUTIONS BY LOBBYISTS ON PROCUREMENT ISSUES CITY CODE SECTION 2488 • REQUIREMENT FOR CITY CONTRACTORS TO PROVIDE EQUAL BENEFITS FOR CITY CODE SECTION 2-373 DOMESTIC PARTNERS • LIVING WAGE REQUIREMENT CITY CODE SECTIONS 2-407 THROUGH 2-410 • PREFERENCE FOR FLORIDA SMALL BUSINESSES OWNED AND CONTROLLED BY CITY CODE SECTION 2-374 VETERANS AND TO STATE-CERTIFIED SERVICE-DISABLED VETERAN BUSINESS ENTERPRISES • FALSE CLAIMS ORDINANCE CITY CODE SECTION 70-300 • ACCEPTANCE OF GIFTS,FAVORS& CITY CODE SECTION 2-449 SERVICES 9. PUBLIC ENTITY CRIME. A person or affiliate who has been placed on the convicted vendor list following a conviction for public entity crimes may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to public entity, may not be awarded or perform work as a contractor, supplier, sub-contractor, or consultant under a contract with a public entity, and may not transact business with any public entity in excess of the threshold amount provided in Sec. 287.017, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list. 10. COMPLIANCE WITH THE CITY'S LOBBYIST LAWS.This RFQ is subject to,and all Proposers are expected to be or become familiar with, all City lobbyist laws. Proposers shall be solely responsible for ensuring that all City lobbyist laws are complied with, and shall be subject to any and all sanctions, as prescribed therein, including, without limitation,disqualification of their responses, in the event of such non-compliance. 11. DEBARMENT ORDINANCE: This RFQ is subject to, and all proposers are expected to be or become familiar with,the City's Debarment Ordinance as codified in Sections 2-397 through 2-406 of the City Code. 12. WITH THE CITY'S CAMPAIGN FINANCE REFORM LAWS. This RFQ is subject to, and all Proposers are expected to be or become familiar with, the City's Campaign Finance Reform laws, as codified in Sections 2-487 through 2-490 of the City Code. Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Campaign Finance Reform laws are complied with, and shall be subject to any and all sanctions, as prescribed therein, including disqualification of their responses, in the event of such non-compliance. 13. CODE OF BUSINESS ETHICS. Pursuant to City Resolution No.2000-23879,the Proposer shall adopt a Code of Business Ethics ("Code") and submit that Code to the Procurement Department with its response or within five (5) days upon receipt of request. The Code shall, at a minimum, require the Proposer, to comply with all applicable governmental rules and regulations including, among others, the conflict of interest, lobbying and ethics provision of the City of Miami Beach and Miami Dade County. 14. AMERICAN WITH DISABILITIES ACT (ADA). Call 305-673-7490 to request material in accessible format; sign RFQ 2018-141-ND 5 MIAMI BEACH language interpreters(five (5)days in advance when possible), or information on access for persons with disabilities. For more information on ADA compliance, please call the Public Works Department, at 305-673-7000, Extension 2984. 15. POSTPONEMENT OF DUE DATE FOR RECEIPT OF PROPOSALS. The City reserves the right to postpone the deadline for submittal of proposals and will make a reasonable effort to give at least three (3) calendar days written notice of any such postponement to all prospective Proposers through PublicPurchase. 16. PROTESTS. Proposers that are not selected may protest any recommendation for selection of award in accordance with eh proceedings established pursuant to the City's bid protest procedures,as codified in Sections 2- 370 and 2-371 of the City Code (the City's Bid Protest Ordinance). Protest not timely made pursuant to the requirements of the City's Bid Protest Ordinance shall be barred. 17. JOINT VENTURES. Joint Ventures are not allowed. Proposals shall be submitted only by the prime contractor who will serve as the CMR. The City will only contract with the prime contractor who will serve as the CMR. Proposals may, however, identify other sub-contractors or sub-consultants to the prime Proposer who may serve as team members. 18.VETERAN BUSINESS ENTERPRISES PREFERENCE. Pursuant to City Code Section 2-374,the City shall give a preference to a responsive and responsible Proposer which is a small business concern owned and controlled by a veteran(s) or which is a service-disabled veteran business enterprise, and which is within five percent (5%) of the lowest responsive, responsible proposer, by providing such proposer an opportunity of providing said goods or contractual services for the lowest responsive proposal amount (or in this RFQ, the highest proposal amount). Whenever, as a result of the foregoing preference, the adjusted prices of two (2) or more proposers which are a small business concern owned and controlled by a veteran(s) or a service-disabled veteran business enterprise constitute the lowest proposal pursuant to an RFQ or oral or written request for quotation, and such proposals are responsive, responsible and otherwise equal with respect to quality and service, then the award shall be made to the service-disabled veteran business enterprise. 19. DETERMINATION OF AWARD. The final ranking results of Step 1 & 2 outlined in Section 0400,Evaluation of Proposals, will be considered by the City Manager who may recommend to the City Commission the Proposer(s) s/he deems to be in the best interest of the City ormay recommend rejection of all proposals. The City Manager's recommendation need not be consistent with the scoring results identified herein and takes into consideration Miami Beach City Code Section 2-369,including the following considerations: (1)The ability,capacity and skill of the Proposer to perform the contract. (2)Whether the Proposer can perform the contract within the time specified,without delay or interference. (3)The character, integrity, reputation,judgment, experience and efficiency of the Proposer. (4)The quality of performance of previous contracts. (5)The previous and existing compliance by the Proposer with laws and ordinances relating to the contract. The City Commission shall consider the City Manager's recommendation and may approve such recommendation. The City Commission may also, at its option, reject the City Manager's recommendation and select another Proposal or Proposals which it deems to be in the best interest of the City, or it may also reject all Proposals. 20. NEGOTIATIONS. Following selection, the City reserves the right to enter into further negotiations with the selected Proposer. Notwithstanding the preceding, the City is in no way obligated to enter into a contract with the selected Proposer in the event the parties are unable to negotiate a contract. It is also' understood and acknowledged by Proposers that no property, contract or legal rights of any kind shall be created at any time until and unless an Agreement has been agreed to;approved by the City; and executed by the parties. RFQ 2018-141-ND 6 MIAAAI BEACH . 21. POSTPONEMENT/CANCELLATION/ACCEPTANCE/REJECTION. The City may, at its sole and absolute discretion, reject any and all, or parts of any and all, responses; re-advertise this RFQ; postpone or cancel, at any time, this RFQ process; or waive any irregularities in this RFQ, or inany responses received as a result of this RFQ. Reasonable efforts will be made to either award the proposer the contract or reject all proposals within one-hundred twenty(120) calendar days after proposal opening date.A proposer may withdraw its proposal after expiration of one hundred twenty (120) calendar days from the date of proposal opening by delivering written notice of withdrawal to the Department of Procurement Management prior to award of the contract by the City Commission. 22. PROPOSER'S RESPONSIBILITY. Before submitting a response, each Proposer shall be solely responsible for making any and all investigations, evaluations, and examinations, as it deems necessary, to ascertain all conditions and requirements affecting the full performance of the contract. Ignorance of such conditions and requirements, and/or failure to make such evaluations, investigations, and examinations, will.not relieve the Proposer from any obligation to comply with every detail and with all provisions and requirements of the contract, and will not be accepted as a basis for any subsequent claim whatsoever for any monetary consideration on the part of the Proposer. 23. COSTS INCURRED BY PROPOSERS.All expenses involved with the preparation and submission of Proposals, or any work performed in connection therewith, shall be the sole responsibility (and shall be at the sole cost and expense)of the Proposer, and shall not be reimbursed by the City. 24. RELATIONSHIP TO THE CITY. It is the intent of the City, and Proposers hereby acknowledge and agree, that the successful Proposer is considered to be an independent contractor, and that neither the Proposer, nor the Proposer's employees, agents, and/or contractors, shall, under any circumstances, be considered employees or agents of the City. 24. OCCUPATIONAL HEALTH AND SAFETY. In compliance with Chapter 442, Florida Statutes, any toxic substance listed in Section 38F-41.03 of the Florida Administrative Code delivered as a result of this proposal must be accompanied by a Material Safety Data Sheet(MSDS)which may be obtained from the manufacturer. 25. ENVIRONMENTAL REGULATIONS. The City reserves the right to consider a proposer's history of citations and/or violations of environmental regulations in investigating a proposer's responsibility, and further reserves the right to declare a proposer not responsible if the history of violations warrant such determination in the opinion of the City. Proposer shall submit with its proposal, a complete history of all citations and/or violations, notices and dispositions thereof. The non-submission of any such documentation shall be deemed to be an affirmation by the Proposer that there are no citations or violations. Proposer shall notify the City immediately of notice of any citation or violation which proposer may receive after the proposal opening date and during the time of performance of any contract awarded to it. 26.TAXES.The City of Miami Beach is exempt from all Federal Excise and State taxes. 27. MISTAKES. Proposers are expected to examine the terms, conditions, specifications, delivery schedules, proposed pricing, and all instructions pertaining to the goods and services relative to this RFQ. Failure to do so will be at the Proposer's risk and may result in the Proposal being non-responsive. 28. PAYMENT. Paymentwill be made by the City after the goods or services have been received, inspected, and found to comply with contract, specifications, free of damage or defect, and are properly invoiced. Invoices must be consistent with Purchase Order format. RFQ 2018-141-ND 7 MIAMI BEACH 29. COPYRIGHT, PATENTS& ROYALTIES. Proposer shall indemnify and save harmless the City of Miami Beach, Florida, and its officers, employees, contractors,and/or agents,from liability of any nature or kind, including cost and expenses for, or on account of, any copyrighted, patented,or unpatented invention, process, or article manufactured or used in the performance of the contract, including its use by the City of Miami Beach, Florida. If the Proposer uses any design, device or materials covered by letters, patent, or copyright, it is mutually understood and agreed, without exception, that the proposal prices shall include all royalties or cost arising from the use of such design, device, or materials in any way involved in the work. 30. DEFAULT. Failure or refusal of the selected Proposer to execute a contract following approval of such contract by the City Commission, or untimely withdrawal of a response before such award is made and approved, may result in a claim for damages by the City and may be grounds for removing the Proposer from the City's vendor list. 31. MANNER OF PERFORMANCE. Proposer agrees to perform its duties and obligations in a professional manner and in accordance with all applicable Local, State, County, and Federal laws, rules, regulations and codes. Lack of knowledge or ignorance by the Proposer with/of applicable laws will in no way be a cause for relief from responsibility. Proposer agrees that the services provided shall be provided by employees that are educated,trained, experienced, certified, and licensed in all areas encompassed within their designated duties. Proposer agrees to furnish to the City any and all documentation, certification, authorization, license, permit, or registration currently required by applicable laws, rules, and regulations. Proposer further certifies that it and its employees will keep all licenses, permits, registrations, authorizations, or certifications required by applicable laws or regulations in full force and effect during the term of this contract. Failure of Proposer to comply with this paragraph shall constitute a material breach of this contract. Where contractor is required to enter or go on to City of Miami Beach property to deliver materials or perform work or services as a result of any contract resulting from this solicitation, the contractor will assume the full duty, obligation and expense of obtaining all necessary licenses, permits, and insurance, and assure all work complies with all applicable laws. The contractor shall be liable for any damages or loss to the City occasioned by negligence of the Proposer,or its officers,employees, contractors,and/or agents,for failure to comply with applicable laws. 32. SPECIAL CONDITIONS. Any and all Special Conditions that may vary from these General Terms and Conditions shall have precedence. 33. NON-DISCRIMINATION. The Proposer certifies that it is in compliance with the non-discrimination clause contained in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to equal employment opportunity for all persons without regard to race,color, religion, sex or national origin. In accordance with the City's Human Rights Ordinance, codified in Chapter 62 of the City Code, Proposer shall prohibit discriminationby reason of race, color, national origin, religion, sex, intersexuality, gender identity, sexual orientation, marital and familial status,and age or disability. 34. DEMONSTRATION OF COMPETENCY. The city may consider any evidence available regarding the financial, technical, and other qualifications and abilities of a Proposer, including past performance (experience) in making an award that is in the best interest of the City,including: A.Pre-award inspection of the Proposer's facility may be made prior to the award of contract. B. Proposals will only be considered from firms which are regularly engaged in the business of providing the goods and/or services as described in this solicitation. C. Proposers must be able to demonstrate a good record of performance for a reasonable period of time, and have sufficient financial capacity, equipment, and organization to ensure that they can satisfactorily perform the services if awarded a contract under the terms and conditions of this solicitation. RFQ 2018-141-ND 8 MIAMI BEACH D. The terms "equipment and organization", as used herein shall, be construed to mean a fully equipped and well established company in line with the best business practices in the industry, and as determined by the City of Miami Beach. E. The City may consider any evidence available regarding the financial, technical, and other qualifications and abilities of a Proposer, including past performance(experience),in making an award that is in the best interest of the City. F.The City may require Proposer s to show proof that they have been designated as authorized representatives of a manufacturer or supplier,which is the actual source of supply. In these instances, the City may also require material information from the source of supply regarding the quality, packaging, and characteristics of the products to be supply to the City. 35. ASSIGNMENT. The successful Proposer shall not assign, transfer, convey, sublet or otherwise dispose of the contract, including any or all of its right, title or interest therein, or his/her or its power to execute such contract, to any person,company or corporation,without the prior written consent of the City. 36. LAWS, PERMITS AND REGULATIONS. The Proposer shall obtain and pay for all licenses, permits, and inspection fees required to complete the work and shall comply with all applicable laws. 37. OPTIONAL CONTRACT USAGE. When the successful Proposer(s) is in agreement, other units of government or non-profit agencies may participate in purchases pursuant to the award of this contract at the option of the unit of government or non-profit agency. 38. VOLUME OF WORK TO BE RECEIVED BY CONTRACTOR. It is the intent of the City to purchase the goods and services specifically listed in this solicitation from the contractor. However, the City reserves the right to purchase any goods or services awarded from state or other governmental contract, or on an as-needed basis through the City's'spot market purchase provisions. 39. DISPUTES. In the event of a conflict between the documents,the order of priority of the documents shall be as follows: A. Any contract or agreement resulting from the award of this solicitation;then B. Addendum issued for this solicitation,with the latest Addendum taking precedence;then C. The solicitation;then D. The Proposer's proposal in response to the solicitation. 40. INDEMNIFICATION.The Proposer shall indemnify and hold harmless the City and its officers,employees,agents and instrumentalities from any and all liability, losses or damages, including attorney's fees and costs of defense, which the City or its officers, employees, agents or instrumentalities may incur as a result of claims, demands, suits, causes of actions or proceedings of any kind or nature arising out of, relating to or resulting from the performance of the agreement by the contractor or its employees, agents, servants, partners, principals or subcontractors. The contractor shall pay all claims and losses in connection therewith, and shall investigate and defend all claims, suits or actions of any kind or nature in the name of the City,where applicable,including appellate proceedings, and shall pay all costs,judgments, and attorney's fees which may be incurred thereon. The Proposer expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by the contractor shall in no way limit the responsibility to indemnify, keep and save harmless and defend the City or its officers, employees, agents and instrumentalities as herein provided. The above indemnification provisions shall survive the expiration or termination of this Agreement. 41. CONTRACT EXTENSION. The City reserves the right to require the Contractor to extend contract past the RFQ 2018-141-ND 9 MIAMI BEACH stated termination date for a period of up to 120 days in the event that a subsequent contract has not yet been awarded. Additional extensions past the 120 days may occur as needed by the City and as mutually agreed upon by the City and the contractor. 42. FLORIDA PUBLIC RECORDS LAW. Proposers are hereby notified that all Bid including, without limitation, any and all information and documentation submitted therewith, are exempt from public records requirements under Section 119.07(1), Florida Statutes, and s. 24(a), Art. 1 of the State Constitution until such time as the City provides notice of an intended decision or until thirty (30) days after opening of the proposals, whichever is earlier. Additionally, Contractor agrees to be in full compliance with Florida Statute 119.0701 including, but not limited to, agreement to (a) Keep and maintain public records that ordinarily and necessarily would be required by the public • agency in order to perform the services; (b) provide the public with access to public records on the same terms and Conditions that the public agency would provide the records and at a costithat does not exceed the cost provided in this chapter or as otherwise provided by law; (c) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law; (d) Meet all requirements for retaining public records and transfer, at no cost, to the public agency all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the public agency in a format that is compatible with the information technology systems of the public agency. 43. OBSERVANCE OF LAWS. Proposers are expected to be familiar with, and comply with, all Federal,State, County, and City laws, ordinances, codes, rules and regulations, and all orders and decrees of bodies or tribunals having jurisdiction or authority which, in any manner, may affect the scope of services and/or project contemplated by this RFQ (including, without limitation, the Americans with Disabilities Act, Title VII of the Civil Rights Act, the EEOC Uniform Guidelines, and all EEO regulations and guidelines). Ignorance of the law(s) on the part of the Proposer will in no way relieve it from responsibility for compliance. 44. CONFLICT OF INTEREST. All Proposers must disclose, in their Proposal, the name(s) of any officer, director, agent, or immediate family member(spouse, parent, sibling, and child)who is also an employee of the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns, either directly or indirectly, an interest of ten (10%) percent or more in the Proposer entity or any of its affiliates. 45. MODIFICATION/WITHDRAWALS OF PROPOSALS.A Proposer may submit a modified Proposal to replace all or any portion of a previously submitted Proposal up until the Proposal due date and time. Modifications received after the Proposal due date and time will not be considered. Proposals shall be irrevocable until contract award unless withdrawn in writing prior to the Proposal due date,or after expiration of 120 calendar days from the opening of Proposals without a contract award. Letters of withdrawal received after the Proposal due date and before said expiration date, and letters of withdrawal received after contract award will not be considered. 47. EXCEPTIONS TO RFQ. Proposers must clearly indicate any exceptions they wish to take to any of the terms in this RFQ, and outline what,if any,alternative is being offered. All exceptions and alternatives shall be included and clearly delineated, in writing, in the Proposal. The City, at its sole and absolute discretion, may accept or reject any or all exceptions and alternatives. In cases in which exceptions and alternatives are rejected, the City shall require the Proposer to comply with the particular term and/or condition of the RFQ to which Proposer took exception to (as said term and/or condition was originally set forth on the RFQ). 48. ACCEPTANCE OF GIFTS, FAVORS,SERVICES. Proposers shall not offer any gratuities,favors, or anything of RFQ 2018-141-ND 10 MIAMI BEACH monetary value to any official, employee, or agent of the City, for the purpose of influencing consideration of this Proposal. Pursuant to Sec. 2-449 of the City Code, no officer or employee of the City shall accept any gift, favor or service that might reasonably tend improperly to influence him in the discharge of his official duties. 49. SUPPLEMENTAL INFORMATION. City reserves the right to request supplemental information from Proposers at any time during the RFQ solicitation process. 50. ADDITIONAL SERVICES. Although this solicitation and resultant contract identifies specific goods, services or facilities ("items"), it is hereby agreed and understood that the City, through the approval of the Department and Procurement Directors (for additional items up to $50,000) or the City Manager (for additional items greater than $50,000), may require additional items to be added to the Contract which are required to complete the work. When additional items are required to be added to the Contract, awarded vendor(s), as applicable to the item being requested, under this contract may be invited to submit price quote(s) for these additional requirements. If these quote(s) are determined to be fair and reasonable, then the additional work will be awarded to the current contract vendor(s) that offers the lowest acceptable pricing. The additional items shall be added to this contract by through a Purchase Order(or Change Order if Purchase Order already exists). In some cases,the City may deem it necessary to add additional items through a formal amendment to the Contract, to be approved by the City Manager. The City may determine to obtain price quotes for the additional items from other vendors in the event that fair and reasonable pricing is'not obtained from the current contract vendors, or for other reasons at the City's discretion. Balance of Page Intentionally Left Blank • RFQ 2018-141-ND 11 MIAMI BEACH SECTION 0300 SUBMITTAL INSTRUCTIONS AND FORMAT 1. SEALED RESPONSES. One original Proposal (preferably in 3-ring binder) must be submitted in an opaque, sealed envelope or container on or before the due date established for the receipt of proposals.Additionally, ten (10) bound copies and one (1) electronic format (CD or USB format) are to be submitted. The following information should be clearly marked on the face of the envelope or container in which the proposal is submitted: solicitation number, solicitation title, proposer name, proposer return address. Proposals received electronically, either through email or facsimile, are not acceptable and will be rejected. 2. LATE PROPOSALS. Proposals are to be received on or before the due date established herein for the receipt of proposals. Any proposal received after the deadline established for receipt of Proposals will be considered late and not be accepted or will be returned to proposer unopened. The City does not accept responsibility for any delays, natural or otherwise. 3. PROPOSAL FORMAT. In order to maintain comparability, facilitate the review process and assist the Evaluation Committee in review of Proposals, it is strongly recommended that Proposals be organized and tabbed in accordance with the sections and manner specified below. Hard copy submittal should be tabbed0400 as enumerated below and contain a table of contents with page references. Electronic copies should also be tabbed and contain a table of contents with page references. Proposals that do not include the required information will be deemed non-responsive and will not be considered. •.... TAB,1 `#; Cover Letter&Table of Content • 1.1 Cover Letter. The cover letter must be signed by a principal or agent able to the bind the firm and contain the following: (a) Prime Proposer. Include the name and location of the Prime Proposer, Primary Proposer's Representative for the RFQ, Representative's Contact.Joint Ventures are not allowed under this RFQ. (b) Selected Category of Work. Proposer must indicate the category of work for which proposal is submitted. Categories of Work, include: Architecture General; Architecture — Landscape; Engineering — Environmental; Engineering—Mechanical, Electrical &Plumbing; Engineering—Structural. Proposers shall submit separate proposals for each category of work for which a proposal is submitted. Example: a firm which provides general architecture and landscape architecture shall submit one proposal for Architecture—General and a separate and distinct proposal for Architecture—Landscape. • '“TAB 2r-1' Minimum Requirements 1.3 Minimum Qualifications Requirements. Submit verifiable information documenting compliance with the minimum qualifications requirements established in Appendix C Minimum Requirements and Specifications, including a) Architect / Engineering Firm. Provide copies of that the firm is certified by the Florida Department of Business and Professional Regulation to do business in Florida. b) Principle and Account Representatives. For the principle and account representative(s) submitted under Tab 2 below, submit copies that individuals are licensed by the Florida Department of Business and Professional Regulation to do business in Florida. Proposer should also submit copies of architect/engineer license for all licensed firm employees. TAB 2:1', ' Experience&Qualifications ofthe:Firm 2.1 Standard Form 330. The proposing firm shall submit a completed Standard From 330 (attached). No proposal will be considered without this required form. In addition to experience and qualifications considerations, the City may use RFQ 2018-141-ND 12 • MIAMI BEACH this information to consider the firm's previous and current workload. 2.2 Qualifications of Proposing Firm. Submit detailed information regarding the firm's history and relevant experience and proven track record of providing architecture or engineering services, preferably to public sector agencies, for non- residential small projects (construction costs below$325,000 and planning/studies below$35,000). Submit at least five (5) small projects relevant to the category of work for which the proposal has been submitted, performed in the last five (5) years as evidence of requested experience, preferably to public sector agencies. For each small project submitted, the following is required: • project name, • project description, • agency/client name, • agency/client contact, • contact telephone&email, • and year(s)and term of engagement. 2.3 Financial Capacity. Following the bid opening and at the request of the City proposer shall arrange for Dun & Bradstreet to submit a Supplier Qualifier Report(SQR) directly to the Procurement Contact named herein. No proposal will be considered without receipt, by the City, of the SQR directly from Dun&Bradstreet.The cost of the preparation of the SQR shall be the responsibility of the Proposer.The Proposer shall request the SQR report from D&B at: httos://suoolieroortal.dnb.com/webaoo/wcs/stores/servlet/SuoolierPortal?storeld=11696 Proposals are responsible for the accuracy of the information contained in its SQR. It is highly recommended that each proposer review the information contained in its SQR for accuracy prior to submittal to the City and as early as possible in the solicitation process. For assistance with any portion of the SQR submittal process, contact Dun & Bradstreet at 800-424-2495. 2.3.1 Audited Financial Statements. In lieu of a D & B SQR, the Proposer may submit its latest audited financial statements which must be dated December.31,2014 or later.. Experience&Qualifications of the Team 3.1 Qualifications of Proposer Team (Architects and Engineers). Provide an organizational chart which indicates, at a minimum, theprinciples of the firm and the account representatives assigned to award by the City of Miami Beach pursuant to this RFQ. Include details on the role that each team member will play in providing the services detailed herein and each team members' qualifications. A resume of each individual, including education, experience, and any other pertinent information,shall be included for each respondent team member to be assigned to this contract. 3.1.1 Project Experience. For each architect and engineer, include information for three (3) relevant projects, performed in the last five (5) years for public or private sector clients. Relevant projects shall include those projects similar in scope to those services listed in Appendix C. Submit at least three (3) small projects (as defined in Section 2.1 above) relevant to the category of work for which the proposal has been submitted, performed in the last five (5)years as evidence of requested experience, preferably to public or private sector agencies.For each small project submitted,the following is required: • project name • project description, • agency/client name, • . agency/client corttact, • contact telephone&email, • and year(s)and term of engagement. RFQ 2018-141-ND 13 AAIAMI BEACH Note: After proposal submittal, the City reserves the right to require additional information from Proposer (or proposer team members or sub-consultants) to determine: qualifications (including, but not limited to, litigation history, regulatory action, or additional references); and financial capability (including, but not limited to, annual reviewed/audited financial statements with the auditors notes for each of their last two complete fiscal years). RFQ 2018-141-ND 14 MIAMI BEACH SECTION 0400 PROPOSALS EVALUATION 1. Evaluation Committee.An Evaluation Committee, appointed by the City Manager, shall meet to evaluate each Statement of Qualifications in accordance with the requirements set forth in the solicitation. If further information is desired, Proposals may be requested to make additional written submissions of a clarifying nature or oral presentations to the Evaluation Committee. The evaluation of Statement of Qualifications will proceed in a two-step process as noted below. It is important to note that the Evaluation Committee will score the qualitative portions of the' Statement of Qualifications only. The Evaluation Committee does not make an award recommendation to the City Manager.The results of Step 1 &Step 2 Evaluations will be forwarded to the City Manager who will utilize the results to make a recommendation to the City Commission. In the event that only one responsive proposal is received, the City Manager, after determination that the sole responsive proposal materially meets the requirements of the RFP, may, without an evaluation committee, recommend to the City Commission that the Administration enter into negotiations. The City, in its discretion, may utilize technical or other advisers to assist the evaluation committee in the evaluation of proposals. 2. Step 1 Evaluation. The first step will consist of the qualitative criteria listed below to be considered by the Evaluation Committee. The second step will consist of quantitative criteria established below to be added to the Evaluation Committee results by the Department of Procurement Management. An Evaluation Committee, appointed by the City Manager, shall meet to evaluate each Statement of Qualifications in accordance with the qualifications criteria established below for Step 1, Qualitative Criteria. In doing so, the Evaluation Committee may review and score all proposals received,with or without conducting interview sessions. Step 1-Qualitative Criteria`,2'"' Maximum Points • Experience of the Proposing Firm 50 Experienceof the Team 50 ` :TOTALAVAILABLESTEP 1 POINTS: 100 ' • 3. Step 2 Evaluation. Following the results of Step 1 Evaluation of qualitative criteria, the Proposer may receive additional quantitative criteria points to be added by the Procurement Department to those points earned in Step 1, as follows. — -• ,Step 2-Quantitative Criteria ` iM1, x` r , „� Maximum. •Points` Veterans Preference 5 'F. ,, y s,'.,' , :,:iTOTALAVAILABLE STEP2POINTS V 5: > RFQ 2018-141—ND 15 ` I MIAMI BEACH 4. Determination of Final Ranking. At the conclusion of the Evaluation Committee Step 1 scoring, Step 2 Points will bbe added to each evaluation committee member's scores by the Department of Procurement Management. Step 1 and 2 scores will be converted to rankings in accordance with the example below: • Proposer Proposer Proposer - A B C .'` Ste. 1 Points 82 76 80 Committee` Ste•2 Points 22 15 12 Member 1; .. Total 104 91 92 Ste. 1 Points 79 85 72 Committee" Ste.2 Points 22 15 12 Member 2 . Total 101 100 84 3- Ste. 1 Points 80 . 74 66 'Committee Ste.2 Points 22 15 12 Member 2 Total 102 89 78 ' 'Rank • 1.-;, ..,. '..:.. +2. 3 Low Aggregate Score `n� ' 3 7 8 * ... .Firial'Ranking* 1 :n +' _ 1. 2 a * Final Ranking is presented to the City Manager for further due diligence and recommendation to the City Commission. Final Ranking does not constitute an award recommendation until such time as the City Manager has made his recommendation to the City Commission, which may be different than final ranking results. RFQ 2018-141-ND 16 1 APPENDIX A MIAMI BEACH Response Certification , Questionnaire- & Req uirements Affidavit RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR SMALL PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 17 Solicitation No: Solicitation Title: RFQ 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS Procurement Contact: Tel: Email: NATALIA DELGADO 305.673.7000, Ext.6263 NATALIADELGADO an.MIAMIBEACHFL.GOV STATEMENTS OF QUALIFICATIONS CERTIFICATION,QUESTIONNAIRE&REQUIREMENTS AFFIDAVIT Purpose: The purpose of this Response Certification, Questionnaire and Requirements Affidavit Form is to inform prospective Proposals of certain solicitation and contractual requirements, and to collect necessary information from Proposals in order that certain portions of responsiveness, responsibility and other determining factors and compliance with requirements may be evaluated. This Statement of Qualifications Certification, Questionnaire and Requirements Affidavit Form is a REQUIRED'FORM that must be submitted fully completed and executed. 1. General Proposer Information. FIRM NAME: NO.OF YEARS IN BUSINESS: NO.OF YEARS IN BUSINESS LOCALLY: ' NO.OF EMPLOYEES: OTHER NAME(S)PROPOSER HAS OPERATED UNDER IN THE LAST 10 YEARS: FIRM PRIMARY ADDRESS(HEADQUARTERS): CITY: STATE: ZIP CODE: TELEPHONE NO.: TOLL FREE NO.: FAX NO.: FIRM LOCAL ADDRESS: CITY: STATE: ZIP CODE: PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT: ACCOUNT REP TELEPHONE NO.: ACCOUNT REP TOLL FREE NO.: ACCOUNT REP EMAIL: FEDERAL TAX IDENTIFICATION NO.: The City reserves the right to seek additional information from proposer or othersource(s),including but not limited to:any firm or principal information,applicable licensure,resumes of relevant individuals,client information,financial information,or any information the City deems necessary to evaluate the capacity of the proposer to perform in accordance with contract requirements. • RFQ 2018-141—ND 18 1. Veteran Owned Business.Is Pro oser claiming a veteran owned business status? YES NO SUBMITTAL REQUIREMENT: Proposers claiming veteran owned business status shall submit a documentation proving that firm is certified as a veteran-owned business or a service-disabled veteran owned business by the State of Florida or United States federal government,as required pursuant to ordinance 2011-3748. 2. Conflict Of Interest. All Proposers must disclose, in their Proposal, the name(s) of any officer, director, agent, or immediate family member(spouse, parent,sibling,and child)who is also'an employee of the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns,either directly or indirectly,an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates. SUBMITTAL REQUIREMENT: Proposers must disclose the name(s)of any officer,director,agent,or immediate family member (spouse,parent,sibling,and child)who is also an employee of the City of Miami Beach. Proposers must also disclose the name of any City employee who owns,either directly or indirectly,an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates 3. References&Past Performance.Proposer shall submit at least three(3)references for whom the Proposer has completed work similar in size and nature as the work referenced in solicitation. SUBMITTAL REQUIREMENT: For each reference submitted, the following information is required: 1) Firm Name, 2) Contact Individual Name&Title,3)Address,4)Telephone,5)Contact's Email and 6)Narrative on Scope of Services Provided. 4. Suspension, Debarment or Contract Cancellation. Has Proposer ever been debarred, suspended or other legal violation, or had a contract cancelled due to non-performance b y an public sector agency? YES NO SUBMITTAL REQUIREMENT:If answer to above is"YES,"Proposer shall submit a statement detailing the reasons that led to action(s). 5. Vendor Campaign Contributions.Proposers are expected to be or become familiar with, the City's Campaign Finance Reform laws, as codified in Sections 2-487 through 2-490 of the City Code.Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Campaign Finance Reform laws are complied with, 'and shall be subject to any and all sanctions,as prescribed therein,including disqualification of their Proposals,in the event of such non-compliance. SUBMITTAL REQUIREMENT: Submit the names of all individuals or entities(including your sub-consultants)with a controlling financial interest as defined in solicitation. For each individual or entity with a controlling financial interest indicate whether or not each individual or entity has contributed to the campaign either directly or indirectly,of a candidate who has been elected to the office of Mayor or City Commissioner for the City of Miami Beach. 6. Code of Business Ethics.Pursuant to City Resolution No.2000-23879,each person or entity that seeks to do business with the City shall adopt a Code of Business Ethics("Code")and submit that.Code to the Department of Procurement Management with its proposal/response or within five(5)days upon receipt of request.The Code shall,at a minimum,require the Proposer,to comply with all applicable governmental rules and regulations,including, among others, the conflict of interest, lobbying and ethics provision of the City of Miami Beach and Miami Dade County. SUBMITTAL REQUIREMENT: Proposer shall submit firm's Code of Business Ethics. In lieu of submitting Code of Business Ethics, Proposer may submit a statement indicating that it will adopt,as required in the ordinance,the City of,Miami Beach Code of Ethics,available at http://www.miamibeachfl.aov/citv-hall/procurement/ RFQ 2018-141—ND • 19 • • 7. - • P. - - _ - - - - - , • benefits, 2. Effective January 1, 2019, covered employees must be paida-living wage ratc of no less than$11.70 per hour with benefits. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees to the living wage requirement. 8. Equal Benefits for Employees with Spouses and Employees with Domestic Partners.When awarding competitively solicited contracts valued at over$100,000 whose contractors maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks,the Equal Benefits for Domestic Partners Ordinance 2005-3494 requires certain contractors doing business with the City of Miami Beach,who are awarded a contract pursuant to competitive proposals,to provide"Equal Benefits"to their employees with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a Contractor who..work within the City limits of the City of Miami Beach, Florida; and the Contractor's employees located in the United States, but outside of the City of Miami Beach limits,who are directly performing work on the contract within the City of Miami Beach. A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of employees? YES NO B. Does your company provide or offer access to any benefits to employees with(same or opposite sex)domestic,partners*or to domestic partners of employees? YES NO C. Please check all benefits that apply to your answers above and list in the"other"section any additional benefits not already specified. Note: some benefits are provided to employees because they havea spouse or domestic partner, such as bereavement leave;other benefits are provided directly to the spouse or domestic partner,such as medical insurance. BENEFIT Firm Provides for Firm Provides for Firm does not Employees with Employees with Provide Benefit Spouses Domestic Partners Health Sick Leave Family Medical Leave - Bereavement Leave If Proposer cannot offer a benefit to domestic partners because of reasons outside your control, (e.g., there are no insurance providers in your area willing to offer domestic partner coverage)you may be eligible for Reasonable Measures compliance.To comply on this basis, you must agree to pay a cash equivalent and submit a completed Reasonable Measures Application (attached)with all necessary documentation.Your Reasonable Measures Application will be reviewed for consideration by the City Manager, or his designee. Approval is not guaranteed and the City Manager's decision is final. Further information on the Equal Benefits requirement is available at httD:/fwww.miamibeachfl.gov/city-hall/Drocurement/procurement-related-ordinance-and- procedures/ RFQ 2018-141—ND 20 9. Public Entity Crimes.Section 287.133(2)(a),Florida Statutes,as currently enacted oras amended from time to time,states that a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not ' submit.a proposal,proposal,or reply on a contract to provide any goods or services to a public entity;may not submit a proposal, proposal,or reply on a contract with a public entity for the construction or repair of a public building or public work;may not submit proposals,proposals,or replies on leases of real property to a public entity;may not be awarded or perform work as a contractor, supplier,subcontractor,or consultant under a contract with any public entity;and may not transact business with any public entity in excess of the threshold amount provided in s.287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendor list. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees with the requirements of Section 287.133,Florida Statutes,and certifies it has not been placed on convicted vendor list. 10. Non-Discrimination.Pursuant to City Ordinance No.2016-3990,the City shall not enter into a contract with a business unless the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a)of the City Code,including the blacklisting,divesting from,or otherwise refusing to deal with a person or entity when such action is based on race,color,national origin,religion,sex,intersexuality,gender identity,sexual orientation,marital or familial status,age or disability. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code. 11. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi. Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida, prohibits official City travel to the states of North Carolina and Mississippi,as well as the purchase of goods or services sourced in North Carolina and Mississippi. Proposer shall agree that no travel shall occur on behalf of the City to North Carolina or Mississippi,nor shall any product or services it provides to the City be sourced from these states. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees it is and shall remain in full compliance with Resolution 2016-29375. 12. Fair Chance Requirement.Pursuant to Section 2-376 of the City Code,the City shall not enter into any contract resulting from a competitive solicitation, unless the proposer certifies in writing that the business has adopted and employs written policies, practices,and standards that are consistent with the City's Fair Chance Ordinance,set forth in Article V of Chapter 62 of the City Code ("Fair Chance Ordinance"), and which, among other things, (i) prohibits City contractors, as an employer, from inquiring about an applicant's criminal history until the applicant is given a conditional offer of employment; (ii).prohibits advertising of employment positions with•a statement that an individual with a criminal record may not apply for the position,and(iii)prohibits placing a statement on an employment application that a person with a criminal record may not apply for the position. SUBMITTAL REQUIREMENT: No additional submittal is required at this time. By virtue of executing this affidavit, Proposer certifies that it has adopted policies,practices and standards consistent with the City's Fair Chance Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon request. Proposer further agrees that any breach of the representations made herein shall constitute a material breach of contract, and shall entitle the City to the immediate termination for cause of the agreement,in addition to any damages that may be available at law and in equity. 13. Acknowledgement of Addendum. After issuance of solicitation,the City may release one or more addendum to the solicitation which may provide additional information to Proposers or alter solicitation requirements. The City will strive to reach every Proposer having received solicitation through the City's e-procurement system, PublicPurchase.com. However, Proposers are solely responsible for assuring they have received any and all addendum issued pursuant to solicitation.This Acknowledgement of Addendum section certifies that the Proposer has received all addendum released by the City pursuant to this solicitation. Failure to obtain and acknowledge receipt of all addenda may result in proposal disqualification. Initial to Confirm Initial to Confirm Initial to Confirm Receipt Receipt Receipt Addendum 1 Addendum 6 Addendum 11 Addendum 2 Addendum 7 Addendum 12 Addendum 3. Addendum 8 Addendum 13 Addendum 4 Addendum 9 Addendum 14 Addendum 5 Addendum 10 ' Addendum 15 If additional confirmation of addendum is required,submit under separate cover. RFQ 2018-141—ND 21 • • DISCLOSURE AND DISCLAIMER SECTION The solicitation referenced herein is being furnished to the recipient by the City of Miami Beach(the"City")for the recipient's convenience. Any action taken by the City in response to Statement of Qualifications made pursuant to this solicitation, or in making any award, or in failing or refusing to make any award pursuant to such Statement of Qualifications,or in cancelling awards,or in withdrawing or cancelling this solicitation,either before or after issuance of an award,shall be without any liability or obligation on the part of the City. In its sole discretion,the City may withdraw the solicitation either before or after receiving Statement of Qualifications,may accept or reject Statement of Qualifications,and may accept Statement of Qualifications which deviates from the solicitation,as it deems appropriate and in its best interest. In its'sole discretion, the City may determine the qualifications and acceptability of any party or parties submitting Statement of Qualifications in response to this solicitation. Following submission of Statement of Qualifications, the applicant agrees to deliver such further details, information and assurances, including financial and disclosure data, relating to the Statement of Qualifications and the applicant including, without limitation, the applicant's affiliates,officers,directors,shareholders,partners and employees,as requested by the City in its discretion. The information contained herein is provided solely for the convenience of prospective Proposals. It is the responsibility of the recipient to assure itself that information contained herein is accurate and complete.The City does not provide any assurances as to the accuracy of any information in this solicitation. Any reliance on these contents,or on any permitted communications with City officials,shall be at the recipient's own risk.Proposals should rely exclusively on their own investigations,interpretations,and analyses.The solicitation is being provided by the City without any warranty or representation,express or implied,as to its content,its accuracy,or its completeness.No warranty or representationis made by the City or its agents that'any Statement of Qualifications conforming to these requirements will be selected for consideration, negotiation, or approval. The City shall have no obligation or liability with respect to this solicitation,the selection and the award process,or whether any award will be made.Any recipient of this solicitation who responds hereto fully acknowledges all the provisions of this Disclosure and Disclaimer,is 'totally relying on this Disclosure and Disclaimer,and agrees to be bound by the terms hereof.Any Statement of Qualifications submitted to the City pursuant to this solicitation are submitted at the sole risk and responsibility of the party submitting such Statement of Qualifications. This solicitation is made subject to correction of errors,omissions,or withdrawal from the market without notice.Information is for guidance only,and does not constitute all or any part of an agreement. The City and all Proposals will be bound only as,if and when a Statement of Qualifications,as same may be modified,and the applicable definitive agreements pertaining thereto, are approved and executed by the parties, and then only pursuant to the terms of the definitive agreements executed among the parties.Any response to this solicitation may be accepted or rejected by the City for any reason,or for no reason,without any resultant liability to the City. The City is governed by the Govemment-in-the-Sunshine Law, and all Statement of Qualifications and supporting documents shall be subject to disclosure as required by such law.All Statement of Qualifications shall be submitted in sealed proposal form and shall remain confidential to the extent permitted by Florida Statutes, until the date and time selected for opening the responses, At that time, all documents received by the City shall become public records. Proposals are expected to make all disclosures and declarations as requested in this solicitation. By submission of a Statement of Qualifications,the Proposer acknowledges and agrees that the City has the right to make any inquiry or investigation it deems appropriate to substantiate or supplement information contained in the Statement of Qualifications,and authorizes the release to the City of any and all information sought in such inquiry or investigation.Each Proposer certifies that the information contained in the Statement of Qualifications is true,accurate and complete,to the best of its knowledge,information,and belief. Notwithstanding the foregoing or anything contained in the solicitation, all Proposals agree that in the event of a final unappealable judgment by a court of competent jurisdiction which imposes on the City any liability arising out of this solicitation, or any response thereto, or any action or inaction by the City with respect thereto, such liability shall be limited to $10,000.00 as agreed-upon and liquidated damages. The previous sentence, however, shall not be construed to circumvent any of the other provisions of this Disclosure and Disclaimer which imposes no liability on the City. In the event of any differences in language between this Disclosure and Disclaimer and the balance of the solicitation,it is understood that the provisions of this Disclosure and Disclaimer shall always govern.The solicitation and any disputes arising from the solicitation shall be governed by and construed in accordance with the laws of the State of Florida. RFQ 2018-141—ND 22 ' PROPOSER CERTIFICATION I hereby certify that: I, as an authorized agent of the Proposer , am submitting the,following information as my firm's proposal; Proposer agrees to complete and unconditional acceptance of the terms and conditions of this document, inclusive of this solicitation,all attachments,exhibits and appendices and the contents of any Addenda released hereto,and the Disclosure and Disclaimer Statement; proposer agrees to be bound to any and all specifications, terms and conditions contained in the solicitation, and any released Addenda and understand that the following are requirements of this solicitation and failure to comply will result in disqualification of proposal submitted; Proposer has not divulged, discussed, or compared the proposal with other Proposals and has not colluded with any other proposer or party to any other proposal; proposer acknowledges that all information contained herein is part of the public domain as defined by the State of Florida Sunshine and Public Records Laws; all responses, data and information contained in this proposal, inclusive of the Statement of Qualifications Certification,Questionnaire and Requirements Affidavit are true and accurate. Name of Proposer's Authorized Representative: Title of Proposer's Authorized Representative: Signature of Proposer's Authorized Representative: Date: • State of FLORIDA ) On this_day of ,20_,personally appeared before me who County of ) stated that (s)he is the of , a corporation, and that the instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said instrument to be its voluntary act and deed. Before me: Notary Public for the State of Florida My Commission Expires: RFQ 2018-141—ND 23 APPENDIX B AAIA/v'WEACH } " No Bid " Form RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR SMALL • PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Note: It is important for,those vendors who have received notification of ,:ibis solicitation but have decided not to,respond,to'•complete and submit the attached, "Statement of to,Bid." The "Statement of No Bid" provides the 'Ci1t with information, on'flovi°to improve"the solicitation process.. FQiiure to submit a "Statement of No.Bid" may result in not being notified cif lure s©licitatrons;bt the.City. RFQ 2018-141-ND • 24 , Statement of No Bid WE HAVE ELECTED NOT TO SUBMIT A PROPOSAL AT THIS TIME FOR REASON(S) CHECKED AND/OR INDICATED BELOW: _Workload does not allow us to proposal _Insufficient time to respond _Specifications unclear or too restrictive _ Unable to meet specifications _Unable to meet service requirements _Unable to meet insurance requirements _Do not offer this,product/service ' _OTHER. (Please specify) We do_do not_want to be retained on your mailing list for future proposals of this type product and/or service. Signature: Title: Legal Company Name: Note:'Failure to respond, either by submitting a proposal or this completed form, may result in your company being removed from our vendors list. PLEASE RETURN TO: CITY OF MIAMI BEACH PROCUREMENT DEPARTMENT ATTN: NATALIA DELGADO PROPOSALS#2018-141-ND 1755 Meridian Avenue, 3rd Floor MIAMI BEACH, FL 33139 RFQ 2018-141-ND 25 APPENDIX C . MIAMIFEACH BEACH Minimum Requirements & Specifications • RFQ No. 2018- 141 -ND PROFESSIONAL .ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS PROCUREMENT DEPARTMENT .1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 26 Cl. Minimum Eligibility Requirements.'The Minimum Eligibility Requirements for this solicitation are listed below. Proposer shall submit, with its proposal, the required submittal(s) documenting compliance with each minimum requirement. Proposers that fail to include the required submittals with its proposal or fail to comply with minimum requirements shall bedeemed non-responsive and shall not have its proposal considered. 1. Firms. Firms must be certified by the Florida Department of Business and Professional Regulation as architecture or engineering business. 2. Architects/Engineers. Architects and engineers must be licensed by the Florida Department of Business and Professional Regulation for their area of work. C2. Statement of Work Required. It is the intent of the City of Miami Beach to select multiple firms within each category that may be contacted on an "as-needed basis" during theterm of the contract to submit consulting proposals on small projects whose estimated construction value is less than the amount established in Category 5, Section 287.017, Florida Statutes (currently$325,000 or as amended by law) or for a planning or study activity valued up to the amount established in Category 2, Section 287.017, Florida Statutes(currently$35,000 or as amended by law).. The categories of work shall include: •Architecture—General •Architecture—Landscape •Engineering—Environmental Services and Testing •Engineering—Mechanical,Electrical &Plumbing •Engineering—Structural •Engineering—Structural •Interior Design I Space Planning •LEED Commissioning The Administration will negotiate with a consultant(s)deemed to best qualified for the project based on an hourly rate (see Appendix E)or on a negotiated lump sum basis per project. If agreement is reached with the consultant for a specific project, a Consultant Service Order(CSO)will be issued, along with a Purchase Order(PO). No work is authorized, nor shall the City be liable for payment, until the CSO and PO are issued. The select consultant will be ,required to perform the architectural and engineering services in accordance with the Master Agreement(Appendix.E) and the CSO.The highest professional standards shall be utilized for all work. RFQ 2018-141-ND 27 The selected consultant will be required to retain and be responsible for all sub-consultants necessary to achieve the assigned scope of work. Sub-consultants shall be included in the CSO. The City may reject the use of any sub-consultant. The services authorized under the resulting Master Agreement, include(but are not limited to): • Acoustics,Noise Abatement • Fire Protection • Air Pollution Control • Heating;Ventilating;Air Conditioning • Auditoriums and Theaters • Interior Design;Space Planning • Automation;Controls;Instrumentation • Irrigation;Drainage • Boundary Survey • Lab Testing Services • Codes;Standards;Ordinances • Landscape Architecture • Communications Systems;TV;Microwave • Lighting(Interior,Display,Theater,etc.) • Conceptual Studies • , Lighting(Exterior,Streets,Memorials,Athletic Fields, • Construction Administration etc.) • Cost Estimating • Plumbing and Piping Design • Energy Conservation/Energy Sources • Recreation Facilities(Parks,Marinas,etc.) • Electrical • Rehabilitation, Remodel, Renovate (Buildings, • General Environmental Services: Structures,Facilities,etc.) • o Environmental Assessments • Safety Engineering;Accident Studies;OSHA Studies o Air and Water quality testing and • Security Systems;Intruder&Smoke Detection monitoring • Soils&Geologic Studies;Foundations o Environmental sustainability planning • Storage Tank Repair and Monitoring services • Structural Design;Special Structures o Environmental support services to • Surveying,Mapping,GIS,and other services: achieve and maintain regulatory • Platting;Mapping;Flood Plain Studies compliance • Roofing Assessments,Replacements • Contamination Assessment: • Swimming Pools o Environmental Site Assessments • Testing&Inspection Services o Oversee and coordinate remediation • Topographical Survey project • Urban Renewals;Community Development o Preparation of sampling and remediation • Value Analysis;Life-Cycling Costing plans and other related documents • Any other professional services normally considered o Other associated tasks related to under the disciplines of architecture and engineering. regulatory compliance The selected architectural and/or engineering firms will be responsible for reviewing all existing City of Miami Beach Zoning Ordinances and Building Codes, as well as any other applicable law or regulation. The teams will be responsible for incorporating all the above data into complete construction'documents, including final working drawings, specifications, and bid documents necessary for the bidding and construction of the project, and in some instances, for construction management. The construction documents and drawings must comply with the City of Miami Beach with all applicable local,state and federal regulations. C3. Term of Contract: It is expected that any resulting agreement shall be valid for a term of three (3) years from effective date. The City Manager may approve two (2) additional one (1) year renewal periods based on satisfactory performance. C4. Fee Standards: For determination of project fees'the City will use the Design Professional Fee Guidelines for "Basic" Architectural and Engineering Services available at https://fo.state.fl.us/docs/DMSAEFeeGuidedefinition.aso RFQ 2018-141—ND 28 APPENDIX D M IAMI B Insurance Requirements RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT ' PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 29 1 I ' INSURANCE REQUIREMENTS This document sets forth the minimum levels of insurance that the contractor is required to maintain throughout the term of the contract and any renewal periods. XXX 1. Workers' Compensation and Employer's Liability per the Statutory limits of the state of Florida. XXX 2. Comprehensive General Liability(occurrence form), limits of liability$500,000.00 per occurrence,for bodily injury property damage to include Premises/ Operations; Products, Completed Operations and Contractual Liability. Contractual Liability and Contractual Indemnity (Hold harmless endorsement exactly as written in "insurance requirements"of specifications). XXX 3. Automobile Liability - $100,000 each occurrence - owned/non-owned/hired automobiles included. 4. Excess Liability-$ .00 per occurrence to follow the primary coverages. XXX 5. The City must be named as and additional insured on the liability policies;and it must be stated on the certificate. XXX 6. Other Insurance as indicated: Builders Risk completed value $ .00 Liquor Liability $ .00 Fire Legal Liability $ .00 Protection and Indemnity $ .00 Employee Dishonesty Bond • $ .00 XXX Other: Professional Liability $1,000,000.00 XXX 7. Thirty(30)days written cancellation notice required. XXX 8. Best's guide rating B+:VI or better, latest edition. XXX 9. The certificate must state the proposal number and title The City of Miami Beach is self-insured. Any and all claim payments made from self- insurance are subject to the limits and provisions of Florida Statute 768.28, the Florida Constitution, and any other applicable Statutes. RFQ 2018-141-ND 30 APPENDIX E MIAMI B SAMPLE CO NTRACT RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 31 AGREEMENT BETWEEN CITY OF MIAMI BEACH AND XXXXXXXXXXXXXXXXXXXXXXXX FOR PROFESSIONAL ARCHITECTURE AND ENGINEERING SERVICES FOR THE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Resolution No. RFQ 2018-141-ND 32 AGREEMENT BETWEEN CITY OF MIAMI BEACH AND FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SPECIALIZED CATEGORIES ON AN "AS-NEEDED-BASIS" PURSUANT TO REQUEST FOR QUALIFICATIONS NO. DISCIPLINE: RESOLUTION NO. RFQ 2018-141-ND 33 TABLE OF CONTENTS ' DESCRIPTION PAGE ARTICLE 1. DEFINITIONS 36 ARTICLE 2. BASIC SERVICES 40 ARTICLE 3. THE CITY'S RESPONSIBILITIES 45 ARTICLE 4. RESPONSIBILITY FOR CONSTRUCTION COST 46 ARTICLE 5. ADDITIONAL SERVICES 48 ARTICLE 6. REIMBURSABLE EXPENSES 49 ARTICLE 7. COMPENSATION FOR SERVICES 49 ARTICLE 8. CONSULTANT'S ACCOUNTING AND OTHER RECORDS 50 ARTICLE 9. OWNERSHIP OF PROJECT DOCUMENTS 50 ARTICLE 10. TERMINATION OF AGREEMENT 51 ARTICLE 11. INSURANCE 52 ARTICLE 12. INDEMNIFICATION AND HOLD HARMLESS 53 ARTICLE 13. ERRORS AND OMISSIONS 53 ARTICLE 14. LIMITATION OF LIABILITY 54 ARTICLE 15. NOTICE 54 ARTICLE 16. MISCELLANEOUS PROVISIONS 54 RFQ 2018-141-ND 34 SCHEDULES: SCHEDULE A 58 SCHEDULE B 59 SCHEDULE C 61 ATTACHMENTS: ATTACHMENT A Error! Bookmark not defined. ATTACHMENT B Error! Bookmark not defined. ATTACHMENT C Error! Bookmark not defined. • RFQ 2018-141-ND 35 AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SPECIALIZED CATEGORIES ON AN "AS-NEEDED-BASIS" This Agreement made and entered into this day of , 2016 , (Effective Date), by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139, (hereinafter referred to as City), and a Florida corporation having its principal office at (hereinafter referred to as Consultant). WITNESSETH: WHEREAS, ; and NOW THEREFORE, City and Consultant, in consideration of the mutual covenants and agreement herein contained, agree as follows: ARTICLE 1. DEFINITIONS 1.1 Definitions. The definitions included in this Section are not exhaustive of all definitions used in this Agreement. Additional terms may be defined in other Contract Documents. The following terms shall have the meanings specified herein unless otherwise stated herein: ADDITIONAL SERVICES: "Additional Services" shall mean those services, in addition to the Basic Services in this Agreement, as described in Article 5 and the Consultant Service Order, which the Consultant shall perform, at the City's option, and which must be duly authorized, in writing, by the City Manager, or designee(s), or his authorized designee, prior to commencement of same. APPLICABLE LAWS: "Applicable Laws" means all laws, statutes, codes (including, but not limited to, building codes), ordinances, rules, regulations, lawful orders and decrees of governmental authorities having jurisdiction over the Project, the Project Site or the Parties. BASE BID: "Base Bid" shall mean the elements contained in the Construction Documents recommended by the Consultant(and approved by the City) as being within the Construction Cost Budget. "Base Bid" shall not include additive alternates or deductive alternates. BASIC SERVICES: "Basic Services" shall include those services which Consultant shall perform in accordance with the terms of the Agreement, as described in Article 2 and the Consultant Service Order. Any Services not specifically enumerated as Additional Services (as defined herein) shall also be considered Basic Services. RFQ 2018-141-ND 36 CITY(OR OWNER): The "City" shall mean the City of Miami Beach, a Florida municipal corporation having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139. In all respects hereunder, City's obligations and performance is pursuant to City's position as the owner of the Project acting in its proprietary capacity. In the event City exercises its regulatory authority as a governmental body including, but not limited to, its regulatory authority for code inspections and issuance of Building Department permits, Public Works Department permits, or other applicable permits within its jurisdiction, the exercise of such regulatory authority and the enforcement of any Applicable Laws shall be deemed to have occurred pursuant to City's regulatory authority as a governmental body and shall not be attributable in any manner to City as a Party to this Agreement. CITY COMMISSION: "City Commission" shall mean the governing and legislative body of the City. CITY MANAGER: The "City Manager, or designee(s)," shall mean the chief administrative officer of the City. The City Manager, or designee(s), shall also be construed to include any duly authorized representatives designated by the City Manager, or designee(s), in writing, including the Project Administrator, with respect to any specific matter(s) concerning the Services and/or this Agreement (exclusive of those authorizations reserved to the City Commission under this Agreement, or to regulatory or administrative bodies having jurisdiction over the Project). CONSTRUCTION COST BUDGET: The "Construction Cost Budget" shall mean the amount budgeted and established by the City to provide for the cost of construction of the Work for the Project("Construction Cost"), as set forth in the Consultant Service Order. CONSTRUCTION DOCUMENTS: "Construction Documents" shall mean the final (100% completed) plans, technical specifications, drawings, schematics, documents, and diagrams prepared by the Consultant pursuant to this Agreement, setting forth in detail the requirements for the construction of the Project. The Construction Documents shall set forth in full all details necessary to complete the construction of the Project in accordance with the Contract Documents. Construction Documents shall not be part of the Contract , Documents, until (a) the Consultant has submitted completed Construction Documents to the City and (b) they have been reviewed and approved by the City and any agencies having jurisdiction in accordance with the procedures as otherwise provided by the Contract Documents. However, approvalby the City shall not in any way be construed, interpreted and/or deemed to constitute a waiver or excuse Consultant's obligations to ensure the Construction Documents are constructible, in compliance with all Applicable Laws and in accordance with the Contract Documents. CONSULTANT: The named entity on page 1 of this Agreement, the "Consultant" shall mean the qualified and properly professionally licensed design professional in the State of Florida and as otherwise required by any entities, agencies, boards, governmental authorities and/or any other professional organizations with jurisdiction governing the professional practice area for which the design professional has been engaged by City and who will perform (or cause to be performed through Subconsultants acceptable to the City) all architectural, design and engineering services required under this Agreement and/or Consultant Service Order and will serve as the "architect of record" and/or"engineer of record"for the Project. When the term "Consultant" is used in this Agreement it shall also be deemed to include any officers, employees, or agents of Consultants, and any other person or entity acting under the supervision, direction, or control of Consultant to provide any architectural, design, engineering or similarprofessional services with respect to a Project ("Subconsultants"). The Consultant shall not be replaced by any other entity, except as otherwise permitted in this Agreement. Further, any Subconsultant that may perform services on behalf of the Consultant shall be a qualified and properly professionally licensed design professional in the State of Florida and as otherwise required by any entities, agencies, boards, governmental authorities and/or any other professional organizations with jurisdiction governing the professional practice area for which the Subconsultant has been engaged by Consultant to perform professional design services in connection with the Project. The Subconsultants in Schedule "C", attached hereto, are hereby approved by the City Manager, RFQ 2018-141-ND 37 or designee(s), for the Project. CONSULTANT SERVICE ORDER: Consultant Service Order shall mean the work order issued by the City to Consultant (in substantial form as in Schedule A attached hereto), that specifically describes and delineates the particular Services (Basic Services and/or Additional Services) which will be required of Consultant for the Project that is the subject of such Consultant Service Order, and which may include studies or study activity, and/or professional services as defined in the RFQ. CONTRACT AMENDMENT: "Contract Amendment" shall mean a written modification to the Agreement approved by the City (as specified below) and executed between City and Consultant, covering changes, additions, or reductions in the terms of this Agreement including, without limitation, authorizing a change in the Project, or the method and manner of performance thereof, or an adjustment in the fee and/or completion dates. Contract Amendments shall be approved by the City Manager, or designee(s), CONTRACT DOCUMENTS: "Contract Documents" shall mean this Agreement (together with all exhibits, addenda, Consultant Service Orders and written amendments issued thereto), and all Design Documents and Construction Documents. The Contract Documents shall also include, without limitation (together with all exhibits, addenda, and written amendments issued thereto), the Invitation to Bid (ITB), instructions to bidders, bid form, bid bond, Design Criteria Package (if any), the Contract for Construction, surety payment and performance bonds, Conditions of the Contract for Construction (General, Supplementary, and other Conditions), Divisions 0-17 specifications, an approved Change Order(s), approved Construction Change Directive(s), and/or approved written order(s)for a minor change in the Work. CONTRACT FOR CONSTRUCTION: "Contract for Construction" shall mean the legally binding agreement between City and Contractor for performance of the Work covered in the Contract Documents, including, without limitation, a general contractor, construction manager, design-builder or any other duly licensed construction contractor selected pursuant to any other procurement methodology available under Florida law. CONTRACTOR: "Contractor" shall mean the individual or individuals, firm, company, corporation, joint venture, or other entity contracting with City for performance of the Work covered in the Contract Documents. DESIGN CRITERIA PACKAGE or DCP: "Design Criteria Package" means concise, performance-oriented drawings or specifications of a design-build Project, prepared for the purpose of furnishing sufficient information to permit design-build firms to prepare a bid or a response to a City request for proposal, or to permit the City to enter into a negotiated design-build contract. The Design Criteria Package must specify performance-based criteria for the design-build Project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. DESIGN DOCUMENTS: "Design Documents" means all plans, drawings specifications, schematics and all other documents which set forth in full the design of the Project and fix and describe in detail the size, configuration and character of the Project concerning all items of the Project necessary for the final preparation of the 100% completed, permitted Construction Documents in accordance with the requirements of the Contract Documents including, without limitation, all architectural and engineering elements as may be appropriate. Design Documents shall not be part of the Contract Documents, until (a) the Consultant has submitted completed Design Documents to the City and (b) they have been reviewed and approved by the City and agencies having jurisdiction in accordance with the procedures as provided by the Contract Documents. However, approval by the City shall not in any way be construed, interpreted and/or deemed to constitute a waiver or excuse Consultant's obligations to ensure the Design Documents are constructible, in compliance with all Applicable Laws and in accordance with the Contract Documents. RFQ 2018-141-ND 38 FORCE MAJEURE: "Force Majeure" shall mean any delay occasioned by superior or irresistible force occasioned by violence in nature without the interference of human agency such as a hurricane, tornado, flood, loss caused by fire and other similar unavoidable casualties; or other causes beyond the City's or Consultant's control that are not due to any act, omission or negligence of either City or Consultant and, which have, or may be reasonably expected to have, a material adverse effect on the Project, or on the rights and obligations of City or Consultant under this Agreement and which, by the exercise of due diligence, such parties shall not have been able to avoid; provided, however, that inclement weather(except as noted above), • the acts or omissions of Subconsultants, the Contractor and its sub-contractors, market conditions, labor conditions, construction industry price trends, and similar matters which normally impact on the construction process shall not be considered a Force Majeure. If the Consultant is delayed in performing any obligation under this Agreement due to a Force Majeure, the Consultant shall request a time extension from the Project Administrator within five (5) business days of said Force Majeure. Any time extension shall be subject to mutual agreement and shall not be cause for any claim by the Consultant for extra compensation, unless Additional Services are required and approved pursuant to Article 5 hereof. PROJECT: The "Project" shall mean that certain City capital project described in the Consultant Service Order. Project Cost: The "Project Cost", shall mean the estimated total cost of the Project, as prepared and established by the City, including the estimated Construction Cost and Soft Costs. The Project Cost may, from time to time, be revised or adjusted by the City, in its sole discretion, to accommodate approved modifications or changes to the Project or scope of work. Project Scope: The "Project Scope" shall mean the description of the Project, as described in the Consultant Service Order. • PROJECT ADMINISTRATOR: The "Project Administrator" shall meanthe individual designated by the City Manager, or designee(s), who shall be the City's authorized representative to issue directives and notices on behalf of the City with respect to all matters concerning the Services of this Agreement (exclusive of those authorizations reserved to the City Manager, or designee(s), or City Commission under this Agreement, or to regulatory or administrative bodies having jurisdiction over the Project). PROPOSAL DOCUMENTS: "Proposal Documents" shall mean the RFQ, together with all amendments or addenda thereto (if any), which is incorporated by reference to this Agreement and made a part hereof; provided, however, that in the event of an express conflict between the Proposal Documents and this Agreement, the Agreement shall prevail. Consultant's proposal in response to the RFQ is included for reference purposes only and shall not be incorporated as part of this Agreement, except with respect to Consultant's representations regarding the qualifications and experience of Consultant and its key personnel, its commitment to provide the key personnel listed therein, and its capability to perform and deliver the Services in accordance with this Agreement and consistent with the all representations made therein. SCHEDULES: "Schedules" shall mean the various schedules attached to this Agreement and referred to as follows: Schedule A— Consultant Service Order Schedule B—Consultant Compensation and Hourly Billing Rate Schedule. Schedule C—Approved Subconsultants. SCOPE OF SERVICES: "Scope of Services" shall include the Project Scope, Basic Services, and any RFQ 2018-141-ND 39 Additional Services (as approved by the City), all as described in Schedule "A" hereto. SERVICES: "Services"shall mean all services, work, and actions by the Consultant performed pursuant to or undertaken under this Agreement. SOFT COSTS: "Soft Costs" shall mean costs related to the Project other than Construction Cost including, without limitation, Consultant's Basic Services, Additional Services, surveys, testing, general consultant, financing, permitting fees and other similar costs, as determined by the City, that are not considered as direct costs for the construction of the Project. STATEMENT OF PROBABLE CONSTRUCTION COST: The "Statement of Probable Construction Cost" shall mean the detailed estimate prepared b`y Consultant in Construction Standard Index(CSI)format or other format approved by the Project Administrator, which includes the Consultant's estimated total construction cost to the City of the Work for the Project (as established in the Contract Documents, as they may be amended from time to time). The Statement of Probable Construction Cost shall be in sufficient detail to identify the costs of each element of the Project and include a breakdown of the fees, general conditions and construction contingency for the Project. Costs shall be adjusted to the projected bid date to take into account anticipated price escalation. WORK: "Work" shall mean all labor, materials, equipment, supplies, tools, machinery, utilities, fabrication, transportation, insurance, bonds, permits and conditions thereof, building code changes and government approvals, licenses, tests, quality assurance and/or quality control inspections and related certifications, surveys, studies, and other items, work and services that are necessary or appropriate for the total construction, installation, and functioning of the Project, together with all additional, collateral and incidental items, and work and services required for delivery of a completed, fully functional and functioning Project as set forth in the Contract Documents. ARTICLE 2. BASIC SERVICES 2.1 The Consultant shall provide Basic Services for the Project, specifically described in the Consultant Service Order. 2.2 The Services will be commenced by the Consultant upon receipt of a written Consultant Service Order signed by the City Manager, or designee(s), or the Project Administrator. Consultant shall countersign the Consultant Service Order upon receipt and return the signed copy to the City. 2.3 As it relates to the Services and the Project, Consultant warrants and represents to the City that it is knowledgeable of and shall comply with all Applicable Laws. The Consultant;agrees to comply with all Applicable Laws, whether now in effect or as may be amended or adopted from time to time, and shall further take into account all known pending changes to the foregoing of which it should reasonably be aware. 2.4 The Consultant warrants and represents to the City that all of the Services required under this Agreement shall be performed in accordance with the standard of care normally exercised in the design of comparable projects in South Florida. Consultant warrants and represents to the City that it is experienced, fully qualified, and properly licensed (pursuant to Applicable Laws) to perform the Services. Consultant warrants and represents to the City that it is responsible for the technical accuracy of the Services (including, without limitation, the Design Documents contemplated in Schedule "A" hereto). Consultant further warrants and represents that the approved and permitted Construction Documents shall constitute a representation by Consultant to City that the Project, if constructed as required by the Contract Documents, will be fully functional, suitable and sufficient for its intended purposes. 2.5 The Consultant's Basic Services may consist of various tasks, including planning, design, RFQ 2018-141-ND 40 bidding/award, preparation of a DCP, studies, construction administration, and Additional Services (as may be approved), all as further described in the Consultant Service Order; and shall also include any and all of Consultant's responsibilities and obligations with respect to the Project, as set forth in the General Conditions of the Contract for Construction. 2.6 RESPONSIBILITY FOR CLAIMS AND LIABILITIES: No action or omission by City shall waive or excuse Consultant's obligations under the Agreement and/or other Contract Documents and that Consultant shall remain fully liable for all work performed by Consultant including, without limitation, any design errors or omissions. Written decisions and/or approvals issued by the City shall not constitute nor be deemed a release of the responsibility and liability of the Consultant (or any Subconsultants), for the accuracy and competency of the Design Documents and Construction Documents, nor shall any City approval and/or decisions be deemed to be an assumption of such responsibility by the City for a defect, error or omission in the Design Documents and the Construction Documents. Moreover, neither the City's inspection, review, approval or acceptance of, nor payment for, any Services required under the Agreement shall be construed to relieve the Consultant (or any Subconsultant) of its obligations and responsibilities under the Agreement, nor constitute a waiver of any of the City's rights under the Agreement, or of any cause of action arising out of the performance of the Agreement. The Consultant shall be and remain liable to the City in accordance with Applicable Laws for all damages to City caused by any failure of the Consultant or to comply with the terms and conditions of the Agreement or by the Consultant's misconduct, unlawful acts, negligent acts, errors or omissions in the performance of the Agreement. 2.7 TIME: It is understood that time is of the essence in the completion of the Project and, in this respect, the parties agree as follows: 2.7.1, Term: The term of this Agreement shall commence upon execution by the City and Consultant, which shall be the Effective Date referred to on page 1 hereof, and shall be in effect for three (3) years ("Initial Term"), plus two (2), one (1) year renewal options, to be exercised at the sole discretion of the City Manager, or designee(s), (Initial Term and any renewals shall be collectively referred to as the "Term"). Notwithstanding the preceding Term, Consultant shall adhere to any and all timelines and/or deadlines, as set forth in the Consultant Service Order, including the time for completion of the work and/or services for such Project (as set forth in the particular Consultant Service Order). 2.7.2 The Consultant shall perform the Services as expeditiously as is consistent with the standard of professional skill and care required by this Agreement, and the orderly progress of the Work. 2.7.3 Recognizing that the construction of other projects within the City may affect scheduling of the construction for the Project, the Consultant shall diligently coordinate performance of the Services with the City (through the Project Administrator) in order to provide for the safe, expeditious, economical and efficient completion of the Project, without negatively impacting concurrent work by others. The Consultant shall coordinate the Services with all of its Subconsultants, as well as other consultants, including, without limitation, City provided consultants (if any). 2.7.4 The Services shall be performed in a manner that shall conform to the Consultant Service Order. The Consultant may submit requests for an adjustment to the Consultant Service Order completion time, if made necessary because of undue delays resulting from untimely review taken by the City(or authorities having jurisdiction over the Project) to approve the Consultant's submissions, or any other portion of the Services requiring approval by the City (or other governmental authorities having jurisdiction over the Project). Consultant shall immediately provide the Project Administrator with written notice stating the reason for the particular delay; the requested adjustment (i.e. extension) to the Project Schedule; and a revised anticipated schedule of completion. Upon receipt and review of Consultant's request (and such other documentation as the Project Administrator may require), the RFQ 2018-141-ND 41 Project Administrator may grant a reasonable extension of time for completion of the particular work involved, and authorize that the appropriate adjustment be made to the Project Schedule. The Project Administrator's approval (if granted)shall be in writing. 2.8 Consultant shall use its best efforts to maintain a constructive, professional, cooperative working relationship with the Project Administrator, Contractor, and any and all other individuals and/or firms that have been contracted, or otherwise retained, to perform work on the Project. 2.9 The Consultant shall perform itsduties under this Agreement, and under a Consultant Service Order, in a competent, timely and professional manner, and shall be responsible to the City for any failure in its performance, except to the extent that acts or omissions by the City make such performance impossible. 2.10 The Consultant is responsible for the professional quality, technical accuracy, completeness, performance and coordination of all Services required under the Agreement and under the Consultant Service Order (including the services performed by Subconsultants), within the specified time period and specified cost. . The Consultant shall perform the Services utilizing the skill, knowledge, and judgment ordinarily possessed and used by a proficient consulting with respect to the disciplines required for the performance of such Services in the State of Florida. The Consultant is responsible for, and shall represent to City that the Services conform to the,City's requirements, the Contract Documentsand all Applicable Laws. The Consultant shall be and remain liable to the City for all damages to the City caused by the Consultant's negligent acts or errors pr omissions in the performance of the Services. In addition to all other rights and remedies which the City may have, the Consultant shall, at its expense, re-perform all or any portion of the Services to correct any deficiencies which result from the Consultant's failure to perform in accordance with the above standards. The Consultant shall also be liable for the replacement or repair of any defective materials and equipment and re-performance of any non-conforming construction work resulting from such deficient Services,(i) for a period from the Effective Date of this Agreement, until twelve (12) months following final acceptance of the Work, (ii) or for the period of design liability required by applicable law, whichever is later. The Project Administrator shall notify the Consultant, in writing, of any deficiencies and shall approve the method and timing of the corrections. 2.10.1 The Consultant shall be responsible for deficient, defective Services and any resulting deficient, defective construction work re-performed within twelve (12) months following final acceptance and shall be subject to further re-performance, repair and replacement for twelve (12) months from the date of initial re-performance, not to exceed twenty-four months (24) from final acceptance. 2.11 The City shall have the right, at any time, in its sole and absolute discretion, to submit for review to other consultants (engaged by the City at its expense) any or all parts of the Services and the Consultant shall fully cooperate in such review(s). Whenever others are required to verify, review, or consider any Services performed by Consultant (including, without limitation, contractors, other design professionals, and/or other consultants retained by the City), the intent of such requirement is to enable the Consultant to receive input from others' professional expertise to identify any discrepancies, errors or omissions that are inconsistent with industry standards for design or construction of comparable projects; or which are inconsistent with Applicable Laws; or which are inconsistent with standards, decisions or approvals provided by the City under this Agreement. Consultant will use reasonable care and skill, in accordance and consistent with customary professional standards, in responding to items identified by other reviewers in accordance with this subsection. Consultant shall receive comments from reviewers, in writing, including, without limitation (and where applicable), via a set of marked-up drawings and specifications. Consultant shall address comments forwarded to it in a timely manner. The term "timely" shall be defined to mean as soon as possible under the circumstances, taking into account the timelines of the Project schedule. 2.11.1 The Consultant is advised that a performance evaluation of the Services rendered throughout RFQ 2018-141-ND 42 this Agreement will be completed by the City and kept in the City's files for evaluation of future solicitations. 2.12 Consultant agrees that when any portion of the Services relates to a professional service which, under Florida Statutes, requires a license, certificate of authorization, or other form of legal entitlement to practice and/or perform such Service(s), it shall employ and/or retain only qualified duly licensed certified personnel to provide same. 2.13 Consultant agrees to designate, in writing, within five(5) calendar days after receiving a fully executed Consultant Service Order, a qualified licensed professional to serve as its project manager (hereinafter referred to as the "Project Manager"). The Project Manager shall be authorized and responsible to act on behalf of Consultant with respect to directing, coordinating and administrating all aspects of the Services. Consultant's Project Manager(as well as any replacement)shall be subject to the prior written approval of the City Manager, or designee(s), or the Project Administrator. Replacement (including reassignment) of an approved Project Manager shall not be made without the prior written approval of the City Manager, or designee(s), or his designee (i.e. the Project Administrator). 2.13.1 Consultant agrees, within fourteen (14) calendar days of receipt of written notice from the City Manager, or designee(s), or the Project Administrator (which notice shall state the cause therefore), to promptly remove and replace a Project Manager, or any other personnel employed or otherwise retained by Consultant for the Project( including,without limitation, any Subconsultants). 2.14 Consultant agrees not to divulge, furnish or make available to any third party(ies), any non-public information concerning the Services or the Project, without the prior written consent of the City Manager, or designee(s), or the Project Administrator, unless such disclosure is incident to the proper performance of the Services; or the disclosure is required pursuant to Florida Public Records laws; or, in the course of judicial proceedings; where such information has been properly subpoenaed. Consultant shall also require Subconsultants to comply with this subsection. 2.15 The City and Consultant acknowledge that the Services, as described in the Agreement and the Consultant Service Order, do not delineate 'every detail and minor work task required to be performed by Consultant to complete the work and/or services described and delineated under a Consultant Service Order issued to Consultant by the City for a particular Project. If, during the course of performing work, services and/or tasks on a particular Consultant Service Order, Consultant determines that work and/or services should be performed (to complete the Project delineated under such Order) which is, in the Consultant's reasonable opinion, outside the level of effort originally anticipated in the Consultant Service Order, then Consultant shall promptly notify the Project Administrator, in writing, and shall obtain the Project Administrator's written consent before proceeding with such work and/or services. If Consultant proceeds with any such additional work and/or services without obtaining the prior written consent of the Project Administrator, said work and/or services shall be deemed to be a Basic Service under this Agreement and shall also be deemed to be within the scope of services delineated in the Consultant Service Order (whether or not specifically addressed in the Scope of Services). Mere notice by Consultant to the Project Administrator shall not constitute authorization or approval by the City to perform such work. Performance of any such work and/or services by Consultant without the prior written consent of the Project Administrator shall be undertaken at Consultant's sole risk and liability. 2.16 Consultant shall establish, maintain, and categorize any and all Project documents and records pertinent to the Services and shall provide the City, upon request, with copies of any and all such documents and/or records. In addition, Consultant shall provide electronic document files to the City upon completion of the Project. 2.17 THE CITY HAS NO OBLIGATION TO ASSIST, FACILITATE AND/OR PERFORM IN ANY WAY THE RFQ 2018-141-ND 43 CONSULTANT'S OBLIGATIONS UNDER THE AGREEMENT OR OTHER CONTRACT DOCUMENTS. THE CITY'S PARTICIPATION, FACILITATION AND/OR ASSISTANCE TO THE CONSULTANT SHALL BE AT ITS SOLE DISCRETION AND SHALL NOT, IN'ANY WAY, BE CONSTRUED, INTERPRETED AND/OR CONSTITUTE AN ASSUMPTION BY THE CITY OF CONSULTANT'S OBLIGATIONS, A WAIVER OF CONSULTANT'S OBLIGATIONS AND/OR EXCUSE ANY BREACH BY CONSULTANT OF ITS OBLIGATIONS UNDER THE CONTRACT DOCUMENTS. THE PARTICIPATION IN THE PERFORMANCE OF ANY OF CONSULTANT'S OBLIGATIONS SHALL NOT PRECLUDE THE CITY FROM DECLARING CONSULTANT IN DEFAULT FOR CONSULTANT'S FAILURE TO PERFORM SUCH OBLIGATION, NOR SHALL IT LIMIT, IN ANY WAY, THE CITY'S RIGHTS AND REMEDIES IN CONNECTION THEREWITH. THE CONSULTANT EXPRESSLY ACKNOWLEDGES AND AGREES NOT TO RAISE OR ASSERT AS DEFENSE TO ANY CLAIM, ACTION, SUIT AND/OR OTHER PROCEEDING OF A SIMILAR NATURE, THE CITY'S PARTICIPATION, ASSISTANCE AND/OR FACILITATION IN THE PERFORMANCE OF CONSULTANT'S OBLIGATIONS. INCLUDING, WITHOUT LIMITATION, ASSISTING WITH OBTAINING PERMITS OR WITH COORDINATION WITH UTILITIES, OR OTHER MATTERS RELATED TO THE PROJECT. IN THE EVENT OF ANY CONFLICT BETWEEN THIS SECTION AND/OR ANY OTHER PROVISION OF THIS AGREEMENT OR OTHER CONTRACT DOCUMENTS, THIS SECTION SHALL GOVERN. 2.18 GREEN BUILDING STANDARDS: The Consultant shall comply with the requirements of Section 255.2575, Florida Statutes, and Chapter 100 of the City Code, as both may be amended from time to time, addressing applicable Leadership in Energy and Environmental Design (LEED) compliance requirements. 2.19 SUBCONSULTANTS: All services provided by Subconsultants shall be consistent with those commitments made by the Consultant in its Proposal and during the competitive solicitation selection process and interview. Such services shall be undertaken and performed pursuant to appropriate written agreements between the Consultant and the Subconsultants, which shall contain provisions that preserve and protect the rights of the City under this Agreement Nothing contained in this Agreement shall create any contractual relationship between the City and the Subconsultants. The Consultant shall not retain, add, or replace any Subconsultant without the prior written approval of the City Manager, or designee(s)„ in response to a written request from the Consultant stating the reasons for any proposed substitution. The Consultant shall cause the names of Subconsultants responsible for significant portions of the Services to be inserted on the plans and specifications. The Consultant shall be ultimately responsible for ensuring the Consultant's and all of its Subconsultants' compliance with the requirements of this Section and any other provision of the Agreement and/or Consultant Service Order. With respect to the performance of work by Subconsultants, the Consultant shall, in approving and accepting such work, ensure the professional quality, completeness, and coordination of the Subconsultant's work. The Consultant shall, upon the request of the City, submit to the City such documentation and information as the City reasonably requests to evidence the creation, standing, ownership and professional licensure of the Consultant(and Subconsultants), including organizational documents, operating agreements and professional licensure documentation, and copies of the Consultant's contracts with the Subconsultant with respect to the Project. However, the City's failure to request such documentation or evidence and/or failure to enforce in any way the terms and provisions of this Section, the Agreement and/or any other Consultant Service Order during the Project does not excuse,•waive and/or condone in any way any noncompliance of the requirements set forth therein including, without limitation, the professional licensure requirements. Any approval of a Subconsultant by the City shall in no way shift from the Consultant to City the responsibility for the quality and acceptability of the services performed by the Subconsultant. Payment of Subconsultants shall be the sole responsibility of the Consultant, and shall not be cause for any increase in compensation to the Consultant for payment of the Services. RFC/ 2018-141-ND 44 ARTICLE 3. THE CITY'S RESPONSIBILITIES 3.1 The City Manager, or designee(s), shall designate a Project Administrator, who shall be the City's authorized representative to act on City's behalf with respect to the City's responsibilities or matters requiring City's approval under the Contract Documents. The Project Administrator shall be authorized (without limitation) to transmit instructions, receive information, and interpret and define City policies and decisions with respect to the Services and the Project. The Project Administrator shall have full authority to require the Consultant to comply with the Contract Documents, provided, however, that any failure of the Project Administrator to identify any noncompliance, or to specifically direct or require compliance, shall in no way constitute a waiver of, or excuse, the Consultant's obligation to comply with the requirements of the Contract Documents. 3.2 The City shall make available to Consultant, for the convenience of the Consultant only, information that the City has in its possession pertinent to the Project. Consultant hereby agrees and acknowledges that, in making any such information available to Consultant, the City makes no express or implied certification, warranty, and/or representation as to the accuracy or completeness of such information and assumes no responsibility whatsoever with respect to, the sufficiency, completeness or accuracy of such information. The Consultant understands, and hereby agrees and acknowledges, that it is obligated to verify to the extent it deems necessary all information furnished by the City, and that it is solely responsible for the accuracy and applicability of all such information used by Consultant. Such verification shall include, without limitation, visual examination of existing conditions in all locations encompassed by the Project, where such examination can be made without using destructive measures (i.e. excavation or demolition). Survey information shall be spot checked to'th'e extent that Consultant has satisfied itself as to the reliability of the information. 3.3 At any time, in his/her sole discretion, the City Manager, or designee(s), may furnish accounting, and insurance counseling services for the Project (including, without limitation, auditing services to verify the Consultant's applications for payment, or to ascertain that Consultant has properly remitted payment due to its Subconsultants or vendors). 3.4 If the City observes or otherwise becomes aware of any fault or defect in the Project, or non- conformance with the Contract Documents, the City, through the Project Administrator, shall give prompt written notice thereof to the Consultant. 3.5 The City, acting in its proprietary capacity as Owner and not in its regulatory capacity, shall render any administrative approvals and decisions required under this Agreement, in writing, as reasonably expeditious for the orderly progress of the Services and of the Work. 3.6 Except where otherwise expressly noted in this Agreement, the City Manager, or designee(s), shall serve as the City's primary representative to whom administrative (proprietary) requests for decisions and approvals required hereunder by the City shall be made. Except where otherwise expressly noted in this Agreement or the Contract Documents, the City Manager, or designee(s), shall issue decisions and authorizations which may include, without limitation, proprietary review, approval, or comment upon the schedules, plans, reports, estimates, contracts, and other documents submitted to the City by Consultant. 3.6.1 The City Manager, or designee(s), shall have prior review and approval of the Project Manager (and any replacements) and of any Subconsultants (and any replacements). 3.6.2 The City Manager, or designee(s), shall decide, and render administrative (proprietary) decisions on matters arising pursuant to this Agreement which are not otherwise expressly provided for in this Agreement. in his/her discretion, the City Manager, or designee(s), may also consult with the City Commission on such matters. RFQ 2018-141-ND 45 3.6.3 At the request of Consultant, the City Manager, or designee(s), shall be authorized, but not required, to reallocate monies already budgeted toward payment of the Consultant; provided, however, that the Consultant's compensation (or other budgets established by this Agreement) may not be increased without the prior approval of the City Commission, which approval (if granted at all) shall be in its sole and reasonable discretion. 3.6.4 The City Manager, or designee(s), may approve Contract Amendments. 3.6.5 The City Manager, or designee(s), may, in his/her sole discretion, form a committee or committees, or inquire of, or consult with, persons for the purpose of receiving advice and recommendations relating to the exercise of the City's powers, duties, and responsibilities under this Agreement or the Contract Documents. 3.6.6 The City Manager, or designee(s), shall be the City Commission's authorized representative with regard to acting on behalf of the City in the event of issuing any default notice(s) under this Agreement, and, should such default remain uncured, in terminating the Agreement (pursuant to and in accordance with Article 10 hereof). 3.7 The City's review, evaluation, or comment as to any documents prepared by or on behalf of the Consultant shall be solely for the purpose of the City's determining for its own satisfaction the suitability of the Project, or portions thereof, detailed in such documents for the purposes intended therefor by the City, and may not be relied upon in any way by the Consultant or any other third party as a substantive review thereof. ARTICLE 4. RESPONSIBILITY FOR CONSTRUCTION COST 4.1 The City shall establish a Construction Cost Budget for the Project, as set forth in the Consultant Service Order. Consultant shall design the Project so that the Construction Cost Budget for the Project is not exceeded. As part of the Basic Services, Consultant ;shall design and/or re-design the Project to the Construction Cost Budget in accordance with this Article 4, making all revisions necessary to maintain the Construction Cost Budget. Consultant shall attend meetings with the City to review and discuss cost estimates, cost-saving alternatives, and implementation or revision of the Design Documents and Construction Documents to address such items, as necessary to meet the established budget parameters set forth in the City Construction Budget. 4.2. Consultant shall provide and/or update the Statement of Probable Construction Cost at each stage of completion of the Design Documents and at completion of the Construction Documents, unless otherwise specified in the Consultant Service Order or other written directive of the Project Administrator. 4.2.1. At completion of the conceptual design (at such stage of completion of the Design Documents as may be specified by the Project Administrator), Consultant shall provide the City a Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus fifteen percent (+1-15%) of the Construction Cost Budget. If at the foregoing stage of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than fifteen percent(15%), then the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s) for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within fifteen percent (15%) of the City's Construction Budget. Upon obtaining City's approval of any proposed modifications, Consultant shall incorporate such modifications within the Design Documents as part of the Basic Services and at no additional cost to the City. 4.2.2. At the 30% and 60% completion of the Design Documents, Consultant shall update its RFQ 2018-141-ND 46 I ' Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus ten percent (+/-10%) of the Construction Cost Budget. If at the foregoing stages of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than ten percent (10%), the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s) for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within ten percent (10%) of the City's Construction Budget. Upon obtaining City's approval of any proposed modifications, Consultant shall incorporate such modifications within the Design Documents as part of the Basic Services and at no additional cost to the City. 4.2.3. At the 90% stage completion of the Design Documents and at completion of the Construction Documents, Consultant shall update its Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus five percent (+/-5%) of the Construction Cost Budget. If at the foregoing stages of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than five percent (5%), the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s)for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within five percent (5%) of the City's Construction Budget. Upon obtaining the City's approval, Consultant shall promptly modify the Design Documents or Construction Documents within the time period specified by the Project Administrator (which time period for completion shall not exceed ninety (90) days from the date Consultant is notified to re-design), as part of the Basic Services and at no additional cost to the City. 4.2.4. To ensure that the Construction Cost shall not exceed the City's Construction Budget, each Statement of Probable Construction Cost shall be in sufficient detail to identify the costs of each element and include a breakdown of the fees, general conditions and a, reasonable and appropriate construction contingency. 4.3. Consultant shall certify and warrant to the City that the Statement of Probable Construction Cost and any update thereto, represents Consultant's best judgment of the Construction Cost for the Project as an experienced design professional familiar with the construction industry.,: provided, however, that Consultant cannot (and does not). guarantee that bids or negotiated prices will not vary from any estimates of Construction Cost or other cost evaluation(s) prepared (or otherwise provided) by Consultant. 4.4 If the lowest and best Base Bid exceeds the Consultant's final updated Statement of Probable Cost by more than ten percent (10%), the Project Administrator shall provide notice thereof to the Consultant, and the Consultant shall re-design the Project within the Project Scope, construction schedule, sequence of Work, or such other action, as deemed necessary, to reduce the Statement of Probable Construction Cost, and Consultant shall provide any required revisions to the Contract Documents (including, without limitation, the Construction Documents) within the time period specified by the Project Administrator (which time period for completion shall not exceed ninety (90) days from the date Consultant is notified to re-design), and shall provide re-bidding services, as many times as may be reasonably requested by the City, as part of the Basic Services and at no additional cost to the City, in order to bring any resulting, responsive and responsible bids within ten percent(10%)of the Consultant's final updated Statement of Probable Cost. 4.5. The Construction Cost Budget shall not be exceeded without fully justifiable, extraordinary, and unforeseen circumstances (such as Force Majeure) which are beyond the control of the parties. Any I expenditure above this amount shall be subject to prior City Commission approval which, if granted at all, shall be at the sole and reasonable discretion of the City Commission. The City Commission shall have no obligation to approve an increase in the Construction Cost Budget and, if such Construction Cost Budget is exceeded, the City Commission may, at its sole and absolute discretion, terminate this Agreement (and the remaining Services)without any further liability to the City. RFQ 2018-141-ND 47 4.6. The City Commission may, at its sole and absolute discretion, and without relieving Consultant of its obligations under this Agreement to design the Project to the Construction Cost Budget as set forth in Sections 4.1 through 4.5 above, separately elect any of the following options: (1) approve an increase to the Construction Cost Budget; (2) reject all bids, and (at its option) authorize rebidding of the Project; (3) abandon the Project and terminate the remaining Services without any further liability to the City; (4) select as many deductive alternatives as may be necessary to bring the lowest and best bid within the Construction Cost Budget. ARTICLE 5. ADDITIONAL SERVICES 5.1 Additional Services shall only be performed by Consultant following receipt of written authorization by the Project Administrator (which authorization must be obtained prior to commencement of any such additional work by Consultant). The written authorization shall contain a description of the Additional Services required; a lump sum to be negotiated at the time of the request for additional services or an hourly fee (in accordance with the rates in Schedule "B" hereto), with a "Not to Exceed" amount; Reimbursable Expenses (if any) with a "Not to Exceed" amount; the amended Construction Cost Budget (if applicable); the time required to complete the Additional Services; and an amended Project Schedule (if applicable). "Not to Exceed" shall mean the maximum cumulative hourly fees allowable (or, in the case of Reimbursable Expenses, the maximum cumulative expenses allowable), which the Consultant shall not exceed without further written authorization of the Project Administrator. The "Not to Exceed" amount is not a guaranteed maximum cost for the additional work requested (or, in the case of Reimbursables, for the expenses), and all costs applicable to same shall be verifiable through time (and, for Reimbursables, expense reviews). 5.2 Additional Services include the following: 5.2.1 Appraisals: Investigation and creation of detailed appraisals and valuations of existing facilities, and surveys or inventories in connection with construction performed by City. 5.2.2. Unforeseen Conditions. Providing additional work relative to the Project which arises from subsequent circumstances and causes which could not reasonably have been foreseen at the time of the Consultant Service Order (excluding conditions determined by all prior studies available to Consultant and excluding circumstances and causes resulting from error, omission, inadvertence, or negligence of Consultant). 5.2.3. City-Requested Revisions to Construction Documents: Making revisions to Construction Documents resulting in or from City-requested changes in Scope of Work involving new program elements, when such revisions are inconsistent with written approvals or instructions previously given by City and/or are due to causes beyond the control of Consultant. 5.2.4 Expert Witness: Except insofar as the Consultant is required by legal process or subpoena to appear and give testimony, preparing to serve or serving as an expert witness in connection with any state or federal court action to which the Consultant is not a party in its own name, that is not instituted by the Consultant or in which the performance of the Consultant is not in issue. 5.2.5 Procurement: Assistance in connection with bid protests, re-bidding, or re-negotiating contracts (except for Contract Document revisions and re-bidding services required under Section 4.4 hereof, which shall be provided at no additional cost to City). 5.2.6. Models: Preparing professional perspectives, models or renderings in addition to those provided for in this Agreement except insofar as these are otherwise useful or necessary to the Consultant in the provision of Basic Services. RFQ 2018-141-ND 48. 5 5.2.7. Threshold Inspection/Material Testing and Inspection: Providing threshold inspection services and material testing/special inspection services, provided that Consultant, as part of the Basic Services, shall report on the progress the Work, including any defects and deficiencies that may be observed in the Work. 5.2.8 Pre-Design Surveys & Testing: Environmental investigations and site evaluations, provided, however, that surveys of the existing structure required to complete as-built documentation are not additional services. 5.2.9 Geotechnical engineering. Providing geotechnical engineering services or site surveys. Except as specified herein, services that are required for completion of the Construction Documents shall be part of Consultant's Basic Services. ARTICLE 6. REIMBURSABLE EXPENSES 6.1 Reimbursable Expenses must be authorized, in advance, in writing, by the Project Administrator. Invoices or vouchers for Reimbursable Expenses shall be submitted to the Project Administrator(along with any supporting receipts and other back-up material requested by the Project Administrator). Consultant shall certify as to each such invoice and/or voucher that the amounts and items claimed as reimbursable are "true and correct and in accordance with the Agreement." Reimbursable Expenses may include, but not be limited to, the following: Cost of reproduction, courier,,and postage and handling of drawings, plans, specifications, and other Project documents (excluding reproductions for the office use of the Consultant and its Subconsultants, .and courier, postage and handling costs between the Consultant and its Subconsultants). Costs for reproduction and preparation of graphics for community workshops. Permit fees required by City of Miami Beach regulatory bodies having jurisdiction over the Project (i.e. City permit fees). ARTICLE 7. COMPENSATION FOR SERVICES 7.1 Consultant's"Lump Sum" or "Not to Exceed" fee for provision of the Services, or portions thereof, as may be set forth and described in the Consultant Service Order issued for a particular Project, shall be negotiated between the City and Consultant, and shall be set forth in the Consultant Service Order. 7.2 Payments for Services shall be made within forty-five (45) calendar days of receipt and approval of an acceptable invoice by the. Project Administrator. Payments shall be made in proportion to the Services satisfactorily performed, so that the payments for Services never exceed the progress percentage noted in the Consultant's Progress Schedule (to be submitted with each invoice). No mark-up shall be allowed on subcontracted work. In addition to the invoice, the Consultant shall, for Hourly Rate authorizations, submit a progress report giving thepercentage of completion of the Project and the total estimated fee to completion. 7.3 Approved Additional Services shall be compensated in accordance with the hourly rates set forth in Schedule "B," attached hereto. Any request for payment of Additional Services shall be included with a Consultant payment request. No mark-up shall be allowed on Additional Services (whether sub-contracted or not). RFQ 2018-141-ND 49 7.4 Approved Reimbursable Expenses shall be paid in accordance with Article 6 hereto, up to the "Not to Exceed" Reimbursable allowance amount in the Consultant Service Order hereto. Any request for payment of Reimbursable Expenses shall also be included with Consultant's payment request. No mark-up shall be allowed on Reimbursable Expenses. 7.5 ESCALATION: The initial hourly rates shall remain constant for the Initial Term of the agreement. Ninety (90) days prior to expiration of the Initial Term, the City may consider an adjustment to the preceding year's unit costs for the subsequent year. Only request for increases based on a corresponding increase in the Consumer Price Index for All Urban Consumers; U.S. City average (1982-84=100), as established by the United States Bureau of Labor Statistics ("CPI"), or material adjustments to the scope or requirements of the RFQ by the City, including (but not limited to) living wage increases, will be considered. In the event that the City determines that the requested increase i5 unsubstantiated, the Consultant agrees to perform all duties at the current cost terms. 7.6 No retainage shall be made from the Consultant's compensation on account of sums withheld by the City on payments to Contractor. 7.7 METHOD OF BILLING AND PAYMENT. Consultant shall invoice the Project Administrator in a timely manner, but no more than once on a monthly basis. Invoices shall identify the nature and extent of the work performed; the total hours of work performed by employee category; and the respective hourly billing rate associated therewith. In the event Subconsultant work is used, the percentage of completion shall be identified. Invoices shall also itemize and summarize any Additional Services and/or Reimbursable Expenses. A copy of the written approval of the Project Administrator for the requested Additional Service(s) or Reimbursable Expense(s) shall accompany the invoice. 7.7.1 If requested, Consultant shall provide back-up for past and current invoices that records hours for all work (by employee category), and cost itemizations for Reimbursable Expenses (by category). ARTICLE 8. CONSULTANT'S ACCOUNTING AND OTHER RECORDS 8.1 " All books, records (whether financial or otherwise), correspondence, technical documents, and any ' other records or documents related to the Services and/or Project will be available for examination and audit by the City Manager, or designee(s),,,or his/her authorized representatives, at Consultant's office (at the address designated in Article 15 ["Notices"]), during customary business hours. All such records shall be kept at least for a period of three (3) years after Consultant's completion of the Services. Incomplete or incorrect entries in such records and accounts relating personnel services and expenses may be grounds for City's disallowance of any fees or expenses based upon such entries. Consultant shall also bind its Subconsultants to the requirements of this Article and ensure compliance therewith ARTICLE 9. OWNERSHIP OF PROJECT DOCUMENTS 9.1 All notes, correspondence, documents, plans and specifications, designs, drawings, renderings, calculations, specifications, models, photographs, reports, surveys, investigations, and any other documents (whether completed or partially completed) and copyrights thereto for Services performed or produced in the performance of this Agreement, or related to the Project, whether in its native electronic form, paper or other hard copy medium or in electronic medium, except with respect to copyrighted standard details and designs owned by the.Consultant or owned by a third party and licensed to the Consultant for use and reproduction, shall become the property of the City. Consultant shall deliver all such documents to the Project Administrator in their native electronic form, as required in the Consultant Service Order within thirty (30) days of completion of the Services (or within thirty (30) days of expiration or earlier termination of this Agreement as the case may be). However, the City may grant an exclusive license of the copyright to the Consultant for reusing and reproducing copyrighted materials or portions thereof as authorized by the City Manager, or designee(s), in RFQ 2018-141-ND 50 7 • advance and in writing, In addition, the Consultant shall not disclose, release, or make available any document to any third party without prior written approval from the City Manager, or designee(s),. The Consultant shall warrant to the City that it has been granted a license to use and reproduce any standard details and designs owned by a third party and used or reproduced by the Consultant in the performance of this Agreement. Nothing contained herein shall be deemed to exclude any document from Chapter 119, Florida Statutes. 9.2 The Consultant is permitted to reproduce copyrighted material described above subject to prior written approval of the City Manager, or designee(s),. 9.3 At the City's option, the Consultant may be authorized, as an Additional Service, to adapt copyrighted material for additional or other work for the City; however, payment to the Consultant for such adaptations will be limited to an amount not greater than 50% of the original fee earned to adapt the original copyrighted material to a new site. 9.4 The City shall have the right to modify the Project or any components thereof without permission from the Consultant or without any additional compensation to the Consultant. The Consultant shall be released from any liability resulting from such modification. 9.5 The Consultant shall bind all Subconsultants to the Agreement requirements for re-use of plans and specifications. ARTICLE 10. TERMINATION OF AGREEMENT 10.1 TERMINATION FOR LACK OF FUNDS: The City is a governmental entity and is subject to the appropriation of funds by its legislative body in an amount sufficient to allow continuation of its performance in accordance with the terms and conditions of this Agreement. In the event there is a lack of adequate funding either for the Services or the Project(or both), the City may terminate this Agreement without further liability to the City. 10.2 TERMINATION FOR CAUSE: The City, through the City Manager, or designee(s)„ may terminate this Agreement for cause, upon written notice to Consultant, in the event that the Consultant (1) violates any provision of this Agreement or performs same in bad faith; (2) unreasonably delays the performance of the Services or any portion thereof; or (3) does not perform the Services or any portion thereof in a timely and satisfactory manner. In the case of termination for cause by the City, the Consultant shall first be granted a thirty (30) day cure period (commencing upon receipt of the initial written notice of default from the City). 10.2.1 In the event this Agreement is terminated for cause by the City, the City, at its sole option and discretion, may take over the remaining Services and complete them by contracting with another consultant(s), or otherwise. The Consultant shall be liable to the City for any additional cost(s) incurred by the City due to such.termination. "Additional Cost" is defined as the difference between the actual cost of completion of the Services, and the cost of completion of such Services had the Agreement not been terminated. 10.2.2 In the event of termination for cause by the City, the City shall only be obligated to pay Consultant for those Services satisfactorily performed and accepted prior to the date of termination (as such date is set forth in, or can be calculated from, the City's initial written default notice). Upon payment of any amount which may be due to Consultant pursuant to this subsection 10.2.2, the City shall have no further liability to Consultant. 10.2.3 As a condition precedent to release, of any payment which may be due to Consultant under subsection 10.2.2, the Consultant shall promptly assemble and deliver to the Project Administrator any RFQ 2018-141-ND 51 and all Project documents prepared (or caused to be prepared) by Consultant(including, without limitation, those referenced in subsection 9.1 hereof). The City shall not be responsible for any cost incurred by Consultant for assembly, copy, and/or delivery of Project documents pursuant to this subsection. 10.3 TERMINATION FOR CONVENIENCE: In addition to the City's right to terminate for cause, the City through the City Manager, or designee(s)„ may also terminate this Agreement, upon fourteen (14) days prior written notice to Consultant,for convenience, without cause, and without penalty, when (in its sole discretion) it deems such termination to be in the best interest of the City. In the event the City terminates the Agreement for convenience, Consultant shall be compensated for all Services satisfactorily performed and accepted up to the termination date (as set forth in the City's written notice), and for Consultant's costs in assembly and delivery to the Project Administrator of the Project documents (referenced in subsection 10.2.3 above). Upon payment of any amount which may be due to Consultant pursuant this subsection 10.3, the City shall have no further liability to Consultant. 10.4 TERMINATION BY CONSULTANT: The Consultant may only terminate this Agreement for cause, upon thirty (30) days prior written notice to the City, in the event that the City willfully violates any provisions of this Agreement or unreasonably delays payment of the Services or any portion thereof. In the event of a termination for cause by Consultant, the City shall pay Consultant for any Services satisfactorily performed and accepted up to the date of termination; provided, however, that the City shall first be granted a thirty (30) ' day cure period (commencing upon receipt of Consultant's initial written notice). 10.4.1 The Consultant shall have no right toterminatethis Agreement for convenience. 10.5 IMPLEMENTATION OF TERMINATION: In the event of termination (whether for cause or for convenience), the Consultant shall immediately, upon receipt of the City's written notice of termination: (1) stop the performance of Services; (2) place no further orders or issue any.other subcontracts, except for those which may have already been approved, in writing, by the Project Administrator; (3) terminate all existing orders and subcontracts; and (4) promptly assemble all Project documents (for delivery to the Project Administrator). ARTICLE 11. INSURANCE 11.1 At all times during the Term of this Agreement, Consultant shall maintain the following required insurance coverage in full force and effect. The Consultant shall not commence any work until satisfactory proof of all required insurance coverage has been furnished to the Project Administrator: (a) Workers' Compensation and Employer's Liability per the Statutory limits of the State of Florida. (b) Commercial General Liability on a comprehensive basis in an amount not less than $500,000 combined single limit per occurrence for bodily injury and property damage. (c) Automobile Liability Insurance covering all owned, 'non-owned and hired vehicles used in connection with the work, in an amount not less than $100,000 combined single limit per occurrence for bodily injury and property damage. (d) Professional Liability Insurance in an amount not less than $1,000,000 with the deductible per claim, if any, not to exceed 10% of the limit of liability. 11.2 The City must be named as and additional insured on the liability policies; and it must be stated on the certificate. 11.3 The Consultant must give the Project Administrator at least thirty (30) days prior written notice of cancellation or of substantial modifications in any required insurance coverage. All certificates and endorsements shall contain this requirement. RFQ 2018-141-ND 52 11.4 The insurance must be furnished by an insurance company rated A:V or better, or its equivalent, according to Bests' Guide Rating Book, and by insurance companies duly authorized to do business in the State of Florida, and countersigned by the company's Florida resident agent. 11.5 Consultant shall provide the Project Administrator with a certificate of insurance of all required insurance policies. The City reserves the right to require a certified copy of such policies, upon written request to Consultant. ARTICLE 12. INDEMNIFICATION AND HOLD HARMLESS 12.1 To the fullest extent permitted by Section 725.08, Florida Statutes, the Consultant shall indemnify and-' hold harmless the City and its officers, employees, agents, and instrumentalities, from liabilities, damages, losses, and costs, including, but riot limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Consultant and other persons employed or utilized by the Consultant in the performance of this Agreement. The Consultant shall pay all claims and losses in connection therewith and shall investigate and defend all claims, suits, or actions of any kind or nature in the name of the City, where applicable, including appellate proceedings, and shall pay all costs, judgments, and attorney's fees which may issue thereon. Consultant expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by Consultant shall in no way limit its responsibility to indemnify, keep, and save harmless and defend the City or its officers, employees, agents, and instrumentalities as herein provided. 12.2 The Consultant agrees and recognizes that the City shall not be held liable or responsible for any claims which may result from any negligent, reckless, or intentionally wrongful actions, errors or omissions of the Consultant in which the City participated either through review or concurrence of the Consultant's actions. In reviewing, approving or rejecting any submissions by the Contractor, or other acts of the Consultant, the City in no way assumes or shares any responsibility or liability of the Consultant (including, without limitation its Subconsultants and/or any registered professionals (architects and/or engineers) under this Agreement). ARTICLE 13. ERRORS AND OMISSIONS 13.1 ERRORS AND OMISSIONS: It is specifically agreed that any construction changes categorized by the City as caused by an error, an omission, or any combination thereof in the Contract Documents that were prepared by the Consultant will constitute an additional cost to the City that would not have been incurred without the error. The damages to the City for errors, omissions or any combinations thereof shall be calculated as the total cost of any damages or incrementalcosts to the City resulting out of the errors or omissions by the Consultant, including, without limitation, the direct, indirect and/or consequential damages resulting from the Consultant's errors and/or omissions or any combination thereof. Damages shall include delay damages caused by the error, omission, or any combination thereof. Should the Consultant disagree that all or part of such damages are the result of errors, omissions, or any combination thereof, the Consultant may appeal thisdetermination, in writing, to the applicable Assistant City Manager, or designee(s),. The Project Administrator's decision on all claims, questions and disputes shall be final, conclusive and binding upon the parties hereto unless such determination is clearly arbitrary or unreasonable. In the event that the Consultant does not agree with the decision of the Project Administrator, the Consultant shall present any such objections, in writing, to the City Manager, or designee(s),. The Project Administrator and the Consultant shall abide by the decision of the City Manager, or designee(s),. This paragraph does not constitute a waiver of any party's right to proceed in a court of competentjurisdiction after the above administrative remedies have been exhausted. RFQ 2018-141-ND 53 ARTICLE 14. LIMITATION OF LIABILITY The City desires to enter into this Agreement only if in so doing the City can place a limit on its liability for any cause of action for money damages due to an alleged breach by the City of this Agreement, so that its liability for any such breach never exceeds the "not to exceed" amount of the fee paid to Consultant under this Agreement, less any amount(s) actually paid to Consultant hereunder. Consultant hereby expresses its willingness to enter into this Agreement, with Consultant's recovery from the City for any damages for action for breach of contract to be limited to Consultant's "not to exceed" fee under this Agreement, less any amount(s) actually paid by the City to the Consultant hereunder. Accordingly, and notwithstanding any other term or condition of this Agreement, Consultant hereby agrees that the City shall not be liable to Consultant for money damages due to an alleged breach by the City of this Agreement, in an amount in excess of the "not to exceed amount" of Consultant's fees under this Agreement, which amount shall be reduced by any amount(s) actually paid by the City to Consultant hereunder. Nothing contained in this subsection, or elsewhere in this Agreement, is in any way intended to be a waiver of the limitation placed upon City's liability, as set forth in Section 768.28, Florida Statutes. ARTICLE 15. NOTICE All written notices given to City by Consultant shall be addressed to: City Manager, or designee(s),'s Office City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Attn: Jimmy L. Morales, City Manager, or designee(s), With a_copy to: City Manager, or designee(s),'s Office City of Miami Beach • 1700 Convention Center Drive Miami Beach, Florida 33139 Attn: Eric T. Carpenter, Assistant City Manager, or designee(s), All written notices given to the Consultant from the City shall be addressed to: All notices mailed to either party shall be deemed to be sufficiently transmitted if sent by certified mail, return receipt requested. ARTICLE 16. MISCELLANEOUS PROVISIONS 16.1 VENUE: This Agreement shall be governed by, and construed in accordance with, the laws of the State of Florida, both substantive and remedial, without regard to principles of conflict of laws. The exclusive venue for any litigation arising out of this Agreement shall be Miami-Dade County, Florida, if in state court, and the U.S. District Court, Southern District of Florida, in federal court. BY ENTERING INTO THIS AGREEMENT,.CONSULTANT AND CITY EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE RFQ 2018-141-ND ., 54 TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO, OR ARISING OUT OF, THIS AGREEMENT. 16.2 EQUAL OPPORTUNITY EMPLOYMENT GOALS: Consultant agrees that it will not discriminate against any employee or applicant for employment for work under this Agreement because of race, color, national origin, religion, sex, gender identity, sexual orientation, disability, marital or familial status, or age, and will take affirmative steps to ensure that applicants areemployed and employees are treated during employment without regard to race, color, national origin, religion, sex, gender identity, sexual orientation, disability, marital or familial status, or age. 16.3 PUBLIC ENTITY CRIMES ACT: In accordance with the Public Entity Crimes Act (Section 287.133, Florida Statutes), a person or affiliate whb is a consultant, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not bid on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or subconsultant under a contract with the City, and may not transact business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for Category Two, for a period of 36 months from the date of being placed on the convicted vendor list. For violation of this subsection by Consultant, City shall have the right to terminate the Agreement without any liability to City, and pursue debarment of Consultant 16.4 NO CONTINGENT FEE: Consultant warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement, and that it has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Agreement. For the breach or violation of this subsection, City shall have the right to terminate the Agreement, without any liability or, at its discretion, to deduct from the contract price (or otherwise recover) the full amount of such fee, commission, percentage, gift, or consideration. 16.5 LAWS AND REGULATIONS: 16.5.1 The Consultant shall, during the Term of this Agreement, be governed by all Applicable Laws which may have a bearing on the Services involved in the Project. 16.5.2 Proiect Documents. In accordance with Section 119.07 (3) (ee), Florida Statutes, entitled "Inspection, Examination, and Duplication of Records; Exemptions," all building plans, blueprints, schematic drawings, and diagrams,including draft, preliminary, and final formats, are exempt from the provisions of Section 11.9.07(1), Florida Statutes (inspection and copying of public records), and s. 24(a), Article I of the State Constitution. Information made exempt by this paragraph, with prior written approval from the City Manager, or designee(s);, may be disclosed to another entity to perform its duties and responsibilities; to a licensed architect, engineer, or contractor who is performing work on or related to the Project; or upon a showing of good cause before a court of competent jurisdiction. The entities or persons receiving such information shall maintain the exempt status of the information. 16.5.2.1 In addition to the requirements in this subsection 16.5.2, the Consultant agrees to abide by all applicable Federal, State, and City procedures, as may be amended from time to time, by which the documents are handled, copied, and distributed which may include, but is not limited to, each employee of Consultant and Subconsultants that will be involved in the Project being required to sign an agreement stating that they will not copy, duplicate, or distribute the documents RFQ 2018-141-ND 55 unless authorized by the City Manager, or designee(s)„ in writing. 16.5.2.2 The Consultant and its Subconsultants agree in writing that the Project documents are to be kept and maintained in a secure location. 16.5.2.3 Each set of the Project documents are to be numbered and the whereabouts of the documents shall be tracked at all times. 16.5.2.4 A log is developed to track each set of documents logging in the date, time, and name of the individual(s)that work on or view the documents. 16.6 CORRECTIONS TO CONTRACT DOCUMENTS: The Consultant shall prepare, without added compensation, all necessary supplemental documents to correct errors, omissions, and/or ambiguities which may exist in the Contract Documents prepared by Consultant, including documents prepared by its Subconsultants. Compliance with this subsection shall not be construed to relieve the Consultant from any liability resulting from any such errors, omissions, and/or ambiguities in the Contract Documents and other documents or Services related thereto. 16.7 ASSIGNMENT: The Consultant shall not assign, transfer or convey this Agreement to any other. person, firm, association or corporation, in whole or in part, without the prior written consent of the City Commission, which consent, if given at all, shall be at the Commission's,sole option and discretion. However, the Consultant will be permitted to cause portions of the Services to be performed by Subconsultants, subject to the prior written approval of the City Manager, or designee(s),. 16.8 SUCCESSORS AND ASSIGNS: The Consultant and the City each binds himself/herself, his/her partners, successors, legal representatives and assigns to the other party of the Agreement and to the partners, successors, legal representatives, and assigns of such party in respect to all covenants of this Agreement. The Consultant shall afford the City (through the City Commission) the opportunity to approve or reject all proposed assignees, successors or other changes in the ownership structure and composition of the Consultant. Failure to do so constitutes a breach of this Agreement by the Consultant. 16.9 PROVISION OF ITEMS NECESSARY TO COMPLETE SERVICES: In the performance of the Services prescribed herein, it shall be the responsibility of the Consultant to provide all salaries, wages, materials, equipment, Subconsultants, and other purchased services, etc., as necessary to complete said Services. 16.10 INTENT OF AGREEMENT: , 16.10.1 The intent of the Agreement is for the Consultant to provide design and other services, and to include all necessary items for the proper completion of such services for a fully functional Project which, when constructed in accordance with the design, will be able to be used by the City for its intended purpose. The Consultant shall perform, as Basic Services, such incidental work which may not be specifically referenced, as necessary to complete the Project. 16.10.2 This Agreement is for the benefit of the parties only and it does not grant rights to a third party beneficiary, to any person, nor does it authorize anyone not a party to the Agreement to maintain a suit for personal injuries, professional liability, or property damage pursuant to the terms or provisions of the Agreement. 16.10.3 No acceptance, order, payment, or certificate of or by the City, or its employees or agents, shall either stop the City from asserting any rights or operate as a waiver of any provisions RFQ 2018-141-ND 56 hereof or of any power or right herein reserved to the City or of any rights to damages herein provided. 16.11 This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, or understandings applicable to the matters contained herein; and the parties agree that there are no commitments, agreements, or understandings concerning the subject matter of this Agreement that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless memorialized in written document approval and executed with the same formality and of equal dignity herewith. IN WITNESS WHEREOF, the parties hereto have hereunto caused these presents to be signed in their names by their duly authorized officers and principals, attested by their respective witnesses and City Clerk on the day and year first hereinabove written. Attest CITY OF MIAMI BEACH: CITY CLERK MAYOR Attest xxxxxxxxxxxxxxx Signature/Secretary Signature/President Print Name Print Name RFQ 2018-141-ND 57 SCHEDULE A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND CONSULTANT SERVICE ORDER Service Order No. _ for Consulting Services. • TO: PROJECT NAME: Project Name DATE: Pursuant to the agreement between the City of Miami Beach and Consultant for PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SPECIALIZED CATEGORIES ON AN "AS-NEEDED" BASIS (RFQ XXXXXXXX) you are directed to provide the following services: SCOPE OF SERVICES: Per attached proposal dated , to be considered part of this Agreement. Estimated calendar days to complete this work: Days Original Service Order Amount: Total From Previous Additional Service Orders: $ Fee for this Service Order is Lump Sum/Not to Exceed amount $ of: Total Agreement to Date: $ City's Project Date Coordinator/Manager Assistant Director Date Consultant. Date Project Administrator-Director Date RFQ 2018-141-ND 58 SCHEDULE B CONSULTANT COMPENSATION Schedule of Payments Planning Services * $XXXXXXXX Design Services* $XXXXXXXX Bidding and Award Services $XXXXXXXX • Construction Administration** $XXXXXXXX Reimbursable Allowance*** $XXXXXXXX Note*: These services will be paid lump sum based. on percentage complete of each phase as identified in the individual tasks. Note**: Construction Administration will be paid on a monthly basis upon commencement of construction. In the event that, through no fault of the Consultant, Construction Administration services are required to be extended, which extension shall be subject to prior City approval, and what shall be at the City's sole discretion, the Consultant agrees to extend said services for$XXXXXX, per month, for theduration required to complete the Project. Note***: The Reimbursable Allowance belongs to the City and must be approved in writing, in advance, by the Project Administrator. Unused portions will not be paid to the Consultant. • RFQ 2018-141-ND 59 • HOURLY BILLING RATE SCHEDULE Project Principal $172.50 Project Engineer(Coastal or $116.15 Other) Project Manager $138.00 Sr. Field Services Professional $116.15 Senior Civil Engineer $138.00 Field Services Professional $ 80.50 Civil Engineer $116.15 ' Threshold Inspector $138.00 Senior Electrical Engineer $138.00 Structural Special Inspector $109.25 Electrical Engineer $116.15 Technical Editor $ 74.75 Senior Mechanical Engineer $138.00 Senior GIS Specialist $116.15 Mechanical Engineer $116.15__ -GIS Specialist $ 86.25_. Senior Structural Engineer $138.00 Staff Engineer/Geologist/Scientist $ 94.30 Structural Engineer $116.15 Landscape Designer $ 95.45 Senior Environmental Engineer $138.00 Planner $116.15 Environmental Engineer $116.15 Project Principal.( Structural Engineer) $172.50 Environmental Technician $ 74.75 Project Manager(Structural Engineer) $138.00 Environmental Specialist $ 63.25. CAD Technician (Structural) $ 63.25 Environmental Permit Specialist $ 63.25 Traffic Engineers $116.15 Project Scientist $120.75 Cost Estimator $ 74.75 Senior Surveyor $138.00 Specifications Writer $ 63.25 Surveyor $116.15 Construction Administrator/Manager $ 94.30 Surveyor Support Staff $ 69.00 Senior Project Manager $138.00 • Senior Architect $138.00 MEP Project Engineer $138.00 Architect $116.15 Horticultural/maintenance Consultant $ 86.25 Senior Designer $138.00 Irrigation Engineer ,$ 94.30 Designer $ 95.45 Job Captain $ 92.00 Senior Urban Planner • $138.00 Interior Designer $ 95.45 Senior CAD Technician $ 69.00 Principal/Director of Design $138.00 CAD Technician $ 63.25 Senior Landscape Architect $138.00 Landscape Architect $116.15 Clerical $ 40.25 Administrative Assistant $ 40.25 Survey Crew Party of2 $140.68 Survey Crew Party of 2 w/GPS $168.51 Survey Crew Party of 3 $170.44. Survey Crew Party of3w/GPS $197.01 Survey Crew Party of 4 $211.31 Survey Crew Party of 4 w/GPS $250.13 Sr. Inspector(CEI) $103.50 Inspector(CEI, Field or $ 94.88 Construction) RFQ 2018-141-ND 60 SCHEDULE C APPROVED SUBCONSULTANTS RFQ 2018-141--ND 61 APPENDIX F MIAMLIEACH STANDARD FORM 330 RFQ No. 20187141. -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach:Florida 33139 RFQ 2018-141-ND 62 ARCHITECT-ENGINEER QUALIFICATIONS OMB Control Number: 9000-0157 Expiration Date: 11/30/2017 Paperwork Reduction Act Statement-This information collection meets the requirements of 44 USC§3507,as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget(OMB)control number. The OMB control number for this collection Is 9000-0157, We estimate that it will take 29 hours(25 hours for part 1 and 4 hours for Part 2)to read the Instructions,gather the facts,and answer the questions. Send only comments relating to our time estimate,Including suggestions for reducing this burden,or any other aspects of this collection of Information to: General Services Administration,Regulatory Secretariat Division(M1VICB),1800 F Street,NW,Washington,DC 20405, PURPOSE DEFINITIONS Federal agencies use this form to obtain information from Architect-Engineer Services: Defined in FAR 2.101. architect-engineer(A-E)firms about their professional qualifications. Federal agencies select firms for A-E contracts on the basis of professional qualifications as required by 40 U.S.C. Branch Office: A geographically distinct place of business or chapter 11, Selection of Architects Engineers,and Part 36 of the subsidiary office of a firm that has a key role on the team. Federal Acquisition Regulation(FAR). • Discipline: Primary technical capabilities of key personnel,as • The Selection of Architects and Engineers statute requires the evidenced by academic degree, professional registration, public announcement of requirements for A-E services(with certification,and/or extensive experience. some exceptions provided by other statutes),and the selection of at least three of the most highly qualified firms based on Firm: Defined in FAR 36.102. demonstrated competence and professional qualifications • according to specific criteria published in the announcement. Key Personnel: Individuals who will have major contract The Act then requires the negotiation of a contract at a fair and responsibilities and/or provide unusual or unique expertise. reasonable price starting first with the most highly qualified firm. . The information used to evaluate firms Is from this form and other SPECIFIC INSTRUCTIONS sources, including performance evaluations,any additional data requested by the agency,and interviews with the most highly Part I-Controct-Specific Qualifications qualified firms and their references. Section A.Contract Information. • GENERAL INSTRUCTIONS 1. Title and Location. Enter the title and location of the • contract for which this form is being submitted,exactly as shown Part I presents the qualifications for a specific contract in the public•announcement or agency request. Part II presents the general qualifications of a firm or a specific 2. Public Notice Date. Enter the posted date of the agency's branch office of a firm. Part II has,two uses: notice on the Federal Business Opportunity website (FedBizOpps), other-form of public announcement or agency • request for this contract. 1 1. An A-E firm may submit Part Ii to the appropriate central, • regional or local office of each Federal agency to be kept on file. 3. Solicitation or Project Number. Enter the agency's A public announcement is not required for certain contracts,and solicitation number and/or project number, if applicable, agencies may use Part II as a basis for selecting at least three of exactly as shown in the public announcement or agency request the most highly qualified firms for discussions prior to requesting for this contract. submission of Part I. Firms are encouraged to update Part II on file with agency offices,as appropriate,according to FAR Part Section B. Architect-Engineer Point of Contact,. 36. If a firm has branch offices,submit a separate Part II for each branch office seeking work. 4-8. Name, Title, Name of Firm, Telephone Number, Fax (Facsimile) Number and E-mail (Electronic Mail) Address. 2. Prepare a separate Part li for each firm that will be part of Provide information for a representative of the prime contractor the team proposed_foLa_sp_ecific_contract-and"submitted-with-Part.- .-•---or--joint-venture-that. the-agency—can-contact-foratlditioflal" I. If a firm has branch offices,submit a separate Part iI for each information. branch office that has a key role on the team. • 1 INDIVIDUAL AGENCY INSTRUCTIONS 1 Individual agencies may supplement these instructions. For example,they may limit the number of projects or number of pages submitted in Part I in response to"a public announcement for a particular project. Carefully comply with any agency instructions when preparing and submitting this form. Be as concise as possible and provide only the information requested by the agency. AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV.8/2016)PAGE 1 OF INSTRUCTIONS • Prescribed by GSA-FAR(48 CFR)53.238.2(b) • Section C. Proposed Team, 19. Relevant Projects. Provide information on up to five projects in which the person had a significant role that 9-11. Firm Name,Address,and Role in This Contract demonstrates the person's capability relevant to her/his proposed Provide the contractual relationship, name,full mailing address, role in this contract. These projects do not necessarily have to and a brief description of the role of each firm that will be be any of the projects presented in Section F for the project team involved in performance of this contract. List the prime if the person was not involved in any of those projects or the contractor or Joint venture partners first. If a firm has branch person worked on other projects that were more relevant than offices,indicate each individual branch office that will have a,key the team projects in Section F. Use the check box provided to role.on the team. The named subcontractors and outside indicate if the project was performed with any office of the current associates or consultants must be used,and any change must firm. If any of the professional services or construction projects be approved by the contracting officer.(See FAR Part 52 Clause are not complete,leave Year Completed blank and Indicate the "Subcontractors and Outside Associates and Consultants status In Brief Description and Specific Role(block(3)). (Architect-Engineer Services)"). Attach an additional sheet in the same format as Section C if needed. Section F. Example Projects Which Best Illustrate Proposed Team's Qualifications for this Contract Section D. Organizational Chart of Proposed Team. Select projects where multiple team members worked As an attachment after Section C,present an organizational • together,if possible,that demonstrate the team's capability to • chart of the proposed team showing the names and roles of all perform work similar to that required for this contract. Complete • key personnel listed in Section E and the firm they are one Section F for each project Present ten projects,unless associated with as listed in Section C. otherwise specified by the agency. Complete the following • blocks for each project: Section E. Resumes of Key Personnel Proposed for this Contract. 20. Example Project Key Number. Start with"1"for the first - project and number consecutively. Complete this section for each key person who will participate in this contract. Group by firm,with personnel of the 21. Title and Location. Title and location of project or prime contractor or joint venture partner firms first. The following contract. For an indefinite delivery contract,the location is the blocks must be completed for each resume: geographic scope of the contract. . 12. Name. Self-explanatory. 22. Year Completed. Enter the year completed of the professional services(such as planning,engineering study, . 13.'Role In this contract. Self-explanatory. design,or surveying),and/or the year completed of construction, if applicable. If any of the professional services or the construction.projects are.not complete,leave Year Completed 14. Years Experience. Total years of relevant experience blank and indicate the status in Brief Description of Project and (block 14a),and years of relevant experience with current firm, • Relevance to this Contract(block 24). but not necessarily the same branch office(block 14b). 23a. Project Owner. Project owner or user,such as a 15. Firm Name and Location. Name,city and state of the government agency or installation,an institution,a corporation or firm where the person currently works,which must correspond private individual. with one of the firms(or branch office of a firm,if appropriate) I listed in Section C. 23b. Point of Contact Name. Provide name of a person associated with the project owner or the organization which 16. Education. Provide information on the highest relevant contracted for the professional services,who is very familiar with academic degree(s)received. indicate the area(s)of the project and the firm's(or firms')performance. specialization for each degree. 23c. Point of Contact Telephone Number. Self-explanatory. 17. Current Professional Registration. Provide Information • on current relevant professional registrations)in a State or 24. Brief Description of Project and Relevance to Ihls possession of the United States,Puerto Rico,or the District of Columbia according to FAR Part 36. Contract. Indicate scope,size,cost,principal elements and . special features of the project. Discuss the relevance of the example project to this contract. Enter any other Information 18. Other Professional Qualifications. Provide information requested by the agency for each example project on any other professional qualifications relating to this contract, such as education;professional registration,publications, organizational memberships,certifications,training, awards,and foreign language capabilities. STANDARD FORM 330(REV.8/2016) PAGE 2 OF INSTRUCTIONS 25. Firms from Section C Involved with this Project. Indicate 29. Example Projects Key, List the key numbers and titles of which firms(or branch offices,if appropriate)on the project team the example projects in the same order as they appear in Section were involved in the example project,and their roles. List in the F. • same order as Section C. Section H. Additional Information. Section G. Key Personnel Participation in Example Projects. 30. Use this section to provide additional information This matrix is intended to graphically depict which key specifically requested by the agency or to address selection personnel identified in Section E worked on the example projects criteria that are not covered by the information provided in listed in Section F. Complete the following blocks(see example Sections A-G. below). Section I. Authorized Representative. • 26,and 27. Names of Key Personnel and Role in this Contract List the names of the key personnel and their 31,and 32. Signature of Authorized Representative and proposed roles in this contract in the same order as they appear Date. An authorized representative of a joint venture or the in Section E. prime contractor must sign and date the completed form. • Signing attests that the information provided is current and 28. Example Projects Listed in Section F. In the column factual, and that all firms on the proposed team agree to work on under each project key number(see block 29)and for each key the project. Joint ventures selected for negotiations must make • person,place an"X"under the project key number for available a statement of participation by a principal of each 'participation in the same or similar role. member of the joint venture. • 33. Name and Title. Self-explanatory. • SAMPLE ENTRIES FOR SECTION G (MATRIX) 26, NAMES OF KEY 27, ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill in"Example Projects Key"section below first,before (From Section E, (From Section E, completing table. Place'X'under project key number for Block 12) Block 13) ' participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 • Jane A. Smith. • Chief Architect X X Joseph B. Williams Chief Mechanical Engineer X X X X Tara C. Donovan Chief Electricial Engineer X X X • • 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT(From Section F) NUMBER TITLE OF EXAMPLE PROJECT(From Section F) 1 Federal Courthouse, Denver, CO 6 XYZ Corporation Headquarters, Boston, MA 2 Justin J. Wilson Federal Building, 7 Founder's Museum, Newport, RI Baton Rouge, LA STANDARD FORM 330(REV.812016) PAGE 3 OF INSTRUCTIONS i I Part II•General Qualifications See the"General Instructions"on page 1 for firms with branch b. Employees by Discipline. Use the relevant disciplines and , Offices. Prepare Part II for the specific branch office seeking associated function codes shown at the end of these instructions work if the firm has branch offices. and list in the same numerical order. After the listed disciplines, write In any additional disciplines and leave the function code • 1. Solicitation Number. If Part II is submitted for a specific blank. List no more than 20 disciplines. Group remaining contract,insert the agency's solicitation number and/or project employees under"Other Employees"in column b, Each person number,if applicable,exactly as shown in the public can be counted only once according to his/her primary function. announcement or agency request. If Part II is prepared for a firm(including all branch offices),enter the number of employees by disciplines In column c(1). If Part II 2a-2e, Firm(or Branch Office)Name and Address. Self- is prepared for a branch office,enter the number of employees explanatory. by discipline in column c(2)and for the firm in column c(1). j 3. Year Established. Enter the year the firm(or branch 10. Profile of Firm's Experience and Annual Average office,if appropriate)was established under the current name. Revenue for Last 5 Years. Complete this block for the firm or branch office for which this Part II is prepared. Enter the 1 • 4. Unique Entity Identifier. Insert the unique entity identifier experience categories which most accurately reflect the firm's I issued by the entity designated at SAM. See FAR part 4.6. technical capabilities and project experience. Use the relevant experience categories and associated profile codes shown at the 5. Ownership. end of these instructions,and list in the same numerical order. After the listed experience categories,write in any unlisted a,Type. Enter the type of ownership or legal structure of the relevant project experience categories and leave the profile firm(sole proprietor,partnership,corporation,joint venture,etc.). . codes blank. For each type of experience,enter the appropriate revenue index number to reflect the professional services •l b.Small Business Status. Refer to the North American revenues received annually(averaged over the last 5 years)by + Industry Classification System(NAICS)code ih the public the firm or branch office for performing that type of work. A announcement, and indicate if the firm is a small business particular project may be identified with one experience category according to the current size standard for that NAICS code(for or it may be broken into components,as best reflects the . example, Engineering Services(part of NAICS 541330), capabilities and types of work performed by the firm. However, Architectural Services(NAICS 541310), Surveying and Mapping do not double count the revenues received on a particular Services(NAICS 541370)). The small business categories and project. the.internet website for the NAICS codes appear in FAR part 19. Contact the requesting agency for any questions. Contact your 11. Annual Average Professional Services Revenues of Firm . local U.S:Small Business Administration office for any questions for Last 3 Years. Complete this block for the firm or branch office regarding Business Status. _ for which this Part II is prepared, Enter the appropriate.revenue I index numbers to reflect the professional services revenues 6a-6c. Point of Contact. Provide this information for a received annually(averaged over the last 3 years)by the firm or • representative of the firm that the agency can contact for branch office. Indicate Federal work(performed directly for the additional information. The representative must be empowered Federal Government,either as the prime contractor or j ,non-Federal work(all other domestic and foreign j subcontractor to speak on contractual and policy matters. ) work,including Federally-assisted projects),and the total. If the 7. Name of Firm. Enter the name of the firm if Part II Is firm has been in existence for less than 3 years,see the prepared for a branch office. definition for"Annual Receipts"under FAR 19.101. 8a-8c. Former Firm Names. Indicate any other previous 12. Authorized Representative. An authorized , names for the firm(or branch office)during the last six years. representative of the firm or branch office must sign and date the Insert the year that this corporate name change was effective completed form. Signing attests that the information provided is j and the associated unique entity identifier. This information is current and factual. Provide the name and title of the authorized used to review past performance on Federal contracts. representative who signed the form.• • • • STANDARD FORM 330(REV.812016) PAGE 4 OF INSTRUCTIONS • List of Disciplines (Function.Codes) Code Description Code Description 01 Acoustical Engineer 32 Hydraulic Engineer 02 Administrative 33 Hydrographic Surveyor• 03 Aerial Photographer 34 Hydrologist 04 Aeronautical Engineer 35 Industrial Engineer • 05 Archeologist 36 Industrial Hygienist • • 06 Architect 37 Interior Designer 07 Biologist 38 Land Surveyor • 08 CADD Technician 39 Landscape Architect • 09 Cartographer 40 Materials Engineer 10 Chemical Engineer 41 Materials Handling Engineer 11 Chemist 42 Mechanical Engineer - 12 Civil Engineer 43 Mining Engineer , 13 Communications Engineer 44 Oceanographer 14 Computer Programmer 45 Photo Interpreter 15 Construction Inspector 46 Photogrammetrist 16 Construction Manager 47 Planner: Urban/Reglonal l 17 Corrosion Engineer 48 Project Manager 18 Cost Engineer/Estimator 49 Remote Sensing Specialist 19 Ecologist 50 Risk Assessor 1 1 20 Economist 51 Safety/Occupational Health Engineer 21 Electrical Engineer 52 Sanitary Engineer 22 . Electronics Engineer 53 Scheduler i 23 Environmental Engineer - 54 Security Specialist 24 • Environmental Scientist 55 Soils Engineer I 25 Fire Protection Engineer 56 Specifications Writer• i 26 Forensic Engineer 57 Structural Engineer ' 27 Foundation/Geotechnical Engineer 58 Technician/Analyst 28 Geodetic Surveyor . 59 Toxicologist 29 Geographic Information System Specialist 60 Transportation Engineer • 30 Geologist 61 Value Engineer 31 Health Facility Planner 62 Water Resources Engineer i I i . 1 1 • • • STANDARD FORM 330(REV.812016) PAGE 5 OF INSTRUCTIONS List of Experience Categories (Profile Codes) Code Description Code Description A01 Acoustics,Noise Abatement E01 Ecological&Archeological Investigations A02 Aerial Photography;Airborne Data and Imagery E02 Educational Facilities;Classrooms Collection and Analysis E03 Electrical Studies and Design A03 Agricultural Development;Grain Storage;Farm Mechanization E04 Electronics A04 Air Pollution Control E05 Elevators;Escalators;People-Movers E06 Embassies and Chanceries A05 Airports; Navaids;Airport Lighting;Aircraft Fueling E07 Energy Conservation;New Energy Sources A06 Airports;Terminals and Hangars; Freight Handling E08 Engineering Economics A07 Arctic Facilities E09 Environmental Impact Studies, A08 Animal Facilities Assessments or Statements A09 Anti-Terrorism/Force Protection • El0 Environmental and Natural Resource A10 Asbestos Abatement Mapping All Auditoriums&Theaters El1 Environmental Planning E12 Environmental Remediation Al2 Automation;Controls; Instrumentation E13 Environmental_Testing and Analysis B01 Barracks;Dormitories B02 Bridges • F01 Fallout shelters;Blast-Resistant Design F02 Field Houses;Gyms;Stadiums C01 Cartography . F03 Fire Protection • F04 Fisheries;Fish ladders i CO2 Cemeteries(Planning&Relocation) F05 Forensic Engineering CO3 Charting: Nautical and Aeronautical F06 Forestry&Forest products C04 Chemical Processing&Storage C05 Child Care/Development Facilities G01 Garages;Vehicle Maintenance Facilities; • C06 . Churches;Chapels Parking Decks C07 Coastal Engineering G02 Gas Systems(Propane;Natural,Etc.) C08 Codes;Standards;Ordinances G03 Geodetic Surveying:Ground and Air-borne •. C0O Cold Storage; Refrigeration and Fast Freeze G04 Geographic Information System Services: • C10 Commercial Building(low rise);Shopping Centers Development,Analysis,and Data Collection • Cil Community Facilities 005 Geospatial Data Conversion:Scanning, C12 Communications Systems;TV;Microwave Digitizing,Compilation,Attributing,Scribing, . C13 Computer Facilities;Computer Service Drafting C14 Conservation and Resource Management G06 Graphic Design C15 Construction ManagementH01 Harbors;Jetties;Piers,Ship Terminal .• C16 Construction Surveying FacilitiesI C17 Corrosion Control;Cathodic Protection;Electrolysis H02 Hazardous Materials Handling and Storage 618 Cost Estimating;Cost Engineering and H03 Hazardous,Toxic,Radioactive Waste i Analysis;Parametric Costing;Forecasting Remediation C19 Cryogenic Facilities H04 Heating;Ventilating;Air Conditioning H05 Health Systems Planning D01 Dams(Concrete;Arch) H06 Highrise;Air-Rights-Type Buildings j D02 Dams (Earth;Rock);Dikes;Levees H07 Highways; Streets;Airfield Pavirig;Parking j Lots I D03 Desalinization(Process&Facilities) H08 Historical Preservation • D04 Design-Build-Preparation of Requests for Proposals H09 Hospital&Medical Facilities D05 Digital Elevation and Terrain Model Development H10 Hotels;Motels D06 Digital Orthophotography 1-111 Housing (Residential, Multi-Family,' D07 Dining Halls;Clubs; Restaurants Apartments;Condominiums) • D08 Dredging Studies and Design H12 Hydraulics&Pneumatics H13 Hydrographic Surveying STANDARD FORM 330(REV.8/2016) PAGE 6 OF INSTRUCTIONS • List of Experience Categories (Profile Codes continued) . i Code Description Code Description 101 Industrial Buildings;Manufacturing Plants P09 Product,Machine Equipment Design • 102 Industrial Processes;Quality Control P10 Pneumatic Structures,Air-Support Buildings 103 Industrial Waste Treatment P11 Postal Facilities 104 Intelligent Transportation Systems P12 Power Generation,Transmission,Distribution 105 Interior Design;Space Planning P13 Public Safety Facilities 106 Irrigation;Drainage RO1 Radar;Sonar;Radio&Radar Telescopes JOi Judicial and Courtroom Facilities R02 Radio Frequency Systems&Shieldings L01 Laboratories;Medical Research Facilities R03 Railroad;Rapid Transit L02 Land Surveying R04 Recreation Facilities(Parks,Marinas,Etc.) L03 Landscape Architecture R05 Refrigeration Plants/Systems L04 Libraries;Museums; Galleries R06 Rehabilitation(Buildings;Structures;Facilities) L05 Lighting(Interior; Display;Theater, Etc.) I R07 Remote Sensing L06 Lighting(Exteriors;Streets; Memorials; R08 Research Facilities Athletic Fields, Etc.) R09 Resources Recovery;Recycling MO1 Mapping Location/Addressing Systems R10 Risk Analysis M02 Materials Handling Systems; Conveyors;Sorters R11 Rivers;Canals;Waterways;Flood Control M03 Metallurgy R12 Roofing M04 Microclimatology;Tropical Engineering SO1 Safety Engineering;Accident Studies;OSHA • M05 Military Design Standards Studies M06 Mining&Mineralogy SO2 Security Systems;Intruder&Smoke Detection •• M07 Missile Facilities(Silos;Fuels;Transport) S03 Seismic Designs&Studies ' M08 Modular Systems Design;Pre-Fabricated Structures or SO4 Sewage Collection,Treatment and Disposal Components i S05 Soils&Geologic Studies;Foundations S06 Solar Energy Utilization N01 .Naval Architecture;Off-Shore Platforms S07 Solid Wastes;Incineration; Landfill NO2 Navigation Structures; Locks ' SO8 Special Environments;Clean Rooms,Etc. NO3 Nuclear Facilities;Nuclear Shielding SO9 Structural Design;Special Structures 001 Office Buildings; Industrial Parks S10 Surveying; Platting;Mapping; Flood 002 Oceanographic Engineering Plain Studies 003 Ordnance; Munitions;Special Weapons Sit Sustainable Design S12 •Swimming Pools P01 Petroleum Exploration;Refining. _ S13 Storm Water Handling&Facilities P02 Petroleum and Fuel(Storage and Distribution) T01 Telephone Systems(Rural;Mobile;Intercom, P03 Photogrammetry Etc.) PO4 Pipelines(Cross-Country-Liquid&Gas) T02 Testing&Inspection Services P05 Planning(Community, Regional,Areawide and State) T03 Traffic&Transportation Engineering P06 Planning(Site, Installation,and Project) T04 Topographic Surveying and Mapping TO5 Towers(Self-Supporting&Guyed Systems) P07 Plumbing&Piping Design T06 Tunnels&Subways P08 Prisons&Correctional Facilities • STANDARD FORM 330(REV.812016) PAGE 7 OF INSTRUCTIONS J List of Experience Categories (Profile Codes continued) Code• Description • U01 Unexploded Ordnance Remediation UO2 Urban Renewals;Community Development UO3 Utilities(Gas and Steam) V01 Value Analysis; Life-Cycle Costing W01 Warehouses&Depots W02 Water Resources; Hydrology;Ground Water W03 Water Supply;Treatment and Distribution W04 Wind Tunnels; Research/Testing Facilities Design Z01 Zoning; Land Use Studies • • • II • STANDARD FORM 330(REV.8/2016) PAGE 8 OF INSTRUCTIONS ARCHITECT - ENGINEER.QUALIFICATIONS PART I -CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE 5, NAME OF FIRM 8, TELEPHONE NUMBER 7. FAX NUMBER 8. E-MNL ADDRESS C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) re 2 'F m° 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT zi PLO a. 0 CHECK IF BRANCH OFFICE b. ❑CHECK IF BRANCH OFFICE • C. ❑CHECK IF BRANCH OFFICE • d. El CHECK IF BRANCH OFFICE e. . 1 ❑CHECK IF BRANCH OFFICE f. 1 ❑CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM ❑ (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV.812016) • I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a.TOTAL I6.WITH CURRENT FIRM • 15. FIRM NAME AND LOCATION (City and State) •• 16. EDUCATION(Degree and Specialization) - 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) .• 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) 19, RELEVANT PROJECTS • (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION(if applicable) (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE LI Check if project performed with current firm • a. • (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED • PROFESSIONAL SERVICES CONSTRUCTION(If applicable) b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check If project performed with current firm • c, (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED• PROFESSIONAL SERVICES CONSTRUCTION(If applicable) d.(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE LI Check if project performed with current firm e, j • STANDARD FORM 330(REV.8/2016)PAGE 2 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION(City and State) 22. YEAR COMPLETED • PROFESSIONAL SERVICES CONSTRUCTION(inapplicable) • 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) I � • • • • { 25, FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) '(3)ROLE a. (1)FIRM NAME '(2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE • • C. f (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE • d. (1)FIRM NAME (2)FIRM LOCATION(City and Slate) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE • f. STANDARD FORM 330(REV.8/2016)PAGE 3 • G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS • 26. NAMES OF KEY 27. ROLE IN THIS28. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill In"Example Projects Key"section below before completing table. (From Section E,Block 12) (From Section E,Block 13)' Place'X"under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 • • • • • • • • • • T I ' f II 29. EXAMPLE PROJECTS KEY , • I NUMBER TITLE OF EXAMPLE PROJECT(From Section F) NUMBER TITLE OF EXAMPLE PROJECT(From Section F) 1 6 2 7 3 8 4 9 5 10 STANDARD FORM 330(REV. 8/2016)PAGE 4 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. • • I • • i . I I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE 33. NAME AND TITLE STANDARD FORM 330(REV.8/2016)PAGE 5 1. SOLICITATION NUMBER(If any) ' ARCHITECT-ENGINEER QUALIFICATIONS PART II -GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM(or Branch Office)NAME 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 2b. STREET 5. OWNERSHIP a.TYPE 2c. CITY 2d. STATE '2e. ZIP CODE b.SMALL BUSINESS STATUS Ba. POINT OF CONTACT NAME AND TITLE 7. NAME OF FIRM(If Block 2a Is a Branch Office) Bb. TELEPHONE NUMBER ec. E-MAIL ADDRESS 8a, FORMER FIRM NAME(S)(If any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER 9. EMPLOYEES BY DISCIPLINE 10, PROFILE OF FIRM'S EXPERIENCE • AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS • c.Number of Employees a.Profile C.Revenue Index • a.Function b. • Discipline b.Experience Number Code (1)FIRM (2)BRANCH Code (see below) • • • • • • Other Employees Total 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than$100,000 6. $2 million to less than$5 million J+ (Insert revenue index number shown at right) 2. $100,000 to less than$250,000 7. $5 million to less than$10 million a.Federal Work 3, $250,000 to less than$500,000 8. $10 million to less than$25 million- 4. illion b.Non-Federal Work 4. $500,000 to less than$1 million 9. $25 million to less than$50 million 5. $1 million to less than$2 million 10. $50 million or greater c.Total Work • 12. AUTHORIZED REPRESENTATIVE• The foregoing is a statement of facts. a.SIGNATURE b.DATE c.NAME AND TITLE • STANDARD FORM 330(REV.8/2016)PAGE 6 ATTACHMENT C CONSULTANT'S RESPONSE TO THE RFQ 36 Detail by FEI/EIN Number I Page 1 of 2 Florida Department of State DIVISION OF CORPORATIONS 4144t, Dt'tt tr i'l J.J r j, / : .orgr �; ���r1 ?�� r c) r;r i!iiirirrt trrrr.;,J rrr rirlrr Department of State / Division of Corporations / Search Records / Detail By Document Number/ Detail by FEI/EIN Number Florida Profit Corporation SOL-ARCH, INC. Filing Information Document Number P05000156804 FEI/EIN Number 20-3874445 Date Filed 11/29/2005 State FL Status. ACTIVE Last Event • AMENDMENT Event Date Filed 01/11/2013 Event Effective Date NONE Principal Address 6780 SW 80 ST MIAMI, FL 33143 Changed:06/07/2017_ Mailing Address 6780 SW 80 ST MIAMI, FL 33143 Changed: 06/07/2017 Registered Agent Name&Address FIGUEREDO, MICHAEL 4917SW74CT MIAMI, FL 33155 Name Changed:08/27/2010 Address Changed:08/27/2010 Officer/Director Detail Name&Address Title D FIGUEREDO, MICHAEL 4917 SW 74 COURT MIAMI, FL 33155 http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inqui... 1/8/2019 Detail by FEI/EIN Number Page 2 of 2 Title D CONDE, DULCE M • 4917 SW 74 COURT MIAMI, FL 33155 Title D • CONDE, PRIMITIVO, E 4917 SW 74,COURT MIAMI, FL 33155 Annual Reports Report Year Filed Date • 2016 01/19/2016 2017 01/10/2017 2018 01/16/2018 • Document Images 01/16/2018—ANNUAL REPORT View image in PDF format 01/10/2017—ANNUAL REPORT View image in PDF format 01/19/2016—ANNUAL REPORT View image in PDF format 01/14/2015—ANNUAL REPORT View image in PDF format 03/20/2014--ANNUAL REPORT View image in PDF format 01/11/2013—Amendment View image in PDF format 01/08/2013—ANNUAL REPORT View image in PDF format 11/20/2012—Amendment View image in PDF format 01/04/2012—ANNUAL REPORT View image in PDF format 04/29/2011--ANNUAL REPORT View image in PDF format 08/27/2010--Reg.Agent Change View image in PDF format 01/07/2010—ANNUAL REPORT View image in PDF format 04/15/2009—ANNUAL REPORT View image in PDF format 04/08/2009—ANNUAL REPORT View image in PDF format 03/25/2009--Off/Dir Resignation View image in PDF format • 01/20/2009—ANNUAL REPORT - View image in PDF format. 04/30/2008—ANNUAL REPORT View image in PDF format 02/01/2007—ANNUAL REPORT View image in PDF format 01/02/2007-Amendment View image in PDF format 12/08/2006--REINSTATEMENT View image in PDF format 11/29/2005—Off/Dir Resignation View image in PDF format 11/29/2005--Domestic Profit View image in PDF format Florida Department of State,Division of Corporations http://search.sunbiz..org/Inquiry/CorpbrationSearch/SearchResultDetail?inqui... 1/8/2019 SOL 'ARCH ARCHITECTURE o f j y * t • REQUEST FOR QUALIFICATIONS Professional Architectural and Engineering Services for Capital Renewal and Replacement Projects RFQ#2018-141-ND Prepared For: City of Miami Beach 1755 Meridian Avenue 3rd Floor Miami Beach, Florida 33139 Prepared By: Sol-ARCH,Inc. 6780 SW 80 Street Miami,Florida 33143 (305)740-0723 Open Date: May 7, 2018 at 3:00 PM ORIGINAL SOI-ARCH ► www.sol-arch.com 1 3 � � r } ARCHITECTUREsoLlimARcH J pt„ � '°a y���� •, L1,4 ,x °r M" s d �.N "�a... M_ _ ua ...`. . ,v a.. :aI,L L"et Letter' May 7,2018 City of Miami Beach Procurement Department 1755 Meridian Avenue 3rd Floor Miami Beach, Florida 331339 Sol-ARCH is pleased to submit its proposal for the City of Miami Beach's Request for Qualifications for Professional Architectural and Engineering Services for Capital Renewal and Replacement Projects as set forth in and pursuant to RFQ 2018-141-ED. Herein you will find all documents requested per RFQ 2018-141-ED. We are a highly qualified firm that has the experience and ability to complete the work described in this RFQ, specifically for: Architecture—General. It would be an honor and pleasure for our team to work with you, your staff, and the community and you have our full commitment to the projects. Sol-ARCH is located at 6780 SW 80 ST, Miami, Florida 33143 and I, Dulce Conde,will serve as the Representative of this RFQ. • Please accept this Cover Letter in response to the Submittal Package of RFQ 2018-141-ED: Warmest Regards, sliftaese eillotdot Dulce Conde,RA Sol-ARCH { THE CITY OF MIAMI BEACH RFQ 2018-141-ED Architecture—General PAGE I 1 i s ARCHITECTUREsoLNNARcH R�;. .�. ' ,...� �..� �_.-.- . . . . : 'ab ot„Centet�ts� TAB 1 Cover Letter 1 Table of Contents 2 Appendix A 3 Response Certification and Questionnaire 10 TAB 2 Licenses 12 TAB 3 Qualifications of Proposing Firm 13 TAB 4 Qualifications of the Team 16 TAB 5 SF330 20 THE CITY OF MIAMI BEACH RFQ 2018-141-ED I Architecture—General PAGE 12 APPENDIX A MIAMBEACH Response Certification , Questionnaire & Requirements Affidavit RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR SMALL PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 17 r , • Solicitation No: Solicitation Title: • RFQ 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS Procurement Contact Tel: Email: NATALIA DELGADO 305.673.7000,Ext.6263 NATALIADELGADOOMIAMIBEACHFL.GOV STATEMENTS OF QUALIFICATIONS CERTIFICATION, QUESTIONNAIRE&REQUIREMENTS AFFIDAVIT Purpose: The purpose of this Response Certification, Questionnaire and Requirements Affidavit Form is to inform prospective Proposals of certain solicitation and contractual requirements, and to collect necessary information from Proposals in order that certain portions of responsiveness, responsibility and other determining factors and compliance with requirements may be evaluated. This Statement of Qualifications Certification, Questionnaire and Requirements Affidavit Form is a REQUIRED FORM that must be submitted fully completed and. executed. 1. General Proposer Information. • FIRM NAME: Sol-ARCH, Inc. NO.OF YEA5S IN BUSINESS: 13 NO.OF YEARS IN BUSINESS LOCALLY: 13 NO.OF EMPLOYEES: 13 OTHER NAME(S)PROPOSER HAS OPERATED UNDER IN THE LAST 10 YEARS: Not applicable FIRM PRIMARY ADDRESS(HEADQUARTERS): 6780 SW 80 Street CITY: Miami STATE: Florida ZIP CODE: 33143 TELEPHONE NO.: .305-740-0723 TOLL FREE NO.: • Not applicable • FAX NO.: 305-740-0718 FIRM LOCAL ADDRESS: 6780 SW 80 Street CITY: Miami STATE: Florida ZIP CODE: 33143 PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT: Dulce Conde ACCOUNT REP TELEPHONE NO.: 305-740-0723 ACCOUNT REP TOLL FREE NO.: 305440-0718 ACCOUNT REP EMAIL:d@sol-arch.com FEDERAL TAX IDENTIFICATION NO.: 20-3874445 The City reserves the right to seek additional information from proposer or other source(s),r including but not limited to:any firm or principal information,applicable licensure,resumes of relevant individuals,client information,financial information,or any information the City deems necessary to evaluate the capacity of the proposer to perform in accordance with contract requirements. RFQ 2018-141—ND 18 1. Veteran Owned Business.Is Pro oser claiming a veteran owned business status? DYES , x NO SUBMITTAL REQUIREMENT:Proposers claiming veteran owned business status shall submit a documentation proving that firm is certified as a veteran-owned business or a service-disabled veteran owned business by the State of Florida or United States federal government,as required pursuant to ordinance 2011-3748. 2. Conflict Of Interest.All Proposers must disclose, in their Proposal, the name(s) of any officer, director, agent, or immediate family member(spouse,parent,sibling, and child)who is also an employeeof the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns,either directly or indirectly,an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates. SUBMITTAL REQUIREMENT:Proposers must disclose the name(s)of any officer,director,agent,or immediate family member (spouse,parent,sibling,and child)who is also an employee of the City of Miami Beach. Proposers must also disclose the name of any City employee who owns,either directly or indirectly,an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates 3. References&Past Performance.Proposer shall submit at least three(3)references for whom the Proposer has completed work similar in size and nature as the work referenced in solicitation. SUBMITTAL REQUIREMENT: For each reference submitted, the following information is required: 1) Firm Name, 2) Contact Individual Name&Title,3)Address,4)Telephone,5)Contacts Email and 6)Narrative on Scope of Services Provided. 4. Suspension, Debarment or Contract Cancellation.Has Proposer ever been debarred, suspended or other legal violation,or had a contract cancelled due to non-performance b an public sector agency? YES © NO SUBMITTAL REQUIREMENT: If answer to above is"YES,"Proposer shall submit a statement detailing the reasons that led to action(s). 5. Vendor.Campaign Contributions.Proposers are expected to be or become familiar with,the City's Campaign Finance Reform laws, as codified in Sections 2-487 through 2-490 of the City Code. Proposers shall be solelyy responsible for ensuring that all applicable provisions of the City's Campaign Finance Reform laws are complied with, and shall be subject to any and all sanctions,as prescribed therein,including disqualification of their Proposals,in the event of such non-compliance. SUBMITTAL REQUIREMENT: Submit the names of all individuals or entities (including your sub-consultants)with a controlling financial interest as defined in solicitation.For each individual or entity with a controlling financial interest indicate whether or not each individual or entity has contributed to the campaign either directly or indirectly,of a candidate who has been elected to the office of Mayor or City Commissioner for the City of Miami Beach. 6. Code of Business Ethics.Pursuant to City Resolution No.2000-23879,each person or entity that seeks to do business with the City shall adopt a Code of Business Ethics("Code")and submit that.Code to the Department of Procurement Management with its proposal/response or within five(5)days upon receipt of request.The Code shall,at a minimum,require the Proposer,to comply with all applicable governmental rules and regulations including, amongothers, the conflict of interest, lobbying and ethics provision of the City of Miami Beach and Miami Dade County. SUBMITTAL REQUIREMENT: Proposer shall submit firm's Code of Business Ethics. In lieu of submitting Code of Business Ethics,Proposer may submit a statement indicating that it will adopt,as required in the ordinance,the City of Miami Beach Code of Ethics,available at http://www.miamibeachfl.qov/city-hall/procurement/ RFQ 2018-141—ND 19 7. benefits:• _ .. r _ .. - _ '• - -- '. .. . . .. _. .• . __ . . . ... .. .- •- , _ '-' _ - -.. :. •!! __ ••, .: •:. •:...• .. _ benefits: SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees to the living wage requirement. 8. Equal Benefits for Employees with Spouses and Employees with Domestic Partners.When awardingcompetitively solicited contracts valued at over$100,000 whose contractors maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks,the Equal Benefits for Domestic Partners Ordinance 2005-3494 requires certain contractors doing business with the City of Miami Beach,who are awarded a contract pursuant to competitive proposals,to provide°Equal Benefits"to their employees with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a Contractor who work within the City limits of the.City of Miami Beach, Florida; and the Contractor's employees located in the United States, but outside of the City.of Miami Beach limits,who•are directly performing work on the contract within the City of Miami.Beach. •• A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of employees? x YES NO B. Does your company provide or offer access to any benefits toemployees with(same or oppositesex)domestic partners*or to domestic partners of employees? x YES NO C. Please check all benefits that apply to your answers above and list in the'other"section any additional benefits not already specified. Note: some benefits are provided to employees because they have a spouse or domestic partner, such as bereavement leave;other benefits are provided directly to the spouse or domestic partner,such as medical insurance. BENEFIT Firm Provides for Firm Provides for Firm does not Employees with Employees with Provide Benefit Spouses Domestic Partners Health x x Sick Leave x x Family Medical Leave x Bereavement Leave x If Proposer cannot offer a benefit to domestic partners because of reasons outside your control, (e.g., there are no insurance providers in your area willing to offer domestic partner coverage)you may be eligible for Reasonable Measures compliance.To comply on this basis,,you must agree to pay a.cash equivalent and submit a completed Reasonable Measures Application (attached)with all necessary documentation.Your Reasonable Measures Application will be reviewed for consideration by the City Manager,or his designee.Approval is not guaranteed and the City Manager's decision is final. Further information on the Equal Benefits requirement is available at http:llwww.miamibeachfl.Qov/city-halllprocurement/procurement-related-ordinance-and-, procedures/ RFQ 2018-141—ND 20 9. Public Entity Crimes.Section 287.133(2)(a),Florida Statutes,as currently enacted or as amended from time to time,states that a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal,proposal,or reply on a contract to provide any goods or services to a public entity;may not submit a proposal, proposal,or reply on a contract with a public entity for the construction or repair of a public building or public work;may not submit proposals,proposals,or replies on leases of real property to a public entity;may not be awarded or perform work as a contractor, supplier,subcontractor,or consultant under a contract with any public entity;and may not transact business with any public entity in excess of the threshold amount provided in s.287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendorlist. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees with the requirements of Section 287.133,Florida Statutes,and certifies it has not been placed on convicted vendor list 10. Non-Discrimination.Pursuant to City Ordinance No.2016-3990,the City shall not enter into a contract with a business unless the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a)of the City Code,including the blacklisting,divesting from,or otherwise refusing to deal with a person or entity when such action is based on race,color,national origin,religion,sex,intersexuality,gender identity,sexual orientation,marital or familial status,age or disability. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code. 11. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and: Mississippi. Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida, prohibits official City travel to the states of North Carolina and Mississippi,as well as the purchase of goods or services sourced in North Carolina and Mississippi. Proposer shall agree that no travel shall occur on behalf of the City to North Carolina or Mississippi,nor shall any product or services it provides to the City be sourced from these states. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees it is and shall remain in full compliance with Resolution 2016-29375. 12. Fair Chance Requirement.Pursuant to Section 2-376 of the City Code,the City shall not enter into any contract resulting from a competitive solicitation, unless the proposer certifies in writing that the business has adopted and employs written policies, practice%and standards that are consistent with the Ciys Fair Chance Ordinance,set forth in Article V of Chapter 62 of the City Code.("Fair Chance Ordinance"), and which, among other things, (i) prohibits City contractors;as an employer,from inquiring about an applicant's criminal history until the applicant is given a conditional offer of employment; (ii) prohibits advertising of employment positions with a statement that an individual with a criminal record may not apply for the position,and(iii)prohibits placing a statement on an employment application that a person with a criminal record may not apply for the position. SUBMITTAL REQUIREMENT: No additional submittal is required at this time. By virtue of executing this affidavit, Proposer certifies that it has adopted policies,practices and standards consistent with the City's Fair Chance Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon request Proposer further agrees that any breach of the representations made herein shall constitute a material breach of contract, and shall entitle the City to the immediate termination for cause of the agreement,in addition to any damages that may be available at law and in equity. 13. Acknowledgement of Addendum. After issuance of solicitation,the City may release one or more addendum to the solicitation which may provide additional information to Proposers or alter solicitation requirements. The City will strive to reach every Proposer having received solicitation through the City's e-procurement system, PublicPurchase.com. However, Proposers are solely responsible for assuring they have received any and all addendum issued pursuant to solicitation.This'Acknowledgement of Addendum section certifies that the Proposer has received all addendum released by the City pursuant to this solicitation. Failure to obtain and acknowledge receipt of all addenda may result in proposal disqualification. Initial to Confirm Initial to Confirm Initial to Confirm Receipt Receipt Receipt x Addendum 1 X Addendum 6 Addendum 11 x Addendum 2 X Addendum 7 Addendum 12 x Addendum 3 Addendum 8 Addendum 13 x Addendum 4 Addendum 9 Addendum 14 x Addendum 5 Addendum 10 Addendum 15 If additional confirmation of addendum is required,submit under separate cover. 1.1010111M6 ,3202984.3.96 N=II=0, •IDZIMENIMIMS /Sfte, 02.21.05.012611 RFQ 2018-141—ND 21 DISCLOSURE AND DISCLAIMER SECTION The solicitation referenced herein is being furnished to the recipient by the City of Miami Beach(the"City")for the recipient's convenience. Any action taken by the City in response to Statement of Qualifications made pursuantto this solicitation, or in making any award, or in failing or refusing to make any award pursuant to such Statement of Qualifications,or in cancelling awards,or in withdrawing or cancelling this solicitation,either before or after issuance of an award,shall be without any liability or obligation on the part of the City. In its sole discretion,the City may withdraw the solicitation either before or after receiving Statement of Qualifications,may accept or reject Statement of Qualifications,and may accept Statement of Qualifications which deviates from the solicitation,as it deems appropriate and in its best interest. In its sole discretion, the City may determine the qualifications and acceptability of any party or parties submitting Statement of Qualifications in response to this solicitation. Following submission of Statement of Qualifications, the applicant agrees to deliver such further details, information and assurances, including financial and disclosure data, relating to the Statement of Qualifications and the applicant including, without limitation, the applicant's affiliates,officers,directors,shareholders,partners and employees,as requested by the City in its discretion. The informationcontained herein is provided solely for the convenience of prospective Proposals. It is the responsibility of the recipient to assure itself that information contained herein is accurate and complete.The City does not provide any assurances as to the accuracy of any information in this solicitation. Any reliance on these contents,or on any permitted communications with City officials,shall be at the recipient's own risk.Proposals should rely exclusively on their own investigations,interpretations,and analyses.The solicitation is being provided by the City without any warranty or representation,express or implied,as to its content,its accuracy,or its completeness.No warranty or representation is made by the City or its agents that any Statement of Qualifications conforming to these requirements will be selected for consideration, negotiation, or approval. The City shall have no obligation or liability with respect to this solicitation,the selection and the award process,or whether any award will be made.Any recipient of this solicitation who responds hereto fully acknowledges all the provisions of this Disclosure and Disclaimer,is totally relying on this Disclosure and Disclaimer,and agrees to be bound by the terms hereof.Any Statement of Qualifications submitted to the City pursuant to this solicitation are submitted at the sole risk and responsibility of the party submitting such Statement of Qualifications. This solicitation is made subject to correction of errors,omissions,or withdrawal from the market without notice.Information is for guidance only,and does not constitute all or any part of an agreement. The City and all Proposals will be bound only as,if and when a Statement of Qualifications,as same may be modified,and the applicable definitive agreements pertaining thereto, are approved and executed by the parties,and then only pursuant to the terms of the definitive agreements executed among the parties.Any response to this solicitation may be accepted or rejected by the City for any reason,or for no reason,without any resultant liability to the City. The City is governed by the Government-in-the-Sunshine Law, and all Statement of Qualifications and supporting documents shall be subject to disclosure as required by such law.All Statement of Qualifications shall be submitted in sealedproposalform and shall remain confidential to the extent permitted by Florida Statutes, until the date and time selected for opening the responses. At that time, all. documents received by the City shall become public records. Proposals areexpected to make all disclosures and declarations as requested in this solicitation. By submission of a Statement of Qualifications,the Proposer acknowledges and agrees that the City has the right to make any inquiry or investigation it deems appropriate to substantiate or supplement information contained in the Statement of Qualifications,and authorizes the release to the City of any and all information sought in such inquiry or investigation.Each Proposer certifies that the information contained in the Statement of Qualifications is true,accurate and complete,to the best of its knowledge,information,and belief. Notwithstanding the foregoing or anything contained in the solicitation, all Proposals agree that in the event of a final unappealable judgment by a court of competent jurisdiction which imposes on the City any liability arising out of this solicitation,or any response thereto, or any action or inaction by the City with respect thereto, such liability shall be limited to $10,000.00 as agreed-upon and liquidated damages. The previous sentence, however, shall not be construed to circumvent any of the other provisions of this Disclosure and Disclaimer which imposes no liability on the City. In the event of any differences in language between this Disclosure and Disclaimer and the balance of the solicitation,it is understood that the provisions of this Disclosure and Disclaimer shall always govern.The solicitation and any disputes arising,from the solicitation shall be governed by and construed in accordance with the laws of the State of Florida. RFQ 2018-141—ND 22 PROPOSER CERTIFICATION I hereby certify that: I, as an authorized agent of the Proposer , am submitting the following information as my firm's proposal; Proposer agrees to complete and unconditional acceptance of the terms and conditions of this document, inclusive of this solicitation,all attachments,exhibits and appendices and the contents of any Addenda released hereto,and the Disclosure and Disclaimer Statement; proposer agrees to be bound to any and all specifications, terms and conditions contained in the solicitation, and any released Addenda and understand that the following are requirements of this solicitation and failure to comply will result in disqualification of proposal submitted; Proposer has not divulged,discussed, or compared the proposal with other Proposals and has not colluded with any other proposer or party to any other proposal; proposer acknowledges that all information contained herein is part of the public domain as defined by the State of Florida Sunshine and Public Records Laws; all responses, data and information contained in this proposal, inclusive of the Statement of Qualifications Certification,Questionnaire and Requirements Affidavit are true and accurate. Name of Proposer's Authorized Representative: Title of Proposer's Authorized Representative: UULCE CON DE PRNCA PflL Signature of Pr oser's Authorized,Representative: Date: utte,e, Lc)\ 2' 1 B State of FLORIDA ) On this 2 day of At'Rt t_ ,20L,personally appeared before me Dut.GG CONDE who County of N tAt i t-DADE) stated that (s)he is the o w N E R of soL-ARCH , a corporation,and that the instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said instrument to be its voluntary act and deed.Before me: 1'acuuuzl A e oru tl Notary Public for the State of Florida � .. .r My Commission Expires: 01 1141'2-02-D . �L r C ?, Notary Public State of Fiona Marisela Conde t,c S..e My Commission FF 96733. ' rOF!OF Expires 07/24/2020 s.r Via: RFQ 2018-141-ND 23 ARCHIsoLsoARcH IECIURE ° 04, ikr n t o�a o 1.Veteran Owned Business. Is proposed claiming a veteran owned business status? Response: NO. 2.Conflict of Interest. Response: Sol-ARCH does not have any officer, director, agent, or immediate family member (spouse, parent,sibling, and child)who is also an employee of the City of Miami Beach.Sol-ARCH does not have a City employee who owns, either directly or indirectly, an interest of ten (10%) percent or more in our entity or any of our affiliates. 3. References&Past Performance. Response: The City of Miami Beach may contact the following references to confirm that Sol-ARCH has completed work of similar size and nature as work referenced in this solicitation: 1. Firm Name:Advanced Learning Charter School 2. Contact Name/Title:Carlos Gonzales, Principal 3.Address:5855 NW 1715T Street, Hialeah, Florida 4. Phone: 305-231-4888 5. Email: cvgonzalez@hiveprep.com 6. Scope of Services Provided: Selected as design firm/architects in charge of various projects for Advanced Learning Charter School. 1. Firm Name: Logrono Medical Office 2.Contact Name/Title: Enrique Cano,Office Manager 3.Address: 1 SW 129 AV,Suite 201, Pembroke Pines, Florida 4. Phone:770-403-1702 5. Email: drarturologrono@comcast.net 6. Scope of Services Provided: Architects in charge of interior remodeling of a 4,500 square foot doctor's office. 1. Firm Name:AutoNation 2. Contact Name/Title:Carl Fortney,Contractor 3.Address:Various Locations 4. Phone:415-269-1957 5. Email:carl@tashconcorp.com 6. Scope of Services Provided: Design firm/architects in charge of the design and remodeling of various automotive facilities throughout Florida. 4. Suspension, Debarment or Contract Cancellation. Has proposer ever been debarred, suspended or other legal violation,or had a contract cancelled due to non-performance by any public sector agency? Response: NO. 1 THE CITY OF MIAMI BEACH RFQ 2018-141-ED I Architecture—General PAGE 110 ARCHITECIUREsoLnitARcH i4' x s , to V.ZA 4 + t4t`_�, aar� ` 0 5.Vendor Campaign Contributions. Response: Sol-ARCH does not have any individuals or entities (including our sub-consultants) with a controlling financial interest as defined in this solicitation. 6.Code of Business Ethics. Response: Sol-ARCH will adopt, as required in Ordinance 2000-23879 — "Code of Ethics", the City of Miami Beach Code of Ethics,available at http://www.miamibeachfl.gov/city-ha Il/procurement 7. Living Wage. Response: Not applicable. 8. Equal Benefits for Employees with Spouses and Employees with Domestic Partners. Response:See response in Appendix A. 9.Public Entity Crimes. Response: By virtue of executing this affidavit document, proposer agrees with the requirements of Section 287.133, Florida Statutes,and certifies it has not been placed on convicted vendor list. - 10.Non-Discrimination. Response: By virtue of executing this affidavit document, proposer agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code. 11. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi. Response: By virtue of executing this affidavit document, proposer agrees it is and shall remain in full compliance with Resolution 2016-29375. 12.Fair Chance Requirement. Response: By virtue of executing this affidavit, proposer certifies that is has adopted policies, practices and standards consistent with the City's Fair Chance Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon request. Proposer further agrees that any breach of the representations made herein shall constitute a material breach of contract, and shall entitle the City to immediate termination for cause of the agreement, in addition to any damages that may be available at law and in equity. 13.Acknowledgement of Addendum. Response:See responses in Appendix A. THE CITY OF MIAMI BEACH RFQ 2018-141-ED I Architecture—General PAGE 111 SOL 'ARCH ARCHITECEURE b - . R � Minimum r C�ual�fi�catiar}s: >�ttu e. . . m STATE OF FLORIDA 1 = DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION a -0 _ - _ BOARD OF ARCHITECTURE&INTERIOR DESIGN ,,, -A. ' LICENSE NUMBER _ -- - "`*�." � - - .6 �._ I '. AA2EGO1552.y - _ - �'1 .i' : .. The ARCHITECT CORPORATION - Named below IS CERTIFIED` :' -r''" '=1 ,"Under;the.provisionsof:ChapterA81FS, ° �3 EipiraGan date.1EEB`28;2019_ -m M ori o SOLARCH INC ., = 4917:SW 74TH COURT , v • `'MIAMI' FL33155 - -----,•.'..."•.,-7,,---.7,4.47'---•:.:',.:-..---:N.,„-- I , r +••j ; - '" ..:mow- ., .5,..--, . ,, ` ` ` \ ' " STATE OF FLORIDA. DEPARTMENT-OFBUSINESS AND.PROFESSIONAL REGULATION i - L. _ BOARD OFARCHITECTURE&INTERIOR DESIGN ,,, .LICENSE NUMBER _. `+. , ` C F -7,5;AR0015e03- _ .. 4-1,-.,.,' i e! The ARCHITECT.' - - *-,'� Named below IS LICENSED .4,;,i,.; Under.the-provisions of Chapter 481 FS : ---a , Expiration date:-FES28,2019-- -- r.,:----;2—S-.-----' CONOE DULCE'M +5 f 4917,SW 74TH COURT,k. . Z MIAMI" .FL 33155 77.',N - :�� , :- t`' , :14 ; ). STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION - <,,;•,F BOARD OF ARCHITECTURE&INTERIOR DESIGN 1:84.`"c,.. The ARCHITECT o :', ; • ' Named below IS LICENSED— - -_ „ Under the provisions of Chapter 481 FS. _. �., ' Expiration date.-FEB 28;2019;_ - ."-"-- `' BEJEL,RAIL .- v .F"• •C ■ 9220 S.W.56TH STREET •, 7ry.P MIAMI' '...FL33165 "'- °"�� ;, F ,- THE CRY OF MIAMI BEACH RFQ 2018-141-ED I Architecture_,--General PAGE 112 SOLx*AR.CH ARCHITECTURE ' 4:10afiTi a. b WQ o5i g ir i Sol-ARCH is pleased to submit its proposal for the City of Miami Beach's Request for Qualifications for Professional Architectural and Engineering Services for Capital Renewal and Replacement Projects as described in RFQ 2018-141-ED. Sol-ARCH is a multidisciplinary architecture Corporation of global capacity. Our expertise lies with producing our clients with a turn-key, one-stop shop experience and service. We provide architecture, interiors, planning, sustainable design, construction management, renderings, animations and scale model services. Our projects cover a wide range of markets, including but not limited to civic, education, residential, commercial, retail hospitality, health care, modular building systems and maritime projects. Our company also offers due diligence,and zoning feasibility studies. Dulce Conde is the female owner and registered architect of the firm. Raul Bejel is the designer/project architect. Under their direction are technical staff members all qualified to perform production drawings and visualization. Proposer: Sol-ARCH, Inc. Location:. South Miami, Florida Address: 6780 SW 80 ST Miami, Florida 33143 Phone: 305-740-0723 Fax: 305-740-0718 Founded In: Florida—2005 Business Structure: S-Corp Firm Size: 13 employees Sol-ARCH has set itself as one of Miami-Dade County's leaders in sustainable design. We designed and built the first green building in Miami-Dade County, a Staples retail store (Biscayne Blvd) with a U.S.G.B.C. rating of"Gold".We have set a series of green principles which have become our bench mark for the way we design. In addition to Sol-ARCH being a qualified architectural firm, Dulce Conde owner and the firm qualifier has over 10 years experience working in the building and zoning department of the City of Coral Gables. For three years she worked as a permit clerk followed by seven years as a zoning technician. Her expertise in civic and governmental offices stem from being an end user for over 10 years. She not only understands the day to day interdepartmental relationships but she has experienced how the customer uses these types of facilities. This type of knowledge is rare and instrumental to the design of your facilities. Sol-ARCH can show possession of necessary facilities,technical ability and financial resources to execute the work in a satisfactory manner and our capacity to implement and complete the work within the time specified., THE CITY OF MIAMI BEACH RFQ 2018-141-ED I Architecture—General PAGE 113 ARcH..a ® ARCH E C I U R E .,i-11,,, ,, A. 0 )a A, .. ' -.?;11',"7.17,- €�3 ti. ..,I ' *y L F �F.': As per the City's request, please find below examples of small, non-residential projects that Sol-ARCH has completed in the last five(5)years. CITY OF SOUTH MIAMI—Palmer Park Client Name: City of South Miami , Contact Info: Quentin Pough—Qpough@southmiamifl.gov Project Location: 6100 SW 67th AV,South Miami, Florida 33143 Completion Date: 2015 Personnel Assigned to Project: Dulce Conde, Raul Bejel,Juan Calero Construction Cost: $85,000 Scope of Work: Complete analysis, inspection and design, and specifications for bathroom renovations and ADA compliance at Palmer Park of approximately 600 s.f, g 1 j k X d BEFORE L t, '•. =--^-- 4 t r, 1 - . t. 0 1 MI. AFTER I, ' ..'. CITY OF SOUTH MIAMI—Dante Fascell Client Name: City of South Miami Contact Info: Quentin Pough—Qpough@southmiamifl.gov Project Location: 8700 SW 57th AV,South Miami, Florida 33143 Completion Date: 2015 Personnel Assigned to Project: Dulce Conde, Raul Bejel,Juan Calero Construction Cost: $85,000 Scope of Work: Complete analysis, inspection and design, and specifications for bathroom renovations and ADA compliance of approximately 600 s.f. at Dante Fascell Park. THE CITY OF MIAMI BEACH RFQ 2018-141-ED I Architecture—General PAGE 114 ARCHIIECFAREsoL..ARcH CITY OF SOUTH MIAMI—Gibson-Bethel Community Center Client Name: City of South Miami Contact Info: Quentin Pough—Qpough@southmiamifl.gov Project Location: 5800 SW 66th Street,South Miami, Florida 33143 Completion Date: 2016 Personnel Assigned to Project: Dulce Conde, Raul Bejel Construction Cost: $100,000 Scope of Work: Project architects selected by the City of South Miami for a renovation of an existing multi-purpose 900 s.f. building to a community center comprising of a fitness room,multi-purpose room,and craft room. ADVANCED LEARNING CHARTER SCHOOL—Bathroom Renovation,ADA Compliance Client Name: Advanced Learning Charter School Contact Info: Carlos Gonzalez—cvgonzalez@hiveprep.com Project Location: 17701 NW 57th Avenue, Miami Gardens, FL 33055 Completion Date: 2016 Personnel Assigned to Project: Dulce Conde, Raul Bejel Construction Cost: $180,000 Scope of Work: Project architects selected by Advanced Learning Charter Schools for a renovation of existing 900 s.f. bathrooms to include fire alarm and ADA compliance. IMMOKALEE PLANNING STUDY—Planning and Zoning Analysis Client Name: GL Commercial Contact Info: Reed McLane—reed.mclane@glcommercial.com Project Location: Naples, Florida Completion Date: 8/2016—12/2017 Personnel Assigned to Project: Dulce Conde, Raul Bejel Cost: $25,000 Scope of Work: Planning study for a commercial retail center of 130,000 s.f. that included out parcels. THE CITY OF MIAMI BEACH RFQ 2018-141-ED I Architecture—General PAGE I 1.5 SOLARCH> ARCHITECTURE t cs a _ , „ a s t , , s t f.�^ ?� mom,�, "�°su .+ur.:�c F �. sacfro �. - * ... Overview of Capabilities Dulce Conde is the female owner and registered architect of the firm. Mrs. Conde has over 28 years of experience with 10 of those years in private practice. As a registered architect Mrs. Conde has been involved in the design and project management of numerous projects ranging from school facilities to cruise terminals, luxury mixed-use/residential developments and retail facilities within the United States, Europe and South America. Many of these projects have earned design awards from local and national organizations. Her expertise lies in being able to understand her client's needs and translating them into design solutions that have surpassing the client's expectations. Her ten year involvement with the City of Coral Gables Building and Zoning Department provides her knowledge and expertise to resolve project specific issues that come up during the projects approval process. Raul Bejel is the project manager. Mr. Bejel has over 15 years of experience in architectural design, new construction, additions, renovations and design/build projects. Included in those years, Raul has served as a fire safety inspector for a wide variety of multifaceted projects including ports and cruise terminals, commercial developments, residential projects and educational facilities for the Miami Dade. County Public School System. His experience includes project management, field inspection, shop drawings supervision,CADD drafting in addition to liaising with clients,contractors and other designers in order to ensure optimum project delivery. He has also been involved in the preparation of cost estimates, engineering plans, specifications as well as a certified fire safety inspector in the technical review of the plans prepared by other firms and participated in inspections. Sol-ARCH will develop 'a strong workingrelationship with the City. and staff by providing timely information, analysis, and solutions as the project evolves. Our team, throughout the assessment process, will use their expertise and skills to provide a product to the Client that has a clear vision and demonstrates innovation while maintaining security,schedule and budget. Thank you for the opportunity to present this proposal to you. If you have any comments or concerns about this proposal, please do not hesitate to contact us at your convenience. • THE CITY or MIAMI BEACH RFQ 2018-141-ED I Architecture—General PAGE 116 soLamARcH ARCHITECTURE 14:*` ga , w .,„ . k Y#ca xaC.: w fit;g�,„,r e coser TOM*, -v �� � *F r� se ;fie�� �,.r�� �� � �a � a k i Project Team Organization/Members SOL—ARCH, INC. PRINCIPALS R . . Arc t:e Primitivo Conde-Architect Michael Figueredo-General Contractor � 1 PROJECT MANAGER DRAFTING ( [J1 re 'e • Juan Calero • Kristopher Ruiz • Marisela Conde Sol-Arch is presenting an extremely highly qualified firm committed to delivering exceptional results for all projects. Please find resumes for each individual that will be assigned to this contract attached to the end of this section. 4 THE CITY OF MIAMI BEACH RFQ 2018-141-ED I Architecture-General PAGE 117 soL,4EARcH A P C H I F E C i U R E 14' e mj (F a s ' r a�; ." "x ssR'^::...:da .�' »rmaww.. .� �;.1'�... ,�»v�xr,.�.a.:i. rrx✓° ,�.. '�'. , � xma,+ _ ,�sa}q �a a" y-. 4.1.1 Project Experience As per the City of Miami Beach's request, specified in RFQ 2018-141-ND, below you will find three relevant projects performed in the last five years for public or private sector clients for architect Dulce Conde: LOGRONO MEDICAL OFFICE—Tenant Improvement Client Name: Doctor Logrono Contact Info: Enrique Cano—770-403-1702 Project Location: 1 SW 129 AV,Suite 201, Pembroke Pines, Florida 33027 Completion Date: 2014-2015 Construction Cost: $180,000 Scope of Work: Commissioned by Doctor Logrono as the architects in charge of the interior remodeling of a 4,500 s.f.doctor's medical office. AUTONATION SR 84—Parking Lot Client Name: AutoNation Contact Info: Carl Fortney—carl@tashconcorp.com Project Location: 130 W State Road 84, Fort Lauderdale, Florida Completion Date: 2017 Construction Cost: $300,000 Scope of Work: Commissioned by AutoNation as architects in charge of a new parking lot with 200 spaces for an automobile dealership. AUTONATION PARTS WAREHOUSE—Warehouse Client Name: AutoNation Contact Info: Carl Fortney-carl@tashconcorp.com ProjectiLocation: 12050 49th Street,Clearwater, Florida 33762 Completion Date: 2018 Construction Cost: $297,000 Scope of Work: Commissioned by AutoNation as architects in charge of the interior remodeling of a 60,000 s.f.warehouse in Clearwater, Florida. THE CITY OF MIAMI BEACH RFQ 2018-141-ED I Architecture—General PAGE 118 ARCHITECTUREsoLEmARcH ,N f y,�gG x"�{ f �" A C; . /per ` :f 'P,+. a£.k r;r6 h b. 'kNFSR 1�.,ks..6''Wn.a, .,,;Y ., a .&C,:. yYai :.E.. _ cr�., :^ 4.1.1 Project Experience As per the City of Miami Beach's request, specified in RFQ 2018-141-ND, below you will find-three relevant projects performed in the last five years for public or private sector clients for architect Raul Bejel: CORAL GABLE OFFICE—Tenant Improvement Client Name: De La Hoz,Perez&Barbeito Contact Info: Michael Betancourt—michael.bcallc@gmail.com Project Location: 304 Palermo Avenue,Coral Gables, Florida 33134 Completion Date: 2015 Construction Cost: $218,000 Scope of Work: Commissioned by De La Hoz, Perez & Barbeito as the project architects in charge of the interior renovation of a 10,000 s.f. business office in Coral Gables. SOBE PROMOS—Mixed-Use Warehouse Client Name: SOBE Promos - Contact Info: Spencer Kraemer Project Location: 3615 NW 2"d Avenue, Miami, Florida 33127 Completion Date: 2017 Construction Cost: $246,000 Scope of Work: Commissioned by Mr. Kramer as the architects in charge of the interior remodeling and conversion to ADA compliant mixed-use warehouse. AUTONATION PINELLAS PARK--New Roof Client Name: AutoNation Contact Info: Carl Fortney—carl@tashconcorp.com Project Location: 8501 US Hwy 19 N, Pinellas Park, FL 33781 Completion Date: 2017 Construction Cost: $120,000 Scope of Work: Commissioned by AutoNation as the design team in charge of designing a.new 20,000 s.f. roof for a dealership in Pinellas Park,Florida. THE CITY OF MIAMI BEACH RFQ 2018.141-ED I Architecture—General PAGE 119 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1.TITLE AND LOCATION(City and State/ Architectural Services for Capital Renewal &Replacement Projec Miami Beach, FL 2.PUBLIC NOTICE DATE 3.SOLICITATION OR PROJECT NUMBER 02/15/2018 RFQ#2018-141-ND B. ARCHITECT-ENGINEER POINT OF CONTACT 4.NAME AND TITLE Dulce Conde, Principal 5.NAME OF FIRM Sol-ARCH, Inc. 6.TELEPHONE NUMBER 7.FAX NUMBER 8.E-MAIL ADDRESS 305-740-0723 305-740-0718 d@sol-arch.cotn C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) cc w Zoe 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT 4c"mQ aCOF- 4917 SW 74th Court Sol-ARCH, Inc. Miami, FL 33155 Architecture a. X ❑ CHECK IF BRANCH OFFICE b. ❑ CHECK IF BRANCH OFFICE C. E CHECK IF BRANCH OFFICE d. ❑ CHECK IF BRANCH OFFICE e. ❑ CHECK IF BRANCH OFFICE f. 1 ❑ CHECK IF BRANCH OFFICE D.ORGANIZATIONAL CHART OF PROPOSED TEAM Q. (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330.(6/2004) PAGE 1 • E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE a.TOTAL b.WITH CURRENT FIRM Dulce Conde Principal Architect 30 8 15.FIRM NAME AND LOCATION(City and State) Sol-ARCH. Inc. 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) Professional Bachelors of Architecture State of Florida, Architecture 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.1 NCARB Certified, Port of Miami Maritime Park Award of Merit AIA & Award of Excellence SARA, Florida Design Dwors Residence, Home & Condo Sachs Residence, Gables Grand Plaza FAME Award, YWCA Day Care Center Honorable Mention 19. RELEVANT PROJECTS • (1)TITLE AND LOCATION(City and State) 12)YEAR COMPLETED Workforce One ReRoof Hollywood, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2012 2012 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm a. Project architect for a 30,000 s.f. reroof with a cost of $180,000. Scope of work: inspections, drawings, permitting and calculations. (11 TITLE AND LOCATION(City and Stare) 12)YEAR COMPLETED Tamiami Hangars - Two Metal Hangars Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2013 2016' (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm a. Project architect for two new metal hangars, 11,000 sf each. Approximate cost of construction was $1,700,000. Scope of work: design, construction documents and construction management. (1)TITLE AND LOCATION(City and Stare& (2)YEAR COMPLETED Advanced Learning Academy Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2015 2017 131 BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE L^j Check if project performed with current firm c. Project architect for a 40,000 s.f. addition to school. Construction cost approximately $6 million. Scope of work: design, construction documents, construction management. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Advanced Learning Academy d/b/a Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) HIVE Prep -Riverside 2015 2018 (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFICROLE U Check if project performed with current firm d. Project architect for a 45,000 s.f. addition to school. Construction cost approximately $8 million. Scope of work: design, construction documents, construction management. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Advanced Learning Academy d/b/a/ Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) IBB Church 2015 (3) BRIEF DESCRIPTION(Brief scope,size,cost.etc.)AND SPECIFIC ROLE U Check if project performed with current firm Project architect for a 8,000 s.f. addition to school. Construction cost approximately $120,000. Scope of work': design, construction documents, construction management. STANDARD FORM 330 16)2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) ( 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE a.TOTAL b.WITH CURRENT FIRM Raul Bezel Project Manager 16 10 15.FIRM NAME AND LOCATION(City and State) Sol-ARCH. Inc. 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) Bachelors of Architecture 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) 19. RELEVANT PROJECTS (11 TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Autoway Chevrolet Clearwater, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2011 2012 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm a. Project manager for image branding and renovation of existing 46,000 s.f. Chevrolet dealership. Scopeof work: facility design, manufactured image compliance, working drawings and construction administration. Project cost was approximately $2,000,000. (11 TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Maroone Chevrolet of Miami Miami,, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2012 (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE u Check if project performed with current firm b. Project manager for image branding and renovation of existing 46,000 s.f. Chevrolet dealership. Scope of work: facility design, manufactured image compliance, working drawings and construction administration. Project cost was approximately $5,000, 000. Ill TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Lexus of Kendall Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2015 2015 (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE L2 I Check if project performed with current firm c. Interior remodeling of service and waiting area of approximately 15, 000 s.f. Construction cost of $1.1 million. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Logrofio Doctor Office Pembroke Pines, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) FL 2014 2015 (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE -LI]Check if project performed with current firm d. Interior remodeling of doctor's office of approximately 45,000 s.f. Construction cost of $160,000. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED City of South Miami Park Bathroom South Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) • Remodeling 2015 2015 (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE lJ Check if project performed with current firm e. Professional services contract with City of South Miami for ADA compliance and remodel of two bathrooms in two parks in the City of South Miami. STANDARD FORM 330 (6)2004)PAGE 2 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT . NUMBER (Present as many projects as requested by the agency,or 10 projects, if not specified. Complete one Section F for each project.) 1 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Tamiami Hangars - Two Metal Hangars Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2013 2016 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Jorge Marin 305-740-0723 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Commissioned by Miami-Dade County to provide design of two metal hangars, 11,000 square feet each, for fuel loaded plans in conjunction with adjacent office space. Will also produce construction documents and construction management. Approximate cost of construction was $1.7 million. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) 13)ROLE a. Sol-ARCH, Inc. Miami, FL Architect (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. • • (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE.PROPOSED TEAM'S 20, EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT . NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. Complete one Section.F for each project:) 2 21.TITLE AND LOCATION(City and State) 22,YEAR COMPLETED City of South Miami South Miami, FL PROFESSIONAL SERVICES CONSTRUCTION of applicable) 2015 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c,POINT OF CONTACT TELEPHONE NUMBER City of South Miami Ricardo Ayala 305-663-6350 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO.THIS CONTRACT(Include scope,size,and cost) Complete analysis, inspection and design, and specifications for 600 s.f. bathroom renovations and ADA compliance at Palmer Park. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME 121 FIRM LOCATION(City and State) 13).ROLE a. Sol-ARCH, Inc. Miami, FL Professional Services Architect (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (31 ROLE C. (1)FIRM NAME 121 FIRM LOCATION(City and State) (31 ROLE d. (1)FIRM NAME (21 FIRM LOCATION(City and State) (31 ROLE e. f. 11)FIRM NAME 121 FIRM LOCATION(City and State) 13)ROLE STANDARD FORM 330(6)20041 PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT • NUMBER (Present as many projects as requested by the agency, or 1(?projects, if not specified. Complete one Section F for each project.) 3 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Advanced Learning Charter School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2015 2017 • 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER International Bible Baptist Carlos Gonzalez 305-231-4888 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Advanced Learning Charter School is a project adding 40,000 s.f. to the school. The scope of work includes design, construction documents and construction management with the approximate cost of constructing being $6 million. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. Sol-ARCH, Inc. Miami, FL Architect (1)FIRM NAME 12)FIRM LOCATION(City and State) (3)ROLE b. In FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION(City and State) 13)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (21 FIRM LOCATION(City and State) (3)ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) • 4 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Williams Island Marina Aventura, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2012 2015 • 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Scott Huizenga Bill Draughon 305-937-7813 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) The Marina at Williams Island is part of a mix-use project. in an established community. The • marina building is a 4,500 sf interior fit up at the base of a residential tower. The cost of the project •is $200,000. The scope included to design and d& construction documents for the facility. The two-story space has the marina offices, conference room and the second floor has the crew space consisting of showers, laundry room, recreation room and a gym. • • • 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (l l FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. Sol-ARCH, Inc. Miami, FL Architect (1)FIRM NAME 121 FIRM LOCATION(City and State) 13)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION(City and Stare) (3)ROLE d. (1)FIRM NAME (21 FIRM LOCATION(City and State) (3)ROLE e. (11 FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. STANDARD FORM 330 (6(2004) PAGE 3 • F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20, EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested bythe agency, or 10,projects,if not specified. Complete one Section F for each project.) 5 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Lexus of Kendall Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(/f applicable) 2015 2015 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Lexus of Kendall Orlando Sharpe 954-275-1974 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(include scope,size,and cost) Interior remodeling of 15,000 s.f. of service and waiting areas with an approximate construction cost of $1.1 million. • 1 ( 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1).FIRM NAME (21 FIRM LOCATION(City and State) (3)ROLE a. Sol-ARCH, Inc. Miami, FL Architect (1)FIRM NAME (21 FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. ( (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by,the agency, or 10 projects,if not specified. Complete one Section F for each project.) 6 21.TITLE AND LOCATION(City and Statel 22.YEAR COMPLETED Logrono Medical Office Pembroke Pines, PROFESSIONAL SERVICES CONSTRUCTION applicable) FL 2014 2015 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Dr. Logrono Enrique Cano 770-403-1702 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Interior remodeling of a 45,000 s.f. medical doctor office. Approximate cost of construction was $180,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. Sol-ARCH, Inc. Miami, FL Architect (1)FIRM NAME ' (2)FIRM LOCATION(City and State) 131 ROLE b. (1)FIRM NAME 12)FIRM LOCATION(City and State) (3)ROLE C. 11)FIRM NAME (2)FIRM LOCATION(City and State) A(3)ROLE' d. (1)FIRM NAME (21 FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) A(3)ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 • F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many protects as requested by the agency, or 10 projects,if not specified. Complete one Section F for each project.) 7 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Work Force One Reroof Hollywood, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2012 2012 23. PROJECT OWNER'S INFORMATION 'a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER State of Florida Derrick Smith 305-740-0723 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Complete analysis, inspection and design for a reroof project. Approximately 30,000 s.f. at a stand alone work force office building in Hollywood Florida. Bidding and construction administration was also performed. Approximate cost of construction was $180,000. • 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. Sol-ARCH, Inc. Miami, FL Architect (11 FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) 13)ROLE f. STANDARD FORM 330 (612004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER r (Present as many projects as requested by the agency, or 10 projects,if not specified. 1 Complete one Section F for each project.) 8 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Tuscany Palm Beach, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2015 2015 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER GL Homes Reed McLane 954-753-1730 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Tuscany is a 30,000 s.f. one-story retail shopping center in Palm Beach, Florida. The scope of work included design, construction documents and construction management. Construction cost of approximately $10 million. • 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT Ill FIRM NAME (21 FIRM LOCATION(City and State) (31 ROLE a. Sol-ARCH, Inc. Miami, FL Architect (1)FIRM NAME (21 FIRM LOCATION(City and State) 131 ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. • (1)FIRM NAME A(21 FIRM LOCATION(City and State) (3)ROLE • d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (11 FIRM NAME (2)FIRM LOCATION(City and State) (31 ROLE f. STANDARD FORM 330 (6120041 PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 9 21,TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Fiat Dealership Perrine, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2011 2011 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Chrysler Sean Gerhart 810-358-9172 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Sol-ARCH was commissioned to work closely with Chrysler and their DID (image branding) to design a prototype that would launch their new Fiat cars into the market. The dealership consisted of offices, showroom and service center. Scope included remodel and expansion of an existing 6,500 s.f. stand alone retail building into a Fiat Dealership. Approximate total cost of construction was $1.1 million. • 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (11 FIRM NAME (2)FIRM LOCATION(City and State) 13)ROLE a. Sol-ARCH, Inc. Miami, FL Lead Architect (11 FIRM NAME 121 FIRM LOCATION(City and State) (31 ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) 13)ROLE C. (1)FIRM NAME , '12)FIRM LOCATION(City and State) 13)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (31 ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. STANDARD FORM 330 16)2004) PAGE 3 � I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by,the agency, or 10 projects,if not specified. Complete one Section F for each project.) 10 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Tribute Element Hotel Ft. Lauderdale, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) FL 2015 2016 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Wurzak Hotel Group Jake Wurzak 610-299-8545 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(include scope,size,and cost) A 24-story, mix-use retail and 323 key hotel in the heart of Fort Lauderdale. The scope of work for this project consists of design, construction management and construction documents with a $53 million cost of construction. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. (11 FIRM NAME (2)FIRM LOCATION(City end State) (3)ROLE b. (11 FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. 11)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) 131 ROLE 1 f. STANDARD FORM 330 16)20041 PAGE 3 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F 26. NAMES OF KEY 27. ROLE IN THIS (Fill in "Example Projects Key" section below before completing PERSONNEL CONTRACT table. Place "X" under project key number for • (From Section E, (From Section E, participation in same or similar role.) Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10 Dulce Conde Principal Architect/ Project Manager X K K K K Raul Bejel Project Manager K K K K K K t 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Tamiami Hangars 6 Dr. Logrono Medical Office 2 City of South Miami 7 Workforce One Reroof • 3 HIVE Advanced Learning Charter 8 Tuscany/GL Homes Schools 4 Williams Island Marina 9 Fiat Dealership ' 5 Lexus of Kendall Dealership 10 Tribute/Element Hotel STANDARD FORM 330(6/2004)PAGE 4 H.ADDITIONAL INFORMATION 30.PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. 5 I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31.SIG - 32.DATE iI I ,33.NAME AN*TITLE Dulce Conde, Principal STANDARD FORM 330.16/2004)PAGE 5 1.SOLICITATION NUMBER(II any) ARCHITECT-ENGINEER QUALIFICATIONS PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a.FIRM(OR BRANCH OFFICE) NAME 3.YEAR ESTABLISHED 4.DUNS NUMBER Sol-ARCH, Inc. 2b.STREET ?.ODS 817173914 5. OWNERSHIP 6780 SW 70 ST a.TYPE 2c,CITY 2d.STATE 2e.ZIP CODE Corporate Miami FL 33143 b,SMALL BUSINESS STATUS 6a.POINT OF CONTACT NAME AND TITLE SBE Dulce Conde, Principal 7.NAME OF FIRM f/fblock 2a is a branch office) N/A 6b.TELEPHONE NUMBER 6c.E-MAIL ADDRESS 305-740-0723 d@sol-arch.com 8a. FORMER FIRM NAME(S)(It any) 8b.YR. ESTABLISHED 8c. DUNS NUMBER N/A 837373914 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c.No.of Employees a.Profile c. Revenue Index b. Discipline b. Experience Number Code (1)FIRM (2)BRANCH Code (see below) 02 Administrative 2 0 C05 Child Care Development 1 u6 Architect 4 .0 C10 Commercial Building 4 U8 CADD Technician S U C15 Construction Management 1 48 Project Manager 1 U D04 Design Build 1 H09 Hospital and Medical 1 Hil Housing 3 . I01 Industrial Buildings 1 I05 Interior Design 2 001 Office Buildings 2 P06 Planning 1 R12 Roofing 1 _Sil Sustainable Design 1 ZO1 Zoning Land Use 1 Other Employees Total 12 U 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million (Insert revenue index number shown at right) 2. $100,00 to less than $250,000 7. $5 million to less.than $10 million a. Federal Work 3 3. $250,000 to less than $500,000 8. $10.million to less than $25 million b. Non-Federal Work- 6- 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c.Total Work 6 5. $1 million to less than $2 million 10. $50 million or greater 12.AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a.SIGNATUR b.DATE . 1� ,0a - c.NAME AND TITLE Dulce Conde, Principal AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33016/2004) PAGE 6 Dulce Conde, RA Senior Architect, Principal Professional Design Experience Mrs.Conde has over 28 years of experience with 19 of those years in private practice.As a registered architect Mrs.Conde has been involved in the design and project management of numerous projects ranging from school facilities to cruise terminals, luxury mixed-use/residential developments and retail facilities within the United States, Europe and South America. Many of these projects have earned design awards from local and national organizations.Her expertise lies in being able to understand her client's needs and translating them into design solutions that have surpassing the client's expectations. Her ten year involvement with the City of Coral Gables Building and Zoning Department provides her knowledge and expertise to resolve project specific issues that come up during the projects approval • • process. EDUCATION Bachelor of Architecture PLANNING/DESIGN University of Miami Principal-in-charge of a team of architects and designers that are involved in the programming, master planning,schematic design and design development of a variety of projects for our international clients. PROFESSIONAL The scope of the projects vary and are always worked in conjunction with the local architectural and REGISTRATION engineering teams of record. As part of our overall scope we are tasked with making sure that the design Registered Architect intent is maintained by the local team throughout the development and construction of the project. State of Florida • INJ Plaza-Honduras No.AR 0015803 • Rio Piedras-Honduras • SCI Esplanada-Brasil NCARB Certified • SCI Rio Preto-Brasil AIA Membership 38202534 • SCI San Jose dos Campos-Brasil • SCI Votorantim-Brasil AWARDS • SCI Ribeirao Preto-Brasil Port of Miami Maritime • MD Medical Campus-Miami,FL Park • Unity of the Bay-Miami,FL Award of merit AIA • 17 Edgewater-Miami,FL Award of excellence, • China Town Study-Miami,FL SARA • Las Terrenas-Samana,DR • Coson Property-Samana,DR Gables Grand Plaza • Jackson Property-Samana,DR FAME Award • Las Brisas-Casa de Campo,DR Architecture Un-built • Los Altos-Casa de Campo,DR • Las Terrenas-Samana,DR Community Appearance • Costa Blanca-Costa Blanca,DR Award-Fort Lauderdale • HH Commercial Site-Hollywood,FL Strautman Residence Dwors Residence EDUCATIONAL/CHILD CARE. Ryder Child Development Center, Miami Florida - Lead designer/project manager involved in the YWCA Day Care Center planning, design, design-development and client relations of a 13,000 s.f. remodel of a child care Honorable Mention,SARA center. Design Excellence City of Miami YWCA Day Care Center, Miami , Florida -Lead designer/project manager involved in the planning, design,design-development and client relations of a 28,000 s.f.two-story day care building. PUBLICATIONS FLORIDA DESIGN DCPS - Primary Learning Center, Miami, Florida - Lead designer/project manager involved in the Dwors Residence planning, design, design-development and client relations of a programming prototype of a 30,500 Fort Lauderdale,Florida s.f.primary learning center building. 6,400 sf residence Project Architect&Design Kfdco V and VI,Miami,Florida -Lead designer/project manager on a team involved in the planning, design, interior design and programming, design-development, construction documentation and HOME AND CONDO construction supervision of two daycares;one 2,400 s.f.and the other 4,200 s.f. Sachs Residence Naples,Florida Kid S.P.O.T., Hollywood, Florida-Lead designer/project manager on a team involved in the planning, design, interior design and programming, design-development, construction documentation and • EXPERIENCE construction supervision of a 3,296 s.f.daycare. 28 years Dulce Conde, RA. Senior Architect, Principal State School A,Miami, Florida -Lead designer/production manager involved in the planning, design, design-development and client relations of a DCPS school prototype. University of Miami,Miami, Florida- Lead designer/project manager involved in the planning,design, design-development and client relations of a Student Union remodel. UM Lobby, Miami, Florida - Project manager for lobby remodeling at Jackson Memorial, Rosenstiel Building. Advanced Learning Academy, Miami, FL - Project architect for a 40,000 s.f. addition to school. Provided design,construction documents,and construction management. Advanced Learning Academy- Riverside, Miami, FL Project architect for a 45,000 s.f. addition to school.Provided design,construction documents,and construction management. Advanced Learning Academy-HIVE Preparatory, Miami Lakes, FL- Project architect for a 8,000 s.f. addition to school.Provided design,construction documents,and construction management. COMMERCIAL/RETAIL EXPERIENCE Miami International Airport, Edge Beam,Miami, Florida- Lead designer/project manager involved in the planning, design, design-development and client relations of improvements of FF and E at'Miami International Airport. Tamiami Airport, Building 221 and Building 247 Miami, Florida - Project architect involved in the preparation ofdocumentation for repairs caused by hurricane damage for two new metal hangars,. 11,000 s.f.each. Tamiami Airport, Hangars 102 and 109,Miami, Florida- Project architects involved in design for two metal hangars for fuel loaded planes in conjunction with office space approximately 12,000 s.f. Opa-Locka Airport,Miami, Florida- Lead designer/project manager involved in the planning,design. design-development and client relations of a office refurbishment. Gables Grand Plaza,Coral Gables, Florida - Lead designer/project manager involved in the planning, design, design-development and client relations of a 300,000 s.f. mix-use building for the Related Group. 137 Ave Shopping Center, Miami, Florida - Project architect for 10,000 s.f. of retail tenant improvement for several doctor offices and retail spaces. City of Coral Gables Fire Station#3,Coral Gables Florida-Lead designer/co-project manager on a 3- person team involved in the schematic design, design development, construction documentation and construction supervision of a fire station. Hermida Law Offices, Coral Gables, Florida - Lead designer/project manager involved in the planning,design,design-development and client relations of a 3,000 s.f.attorney's office. Williams Island Marina, Aventura, Florida - Designer for the interior space planning and design of 4,500 s.f.main dock masters offices for a marina. HYVAC,Inc,Deerfield Beach,Florida-Project manager involved in the legalization of a warehouse in Pompano Beach due to a fire violation. FIRC,Coconut Grove, Florida-Project manager in charge of involved in the planning;.design,design- development of a 1,000 s.f.office space located in an office building. Dulce Conde, RA Senior Architect, Principal Lucky 7, LLC, Miami Lakes, Florida-Project manager in charge of the remodeling of a strip center after a fire(food shop,beauty salon,and hobby store). Coconut Grove Hilton, Coconut Grove, Florida - Project manager involved in the planning, design, design-development for the due diligence work to remodel the hotel into a Hilton brand. Ramada Inn,.Hialeah, Florida - Project manager involved in the ADA compliance for hotel rooms, lounge and site of this hotel(approximately 15 rooms were remodeled). Dance Studio, Miami, Florida - Project manager in charge of design and working drawings of a 4 studio dance center that was 3,500 s.f. Eten Food, Ft. Lauderdale, Florida - Project manager involved in the planning, design, and design- development providing outdoor dining space to this existing restaurant. Red's Popcorn and Candy Shoppe,Plantation,Florida-Project manager involved in the planning and construction documents of the retail store. B&B Restaurant, Mary Brickell Village, Miami, Florida - Project architect on a team involved in the planning, design, interior design and programming, design-development, construction • documentation and construction supervision of a 5,169 s.f. remodeling with addition of a Beer and Burger Joint restaurant. Crudo Bar, Miami Beach, Florida - Project architect involved in the planning, design, design- development of a 1,200 s.f.restaurant and 600 s.f.outdoor dining in Miami Beach. Salsa Fiesta, Pembroke Pines, Florida - Project architect on a team involved in the planning, design. interior design and programming, design-development, construction documentation and construction supervision of a 2,636 s.f.interior build out of a restaurant. Salsa Fiesta II,Aventura, Florida-Project architect on a team involved in the planning,design.interior design and programming, design-development, construction documentation and construction supervision of a 2,175 s.f.interior build out of a restaurant. • Tallahassee Club and Liquor, Tallahassee, Florida - Project architect on a team involved in the planning, design, interior design and programming, design-development, construction documentation and construction supervision of a 4,500 s.f. liquor store and 12,000 s.f. night club including private dining and 3 bars. RESIDENTIAL EXPERIENCE Kennedy Residence, Plantation, Florida - Lead designer/project manager involved in the planning, design,and design-development of a 16,000 s.f.residence. Duprey Residence, Fort Lauderdale, Florida-Lead designer/project architect on a team involved in the planning, design, interior design and programming, design-development, construction documentation and construction supervision of a 8,600 s.f. two-story residence remodeling with addition. People's Residence, North Miami, Florida - Lead designer/project manager involved in the planning, design,design-development of a 695 s.f.remodeling and addition. Gonzalez Residence, Coral Gables, Florida - Lead designer/project manager involved in the. planning,design,and design-development of a 5,445 s.f.two story addition. Crosby Residence, Miami Beach, Florida - Lead designer/project manager involved in the planning, design,and design-development of a 750 s.f.addition and remodeling to the residence. u Dulce Conde, RA Senior Architect, Principal Izquierdo Residence, Coral Gables, Florida - Lead designer/project manager involved in the planning,design,and design-development of a 7,500 new residence. Weiner Reisdence, Coral Gables, Florida - Lead designer/project manager involved in the planning. design,and design-development of a 600 s.f.addition. Dopazo Residence,Miami, Florida-Lead designer/project manager involved in the planning, design, and design-development of an addition and remodeling of 1,200 s.f.to the existing residence. Tequesta Residence, Coral Gables, Florida - Project manager involved in the planning, design, and design-development of a 3,400 s.f.new residence. • 2575 Lincoln Avenue, Miami, Florida - Project manager involved in the planning, design, design- development and client relations of a cottage turned into garage and guest house for main house, 3075 Blaine Street, Miami, Florida - Project manager involved in the planning, design, and design- development of a residence,interior remodeling,legalization and replat. 3025 Blaine Street, Miami, Florida - Project manager involved in the planning, design, and design- development of a 3,600 s.f. residence. House 1st floor was remodeled and new second floor was added. 431 Rivo Alto, Miami Beach, Florida - Lead designer/project manager involved in the planning, design,and design-development of a remodeling for the residence. Miramar House, Miramar, Florida - Lead designer/project manager involved in the planning, design,. and design-development of a 1,300,s.f.new residence.for income revenue to the client. Palm Beach House, West Palm Beach, Florida - Lead designer/project manager involved in the planning,design,and design-development of a 1,200 s.f.remodeling and addition to the residence. Hollywood Townhouses, Hollywood, Florida - Lead designer/project manager involved in the planning,design,and design-development of 22,000 s.f./15 unit townhomes. Sunset Harbor Townhomes, Miami Beach, Florida - Lead designer/project manager involved in the planning, design, design-development and client relations of a 120,000 s.f. of town homes and an apartment building. New French Village,Coral Gables,Florida-Lead designer/project manager involved in the planning, design,design-development and client relations of a 80,000 s.f.apartment building Dwors Residence, Ft. Lauderdale, Flrorida -Lead designer/project manager involved in the planning, design,design-development and client relations of a 6,400 s.f.residence Strautman Residence, Ft. Lauderdale, Florida - Lead designer/project manager involved in the planning,design,design-development and client relations of a 4,200 s.f.residence Oltarsh Residence, Ft. Lauderdale,Florida -Lead designer/project manager involved in the planning, . design,design-development and client relations of a 4,500 s.f.residence. Dulce Conde, RA Senior Architect, Principal AUTOMOTIVE EXPERIENCE Autoway Chevrolet, Clearwater, Florida - Project architect involved in facility design, manufactured image compliance, and working drawings for image branding and renovation of existing 46,000 s.f. Chevrolet dealership. Courtesy Chevrolet Airport, Orlando, Florida - Project architect of a design team involved in the planning, design, interior programming and design,design-development, construction documentation and construction supervision of a 8,002 s.f.image branding of an existing automotive dealership. Courtesy Chevrolet West Colonial,Orlando, Florida-Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 30,549 s.f.image branding of an existing automotive dealership. Maroone Chevrolet, Delray, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 17,725 s.f.image branding-of an existing automotive dealership. Maroone Chevrolet, Ft. Lauderdale, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 16,620 s.f.image branding of an existing automotive dealership. Maroone Chevrolet, Pembroke Pines, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 14,659 s.f.image branding of an existing automotive dealership. Maroone Chevrolet of West Dade, Miami, Florida- Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 27,570 s.f.image branding of an existing automotive dealership. Maroone Cadillac, West Palm Beach, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 60.943 s.f.image branding of an existing automotive dealership. Maroone Chevrolet, Miami, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 18,859 s.f.image branding of an existing automotive dealership. Fox Chevrolet, Timonium, Maryland - Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 9,672 s.f.image branding of an existing automotive dealership. Nimnicht Chevrolet,Jacksonville,Florida-Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 12,859 s.f.image branding of an existing automotive dealership. Roger Dean Chevrolet, West Palm Beach, Florida - Project architecton a team involved in the planning, design, interior design and programming, design-development, construction documentation and construction supervision of a 6,837 s.f. image branding of a automotive dealership. Greenwood Chevrolet, Greenwood, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design-development, construction documentation and construction supervision of a 5,717 s.f. image branding of an existing automotive dealership. Dealership was awarded a grant for Green Building for energy efficiency. • Dulce Conde, RA Senior Architect, Principal CRUISE TERMINAL EXPERIENCE Maritime Park Master Plan,Miami, Florida-Lead designer/project manager involved in the planning and preliminary design of terminals and a park,also involved in City approval. Port of Miami, Miami, Florida - Lead designer/project manager involved in the planning, design, design-development and client relations of Carnival Cruise line terminals 8 and 9. Port of Algeciras,Algeciras,Spain -Lead designer/project manager involved in the planning, design, design-development and client relations of a Terminal and holding areas. REROOFING EXPERIENCE Work Force One, Hollywood, Florida - Lead designer/project architect involved in the planning, design,design-development,inspections, permitting and calculations,and client relations of a 30,000 s.f.reroof of a Work Force One office building in Hollywood,Florida. SUSTAINABLE DESIGN EXPERIENCE Tirado Residence, Boynton Beach,Florida-Lead designer/project architect on a team involved in the planning, design, interior design and programming, design-development, and construction documentation of a 6,299 s.f.Florida Building Council Green residence. Staples,Miami, Florida-Designer/project manager as well as construction administration,on a 20,300 s.f. new Staples building located at 2121 Biscayne Blvd.The project served as a benchmark for the future City of Miami projects, which now require USGBC Certifications. Our project received USGBC rating of LEED "Gold". Villa Soninha,Miami Beach,Florida-Lead designer/project architect on a team involved in the planning, design, interior design and programming, design-development, progress and construction documentation of a 1,635 s.f.residence.Our project received USGBC rating of LEED"Platinum". Raul Bejel, RA Senior Project Manager, Certified Fire Inspector Professional Design Experience Mr. Bejel has over 15 years of experience in architectural design, new construction, additions, renovations and design/build projects. Included in those years, Raul has served as a fire safety inspector for a wide variety of multifaceted projects including ports and cruise terminals, commercial developments, residential -• projects and educational facilities for the Miami Dade County Public School System, His experience includes project management, field inspection,shop drawings supervision, CADD drafting in addition to liaising with clients, contractors and other designers in order to ensure optimum project delivery. He has also been involved in the preparation of cost estimates, engineering plans, specifications as well as a certified fire safety inspector in the technical review of the plans prepared by other Firms and participated in inspections of construction for several public schools EDUCATION FIRE SAFETY INSPECTOR-EXAMINER Master of Miami Dade County Public School, Dade County, Florida - Served as a BBC consultant for Dade County Architecture Public Schools since 2000. Provided contract administration services to the Dade County Public School Florida International Board,inclusive of design review and criteria and performing building inspections during construction phase University, 1998 and assisting in issuing final occupancy certification. Bachelor of Science List of schools reviewed and inspected while at SOL-ARCH: in Design,Florida • Miami Sunset SHS(Fire Sprinkler Upgrades) International • Shadowlawn ES(Fire.Alarm Upgrades) University, 1996 • WJ Bryan ES(Fire Alarm Upgrades) • South Hialeah ES (Fire Alarm Upgrades) PROFESSIONAL • South Dade Technical(Fire Alarm Upgrades) REGISTRATION v Eneido Massas Hartner ES(Fire Alarm Upgrades) Registered Architect: • Ethel F.Beckford LC (Fire Alarm Upgrades) Florida • Olympia Heights ES(Fire Alarm Upgrades) Florida Division of • John I Smith Center(Fire Alarm Upgrades) State Fire Marshal • Robert R.Motbn ES (Fire Alarm Upgrades) Certified Fire r Leewood K-8(Fire Alarm Upgrades) Inspector# 110391, • Miami Northwestern SHS (Fire Alarm Upgrades) 2005 • Melrose:ES(Fire Alarm Upgrades) • West Homestead K-8(Fire Alarm Upgrades) EXPERIENCE • Neva King Cooper Ed (Fire Alarm Upgrades) 15 years • Cutler Bay MS(New Building&Fire Alarm Upgrades) • Coral Terrace ES(Fire Alarm Upgrades) • • Rockway ES(Fire Alarm Upgrades) • DA Dorsey Tech(Fire Alarm Upgrades) CIVIL/PUBLIC EXPERIENCE Joseph Caleb Courthouse/Parking Facility,Miami,Florida-Job Captain responsible for Fire/Life Safely Analysis,development of,construction drawings,coordination and all permitting activities associated with this project. The project consists of a new 39,000 sq.ft.judicial building,intended to provide office space for resident judges,visiting judicial officers,court administration staff and programs,and public service and operational spaces for an expanded Clerk of Courts operation and a 190,000 sq.ft./475 parking space garage. Currently;B&A has registered this project with the U.S.Green Building Council and is awaiting completion of the project to complete the LEED"Silver"certification process. TECOTA (Technology Center of the Americas) Data Center / Tenant Improvements, Miami, Florida - Job Captain responsible for Fire/ Life Safety Analysis, development of construction drawings and all permitting matters associated with the continuing build out of data centers within the existing building. Raul Bejel, RA Senior Project Manager,Certified Fire Inspector TECOTA(Technology Center of the Americas)Miami,Florida-Job Captain responsible for development of construction drawings,Fire/Life Safety Analysis,and all permitting matters associated with this project. TECOTA is the country's first telecommunication hotel that houses the Network Access Point of the Americas(NAP of the Americas),the fifth carrier-neutral,Tier-1 NAP in the western hemisphere.This 6-story,125,000 sq.ft.state-of-the- art hotel will provide a class"A"facility for telecom tenants. B&A provided architectural services from design through construction administration working within an extremely tight schedule that included preparation of construction documents in 45 days for this city-block sized facility.. COMMERCIAL/RETAIL EXPERIENCE SCI-Rio Petro; Sao Jose do Rio Preto, Brazil- Project manager of a 3-person team involved in the master planning through design development for a new 50,000 m2 GLA 3 level regional shopping center with underground parking. The design included outparcels for commercial office towers. SCI-Votorantim;Sao Jose do Rio Preto, Brazil-Project manager of a 3-person team involved in the master planning through design development for a new 52,000 m2 GLA 3 level regional shopping center with underground parking.The design included outparcels for commercial office towers. RESIDENTIAL/MIXED-USE DEVELOPMENT EXPERIENCE Old Spanish Village Master Plan, Coral Gables, Florida - Project Manager responsible for schematic and conceptual design development as well as, acquiring all city approvals,. Old Spanish Village is a mixed-use development located in close proximity to the Coral Gables business district.The master plan covers an area of 6.5 acres being developed into a 38-unit Park Place luxury townhome development, a 16-story office tower,on 8-story residential structure that houses 82 luxury units,and the development of Casa Palermo-an 8 story mixed-use building with 5,000 SF of commercial space and 122 residential units. Casa Palermo, Coral Gables, Florida - Project Manager responsible for Fire / life Safety Analysis during all project phases, from design development to construction administration. Casa Palermois a residential component of a larger mixed-use development in Coral Gables, master planned by B&A,and known as Old Spanish Village. Casa Palermo is an 8-story mixed-use development consisting of 5,000 SF of commercial space and 430,000 SF being developed into 122 residential units. Opera Place,West Palm Beach; Florida-Job Captain and Project Manager responsible for development of construction drawings and all permitting activities associated with this project. Opera Place is a 1.5 million SF mixed use commercial/retail development which will include a cultural component comprised of a 500-seat theater. Grand Central Master Plan,The World,Dubai,U.A.E.-Job Captain responsible for various schematic and conceptual design proposals for the Master Plan of Grand Central,the mainland transportation and logistics hub for The World and the most critical component of the development. It measures approximately 280 hectares and consists of 5 distinct districts. The Beachfront residential district,the Gateway/Ferry district from which all ferries to and from The World will depart,the Marina district,the Government district will contain the Fire,Police and Coast Guard parcels for service to The World and finally,the Logistics Harbor district will be the logistics yard for The World,providing all services,storage and provisioning for The World. MARITIME FACILITY EXPERIENCE KAI TAK Master Plan,Kowloon Bay,Hong Kong-Job Captain responsible for schematic and conceptual design of new Multi-Use cruise and maritime facilities.The design•accompanied cruise market assessment and action plan formulation as a first step toward developing new multiuse cruise and maritime facilities to meet projected increases in regional and local traffic.The study provided over 100 action items for the development of capital improvements,logistical enhancements and marketing efforts.The study was updated in 2004 with a comprehensive review of cruise infrastructure development options.In September 2006,plans were announced to develop the cruise facility at the Kai Tak Airport site. Raul Bejel, RA Senior Project Manager, Certified Fire Inspector New York Cruise Terminals and Waterfront Planning and Development, New York, New York-Job Captain . responsible for initial designs, development of construction drawings including Fire/Life Safety Analysis, and all permitting activities associated with this award-winning project.Project consists of the master plan for the revitalization of the Manhattan cruise terminals and the expansion of cruising into Brooklyn, converting what was originally a single-story waterfront cargo warehouse into Brooklyn's Pier 12, an efficient contemporary embarkation and debarkation passenger terminal named by Editor-in-Chief of Porthole Magazine as "Best New U.S.Homeport". Norfolk Cruise Terminal, Norfolk, Virginia - Job Captain responsible for master planning and design development. Project entailed a market study for the development of a new passenger cruise terminal in the City of Norfolk, Virginia, as well as design proposals for the design of the terminal and surrounding waterfront area including a new park design. - Port Everglades Terminal No.29, No.26/27, Broward County,Florida-Job Captain responsible for designing, development of construction drawings including Fire / Life Safety Analysis, and all permitting activities associated with this project, including coordination with the various consultants and local government agencies. Project entailed improvements made to an existing warehouse building to be converted into a passenger cruise terminal; this included the design of new passenger waiting, check-in and security / processing areas as well as a new elevated concourse and the addition of new gangway system. Port Everglades Terminal No.22/24, Broward County, Florida- Job Captain responsible for creating a set of as-built drawings of the existing terminal, designing the new security / processing areas to meet current standards, development of construction drawings including Fire / Life Safety Analysis, and all permitting activities as well as coordination with the various consultants and local government agencies. Port Everglades, Building 28, Broward County, Florida-Job Captain responsible for creating a set of as-built drawings of an existing warehouse building. Worked closely with structural engineers to determine overall structural integrity of the building and to create solutions to bring it up to code. Port Everglades Security Improvements, Broward County, Florida-Job Captain responsible for development of construction drawings and all permitting activities associated with. this project. Assisted in the coordination of overall security improvements for Port Everglades including security gate complexes,control center,perimeter wall and the installation of security equipment throughout the Port. Port of San Juan Passenger Terminal 4 • Rehabilitation and Expansion, San Juan, Puerto Rico -Job Captain responsible for the overall design and development of construction documents including Fire/ Life Safety Analysis, and coordinating with the various consultants and local governmental agencies while aiding in construction administration. Theproject consisted of a comprehensive rehabilitation and expansion program for San Juan's Cruise Passenger Terminal 4.enhancing its ability to accommodate larger passenger loads associated with Carnival Cruise Line's mega cruise vessels. The program included provisions for the latest passenger processing and security requirements of US Customs and Border Protection, as well as the incorporation of a new state-of-the-art gangway system. Port of Seattle Pier 91 Cruise Terminal, Seattle, Washington - Job Captain responsible for various design proposals to the Port Authority for improvements made to an existing warehouse building being converted into a passenger.cruise terminal. North Shore Park and Recreation Center,Miami Beach, Florida-Job Captain responsible for development of construction drawings and all permitting matters associated with this project. Project entailed the construction of a newly created community/recreation center which included tennis courts, a community center and a basketball pavilion.Existing amenities were also renovated. Quayside Lake Townhomes, Biscayne Bay, Florida - Job Captain responsible for development of construction drawings and all permitting matters associated with this project. Project consists of a property being developed intol8 luxury townhome units along Biscayne Bay and 32 lakeside townhomes. SA Corporate Offices ,z; ; �, asp �f` tL�,1 ` 3 , ., ,,.......-: - IIM 111wmid , ' ill _., ,:::t_:11), ,,,, . : 1 . 1.._ maiii cm , .r ,. I' . i 1 _ e y a'r-7-7' . Y ,...0.0 0,---" '-:" • '..,;:74....,:,,;.:-.,,,t.,, . :. -:"4 '' ,it + .' t rf. : r; R '1*Stkt4 Al , .',[.. f t 1 t,' '., ti 'pis,. SOLARC - ,_ SOL-ARCH The Company Sol-ARCH started in 2003 with a need in Miami's Real Estate and Design markets for photorealistic renderings. In 2005 a new trend towards sustainable design was up and coming and Sol-ARCH created a division focused in designing buildings with a sensibility to the environment and in 2008 Sol-ARCH was responsible for the design and construction administration of the first U.S.G.B.C. LEED "GOLD" certified building in Miami-Dade County. Today Sol-ARCH is licensed in 12 States and is involved in Domestic and International projects that include corporate offices and retail/commercial developments, hospitality resorts, cruise terminal structures, residential and multiuse developments, automotive and specialty facilities. Although our focus is primarily Architecture, Sol-ARCH takes pride in its ability to bring to its clients a one stop shop for their projects with services that include initial site due diligence, financial feasibility, marketing, development, Architecture and construction services. • ,A f y4 , " > ,� - t� i t. . • 3 1. a' N, f:- - ----- ' -T.:„,,,iy' C f } , i ,„, . 4: 1 t w4, •Y ' ,- `. .- Iti: . ii .+N _ _ -- , - 77 r + . _ m ' ilio. , . A SOLARCH The Company *Experience: •A combined experience of over 45 sol ARCH years � Production 'Domestic and International Projects Architecture *Focus: 'Client Oriented/Service Based Services: HLARC t ARCH Sol-ARCH Design Construction •Architecture, Interiors, Planning, Sustainability, Project Due Diligence and Feasibility •Visualization, 3D, Scale Models •Construction Supervision, Construction (limited) Sol-ARCH Visualization •Headquarters & Offices: •Miami, Florida 'Licensed in multiple states (11) 'Staff: •3 Principals (Licensed) •9 Production/Intern Architects 'Interdisciplinary/Broadly Experienced SOL •ARCH The Company Architecture Visualization Construction • Project Due Diligence • 3D Massing Studies • Construction Supervision • Facility and Land Data Base • Renderings • Shop Drawing Review • Existing Facility Analysis • Exterior • RFI Response • Code Compliance • Interior • Change Order Review • Image Branding • Camera Match • Pay Request Review • Facility As-Built •Animations • Site Visits •Site Plan Approval • Virtual (CG) • Construction Management • Variances • Camera Match • On-Site Personnel • Platting •Scale Model Massing Studies • Project scheduling • Zoning Change •Scale Models • Cost Estimating • Zoning Analysis • Monochromatic • Construction Supervision • Feasibility Studies • Detailed • Project Close-out • Financial • Lighting • Construction • Physical • Crating • Single Family Residential • Strategic Planning • Any Scale • Small Multi-Family • Master Planning •2 Laser Machines • Small Commercial •Architecture • 54x48 capacity • Code Compliance • Remodeling/Renovations • Conceptual Design • 24x18 capacity • Expansions • Design Development • Interiors • Construction Document • Interior Design • Sustainable Design • Project Bidding • Project Permitting SOLARCH The Partners Mr. Conde has 28 years of experience as a senior project manager, leading A/E teams for a wide range of multifaceted projects including corporate offices and retail/commercial developments, hospitality - resorts, cruise terminal structures, residential and multiuse developments, automotive and specialty facilities in both domestic and international markets. r •Registered Architect in the state of Florida and 8 other States 'Worked 7 years as Director of Design and Construction for AutoNation 'Worked 10 years as VP of Design and Construction for BAP Development Group and continues to consult for the Firm. •Current responsibilities include day to day communication with clients and overseeing larger Domestic and International projects. Mrs. Conde has over 28 years of experience as a project manager located in Miami, Florida. As a ip registered architect she performs project management and design on numerous projects ranging from school facilities to cruise terminals, luxury residential and retail facilities in the United States, Europe and South America. These projects have earned design awards from local and national organizations. jr Her expertise lies in her knowledge of Local, Municipal and Federal zoning and building codes. 'Registered Architect in the State of Florida •Worked 10 years with the City of Coral Gables in their Building and Zoning Departments •Current responsibilities include day to day communication with staff and overseeing projects in the construction phase. Mr. Figueredo has over 18 years of experience as a production manager with a specialty in architectural visualization and office management. He is experienced in planning and designing projects ranging from mixed-use commercial, lower and higher education, low, mid and high-rise luxury residential condominiums, office towers, hotels, automobile dealerships and single family residences. ' -Founded Sol-ARCH 8 years ago. • 'Oversees the firm's operations with a focus on financing and marketing. 'Licensed General Contractor. -Current responsibilities include overseeing the Visualization Division SOL -ARCH The Partners Mr. Herbert has over 28 years of experience in architecture. His design talents have allowed him the opportunity to work on signature projects within the U.S. and Internationally, with a primary focus in South America. Mr. Herbert has been Lead Designer on retail, hotel, mixed-use buildings, office and residential projects which have received awards for excellence in design. Mr. Herbert is the lead designer for Sol ARCH and specializes in the design of various types of projects through all the phases of the design process. ' -Registered Architect in the State of Florida and Utah. •Current responsibilities include programming and design for domestic and international projects. -Project Master Planning and architectural building character. SOLARCH �� �__- _ The Projects ' . t „owl -,,.,-.. ., 1 dart - i4f, ,. � . ; ' 1 1:... '.:.4 ' , a ,.....r a. `i ..4.1 lc -mar, '". Automotive Commercial Commercial Mixed Use Interiors Y _ , isvi % ` )% I s! i )` �1...!:-. I _ lower. -------- ilr' '1*1 Residential & Planning Visualization Visualization Hospitality Renderings Scale Models Sol-ARCH projects are each born of a creative problem-solving processes. As a result, our clients are assured of a product that not only meets their requirements, but exemplifies quality, function, and very often, award winning design. To better respond to client needs, Sol-ARCH adopts a market-based philosophy, thus organizing its resources by market sector. Today Sol-ARCH services 6 markets and 2 sub- markets worldwide. SOL-ARCH Automotive Projects Before After AutoNation "" • •Maroone Chevrolet-West Dade, FL „ _ Project: Fiat of South Miami •Maroone Chevrolet-Miami, FL 4f1 +r Location: Miami, FL •Maroone Chevrolet-Pembroke Pines,FL g 4.6.6.4. � ... • 're. _ Client: Chrysler Corporation •Maroone Chevrolet-Ft. Lauderdale, FL -- • Status : Completed •Hollywood Honda-Hollywood, FL •Maroone Chevrolet-Delray,FL •Maroone Cadillac-West Palm Beach I' : ;- •Lexus of Tampa Bay-Tampa,FL •Courtesy Chevrolet-Orlando,FL `e�•� r Project: Rosner Chevrolet •Courtesy Chevrolet Airport-Orlando,FL 1111111116._ .. 7, . Location: Melbourne, FL •Fox Chevrolet-Timonium,MD lit� Client: Rosner Group •Fox Chevrolet Laurel,MD _„: - k Status: Completed Sunset Automotive ® '' *Coast Cadillac-Sarasota,FL r 'Sunset Buick GMC-Sarasota,FL i v Project: Autoway Chevrolet •SunsetChevrolet-Sarasota, FL I •Tropical Cadillac-Bradenton, FL Location: Clearwater, FL .�• - r. ='t Client: AutoNation Sonic Automotive — ' _ r;, Status: Under Construction *Massey Cadillac-Plymouth, MI •Massey Cadillac-North Orlando,FL •MasseyCadillac-SouthOrlando,FL 1 *Capitol Chevrolet-Columbia,SC Project: Crest Cadillac J � 01100 0 " Private Clients Location: Sarasota, FL eii - tame • •Nimnicht Chevrolet-Jacksonville, FL � � I} W _ ��pF. ,,, Client: •Sunset Automotive t •Nimnicht Buick GMC—Jacksonville,FL is . ap Status: Under Construction *Greenwood Chevrolet-Ft. Meade,FL - - •Crest Cadillac-Nashville,TN •Bennett Chevrolet-Kingsland,GA •Hudson Subaru-Jersey City,NJ •Nalley Buick GMC-Brunswick,GA •Roger Dean Chevrolet-WPB, FL _ SOL -ARCH Commercial Centers & Interiors Projects r N 'a�� � \ HLARC(Partnership) )/ / I f` ` Project: SCI-Ribeirao Preto •INJ Plaza-Honduras •. Z `` :t •Rio Piedras-Honduras I Location: Ribeirao Preto SP/Brasil I •..d , . �� ` •' SCI Esplanada—Brasil t "' s� • Client: HLARC -SCI-Porto Alegre Expansion—Brasil !r,� t• C , { ` Status : Completed •SCI-Rio Preto—Brasil 4. =;ir 4, -SCI-San Jose dos Campos—Brasil •,, , • •SCI-Jundiai Outlet—Brasil N •SCI-Votorantim—Brasil ! Project: SCI-Esplanada •SCI-Ribeirao Preto—Brasil I i I i Location: • Sorocaba. SP/Brasil •SCI Galleria—Brasil i •Recife Outlet Center—Brasil - ! Client: HLARC -Porto Belo Premium Outlets-Brasil - . ..••I'T-.,+►��,'•-r Status: Completed .ij , Clients -- _- •Staples—Miami, FL •CC-La Rosa—Malaga,Spain Project: SCI-Jundiai -CC-El Brillante—Cordoba,Spain � It it tit,t...-b.! _ -- Location: Jundiai, SP/Brasil Client: HLARC Commercial Interiors •Crudo Bar—Miami Beach,FL Status: Design Development •Brickell Salon—Miami, FL Miket,r Ailk-, M - •Red's Popcorn&Candy Shop- FTL, FL •EL Vato Cantina—Miami,FL •Roka Sushi Restaurant—Miami, FL I :r... 4 Project: Rio Piedras •Yogurtlicious—Miami,FL { ii/.1"" ,,, „ '° "'' Location: San Pedro Sula, Honduras *Salsa Fiesta—Various Locations 1 •Kid's Spot- Pompano Beach, FL • .... 4i41GJ Xit 1 ktt. Client: HLARC •Paradigm(Doctor's Office)—Miami,FL I rel'"`' Status: Construction Documents `��.4—- j ing •Fortunoff—Various Locations •Speedemissions—Prototype •Mijana Restaurant—Miami Gardens, FL •Beer&Burger Joint—Various Locations SOLr•ARCH Mixed-Use Projects f r .It . -II HLARC(Partnership) V" ! r I { -INJ Plaza—Honduras , ,- Y- 1 t =_ .K.a ' Project: INJ Plaza 1—' � � ` - ' :� *Rio Piedras—Honduras i1` a : Location: San Pedro Sula, HN •SCI-Esplanade—Brasil f -„' ,,,% , ":.1.--:1 J • Client: HLARC •SCI-Rio Preto—Brasil Status : Design Development -SO-San Jose dos Campos—Brasil '�, ,7„. e . }! ' •SCI-Votorantim—Brasil �`• •SCI-Ribeirao Preto—Brasil . x. .r,;',1,7-X.V ,r Project: SCI-Rio Preto Clients • . . r4- ,. -MD Medical Campus—Miami, FL r . Lcation: Rio Preto, SP/Brasil _ Jr;, Unity on the Bay—Miami, FL I-:! ;- 'r ' � • Client: HLARC •17 Edgewater—Miami, FL $ 46101,. Status: Construction -China Town Study—Miami,FL *Lakeview Center—WPB,FL rollillIPIllims^ •Las Terrenas—Samana, DR j II "1--2 ,- ! �4`„ ;4, � 11 Project: Lake View Center ,, = - *'-z:::.i-'moi = , Location: WPB, FL - ' a Client: BAP Development V ' r 1. - M? a ye`` ' �^l `V; . i Status: Design Development f vow),to o4(1111 •. L. ` , _ ,k • l �"i - 4. Project: MD Medical Campus y Location: Miami, FL •-- % Client: BAP Development 00 _ t. ;i Status: Preliminary Design SOL •ARCH ____ Residential & Hospitality Projects Residential-Multi Family jr-. Project: 17 Edgewater •17 Edgewater-Miami,FL •Unity Site-Miami,FL Location: Miami, FL •INJ Plaza-San Pedro Sula,HN /� Client: MAK • •OakTownhomes-Hollywood,FL �'Y Status : Conceptual Design 0 I% -;, I .. Residential-Single Family -1, --:�°•, •Tequesta Residence-N Miami, FL : ,, Project: Unity on the Bay •Duprey Residence FTL, FL Location: Miami, FL g Tirado Residence-Boynton Beach, GL -Blaine Residence-Coconut Grove, FL 1. } +a Client: BAP Development •"'+� ; r•- e~ y � �► •Izquierdo Residence-Coral Gables, FL Status: Conceptual Design • •Strautman Residence-FTL,FL - " T., •Dwors Residence-FTL, FL •Dylewski Residence-Pinecrest, FL r .• •Mena Residence-Key West, FL _ •1519 Bay Drive-Miami Beach,FL Project: Oak Townhomes g,'-'` b �." -. I-_ • _ f" -South Miami Residence-SM,FL Location: Holl wood, FL .,�.._ �!.1tw r z,:• .;' '', �."' y •288 Ocean Residence-Golden Beach, FL - * Client: HLARC _:�. . en • La Gorce Residence-Miami Beach, FL Status: Construction Documents •Kenny Residence-Plantation,FL •Dial Residence-N Miami, FL •Oltarsh Residence-FTL, FL _ _ . _ , •Cappadona Residence-FTL, FL '' Project: Blaine Residence 4,..... `,1 s', Location: Coconut Grove, FL Hospitality • .. d� •INJ Plaza-San Pedro Sula,HN Client: MAK -Beaches-Turks&Caicos, BVI .* • e•Th" Status: Construction Documents •Cartagena Hyatt-Cartagena,CO 1 •Onyx 2-Miami,FL •Renaissance Hotel-Antigua,BVI •Mayalum Resort-Cancun,MX •Goodman's Bay Resort-Nassau,BS *Grand Bay Hotel-Miami,FL ____ __ _____ SOL•ARCH Planning Projects BAP Development .•...glOir �'� ii°'� ,••�.,,;r-..-- Project: TWI-Severnaya 'TWI Severnaya-Dubai,UAE '- �•, .8 •TWI-Arabian Nights-Dubai,UAE '%r ,1t. o Location: The World Islands Dubai .i r- •TWI-United Kingdom-Dubai,UAE , ,res I''''. .. 7., . ''' Client: BA �:• c .� •TWI-Heart of Europe-Dubai,UAE '^� Status : Master Plan •TWI-Osaka-Dubai, UAE rr ah el 4 ;i7 •-"' Clients •Coson Property-Samana, DR ,,+' �_ Project: Las Terrenas *Jackson Property Samana, DR "�. s' .... +^ '• if., Las Brisas-Casa de Campo, DR •1, 'a '.;,;,.'/�^:;\. Location: Samana, DR p '•ii -5----1 •Los Altos-Casa de Campo, DR ,, •' Client: BAP Development •Las Terrenas Samana, DR Status: Master Plan •Costa Blanca-Costa Blanca, DR •HH Commercial Site-Hollywood, FL '0 . ! , i ; . ' Project: Crystal Bay .., A .. Location: Antigua, BVI Client:111BAP Development ItO Status: Conceptual Design —._-_,,. ; — :iii j L., i :L ": Project: Hollywood Honda Site i LI_ emm:o t ::,-1. Location: Hollywood, FL "--'i,w- m"®®...mn®mmmm®m® Client: AutoNation I; .1„ �.�� ... ; CI Status: Master Plan 1 z, SOL =ARCH Visualization Projects Renderings/Animations _ .,�• • ,. .y .,r $a" •HLARCProjects-Various •-7-,.- —- -• —_\ *Honduras Airport-San Pedro Sula, HN mus �, _ _ l'( e, ,,,,,,t,: •Miami Springs Library-MS,FL •17 Edgewater-Miami,FL ':tt _ �� 'Unity on the Bay-Miami,FL 11.11111111.111111111111111111111111111111111111 -iFt� ti li- - ;/,� •Apogee-Miami Beach Aar •\ �' i 'South Miami Hospital-South Miami, FL y , it •Porsche of Broward-FTL,FL ,il: . Ili'iik i i3 '� •Nunez Dental-Miami, FL ill E _ ill [ l '/.../,• �., •MD Medical Campus-Miami,FL _" fs;; .•i:;• E - Biscayne Beach-Miami, FL -- js •4- s • E I Bay Drive Residence-Miami, FL =' r0 •Ocean Residence-Miami,FL - •Blaine Residence-Coconut Grove, FL *South Miami Residence-SM,FL r •AutoNation Dealerships-Various t '1 Scale Models = ., •Marriott Ocean Watch Villas-FL y , -,.. s s` •Venue-Miami, FL - •••••- •� • NI • ' f Crystal Bay-Antigua,BVI •-w y�.- ,f M •Oasis on the Bay-Miami,FL ,•. •Porsche of Broward-FTL,FL 16•"'gyp_ •Aruba Medical Center-Aruba,BVI %‘,..„1 . if I=.1 - •Los Altos Casa de Campo,DR •Hyde Beach-Sunny Isles,FL y I" *Biscayne Beach-Sunny Isles, FL ire. •Trump Hollywood-Hollywood,FL Iftl- •INJ Plaza-San Pedro Sula, HN Imo'1,, ,y J ��YY / SOL--ARCH Current Projects Automotive Tribute/Element Hotel FTL AutoNation Ford , „ '' •Massey Cadillac South-Orlando,FL •AutoNation Honda-Sanford,FL •AutoNation Chevrolet-Greenacres, FL •AutoNationCoral Gables-Miami,FL ”; t 4 .AutoNation Ford-Delray,FL ,. \ lad , ,, + a Cr_ , w Commercial - \ . :-to - •Atlantic Commons Pompano,FL •Campo Largo- Parana, Brasil / •Blue Grass Sales Center-Hollywood,FL "= "' ''� - 'Naples Garden Shops-Naples,FL . .. ~�. Commercial Interiors r 0 Ili. Alit- -Hotel Boulan Retail-Miami Beach,FL , i i III •Hotel Boulan Offices-Miami Beach, FL -,.�.: • Mixed Use +� �,`" I' t - 1 ' •SCIESP Unificacac -Sorocaba,Brasil . ,r +I� �ti,._. �i j ‘i*-- `-j'` ` •Alphaville Center- Alphaville, Brasil AC ...-z-,--**-- ' ' ; l I �l 1; i Residential/Hospitality 1... ,. ,r i, I,t =_a i . #�..', . ,.- j -Tribute/Element Downtown FTL-FTL, FL =,r. _( i •830 Residences-Miami,FL I E *' G alb, •Sheridan House-Miami Beach, L ~ um •• �``"'-_, •Holtz Residence-Coconut Grove,FL ,r I t. lit _'.•; •Diego Residence-Palmetto Bay, FL �,+ i 1�A A •Praire Residence-Miami Beach,FL ' f I *Villa Soninha-Miami Beach Florida ri rPi »fit+• *Aloft Hotel-FTL, FL tt I M •NW 7th Street Residences bute/Element Hotel FTL Sheridan House .. c.-` x .. •SW 8th Street Residences Educational •Advanced Learning Academy-Miami *Advanced Learning Academy-Riverside SOL$•ARCH Current Projects Planning r a -_ is rass Sales Center Rivers Edge—FTL, FL _ " `, • *Kendall Property-Miami, FL ---; .'*.• ' '- ' -Coconut Creek-Coconut Creek, FL r �4. � `. , 1' •Airport City Porto Alegre,Brasil _ r x - sr Visualization sv t f a "' ' II' i -Oasis Hallandale-Hallandale,FL .. .ice a -` c.., •SCIESP Model-Sorocaba, Brasil •UOTB Theatre Miami,FL :. ._..,.... •Porsche of Broward- s •Lourdes Academy Gym-Miami,FL Rieept Edge ;:1. - A Construction -.2:: t _ l ,• A •Logrono Medical Offices-Pompano,FL � la I' IsZ.t!,: .I• ., `- * eaw •Paradigm Medical Office-Miami, FL �;. # ti • �� 11....r,_, ,, _ • r ,�i,, a tit., ,r r .� Bio Reference Laboratories-Kendall, FL • +r��+' T , f l'?:::-=1. •Sol-ARCH Headquarters-Miami,FL ' poti "• _ *B KS Studios-Miami,FL Coconut Creek Oasis 1 '•ire F• . ....•:.;ii,,,,r,"I._ - .. ____ tki • ..i'.‘44/44 5 gi -.1 • 4-11—r4: .► ,�� Airport City Brasil Vt �` 4 �, AirportCitys SOL ARCH Current Projects sta Roveri s. fOCc9 e, #: Ri. --414...ts... ; i (C t :' Ns i to ' ! :_ Lip.---•-•.-:...--?-- • .• .. - r r� k k ., o rt 1 )' r • - R y a .. 'aft' rr',�' jeer t a tom`'74. :,< _ i ,)_ a R Naples Garden Shops r lar}Gty C tiitiet Cypress Club i- Prada Atanasio-Guatemala `�ti mac_ �t.�4r ..ay„ _ • - -}�!" NY: .►,J - �' . Mi oftland' - SOL•ARCH Current Projects .- k 4, t Atii n mons _ ,. rn, - , t i, y t { t. Y �. > "ice 1j ' •� �. - - -, till 830 Residences r Herrsein Residences ' I "r2-Tf.:17r7V7-Tr, ''.. 11"7" Alf 14 WI" pi :....„ "or; ,,-; '-1?‹•: ----'-'''''. , ,' flingi "roil 1 a 7_ wr i Y ®"""'9i � �',•--•� .......,wry ^# `-- - .. F :4,. ....40-"' ,..--- 14 IllibmIllii HIVE-Miami Midtown Portland HIVE-Miimi ;-- ► f r t /� lfrlIlli:� in 1111 . r1 ViiMMEN.ainwir 4. ii. _. .4.- .,:4 wi• • ..r-- v d 4.,- mss- ., - -- --. SOL..-ARCH Typical Project Scope - Project ."^•^„ .'•'^.. --� - *Ad dress ili . _..-. + •Folio Number - s °•" •Aerial ...-1.. U.....MY s - ..._ . Process r "` ''' Perform Property Search .• w m 4 ............. , r., _ _ -r",_ k *Gather Site Information _ -,,. •Perform Site Visit(if possible) 1...........11. """ • .17.7:::-:'""-: - - -......1'.'.7-'1_, _...._i.' y -- . •Perform Zoning Analysis . =17..._... -777 _ i z-- - *Co mmunicate with Municipality _— _ v • -Establish Financial Criteria - I.. 11.... � , - 6 4 •Generate Financial Proforma w= I .< ""'~u- + • 7-774 I,. •Test Site - • """ _ •Single Line diagrams — • " Adjust Financial Proforma , w " Y Y ` •`� Generate Conceptual Design Package n 4, ,1 -r�` Lc_` 1,1 •Site Plan • , ,II • I. ,t - ' •`t` •Floor Plans '' i •Elevations . ..r__. --- .. .,_.__ I ,P I ... ... ....w..�. .. ._...._......... -%,• '.1414 .....,e, ••Sections f kr...4C,— - :•» t •Renderings 1._1 •,,_ . ___.-. ti •Generate Investment Package -1 " 1 I tt _ witP,l .21 .1-1, 11-117- 1.:41 1 :14-_ 1,17 71 ! — .' i a $ytr 1I 3,1,1 -_- , - t...-.41 f f ] in ky �. 'I _li'� FT I SOL .i.ARCH Typical Project Scope _ ,..... __� I -�rcir4.rt�iffr---- -__ •xs gmaMt _ 1s .NIBS , �,� a,. , . .A WAS ad.,*:meet r!:11.1.....3C:euro IIIIISISRAI 3. 19/...4/ 121,514 •...Lcrmrl.uc'cw .ae, 1,6 1 45,41;,ea*r • 9M,..k34.r16UCt,.Y.14'•.1.11, Lia* 9a. I '3631* 1))54.1 „`. .'4 1C: ,7°8. . llr. sl r- t.M1PaaCWP,:t..iSIS w a..•ertI*S, 1 )n1•x.water*... O%Ct;:fa-tM,0,4f X e".e1 Civ • 151.:?' i •P-1. it`f !Y4rR"ee s iC,..1NCCl C:A*3 , rF\,ri a '4orm ,.-.r4.t.. 1 < eb T. lRSICLUIN i i®!R Laid Ci Yt"+: 111. ..N.0....,*. 1219 3'5 Y_1 l ..Cel Is. aw•w*.ly{ 461.2 MY,:, .4,.4054081•...t$ )it •,,.,a, 101n 429 14, 411 ala Os lit ...sew:, 1291`• _ r__.- ___-_ZS.RFa-Falk -_.- _ _= 9M f19 Vis ••••••••• rat v,.s Os 15 exw.O U., .W.L W:ai 5l\ 1 Wile .... .rM ............, nc.c 4. 1,...+.p t.•2,• *A.P., uu M M 6r• ntof r •Pa 1/111?: See Ni.) �_._.._. .4504 ..- • •W 3e 4 Y. . I uw....r.w r...rwxY.b.•,.. ,I .L Wt4:Y SO. 0,3M1:+14'ry 11 l-1fA�a. E Ot .Id..:�.aYY i.orQj a I 1f.1MM s Zr PROPERTY ZONING ANALYSIS: 157.6 co. 4u�....--e •�'• • w••a 5oL NE 17th Street P51C111 AN.,CO. ...I.. .... ' 1 1134 �42 W wipwwee 11 Pa*11i 11.f*e 1Iv •«..., .., cera .0134 44•I s Q orr � _ 'fans .9 WO iYa116,00011s Mt •01...t Or1Ym 1/10maQ1eY aaa t1-G.aite,.s, 1541)41 1 E .oven Wm.. 1'Y*. rr .3,,,„ `1 111,._1.5' 1 I.® Se,v,IM. M .1 t • 1 , .... 1 1.801.1141 2. MM fl ...-c 144 Cp.. I e_t...e. I "C.!•, .a ld*S1111 LIM Mill .....Pada..P Pei[ ,R"i sxa'1...- 1 •i 1 , w 1 u•L.L 24% Mw.trt V.. Y. •.. 5:1 161. ..1..0<...M. i 111:994 N\ ._ fe, a a `*3,125 3ti ,.•r•. 3 Y.1 Y1, I 5_15 I . $ taYl 41 02 8..*4Qa•s1.++;-5 1 Mn•7 1 .. 1 �• tr.i.,..t '0.•a ♦,..431 4s'..t 11a.N. .1. 1 .a Cml$. 545 4,5 55 .....,... .+,mooI e..1 • . <.w.. r''''." ween alpir 7wQe91 ( Lot 1 3i. )u- 1.3 Y r ,. a.y..Id Ida-N.!. �!• ,..i .., 9....Ye let N. M...P e...w e.xr !a,•I,C 4Misw Hra 53511 e1F r F.P 1 !..Y ,,,.M..... 1 + ../ , I 416 450.B.n 3.*5 "3 113 P+•1" rue el.e•r a.`.. 'ft t . _nt .. " . 525 latC0C 1N,1451 1p..,, .,:. I ..e 1 . , 1" t, '11.,,. �t .•I'i-el-e..n1,11r' •5 W' ..', MS......... so.... HM•e, . S. .... ... •n• r.1 .�. SYayeX •315 1136 _ )...1.inie� G%Pa 11*• 0)131,51 , 9A:1 ... 4' Me 1 . . • . 1t, i t M T1� &mop%INKa:non?1 < urgr ef<ar,t.51 c•Arg•4•_ ,rt././1.5. •441 a.0,. .4.,.11 w�• Sluff•eo742 FL C:1U Q•;R 13*42 h .�r: »n i Os(...At>`� 1 es.v.,i.., is at �1-a 1 .......".....r. .• Nm e.)FL n.p O'1e. on7II''A_ I. •kV<maw•.. _l rem 5{F.T5 MF.ai P.w.4/*1.�.....•..+ ... •^It .� ...En r et PAU lad, a/.55* (044,11 18144* ...........•rd. N•* I.la. .*•.w PNlM9 NV Je.<501 me 3 .. ., reya.n•• P.,1.0 A 1511., .44i 146 M ''''T-1't " ,il)Sa 5.1)1a 9153:4 .•-I..x.'-ti ••• 1.3.4. 414rr4.2 1.11XM r9.CCJ :vv.=II i"•". .. aa •5Melt '.4 a.-• .•N al is •i . War vi'1.A: , x. !1.9 :19 s**.•••MOM 143 .......••.......•x.r..* ,41f. SOLARCH Typical Project Scope .1 4 1 u.lf r—-LI--; ti /. ` 1 r i �7% k`' N, c ,�, ! y\ S . ,. ,,...... .. . . I' ...._,..— _.- I 1* .. q ,„ , , . 11 1( . , , 1� ..• • 1:7,. -.' � ` — b t d ,—d -- - I� I nY • • 1106 a* ir�Aa • ,te"4LI •&' `� K G _ •... 1 •4114.•4i.:477-111- t . , t; 1 1.:47 �. a..1'..- • Crl ( .,. 11 . . YO•••••IPwRM1M r �.SO(�_ __ �r�10F—_ 17 EDGEWATER r aar rs= - �,�, - d��_ 17 EDGEWATER ' �TMA� •"6—.74.-11�..... --.1: 4.44444.24. ..r...�t...7P s'ssr rl r.an .iitn SOLARCH Typical Project Scope J L J L "7..., P", 7 •0 4.74-• •D ..) t t t tt t ' • I •it! I 11 ','....,,,,,.. i 11. ,..." i I P la I P S I'_, . Li - ___-.• ! I I 1 i ; I aieill -, , , , , ,. , 1 ; _, -....... • L__,_- i___-_, . I , . i i •i ,,moi wi/1_111 — P P• •".7-4"V _ I, ' • •••••• I ini I a "dr:Vrtr' - =--••• 1.-=-1-1••• ; 1 W. ft- 1---T, r I.. -IP ' I , ., , I • , I ' 1 ' , -.11 i 11 ., ..--•r!or..."':. ' ^- ' r , ,...^-'...r..—,..114—.7.- ..-. ..---. , ( • WI, ...,1111044...omp Imam • T . •i 44471$10r."7,#.114?. Arj4don i I 0 i a •"7.or.,'''_",,,1•••••3 ' - I , .., '_ r i 1 -, •—.a Oli4.".,61111i447;OW I t• ,1 I IN&411'.....0•V....,IP" - VeL4W 0 .- 44..' .0...''''' — -- -,-- ... It ....,,, - - . r_j_ 0";' .'1- =.-r ! --,i ' •••-+--i — • - 1 1 1! i I I ? , • • I I 1 I. • i , P I p•JJ-,-- / .._.... i .... '.--- paw.. l', 1 1 I+ 1 i 7 :, .,,.,_. i •, , . 1 ' I 1 I • a; 1 ': , " 4 ' '- , , .._,. r . 1 . , , -- 1 141.••••••••••1.MOO 4 4 4 ............. - ••••-• - --saimommo -• --•• - —SOIAMIIMMINNIUM ....... .„,....,=._....-_,.. ..,., 11 EDGEWATER ..s----------- =7.. 7= 17 EDGEWATER ENNE-=IWSIF 77:"' 7= =7. 7.. . 1= la....r• Oa!:Mi.47.,AT- 1 ■ 6780 SW 80 Street Miami, FL 33143 305.740.0723