Loading...
Agreement with TSAO Design Group, Inc. 9_0 30c3 AGREEMENT BETWEEN CITY OF MIAMI BEACH AND TSAO DESIGN GROUP, INCORPORATED. FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS PURSUANT TO REQUEST FOR QUALIFICATIONS NO. 2018-141-ND DISCIPLINE: ARCHITECTURE -GENERAL INTERIOR DESIGN SPACE PLANNING RESOLUTION NO. 2018-30534 1 TABLE OF CONTENTS DESCRIPTION PAGE ARTICLE 1. DEFINITIONS 4 ARTICLE 2. BASIC SERVICES 9 ARTICLE 3. THE CITY'S RESPONSIBILITIES 14 ARTICLE 4. RESPONSIBILITY FOR CONSTRUCTION COST 16 ARTICLE 5. ADDITIONAL SERVICES 18 ARTICLE 6. REIMBURSABLE EXPENSES 19 ARTICLE'7. COMPENSATION FOR SERVICES 20 ARTICLE 8. CONSULTANT'S ACCOUNTING AND OTHER RECORDS 21 ARTICLE 9. OWNERSHIP OF PROJECT DOCUMENTS 21 ARTICLE 10. TERMINATION OF AGREEMENT 22 ARTICLE 11. INSURANCE 23 ARTICLE 12. INDEMNIFICATION AND HOLD HARMLESS 24 ARTICLE 13. ERRORS AND OMISSIONS 24 ARTICLE 14. LIMITATION OF LIABILITY 25 ARTICLE 15. NOTICE 25 ARTICLE 16. MISCELLANEOUS PROVISIONS 26 2 SCHEDULES: SCHEDULE A Consultant Service Order 30 SCHEDULE B Consultant Compensation 31 SCHEDULE C Hourly Billing Rate Schedule 32 SCHEDULE D Approved Subconsultants 33 ATTACHMENTS: ATTACHMENT A Resolution & Commission Memorandum 34 ATTACHMENT B Request for Quailifications &Addendums 35 - ATTACHMENT C Consultant's Response to the RFQ 36 3 AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND TSAO DESIGN GROUP, INCORPORATED. FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SPECIALIZED CATEGORIES ON AN "AS-NEEDED-BASIS" This Agreement made and entered into this /a day of 1---74- la r , 20 1. 1 , (Effective Date), by and between the CITY OF MIAMI BEACH, a municipal cor oration existing under the laws of the State of Florida, having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139, (hereinafter referred to as City), and TSAO Design Group, Incorporated., a California corporation registered to do business in Florida, and having its local office at 7610 NE 4 Court # 5 Suite 101, Miami, FL. 33138 (hereinafter referred to as Consultant). WITNESSETH: WHEREAS, on September 17, 2014, the Mayor and City Commission approved the issuance of Request for Qualifications No. 2018-141-ND for Professional Architectural and Engineering Services in Specialized Categories On An "As-Needed-Basis" (the RFQ); and WHEREAS, the RFQ was intended to provide access to architectural and engineering firms in accordance with the Florida Consultant's Competitive Negotiation Act; and WHEREAS, on October 17, 2018, the City Commission approved Resolution No. 2018- 30534, respectively, authorizing the City to enter into negotiations with TSAO Design Group, Incorporated., and, if successful, execute an agreement with the Consultant pursuant to the RFQ; and WHEREAS, City and the Consultant have negotiated the following agreement pursuant to the RFQ; and NOW THEREFORE, City and Consultant, in consideration of the mutual covenants and agreement herein contained, agree as follows: ARTICLE 1. DEFINITIONS 1.1 Definitions. The definitions included in this Section are not exhaustive of all definitions used in this Agreement. Additional terms may be defined in other Contract Documents. The following terms shall have the meanings specified herein unless otherwise stated herein: ADDITIONAL SERVICES: "Additional Services" shall mean those services, in addition to the 4 Basic Services in this Agreement, as described in Article 5 and the Consultant Service Order, which the Consultant shall perform, at the City's option, and which must be duly authorized, in writing, by the Department Head, prior to commencement of same. APPLICABLE LAWS: "Applicable Laws" means all laws, statutes, codes (including, but not limited to, building codes), ordinances, rules, regulations, lawful orders and decrees of governmental authorities having jurisdiction over the Project, the Project Site or the Parties. BASE BID: "Base Bid" shall mean the elements contained in the Construction Documents recommended by the Consultant (and approved by the City) as being within the Construction Cost Budget. "Base Bid" shall not include additive alternates or deductive alternates. BASIC SERVICES: "Basic Services" shall include those services which Consultant shall perform in accordance with the terms of the Agreement, as described in Article 2 and the Consultant Service Order. Any Services not specifically enumerated as Additional Services (as defined herein) shall also be considered Basic Services. CITY(OR OWNER): The "City" shall mean the City of Miami Beach, a Florida municipal corporation having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139. In all respects hereunder, City's obligations and performance is pursuant to City's position as the owner of the Project acting in its proprietary capacity. In the event City exercises its regulatory authority as a governmental body including, but not limited to, its regulatory authority for code inspections and issuance of Building Department permits, Public Works Department permits, or other applicable permits within its jurisdiction, the exercise of such regulatory authority and the enforcement of any Applicable Laws shall be deemed to have occurred pursuant to City's regulatory authority as a governmental body and shall not be attributable in any manner to City as a Party to this Agreement. CITY COMMISSION: "City Commission" shall mean the governing and legislative body of the City. CITY MANAGER: The "City Manager" shall mean the chief administrative officer of the City. The City Manager shall also be construed to include any duly authorized representatives designated by the City Manager in writing, including the Project Administrator, with respect to any specific matter(s) concerning the Services and/or this Agreement (exclusive of those authorizations reserved to the City Commission under this Agreement, or to regulatory or administrative bodies having jurisdiction over the Project). CONSTRUCTION COST BUDGET: The "Construction Cost Budget" shall mean the amount budgeted and established by the City to provide for the cost of construction of the Work for the Project ("Construction Cost"), as set forth in the Consultant Service Order. CONSTRUCTION DOCUMENTS: "Construction Documents" shall mean the final (100%'- completed) plans, technical specifications, drawings, schematics, documents, and diagrams prepared by the Consultant pursuant to this Agreement, setting forth in detail the requirements for the construction of the Project. The Construction Documents shall set forth in full all details necessary to complete the construction of the Project in accordance with the Contract Documents. Construction Documents shall not be part of the Contract Documents, until (a) the Consultant has submitted completed Construction Documents to the City and (b) they have been reviewed and approved by the City and any agencies having jurisdiction in accordance with the procedures as otherwise provided by the Contract Documents. However, approval by 5 the City shall not in any way be construed, interpreted and/or deemed to constitute a waiver or excuse Consultant's obligations to ensure the Construction Documents are constructible, in compliance with all Applicable Laws and in accordance with the Contract Documents. CONSULTANT: The named entity on page 1 of this Agreement, the "Consultant" shall mean the qualified and properly professionally licensed design professional in the State of Florida and as otherwise required by any entities, agencies, boards, governmental authorities and/or any other professional organizations with jurisdiction governing the professional practice area for which the design professional has been engaged by City and who will perform (or cause to be performed through Subconsultants acceptable to the City) all architectural, design and engineering services required under this Agreement_and/or Consultant Service Order and will serve as the "architect of record" and/or "engineer of record" for the Project. When the term "Consultant" is used in this Agreement it shall also be deemed to include any officers, employees, or agents of Consultants, and any other person or entity acting under the supervision, direction, or control of Consultant to provide any architectural, design, engineering or similar professional services with respect to a Project ("Subconsultants"). The Consultant shall not be replaced by any other entity, except as otherwise permitted in this Agreement. Further, any Subconsultant that may perform services on behalf of the Consultant shall be a qualified and properly professionally licensed design professional in the State of Florida and as otherwise required by any entities, agencies, boards, governmental authorities and/or any other professional organizations with jurisdiction governing the professional practice area for which the Subconsultant has been engaged by Consultant to perform professional design services in connection with the Project. The Subconsultants in Schedule "D", attached hereto, are hereby approved by the City Manager for the Project. CONSULTANT SERVICE ORDER: Consultant Service Order shall mean the work order issued by the City to Consultant (in substantial form as in Schedule A attached hereto), that specifically describes and delineates the particular Services (Basic Services and/or Additional Services) which will be required of Consultant for the Project. CONTRACT AMENDMENT: "Contract Amendment" shall mean a written modification to the Agreement approved by the City (as specified below) and executed between City and Consultant, covering changes, additions, or reductions in the terms of this Agreement including, without limitation, authorizing a change in the Project, or the method and manner of performance thereof, or an adjustment in the fee and/or completion dates. Contract Amendments shall be approved by the City Commission if they exceed fifty thousand dollars ($50,000.00). Even for Contract Amendments of fifty thousand dollars ($50,000.00) or less (or other such threshold contract amount as may be specified by the City of Miami Beach Procurement Ordinance), the City Manager reserves the right to seek and obtain concurrence of the City Commission for approval of any such Contract Amendment. CONTRACT DOCUMENTS: "Contract Documents" shall mean this Agreement (together with all exhibits, addenda, Consultant Service Orders and written amendments issued thereto), and all Design Documents and Construction Documents. The Contract Documents shall also include, without limitation (together with all exhibits, addenda, and written amendments issued thereto), the Invitation to Bid (ITB), instructions to bidders, bid form, bid bond, Design Criteria Package (if any), the Contract for Construction, surety payment and performance bonds, Conditions of the Contract for Construction (General, Supplementary, and other Conditions), Divisions 0-17 specifications, an approved Change Order(s), approved Construction Change Directive(s), and/or approved written order(s)for a minor change in the Work. 6 CONTRACT FOR CONSTRUCTION: "Contract for Construction" shall mean the legally binding agreement between City and Contractor for performance of the Work covered in the Contract Documents, including, without limitation, a general contractor, construction manager, design- builder or any other duly licensed construction contractor selected pursuant to any other procurement methodology available underFlorida law. CONTRACTOR: "Contractor" shall mean the individual or individuals, firm, company, corporation, joint venture, or other entity contracting with City for performance of the Work covered in the Contract Documents. DESIGN 'CRITERIA PACKAGE or DCP: "Design Criteria Package" means concise, performance-oriented drawings or specifications of a design-build Project, prepared for the purpose of furnishing sufficient information to permit design-build firms to prepare a bid or a response to a City request for proposal, or to permit the City to enter into a negotiated design- build contract. The Design Criteria Package must specify performance-based criteria for the design-build Project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. DESIGN DOCUMENTS: "Design Documents" means all plans, drawings specifications, schematics and all other documents which set forth in full the design of the Project and fix and describe in detail the size, configuration and character of the Project concerning all items of the Project necessary for the final preparation of the 100% completed, permitted Construction Documents in accordance with the requirements of the Contract Documents including, without limitation, all architectural and engineering elements as may be appropriate. Design Documents shall not be part of the Contract Documents, until (a) the Consultant has submitted completed Design Documents to the City and (b) they have been reviewed and approved by the City and agencies having jurisdiction in accordance with the procedures as provided by the Contract Documents. However, approval by the City shall not in any way be construed, interpreted and/or deemed to constitute a waiver or excuse Consultant's obligationsto ensure the Design Documents are constructible, in compliance with all Applicable Laws and in accordance with the Contract Documents. FORCE MAJEURE: "Force Majeure" shall mean any delay occasioned by superior or irresistible force occasioned by violence in nature without the interference of human agency such as a hurricane, tornado, flood, loss caused by fire and other similar unavoidable casualties; or other causes beyond the City's or Consultant's control that are not due to any act, omission or negligence of either City or Consultant and, which have, or may be reasonably expected to have, a material adverse effect on the Project, or on the rights and obligations of City or Consultant under this Agreement and which, by the exercise of due diligence, such parties shall not have been able to avoid; provided, however, that inclement weather (except as noted above), the acts or omissions of Subconsultants, the Contractor and its sub-contractors, market conditions, labor conditions, construction industry price trends, and similar matters which normally impact on the construction process shall not be considered a Force Majeure. If the Consultant is delayed in performing any obligation under this Agreement due to a Force Majeure, the Consultant shall request a time extension from the Project Administrator within five (5) business days of said Force Majeure.. Any time extension shall be subject to mutual 7 agreement and shall not be cause for any claim by the Consultant for extra compensation, unless Additional Services are required and approved pursuant to Article 5 hereof. PROJECT: The "Project" shall mean that certain City capital project described in the Consultant Service Order. Project Cost: The "Project Cost", shall mean the estimated total cost of the Project, as prepared and established by the City, including the estimated Construction Cost and Soft Costs. The Project Cost may, from time to time, be revised or adjusted by the City, in its sole discretion, to accommodate approved modifications or changes to the Project or scope of work. The estimated construction value shall be less than the amount established in Category 5, Section 287.017, Florida Statutes (currently $325,000 or as amended by law) or for a planning or study activity shall not exceed the amount established in Category 2, Section 287.017, Florida Statutes (currently $35,000 or as amended by law). Project Scope: The "Project Scope" shall mean the description of the Project, as described in the Consultant Service Order. PROJECT ADMINISTRATOR: The "Project Administrator" shall mean the individual designated by the City Manager who shall be the City's authorized representative'to issue directives and notices on behalf of the City with respect to all matters_concerning the Services of this Agreement (exclusive of those authorizations reserved to the City Manager or City Commission under this Agreement, or to regulatory or administrative bodies having jurisdiction over the Project). PROPOSAL DOCUMENTS: "Proposal Documents" shall mean the RFQ, together with all amendments or addenda thereto (if any), which is incorporated by reference to this Agreement and made a part hereof; provided, however, that in the event of an express conflict between the Proposal Documents and this Agreement, the Agreement shall prevail. Consultant's proposal in response to the RFQ is included for reference purposes only and shall not be incorporated as part of this Agreement, except with respect to Consultant's representations regarding the qualifications and experience of Consultant and its key personnel, its commitment to provide the key personnel listed therein, and its capability to perform and deliver the Services in accordance with this Agreement and consistent with the all representations made therein. SCHEDULES: "Schedules" shall mean the various schedules attached to this Agreement and referred to as follows: Schedule A— Consultant Service Order. Schedule B— Consultant Compensation. Schedule C— Hourly Billing Rate Schedule. Schedule D --Approved Subconsultants. SCOPE OF SERVICES: "Scope of Services" shall include the Project Scope, Basic Services, and any Additional Services (as approved by the City), all as described in Schedule "A" hereto. SERVICES: "Services" shall mean all services, work, and actions by the Consultant performed pursuant to or undertaken under this Agreement. 8 SOFT COSTS: "Soft Costs" shall mean costs related to the Project other than Construction Cost including, without limitation, Consultant's Basic Services, Additional Services, surveys, testing, general consultant, financing, permitting fees and other similar costs, as determined by the City, that are not considered as direct costs for the construction of the Project. STATEMENT OF PROBABLE CONSTRUCTION COST: The "Statement of Probable Construction Cost" shall mean the detailed estimate prepared by Consultant in Construction Standard Index (CSI) format or other format approved by the Project Administrator, which includes the Consultant's estimated total construction cost to the City of the Work for the Project (as established in the Contract Documents, as they may be amended from time to time). The Statement of Probable Construction Cost shall be in sufficient detail to identify the costs of each element of the Project and include a breakdown of the fes, general conditions and construction contingency, for the Project. Costs shall be adjusted to the projected bid date to take into account anticipated price escalation. WORK: "Work" shall mean all labor, materials, equipment, supplies, tools, machinery, utilities, fabrication, transportation, insurance, bonds, permits and conditions thereof, building code changes and government approvals, licenses, tests, quality assurance and/or quality control inspections and related certifications, surveys, studies, and other items, work and services that are necessary or appropriate for the total construction, installation, and functioning of the Project, together with all additional, collateral and incidental items, and work and services required for delivery of a completed, fully functional and functioning Project as set forth in the Contract Documents. ARTICLE 2. BASIC SERVICES 2.1 The Consultant shall provide Basic Services for the Project, specifically described in the Consultant Service Order. Consultant acknowledges and agrees that this Agreement and the award of any work hereunder, is non-exclusive, and the City may, at its sole and absolute discretion, award similar services or work to other firms under contract with the City. No Consultant Service Order shall be issued to Consultant, and no work or Services shall be authorized under this Agreement, except at City's sole discretion. Consultant shall have no entitlement to perform any services hereunder, or to be compensated for any Services, unless set forth in a written Consultant Service Order. 2.2 The Services will be commenced by the Consultant upon receipt of a written Consultant Service Order signed by the Department Head. Consultant shall countersign the Consultant Service Order upon receipt and return the signed copy to the City. 2.3 As it relates to the Services and the Project, Consultant warrants and represents to the City that it is knowledgeable of and shall comply with all Applicable Laws. The Consultant agrees to comply with all Applicable Laws, whether now in effect or as may be amended or adopted from time to time, and shall further take into account all known pending changes to the foregoing of which it should reasonably be aware. 2.4 The Consultant warrants and represents to the City that all of the Services required under this Agreement shall be performed in accordance with the standard of care normally exercised in the design of comparable projects in South Florida. Consultant warrants and represents to the City that it is experienced, fully qualified, and properly licensed (pursuant to 9 Applicable Laws) to perform the Services. Consultant warrants and represents to the City that it is responsible for the technical accuracy of the Services (including, without limitation, the Design Documents contemplated in Schedule "A" hereto). Consultant further warrants and represents that the approved and permitted Construction Documents shall constitute a representation by Consultant to City that the Project, if constructed as required by the Contract Documents, will be fully functional, suitable and sufficient for its intended purposes. 2.5 The Consultant's Basic Services may consist of various tasks, including planning, design, bidding/award, preparation of a DCP, studies, construction administration, and Additional Services (as may be approved), all as further described in the Consultant Service Order; and shall also include any and all of Consultant's responsibilities and obligations with respect to the Project, as set forth in the General Conditions of the Contract for Construction. 2.6 RESPONSIBILITY FOR CLAIMS AND LIABILITIES: No action or omission by City , shall waive or excuse Consultant's obligations under the Agreement and/or other Contract ' Documents and that Consultant shall remain fully liable for all work performed by Consultant including, without limitation, any design errors or omissions. Written decisions and/or approvals issued by the City shall not constitute nor be deemed a release of the responsibility and liability of the Consultant (or any Subconsultants), for the accuracy and competency of the Design Documents and Construction Documents, nor shall any City approval and/or decisions be deemed to be an assumption of such responsibility by the City for a defect, error or omission in the Design Documents and the Construction Documents. Moreover, neither the City's inspection, review, approval or acceptance of, nor payment for, any Services required under the Agreement shall be construed to relieve the Consultant (or any Subconsultant) of its obligations and responsibilities under the Agreement, nor constitute a waiver of any of the City's rights under the Agreement, or of any cause of action arising out of the performance of the Agreement. The Consultant shall be and remain liable to the City in accordance with Applicable Laws for all damages to City caused by any failure of the Consultant or to comply with the terms and conditions of the Agreement or by the Consultant's misconduct, unlawful acts, negligent acts, errors or omissions in the performance of the Agreement. 2.7 TIME: It is understood that time is of the essence in the completion.of the Project and, in this respect, the parties agree as follows: 2.7.1 Term: The term of this Agreement shall commence upon execution by the City and Consultant, which shall be the Effective Date referred to on page 1 hereof,and shall be in effect for three (3) years ("Initial Term"), plus two (2), one (1) year renewal options, to be exercised at the sole discretion of the City Manager (Initial Term and any renewals shall be collectively referred to as the "Term"). Notwithstanding the preceding Term, Consultant shall adhere to any and all timelines and/or deadlines, as set forth in the Consultant Service Order, including the time for completion of the work and/or services for such Project(as set forth in the particular Consultant Service Order). 2.7.2 The Consultant shall perform the Services as expeditiously as is consistent with the standard of professional skill and care required by this Agreement, and the orderly progress of the Work. 2.7.3 Recognizing that the construction of other projects within the City may affect scheduling of the construction for the Project, the Consultant shall diligently coordinate performance of the Services with the City (through the Project Administrator) in order to provide for the safe, expeditious, economical and efficient completion of the Project, 10 without negatively impacting concurrent work by others. The Consultant shall coordinate the Services with all of its Subconsultants, as well as other consultants, including, without limitation, City provided consultants (if any). 2.7.4 The Services shall be performed in a manner that shall conform to the Consultant Service Order. The Consultant may submit requests for an adjustment to the Consultant Service Order completion time, if made necessary because of undue delays resulting from untimely review taken by the City(or authorities having jurisdictionover the Project) to approve the Consultant's submissions, or any other portion of the Services requiring approval by the City (or other governmental authorities having jurisdiction over the Project). Consultant shall immediately provide the Project Administrator with written notice stating the reason for the particular delay; the requested adjustment (i.e. extension) to the Project Schedule; and a revised anticipated schedule of completion. Upon receipt and review of Consultant's request (and such other documentation as the Project Administrator may require), the Project Administrator may grant a reasonable extension of time for completion of the particular work involved, and authorize that the appropriate adjustment be made to the Project Schedule. The Project Administrator's approval (if granted) shall be in writing. 2.8 Consultant shall use its best efforts to maintain a constructive, professional, cooperative working relationship with the Project Administrator, Contractor, and any and all other individuals and/or firms that have been contracted, or otherwise retained, to perform work on the Project. 2.9 The Consultant\shall perform its duties under this Agreement, and under a Consultant Service Order, in a competent, timely and professional manner, and shall be responsible to the City for any failure in its performance, except to the extent that acts or omissions by the City make such performance impossible. 2.10 The Consultant is responsible for the professional quality, technical accuracy, completeness, performance and coordination of all Services required under the Agreement and under the Consultant Service Order (including the services performed by Subconsultants), within the specified time period and specified cost. The Consultant shall perform the Services utilizing the skill, .knowledge, and judgment ordinarily possessed and used by a proficient consulting with respect to the disciplines required for the performance of such Services in the State of Florida. The Consultant is responsible for, and shall represent to City that the Services conform to the City's requirements, the Contract Documents and all Applicable Laws. The Consultant shall be and remain liable to the City for all damages to the City caused by the Consultant's negligent acts or errors or omissions in the performance of the Services. In addition to all other rights and remedies which the City may have, the Consultant shall, at its expense, re-perform all or any portion of the Services to correct any deficiencies which result from the Consultant's failure to perform in accordance with the above standards. The Consultant shall also be liable for the replacement or repair of any defective materials and equipment and re-performance of any non-conforming construction work resulting from such deficient Services (i) for a period from the Effective Date of this Agreement, until twelve (12) months following final acceptance of the Work, (ii) or for the period of design liability required by applicable law, whichever is later. The Project Administrator shall notify the Consultant, in writing, of any deficiencies and shall approve the method and timing of the corrections. 2.10.1 The Consultant shall be responsible for deficient, defective Services and any resulting deficient, defective construction work re-performed within twelve (12) months following final acceptance and shall be subject to further re-performance, repair and 11 replacement for twelve (12) months from the date of initial re-performance, not to exceed twenty-four months (24)from final acceptance. 2.11 The City shall have the right, at any time, in its sole and absolute discretion, to submit for review to other consultants (engaged by the City at its expense) any or all parts of the Services and the Consultant shall fully cooperate' in such review(s). Whenever others are required to verify, review, or consider any Services performed by Consultant (including, without limitation, contractors, other design professionals, and/or other consultants retained by the City), the intent of such requirement is to enable the Consultant to receive input from others' professional expertise to identify any discrepancies, errors or omissions that are inconsistent with industry standards for design or construction of comparable projects; or which are inconsistent with Applicable Laws; or which are inconsistent with standards, decisions or approvals provided by the City under this Agreement. Consultant will use reasonable care and skill, in accordance and consistent with customary professional standards, in responding to items identified by other reviewers in accordance with this subsection. Consultant shall receive comments from reviewers, in writing, including, without limitation (and where applicable), via a set of marked-up drawings and specifications. Consultant shall address comments forwarded to it in a timely manner. The term "timely" shall be defined to mean as soon as possible under the circumstances, taking into account the timelines of the Project schedule. 2.11.1 The Consultant is advised that a performance evaluation of the Services rendered throughout this Agreement will be completed by the City and kept in the City's files for evaluation of future solicitations. 2.12 Consultant agrees that when any portion of the Services relates to a professional service which, under Florida Statutes, requires a license, certificate of authorization, or other form of legal entitlement to practice and/or perform such Service(s), it shall employ and/or retain only qualified duly licensed certified personnel to provide same. 2.13 Consultant agrees to designate, in writing, within five (5) calendar days after receiving a fully executed Consultant Service Order, a qualified licensed professional to serve as its project manager (hereinafter referred to as the "Project Manager"). The Project Manager shall be authorized and responsible to act on behalf of Consultant with respect to directing, coordinating and administrating all aspects of the Services. Consultant's Project Manager (as well as any replacement) shall be subject to the prior written approval of the City Manager or the Project Administrator. Replacement (including reassignment) of an approved Project Manager shall not be made without the prior written approval of the City Manager or his designee (i.e. the Project Administrator). 2.13.1 Consultant agrees, within fourteen (14) calendar days of receipt of written notice from the City Manager or the Project Administrator (which notice shall state the cause therefore), to promptly remove and replace a Project Manager, or any other personnel employed or otherwise retained by Consultant for the Project ( including, without limitation, any Subconsultants). 2.14 Consultant agrees not to divulge, furnish or make available to any third party(ies), any non-public information concerning the Services or the Project, without the prior written consent of the City Manager or the Project Administrator, unless such disclosure is incident to the proper performance of the Services; or the disclosure is required pursuant to Florida Public Records laws; or, in the course of judicial proceedings, where such information has been properly subpoenaed. Consultant shall also require Subconsultants to comply with this subsection. 12 2.15 The City and Consultant acknowledge that the Services, as described in the Agreement and the Consultant Service Order, do not delineate every detail and minor work task required to be performed by Consultant to complete the work and/or services described and delineated under a Consultant Service Order issued to Consultant by the City for a particular Project. If, during the course of performing work, services and/or tasks on a particular Consultant Service Order, Consultant determines that work and/or services should be performed (to complete the Project delineated under such Order) which is, in the Consultant's reasonable opinion, outside the level of effort originally anticipated in the Consultant Service Order, then Consultant shall promptly notify the Project Administrator, in writing, and shall obtain the Project Administrator's written consent before proceeding with such work and/or services. If Consultant proceeds with any such additional work and/or services without obtaining the prior written consent of the Project Administrator, said work and/or services shall be deemed to be a Basic Service under this Agreement and shall also be deemed to be within the scope of services delineated in the Consultant Service Order(whether or not specifically addressed in the Scope of Services). Mere notice by Consultant to the Project Administrator shall not constitute authorization or approval by the City to perform such work. Performance of any such work and/or services by Consultant without the prior written consent of the Project Administrator shall be undertaken at Consultant's sole risk and liability. 2.16 Consultant shall establish, maintain, and categorize any and all Project documents and records pertinent to the Services and shall provide the City, upon request, with copies of any and all such documents and/or records. In addition, Consultant shall provide electronic document files to the City upon completion of the Project. 2.17 THE CITY HAS NO OBLIGATION TO ASSIST, FACILITATE AND/OR PERFORM IN ANY WAY THE CONSULTANT'S OBLIGATIONS UNDER THE AGREEMENT OR OTHER CONTRACT DOCUMENTS. THE CITY'S PARTICIPATION, FACILITATION AND/OR ASSISTANCE TO THE CONSULTANT SHALL BE AT ITS SOLE DISCRETION AND SHALL NOT, IN ANY WAY, BE CONSTRUED, INTERPRETED AND/OR CONSTITUTE AN ASSUMPTION BY THE CITY OF CONSULTANT'S OBLIGATIONS, A WAIVER OF CONSULTANT'S OBLIGATIONS AND/OR EXCUSE ANY BREACH BY CONSULTANT OF ITS OBLIGATIONS UNDER THE CONTRACT DOCUMENTS. THE PARTICIPATION IN THE PERFORMANCE OF ANY OF CONSULTANT'S OBLIGATIONS SHALL NOT PRECLUDE THE CITY FROM DECLARING CONSULTANT IN DEFAULT FOR CONSULTANT'S FAILURE TO PERFORM SUCH OBLIGATION, NOR SHALL IT LIMIT, IN ANY WAY, THE CITY'S RIGHTS AND REMEDIES IN CONNECTION THEREWITH. THE CONSULTANT EXPRESSLY ACKNOWLEDGES AND AGREES NOT TO RAISE OR ASSERT AS DEFENSE TO ANY CLAIM, ACTION, SUIT AND/OR OTHER PROCEEDING OF A SIMILAR NATURE, THE CITY'S PARTICIPATION, ASSISTANCE AND/OR FACILITATION IN THE PERFORMANCE OF CONSULTANT'S OBLIGATIONS. INCLUDING, WITHOUT LIMITATION, ASSISTING WITH OBTAINING PERMITS OR WITH COORDINATION WITH UTILITIES, OR OTHER MATTERS RELATED TO THE PROJECT. IN THE EVENT OF ANY CONFLICT BETWEEN THIS SECTION AND/OR ANY OTHER PROVISION OF THIS AGREEMENT OR OTHER CONTRACT DOCUMENTS, THIS SECTION SHALL GOVERN. 2.18 GREEN BUILDING STANDARDS: The Consultant shall comply with the requirements of Section 255.2575, Florida Statutes, and Chapter 100 of the City Code, as both may be amended from time to time, addressing applicable Leadership in Energy and Environmental Design (LEED) compliance requirements. 13 2.19 SUBCONSULTANTS: All services provided by Subconsultants shall be consistent with those commitments made by the Consultant in its Proposal and during the competitive solicitation selection process and interview. Such services shall be undertaken and performed pursuant to appropriate written agreements between the Consultant and the Subconsultants, which shall contain provisions that preserve and protect the rights of the City under this Agreement. Nothing contained in this'Agreement shall create `any contractual relationship between the City and the Subconsultants. The Consultant shall not retain, add, or replace any Subconsultant without the prior written approval of the City Manager, in response to a written request from the Consultant stating the reasons for any proposed substitution. The Consultant shall cause the names of Subconsultants responsible for significant portions of the Services to be inserted on the plans and specifications. The Consultant shall be ultimately responsible for ensuring the Consultant's and all of its Subconsultants' compliance with the requirements of this Section and any other provision of the Agreement and/or Consultant Service Order. With respect to the performance of work by Subconsultants, the Consultant shall, in approving and accepting such work, ensure the professional quality, completeness, and coordination of the Subconsultant's work. The Consultant shall, upon the request of.the City, submit to the City such documentation and information as the City reasonably requests to evidence the creation, standing, ownership and professional licensure of the Consultant (and Subconsultants), including organizational documents, operating agreements and professional licensure documentation, and copies of the Consultant's contracts with the Subconsultant with respect to the Project. However, the City's failure to request such documentation or evidence and/or failure to enforce in any way the terms and provisions of this Section, the Agreement and/or any other Consultant Service Order during the Project does not excuse, waive and/or condone in any way any noncompliance of the' requirements set forth therein including, without limitation, the professional licensure requirements. Any approval of a Subconsultant by the City shall in no way shift from the Consultant to City the responsibility for the quality and acceptability of the services performed by the Subconsultant. Payment of Subconsultants shall be the sole responsibility of the Consultant, and shall not be cause for any increase in compensation to the Consultant for payment of the Services. ARTICLE 3. THE CITY'S RESPONSIBILITIES 3.1 The City Manager shall designate a Project Administrator, who shall be the City's authorized representative to act on City's behalf with respect to the City's responsibilities or matters requiring City's approval under the Contract Documents. The Project Administrator shall be authorized (without limitation) to transmit instructions, receive information, and interpret and define City policies and decisions with respect to the Services and the Project. The Project Administrator shall have full authority to require the Consultant to comply with the Contract Documents, provided, however, that any failure of tie Project Administrator to identify any noncompliance, or to specifically direct or require compliance, shall in no way constitute a waiver of, or excuse, the Consultant's obligation to comply with the requirements of the Contract Documents. 3.2 The City shall make available to Consultant, for the convenience of the Consultant only, information that the City has in its possession pertinent to the Project. Consultant hereby agrees and acknowledges that, in making any such information available to Consultant, the City 14 makes no express or implied certification, warranty, and/or representation as to the accuracy or completeness of such information and assumes no responsibility whatsoever with respect to, the sufficiency, completeness or accuracy of such information. The Consultant understands, and hereby agrees and acknowledges, that it is obligated to verify to the extent it deems necessary all information furnished by the City, and that it is solely responsible for the accuracy and applicability of all such information used by Consultant. Such verification shall include, without limitation, visual examination of existing conditions in all locations encompassed by the Project, where such examination can be made without using destructive measures (i.e. excavation or demolition). Survey information shall be spot checked to the extent that Consultant has satisfied itself as to the reliability of the information. 3.3 At any time, in his/her sole discretion, the City Manager may furnish accounting, and insurance counseling,services for the Project (including, without limitation, auditing services to verify the Consultant's applications for payment, or to ascertain that Consultant has properly remitted payment due to its Subconsultants or vendors). 3.4 If the City observes or otherwise becomes aware of any fault or defect in the Project, or non-conformance with the Contract Documents, the City, through the Project Administrator, shall give prompt written notice thereof to the Consultant. 3.5 The City, acting in its proprietary capacity as Owner and not in its regulatory capacity, shall render any administrative approvals and decisions required under this Agreement, in writing, as reasonably expeditious for the orderly progress of the Services and of the Work. 3.6 The City Commission shall be the final authority to do or to approve the following actions or conduct, by passage of an enabling resolution or amendment to this Agreement: 3.6.1 Except where otherwise expressly noted in the Agreement or the Contract Documents, the City Commission shall be the body to consider, comment upon, or approve any amendments or modifications to this Agreement. 3.6.2 The City Commission shall be the body to consider, comment upon, or approve any assignment, sale, transfer or subletting of this Agreement. Assignment and transfer shall be defined to also include sale of the majority of the stock of a corporate consultant. 3.6.3 The City Commission shall approve or consider all Contract Amendments that exceed the sum of fifty thousand dollars ($50,000.00) (or other such amount as may be specified by the City of Miami Beach Procurement Ordinance, as amended). 3.7 Except where otherwise expressly noted in this Agreement, the City Manager shall serve as the City's primary representative to whom administrative (proprietary) requests for decisions and approvals required hereunder by the City shall be made. Except where otherwise expressly noted in this Agreement or the Contract Documents, the City Manager shall issue decisions and authorizations which may include, without limitation, proprietary review, approval, or comment upon the schedules, plans, reports, estimates, contracts, and other documents submitted to the City by Consultant. 3.7.1 The City Manager shall have prior review and approval of the Project Manager (and any replacements) and of any Subconsultants (and any replacements). 15 3.7.2 The City Manager shall decide, and render administrative (proprietary) decisions on matters arising pursuant to this Agreement which are not otherwise expressly provided for in this Agreement. In his/her discretion, the City Manager may also consult with the City Commission on such matters. 3.7.3 At the request of Consultant, the City Manager shall be authorized, but not required, to reallocate monies already budgeted toward payment of the Consultant; provided, however, that the Consultant's compensation (or other budgets established by this Agreement) may not be increased without the prior approval of the City Commission, which approval (if granted at all) shall be in its sole and reasonable discretion. 3.7.4 The City Manager may approve Contract Amendments which do not exceed the sum of fifty thousand dollars ($50,000.00) (or other such amount as may be specified by the City of Miami Beach Purchasing Ordinance, as amended); provided that no such amendments increase any of the budgets established by this Agreement. 3.7.5 The City Manager may, in his/her sole discretion, form a committee or committees, or inquire of, or consult with, persons for the purpose of receiving advice and recommendations relating to the exercise of the City's powers, duties, and responsibilities under this Agreement or the Contract Documents. 3.7.6 The City Manager shall be the City Commission's authorized representative with regard to acting on behalf of the City in the event of issuing any default notice(s) under this Agreement, and, should such default remain uncured, in terminating the Agreement (pursuant to and in accordance with Article 10 hereof). 3.8 The City's review, evaluation, or comment as to any documents prepared by or on behalf of the Consultant shall be solely for the purpose of the City's determining for its own satisfaction the suitability of the Project, or portions thereof, detailed in such documents for the purposes intended therefor by the City, and may not be relied upon in any way by the Consultant or any other third party as a substantive review thereof. ARTICLE 4. RESPONSIBILITY FOR CONSTRUCTION COST 4.1 The City shall establish a Construction Cost Budget for the Project, as set forth in the Consultant Service Order. Consultant shall design the Project so that the Construction Cost Budget for the Project is not exceeded. As part of the Basic Services, Consultant shall design and/or re-design the Project to the Construction Cost Budget in accordance with this Article 4, making all revisions necessary to maintain the Construction Cost Budget. Consultant shall attend meetings with the City to review and discuss cost estimates, cost-saving alternatives, and implementation or revision of the Design Documents and Construction Documents to address such items, as necessary to meet the established budget parameters set forth in the City Construction Budget. 4.2. Consultant shall provide and/or update the Statement of Probable Construction Cost at each stage of completion of the Design Documents and at completion of the Construction Documents, unless otherwise specified in the Consultant Service Order or other written directive of the Project Administrator. 4.2.1. At completion of the conceptual design (at such stage of completion of the 16 Design Documents as may be specified by the Project Administrator), Consultant shall provide the City a Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus fifteen percent (+/-15%) of the Construction Cost Budget. If at the foregoing stage of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than fifteen percent (15%), then the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s) for the difference and recommend in writing for the City's ,approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within fifteen percent (15%) of the City's Construction Budget. Upon obtaining City's approval of any proposed modifications, Consultant shall incorporate such modifications within the Design Documents as part of the Basic Services and at no additional cost to the City. 4.2.2. At the 30% and 60% completion of the Design Documents, Consultant shall update its Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus ten percent (+1-10%) of the Construction Cost Budget. If at the foregoing stages of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than ten percent (10%), the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s)for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within ten percent (10%) of the City's Construction Budget. Upon obtaining City's approval of any proposed modifications, Consultant shall incorporate such modifications within the Design Documents as part of the Basic Services and at no additional cost to the City. 4.2.3. At the 90% stage completion of the Design Documents and at completion of the Construction Documents, Consultant shall update its Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus five percent (+/-5%) of the Construction Cost Budget. If at the foregoing stages of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than five percent (5%), the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s) for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within five percent (5%) of the City's Construction Budget. Upon obtaining the City's approval, Consultant shall promptly modify the Design Documents or Construction Documents within the time period specified by the Project Administrator (which time period for completion shall not exceed ninety (90) days from the date Consultant is notified to re-design), as part of the Basic Services and at no additional cost to the City. 4.2.4. To ensure that the Construction Cost shall not exceed the City's Construction Budget, each Statement of Probable Construction Cost shall be in sufficient detail to identify the costs of each element and include a breakdown of the fees, general conditions and a reasonable and appropriate construction contingency. 4.3. Consultant shall certify and warrant to the City that the Statement of Probable Construction Cost and any update thereto, represents Consultant's best judgment of the Construction Cost for the Project as an experienced design professional familiar with the construction industry, provided, however, that Consultant cannot (and does not) guarantee that bids or negotiated prices will not vary from any estimates of Construction Cost or other cost 17 evaluation(s) prepared (or otherwise provided) by Consultant. 4.4 If the lowest and best Base Bid exceeds the Consultant's final updated Statement of Probable Cost by more than ten percent (10%), the Project Administrator shall provide notice thereof to the Consultant, and the Consultant shall re-design the Project within the Project Scope, construction schedule, sequence of Work, or such other action, as deemed necessary, to reduce the Statement of Probable Construction Cost, and Consultant shall provide any required revisions to the Contract Documents (including, without limitation, the Construction Documents) within the time period specified by the Project Administrator (which time period for 'completion shall not exceed ninety (90) days from the date Consultant is notified to re-design), and shall provide re-bidding services, as many times as may be reasonably requested by the City, as part of the Basic Services and at no additional cost to the City, in order to bring any resulting, responsive and responsible bids within ten percent (10%) 'of the Consultant's final updated Statement of Probable Cost. 4.5. The Construction Cost Budget shall not be exceeded without fully justifiable, extraordinary, and unforeseen circumstances (such as Force Majeure) which are beyond the control of the parties. Any expenditure above this amount shall be subject to prior City Commission approval which, if granted at all, shall be at the sole and reasonable discretion of the City Commission. The City Commission shall have no obligation to approve an increase in the Construction Cost Budget and, if such Construction Cost Budget is exceeded, the City Commission may, at its sole and absolute discretion, terminate this Agreement (and the remaining Services)without any further liability to the City. 4.6. The City Commission may, at its sole and absolute discretion, and without relieving Consultant of its obligations under this Agreement to design the Project to the Construction Cost Budget as set forth in Sections 4.1 through 4.5 above, separately elect any of the following options: (1) approve an increase to the Construction Cost Budget; (2) reject all bids, and (at its option) authorize rebidding of the Project; (3) abandon the Project and terminate the remaining Services without any further liability to the City; (4) select as many deductive alternatives as may be necessary to bring the lowest and best bid within the Construction Cost Budget. ARTICLE 5. ADDITIONAL SERVICES 5.1 Additional Services shall only be performed by Consultant following receipt of written authorization by the Project Administrator (which authorization must be obtained prior to commencement of any such additional work by Consultant). The written authorization shall contain a description of the Additional Services required; a lump sum to be negotiated at the time of the request for additional services or an hourly fee (in accordance with the rates in Schedule "B" hereto), with a "Not to Exceed" amount; Reimbursable Expenses (if any) with a "Not to Exceed" amount; the amended Construction Cost Budget (if applicable); the time required to complete the Additional Services; and an amended Project Schedule (if applicable). "Not to Exceed" shall mean the maximum cumulative hourly fees allowable (or, in the case of Reimbursable Expenses, the maximum cumulative expenses allowable), which the Consultant. shall not exceed without further written authorization of the Project Administrator. The "Not to Exceed" amount is not a guaranteed maximum cost for the additional work requested (or, in the case of Reimbursables, for the expenses), and all costs applicable to same shall be verifiable through time sheets (and, for Reimbursables, expense reviews). • 5.2 Additional Services include the following: 18 5.2.1 Appraisals: Investigation and creation of detailed appraisals and valuations of existing facilities, and surveys or inventories in connection with construction performed by City. 5.2.2. Unforeseen Conditions. Providing additional work relative to the Project which arises from subsequent circumstances and causes which could not reasonably have been foreseen at the time of the Consultant Service Order (excluding conditions determined by all prior studies available to Consultant and excluding circumstances and causes resulting from error, omission, inadvertence, or negligence of Consultant). 5.2.3. City-Requested Revisions to Construction Documents: Making revisions to Construction Documents resulting in or from City-requested changes in Scope of Work involving new program elements, when such revisions are inconsistent with written approvals or instructions previously given by City and/or are due to causes beyond the control of Consultant. ' 5.2.4 Expert Witness: Except insofar as the Consultant is required by legal process or subpoena to appear and give testimony, preparing to serve or serving as an expert witness in connection with any state or federal court action to which the Consultant is not a party in its own name, that is not instituted by the Consultant or in which the performance of the Consultant is not in issue. 5.2.5 Procurement: Assistance in connection with bid protests, re-bidding, or re- negotiating contracts (except for Contract Document revisions and re-bidding services required under Section 4.4 hereof, which shall be provided at no additional cost to City). 5.2.6. Models: Preparing professional perspectives, models or renderings in addition to those provided for in this Agreement except insofar as these are otherwise useful or necessary to the Consultant in the provision of Basic Services. 5.2.7. Threshold Inspection/Material Testing and Inspection: Providing threshold inspection services and material testing/special inspection services, provided that Consultant, as part of the Basic Services, shall report on the progress the Work, including any defects and deficiencies that may be observed in the Work. 5.2.8 Pre-Design Surveys & Testing: - Environmental investigations and site evaluations, provided, however, that surveys of the existing structure required to complete as-built documentation are not additional services. 5.2.9 Geotechnical engineering. Providing geotechnical engineering services or site surveys. Except as specified herein, services that are required for completion of the Construction Documents shall be part of Consultant's Basic Services. ARTICLE 6. REIMBURSABLE EXPENSES 19 • 6.1 Reimbursable Expenses must be authorized, in advance, in writing, by the Project Administrator. Invoices or vouchers for Reimbursable Expenses shall be submitted to the Project Administrator (along with any supporting receipts and other back-up material requested by the Project Administrator). Consultant shall certify.as to each such invoice and/or voucher that the amounts and items claimed as reimbursable are "true and correct and in accordance with the Agreement." Reimbursable Expenses may include, but not be limited to, the following: Cost of reproduction, courier, and postage and handling of drawings,, plans, specifications, and other Project documents (excluding reproductions for the office use of the Consultant and its Subconsultants, and courier, postage and handling costs between the Consultant and its Subconsultants). Costs for reproduction and preparation of graphics for community workshops. Permit fees required by City of Miami Beach regulatory bodies having jurisdiction over the Project(i.e. City permit fees). ARTICLE 7. COMPENSATION FOR SERVICES 7.1 Consultant's "Lump Sum" or"Not to Exceed"fee for provision of the Services, or portions thereof, as may be set forth and described in the Consultant Service Order issued for a particular Project, shall be negotiated between the City and Consultant, and shall be set forth in the Consultant Service Order. 7.2 Payments for Services shall be made within forty-five (45) calendar days of receipt and approval of an acceptable invoice by the Project Administrator. Payments shall be made in proportion to the Services satisfactorily performed, so that the payments for Services never exceed the progress percentage noted in the Consultant's Progress Schedule (to be submitted with each invoice). No mark-up shall be allowed on subcontracted work. In addition to the invoice, the Consultant shall, for Hourly Rate authorizations, submit a progress report giving the percentage of completion of the Project and the total estimated fee to completion. 7.3 All Services shall be compensated in accordance with the hourly rates set forth in Schedule "C," attached hereto. Any request for payment of Additional Services shall be included with a Consultant payment request. No mark-up shall be allowed on Additional Services (whether sub-contracted or not). 7.4 Approved Reimbursable Expenses shall be paid in accordance with Article 6 hereto, up to the "Not to Exceed" Reimbursable allowance amount in the Consultant Service Order hereto. Any request for payment of Reimbursable Expenses shall also be included with Consultant's payment request. No mark-up shall be allowed on Reimbursable Expenses. 7.5 ESCALATION: The initial hourly rates shall remain constant for the Initial Term of the agreement. Ninety (90) days prior to expiration of the Initial Term, the City may consider an adjustment to the preceding year's unit costs for the subsequent year. Only request for increases based on a corresponding increase in the Consumer Price Index for All Urban Consumers; U.S. City average (1982-84=100), as established by the United States Bureau of Labor Statistics ("CPI"), or material adjustments to the scope or requirements of the RFQ by the City, including (but not limited to) living wage increases, will be considered. In the event that the City determines that the requested increase is unsubstantiated, the Consultant agrees to 20 perform all duties at the current cost terms. 7.6 No retainage shall be made from the Consultant's compensation on account of sums withheld by the City on payments to Contractor. 7.7 METHOD OF BILLING AND PAYMENT. Consultant shall invoice the Project Administrator in a timely manner, but no more than once on a monthly basis. Invoices shall identify the nature and extent of the work performed; the total hours of work performed by employee category; and the respective hourly billing rate associated therewith. In the event Subconsultant work is used, the percentage of completion shall be identified. Invoices shall also itemize and summarize any Additional Services and/or Reimbursable Expenses. A copy of the written approval of the Project Administrator for the requested Additional Service(s) or Reimbursable Expense(s) shall accompany the invoice. 7.7.1 If requested, Consultant shall provide back-up for past and current invoices that records hours for all work (by employee category), and cost itemizations for Reimbursable Expenses (by category). ARTICLE 8. CONSULTANT'S ACCOUNTING AND OTHER RECORDS 8.1 All books, records (whether financial or otherwise), correspondence, technical documents, and any other records or documents related to the Services and/or Project will be available for examination and audit by the City Manager, or his/her authorized representatives, at Consultant's office (at the address designated in Article 15 ["Notices"]), during customary business hours. All such records shall be kept at least for a period of three (3) years after Consultant's completion of the Services. Incomplete or incorrect entries in such records and accounts relating personnel services and expenses may be grounds for City's disallowance of any fees or expenses based upon such entries. Consultant shall also bind its Subconsultants to the requirements of this Article and ensure compliance therewith ARTICLE 9. OWNERSHIP OF PROJECT DOCUMENTS 9.1 All notes, correspondence, documents, plans and specifications, designs, drawings, renderings, calculations, specifications, models, photographs;reports, surveys, investigations, and any other documents (whether completed or partially completed) and copyrights thereto for Services performed or produced in the performance of this Agreement, or related to the Project, whether in its native electronic form, paper or other hard copy medium or in electronic medium, except with respect to copyrighted standard details and designs owned by the Consultant or owned by a third party and licensed to the Consultant for use and reproduction, shall become the property of the City. Consultant shall deliver all such documents to the Project Administrator in their native electronic form, as required in the Consultant Service Order within thirty (30) days of completion of the Services (or within thirty (30) days of expiration or earlier termination of this Agreement as the case may be). However, the City may grant an exclusive license of the copyright to the Consultant for reusing and reproducing copyrighted materials or portions thereof as authorized by the City Manager in advance and in writing, In addition, the Consultant shall not disclose, release, or make available any document to any third party without prior written approval from the City Manager. The Consultant shall,warrant to the City that it has been granted a license to use and reproduce any standard details and designs owned by a third party and used or reproduced by the Consultant in the performance of this Agreement. Nothing contained herein shall be deemed to exclude any document from Chapter 119, Florida Statutes. 21 -9.2 The Consultant is permitted to reproduce copyrighted material described above subject to prior written approval of the City Manager. 9.3 At the City's option, the Consultant may be authorized, as an Additional Service, to adapt copyrighted material for additional or other work for the City; however, payment to the Consultant for such adaptations will be limited to an amount not greater than 50% of the original fee earned to adapt the original copyrighted material to a new site. 9.4 The City shall have the right to modify the Project or any components thereof without permission from the Consultant or without any additional compensation to the Consultant. The Consultant shall be released from any liability resulting from such modification. 9.5 The Consultant shall bind all Subconsultants to the Agreement requirements for re-use of plans and specifications. ARTICLE 10. TERMINATION OF AGREEMENT 10.1 TERMINATION FOR LACK OF FUNDS: The City is a governmental entity and is subject to the appropriation of funds by its legislative body in an amount sufficient to allow continuation of its performance in accordance with the terms and conditions of this Agreement. In the event there is a lack of adequate funding either for the Services or the Project (or both), the City may terminate this Agreement without further liability to the City. 10.2 TERMINATION FOR CAUSE: The City, through the City Manager, may terminate this Agreement for cause, upon writtennotice to-Consultant, in the event that the Consultant (1) violates any provision of this Agreement or performs same in bad faith; (2) unreasonably delays the performance of the Services or any portion thereof; or (3) does not perform the Services or any portion thereof in a timely and satisfactory manner. In the case of termination for cause by the City, the Consultant shall first be granted a thirty (30) day cure period (commencing upon receipt of the initial written notice of default from the City). 10.2.1 In the event this Agreement is terminated for cause by the City, the City, at its sole option and discretion, may take over the remaining Services and complete them by contracting with another consultant(s), or otherwise. The Consultant shall be liable to the City for any additional cost(s) incurred by the City due to such termination. "Additional Cost" is defined as the difference between the actual cost of completion of the Services, and the cost of completion of such Services had the Agreement not been terminated. 10.2.2 In the event of termination for cause by the City, the City shall only be obligated to pay Consultant for those Services satisfactorily performed and accepted prior to the date of termination (as such date is set forth in, or can be calculated from, the City's initial written default notice). Upon payment of any amount which may be due to Consultant pursuant to this subsection 10.2.2, the City shall have no further liability to Consultant. 10.2.3 As a condition precedent to release of any payment which may be due to Consultant under subsection 10.2.2, the Consultant shall promptly assemble and deliver to the Project Administrator any and all Project documents prepared (or caused to be prepared) by Consultant(including, without limitation, those referenced in subsection 9.1 22 hereof). The City shall not be responsible for any cost incurred by Consultant for assembly, copy, and/or delivery of Project documents pursuant to this subsection. 10.3 TERMINATION FOR CONVENIENCE: In addition to the City's right to terminate for, cause, the City through the City Manager, may also terminate this Agreement, upon fourteen (14) days prior written notice to Consultant, for convenience, without cause, and without penalty, when (in its sole discretion) it deems such termination to be in the best interest of the City. In the event the City terminates the Agreement for convenience, Consultant shall be compensated for all Services satisfactorily performed and accepted up to the termination date (as set forth in • the City's written notice), and for Consultant's costs in assembly and delivery to the Project Administrator of the Project documents (referenced in subsection 10.2.3 above). Upon payment of any amount which may be due to Consultant pursuant this subsection 10.3, the City shall have no further liability to Consultant. 10.4 TERMINATION BY CONSULTANT: The Consultant may only terminate this Agreement for cause, upon thirty (30) days prior written notice to the City, in the event that the City willfully violates any provisions of this Agreement or unreasonably delays payment of the Services or any portion thereof. In the event of a termination for cause by Consultant, the City shall pay Consultant for any Services satisfactorily performed and accepted up to the date of termination; provided; however, that the City shall first be granted a thirty (30) day cure period (commencing upon receipt of Consultant's initial written notice). 10.4.1 The Consultant shall have no right to terminate this Agreement for convenience. 10.5 IMPLEMENTATION OF TERMINATION: In the event of termination (whether for cause or for convenience), the Consultant shall immediately, upon receipt of the City's written notice of termination: (1) stop the performance of Services; (2) place no further orders or issue any other subcontracts, except for those which may have already been approved, in writing, by the Project Administrator; (3) terminate all existing ordersand subcontracts; and (4) promptly assemble all Project documents (for delivery to the Project Administrator). ARTICLE 11. INSURANCE 11.1: At all times during the Term of this Agreement, Consultant shall maintain the following required insurance coverage in full force and effect. The Consultant shall not commence any work until satisfactory proof of all required insurance coverage has been furnished to the Project Administrator: (a) Workers' Compensation and Employer's Liability per the Statutory limits of the State of Florida. (b) Commercial General Liability on a comprehensive basis in an amount not less than $1,000,000 combined single limit per occurrence for bodily injury and property damage. (c) Automobile Liability Insurance covering all owned, non-owned and hired vehicles used in connection with the work, in,an amount not less than $500,000 combined single limit per occurrence for bodily injury and property damage. (d) Professional Liability Insurance in an amount not less than'$1,000,000 with the deductible per claim, if any, not to exceed 10% of the limit of liability. 23 11.2 The City must be named as and additional insured on the liability policies; and it must be stated on the certificate. 11.3 The Consultant must give the Project Administrator at least thirty (30) days prior written notice of cancellation or of substantial modifications in any required insurance coverage. All certificates and endorsements shall contain this requirement. 11.4 The insurance must be furnished by an insurance company rated A:V or better, or its equivalent, according to Bests' Guide Rating Book, and by insurance companies duly authorized to do business in the State of Florida, and countersigned by the company's Florida resident agent. 11.5 Consultant shall provide the Project Administrator with a certificate of insurance of all required insurance policies. The City reserves the right to require a certified copy of such policies, upon written request to Consultant. ARTICLE 12. INDEMNIFICATION AND HOLD HARMLESS 12.1 To the fullest extent permitted by Section 725.08, Florida Statutes, the Consultant shall indemnify and hold harmless the City and its officers, employees, agents, and instrumentalities, from liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Consultant and other persons employed or utilized by the Consultant in the performance of this Agreement. The Consultant shall pay all claims and losses in connection therewith and shall investigate and defend all claims, suits, or actions of any kind or nature in the_ name of the City, where ,applicable, including appellate proceedings, and shall pay all costs, judgments, and attorney's fees which may issue thereon. Consultant expressly understands and agrees that any insurance protection.;required by this Agreement or otherwise provided by Consultant shall in no way limit its responsibility to indemnify, keep, and save harmless and defend the City or its officers, employees, agents, and instrumentalities as herein provided. 12.2 The Consultant agrees and recognizes that the City shall not be held liable or responsible for any claims which may result from any negligent, reckless, or intentionally wrongful actions, errors or omissions of the Consultant in which the City participated either through review or concurrence of the Consultant's actions. In reviewing, approving or rejecting any submissions by the Contractor, or other acts of the Consultant, the City in no way assumes or shares any responsibility or liability of the Consultant (including, without limitation its Subconsultants and/or any registered professionals (architects and/or engineers) under this Agreement). ARTICLE 13. ERRORS AND OMISSIONS 13.1 ERRORS AND OMISSIONS: 'It is specifically agreed that any construction changes categorized by the City as caused by an error, an omission, or any combination thereof in the Contract Documents that were prepared by the Consultant will,constitute an additional cost to the City that would not have been incurred without the error. The damages to the City for errors, omissions or any combinations thereof shall be calculated as the total cost of any damages or incremental costs to the City resulting out of the errors or omissions by the 24 Consultant, including, without limitation, the direct, indirect and/or consequential damages resulting from the Consultant's errors and/or omissions or any combination thereof. Damages shall include delay damages caused by the error, omission, or any combination thereof. Should the Consultant disagree that all or part of such damages are the result of errors, omissions, or any combination thereof, the Consultant may appeal this determination, in writing, to the applicable Assistant City Manager. The Project Administrator's decision on all claims, questions and disputes shall be final, conclusive and binding upon the parties hereto unless such determination is clearly arbitrary or unreasonable. In the event that the Consultant does not agree with the decision of the Project Administrator, the Consultant shall present any such objections, in writing, to the City Manager. The Project Administrator and the Consultant shall abide by the decision of the City Manager. This paragraph does not constitute a waiver of any party's right to proceed in a court of competent jurisdiction after the above administrative remedies have been exhausted. ARTICLE 14. LIMITATION OF LIABILITY The City desires to enter into this Agreement only if in so doing the City can place a limit on its liability for any cause of action for money damages due to an alleged breach by the City of this Agreement, so that its liability for any such breach never exceeds the "not to exceed" amount of the fee paid to Consultant under this Agreement, less any amount(s) actually paid to Consultant hereunder. Consultant hereby expresses its willingness to enter into this Agreement, with Consultant's recovery from the City for any damages for action for breach of contract to be limited to Consultant's "not to exceed" fee under this Agreement, less any amount(s) actually paid by the City to the Consultant hereunder. Accordingly, and notwithstanding any other term or condition of this Agreement, Consultant hereby agrees that the City shall not be liable to Consultant for money damages due to an alleged breach by the City of this Agreement, in an amount in excess of the "not to exceed amount" of Consultant's fees under this Agreement, which amount shall be reduced by any amount(s) actually paid by the City to Consultant hereunder. Nothing contained in this subsection, or elsewhere in this Agreement, is in any way intended to be a waiver of the limitation placed upon City's liability, as set forth in Section 768.28, Florida Statutes. ARTICLE 15. NOTICE All written notices given to City by Consultant shall be addressed to: City Manager's Office City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Attn: Jimmy L. Morales, City Manager With a copy to: City Manager's Office City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Attn: Eric T. Carpenter, Assistant City Manager 25 All written notices given to the Consultant from the City shall be addressed to: TSAO Design Group, Incorporated. 7610 NE 4 Court#47, Suite 101 Miami , FL. 33138 Tel: (305) 576-2006 ext. 15 Fax: 305-576-2005 Email:jhaoopian(a�tsaodesign.com Attn: Jason Hagopian All notices mailed to either party shall be deemed to be sufficiently transmitted if sent by certified mail, return receipt requested. ARTICLE 16. MISCELLANEOUS PROVISIONS 16.1 VENUE: This Agreement shall be governed by, and construed in accordance .with, the laws of the State of Florida, both substantive and remedial, without regard to principles of conflict of laws. The exclusive venue for any litigation arising out of this Agreement shall be Miami-Dade County, Florida, if in state court, and the U.S. District Court, Southern District of Florida, in federal court. BY ENTERING INTO THIS AGREEMENT, CONSULTANT AND CITY EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO, OR ARISING OUT OF, THIS AGREEMENT. 16.2 EQUAL OPPORTUNITY EMPLOYMENT GOALS: Consultant agrees that it will not discriminate against any employee or applicant for employment for work under this Agreement because of..race, color, national origin, religion, sex, gender identity, sexual orientation, disability, maritel or familial status, or age, and will take affirmative steps. to ensure that • applicants are employed and employees are treated during employment without regard to race, color, national origin, religion, sex, gender identity, sexual orientation, disability, marital or familial status, or age. 16.3 PUBLIC ENTITY CRIMES ACT: In accordance with the Public Entity Crimes Act (Section 287.133, Florida Statutes), a person or affiliate who is a consultant, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not bid on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or subconsultant under a contract with the City, and may not transact business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for Category Two, for a period of 36 months from the date of being placed on the convicted vendor list. For violation of this subsection by Consultant, City shall have the right to terminate the Agreement without any liability to City, and pursue debarment of Consultant 16.4 NO CONTINGENT FEE: Consultant warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement, and that it has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Agreement. For the breach or violation of this subsection, City shall 26 have the right to terminate the Agreement, without any liability or, at its discretion, to deduct from the contract price (or otherwise recover) the full amount of such fee, commission, percentage, gift, or consideration. 16.5 LAWS AND REGULATIONS: 16.5.1 The Consultant shall, during the Term of this Agreement, be governed by all Applicable Laws which may have a bearing on the Services involved in the Project. 16.5.2 Project Documents. In accordance with Section 119.07 (3) (ee), Florida Statutes, entitled "Inspection, Examination, and Duplication of Records; Exemptions," all building plans, blueprints, schematic drawings, and diagrams, including draft, preliminary, and final formats, are exempt from the provisions of Section 119.07(1), Florida Statutes (inspection and copying of public records), and s. 24(a), Article I of the State Constitution. Information made exempt by this paragraph, with prior written approval from the City Manager, may be disclosed to another entity to perform its duties and responsibilities; to a licensed architect, engineer, or contractor who is performing work on or related to the Project; or upon a showing of good cause before a court of competent jurisdiction. The entities or persons receiving such information shall maintain the exempt status of the information. 16.5.2.1 In addition to the requirements in this subsection 16.5.2, the Consultant agrees to abide by all applicable Federal, State, and City procedures, as may be amended from time to time, by which the documents are handled, copied, and distributed!which may include, but is not limited to, each employee of Consultant and Subconsultants that will be involved in the Project being required to sign an agreement stating that they will not copy, duplicate, or distribute the documents unless authorized by the City Manager, in writing. 16.5.2.2 -The Consultant and its. Subconsultants agree in writing that the Project documents are to be kept and maintained in a secure location. 16.5.2.3 Each set of the Project documents are to be numbered and the whereabouts of the documents shall be tracked at all times. 16.5.2.4 A log is developed to track each set of documents logging in the date, time, and name of the individual(s) that work on or view the documents. 16.6 CORRECTIONS TO CONTRACT DOCUMENTS: The Consultant shall prepare, without added compensation, all necessary supplemental documents to correct errors, omissions, and/or ambiguities which may exist in the Contract Documents prepared by Consultant, including documents prepared by its Subconsultants. Compliance with this subsection shall not be construed to relieve the Consultant from any liability resulting from any such errors, omissions, and/or ambiguities in the Contract Documents and other documents or Services related thereto. 27 16.7 ASSIGNMENT: The Consultant shall not assign, transfer or convey this Agreement to any other person, firm, association or corporation, in whole or in part, without the prior written consent of the City Commission, which consent, if given at all, shall be at the Commission's sole option and discretion. However, the Consultant will be permitted to cause portions of the Services to be performed by Subconsultants, subject to the prior written approval of the City Manager. 16.8 SUCCESSORS AND ASSIGNS: The Consultant and the City each binds himself/herself, his/her partners, successors, legal representatives and assigns to the other party of the Agreement and to the partners, successors, legal representatives, and assigns of such party in respect to all covenants of this Agreement. The Consultant shall afford the City (through the City Commission) the opportunity to approve or reject all proposed assignees, successors or other changes in the ownership structure and composition of the Consultant. Failure to do so constitutes a breach of this Agreement by the Consultant. 16.9 PROVISION OF ITEMS NECESSARY TO COMPLETE SERVICES: In the performance of the Services prescribed herein, it shall be the responsibility of the Consultant to provide all salaries, wages, materials, equipment, Subconsultants, and other purchased services, etc., as necessary to complete said Services. 16.10 INTENT OF AGREEMENT: 16.10.1 The intent of the Agreement is for the Consultant to provide design and other services, and to include all necessary items for the proper completion of such services for a fully functional Project which, when constructed in accordance with the design, will be able to be used by the City for its intended purpose. The Consultant shall perform, as Basic Services, such incidental work which may not be specifically referenced, as necessary to complete the Project. 16.10.2 This Agreement is for the benefit of the parties only and it does not grant rights to a third party beneficiary, to any person, nor does it authorize anyone not a party to the Agreement to maintain a suit for,personal injuries, professional liability, or property damage pursuant to the terms or provisions of the Agreement. 16.10.3 No acceptance, order, payment, or certificate of or by the City, or its employees or agents, shall either stop the City from asserting any rights or operate as a waiver of any provisions hereof or of any power or right herein reserved to the City or of any rights to damages herein provided. 16.11 This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, or understandings applicable to the matters contained herein; and the parties agree that there are no commitments, agreements, or understandings concerning the subject matter of this Agreement that are not contained in this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless memorialized in written document approval and executed with the same formality and of equal dignity herewith. 28 1 IN WITNESS WHEREOF, the parties hereto have hereunto caused these presents to be signed in their names by their duly authorized officers and principals, attested by their respective witnesses and City Clerk on the day and year first hereinabove written. Attest CITY *'i U. , i BEACH: „____ (?))/1 gitilci _ _ CITY CLER MAYOR Attest TSAO DESIGN GROUP, INCORPORATED. Signature/Secretarygn resident Print Name Print Name , ,, t, . \ ?, O! APPROVED AS TO r„s==, O �- FORM &LANGUAGE\ &FOR EXECUTION (..... 0......cLaoi____. (-'Z3 City Attorney Date 29 SCHEDULE A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND TSAO DESIGN GROUP, INCORPORATED CONSULTANT SERVICE ORDER Service Order No. _for Consulting Services. TO: TSAO Design Group, Incorporated. 7610 NE 4 Court#5, Suite 101 Miami , FL. 33138 PROJECT NAME: Project Name DATE: Pursuant to the agreement between the City of Miami Beach and Consultant for PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS (RFQ 2018-141-ND) you are directed to provide the following services: SCOPE OF SERVICES: Per attached proposal dated , to be considered part of this Agreement. Estimated calendar days to complete this work: Days Original Service Order Amount: $ Total From Previous Additional Service Orders: Fee for this Service Order is Lump Sum/Not to Exceed amount of: Total Agreement to Date1: $ City's Project Date Coordinator/Manager Assistant Director Date Consultant. Date • Project Administrator-Director Date 1 Section 287.055,Florida Statutes,commonly known as the Consultant's Competitive Negotiation Act(CCNA),is applicable to the selection of professional services consultants(architecture,professional engineering,landscape architecture,or registered surveying and mapping)by public agencies for projects valued up to the amount established in Category 5,Section 287.017,Florida Statutes(currently$325,000 or as amended by law)or for a planning or study activity valued up to the amount established in Category 2,Section 287.017,Florida Statutes(currently$35,000 or as amended by law). 30 SCHEDULE B CONSULTANT COMPENSATION Schedule of Payments Planning Services * $XXX)0000( Design Services* "$)0X)0000( Bidding and Award Services $)0XXXXXX Construction Administration ** $XX0 )000(X Reimbursable Allowance*** $XXX)0000( Note*: These services will be paid lump sum based on percentage complete of each phase as identified in the individual tasks. Note**: Construction Administration will be paid on a monthly basis upon commencement of construction. In 'the event that, through no fault of the Consultant, Construction Administration services are required to be extended, which extension shall be subject to prior City approval, and what shall be at the City's sole discretion, the Consultant agrees to extend said services for$XXX)OO(, per month, for the duration required to complete the Project. Note***: The Reimbursable Allowance belongs to the City and must be approved in writing, in advance, by the P;,roject Administrator. Unused portions will not be paid to the Consultant. 31 SCHEDULE C HOURLY BILLING RATE SCHEDULE Project Principal $172.50 Project Engineer(Coastal or $116.15 Other) Project Manager $138.00 Sr. Field Services Professional $116.15 Senior Civil Engineer $138.00 Field Services Professional $ 80.50 Civil Engineer $116.15 Threshold Inspector $138.00 Senior Electrical Engineer $138.00 Structural Special Inspector $109.25 Electrical Engineer $116.15 Technical Editor $ 74.75 Senior Mechanical Engineer $138.00 Senior GIS Specialist $116.15 Mechanical Engineer $116.15 GIS Specialist $ 86.25 Senior Structural Engineer $138.00 Staff Engineer/Geologist/Scientist $ 94.30 Structural Engineer $116.15 Landscape Designer $ 95.45 Senior Environmental Engineer $138.00 Planner $116.15 Environmental Engineer $116.15 Project Principal ( Structural Engineer) $172.50 Environmental Technician $ 74.75 Project Manager(Structural Engineer) $138.00 Environmental Specialist $ 63.25 CAD Technician (Structural) $ 63.25 Environmental Permit Specialist $ 63.25 Traffic Engineers $116.15 Project Scientist $120.75 Cost Estimator $ 74.75 Senior Surveyor $138.00 Specifications Writer $ 63.25 Surveyor $116.15 Construction Administrator/Manager $ 94.30 Surveyor Support Staff $ 69.00 Senior Project Manager $138.00 Senior Architect $138.00 MEP Project Engineer $138.00 Architect $116.15 ' Horticultural/maintenance Consultant $ 86.25 Senior Designer $138.00 Irrigation Engineer $ 94.30 Designer $ 95.45 Job Captain $ 92.00 Senior Urban Planner $138.00 Interior Designer $ 95.45 Senior CAD Technician $ 69.00 Principal/Director of Design $138.00 CAD Technician $ 63.25 Senior Landscape Architect $138.00 Landscape Architect $116.15 Clerical $ 40.25 Administrative Assistant $ 40.25 Survey Crew Party of2 $140.68 Survey Crew Party of 2 w/GPS $168.51 Survey Crew Party of 3 $170.44 Survey Crew Party of 3w/ GPS $197.01 Survey Crew Party of 4 $211.31 Survey Crew Party of 4 w/ GPS $250.13 Sr. Inspector(CEI) $103.50 Inspector(CEI, Field or $ 94.88 Construction) 32 SCHEDULE D APPROVED SUBCONSULTANTS 33 ATTACHMENT A RESOLUTION, COMMISSION ITEM, AND COMMISSION MEMORANDUM 34 RESOLUTION NO. , 2018-30534 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER PERTAINING TO THE RANKING OF PROPOSALS PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) NO. 2018-141-ND, FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH WILLIAM B. MEDELLIN ARCHITECT P.A., CSA CENTRAL, INC., SCHINDLER ARCHITECTS, INC., TSAO DESIGN GROUP, INCORPORATED, CPH, INC., SOL-ARCH, INC.,WILLIAM LANE ARCHITECT, INC., MOSS ARCHITECTURE AND DESIGN GROUP, INC., ALLEGUEZ ARCHITECTURE, INC„ R.J. HEISENBOTILE ARCHITECTS, AND P.A., VITALINI CORAZZINI, P.A., FOR THE DISCIPLINE OF GENERAL ARCHITECTURE; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SAVINO & MILLER DESIGN STUDIO, P.A., KEITH AND SCHNARS, P.A., CPH, INC., CURTIS & ROGERS DESIGN STUDIO, INC., CHEN-MOORE ASSOCIATES, AND MILLER, LEGG & ASSOCIATES, INC., FOR THE DISCIPLINE OF LANDSCAPE ARCHITECTURE; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SCHWEBKE-SHISKIN & ASSOCIATES, INC., CES CONSULTANTS, INC., CHEN-MOORE ASSOCIATES, 305 CONSULTING ENGINEERS, LLC, MILLER, LEGG & ASSOCIATES, INC., AND SRS ENGINEERING, INC., FOR THE DISCIPLINE OF CIVIL ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH E SCIENCES, INC., TERRACON CONSULTANTS, INC., EBS ENGINEERING, INC., AND CSA CENTRAL, INC., FOR THE DISCIPLINE OF 'ENVIRONMENTAL SERVICES AND TESTING ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH CSA CENTRAL, INC., 3FM ENGINEERING, INC., AND UCI ENGINEERING INC., FOR THE DISCIPLINE OF MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH 305 CONSULTING ENGINEERS, LLC, EASTERN ENGINEERING GROUP COMPANY, CES CONSULTANTS, INC., MASTER CONSULTING ENGINEERS, INC., UCI ENGINEERING INC., AND DIAZ, CARRENO, SCOTT! & PARTNERS, INC., FOR THE DISCIPLINE OF STRUCTURAL ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH TSAO DESIGN GROUP, INCORPORATED, AND MC DESIGNERS, INC., FOR THE DISCIPLINE OF INTERIOR DESIGN / SPACE PLANNING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SCHWEBKE-SHISKIN & ASSOCIATES, INC. FOR THE DISCIPLINE OF SURVEYING; AND FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH EACH OF THE RECOMMENDED PROPOSERS UPON CONCLUSION OF SUCCESSFUL NEGOTIATIONS BY THE ADMINISTRATION. WHEREAS, on February 14, 2018, the City Commission approved the issuance of Request for Qualifications (RFQ) No. 2018-141-ND for Professional Architectural and Engineering Services for Capital Repair and Replacement Projects; and, WHEREAS, Request for Qualifications No. 2018-141-ND (the "RFQ") was released on February 15, 2018; and WHEREAS, a voluntary pre-proposal meeting was held on February 27, 2018; and WHEREAS,on May 7, 2018, the City received thirty-seven (37) proposals; and WHEREAS, on February 26, 2018 the City Manager via Letter to Commission (LTC) No. 105-2018, appointed an Evaluation Committee (the "Committee"), consisting of the following - individuals: Lily Alvarez, Construction Manager, Property Management Department, City of Miami Beach; Pilar Caurin, Construction Manager, Office of Capital Improvement Projects, City of Miami Beach; Elizabeth Estevez, Parks and Capital Projects Manager, Parks and Recreation Department, City of Miami Beach; and Francisco Garcia, Construction Manager, Property Management Department, City of Miami Beach;and WHEREAS, the Committee convened on August 6, 2018 to review and score the remaining proposals; and WHEREAS, the Committee was provided an overview of the project, information relative to the City's Cone of Silence Ordinance and the Government Sunshine Law, general information on the scope of services, and a copy of each proposal; and WHEREAS, the Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFQ; and WHEREAS, the Committee's ranking for the discipline of General Architecture was as follows: William B. Medellin Architect P.A., as the first ranked proposer; CSA Central,' Inc., as the second ranked proposer; Schindler Architects, Inc. and TSAO Design Group, Incorporated, tied as the third ranked proposers; CPH, Inc., as the fifth ranked proposer; Sol-ARCH, Inc., as the sixth ranked proposer; William Lane Architect, Inc., as the seventh ranked proposer; Moss Architecture and Design Group, Inc., as the eighth ranked proposer; Alleguez Architecture, Inc., as the ninth ranked proposer; R.J. Heisenbottle Architects, and P.A., as the tenth ranked proposer; Vitalini Corazzini, P.A., as the eleventh ranked proposer; ArcBuilders and Group Incorporated, as the twelfth ranked proposer; Alejandro Pardo Architecture, Inc., as the j thirteenth ranked proposer; and UCI Design, Inc., as the fourteenth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Landscape Architecture was as follows: Savino & Miller Design Studio, P.A., as the first ranked proposer; Keith and Schnars, P.A., as the second ranked proposer; CPH, Inc., as the third ranked proposer; Curtis & Rogers Design Studio, Inc., as the fourth ranked proposer; Chen-Moore Associates, as the fifth ranked proposer; Miller, Legg & Associates, Inc., as the sixth ranked proposer; Calvin, Giordano & Associates, Inc., as the seventh ranked proposer; and Landscape DE, LLC, as the eighth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Civil Engineering was as follows: Schwebke-Shiskin & Associates, Inc., as the first ranked proposer; CES Consultants, Inc., as the second ranked proposer; Chen-Moore Associates, as the third ranked proposer, 305 Consulting Engineers, LLC, Miller, Legg & Associates, Inc., and SRS Engineering, Inc., tied as the fourth ranked proposers; CPH, Inc., as the seventh ranked proposer; and T.Y. Lin International, as the eighth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Environmental Services and Testing Engineering was as follows: E Sciences, Inc., as the first ranked proposer; Terracon Consultants, Inc., as the second ranked proposer; EBS Engineering, Inc., as the third ranked proposer; CSA Central, Inc., as the fourth ranked proposer; and Florida Technical Consultants, LLC, as the fifth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Mechanical, Electrical, and Plumbing Engineering was as follows: CSA Central, Inc. and Ross & Baruzzini, Inc., tied as the first ranked proposers; 3FM Engineering, Inc., as the third ranked proposer; and UCI Engineering Inc., as the fourth ranked proposer; and WHEREAS, subsequent to the evaluation of proposals, Ross &Baruzzini, Inc. submitted the a letter indicating that without local MEP resources it no longer wished to be considered for award; and WHEREAS, the Committee's ranking for the discipline of Structural Engineering was as follows: 305 Consulting Engineers, LLC and Eastern Engineering Group Company, tied as the first ranked proposers; CES Consultants, Inc., as the third ranked proposer; Master Consulting Engineers, Inc., as the fourth ranked proposer; UCI Engineering Inc., as the fifth ranked proposer; and Diaz, Carreno, Scotti & Partners, Inc., as the sixth ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Interior Design / Space Planning was as follows: TSAO Design Group, Incorporated, as the first ranked proposer; and MC Designers, Inc., as the second ranked proposer; and WHEREAS, the Committee's ranking for the discipline of Surveying was follows: Schwebke-Shiskin&Associates, Inc., as the first ranked proposer;and WHEREAS, after reviewing all the submissions and the results of the evaluation process, the City Manager recommends that the Administration be authorized to enter into negotiations as follows: William B. Medellin Architect P.A., CSA Central, Inc., Schindler Architects, Inc., TSAO Design Group, Incorporated, CPH, Inc., Sol-ARCH, Inc., William Lane Architect, Inc., Moss Architecture and Design Group, Inc. Alleguez Architecture, Inc., R.J. Heisenbottle Architects, and P.A., Vitalini Corazzini, P.A., for the discipline of General Architecture. Savino & Miller Design Studio, P.A., Keith and Schnars, P.A., CPH, Inc., Curtis& Rogers Design Studio, Inc., Chen-Moore Associates, and Miller, Legg &Associates, Inc., for the discipline of Landscape Architecture. Schwebke-Shiskin & Associates, Inc., CES Consultants, Inc., Chen-Moore Associates, 305 Consulting Engineers, LLC, Miller, Legg & Associates, Inc., and SRS Engineering, Inc., for the discipline of Civil Engineering. E Sciences, Inc., Terracon Consultants, Inc., EBS Engineering, Inc., and CSA Central, Inc., for the discipline of Environmental Services and Testing Engineering. CSA Central, Inc., 3FM Engineering, Inc., and UCI Engineering Inc., for the discipline of Mechanical, Electrical, and Plumbing Engineering. 305 Consulting Engineers, LLC, Eastern Engineering Group Company, CES Consultants, inc., Master Consulting Engineers, Inc., UCI Engineering Inc., and Diaz, Carreno, Scotti & Partners, Inc., for the discipline of Structural Engineering. TSAO Design Group, Incorporated, and MC Designers, Inc., for the discipline of Interior Design/Space Planning. Schwebke-Shiskin &Associates, Inc. for the discipline of Surveying. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the City Manager pertaining to the ranking of proposals pursuant to Request for Qualifications (RFQ) No. 2018-141-ND for Professional Architectural and Engineering Services for Capital Repair and Replacement Projects; authorizing the administration to enter into negotiations with William B. Medellin Architect P.A., CSA Central, Inc., Schindler Architects, Inc., TSAO Design Group, Incorporated, CPH, Inc., Sol- ARCH, Inc., William Lane Architect, Inc., Moss Architecture and Design Group, Inc., Alleguez Architecture, Inc., R.J. Heisenbottle Architects, and P.A., Vitalini Corazzini, P.A., for the discipline of General Architecture; authorizing the Administration to enter into negotiations with Savino & Miller Design Studio, P.A., Keith and Schnars, P.A., CPH, Inc., Curtis & Rogers Design Studio, Inc., Chen-Moore Associates, and Miller, Legg & Associates, Inc., for the discipline of Landscape Architecture; authorizing the Administration to enter into negotiations with Schwebke-Shiskin &Associates, Inc., CES Consultants, Inc., Chen-Moore Associates, 305 / Consulting Engineers, LLC, Miller, Legg & Associates, Inc., and SRS Engineering, Inc., for the discipline of Civil Engineering; authorizing the Administration to enter into negotiations with E Sciences, Inc., Terracon Consultants, Inc., EBS Engineering, Inc., and CSA Central, Inc., for the discipline of Environmental Services And Testing Engineering; authorizing the Administration to enter into negotiations with CSA Central, Inc., 3FM Engineering, Inc., and UCI Engineering Inc., for the discipline of Mechanical, Electrical, And Plumbing Engineering; authorizing the Administration to enter into negotiations with 305 Consulting Engineers, LLC, Eastern Engineering Group Company, CES Consultants, Inc.; Master Consulting Engineers, Inc., UCI Engineering Inc., and Diaz, Carreno, Scotti & Partners, Inc., for the discipline of Structural Engineering; authorizing the Administration to enter into negotiations with TSAO Design Group, Incorporated, and MC Designers, Inc., for the discipline of Interior Design / Space Planning; authorizing the Administration to enter into negotiations with Schwebke-Shiskin & Associates, Inc. for the discipline of Surveying; and further authorizing the Mayor and.City Clerk to execute an agreement with each of the recommended proposers upon conclusion of successful negotiations by the Administration. /� PASSED AND ADOPTED this /7 day of All o er 2018. ATTEST: to/30141 RAF EL E. GRANADO, CITY CLEFtriz, DAN GELBER, MAYOR ti F:TURC1Solicttations1201812018-141-N _ giffe?r. :,s110-AwardtRESO2018-141-ND.doc • APPROVED AS TO FORM &LANGUAGE • 1._' ��. 'S * I a &FOR EXECUTION O ATED= ., v _ih�Gl�F� i , 0) A71 0 4 OP-- " -,2-01`j. 7 e 1'r` Cair\ City Attorney ,�.P Data r Resolutions-C7 P MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: October 17, 2018 SUBJECT A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE CITY MANAGER PERTAINING TO THE RANKING OF PROPOSALS PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) NO. 2018-141-ND, FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH WILLIAM B. MEDELLIN ARCHITECT P.A., CSA CENTRAL, INC., SCHINDLER ARCHITECTS, INC., TSAO DESIGN GROUP, INCORPORATED, CPH, INC., SOL-ARCH, INC., WILLIAM LANE ARCHITECT, INC., MOSS .ARCHITECTURE AND DESIGN GROUP, INC., ALLEGUEZ ARCHITECTURE, INC., R.J. HEISENBOTTLE ARCHITECTS, AND P.A,, VITALINI CORAZZINI, RA., FOR THE DISCIPLINE OF GENERAL ARCHITECTURE; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SAVINO & MILLER DESIGN STUDIO, P.A., KEITH AND SCHNARS, P.A., CPH, INC., CURTIS & ROGERS DESIGN STUDIO, INC., CHEN-MOORE ASSOCIATES, AND MILLER, LEGG & ASSOCIATES, INC., FOR THE DISCIPLINE OF LANDSCAPE ARCHITECTURE; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SCHWEBKE- SHISKIN & ASSOCIATES, INC., CES CONSULTANTS, INC., CHEN-MOORE ASSOCIATES, 305 CONSULTING ENGINEERS, LLC, MILLER, LEGG & ASSOCIATES, INC., AND SRS ENGINEERING, INC., FOR THE DISCIPLINE OF CIVIL ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH E SCIENCES, INC., TERRACON CONSULTANTS, INC., EBS ENGINEERING, INC., AND CSA CENTRAL, INC., FOR THE DISCIPLINE OF ENVIRONMENTAL SERVICES AND TESTING ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH CSA CENTRAL, INC., 3FM ENGINEERING, INC., AND UCI ENGINEERING INC., FOR THE DISCIPLINE OF MECHANICAL, ELECTRICAL, AND PLUMBING ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH 305 CONSULTING ENGINEERS, LLC, EASTERN ENGINEERING GROUP COMPANY, CES CONSULTANTS, INC., MASTER CONSULTING ENGINEERS, INC., UCI ENGINEERING INC., AND DIAZ, CARRENO, SCOTT! & PARTNERS, . INC., FOR THE DISCIPLINE OF STRUCTURAL ENGINEERING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH TSAO DESIGN GROUP, INCORPORATED, AND MC DESIGNERS, INC., FOR THE DISCIPLINE OF INTERIOR DESIGN / SPACE PLANNING; AUTHORIZING THE ADMINISTRATION TO ENTER INTO NEGOTIATIONS WITH SCHWEBKE- SHISKIN & ASSOCIATES, INC. FOR THE DISCIPLINE OF SURVEYING; AND - FURTHER AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN Page 436 of 1637 AGREEMENT WITH EACH OF THE RECOMMENDED PROPOSERS UPON CONCLUSION OF SUCCESSFUL NEGOTIATIONS BY THE ADMINISTRATION. RECOMMENDATION Adopt the Resolution ANALYSIS On September 28, 2004, through Resolution 2004-24697, the City Commission created the Capital Renewal and Replacement Program (the "CRR Program"). The intent of the CRR Program is to provide funding for proactive renewal and replacement of the City's facilities and the building systems within those facilities (e.g., HVAC, roofs, fire safety systems, etc). The CRR program is also used to execute small repairs, remodels or renovation projects, with total project budgets under $325,000. The average value of the current CRR projects is approximately $158,000, but can be as low as $25,000 or less. In addition to CRR projects, award(s)of this RFQ may also be used for other small projects.. Section 287.055, Florida Statutes, commonly known as the Consultant's Competitive Negotiation Act (CCNA), is applicable to the selection of professional consultant services (architecture, professional engineering, landscape architecture, or registered surveying and mapping) by public agencies for projects valued up to the amount established in Category 5, Section 287.017, Florida Statutes (currently $325,000 or as amended by law) or for a planning or study activities valued up to the amount established in Category 2, Section 287.017, Florida Statutes (currently $35,000 or as amended by law). Even for projects below these thresholds, an architect or engineer is often required to develop construction documents for construction and permitting. Award of this RFQ will expedite the selection of architects and engineers as required for small projects. In order to maximize the cost effectiveness of small projects, through this RFQ the City sought to establish a pool of qualified architectural and engineering consultants interested in providing the City with professional services for small projects. The categories of work are, as further defined in Appendix C, Architecture — General, Architecture — Landscape Architecture, Engineering — Environmental Services and Testing, and Engineering — Mechanical, Electrical & Plumbing, Engineering—Structural. RFQ PROCESS On February 14, 2018,the City Commission approved to issue the Request for Qualifications (RFQ) No. 2018-141-ND for Professional Architectural and Engineering Services for Capital Repair and Replacement Projects. On February 15, 2018, the RFQ was issued. A voluntary pre-proposal conference to provide information to proposers submitting a response was held on February 27, 2018. Seven addenda were issued. The Procurement Department issued bid notices to 275 companies utilizing www.publicpurchase.com website. 263 prospective bidders accessed the advertised solicitation. RFQ responses were due and received on May 7, 2018. The City received proposals in response to the RFQ from the following 37 firms for a variety of categories as indicated in Attachment A: 305 Consulting Engineers, LLC 3FM Engineering, Inc. Alejandro Pardo Architecture, Inc. AlleguezArchitecture, Inc. ArcBuilders and Group Incorporated Page 437 of 1637 Calvin, Giordano&Associates, Inc. CES Consultants, Inc. • Chen-Moore Associates CPH, Inc. CSA Central, Inc. Curtis & Rogers Design Studio, Inc. Diaz, Carreno, Scotti& Partners, Inc. E Sciences, Inc. Eastern Engineering Group Company EBS Engineering, Inc. Florida Technical Consultants, LLC Keith and Schnars, P.A. Landscape DE, LLC Master Consulting Engineers, Inc. MC Designers, Inc. Miller, Legg&Associates, Inc. Moss Architecture and Design Group, Inc. R.J. Heisenbottle Architects, P.A. Ross&Baruzani, Inc. Savino&Miller Design Studio, P.A. Schindler Architects, Inc. Schwebke-Shiskin &Associates, Inc. Sol-ARCH, Inc. SRS Engineering, Inc. T.Y. Lin International Terracon Consultants, Inc. TSAO Design Group, incorporated • UCI Engineering Inc. • UCI Engineering, Inc. D/B/AUCI Design, Inc. Vitalini Corazzini, P.A. William B. Medellin Architect.P.A. William Lane Architect, Inc. On February 26, 2018, the City Manager appointed the Evaluation Committee via LTC # 105-2018. The Evaluation Committee convened on August 6, 2018; to consider proposals received. The Committee was comprised of Lily Alvarez, Construction Manager, Property Management Department, City of Miami Beach; Pilar Caurin, Construction Manager, Office of Capital Improvement Projects, City of Miami Beach; Elizabeth Estevez, Capital Projects Manager, Parks and Recreation Department, City of Miami Beach; and Francisco Garcia, Construction Manager, Property Management Department, City of Miami Beach'. The Committee was provided an overview of the project, information relative to the City's Cone of Silence Ordinance and the Government Sunshine Law. The Committee was also provided with general information on the scope of services and a copy of each proposal. The Committee was instructed to score and rank each proposal pursuant to the evaluation criteria established in the RFQ. The evaluation process resulted in the ranking of proposers as indicated in Attachment A. Subsequent to the evaluation of proposals, Ross & Barumni, Inc. submitted the attached letter indicating that without local MEP resources it no longer wished to be considered for award. Due to the large number of responses, a summary of each top-ranked firm or the firm's proposal is available upon request. Page 438 of 1637 CONCLUSION After reviewing ail the submissions and the results of the evaluation process, I note that the City is fortunate to have received a large number of responses to the RFQ. In determining the number of firms to award in each category,staff has recommended the number of firms believed to be necessary to complete the volume of work available for each category. Awarding too many firms in any given category would not be in the City's best interest as,an insufficient volume of projects may cause, the awarded firms to become disinterested and not provide the necessary level of service to the City. Therefore, I recommend that the Mayor and City Commission approve the Resolution authorizing the Administration to enter into negotiations as follows: William B. Medellin Architect P.A., CSA Central, Inc., Schindler Architects, Inc., TSAO Design Group, Incorporated, CPH, Inc., Sol-ARCH, Inc., William Lane Architect, Inc., Moss Architecture and Design Group, Inc., Alleguez Architecture, Inc., R.J. Heisenbottle Architects, and P.A., Vitalini Corazani, P.A., for the discipline of General Architecture. Savino & Miller Design Studio, P.A., Keith and Schnars, RA, CPH, Inc., Curtis & Rogers Design Studio, Inc., Chen-Moore Associates, and Miller, Legg & Associates, Inc., for the discipline of Landscape Architecture. Schwebke-Shiskin & Associates, Inc., CES Consultants, Inc., Chen-Moore Associates, 305 Consulting Engineers, LLC, Miller, Legg & Associates, Inc., and SRS Engineering, Inc., for the discipline of Civil Engineering. E Sciences, Inc., Terracon Consultants, Inc., EBS Engineering, Inc., and CSA Central, Inc., for the discipline of Environmental Services and Testing Engineering. CSA Central, Inc., 3FM Engineering, Inc., and UCI Engineering Inc.,for the discipline of Mechanical. Electrical.and Plumbing Engineering. 305 Consulting Engineers, LLC, Eastern Engineering Group Company, CES Consultants, Inc., Master Consulting Engineers, Inc., UCI Engineering Inc., and Diaz, Carreno, Scotti & Partners, Inc., for the discipline of Structural Engineering. TSAO Design Group, Incorporated, and MC Designers, Inc., for the discipline of Interior Design / Space Planning. Schwebke-Shiskin &Associates, Inc.for the discipline of Surveying. and further authorize the Mayor and City Clerk to execute an agreement with each of the recommended proposers upon conclusion of successful negotiations by the Administration. KEY INTENDED OUTCOMES SUPPORTED Build And Maintain Priority Infrastructure With FullAccountabilty FINANCIAL IN FORMATION The cost of the related services, determined upon successful negotiations, are subject to funds availability approved through the City's budgeting process. Legislative Tracking Property Management/Procurement Page 439 of,1637 • ATTACH MEN TS: Description D Attachment A o Ross and Barazzuni Letter o Resolution • Page 440 of 1637 ATTACHMENT A ARCHITECTURE-GENERAL RF9:O*44I.I OPROFF9510IAL -- _ .-.— --~- I . 03 to co NiGIi1FCIURN.ANO ENOOtEERPIG LII Alvarez ` Pilar Caurin Elizabeth Estev ez ---_-- ` - •- LOW I __ Y Francisco Garcia SERVICES FOR CAPITAL RENEWAL AND 3t im ;IC RERACEMENT PROJECTS r`gp c G A92 agate . _. ,- 0C es Totals ;K •Qualltativa Quantitative I Subtotal Qualitative 1 Quantitative 1 Subtotal jQualitativo Quantitative Subtotal 'Qualitative , Quantitative Subtotal WilbamB.Medellin Architect -•-'--•--j P.A. 96 0 96 1 95 0 95 4 92 0 92 3 100 0 100 I 1 9 1 • CSA Central,Inc. .•- _ 96 0 96 1 I 98 0 98 1 91 0 91 4 98 0 90 5 11 2 -.. Schindler.Architects.Inc. 95 - 6 95 6 _..94 0 94 5 95 0 95 1 99 0 99 3 15 3 TSAO Design Group, -'-- Incorporated 95 0 95 6 93 0 93 6 _94 _ 0 94 ' 2 100 0 100 1 15 3 CPH,Inc. 96 0 96 1 97 0 97 3 84 0 84 9 99 0 99 3 16 •5 Sol-ARCH.Inc. I 95 0 95 0 98 0 98 1 86 0 86 7 98 0 1 98 5 IS __ 6 William Lane Architect f Inc. 95 0 _ _96 I t 87 0 87 10 90 0 90 5 93 0 93 11 27 7 Moss Architecture and Design I I - - Group.Inc. 95 0 95 6 90' 0 90 8 86 0 66 7 97 0 97 8 29 8 AIIeOuezArchitecture.Inc. 96 0 86 1. 89 0 89 9 80 0 80 11 94 - 0 94 9 30 9 R.J.Heisenbottle Architects, - - . P A. 94 0 _ 94 10 91 • 0 91 7 88 0 68 6 94 0 94 9 32 10 VtOlini Coraztini•P.A. 94 --0 - - 94 •10 82 0 82 12 82 0 62 10 98 0 ' 98 537 1111 ArcBuilders and Group '- -- ---`-•--- Ineorported 94 0 94 10 84 0 84 11 75 0 ! 75' 14 84 0 84 12 47 12 Alejandro Pardo Architecture, Inc. 93 0 93 13 8I3 0 ,_y 80 ,13 79 0 79 12 79 0 79 13 51 13 UCI Design.Inc. 88 0 88 14 69 ... 0 1 69 -114 78 I 0 78 13 76 0 __. 78 14 55 `14 / Propr _Pelves Coif, Sabi OwRyha e Moria Para.Asiva01,4f,MC 0 0 aloe.Ncl[ia.t ia.. 0 , 0 - . • Nal10aa0 and Ge.gs*Paae.a a 0 CPH Inc 0 0 . A Ceram Inc •. ••_•0 0 _- • GS Alga Nm (A9um and Osage Gap,Pre.- 0 0 R I r0,-.1,0000.944,11.PA a 0 Sr bMw04.1 I00 0 0 M▪AO Dego Gnap.hf 00,ai 0 0 , tail 00000x05 0a MIA VCS 00490,W. 0 0 1bJit Caam,i,PA 0 0 WI&s,0 41a0ean d.odulat PA0 0 mem lam mama=Ire •• 1 0 - --_-0-_ . FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • Page 441 of 1637 ATTACHMENT A ARCHITECTURE-LANDSCAPE • i .•RFQiDN•N1.ND PROFES90NAL . ..—. • ARCNntEgURALANDEYOUtEENMQ m m i g SERVICES FOR CAP❑ALRENEWaLAND Lily Alvarez--- .S Pilar Caurin ;Y Elizabeth EsteveZ Francisco Garcia 'c Low Tc 1iFPLACEYE3R PRAIEaTB 1 I m c :G A99regatrr ' . ¢--—.-- --J C _ — —J`� Totals Quablative goarWtative Sutton 1 0ualltative Ouantitative Subtotal- i QualitaEva _Quantitative Subtotal I qualitative Quantitative Suh stat I Savin&Miller Design Studio. "--'—"-" - -—•-- P A 97 0 97 1 ' 95 0 95 4 94 0 94 1 100 7 1 Keith and Schnars.P.A. — -96 __ 0 _ •96 -- 97 0 97 2 92 Cl 92 2 100-- 0 —. -_-100 1 8 2 CPH,Inc. 96 a 96 3; 97 --0 97 2 86 0 86 6 100 0 I 100 7 12—T�S Curtis&Rogers Design Studio. _ —`— Inc. _ 96 _ 0 _ 96 3 98 0 98 1 87 0 87 5 ' 98 0 98 5 414 -4 Chen-Moore Associates __97 -,— 0 — 97 1 ; 91 0 91 B 90 0 •_ 90 4 -98 0 1 98 .6 16 i 6 • Miller.Legg&Associates.Inc. 95 0 95 6 88 0 88 7 91 0 91 3 100 0 l 100 ..1 17 '6 Calvin.Giordano&Associates. — —- - - - Inc. , 95 0 95 6 92 0 92 _8 5 ___ B6 0 86 6 96 0 96 .7 24 •7 Landscape IDE.LLC 93 0 93 •_ .. . .. . 0 83 80 0 - 80 8 96 0 96 7 1 31 •8 • ... ... '1'i•:'�-:.7.o".mei,o:.Y6ti6;::..:::•:• i::"t:. . Precaa•r gown.Poiaa Tato Om... CaKA Medan&A..m...... 0 0 Ca.auo.•...cw,w --- 0 0 CPK IK. —.__...0 a Cvroa n.0..o...u.siwP.un a - 0 Kdh.rdaew.PA. a e 1.0..0E,LI.0 0 0 P.,.tor ari.aomw.rrc 0 0 - • Ss ro a Oaim Du n SIac P.A. 0 0 • FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTRUTE AN AWARD RECOMMENDATION. • • • Page 442 of 1637 . • - ATTACHMENT A ENGINEERING-CIVIL Rf4>f1IO IL14lDYROFESSIOW L - — ._-_.._.—_ _ _ __ TURAL AN ENGINEERING 2 w e low c � � illy Alvarez Pilar Cantle Elizabeth beth Estevez I co SERVICES FOR CAPITAL RENEWAL AN ;s� s j Francisco Garcia REPLACEMENT PROJECTS s 1 { c Aggregate c c re ata e c to � � --_—_--.__.. 2 Totals � Qualitative Quantitative subtotal Qualitative Quantitative subtotal Qualitative �uantltative Subtotal Qualitative i Quantitative Subtotal Schwebke-Sniskin 8 ... ---�,__ •-- ---- •• •—-- - ---t Associates,Inc. 95 0 95 5 97 0 57 3' 95 0 95 1 100 0 100 2 11 1 CES Consultants,Inc. 97 _ 0 97 2 95 0 95 4. 92 0 92 5 100 0 100 2 13 2 Chen-Moore Associates _97 _0 _ 97 2 91 0 91 7, 93 0 93 3 100 0 100 2 14 3 305 Consulting Engineers.LLC - 5_ 95 ••,- 100 1 84 5 89 8 i 87 6 _ _ 92 5 98 5 103 1 15 4 94 _. 5 ...93 0 93 3 100 0 100 Miller,Le 8 Aasoclates.Inc. 95 0 95 5 94 84 • - _ _—•-----_..._. .- 0 -,- 2 /5 4 SRS Engineering,Inc. 95 0 •95 5 08 ..988--__. 1-___ 134- 0 94 2 98 _ 0 98 7 _. 15 4 CPH.Inc. 94 - 0 94 _8 i__ 96---_ 0 88 _ 1 _ 91 0 91 7 100 0 100 2 18 7 T Y.tin International 97 0 97 2' 92 0 92 6- 90 _- 0 __ _ ---__ 90 8 98 0 98 7 23 '8- wa. Y..vc(ana:.t.( ti .. Teta- ' 306C0O4q Cfpna..LLC n t 0 CESCm.wa.Ihr 0 i e C..Move M.wY.a 0 D CpMvc 0 0 Mon Lapp 00.Gaoae..00 0 0 $eamtSlMON IpWot,m Me 0 0 GRS 5np. eq a,c 0 0 r.Y la wn.a smi 0 0 FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. Page 443 of 1637 ATTACHMENT A ENGINEERING-ENVIRONMENTAL SERVICES AND TESTING . ..... life 2011.141ND PROFESSIONAL - • 03' oi ARCHITECTURAL AND ENCNIFIRe49 e. .E 2 c. e Low g Lily Alvarez PitCaurin a r Elizabeth Estevei Francisco Garcia SERVICES FORCJPITAL neitivALATe) -a ..‘ REPLACEMENT PROJECTS g ce . g1 Aggregate .-g ix Totals c? Qualitative Quanthativa Subtotal Qualitative Quantitative Subtotal Qualitative • Quantitative Subtotal ' Qualitative ODantltative Subtotal .,.. - . . E Sciences.Inc. 96 0 96 1 95 0 95 i 2 96 0 86 1 100 0 100 1 5 I. . Terracon Consultants,Inc 96 0 96 1 95 0 95 ,2 88 —.-• - 0 88 1 100 0 100 1 EBS Engineering,Inc. • 95 0 95 4 98 0 98 ;1 92 0 .62 2 100 0 100 1 8 CSA Cenlral.inc. 96 0 96 1 as 0 69 I 4 . 87 0 87 4 100 0 101) 1 10 4 Honda Technical Consultants, - LLC 94 9 94 5 82 0 82 :5 82 - 5 94 0 94 5 21) 5 f::,'-'4'f;•':,.•-r!,i'ilj,:".': ;gi,;;;.ii'l.i...':.:";/11,;:j:::-F.• ' 1 Pram*. Vemlnal PON,1 Toni Wenntifts CFA Cemal.bs 0 1 0 E&nous na 0 ; 0 FM Fn0nnung Pc 0 1 0 Ftrlda FeamcalCossuMmn.LLL n ! n . :TmeoanCereurbeas arc a ! 0 ' FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • • Page 444 of 1637 . . ATTACHMENT A ENGINEERING-MECHANICAL,ELECTRICAL,AND PLUMBING RPG a 0 1111.14c PROFESSIONAL • _ •-- -• _ •- . ARCHITECTURAL AND ENONEEWNG a to m LIIy Alvarez Pilar Cawin x Elin6alh Ectevex x Francisco Garcia E —` aEavu8s FORCAMAL RENEWAL NC Law c REPLACEMENT PR0JECT5 P c c Aggregat0 .¢- 12 a a3 Totals .. OaaNatIva QUantltatIve Subtotal Qualitative I QuanWative j Subtotal Qualitative LQoaetiµavo Sybtotal CluaWtiva Quantitative ' Subtotal ICSH Central.Inc. 95 0 95 1 96 0 96 1 89 _ I) _ _89 Z ' 100 0 100 1 5 • 1 Ross&Baruuinl.Inc. 95 0 95 I 1 95 0 95 2_ D2_ - 0� •� 1 100 • 0 100 1 5 f :3FM Engineering.Inc. 90 0 90 3 94 0 _ 94 3 88 '— 92 0 ea 3 99 0 ! 98 4 I - 13 _ 3 jUCI Engineering.Inc. 90 0 90 3 90 0 1 90 4 86 0 86 4 99 0 j_ 99 —3 I 14 4 . :: '........ aqua... •., Prop" Venn's Patna Tanribmati n SUMEi011w00 Vic 0 0 Ras\eapian rc 0 0 • UG EnyeiM_mc 0 - 0 , FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • l _-- Page 445 of 1637 • ATTACHMENT A ENGINEERING-STRUCTURAL RW 511441-ND PROFESSIONAL --.. .. ___-.-.___. -_ co ARpNECraRAL AND ENOWEEROIfa o w c Low •c LilyAlvarez 5 Pier Cowin ° Elizabeth Estevez 5 Francisco Garcia SFAVtGESFOR CAPITAL RENEWAL AND AC s - RERACENEiffPRO)E.CS w I m a Aggregate • Li _._._..._._ ___.__..... .CC .. a _... ..-..___-..__tto Totals gOalitathrquantitative Subtotal a I --_ _-___ `_- Quail... quantitative Subtotal i Qualitative I quantitative •Subtotal qualitelive� Ouantltaflve• Subtotal 305 Consulting Engineers,LLC 95 5 100 1• 88 5 93 1 79 5 84 5 100 • 5 105 1 8 1 Eastern Engineering Group -••- Company 95 0 95 3 92 0 92 2 90 _ 0____ 90 1 100 0__ 100 2 L 8 1 _ CES Consultants,Inc. 97 0 97 2 91 0 91 3 87 0 87 3 100 0 100 •2 10 3 Master Consulting Engineers. - "• -••- - -• -'-- - Inc. 95 0 95 3 84 0 84 5 89 0 89 2 i 9B I) 984 14 4 1 - UCi Engineering,Inc. 94 0 ,-_ 94 5 91 0 91 3 87 0 87 3 94 0 94 5• 16 5 t Oiaz.Carreno.Scott'8 ------- Partners.Inc. 92. 0 92 6 81 0 81 - 6 75 0 75 6 92 T 0 _ • 92 6 I 24 '8 i _. Pam., v.o..n•.w:d. Taucvmmw.e. 105CO'au A2&q..t•...1.lc s 5 CES CP9.iILGL M. 5 . 0 NY.Clew..S.014 Pave,a' 0 0 farm F.gnv..p Cn,CU/p:, G 0 - ai.+er cwaum0 La0.Kon.0G - -. _....—.p 0 I . i FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • • • Page 446 of 1637 ATTACHMENT A INTERIOR DESIGN I SPACE PLANNING ItFO 701a141•NO PROFESSIONAL ARGNIIECIORALARO ENOINEERNO c -- e • c c Law I c SERYKES FOR CAPITAL Rp1EWA1,AND Llly Alvarez Y Pear Caurin I,Y Elizabeth Estevez i Francisco Garcia Y REPLACEMENT PROJECTS ._... •••a l C a A Totals 1e n C Qualitative Qllantltative SuDlotat , Qualitative Quantllative I Subtotal i Qualitative ! Quantitative . Subtotal Qualitative jQvzntitative f Subtotal TSAO Design Group, Incorporated 95 0 95 1 93 0 93 1 93 .._•, 0--., 93 1 100 0 100 1 . , a _ 1 MC Deoi9ners,Inc. I 93• 0 93 2 87 0 87 2 89 0 89 —, 2 98 0 98 .2 1 8 12 rtiape •N,•e'e Poen TaulOslawl. *0 Dcagm,vc. a 0 76IO Dalge GA..03000 6.2 0 0 FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • C - Page 447 of 1637 ATTACHMENT A SURVEYING RFQ281iti1•NG PROFESSIONAL • AliCHITEt:TGRAL AlA ENGINEERING Yc• e Low SERVICES FORCAPIFAL RENEWAL ANG Lily Alvarez x Pilar Caitlin,. Elizabeth EsfeveL Francisco Garcia REPLACEMENT PRG1ECT8 is I I 'e Aggregate e, C .tY Totals I C I Qualitative Quantitative Subtotal Clan Oh OVIBQuantitative Subtotal Qualitative Quantitative Subtotal Qualitative Quantitative Subtotal Schwebke-Shiskin S —— Asaociates;Inc 95 0 95 1 98 D 98 t 95 5 95 1 109 0_^ 100 .1 4 — _1.1 1 • R, yalarauh Faints Total GrrnutAa IsrFSra.4Aawam.4c' j 0 t 0 FOR DISPLAY PURPOSES ONLY.FINAL RANKING DOES NOT CONSTITUTE AN AWARD RECOMMENDATION. • • • Page 448 of 1637 Ross; aruzzrnl 7200 NW 19`"Street,Suite 305 Miami,Florida 33126 305.477.8338 October 2,2018 Ms.Natalia Delgado City of Miami Beach Procurement Department 1755 Meridian Avenue,3"'Floor Miami Beach,Florida 33139 RE: RFQ 2018-141-ND,Professional Architectural and Engineering Services for Capital Renewal and Replacement Projects,Engineering—Mechanical,Electrical&Plumbing Dear Ms.Delgado and Members of the Selection Committee, This letter is a follow-up to our submission submitted to,the City of Miami Beach on May 7 relative to On-Call Mechanical/Electrical/Plumbing (MEP) Engineering Services. We understand that Ross & Baruzzini is being considered as a candidate for award of the On-Call Contract. We wanted to inform the City of Miami Beach that our local resources have changed since we submitted our Proposal: • Our local office remains strong in the security,communications and technology disciplines and our firm will continue to offer these services form our local office. • We no longer have mechanical,electrical and plumbing(MEP)resources in our local office;but do have these resources within our headquarters in St.Louis. We remain interested in the contract relative to security,communications and technology focused projects;but without local MEP resources it may be in your best interest to consider firms with local MEP resources for projects that are MEP focused. l We thought it best to inform the City of Miami Beach of this change in local resources since our submission and understand any ramifications relative to selection of firms for the contract. Respectfully, Michael E.Shea,AIA Senior Vice President,Government Market M:314.378.6082;mshea@rossbar.com Cc:Susan Dimond,Bill Overturf rossbar.com Page 449 of 1637 ATTACHMENT B REQUEST FOR QUALIFICATIONS (RFQ) &ADDENDUMS 35 • MInProcurement Department/�I �/ ` 1755 Meridian Ave, 3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov • • ADDENDUM NO,7 • REQUEST FOR QUALIFICATIONS NO.2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS(the RFQ) April 18,/018 This Addendum to the above-referenced RFQ is issued-in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The RFQ is amended in the following particulars only(deletions are shown by strikethrough and additions are underlined). 1, RFQ DUE DATE AND TIME. The deadline for receipt of submittals is'extended until 3:00 p.m., Monday, May 7,2018,at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor. Miami Beach, Florida 33139 • Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow for traffic or other delays for which the Proposer is solely responsible. No further questions will be considered. 2. RESPONSES TO QUESTIONS RECEIVED. Q1: The answer to Q17 states that the City already has a pool of professional surveyors and the City will not consider adding this category to the list of services. Under the Revised Statement of Work Required —Exhibit B (Revised Exhibit C), Surveying has been listed as a category of work. Please clarify whether surveying is included as a category in this RFQ proposal or not. Al: Please refer to Addendum No. 5, Exhibit B: Revised Appendix C, Minimum Requirements &Specifications,surveying has been added to the categories of work. Any questions regarding this" Addendum .should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext. 6263 nataliadelgado@miamibeachfl.gov Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission. Potential prop rs that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Pr sp c ive pidders"questionnaire with the reason(s)for not submitting a proposal. Sin -ly, • lex �- is Pro -ment Director RFQ No.2018-141-ND Addendum#7 4/18/2018 MIAA /� I B E,AC Procurement Department I V 11755 Meridian Ave, 3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM NO.6 REQUEST FOR QUALIFICATIONS NO.2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS(the RFQ) April 16,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The RFQ is amended in the following particulars only(deletions are shown by strikethrough and additions are underlined). 1. RFQ DUE DATE AND TIME. The deadline for receipt of submittals is extended until 3:00 p.m., Monday, April 30, 2018,at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow for traffic or other delays for which the Proposer is solely responsible. No further--questions will be considered: Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext.6263 nataliadelgado@rniamibeachfl.gov Proposers are' reminded to acknowledge receipt of this addendum as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Pros ctive Bidders"questionnaire with the reason(s)for not submitting a proposal. 'n ,ely, AP2-� lex D. Procurement Director RFQ No.2018-141-ND Addendum#6 • 4/16/2018 M 1 Atv\I B EACHProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov . i ADDENDUM NO.5 REQUEST FOR QUALIFICATIONS NO. 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS (the RFQ) April 13,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The RFQ is amended in the following particulars only(deletions are shown by strikethrough and additions are underlined). • 1. REVISION: Delete Section 0300, Submittal Instructions and Format, on page 12—13 of the RFQ, in its entirety and Replace with Revised Section 0300, Submittal Instructions and Format, attached hereto as Exhibit A. 2. REVISION: Delete Appendix C, Minimum Requirements & Specifications, on page 27—28 of the RFQ, in its entirety and Replace with Revised Appendix C, Minimum Requirements & Specifications, attached here to as Exhibit B. 3. ATTACHMENTS. Exhibit A: Revised Section 0300, Submittal Instructions and Format Exhibit B: Revised Appendix C, Minimum Requirements&Specifications 4. RESPONSES TO QUESTIONS RECEIVED. Q1: Could you please clarify what is needed for the three references? Do we need reference letters or just contact information? Al: As stipulated in Appendix A, Response Certification, Questionnaire & Requirements Affidavit, 3. References & Past Performance, for each reference submitted, the following information is required: 1) Firm Name, 2) Contact Individual Name & Title,.3) Address, 4) Telephone,5)Contact's Email and 6)Narrative on Scope of Services Provided. Q2: Do only originals need to be in 3 ring binders or the 10 copies also? A2: As stipulated in Section 0300, Submittal Instructions and Format, 1. Sealed Responses, the City prefers that the original be in a 3-ring. Additionally,that the Proposer submit ten (10) bound copies and one(1)electronic format(CD or USB format). How the copies are bound is up to the proposer. Q3: Pg 13, Section 2.3.1 Audited Financial Statements in lieu of D&B SQR. Will a current (2017-2018) certification letter from FDOT suffice for Audited Financial Statements?or do you require the Audited Financial Statement itself as submitted to FDOT for Certification? . A3: Please refer to Exhibit A: Revised Section 0300, Submittal Instructions and Format. Neither is requested at this time. RFQ No.2018-141-ND Addendum#5 4/13/2018 V IAI B E4C H Procurement Department 1755 Meridian , Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov Q4: Are the proposing firms required to submit sub-consultants to address all the service areas identified on p. 28 of Appendix C? A4: Proposers may but are not required to submit proposals for all categories of work • stated within the RFQ. Proposals must be limited to a single category of work. Those Proposers wishing to submit proposals for multiple categories of work must submit a separate proposal for each category. For example, if a Proposer wishes to submit a proposal • for Architecture-General AND for Engineering-Structural, the Proposer must submit a single • proposal for Architecture-General and a separate and distinct proposal for Engineering • - Structural. • • Proposals are not to include sub-consultants at this time.Proposals shall only be submitted • for the areas of work that will be completed by the submitting firm. • • Q5: Under"Experience and Qualifications of the Firm", you have asked for an SF330. Then, under "Experience and Qualifications of the Team", you have asked, "A resume of each individual, • including education, experience, and any other pertinent information, shall be included for each respondent team member to be assigned to this contract". The SF330 includes resumes. Are you looking for resumes to be included twice in two separate sections? A5: Please refer to Exhibit A: Revised Section 0300,Submittal Instructions and Format. Q6: Under"Experience and Qualifications of the Team", you are asking for "Project Experience: For each architect and engineer, include information for three (3) relevant projects, performed in the last five years, for public or private sector clients."Does"architect and engineer' refer to each individual on the team,or rather to the firm as a whole? Projects are included in the SF330.Are you looking for • projects to be included twice in two separate sections? A6: See response to item Q5 above. • Q7: Do we have to submit info for both Tab 2 and Tab 3.or just Tab 2 since we are submitting as a firm and not as a Team? A7: See response to item Q4 above. Q8: In the RFQ, under the Format section, for Tab 2.2 (Qualifications of Proposing Firm), are we to use SF 330 section F to present this information? AB: See response to item Q5 above. Q9: We are a consulting engineer (Mechanical, Electrical, and Plumbing) firm, do we have to be listed under an architect in the proposal or can we submit our own proposal? A9: See response to item Q4 above. • RFQ No.2018-141-ND Addendum#5 . 4/13/2018 MIA I B EACProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov Q10: Insurance Requirements-Are we required to carry Workers'Comp,General Liability, and Automobile Liability?We do carry the 1 M professional liability being an engineering firm. A10: Yes, the Consultant will need to maintain the minimum levels of insurance indicated in Appendix D, Insurance Requirements. Q11: Could the City please clarify intent?"Teams"with the"Prime" being the discipline under which you are submitting or Single-discipline proposals with no sub-consultants included?or will both types of submittals be allowed in which case..is it up to the Proposer? All: See response to item Q4 above. Q12: Tab 2 Section 2.2 asks for client references,Tab 3 Section 3.1.1 also asks for client references, and item 3 of the Response Certification, Questionnaire & Requirements Affidavit also asks for • references. Can these references be the same? Al2: No, references requested under Appendix A and Tab 3 are for the firm. References requested under Tab 4 are for the Proposer's individual team members (architects and engineers). • Q13: Can the proposer include references from City of Miami Beach staff? A13: Yes, the proposer can include references from the City, providing they are specific to a project. Q14: Is there a preponderance of vertical or horizontal tasks anticipated from this contract? A14: The City anticipates there to be a preponderance of vertical tasks resulting from the , award of this solicitation. Q15: While we understand that the industry is generally called Architectural/Engineering Services, Page 27 item 02' lists categories being sought grouped categorically as either "Architecture" or "Engineering". In the case of, for example, "Architecture — Landscape", the fact that it is written where landscape is appended to architecture it could be misunderstood to read that a landscape architectural firm must be a sub or part of architectural team because of the way it written. Please clarify that it is not the intent of the City to force landscape architecture services to be solely provided as a sub to an architectural prime, and instead landscape architectural services can be submitted. independently. A15: See response to item Q4 above. Q16: "Engineering — Structural" is listed twice. Can the City clarify if one of those was intended to be "Engineering—Civil" A16: Please refer to Exhibit B: Revised Appendix C, Minimum Requirements & Specifications. RFQ No.2018-141-ND Addendum#5 4/13/2018 MI ANI I B EAC F-IProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www,miamibeachfl.gov - i Q17: Does the City already have a pool of Professional Surveyors? If not, will the City consider adding this category to the list of services? All: The City already has a pool of Professional Surveyors. Hence, the City will not consider adding this category to the list of services. Q18: Mechanical, Electrical and Plumbing services are all grouped together, however there are many highly qualified firms that provide one and not all three of those services. Will the City consider breaking each of these out into separate categories? A18: See response to item Q16 above. Q19: If the City will not break-out Mechanical, Electrical and Plumbing services into separate categories, • will the City clarify if a firm that does not provide all three services in-house will preclude them from being eligible to submit. A19: 'See response to item 016 above, Q20: During the Pre-Proposal Conference it was stated that firms could submit individually or as a part of a team. Concerns were brought up by several of the participants and attendees that that structure would result in disadvantageous situations for the applicants. Seldom are projects, even the small ones, only the product of one sole discipline. Therefore, an applicant may be selected by the City as part of a 'pool', for example for.Landscape Architectural or Civil Engineering Services. If, for example, a project is then given to an Architect for a building renovation or annex that will also require landscape and civil work, and if that Architect's RFQ submittal included a Civil Engineer or • Landscape Architect as a part of their 'team', then the contracted firm in the pool of qualified consultants selected by the City will not see the benefits of having submitted to perform any necessary intersecting services required as a part of the scope for that specific building renovation project. We think that the option to submit independently or as a part of a team may result in (a) bulking-up all the RFQ responses that will be received by the City to include both prime and consultant services which will make the task of an apples-to-apples comparison by the evaluation committee very difficult — or it may (b) dissuade qualified applicants from submitting altogether because they have not formed the established relationships other 'teams' may have in place — ultimately reducing the options for qualified professionals available for the City to choose from and setting the City at a disadvantage. We would respectfully recommend that all responses be made solely for the primary in-house service offered and that the option to also submit as part of a team be eliminated. That way, each applicant will be solely evaluated based on that primary service they are providing. The City could request that each applicant could state what firms they have had past experiences with thatprovide what would be sub-consultant services in a new Tab 2.4 to be included in Page 13. The City could then clarify that as a project becomes available, it would be the City's responsibility to assemble the. project team solely from those within the pool. If a prime has a stated working relationship with another firm that is also in the pool, then the City could favorably select that second firm to be a part of the team,or not. Ultimately,this will be in the City's best interest because(a)it will ensure that all team-members have been properly vetted through the selection process, and (b) it will clarify the process to those of us responding to this RFQ. RFQ No.2018-141-ND Addendum#5 4/13/2018 - I IMI ANI Procurement Department EAC H 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www,miamibeachfl.gov Given the above, please confirm-if it is still the intent of the City to allow submittals to be • independently submitted as well as a part of a team. A20: See response to item Q4 above. • Q21: We understood from the statements made during the Pre-Proposal Conference that, for ease and facility of review, all submittals for each different service category should be submitted as separate packages, independently. Therefore, 1 firm who submits for 3 different service categories will . provide 3 separate submittals. We certainly understand the effectiveness of this request; we simply want to confirm if our understanding is correct. A21: The City confirms that for ease and facility of review all submittals for each different service category must be submitted as separate packages,independently. Q22: Appendix A.What tab does the questionnaire affidavit fall under.Should Appendix A be a tab unto itself? A22: See response to item Q5 above. • Q23: 2.3 Financial Capacity. Do we request D&B SQR after the bid opening upon notification from the City or do we have D&B send the SQR to the City now? A23: As stipulated in Section 0300, Submittal Instructions and Format, 4. Financial Capacity, Proposer shall arrange for Dun & Bradstreet to submit a Supplier Qualifier Report (SQR)within three (3)days of request by the City, Q24: The numbering under the Submittal Instructions and Format seems to be off starting on page 12.Will you be updating that? A24: See response to item Q5 above. Q25: Are you looking for teams or individual firms for each"category"? A25: See response to item Q4 above. Q26: Civil engineering is not listed but structural is listed twice. Please clarify. A26: See response to item Q16 above. • Q27: Is the City of Miami Beach looking to award individual Agreements for each Discipline or only (1) Agreement with a Prime and Sub-consultants. Also, if it will only be(1)Agreement,who shall be the Prime? A27: Sub-consultants are not being considered at this time. The City of Miami Beach is looking to award individual agreements for each discipline. In the case were a firm is awarded various disciplines, one agreement will be executed and will indicate the various disciplines. • RFQ No.2018-141-ND Addendum#5 4/13/2018 - 1"/\ /\/\/\ I R ^I V E J 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov Q28: Would the City be able to provide a list of the firms that currently hold contracts and expiration date of those contracts? • A28: The City currently does not have a contract for professional architectural and engineering services for capital renewal and replacement projects. • Q29: Is the Architectural and Engineering Services for this RFQ associated with the cost less than $325,000? A29: Yes, this RFQ is for professional architectural and engineering services for capital renewal and replacement projects usually expected to cost less than$325,000.. Q30: Page 27 lists Engineering -Structural as a category two times. Is another category of engineering required? A30: See response to item Q16 above. Q31: Please elaborate on the type of testing &inspection services required under the Master Agreement. A31: No testing or inspection services are required.See response to item Q16 above. Q32: Can a firm submit as a prime;consultant&be a subconsultant on other firm's teams? A32: See response to item Q4 above. Q33: Under which category(ies)does the following services fall under? • -Lab Testing • -Soils&Geologic Studies,Foundations -Roofing Assessments, Replacements • -Testing &Inspection Services A33: See response to item Q16 above. Soils & Geologic Studies, Foundations falls under the Engineering — Environmental Services and Testing category. Roofing Assessments, Replacements falls under the Architecture—General category. • Q34: Please provide information on what type of testing services are required for the Engineering- Environmental Services category. • A34: Various, including, but not limited to: surveys for asbestos containing materials (or ACM);lead based materials,Asbestos/Lead Abatement,andindoor air monitoring services. . Q35: Please provide clarification as to what lab testing services are required under the Master Agreement. A35: The category for lab testing services was deleted from Appendix C, Minimum Requirements&Specifications. RFQ No.2018-141-ND Addendum#5 4/13/2018 ,Ai\/ I B EPC H Procurement Department 1755 Meridian , , Miami Beach, Florida 33139 www.miamibeachfl.gov Q36: Page 12, TAB 2 reads 1.3.Should this be part of TAB 1 or TAB 2? A36: See response to item Q5 above. Q37: Under "SECTION 0300/SUBMITTAL INSTRUCTIONS AND FORMAT", please clarify where APPENDIX A, B, D&E are to be placed in RFQ Submittal package. A37: See response to Item Q22 above. Appendix B is to be submitted if the Proposer has elected not to submit a proposal. Hence, it is not mentioned in Section 0300, Submittal Instructions and Format. Appendix D and E are not to be included in the proposal. • Q38: Section 2.2(Qualifications of Proposing Firm) ask to submit information regarding experience on non-residential small projects, construction cost below 325,000. Is it possible to include private offices, retail, restaurants, city projects such as certifications, zoning,consulting and private historical like Deering Estate or Woman's Club at Coconut Grove? • A38: Yes, when submitting information regarding experience you can include private offices, retail, restaurants, city projects such as certifications, zoning consulting and private historical projects. Q39: For section 3.1.1 it seems to duplicate section 2.2.Are we to provide small projects in both sections? • and are the projects supposed to be individual experience, firm,experience or subconsultant experience? A39: Tab 3, Section 3.1 Qualifications of Proposing Firm, requests firm's history and relevant experience and proven track record of providing architecture or engineering • services, preferably to'public sector agencies, for-non-residential small projects. Tab 4, Section 4.1.1 Project Experience, requests the experience of the firm's individual team members on small projects as defined in Section 3.1. Proposals are not to include sub • - consultants at this time. Q40: Should the DUNS information required in Tab 2.3 be sent to you? A40: Not at this time. As'-stipulated in Section 0300, Submittal Instructions and Format, 4. Financial Capacity, Proposer shall arrange for Dun&Bradstreet to submit a Supplier Qualifier Report(SQR)within three(3)days of request by the City. The Supplier Qualifier Report(SQR) • shall be sent via email to nataliadelgado(),miamibeachfl.gov. Q41: In Section C2. Statement of Work Required(Page 27 of RFQ), could the City please clarify what the scope of items are for the Engineering—Environmental Services and Testing category? A41: See response to item Q34 above. Q42: We would like to know how we should structure the proposal in regards to Tab 2 (Page 12 of RFQ). Would the City like two tabs for#2, one in front of item 1.3 and one in front of item 2.1? A42: See response to item Q5 above. •RFQ No.2018-141-ND Addendum#5 4/13/2018 MIAProcurement Department! 1�,n /�y 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov Q43: Are there any subs which may be excluded from participating on teams, as they may be on existing contracts/with the City? A43: See response to item Q36 above, Q44: We understand that "testing," as it relates to geotechnical, laboratory services, and/or building materials testing, is included in the"Environmental—Environmental Services and Testing"category, Is this correct? If no,then what categories do each of the following services fall under? • Lab Testing • Soils&Geologic Studies, Foundations • Roofing Assessments, Replacements • Testing & Inspection Services A44: See response to item Q33 above. Q45: Can a firm submit as a prime consultant&be a subconsultant on other firm's teams? A45: See response to item Q32 above. Q46: Page 27 lists "Engineering —Structural" as a category two times. Is another category of engineering required? A46: See response to item Q16 above. Q47: Who are the incumbents? A47: See response to item Q28 above. Q48: Page 12: Please confirm that the hard copy submittal requires tab label of "0400" or if it can be labeled as outlined in the Proposal format(Tab 1,Tab 2,etc.). A48: It is strongly recommended that the Proposals be organized and tabbed in accordance with Section 0300,Submittal Instructions and Format. Q49: Page 13: Please clarify minimum required small projects of as minimum of three or five. A49: See response to item Q5 above. Q50: Page 13: Section 3.1.1. cites small projects as defined in 2.1. Please clarify that definition of small projects is per Section 2.2. A50: See response to item Q5 above. Q51: Where should we include Appendix A? A51: See response to item Q5 above. RFQ No.2018-141-ND • Addendum#5 4/13/2018 • V n M I B EAS H Procurement Department 1755 Meridian , ,Miami Beach, Florida 33139 www.miamibeachfl.gov Q52: Regarding the proposal format, noticed that you have Tab 2 twice. Should the second Tab 2 be • changed to Tab 3 and so on.. A52: See response to item Q5 above. Q53: Could you please make clarification in reference to the requested structure of the response. On tab 2, section 2.1 is requesting the use of Standard Form 330. On this form, it is a requirement to show • 10 projects that show qualification of the firm and the key people involved (which is reflected in the matrix section G of the SF330). A53: See response to item Q5 above. Q54: On the "Submittal Instructions and Format" proposed by Miami Beach, is the information to be included in Tab 2#2.2"Qualifications of Proposing Firm"the Form 330 Section E or Section F from Form 330? Section E lists 5 relevant projects to be entered in that section while we are required to submit three (3) Section F "Example Projects" as per Tab 3 on the "Submittal Instructions and Format"proposed by Miami Beach. A54: Tab 3 Section 3.1 requests the Qualifications of the Proposing Firm. Form 330 Section E and F make reference to the key personnel and team. Q55: Regarding Form 330 Section F, I.understand we need to submit three (3) small projects relevant to the category of work for this proposal/RFQ (Three (3) small projects are specified in Tab 3 on the "Submittal Instructions and Format" proposed by Miami Beach). Is Section F the same information that is specified to be included in Tab 3 on the "Submittal Instructions and Format" proposed by Miami Beach? If so, do I place a copy of those three(3)Section F example projects together with the Form 330 in Tab 2 and another copy of the Section F three(3)small projects in Tab 3 as well? A55: See response to item Q5 above. • Any questions regarding this Addendum should be submitted in writing to the Procurement Management • Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov . Contact: Telephone:' Email: Natalia Delgado 305-673-7000 ext.6263 nataliadelgado@miamibeachfl.gov Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Prospective Bidders"questionnaire with the reason(s)for not submitting a proposal. Si ;rely, 1, Al•xD-.' • •curement Director • RFQ No.2018-141-ND • Addendum#5 4/13/2018 / V 1 I A Y 1 I B EACHProcurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov Exhibit A Revised Section 0300, Submittal Instructions and Format • • RFQ No.2018-141-ND Addendum#5 4/13/2018 MIAMI BEACH SECTION 0300 SUBMITTAL INSTRUCTIONS AND FORMAT 1. SEALED RESPONSES. One original Proposal (preferably in 3-ring binder) must be submitted in an opaque, sealed envelope or container on or before the due date established for the receipt of proposals.Additionally,ten (10). bound copies and one (1) electronic format (CD or USB format) are to be submitted. The following information should be clearly marked on the face of the envelope or container in which the proposal is submitted: solicitation number, solicitation title, proposer name, proposer return address. Statement of Qualifications received • electronically, either through email or facsimile, are not acceptable and will be rejected. 2. LATE BIDS. Statement of Qualifications is to be received,on or before the due date established herein for the receipt of Bids.Any Bid received after the deadline established for receipt of Statement of Qualifications will , • be considered late and not be accepted or will be returned to proposer unopened. The City does not accept responsibility for any delays, natural or otherwise. 3. STATEMENTS OF QUALIFICATIONS FORMAT. In order to maintain comparability, facilitate the review process and assist the Evaluation Committee in review of Statement of Qualifications, it is strongly recommended that Statement of Qualifications be organized and tabbed in accordance with the sections and manner specified below. • Hard copy submittal should be tabbed as enumerated below and contain a table of contents with page references. Electronic copies should also be tabbed and contain a table of contents with page references. TAB 1 Cover Letter&Table of Content 1.1 Cover Letter.The cover letter must be signed by a principal or agent able to the bind the firm and contain the following: (a) Prime Proposer. Include the name and location of the Prime Proposer, Primary Proposer's Representative for the RFQ, Representative's Contact.Joint Ventures are not allowed under this RFQ. (b) Selected Category of Work. Proposer must indicate the category of work for which proposal is submitted. Categories of Work: include: Architecture — General; Architecture — Landscape; Engineering — Environmental; Engineering—Mechanical,Electrical&Plumbing; Engineering—Structural. Proposers shall submit separate proposals for each category of work for which a proposal is • submitted. Example: a firm which provides general architecture and landscape architecture shall submit one proposal for Architecture—General and a separate and distinct proposal for Architecture—Landscape. • 1.2 Response Certification, Questionnaire & Requirements Affidavit (Appendix A). Attach Appendix A fully completed and executed. TAB 2 i Minimum Requirements 2.1 Minimum Qualifications Requirements. Submit verifiable information documenting compliance with the minimum qualifications requirements established in Appendix C Minimum Requirements and Specifications, including a) Architect 1.. Engineering Firm, Provide copies that the firm is certified by the Florida Department of Business and Professional Regulation to do business in Florida. b) Principle and Account Representatives. For the principle and account representative(s) submitted • • under Tab 2 below, submit copies that individuals are licensed by the Florida Department of Business and; Professional Regulation to do business in Florida. Proposer should also submit copies of architect/engineer license for all licensed firm employees. RFQ 2018-141-ND • MIAMI BEACH TAB 3 Experience&Qualifications of the Firm 3.1 Qualifications of Proposing Firm. Submit detailed information regarding the firm's history and relevant experience and proven track record of providing architecture or engineering services, preferably to public sector agencies, for non-residential small projects (construction costs below $325,000 and planning/studies below $35,000), Submit at least three (3) small projects relevant to the category of work for which the proposal has been submitted, performed in the last five (5) years as evidence of requested experience, preferably to public sector agencies. For each small project submitted,the following is required: • project name, • project description (including cost/budget), • agency/client name, • agency/client contact, • contact telephone&email, • • and year(s) and term of engagement. • TAB 4 Experience&Qualifications of the Team 4.1 Qualifications of Proposer's Individual Team Members (Architects and Engineers). Provide an organizational chart which indicates, at a minimum,the principles of the firm, account representatives and individual team members to be assigned to any award by the City of Miami Beach pursuant to this RFQ. Include details on the role that each team member will play in providing the services detailed herein 'and each team members' qualifications. A resume of each individual, including education, experience, and any other pertinent information, shall be included for each respondent team member to be assigned to this contract, THIS SECTION IS NOT DIRECTED AT SUB-CONSULTANTS. SUB-CONSULTANTS ARE NOT TO BE SUBMITTED AT THIS TIME. 4.1.1 Project Experience. For each architect and engineer (Firm's individual team members), include information for three (3) relevant projects, performed in the last five (5) years for public or private sector clients. Relevant projects shall include those projects similar in scope to those services listed in Appendix C. Submit'at least three (3) small projects (as defined in Section 3.1 above) relevant to the category of work for which the proposal has been submitted, performed in the last five (5) years as evidence of . requested experience, preferably to public or private sector agencies. For each small project submitted,the following is required: •. project name • project description, • 'agency/client name, • agency/client contact, • contact telephone&email, • and year(s) and term of engagement. TAB 5 Required Forms 5.1 Standard Form 330.The proposing firm shall submit a completed Standard From 330 (attached). No proposal will be considered without this required form. In addition to experience and qualifications considerations,the City may use this information to consider the firm's previous and current workload. • 4. FINANCIAL CAPACITY. Within three (3) business days of request by the City, each Proposer shall arrange for • Dun & Bradstreet to submit a Supplier Qualification Report(SQR)directly to the Procurement Contact named herein. No proposal will be considered without receipt, by the City, of the SQR directly from Dun & Bradstreet. The cost of the preparation Of the SQR shall be the responsibility of the Proposer. The Proposer shall request the SQR report RFQ 2018-141-ND MIAMI BEACH from D&B at: https:/!supplierportal.dn b.com/webapplwcs/sto reslservletlSupplierPortal?storeld=11696 • Proposers are responsible for the accuracy of the information contained in its SQR. It is highly recommended that each Proposer review the information contained in its SQR for accuracy prior to submittal to the City and as early as possible in the solicitation process. For assistance with any portion of the SQR submittal process,contact Dun &Bradstreet at 800.424.2495. 5. ADDITIONAL INFORMATION OR CLARIFICATION. After proposal submittal, the City reserves the right to • require additional information from Proposers (or Proposer team members or sub-consultants) to determine: qualifications (including, but not limited to, litigation history, regulatory action, or additional references); and financial capability (including, but not limited to,annual reviewed/audited financial statements with the auditors notes for each of their last two complete fiscal years). • • • • • RFQ 2018-141-ND MI/`� / 1 /`�A // I B E /� c � Procurement Department 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 • www.miamibeachfl.gov Exhibit B Revised Appendix C, Minimum Requirements & Specifications • RFQ No.2018-141-ND Addendum#5 j 4/13/2018 C1. Minimum Eligibility Requirements.The Minimum Eligibility Requirements for this solicitation are listed below. Proposer shall submit, with its proposal, the required submittal(s) documenting compliance with each minimum requirement. Proposers that fail to include the required submittals with its proposal or fail to comply with minimum requirements shall be deemed non-responsive and shall not have its proposal considered. 1. Firms. Firms must be certified by the Florida Department of Business and Professional • Regulation as architecture or engineering business. 2. Architects/Engineers. Architects and engineers must be licensed by the Florida Department of Business and Professional Regulation for their area of work. C2. Statement of Work Required. It is the intent of the City of Miami Beach to select multiple firms within each category that may be contacted on an "as-needed basis" during the term of the contract to submit consulting proposals on small projects whose estimated construction value is less than the amount established in Category 5, Section 287.017, Florida Statutes (currently$325,000 or as amended by law) or for a planning or study activity valued up to the amount established in Category 2, Section 287.017, Florida Statutes (currently$35,000 or as amended by law).. The categories of work shall include: •Architecture—General 'Architecture—Landscape •Engineering—Environmental Services and Testing 'Engineering—Mechanical, Electrical &Plumbing 'Engineering—Electrical •Engineering—Plumbing • •Engineering-Mechanical •Engineering—Structural •Engineering—Civil •Interior Design/Space Planning •LEED Commissioning •Surveying • The Administration will negotiate with a consultant(s)deemed to best qualified for the project based on an hourly rate (see Appendix E) or on a negotiated lump sum basis per project. If agreement is reached with the consultant for a specific project, a Consultant'Service Order (CSO) will be issued, along with a Purchase Order(PO). No work is authorized, nor shall the City be liable for payment, until the CSO and PO are issued. The select consultant will be required to perform the architectural and engineering services in accordance with the Master Agreement(Appendix E) and the CSO.The highest professional standards shall be utilized for all work. RFQ 2018-141-ND 27 The selected consultant will be required to retain and be responsible for all sub-consultants necessary to achieve the assigned scope of work. Sub-consultants shall be included in the CSO. The City may reject the use of any sub-consultant. The services authorized under the resulting Master Agreement, include(but are not limited to): Acoustics,Noise Abatement • Fire Protection • Air Pollution Control • Heating;Ventilating;Air Conditioning • Auditoriums and Theaters • Interior Design;Space Planning • Automation;Controls;Instrumentation • Irrigation;Drainage • Boundary Survey • Landscape Architecture • Codes;Standards;Ordinances • Lighting(Interior,Display,Theater,etc.) • • Communications Systems;TV;Microwave • Lighting(Exterior,Streets,Memorials,Athletic Fields, • Conceptual Studies etc.) • Construction Administration • Plumbing and Piping Design • Cost Estimating • Recreation Facilities(Parks,Marinas,etc.) • Energy Conservation/Energy Sources • Rehabilitation, Remodel, Renovate (Buildings, • Electrical Structures,Facilities,etc.) • General Environmental Services: • Safety Engineering;Accident Studies;OSHA Studies o Environmental Assessments • Security Systems;intruder&Smoke Detection o Air and Water quality testing and • Soils&Geologic Studies;Foundations monitoring . • Storage Tank Repair and Monitoring o Environmental sustainability planning • Structural Design;Special Structures services • Surveying,Mapping,GIS,and other services: o Environmental support services to • Platting;Mapping;Flood Plain Studies achieve and maintain regulatory • Roofing Assessments,Replacements compliance • Swimming Pools • Contamination Assessment: • Topographical Survey o Environmental Site Assessments • Urban Renewals;Community Development o Oversee and coordinate remediation • Value Analysis;Life-Cycling Costing project • Any other professional services normally considered . o Preparation of sampling and remediation under the disciplines of architecture and engineering. plans and other related documents • Improve Building Performance o Other associated tasks related to regulatory compliance The selected architectural and/or engineering firms will be responsible for reviewing all existing City of Miami Beach Zoning Ordinances and Building Codes, as well as any other applicable law or • regulation. The teams will be responsible for incorporating all the above data into complete construction documents, including final working drawings, specifications, and bid documents necessary for the bidding and construction of the project, and in some instances, for construction management. The construction documents and drawings must comply with the City of Miami Beach with all applicable local, state and federal regulations. C3.Term of Contract:_It is expected that any resulting agreement shall be valid for a term of three (3) years from effective date. The City Manager may approve two (2) additional one (1) year renewal periods based on satisfactory performance. C4. Fee Standards:For determination of project fees the City will use the Design Professional Fee Guidelines for "Basic" Architectural and Engineering Services available at https://fp.state.fl.us/docs/DMSAEFeeGuidedefinition.asp RFQ 2018-141—ND 28 MIAAAIBEACH Procurement Department 1755 Meridian , , Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM NO.4 REQUEST FOR QUALIFICATIONS NO. 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS(the RFQ) April 11, 2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The RFQ is amended in the following particulars only(deletions are shown by strikethrough and additions are underlined). 1. RFQ DUE DATE AND TIME. The deadline for receipt of submittals is extended until 3:00 p.m., Monday, April 23,2018,at the following location: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow for traffic or other delays for which the Proposer is solely responsible. A FORTHCOMING ADDENDUM WILL CONTAIN RESPONSES TO QUESTIONS RECEIVED. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext.6263 nataliadelgado@miamibeachfl.gov • Proposers are reminded to-acknowledge receipt of this addendum as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Pros ective Bidders"questionnaire with the reason(s)for not submitting a proposal. ' c ly, • • Air' AxDes rocu ent Director RFQ No.2018-141-ND Addendum#3 { 4/11/2018 it MIAn /� I B EAC FlProcurement Department / V 1755 Meridian Ave,3rd Floor, Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM NO,3 REQUEST FOR QUALIFICATIONS NO.2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND ' REPLACMENT PROJECTS(the RFQ) March 28,2018 • This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City. The RFQ is amended in the following particulars only(deletions are shown by strikethrough and additions are underlined). 1. RFQ DUE DATE AND TIME. The deadline for receipt of submittals is extended until 3:00 p.m., Monday, April 16,2018,at the following location: City of Miami Beach • Procurement Department 1755 Meridian Avenue, 31d Floor Miami Beach, Florida 33139 Late submittals will not be accepted. Proposers are cautioned to plan sufficient time to allow ' for traffic or other delays for which the Proposer is solely responsible. A FORTHCOMING ADDENDUM WILL CONTAIN RESPONSES TO QUESTIONS RECEIVED. Any questions regarding this Addendum should be submitted in writing to the Procurement Management Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext. 6263 nataliadelgado@miamibeachfl.gov Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission, Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to ioeProsp- ; Bidders"questionnaire with the reason(s)for not submitting a proposal. ;o� il co,,or is 0,W' o urement Director RFQ No.201B-141-ND Addendum#3 3/28/2018 f /� I /� I BEA Procurement Department 1 V 1 /- !n /�1 I-11700 Convention Center Drive, Miami Beach, Florida 33139 www.miamibeachfl.gov ADDENDUM NO.2 REQUEST FOR QUALIFICATIONS NO. 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS (the RFQ) March 6,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City.The RFQ is amended in the following particulars only. • • 1. ATTACHMENTS: • Exhibit A: Pre-Proposal Meeting Sign-In Sheet • A FORTHCOMING ADDENDUM WILL CONTAIN RESPONSES TO QUESTIONS RECEIVED. • Any questions regarding this Addendum should be submitted in writing to the Procurement Management ' Department to the attention of the individual named below, with a copy to the City Clerk's Office at RafaelGranado@miamibeachfl.gov Contact: Telephone: Email: Natalia Delgado 305-673-7000 ext.6263 nataliadelgado@miamibeachfl.gov - Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to Prospective Bidders"questionnaire with the reason(s)for not submitting a proposal. •rely, Ale vnis Pro ement Director • • RFQ No.2018-141-ND Addendum#2 3/6/2018 IV\ IA V ( B EA C H Procurement Department 1700 Convention Center , Miami Beach, Florida 33139 www,miamibeachfl.gov Exhibit A • Pre-Proposal Meeting Sign-In Sheet • • RFQ No.2018-141-ND Addendum#2 316/2018 MIAMIBEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018 TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS �v"7R`: � A3� e � f• i ��++�'�,��..^4r�y � aw ec sa ,� � A��.�re �' a a Snf f �a '^�°at 1�,-,� i� T�'Y! >f a�h$ 4� "iii f� '� � � Q�p ,1 '2' {{tt t d t, 'kvtGi "�� ot.t,Qii: !Y'Y`� �y 't k ,`t f 60 1 ( Y' t� .4„ r, h�� Ufa x s �•,,4 y P,3 f3 6 ,': r C f', ,11.:.'k,,,l ,,o', i,Mn Ytltrc� � fitL���t I}27,'� � a �. t � f +"P3 a '"+r a& �ki �a0 �� 3,i j ii 11� I < ` i s '„�, 3 4 , t . t 4 " . t'-0 c.63`4.��Yrv:Sti'��,1 Y.�n�1,�.�� �>� � (( y{ap� ����U k �''� II l � mi w h �,... 4 lY�' A.e�l+ t F4i mar„t3 ��ri d� '�''• t „'- !4 \ 4” fifi,.<m", YN{...k•,4'..,n"su>. 44.t,^{ ' ' ro �� :5 �:;bntd' Natalia Delgado Procurement-CMB 305-673-7000 nataliadelgado@miamibeachfl.gov Ext.6263 ==i. ?waEarE 305-673^ � M .,i�� -70 a v -'ca�y_�g r,,...41,-6-4 d nn:..,..�6x5 a.,rt.ya 0 x .7.-• - VC4p,,CL vveutevic, e,,,,;u,,;. 4 A (gla2 lVec t -Cu-s•-vb OW, ��yt Goya( Do�\,s 1) J 40e. -I. ,_ )-��a))_ 3os�-161 - IkbOVVr Pdog)...11ocX•bit 315'0 xl' 30a_ -�'d,@bbamiokmi. cowl, 3os-2nD- ra-r 1vJZ bougon-- SZS I u X-}. !0S �-�ut� Gc ifs t� / 11,\(,. s, ktiKZ 6RPt6€64gefAteCIA6%,tom 61-T• 'KO -r ,- �/� N Qua Ca�L .�-1 3° _ q _ iv j 04i-- Fr° yu f- / �yB�) 3 90- < L a(0_,t G 'In-'r.,.c,sc.DGc-+rcic- N...----Los-Los += Zry /31// 4r,•da TY L.r'n @ (5°'-' 3 0 r err (fie riaeo.Ani do&o!`/t/H_Cofr7 4.i"O O P.3� I(/<L%"Y a., -e ctS1reY'{1s{r.o.wt (-tJwp Stiy\eUi Tb eao ./ -sAm- va1Q P�Sr aeves.c 3DB 1 05 1 M1AMIBEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018 TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS 1 ����I � ,�" �c�'t z�1�7q. ���t� v+n °l�, � d p sr t� �*. r f�� q + Fx- 4 0 M t5fa �.R$ '1�, ' Ry L.1 �'" + ; � I ry +�� r `�[�JII �T" t "Y� a i I I7�}Nu� 4 1 xaI FI,L >}Ptit�)y�'i e Aft $ t � 4t ..�.._1Y 14., S..n. P+�2.e� ., ., kiltad L .,t . A ee3e3sxs;,?Li,lrM 1.d . 4,k 44 '� NIA* . >�ll,�, €'' .fast. titeo Dg g ENG-tN ICS hND fgtt{trar. SI-tNIZMIA SIJD17taltx sstvatattuat)S-e a.0 M 86-441-stzo -1 b2 En,/ clu1J Ys ad_Ai P/�II,tT, karn►7od-aNB-EA/ -eom ,--$26-441-611,0 CFJrt in 00W 5 r1JoC11rrc f a c'rtc^�44.0a .com err"Ai,�(�s Aos€ MCG-1\i6tni- J7f. cuR is or dcbandta2.9bu;ldi,r6enu;tv•co 3oS- 3o 'Pic11- 3bC`^ -�' a7- ���IA; 1,‘ e,. 4,4 Ard„ ft�lolt�tna lk1 r1tK► C"' r ,voe{-k. e.ro 0,54)1/07) 1 1c�Yt�/ i 1 , J1S9 � c.11MF.1VE2 1S6‘0 DES1uQ ((2Lup 30s--s-) 9(.0L, 56E—D-13E TS/40 'DG 6" or--DBE) ,r ,� @-rsAGne;Siku.cotit )Vlra 6-01,41)a sot_-aszcu INc Sot_.—AItGF{, 1tJc - ?05-140 0123 3oS7400n18 bQ SOL-n AP-C-14 C.oP1. wire-2. \A\''';" t'1oQ.ckk A�iCho -183,-3 t1-1357- Opo1 i tnCrMo\ .cam. ikgc Hca &atc i wpT - 30S--727— com- MIAMI BEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018 TITLE: RFQ-2018-141.ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS ";i'i.!, El,", vi, :t...01 7 r. 1•:-. NFV!'.:1...0.,ri:jtc3t1;,7 vt'r•14 v,:iToa: ,c..:- vlsquif rv; ' -,, •'.q.1;7M, - '''r'',.',,i,, iff4,-t,,,,,,A,,,,,,,,Apn-,g'eat,.,,,,l,,,,5'l0.'0,,1,;;;A•.'i,bs,:,:,ir,l,l,tIs,4,.-,7,14,,,,t4O,.,6,,v,,,,,,ro1,,,,..v,,4: ;6§• r,x4i.,ii4,l j-•l••1'4.y:„L-i1,6'•-,•p,5i-.„1l;,: .l1it',,E.k.,tc,,ti r'-,',i4.',tttl,,,, •*,,'1gi 4V,,i,tf 4 401Ot , ,. . _ c_komic.\\.0,. 1.c.,, , c. E„7 ockwic, 0 cle.wle...y.,v_%- 3os 5,6317 c'y c-V G 3o5 963 r9h Do ci. laS 11;10 Svn Land scq re Dr-. _ Pp i.,6, ,,,c01...4.-asc,,,peix. coi,„, sos-zis-W83 — lekiqc,& ("P:1- ). AIN, 1,91,t, -Avew-ce:t3o5.vo co. 3 . t•kilameultilsuividOtlie, cOVIA Al vayo G6A-C,A. j1akc.o Sco-69aci-,LLG ae'ctioD . . . .1..ii,r.9.%ke)n\e±C.,C5S03600R4r.Con\ C511-75- OcCEIC. oriit\jpite., *wl IV Dlig-12, Pc1z-e-i41 l'Et--13 Ns1 0 .32. 3--w5estoinkuitritcHtEcTs tt_ e.K Llz.t.11q Cl'ii 305 2.744Oo 5 3 o5 L7807 i UzU t%@ cAphco rr.cor11 LUC--kc 5 C-78g) gPas:to So-6iPic 1-frr-i. , ____ If LIZE Z%) 44 r f4 S°C2'cc A14t614t6 jz C.4121ZercioC4i1 ,0, ot - co ,4 0 ker a 'a-r-veno vcs r-2 e.e_cD4A. CI c.km..a4t, -vi / ( .9 43-)8o6- IA a.Arttue-1 Or- .01-14-04 me el 4-cc-1 _60 , 1 8 22 chi a n r:Ivc./151-.4g.env;to.rnei14.1.47.1 '10?--133 1-908 NvL4rdni-hgc,ft,re 19,A_ N .LNILLif.--;.1ooc o qoevi)ir)i eVet 14' G A .-e--04(-recf 32:2- 0 ____ M1AMIBEACH . CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018 TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR cg CAPITAL RENEWAL AND REPLACEMENT PROJECTS 5, O' �,c i i h r ' hp°akx# sem,,�U'rc J } T t A�a �s R' + ` �fl t wt �. r' ,s � �5 a .� ,' in �1�?�!{ISh�C �� �tr\ + t o p # 4 a i,,., av w �,_,..a 9 1 e ry- 9*.y.,r..O rk $ t., 1F:e t`E." ,�Li' ,.3e. t 7�,s o CoWkl, , { I �f , I UG ei` /¢ },— ...�, .., • acl� @ aea/ orio',co k000 5 8 C �1i At ou .3 �6-7- 11m741- 'izn-k16 5i;.rawac,)\:-eAtft.-6v,goevvves.cah c4-1 1-1 e. Dettit 5, Dav 5 {i&ViC'GMtn,t 9,„,17.52....5-1,..-6 oe\J6���2 - . r'n Vsai-eQctqViS-eitnv Win RADAAfid1{(t& F� ti, 7L-25-1541(i ?a7Y9.f5 eg b pr ; N. -IIC-. _ t.L.), i-1 AE. t?Te ;e--,0.O e • 3os-g3tl- 1Y2. mos=a-t5- 15.0 Ed r,0,\l;k-e(; 30r--9-t5'-'''rt5o N EWA e›-TUT-0 L4 A KS t Ervcjtrubug,iktzi.4'a4:11-s k,L„,A Sv t "`1 2e5 .619.81(!0 186.22(1.266;I /}n,a�,$ KutMbF,o a✓ diP �n.5<-4,f-a..t,fs $r1� - Jk d8'-s 162gs &dE.C(C-24 Rt CA,as r`ta.Lt1 `reisKt(-toN Acn.kt trciv1j Ca. 3o5-3/S-/t2$ AA MtdcNAFi a vis lc-cLt J-6.,5.£ort �`i1 c --6,04.-rota �!<,v5t-t 1 -PR- 3DS 414(,21M1-1AOS JAANEN� N 6, -'9` WN ,X -lo-b Pt.--s? ‘- Pk b \ Q I scx2_0_4 �crt 3"5.2 _13-' 14/N EA. �(y �ral jeckiie ( ✓ e9°5S� �Ered}@Mass-arae,taM 305-7(41-66.77 % " G-,.r;o. C- PoWri' - star a •k$31- Li.(LIAN. Cie' -P`- tuuan>coAFcQc-u"rF2cis- 4 .... .. .. __.. .. ,. . . . • MIAMIBEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING SIGN-IN SHEET DATE: February 27,2018• TITLE: REQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES-FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS 9SrliIRFC. '..?.f 7FINtlardtl-,::;M:MA„Itit i TinAttt"tit A.,IftV v.,,,:4, ,A ,iSk.443;4 , A k:t:,,,:,.:t.e.w.,,,,44,,,,,,v,,,. .,!- 1.--,,,, -!. t4:411Ult 41,-11 . VtligNMARVE4V4titAt***140k4Atirk Ait'.'4tr'''I''".''IOW _,., . .',,,,.,,,,tAwl, ..:1 :Viz' ii ) old 0 1 tIii2, 3o0)\0 Do,sARn SA.udi 0 . \ •-k • , `--OwAte...s. (9 Gkok -la IA cute,s. -nc,. \A 1 1 1 i Qrn 012.4.9-11.h \Al"1"3' 14-ctaAn I } --ri.c„ r,_-.101 • 1 \LIALssci reaebiukrz_ ske r\-;,1 v-tteA\14-P, - " . \ (12.03,\IAQ1-0 voi 2 34) ,mp 0 Gaete_ ..) . ... .vcv.h1,0, eston INce.h t 4-e.,e9,-s, cP•A. . 0ova eon so 1-k;-)0 I) , i•lin SChlYi IC414- . y ILweikt,, . 7C---c54(2..gon to, KLA--Q:14- Z r__TAT-i ckr--N. fbci Et4oe 7. Orfl tot et-Y)q . . i k i S ,ke-Oin t tee-4-s Cine-.)-(4-- ... • ,eal ON roalc\oi "F--r\OAA kA20.17-s_r10, • 2 . . MIAMIBEACH CITY OF MIAMI BEACH PRE-SUBMITTAL MEETING • SIGN-IN SHEET • DATE: February 27,2018 • TITLE: RFQ-2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS ,,; ,1,,w ftl ".eq,,-ap,a, t�� g me�1p t...t x a'R +d P f•i'"' s sF ----- r,,,,W,t,'',' I�` z e a uv t3 * �s C P l� �1' lTM$� Gr ti)4' I10 tt + k , t f ( aI }v�� �s+'11t�s1 [ UI)I.�h,a '.r� h ' , I .. ..g ,, 7&,$arc uEA. +o . sst t2 ,t2-c>P-? • t Gln a S�x.t a-4-e s. `�, C.-.511 /2.1.A.1., S 2 _ 'ci aw 2 &Q. ,t•s 1 1-sak)i.s • rfkiejni 4-ae..9k--s. . zi -in I i2-D At20-1 t 4-Q.2C9-S n ,,t -k5s4 S-�-Q{tel--s (........./r.\\ 7).-- a.s - cast-i-e_S ` 1. ik-est; C_, 4 - 3 . MI/"1/ �//� I B EAProcurement DepartmentI /"°� 1700 Convention Center Drive, Miami Beach, Florida 33139 www,miamibeachfl.gov • ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS NO. 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACMENT PROJECTS(the RFQ) February 26,2018 This Addendum to the above-referenced RFQ is issued in response to questions from prospective proposers, or other clarifications and revisions issued by the City.The RFQ is amended in the following particulars only. 1. REVISION: Section 0200– Instructions to Respondents & General Conditions, 5. Pre-Proposal Meeting or Site Visit(s) on page 4 of the RFQ, is hereby amended as follows. (deletions are shown by strikethrough and _ _. additions_are_underlin_ed).:__._._ —_ ..__ __. _ Only if deemed necessary by the City, a pre-proposal meeting or site visit(s) may be scheduled. A Pre-PROPOSAL conference will be held as scheduled in Anticipated RFQ Timetable section above at the • following address: • City of Miami Beach Procurement Department Conference Room 1755 Meridian Avenue, 3rd Floor Miami Beach,Florida 33139 Attendance (in person or via telephone) is encouraged and recommended as a source of information, but is not mandatory. Proposers Interested in participating.in the Pre-Proposal Submission Meeting via telephone must follow these steps: (1) Dial the TELEPHONE NUMBER: 1-888-270-9936(Toll-free North America) (2) Enter the MEETING NUMBER: 1112611 9415468 Proposers who are interested in participating via telephone should send an e-mail to the contact person listed in this RFQ expressing their intent to participate via telephone. Any questions regarding this Addendum should be submitted in writing to the Procurement Management • Department to the attention of the individual named below, with a copy to the City Clerk's Office •at RafaelGranado@miamibeachfl.gov . Contact: Telephone: Email; Natalia Delgado 305-673-7000 ext.6263 .nataliadelgado@miamibeachfl.gov • Proposers are reminded to acknowledge receipt of this addendum as part of your RFQ submission. Potential proposers that have elected not to submit a response to the RFQ are requested to complete and return the"Notice to • Prospective Bidders"questionnaire with the reason(s)for not submitting a proposal. • ex De rocur- ent Director RFQ No,2018-141-ND Addendum#1 2/26/2018 / I , REQUEST FOR QUALIFICATIONS ( RFQ ) PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS RFQ 2018-141-ND RFQ ISSUANCE DATE: FEBRUARY 15, 2018 RESPONSES DUE: APRIL 2, 2018 @ 3:00 PM ISSUED BY: NATALIA DELGADO MIAMIBEACH PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3RD Floor, Miami Beach, FL, 33139 305.673.7490 IJ www.miamibeachfl.gov . MIAMI BEACH TABLE OF CONTENTS SOLICITATION SECTIONS: PAGE 0100 NOT UTILIZED N/A 0200 INSTRUCTIONS TO RESPONDENTS &GENERAL CONDITIONS 3 0300 SUBMITTAL.INSTRUCTIONS & FORMAT 12 0400 EVALUATION PROCESS 15 APPENDICES: PAGE APPENDIX A RESPONSE CERTI.FICATON, QUESTIONNAIRE AND AFFIDAVITS 17 APPENDIX B "NO BID" FORM 24 APPENDIX C MINIMUM REQUIREMENTS &SPECIFICATIONS 26 APPENDIX D INSURANCE REQUIREMENTS 29 APPENDIX E SAMPLE CONTRACT 31 APPENDIX F STANDARD FORM 330 62 RFQ 2018-141-ND 2 MIAMI BEACH SECTION 0200 INSTRUCTIONS TO RESPONDENTS&GENERAL CONDITIONS 1. GENERAL.This Request for Qualifications(RFQ)is issued by the City of Miami Beach, Florida(the"City"), as the means for prospective Proposer to submit their qualifications, proposed scopes of work and cost Proposals (the "proposal") to the City for the City's consideration as an option, in achieving the required scope of services and requirementsas noted herein. All documents released in connection with this solicitation, including all appendixes and addenda, whether included herein or released under separate cover, comprise the solicitation, and are complementary to one another and together establish.the complete terms, conditions and obligations of the Proposer and,subsequently,the successful proposer(s)(the"contractor[s]") if this RFQ results in an award. The City utilizes PublicPurchase (www.oublicourchase.com) for automatic notification of competitive solicitation opportunities and documentfulfillment, including the issuance of any addendum to this RFQ. Any prospective proposer who has received this RFQ by any means other than through PublicPurchase must register immediately with PublicPurchase to assure it receives any addendum issued to this RFQ. Failure to receive an addendum may result in disqualification of proposal submitted. 2. PURPOSE. On September 28, 2004, through Resolution 2004-24697, the City Commission created the Capital Renewal and Replacement Program (the "CRR Program"). The intent of the CRR Program is to provide funding a proactive renewal and replacement of the City's facilities and the systems within those facilities (e.g., HVAC, roofs, fire safety systems, etc), The CRR is also used for approved for small repair, remodel or renovation projects,usually expected to cost less than$325,000.The average value of the current CRR Projects is approximately$158,000, but can be as low as$25,000 or less. In addition to CRR projects, award(s)of this RFQ may also be used for other small projects. Section 287.055, Florida Statutes, commonly known as the Consultant's Competitive Negotiation Act (CCNA), is. applicable to the selection of professional services consultants (architecture; professional engineering, landscape. ,architecture, or registered surveying and mapping) by public.agencies for projects valued up to the amount established in.Category 5, Section 287.017, Florida Statutes (currently $325,000 or as amended by law) or for a planning or study activity valued up to the amount established in Category 2, Section 287.017, Florida Statutes (currently$35,000 or as amended by law).THEREFORE,CCNA IS NOT APPLICABLE TO THIS RFQ. In order to maximize the cost effectiveness of small projects, through this RFQ the City seeks to establish a pool of qualified architectural and engineering consultants for those projects whose value is below the thresholds stipulated in. CCNA. The categories of work are, as further defined in Appendix C, Architecture — General, Architecture — Landscape, Engineering — Environmental Services and Testing, Engineering — Mechanical, Electrical & Plumbing, Engineering—Structural. Because of the nature and size of the small projects being considered under this RFQ, the City desires to engage firms with sufficient experience in small projects. 3.SOLICITATION TIMETABLE.The tentative schedule for this solicitation is as follows: Solicitation Issued FEBRUARY 15, 2018 Pre-Submittal Meeting FEBRUARY 27,2018 @ 10:00AM EST Deadline for Receipt of Questions MARCH 23,2018 @ 5:00 PM EST Responses Due APRIL 2,2018 @ 3:00 PM EST Evaluation Committee Review TBD RFQ 2018-141-ND 3 MIAMI BEACH Proposer Presentations(if deemed necessary) TBD Tentative Commission Approval TBD 4. PROCUREMENT CONTACT. Any questions or clarifications concerning this solicitation shall be submitted to the Procurement Contact named herein, in writing, with a copy to the City Clerk's Office, Rafael E. ,Granado via e-mail: RafaelGranado@miamibeachfl.gov ; or facsimile: 786-394-4188. The Bid title/number shall be referenced on all correspondence. All questions or requests for clarification must be receivedno later than ten (10) calendar days prior to the date Proposals are due as scheduled in Section 0200-3. All responses to questions/clarifications will be sent to all prospective Proposer in the form of an addendum. Procurement Contact: Telephone: Email: NATALIA DELGADO 305.673.7000 Ext.6263 NATALIADELGADO@MIAMIBEACHFL.GOV 5. PRE-PROPOSAL MEETING OR SITE VISITL Only if deemed necessary by the City,a pre-proposal meeting or site visit(s) may be scheduled. A Pre-PROPOSAL conference will be held as scheduled in Anticipated RFQ Timetable section above at the following address: City of Miami Beach Procurement Department Conference Room • 1755 Meridian Avenue,3rd Floor Miami Beach, Florida 33139 Attendance (in person or via telephone) is encouraged and recommended as a source of information, but is not mandatory. Proposers interested in participating in the Pre-Proposal Submission Meeting via telephone must follow these steps: (1) Dial the TELEPHONE NUMBER: 1-888-270-9936(Toll-free North America) (2) Enter the MEETING NUMBER: 1142644 Proposers who are interested in participating via telephone should send an e-mail to the contact person listed in this RFQ expressing their intent to participate via telephone. 6. PRE-PROPOSAL INTERPRETATIONS. Oral information or responses to questions received by prospective Proposers are not binding on the City and will be without legal effect, including any information received at pre- submittal meeting or site visit(s). The City by means of Addenda will issue interpretations or written addenda clarifications considered necessary by the City in response to questions. Only questions answered by written addenda will be binding and may supersede terms noted in this solicitation. Addendum will be released through PublicPurchase. Any prospective proposer who has received this RFQ by any means other than through PublicPurchace must register immediately with PublicPurchase to assure it receives any addendum issued to this RFQ. Failure to receive an addendum may result in disqualification of proposal. Written questions should be received no later than the date outlined in the Anticipated RFQ Timetable section. 7. CONE OF SILENCE. This RFQ is subject to, and all proposers are expected to be or become familiar with, the City's Cone of Silence'Requirements, as codified in Section 2-486 of the City'Code. Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Cone of Silence are complied with, and shall be subject to any and all sanctions, as prescribed therein, including rendering their response voidable, in the event of RFQ 2018-141-ND 4 MIAMI BEACH such non-compliance. Communications regarding this solicitation are to be submitted in writing to the Procurement Contact named herein with a copy to the City Clerk at rafaelgranado@miamibeachfl.gov 8. SPECIAL NOTICES. You are hereby advised that this solicitation is subject to the following ordinances/resolutions,which may be found on the City Of Miami Beach website: http://www.miamibeachfl.aov/city-hall/procurement/orocurement-related-ordinance-and-procedures/ • CONE OF SILENCE CITY CODE SECTION 2-486 • PROTEST PROCEDURES CITY CODE SECTION 2-371 • DEBARMENT PROCEEDINGS CITY CODE SECTIONS 2-397 THROUGH 2-485.3 • LOBBYIST REGISTRATION AND DISCLOSURE OF FEES CITY CODE SECTIONS 2-481 THROUGH 2.406 • CAMPAIGN CONTRIBUTIONS BY VENDORS CITY CODE SECTION 2-487 • CAMPAIGN CONTRIBUTIONS BY LOBBYISTS ON PROCUREMENT ISSUES CITY CODE SECTION 2-488 • REQUIREMENT FOR CITY CONTRACTORS TO PROVIDE EQUAL BENEFITS FOR CITY CODE SECTION 2-373 DOMESTIC PARTNERS • LIVING WAGE REQUIREMENT CITY CODE SECTIONS 2-407 THROUGH 2-410 • PREFERENCE FOR FLORIDA SMALL BUSINESSES OWNED AND CONTROLLED BY CITY CODE SECTION 2-374 VETERANS AND TO STATE-CERTIFIED SERVICE-DISABLED VETERAN BUSINESS ENTERPRISES • FALSE CLAIMS ORDINANCE CITY CODE SECTION 70-300 • ACCEPTANCE OF GIFTS,FAVORS& CITY CODE SECTION 2-449 SERVICES 9. PUBLIC ENTITY CRIME. A person or affiliate who has been placed on the convicted vendor list following a conviction for public entity crimes may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to public entity, may not be awarded or perform work as a contractor, supplier, sub-contractor, or consultant under a contract with a public entity, and may not transact business with any public entity in excess of the threshold amount provided in Sec. 287.017, for CATEGORY TWO for a period of 36 mouths from the dateof being placed on the convicted vendor list. 10: COMPLIANCE WITH THE CITY'S LOBBYIST LAWS.This RFQ is subject to,and all Proposers are expected to be or become familiar with, all City lobbyist laws. Proposers shall be solely responsible for ensuring that all City lobbyist laws are complied with, and shall be subject to any and all sanctions, as prescribed therein, including, without limitation,disqualification of their responses,in the event of such non-compliance. 11. DEBARMENT ORDINANCE: This RFQ is subject to, and all proposers are expected to be or become familiar with,the City's Debarment Ordinance as codified in Sections 2-397 through 2-406 of the City Code. 12. WITH THE CITY'S CAMPAIGN FINANCE REFORM LAWS. This RFQ is subject to, and all Proposers are expected to be or become familiar with, the City's Campaign Finance Reform laws, as codified in Sections 2-487 through 2-490 of the City Code. Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Campaign Finance Reform laws are complied with, and shall be subject to any and all sanctions, as prescribed therein, including disqualification of their responses, in the event of such non-compliance. 13.CODE OF BUSINESS ETHICS. Pursuant to City Resolution No.2000-23879,the Proposer shall adopt a Code of Business Ethics ("Code") and submit that Code to the Procurement Department with its response or within five (5) days upon receipt of request. The Code shall, at a minimum, require the Proposer, to comply with all applicable governmental rules and regulations including, among others, the conflict of interest, lobbying and ethics provision of the City of Miami Beach and Miami Dade County. 14. AMERICAN WITH DISABILITIES ACT(ADA). Call 305-673-7490 to request material in accessible format; sign RFQ 2018-141-ND 5 MIAMI BEACH language interpreters(five (5)days in advance when possible), or information on access for persons with disabilities. For more information on ADA compliance, please call the Public Works Department, at 305-673-7000, Extension 2984. 15. POSTPONEMENT OF DUE DATE FOR RECEIPT OF PROPOSALS. The City reserves the right to postpone the deadline for submittal of proposals and will make a reasonable effort to give at least three (3) calendar days written notice of any such postponement to all prospective Proposers through PublicPurchase. 16. PROTESTS. Proposers that are not selected may protest any recommendation for selection of award in accordance with eh proceedings established pursuant to the City's bid protest procedures, as codified in Sections 2- 370 and 2-371 of the City Code (the City's Bid Protest Ordinance). Protest not timely made pursuant to the requirements of the City's Bid Protest Ordinance shall be barred. 17. JOINT VENTURES. Joint Ventures are not allowed. Proposals shall be submitted only by the prime contractor who will serve as the CMR. The City will only contract with the prime contractor who will serve as the CMR. Proposals may, however, identify other sub-contractors or sub-consultants to the prime Proposer who may serve as team members. 18.VETERAN BUSINESS ENTERPRISES PREFERENCE. Pursuant to City Code Section 2-374, the City shall give a preference to a responsive and responsible Proposer which is a small business concern owned and controlled by a veteran(s) or which is a service-disabled veteran business enterprise, and which is within five percent (5%) of the lowest responsive, responsible proposer, by providing such proposer an opportunity of providing said goods or contractual services for the lowest responsive proposal amount (or in this RFQ, the highest proposal amount). Whenever, as a result of the foregoing preference, the adjusted:prices of two (2) or more proposers which are a small business concern owned and controlled by a veteran(s) or a service-disabled veteran business enterprise constitute the lowest proposal pursuant to an RFQ or oral or written request for quotation, and such proposals are responsive, responsible and otherwise equal with respect to quality and service, then the award shall be made to the service-disabled veteran business enterprise. 19. DETERMINATION OF AWARD. The final ranking results of Step 1 & 2 outlined in Section 0400, Evaluation of Proposals, will be considered by the City Manager who may recommend to the City Commission the Proposer(s) s/he deems to be in the best interest of the City or may recommend rejection of all proposals. The City Manager's recommendation need not be consistent with the scoring results identified herein and takes into consideration Miami Beach City Code Section 2-369, including the following considerations: (1)The ability,capacity and skill of the Proposer to perform the contract. (2)Whether the Proposer can perform the contract within the time specified,without delay or interference. (3)The character, integrity, reputation,judgment,experience and efficiency of the Proposer. (4)The quality of performance of previous contracts. (5)The previous and existing compliance by the Proposer with laws and ordinances relating to the contract. The City Commission shall consider the City Manager's recommendation and may approve such recommendation. The City Commission may also, at its option, reject the City Manager's recommendation and select another Proposal or Proposals which it deems to be in the best interest of the City, or it may also reject all Proposals. 20. NEGOTIATIONS. Following selection, the City reserves the right to enter into further negotiations with the selected Proposer. Notwithstanding the preceding, the City is in no way obligated to enter into a contract with the selected Proposer in the event the parties are unable to negotiate a contract. It is also understood and acknowledged by Proposers that no property, contract or legal rights of any kind shall be created at any time until and unless an Agreement has been agreed to;approved by the City;and executed by the parties. RFQ 2018-141-ND 6 MIAMI BEACH 21. POSTPONEMENT/CANCELLATION/ACCEPTANCE/REJECTION. The City may, at its sole and absolute discretion, reject any and all, or parts of any and all, responses; re-advertise this RFQ; postpone or cancel, at any time, this RFQ process; or waive any irregularities in this RFQ, or inany responses received as a result of this RFQ. Reasonable efforts will be made to either award the proposer the contract or reject all proposals within one-hundred twenty(120) calendar days after proposal opening date.A proposer may withdraw its proposal after expiration of one hundred twenty (120) calendar days from the date of proposal opening by delivering written notice of withdrawal to the Department of Procurement Management prior to award of the contract by the City Commission. 22. PROPOSER'S RESPONSIBILITY. Before submitting a response, each Proposer shall be solely responsible for making any and all investigations, evaluations, and examinations, as it deems necessary, to ascertain all conditions and requirements affecting the full performance of the contract. Ignorance of such conditions and requirements, and/or failure to make such evaluations, investigations, and examinations, will not relieve the Proposer from any obligation to comply with every detail and with all provisions and requirements of the contract, and will not be accepted as a basis for any subsequent claim whatsoever for any monetary consideration on the part of the Proposer. 23. COSTS INCURRED BY PROPOSERS.All expenses involved with the preparation and submission of Proposals, or any work performed in connection therewith, shall be the sole responsibility (and shall be at the sole cost and expense) of the Proposer,and shall not be reimbursed by the City. 24. RELATIONSHIP TO THE CITY. It is the intent of the City, and Proposers hereby acknowledge and agree, that the successful Proposer is considered to be an independent contractor, and that neither the Proposer, nor the Proposer's employees, agents, and/or contractors, shall, under any circumstances, be considered employees or agents of the City. 24. OCCUPATIONAL HEALTH AND SAFETY. In compliance with Chapter 442, Florida Statutes, any toxic substance listed in Section 38F-41.03 of the Florida Administrative Code delivered as a result of this proposal must be accompanied by a Material Safety Data Sheet(MSDS)which may be obtained from the manufacturer. 25. ENVIRONMENTAL REGULATIONS. The City reserves the right to consider a proposer's history of citations and/or violations of environmental regulations in investigating a proposer's responsibility, and further reserves the right to declare a proposer not responsible if the history of violations warrant such determination in the opinion of the City. Proposer shall submit with its proposal, a complete history of all citations and/or violations, notices and dispositions thereof. Thenon-submission of any such documentation shall be deemed to be an affirmation by the Proposer that there are no citations or violations. Proposer shall notify the City immediately of notice of any citation or violation which proposer may receive after the proposal opening date and during the time of performance of any contract awarded to it. 26.TAXES.The City of Miami Beach is exempt from all Federal Excise and State taxes. 27. MISTAKES. Proposers are expected to examine the terms, conditions, specifications, delivery schedules, proposed pricing, and all instructions pertaining to the goods and services relative to this RFQ. Failure to do so will be at the Proposer's risk and may result in the Proposal being non-responsive. 28. PAYMENT. Payment will be made by the City after the goods or services have been received, inspected, and found to comply with contract, specifications, free of damage or defect, and are properly invoiced. Invoices must be consistent with Purchase Order format. RFQ 2018-141-ND 7 MIAMI BEACH 29. COPYRIGHT, PATENTS & ROYALTIES. Proposer shall indemnify and save harmless the City of Miami Beach, Florida, and its officers, employees, contractors,and/or agents, from liability of any nature or kind, including cost and t expenses for, or on account of, any copyrighted, patented,or unpatented invention, process, or article manufactured or used in the performance of the contract, including its use by the City of Miami Beach, Florida. If the Proposer uses any design, device or materials covered by letters, patent, or copyright, it is mutually understood and agreed, without exception, that the proposal prices shall include all royalties or cost arising from the use of such design, device, or materials in any way involved in the work. 30. DEFAULT. Failure or refusal of the selected Proposer to execute a contract following approval of such contract by the City Commission, or untimely withdrawal of a response before such award is made and approved, may result in a claim for damages by the City and may be grounds for removing the Proposer from the City's vendor list. 31. MANNER OF PERFORMANCE. Proposer agrees to perform its duties and obligations in a professional manner and in accordance with all applicable Local, State, County, and Federal laws, rules, regulations and codes. Lack of knowledge or ignorance by the Proposer with/of applicable laws will in no way be a cause for relief from responsibility. Proposer agrees that the services provided shall be provided by employees that are educated,trained, experienced, certified, and licensed in all areas encompassed within their designated duties. Proposer agrees to furnish to the City any and all documentation, certification, authorization, license, permit, or registration currently required by applicable laws, rules, and regulations. Proposer further certifies that it and its employees will keep all licenses, permits, registrations, authorizations, or certifications required by applicable laws or regulations in full force and effect during the term of this contract. Failure of Proposer to comply with this paragraph shall constitute a material breach of this contract. Where contractor is required to enter or go on to City of Miami Beach property to deliver materials or perform work or services as a result of any contract resulting from this solicitation, the contractor will assume the full duty, obligation and expense of obtaining all necessary licenses, permits, and insurance, and assure all work complies with all applicable laws. The contractor shall be liable for any damages or loss to the City occasioned by negligence of the Proposer,or its officers,employees, contractors,and/or agents,for failure to comply with applicable laws. 32. SPECIAL CONDITIONS. Any and all Special Conditions that may vary from these General Terms and Conditions shall have precedence. 33. NON-DISCRIMINATION. The Proposer certifies that it is in compliance with the non-discrimination clause contained in Section 202, Executive Order 11246, as amended by Executive Order 11375, relative to equal employment opportunity for all persons without regard to race, color, religion, sex or national origin. In accordance with the City's Human Rights Ordinance, codified in Chapter 62 of the City Code, Proposer shall prohibit discrimination by reason of race, color, national origin, religion, sex, intersexuality, gender identity, sexual orientation, marital and familial status,and age or disability. 34. DEMONSTRATION OF COMPETENCY. The city may consider any evidence available regarding the financial, technical, and other qualifications and abilities of a Proposer, including past performance (experience) in making an award that is in the best interest of the City, including: A.Pre-award inspection of the Proposer's facility may be made prior to the award of contract. B. Proposals will only be considered from firms which are regularly engaged in the business of providing the goods and/or services as described in this solicitation. C. Proposers must be able to demonstrate a good record of performance for a reasonable period of time, and have sufficient financial capacity, equipment, and organization to ensure that they can satisfactorily perform the services if awarded a contract under the terms and conditions of this solicitation. RFQ 2018-141-ND 8 MIAMI BEACH D. The terms "equipment and organization", as used herein shall, be construed to mean a fully equipped and well established company in line with the best business practices in the industry, and as determined by the City of Miami Beach. E. The City may consider any evidence available regarding the financial, technical, and other qualifications and abilities of a Proposer, including past performance (experience), in making an award that is in the best interest of the City. F.The City may require Proposer s to show proof that they have been designated as authorized representatives of a manufacturer or supplier,which is the actual source of supply. In these instances, the City may also require material information from the source of supply regarding the quality, packaging, and characteristics of the products tobe supply to the City. 35. ASSIGNMENT. The successful Proposer shall not assign, transfer, convey, sublet or otherwise dispose of the contract, including any or all of its right, title or interest therein, or his/her or its power to execute such contract, to any person, company or corporation,without the prior written consent of the City. 36. LAWS, PERMITS AND REGULATIONS. The Proposer shall obtain and pay for all licenses, permits, and inspection fees required to complete the work and shall comply with all applicable laws. 37. OPTIONAL CONTRACT USAGE. When the successful Proposer(s) is in agreement,other units of government or non-profit agencies may participate in purchases pursuant to the award of this contract at the option of the unit of government or non-profit agency. 38. VOLUME OF WORK TO BE RECEIVED BY CONTRACTOR. Itis the intent of the City to purchase the goods and services specifically listed in this solicitation from the contractor. However, the City reserves the right to purchase any goods or services awarded from state or other governmentalcontract, or on an as-needed basis through the City's spot market purchase provisions. 39. DISPUTES. In the event of a conflict between the documents, the order of priority of the documents shall be as follows: A. Any contract or agreement resulting from the award of this solicitation;then B. Addendum issued for this solicitation,with the latest Addendum taking precedence;then C. The solicitation;then D. The Proposer's proposal in response to the solicitation. 40. INDEMNIFICATION.The Proposer shall indemnify and hold harmless the City and its officers, employees,agents and instrumentalities from any and all liability, losses or damages, including attorney's fees and costs of defense, which the City or its officers, employees, agents or instrumentalities may incur as a result of claims, demands, suits, causes of actions or proceedings of any kind or nature arising out of, relating to or resulting from the performance of the agreement by the contractor or its employees, agents, servants, partners, principals or subcontractors. The contractor shall pay all claims and losses in connection therewith, and:shall investigate and defend all claims, suits or actions of any kind or nature in the name of the City,where applicable, including appellate proceedings,and shall pay all costs,judgments, and attorney's fees which may be incurred thereon. The Proposer expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by the contractor shall in'no way limit the responsibility to indemnify, keep and save harmless and defend the City or its officers, employees, agents and instrumentalities as herein provided. The above indemnification provisions shall survive the expiration or termination of this Agreement. 41. CONTRACT EXTENSION. The City reserves the right to require the Contractor to extend contract past the RFQ 2018-141-ND 9 MIAMI BEACH stated termination date for a period of up to 120 days in the event that a subsequent contract has not yet been awarded.Additional extensions past the 120 days may occur as needed by the City and as mutually agreed upon by the City and the contractor. 42. FLORIDA PUBLIC RECORDS LAW. Proposers are hereby notified that all Bid including, without limitation, any and all information and documentation submitted therewith, are exempt from public records requirements under Section 119.07(1), Florida Statutes, and s. 24(a), Art. 1 of the State Constitution until such time as the City provides notice of an Intended _decision or until thirty (30) days after opening of the proposals, whichever is earlier. Additionally, Contractor agrees to be in full compliance with Florida Statute 119.0701 including, but not limited to, agreement to (a) Keep and maintain public records that ordinarily and necessarily would be required by the public agency in order to perform the services; (b) provide the public with access to public records on the same terms and conditions that the public agency would provide the records and at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law; (c) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law; (d) Meet all requirements for retaining public records and transfer, at no cost, to the public agency all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the public agency in a format that is compatible with the information technology systems of the public agency. 43. OBSERVANCE OF LAWS. Proposers are expected to be familiar with, and comply with, all Federal, State, County, and City laws, ordinances, codes, rules and regulations, and all orders and decrees of bodies or tribunals having jurisdiction or authority.which, in any manner, may affect the scope of services and/or project contemplated by this RFQ (including, without limitation, the Americans with Disabilities Act, Title VII of the Civil Rights Act, the EEOC Uniform Guidelines, and all EEO regulations and guidelines). Ignorance of the law(s) on the part of the Proposer will in no way relieve it from responsibility for compliance. 44. CONFLICT OF INTEREST. All Proposersmust disclose, in their Proposal, the name(s) of any officer, director, agent, or immediate family member(spouse, parent,sibling, and child)who is also an employee of the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns, either directly or indirectly, an interest of ten (10%)percent or more in the Proposer entity or any of its affiliates. 45. MODIFICATION/WITHDRAWALS OF PROPOSALS.A Proposer may submit a modified Proposal to replace all or any portion of a previously submitted Proposal up until the Proposal due date and time. Modifications received after the Proposal due date and time will not be considered. Proposals shall be irrevocable until contract award unless withdrawn in writing prior to the Proposal due date, or after expiration of 120 calendar days from the opening of Proposals without a contract award. Letters of withdrawal received after the Proposal due date and before said expiration date,and letters of withdrawal received after contract award will not be considered. 47. EXCEPTIONS TO RFQ. Proposers must clearly indicate any exceptions they wish to take to any of the terms in this RFQ, and outline what, if any,alternative is being offered. All exceptions and alternatives shall be included and clearly delineated, in writing, in the Proposal. The City, at its sole and absolute discretion, may accept or reject any or all exceptions and alternatives. In cases in which exceptions and alternatives are rejected, the City shall require the Proposer to comply with the particular term and/or condition of the RFQ to which Proposer took exception to (as said term and/or condition was originally set forth on the RFQ). 48.ACCEPTANCE OF GIFTS, FAVORS,SERVICES. Proposers shall not offer any gratuities,favors, or anything of RFQ 2018-141-ND 10 MIAMI BEACH monetary value to any official, employee, or agent of the City, for the purpose of influencing consideration of this Proposal. Pursuant to Sec. 2-449 of the City Code, no officer or employee of the City shall accept any gift, favor or service that might reasonably tend improperly to influence him in the discharge of his official duties. 49. SUPPLEMENTAL INFORMATION. City reserves the right to request supplemental information from Proposers at any time during the RFQ solicitation process. 50. ADDITIONAL SERVICES. Although this solicitation and resultant contract identifies specific goods, services or facilities ("items"), it is hereby agreed and understood that the City, through the approval of the Department and Procurement Directors (for additional items s up to $50,000) or the City Manager (for additional items greater than $50,000), may require additional items to be added to the Contract which are required to complete the work. When additional items are required to be added to the Contract, awarded vendor(s), as applicable to the item being requested, under this contract may be invited to submit price quote(s) for these additional requirements. If these quote(s) are determined to be fair and reasonable, then the additional work will be awarded to the current contract vendor(s) that offers the lowest acceptable pricing. The additional items shall be added to this contract by through a Purchase Order(or Change Order if Purchase Order already exists). In some cases,the City may deem it necessary to add additional items through a formal amendment to the Contract, to be approved by the City Manager. The City may determine to obtain price quotes for the additional items from other vendors in the event that fair and reasonable pricing is not obtained from the current contract vendors, or for other reasons at the City's discretion. Balance of Page Intentionally Left Blank RFQ 2018-141-ND 11 Y 1 MIAMI BEACH SECTION 0300 SUBMITTAL INSTRUCTIONS AND FORMAT 1. SEALED RESPONSES. One original Proposal (preferably in 3-ring binder) must be submitted in an opaque, sealed envelope or container on or before the due date established for the receipt of proposals.Additionally,ten (10) bound copies and one (1) electronic format (CD or USB format) are to be submitted. The following information should be clearly marked on the face of the envelope or container in which the proposal is submitted: solicitation number, solicitation title, proposer name, proposer return address. Proposals received electronically, either through email or facsimile, are not acceptable and will be rejected. 2. LATE PROPOSALS. Proposals are to be received on or before the due date established herein for the receipt of proposals. Any proposal received after the deadline established for receipt of Proposals will be considered late and not be accepted or will be returned to proposer unopened. The City does not accept responsibility for any delays, natural or otherwise: 3. PROPOSAL FORMAT. In order to maintain comparability, facilitate the review process and assist the Evaluation Committee in review of Proposals, it is strongly recommended that Proposals be organized and tabbed in • accordance with the sections and manner specified below. Hard copy submittal should be tabbed0400 as enumerated below and contain a table of contents with page references. Electronic copies should also be tabbed and contain a table of contents with page references. Proposals that do not include the required information will be deemed non-responsive and will not be considered. ,TAB,'h :` :i Cover Letter&Table of Content. 1.1 Cover Letter. The cover letter must be signed by a principal or agent able to the bind the firm and contain the following: (a) Prime Proposer. Include the name and location of the Prime Proposer, Primary Proposer's Representative for the RFQ, Representative's Contact.Joint Ventures are not allowed under this RFQ. (b) Selected Category of Work. Proposer must indicate the category of work for which proposal is submitted. Categories of Work, include: Architecture — General; Architecture — Landscape; Engineering — Environmental; Engineering—Mechanical, Electrical&Plumbing; Engineering—Structural. Proposers shall submit separate proposals for each category of work for which a proposal is submitted. Example: a firm which provides general architecture and landscape architecture shall submit one proposal for Architecture—General and a separate and distinct proposal for Architecture—Landscape. .TAB'2' ,*`;; Minimum Requirements 1.3 Minimum Qualifications Requirements. Submit verifiable information documenting compliance with the minimum qualifications requirements established in Appendix C Minimum Requirements and Specifications, including a) Architect I Engineering Firm. Provide copies of that the firm is certified by the Florida Department of Business and Professional Regulation to do business in Florida. b) Principle and Account Representatives. For the principle and account representative(s) submitted under Tab 2 below, submit copies that individuals are licensed by the Florida Department of Business and Professional Regulation to do business in Florida. Proposer should also submit copies of architect/engineer license for all licensed firm employees. TAB2..,, Experience&Qualifications of the Firm 2.1 Standard Form 330.The proposing firm shall submit a completed Standard From 330 (attached). No proposal will be considered without this required form.. In addition to experienceand qualifications considerations, the City may use RFQ 2018-141-ND 12 MIAMI BEACH this information to consider the firm's previous and current workload. 2.2 Qualifications of Proposing Firm.Submit detailed information regarding the firm's history and relevant experience and proven track record of providing architecture or engineering services, preferably to public sector agencies, for non- residential small projects (construction costs below$325,000 and planning/studies below $35,000). Submit at least five (5) small projects relevant to the category of work for which the proposal has been submitted, performed in the last five (5) years as evidence of requested experience, preferably to public sector agencies. For each small project submitted, the following is required: • project name, • project description, • agency/client name, • agency/client contact, • contact telephone&email, • and year(s)and term of engagement. 2.3 Financial Capacity. Following the bid opening and at the request of the City proposer shall arrange for Dun & Bradstreet to submit a Supplier Qualifier Report(SQR) directly to the Procurement Contact named herein. No proposal will be considered without receipt, by the City,of the SQR directly from Dun &Bradstreet.The cost of the preparation of the SQR shall be the responsibility of the Proposer.The Proposer shall request the SQR report from D&B at: httos://suoolierportal.dnb.com/webaDD/wcs/storesIservlet/SuoclierPortal?storeld=11696 Proposals are responsible for the accuracy of the information contained in its SQR. It is highly recommended that each proposer review the information contained in its SQR for accuracy prior to submittal to the City and as early as possible in the solicitation process. For assistance-with any portion of the SQR submittal process, contact Dun & Bradstreet at 800-424-2495. 2.3.1 Audited Financial Statements. In lieu of a D .& B SQR, the Proposer may submit its latest audited financial statements which must be dated December 31,2014. or later.. ,TA&3r ,%w Experience&Qualifications of the Team 3.1 Qualifications of Proposer Team (Architects and Engineers). Provide an organizational chart which indicates,at a minimum, the principles of the firm and the account representatives assigned to award by the City of Miami Beach pursuant to this RFQ. Include details on the role that each team member will play in providing the services detailed herein and each team members'qualifications. A resume of each individual, including education, experience, and any other pertinent information,shall be included for each respondent team member to be assigned to this contract. 3.1.1 Project Experience. For each architect and engineer, include information for three (3) relevant projects, performed in the last five (5) years for public or private sector clients. Relevant projects shall include those projects similar in scope to those services listed in Appendix C. Submit at least three (3) small projects (as defined in Section 2.1 above) relevant to the category of work for which the proposal has been submitted, performed in the last five (5)years as evidence of requested experience, preferably to public or private sector agencies.For each small project submitted,the following is required: • project name • project description, •. agency/client name, • agency/client contact, • contact telephone&email, • and year(s)and term of engagement. RFQ 2018-141-ND 13 MIAMI BEACH Note: After proposal submittal, the City reserves the right to require additional information from Proposer (or proposer team members or sub-consultants) to determine: qualifications (including, but not limited to, litigation history, regulatory action, or additional references); and financial capability (including, but not limited to, annual reviewed/audited financial statements with the auditors notes for each of their last two complete fiscal years). RFQ 2018-141-ND 14 MIAMI BEACH SECTION 0400 PROPOSALS.EVALUATION 1. Evaluation Committee.An Evaluation Committee, appointed by the City Manager, shall meet to evaluate each Statement of Qualifications in accordance with the requirements set forth in the solicitation. If further information is desired, Proposals may be requested to make additional written submissions of a clarifying nature or oral presentationsto the Evaluation Committee. The evaluation of Statement of Qualifications will proceed in a two-step process as noted below. It is important to note that the Evaluation Committee will score the qualitative portions of the Statement of Qualifications only. The Evaluation Committee does not make an award recommendation to the City Manager.The results of Step 1 &Step.2 Evaluations will be forwarded to the City Manager who will utilize the results to make a recommendation to the City Commission. In the event that only one responsive proposal is received,the City Manager, after determination that the sole responsive proposal materially meets the requirements of the RFP, may, without an evaluation committee, recommend to the City Commission that the Administration enter into negotiations. The City, in its discretion, may utilize technical or other advisers to assist the evaluation committee in the evaluation of proposals. 2. Step 1 Evaluation. The first step will consist of the qualitative criteria listed below to be considered by the Evaluation Committee. The second step will consist of quantitative criteria established below to be added to the Evaluation Committee results by the Department of Procurement Management.An Evaluation Committee, appointed by the City Manager, shall meet to evaluate each Statement of Qualifications in accordance with the qualifications criteria established below.for Step 1, Qualitative Criteria. In doing so,the Evaluation Committee may review and score all proposals received,with or without conducting interview sessions. Step-1,-Qualitative Criteria w •' Maximum Points .,s:, .. , Experience of the Proposing Firm 50 Experience of the Team 50 • }.TOTALAVAILABLESTEP,11 POINTS,:' 100 a s .S a`. a C'.:,N.., -.•--. _ x.., x._ ' 3. Step 2 Evaluation. Following the.results of Step 1 Evaluation of qualitative criteria, the Proposer may receive additional quantitative criteria points to be added by the Procurement Department to those points earned in Step 1, as follows. Step 2'-Quantitative Criteria ' „ � Fi }, �Yyc. Maximum.Points; Veterans Preference 5 _ ;. :,a TOTALAVAILABLE,STEPZ.POINTS ..;' ' ` '5: '- . RFQ 2018-141—ND 15 ' I MIAMI BEACH 4. Determination of Final Ranking. At the conclusion of the Evaluation Committee Step 1 scoring, Step 2 Points will be added to each evaluation committee member's scores by the Department of Procurement Management.Step 1 and 2 scores will be converted to rankings in accordance with the example below: Proposer Proposer Proposer =3 A B C Ste. 1 Points 82 76 80 Committee. Ste•2 Points 22 15 12 Member 1_ Total 104 91. 92 Rank 1`: . 3 , ..,. ,. .. 2 Ste• 1 Points 79 85 72 Committee„ Ste.2 Points 22 15 12 Member 2, ; Total 101 100 84 tarra_M 3.: Ste• 1 Points 80 74 66 Committee Ste.2 Points 22 15 12 Member 2 Total 102 89 78 Low Aggregate Score + "• • '3. 7 8 Firial Ranking*� ';';`•�'.:.• 4` 2 3 *Final Ranking is presented to the City Manager for further due diligence and recommendation to the City Commission. Final Ranking does not constitute an award recommendation until such time as the City Manager has made his recommendationto the City Commission, which may be different than final ranking results. RFQ 2018'-141-ND 16 APPENDIX A MIAMI BEACH Response Certification , Questionnaire & Requirements Affidavit RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR SMALL PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor ' Miami Beach, Florida 33139 RFQ 2018-141-ND 17 Solicitation No: Solicitation Tile: RFQ 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS Procurement Contact: Tel: Email: NATALIA DELGADO 305.673.7000,Ext.6263 NATALIADELGADO a(�.MIAMIBEACHFL.GOV STATEMENTS OF QUALIFICATIONS CERTIFICATION,QUESTIONNAIRE&REQUIREMENTS AFFIDAVIT Purpose: The purpose of this Response Certification,.Questionnaire and Requirements Affidavit Form is to inform prospective Proposals of certain solicitation and contractual requirements, and to collect necessary information from Proposals in order that certain portions of responsiveness, responsibility and other determining factors and compliance with requirements may be evaluated. This Statement of Qualifications Certification, Questionnaire and Requirements Affidavit Form is a REQUIRED FORM that must be submitted fully completed and executed. 1. General Proposer Information. • FIRM NAME: NO.OF YEARS IN BUSINESS: NO.OF YEARS IN BUSINESS LOCALLY: NO.OF EMPLOYEES: • OTHER NAME(S)PROPOSER HAS OPERATED UNDER IN THE LAST 10 YEARS: FIRM PRIMARY ADDRESS(HEADQUARTERS): CITY: STATE: ZIP CODE: TELEPHONE NO.: • TOLL FREE NO.: FAX NO.: FIRM LOCAL ADDRESS: CITY: STATE: ZIP CODE: PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT: ACCOUNT REP TELEPHONE NO.: • ACCOUNT REP TOLL FREE NO.: • ACCOUNT REP EMAIL: FEDERAL TAX IDENTIFICATION NO.: The City reserves the right to seek additional information from proposer or other source(s),including but not limited to:any firm or principal information,applicable licensure,resumes of relevant individuals,client information,financial information,or any information the City deems necessary to evaluate the capacity of the proposer to perform in accordance with contract requirements. RFQ 2018-141—ND 18 1 1. Veteran Owned Business.Is Pro oser claiming a veteran owned business status? YES NO SUBMITTAL REQUIREMENT:Proposers claiming veteran owned business status shall submit a documentation proving that firm is certified as a veteran-owned business or a service-disabled veteran owned business by the State of Florida or United States federal government,as required pursuant to ordinance 2011-3748. 2. Conflict Of Interest. All Proposers must disclose, in their Proposal, the name(s) of any officer, director, agent, or immediate family member(spouse, parent,sibling,and child)who is also'an employee of the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns,either directly or indirectly,an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates. SUBMITTAL REQUIREMENT: Proposers must disclose the name(s)of any officer,director,agent,or immediate family member (spouse,parent,sibling,and child)who is also an employee of the City of Miami Beach. Proposers must also disclose the name of any City employee who owns,either directly or indirectly,an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates 3. References&Past Performance.Proposer shall submit at least three(3)references for whom the Proposer has completed work similar in size and nature as the work referenced in solicitation. SUBMITTAL REQUIREMENT: Foreach reference submitted, the following information is required: 1) Firm Name, 2) Contact Individual Name&Title,3)Address,4)Telephone,5)Contact's Email and 6)Narrative on Scope of Services Provided. 4. Suspension, Debarment or Contract Cancellation. Has Proposer ever been debarred, suspended or other legal violation, or had a contract cancelled due to non-performance b an public sector agency? YES NO SUBMITTAL REQUIREMENT: If answer to above is"YES,"Proposer shall submit a statement detailing the reasons that led to action(s). 5.' Vendor Campaign Contributions.Proposers are expected to be or become familiar with, the City's Campaign Finance Reform laws, as codified in Sections 2-487 through 2-490 of the City Code. Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Campaign Finance Reform laws are complied with, 'and shall be subject to any and all sanctions,as prescribed therein,including disqualification of their Proposals,in the event of such non-compliance. SUBMITTAL REQUIREMENT: Submit the,names of all individuals or entities(including your sub-consultants)with a controlling financial interest as defined in solicitation.For each individual or entity with a controlling financial interest indicate whether or not each individual or entity has contributed to the campaign either directly or indirectly,of a candidate who has been elected to the office of Mayor or City Commissioner for the City of Miami Beach. 6. Code of Business Ethics.Pursuant to City Resolution No.2000-23879,each person or entity that seeks to do business with the City shall adopt a Code of Business Ethics("Code")and submit that Code to the Department of Procurement Management with its proposal/response or within five(5)days upon receipt of request.The Code shall,at a minimum,require the Proposer,to comply with all applicable governmental rules and regulationsincluding, among others, the conflict of interest, lobbying and ethics provision of the City of Miami Beach and Miami Dade County. SUBMITTAL REQUIREMENT: Proposer shall submit firm's Code of Business Ethics. In lieu of submitting Code of Business Ethics, Proposer may submit a statement indicating that it will adopt,as required in the ordinance,the City of Miami Beach Code of Ethics,available at htto://www.miamibeachfl.qov/city-halllorocurementl RFQ 2018-141—ND 19 7. benefits: benefits: • SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees to the living wage requirement. 8. Equal Benefits for Employees with Spouses and Employees with Domestic Partners.When awarding competitively solicited contracts valued at over$100,000 whose contractors maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks,the Equal Benefits for Domestic Partners Ordinance 2005-3494 requires certain contractors doing business with the City of Miami Beach,who are awarded a contract pursuant tocompetitive proposals,to provide"Equal Benefits"to their employees with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a Contractor who work within the City limits of the City of Miami Beach, Florida; and the Contractor's employees located in the United States, but outside of the City of Miami Beach limits,who are directly performing work on the contract within the City of Miami Beach. A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of employees? YES NO B. Does your company provide or offer access to any benefits to employees with(same or opposite sex)domestic partners*or to domestic partners of employees? YES NO C. Please check all benefits that apply to your answers above and list in the"other"section any additional benefits not already specified. Note: some benefits are provided to employees because they have a spouse or domestic partner, such as bereavement leave;other benefits are provided directly to the spouse or domestic partner,such as medical insurance. BENEFIT Firm Provides for Firm Provides for Firm does not Employees with Employees with Provide Benefit Spouses Domestic Partners Health Sick Leave Family Medical Leave Bereavement Leave If Proposer cannot offer a benefit to domestic partners because of reasons outside your control, (e.g., there are no insurance providers in your'area willing to offer domestic partner coverage)you may be eligible for Reasonable Measures compliance.To comply on this basis, you must agree to pay a cash equivalent and submit a completed Reasonable Measures Application (attached)with all necessary documentation. Your Reasonable Measures Application will be reviewed for consideration by the • City Manager, or his designee. Approval is not guaranteed and the City Manager's decision is final. Further information on the Equal Benefits requirement is available at htto://www.miamibeachfl.gov/city-hall/procurement/procurement-related-ordinance-and- procedures/ RFQ 2018-141—ND - 20 L 9. Public Entity Crimes.Section 287.133(2)(a),Florida Statutes,as currently enacted or as amended from time to time,states that a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal,proposal,or reply on a contract to provide any goods or services to a public entity;may not submit a proposal, proposal,or reply on a contract with a public entity for the construction or repair of a public building or public work;may not submit • proposals,proposals,or replies on leases of real property to a public entity;may not be awarded or perform work as a contractor, supplier,subcontractor,or consultant under a contract with any public entity;and may not transact business with any public entity in excess of the threshold amount provided in s.287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendor list. C SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees with the requirements of Section 287.133,Florida Statutes,and certifies it has not been placed on convicted vendor list. 10. Non-Discrimination.Pursuant to City Ordinance No.2016-3990,the City shall not enter into a contract with a business unless the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a)of the City Code,including the blacklisting,divesting from,or otherwise refusing to deal with a person or entity when such action is based on race,color,national origin,religion,sex,intersexuality,gender identity,sexual orientation,marital or familial status,age or disability. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code. 11. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi. Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida, prohibits official City travel to the states of North Carolina and Mississippi,as well as the purchase of goods or services sourced in North Carolina and Mississippi. Proposer shall agree that no travel shall occur on behalf of the City to North Carolina or Mississippi,nor shall any product or services it provides to the City be sourced from these states. SUBMITTAL REQUIREMENT:No additional submittal is required.By virtue of executing this affidavit document,Proposer agrees it is and shall remain in full compliance with Resolution 2016-29375. 12. Fair Chance Requirement.Pursuant to Section 2-376 of the City Code,the City shall not enter into any contract resulting from a competitive solicitation; unless the proposer certifies in writing that the business has adopted and employs written policies, practices,and standards that are consistent with the City's Fair Chance Ordinance,set forth in Article V of Chapter 62 of the City Code ("Fair Chance Ordinance"), and which, among other things, (i) prohibits City contractors, as an employer, from inquiring about an applicant's criminal history until the applicant is given a conditional offer of employment; (ii) prohibits advertising of employment positions with.a statement that an individual with a criminal record may not apply for the position,and(iii)prohibits placing a statement on an employment application that a person with a criminal record may not apply for the position. SUBMITTAL REQUIREMENT: No additional submittal is required at this time. By virtue of executing this affidavit, Proposer certifies that it has adopted policies,practices and standards consistent with the City's Fair Chance Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon request. Proposer further agrees that any breach of the representations made herein shall constitute a material breach of contract, and shall entitle the City to the immediate termination for cause of the agreement,in addition to any damages that may be available at law and in equity. 13. Acknowledgement of Addendum. After issuance of solicitation,the City may release one or more addendum to the solicitation which may provide additional information to Proposers or alter solicitation requirements. The City will strive to reach every Proposer having received solicitation through the City's e-procurement system, PublicPurchase.com. However, Proposers are solely responsible for assuring they have received any and all addendum issued pursuant to solicitation.This Acknowledgement of Addendum section certifies that the Proposer has received all addendum released by the City pursuant to this solicitation. Failure to obtain and acknowledge receipt of all addenda may result in proposal disqualification. Initial to Confirm Initial to Confirm Initial to Confirm Receipt Receipt Receipt Addendum 1 Addendum 6 Addendum 11 Addendum 2 Addendum 7 Addendum 12 Addendum 3 Addendum 8 _ Addendum 13 Addendum 4 Addendum 9 Addendum 14 Addendum 5 Addendum 10 Addendum 15 If additional confirmation of addendum is required,submit under separate cover. RFQ 2018-141—ND 21 — DISCLOSURE AND DISCLAIMER SECTION The solicitation referenced herein is being furnished to the recipient by the City of Miami Beach(the"City")for the recipient's convenience. Any action taken by the City in response to Statement of Qualifications made pursuant to this solicitation, or in making any award, or in failing or refusing to make any award pursuant to such Statement of Qualifications,or in cancelling awards,or in withdrawing or cancelling this solicitation,either before or after issuance of an award,shall be without any liability or obligation on the part of the City. In its sole discretion,the City may withdraw the solicitation either before or after receiving Statement of Qualifications,may accept or reject Statement of Qualifications,and may accept Statement of Qualifications which deviates from the solicitation,as it deems appropriate and in its best interest. In its.sole discretion, the City may determine the qualifications and acceptability of any party or parties submitting Statement of Qualifications in response to this solicitation. Following submission of Statement of Qualifications, the applicant agrees to deliver such further details, information and assurances, including financial and disclosure data, relating to the Statement of Qualifications and the applicant including, without limitation, the applicant's affiliates,officers,directors,shareholders,partners and employees,as requested by the City in its discretion. The information contained herein is provided solely for the convenience of prospective Proposals.It is the responsibility of the recipient to assure itself that information contained herein is accurate and complete.The City does not provide any assurances as to the accuracy of any information in this solicitation. Any reliance on these contents,or on any permitted communications with Cityofficials,shall be at the recipient's own risk.Proposals should rely exclusively on their own investigations,interpretations,and analyses.The solicitation is being provided by the City without any warranty or representation,express or implied,as to its content,its accuracy,or its completeness.No warranty or representation is made by the City or its agents that any Statement of Qualifications conforming to these requirements will be selected for consideration, negotiation, or approval. The City shall have no obligation or liability with respect to this solicitation,the selection and the award process,or whether any award will be made.Any recipient of this solicitation who responds hereto fully acknowledges all the provisions of this Disclosure and Disclaimer,is totally relying on this Disclosure and Disclaimer,and agrees to be bound by the terms hereof.Any Statement of Qualifications submitted to the City pursuant to this solicitation are submitted at the sole risk and responsibility of the party submitting such Statement of Qualifications. This solicitation is made subject to correction of errors,omissions,or withdrawal from the market without notice.Information is for guidance only,and does not constitute all or any part of an agreement. The City and all Proposals will be bound only as,if and when a Statement of Qualifications,as same may be modified,and the applicable definitive agreements pertaining thereto, are approved and executed by the parties, and then only pursuant to the terms of the definitive agreements executed among the parties.Any response to this solicitation may be accepted or rejected by the City for any reason,or for no reason,without any resultant liability to the City. The City is governed by the Government-in-the-Sunshine Law, and all Statement of Qualifications and supporting documents shall be subject to disclosure as required by such law.All Statement of Qualifications shall be submitted in sealed proposal form and shall remain confidential tothe extent permitted by Florida Statutes, until the date and time selected for opening the responses. At that time, all documents received by the City shall become public records. • Proposals are expected to make all disclosures and declarations as requested in this solicitation. By submission of a Statement of Qualifications,the Proposer acknowledges and agrees that the City has the right to make any inquiry or investigation it deems appropriate to substantiate or supplement information contained,in the Statement of Qualifications,and authorizes the release to the City of any and all information sought in such inquiry or investigation.Each Proposer certifies that the information contained in the Statement of Qualifications is true,accurate and complete,to the best of its knowledge,information,and belief. Notwithstanding the foregoing or anything contained in the solicitation, all Proposals agree that in the event of a final unappealable judgment by a court of competent jurisdiction which imposes on the City any liability arising out of this solicitation,or any response thereto, or any action or inaction by the City with respect thereto, such liability shall be limited to $10,000.00 as agreed-upon and liquidated damages. The previous sentence, however, shall not be construed to circumvent any of the other provisions of this Disclosure and Disclaimer which imposes no liability on the City. In the event of any differences in language between this Disclosure and Disclaimer and the balance of the solicitation,it is understood that the provisions of this Disclosure and Disclaimer shall always govern.The solicitation and any disputes arising from the solicitation shall be governed by and construed in accordance with the laws'of the State of Florida. RFQ 2018-141—ND 22 PROPOSER CERTIFICATION I hereby certify that: I, as an authorized agent of the Proposer , am submitting.the,following information as my firm's proposal; Proposer agrees to complete and unconditional acceptance, of the terms and conditions of this document, inclusive of this solicitation,all attachments,exhibits and appendices and the contents'of any Addenda released hereto,and the Disclosure and Disclaimer Statement;proposer agrees to be bound to any and all specifications, terms and conditions contained in the solicitation, and any released Addenda and understand that the following are requirements of this solicitation and failure to comply will result in disqualification of proposal submitted; Proposer has not divulged, discussed, or compared the proposal with other Proposals and has not colluded with any other proposer or party to any other proposal; proposer acknowledges that all information contained herein is part of the public domain as defined by the State of Florida Sunshine and Public Records Laws; all responses, data and information contained in this proposal, inclusive of the Statement of Qualifications Certification,Questionnaire and Requirements Affidavit are true and accurate. • Name of Proposer's Authorized Representative: Title of Proposer's Authorized Representative: Signature of Proposer's Authorized Representative: . Date: State of FLORIDA ) On this_day of ,20_,personally appeared before me who County of ) stated that (s)he is the of , a corporation, and that the instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said J instrument to be its voluntary act and deed. Before me: Notary Public for the State of Florida My Commission Expires: • • RFQ 2018-141—ND 23 APPENDIX B MIAMIBEAH " No Bid " Form RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR SMALL • PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 Note: It is irnparta.rit for those vendors who have received notification of this solicftatfon bot have de'eided not to.respond,.,to complete and submit the°attached. "Statement'of No'Bid:"The "Staternent'of No Bid" provides the City with. information on how to improve the solicitation process_ Failure to submit a ` m `t5tofeent of No Bid"` May result in not being notified -of future solicitations by the City. RFQ 2018-141-ND 24 Statement of No Bid • WE HAVE ELECTED NOT TO SUBMIT A PROPOSAL AT THIS TIME FOR REASON(S) CHECKED AND/OR INDICATED BELOW: _Workload does not allow us to proposal _Insufficient time to respond _Specifications unclear or too restrictive Unable to meet specifications _Unable to meet service requirements _Unable to meet insurance requirements _Do not offer this product/service _OTHER. (Please specify) We do_do not_want to be retained on your mailing list for future proposals of this type product and/or service. Signature: Title: Legal Company Name: Note: Failure to respond, either by submitting a proposal or this completed form, may result in your company being removed from our vendors list. PLEASE RETURN TO: CITY OF MIAMI BEACH PROCUREMENT DEPARTMENT ATTN: NATALIA DELGADO PROPOSALS#2018-141-ND 1755 Meridian Avenue, 3`d Floor MIAMI BEACH, FL 33139 RFQ 2018-141-ND 25 APPENDIX C MIAMI BEACH Minimum Req uirement§ & Specifications RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS • PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 26 Cl. Minimum Eligibility Requirements. The Minimum Eligibility Requirements for this solicitation are listed below. Proposer shall submit, with its proposal, the required submittal(s) documenting compliance with each minimum requirement. Proposers that fail to include the required submittals with its proposal or fail to comply with minimum requirements shall be deemed non-responsive and shall not have its proposal considered. 1. Firms. Firms must be certified by the Florida Department of Business and Professional Regulationas architecture or engineering business. 7 2. Architects/Engineers. Architects and engineers must be licensed by the Florida Department of Business and Professional Regulation for their area of work. C2.Statement of Work Required. It is the intent of the City of Miami Beach to select multiple firms within each category that may be contacted on an "as-needed basis" during the term of the contract to submit consulting proposals on small projects whose estimated construction value is less than the amount established in Category 5, Section 287.017, Florida Statutes (currently$325,000 or as amended by law) or for a planning or study activity valued up to the amount established in Category 2, Section 287.017, Florida Statutes(currently$35,000 or as amended by law).. The categories of work shall include: •Architecture—General 'Architecture—Landscape •Engineering—Environmental Services and Testing •Engineering—Mechanical,Electrical &Plumbing •Engineering—Structural •Engineering—Structural •Interior Design/Space Planning •LEED Commissioning The Administration will negotiate with a consultant(s)deemed to best qualified for the project based on an hourly rate(see Appendix E) or on a negotiated lump sum basis per project. If agreement is reached with the consultant for a specific project, a Consultant Service Order(CSO)will be issued, along with a Purchase Order(PO). No work is authorized, nor shall the City be liable for payment, until the CSO and PO are issued. The select consultant will be required to perform the architectural and engineering services in accordance with the Master Agreement(Appendix E)and the CSO.The highest professional standards shall be utilized for all work. RFQ 2018-141-ND 27 The selected consultant will be required to retain and be responsible for all sub-consultants necessary to achieve the assigned scope of work. Sub-consultants shall be included in the CSO. The City may reject the use of any sub-consultant. The services authorized under the resulting Master Agreement,include(but are not limited to): • Acoustics,Noise Abatement • Fire Protection • Air Pollution Control • Heating;Ventilating;Air Conditioning • Auditoriums and Theaters • Interior Design;Space Planning • Automation;Controls;Instrumentation • Irrigation;Drainage • Boundary Survey • Lab Testing Services • Codes;Standards;Ordinances • Landscape Architecture • • Communications Systems;TV;Microwave • Lighting(Interior,Display,Theater,etc.) • Conceptual Studies • Lighting(Exterior,Streets,Memorials,Athletic Fields, • Construction Administration etc.) • Cost Estimating • Plumbing and Piping Design • Energy Conservation/Energy Sources • Recreation Facilities(Parks,Marinas,etc.) • Electrical • Rehabilitation, Remodel, Renovate (Buildings, • General Environmental Services: Structures,Facilities,etc.) o Environmental Assessments • Safety Engineering;Accident Studies;OSHA Studies o Air and Water quality testing and • Security Systems;Intruder&Smoke Detection monitoring • Soils&Geologic Studies;Foundations o Environmental sustainability planning • Storage Tank Repair and Monitoring services • Structural Design;Special Structures o Environmental support services to • Surveying,Mapping,GIS,and other services: achieve and maintain regulatory • Platting;Mapping;Flood Plaih Studies compliance • Roofing Assessments,Replacements • Contamination Assessment: • Swimming Pools o Environmental Site Assessments • Testing&Inspection Services o Oversee and coordinate remediation • Topographical Survey project • Urban Renewals;Community Development o Preparation of sampling and remediation • Value Analysis;Life-Cycling Costing plans and other related documents • Any other professional services normally considered o Other associated tasks related to under the disciplines of architectureand engineering. regulatory compliance The selected architectural and/or engineering firms will be responsible for reviewing all existing City of Miami Beach Zoning Ordinances and Building Codes, as well as any other applicable law or regulation. The teams will be responsible for incorporating all the above data into complete construction documents, including final working drawings, specifications, and bid documents necessary for the bidding and construction of the project, and in some instances, for construction management. The construction documents and drawings must comply with the City of Miami Beach with all applicable local, state and federal regulations. C3.Term of Contract: It is expected that any resulting agreement shall be valid for a term of three (3) years from effective date. The City Manager may approve two (2) additional one (1) year renewal periods based on satisfactory performance. C4. Fee Standards: For determination of project fees the City will use the Design Professional Fee Guidelines for `Basic" Architectural and Engineering Services available at httos://fp.state.fl.us/docs/DMSAEFeeGuidedefinition.asp RFQ 2018-141—ND 28 4 • APPENDIX D AA IMI BEACH Insurance Requirements RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 29 INSURANCE REQUIREMENTS This document sets forth the minimum levels of insurance that the contractor is required to maintain throughout the term of the contract and any renewal periods. XXX 1. Workers' Compensation and Employer's Liability per the Statutory limits of the state of Florida. XXX 2. Comprehensive General Liability(occurrence form), limits of liability$ 500,000.00 per occurrence for bodily injury property damage to include Premises/ Operations; Products, Completed Operations and Contractual Liability. Contractual Liability and Contractual Indemnity (Hold harmless endorsement exactly as written in "insurance requirements"of specifications). XXX 3. Automobile Liability - $100,000 each occurrence - owned/non-owned/hired automobiles included. 4. Excess Liability-$ .00 per occurrence to follow the primary coverages. XXX 5. The City must be named as and additional insured on the liability policies; and it must be stated on the certificate. XXX 6. Other Insurance as indicated: Builders Risk completed value $ .00 _Liquor Liability $ .00 Fire Legal Liability $ .00 Protection and Indemnity $ .00 Employee Dishonesty Bond - $ .00 XXX Other: Professional Liability $1,000,000.00 XXX 7. Thirty(30)days written cancellation notice required. XXX 8. Best's guide rating B+:VI or better, latest edition. XXX 9. The certificate must state the proposal number and title The City of Miami Beach is self-insured. Any and all claim payments made from self- insurance are subject to the limits and provisions of Florida Statute 768.28, the Florida Constitution, and any other applicable Statutes. RFQ 2018-141-ND 30 APPENDIX E MIAW\ J BEACH SAMPLE CONTRACT RFQ No. 2018- 141 -ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 31 AGREEMENT BETWEEN • CITY OF.MIAMI BEACH AND XXXXXXXXXXXXXXXXXXXXXXXX FOR PROFESSIONAL ARCHITECTURE AND ENGINEERING SERVICES FOR THE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Resolution No. RFC? 2018-141-ND 32 J AGREEMENT BETWEEN CITY OF MIAMI BEACH AND FOR , PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SPECIALIZED CATEGORIES ON AN "AS-NEEDED-BASIS" PURSUANT TO REQUEST FOR QUALIFICATIONS NO. DISCIPLINE: RESOLUTION NO. RFQ 2018-141-ND 33 TABLE OF CONTENTS DESCRIPTION PAGE ARTICLE 1. DEFINITIONS 36 ARTICLE 2. BASIC SERVICES 40 ARTICLE 3.THE CITY'S RESPONSIBILITIES 45 ARTICLE 4. RESPONSIBILITY FOR CONSTRUCTION COST 46 ARTICLE 5. ADDITIONAL SERVICES 48 ARTICLE 6. REIMBURSABLE EXPENSES 49 ARTICLE 7. COMPENSATION FOR SERVICES 49 ARTICLE 8. CONSULTANT'S ACCOUNTING AND OTHER RECORDS 50 ARTICLE 9. OWNERSHIP OF PROJECT DOCUMENTS 50 ARTICLE 10. TERMINATION OF AGREEMENT 51 ARTICLE 11. INSURANCE 52 ARTICLE 12. INDEMNIFICATION AND HOLD HARMLESS 53 ARTICLE 13. ERRORS AND OMISSIONS 53 ARTICLE 14. LIMITATION OF LIABILITY 54 ARTICLE 15. NOTICE 54 ARTICLE 16. MISCELLANEOUS PROVISIONS 54 RFQ 2018-141-ND 34 1 SCHEDULES: SCHEDULE A 58 SCHEDULE B 59 SCHEDULE C 61 ATTACHMENTS: ATTACHMENT A Error! Bookmark not defined. ATTACHMENT B Error! Bookmark not defined. ATTACHMENT C Error! Bookmark not defined. RFQ 2018-141-ND 35 AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND FOR PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SPECIALIZED CATEGORIES ON AN "AS-NEEDED-BASIS" This Agreement made and entered into this day of , 2016 , (Effective Date), by and between the CITY OF MIAMI BEACH, a municipal corporation existing under the laws of the State of Florida, having its principal offices at 1700 Convention Center Drive, Miami. Beach, Florida, 33139, (hereinafter referred to as City), and a Florida corporation having its principal office at (hereinafter referred to as Consultant). WITNESSETH: WHEREAS, ; and NOW THEREFORE, City and Consultant, in consideration of the mutual covenants and agreement herein contained, agree as follows: ARTICLE 1. DEFINITIONS • 1.1 Definitions. The definitions included in this Section are not exhaustive of all definitions used in this Agreement. Additional terms may be defined in other Contract Documents. The following terms shall have the meanings specified herein unless otherwise stated herein: ADDITIONAL SERVICES: "Additional Services" shall mean those services, in addition to the Basic Services in this Agreement, as described in. Article 5 and the Consultant Service Order, which the Consultant shall perform, at the City's option, and which must be duly authorized, in writing, by the City Manager, or designee(s), or his authorized designee, prior to commencement of same. APPLICABLE LAWS: "Applicable Laws" means all laws, statutes, codes (including, but not limited to, building codes), ordinances, rules, regulations, lawful orders and decrees of governmental authorities having jurisdiction over the Project, the Project Site or the Parties. BASE BID: "Base Bid" shall mean theelements contained in the Construction Documents recommended by the Consultant (and approved by the City) as being within the Construction Cost Budget. "Base Bid" shall not include additive alternatesor deductive alternates. BASIC SERVICES: "Basic Services" shall include those services which Consultant shall perform in accordance with the terms of the Agreement, as described in Article 2 and the Consultant Service Order. Any Services not specifically enumerated as Additional Services (as defined herein) shall also be considered Basic Services. RFQ 2018-141-ND 36 CITY (OR OWNER): The "City" shall mean the City of Miami Beach, a Florida municipal corporation having its principal offices at 1700 Convention Center Drive, Miami Beach, Florida, 33139. In all respects hereunder, City's obligations and performance is pursuant to City's position as the owner of the Project acting in its proprietary capacity. In the event City exercises its regulatory authority as a governmental body including, but not limited to, its regulatory authority for code inspections and issuance of Building Department permits, Public Works. Department permits, or other applicable permits within its jurisdiction, the exercise of such regulatory authority and the enforcement of any Applicable Laws shall be deemed to have occurred pursuant to City's regulatory authority as a governmental body and shall not be attributable in any manner to City as a Party to this Agreement. CITY COMMISSION: "City Commission"shall mean the governing and legislative body of the City. • CITY MANAGER: The "City.:Manager, or designee(s)," shall mean the chief administrative officer of the City. The City Manager, or designee(s), shall also be construed to include any duly authorized representatives designated by the City Manager, or designee(s), in writing, including the Project Administrator, with respect to ' any specific matter(s) concerning the Services and/or this Agreement (exclusive of those authorizations reserved to the City Commission under this Agreement, or to regulatory or administrative bodies having jurisdiction over the Project). CONSTRUCTION COST BUDGET: The "Construction Cost Budget" shall mean the amount budgeted and established by the City to provide for the cost of construction of the Work for the Project("Construction Cost"), as set forth in the Consultant Service Order. CONSTRUCTION DOCUMENTS: "Construction Documents" shall mean the final (100% completed) plans, technical specifications, drawings, schematics, documents, and diagrams prepared by the Consultant pursuant to this Agreement, setting forth in detail the requirements for the construction of the Project. The Construction Documents shall set forth in full all details necessary to complete the construction of the Project in accordance with the Contract Documents. Construction Documents shall not be part of the Contract Documents, until (a)"the Consultant has submitted completed. Construction Documents to the City and (b) they have been reviewed and approved by the City and any agencies having jurisdiction in accordance with the procedures as otherwise provided by the Contract Documents. However, approval by the City shall not in any way be construed, interpreted and/or deemed to constitute a waiver or excuse Consultant's obligations to ensure the Construction Documents are constructible, in compliance with all Applicable Laws and in accordance with the Contract Documents. CONSULTANT: The named entity on page 1 of this Agreement, the "Consultant" shall mean the qualified and properly professionally licensed design professional in the State of Florida and as otherwise required by any entities, agencies, boards, governmental authorities and/or any other professional organizations with jurisdiction governing the professional practice area for which the design,professional has been engaged by City and who will perform (or cause to be performed through Subconsultants acceptable to the City) all architectural, design and engineering services required under this Agreement and/or Consultant Service Order and will serve as the "architect of record" and/or"engineer of record"for the Project. When the term "Consultant" is used in this Agreement it shall also be deemed to include any officers, employees, or agents of Consultants, and any other person or entity acting under the supervision, direction, or control of Consultant to provide any architectural, design, engineering or similar professional services with respect to a Project ("Subconsultants"). The Consultant shall not be replaced by any other entity, except as otherwise permitted in this Agreement. Further, any Subconsultant that may perform services on behalf of the Consultant shall be a qualified and properly professionally licensed design professional in the State of Florida and as otherwise required by any entities, agencies, boards, governmental authorities and/or any other professional organizations. with jurisdiction governing the professional practice area for which the Subconsultant has been engaged by Consultant to perform professional design services in connection with the Project. The•Subconsultants in Schedule "C", attached hereto, are hereby approved by the City Manager, RFQ 2018-141-ND 37 � f or designee(s), for the Project. CONSULTANT SERVICE ORDER: Consultant Service Order shall mean the work order issued by the City to Consultant (in substantial form as in Schedule A attached hereto), thatspecifically describes and delineates the particular Services (Basic Services and/or Additional Services) which will be required of Consultant for the Project that is the subject of such Consultant Service Order, and which may include studies or study activity, and/or professional services as defined in the RFQ. CONTRACT AMENDMENT: "Contract Amendment" shall mean a written modification to the Agreement approved by the City (as specified below) and executed between City and Consultant, covering changes, additions, or reductions in the terms of this Agreement including, without limitation, authorizing a change in the Project, or the method and manner of performance thereof, or an adjustment in the fee and/or completion dates. Contract Amendments shall be approved by the City Manager, or designee(s), CONTRACT DOCUMENTS: "Contract Documents" shall mean this Agreement (together with all exhibits, addenda, Consultant Service Orders and written amendments issued thereto), and all Design Documents and Construction Documents. The Contract Documents shall also include, without limitation (together with all exhibits, addenda, and written amendments issued thereto), the Invitation to Bid (ITB), instructions to bidders, bid form, bid bond, Design Criteria Package (if any), the Contract for Construction, surety payment and performance bonds, Conditions of the Contract for Construction (General, Supplementary, and other Conditions), Divisions 0-17 specifications, an approved Change Order(s), approved Construction Change Directive(s), and/or approved written order(s)for a minor change in the Work. CONTRACT FOR CONSTRUCTION: "Contract for Construction" shall mean the legally binding agreement between City and Contractor for performance of the Work covered in the Contract Documents, including, without limitation, a general contractor, construction manager, design-builder or any other duly licensed construction contractor selected pursuant to any other procurement methodology available under Florida law. CONTRACTOR: "Contractor" shall mean the individual or individuals, firm, company, corporation, joint venture, or other entity contracting with City for performance of the Work covered in the Contract Documents. DESIGN CRITERIA PACKAGE or DCP: "Design Criteria Package" means concise, performance-oriented drawings or specifications of a design-build Project, prepared for the purpose of furnishing sufficient information to permit design-build firms to prepare a bid or a response to a City request for proposal, or to permit the City to enter into a negotiated design-build contract. The Design Criteria Package must specify performance-based criteria for the design-build Project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. DESIGN DOCUMENTS: "Design Documents" means all plans, drawings specifications, schematics and all other documents which set forth in full the design of the Project and fix and describe in detail the size, configuration and character of the Project concerning all items of the Project necessary for the final preparation of the 100% completed, permitted ConstructionDocuments in accordance with the requirements of the Contract Documents including, without limitation, all architectural and engineering elements as may be appropriate. Design Documents shall not be part of the Contract Documents, until (a) the Consultant has submitted completed Design Documents to the City and (b) they have been reviewed and approved by the City and agencies having jurisdiction in accordance with the procedures as provided by the Contract Documents. However, approval by the City shall not in any way be construed, interpreted and/or deemed to constitute a waiver or excuse Consultant's obligations to ensure the Design Documents are constructible, in compliance with all Applicable Laws and in accordance with the Contract Documents. RFQ 2018-141-ND 38 ' FORCE MAJEURE: "Force Majeure" shall mean any delay occasioned by superior or irresistible force occasioned by violence in nature without the interference of human agency such as a hurricane, tornado, flood, loss caused by fire and other similar unavoidable casualties; or other causes beyond the City's or Consultant's control that are not due to any act, omission or negligence of either City or Consultant and, which have, or may be reasonably expected to have, a material adverse effect on the Project, or on the rights and obligations of City or Consultant under this Agreement and which, by the exercise of due diligence, such parties shall not have been able to avoid; provided, however, that inclement weather(except as noted above), the acts or omissions of Subconsultants, the Contractor and its sub-contractors, market conditions, labor conditions, construction industry price trends, and similar matters which normally impact on the construction processshall not be considered a Force Majeure. If the Consultant is delayed in performing any obligation under this Agreement due to a Force Majeure, the Consultant shall request a time extension from the Project Administrator within five (5) business days of said Force Majeure. Any time extension shall be subject to mutual agreement and shall not be cause for any claim by the Consultant for extra compensation, unless Additional Services are required and approved pursuant to Article 5 hereof. PROJECT: The "Project" shall mean that certain City capital project described in the Consultant Service Order. Project Cost: The "Project Cost", shall mean the estimated total cost of the Project, as prepared and established by the City, including the estimated.Construction Cost and Soft Costs. The Project Cost may, from time to time, be revised or adjusted by the City, in its sole discretion, to accommodate approved modifications or changes to the Project or scope of work. Project Scope: The "Project Scope" shall mean the description of the Project, as described in the Consultant Service Order. • • PROJECT ADMINISTRATOR': The "Project Administrator" shall mean the individual designated by the City Manager, or designee(s), who shall be the City's authorized representative to issue directives and notices on behalf of the City with respect to all matters concerning the Services of this Agreement (exclusive of those authorizations reserved to the City Manager, or designee(s), or City Commission under this Agreement, or to regulatory or administrative bodies having jurisdiction over the Project). PROPOSAL DOCUMENTS: "Proposal Documents" shall mean the RFQ, together with all amendments or addenda thereto (if any), which is incorporated by reference to this Agreement and made a part hereof; • provided, however, that in the event of an express conflict between the Proposal Documents and this Agreement, the Agreement shall prevail. Consultant's proposal in response to the RFQ is included for reference purposes only and shall not be incorporated as part of this Agreement, except with respect to Consultant's representations regarding the qualifications and experience of Consultant and its key personnel, its commitment to provide the key personnel listed therein, and its capability to perform and deliver the Services in accordance with this Agreement and consistent with the all representations made therein. SCHEDULES: "Schedules" shall mean the various schedules attached to this Agreement and referred to as follows: Schedule A— Consultant Service.Order Schedule B—Consultant Compensation and Hourly Billing Rate Schedule. Schedule C—Approved Subconsultants. SCOPE OF SERVICES: "Scope of Services" shall include the Project Scope, Basic Services, and any RFQ 2018-141-ND 39 i i Additional Services (as approved by the City), all as described in Schedule "A" hereto. SERVICES: "Services" shall mean all services, work, and actions by the Consultant performed pursuant to or undertaken under this Agreement. SOFT COSTS: "Soft Costs" shall mean costs related to the Project other than Construction Cost including, without limitation, Consultant's Basic Services, Additional Services, surveys, testing, general consultant, financing, permitting fees and other similar costs, as determined by the City, that are not considered as direct costs for the construction of the Project. STATEMENT OF PROBABLE CONSTRUCTION COST: The "Statement of Probable Construction Cost" shall mean the detailed estimate prepared by Consultant in Construction Standard Index(CSI)format or other format approved by the Project Administrator, which includes the Consultant's estimated total construction cost to the City of the Work for the Project (as established in the Contract Documents, as they may be amended from time to time). The Statement of Probable Construction Cost shallbe in sufficient detail to identify the costs of each element of the Project and include a breakdown of the fees, general conditions and construction contingency for the Project. Costs shall be adjusted to the projected bid date to take into account anticipated price escalation. WORK: "Work" shall mean all labor, materials, equipment, supplies, tools, machinery, utilities, fabrication, transportation, insurance, bonds, permits and conditions thereof, building code changes and government approvals, licenses, tests, quality assurance and/or quality control inspections and related certifications, surveys, studies, and other items, work and services that are necessary or appropriate for the total construction, installation, and functioning of the Project, together with all additional, collateral and incidental items, and work and services required for delivery of a completed, fully functional and functioning Project as set forth in the Contract Documents. ARTICLE 2. BASIC SERVICES 2.1 The Consultant shall provide Basic Services for the Project, specifically described in the Consultant Service Order. 2.2 The Services will be commenced by the Consultant upon receipt of a written Consultant Service Order signed by the City Manager, or designee(s), or the Project Administrator. Consultant shall countersign the Consultant Service Order upon receipt and return the signed copy to the City. 2.3 As it relates to the Services and the Project, Consultant warrants and represents to the City that it is knowledgeable of and shall comply with all Applicable Laws. The Consultant agrees to comply with all Applicable Laws, whether now in effect or as may be amendedor adopted from time to time, and shall further take into account all known pending changes to the foregoing of which it should reasonably be aware. 2.4 The Consultant warrants and represents to the City that all of the Services required under this Agreement shall be performed in accordance with the standard of care normally exercised in the design of comparable projects in South Florida. Consultant warrants and represents to the Citythat it is experienced, fully qualified, and properly licensed (pursuant to Applicable Laws) to perform the Services. Consultant warrants and represents to the City that it is responsible for the technical accuracy of the Services (including, without limitation, the Design Documents contemplated in Schedule "A" hereto). Consultant further warrants and represents that the approved and permitted Construction Documents shall constitute a representation by Consultant to City that the Project, if constructed as required by the Contract Documents, will be fully functional, suitable and sufficient for its intended purposes. 2.5 The Consultant's Basic Services may consist of :various tasks, including planning, design, RFQ 2018-141-ND 40 bidding/award, preparation of a DCP, studies, construction administration, and Additional Services (as may be approved), 'all as further described in the Consultant Service Order; and shall also include any and all of Consultant's responsibilities and obligations with respect to the Project, as set forth in the General Conditions of the Contract for Construction. 2.6 RESPONSIBILITY FOR CLAIMS AND LIABILITIES: No action or omission by City shall waive or excuse Consultant's obligations under the Agreement and/or other Contract Documents and that Consultant shall remain fully liable for all work performed by Consultant including, without limitation, any design errors or omissions. Written decisions and/or approvals issued by,the City shall not constitute nor be deemed a release of the responsibility and liability of the Consultant (or any Subconsultants), for the accuracy and competency of the Design Documents and Construction Documents, nor shall any City approval and/or decisions be deemed to be an assumption of such responsibility by the City for a defect, error or omission in the Design Documents and the Construction Documents. , Moreover, neither the City's inspection, review, approval or acceptance of, nor payment for, any Services required under the Agreement shall be construed to relieve the Consultant (or any Subconsultant) of its obligations and responsibilities under the Agreement, nor constitute a waiver of any of the City's rights under the Agreement, or of any cause of action arising out of the performance of the Agreement. The Consultant shall be and remain liable to the City in accordance with Applicable Laws for all damages to City caused by any failure of the Consultant or to comply with the terms and conditions of the Agreement or by the Consultant's misconduct, unlawful acts, negligent acts, errors or omissions in the performance of the Agreement. 2.7 TIME: It is understood that time is of the essence in the completion of the Project and, in this respect, the parties agree as follows: 2.7.1 Term: The term of this Agreement shall commence upon execution by the City and Consultant, which shall be the Effective Date referred to on page 1 hereof, and shall be in effect for three (3) years ("Initial Term"),, plus two (2), one (1) year renewal options, to be exercised at the sole discretion of the City Manager, or designee(s), (Initial Term and any renewals shall be'collectively referred to as the "Term"). Notwithstanding the preceding Term, Consultant shall adhere to any and all timelines and/or deadlines, as set forth in the Consultant Service Order, including the time for completion of the work and/or services for such Project (as set forth in the particular Consultant Service Order). 2.7.2 The Consultant shall perform the Services as expeditiously as is consistent with the standard of professional skill and care required by this Agreement, and the orderly progress of the Work. 2.7.3 Recognizing that the construction of other projects within the City may affect scheduling of the construction for the Project, the Consultant shall diligently coordinate performance of the Services with the City (through the Project Administrator) in order to provide for the safe, expeditious, economical and efficient completion of the Project, without negatively impacting concurrent work by others. The Consultant shall coordinate the Services with all of its Subconsultants, as well as other consultants, including,without limitation, City provided consultants (if any). 2.7.4 The Services shall be performed in amanner that shall conform to the Consultant Service Order. The Consultant may submit requests for an adjustment to the Consultant Service Order completion time, if made necessary because of undue delays resulting from untimely review taken by the City(or authorities having jurisdiction over the Project)to approve the Consultant's submissions, or any other portion of the Services requiring approval by the City (or other governmental authorities having jurisdiction over the Project). Consultant shall immediately provide the Project Administrator with written notice stating the reason for the particular delay; the requested adjustment (i.e. extension) to the Project Schedule; and a revised anticipated schedule of completion. Upon receipt and review of Consultant's request (and such other documentation as the Project Administrator may require), the RFQ 2018-141=ND 41 Project Administrator may grant a reasonable extension of time for completion of the particular work involved, and authorize that the appropriate adjustment be made to the Project Schedule. The Project Administrator's approval (if granted)shall be in writing. 2.8 Consultant shall use its best efforts to maintain a constructive, professional, cooperative working relationship with the Project Administrator, Contractor, and any and all other individuals and/or firms that have been contracted, or otherwise retained, to perform work on the Project. 2.9 The Consultant shall perform its duties under this Agreement, and under a Consultant Service Order, in a competent, timely and professional manner, and shall be responsible to the City for any failure in its performance, except to the extent that acts or omissions by the City make such performance impossible. 2.10 The Consultant is responsible for the professional quality, technical accuracy, completeness, performance and coordination of all Services required under the Agreement and under the Consultant Service Order (including the services performed by Subconsultants), within the specified time period and specified cost. The Consultant shall perform the Services utilizing the skill, knowledge, and judgment ordinarily possessed and used by a proficient consulting with respect to the disciplines required for the performance of such Services in the State of Florida. The Consultant is responsible for, and shall represent to City that the Services conform to the City's requirements, the Contract Documents and all Applicable Laws. The Consultant shall be and remain liable to the City for all damages to the City caused by the Consultant's negligent acts or errors or omissions in the performance of the Services. In addition to all other rights and remedies which the City may have, the Consultant shall, at its expense, re-perform all or any portion of the Services to correct any deficiencies which result from the Consultant's failure to perform in accordance with the above standards. The Consultant shall also be liable for the replacement or repair of any defective materials and equipment and re-performance of any non-conforming construction work resulting from such deficient Services (i) for a period from the Effective Date of this Agreement, until twelve (12) months following final acceptance of the Work, (ii) or for the period of design liability required by applicable law, whichever is later. The Project Administrator shall notify the Consultant, in writing, of any deficiencies and shall approve the method and timing of the corrections. 2.10.1 The Consultant shall be responsible for deficient, defective Services and any resulting deficient, defective construction work re-performed within twelve (12) months following final acceptance and shall be subject to further re-performance,, repair and replacement for twelve (12) months from the date of initial re-performance, not to exceed twenty-four months (24) from final acceptance. 2.11 The City shall have the right, at any time, in its sole and absolute discretion, to submit for review to other consultants (engaged by the City at its expense) any or all parts of the Services and the Consultant shall fully cooperate in such review(s). Whenever others are required to verify, review, or consider any Services performed by Consultant (including, without limitation, contractors, other design professionals, and/or other consultants retained by the City), the intent of such requirement is to enable the Consultant to receive input from others' professional expertise to identify any discrepancies, errors or omissions that are inconsistent with industry standards for design or construction of comparable projects; or which are inconsistent with Applicable Laws; or which are inconsistent with standards, decisions or approvals provided by the City under this Agreement. Consultant will use reasonable care and skill, in accordance and consistent with customary professional standards, in responding to items identified by other reviewers in accordance with this subsection. Consultant shall receive comments from reviewers, in writing, including, without limitation (and where applicable), via a set of marked-up drawings and specifications. Consultant shall address comments forwarded to it in a timely manner. The term "timely" shall be defined to mean as soon as possible under the circumstances, taking into account the timelines of the Project schedule. 2.11.1 The Consultant is advised that a performance evaluation of the Services rendered throughout RFQ 2018-141-ND 42 this Agreement will be completed by the City and kept in the City's files for evaluation of future solicitations. 2.12 Consultant agrees that when any portion of the Services relates to a professional service which, under Florida Statutes, requires a license, certificate of authorization, or other form of legal entitlement to practice and/or perform such Service(s), it shall employ and/or retain only qualified duly licensed certified personnel to provide same. 2.13 Consultant agrees to designate, in writing, within five (5) calendar days after receiving a fully executed Consultant Service Order, a qualified licensed professional to serve as its project manager (hereinafter referred to as the "Project Manager"). The Project Manager shall be authorized and responsible to act on behalf of Consultant with respect to directing, coordinating and administrating all aspects of the Services. Consultant's Project Manager(as well as any replacement)shall be subject to the prior written approval of the City Manager, or designee(s), or the Project Administrator. Replacement (including reassignment) of an approved Project Manager shall not be made without the prior written approval of the City Manager, or designee(s), or his designee (i.e. the Project Administrator). 2.13.1 Consultant agrees, within fourteen (14) calendar days of receipt of written notice from the City Manager, or designee(s), or the Project Administrator(which notice shall state the cause therefore), to promptly remove and replace a Project Manager, or any other personnel employed or otherwise retained by Consultant for the Project( including, without limitation, any Subconsultants). 2.14 Consultant agrees not to divulge, furnish or make available to any third party(ies), any non-public information concerning the Services or the Project, without the prior written consent of the City Manager, or designee(s), or the Project Administrator, unless such disclosure is incident to the proper performance of the Services; or the disclosure is required pursuant to Florida Public Records laws; or, in the course of judicial proceedings, where such information has been properly subpoenaed. Consultant shall also require Subconsultants to comply with this subsection. 2.15 The City and Consultant acknowledge that the.Services, as described in the Agreement and the Consultant Service Order, do not delineate every detail and minor work task required to be performed by Consultant to complete the work and/or services described and delineated under a Consultant Service Order issued to Consultant by the City for a particular Project. If, during the course of performing work, services and/or tasks on a particular Consultant Service Order, Consultant determines that work and/or services should be performed (to complete the Project delineated under such Order) which is, in the Consultant's reasonable opinion, outside the level of effort originally anticipated in the Consultant Service Order, then Consultant shall promptly notify the Project Administrator, in writing, and shall obtain the Project Administrator's written consent before proceeding with such work and/or services. If Consultant proceeds with any such additional work and/or services without obtaining the prior written consent of the Project Administrator, said work and/or services shall be deemed to be a Basic Service under this Agreement and - shall also be deemed to be within the scope of services delineated in the Consultant Service Order (whether or not specifically addressed in the Scope of Services). Mere notice by Consultant to the Project Administrator shall not constitute authorization or approval by the City to perform such work. Performance of any such work and/or services by Consultant without the prior written consent of the Project Administrator shall be undertaken at Consultant's sole risk and liability. 2.16 Consultant shall establish, maintain, and categorize any and all Project documents and records pertinent to the Services and shall provide the City, upon request, with copies of any and all such documents and/or records. In addition, Consultant shall provide electronic document files to the City upon completion of the Project. - 2.17 THE CITY HAS NO OBLIGATION TO ASSIST, FACILITATE AND/OR PERFORM IN ANY WAY THE RFQ 2018-141-ND 43 CONSULTANT'S OBLIGATIONS UNDER THE AGREEMENT OR OTHER CONTRACT DOCUMENTS. THE CITY'S PARTICIPATION, FACILITATION AND/OR ASSISTANCE TO THE CONSULTANT SHALL BE AT ITS SOLE DISCRETION AND SHALL NOT, IN ANY WAY, BE CONSTRUED, INTERPRETED AND/OR CONSTITUTE AN ASSUMPTION BY THE CITY OF CONSULTANT'S OBLIGATIONS, A WAIVER OF CONSULTANT'S OBLIGATIONS AND/OR EXCUSE ANY BREACH BY CONSULTANT OF ITS OBLIGATIONS UNDER THE CONTRACT DOCUMENTS. THE PARTICIPATION IN THE PERFORMANCE OF ANY OF CONSULTANT'S OBLIGATIONS SHALL NOT PRECLUDE THE CITY FROM DECLARING CONSULTANT IN DEFAULT FOR CONSULTANT'S FAILURE TO PERFORM SUCH OBLIGATION, NOR SHALL IT LIMIT, IN ANY WAY, THE CITY'S RIGHTS AND REMEDIES IN CONNECTION THEREWITH. THE CONSULTANT EXPRESSLY'ACKNOWLEDGES AND AGREES NOT TO RAISE OR ASSERT AS DEFENSE TO ANY CLAIM, ACTION, SUIT AND/OR OTHER PROCEEDING OF A SIMILAR NATURE,THE CITY'S PARTICIPATION, ASSISTANCE AND/OR FACILITATION IN THE PERFORMANCE OF CONSULTANT'S OBLIGATIONS. INCLUDING, WITHOUT LIMITATION, ASSISTING WITH OBTAINING PERMITS OR WITH COORDINATION WITH UTILITIES, OR OTHER MATTERS RELATED TO THE PROJECT. IN THE EVENT OF ANY CONFLICT BETWEEN THIS SECTION AND/OR ANY OTHER PROVISION OF THIS AGREEMENT OR OTHER CONTRACT DOCUMENTS, THIS SECTION SHALL GOVERN. ' 2.18 GREEN BUILDING STANDARDS: The Consultant shall complywith the requirements of Section 255.2575, Florida Statutes, and Chapter 100 of the City Code, as both may be amended from time to time, addressing applicable Leadership in Energy and Environmental Design (LEED) compliance requirements. 2.19 SUBCONSULTANTS:, All services provided by Subconsultants shall be consistent with those commitments made by the Consultant in its Proposal and during the competitive solicitation selection process and interview. Such services shall be undertaken and performed pursuant to appropriate written agreements between the Consultant and the Subconsultants, which shall,contain provisions that.preserve and protect the rights of the City under this Agreement. Nothing contained in this Agreement shall create any contractual relationship between the City and the Subconsultants. The Consultant shall not retain, add, or replace any Subconsultant without the prior.written approval of the City Manager, or designee(s)„ in response to a written request from the Consultant stating the reasons for any proposed substitution. The Consultant shall cause the names of Subconsultants responsible for significant portions of the Services to be inserted on the plans and specifications. The Consultant shall be ultimately responsible for ensuring the Consultant's and all of its Subconsultants' compliance with the requirements of this Section and any other provision of the Agreement and/or Consultant Service Order. With respect to the performance of work by Subconsultants, the Consultant shall, in approving and accepting such work, ensurethe professional quality, completeness, and coordination of the Subconsultant's work. The Consultant shall, upon the request of the City; submit to the City such documentation and information as the City reasonably requests to evidence the creation, standing, ownership and professional licensure of the Consultant(and Subconsultants), including organizational documents, operating agreements and professional. licensure documentation„and copies of the Consultant's contracts with the Subconsultant with respect to the Project. However, the City's failure to request such documentation or evidence and/or failure to enforce in any way the terms and provisions of this Section, the Agreement and/or any other Consultant Service Order during the Project does not excuse, waive and/or condone in any way any'noncompliance of the requirements set forth therein including, without limitation, the professional licensure requirements. Any approval of a Subconsultant by the City shall in no way shift from the Consultant to City the responsibility for the quality and acceptability of the services performed by the Subconsultant. Payment of Subconsultants shall be the sole responsibility of the Consultant, and shall not be cause for any increase in compensation to the Consultant for payment of the Services. RFQ 2018-141-ND 44 ti ARTICLE 3. THE CITY'S RESPONSIBILITIES 3.1 The City Manager, or designee(s), shall designate a Project Administrator, who shall be the City's authorized representative to act on City's behalf with respect to the City's responsibilities or matters requiring City's approval under the Contract Documents. The Project Administrator shall be authorized (without limitation) to transmit instructions, receive information, and interpret and define City policies and decisions with respect to the Services and the Project. The Project Administrator shall have full authority to require the Consultant to comply with the Contract Documents, provided, however, that any failure of the Project Administrator to identify any noncompliance, or to specifically direct or require compliance, shall in no way constitute a waiver of, or excuse, the Consultant's obligation to comply with the requirements of the Contract Documents. 3.2 The City shall make available to Consultant, for the convenience of the Consultant only, information that the City has in its possession pertinent to the Project. Consultant hereby agrees and acknowledges that, in making any such information available to Consultant, the City makes no express or implied certification, warranty, and/or representation as to the accuracy or completeness of such information and assumes no responsibility whatsoever with respect to, the sufficiency, completeness or accuracy of such information.The Consultant understands, and hereby agrees and acknowledges, that it is obligated to verify to the extent it deems necessary all information furnished by the City, and that it is solely responsible for the accuracy and, applicability of all such information used by Consultant. Such verification shall include, without limitation, visual examination of existing conditions in all locations encompassed by the Project, where such examination can be made without using destructive measures (i.e. excavation or demolition). Survey information shall be spot checked to the extent that Consultant has satisfied itself as to the reliability of the information. 3.3 At any time, in his/her sole discretion, the City Manager, or designee(s), may furnish accounting, and insurance counseling services for the Project (including, without limitation, auditing services to verify the Consultant's applications for payment, or to ascertain that Consultant has:properly remitted payment due to its Subconsultants or vendors). 3.4 If the City observes or otherwise becomes aware of any fault or defect in the Project, or non- conformance with the Contract Documents, the City, through the Project Administrator, shall give prompt written notice thereof to the Consultant. 3.5 The City, acting in its proprietary capacity as Owner and not in its regulatory capacity, shall render any administrative approvals and decisions required under this Agreement, in writing, as reasonably expeditious for the orderly progress of the Services and of the Work. 3.6 Except where otherwise expressly noted in this Agreement, the City Manager, or designee(s), shall serve as the City's primary representative to whom administrative (proprietary) requests for decisions and approvals required hereunder by the City shall be made. Except where otherwise expressly noted in this Agreement or the Contract Documents, the City Manager, or designee(s), shall issue decisions and authorizations which may include, without limitation, proprietary review, approval, or comment upon the schedules, plans, reports, estimates, contracts, and other documents submitted to the City by Consultant. 3.6.1 The City Manager, or designee(s), shall have prior review and approval of the Project Manager (and any replacements) and of any Subconsultants (and any replacements). 3.6.2 The City Manager, or designee(s), shall decide, and render administrative (proprietary) decisions on matters arising pursuant to this Agreement which are not otherwise expressly provided for in this Agreement. In his/her discretion, the City Manager, or designee(s), may also consult with the City Commission on such matters. RFQ 2018-141-ND 45 3.6.3 At the request of Consultant, the City Manager, or designee(s), shall be authorized, but not required, to reallocate monies already ,budgeted toward payment of the Consultant; provided, however, that the Consultant's compensation (or other budgets established by this Agreement) may not be increased without the prior approval of the City Commission, which approval (if granted at all) shall be in its sole and reasonable discretion. 3.6.4 The City Manager, or designee(s), may approve Contract Amendments. 3.6.5 The City Manager, or designee(s), may, in his/her sole discretion, form a committee or committees, or inquire of, or consult with, persons for the purpose of receiving advice and recommendations relating to the exercise of the City's powers; duties, and responsibilities under this Agreement or the Contract Documents. 3.6.6 The City Manager, or designee(s), shall be the City Commission's authorized representative with regard to acting on behalf of the City in the event of issuing any default notice(s) under this Agreement and, should such default remain uncured, in terminating the Agreement (pursuant to and in accordance with Article 10 hereof). 3.7 The City's review, evaluation, or comment as to any documents prepared by or on behalf of the Consultant shall be solely for the purpose of the City's determining for its own satisfaction the suitability of the Project, or portions thereof, detailed in such documents for the purposes intended therefor by the City, and may not be relied upon in any way by the Consultant or any other third party as a substantive review thereof. ARTICLE 4. RESPONSIBILITY FOR CONSTRUCTION COST 4.1 The City shall establish a Construction Cost Budget for the Project, as set forth in the Consultant Service Order. Consultant shall design the Project so that the Construction Cost Budget for the Project is not exceeded. As part of the Basic Services, Consultant :shall design and/or re-design the Project to the Construction Cost Budget in accordance with this Article 4, making all revisions necessary to maintain the Construction Cost Budget. Consultant shall attend meetings. with the City to review and discuss cost estimates, cost-saving alternatives, and implementation or revision of the Design Documents and Construction Documents to address such items, as necessary to meet the established budget parameters set forth in the City Construction Budget. 4.2. Consultant shall provide and/or update the Statement of Probable Construction Cost at each stage of completion of the Design Documents and at completion of the Construction Documents, unless otherwise specified in the Consultant Service Order or other written directive of the Project Administrator. 4.2.1. At completion of the conceptual design (at such stage of completion of the Design Documents as may be specified by the Project Administrator), Consultant shall provide the City a Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus fifteen percent (+/-15%) of the Construction Cost Budget. If at the foregoing stage of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than fifteen percent(15%), then the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s) for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary'to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within fifteen percent (15%) of the City's Construction Budget. Upon obtaining City's approval of any proposed modifications, Consultant shall incorporate such modifications within the Design Documents as part of the Basic Services and at no additional cost to the City. 4.2.2. At the 30% and 60% completion of the Design Documents, Consultant shall update its RFQ 2018-141-ND 46 r Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus ten percent (+/-10%) of the Construction Cost Budget. If at the foregoing stages of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than ten percent (10%), the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s) for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within ten percent (10%) of the City's Construction Budget. Upon obtaining City's approval of any proposed modifications, Consultant shall incorporate such modifications within the Design Documents as part of the Basic Services and at no additional cost to the City. 4.2.3. At the 90% stage completion of the Design Documents and at completion of the Construction Documents, Consultant shall update its Statement of Probable Construction Cost, which must include an estimated Construction Cost for the Project within a range of plus or minus five percent (+/-5%) of the Construction Cost Budget. If at the foregoing stages of design the Consultant's Statement of Probable Construction Cost exceeds the City's Construction Budget by more than five percent (5%), the Project Administrator shall provide notice thereof to the Consultant. Consultant shall then identify the cause(s)for the difference and recommend in writing for the City's approval any modification in the Design Documents necessary to conform the Consultant's estimated total costs in the Statement of Probable Construction Cost to within five percent (5%) of the City's Construction Budget. Upon obtaining the City's approval, Consultant shall promptly modify the Design Documents or Construction Documents within the time period specified by the Project Administrator (which time period for completion shall not exceed ninety (90) days from the date Consultant is notified to re-design), as part of the Basic Services and at no additional cost to the City. 4.2.4. To ensure that the Construction Cost shall not exceed the City's Construction Budget, each' Statement of Probable Construction Cost shall be in sufficient detail to identify the costs of each element and include a breakdown of the fees, general conditions and a reasonable and appropriate construction contingency. 4.3. Consultant shall certify and warrant to the City.that the Statement of Probable Construction Cost and any update thereto, represents Consultant's best judgment of the Construction Cost for the Project as an experienced design professional familiar with the construction industry,'provided, however, that Consultant cannot (and does not) guarantee that bids ornegotiated prices will not vary from any estimates of Construction Cost or other cost evaluation(s) prepared (or otherwise provided) by Consultant. 4.4 If the lowest and best Base Bid exceeds the Consultant's final updated Statement of Probable Cost by more than ten percent (10%), the Project Administrator shall provide notice thereof to the Consultant, and the Consultant shall re-design the Project within the Project Scope, construction schedule, sequence of Work, or such other action„ as deemed necessary, to reduce the Statement of Probable Construction Cost, and Consultant shall provide any required revisions to the Contract Documents (including, without limitation, the Construction Documents) within the time period specified by the Project.Administrator (which time period for completion shall not exceed ninety (90) days from the date Consultant is notified to re-design),. and shall provide re-bidding services, as many times as may be reasonably requested by the City, as part of the Basic Services and at no additional cost to the City, in order to bring any resulting, responsive and responsible bids within ten percent(10%) of the Consultant's final updated Statement of Probable Cost. 4.5. The Construction Cost Budget shall not be exceeded without fully justifiable, extraordinary, and unforeseen circumstances (such as Force Majeure) which are beyond the control of the .parties. Any expenditure above this amount shall be subject to prior City Commission approval which, if granted at all, shall be at the sole and reasonable discretion of the City Commission. The City Commission shall have no obligation to approve an increase in the Construction Cost Budget and, if such Construction Cost Budget is exceeded, the City Commission may, at its sole and absolute discretion, terminate this Agreement (and the remaining Services)without any further liability to the.City. RFQ 2018-141-ND 47 4.6. The City Commission may, at its sole and absolute discretion, and without relieving Consultant of its obligations under this Agreement to design the Project to the Construction Cost Budget as set forth in Sections 4.1 through 4.5 above, separately elect any of the following options: (1) approve an increase to the Construction Cost Budget;(2) reject all bids, and (at its option) authorize rebidding of the Project; (3) abandon the Project and terminate the remaining Services without any further liability to the City; (4) select as many deductive alternatives as may be necessary to bring the lowest and best bid within.the Construction Cost Budget. ARTICLE 5. ADDITIONAL SERVICES 5.1 Additional Services shall only be performed by Consultant following receipt of written authorization by the Project Administrator (which authorization must be obtained prior to commencement of any such additional work by Consultant). The written authorization shall contain a description of the Additional Services required; a lump sum to be negotiated at the time of the request for additional services or an hourly fee (in 'accordance with the rates in Schedule "B" hereto), with a "Not to Exceed" amount; Reimbursable Expenses (if any) with a "Not to Exceed" amount; the amended Construction Cost Budget (if applicable); the time required to complete the Additional Services; and an amended Project Schedule (if applicable). "Not to Exceed" shall mean the maximum cumulative hourly fees allowable (or, in the case of Reimbursable Expenses, the maximum cumulative expenses allowable), which the Consultant shall not exceed without further written authorization of the Project Administrator. The "Not to Exceed"amount is not a guaranteed maximum cost for the additional work requested (or, in the case of Reimbursables, for the expenses), and all costs applicable to same shall be verifiable through time sheets (and, for Reimbursables, expense reviews). 5.2 Additional Services include the following: 5.2.1 Appraisals: Investigation and creation of detailed appraisals and valuations of existing facilities, and surveys or inventories in connection with construction performed by City. 5.2.2. Unforeseen Conditions. Providing additional work relative to the Project which arises from subsequent circumstances and causes which could not reasonably have been foreseen at the time of the Consultant Service Order (excluding conditions determined. by all prior studies available to Consultant and excluding circumstances and causes resulting from error, omission, inadvertence, or negligence of Consultant). 5.2.3. Citv-Requested Revisions to Construction Documents: Making revisions to Construction Documents resulting in or from City-requested changes in Scope of Work involving new program elements, when such revisions are inconsistent with written approvals or instructions previously given by City and/or are due to causes beyond the control of Consultant. 5.2.4 Expert Witness: Except insofar as the Consultant is required by legal process or subpoena to appear and give testimony, preparing to serve or serving as an expert witness in connection with any state or federal court action to which the Consultant is not a party in its own name, that is not instituted by the Consultant or in which the performance of the Consultant is not in issue. 5.2.5 Procurement: Assistance in connection with bid protests, re-bidding, or re-negotiating contracts (except for Contract Document revisions and re-bidding services required under Section 4.4 hereof, which shall be provided at no additional cost to City). 5.2.6. Models: Preparing professional perspectives, models or renderings in addition to those provided for in this Agreement except insofar as these are otherwise useful or necessary to the Consultant in the provision of Basic Services. RFQ 2018-141-ND 48 5.2.7. Threshold Inspection/Material Testing and Inspection: Providing threshold inspection services and material testing/special inspection services, provided that Consultant, as part of the Basic Services, shall report on the progress the Work, including any defects and deficiencies that may be observed in the Work. 5.2.8 Pre-Design Surveys & Testing: Environmental investigations and site evaluations, provided, however, that surveys of the existing structure required to complete as-built documentation are not additional services. 5.2.9 Geotechnical engineering. Providing geotechnical engineering services or site surveys. Except as specified herein, services that are required for completion of the Construction Documents shall be part of Consultant's Basic Services. ARTICLE 6. REIMBURSABLE EXPENSES 6.1 Reimbursable Expenses must be authorized, in advance, in writing, by the Project Administrator. Invoices or vouchers for Reimbursable Expenses shall be submitted to the Project Administrator (along with any supporting receipts and other back-up material requested by the Project Administrator). Consultant shall certify as to each such invoice and/or voucher that the amounts and items claimed as reimbursable are "true and correct and in accordance with the Agreement." Reimbursable Expenses may include, but not be limited to, the following: Cost of reproduction, courier, and postage and handling of drawings, plans, specifications, and other Project documents (excluding reproductions for the office use of the Consultant and its Subconsultants, and courier, postage and handling costs between the Consultant and its Subconsultants). Costs for reproduction and preparation of graphics for community workshops. - Permit fees required by City of Miami Beach regulatory bodies having jurisdiction over the Project(i.e. City permit fees). ARTICLE 7. COMPENSATION FOR SERVICES 7.1 Consultant's "Lump Sum" or "Not to Exceed" fee for provision of the Services, or portions thereof, as may be set forth and described in the Consultant Service Order issued for a particular Project, shall be negotiated between the City and Consultant, and shall be set forth in the Consultant Service Order. 7.2 . Payments for Services shall be made within forty-five (45) calendar days of receipt and approval of an acceptable invoice by the Project Administrator. Payments shall be made in proportion to the Services satisfactorily performed, so that the payments for Services never exceed the progress percentage noted in the Consultant's Progress Schedule (to be submitted with each invoice). No mark-up shall be allowed on subcontracted work. In addition to the invoice, the Consultant shall, for Hourly Rate authorizations, submit a progress report giving the percentage of completion of the Project and the total estimated fee to completion. 7.3 Approved Additional Services shall be compensated in accordance with the hourly rates set forth in. Schedule "B," attached hereto. Any request for payment of Additional Services shall be included with a Consultant payment request. No mark-up shall be allowed on Additional Services (whether sub-contracted or not). RFQ 2018-141-ND 49 7.4 Approved Reimbursable Expenses shall be paid in accordance with Article 6 hereto, up to the "Not to Exceed" Reimbursable allowance amount-in the Consultant Service Order hereto. Any request for payment of Reimbursable Expenses shall also be included with Consultant's payment request. No mark-up shall be allowed on Reimbursable Expenses. 7.5 ESCALATION: The initial hourly rates shall remain constant for the Initial Term of the agreement. Ninety (90) days prior to expiration of the Initial Term, the City may consider an adjustment to the preceding year's unit costs for the subsequent year. Only request for increases based on a corresponding,increase in the Consumer Price Index for All Urban Consumers; U.S. City average (1982-84=100), as established by the United States Bureau of Labor Statistics ("CPI"), or material adjustments to the scope or requirements of the. RFQ by the City, including (but not limited to) living wage increases, will be considered. In the event that the City determines that the requested increase is unsubstantiated, the Consultant agrees to perform all duties at the current cost terms. 7.6 No retainage shall be made from the Consultant's compensation on account of sums withheld by the City on payments to Contractor. 7.7 METHOD OF BILLING AND PAYMENT. Consultant shall invoice-the Project Administrator in a timely manner, but no more than once on a monthly basis. Invoices shall identify the nature and extent of the work performed; the total hours of work performed by employee category; and the respective hourly billing rate associated therewith. In the event Subconsultant work is used, the percentage of completion shall be identified. Invoices shall also itemize and summarize any Additional Services and/or Reimbursable Expenses. A copy of the written approval of the Project Administrator for the requested Additional Service(s) or Reimbursable Expense(s) shall accompany the invoice. 7.7.1 If requested, Consultant shall provide back-up for past and current invoices that records hours for all work (by employee category), and cost itemizations for Reimbursable Expenses (by category). - ARTICLE 8. CONSULTANT'S ACCOUNTING AND OTHER RECORDS 8.1 All books, records (whether financial or otherwise), correspondence, technical documents, and any other records or documents related to the Services and/or Project will be available for examination and audit by the City Manager, or designee(s)„ or his/her authorized representatives, at Consultant's office (at the address designated in Article 15 ["Notices"]), during customary business hours. All such records shall be kept at least for a period of three (3) years after Consultant's completion of the Services. Incomplete or incorrect entries in such records and accounts relating personnel services and expenses may be grounds for City's disallowance of any fees or expenses based upon such entries. Consultant shall also bind its Subconsultants to the requirements of this Article and ensure compliance therewith ARTICLE 9. OWNERSHIP OF PROJECT DOCUMENTS 9.1 All notes, correspondence, documents, plans and specifications, designs, drawings, renderings, calculations, specifications, models, photographs, reports, surveys, investigations, and any other documents (whether completed or partially completed) and copyrights thereto for Services performed or produced in the performance of this Agreement, or related to the Project, whether in its native electronic form, paper or other hard copy medium or in electronic medium, except with respect to copyrighted standard details and designs owned by the Consultant or owned by a third party and licensed to the Consultant for use and reproduction, shall become the property of the City. Consultant shall deliver all such documents to the Project Administrator in their native electronic form, as required in the Consultant Service Order within thirty (30) days of completion of the Services (or within thirty (30) days of expiration or earlier termination of this Agreement as the case may be). However, the City may grant an exclusive license of the copyright to the Consultant for reusing and reproducing copyrighted materials or portions thereof as authorized by the City Manager, or designee(s), in RFQ 2018-141-ND 50 • advance and in writing, In addition, the Consultant shall not disclose, release, or make available any document to any third party without prior written approval from the City Manager, or designee(s),. The Consultant shall warrant to the City that it has been granted a license to use and reproduce any standard details and designs owned by a third party and used or reproduced by the Consultant in the performance of this Agreement. Nothing contained herein shall be deemed to exclude any document from Chapter 119, Florida Statutes. 9.2 The Consultant is permitted to reproduce copyrighted material described above subject to prior written approval of the City Manager, or designee(s),. 9.3 At the City's option, the Consultant may be authorized, as an Additional Service, to adapt copyrighted material for additional or other work for the City; however, payment to the Consultant for such adaptations will be limited to an amount not greater than 50% of the original fee earned to adapt the original copyrighted material to a new site. 9.4 The City shall have the right to modify the Project or any components thereof without permission from the Consultant or without any additional compensation to the Consultant. The Consultant shall be released from any liability resulting from such modification. 9.5 The Consultant shall bind all Subconsultants to the Agreement requirements for re-use of plans and specifications. ARTICLE 10.TERMINATION OF AGREEMENT 10.1 TERMINATION FOR LACK OF FUNDS: The City is a governmental entity and is subject to the appropriation of funds by its legislative body in an amount sufficient to allow continuation of its performance in accordance with the terms and conditions of this Agreement. In the event there is a lack of adequate funding either for the Services or the Project(or both), the City may terminate this Agreement without further liability to the City. 10.2 TERMINATION FOR CAUSE: The City, through the City Manager, or designee(s)„ may terminate this Agreement for cause, upon written notice to Consultant, in the event that the Consultant (1) violates any provision of this Agreement or performs same in bad faith; (2) unreasonably delays the performance of the Services or any portion thereof; or (3) does not perform the Services or any portion thereof in a timely and satisfactory manner. In the case of termination for cause by the City, the Consultant shall first be granted a thirty (30) day cure period (commencing upon receipt of the initial written notice of default from the City). 10.2.1 In the event this Agreement is terminated for cause by the City, the City, at its sole option and discretion, may take'over the remaining Services and complete them by contracting with another consultant(s), or otherwise. The Consultant shall be liable to the City for any additional cost(s) incurred by the City due to such termination. "Additional Cost" is defined as the difference between the actual cost of completion of the Services, and the cost of completion of such Services had the Agreement not been terminated. 10.2.2 In the event of termination for cause by the City, the City shall only be obligated to pay Consultant for those Services satisfactorily performed and accepted prior to the date of termination (as such date is set forth in, or can be calculated from, the City's initial written default notice). Upon payment of any amount which may be due to Consultant pursuant to this subsection 10.2.2, the City shall have no further liability to Consultant. 10.2.3 As a condition precedent to release. of any payment which may be due to Consultant under subsection 10.2.2, the Consultant shall promptly assemble and deliver to the Project Administrator any RFQ 2018-141-ND 51 and all Project documents prepared (or caused to be prepared) by Consultant(including, without limitation, those referenced in subsection 9.1 hereof). The City shall not be responsible for any cost incurred by Consultant for assembly, copy, and/or delivery of Project documents pursuant to this subsection. 10.3 TERMINATION FOR CONVENIENCE: In addition to the City's right to terminate for cause, the City through the City Manager, or designee(s)„ may also terminate this Agreement, upon fourteen (14) days prior written notice to Consultant,for convenience, without cause, and without penalty, when (in its sole discretion) it deems such termination to be in the best interest of the City. In the event the City terminates the Agreement for convenience, Consultant shall be compensated for all Services satisfactorily performed and accepted up to the termination date (as set forth in the City's written notice), and for Consultant's costs in assembly and delivery to the Project Administrator of the Project documents (referenced in subsection 10.2.3 above). Upon payment of any amount which may be due to Consultant pursuant this subsection 10.3, the City shall have no further liability to Consultant. 10.4 TERMINATION BY CONSULTANT: The Consultant may only terminate this Agreement for cause, upon thirty (30) days prior written notice to the City, in the event that the City willfully violates any provisions of this Agreement or unreasonably delays payment of the Services or any portion thereof. In the event of a termination for cause by Consultant, the City shall pay Consultant for any Services satisfactorily performed and accepted up to the date of termination; provided, however, that the City shall first be granted a thirty (30) day cure period (commencing upon receipt of Consultant's initial written notice). 10.4.1 The Consultant shall have no right to terminate this Agreement for convenience. 10.5 IMPLEMENTATION OF TERMINATION: In the event of termination (whether for cause or for convenience), the Consultant shall immediately, upon receipt of the City's written notice of termination: (1) stop the performance of Services; (2) place no further orders or issue any other subcontracts, except for those which may have already been approved, in writing,.by the Project Administrator; (3) terminate all existing orders and subcontracts; and (4) promptly assemble all Project documents (for delivery to the Project Administrator). ARTICLE 11. INSURANCE 11.1 At all times during the Term of this Agreement, Consultant shall maintain the following required insurance coverage in full force and effect. The Consultant shall not commence any work until satisfactory proof of all required insurance coverage has been furnished to the Project Administrator: (a) Workers' Compensation and Employer's Liability per the Statutory limits of the State of Florida. (b) Commercial General Liability on a comprehensive basis in an amount not less than $500,000 combined single limit per occurrence for bodily injury and property damage. (c) Automobile Liability Insurance covering all owned, non-owned and hired vehicles used in connection with the work, in an amount not less than $100,000 combined single limit per occurrence for bodily injury and property damage. (d) Professional Liability Insurance in an amount not less than $1,000,000 with the deductible per claim, if any, not to exceed 10% of the limit of liability. 11.2 The City must be named as and additional insured on the liability policies; and it must be stated on the certificate. 11.3 The Consultant must give the Project Administrator at least thirty (30) days prior written notice of cancellation or of substantial modifications in any required insurance coverage. All certificates and endorsements shall contain this requirement. RFQ 2018-141-ND 52 11.4 The insurance must be furnished by an insurance company rated A:V or better, or its equivalent, according to Bests' Guide Rating Book, and by insurance companies duly authorized to do business in the State of Florida, and countersigned by the company's Florida resident agent. 11.5 Consultant shall provide the Project Administrator with a certificate of insurance of all required insurance policies. The City reserves the right to require a certified copy of such policies, upon written request to Consultant. ARTICLE 12. INDEMNIFICATION AND HOLD HARMLESS 12.1 To the fullest extent permitted by Section 725.08, Florida Statutes, the Consultant shall indemnify and hold harmless the City and its officers, employees, agents, and instrumentalities, from liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Consultant and other persons employed or utilized by the Consultant in the performance of this Agreement. The Consultant shall pay all claims and losses in connection therewith and shall investigate and defend all claims, suits, or actions of any kind or nature in the name of the City, where applicable, including appellate proceedings, and shall pay all costs, judgments, and attorney's fees which may issue thereon. Consultant expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by Consultant shall in no way limit itsresponsibility to indemnify, keep, and save harmless and defend the City or its officers, employees, agents, and instrumentalities as herein provided. 12.2 The Consultant agrees and recognizes that the City shall not be held liable or responsible for any claims which may result from any negligent, reckless, or intentionally wrongful actions, errors or omissions of the Consultant in which the City participated either through review or concurrence of the Consultant's actions. In reviewing, approving or rejecting any submissions by the Contractor, or other acts of the Consultant, the City in no way assumes or shares any responsibility or liability of the Consultant (including, without limitation its Subconsultants and/or any registered professionals (architects and/or engineers) under this Agreement). ARTICLE 13. ERRORS AND OMISSIONS 13.1 ERRORS AND OMISSIONS: It is specifically agreed that any construction changes categorized by the City as caused by an error, an omission, or any combination thereof in the Contract Documents that were prepared by the Consultant will constitute an additional cost to the City that would not have been incurred without the error. The damages to the City for errors, omissions or any combinations thereof shall be calculated as the total cost of any damages or incremental costs to the City resulting out of the errors or omissions by the Consultant, including, without limitation, the direct, indirect and/or consequential damages resulting from the Consultant's errors and/or omissions or any combination thereof. Damages shall include delay damages caused by the error, omission, or any combination thereof. Should the Consultant disagree that all or part of such damages are the result of errors, omissions, or any combination thereof, the Consultant may appeal this determination, in writing, to the applicable Assistant City Manager, or designee(s),. The Project Administrator's decision on all claims, questions and disputes shall be final, conclusive and binding upon the parties hereto unless such determination is clearly arbitrary or unreasonable. In the event that the Consultant does not agree with the decision of the Project Administrator, the Consultant shall present any such objections, in writing, to the City Manager, or designee(s),. The Project Administrator and the Consultant shall abide by the decision of the City Manager, or designee(s),. This paragraph does not constitute a waiver of any party's right toproceed in a court of competent jurisdiction after the above administrative remedies have been exhausted. RFQ 2018-141-ND 53 ARTICLE 14. LIMITATION OF LIABILITY The City desires to enter into this Agreement only if in so doing the City can place a limit on its liability for any cause of action for money damages due to an alleged breach by the City of this Agreement, so that its liability for any such breach never exceeds the "not to exceed" amount of the fee paid to Consultant under this Agreement, less any amount(s) actually paid to Consultant hereunder. Consultant hereby expresses its willingness to enter into this Agreement, with Consultant's recovery from the City for any damages for action for breach of contract to be limited to Consultant's "not to exceed" fee under this Agreement, less any amount(s) actually paid by the City to the Consultant hereunder. Accordingly, and notwithstanding any other term or condition of this Agreement, Consultant hereby agrees that the City shall not be liable to Consultant for money damages due to an alleged breach by the City of this Agreement, in an amount in excess of the "not to exceed amount" of Consultant's fees under this Agreement, which amount shall be reduced by any amount(s) actually paid by the City to Consultant hereunder. Nothing contained in this subsection, or elsewhere in this Agreement, is in any way intended to be a waiver of the limitation placed upon City's liability, as set forth in Section 768.28, Florida Statutes. ARTICLE 15. NOTICE All written notices given to City by Consultant shall be addressed to: City Manager, or designee(s),'s Office City,of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Attn: Jimmy L. Morales, City Manager, or designee(s), With a copy to: City Manager, or designee(s),'s Office City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Attn: Eric T. Carpenter, Assistant City Manager, or designee(s), All written notices given to the Consultant from the City shall beaddressed to: All notices mailed to either party shall be deemed to be sufficiently transmitted if sent by certified mail, return receipt requested. ARTICLE 16. MISCELLANEOUS PROVISIONS 16.1 VENUE: This Agreement shall be governed by, and construed in accordance with, the laws of the State of Florida, both substantive and remedial, without regard to principles of conflict of laws. The exclusive venue for any litigation arising out of this Agreement shall be Miami-Dade County, Florida, if in state court, and the U.S. District Court, Southern District of Florida, in federal court. BY ENTERING INTO THIS AGREEMENT, CONSULTANT AND CITY EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE RFQ 2018-141-ND 54 TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO, OR ARISING OUT OF, THIS AGREEMENT. 16.2 EQUAL OPPORTUNITY EMPLOYMENT GOALS: Consultant agrees that it will not discriminate against any employee or applicant for employment for work under this Agreement because of race, color, national origin, religion, sex, gender identity, sexual orientation, disability, marital or familial status, or age, and will take affirmative steps to ensure that applicants areemployed and employees are treated during employment without regard to race, color, national origin, religion, sex, gender identity, sexual orientation, disability, marital or familial status, or age. 16.3 PUBLIC ENTITY CRIMES ACT: In accordance with the Public Entity Crimes Act (Section 287.133, Florida Statutes), a person or affiliate who is a consultant, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not bid on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or subconsultant under a contract with the City, and may not transact business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for Category Two, for a period of 36 months from the date of being placed on the convicted vendor list.. For violation of this subsection by Consultant, City shall have the right.to terminate the Agreement without any liability to City, and pursue debarment of Consultant 16.4 NO CONTINGENT FEE: Consultant warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement, and that it has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Agreement. For the breach or violation of this subsection, City shall have the right to terminate the Agreement, without any liability or, at its discretion, to deduct from the contract price (or otherwise recover) the full amount of such fee, commission, percentage, gift, or consideration. 16.5 LAWS AND REGULATIONS: 16.5.1 The Consultant shall, during the Term of this Agreement, be governed by all Applicable Laws which may have a bearing on the Services involved in the Project. 16.5.2 Proiect Documents. In accordance with Section 119.07 (3) (ee), Florida Statutes, entitled "Inspection, Examination, and Duplication of Records; Exemptions," all building plans, blueprints, schematic drawings, and diagrams, including draft, preliminary, and final formats, are exempt from the provisions of Section 11.9.07(1), Florida Statutes (inspection and copying of public records), and s. 24(a), Article I of the State Constitution. Information made exempt by this paragraph, with prior written approval from the City Manager, or designee(s)„ may be disclosed to another entity to perform its duties and responsibilities; to a licensed architect, engineer, or contractor who is performing work on or related to the Project; or upon a showing of good cause before a court of competent jurisdiction. The entities or persons receiving such information shall maintain the exempt status of the information. 16.5.2.1 In addition to the requirements in this subsection 16.5.2, the Consultant agrees to abide by all applicable'Federal, State, and City procedures, as may be amended from time to time, by which the documents are handled, copied, and distributed which may include, but is not limited to, each employee of Consultant and Subconsultants that will be involved in the Project being required to sign an agreement stating that they will not copy, duplicate, or distribute the documents RFQ 2018-1'41=ND 55 unless authorized by the City Manager, or designee(s)„ in writing. 16.5.2.2 The Consultant and its Subconsultants agree in writing that the Project documents are to be kept and maintained in a secure location. 16.5.2.3 Each set of the Project documents are to be numbered and the whereabouts of the documents shall be tracked at all times. 16.5.2.4 A log is developed to track each set of documents logging in the date, time, and name of the individual(s) that work on or view the documents. 16.6 CORRECTIONS TO CONTRACT DOCUMENTS: The Consultant shall prepare, without added compensation, all necessary supplemental documents to correct errors, omissions, and/or ambiguities which may exist in the Contract Documents prepared by Consultant, including documents prepared by its Subconsultants. Compliance with this subsection shall not be construed to relieve the Consultant from any liability resulting from any such errors, omissions, and/or ambiguities in the Contract Documents and other documents or Services related thereto. 16.7 ASSIGNMENT: The Consultant shall not assign, transfer or convey this Agreement to any other person, firm, association or corporation, in whole or in part, without the prior written consent of the City Commission, which consent, if given at all, shall be at the Commission's sole option and discretion. However, the Consultant will be permitted to cause portions of the Services to be performed by Subconsultants, subject to the prior written approval of the City Manager,or designee(s),. • 16.8 SUCCESSORS AND ASSIGNS: The Consultant and the City each binds himself/herself, his/her partners, successors, legal representatives and assigns to the other party of the Agreement and to the partners, successors, legal representatives, and assigns of such party in respect to all covenants of this Agreement. The Consultant shall afford the City (through the City Commission) the opportunity to approve or reject all proposed assignees, successors or other changes in the ownership structure and composition of the Consultant. Failure to do so constitutes a breach of this Agreement by the Consultant. 16.9 PROVISION OF ITEMS NECESSARY TO COMPLETE SERVICES: In the performance of the Services prescribed herein, it shall be the responsibility of the Consultant to provide all salaries, wages, materials, equipment, Subconsultants, and other purchased services, etc., as necessary to complete said Services. 16.10 INTENT OF AGREEMENT: 16.10.1 The intent of the Agreement is for the Consultant to provide design and other services, and to include all necessary items for the proper completion of such services for a fully functional Project which, when constructed in accordance with the design, will be able to be used by the City for its intended purpose. The Consultant shall perform, as Basic Services, such incidental work which may not be specifically referenced, as necessary to complete the Project. 16.10.2 This Agreement is for the benefit of the parties only and it does not grant rights to a third party beneficiary, to any person, nor does it authorize anyone not a party to the Agreement to maintain a suit for personal injuries, professional liability, or property damage pursuant to the terms or provisions of the Agreement. 16.10.3 No acceptance, order, payment, or certificate of or by the City, or its employees or agents, shall either stop the City from asserting any rights or operate as a waiver of any provisions RFQ 2018-141-ND 56 • hereof or of any power or right herein reserved to the City or of any rights to damages herein provided. 16.11 This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, or understandings applicable to the matters contained herein; and the parties agree that there are no commitments, agreements, or understandings concerning the subject matter of this Agreement that are not containedin this document. Accordingly, the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless memorialized in written document approval and executed with the same formality and of equal dignity herewith. IN WITNESS WHEREOF, the parties hereto have hereunto caused these presents to be signed in their names by their duly authorized officers and principals, attested by their respective witnesses and City Clerk on the day and year first hereinabove written. Attest CITY OF MIAMI BEACH: CITY CLERK MAYOR Attest xxxxxxxxxxxxxxx Signature/Secretary Signature/President Print Name Print Name RFQ 2018-141-ND 57 SCHEDULE A PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MIAMI BEACH AND CONSULTANT SERVICE ORDER Service Order No. _ for Consulting Services. TO: PROJECT NAME: Project Name DATE: Pursuant to the agreement between the City of Miami Beach and Consultant for PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES IN SPECIALIZED CATEGORIES ON AN "AS-NEEDED" BASIS (RFQ)0XXXXXXX) you are directed to provide the following services: SCOPE OF SERVICES: Per attached proposal dated , to be considered part of this Agreement. Estimated calendar days to complete this work: Days Original Service Order Amount: $ • - Total From Previous Additional Service Orders: $ Fee for this Service Order is Lump Sum/Not to Exceed amount of: Total Agreement to Date: $ City's Project Date Coordinator/Manager Assistant Director Date Consultant. Date Project Administrator-Director Date RFQ 2018-141-ND 58 SCHEDULE B CONSULTANT COMPENSATION Schedule'of Payments Planning Services* $XXXXXXXX Design Services* $XXXXXXXX Bidding and Award Services $XXXXXXXX Construction Administration** $XXXXXXXX Reimbursable Allowance*** $XXXXXXXX Note*: These services will be paid lump sum based on percentage complete of each phase as identified in the individual tasks. Note**: Construction Administration will be paid on a monthly basis upon commencement of construction. In the event that, through no fault of the Consultant, Construction Administration services are required to be extended, which extension shall be subject to prior City approval, and what shall be at the City's sole discretion, the Consultant agrees to extend said services for$XXXXXX, per month,for the duration required to complete the Project. Note***: The Reimbursable Allowance belongs to the City and must be approved in writing, in advance, by the Project Administrator. Unused portions will not be paid to the Consultant. RFQ 2018-141-ND 59 HOURLY BILLING RATE SCHEDULE Project Principal $172.50 Project Engineer(Coastal or $116.15 Other) Project Manager $138.00 Sr. Field Services Professional $116.15 Senior Civil Engineer $138.00 Field Services Professional $ 80.50 Civil Engineer $116.15 Threshold Inspector $138.00 Senior Electrical Engineer $138.00 Structural Special Inspector $109.25 Electrical Engineer $116.15 Technical Editor $ 74.75 Senior Mechanical Engineer .$138.00 Senior GIS.Specialist $116.15 Mechanical Engineer $116.15 _GIS Specialist. $ .86.25 _ Senior Structural Engineer $138.00 Staff Engineer/Geologist/Scientist $ 94.30 Structural Engineer $116.15 Landscape Designer $ 95.45 Senior Environmental Engineer $138.00 Planner $116.15 Environmental Engineer $116.15 Project Principal ( Structural Engineer) $172.50 Environmental Technician $ 74.75 Project Manager(Structural Engineer) $138.00 Environmental Specialist $ 63.25 CAD Technician (Structural) $ 63.25 Environmental Permit Specialist $ 63.25 Traffic Engineers $116.15 Project Scientist $120.75 Cost Estimator $ 74.75 Senior Surveyor $138.00 Specifications Writer $ 63.25 Surveyor $116.15 Construction Administrator/Manager $ 94.30 Surveyor Support Staff $ 69.00 Senior Project Manager $138.00 Senior Architect $138.00 MEP Project Engineer $138.00 Architect $116.15 Horticultural/maintenance Consultant $ 86.25 Senior Designer $138.00 Irrigation Engineer $ 94.30 Designer $ 95.45 Job Captain $ 92.00 Senior Urban Planner $138.00 Interior Designer $ 95.45 Senior CAD Technician $ 69.00 Principal/Director of Design $138.00 CAD Technician $ 63.25 Senior Landscape Architect $138.00 Landscape Architect $116.15 Clerical $ 40.25 Administrative Assistant $ 40.25 Survey Crew Party of2 $140.68 Survey Crew Party of 2w/GPS $168.51 Survey Crew Party of 3 $170.44 Survey Crew Party of 3 w/GPS . $197.01 Survey Crew Party of 4 $211.31 Survey Crew Party of 4 w/GPS $250.13 Sr. Inspector(CEI) $103_50 Inspector(CEI, Field or $ 94.88 Construction) . • RFQ 2018-141-ND 60 SCHEDULE C APPROVED SUBCONSULTANTS RFQ 2018-141-ND 61 APPENDIX F /V\ 1AMIBEACH STANDARD FORM 330 • •RFQ No. 2018- 141. -ND - PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS PROCUREMENT DEPARTMENT 1755 Meridian Avenue, 3rd Floor Miami Beach, Florida 33139 RFQ 2018-141-ND 62 ARCHITECT-ENGINEER QUALIFICATIONS OMB Control Number: 9000.0157 Expiration Date: 11/30/2017 Paperwork Reduction Act Statement-This information collection meets the requirements of 44 USC§3507,as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget(OMB)control number. The OMB control number for this collectidn Is 9000-0157, We estimate that it will take 29 hours(25 hours for part 1 and 4 hours for Part 2)to read the Instructions,gather the facts,and answer the questions. Send only comments relating to our time estimate,including suggestions for reducing this burden,or any other aspects of this collection of information to; General Services Administration,Regulatory Secretariat Division(M1V10B),1800 F Street,NW,Washington,DC 20405. ' PURPOSE DEFINITIONS Federal agencies use this form to obtain information from Architect-Engineer Services: Defined in FAR 2.101. architect-engineer(A-E)firms about their professional qualifications. Federal agencies select firms for A-E contracts on the basis of professional qualifications as required by 40 U.S.C. Branch Office: A geographically distinct place of business or chapter 11;Selection of Architects Engineers,and Part 36 of the subsidiary office of a firm that has a key role on the team. Federal Acquisition Regulation(FAR). • Discipline: Primary technical capabilities of key personnel,as • The Selection of Architects and.Engineers statute requires the evidenced by academic degree, professional registration, public announcement of requirements for A-E services(with certification,and/or extensive experience. some exceptions provided by other statutes),and the selection of at least three of the most highly qualified firms based on Firm: Defined In FAR 36.102. demonstrated competence and professional qualifications • according to specific criteria published in the announcement Key Personnel: Individuals who will have major contract The Act then requires the negotiation of a contract at a fair and responsibilities and/or provide unusual or unique expertise. reasonable price starting first with the most highly qualified firm. The information used to evaluate firms is from this form and other sources, including performance evaluations,any additional data SPECIFIC INSTRUCTIONS requested by the agency,and interviews with the most highly Part I-Contract-Specific Qualifications qualified firms and their references. Section A.Contract Information. GENERAL INSTRUCTIONS 1, Title and Location. Enter the title and location of the " •. contract for which this form is being submitted,exactly as shown •• Part I presents the qualifications for a specific contract in the public•announcement or agency request. • Part II presents the general qualifications of a firm or a specific 2.Public Notice Date. Enter the posted date of the agency's branch office of a firm. Part II has two uses: . notice on the Federal Business Opportunity website (FedBizOpps), other form of public announcement or agency request for this contract. 1 1. An A-E firm may submit Part II to the appropriate central, regional or local office of each Federal agency to be kept on file. 3, Solicitation or Project Number. Enter the agency's A public announcement is not required for certain contracts,and solicitation number andlor project number, if c applicable, agencies may use Part II as a basis for selecting at least three of exactly as shown in the public announcement or agency request the most highly qualified firms for discussions prior to requesting for this contract. submission of Part I. Firms are encouraged to update Part II on file with agency offices,as appropriate,according to FAR Part Section B. Architect-Engineer Point of Contact.. 36. If a firm has branch offices,submit a separate Part II for each branch office seeking work. 4-8. Name, Title, Name of Firm, Telephone Number, Fax 1 (Facsimile) Number and E-mail (Electronic Mail) Address. j 2. Prepare a separate Part II for each firm that will be part of Provide information for a representative of the prime contractor the team propo edl_foLa-specificcontract.and..submitted with-Part-- •----or"-joint-venture--that-the-agency—can-contact-for-addltibrral" " I. If a firm has.branch offices,submit a separate Part Ii for each information. branch office that has a key role on the team, • INDIVIDUAL AGENCY INSTRUCTIONS • Individual agencies may supplement these instructions. For example,they may limit the number of projects or number of pages submitted in Part I in response to a public announcement for a particular project. Carefully comply with any agency instructions when preparing and submitting this form. Be as concise as possible and provide only the information requested by the agency. AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV,8/2016)PAGE 1 OF INSTRUCTIONS • • Prescribed by GSA-FAR(48 CFR)53.236.2(b) • • Section C. Proposed Team, 19. Relevant Projects. Provide information on up to five projects in which the person had a significant role that 9-11. Firm Name,Address,and Role in This Contract demonstrates the person's capability relevant to her/his proposed Provide the contractual relationship, name,full mailing address, role in this contract. These projects do not necessarily have to and a brief description of the role of each firm that will be be any of the projects presented in Section F for the project team involved in performance of this contract. List the prime if the person was not involved in any of those projects or the . contractor or joint venture partners first. If a firm has branch person worked on other projects that were more relevant than offices,indicate each individual branch office that will have a key the team projects in Section F. Use the check box provided to roleion the team. The named subcontractors and outside indicate if the project was performed with any office of the current associates or consultants must be used,and any change must firm. If any of the professional services or construction projects be approved by the contracting officer.(See FAR Part 52 Clause are not complete,leave Year Completed blank and Indicate the "Subcontractors and Outside Associates and Consultants status In Brief Description and Specific Role(block(3)). (Architect-Engineer Services)"). Attach an additional sheet in the same format as Section C if needed. Section F. Example Projects Which Best Illustrate Proposed Team's Qualifications for this Contract. Section D. Organizational Chart of Proposed Team. • Select projects where multiple team members worked As an attachment after Section C,present an organizational • together, if possible,that demonstrate the team's capability to • chart of the proposed team showing the names and roles of all perform work similar to that required for this contract. Complete • key personnel listed in Section E and the firm they are one Section F for each project Present ten projects,unless associated with as listed in Section C. otherwise specified by the agency. Complete the following • blocks for each project: Section E. Resumes of Key Personnel Proposed for this Contract. 20. Example Project Key Number. Start with"1"for the first project and number consecutively. Complete this section for each key person who will participate in this contract. Group by firm,with personnel of the 21. Title and Location. Title and location of project or prime contractor or joint venture partner firms first. The following contract, For an indefinite delivery contract,the location is the blocks must be completed for each resume: geographic scope of the contract. 12. Name. Self-explanatory. 22. Year Completed. Enter the year completed of the professional services(such as planning,engineering study, 13. Role in this contract. Self-explanatory. design,or surveying),and/or the year completed of construction, if applicable. If any of the professional services or the •construction projects are not complete,leave Year Completed • 14. Years Experience. Total years• • of relevant experience blank and indicate the status in Brief Description of Project and ; (block 14a),and years of relevant experience with current firm, Relevance to this Contract(block 24). but not necessarily the same branch office(block 14b). • 23a. Project Owner. Project owner or user,such as a 15. Firm Name and Location. Name,city and state of the government agency or installation,an institution,a corporation or firm where the person currently works,which must correspond private individual. with one of the firms(or branch office of a firm,if appropriate) i listed in Section C. 23b, Point of Contact Name. Provide name of a person • associated with the project owner or the organization which 16. Education. Provide information on the highest relevant contracted for the professional services,who is very familiar with academic degree(s)received. Indicate the area(s)of the project and the firm's(or firms')performance. specialization for each degree. 23c. Point of Contact Telephone Number. Self-explanatory. 17. Current Professional Registration. Provide information • on current relevant professional registration(s)in a State or 24. Brief Description of Project and Relevance to this possessionColumbia c the United States,Puerto Rico,or the District of Contract. Indicate scope,size,cost,principal elements and Columbia according to FAR Part 36. special features of the project. Discuss the relevance of the • example project to this contract. Enter any other Information 18, Other Professional Qualifications. Provide information requested by the agency for each example project on any other professional qualifications relating to this contract, such as education,professional registration,publications, organizational memberships, certifications,training, awards,and foreign language capabilities. STANDARD FORM 330(REV.812016) PAGE 2 OF INSTRUCTIONS 25. Firms from Section C Involved with this Project. Indicate 29. Example Projects Key, List the key numbers and titles of which firms(or branch offices,if appropriate)on the project team the example projects In the same order as they appear in Section were Involved In the example project,and their roles. List in the F. • same order as Section C. Section H. Additional Information. Section G. Key Personnel Participation in Example Projects. 30. Use this section to provide additional information This matrix is intended to graphically depict which key specifically requested by the agency or to address selection personnel identified in Section E worked on the example projects criteria that are not covered by the information provided in listed in Section F. Complete the following blocks(see example Sections A-G. below). Section I. Authorized Representative. 26, and 27. Names of Key Personnel and Role in this Contract. List the names of the key personnel and their 31,and 32. Signature of Authorized Representative and proposed roles in this contract in the same order as they appear Date. An authorized representative of a joint venture or the in Section E. prime contractor must sign and date the completed form. Signing attests that the information provided is Current and 28. Example Projects Listed in Section F. In the column factual,and that all,firms on the proposed team agree to work on under each project key number(see block 29)and for each key the project. Joint ventures selected for negotiations must make person,place an"X"under the project key number for available a statement of participation by a principal of each . participation in the same or similar role. member of the joint venture, 33. Name and Title. Self-explanatory. • • j SAMPLE ENTRIES FOR SECTION G (MATRIX) 26. NAMES OF KEY 27, ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill in"Example Projects Key"section below first,before (From Section E, (From Section E, completing table. Place'X"under project key number for Block 12) Block 13) ' participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 • Jane A. Smith Chief Architect X X Joseph B. Williams Chief Mechanical Engineer X X X X Tara C. Donovan Chief Electricial Engineer X X X • - i 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT(From Section F) • NUMBER TITLE OF EXAMPLE PROJECT(From Section F) 1 Federal Courthouse, Denver, CO 6 XYZ Corporation Headquarters, Boston, MA 2 Justin J. Wilson Federal Building, 7 Founder's Museum, Newport, RI Baton Rouge, LA STANDARD FORM 330(REV.8/2016) PAGE 3 OF INSTRUCTIONS Part II•General Qualifications See the"General Instructions"on page 1 for firms with branch 9. Employees by Discipline. Use the relevant disciplines and , Offices. Prepare Part II for the specific branch office seeking associated function codes shown at the end of these instructions work if the firm has branch offices. and list in the same numerical order. After the listed disciplines, write In any additional disciplines and leave the function code • 1. Solicitation Number. If Part II is submitted for a specific blank. List no more than 20 disciplines, Group remaining contract,insert the agency's solicitation number and/or project employees under"Other Employees"in column b, Each person • number,if applicable,exactly as shown in the public can be counted only once according to his/her primary function. announcement or agency request. If Part II Is prepared for a firm(including all branch offices),enter the number of employees by disciplines in column c(1). If Part II 2a-2e. Firm(or Branch Office)Name and Address. Self- is prepared for a branch office,enter the number of employees • explanatory. by discipline in column c(2)and for the firm in column c(1). I • 3. Year Established, Enter the year the firm(or branch 10. Profile of Firm's Experience and Annual Average office,if appropriate)was established under the current name. Revenue for Last 5 Years. Complete this block for the firm or I • branch office for which this Part II is prepared. Enter the I •• 4. Unique Entity Identifier. Insert the unique entity Identifier experience categories which most accurately reflect the firm's I issued by the entity designated at SAM. See FAR part 4.6. technical capabilities and project experience. Use the relevant experience categories and associated profile codes shown at the 5. Ownership. end of these instructions,and.list in the same numerical order. After the listed experience categories,write in any unlisted a.Type. Enter the type of ownership or legal structure of the relevant project experience categories and leave the profile firm(sole proprietor,partnership,corporation,joint venture,etc.). . codes blank. For each type of experience,enter the appropriate revenue index number to reflect the professional services b.Small Business Status. Refer to the North American revenues received annually(averaged over the last 5 years)by Industry Classification System(NAICS)code in the public the firm or branch office for performing that type of work. A announcement, and indicate if the firm is a small business particular project may be identified with one experience category according to the current size standard for that NAICS code(for or it may be broken into components,as best reflects the example,Engineering Services(part of NAICS 541330), capabilities and types of work performed by the firm. However, Architectural Services(NAICS 541310), Surveying and Mapping do not double count the revenues received on a particular Services(NAICS 541370)). The small business categories and project. the.internet website for the NAICS codes appear in FAR part 19. Contact the requesting agency for any questions. Contact your 11. Annual Average Professional Services Revenues of Firm local U.S. Small Business Administration office for any questions for Last 3 Years. Complete this block for the firm or branch office regarding Business Status. for which this Part II is prepared, Enter the appropriate.revenue ; index numbers to reflect the professional services revenues 6a-6c. Point of Contact. Provide this information for a received annually(averaged over the last 3 years)by the firm or • representative of the firm that the agency can contact for branch office. Indicate Federal work(performed directly for the additional information. The representative must be empowered Federal Government,either as the prime contractor or I to speak on contractual and policy matters. subcontractor),non-Federal work(all other domestic and foreign 1 work,including Federally-assisted projects),and the total. If the II 7. Name of Firm. Enter the name of the firm if Part II Is firm has been in existence for less than 3 years,see the !• prepared for a branch office. definition for"Annual Receipts"under FAR 19.101. 8a-8c. Former Firm Names. Indicate any other previous '12. Authorized Representative. An authorized names for the firm(or branch office)during the last six years. representative of the firm or branch office must sign and date the Insert the year that this corporate name change was effective completed form. Signing attests that the information provided is and the associated unique entity identifier. This information Is current and factual. Provide the name and title of the authorized j used to review past performance on Federal contracts. representative who signed the form. i I • STANDARD FORM 330(REV.81201.6) PAGE 4 OF INSTRUCTIONS • List of Disciplines (Function,Codes) Code Description Code Description 01 Acoustical Engineer 32 Hydraulic Engineer 02 Administrative33 Hydrographic Surveyor 03 Aerial Photographer 34 Hydrologist 04 Aeronautical Engineer 35 Industrial Engineer • 05 Archeologist 36 Industrial Hygienist • 06 Architect 37 Interior Designer 07 Biologist 38 Land Surveyor • 08 CADD Technician 39 Landscape Architect • 09 Cartographer 40 Materials Engineer I 10 Chemical Engineer 41 Materials Handling Engineer I 11 Chemist 42 Mechanical Engineer • 12 Civil Engineer 43 Mining Engineer I 13 Communications Engineer - 44 Oceanographer • 14 Computer Programmer 45 Photo Interpreter 15 Construction Inspector 46 Photogrammetrist 16 Construction Manager 47 Planner: Urban/Regional ' I 17 Corrosion Engineer 48 Project Manager 18 Cost Engineer/Estimator 49 Remote Sensing Specialist 19 Ecologist 50 Risk Assessor 9 20 Economist 51 Safety/Occupational Health Engineer 21 Electrical Engineer 52 Sanitary Engineer 22 _ Electronics Engineer 53 Scheduler ' 23 Environmental Engineer 54 Security Specialist • 24 • Environmental Scientist 55 Soils Engineer 25 Fire Protection Engineer 56 Specifications Writer ,i 26 0 Forensic Engineer 57 Structural Engineer 27 Foundation/Geotechnical Engineer 58 Technician/Analyst 28 Geodetic Surveyor 59 Toxicologist • 29 Geographic Information System Specialist 60 Transportation Engineer • 30 Geologist 61 Value Engineer 31 Health Facility Planner 62 Water Resources Engineer • i • I i I i • I i STANDARD FORM 330(REV.812016) • PAGE 5 OF INSTRUCTIONS • List of Experience Categories (Profile Codes) Code Description Code Description A01 Acoustics,Noise Abatement E01 Ecological&Archeological Investigations A02 Aerial Photography;Airborne Data and ImageryE02 Educational Facilities;Classrooms Collection and Analysis E03 Electrical Studies and Design A03 Agricultural Development; Grain Storage;Farm Mechanization E04 Electronics A04 Air Pollution Control E05 Elevators;Escalators;People-Movers Aircraft Fueling Airports; Navaids;Airport Lighting; E06 Embassies and ChanceriesE07 Energy Conservation;New Energy Sources A06 Airports;Terminals and Hangars; Freight Handling E08 Engineering Economics A07 Arctic Facilities E09 Environmental Impact Studies, A08 Animal Facilities Assessments or Statements A09 Anti-Terrorism/Force Protection • E10 Environmental and Natural Resource A10 Asbestos Abatement Mapping All Auditoriums&Theaters Eli Environmental Planning Al2 Automation;Controls; Instrumentation E12 Environmental Remediation E13 Environmental Testing and Analysis B01 Barracks;Dormitories B02 - Bridges • F01 Fallout Shelters; Blast-Resistant Design F02 Field Houses;Gyms;Stadiums C01 Cartography . F03 Fire Protection CO2Cemeteries(Planning&Relocation) F04 Fisheries;Fish ladders i F05 Forensic Engineering CO3 Charting: Nautical and Aeronautical F06 Forestry&Forest products C04 Chemical Processing&Storage C05 Child Care/Development Facilities G01 Garages;Vehicle Maintenance Facilities; C06 . Churches;Chapels . Parking Decks C07 Coastal Engineering G02 Gas Systems(Propane;Natural,Etc.) • C08 Codes;Standards;Ordinances G03 Geodetic Surveying:Ground and Air-borne • C09 Cold Storage; Refrigeration and Fast Freeze G04 Geographic Information System Services: • • C 1 0 Commercial Building(low rise);Shopping Centers ' Development,Analysis,and Data Collection • C11 Community Facilities G05 Geospatial Data Conversion:Scanning, C12 Communications Systems;TV;Microwave Digitizing,Compilation,Attributing,Scribing, • C13 Computer Facilities;Computer Service Drafting C14 Conservation and Resource Management G06 Graphic Design C15 Construction Management . H01 Harbors;Jetties;Piers,Ship Terminal C16 Construction Surveying . Facilities • C17 Corrosion Control;Cathodic Protection;Electrolysis H02 Hazardous Materials Handling and Storage C18 Cost Estimating;Cost Engineering and H03 Hazardous,Toxic,Radioactive Waste i Analysis;Parametric Costing;Forecasting Remediation • C19 Cryogenic Facilities H04 Heating;Ventilating;Air Conditioning H05 Health Systems Planning D01 Dams(Concrete;Arch) H06 Highrise;Air-Rights-Type Buildings D02 Dams(Earth;Rock);Dikes; Levees H07 Highways; Streets;Airfield Paving; Parking Lots D03 Desalinization(Process&Facilities) H08 Historical Preservation • D04 Design-Build-Preparation of Requests for Proposals H09 Hospital&Medical Facilities D05 Digital Elevation and Terrain Model Development H10 Hotels;Motels D06 Digital Orthophotography H11 Housing (Residential,Multi-Family,' D07 Dining Halls;Clubs; Restaurants Apartments;Condominiums) • D08 Dredging Studies and Design H12 Hydraulics&Pneumatics H13 Hydrographic Surveying • STANDARD FORM 330(REV.8/2016) , . PAGE 6 OF INSTRUCTIONS • ' 1 List of Experience Categories (Profile Codes continued) • Code Description Code Description 101 Industrial Buildings;Manufacturing Plants P09 Product,Machine Equipment Design 102 Industrial Processes;Quality Control P10 Pneumatic Structures,Air-Support Buildings 103 Industrial Waste Treatment P11 Postal Facilities 104 Intelligent Transportation Systems P12 Power Generation,Transmission,Distribution 105 interior Design;Space Planning P13 Public Safety Facilities 106 Irrigation;Drainage RO1 Radar;Sonar;Radio&Radar Telescopes J01 Judicial and Courtroom Facilities R02 Radio Frequency Systems&Shieldings LO1 Laboratories; Medical Research Facilities R03 Railroad;Rapid Transit L02 Land Surveying R04 Recreation Facilities(Parks, Marinas,Etc.) L03 Landscape Architecture R05 Refrigeration Plants/Systems L04 Libraries;Museums; Galleries R06 Rehabilitation(Buildings;Structures;Facilities) L05 Lighting(Interior; Display;Theater, Etc.) R07 Remote Sensing L06 Lighting(Exteriors;Streets; Memorials; RO8 Research Facilities Athletic Fields, Etc.) R019 Resources Recovery;Recycling MO1 Mapping Location/Addressing Systems RIO Risk Analysis M02 Materials Handling Systems;Conveyors;Sorters R11 Rivers;Canals;Waterways;Flood Control M03 Metallurgy R12 Roofing M04 Microclimatology;Tropical Engineering SO1 Safety Engineering;Accident Studies;OSHA M05 Military Design Standards Studies M06 Mining&Mineralogy • S02 Security Systems; Intruder&Smoke Detection • M07 Missile Facilities(Silos;Fuels;Transport) S03 Seismic Designs&Studies • MOB Modular Systems Design; Pre-Fabricated Structures or SO4 Sewage Collection,Treatment and Disposal Components S05 • Soils&Geologic Studies;Foundations S06 Solar Energy Utilization NO1 .Naval Architecture;Off-Shore Platforms S07 Solid Wastes;Incineration; Landfill NO2 Navigation Structures; Locks SO8 Special Environments;Clean Rooms,Etc. NO3 Nuclear Facilities;Nuclear Shielding • S09 Structural Design;Special Structures 001 Office Buildings; Industrial Parks S10 Surveying; Platting;Mapping; Flood 002 Oceanographic Engineering Plain Studies 003 Ordnance; Munitions;Special Weapons S11 Sustainable Design S12 •Swimming Pools P01 Petroleum Exploration; Refining, S13_ Storm Water Handling&Facilities P02 Petroleum and Fuel(Storage and Distribution) T01 Telephone Systems(Rural;Mobile;Intercom, P03 Photogrammetry Etc.) PO4 Pipelines(Cross-Country-Liquid&Gas) T02 Testing&Inspection Services' P05 Planning(Community, Regional,Areawide and State) T03 Traffic&Transportation Engineering P06 Planning(Site, Installation,and Project) T04 Topographic Surveying and Mapping TO5 Towers(Self-Supporting&Guyed Systems) PO7 Plumbing&Piping Design T06 Tunnels&Subways P08 Prisons&Correctional Facilities • • STANDARD FORM 330(REV.812016) • • PAGE 7 OF INSTRUCTIONS List of Experience Categories (Profile Codes continued) Code, Description U01 Unexploded Ordnance Remediation • UO2 Urban Renewals;Community Development UO3 Utilities(Gas and Steam) Vol Value Analysis; Life-Cycle Costing WO1 Warehouses&Depots W02 Water Resources;Hydrology; Ground Water •W03 Water Supply;Treatment and Distribution W04 Wind Tunnels; Research/Testing Facilities Design Z01 Zoning; Land Use Studies • • • i • I . I� • STANDARD FORM 330(REV.8/2016) PAGE 8 OF INSTRUCTIONS ARCHITECT - ENGINEER.QUALIFICATIONS PART I -CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and Slate) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE • 5. NAME OF FIRM • 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) w F ° 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a a0� • a. ❑CHECK IF BRANCH OFFICE b. ❑CHECK IF BRANCH OFFICE • C. ❑CHECK IF BRANCH OFFICE • d. ❑CHECK IF BRANCH OFFICE e. ❑CHECK IF BRANCH OFFICE f. ❑CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM ❑ (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV.812016) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT • (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a.TOTAL lb,WITH CURRENT FIRM ; 15. FIRM NAME AND LOCATION (City and State) 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) 19. RELEVANT PROJECTS • (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION(If applicable) (3)BRIEF DESCRIPTION(Bdefscope,size,cost,etc.)AND SPECIFIC ROLE El Check if project performed with current firm a. (1)'T1TLE AND LOCATION(City and State) • (2)YEAR COMPLETED • PROFESSIONAL SERVICES CONSTRUCTION(If applicable) b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check If project performed with current firm (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION(If applicable) • (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Ei Check If project performed with current firm • c. • a (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Il d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE []Check if project performed with current firm • (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION(If applicable) '1 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE fl Check if project performed with current firm e. STANDARD FORM 330(REV.812016).PAGE 2 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER • (Present as many projects as requested by the agency,or 10 projects,if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION(City and State) 22. YEAR COMPLETED • PROFESSIONAL SERVICES CONSTRUCTION(if applicable) 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER 24.•BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope,size,and cost) I h • • • • • I I • •, • � I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE . a. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. • (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE • • C. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. • • • (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE B. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE • f. STANDARD FORM 330(REV,8/2016)PAGE 3 • • G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F , • PERSONNEL CONTRACT (Fill in"Example Projects Key"section below before completing table. (From Section E,Block 12) (From Section E, Block 13) Place'X"under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 ,10 • •• i • • 1 . I • • • • • • • • • • • • • • • II 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT(From Section F) NUMBER TITLE OF EXAMPLE PROJECT(From Section F) 1 • 6 2 7 3 8 • 4 9 5 10 STANDARD FORM 330(REV. 812016)PAGE 4 J H. ADDITIONAL INFORMATION 30, PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. • • • • • • • I • •• • • • • • I I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. ' 31. SIGNATURE 32. DATE 33, NAME AND TITLE • STANDARD FORM 330(REV. 812016)PAGE 5 • 1. SOLICITATION NUMBER(If any) ARCHITECT-ENGINEER QUALIFICATIONS PART II -GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM(or Branch Office)NAME 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER • 2b. STREET 5. OWNERSHIP a.TYPE 2c. CITY 2d. STATE 2e. ZIP CODE b.SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE 7. NAME OF FIRM(If Block 2a Is a Branch Office) 6b. TELEPHONE NUMBER 6c. E•MAIL ADDRESS • • 8a, FORMER FIRM NAME(S)(If any) Sb. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE • AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function c.Number of Employees a.Profile C.Revenue Index b.Discipline b.Experience Number Code (1)FIRM (2)BRANCH Code (see below) • • . • • • I • Other Employees Total 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRMll FOR LAST 3 YEARS 1. Less than$100,000 6. $2 million to less than$5 million (Insert revenue index number shown at right) 2. $100,000 to less than$250,000 7. $5 million to less than$10 million a.Federal Work 3. $250,000 to less than$500,000 8. $10 million to less than$25 million 4. $500,000 to less than$1 million 9. $25 million to less than$50 million b.Non-Federal Work 5. $1 million to less than$2 million 10. $50 million or greater c.Total Work 1.2. AUTHORIZED REPRESENTATIVE• The foregoing is a statement of facts. a.SIGNATURE b.DATE c NAME AND TITLE • L STANDARD FORM 330(REV.8/2016)PAGE 6 ATTACHMENT C CONSULTANT'S RESPONSE TO THE RFQ 1 J 36 Detail by FEI/EIN Number Page 1 of 2 Florida Department of State DIVISION OF CORPORATIONS 00,ad..4114‘ DP/iir011 fIJ �j r_J.r 'rJ ivegzeorg .�D�� � �;�rrro� s 'UJ uric itl !rtt_ •ij rk+rit/rt rrjtaitt' Department of State / Division of Corporations / Search Records / Detail By Document Number/ Detail by FEI/EIN Number Foreign Profit Corporation TSAO DESIGN GROUP, INCORPORATED Filing Information • Document Number F02000000789 FEI/EIN Number 94-3364738 Date Filed 02/12/2002 • State CA Status ACTIVE Last Event REINSTATEMENT Event Date Filed 10/23/2018 Principal Address • • 160 PINE STREET 6TH FLOOR SAN FRANCISCO, CA 94111 Changed:01/04/2016 Mailing Address 7610 NE 4TH COURT • #5, SUITE 101 MIAMI, FL 33138 Changed:01/04/2016 • Registered Agent Name&Address HAGOPIAN,JASON 6444 ALLISON ROAD MIAMI BEACH, FL 33141 Name Changed:01/04/2016 Officer/Director Detail Name&Address Title PST TSAO,JONATHAN http://search.sunbiz.org/Inquiry/CorporationSearch/S earchResultDetail?inqui... 1/8/2019 Detail by.FEI/EIN Number Page 2 of 2 160 PINE STREET 6TH FLOOR SAN FRANCISCO, CA 94111 Title CD TSAO,JONATHAN 160 PINE STREET 6TH FLOOR SAN FRANCISCO,CA 94111 Annual Reports Report Year Filed Date 2016 01/04/2016 2017 04/28/2017 2018 10/23/2018 Document Images • • 10/23/2018—REINSTATEMENT View image in PDF format 04/28/2017—ANNUAL REPORT View image in PDF format 01/04/2016—REINSTATEMENT View image in PDF format 04/17/2014—ANNUAL REPORT View image in PDF format 01/23/2013--ANNUAL REPORT View image in PDF format 02/15/2012—ANNUAL REPORT View image in PDF format 06/13/2011—ANNUAL REPORT View image in PDF format 04/22/2010--ANNUAL REPORT View image in PDF format 03/20/2009—ANNUAL REPORT View image in PDF format 03/21/2008--ANNUAL REPORT View image in PDF format 01/25/2007—ANNUAL REPORT View image in PDF format • • 02/17/2006—ANNUAL REPORT View image in PDF format 04/13/2005--ANNUAL REPORT View image in PDF format 03/29/2004—ANNUAL REPORT View image in PDF format 04/21/2003--ANNUAL REPORT View image in PDF format • 02/12/2002—Foreign Profit View image in PDF format Florida Department of State,Division of Corporations http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inqui... 1/8/2019 - N. .; . I , `7 _ ' ! j"- L�� � ��.,,:�: r. 1 MIAMIBEACH RFQ 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS CATEGORY OF WORK: ARCHITECTURE-GENERAL Response Package 05.07.18 PREPARED FOR: City of Miami Beach Procurement Department 1755 Meridian Avenue,3rd Floor Miami Beach, FL 33139 www.miamibeachfl.gov (305) 673-7490 APPLICANT FIRM: TSAO DesignGroup TSAO Design Group, Incorporated 7610 NE 4th Court,#5 Suite 101 Miami, Florida 33138 tsaodesign.com CONTACT: Jason Hagopian,AIA; LEED AP Principal jhagopian@tsaodesign.com 305.576.2006 x15 1 TSAO DesignGroup TAB 1 - Cover Letter&Table Of Content CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 2 TSAO DesignGroup 1.1 COVER LETTER Miami May 7,2018 San Francisco City of Miami Beach Procurement Department 1755 Meridian Avenue,3rd Floor,Miami Beach,FL 33139 SELECTED CATAGORY OF WORK: ARCHITECTURE-GENERAL Miami Iron Side RFQ-2018-141-ND,PROFESSIONAL ARCHITECTURAL SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT 7610 NE 4th Court,#5 PROJECTS Suite 101 Dear Selection Committee, Miami,FL 33138 It is our pleasure to submit the enclosed response to the City of Miami Beach for PROFESSIONAL 305.576.2006 p ARCHITECTURAL SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS. 305.576.2005 f TSAO Design Group, Incorporated (TSAO) is committed to providing exemplary service and design www.tsaodesign.com to the City of Miami Beach. We look forward to helping the City of Miami Beach complete their projects and building a long—term relationship that will allow TSAO Design Group to become a valued partner of the City of Miami Beach. Our team at TSAO Design Group have been long time residents and active members of the community of Miami Beach. TSAO Design Group shares the aspiration of the City of Miami Beach to place quality,sustainable and resilient design and architecture to the forefront while preserving the unique architectural style of the city. TSAO Design Group understands special design considerations as they relate to the coastal and tropical positioning of the city and its environment. We have specialized experience in flood resistant construction, flood plain management, water remediation, wind mitigation, shade structures,acoustics/noise abatement,technology integration,and sustainable building practices. Improving building performance and user comfort through resilient design and high performance building practices is at the forefront of our philosophy. We are seasoned and accredited architects,interior designers and planners Our unique boutique approach to service and design will provide the City of Miami Beach: ✓ An extensive portfolio of work on municipal&government facilities ✓ An in-house,locally staffed,fully licensed team of architects AND interior designers ✓ All principal staff are LEED Accredited Professionals ✓ All staff have in depth experience with renovations,phasing and campus projects ✓ A personal and accessible level of service from ALL staff members assigned to the project ✓ An unsurpassed level of attention and commitment ✓ A Minority owned company with a 35 year history(15 of those in Florida) ✓ A broad range of project experience,working both for public and private sections ✓ Professional willingness to meet time and budget requirements ✓ Our current and projected workload gives us the ability to properly manage this project Thank you again for this opportunity and I invite you to call me anytime at 305.576.2006 ext.15 if you have any questions or require further information. Very sincerely yours, • 6 'sign Group,Incorporated -/ Prime Proposer Jason Hagopian,AIA, LEED AP,NCARB Principal,305.576.2006 ext.15,7610 NE 4th Court,#15 Suite 101,Miami, FL 33138 Registered Agent per Division of Corporations,State of Florida CITY OF MIAMI BEACH-RFQ2018-141-ND-04/16/2018 tsaodesign.com 3 TSAO DeslgnGroup TABLE OF CONTENT page TAB 1 COVER LETTER&TABLE OF CONTENT 1.1 Cover Letter 3 1.2 Response Certification, Questionnaire& Requirements Affidavit 6-14 (Appendix A) TAB 2 MINIMUM REQUIREMENTS 2.1 Cl. Minimum Qualifications Requirements&C2.Statement of Work 17-22 TAB 3 EXPERIENCE&QUALIFICATIONS OF THE FIRM 3.1 Qualifications of the Firm 24-38 TAB 4 EXPERIENCE&QUALIFICATIONS OF THE TEAM 4.1 Qualifications of Proposer's Individual Team Members 41-45 4.1.1 Project Experience 46-57 TAB 5 REQUIRED FORMS 5.1 Standard Form 330 60-77 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 4 TSAO DeslgnGroup 1.2 Response Certification, Questionnaire & Requirements Affidavit (Appendix A) CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 5 Appendix A Solicitation No: Solicitation Title: RFQ 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS Procurement Contact: Tel: Email: NATALIA DELGADO , 305.673.7000, Ext.6263 NATALIADELGADOMIAMIBEACHFL.GOV STATEMENTS OF QUALIFICATIONS CERTIFICATION, QUESTIONNAIRE & REQUIREMENTS AFFIDAVIT Purpose: The purpose of this Response Certification, Questionnaire and Requirements Affidavit Form is to inform prospective Proposals of certain solicitation and contractual requirements, and to collect necessary information from Proposals in order that certain portions of responsiveness, responsibility and other determining factors and compliance with requirements may be evaluated. This Statement of Qualifications Certification, Questionnaire and Requirements Affidavit Form is a REQUIRED FORM that must be submitted fully completed and executed. 1. General Proposer Information. FIRM NAME: TSAO Design Group, Incorporated NO.OF YEARS IN BUSINESS: 18 NO.OF YEARS IN BUSINESS LOCALLY: NO.OF EMPLOYEES: 16 10 OTHER NAME(S)PROPOSER HAS OPERATED UNDER IN THE LAST 10 YEARS: FIRM PRIMARY ADDRESS(HEADQUARTERS): 160 Pine Street, 6th Floor Suite 650 CITY: San Francisco STATE: California ZIP CODE: 94111 TELEPHONE NO.: 415.398.5500 TOLL FREE NO.: FAX NO.: 305.576.2005 FIRM LOCAL ADDRESS: 7610 NE 4th Court, #5, Suite 101 CITY: Miami STATE: Florida ZIP CODE: 33138 PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT: JASON HAGOPIAN ACCOUNT REP TELEPHONE NO.: 305.576.2006 ext. 15 ACCOUNT REP TOLL FREE NO.: ACCOUNT REP EMAIL: jhagopian@tsaodesign.com FEDERAL TAX IDENTIFICATION NO.: 94-3364738 The City reserves the right to seek additional information from proposer or other source(s),including but not limited to: any firm or principal information,applicable licensure, resumes of relevant individuals,client information,financial information,or any information the City deems necessary to evaluate the capacity of the proposer to perform in accordance with contract requirements. RFQ 2018-141—ND 6 Appendix A 1. Veteran Owned Business. Is Pro oser claiming a veteran owned business status? YES x NO SUBMITTAL REQUIREMENT: Proposers claiming veteran owned business status shall submit a documentation proving that firm is certified as a veteran-owned business or a service-disabled veteran owned business by the State of Florida or United States federal government,as required pursuant to ordinance 2011-3748. 2. Conflict Of Interest. All Proposers must disclose, in their Proposal, the name(s) of any officer, director, agent, or immediate family member(spouse, parent, sibling, and child)who is also an employee of the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns,either directly or indirectly, an interest of ten (10%) percent or more in the Proposer entity or any of its affiliates. SUBMITTAL REQUIREMENT: Proposers must disclose the name(s)of any officer, director, agent,or immediate family member (spouse, parent,sibling, and child)who is also an employee of the City of Miami Beach. Proposers must also disclose the name of any City employee who owns, either directly or indirectly,an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates 3. References&Past Performance.Proposer shall submit at least three(3)references for whom the Proposer has completed work similar in size and nature as the work referenced in solicitation. SUBMITTAL REQUIREMENT: For each reference submitted, the following information is required: 1) Firm Name, 2) Contact Individual Name&Title,3)Address,4)Telephone,5)Contact's Email and 6)Narrative on Scope of Services Provided. 4. Suspension, Debarment or Contract Cancellation. Has Proposer ever been debarred, suspended or other legal violation, or had a contract cancelled due to non-performance b an public sector agency? YES X NO SUBMITTAL REQUIREMENT: If answer to above is "YES," Proposer shall submit a statement detailing the reasons that led to action(s). 5. Vendor Campaign Contributions. Proposers are expected to be or become familiar with, the City's Campaign Finance Reform laws, as codified in Sections 2-487 through 2-490 of the City Code. Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Campaign Finance Reform laws are complied with, and shall be subject to any and all sanctions,as prescribed therein,including disqualification of their Proposals,in the event of such non-compliance. SUBMITTAL REQUIREMENT: Submit the names of all individuals or entities (including your sub-consultants)with a controlling financial interest as defined in solicitation. For each individual or entity with a controlling financial interest indicate whether or not each individual or entity has contributed to the campaign either directly or indirectly, of a candidate who has been elected to the office of Mayor or City Commissioner for the City of Miami Beach. 6. Code of Business Ethics. Pursuant to City Resolution No.2000-23879, each person or entity that seeks to do business with the City shall adopt a Code of Business Ethics("Code")and submit that Code to the Department of Procurement Management with its proposal/response or within five(5)days upon receipt of request. The Code shall, at a minimum, require the Proposer, to comply with all applicable governmental rules and regulations including, among others, the conflict of interest, lobbying and ethics provision of the City of Miami Beach and Miami Dade County. SUBMITTAL REQUIREMENT: Proposer shall submit firm's Code of Business Ethics. In lieu of submitting Code of Business Ethics, Proposer may submit a statement indicating that it will adopt,as required in the ordinance,the City of Miami Beach Code of Ethics,available at http://www.miamibeachfl.gov/city-hall/procurement/ RFQ 2018-141—ND 7 Appendix A 7. . .•:. . _:. 'e• •!= •• - • - . ' _ .. .se:, . .. . .. .• - • , - - .. , . . _ benefits-. ... .. .. •.. • . .. . ._ .. •.. ' . ..•..• , ! !, .e -• :•.: • ::. ' .. -- e.': . . •-- . • e •• -•• •-• . . : .. • . • .. e:•: . - , . ..- . - - •- -.. •- :. .1. •-. ••• •.. • •. . benefits- SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees to the living wage requirement. 8. Equal Benefits for Employees with Spouses and Employees with Domestic Partners. When awarding competitively solicited contracts valued at over$100,000 whose contractors maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks,the Equal Benefits for Domestic Partners Ordinance 2005-3494 requires certain contractors doing business with the City of Miami Beach,who are awarded a contract pursuant to competitive proposals, to provide"Equal Benefits"to their employees with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a Contractor who work within the City limits of the City of Miami Beach, Florida; and the Contractor's employees located in the United States, but outside of the City of Miami Beach limits, who are directly performing work on the contract within the City of Miami Beach. A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of employees? X YES NO B. Does your company provide or offer access to any benefits to employees with (same or opposite sex)domestic partners*or to domestic partners of employees? X I YES NO C. Please check all benefits that apply to your answers above and list in the"other"section any additional benefits not already specified. Note: some benefits are provided to employees because they have a spouse or domestic partner, such as bereavement leave;other benefits are provided directly to the spouse or domestic partner,such as medical insurance. BENEFIT Firm Provides for Firm Provides for Firm does not Employees with Employees with Provide Benefit Spouses Domestic Partners Health X X Sick Leave X X Family Medical Leave X X Bereavement Leave X X If Proposer cannot offer a benefit to domestic partners because of reasons outside your control, (e.g., there are no insurance providers in your area willing to offer domestic partner coverage)you may be eligible for Reasonable Measures compliance. To comply on this basis, you must agree to pay a cash equivalent and submit a completed Reasonable Measures Application (attached) with all necessary documentation. Your Reasonable Measures Application will be reviewed for consideration by the City Manager, or his designee. Approval is not guaranteed and the City Manager's decision is final. Further information on the Equal Benefits requirement is available at http://www.miamibeachfl.gov/city-hall/procurement/procurement-related-ordinance-and- procedures/ RFQ 2018-141—ND 8 Appendix A 9. Public Entity Crimes.Section 287.133(2)(a), Florida Statutes,as currently enacted or as amended from time to time,states that a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal,proposal,or reply on a contract to provide any goods or services to a public entity;may not submit a proposal, proposal,or reply on a contract with a public entity for the construction or repair of a public building or public work;may not submit proposals,proposals,or replies on leases of real property to a public entity;may not be awarded or perform work as a contractor, supplier,subcontractor,or consultant under a contract with any public entity;and may not transact business with any public entity in excess of the threshold amount provided in s.287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendor list. SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees with the requirements of Section 287.133, Florida Statutes,and certifies it has not been placed on convicted vendor list. 10. Non-Discrimination.Pursuant to City Ordinance No.2016-3990,the City shall not enter into a contract with a business unless the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a)of the City Code,including the blacklisting,divesting from,or otherwise refusing to deal with a person or entity when such action is based on race,color, national origin, religion,sex,intersexuality,gender identity,sexual orientation, marital or familial status,age or disability. SUBMITTAL REQUIREMENT: No additional submittal is required.By virtue of executing this affidavit document, Proposer agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code. 11. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi. Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida, prohibits official City travel to the states of North Carolina and Mississippi,as well as the purchase of goods or services sourced in North Carolina and Mississippi. Proposer shall agree that no travel shall occur on behalf of the City to North Carolina or Mississippi,nor shall any product or services it provides to the City be sourced from these states. SUBMITTAL REQUIREMENT: No additional submittal is required.By virtue of executing this affidavit document, Proposer agrees it is and shall remain in full compliance with Resolution 2016-29375. 12. Fair Chance Requirement. Pursuant to Section 2-376 of the City Code,the City shall not enter into any contract resulting from a competitive solicitation, unless the proposer certifies in writing that the business has adopted and employs written policies, practices,and standards that are consistent with the City's Fair Chance Ordinance, set forth in Article V of Chapter 62 of the City Code ("Fair Chance Ordinance"), and which, among other things, (i) prohibits City contractors, as an employer, from inquiring about an applicant's criminal history until the applicant is given a conditional offer of employment; (ii) prohibits advertising of employment positions with a statement that an individual with a criminal record may not apply for the position, and (iii) prohibits placing a statement on an employment application that a person with a criminal record may not apply for the position. SUBMITTAL REQUIREMENT: No additional submittal is required at this time. By virtue of executing this affidavit, Proposer certifies that it has adopted policies, practices and standards consistent with the City's Fair Chance Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon request. Proposer further agrees that any breach of the representations made herein shall constitute a material breach of contract, and shall entitle the City to the immediate termination for cause of the agreement,in addition to any damages that may be available at law and in equity. 13. Acknowledgement of Addendum. After issuance of solicitation, the City may release one or more addendum to the solicitation which may provide additional information to Proposers or alter solicitation requirements. The City will strive to reach every Proposer having received solicitation through the City's e-procurement system, PublicPurchase.com. However, Proposers are solely responsible for assuring they have received any and all addendum issued pursuant to solicitation. This Acknowledgement of Addendum section certifies that the Proposer has received all addendum released by the City pursuant to this solicitation. Failure to obtain and acknowledge receipt of all addenda may result in proposal disqualification. Initial to Confirm Initial to Confirm Initial to Confirm Receipt __ Receipt Receipt JH Addendum 1 JH Addendum 6 Addendum 11 JH Addendum 2 JH Addendum 7 Addendum 12 JH Addendum 3 Addendum 8 Addendum 13 JH Addendum 4 Addendum 9 Addendum 14 JH Addendum 5 Addendum 10 Addendum 15 If additional confirmation of addendum is required,submit under separate cover. RFQ 2018-141—ND 9 Appendix A DISCLOSURE AND DISCLAIMER SECTION The solicitation referenced herein is being furnished to the recipient by the City of Miami Beach(the"City")for the recipient's convenience. Any action taken by the City in response to Statement of Qualifications made pursuant to this solicitation, or in making any award, or in failing or refusing to make any award pursuant to such Statement of Qualifications, or in cancelling awards, or in withdrawing or cancelling this solicitation,either before or after issuance of an award,shall be without any liability or obligation on the part of the City. In its sole discretion,the City may withdraw the solicitation either before or after receiving Statement of Qualifications, may accept or reject Statement of Qualifications,and may accept Statement of Qualifications which deviates from the solicitation,as it deems appropriate and in its best interest. In its sole discretion, the City may determine the qualifications and acceptability of any party or parties submitting Statement of Qualifications in response to this solicitation. Following submission of Statement of Qualifications, the applicant agrees to deliver such further details, information and assurances, including financial and disclosure data, relating to the Statement of Qualifications and the applicant including, without limitation, the applicant's affiliates,officers,directors,shareholders,partners and employees,as requested by the City in its discretion. The information contained herein is provided solely for the convenience of prospective Proposals. It is the responsibility of the recipient to assure itself that information contained herein is accurate and complete. The City does not provide any assurances as to the accuracy of any information in this solicitation. Any reliance on these contents,or on any permitted communications with City officials,shall be at the recipient's own risk. Proposals should rely exclusively on their own investigations,interpretations,and analyses.The solicitation is being provided by the City without any warranty or representation, express or implied, as to its content, its accuracy,or its completeness. No warranty or representation is made by the City or its agents that any Statement of Qualifications conforming to these requirements will be selected for consideration, negotiation, or approval. The City shall have no obligation or liability with respect to this solicitation, the selection and the award process, or whether any award will be made. Any recipient of this solicitation who responds hereto fully acknowledges all the provisions of this Disclosure and Disclaimer, is totally relying on this Disclosure and Disclaimer,and agrees to be bound by the terms hereof.Any Statement of Qualifications submitted to the City pursuant to this solicitation are submitted at the sole risk and responsibility of the party submitting such Statement of Qualifications. This solicitation is made subject to correction of errors,omissions, or withdrawal from the market without notice. Information is for guidance only,and does not constitute all or any part of an agreement. The City and all Proposals will be bound only as, if and when a Statement of Qualifications, as same may be modified, and the applicable definitive agreements pertaining thereto, are approved and executed by the parties, and then only pursuant to the terms of the definitive agreements executed among the parties.Any response to this solicitation may be accepted or rejected by the City for any reason, or for no reason,without any resultant liability to the City. The City is governed by the Government-in-the-Sunshine Law, and all Statement of Qualifications and supporting documents shall be subject to disclosure as required by such law. All Statement of Qualifications shall be submitted in sealed proposal form and shall remain confidential to the extent permitted by Florida Statutes, until the date and time selected for opening the responses. At that time, all documents received by the City shall become public records. Proposals are expected to make all disclosures and declarations as requested in this solicitation. By submission of a Statement of Qualifications, the Proposer acknowledges and agrees that the City has the right to make any inquiry or investigation it deems appropriate to substantiate or supplement information contained in the Statement of Qualifications, and authorizes the release to the City of any and all information sought in such inquiry or investigation. Each Proposer certifies that the information contained in the Statement of Qualifications is true,accurate and complete,to the best of its knowledge,information,and belief. Notwithstanding the foregoing or anything contained in the solicitation, all Proposals agree that in the event of a final unappealable judgment by a court of competent jurisdiction which imposes on the City any liability arising out of this solicitation, or any response thereto, or any action or inaction by the City with respect thereto, such liability shall be limited to $10,000.00 as agreed-upon and liquidated damages. The previous sentence, however, shall not be construed to circumvent any of the other provisions of this Disclosure and Disclaimer which imposes no liability on the City. In the event of any differences in language between this Disclosure and Disclaimer and the balance of the solicitation, it is understood that the provisions of this Disclosure and Disclaimer shall always govern.The solicitation and any disputes arising from the solicitation shall be govemed by and construed in accordance with the laws of the State of Florida. RFQ 2018-141—ND 10 Appendix A PROPOSER CERTIFICATION I hereby certify that: I, as an authorized agent of the Proposer , am submitting the following information as my firm's proposal; Proposer agrees to complete and unconditional acceptance of the terms and conditions of this document, inclusive of this solicitation,all attachments,exhibits and appendices and the contents of any Addenda released hereto,and the Disclosure and Disclaimer Statement; proposer agrees to be bound to any and all specifications,terms and conditions contained in the solicitation, and any released Addenda and understand that the following are requirements of this solicitation and failure to comply will result in disqualification of proposal submitted; Proposer has not divulged,discussed, or compared the proposal with other Proposals and has not colluded with any other proposer or party to any other proposal; proposer acknowledges that all information contained herein is part of the public domain as defined by the State of Florida Sunshine and Public Records Laws; all responses, data and information contained in this proposal, inclusive of the Statement of Qualifications Certification,Questionnaire and Requirements Affidavit are true and accurate. Name of Proposer's Authorized Representative: Title of Proposer's Authorized Representative: Jason Hagopian,AIA,LEED AP Principal S' re of Proposer's Au ' d Representative: Date: 0 .03. lg State of FLORIDA ) On this qday of /may ,2011L ersonal yid ) eare before m who County of ji/1 AM i t A 6 ) sta ed that (s)he is the PitultrAFAi of-manorktA, sante, a corporation, and that the instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said instrument to be its voluntary act and deed. Before me: / /i Notary Public fo th State of Florida My Commissio Ex ires: AMAR(„N 13JZ672 RFQ 2018-141-ND 11 Appendix A PROPOSER CERTIFICATION I hereby certify that: I, as an authorized agent of the Proposer , am submitting the following information as my firm's proposal; Proposer agrees to complete and unconditional acceptance of the terms and conditions of this document, inclusive of this solicitation,all attachments,exhibits and appendices and the contents of any Addenda released hereto,and the Disclosure and Disclaimer Statement; proposer agrees to be bound to any and all specifications,terms and conditions contained in the solicitation, and any released Addenda and understand that the following are requirements of this solicitation and failure to comply will result in disqualification of proposal submitted; Proposer has not divulged,discussed, or compared the proposal with other Proposals and has not colluded with any other proposer or party to any other proposal; proposer acknowledges that all information contained herein is part of the public domain as defined by the State of Florida Sunshine and Public Records Laws; all responses, data and information contained in this proposal, inclusive of the Statement of Qualifications Certification,Questionnaire and Requirements Affidavit are true and accurate. Name of Proposer's Authorized Representative: Title of Proposer's Authorized Representative: Jason Hagopian,AIA,LEED AP Principal S' re of Proposer's Au ' d Representative: Date: State of FLORIDA ) On this s—day of Aioky ,20j L ersonaly� . j a before mem td/Uoc w1 who County of MIAMI D&D6 ) sta ed that (s)he is the P1aUVL►Pre4l ofrsacst nitro seat., a corporation, and that the instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said instrument to be its voluntary act and deed. Before me: li Notary Public fo th tate of Florida My Commissio Ex ires: MARCO 1332C72. RFQ 2018-141—ND 11 TSAO DesignGroup REFERENCES, page 1 of 3 ._.-__ 1111.11, 111111111=1 FIRM NAME ASPCA,The American Society for the . 4 T ' - f.• • ` '4. IH t1`4'" .441 t - r , I ♦ r ♦ ills r Prevention of Cruelty to Animals t! ;;, I.�'J ..litt'�'or . �� ' ' +l`f`L ' ‘ r .. 1� CONTACT NAS`. Stephen J.Musso i `' i �:� TIT Executive Vice President of Capital Projects, 1 Facilities Planning/Management,New York BD �ICA�t J.` u�2rxfcaAe u3+i: 520 8th Ave. '~. _ 4C? ' IL. /44 New York,NY 10018 t . 4*-19r4111 TELEPHON 212.876.7700 x4301 -- EMAP Stephen.musso@aspca.org {-- ' — 1 ASPCA/ASD LibertyCityAnimal Clinic r -- SCOPE NARRATIVE The ASPCA and Miami-Dade County are co- developers in the construction of a animal clinic for the purposes of providing animal- related services, without limitation, ' " fspay/neuter operations and primary pet care � l - _� . services, to the County's residents, including }a*---fix = `g the under-served areas of Miami �^ , .,4, Alt = Dade County particularly the Liberty City/ _ =$f ---__"-s•__ { 7-- Overtown areas. I I The proposed building is an approximately =__-_ ....4. ,`S 6,900 square foot single floor level building to IIr:[`: be constructed on the vacant property. The ----"i project proudly will be pursuing LEED Silver and will incorporate Art in Public Places art work into its architecture. Animal Client (no boarding) will be the primary use, with accessory uses including retail and office. (9 4,, _- ' " ri ......L2.74 ,,,t tsaodesign.com 12 TSAO DesignGroup REFERENCES, page 2 of 3 , 1111111 FIRM NAME Structured Solutions,Inc. al..� ,,,.' CONTACT NAME Steven J.Loper 4!1 �i d VIl ' ' r� .. �, TITLE President ` ADDRESS 8 Essez Center Drive ; .4 Peobody,MA 01960 • - . ini, i ...4_,...,„ ,-,:.. , TELEPHONE 978.232.3610 . , i' ax. . . }Off EMAIL sjl@structuredsolutions.biz IS -" 'aIj ,ate ' " SCOPE NARRATIVE Royal Palm Hotel,South Beach y .- ; •01 The Royal Palm South Beach property is part ., of Starwood's Tribute Portfolio. During the an• previous ownership, the guest rooms and public corridors were renovated. The client's _ - — renovation objective was to raise the Royal = ` Palm from 3-star property to 4-star hotel i. I lito—• .---1 4 ' � 1 �� I resort. The design team worked to creates visually cohesive and inviting public spaces. �i There is now an improved entry experience and better connection between the pone cochere, lobby, reception, restaurant space "�'1 l;;.r '� .I � 1j and the pool deck. Services included design, 7;*al da A' construction documents, permitting and construction administration. tt s'• . .ps ,rah pi r y 1. rs /'•: , lir s r 41,,_ tsaodesign.com 13 I TSAO DesignGroup REFERENCES, page 3 of 3 . ,0' FIRM NAAmicon Construction ., i Fii4 ME x kiCONTACT NAME Jon Weislow kb. ry',' /��/t TITLE Project Manager tix s ADDRESS 2400 NE 2nd Ave, Miami,Florida 33009 '' - , .... ...,......4„, ISO TELEPHONE 786.641.6351 err. _ EMAIL jweisiow@amicon.us .;,A �� 4"'"1" �� SCOPE NARRATIVE The Hallandale Beach Club "# *', '� ._' , The Hallandale Beach Club is a 45 story three- tower oceanfront condominium complex with �� 1,258 units. The project scope started with the `�r redesign of pool deck spaces of Towers II and III; the scope was later increased to 132,000 S.F. with the addition of the Tower I pool deck. dialstztagArop ■ Alongside pool remediation and water proofing, mi.. ` '': the design objectives include improving circulation, wind mitigation, better utilization of deck _mr.._: spaces, expansion of outdoor amenities, ii ,r. '.' rebranding of food/beverage areas,and aesthetic _ i q 'i/ /� updates to the property. = 1, k� 1 ' ",. ��� wimimmi In order for the design team to meet the I .. = ``'�� client's needs for the pool deck and exteriorti ... ■` amenity space remodel, they had to conduct a thorough review of the Building Code, including both state and local codes, as well as a r conduct a thorough Planning and Zoning Code - _ • }. r review. The design team had to meet with the „' , I Hallandale Beach Planning and Zoning E ,,A , ., department and review project scope for 'YA1 / • _,.. feasibility. Existing as-built drawings were • , , , reviewed to analyze design options which '' ,. included architectural, structural, and MEP feasibility. A land use assessment was also provided by a licensed land use attorney. tsaodesign.com 14 TSAO DesignGroup TAB 2 - Minimum Requirements CITY OF MIAMI BEACH-RFQ 2018441-ND-04/16/2018 tsaodesign.com 15 TSAO DesignGroup 2.1 C1.Minimum Qualification Requirements CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 16 TSAO DesignGroup State of Florida Department of State I certify from the records of this office that TSAO DESIGN GROUP, INCORPORATED is a California corporation authorized to transact business in the State of Florida,qualified on February 12,2002. The document number of this corporation is F02000000789. I further certify that said corporation has paid all fees due this office through December 31,2017, that its most recent annual report/uniform business report was filed on April 28,2017, and that its status is active. I further certify that said corporation has not filed a Certificate of Withdrawal. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Twenty-eighth day of April, 2017 414ill ;e:--• - — "71:.ty ION 0 4)A :•.. Secretary of State "4,.GOD wi. Tracking Number:CC3867359655 To authenticate this certificate,visit the following site,entcr this number.and then follow the instructions displayed. https://services.sunbiz.org/Filings/Certifica IeOtStatus/Certitic ate1.uthentication CITY OF MIAMI BEACH-RFQ 201B-141-ND-04/16/2018 tsaodesign.com 17 TSAO DesignGroup State of Florida Architecture Firm License —TSAO Design Group Incorporated P'i--aw; STATE OF FLORIDA ( � DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION \; - BOARD OF ARCHITECTURE& INTERIOR DESIGN (850)487-1395 `.zt,,..,�j 2601 BLAIR STONE ROAD TALLAHASSEE FL 32399-0783 TSAO DESIGN GROUP INCORPORATED 7610 N.E.4TH COURT#5 SUITE 101 MIAMI FL 33138 Congratulations) With this license you become one of the nearly one million Floridians licensed by the Department of Business and 1� Professional Regulation. Our professionals and businesses range /Oil_ STATE OF FLORIDA . from architects to yacht brokers,from boxers to barbeque k"ca DEPARTMENT OF BUSINESS AND restaurants,and they keep Florida's economy strong. PROFESSIONAL REGULATION Every day we work to improve the way we do business in order AA26001044 ISSUED' 02/27/2017 to serve you better. For information about our services,please log onto www.myftoridaltcense.com. There you can find more ARCHITECT CORPORATION information about our divisions and the regulations that impact TSAO DESIGN GROUP INCORPORATED you,subscribe to department newsletters and learn more about the Department's initiatives. Our mission at the Department is.License Efficiently,Regulate Fairly.We constantly strive to serve you better so that you can serve your customers. Thank you for doing business in Florida. IS CERTIFIED under the prones ons or CS 481 FS and congratulations on your new license, e.wabn date, FFB 78 019 L17972701:1001917 DETACH HERE RICK SCOTT,GOVERNOR MATILDE MILLER,INTERIM SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION jir BOARD OF ARCHITECTURE&INTERIOR DESIGN ti- l• NUMBENf '., .µ' AA2600t044 '.y' Kay ' The ARCHITECT CORPORATION T Named below IS CERTIFIED Under the provisions of Chapter 481 FS Expiration date. FEB 28,2019 ETry r TSAO DESIGN GROUP INCORPORATED 7610 N.E.4TH COURT#5 Wit4; :"0% SUITE 101 6:0•1141:"• r MIAMI FL 33138 '1 iiq:.;•+h Q • I irX15 ISSUED 02/27/2017 DISPLAY AS REQUIRED BY LAW SEC)d L1702270000847 CITY OF MIAMI BEACH—RFQ 2018-141-ND-04/16/2018 tsaodesign.com 18 TSAO DesignGroup State of Florida Architectural License —Jason R. Hagopian, AIA, LEED AP ,0, f+:, STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION ' -...,140V BOARD OF ARCHITECTURE& INTERIOR DESIGN (850)487-1395 .:-�%' 2601 BLAIR STONE ROAD TALLAHASSEE FL 32399-0783 HAGOPIAN.JASON RONALD 6444 ALLISON RD MIAMI BEACH FL 33141 Congratulations! With this license you become one of the nearly one million Floridians licensed by the Department of Business and Professional Regulation. Our professionals and businesses range STATE OF FLORIDA from architects to yacht brokers,from boxers to barbequelij DEPARTMENT OF BUSINESS AND restaurants.and they keep Florida's economy strong. =•y PROFESSIONAL REGULATION Every day we work to improve the way we do business in order AR91288 ISSUED. 02/27/2017 to serve you better. For information about our services,please log onto www.myfloridalicense.com. There you can find more ARCHITECT information about our divisions and the regulations that impact HAGOPIAN,JASON RONALD you,subscribe to department newsletters and learn more about the Department's initiatives Our mission at the Department is License Efficiently,Regulate Fairly.We constantly strive to serve you better so that you can serve your customers. Thank you for doing business in Florida. is LICENSED under the provisions of Ch.aet FS and congratulations on your new license! E+pralion des FEB 2E.2019 Lt102210000E.fi DETACH HERE RICK SCOTT,GOVERNOR MATILDE MILLER,INTERIM SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE&INTERIOR DESIGN tT I:,ry AR 61288 u. • '.a The ARCHITECT Named below IS LICENSED Under the provisions of Chapter 481 FS. Expiration date FEB 28,2019 El HAGOPIAN,JASON RONALD • i • ti•• 6444 ALLISON RD MIAMI BEACH FL 33141 •, • ;VI% •ISSUED 02/27/2017 DISPLAY AS REQUIRED BY LAW SEQ 8 1.1702270000646 CITY OF MIAMI BEACH—RFQ 2018-141-ND-04/16/2018 tsaodesign.com 19 TSAO DesignGroup State of Florida Architectural License —Jonathan Tsao, AIA, LEED AP z.,,...0,-.6.'., STATE OF FLORIDA t"x :: DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION ff I N 5 487-1 \ ,., .;' BOARD OF ARCHITECTURE& INTERIOR DES G (8 0) 395 ; 2601 BLAIR STONE ROAD TALLAHASSEE FL 32399-0783 TSAO.JONATHAN 160 PINE STREET ' SUITE 650 SAN FRANCISCO CA 94111 Congratulations' With this license you become one of the nearly one million Floridians licensed by the Department of Business and Professional Regulation Our professionals and businesses range STATE OF FLORIDA �� from architects to yacht brokers.from boxers to barbeque .'. DEPARTMENT OF BUSINESS AND restaurants,and they keep Flonda's economy strong. PROFESSIONAL REGULATION Every day we work to improve the way we do business in order AR0017139 ISSUED: 02/27/2017 to serve you better For information about our services,please log onto www.myftoridalicense.com. There you can find more ARCHITECT information about our divisions and the regulations that impact TSAO,JONATHAN you,subscribe to department newsletters and learn more about the Departments initiatives. Our mission at the Department is License Efficiently,Regulate Fairly We constantly strive to serve you better so that you can serve your customers Thank you for doing business in Florida. IS LICENSED under In•pronsions of Ch 4 111 FS and congratulations on your new license! E"°"r°"°r' cee2e 2019 1+7m270oor6e DETACH HERE RICK SCOTT,GOVERNOR MATILDE MILLER.INTERIM SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE&INTERIOR DESIGN LICENSE NUMMI -Z.1,• AR0017139 s t„ The ARCHITECT Named below IS LICENSED Under the provisions of Chapter 481 FS Expiration date. FEB 28.2019 TSAO,JONATHAN l� 160 PINE STREET ' SUITE 650 +ti• re SAN FRANCISCO CA 94111 1 ISSUED 02127,2017 DISPLAY AS REQUIRED BY LAW SEC)S L1702270000768 CRY OF CORAL SPRINGS-LOI NO.18-A-002-11/15/2017 tsaodesign.com 20 TSAO DesignGroup 2.1 C2.Statement of Work CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 21 TSAO DesignGroup C2. STATEMENT OF WORK TSAO Design Group is persuing below catagories of work: Architecture - General CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 22 TSAO DesignGroup , it 1 _Jri .Jf[ ,, A. �1 r tiri:I 0 r . .ii 13 ' 1 -Pli g • L . , _ . , a4r ,` - - 4,..,,, , 1 TAB 3 EXPERIENCE & QUALIFICATIONS OF THE FIRM CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 23 FIRM HISTORY-OVERVIEW i ''N TSAO Design Group is an award winning t architecture and interior design firm serving 4 institutional, hospitality, corporate and private i 9f clients. Our offices in Miami and San Francisco ,,,,,,,,,......e---- t provide comprehensive design services for the -'' II ' - 11 ,/ development of new buildings, renovation of existing • e � `� : �,ta I+++ = f structures and every aspect of architecture and ! .„,,,„.„1. �` r � µ i interior design. Our design portfolio contains over three .: u�-._,� 4,r4 decades of work in over 40 states nationwide. In r ^_. � A 2018 the firm celebrates 37 years in business. +7,,.`, i i // /---__.- Design At TSAO Design Group we do not 4'" `•:, .. , ..; I endorse a particular architectural style. Our design portfolio contains over two and a half `a decades of work expressing a variety of architectural styles as different as our clients. Each project expresses an individual aesthetic created in response to a program, a site and a share vision. Our ...1 - 06k pto design is user centric and site specific, Agri `" approach`�''''',1 rooted in a passionate belief that our highest v, responsibility as architects is to cultivate what is V" �t unique about each project, each client and each - opportunity. This holds true whether we are —Ix designing a museum, a retail facility, executive II offices or a private residence. There can be no 1 . y — ' 1. greater fulfillment that to engage a client deeply - L and jointly craft a design that exceeds both our ` , expectations. 1110 / Sustainability TSAO Design Group is proud to be a member of the U.S. Green Building Council and each year our professional development programs enable an increasing number of staff to become LEED Accredited Professionals. We are passionate 1.0 Pil •to s about sustainability and about accepting responsibility for the environment now and into the future. •W.'-;' Community We re-invest in our community ONO •fir;. •- by supporting a broad range of charitable .K I>:le 1 4 ., programs. Each of the firm's principals serve on the - board of directors for selected community and non- profit organizations and our annual operating budget - -_- underwrites donations and pro bono services r.."".1 :, throughout the year. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 24 FIRM HISTORY- PRACTICE & LOCATIONS TSAO DesignGroup Miami Architecture San Francisco Interior Design Award winning architecture and interior design firm with offices in Miami and San Francisco servicing . - - . _ 7 corporate, institutional and private clients. TSAO Design Group, Incorporated is celebrating 15Y2 years ,.:.,,, , �; /LLCM in business. UY!+ a : ,; Organization Type Corporation Minority Business Enterprise �s. _ 7,-.., Practice Areas/ Institutional �; 4 _ F' -4 '- Market Segments Hospitality ` - �- � _ r.:104446 Corporate Interiors '�A. Retail Life Science/Healthcare Residential � � —" I 1i Special Projects `.t- c .'J rrv...--: Office Locations Miami,Eastern Region - "i0 San Francisco,Western Region Service Region North America 1(' Registered Architects in 35 states Corporate Affiliations American Institute of Architects U.S. Green Building Council National Minority Supplier Development Council Florida Regional Minority Business Council Northern California Supplier Development Council Principal Contacts Eastern Region Jason Hagopian,AIA, LEED AP ' ^',r„13 1 305.576.2006 ext. 15 s�� _ jhagopian@tsoodesign.com SIE Joe�� ' I� Janie Coka, IIDA, LEED AP ‘, 305.576.2006 ext. 14 ''S, \ - Ilk jcoka@tsaodesign.com ,,, Western Region 404 —�'" Jonathan Tsao,AIA,LEED AP / ,; r,,r+ 415.398.398.5500 ext.222 jtsao@tsaodesign.com �, __ _ Mary Wang,AIA, LEED AP 415.398.5000 ext.247 ). mwang@tsaodesign.corn CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 25 FIRM HISTORY- SERVICES TSAO DesignGroup ird9ea I i - ,may .p _.• v i ' � �. -;,,.'i :..,,,' '..''''''''''''' ' ii .. Ili . esr•V: l 0 sr -Y.- .„-„...-f,..-,... „A.A._ i i ,- M q� I"' .,.,,,.._,.„. .,., , t t R.;- f '� yy .�. Yid..,. � .. � . .F; a+ ' -: '.d 47. A s Commercial Design Services Project management Field Surveying Construction management As-built drawings Project liaison services Site selection CAFM system support Lease review Occupancy tracking Strategic facilities planning Relocation analysis Existing facility analysis Project budgeting/scheduling Access/code Sustainability analysis compliance Cultural mapping Preliminary test fit planning Environmental branding Design/design development Qualitative/ quantitative programming Construction documents Departmental/key person interviews Engineering coordination Adjacency/productivity analysis Cost estimating/value engineering Furnishings/accessories evaluation Bidding/ negotiation Space optimization Committee Presentations Furniture design Regulatory agency liaison Alternative work environments Permit expediting Workplace systems integration: Construction administration Sustainability/ lighting/acoustics/ Post occupancy evaluation furnishings/ergonomics/technology CITY OF MIAMI BEACH-RFQ 2018-141-NO-04/16/2018 tsaodesign.com 26 FIRM HISTORY-APPROACH TSAO DesIgnGroup APPROACH TO SCOPE OF SERVICES TSAO Design Group, Incorporated proposes an implementation strategy based on our experience accumulated over 15 1/2 years of designing complex and varied project types. The foundation of our approach is built upon effective communication and strict adherence to the schedule and to the budget. Following are key elements of our implementation strategy: [ . . 0 • ....c... •.1.% .r. ' COLLABORATION No single stakeholder will be successful without the support and co-operation of other stakeholders and we must work collaboratively, within our respective disciplines, united by common goals, towards a single outcome. ; WTd IAY CAMP( R6PIfO0C iYl li'AY/9.� // / \\\'‘ bI Ft 1 --- I, / , \\AV ' g:1:I 4' ' C l WT61AY[.WK'S / �� 1 ' ' \' ' —V.'.. .tp5 ? re-I.---Th J � �AO'` t1." tL iii Nill___ , i4v,i 410,1,.. ..,..61 ,,o,, ‘ • ,, • ,,,, , ,,,r,,--.sfiN, \\.\\\\,,„,,,,, ,; L.2.11 t.• c,$4,. ''', ';'''\ r,;.; r6\ 14,\i„,„0 _...... 1 , ,. ). !IL ,,,/,,, ,, ,f4 ,=7.., ..,.. /1y, .44.„..,-„,/ SAN., [,s r, r fi / ;,' , (6,k CITY OF MIAMI BEACH-RFQ2018-141-ND--04/16/2018 tsaodesign.com 27 FIRM HISTORY-APPROACH TSAO DesignGroup Creativity Our team members are creative in producing design options that will express the City of Miami Beach's culture, image and work processes. However, our creativity is not limited to architectural design. We will apply our creativity to all aspects of the project, from zoning issues,to cost-saving measures,from scheduling to problem-solving. • 1 t ! Y .4 ,14111 I JAL-. w , • I B7n l -- -- - _ I _ �� 1, . WIND-CARVES I TRAJECTORIES I INTERSECTS I EMBEDS I CHANGES DIRECTION r. • 171.--- i s's -- ‘1:::. . r''.'"4 `` -e TAN, , L__ r i I riLi II i s- 7 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 2S3 FIRM HISTORY-APPROACH TSAO DesignGroup We Guarantee a Dedicated Core Team Since we understand the benefit of continuity, we dedicate a team to a project from commencement through completion which substantially reduces quality control issues resulting from staff changes. Extraordinary Service Extraordinary service is not only a marketing concept but a powerful commitment that identifies client satisfaction as the ultimate reward for our actions. Design creativity and technical competence alone do not distinguish us from our peers. Our most valuable contribution is creating a working relationship that is inquisitive, inclusive and interactive. We aspire to a service philosophy that emphasizes listening to our clients as the foundation for enduing relationships. TSAO PROCESS 11114411I DEFINE r IMPROVE COLLECT 1 , BRAINSTORM _ . FEEDBACK DEVELOP po- .wr. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 29 FIRM HISTORY-APPROACH TSAO DesignGroup Project Team Allocation Our Clients really appreciate our nimble approach to our work and know that no matter the size of the projects or the volume of the projects, that we can exceed their expectations. We keep an active file of consultants and potential staff additions for when the need arises for team augmentation. TSAO Design Group performs best when we are busy. The managers and staff keep projects moving briskly through the office while always maintaining quality and service to our Clients. Our project teams are sized to fit our Client's workload and as a result our office size can flex as needed. As we begin 2018, our office is poised for more steady growth and continued support to our existing Clients. Code Expertise Our practice is well-versed in restrictive regional codes specific to handicapped accessibility and energy conservation and how they impact the built environment. We also have first-hand experience with the regional nuances of the permitting process and we know how to maneuver projects through varying and complex agency procedures. 40,46, all E' Imo.. § ' Akhoull t CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 30 FIRM HISTORY- MANAGEMENT TOOLS TSAO DesignGroup Effective Management Tools We have developed proprietary tools for project management, time management and quality control. At the commencement of the project we will coordinate a kick-off meeting to identify the City of Coral Springs's priorities, assign roles and responsibilities for each team member, identify budget and schedule constraints, and jointly develop two powerful tools: the Project Road Map and the Project Schedule. Jointly they represent an extremely effective method for project management, time management, and monitoring task/document completion by phase. Using these tools promotes collaboration, establishes the City of Coral Springs's expectations and how each team member will meet those expectations throughout the duration of the project. The TSAO Project Road Map synchronizes the activities of the project team by clearly establishing the primary objectives, focus items, tasks and key deliverables for each phase of the project. The Project Schedule uses Microsoft Project, a management software application adapted specifically for architectural design and construction projects. Regular updates to the Project Schedule are made by our project manager and distributed promptly to all stakeholders. .....101.1 0.4%, ,�., ., ... ..... -- ...... • .R...._.... •= -...r.• M..L.........t •..............-.. •......ton.=mos r..... .............. •.i.._w•__r •_.....w -.1 r•. YMa►_........ ••i..r�.•'� •,Y.r•00,•.•.•.' •....rMw =�..w� ww w.W....rhw •rN........ .._..._+•...r sa w_ ...• A=NM AMA A.N_•.... 9610...••_..••.M Y.._nw—_f_...••.. «..r..•.. ........•r •�Ay..•..•._..•• I............ •0.•....•r.• •....w••.. •b_..�0.• •r._m....._._• :RY••vWh+ • •'W........ +.Cry..._ •AOC....•.• •*rr+.. . . •. .:":"="'""" • ,++.Iw.we •.r.lr •M.•..► •0...'•_r.•' ............ •▪111.•.•9 �.'. M__t-+w1 .....;m.. •N=M .661.... •t4:64. W•...F_.n• ...ew: rv._ ram. � .YWai• •....... _ • Mr• • `..f....M_w •.•W..+mos...+_^n . •..•._..•Y•• ••..n. •M :...........=r =.•w�.. ., . •...G..*w' .i :: �' • Y =•••• .• +.. •_• c.....6.. ►• .'�' •`v.11.•" :▪w«►: .• 6666-6 666..—� =0%1=o Amos 1. SAMPLE ROAD MAP CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 31 FIRM HISTORY- MANAGEMENT TOOLS TSAO DesignGroup fi �n k A. .1, Structured Communication We will maintain a high level of communication between the City of Miami Beach's stakeholders, our team including consultants, and project vendors. Effective communication between project stakeholders is essential to maintaining customer satisfaction by ensuring that information is disseminated in a timely manner and Client expectations are met. At project commencement, our project manager will establish simple and direct procedures to maximize how information is transmitted between all project participants. In addition to daily exchanges of information by telephone and email, we will coordinate weekly meetings with team members to incorporate client feedback, monitor progress, and identify potential issues for resolution in advance. We will provide written agendas and meeting reports prior to and following each meeting to assure that all issues, decisions and actions taken are promptly documented and accounted for. TSAO utilizes the following documents to communicate effectively with project stakeholders and to administer the contract. • Meeting Agenda/Reports • Shop Drawings and Submittals Log • Client Approval Forms • Field Observation Form • Addendums/ Bulletins • Punch List Form • Request for Information Log • Findings Reports CITY OF MIAMI BEACH-RFQ 2018.141-ND-04/16/2018 tsaodesign.com 32 FIRM HISTORY- MANAGEMENT TOOLS TSAO DesignGroup I , . , I► . eche 11° i `. Wilr111 ei Schedule control Our Senior Project Manager will be responsible for developing and maintaining a comprehensive master schedule which identifies the deliverables, reviews and approvals for each phase. The master schedule created at the start of the project will be confirmed and updated at each weekly project meeting with critical issues brought to the forefront for timely resolution. Cost Control Adherence to cost control measures along with a proactive role for the collaborative identification of possible alternates in program-wide components and processes is paramount to the success of a program and indicative of a true partnership. Make the whole team responsible for cost control — cost estimates at the end of each phase are important ways to avoid unpredicted cost overruns and damage control techniques such as time consuming document revisions. We support early contractor participation and also require our project managers, designers and consultants to be conversant with construction values so cost control is integrated into the design process and not reduced to an afterthought. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 33 FIRM HISTORY-QUALITY CONTROL TSAO DesignGroup ... ii, \144 4 11 za : 2. il - .. 0 tic - , k . , .., . ._ , i.„ _ . ii liii fT Quality Assurance & Quality Control Quality Assurance and Quality Control are commonly used interchangeably but they are two different processes with a common goal to delivery excellent quality. TSAO Design Group has established protocols and procedures to develop each project from inception to completion to deliver a successful project to our Client's. Quality Control is much more than a set of review procedures and checklists, this reflects a firm's ability to manage and retain qualified staff. Quality problems can be the outcome of high staff turnover and inattentive management. By attracting and keeping highly qualified staff at all experience levels and by working in teams we have significantly reduced quality control issues throughout all phases of our projects from programming through construction administration. Investing in technology and underwriting a strong continuing education program are two additional ways our firm maintains high quality control. The degree of connectivity made possible by computer systems gives us the tools to approach complex design assignments, coordinate with consultants, perform under aggressive time lines and still produce consistently high quality deliverables. E4st,t,,,...: • `ER ,„dm , CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 34 FIRM HISTORY-QUALITY CONTROL METHODOLOGY TSAO DeslgnGroup Accuracy& Quality Control Methodology I a12 Step TSAO Guideliane The TSAO Design Group Architecture is a talented group of Architects and Interior Designers that are prepared to guarantee ultimate success • for the City of Miami Beach stakeholders. Below are TSAO Design 111.111 • Group's 12 steps toward a top-quality, well-coordinated project delivery. O 1. Timing: Schedule projects to accommodate in-house and out of house reviews with adequate time to include any comments or resolve any outstanding issues. 2. Self-checking: Each team member must be responsible for thoroughly checking his or her own work against a firm-standardized checklist as early as several weeks before a job goes out to bid. 3. Red-marking: Include your staff in this process. The job captain or project architect often sits beside me as we review drawings, checking references, and detail keys interrelationship between drawing, grammar, dimensions, and spelling. Drawings do need to be proofed again after the red marks have been picked up. 4. Peer Review: For a peer review to pay off, the reviewer must read every note and check references. The "red pencil" (high-light items that need to be changed) and "yellow marker" (highlighted items that have been verified) techniques help keep the reviewer organized. 5. Technical proficiency: Most important, address problem areas directly. We advise using in- house experts, encouraging on-site construction observation at all professional level, and attending technical seminars and local AIA and CSI meetings. 6. Specifications: Spec writing is perhaps one of the largest least sought-after task for our professional practice. But the fact of the matter is that it is a critical part of the success of a project.TSAO is aligned with experienced and passionate specification writers to ensure top quality written specifications. 7. Codes:All relevant codes and zoning requirements must be understood completely before the project leaves the schematic design phase. The project architect should read through all relevant codes and summarize those sections that apply. This written summary can be used on the data sheet at the beginning of a set to assist the plans examiner with the review. 8. REVIT Accuracy: Utilize software such as Revit to manage conflict detection, cost estimating and collaboration with Owners for better visualization tools prior to construction. 9. Owner Review: Encourage a 50 percent and 90 percent review and which time you can focus a client's attention to critical parts of the project requiring Client direction and/approval to proceed. 10. Contractor Review: Meet with the contractor in person and incorporate their relevant comments and concerns into the bid documents before signing the contract. 11. Follow-though: Thoroughly coordinate all changes into the documents. An unforeseen condition such as a concealed mechanical duct may require that a portion of the ceiling be lowered, affecting structural details, lighting, power distribution drawings etc. 12. Trouble-shooting: Many catchall clauses used in drawings, contracts and specifications, such as "Contractor to verify in field", were created to avoid change orders. Check the AIA General Conditions (A201) for phrases that will better safeguard the construction documents. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 35 f TSAO DesignGroup QUALIFICATIONS OF THE FIRM; Small Project 1 of 3 Project Name THE PRIDE CENTER AT EQUALITY PARK WILTON MANNERS, FT. LAUDERDALE, FLORIDA Project Description The Pride Center hired TSAO Design Group to assist them with the Master Planning of their 6 acre site in Wilton . Manners Florida. The first two project phases included a Visioning Charrette,planning,and a massing study. Development of a master plan for a 6 acre site in Wilton - --- Manners encompassed;housing(180 units),parking, community space,retail,parks and waterfront usage. -Or project scope included complete due diligence, f visioning,budgeting,pre-design,schematic design, • j master planning and 3D visualization. 4 • TSAO Design Group conducted a Visioning Charrette with -‘1414 `••` The Pride Center stakeholders with the intent of `•'• cultivating ideas and focusing a vision for what The Pride 4111•.', A^ ' 1 t' •� Center can be in the future. Pride Centers across the . .globe include such programming as senior housing, Self �r assisted living facilities,theaters,health clubs,event space,outdoor activity space,classrooms,technology =- centers,libraries,art galleries,restaurants,catering ! • �'"' � facilities,health clinics,office space,etc. The Charette provided a forum for ideas and the unique advantage of giving immediate feedback to the designer and VIEW IVIEW � stakeholders. The Visioning Charette allowed everyone .— 1 who participates to be a mutual author of the plan. 1404- 'I 'f After the deliverable from the Visioning Charrette,TSAO created color,three dimensional massing studies r,,,, 11e1� showing the proposed program on the site. Renderings � ;!' included exterior public spaces,landscaping, tom,,A hardscaping,buildings,and shadows. �► a 13 Cost $25,000-500,000 — 1:-7.4044 • Agency/Client Name The Gay&Lesbian Community Center of Greater Fort Lauderdale Inc. Client Contact ROBERT BOO _.. The Gay&Lesbian Community Center of Greater Fort Lauderdale Inc. (954)463-9005 ext,103 Years of Engageme. 2014-ONGOING CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 36 TSAO DesignGroup QUALIFICATIONS OF THE FIRM; Small Project 2 of 3 i Project Name PUBLIC HOUSING AND COMMUNITY DEVELOPEMENT-UFAS UPGRADES MIAMI DADE COUNTY,FLORIDA,MULTIPLE CITIES k I' Project Descripti,, The scope includes renovation of multiple public housing projects (10 to date), in various cities, including Miami, Opa-Locka, Perrine, Homestead and Florida City. -'F's , The projects range from multi family, single family and "f' IV ' community centers. Renovations include site work, 'it*---, 4.— • landscaping, .- landscaping, hard-scaping, interior alterations, ADA/ _ Uniform Federal Accessibility Standards (UFAS) w,,,..► '. '. upgrades, interior design, architecture and engineering. Full site surveys were required. The projects include analysis of UFAS reports and code analysis. #,. .- - a. 0 11115 t Improvements include entirely new interiors, structural n.,..,0,-.t, , 1 4t upgrades, finish specification, site lighting, parking IA improvements, ramps and stairs, and life safety _ .i upgrades. 1 - •Ilii 1: . I A All work was reviewed and approved by a third party for - T: V , Code compliance. All work was inspected and verified I -- then by the Federal Government compliance agencies. Complete pre-design, schematic design, design , development, construction documents, permit services 1 and construction administration were performed. 1. 1< o; Cost Construction costs:varies$100,000-$500,000 ` ' I --- Agency/Client Name Miami-Dade County Public Housing&Community Development y 'e CLI3 „.. „,,,.,, Client Contact FRANCISCO TRUJILLO - Miami-Dade County Public Housing&Community \", r, Development • AN (786)469-4125 4. Years of Engagement 2014-2018 - f- t'= - ' etaililit ,. dr% I CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 37 a , TSAO DesignGroup QUALIFICATIONS OF THE FIRM; Small Project 3 of 3 Project Nam- PG&E Teller Line Replacements (34)sites California it to, ■■ Project Description. TSAO Design Group has provided renovation �L. r services for PG&E for over the past four years for i® "i" N� over 65 Customer Service Offices. Although projects \� 1 . are located in California, the projects have been ,. managed and documented from TSAO Miami offices. 1114141011 \isk The services include ADA compliance, health and wellness upgrades and customer/ 111remployee safe environments. The projectti �' included new ADA accessible work stations and ' custom teller station design and shop drawings review. The scope included full architectural design services from survey/as builts, schematic design, design development,construction document, MEP coordination, construction administration and project m. 4 close-out. a _ j T ROL 43"52 5 ".-.. , 44, Air Ali i : Ali i ,'7..... .:' -�ii G ii Iii :;a Multiple Projects,$200,000-$8,000,000 !i Agency/Client Name Pacific Gas& Electric 11/11.11 Client Contact Carl W.Gowan Gowan Construction Co Inc. (209)836-2482 carl@gowanconstruc.com Years of Engagement 2015-ONGOING r,,,,,,dr----1-------'---::_:_--- _ __ ______:______ .,__ _ • CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 38 TSAO DesignGroup -,7 ir (11:1'114- , ir- 01 44'7,::::•,,, r , 1 / :i „,,,,\ ) 1410 ta , ,.„ .. 0...I I? kk.. .,. Wit. :..1 . . ° 7 4,-'' .1 g:".-5:".'''- : ' M EXPERIENCE & QUALIFICATIONS OF THE TEAM a a v CITY OF MIAMI BEACH-RFQ 2018441-ND-04/16/2018 tsaodesign.com 39 TSAO DesignGroup 4.1 Qualification of Proposer'a Individual Team Members CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 40 TSAO DesignGroup Organizational Chart TMIAMI BEACH ARCHITECTURE &DESIGN TSAO DesignGroup TSAO Design Group, 2 Incorporated FC a FEIN 94-3364738 Jason Hagopian,AIA, Project Executive LEED AP Principal Janie Coka, IIDA, LEED Project Manager AP Principal Yaprak Markeset, Project Support I NCIDQ Senior Designer Alex Betancourt Project Support II Technical Director -- i _. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 41 TSAO DesignGroup Education Bachelor of Architecture Rensselaer Polytechnic Institute ''x:: Troy,NY ,. Bachelor of Building Sciences Rensselaer Polytechnic Institute Troy,NY Certifications Jason R. Hagopian,AIA, Registered Architect in the States of LEED AP Florida California, New York and Georgia Principal,Miami Office FL Licensed Architect,AR91288 National Council of Architectural Registration Boards(NCARB) Jason Hagopian began his career at TSAO Design Group over 20 years ago as a project coordinator. Now he is the managing Principal of the Years of Experience TSAO Design Group Miami office which has been serving Florida for 27 Total over 15 years. Jason is responsible for establishing and growing TSAO Design Group's public projects sectors. 21 TSAO Jason's leadership extends beyond his executive responsibilities as Affiliations managing principal and includes active participation in the planning, AIA Miami Past President,Membership design and production of projects. His skills as a communicator, Chair problem-solver and consensus builder have benefitted all those who American Institute of Architects(AIA) work with TSAO Design Group. National and Local Member City of Miami Beach Design Review Board Long time resident of Miami Beach, Jason has served or is serving on Oakland Park Main Street Board several Associations and Boards including The Pride Center at Equality President and Design Chair Park (Board of Directors), AIA Miami (Immediate Past President, Miami and the Beaches Hotel Association Membership Chair, Christopher Kelly Leadership Development Allied Upgrade Member Program Co-Chair), Rensselaer Alumni Association (Board of Trustees) United States Green Building Council and Greater Miami and the Beaches Hotel Association(Allied Upgrade Member(USGBC) Member and Sustainable Hospitality Council),the City of Miami Beach National Council of Architectural Design Review Board (Chair), City of Miami Beach Contract Review Registration Boards Board,Oakland Park Main Street(President). The Pride Center of Equality Park,Board Jason is a registered Architect in Florida, California, New York and of Directors Georgia. He received his Bachelor of Architecture and his Bachelor of Building Sciences from Rensselaer Polytechnic Institute in Troy NY. Major Clients Originally from Lexington MA, Jason has travelled the world studying Total Bank Miami Beach architecture but calls Miami Beach home. Aldo Shoes Miami Beach Ritz Carlton South Beach On the Miami Beach Capital Renewal and Replacement projects,Jason Citibank Miami Beach will serve as Project Executive and Architect of Record.Jason manages Royal Palm Miami Beach contracts and negotiations. Jason also maintains TSAO's quality Great Florida Bank Miami Beach control and quality assurance. With Jason as your leader you are Princess Cruise Lines ensured that you are in good hands. Miami Dade Aviation Department Rum Bar,Royal Pam Hotel Four Seasons Miami ROLE ON THIS PROJECT PROJECT EXECUTIVE AND ARCHITECT OF RECORD INVOLVEMENT IN PROJECT 35% TSAO DesignGroup Education Bachelor of Science,Interior Design Florida International University Miami,FL Nti. Bachelor of Arts,Psychology Florida International University • Miami,FL Janie Coka, IIDA, LEED AP Principal,Miami Office FL Licensed Interior Designer, 1D5813 Certifications National Council for Interior Design Janie's infectiously positive attitude, self-driven motivation and Qualifications NCIDQ® leadership skills make her an asset to TSAO Design Group.She earned a Bachelor's of Science at Florida International University and is a Years of Experience Florida licensed Interior Designer.Janie started at TSAO Design Group as a project coordinator and is now one of four Principals. Janie 16 Total serves as Studio Director at TSAO Design Group Miami managing 12 TSAO staffing, project loads, agency coordination and consultant coordination. Affiliations Passionate and enthusiastic about Art and Design, as well as serving International Interior Design Association her Clients, Janie welcomes each project as her own. Sensitive to (IIDA) Client's needs and with a second Bachelor's of Arts in Psychology, Janie is trained to listen intensely and translate her Client's objectives. LEED Accredited Professional Expertise in Retail Design, retail philosophy and the psychology of United States Green Building Council purchasing Janie has worked with such clients as Federated Member(USGBC) Department Stores, Sephora, Off Broadway Shoes, among others. Organization and the simplification of complex task allow Janie to navigate the most challenging of projects, leading the projects down Major Clients the road of success. ASPCA Miami Born in the Midwest and early childhood upbringing in Northern AIZIA Restaurant Westin Diplomat Florida Janie is a Floridian at heart.Janie has called Miami home since the early 1980's and has a profound love for Miami with its diversity Burger King Corporation and culture. Family roots in Santiago, Chile instill in Janie a love of Citibank Miami Beach culture and diversity. Aldo Shoes Miami Beach "I feel that a successful project is one of collaboration and creative Four Seasons Miami problem solving with an end result that exceeds Client's Gilead Sciences expectations." Miami-Dade County On the Miami Beach Capital Renewal and Replacement projects,Janie Princess Cruise Lines will serve as Project Manager and will be the point person for the Pacific Gas&Electric client and design team coordination. Duties include maintaining client interaction & satisfaction, the project schedule and timeliness of The Ritz-Carlton Miami Beach deliverables.Janie prides herself in structured listening, application of Sephora client's requirements, organization,timeliness and follow-through. Villagio Restaurant* *Previous experience ROLE ON THIS PROJECT PROJECT MANAGER INVOLVEMENT IN PROJECT 55% TSAO DesignGroup Education , , Master of Arts in Architecture r Florida International University Miami,FL IIA Bachelor of Architecture \ ril.1- Virginia Polytechnic Institute&State University Blacksburg,Virginia Yaprak Markeset Senior Designer,Miami Office Certifications FL Licensed Interior Designer, 1D5103 Associate AIA Associate AIA Florida Licensed Interior Designer National Council for Interior Design Qualifications NCIDQ® Yaprak began her professional career over 20 years ago. A Senior Designer at TSAO Design Group, Yaprak provides conceptual design, custom detailing and specifications for our projects. As the creative lead, Yaprak creates strong conceptual design work based upon Years of Experience extensive project specific research. 24 Total 05 TSAO Yaprak works to extract the unique culture within each project through observation and extensive research. She strives to promote quality design and creative thinking. Yaprak is an advocate for Major Clients sustainable & resilient architecture while remaining sensitive to Axel Hotel Miami Beach project budgets and time-line. SLS Hotel Miami Beach* The Estates at Acqualina Sunny Isles*The Yaprak earned a Master of Arts in Architecture from Florida Mansion at Acqualina Sales Center Kore * International University and a professional degree in Architecture Lounge, Miami Beach * from Polytech Institute & State University. She is a NCIDQ certified Ocean 10,Miami Beach designer with Florida Interior Design License. Balans Restaurants Miami Beach* Hallandale Beach Club Pool Deck On the Miami Beach Capital Renewal and Replacement projects, ASPCA Liberty City Yaprak will serve as the Senior Designer and will be the design lead for The Queen's Flowers Headquarters all for all components of the project, from conceptual design to Miami Onboard Media Doral detailing and everything in between. Within the design she looks for The Stars Group Dania Beach opportunities to bring custom and inventive design solutions to Kaiser Permanente Sport Medicine SF address the Client's program and wishes. Each critical stage of Miami Dade Fire Rescue Training Facility* design is always graphically presented to the Client for feedback and Pentagon Fitness Center Washington DC* comment to ensure that the Client's expectations are being meet. Metropolitan Washington Airports Authority* University of Dubai* *Previous experience ROLE ON THIS PROJECT SENIOR DESIGNER/DESIGN LEAD INVOLVEMENT IN PROJECT 65% TSAO DesignGroup Education Bachelor of Architecture University of Miami Coral Gables,FL 1998 Years of Experience 14 Total qt/ 05 TSAO Alex Betancourt Technical Director, Miami Office Major Clients Axel Hotel South Beach A Miami native, Alex earned his Bachelor of Architecture at the University of Miami. Alex prides himself in his ability to provide Royal Palm Hotel South Beach unconventional solutions to common problems.This is most likely due Aldo Miami Beach to his love of puzzle games and geometry. Alex interest outside of architecture involves camping, hiking and baking; especially French Waldorf Panama* macaroons. Hardrock Megapolis, Panama* ASPCA As Technical Director, Alex is a key individual in keeping TSAO Design Group's technical engine running efficiently. Alex provides lead Hallandale Beach Club support and training in Revit, 3D modeling and stereo panoramic Citigroup renderings. Alex is also responsible for the coordination of site Pioneer Development information and field surveys, production of drawings and specifications, and coordination with engineering consultants, Minotti vendors and suppliers. The Ritz-Carlton Jason of Beverly Hills Alex's patience, understanding and flexible nature allows him to work Hampton Bella Vista,Panama * well others achieving maximum results. His in-depth knowledge of Miami International Airport,Concourse J construction management and experience in Hospitality, Mixed-Use * and Retail design is essential to the TSAO Design Group team. *Circa 39 Miami Performing Arts Center* On the Miami Beach Capital Renewal and Replacement projects, Alex Miami-Dade Transit System will be responsible for complete coordination of the technical Town&Country Center* drawings, 3D modeling and BIM management. Alex will also be the 5th&Alton* lead on RFI's,submittals and shop drawing review. *Previous experience ROLE ON THIS PROJECT TECHNICAL LEAD INVOLVEMENT IN PROJECT 65% TSAO DesignGroup Jason Hagopian, Project Experience —ALDO Collins Avenue Miami Beach Project^I'-- ALDO Group 751 Collins Avenue Miami Beach, FL Project Description The project scope included full scope of architectural& MEP services including Construction Management for interior and exterior renovation of the building. The project high lights include custom lighting,custom retail 1 t Rgfi° • displays and graphics. The project also involved 4.‘.1,..-.7..,... extensive historic review due to the art deco building status. V Ls)) Project Cost: $900,000 Altemok., r 1 MIK) Ili Agency/Client Name Aldo Group 4 Client Contact Sonya Di Sclafani (514)747.6504 ' sdisclafani@aldogroup.com 1 r ■, 4 , it,.: tv` ti *I U Years of Engagement 2013 brie �. - 1 "' !�� ri 1rLr i i - ,� IL u.', ...a _t 0,... I i irk CITY OF MIAMI BEACH-RFQ 2018141 ND-04/16/2018 tsaodesign.com 46 TSAO DesignGroup Jason Hagopian, Project Experience — Miami Dade Aviation Department- Misc. Services Project Name Miami Dade Aviation Department Miscellaneous Services Various locations Miami, FL Project Description Multiple projects at regional airports including:office interiors,change of use applications, historic building surveying and documentation,hanger conversion and ADA upgrades. The scope includes complete site " surveys, pre-design services, schematic design, design development, 40 year re-certifications, I construction documents,permit services and +— • t ,�- construction administration. Specific projects include: Historic documentation, survey and archival drawing creation for buildings _ being demolished at Opa-Locka Airport, the creation _-- 7,-&111414", of a painting work-room at Miami International A - Airport, the upgrade and remodel of a hanger and „Lilt , t tEkt. office space at Opa-Locka Airport, the upgrade and renovation of office space at Miami International Airport, the upgrade and renovation of a hanger and office space at Tamiami Airport. ,> —11 Cas' Construction costs:varies from$50,000 to$350,000 41010 WO Agency/Client Name Miami Dade Aviation Department I Client Contac Elizabeth Ogden Miami Dade Aviation Department (305)801.0940 Years of Engagement 2016 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 47 TSAO DesignGroup Jason Hagopian, Project Experience — PHCD Project Name PUBLIC HOUSING AND COMMUNITY DEVELOPEMENT-UFAS UPGRADES MIAMI DADE COUNTY,FLORIDA, MULTIPLE CITIES 11.k Project Description The scope includes renovation of multiple public ( housing projects(10 to date),in various cities,including M r'. Miami,Opa-Locka,Perrine, Homestead and Florida City. • «"< r The projects range from multi family,single family and -`l, community centers. Renovations include site work, •-2,-.,,;0.1,00"'"` landscaping,hard-scaping,interior alterations,ADA/ iiilif:, t �J (f''01;m {' 01!;!,..- Uniform Federal Accessibility Standards(UFAS) uLarw-11+(r€ ''�' � „,�. ...401e''' upgrades,interior design,architecture and engineering. Full site surveys were required. The projects include analysis of UFAS reports and code analysis. - ' Improvements include entirely new interiors,structural ,-••.-'�,t- C. y ill �' -I upgrades,finish specification,site lighting,pg p g g,parking , improvements,ramps and stairs,and life safetyD ' . 4 upgrades. 4 All work was reviewed and approved by a third party for t m s' , Code compliance. All work was inspected and verified then by the Federal Government compliance agencies. I-1 Complete pre-design,schematic design,design development,construction documents,permit services V Z • and construction administration were performed. '...-1,.. r. Cos: Construction costs:varies$100,000-$500,000 , j I Agency/Client Name Miami-Dade County Public Housing&Community Development 1 .mow. , •a Client Contact FRANCISCO TRUJILLO, Miami-Dade County Public Housing&Community Development ." • (786)469-4125 y • Years of Engageme, 2014-2018 A r , I ii, Eli iiiii CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 48 TSAO DeslgnGroup Janie Coka, Project Experience— Pacific Gas & Electric Company, Multiple locations Project Name PG&E Teller Line Replacements Addres< (34)sites California U, 4, . Project Descriptio TSAO Design Group has provided renovation services for ,. PG&E for over the past four years for over 65 Customer Service Offices. Although projects are located in California, the projects have been managed and documented from TSAO Miami offices. fir ` The services include ADA compliance, health and wellness upgrades and customer/employee safe environments. The project included new ADA accessible work stations and custom teller station design and shop _ +!4 '. drawings review. The scope included full architectural Al u design services from survey/as builts, schematic design, k,- w10-113ii iGtii —� design development, construction document, MEP '. ._ coordination, construction administration and project close- ",+ out. Cost Multiple Projects,$200,000-$8,000,000 tolormirrirr Owner Pacific Gas&Electric T' Owner Carl W.Gowan - = ----" ; -_—3.1r.,4 • Representative Gowan Construction Co Inc. • (209)836-2482 carl@gowanconstruc.com Years of Engagement 2015-ONGOING CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 49 TSAO DesignGroup Janie Coka, Project Experience— Ritz Carlton South Beach Project Name Ritz Carlton South Beach , • Address Miami Beach, FL ;' _Q t ", • m Project Description The Ritz Carlton South Beach scope included renovation of the existing 30,000 sf pool deck area, including new '7: w ,_ landscaping, planters, hard-scaping, plumbing, electrical Nro w ` ; mil_ and plumbing. t Project scope included complete pre-design, schematic F0: ._ .. design,design development,construction documents,and - �` construction administration. ' A- . Challenges involved guest occupied construction, , '�•„ •' ,„ , +,... abbreviated construction schedule, on-site construction :, ., , wr fat lsrm management. 1 TSAO Design Group provided full design, phasing and _ hx...._1 construction management services for this project. The entire renovation occurred on an expedided eight week period while the pool deck was being used by guests.This project highlights TSAO's ability to work creatively and under pressure. All of the pool deck drainage pipes were replaced, non waterproofed pool deck areas that were excavated and re waterproofed, non functioning site irrigation pipes were replaced, including non code , N compliant lighting. IIIIIIIIIINIMIlli Design highlights include two 40 foot high green walls, new landscaping, Ipe wood cladding, decking, new turtle f safe lighting,new furniture,and new tile work. M, +Yr Cos' Project cost:$1,000,000 ------- Owner FLAG LUXURY/LIONSTONE CORPORATION Owner Kevin Kelly Representative (650)712-7000 f. : .0 ;.,1 -‘...$. illi Years of Engagement 2014 �. AIM .a i CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 50 TSAO DeslgnGroup Janie Coka, Project Experience—Citibank Miami Beach Branch Project Name Citibank Addres., Miami Beach, FL A Grabill* Project Descriptio! TSAO Design Group has been servicing Citibank for .r .. "- "'" 35 years. Citibank Miami Beach 5,500 sf bank I '11 ll.r i in branch was a full service ground up project. =- ..7"-- -,,,�, TSAO Design group provided architectural and interior design services including LEED,custom millwork design and construction administration. 40 f , ) The project scope included design of bank offices, J customer lobby,bank vault and a drive up • , �!Arok r component. The building was LEED certified. �� _ __ ,ii,.e L.U. " I,; • I ps,; ,..,a 01 , ., ... , . . 6 l $1,000,000 Owner Citibank alba* iso Owner Melissa Lawrence Representative Facility Manager (786)417-5131 Years of Engagemeh' 2014-2016 00e I **--*.IN CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 51 TSAO DesignGroup Yaprak Markeset, Project Experience—AXEL Hotels South Beach Project Name AXEL HOTELS SOUTH BEACH " 411: 40,...,. . Address 1500 Collins Avenue Miami Beach, Florida 33139 ii '. , s Completion Date 2017 \ ;i101 '"" '1. Project Description The Axel Hotel Miami Beach is a property owned by .-4 ir, o° a premier gay boutique hotel chain Axel - " • ° A atilt Corporation Grupo Hetelero S.L. from Spain. The ' `:• "+.t•,j� " historic hotel Haddon Hall will be renovated to ' a 0..„„ , become an inclusive and hetero-friendly property. t y , 11 Services include Miami Beach Historic Preservation r-- , Board design documents, overall design, r construction documents, permitting, FF&E and z •hi construction administration. f ell-hi ,,44ppir _ ::: 'et', ' T• ,r---7-- Agency/Client Name Axel Corporation Grupo Hetelero S.L. rt. .r + '• 1.- y Barcelona, Spain N a . ``` 1 � ' Agency/Client Contact Owner's Representative: ", 14,-. ft I � r' Inigo Hernandez .' , • i-.,.,.�,,,,, ,. 34-650453393 '• 4'' info@ihtarquitecto.es :, �ia.` t / sy x r r \ 1. a\, 1 t x • i , „ , ..,, . 4 .._ . „ , ...., i, ...„,..... , , :,., ._ _, IL , ...„:7 a'.11 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 52 TSAO DesignGroup Yaprak Markeset, Project Experience—ASPCA/ASD Liberty City Animal Clinic Project Name ASPCA/ASD Liberty City Animal Clinic ' I 111 14" l 1 ,�; Address 1312& 1320 NW 62nd Street i I Ai- c ( zN1 i%Li ne Miami, Florida 3347 j ' I• Rwc:!N.c ii-h-IT I Competition Date 2018t, I '! il'tifitili IVH ' ' - r t►titililllili s _ i i''_ Project Description The ASPCA and Miami-Dade County are co- '1.1.•:: `, developers in the construction of a animal _ ,.: , clinic for the purposes of providing animal- " `::: : a .,w;: ' ,i related services, without limitation, _ s;,l-'s% spay/neuter operations and primary pet care INV"-' Lag services, to the County's residents, including the underserved areas of Miami-Dade County particularly the Liberty City/Overtown areas. = TSAO DesignGroup Yaprak Markeset, Project Experience—The Queen's Flowers Headquarters . Project Name THE QUEEN'S FLOWERS HEADQUARTERS 7001 NW 41111 t Address 25TH Street Miami,FL 33171 Completion Date 2018 • 1 w Project Description The Queen's Flowers imports cut flowers from Colombia and distributes the flowers nationally and + ;L. internationally. The second floor headquarters and (, ^N cool storage facility is to be housed in old 1980's building undergoing extensive renovations by TSAO Design Group. TSAO Design Group's collaboration with The Queen's Flowers originally started as the project Interior Designer. Through the unfortunate passing of the original architect of record,TSAO took . over the project as the new architect of record and was able to complete extensive and well coordinated multi-disciplinary construction documents. 11111Enlia Multiple new architectural building features were L incorporated into the revised design; stainless steel tensile mesh facade, new shade structures with car • • charger ports, new hard-scaping elements,and new lush landscaping with permeable »_- pavers. Building interior features lobby with polished _ ===- concrete ==concrete columns, back lit polycarbonate panels & a • 20'tall tensile air plant sculpture floating above a red mosaic platform. The second floor reception area —_ - was permitted to be an open staircase through TSAO's intensive work with Fire Safety Consultants and was a very involved permitting process. The term„r...—" reception area includes custom banquettes with —_ upholstery inspired by traditional Columbian textiles. Agency/Client Name The Queen's Flowers Agency/Client Contact David Gonzalez,General Manager (305)496.6218 david@queensflowers.com • _ ,.,„ 1- - CITY OF MIAMI BEACH–RFQ 2018-141-ND-04/16/2018 tsaodesign.com 54 TSAO DeslgnGroup Alex Betancourt, Project Experience— Royal Palm Hotel South Beach Project Name ROYAL PALM HOTEL SOUTH BEACH - r t` Address 1530 Collins Avenue ' �Miami Beach, Florida 33139 ill�l Completion Date 2017 • {g j 1 ,. "' `y( Project Descriptior The Royal Palm South Beach property is part of d. Starwood's Tribute Portfolio. During the previous �. ownership, the guest rooms and public corridors were renovated. The new expanded work scope , included reception areas, historic lobby bar, lobby waiting areas, pool bar and pool deck. The client's renovation objective was to raise the Royal , Palm from 3-star property to 4-star hotel resort. `k The project objective was to improve the entry experience and provide better connection between the porte cochere, lobby, reception, restaurant space and the pool deck. Scope services included design, construction documents, permitting and construction • --�■i sy.. administration. .. I, s- -— -_ 41,-, 1 --, -.111t Agency/Client Name RP Hotel Holdings, LLC � '* c/o Chesapeake Lodging Trust A*.N. + ' -;*-324>- L,j Agency/Client Cont, Owner's Representative: f .P.-` 1 ilk vat -. I Structured Solutions, Inc 978.232.3610 . in J-� - - .. � _y � Il - t ? . ir 1 f A 404-37:AW:i.:,f Or- , CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 55 TSAO Deslgneroup Alex Betancourt, Project Experience—Axel Hotels South Beach Project Name AXEL HOTELS SOUTH BEACH r �• Address 1500 Collins Avenue r S Miami Beach, Florida 33139 �;'., --I 1 MA `� .,= J; , a i Completion Date 2017 -, I!f 4 sir'- - - I ke , . ''z' - - Aii i Ir Project Descriptor, The Axel Hotel Miami Beach is a property owned by 7t"---, j rrr a premier gay boutique hotel chain Axel /� III 1!t ` , ;17 ,ir. Corporation Grupo Hetelero S.L. from Spain. The 4 k`' - historic hotel Haddon Hall will be renovated to Irt HI ,t,become an inclusive and hetero-friendly property. ..- ' �111� ; . ,'• : - 1 Services include Miami Beach Historic Preservation — --*s.,..% , Board design documents, overall design, construction documents, permitting, FF&E andims\li.,.i.rii for it4 construction administration. 1 M M I� M, orz '� Agency/Client Name Axel Corporation Grupo Hetelero S.L. "' ' .. . Barcelona, Spain ;4 .. s "�c _ Agency/Client Contact Owner's Representative: " Inigo Hernandez 34-650453393 ' r ;_, info@ihtarquitecto.es �� 4 , vr 4111 . girr:( 4.1/4" ,.. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 56 TSAO DesignGroup Alex Betancourt, Project Experience— Palm Springs Mile - Multiple Renovations Project Name PALM SPRINGS MILE—Multiple Renovations, Architect of r Record Address 419 W 49th Street, 01 -1 Hialeah, FL 33012 : 0000e :--0 A 1 1 I Prill°1 I. Project Description TSAO Design Group has worked with this client for over I ten years,providing design,architecture,and consulting , services. The client owns multiple retail and office I! buildings on West 49th Street in Hialeah,Florida. TSAO Design Group has completed many projects including:construction and permit drawings for a daycare center,construction and permit drawings for a ro new exterior walkway canopy,construction and permit drawings for a multi-block security camera installation, construction and permit drawings for a new parking lot - - - ! I layout and construction and permit drawings for iii; E commercial office space renovations. TSAO has also assisted the real estate side of Philips 'E International by creating lease exhibits, proposed fit ■i - - - 1 plans,construction cost budget information and ' FIRrenderings of proposed improvements. TSAO also % A 1� 1 sill provides landlord representation and drawing review on the landlord's behalf. Services include the review of irk over 50 tenant construction drawing sets and comment response,construction observation for landlord compliance and landlord guidance. Project scope includes pre design,schematic design,site surveys, ill I ' design development,construction documents, construction administration and drawing review and landlord representation. Project costs vary from$5,000 to$500,000 111110 . IIII; ,, Agency/Client Name Philips International Agency/Client Contact Diana Marrone, Philips International (305)755-3955 N.N.N.1111141) 0011140• ___ Ili 2015-2018 iliALLT: ij I 1111111 ,, phi;a j.1 ! CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 57 TSAO DesignGroup TAB 5 - REQUIRED ORMS 4 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 58 TSAO DesignGroup 5.1 Standard Form 330 CITY OF MIAMI BEACH-RFQ2018-141-ND-04/16/2018 tsaodesign.com 59 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1.TITLE AND LOCATION (City and State) Professional Architectural&Engineering Services for Capital Renewal and Replacement Projects, Miami Beach, FLORIDA 2.PUBLIC NOTICE DATE 3.SOLICITATION OR PROJECT NUMBER 02-15-2018 RFQ 2018-141-ND B.ARCHITECT-ENGINEER POINT OF CONTACT 4.NAME AND TITLE JASON HAGOPIAN - PRINCIPAL 5.NAME OF FIRM TSAO DESIGN GROUP INCORPORATED 6.TELEPHONE NUMBER 7.FAX NUMBER 8.E-MAIL ADDRESS (305) 576-2006 X 15 (305) 576-2005 JHAGOPIAN@TSAODESIGN.COM C.PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) z� 2 ,zo° 9. FIRM NAME 10.ADDRESS 11. ROLE IN THIS CONTRACT °eL ��mQ TSAO DESIGN GROUP 7610 NE 4TH COURT#5, SUITE 101 ARCHITECT INCORPORATED MIAMI, FLORIDA 33138 a. ❑CHECK IF BRANCH OFFICE b. ❑CHECK IF BRANCH OFFICE C. ❑CHECK IF BRANCH OFFICE d. ❑CHECK IF BRANCH OFFICE e. ❑CHECK IF BRANCH OFFICE f. ❑CHECK IF BRANCH OFFICE D.ORGANIZATIONAL CHART OF PROPOSED TEAM H'(Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV.8/2016) 60 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE JASON HAGOPIAN, AIA, LEED AP PRINCIPAL/PROJECT EXECUTIVE b.w u 27 20 15.FIRM NAME AND LOCATION (City and State) TSAO DESIGN GROUP INCORPORATED 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BACHELOR OF ARCHITECTURE, 1991; RENSSELAER FLORIDA REGISTERED ARCHITECT, LICENSE N° AR91288 POLYTECHNIC INSTITUTE, TROY, NEW YORK CALIFORNIA REGISTERED ARCHITECT, LICENSE N° C27694 BACHELOR OF BUILDING SCIENCE, 1991; RENSSELAER GEORGIA REGISTERED ARCHITECT, LICENSE N° RA014656 POLYTECHNIC INSTITUTE, TROY, NEW YORK 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications.Organizations. Training.Awards.etc.) AMERICAN INSTITUTE OF ARCHITECTS,MIAMI CHAPTER(AIA MIAMI),PRESIDENT NATIONAL COUNCIL OF ARCHITECTURAL REGISTRATION BOARDS(NCARB),MEMBER USGBC LEED AP: AWARDS: IIDA, NEWH,AIA 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) _IGHTSPEED PROPERTY, DOLPHIN COMMERCE CENTER; MIAMI, FL 2006 N/A (3)BRIEF DESCRIPTION(Brief scope.size,cost.etc.) AND SPECIFIC ROLE TCheck if project performed with current firm a' SCOPE INCLUDED A FULL SITE CONDITION REPORT,A FULL SPACE PROGRAMMING AND FIT PLAN SCOPE OF WORK.THIS REPORT INCLUDED ASSESSMENTS IN THE FOLLOWING ARE: ENVIRONMENTAL SITE,PROPERTY CONDITION ASSESMENT,MICROBIOLOGICAL,ASBESTOS EXISTENCE,LEAD PAINT,RADON,MECHANICALNENTILATION/AIR CONDITIONING SYTEMS, FIRE/EVACUATION SYSTEMS,ELECTRICAL SYSTEMS,PLUMBING SYSTEMS,ROOFING SYSTEMS,ALARM/SECURITY SYSTEMS,ADA COMPLIANCE OF SITE AND BUILDING SYSTEMS, STRUCTURAL SYSTEMS.TOTAL SQUARE FOOTAGE:196,000 SF.TOTAL PROFESSIONAL FEES:$72,000(APPROX.) 1(1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED NORTH EAST TRANSFER STATION OFFICE BUILDING PROFESSIONAL SERVICES CONSTRUCTION (Happicable) MIAMI, FLORIDA 2009-ONGOING b (3)BRIEF DESCRIPTION (Brief scope.size,cost.etc.)AND SPECIFIC ROLE VrCheck if project performed with current firm Design of a new,7,000 sf LEED Certified office building for the Public Works and Waste Management. Complete pre-design,schematic design,design development,construction documents and permit services. Project cost:$2,700,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED MIAMI DADE AVIATION DEPARTMENT-MISCELLANEOUS SERVICES PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI, OPA-LOCKA, TAMIAMI, FLORIDA 2003-2007 2005-2007 (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE PCheck d c project performed with current firm Multiple projects at regional airports including:office interiors,change of use applications,historic building surveying and documentation,hanger conversion and ADA upgrades. Complete site surveys,pre-design,schematic design,design development,40 year recertifications,construction documents,permit services and construction administration. Project cost:varies from$50,000 to$250,000 (1)TITLE AND LOCATION (City and State) J (2)YEAR COMPLETED MINDSHARE OFFICE SPACE 'PROFESSIONAL SERVICES CONSTRUCTION (n applicable) MIAMI, FLORIDA 2013 2014 (3) BRIEF DESCRIPTION (Brief scope.size,cost,etc.)AND SPECIFIC ROLE .'Check if project performed with current firm d 4,000 ft office space located at 601 Brickell Key Drive,Miami,Florida. Complete site surveys,pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:$330,000 (1)TITLE AND LOCATION (City and State) I (2)YEAR COMPLETED CITIBANK-MULTIPLE LOCATIONS,MIAMI DADE,BROWARD,PALM BEACH COUNTIES PROFESSIONAL SERVICES CONSTRUCTION (If applcable)- NEW BRANCHES,OFFICES,TRAINING CENTERS AND MAINTENANCE 2004-ONGOING 2004-ONGOING O. (3)BRIEF DESCRIPTION (Brief scope,size.cost etc.)AND SPECIFIC ROLE [heck if project performed with current firm A long term client,work includes design of ground-up bank branches and in-line branches,as well as training centers,office space and maintenance of existing branches and branch properties. Complete site surveys,pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:varies from$10,000 to$950,000 STANDARD FORM 330(REV.8/2016)PAGE 2 61 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE JANE COKA, LEED AP PRINCIPAL/PROJECT MANAGER/ a.TOTAL b.WITH CURRENT FIRM INTERIOR DESIGNER 16 13 15.FIRM NAME AND LOCATION (City and State) TSAO DESIGN GROUP INCORPORATED 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) LICENSED INTERIOR DESIGNER:NCIDQ STATE OF FLORIDA BACHELOR OF SCIENCE-INTERIOR DESIGN,2002; FLORIDA INTERNATIONAL UNIVERSITY,MIAMI, FLORIDA BACHELOR OF ARTS-PSYCHOLOGY, 1998; FLORIDA INTERNATIONAL UNIVERSITY,MIAMI,FLORIDA 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications.Organizations.Training.Awards.etc.) NATIONAL COUNCIL FOR INTERIOR DESIGN QUALIFICATION(NCDIQ)CERTIFICATE N°021007 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED NORTH EAST TRANSFER STATION OFFICE BUILDING PROFESSIONAL SERVICES CONSTRUCTION (I►applicable) MIAMI, FLORIDA 2009-ONGOING (3)BRIEF DESCRIPTION(Brief scope.size,cost.etc.) AND SPECIFIC ROLE Check if a. project performed with current firm Design of a new,7,000 sf LEED Certified office building for the Public Works and Waste Management. Complete pre-design,schematic design,design development,construction documents and permit services. Project cost:$2,700,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PUBLIC HOUSING AND COMMUNITY DEVELOPMENT PROFESSIONAL SERVICES CONSTRUCTION (N applicable) ADULT DAY CARE-ZONING CHANGE, MIAMI, FLORIDA 2014-ONGOING N/A b (3)BRIEF DESCRIPTION (Brief scope,size.cost.etc.)AND SPECIFIC ROLE Check if project performed with current firm Pursued approval from the City of Miami Planning and Zoning Department for a 9 person Adult Day Care Center at the project site and pursued a Rezoning Plan Amendment that will allow for a 28 person Adult Day Care. Scope included research,document collection,problem solving,preparation of all Zoning Amendment documentation,County meetings and Commission meetings and presentations. Project Fee:$35,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED CITIBANK-MULTIPLE LOCATIONS,MIAMI DADE,BROWARD, PALM BEACH COUNTIES PROFESSIONAL SERVICES CONSTRUCTION (If applicable) NEW BRANCHES,OFFICES,TRAINING CENTERS AND MAINTENANCE 2004-ONGOING 2004-ONGOING (3) BRIEF DESCRIPTION (Beefscope.size.cost.etc.)AND SPECIFIC ROLE lirChecit if project performed with current firm c. A long term client,work includes design of ground-up bank branches and in-line branches,as well as training centers,office space and maintenance of existing branches and branch properties. Complete site surveys,pre-design,schematic design,design development,construction documents and permit services. Project cost:varies from$10,000 to$950,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED GILEAD PROFESSIONAL SERVICES CONSTRUCTION (Ifappicable) MIAMI, FLORIDA 2014 2015 d. (3) BRIEF DESCRIPTION (Brief scope,size.cost.etc.)AND SPECIFIC ROLE 1Check if project performed with current firm Commercial office interior remodel including MEP engineering,AV and IT. Complete site survey,pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:$710,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE RITZ-CARLTON SOUTH BEACH, MIAMI BEACH, FLORIDA PROFE2SII1ONAL4 SERVICES CONSTRUCTION Of applicable) 201!. (3) BRIEF DESCRIPTION (Brief scope.size.cost.etc.)AND SPECIFIC ROLE 'Check if projectperformed with current firm Renovation of existing 30,000 sf pool deck area,including new landscaping,planters,hardscaping,plumbing,electrical and plumbing. Complete pre-design,schematic design,design development,construction documents,construction administration and construction management. Challenges include guest occupied construction,abbreviated construction schedule,on-site construction management. Project cost:$1,000,000 STANDARD FORM 330(REV.8/2016)PAGE 2 62 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE ALEX BETANCOURT TECHNICAL DIRECTOR a.TOTAL b.WITH CURRENT FIRM 14 _ 5 15.FIRM NAME AND LOCATION (City and State) TSAO DESIGN GROUP INCORPORATED 16.EDUCATION (DEGREE AND SPECMUZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND D1SCiPLINE) BACHELOR OF ARCHITECTURE, 2003; UNIVERSITY OF MIAMI, CORAL GABLES, FLORIDA 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications.Organizations,Training.Awards,etc.) 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE RITZ-CARLTON SOUTH BEACH, MIAMI BEACH, FLORIDA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2014 (3)BRIEF DESCRIPTION(Brief scope.size.cost.etc.) AND SPECIFIC ROLE TCheck if project performed with current firm a' Renovation of existing 30,000 sf pool deck area,including new landscaping,planters,hardscaping,plumbing,electrical and plumbing. Complete pre-design,schematic design,design development,construction documents,construction administration and construction management. Challenges include guest occupied construction,abbreviated construction schedule,on-site construction management. Project cost:$1,000,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED MINOTTI MIAMI , MIAMI, FLORIDA PROFESSIONAL SERVICES CONSTRUCTION (M applicable) 2014 2015 b (3) BRIEF DESCRIPTION Wel scope.size,cost.etc.)AND SPECIFIC ROLE WCheck if project performed with current frm Renovation of existing 9,000 sf non code compliant warehouse into a high end furniture showroom. Complete pre-design,schematic design,design development,construction documents,construction administration and construction management. Challenges included improvements required per 40 Year Recertification,updating old systems to energy efficient systems. Project cost:$1,000,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE PRIDE CENTER AT EQUALITY PARK PROFESSIONAL SERVICES CONSTRUCTION (If applicable) WILTON MANNERS, FLORIDA 2014-ONGOING (3) BRIEF DESCRIPTION (Briefscope.size,cost.etc.)AND SPECIFIC ROLE • Check if project performed with current firm C. Development of a master plan for a 6 acre site in Wilton Manners to include:housing(180 units), arking,community space,retail,parks and waterfront usage. Complete due diligence,Visioning,budgeting,pre-design,schematic design,master planning and 3D visualization. Project cost:N/A (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PUBLIC HOUSING AND COMMUNITY DEVELOPMENT (PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MULTIPLE PROJECTS, MIAMI DADE COUNTY, FLORIDA 2014-ONGOING d. (3) BRIEF DESCRIPTION (Brief scope,size,cost.etc.)AND SPECIFIC ROLE Check if project performed with current firm Renovation of public housing projects(10 to date),ranging from multi family,single family and community centers. Renovations include site,landscaping, hardscaping,interior,ADA/UFAS upgrades,etc. Full site surveys required. Analysis of UFAS reports. Code analysis. Complete pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:$2,000,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED NORTH EAST TRANSFER STATION OFFICE BUILDING PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI, FLORIDA 2014-ONGOING (3) BRIEF DESCRIPTION (Brief scope.size,cost.etc.)AND SPECIFIC ROLE VEheck if project performed with current firm A. Design of a new,7,000 sf LEED Certified office building for the Public Works and Waste Management. Complete pre-design,schematic design,design development,construction documents and permit services. Project cost:$2,700,000 STANDARD FORM 330(REV.8/2016)PAGE 2 63 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE YAPRAK MARKESETa.TOTAL 1b.WITHCURRENTFM SENIOR DESIGNER 24 5 15.FIRM NAME AND LOCATION (City and State) TSAO DESIGN GROUP INCORPORATED 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BArch, 1994, Virginia Polytechnical Institute & State University MAA, 2012, Florida International University NCIDQ Registered Interior Designer, Florida Interior Design License 1e.OTHER PROFESSIONAL QUALIFICATIONS (Publications.Orgarrzatons. Training.Awards.etc.) Associate AIA,past adjunct professor in Schools of Architecture&Interior Architecture at Florida International University, 2017 BRAGG AWARD Best Commissioned Project for Beach Club Hallandale 19.RELEVANT PROJECTS (1)TITLE ANO LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) ASPCA/ASD LIBERTY CITY ANIMAL CLINIC, MIAMI, FLORIDA 2016 2018 (3)BRIEF DESCRIPTION(Brief scope.sae,cost.etc.) AND SPECIFIC ROLE St Check if project performed with current firm a' New 6,900 square foot single floor level animal clinic constructed on a vacant property,services include full Architectural&MEP services including Construction Administration. The project includes projecting masonry design&collaboration with Art in Public Places. Project pursuing LEED Silver. Project cost:$2,400,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) AXEL HOTELS SOUTH BEACH, MIAMI BEACH, FLORIDA 2017-ONGOING 2018 b.(3)BRIEF DESCRIPTION (Brief scope.sae.cost etc.)AND SPECIFIC ROLE iiirCheck if project performed with current frm Services include Miami Beach Historic Preservation Board review documents,architectural&interior design concepts,construction documentation, permitting,FF&E and construction administration. Project cost:N/A (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE PRIDE CENTER AT EQUALITY PARK PROFESSIONAL SERVICES CONSTRUCTION Of applicable) WILTON MANNERS, FLORIDA 2014-ONGOING (3) BRIEF DESCRIPTION (Brief scope.size.cost,etc.)AND SPECIFIC ROLE • Check if project performed with current firm C. Development of a master plan for a 6 acre site in Wilton Manners to include:housing(180 units), arking,community space,retail,parks and waterfront usage. Complete due diligence,Visioning,budgeting,pre-design,schematic design,master planning and 3D visualization. Project cost: N/A (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PUBLIC HOUSING AND COMMUNITY DEVELOPMENT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MULTIPLE PROJECTS, MIAMI DADE COUNTY, FLORIDA 2014-ONGOING (3) BRIEF DESCRIPTION (Brief scope.size.cost etc.)AND SPECIFIC ROLE grCheck if project performed with current firm d Renovation of public housing projects(10 to date),ranging from multi family,single family and community centers. Renovations include site,landscaping, hardscaping,interior,ADA/UFAS upgrades,etc. Full site surveys required. Analysis of UFAS reports. Code analysis. Complete pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:$2,000,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE QUEEN'S FLOWERS HEADQUARTERS PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014-ONGOING 2018 A. (3) BRIEF DESCRIPTION (Brief scope.size.cost etc.)AND SPECIFIC ROLE Check if project performed with current firm Project includes full Architectural,Interior Design,Lighting,MEP,Civil&Landscape services for the renovation of 93,000 SF warehouse building. Project includes stainless steel mesh facade,new cantilever shade structures and lush landscaping with permeable pavers. Project cost: N/A STANDARD FORM 330(REV.8/2016)PAGE 2 64 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects, if not specified. 1 Complete one Section F for each project.) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED NORTH EAST TRANSFER STATION OFFICE BUILDING PROFESSIONAL SERVICES CONSTRUCTION (IfappNcaMe) PUBLIC WORKS WASTE MANAGEMENT, MIAMI - FLORIDA 2009-ONGOING 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER MIAMI DADE COUNTY BRENDA REYES (305) 514-6682 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Weide scope,size,and cost) This is a ground-up new 7,000 square foot LEED certified project located in Miami Florida. The project serves as an office building for the staff and workers of the Public Works and Waste Management Department. The project replaces existing non code compliant trailers that have been used on the site for years.The project is designed to allow for the site to function during construction. The project construction is phased in a way that no operation will be effected. The program includes 2,500 square feet of storage,as well as offices,showers,restrooms,locker rooms,conference rooms,reception area,assignment room,dispatch area and staff lounge. Highlights of the project include LEED Silver design including water reclamation,solar,hyper insulated walls and roofs,environmentally sensitive material usage and high efficiency plumbing and HVAC. Programming the building included multiple end-user meetings,coordination with County Departments and Public Arts. Interior design renderings and exterior 3D renderings were created to show end-users the design of the project. TSAO Design Group provided architecture and engineering services as required for the development of this project including pre-design,schematic design, design development,construction documents and permit services. Also,TSAO provided LEED AP services and LEED submission services. The cost of construction is approximately$2.4 million. f, r "le + r �� y ^� 1 ts y _ IP Ili raIIIub a_ ■r . 11 • 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP INCORPORATED MIAMI,FLORIDA ARCHITECT (1)FIRM NAME (2)FIRM LOCATION (CO and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.8/2016)PAGE 3 65 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20 EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 2 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and Slate) 22.YEAR COMPLETED ASPCA/ASD LIBERTY CITY ANIMAL CLINIC PROFESSIONAL SERVICES CONSTRUCTION (Il applicable) MIAMI, FLORIDA 2015 2018 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER AMERICAN SOCIETY FOR THE BONNIE LOPEZ (847)651-4197 PREVENTION OF CRUELTY TO ANIMALS 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) The ASPCA and Miami-Dade County are co-developers in the construction of a animal clinic for the purposes of providing animal-related services, without limitation, spay/neuter operations and primary pet care services, to the underserved area of Liberty City. Animal Client (no boarding)will be the primary use,with accessory uses including retail and office. TSAO Design Group has done extensive site research to understand the site conditions, the history of the neighborhood and to extract vernacular design elements from this diverse but underserved neighborhood. In direct contrast of the faded and bland public housing units across the street, ASPCA building facade includes rain screen walls with extruded brick patterns. The forecourt entry welcomes pet owners and becomes a community space. The proposed building is an approximately 6,900 square foot single floor level building to be constructed on the vacant property. The project proudly will be pursuing LEED Silver and will incorporate Art in Public Places art work into its architecture. ..r 111•'"' yy� '10,6%,A, ,II 7 is ,z,.,ki __.._.„ : . ...:, , . ,.... il ...0,041.... , _... Nit .4I // eV ' ` . _ / i I' ' tfw Y--�' ,,,,“ iii% --*--,:-.•-• ,,,Oii* Him , - - ;'-' ;:.421: IC--- - s- .' ...-*---- 1-:__ , , II ,, . 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e, TSAO DESIGN GROUP MIAMI, FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) i3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV. 8/2016) PAGE 3 66 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 3 Complete one Section F for each project.) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED PUBLIC HOUSING AND COMMUNITY DEVELOPEMENT-UFAS UPGRADES PROFESSIONAL SERVICES CONSTRUCTION (if applicable) MIAMI DADE COUNTY,FLORIDA,MULTIPLE CITIES 2014-ONGOING 2015-ONGOING 23.PROJECT OWNERS INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME C.POINT OF CONTACT TELEPHONE NUMBER PUBLIC HOUSING&COMMUNITY FRANCISCO TRUJILLO (786)469-4125 DEVELOPMENT 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size.and Cost) Renovation of public housing projects(10 to date),in various cities,including Miami,Opa-Locka,Perrine,Homestead and Florida City. The project range from multi family,single family and community centers. Renovations include site,landscaping,hardscaping,interior,AIA/Uniform Federal Accessibility Standards(UFAS)upgrades,interior design,architecture and engineering,etc. Full site surveys required. Analysis of UFAS reports. Code analysis. Project scope included complete pre-design,schematic design,design development,construction documents,permit services and construction administration.lmprovements include entirely new interiors,structural upgrades,finish specification,site lighting,parking improvements,ramps and stairs,and life safety. All work was reviewed and approved by a third party for Code compliance,attention to detail was paramount. All work was inspected and verified then by the Federal Government. Project cost:$300,000-$2,000,000 Or Ck -.. i . 1, -. • • • ,_...10 oit ..i. ,.,„ .1' 0 a ,, is 1 , P ,_ , ., . „I a 1 ---- „_ • .. .. ...,.„ .. . wf ••itylit7„ • , , , h 1 1 ili— ' . w-- I I �. I r -. .oma lett - �a 1 ill 1 oil otwolowww,!.i:IP'„'1111'11.:-, ..*- ' 1. "% „a. ,_ ,. _ _ .... tail' lif i ti•a= . + 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI, FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and Stale) (3)ROLE d. '(1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330 (REV.3/2013)PAGE 3 67 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. . 4 Complete one Section F for each project.) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED HELEN SAWYER ADULT CARE CENTER,ZONING CHANGE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI,FLORIDA 2014-ONGOING 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER PUBLIC HOUSING AND COMMUNITY DEVELOPMENT FRANCISCO TRUJILLO (786)469-4125 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size.and cost) Pubic Housing and Community Development wants to provide an Adult Day Care Center in the ground floor of it's Helen Sawyer property located in Miami Florida. Current zoning only allows for a 9 person Adult Day Care Center. TSAO's scope of work included researching the process for changing the zoning to allow for a 28 person Center,proceeding with the process to make that change and then to design and provide architecture and engineering services for the development of the Center. Services provided included:multiple coordination and fact gathering meetings with the City of Miami Planning and Zoning Departments,the creation of a Zoning Change Application and attendance and presentations at City Commission meetings. TSAO prepared a very complicated package including mailing lists,notifying neighbors,maps,surveys,signatures and applications. The Commission voted favorably for this zoning change. Attention to detail and an understanding of civic processes were key to the success of this project. Service cost:$40,000 MIAMI 21 ZONING MAP(EXISTING) MIAMI 21 ZONING MAP(PROPOSED) 1 1_ 1_11 I_, .-1-1 ; 11 s to 2TNST u Fal Mini I. �.�_� II t _I l c NW QTNST u WY lr sr :111675-'°v ,, 14,7.,,,... - W, j, < �, A-, \--:--- w t' it !NI wsj - , yJlrT6-8-O __- L 8 ) ' .15-8-0 ( ',01- , - T6-8-0 wetdl► Tb-0 i I II.} I 1111 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI, FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. 11)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.8/2016)PAGE 3 68 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 5 Complete one Section F for each project.) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED MIAMI DADE AVIATION DEPARTMENT-MISCELLANEOUS SERVICES PROFESSIONAL SERVICES CONSTRUCTION (if applicable) MIAMI,OPA-LOCKA,TAMIAMI,FLORIDA 2003-2007 2005-2007 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER MIAMI-DADE AVIATION DEPARTMENT ELIZABETH OGDEN,RA, LEED AP (305)801-0940 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) Multiple projects at regional airports including:office interiors,change of use applications,historic building surveying and documentation,hanger conversion and ADA upgrades. Project scope included complete site surveys,pre-design services,schematic design,design development,40 year re-certifications,construction documents, permit services and construction administration. Specific projects include: Historic documentation,survey and archival drawing creation for buildings being demolished at Opa-Locka Airport,the creation of a painting work-room at Miami International Airport,the upgrade and remodel of a hanger and office space at Opa-Locka Airport,the upgrade and renovation of office space at Miami International Airport,the upgrade and renovation of a hanger and office space at Tamiami Airport. Project cost:varies from$50,000 to$250,000 1 - 'SJ _ -- + a 1� 7:1 .. fW. I I ,- r , - � ! ' 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI,FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. 11)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) '(3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.8/2016)PAGE 3 69 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 6 Complete one Section F for each project.) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED PALM SPRINGS MILE-RENOVATIONS AND ARCHITECT OF RECORD,MULTIPLE PROJECTS PROFESSIONAL SERVICES CONSTRUCTION (If applicable) HIALEAH,FLORIDA 2006-ONGOING 2006-ONGOING 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER PHILIPS INTERNATIONAL DIANA MARRONE (305)755-3955 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) TSAO Design Group has worked with this client for over ten years,providing design,architecture,and consulting services. This client owns multiple retail and office buildings on West 49th Street in Hialeah, Florida.TSAO Design Group has completed many projects including: construction and permit drawings for a daycare center,construction and permit drawings for a new exterior walkway canopy,construction and permit drawings for a multi-block security camera installation,construction and permit drawings for a new parking lot layout and construction and permit drawings for commercial office space renovations. TSAO has also assisted the real estate side of Philips International by creating lease exhibits,proposed fit plans,construction cost budget information and renderings of proposed improvements. TSAO also provides landlord representation and drawing review on the landlord's behalf. Services include the review of over 50 tenant construction drawing sets and comment response,construction observation for landlord compliance and landlord guidance. Services include pre design,schematic design,site surveys,design development,construction documents,construction administration and drawing review and landlord representation. Project costs vary from$5,000 to$500,000 ll i !Kr � i _ I ;Saul-j II 1111 ria I: 1 . 1 "rill r 1 1 ti _ . ..... ,... • ,. , t. ,.._ • . I ..i9' i 11 11_ 1_1 '. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP ARCHITECT MIAMI INCORPORATED' MIAMI,FLORIDA (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (11 FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.3/2013)PAGE 3 70 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20 EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 7 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22.YEAR COMPLETED ROYAL PALM SOUTH BEACH MIAMI A TRIBUTE PORTFOLIO RESORT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI BEACH, FLORIDA 2013 2016 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c POINT OF CONTACT TELEPHONE NUMBER CHESAPEAKE LODGING TRUST RICK ADAMS, PRESIDENT (410)972-4143 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size.and cost) The Royal Palm Beach property is part of Starwood's Tribute Portfolio. The Royal Palm South Beach renovation objective was to raise the Royal Palm from a 3-star property to 4-star hotel resort. The design created visually cohesive and inviting public spaces within the historic 1939 building and within historic preservation guidelines. The design team developed multiple areas throughout the hotel, including: entry lobby, lobby bar, reception, concierge, library lounge, pool bar, pool lounge and deck. The historic art deco hotel's lobby, terrazzo floors and original bar are restored to its original grandeur. The reception area is reconfigured so that the concierge desk is located directly across from the check-in location. The existing reception seating, lobby coffee bar and lounge area are expanded and the furnishing is refreshed. The outdoor bar and dining areas were expanded and re-situated for improved views of the pool. The expanded area now includes a lounge space with colorful finishes, paneling and multi-textural furnishings. The new metal awnings with orange canvas shade elements surround the new bar and dining areas, providing protection from the elements. vr.. ,. ,. . _ _,-. - - , _, - r Tic 4 r .wr • 4 .., ___. ._.. . , i, r . . :�_. 3.._.. ; .* - - _ ' • M 41F -1,064105 0 w�. ;, . ,. r 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e, TSAO DESIGN GROUP MIAMI, FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.3/2013)PAGE 3 71 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 8 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22.YEAR COMPLETED THE PRIDE CENTER AT EQUALITY PARK PROFESSIONAL SERVICES CONSTRUCTION (If applicable) WILTON MANNERS,FLORIDA 2014-ONGOING 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME C.POINT OF CONTACT TELEPHONE NUMBER THE GAY&LESBIAN COMMUNITY CENTER OF GREATER FORT LAUDERDALE INC. ROBERT BOO (954)463-9005 X 103 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) The Pride Center hired TSAO Design Group(TSAO)to assist them with the Master Planning of their 6 acre site in Wilton Manners Florida. The first two project phases included a Visioning Charrette and a massing study. Development of a master plan for a 6 acre site in Wilton Manners to include:housing(180 units),parking,community space,retail,parks and waterfront usage. Complete due diligence,Visioning,budgeting,pre-design,schematic design,master planning and 3D visualization. Project cost:N/A TSAO Design Group conducted a Visioning Charrette with The Pride Center stakeholders with the intent of cultivating ideas and focusing a vision for what The Pride Center can be in the future.Pride Centers across the globe include such programming as senior housing,assisted living facilities, theaters,health clubs,event space,outdoor activity space,classrooms,technology centers,libraries,art galleries,restaurants,catering facilities,health clinics,office space,etc.The charrette is an intensive planning session where stakeholders collaborate on a vision for the project. It provides a forum for ideas and offers the unique advantage of giving immediate feedback to the designer and stakeholders.More importantly,it allows everyone who participates to be a mutual author of the plan. After the deliverable from the Visioning Charrette,TSAO created color,three dimensional massing studies showing the proposed program on the site. Renderings included exterior public spaces,landscaping,hardscaping,buildings,and shadows. .MNDE CE 4TI0. .�cM.:ft--a Yew,l. ..._.... I /' • ...,Y........... i Tyr• j `�� FINSTRZOR K ;r --- 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI,FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (I)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.3(2013)PAGE 3 72 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 9 Complete one Section F for each project) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED RITZ-CARLTON SOUTH BEACH,POOL DECK RENOVATION PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI BEACH,FLORIDA 2014 2014 23. PROJECT OWNER'S INFORMATION a PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER FLAG LUXURY/LIONSTONE KEVIN KELLY (650)712-7000 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) The Ritz Carlton South Beach scope included renovation of the existing 30,000 sf pool deck area,including new landscaping,planters,hard-scaping, plumbing,electrical and plumbing. Project scope included complete pre-design,schematic design,design development,construction documents,and construction administration.Challenges involved guest occupied construction,abbreviated construction schedule,on-site construction management. TSAO Design Group also provided full design,phasing and construction management services for this project. The entire renovation occurred on an expedided eight week period while the pool deck was being used by guests.This project highlights TSAO's ability to work creatively and under pressure. All of the pool deck drainage pipes were replaced,non waterproofed pool deck areas that were excavated and re waterproofed,non functioning site irrigation pipes were replaced,including non code compliant lighting. Design highlights include two 40 foot high green walls,new landscaping,Ipe wood cladding,decking,new turtle safe lighting,new fumiture,and new tile work. Project cost:$1,000,000 ,;,:: ► j,� 1 ♦ • a . a4.1 v s ' so-4001101111.1111111010 on is ■ v tC+ • ^?00 t IA _ 3: —► _ "'iZ-cce STs....dee �;,i, .w ri t I' `� , if ... 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI, FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV 3/2013)PAGE 3 73 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 10 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22.YEAR COMPLETED ONBOARD MEDIA OFFICES PROFESSIONAL SERVICES CONSTRUCTION (If applicable) DORAL,FLORIDA 2015-2017 2017 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b POINT OF CONTACT NAME C.POINT OF CONTACT TELEPHONE NUMBER ONBOARD MEDIA CRISTY VIERA (305)673-0315 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) The client is an integrated media company specializing in the global travel and cruise ship industry. The client has vacated its Miami Beach offices near the Lincoln Road mall to move adjacent to their sister company. The design concept was conceived from the notion of bringing the vibrant Lincoln Road promenade to the suburban development of Doral. This office is a 10,000 SF interior fit-out in class A office building in Doral Florida. The newly renovated suite on the 5th floor is connected to the larger sister company suite via internal double doors. The new office does differ greatly from the more formal sister company suite. The office plan is an open-office layout with low panel work stations along windows with enclosed offices toward the building core. The space plan is an open-office arrangement except for few glass-partitioned offices and a conference room off the employee lounge. This conference room houses an unconventional reclaimed steel sewing machine conference table with wood top. The reception area takes cues from the ocean liner interiors of 1930's. The floating slatted wood ceiling is inspired by ship hull construction. All existing ceiling plenum equipment and mechanical systems are exposed; the existing concrete floor is polished for economy of means. The office communal living room, in combination with the reception area,create a center social hub. Suspended swing pod chairs and the long banquettes with tropical fabrics by the perimeter windows add an air of unconventionality and provide work place setting options to this office of creatives. .... BO ---,.;.: - W.d STERN CONSTRUCTION ZJ1, ,.. 4 _ I'. -._fir . I - v .. I r, — r 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI,FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.3/2013)PAGE 3 74 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26 NAMES OF KEY 27. ROLE IN THIS 28 EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill in "Example Projects Key"section below before completing table. (From Section E. Block 12) (From Section E, Block 13) Place "X"tinder project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Jason Hagopian, AIA, LEED AP Principal X X X X X X X X X X Janie Coka IIDA, LEED AP Principal/Project Manager X X X X X X Alex Betancourt Technical Director X X X X X X X Yaprak Markeset Senior Designer X X X X X X X 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT(From Section F) NUMBER TITLE OF EXAMPLE PROJECT(From Section F) 1 Public Works Waste Management 6 Palm Spring-Mile Multiple Improvement Projects, Hialeah, Northeast Transfer Station Office, Miami, Florida Florida 2 ASPCA/ASD Liberty City Animal Clinic, Miami, Florida 7 Royal Palm Hotel, Miami Beach, Florida 3 Public Housing UFAS Upgrades, Miami, Florida 8 The Pride Center at Equality Park,Wilton Manners, Florida 4 Helen Sawyer Adult Care Center, Miami, Florida g Ritz-Carlton Pool Deck&Grounds Renovation, Miami Beach, Florida 5 Miami-Dade Aviation Department Misc. Services, Miami, 10 Onboard Media Offices Opa-Loca, Tamiami, Florida STANDARD FORM 330(REV. 8/2016) PAGE 4 75 H. ADDITIONAL INFORMATION PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATUR� 32. DATE 04.30.18 NAME A'• - .n agopian, AIA, LEED AP, Principal STANDARD FORM 330(REV.8/2016)PAGE 5 76 1.SOLICITATION NUMBER (If any) ARCHITECT-ENGINEER QUALIFICATIONS LOI NO. 18-A-002 PART II -GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a.FIRM(OR BRANCH OFFICE)NAME 3.YEAR ESTABLISHED 4.DUNS NUMBER TSAO DESIGN GROUP INCORPORATED 2002 10-281-6837 2b.STREET 5.OWNERSHIP 7610 NE 4TH COURT#5 SUITE 101 a.TYPE 2c.CITY 2d.STATE 2e.ZIP CODE 'CORPORATION MIAMI FL 33138 b.SMALL BUSINESS STATUS 6a POINT OF CONTACT NAME AND TITLE MINORITY OWNED JASON HAGOPIAN, AIA, LEED AP-PRINCIPAL 7.NAME OF FIRM (If block 2a is a branch office) Lb.TELEPHONE NUMBER 6c.E-MAIL ADDRESS TSAO DESIGN GROUP (305)576.2006 X 15 JHAGOPIAN@TSAODESIGN.COM INCORPORATED 8a.FORMER FIRM NAME(S) pr any) 8b.YR.ESTABLISHED 8c.DUNS NUMBER TGA ARCHITECTS,INC 1984 102816837 9.EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function a No.of Employees a.Profile c.Revenue Index Code b.Discipline (1)FIRM (2)BRANCH Code b.Experience (see belNumbow) 02 ADMINISTRATIVE 2 1 A06 AIRPORTS, TERMINALS 2 06 ARCHITECT 4 3 C05 CHILD CARE/DEVELOPMENT 1 08 CADD TECHNICIAN 6 2 C08 CODES,STANDARDS,ORDIN. 3 37 INTERIOR DESIGNER 3 2 C10 COMMERICIAL,SHOPPING CNT 4 48 PROJECT MANAGER 4 2 C15 CONSTRUCTION MGMT 2 E02 EDUCATION, CLASSROOMS 1 H08 HISTORICAL PRESERVATION 3 H10 HOTELS MOTELS 3 105 INTERIOR DESIGN 4 L05 LIGHTING INTERIOR 2 L06 LIGHTING EXTERIOR 2 _ 001 OFFICE BUILDINGS 2 I S11 SUSTAINABLE DESIGN 3 201 ZONING LAND USE STUDIES 2 Other Employees Total 19 10 11.ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than$100,000 6. $2 million to less than$5 million (Insert revenue index number shown at right) 2. $100,00 to less than$250,000 7 $5 million to less than$10 million a.Federal Work 0 3. $250,000 to less than$500,000 8. $10 million to less than$25 million b. Non-Federal Work 5 4. $500,000 to less than$1 million 9. $25 million to less than$50 million c.Total Work 5 5. $1 million to less than$2 million 10. $50 million or greater 12.AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a SIGNATURE C s b.DATE 05.03.18 c NAME AND TITLE JASON HAGOPIAN, AIA, LEED AP-PRINCIPAL AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV.8/2016)PAGE 6 77 ow- MIAMI BEACH RFQ 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS CATEGORY OF WORK: INTERIOR DESIGN/ SPACE PLANNING Response Package 05.07.18 PREPARED FOR: City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor Miami Beach, FL 33139 www.miamibeachfl.gov (305) 673-7490 APPLICANT FIRM: TSAO DesignGroup TSAO Design Group, Incorporated 7610 NE 4th Court, #5 Suite 101 Miami, Florida 33138 tsaodesign.com CONTACT: Jason Hagopian,AIA, LEED AP Principal jhagopian@tsaodesign.com 305.576.2006 x15 1 TSAO DesignGroup TAB 1 - Cover Letter& Table Of Content CITY OF MIAMI BEACH-REQ 2018-141-N0-04/16/2018 tsaodesign.com 2 TSAO DesignGroup 1.1 COVER LETTER Miami May 7,2018 San Francisco City of Miami Beach Procurement Department 1755 Meridian Avenue, 3rd Floor, Miami Beach,FL 33139 SELECTED CATAGORY OF WORK: INTERIOR DESIGN/SPACE PLANNING Miami Iron Side RFQ-2018-141-ND,PROFESSIONAL ARCHITECTURAL SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT 7610 NE 4'h Court,#5 PROJECTS Suite 101 Dear Selection Committee, Miami,FL 33138 It is our pleasure to submit the enclosed response to the City of Miami Beach for INTERIOR DESIGN/ 305.576.2006 p SPACE PLANNING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS. 305.576.2005 f TSAO Design Group, Incorporated (TSAO) is committed to providing exemplary service and design www.tsaodesign.com to the City of Miami Beach. We look forward to helping the City of Miami Beach complete their projects and building a long—term relationship that will allow TSAO Design Group to become a valued partner of the City of Miami Beach. Our team at TSAO Design Group have been long time residents and active members of the community of Miami Beach. TSAO Design Group shares the aspiration of the City of Miami Beach to place quality,sustainable and resilient design and architecture to the forefront while preserving the unique architectural style of the city. TSAO Design Group understands special design considerations as they relate to the coastal and tropical positioning of the city and its environment. We have specialized experience in flood resistant construction, flood plain management, water remediation, wind mitigation, shade structures,acoustics/noise abatement,technology integration,and sustainable building practices. Improving building performance and user comfort through resilient design and high performance building practices is at the forefront of our philosophy. We are seasoned and accredited architects,interior designers and planners Our unique boutique approach to service and design will provide the City of Miami Beach: ✓ An extensive portfolio of work on municipal&government facilities ✓ An in-house,locally staffed,fully licensed team of architects AND Interior designers ✓ All principal staff are LEED Accredited Professionals ✓ All staff have in depth experience with renovations,phasing and campus projects ✓ A personal and accessible level of service from ALL staff members assigned to the project ✓ An unsurpassed level of attention and commitment ✓ A Minority owned company with a 35 year history(15 of those in Florida) ✓ A broad range of project experience,working both for public and private sections ✓ Professional willingness to meet time and budget requirements ✓ Our current and projected workload gives us the ability to properly manage this project Thank you again for this opportunity and I invite you to call me anytime at 305.576.2006 ext.15 if you have any questions or require further information. Very sincerely yours, TSAO Design Group, Incorporated Prime Proposer Jason Hagopian,AIA, LEED AP, NCARB Principal,305.576.2006 ext.15,7610 NE 4th Court,#5 Suite 101, Miami,FL 33138 Registered Agent per Division of Corporations,State of Florida CITY OF MIAMI BEACH-RFQ 2018-141-NO-04/16/2018 tsaodesign.com 3 TSAO DesignGroup TABLE OF CONTENT page TAB 1 COVER LETTER&TABLE OF CONTENT 1.1 Cover Letter 3 1.2 Response Certification,Questionnaire& Requirements Affidavit 6-14 (Appendix A) TAB 2 MINIMUM REQUIREMENTS 2.1 Cl. Minimum Qualifications Requirements&C2.Statement of Work 17-22 TAB 3 EXPERIENCE &QUALIFICATIONS OF THE FIRM 3.1 Qualifications of the Firm 24-38 TAB 4 EXPERIENCE&QUALIFICATIONS OF THE TEAM 4.1 Qualifications of Proposer's Individual Team Members 41-45 4.1.1 Project Experience 46-57 TAB 5 REQUIRED FORMS 5.1 Standard Form 330 60-77 CITY OF MIAMI BEACH-RFQ 2018141-ND--04/16/2018 tsaodesign.com 4 TSAO DesignGroup 1.2 Response Certification, Questionnaire & Requirements Affidavit (Appendix A) CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 5 Appendix A Solicitation No: Solicitation Title: RFQ 2018-141-ND PROFESSIONAL ARCHITECTURAL AND ENGINEERING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS Procurement Contact: Tel: Email: NATALIA DELGADO 305.673.7000, Ext.6263 NATALIADELGADOna..MIAMIBEACHFL.GOV STATEMENTS OF QUALIFICATIONS CERTIFICATION, QUESTIONNAIRE & REQUIREMENTS AFFIDAVIT Purpose: The purpose of this Response Certification, Questionnaire and Requirements Affidavit Form is to inform prospective Proposals of certain solicitation and contractual requirements, and to collect necessary information from Proposals in order that certain portions of responsiveness, responsibility and other determining factors and compliance with requirements may be evaluated. This Statement of Qualifications Certification, Questionnaire and Requirements Affidavit Form is a REQUIRED FORM that must be submitted fully completed and executed. 1. General Proposer Information. FIRM NAME: TSAO Design Group, Incorporated NO.OF YEARS IN BUSINESS: 18 NO.OF YEARS IN BUSINESS LOCALLY: NO.OF EMPLOYEES: 16 10 OTHER NAME(S)PROPOSER HAS OPERATED UNDER IN THE LAST 10 YEARS: FIRM PRIMARY ADDRESS(HEADQUARTERS): 160 Pine Street, 6th Floor Suite 650 CITY: San Francisco STATE: California ZIP CODE: 94111 TELEPHONE NO.: 415.398.5500 TOLL FREE NO.: FAX NO.: 305.576.2005 FIRM LOCAL ADDRESS: 7610 NE 4th Court,#5, Suite 101 CITY: Miami STATE: Florida ZIP CODE: 33138 PRIMARY ACCOUNT REPRESENTATIVE FOR THIS ENGAGEMENT: JASON HAGOPIAN ACCOUNT REP TELEPHONE NO.: 305.576.2006 ext. 15 ACCOUNT REP TOLL FREE NO.: ACCOUNT REP EMAIL: jhagopian@tsaodesign.com FEDERAL TAX IDENTIFICATION NO.: 94-3364738 The City reserves the right to seek additional information from proposer or other source(s), including but not limited to:any firm or principal information,applicable licensure, resumes of relevant individuals,client information,financial information,or any information the City deems necessary to evaluate the capacity of the proposer to perform in accordance with contract requirements. RFQ 2018-141—ND 6 Appendix A 1. Veteran Owned Business.Is Pro oser claiming a veteran owned business status? YES x NO SUBMITTAL REQUIREMENT: Proposers claiming veteran owned business status shall submit a documentation proving that firm is certified as a veteran-owned business or a service-disabled veteran owned business by the State of Florida or United States federal government,as required pursuant to ordinance 2011-3748. 2. Conflict Of Interest. All Proposers must disclose, in their Proposal, the name(s) of any officer, director, agent, or immediate family member(spouse, parent, sibling, and child) who is also an employee of the City of Miami Beach. Further, all Proposers must disclose the name of any City employee who owns,either directly or indirectly, an interest of ten (10%) percent or more in the Proposer entity or any of its affiliates. SUBMITTAL REQUIREMENT: Proposers must disclose the name(s)of any officer, director, agent, or immediate family member (spouse, parent, sibling, and child)who is also an employee of the City of Miami Beach. Proposers must also disclose the name of any City employee who owns, either directly or indirectly, an interest of ten(10%)percent or more in the Proposer entity or any of its affiliates 3. References&Past Performance.Proposer shall submit at least three(3)references for whom the Proposer has completed work similar in size and nature as the work referenced in solicitation. SUBMITTAL REQUIREMENT: For each reference submitted, the following information is required: 1) Firm Name, 2) Contact Individual Name&Title,3)Address,4)Telephone,5)Contact's Email and 6)Narrative on Scope of Services Provided. 4. Suspension, Debarment or Contract Cancellation. Has Proposer ever been debarred, suspended or other legal violation, or had a contract cancelled due to non-performance b an public sector agency? YES X NO SUBMITTAL REQUIREMENT: If answer to above is "YES," Proposer shall submit a statement detailing the reasons that led to action(s). 5. Vendor Campaign Contributions. Proposers are expected to be or become familiar with, the City's Campaign Finance Reform laws, as codified in Sections 2-487 through 2-490 of the City Code. Proposers shall be solely responsible for ensuring that all applicable provisions of the City's Campaign Finance Reform laws are complied with, and shall be subject to any and all sanctions,as prescribed therein,including disqualification of their Proposals,in the event of such non-compliance. SUBMITTAL REQUIREMENT: Submit the names of all individuals or entities (including your sub-consultants) with a controlling financial interest as defined in solicitation. For each individual or entity with a controlling financial interest indicate whether or not each individual or entity has contributed to the campaign either directly or indirectly, of a candidate who has been elected to the office of Mayor or City Commissioner for the City of Miami Beach. 6. Code of Business Ethics. Pursuant to City Resolution No.2000-23879, each person or entity that seeks to do business with the City shall adopt a Code of Business Ethics("Code")and submit that Code to the Department of Procurement Management with its proposal/response or within five (5)days upon receipt of request. The Code shall, at a minimum, require the Proposer,to comply with all applicable governmental rules and regulations including, among others, the conflict of interest, lobbying and ethics provision of the City of Miami Beach and Miami Dade County. SUBMITTAL REQUIREMENT: Proposer shall submit firm's Code of Business Ethics. In lieu of submitting Code of Business Ethics, Proposer may submit a statement indicating that it will adopt, as required in the ordinance,the City of Miami Beach Code of Ethics,available at http://www.miamibeachfl.gov/city-hall/procurement/ REQ 2018-141—ND Appendix A • benefits-. benefits: ! I • benefits- 0 SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees to the living wage requirement. 8. Equal Benefits for Employees with Spouses and Employees with Domestic Partners.When awarding competitively solicited contracts valued at over$100,000 whose contractors maintain 51 or more full time employees on their payrolls during 20 or more calendar work weeks,the Equal Benefits for Domestic Partners Ordinance 2005-3494 requires certain contractors doing business with the City of Miami Beach,who are awarded a contract pursuant to competitive proposals,to provide"Equal Benefits"to their employees with domestic partners, as they provide to employees with spouses. The Ordinance applies to all employees of a Contractor who work within the City limits of the City of Miami Beach, Florida; and the Contractor's employees located in the United States, but outside of the City of Miami Beach limits, who are directly performing work on the contract within the City of Miami Beach. A. Does your company provide or offer access to any benefits to employees with spouses or to spouses of employees? X YES NO B. Does your company provide or offer access to any benefits to employees with(same or opposite sex)domestic partners*or to domestic partners of employees? X I YES I NO C. Please check all benefits that apply to your answers above and list in the"other"section any additional benefits not already specified. Note: some benefits are provided to employees because they have a spouse or domestic partner, such as bereavement leave;other benefits are provided directly to the spouse or domestic partner,such as medical insurance. BENEFIT Firm Provides for Firm Provides for Firm does not Employees with Employees with Provide Benefit Spouses Domestic Partners Health X X Sick Leave X X Family Medical Leave X X Bereavement Leave ' X X If Proposer cannot offer a benefit to domestic partners because of reasons outside your control, (e.g., there are no insurance providers in your area willing to offer domestic partner coverage)you may be eligible for Reasonable Measures compliance. To comply on this basis, you must agree to pay a cash equivalent and submit a completed Reasonable Measures Application (attached) with all necessary documentation. Your Reasonable Measures Application will be reviewed for consideration by the City Manager, or his designee. Approval is not guaranteed and the City Manager's decision is final. Further information on the Equal Benefits requirement is available at http://www.miamibeachfl.gov/city-hall/procurement/procurement-related-ordinance-and- procedures/ RFQ 2018-141—ND 8 Appendix A 9. Public Entity Crimes.Section 287.133(2)(a),Florida Statutes,as currently enacted or as amended from time to time,states that a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal,proposal,or reply on a contract to provide any goods or services to a public entity;may not submit a proposal, proposal,or reply on a contract with a public entity for the construction or repair of a public building or public work;may not submit proposals,proposals,or replies on leases of real property to a public entity;may not be awarded or perform work as a contractor, supplier,subcontractor,or consultant under a contract with any public entity;and may not transact business with any public entity in excess of the threshold amount provided in s.287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendor list. SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees with the requirements of Section 287.133,Florida Statutes,and certifies it has not been placed on convicted vendor list. 10. Non-Discrimination.Pursuant to City Ordinance No.2016-3990,the City shall not enter into a contract with a business unless the business represents that it does not and will not engage in a boycott as defined in Section 2-375(a)of the City Code, including the blacklisting,divesting from,or otherwise refusing to deal with a person or entity when such action is based on race, color, national origin,religion,sex,intersexuality,gender identity,sexual orientation,marital or familial status,age or disability. SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees it is and shall remain in full compliance with Section 2-375 of the City of Miami Beach City Code. 11. Moratorium on Travel to and the Purchase of Goods or Services from North Carolina and Mississippi. Pursuant to Resolution 2016-29375, the City of Miami Beach, Florida, prohibits official City travel to the states of North Carolina and Mississippi,as well as the purchase of goods or services sourced in North Carolina and Mississippi. Proposer shall agree that no travel shall occur on behalf of the City to North Carolina or Mississippi, nor shall any product or services it provides to the City be sourced from these states. SUBMITTAL REQUIREMENT: No additional submittal is required. By virtue of executing this affidavit document, Proposer agrees it is and shall remain in full compliance with Resolution 2016-29375. 12. Fair Chance Requirement. Pursuant to Section 2-376 of the City Code,the City shall not enter into any contract resulting from a competitive solicitation, unless the proposer certifies in writing that the business has adopted and employs written policies, practices, and standards that are consistent with the City's Fair Chance Ordinance, set forth in Article V of Chapter 62 of the City Code ("Fair Chance Ordinance"), and which, among other things, (i) prohibits City contractors, as an employer, from inquiring about an applicant's criminal history until the applicant is given a conditional offer of employment; (ii) prohibits advertising of employment positions with a statement that an individual with a criminal record may not apply for the position, and (iii) prohibits placing a statement on an employment application that a person with a criminal record may not apply for the position. SUBMITTAL REQUIREMENT: No additional submittal is required at this time. By virtue of executing this affidavit, Proposer certifies that it has adopted policies, practices and standards consistent with the City's Fair Chance Ordinance. Proposer agrees to provide the City with supporting documentation evidencing its compliance upon request. Proposer further agrees that any breach of the representations made herein shall constitute a material breach of contract, and shall entitle the City to the immediate termination for cause of the agreement,in addition to any damages that may be available at law and in equity. 13. Acknowledgement of Addendum. After issuance of solicitation, the City may release one or more addendum to the solicitation which may provide additional information to Proposers or alter solicitation requirements. The City will strive to reach every Proposer having received solicitation through the City's e-procurement system, PublicPurchase.com. However, Proposers are solely responsible for assuring they have received any and all addendum issued pursuant to solicitation. This Acknowledgement of Addendum section certifies that the Proposer has received all addendum released by the City pursuant to this solicitation. Failure to obtain and acknowledge receipt of all addenda may result in proposal disqualification. Initial to Confirm Initial to Confirm Initial to Confirm Receipt Receipt Receipt JH Addendum 1 ,tH Addendum 6 Addendum 11 JH Addendum 2 JH Addendum 7 Addendum 12 JH Addendum 3 Addendum 8 Addendum 13 JH Addendum 4 Addendum 9 Addendum 14 JH Addendum 5 Addendum 10 Addendum 15 If additional confirmation of addendum is required,submit under separate cover. RFQ 2018-141—ND 9 Appendix A DISCLOSURE AND DISCLAIMER SECTION The solicitation referenced herein is being furnished to the recipient by the City of Miami Beach(the"City")for the recipients convenience. Any action taken by the City in response to Statement of Qualifications made pursuant to this solicitation, or in making any award, or in failing or refusing to make any award pursuant to such Statement of Qualifications,or in cancelling awards, or in withdrawing or cancelling this solicitation,either before or after issuance of an award,shall be without any liability or obligation on the part of the City. In its sole discretion,the City may withdraw the solicitation either before or after receiving Statement of Qualifications, may accept or reject Statement of Qualifications, and may accept Statement of Qualifications which deviates from the solicitation,as it deems appropriate and in its best interest. In its sole discretion, the City may determine the qualifications and acceptability of any party or parties submitting Statement of Qualifications in response to this solicitation. Following submission of Statement of Qualifications, the applicant agrees to deliver such further details, information and assurances, including financial and disclosure data, relating to the Statement of Qualifications and the applicant including, without limitation, the applicant's affiliates,officers,directors,shareholders,partners and employees,as requested by the City in its discretion. The information contained herein is provided solely for the convenience of prospective Proposals. It is the responsibility of the recipient to assure itself that information contained herein is accurate and complete. The City does not provide any assurances as to the accuracy of any information in this solicitation. Any reliance on these contents,or on any permitted communications with City officials,shall be at the recipient's own risk. Proposals should rely exclusively on their own investigations, interpretations,and analyses.The solicitation is being provided by the City without any warranty or representation, express or implied, as to its content, its accuracy, or its completeness. No warranty or representation is made by the City or its agents that any Statement of Qualifications conforming to these requirements will be selected for consideration, negotiation, or approval. The City shall have no obligation or liability with respect to this solicitation, the selection and the award process, or whether any award will be made. Any recipient of this solicitation who responds hereto fully acknowledges all the provisions of this Disclosure and Disclaimer, is totally relying on this Disclosure and Disclaimer, and agrees to be bound by the terms hereof.Any Statement of Qualifications submitted to the City pursuant to this solicitation are submitted at the sole risk and responsibility of the party submitting such Statement of Qualifications. This solicitation is made subject to correction of errors,omissions,or withdrawal from the market without notice. Information is for guidance only,and does not constitute all or any part of an agreement. The City and all Proposals will be bound only as, if and when a Statement of Qualifications, as same may be modified, and the applicable definitive agreements pertaining thereto, are approved and executed by the parties, and then only pursuant to the terms of the definitive agreements executed among the parties.Any response to this solicitation may be accepted or rejected by the City for any reason,or for no reason,without any resultant liability to the City. The City is govemed by the Government-in-the-Sunshine Law, and all Statement of Qualifications and supporting documents shall be subject to disclosure as required by such law. All Statement of Qualifications shall be submitted in sealed proposal form and shall remain confidential to the extent permitted by Florida Statutes, until the date and time selected for opening the responses. At that time, all documents received by the City shall become public records. Proposals are expected to make all disclosures and declarations as requested in this solicitation. By submission of a Statement of Qualifications, the Proposer acknowledges and agrees that the City has the right to make any inquiry or investigation it deems appropriate to substantiate or supplement information contained in the Statement of Qualifications, and authorizes the release to the City of any and all information sought in such inquiry or investigation. Each Proposer certifies that the information contained in the Statement of Qualifications is true,accurate and complete,to the best of its knowledge,information,and belief. Notwithstanding the foregoing or anything contained in the solicitation, all Proposals agree that in the event of a final unappealable judgment by a court of competent jurisdiction which imposes on the City any liability arising out of this solicitation, or any response thereto, or any action or inaction by the City with respect thereto, such liability shall be limited to $10,000.00 as agreed-upon and liquidated damages. The previous sentence, however, shall not be construed to circumvent any of the other provisions of this Disclosure and Disclaimer which imposes no liability on the City. In the event of any differences in language between this Disclosure and Disclaimer and the balance of the solicitation, it is understood that the provisions of this Disclosure and Disclaimer shall always govern.The solicitation and any disputes arising from the solicitation shall be governed by and construed in accordance with the laws of the State of Florida. RFQ 2018-141—ND 10 Appendix A PROPOSER CERTIFICATION I hereby certify that: I, as an authorized agent of the Proposer , am submitting the following information as my firm's proposal; Proposer agrees to complete and unconditional acceptance of the terms and conditions of this document, inclusive of this solicitation,all attachments,exhibits and appendices and the contents of any Addenda released hereto,and the Disclosure and Disclaimer Statement; proposer agrees to be bound to any and all specifications, terms and conditions contained in the solicitation, and any released Addenda and understand that the following are requirements of this solicitation and failure to comply will result in disqualification of proposal submitted; Proposer has not divulged,discussed, or compared the proposal with other Proposals and has not colluded with any other proposer or party to any other proposal; proposer acknowledges that all information contained herein is part of the public domain as defined by the State of Florida Sunshine and Public Records Laws; all responses, data and information contained in this proposal, inclusive of the Statement of Qualifications Certification,Questionnaire and Requirements Affidavit are true and accurate. Name of Proposer's Authorized Representative: Tine of Proposer's Authorized Representative: Jason Hagopian,AIA,LEED AP Principal S' ' •Kiser's Authoriz•'Representative: Date: -ar 05.03. 1cir C State of FLORIDA ) On this/ day of MAY ,20 : •ersona p .•peare •efore maurraw ►tA6aw o County of MIAMiDADE ) sta e• that (s)he is the Prinrctp,L. ofd DeiwiuGaap a corporation, and that the instrument was signed in behalf of the said corporation by authority of its board of directors and acknowledged said instrument to be its voluntary act and deed. Before me: Notary Public 1. the tate of Florida My Commissi• Expires: /'U4ecA4 vs)2027. Vi2„ JISSETTE JIMENEZ 4�? i�':State of Florida-Notary Public - Commission #GG 195383 �+ ' I' � My Commission Expires March 13, 2022 RFQ 2018-141—ND 11 TSAO DesignGroup REFERENCES, page 1 of 3 FIRM NAME ONBOARD MEDIA -,a, i _ ___ _ _ _ _ _ ;i'SJ CONTACT NAS' Cristy Viera ,,,' AYR 44' PARTIAL CWETEIf+PLAN ■ TIT Executive Assistant "" ADDRE8400 NW 36th St.,Suite 520 Doral,FL 33166 IJlrP ri TELEPHON 305.938.1259 l` . a' n' �, , r ,F.,. y�ta aam—,CL i.... EMA cristy.viera@onboardmedia.com .; h. Ilk. vol n SCOPE NARRATIVE ONBOARD MEDIA },p ' ® j. • Ili _r a-.) - _ Onboard is an integrated media company specializing in the global travel and cruise ship .11,-...t - '" , industry. The client has vacated its Miami Beach offices near the Lincoln Road mall to move a ' 'i:'*;R ,r; adjacent to their sister company. The design - �� . ' a concept was conceived from the notion of .. '_--N c 4 ra bringing the vibrant Lincoln Road promenade to :�` - ! `r! ' the suburban development of Doral. 1,, This office is a 10,000 SF interior fit-out in class A10511":"'"g4 office building in Doral Florida. The newly . .. . b renovated suite on the 5th floor is connected to - " , Lii the larger sister company suite via internal double doors. The new office does differ greatly `'` from the more formal sister company suite. The i. ts.N office plan is an open-office layout with low panel work stations along windows with enclosed offices toward the building core. The space plan is an open-office arrangement except for few glass-partitioned offices and a I i"`"«� conference room off the employee lounge. The reception area takes cues from the ocean 1? `ar liner interiors of 1930's. The round upholstered M r`il I reception area banquette with the center planter y�+a r references the grand interiors of S. S. A,' w,,,, Normandie. The floating slatted wood ceiling is inspired by ship hull construction. tsaodesign.com 12 TSAO DesignGroup REFERENCES, page 2 of 3 FIRM NAML Structured Solutions,Inc. ='N a r�s[ � x • ' hiIli ai - CONTACT NAME Steven J. LoperI t ,,, i1 I l 4 •TITLE President rng El I,} irF ' ii' ' ADDRESS 8 Essez Center Drive Peobody,MA 01960 "' ? ' i '''-;,..:N''2 .. '0..' --.4 TELEPHONE PH NE 978.232.3610 EMAIL sjl@structuredsolutions.biz .jT`` , SCOPE NARRATI' Royal Palm Hotel,South Beach - The Royal Palm South Beach property is part of Starwood's Tribute Portfolio. During the —...f, • • previous ownership, the guest rooms and �� public corridors were renovated. The client's - i. '. renovation objective was to raise the Royal ' �_ Palm from 3-star property to 4-star hotel • resort. The design team worked to create a- visually cohesive and inviting public spaces. There is now an improved entry experience and better connection between the porte cochere, lobby, reception, restaurant space and the pool deck. Services included design, •• rt r :%._ l'',yae j , ti. construction documents, permitting and construction administration. X17 � � ' are M . 3 - sir -i‘ +=v\w. , tsaodesign.com 13 TSAO DesignGroup REFERENCES, page 3 of 3 FIRM NAM', Amicon Construction , \F.\\ 4,' 7;7 / ,�„w CONTACT NAME Jon Weislow • \ T.. - 4_. TITLE Project Manager r` " ADDRESS 2400 NE 2nd Ave, - T Miami,Florida 33009 Irg TELEPHONE 786.641.6351 -x EMAIL " :: jweislow@amicon.us ."7. '1-7°;�;. ; SCOPE NARRATIV: The Hallandale Beach Club 4` '• * .., The Hallandale Beach Club is a 45 story three- 7. '' tower oceanfront condominium complex with 1,258 units. The project scope started with the 11 " --- k`i,,,,14%. redesign of pool deck spaces of Towers II and III; 41i '�i"�u the scope was later increased to 132,000 S.F. with the addition of the Tower I pool deck. Alongside pool remediation and water proofing, . Ilk, ry the design objectives include improving circulation, , wind mitigation, better utilization of deck .10 _1+ spaces, expansion of outdoor amenities, 14 11/I17Wz/ rebranding of food/beverage areas,and aesthetic ✓: updates to the property. 0.1111, ).k., ` .44 i In order for the design team to meet the I • client's needs for the pool deck and exterior '' N - amenity space remodel, they had to conduct a thorough review of the Building Code, - illi .- including both state and local codes, as well as raimvie f - `• � - 104, conduct a thorough Planning and Zoning Code MINIM I + review. The design team had to meet with the Hallandale Beach Planning and Zoning "'L department and review project scope for ' , r . '� .; ,,,. ' r � feasibility. Existing as-built drawings were e,lik " . t > reviewed to analyze design options which included architectural, structural, and MEP feasibility. A land use assessment was also provided by a licensed land use attorney. tsaodesign.com 14 TSAO DesignGroup TAB 2 - Minimum Requirements CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 15 TSAO DeslgnGroup 2.1 C1.Minimum Qualification Requirements CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 16 TSAO DesignGroup State of Florida Department of State I certify from the records of this office that TSAO DESIGN GROUP, INCORPORATED is a California corporation authorized to transact business in the State of Florida, qualified on February 12,2002. The document number of this corporation is F02000000789. I further certify that said corporation has paid all fees due this office through December 31,2017, that its most recent annual report/uniform business report was filed on April 28,2017,and that its status is active. I further certify that said corporation has not filed a Certificate of Withdrawal. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Twenty-eighth day of April, S�,, 2017 0.,. . , ,_, , ko,. ION 04,,,A Secretary of State Tracking Number:CC3867359655 To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.s unbiz.org/Filings/Certificate0fStatus/CertificateAuthentication CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 17 TSAO DesignGroup State of Florida Architecture Firm License —TSAO Design Group Incorporated ,m.r� �1 STATE OF FLORIDA ti ,) DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION t. - :/ BOARD OF ARCHITECTURE& INTERIOR DESIGN (850)487-1395 ' .o_., 2601 BLAIR STONE ROAD TALLAHASSEE FL 32399-0783 TSAO DESIGN GROUP INCORPORATED 7610 N E.4TH COURT#5 SUITE 101 MIAMI FL 33138 Congratulations) With this license you become one of the nearly one million Floridians licensed by the Department of Business and Professional Regulation. Our professionals and businesses range STATE OF FLORIDA from architects to yacht brokers,from boxers to barbeque ; �) DEPARTMENT OF BUSINESS AND restaurants,and they keep Florida's economy strong. PROFESSIONAL REGULATION Every day we work to improve the way we do business in order AA26001044 ISSUED' 02/27/2017 to serve you better For information about our services,please log onto www.myfloridalicense.com. There you can find more ARCHITECT CORPORATION Information about our divisions and the regulations that impact TSAO DESIGN GROUP INCORPORATED you,subscribe to department newsletters and learn more about the Department's initiatives Our mission at the Department is License Efficiently,Regulate Fairly We constantly strive to serve you better so that you can serve your customers Thank you for doing business in Florida, is CERTIFIED under the provrerona of Ch 481 FS and congratulations on your new license) a q•bon date FFe29.2019 L1702270000641 DETACH HERE RICK SCOTT,GOVERNOR MATILDE MILLER,INTERIM SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE&INTERIOR DESIGN Tom`;: LICENSE NUMBER '`�' .. AA26001044 l"�,r J The ARCHITECT CORPORATION �.; Named below IS CERTIFIED Under the provisions of Chapter 481 FS. Expiration date: FEB 28,2019 TSAO DESIGN GROUP INCORPORATED ❑tr 7610 N.E.4TH COURT#5 "".: '*4. +: *4_ SUITE 101 14.• x. MIAMI FL 33138 + • a• h ISSUED 02/27/2017 DISPLAY AS REQUIRED BY LAW SEQ a L1702270000847 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 18 TSAO DesignGroup State of Florida Architectural License—Jason R. Hagopian, AIA, LEED AP 't; STATE OF FLORIDA 'V4n DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION `:,� .7 BOARD OFARCHITECTURE STONEO HT TU E& INTERIOR DESIGN (850)487-1395 TALLAHASSEE FL 32399-0783 HAGOPIAN,JASON RONALD 6444 ALLISON RD MIAMI BEACH FL 33141 Congratulations! With this license you become one of the nearly one million Floridians licensed by the Department of Business and STATE OF FLORIDA Professional Regulation. Our professionals and businesses range from architects to yacht brokers,from boxers to barbeque k DEPARTMENT OF BUSINESS AND restaurants,and they keep Florida's economy strong. •.... PROFESSIONAL REGULATION Every day we work to improve the way we do business in order AR91288 ISSUED. 02/27/2017 to serve you better For information about our services,please log onto www.myfloridalicense.com There you can find more ARCHITECT information about our divisions and the regulations that impact HAGOPIAN,JASON RONALD you,subscribe to department newsletters and learn more about the Department's initiatives Our mission at the Department is.License Efficiently.Regulate Fairly.We constantly strive to serve you better so that you can serve your customers. Thank you for doing business in Florida, tS LICENSED under the provisions of Ch 461 FS and congratulations on your new license! E w.+�ew• FEB 26.2019 r+razvaooa;+« DETACH HERE RICK SCOTT,GOVERNOR MATILDE MILLER,INTERIM SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION fi,; .� BOARD OF ARCHITECTURE&INTERIOR DESIGN yy LICENSE NUMBER •7? AR91288 yg ~ rvdi 3•: .k The ARCHITECT • Named below IS LICENSED Under the provisions of Chapter 481 FS. Expiration date: FEB 28,2019 ❑ I }+t 0 HAGOPIAN,JASON RONALD i w:• 6444 ALLISON RD • MIAMI BEACH FL 33141 'trI a • 0. • 74. • ISSUED 02/27/2017 DISPLAY AS REQUIRED BY LAW SEC)It L1702270000646 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 19 TSAO DesignGroup State of Florida Architectural License—Jonathan Tsao, AIA, LEED AP .x""- v, STATE OF FLORIDA . ', DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION is . ,, " BOARD OF ARCHITECTURE&INTERIOR DESIGN (850)487-1395 ",_i"s'> 2601 BLAIR STONE ROAD TALLAHASSEE FL 32399-0783 TSAO,JONATHAN 160 PINE STREET SUITE 650 SAN FRANCISCO CA 94111 Congratulations! With this license you become one of the nearly one million Floridians licensed by the Department of Business and professional Regulation. Our professionals and businesses range 41.' STATE OF FLORIDA From architects to yacht brokers.from boxers to barbeque ii "; "' DEPARTMENT OF BUSINESS AND restaurants,and they keep Flonda's economy strong. '- PROFESSIONAL REGULATION Every day we work to improve the way we do business in order AR0017139 ISSUED: 02/27/2017 to serve you better. For information about our services,please log onto www.myfloridalicense.com. There you can find more ARCHITECT information about our divisions and the regulations that impact TSAO,JONATHAN you.subscribe to department newsletters and learn more about the Department's initiatives. Our mission at the Department is License Efficiently,Regulate Fairly We constantly strive to serve you better so that you can serve your customers. Thank you for doing business in Florida. IS LICENSED unser the provisions of Ch 481 FS and congratulations on your new license! e.p..yw aY• FEB 2$ 019 u a 2>omo se DETACH HERE RICK SCOTT,GOVERNOR MATILDE MILLER,INTERIM SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE&INTERIOR DESIGN LICENSE w a ro AR001 ' The ARCHITECT ..• Named below IS LICENSED Under the provisions of Chapter 481 FS Expiration date: FEB 28.2019 TSAO JONATHAN4i 160 PINE STREET ' .. SUITE 650 ' .: 3y SAN FRANCISCO CA 94111 ,.4.1 ..#I, 0 rt�4_ 'r ISSUED 02/27,2017 DISPLAY AS REQUIRED BY LAW SEC)u L1702270000768 CITY OF CORAL SPRINGS-LOI NO.18-A-002-11/15/2017 tsaodesign.com 20 TSAO DesignGroup 2.1 C2.Statement of Work CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 21 TSAO DesignGroup C2. STATEMENT OF WORK TSAO Design Group is persuing below catagories of work: Interior Design /Space Planning CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 22 Iwo ...iiimIR TSAO DesignGroup °S,. { • • \ ott,.. I * "fid �ll 4 /4 i istlia, k f. I iJ n 011141°' I 41 .\--.._L , TAB 3 EXPERIENCE & QUALIFICATIONS OF THE FIRM H' I CITY OF MIAMI BEACH-RFQ 2018-141-NO-04/16/2018 tsaodesign.com 23 FIRM HISTORY- OVERVIEW . `" TSAO Design Group is an award winning architecture and interior design firm serving institutional, hospitality, corporate and private - v clients. Our offices in Miami and San Francisco -r--- '= ) provide comprehensive design services for the • , 1, ,f development of new buildings, renovation of existing t '''' 1, tar-' - fl structures and every aspect of architecture and *.1 di 1 interior design. Our design portfolio contains over three '`-Pe ^.- t , • '`5;` decades of work in over 40 states nationwide. In r i, � t ' 2018 the firm celebrates 37 years in business. ...,"_ , Design At TSAO Design Group we do not z endorse a particular architectural style. Our design portfolio contains over two and a half ' decades of work expressing a variety of architectural styles as different as our clients. Each project :.,,,. � expresses an individual aesthetic created in response its .im 0 to a program, a site and a share vision. Our .1 �� approach to design is user centric and site specific, t rooted in a passionate belief that our highest ' i , responsibility as architects is to cultivate what is c' ' unique about each project, each client and each opportunity. This holds true whether we are ,, , designing a museum, a retail facility, executive ""' = ill _ i offices or a private residence. There can be no - greater fulfillment that to engage a client deeply I and jointly craft a design that exceeds both our _._ ' /I/ expectations. 4 Sustainability TSAO Design Group is proud to be a member of the U.S. Green Building Council and each year our professional development programs enable an increasing number of staff to become 4 LEED Accredited Professionals. We are passionate ;t ` 0 about sustainability and about accepting ` responsibility for the environment now and into the II ;`1 j future. ✓: ' -' Community We re-invest in our community ;alio1111 1 rot �"" by supporting a broad range of charitable a» programs. Each of the firm's principals serve on the f — ! board of directors for selected community and non- viii:a profit organizations and our annual operating budget -- underwrites donations and pro bono services ;mi. it • "' _r 411:: ,,,. throughout the year. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 24 FIRM HISTORY- PRACTICE& LOCATIONS TSAO DeslgnGroup Miami Architecture San Francisco Interior Design «,".ter" . + Award winning architecture and .k " \-- 1 ., interior design firm with offices in Miami and San Francisco servicing 141 r corporate, institutional and private clients. TSAO Design Group, -. "` Incorporated is celebrating 15%2 years in business. Organization Type Corporation r " Minority Business Enterprise 6 J'.r„ Practice Areas/ Institutional '11-17—*7 -Mae " ii Market Segments Hospitality ri .. Corporate Interiors Re .11.. 4. lifeeScience/Healthcare Residential - rillni ti ' A�, s. Special Projects ���� �+ Office Locations Miami, Eastern Region 400:it.��mtL(iL . San Francisco,Western Region sitetc a * ".�1 j Service Region North America ' �� � '`►�`i"� � ,'� Registered Architects in 35 states :4144,1„.....a,..t,...,\ ��')ICorporate Affiliations American Institute of Architects U.S. rr Green Building Council National MfrMinority Supplier Development Council • i Florida Regional Minority Business Council +w . Northern California Supplier — _._ Development Council ---- .. ,., Principal Contacts Eastern Region Jason Hagopian,AIA,LEED AP 305.576.2006 ext. 15 - jhagopian@tsaodesign.com Janie Coka, IIDA, LEED AP 305.576.2006 ext. 14 jcoka @ tsaodesign.corn --,',*•:', iiii, it. f. Western Region Jonathan Tsao,AIA, LEED AP 415.398.398.5500 ext.222 jtsao@tsaodesign.com ■ 111 'N + 111111 Mary Wang,AIA, LEED AP 415.398.5000 ----�- °' IIi� ext.247 •N mwang@tsaodesign.com CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 25 FIRM HISTORY - SERVICES TSAO DesignGroup _ :. =E EN J. 7 *F41 rf— itr-44Pri iii I, ,/,./. , • i 1 ."il ail iI r °. d . till.:..4AltillliillAbillir i CI COMMERCIAL INTERIOR DESIGN SERVICES Field Surveying Project management As-built drawings Construction management Site selection Project liaison services Lease review CAFM system support Strategic facilities planning Occupancy tracking Existing facility analysis Relocation analysis Sustainability analysis Project budgeting/scheduling Access/ Cultural mapping code compliance Environmental branding Preliminary test fit planning Qualitative/ quantitative programming Design/design development Construction Departmental/key person interviews documents Adjacency/ productivity analysis Engineering coordination Furnishings/accessories evaluation Cost estimating/value engineering Space optimization Bidding/negotiation Furniture design Committee Presentations Alternative work environments Regulatory agency liaison Workplace systems integration: Permit expediting Sustainability/lighting/acoustics/ Construction administration furnishings/ergonomics/technology Post occupancy evaluation CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 26 FIRM HISTORY- SERVICES TSAO DesignGroup i --;---__-__ __ :,-_-_,..--,-- \ „ : ----5 ,,,,,_ ._ ._, ___ __I 1 ,._,.:,_..__„ .„..w_ z . :, ,_.?__ .z.,_.,_,___ ,1 SPECIALIZED SPACE PLANNING SERVICES �lr l �� i n ,_...--- ti * WORKPLACE EVALUATION Small meeting spaces have much higher utilization rates Utilization Rates at Peak Periods T ! t * FINDINGS REPORTf I * EFFICIENCY STUDIES "'°' Large Flown(B-12 peoTaa Large Meetlrrg_, r.,:;:,.; Extra-Small Room(1-2 people) One-on-one coaching,interviewing * PROGRAMMING J .._..e..«...............«..< •®... . Overall Average Occupancy 1 Floor Plan lural Mops .,, * LEASE REVIEW i l 4) ""_°""”" . .,,_,... * SITE SELECTION = °_ ' e " - I liii, .,,, 3i) '7-fit.:-1-?:77;r7"-Cf ii gi MEIN ii * MOVE DIAGRAMS ��* Ile maLlj 7w ,..s■in...•p .. M. �. Te .r * MOVE COORDINATION FLOOR 32 CATES • { __.._._ .. ,.._- n, a..-;„ 0I '.1..".:Ti.M.'"*".7...'A"•••••.—A A. ' ' '74.4 < i'Fr' °.r°trIll.°.a" y.. . ems^ rt_,. r L 1 , , 4 J .. e,m j CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 27 FIRM HISTORY-APPROACH TSAO DesignGroup Creativity Our team members are creative in producing design options that will express the City of Miami Beach's culture, image and work processes. However, our creativity is not limited to interior design and architecture. We will apply our creativity to all aspects of the project, from zoning issues, to cost- saving measures,from scheduling to problem-solving. 1440 / a 1 I r 3. I '` a • ,,. . .,,L . . ' 1 ,„,,, .,..., z...,_.' . ,...._1... .404 24111:0 v,..,,, • w _ i _ = I rw�• on, i •e 1.!1,2„..n...„_::::,„ 1 7:....„:„.„-..- - __,... ,,_:71,„„„li,,,ii..... , . -----------.7,,,.....,....„.. .„.. „noir �� 41� 2 t —A411[. — '-.Ti ".--- 7 7--. N ' ''.''''''' ''''' *1 411604.4 416.111. ; ytk .... I Iler CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 28 FIRM HISTORY-APPROACH TSAO DesignGroup We Guarantee a Dedicated Core Team Since we understand the benefit of continuity, we dedicate a team to a project from commencement through completion which substantially reduces quality control issues resulting from staff changes. Extraordinary Service Extraordinary service is not only a marketing concept but a powerful commitment that identifies client satisfaction as the ultimate reward for our actions. Design creativity and technical competence alone do not distinguish us from our peers. Our most valuable contribution is creating a working relationship that is inquisitive, inclusive and interactive. We aspire to a service philosophy that emphasizes listening to our clients as the foundation for enduing relationships. ,.. TSAO PROCESS , RI 111 ' [ , , d - DEFINE 0 6 I. wed r IMPROVEssi COLLECT 11 1� 1 4k,: .. imi 4 'sil i BRAINSTORM FEEDBACK DEVELOP p:/, gir CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 29 FIRM HISTORY-APPROACH TSAO DesignGroup Project Team Allocation Our Clients really appreciate our nimble approach to our work and know that no matter the size of the projects or the volume of the projects, that we can exceed their expectations. We keep an active file of consultants and potential staff additions for when the need arises for team augmentation. TSAO Design Group performs best when we are busy. The managers and staff keep projects moving briskly through the office while always maintaining quality and service to our Clients. Our project teams are sized to fit our Client's workload and as a result our office size can flex as needed. As we begin 2018, our office is poised for more steady growth and continued support to our existing Clients. Code Expertise Our practice is well-versed in restrictive regional codes specific to handicapped accessibility and energy conservation and how they impact the built environment. We also have first-hand experience with the regional nuances of the permitting process and we know how to maneuver projects through varying and complex agency procedures. w W • II Pit Ail ill 9Pi 11411 • • or 4 m M iR ` CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 30 FIRM HISTORY- MANAGEMENT TOOLS TSAO DesignGroup Effective Management Tools We have developed proprietary tools for project management, time management and quality control. At the commencement of the project we will coordinate a kick-off meeting to identify the City of Coral Springs's priorities, assign roles and responsibilities for each team member, identify budget and schedule constraints, and jointly develop two powerful tools: the Project Road Map and the Project Schedule. Jointly they represent an extremely effective method for project management, time management, and monitoring task/document completion by phase. Using these tools promotes collaboration, establishes the City of Coral Springs's expectations and how each team member will meet those expectations throughout the duration of the project. The TSAO Project Road Map synchronizes the activities of the project team by clearly establishing the primary objectives, focus items, tasks and key deliverables for each phase of the project. The Project Schedule uses Microsoft Project, a management software application adapted specifically for architectural design and construction projects. Regular updates to the Project Schedule are made by our project manager and distributed promptly to all stakeholders. : ....ii iimiNi iiissi $ 7 ili 111Hs VI/ sp, lit •., \ id Millr._ �•.•��..�`r^..r. +Y-.....r.ay..r• Shooed*KO K.r..1+.►' ..r.••••••••••• ....►��I.+ ....+..+.....+..r • ...••••• ••.-.• r iy ...N.....•w..•..•.. . ...•.r..... K... =1:;....74.....fir. .w•w*......•. i.pn..Y..N.!••. .ww»w.........v.►. ....•.w•.Mww $4.c•.• 4 ..w..i-..r__•ww1.Mw ..wr•....aw..r.N»: -S ri a uwwra ..•. ..wow W.K.. i":••••"....:"=:.''' a•....r�........ 4 •+•...•.–ww•.w...• �•.r/..r.•-.r ..r.a.. wwl••.•�•. ww•.1..Iw�. tY•w..•w.w...w .•-�+r•w .Y.•w.n..�.�+.•.. .aww��.r... w...w.....� a, *• •.•.. •.•-•”••• •w•••.•....... •••r ••••••••�••.••••••w. O.4..4•••...K. 4.• • ..y....•_•••ww ••••••••••••••• ~_ w•• •••••••••••••••••••••••• •w •••• •••.. : FIRM HISTORY- MANAGEMENT TOOLS TSAO DesignGroup " aw r , ter. TMs : AL Structured Communication We will maintain a high level of communication between the City of Miami Beach stakeholders, our team including consultants, and project vendors. Effective communication between project stakeholders is essential to maintaining customer satisfaction by ensuring that information is disseminated in a timely manner and Client expectations are met. At project commencement, our project manager will establish simple and direct procedures to maximize how information is transmitted between all project participants. In addition to daily exchanges of information by telephone and email, we will coordinate weekly meetings with team members to incorporate client feedback, monitor progress, and identify potential issues for resolution in advance. We will provide written agendas and meeting reports prior to and following each meeting to assure that all issues, decisions and actions taken are promptly documented and accounted for. TSAO utilizes the following documents to communicate effectively with project stakeholders and to administer the contract. • Meeting Agenda/Reports • Shop Drawings and Submittals Log • Client Approval Forms • Field Observation Form • Addendums/ Bulletins • Punch List Form • Request for Information Log • Findings Reports CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 32 FIRM HISTORY- MANAGEMENT TOOLS TSAO DesignGroup 0 ‘ ___ :::: ___. i1� ... Schedule control Our Senior Project Manager will be responsible for developing and maintaining a comprehensive master schedule which identifies the deliverables, reviews and approvals for each phase. The master schedule created at the start of the project will be confirmed and updated at each weekly project meeting with critical issues brought to the forefront for timely resolution. Cost Control Adherence to cost control measures along with a proactive role for the collaborative identification of possible alternates in program-wide components and processes is paramount to the success of a program and indicative of a true partnership. Make the whole team responsible for cost control — cost estimates at the end of each phase are important ways to avoid unpredicted cost overruns and damage control techniques such as time consuming document revisions. We support early contractor participation and also require our project managers, designers and consultants to be conversant with construction values so cost control is integrated into the design process and not reduced to an afterthought. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 33 FIRM HISTORY - QUALITY CONTROL TSAO DesignGroup w 1. t yW. • •� $ .. '''‘ 1 :1;,:r lir:".' ill 4 Quality Assurance & Quality Control Quality Assurance and Quality Control are commonly used interchangeably but they are two different processes with a common goal to delivery excellent quality. TSAO Design Group has established protocols and procedures to develop each project from inception to completion to deliver a successful project to our Client's. Quality Control is much more than a set of review procedures and checklists, this reflects a firm's ability to manage and retain qualified staff. Quality problems can be the outcome of high staff turnover and inattentive management. By attracting and keeping highly qualified staff at all experience levels and by working in teams we have significantly reduced quality control issues throughout all phases of our projects from programming through construction administration. Investing in technology and underwriting a strong continuing education program are two additional ways our firm maintains high quality control. The degree of connectivity made possible by computer systems gives us the tools to approach complex design assignments, coordinate with consultants, perform under aggressive time lines and still produce consistently high quality deliverables. [ Ke CEv11F‘c� 1/4:& rFR � CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 34 FIRM HISTORY-QUALITY CONTROL METHODOLOGY TSAO DesignGroup Accuracy & Quality Control Methodology I a12 Step TSAO Guideliane The TSAO Design Group Architecture is a talented group of Architects [1.11..kw: and Interior Designers that are prepared to guarantee ultimate success for the City of Miami Beach stakeholders. Below are TSAO Design Group's 12 steps toward a top-quality, well-coordinated project delivery. O 1. Timing: Schedule projects to accommodate in-house and out of house reviews with adequate time to include any comments or resolve any outstanding issues. 2. Self-checking: Each team member must be responsible for thoroughly checking his or her own work against a firm-standardized checklist as early as several weeks before a job goes out to bid. 3. Red-marking: Include your staff in this process. The job captain or project architect often sits beside me as we review drawings, checking references, and detail keys interrelationship between drawing, grammar, dimensions, and spelling. Drawings do need to be proofed again after the red marks have been picked up. 4. Peer Review: For a peer review to pay off, the reviewer must read every note and check references. The "red pencil" (high-light items that need to be changed) and "yellow marker" (highlighted items that have been verified) techniques help keep the reviewer organized. 5. Technical proficiency: Most important, address problem areas directly. We advise using in- house experts, encouraging on-site construction observation at all professional level,and attending technical seminars and local AIA and CSI meetings. 6. Specifications: Spec writing is perhaps one of the largest least sought-after task for our professional practice. But the fact of the matter is that it is a critical part of the success of a project.TSAO is aligned with experienced and passionate specification writers to ensure top quality written specifications. 7. Codes:All relevant codes and zoning requirements must be understood completely before the project leaves the schematic design phase. The project architect should read through all relevant codes and summarize those sections that apply. This written summary can be used on the data sheet at the beginning of a set to assist the plans examiner with the review. 8. REVIT Accuracy: Utilize software such as Revit to manage conflict detection, cost estimating and collaboration with Owners for better visualization tools prior to construction. 9. Owner Review: Encourage a 50 percent and 90 percent review and which time you can focus a client's attention to critical parts of the project requiring Client direction and/approval to proceed. 10. Contractor Review: Meet with the contractor in person and incorporate their relevant comments and concerns into the bid documents before signing the contract. 11. Follow-though: Thoroughly coordinate all changes into the documents. An unforeseen condition such as a concealed mechanical duct may require that a portion of the ceiling be lowered, affecting structural details, lighting, power distribution drawings etc. 12. Trouble-shooting: Many catchall clauses used in drawings, contracts and specifications, such as "Contractor to verify in field", were created to avoid change orders.Check the AIA General Conditions (A201) for phrases that will better safeguard the construction documents. CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 35 • TSAO DesignGroup QUALIFICATIONS OF THE FIRM; Small Project 1 of 3 Project Name THE PRIDE CENTER AT EQUALITY PARK WILTON MANNERS, FT. LAUDERDALE, FLORIDA Project Description The Pride Center hired TSAO Design Group to assist them with the Master Planning of their 6 acre site in Wilton Manners Florida. The first two project phases included a Visioning Charrette, planning,and a massing study. — wow Development of a master plan for a 6 acre site in Wilton ..—_ Manners encompassed; housing(180 units),parking, community space,retail,parks and waterfront usage. The project scope included complete due diligence, visioning,budgeting,pre-design,schematic design, master planning and 3D visualization. TSAO Design Group conducted a Visioning Charrette with 'i ..•`= vac 4ttg .- •v The Pride Center stakeholders with the intent of 461. t'19"`1 .' cultivating ideas and focusing a vision for what The PrideC,•%'"4.• ,, Center can be in the future. Pride Centers across the ' globe include such programming as senior housing, • assisted living facilities,theaters,health clubs,event 2r^ r space,outdoor activity space,classrooms,technology centers,libraries,art galleries,restaurants,catering facilities,health clinics,office space,etc. The Charette 1/�7 41,: provided a forum for ideas and the unique advantage of giving immediate feedback to the designer and stakeholders. The Visioning Charette allowed everyone who participates to be a mutual author of the plan. After the deliverable from the Visioning Charrette,TSAO created color,three dimensional massing studies ,,,�,,,,, - W,, showing the proposed program on the site. Renderings included exterior public spaces,landscaping, 0 . hardscaping,buildings,and shadows. _ o ! Cost $25,000-500,000 • t Agency/Client Name The Gay& Lesbian Community Center of Greater Fort Lauderdale Inc. Client Contac, ROBERT BOO -- — The Gay&Lesbian Community Center of Greater Fort — Lauderdale Inc. (954)463-9005 ext, 103 Years of Engagement 2014-ONGOING "^a\ 1101-4 CITY OF MIAMI BEACH—RFQ 2018-141-ND-04/16/2018 tsaodesign.com 36 • f TSAO DesignGroup QUALIFICATIONS OF THE FIRM; Small Project 2 of 3 Project Name PUBLIC HOUSING AND COMMUNITY DEVELOPEMENT-UFAS UPGRADES MIAMI DADE COUNTY,FLORIDA,MULTIPLE CITIES °3 i The scope includes renovation of multiple public N '� '' Project Descrr � ``, ,�;, housing projects (10 to date), in various cities, including Miami, Opa-Locka, Perrine, Homestead and Florida City. The projects range from multi family, single family and 's. community centers. Renovations include site work, 41 i :"' } rC landscaping, hard-scaping, interior alterations, ADA/ ilil illo , I , Uniform Federal Accessibility Standards (UFAS) !!,f,.:...w•'" "" upgrades, interior design, architecture and engineering. Full site surveys were required. The projects include - - , 41 analysis of UFAS reports and code analysis. i.,. f� ' - Improvements include entirely new interiors, structural :.t, ^‘v.'s A 0 upgrades, finish specification, site lighting, parking 4' 10-11 « improvements, ramps and stairs, and life safety ~' �' ;,Y upgrades. aid _ 7 • R" All work was reviewed and approved by a third party for r - " Code compliance. All work was inspected and verified ! i ' ' - -: then by the Federal Government compliance agencies. ; Complete pre-design, schematic design, design ,• ` ,A i development, construction documents, permit services s i and construction administration were performed. k:. ,-"'.: •' ' ' Cost Construction costs:varies$100,000-$500,000 ' ,l r ........ P _ Agency/Client Name Miami-Dade County Public Housing&Community Developmentsit 411 ® 4 4' l Client Contact FRANCISCO TRUJILLO rill '• Miami-Dade County Public Housing&Community ,;A • Development .. ' (786)469-4125 Years of Engagemen 2014-2018 " .....g... .-- *----`"' ' \ ! I! ,41 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 37 TSAO DesignGroup QUALIFICATIONS OF THE FIRM; Small Project 3 of 3 Project Name PG&E Teller Line Replacements (34)sites California '■ 4p, ■■ Project Description TSAO Design Group has provided renovation :"» ' r services for PG&E for over the past four years for s wS over 65 Customer Service Offices. Although projects are located in California, the projects have been managed and documented from TSAO Miami offices. 1111 p ,. The services include ADA compliance, health and wellness upgrades and customer/ employee safe environments. The project Joao included new ADA accessible work stations and custom teller station design and shop drawings review. The scope included full architectural design services from survey/as builts, schematic design, design development,construction document, MEP coordination, construction administration and project close-out. + mi ^ w 411 ,5417 ill II Multiple Projects,$200,000-$8,000,000 ` r .. Agency/Client Name Pacific Gas& Electric Client Contact Carl W.Gowan Gowan Construction Co Inc. (209)836-2482 carl@gowanconstruc.com - - —' Years of Engagernt 2015-ONGOING l t 07-4 CITY OF MIAMI BEACH—RFC)2018-141-ND-04/16/2018 tsaodesign.com 38 TSAO DeslgnGroup a 4,14 -... - # 4 . . , 1 I k:41.4L,i "-' ,., , :It \\ A k EXPERIENCE & QUALIFICATIONS OF THE TEAM i a "4 CITY OF MIAMI BEACH—RFQ 2018-141-NO-04/16/2018 tsaodesign.com 39 TSAO Deslgnoroup 4.1 Qualification of Proposer'a Individual Team Members CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 40 TSAO DesignGroup Organizational Chart MIAMI ARCHITECTURE &DESIGN TSAO DesignGroup TSAO Design Group, Incorporated re FEIN 94-3364738 Jason Hagopian,AIA, Project Executive LEED AP Principal Janie Coka, IIDA,LEED Project Manager �► AP Principal j � J Yaprak Markeset, Project Support I NCIDQ Senior Designer Alex Betancourt Project Support II Technical Director CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 41 TSAO DesignGroup Education Bachelor of Architecture •-- Rensselaer Polytechnic Institute .04 Troy,NY Bachelor of Building Sciences Rensselaer Polytechnic Institute Troy,NY Certifications Jason R. Hagopian,AIA, Registered Architect in the States of LEED AP Florida California, New York and Georgia Principal,Miami Office FL Licensed Architect,AR91288 National Council of Architectural Registration Boards(NCARB) Jason Hagopian began his career at TSAO Design Group over 20 years ago as a project coordinator. Now he is the managing Principal of the Years of Experience TSAO Design Group Miami office which has been serving Florida for 27 Total over 15 years. Jason is responsible for establishing and growing TSAO Design Group's public projects sectors. 21 TSAO Jason's leadership extends beyond his executive responsibilities as Affiliations managing principal and includes active participation in the planning, AIA Miami Past President,Membership design and production of projects. His skills as a communicator, Chair problem-solver and consensus builder have benefitted all those who American Institute of Architects(AIA) work with TSAO Design Group. National and Local Member City of Miami Beach Design Review Board Long time resident of Miami Beach, Jason has served or is serving on Oakland Park Main Street Board several Associations and Boards including The Pride Center at Equality President and Design Chair Park (Board of Directors), AIA Miami (Immediate Past President, Miami and the Beaches Hotel Association Membership Chair, Christopher Kelly Leadership Development Allied Upgrade Member Program Co-Chair), Rensselaer Alumni Association (Board of Trustees) United States Green Building Council and Greater Miami and the Beaches Hotel Association (Allied Upgrade Member(USGBC) Member and Sustainable Hospitality Council),the City of Miami Beach National Council of Architectural Design Review Board (Chair), City of Miami Beach Contract Review Registration Boards Board,Oakland Park Main Street(President). The Pride Center of Equality Park,Board Jason is a registered Architect in Florida, California, New York and of Directors Georgia. He received his Bachelor of Architecture and his Bachelor of Building Sciences from Rensselaer Polytechnic Institute in Troy NY. Major Clients Originally from Lexington MA, Jason has travelled the world studying Total Bank Miami Beach architecture but calls Miami Beach home. Aldo Shoes Miami Beach Ritz Carlton South Beach On the Miami Beach Capital Renewal and Replacement projects,Jason Citibank Miami Beach will serve as Project Executive and Architect of Record.Jason manages Royal Palm Miami Beach contracts and negotiations. Jason also maintains TSAO's quality Great Florida Bank Miami Beach control and quality assurance. With Jason as your leader you are Princess Cruise Lines ensured that you are in good hands. Miami Dade Aviation Department Rum Bar,Royal Pam Hotel Four Seasons Miami ROLE ON THIS PROJECT PROJECT EXECUTIVE AND ARCHITECT OF RECORD INVOLVEMENT IN PROJECT 35% TSAO DesignGroup Education Bachelor of Science,Interior Design c^ir Florida International University 111 Miami,FL Bachelor of Arts,Psychology Florida International University g.; Miami,FL Janie Coka, IIDA, LEED AP Principal,Miami Office FL Licensed Interior Designer, 105813 Certifications National Council for Interior Design Janie's infectiously positive attitude, self-driven motivation and Qualifications NCIDQ® leadership skills make her an asset to TSAO Design Group. She earned a Bachelor's of Science at Florida International University and is a Years of Experience Florida licensed Interior Designer.Janie started at TSAO Design Group as a project coordinator and is now one of four Principals. Janie 16 Total serves as Studio Director at TSAO Design Group Miami managing 12 TSAO staffing, project loads, agency coordination and consultant coordination. Affiliations Passionate and enthusiastic about Art and Design, as well as serving International Interior Design Association her Clients, Janie welcomes each project as her own. Sensitive to (IIDA) Client's needs and with a second Bachelor's of Arts in Psychology, Janie is trained to listen intensely and translate her Client's objectives. LEED Accredited Professional Expertise in Retail Design, retail philosophy and the psychology of United States Green Building Council purchasing Janie has worked with such clients as Federated Member(USGBC) Department Stores, Sephora, Off Broadway Shoes, among others. Organization and the simplification of complex task allow Janie to navigate the most challenging of projects, leading the projects down Major Clients the road of success. ASPCA Miami Born in the Midwest and early childhood upbringing in Northern AIZIA Restaurant Westin Diplomat Florida Janie is a Floridian at heart.Janie has called Miami home since the early 1980's and has a profound love for Miami with its diversity Burger King Corporation and culture. Family roots in Santiago, Chile instill in Janie a love of Citibank Miami Beach culture and diversity. Aldo Shoes Miami Beach "I feel that a successful project is one of collaboration and creative Four Seasons Miami problem solving with an end result that exceeds Client's Gilead Sciences expectations." Miami-Dade County On the Miami Beach Capital Renewal and Replacement projects,Janie Princess Cruise Lines will serve as Project Manager and will be the point person for the Pacific Gas&Electric client and design team coordination. Duties include maintaining client interaction & satisfaction, the project schedule and timeliness of The Ritz-Carlton Miami Beach deliverables.Janie prides herself in structured listening, application of Sephora client's requirements, organization,timeliness and follow-through. Villagio Restaurant* *Previous experience ROLE ON THIS PROJECT PROJECT MANAGER INVOLVEMENT IN PROJECT 55% TSAO DesignGroup Education Master of Arts in Architecture Florida International University Miami,FL // 1 Bachelor of Architecture Virginia Polytechnic Institute&State University Blacksburg,Virginia Yaprak Markeset Senior Designer,Miami Office Certifications FL Licensed Interior Designer, 1D5103 Associate AIA Associate AIA Florida Licensed Interior Designer National Council for Interior Design Qualifications NCIDQ® Yaprak began her professional career over 20 years ago. A Senior Designer at TSAO Design Group, Yaprak provides conceptual design, custom detailing and specifications for our projects. As the creative lead, Yaprak creates strong conceptual design work based upon Years of Experience extensive project specific research. 24 Total 05 TSAO Yaprak works to extract the unique culture within each project through observation and extensive research. She strives to promote quality design and creative thinking. Yaprak is an advocate for Major Clients sustainable & resilient architecture while remaining sensitive to Axel Hotel Miami Beach project budgets and time-line. SLS Hotel Miami Beach* The Estates at Acqualina Sunny Isles*The Yaprak earned a Master of Arts in Architecture from Florida Mansion at Acqualina Sales Center Kore * International University and a professional degree in Architecture Lounge, Miami Beach * from Polytech Institute & State University. She is a NCIDQ certified Ocean 10,Miami Beach designer with Florida Interior Design License. Balans Restaurants Miami Beach* Hallandale Beach Club Pool Deck On the Miami Beach Capital Renewal and Replacement projects, ASPCA Liberty City Yaprak will serve as the Senior Designer and will be the design lead for The Queen's Flowers Headquarters all for all components of the project, from conceptual design to Miami Onboard Media Doral detailing and everything in between. Within the design she looks for The Stars Group Dania Beach opportunities to bring custom and inventive design solutions to Kaiser Permanente Sport Medicine SF address the Client's program and wishes. Each critical stage of Miami Dade Fire Rescue Training Facility* design is always graphically presented to the Client for feedback and Pentagon Fitness Center Washington DC* comment to ensure that the Client's expectations are being meet. Metropolitan Washington Airports Authority* University of Dubai* *Previous experience ROLE ON THIS PROJECT SENIOR DESIGNER/DESIGN LEAD INVOLVEMENT IN PROJECT 65% TSAO DesignGroup Education Bachelor of Architecture ft A University of Miami Coral Gables,FL 1998 , rile Years of Experience 14 Total ',, 0"f 05 TSAO Alex Betancourt Technical Director, Miami Office Major Clients Axel Hotel South Beach A Miami native, Alex earned his Bachelor of Architecture at the University of Miami. Alex prides himself in his ability to provide Royal Palm Hotel South Beach unconventional solutions to common problems.This is most likely due Aldo Miami Beach to his love of puzzle games and geometry. Alex interest outside of architecture involves camping, hiking and baking; especially French Waldorf Panama* macaroons. Hardrock Megapolis, Panama* ASPCA As Technical Director, Alex is a key individual in keeping TSAO Design Group's technical engine running efficiently. Alex provides lead Hallandale Beach Club support and training in Revit, 3D modeling and stereo panoramic Citigroup renderings. Alex is also responsible for the coordination of site Pioneer Development information and field surveys, production of drawings and specifications, and coordination with engineering consultants, Minotti vendors and suppliers. The Ritz-Carlton Jason of Beverly Hills Alex's patience, understanding and flexible nature allows him to work Hampton Bella Vista,Panama * well others achieving maximum results. His in-depth knowledge of Miami International Airport,Concourse J construction management and experience in Hospitality, Mixed-Use * and Retail design is essential to the TSAO Design Group team. *Circa 39 Miami Performing Arts Center* On the Miami Beach Capital Renewal and Replacement projects,Alex Miami-Dade Transit System will be responsible for complete coordination of the technical Town&Country Center* drawings, 3D modeling and BIM management. Alex will also be the 5th&Alton* lead on RFI's,submittals and shop drawing review. *Previous experience ROLE ON THIS PROJECT TECHNICAL LEAD INVOLVEMENT IN PROJECT 65% TSAO DesignGroup Jason Hagopian, Project Experience—ALDO Collins Avenue Miami Beach Project Name ALDO Group 751 Collins Avenue Miami Beach, FL P1ulect uea np1 l The project scope included full scope of architectural& r MEP services including Construction Management forry interior and exterior renovation of the building. The , . . i-t_DO project high lights include custom lighting,custom retail ' it ) displays and graphics. The project also involvedaL`>. . extensive historic review due to the art deco building '"` — _. status. 44 r IltNili 4 t j liII' Project Cost: $900,000 41b ` m Agency/Client Nam- Aldo Group - Client Contac Sonya Di Sclafani (514)747.6504 1 sdisclafani@aldogroup.com No y- r l r 1. r 1J♦`. Yl 42,-....641 a Years of Engagement 2013 1� - "' ..,.4, 21 id •�— • 1 Y Y i Ob...1 linelliallinlealMINUMMIP � . 12 aY raL �` i 3 •Eli 7- i. .), ig‘ — 1 CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 46 TSAO DesignGroup Jason Hagopian, Project Experience— Miami Dade Aviation Department - Misc. Services Project Name Miami Dade Aviation Department Miscellaneous Services Various locations a• � Miami, FL 9; Project Description Multiple projects at regional airports including:office interiors,change of use applications,historic building surveying and documentation,hanger conversion and ..� ADA upgrades. The scope includes complete site „�' surveys, pre-design services, schematic design, /� --r design development, 40 year re-certifications, ,r construction documents,permit services and '" ' - • • construction administration. Specific projects include: Historic documentation, survey and archival drawing creation for buildings being demolished at Opa-Locka Airport, the creation — of a painting work-room at Miami International +"' i' Airport, the upgrade and remodel of a hanger and +•=- y.,� office space at Opa-Locka Airport, the upgrade and renovation of office space at Miami International Airport, the upgrade and renovation of a hanger and office space at Tamiami Airport. Ill/ U. Cost Construction costs:varies from$50,000 to$350,000 avalft A- §` 'a Agency/Client Name Miami Dade Aviation Department ` - Client Contact Elizabeth Ogden Miami Dade Aviation Department �. (305)801.0940 0 a • Years of Engagement 2016 = 5.,(,i CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 47 TSAO DesignGroup Jason Hagopian, Project Experience— PHCD Project Name PUBLIC HOUSING AND COMMUNITY DEVELOPEMENT-UFAS UPGRADES MIAMI DADE COUNTY,FLORIDA,MULTIPLE CITIES Project Description The scope includes renovation of multiple public ` �. housing projects(10 to date),in various cities,including iwr c , , Miami,Opa-Locka, Perrine, Homestead and Florida City. ..' - The projects range from multi family,single family and .I y community centers. Renovations include site work, jj�jiiNlpw landscaping,hard-sca in interior alterations,ADA IN��.E.� �� h� _ ! Uniform Federal Accessibility Standards(UFAS) / !� � ����� ��, ILI upgrades,interior design,architecture and engineering. Full site surveys were required. The projects include , 1101. analysis of UFAS reports and code analysis. t,. � Improvements include entirely new interiors,structural ci,,-'+,y�C',1 upgrades,finish specification,site lighting,parking * improvements,ramps and stairs,and life safety ' Il '''''c.* upgrades. .sal 4. All work was reviewed and approved by a third party for •- ••••# � k. Code compliance. All work was inspected and verified - -'= then by the Federal Government compliance agencies. -, Complete pre-design,schematic design,design r- development,construction documents,permit services and construction administration were performed. Cos[ Construction costs:varies$100,000-$500,000 .'j :moi i Agency/Client Name Miami-Dade County Public Housing&Community 11 Development 't` Client Contact FRANCISCO TRUJILLO, _ # R0 Miami-Dade County Public Housing&Community ,, Development . (786)469-4125 Years of Engagemel 2014-2018 - CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 48 TSAO DesignGroup Janie Coka, Project Experience— Pacific Gas & Electric Company, Multiple locations Project Name PG&E Teller Line Replacements Address (34)sites California „ 1- ■ ... • Project Descriptio TSAO Design Group has provided renovation services for 1 PG&E for over the past four years for over 65 Customer Service Offices. Although projects are located in California, the projects have been managed and documented from TSAO Miami offices. ='w The services include ADA compliance, health and wellness upgrades and customer/employee safe ^' ' scow" environments. The project included new ADA accessible work stations and custom teller station design and shop drawings review. The scope included full architectural Art !! or; j ., design services from survey/as builts, schematic design, design development, construction document, MEP �.� Si coordination, construction administration and project close- out. 4111 Cost Multiple Projects,$200,000-$8,000,000 7000.1‘. Owner Pacific Gas& Electric • .._ le int Owner Carl W.Gowan Representative Gowan Construction Co Inc. (209)836-2482 carl@gowanconstruc.com ' orirtumma •rms••••lr• Years of Engagement 2015-ONGOING CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 49 TSAO DesignGroup Janie Coka, Project Experience— Ritz Carlton South Beach Project Name Ritz Carlton South Beach Address Miami Beach, FL y or Pei W ill,"s WOy; ,®.- ,. ".•'T 7� r Project Descriptio The Ritz Carlton South Beach scope included renovation of _ the existing 30,000 sf pool deck area, including new landscaping, planters, hard-scaping, plumbing, electrical ...' " ,-4-- - and plumbing. . rilitits. 11 Project scope included complete pre-design, schematic t ,.. design,design development,construction documents,and ." construction administration. . Challenges involved guest occupied construction, 4' 4.1.4 `� '- abbreviated construction schedule, on-site construction - 'T ` management. � � -�- TSAO Design Group provided full design, phasing and ____ construction management services for this project. The 1 1 -:...__` entire renovation occurred on an expedided eight week period while the pool deck was being used by guests.This project highlights TSAO's ability to work creatively and '"�"° under pressure. All of the pool deck drainage pipes were ,. replaced, non waterproofed pool deck areas that were _,;. excavated and re waterproofed, non functioning site irrigation pipes were replaced, including non code compliant lighting. III ill Design highlights include two 40 foot high green walls, �; new landscaping, Ipe wood cladding, decking, new turtle �1 '...,, safe lighting, new furniture,and new tile work. i ` I Cost Project cost:$1,000,000 --.7 il f� Own- FLAG LUXURY/LIONSTONE CORPORATION ,_ W lir Owner Kevin Kelly Representative (650)712-7000 ---. • • Years of Engagement 2014 �' 1` ; n i CITY OF MIAMI BEACH—RFQ 2018-141-ND-04/16/2018 tsaodesign.com 50 TSAO DesignGroup Janie Coka, Project Experience—Citibank Miami Beach Branch Project Name Citibank Address Miami Beach, FL A AV( Project Dese'et<< TSAO Design Group has been servicing Citibank for '" i 35 years. Citibank Miami Beach 5,500 sf bank �. I ! I IT.1i ' fi branch was a full service ground up project. -- • ,,. TSAO Design group provided architectural and i ,44 ._, interior design services including LEED,custom millwork design and construction administration. The project scope included design of bank offices, . customer lobby,bank vault and a drive up �` b component. The building was LEED certified. "a 11 SsIti\ 44 b 1 411 iv. 4 , # r Cost $1,000•000441111443•4 i --• Uwne Citibank I. Owner Melissa Lawrence Representative Facility Manager (786)417-5131 L.Allit., tt- Years of Engagemer* 2014-2016 r. -"' -„► . 7'r'r _ i .0 • F O • c- CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 51 TSAO DesignGroup Yaprak Markeset, Project Experience—AXEL Hotels South Beach i Project Name AXEL HOTELS SOUTH BEACH / •irrr�t ,: Address 1500 Collins Avenue ,;`Y •1 Miami Beach, Florida 33139 K ,' Completion Date 2017 R,.. t .aC w,,, Project Description The Axel Hotel Miami Beach is a property owned by `' " alise-^� a premier gay boutique hotel chain Axel °tk;r:; Corporation Grupo Hetelero S.L. from Spain. The -4,r+•l'; Ir-historic hotel Haddon Hall will be renovated to �� i.e.. ■ ,,„„,i. property. become an inclusive and hetero-friendlyill ill\ii "if.,''' t I Services include Miami Beach Historic Preservation Board design documents, overall design, .. "c construction documents, permitting, FF&E and ijam�` .., construction administration. - �N Agency/Client Name Axel Corporation Grupo Hetelero S.L. Barcelona, Spainyfi a• 3' Agency/Client Contact Owners Representative: ,"17. t'rr� ; : I - ' 4 Inigo Hernandez r• ° 34-650453393, 'fr "1 `. info@ihtarquitecto.es li .� ? 4 's , T i\ 'f • - 1 ` .1. r . a �i . F Y �;LtU 4 ' � �.iew�J h�.�11A .- R ` i .. .(-`0 1 _ - 41././ CITY OF MIAMI BEACH—RFQ 2018-141-ND-04/16/2018 tsaodesign.com 52 TSAO DesignGroup Yaprak Markeset, Project Experience—ASPCA/ASD Liberty City Animal Clinic Project Name ASPCA/ASD Liberty City Animal Clinic ' 'f �, �•ijl''I' j r ,s.st Address 1312&1320 NW 62nd Streeta `�'�`�rl� ; ; ►; i K Miami, Florida 3347 f I �r� ► c` ; i i 1 t • Competition Date 2018 t ( ��� t1��)�'�j't e j • h^ IUllil►1►1►1►' •1•1 r101. _ Project Description The ASPCA and Miami-Dade County are co- -___- r.•:': developers in the construction of a animal clinic for the purposes of providing animal- _ _- it r related services, without limitation, • - spay/neuter operations and primary pet care As tor services, to the County's residents, including the underserved areas of Miami-Dade County particularly the Liberty City/Overtown areas. firre The proposed building is an approximately _ -_ -___= __________ 6,900 square foot single floor level building to � : � ' -4■-V be constructed on the vacant property. .FE-3 5,55.55 Animal Client (no boarding) will be the primary use, with accessory uses including retail and office. p � The project proudly will be pursuing LEED Silver and will incorporate Art in Public .';. . Places art work into its architecture. The �■■'■� design and material selection of the � � .0k building was generated through extensive i t, .:ray v site study and vernacular analysis. The ► project incorporates resilient materials such as projecting concrete masonry and breeze block. Owner The American Society for the Prevention of t i_, ..,& Client Contact Cruelty to Animals Stephen J. Musso, Executive Vice President of Capital Projects I 212.876.7700 f! r • Stephen.musso@aspca.org 7 J Owner Cushman &Wakefield Representative Ronnie Lopez, Project Manager 847.651.4197 Ronnie.lopez@cushwake.com CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 53 TSAO Designoroup Yaprak Markeset, Project Experience—The Queen's Flowers Headquarters Project Name THE QUEEN'S FLOWERS HEADQUARTERS 7001 NWS Address 25TH Street 1 '...,^ Miami, FL 33171 Completion Date 2018 rt .....1„ , w, '�` ti I I .iI h Project Description The Queen's Flowers imports cut flowers from IIII w ! l� � Colombia and distributes the flowers nationally and --=_ ".."""~ internationally. The second floor headquarters and - !-' " o cool storage facility is to be housed in old 1980's building undergoing extensive renovations by TSAO .,:« Design Group. TSAO Design Group's collaboration with The Queen's Flowers originally started as the project Interior Designer. Through the unfortunate r passing of the original architect of record,TSAO took ! �` over the project as the new architect of record and ""`"" was able to complete extensive and well coordinated multi-disciplinary construction documents. opini t„,r. Multiple new architectural building features were1 incorporated into the revised design; stainless steel -_ tensile mesh facade, new shade structures with car charger ports, new hard-scaping elements, _ — and new lush landscaping with permeable -- z pavers. . .=.z...:-__.-- i .— Building interior features lobby with polished = - •_-- concrete columns, back lit polycarbonate panels & a -. �_ -t. --1-: 20'tall tensile air plant sculpture floating above a red — mosaic platform. The second floor reception area - - was permitted to be an open staircase through TSAO's intensive work with Fire Safety Consultants and was a very involved permitting process. The m....."--:.--, - reception area includes custom banquettes with - arnamm upholstery inspired by traditional Columbian textiles. II ='" • 1111111111111111. Agency/Client Name The Queen's Flowers T r Agency/Client Contact David Gonzalez,General Manager (305)496.6218 ttidavid@queensflowers.com CITY OF MIAMI BEACH—RFQ 2018-141-ND-04/16/2018 tsaodesign.com 54 TSAO Deslgnoroup Alex Betancourt, Project Experience— Royal Palm Hotel South Beach Project Name ROYAL PALM HOTEL SOUTH BEACH - 'r Addres 1530 Collins Avenue , Miami Beach, Florida 33139 1 l • ,- Completion Dat 2017 !z• AP Project Description The Royal Palm South Beach property is part of • ^'_ Starwood's Tribute Portfolio. During the previous T , . ownership, the guest rooms and public corridors - • . were renovated. The new expanded work scope a-, ihil ,y b ' ., included reception areas, historic lobby bar, lobby .J� ' _.' -; waiting areas, pool bar and pool deck. The t. ``' client's renovation objective was to raise the Royal , i Palm from 3-star property to 4-star hotel resort. The project objective was to improve the entry experience and provide better connection between ,, the porte cochere, lobby, reception, restaurant space and the pool deck. Scope services included design, _ construction documents, permitting and construction administration. ..=" a ..,t • ns., �� ` Agency/Client Name RP Hotel Holdings, LLC `_ / c/o Chesapeake Lodging Trust . ---4i` -•— i ^:e IL__. i Agency/Client Contact Owner's Representative: _ 1 It: � �,,..w s ,.,,, 1 Structured Solutions, Inc 978.232.3610 '�. 41119 . -. k Atit 144, tkl ..,, , ,, a., , yt--4___' 1 4. !` ., r. tet II T-- *11 lr 1(..... CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 55 TSAO Deslgneroup Alex Betancourt, Project Experience—Axel Hotels South Beach Project Nam, AXEL HOTELS SOUTH BEACH - Address 1500 Collins Avenue - Miami Beach, Florida 33139 "� 't gr j. Completion Date 2017 ! Ir , ill Project Descriptior The Axel Hotel Miami Beach is a property owned by ---111 -Li_1. ' a premier it _- �` � '- gay boutique hotel chain Axel -I__ >�i_it Corporation Grupo Hetelero S.L. from Spain. The I historic hotel Haddon Hall will be renovated to — `f, become an inclusive and hetero-friendly property. ,.ititrO Lam•1 �, :1tf I. Services include Miami Beach Historic Preservation .- Board design documents, overall design, construction documents, permitting, FF&E and -` Iir v lid4. construction administration. I MA i - �'a •1, 1 [,i4 t m Agency/Client Name Axel Corporation Grupo Hetelero S.L. ' . -i e": ! . A Barcelona, Spain _ — , Agency/Client Contact Owner's Representative: Inigo Hernandez 34-650453393 M� info@ihtarquitecto.es f r 4 CITY OF MIAMI BEACH—RFQ 2018-141-ND-04/16/2018 tsaodesign.com 56 TSAO Deslgneroup Alex Betancourt, Project Experience— Palm Springs Mile- Multiple Renovations Project Name PALM SPRINGS MILE—Multiple Renovations,Architect of / Record ��"" Address 419 W 49th Street, i 0 Hialeah, FL 33012 / 1 .1111"... - 1 , Project Descriptior TSAO Design Group has worked with this client for over % 11 ten years,providing design,architecture,and consulting 11 services. The client owns multiple retail and office buildings on West 49th Street in Hialeah, Florida. 111 1 . I . TSAO Design Group has completed many projects including:construction and permit drawings for a daycare center,construction and permit drawings forar new exterior walkway canopy,construction and permit '/ � drawings for a multi-block security camera installation, / construction and permit drawings for a new parking lot 1!I m (� layout and construction and permit drawings for commercial office space renovations. --- ` TSAO has also assisted the real estate side of Philips ' / , � International by creating lease exhibits,proposed fit E, plans,construction cost budget information and " 4 I renderings of proposed improvements. TSAO also ii - A) provides landlord representation and drawing review on a — — the landlord's behalf. Services include the review of 111 over 50 tenant construction drawing sets and comment response,construction observation for landlord compliance and landlord guidance. Project scope includes pre design,schematic design,site surveys, II ill design development,construction documents, construction administration and drawing review and landlord representation. h�'�11'I Cos' Project costs vary from$5,000 to$500,000 OP' �1 Agency/Client Name Philips International Ki Agency/Client Cont1-' Diana Marrone, Philips International0111% III (305)755-3955 NN.%4114.-) 00.11 1i Years 2015-2018 1 (;; -�. lii .i 11 I' 111ui�nu1 1111 CITY OF MIAMI BEACH-RFQ2018-141-ND-04/16/2018 tsaodesign.com 57 TSAO DesignGroup TAB 5 - REQUIRED FORMS CITY OF MIAMI BEACH-RFQ 2018-141-ND-04/16/2018 tsaodesign.com 58 TSAO DesignGroup 5.1 Standard Form 330 CITY OF MIAMI BEACH-RFQ 2018441-ND-04/16/2018 tsaodesign.com 59 ARCHITECT - ENGINEER QUALIFICATIONS PART I -CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1.TITLE AND LOCATION (City and State) Professional Architectural&Engineering Services for Capital Renewal and Replacement Projects,Miami Beach,FLORIDA 2.PUBLIC NOTICE DATE 3.SOLICITATION OR PROJECT NUMBER 02-15-2018 RFQ 2018-141-ND B.ARCHITECT-ENGINEER POINT OF CONTACT 4.NAME AND TITLE JASON HAGOPIAN - PRINCIPAL 5.NAME OF FIRM TSAO DESIGN GROUP INCORPORATED 6.TELEPHONE NUMBER 7.FAX NUMBER 8.E-MAIL ADDRESS (305) 576-2006 X 15 (305) 576-2005 •JHAGOPIAN@TSAODESIGN.COM C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 111 'zm° 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT ct Q eL n TSAO DESIGN GROUP 7610 NE 4TH COURT#5, SUITE 101 ARCHITECT INCORPORATED MIAMI, FLORIDA 33138 a. ✓ ❑CHECK IF BRANCH OFFICE b. ❑CHECK IF BRANCH OFFICE C. CHECK IF BRANCH OFFICE d. ❑CHECK IF BRANCH OFFICE e. ❑CHECK IF BRANCH OFFICE f. ❑CHECK IF BRANCH OFFICE D.ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 8/2016) 60 11 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE JASON HAGOPIAN, AIA, LEED AP PRINCIPAL/PROJECT EXECUTIVE R. 27 b.VM 20 15.FIRM NAME AND LOCATION (City and State) TSAO DESIGN GROUP INCORPORATED 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BACHELOR OF ARCHITECTURE, 1991; RENSSELAER FLORIDA REGISTERED ARCHITECT, LICENSE N° AR91288 POLYTECHNIC INSTITUTE, TROY, NEW YORK CALIFORNIA REGISTERED ARCHITECT, LICENSE N° C27694 BACHELOR OF BUILDING SCIENCE, 1991; RENSSELAER GEORGIA REGISTERED ARCHITECT, LICENSE N° RA014656 POLYTECHNIC INSTITUTE, TROY, NEW YORK 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications.Orgarlizabons. Training,Awards,etc.) AMERICAN INSTITUTE OF ARCHITECTS,MIAMI CHAPTER(AIA MIAMI),PRESIDENT NATIONAL COUNCIL OF ARCHITECTURAL REGISTRATION BOARDS(NCARB), MEMBER USGBC LEED AP: AWARDS: IIDA,NEWH,AIA 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) _IGHTSPEED PROPERTY, DOLPHIN COMMERCE CENTER; MIAMI, FL 2006 N/A (3)BRIEF DESCRIPTION(Brief scope.size.cost.etc.) AND SPECIFIC ROLE TChed(if project performed with current firm a. SCOPE INCLUDED A FULL SITE CONDITION REPORT,A FULL SPACE PROGRAMMING AND FIT PLAN SCOPE OF WORK.THIS REPORT INCLUDED ASSESSMENTS IN THE FOLLOWING ARE: ENVIRONMENTAL SITE,PROPERTY CONDITION ASSESMENT,MICROBIOLOGICAL,ASBESTOS EXISTENCE,LEAD PAINT,RADON,MECHANICALIVENTILATION/AIR CONDITIONING SYTEMS, FIRE/EVACUATION SYSTEMS,ELECTRICAL SYSTEMS,PLUMBING SYSTEMS,ROOFING SYSTEMS,ALARM/SECURITY SYSTEMS,ADA COMPLIANCE OF SITE AND BUILDING SYSTEMS, STRUCTURAL SYSTEMS.TOTAL SQUARE FOOTAGE:196,000 SF.TOTAL PROFESSIONAL FEES:$72,000(APPROX.) (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED NORTH EAST TRANSFER STATION OFFICE BUILDING PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI, FLORIDA 2009-ONGOING b.(3) BRIEF DESCRIPTION (Beef scope,size.cost.etc.)AND SPECIFIC ROLE Cheek if project performed with current firm Design of a new,7,000 sf LEED Certified office building for the Public Works and Waste Management. Complete pre-design,schematic design,design development,construction documents and permit services. Project cost:$2,700,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED MIAMI DADE AVIATION DEPARTMENT-MISCELLANEOUS SERVICES PROFESSIONAL SERVICESCONSTRUCTION (if app cable) MIAMI, OPA-LOCKA, TAMIAMI, FLORIDA 2003-2007 l 2005-2007 (3) BRIEF DESCRIPTION (Brief scope,size.cost.etc.)AND SPECIFIC ROLE ViCheck if project performed with current firm c. Multiple projects at regional airports including:office interiors,change of use applications,historic building surveying and documentation,hanger conversion and ADA upgrades. Complete site surveys,pre-design,schematic design,design development,40 year recertifications,construction documents,permit services and construction administration. Project cost:varies from$50,000 to$250,000 (1)TITLE AND LOCATION (City and Stale) J (2)YEAR COMPLETED MINDSHARE OFFICE SPACE 'AROFESSIONAL SERVICES CONSTRUCTION (if applicable) MIAMI, FLORIDA 2013 2014 d (3) BRIEF DESCRIPTION (Brief scope,size,cost.etc.)AND SPECIFIC ROLE ,VChed(if project performed with current firm 4,000 ft office space located at 601 Brickell Key Drive,Miami,Florida. Complete site surveys,pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:$330,000 (1)TITLE AND LOCATION (City and State) I (2)YEAR COMPLETED CITIBANK-MULTIPLE LOCATIONS,MIAMI DADE,BROWARD,PALM BEACH COUNTIES PROFESSIONAL SERVICES CONSTRUCTION (If applicable)- NEW BRANCHES,OFFICES,TRAINING CENTERS AND MAINTENANCE 2004-ONGOING 2004-ONGOING O. (3)BRIEF DESCRIPTION (Brief scope.size.cost.etc.)AND SPECIFIC ROLE heck if project performed with current firm A long term client,work includes design of ground-up bank branches and in-line branches,as well as training centers,office space and maintenance of existing branches and branch properties. Complete site surveys,pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:varies from$10,000 to$950,000 STANDARD FORM 330(REV.8/2016)PAGE 2 61 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE JANE COKA, LEED AP PRINCIPAL/PROJECT MANAGER/ a.TOTAL b.WITH CURRENT FIRM INTERIOR DESIGNER 16 13 15.FIRM NAME AND LOCATION (City and State) TSAO DESIGN GROUP INCORPORATED 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) LICENSED INTERIOR DESIGNER:NCIDQ STATE OF FLORIDA BACHELOR OF SCIENCE-INTERIOR DESIGN,2002; FLORIDA INTERNATIONAL UNIVERSITY,MIAMI,FLORIDA BACHELOR OF ARTS-PSYCHOLOGY, 1998; FLORIDA INTERNATIONAL UNIVERSITY,MIAMI, FLORIDA 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications.Organizations,Training.Awards.etc.) NATIONAL COUNCIL FOR INTERIOR DESIGN QUALIFICATION(NCDIQ)CERTIFICATE N°021007 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED NORTH EAST TRANSFER STATION OFFICE BUILDING PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI, FLORIDA 2009-ONGOING (3)BRIEF DESCRIPTION(Brief scope.size,cost.etc.) AND SPECIFIC ROLE Check if project performed with current firm a. Design of a new,7,000 sf LEED Certified office building for the Public Works and Waste Management. Complete pre-design,schematic design,design development,construction documents and permit services. Project cost:$2,700,000 (1)TITLE AND LOCATION (City and Stale) (2)YEAR COMPLETED PUBLIC HOUSING AND COMMUNITY DEVELOPMENT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) ADULT DAY CARE-ZONING CHANGE, MIAMI, FLORIDA 2014-ONGOING N/A b.(3) BRIEF DESCRIPTION Wel scope.sue,cost.etc.)AND SPECIFIC ROLE Check if project performed with current firm Pursued approval from the City of Miami Planning and Zoning Department for a 9 person Adult Day Care Center at the project site and pursued a Rezoning Plan Amendment that will allow for a 28 person Adult Day Care. Scope included research,document collection,problem solving,preparation of all Zoning Amendment documentation,County meetings and Commission meetings and presentations. Project Fee:$35,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED CITIBANK-MULTIPLE LOCATIONS,MIAMI DADE,BROWARD,PALM BEACH COUNTIES PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) NEW BRANCHES,OFFICES,TRAINING CENTERS AND MAINTENANCE 2004-ONGOING 2004-ONGOING (3) BRIEF DESCRIPTION (Brief scope,size,cost.etc.)AND SPECIFIC ROLE Check if project performed with current firm O. A long term client,work includes design of ground-up bank branches and in-line branches,as well as training centers,office space and maintenance of existing branches and branch properties. Complete site surveys,pre-design,schematic design,design development,construction documents and permit services. Project cost:varies from$10,000 to$950,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED GILEAD PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI, FLORIDA 2014 2015 (3) BRIEF DESCRIPTION (Beef scope,size.cost etc.)AND SPECIFIC ROLE gChedc if project performed with current firm d. Commercial office interior remodel including MEP engineering,AV and IT. Complete site survey,pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:$710,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE RITZ-CARLTON SOUTH BEACH, MIAMI BEACH, FLORIDA PROFESSIONAL SERVICES CONSTRUCTION (Il applicable) 2014 2014 (3) BRIEF DESCRIPTION (Brief scope.size,cost etc.)AND SPECIFIC ROLE Check if project performed with current firm Renovation of existing 30,000 sf pool deck area,including new landscaping,planters,hardscaping,plumbing,electrical and plumbing. Complete pre-design,schematic design,design development,construction documents,construction administration and construction management. Challenges include guest occupied construction,abbreviated construction schedule,on-site construction management. Project cost:$1,000,000 STANDARD FORM 330(REV.8/2016)PAGE 2 62 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE ALEX BETANCOURT TECHNICAL DIRECTOR a.TOTAL b.WITH CURRENT FIRM 14 5 15.FIRM NAME AND LOCATION (City and State) TSAO DESIGN GROUP INCORPORATED 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BACHELOR OF ARCHITECTURE, 2003; UNIVERSITY OF MIAMI, CORAL GABLES, FLORIDA 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications.Organizations,Training.Awards.etc.) 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE RITZ-CARLTON SOUTH BEACH, MIAMI BEACH, FLORIDA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2014 (3)BRIEF DESCRIPTION(Brief scope.site,cost.etc.) AND SPECIFIC ROLE [Check if project performed with current firm a' Renovation of existing 30,000 sf pool deck area,including new landscaping,planters,hardscaping,plumbing,electrical and plumbing. Complete pre-design,schematic design,design development,construction documents,construction administration and construction management. Challenges include guest occupied construction,abbreviated construction schedule,on-site construction management. Project cost:$1,000,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED MINOTTI MIAMI , MIAMI, FLORIDA PROFESSIONAL SERVICES CONSTRUCTION (II applicable) 2014 2015 b.(3)BRIEF DESCRIPTION (Brief scope.sae,cost.etc.)AND SPECIFIC ROLE Check t project performed with current firm Renovation of existing 9,000 sf non code compliant warehouse into a high end furniture showroom. Complete pre-design,schematic design,design development,construction documents,construction administration and construction management. Challenges included improvements required per 40 Year Recertification,updating old systems to energy efficient systems. Project cost:$1,000,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE PRIDE CENTER AT EQUALITY PARK PROFESSIONAL SERVICES CONSTRUCTION (If applicable) WILTON MANNERS, FLORIDA 2014-ONGOING (3) BRIEF DESCRIPTION (Brief scope.size,cost.etc.)AND SPECIFIC ROLE Cperformed heck if project with current firm C. Development of a master plan for a 6 acre site in Wilton Manners to include:housing(180 units), arking,community space,retail,parks and waterfront usage. Complete due diligence,Visioning,budgeting,pre-design,schematic design,master planning and 3D visualization. Project cost: N/A (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PUBLIC HOUSING AND COMMUNITY DEVELOPMENT IPROFESSIONALSERVICES CONSTRUCTION pi applicable) MULTIPLE PROJECTS, MIAMI DADE COUNTY, FLORIDA 2014-ONGOING (3) BRIEF DESCRIPTION (Brief scope,size.cost etc.)AND SPECIFIC ROLE IctCheck if project performed with current firm d. Renovation of public housing projects(10 to date),ranging from multi family,single family and community centers. Renovations include site,landscaping, hardscaping,interior,ADA/UFAS upgrades,etc. Full site surveys required. Analysis of UFAS reports. Code analysis. Complete pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:$2,000,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED NORTH EAST TRANSFER STATION OFFICE BUILDING PROFESSIONAL SERVICES CONSTRUCTION (if applicable) MIAMI, FLORIDA 2014-ONGOING O. (3) BRIEF DESCRIPTION (Brief scope,size.cost etc.)AND SPECIFIC ROLE Check if project performed with current firm Design of a new,7,000 sf LEED Certified office building for the Public Works and Waste Management. Complete pre-design,schematic design,design development,construction documents and permit services. Project cost:$2,700,000 STANDARD FORM 330(REV.8/2016)PAGE 2 63 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE YAPRAK MARKESETa.TOTAL b.WITH CURRENT FIRM SENIOR DESIGNER 24 _ 5 15.FIRM NAME AND LOCATION (City and State) TSAO DESIGN GROUP INCORPORATED 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BArch, 1994, Virginia Polytechnical Institute& State University MAA, 2012, Florida International University NCIDQ Registered Interior Designer, Florida Interior Design License 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications.Organizations, Training,Awards.etc.) Associate AIA,past adjunct professor in Schools of Architecture&Interior Architecture at Florida International University, 2017 BRAGG AWARD Best Commissioned Project for Beach Club Hallandale 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) ASPCA/ASD LIBERTY CITY ANIMAL CLINIC, MIAMI, FLORIDA 2016 2018 (3)BRIEF DESCRIPTION(Brief scope.size,cost.etc.) AND SPECIFIC ROLE RrCheck if project performed with current firm a. New 6,900 square foot single floor level animal clinic constructed on a vacant property,services include full Architectural&MEP services including Construction Administration. The project includes projecting masonry design&collaboration with Art in Public Places. Project pursuing LEED Silver. Project cost:$2,400,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) AXEL HOTELS SOUTH BEACH, MIAMI BEACH, FLORIDA 2017-ONGOING 2018 b.(3) BRIEF DESCRIPTION (Brief scope.size.cost.etc.)AND SPECIFIC ROLE WCheck if project performed with current frm Services include Miami Beach Historic Preservation Board review documents,architectural&interior design concepts,construction documentation, permitting,FF&E and construction administration. Project cost:N/A (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE PRIDE CENTER AT EQUALITY PARK PROFESSIONAL SERVICES CONSTRUCTION (If applicable) WILTON MANNERS, FLORIDA 2014-ONGOING (3) BRIEF DESCRIPTION (Brief scope.size.cost.etc.)AND SPECIFIC ROLE Check if project performed with current firm C. Development of a master plan for a 6 acre site in Wilton Manners to include:housing(180 units), arking,community space,retail,parks and waterfront usage. Complete due diligence,Visioning,budgeting,pre-design,schematic design,master planning and 3D visualization. Project cost:N/A (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED PUBLIC HOUSING AND COMMUNITY DEVELOPMENT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MULTIPLE PROJECTS, MIAMI DADE COUNTY, FLORIDA 2014-ONGOING (3) BRIEF DESCRIPTION (Brief scope,size.cost,etc.)AND SPECIFIC ROLE RiCheck if project performed with current firm d. Renovation of public housing projects(10 to date),ranging from multi family,single family and community centers. Renovations include site,landscaping, hardscaping,interior,ADA/UFAS upgrades,etc. Full site surveys required. Analysis of UFAS reports. Code analysis. Complete pre-design,schematic design,design development,construction documents,permit services and construction administration. Project cost:$2,000,000 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED THE QUEEN'S FLOWERS HEADQUARTERS PROFESSIONAL SERVICES CONSTRUCTION (If applicable)` 2014-ONGOING 2018 A. (3)BRIEF DESCRIPTION (Brief scope.size.cost etc.)AND SPECIFIC ROLE 9Check if project performed with current firm Project includes full Architectural, Interior Design,Lighting,MEP,Civil&Landscape services for the renovation of 93,000 SF warehouse building. Project includes stainless steel mesh facade,new cantilever shade structures and lush landscaping with permeable pavers. Project cost: N/A STANDARD FORM 330(REV.8/2016)PAGE 2 64 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified. Complete one Section F for each project.) 1 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED NORTH EAST TRANSFER STATION OFFICE BUILDING PROFESSIONAL SERVICES CONSTRUCTION (Il applicable) PUBLIC WORKS WASTE MANAGEMENT, MIAMI - FLORIDA 2009-ONGOING 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER MIAMI DADE COUNTY BRENDA REYES (305) 514-6682 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size.and cost) This is a ground-up new 7,000 square foot LEED certified project located in Miami Florida. The project serves as an office building for the staff and workers of the Public Works and Waste Management Department. The project replaces existing non code compliant trailers that have been used on the site for years.The project is designed to allow for the site to function during construction. The project construction is phased in a way that no operation will be effected. The program includes 2,500 square feet of storage,as well as offices,showers,restrooms,locker rooms,conference rooms,reception area,assignment room,dispatch area and staff lounge. Highlights of the project include LEED Silver design including water reclamation,solar,hyper insulated walls and roofs,environmentally sensitive material usage and high efficiency plumbing and HVAC. Programming the building included multiple end-user meetings,coordination with County Departments and Public Arts. Interior design renderings and exterior 3D renderings were created to show end-users the design of the project. TSAO Design Group provided architecture and engineering services as required for the development of this project including pre-design,schematic design, design development,construction documents and permit services. Also,TSAO provided LEED AP services and LEED submission services. The cost of construction is approximately$2.4 million. r Ian , fin I5 • ; j-rigu �� t. ti '46X 1 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a TSAO DESIGN GROUP INCORPORATED MIAMI,FLORIDA ARCHITECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (I)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.8/2016)PAGE 3 65 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20 EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 2 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22.YEAR COMPLETED ASPCA/ASD LIBERTY CITY ANIMAL CLINIC PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI, FLORIDA 2015 2018 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c POINT OF CONTACT TELEPHONE NUMBER AMERICAN SOCIETY FOR THE BONNIE LOPEZ (847)651-4197 PREVENTION OF CRUELTY TO ANIMALS 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope.size.and cost) The ASPCA and Miami-Dade County are co-developers in the construction of a animal clinic for the purposes of providing animal-related services, without limitation, spay/neuter operations and primary pet care services,to the underserved area of Liberty City. Animal Client (no boarding) will be the primary use,with accessory uses including retail and office. TSAO Design Group has done extensive site research to understand the site conditions, the history of the neighborhood and to extract vernacular design elements from this diverse but underserved neighborhood. In direct contrast of the faded and bland public housing units across the street, ASPCA building facade includes rain screen walls with extruded brick patterns. The forecourt entry welcomes pet owners and becomes a community space. The proposed building is an approximately 6,900 square foot single floor level building to be constructed on the vacant property. The project proudly will be pursuing LEED Silver and will incorporate Art in Public Places art work into its architecture. T ya 4 t .M2! II Aillet4OP. +w: +3t ► mac ' a, t ANOW r• < i t II j it. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE TSAO DESIGN GROUP MIAMI, FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.8/2016) PAGE 3 66 F. EXAMPLE PROJECTS WHICH REST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 3 Complete one Section F for each project.) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED PUBLIC HOUSING AND COMMUNITY DEVELOPEMENT-UFAS UPGRADES PROFESSIONAL SERVICES CONSTRUCTION (B applicable) MIAMI DADE COUNTY,FLORIDA, MULTIPLE CITIES 2014-ONGOING 2015 ONGOING 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME C.POINT OF CONTACT TELEPHONE NUMBER PUBLIC HOUSING&COMMUNfTY FRANCISCO TRUJILLO (786)469-4125 DEVELOPMENT 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size.and cost) Renovation of public housing projects(10 to date),in various cities,including Miami,Opa-Locka,Perrine,Homestead and Florida City. The project range from multi family,single family and community centers. Renovations include site,landscaping,hardscaping,interior,ADA/Uniform Federal Accessibility Standards(UFAS)upgrades,interior design,architecture and engineering,etc. Full site surveys required. Analysis of UFAS reports. Code analysis. Project scope included complete pre-design,schematic design,design development,construction documents,permit services and construction administration.Improvements include entirely new interiors,structural upgrades,finish specification,site lighting,parking improvements,ramps and stairs,and life safety. All work was reviewed and approved by a third party for Code compliance,attention to detail was paramount. All work was inspected and verified then by the Federal Govemment. Project cost:$300,000-$2,000,000 111 .7.1* " r { 1. lc. ' i 4 . —. a =-14r 11 -111111, 1... ti„-- 14‘.41 _ • 1°il 11%- I ,_ I If r � :. - ,W,rwu' r talo ' .• +` 1r L.“11111- 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI,FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. '(1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330 (REV.312013)PAGE 3 67 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 4 Complete one Section F for each project.) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED HELEN SAWYER ADULT CARE CENTER,ZONING CHANGE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI, FLORIDA 2014-ONGOING 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER PUBLIC HOUSING AND COMMUNITY DEVELOPMENT FRANCISCO TRUJILLO (786)469-4125 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size.and cost) Pubic Housing and Community Development wants to provide an Adult Day Care Center in the ground floor of it's Helen Sawyer property located in Miami Florida. Current zoning only allows for a 9 person Adult Day Care Center. TSAO's scope of work included researching the process for changing the zoning to allow for a 28 person Center,proceeding with the process to make that change and then to design and provide architecture and engineering services for the development of the Center. Services provided included:multiple coordination and fact gathering meetings with the City of Miami Planning and Zoning Departments,the creation of a Zoning Change Application and attendance and presentations at City Commission meetings. TSAO prepared a very complicated package including mailing lists,notifying neighbors,maps,surveys,signatures and applications. The Commission voted favorably for this zoning change. Attention to detail and an understanding of civic processes were key to the success of this project. Service cost:$40,000 MIAMI 21 ZONING MAP(EXISTING) MIAMI 21 ZONING MAP(PROPOSED) I 7 I_Ii I I I : f1 -n' - II(( yy''—.r—rr g, r NY 12TMST o 111 or Hsi �___l_JI _L._, I a ` Y - I to troisi WY`JTNSi --- $ } r I 6 MI r r� T6-8-0 - iN tN 7 )' :I -8-0IL76.8-0 Kw 11W' TS"O . SJas n / j9 �� r75-11 rTQ Tba� j 1 i 715/ 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI, FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.8/2016)PAGE 3 68 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAMS 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 5 Complete one Section F for each project.) 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED MIAMI DADE AVIATION DEPARTMENT-MISCELLANEOUS SERVICES PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI,OPA-LOCKA,TAMIAMI, FLORIDA 2003-2007 2005-2007 23. PROJECT OWNER'S INFORMATION a PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER MIAMI-DADE AVIATION DEPARTMENT ELIZABETH OGDEN,RA,LEED AP (305)801-0940 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size and cost) Multiple projects at regional airports including:office interiors,change of use applications,historic building surveying and documentation,hanger conversion and ADA upgrades. Project scope included complete site surveys,pre-design services,schematic design,design development,40 year re-certifications,construction documents, permit services and construction administration. Specific projects include: Historic documentation,survey and archival drawing creation for buildings being demolished at Opa-Locka Airport,the creation of a painting work-room at Miami International Airport,the upgrade and remodel of a hanger and office space at Opa-Locka Airport,the upgrade and renovation of office space at Miami International Airport,the upgrade and renovation of a hanger and office space at Tamiami Airport. Project cost:varies from$50,000 to$250,000 moot G 1 . :- -r1:':. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI,FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330 (REV. 8/2016) PAGE 3 69 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects, if not specified. 6 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22.YEAR COMPLETED PALM SPRINGS MILE-RENOVATIONS AND ARCHITECT OF RECORD,MULTIPLE PROJECTS PROFESSIONAL SERVICES CONSTRUCTION (It applicable) HIALEAH, FLORIDA 2006-ONGOING 2006-ONGOING 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER PHILIPS INTERNATIONAL DIANA MARRONE (305)755-3955 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size.and cost) TSAO Design Group has worked with this client for over ten years,providing design,architecture,and consulting services. This client owns multiple retail and office buildings on West 49th Street in Hialeah,Florida.TSAO Design Group has completed many projects including: construction and permit drawings for a daycare center,construction and permit drawings for a new exterior walkway canopy,construction and permit drawings for a multi-block security camera installation,construction and permit drawings for a new parking lot layout and construction and permit drawings for commercial office space renovations. TSAO has also assisted the real estate side of Philips International by creating lease exhibits,proposed fit plans,construction cost budget information and renderings of proposed improvements. TSAO also provides landlord representation and drawing review on the landlord's behalf. Services include the review of over 50 tenant construction drawing sets and comment response,construction observation for landlord compliance and landlord guidance. Services include pre design,schematic design,site surveys,design development,construction documents,construction administration and drawing review and landlord representation. Project costs vary from$5,000 to$500,000 0 Oil —I �I1 N. I.11(2_ 16 ;_-1 ,,,.I °I 111 a' ____ C----.1 1 41 -----'!--- ' ' '' : "T :"Ifirev,I.1 III . '�il�M�i�� I 1111 , u , „.... ________________________ , ,___ ..... ,,_ ,_, _ _ 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI INCORPORATED' MIAMI,FLORIDA ARCHITECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV 3/2013)PAGE 3 70 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20 EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 7 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22.YEAR COMPLETED ROYAL PALM SOUTH BEACH MIAMI A TRIBUTE PORTFOLIO RESORT PROFESSIONAL SERVICES CONSTRUCTION (if applicable) MIAMI BEACH, FLORIDA 2013 2016 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME C.POINT OF CONTACT TELEPHONE NUMBER CHESAPEAKE LODGING TRUST RICK ADAMS, PRESIDENT (410)972-4143 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size.and cost) The Royal Palm Beach property is part of Starwood's Tribute Portfolio. The Royal Palm South Beach renovation objective was to raise the Royal Palm from a 3-star property to 4-star hotel resort. The design created visually cohesive and inviting public spaces within the historic 1939 building and within historic preservation guidelines. The design team developed multiple areas throughout the hotel, including: entry lobby, lobby bar, reception, concierge, library lounge, pool bar, pool lounge and deck. The historic art deco hotel's lobby, terrazzo floors and original bar are restored to its original grandeur. The reception area is reconfigured so that the concierge desk is located directly across from the check-in location. The existing reception seating, lobby coffee bar and lounge area are expanded and the furnishing is refreshed. The outdoor bar and dining areas were expanded and re-situated for improved views of the pool. The expanded area now includes a lounge space with colorful finishes, paneling and multi-textural furnishings. The new metal awnings with orange canvas shade elements surround the new bar and dining areas, providing protection from the elements. ' ^ � . - ,. � .• •4 r •• 4.••r .,..:.,,,, .. j . , • / .4 r `�gilP 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e• TSAO DESIGN GROUP MIAMI, FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.3/2013)PAGE 3 71 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 8 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22,YEAR COMPLETED THE PRIDE CENTER AT EQUALITY PARK PROFESSIONAL SERVICES CONSTRUCTION (If applicable) WILTON MANNERS,FLORIDA 2014-ONGOING 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNESBIANCOMMUNITY CENTER OF b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER THE GREATER FORT LAUDERDALE INC. ROBERT BOO (954)463-9005 X 103 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) The Pride Center hired TSAO Design Group(TSAO)to assist them with the Master Planning of their 6 acre site in Wilton Manners Florida. The first two project phases included a Visioning Charrette and a massing study. Development of a master plan for a 6 acre site in Wilton Manners to include:housing(180 units),parking,community space,retail,parks and waterfront usage. Complete due diligence,Visioning,budgeting,pre-design,schematic design,master planning and 3D visualization. Project cost:N/A TSAO Design Group conducted a Visioning Charrette with The Pride Center stakeholders with the intent of cultivating ideas and focusing a vision for what The Pride Center can be in the future.Pride Centers across the globe include such programming as senior housing,assisted living facilities, theaters,health clubs,event space,outdoor activity space,classrooms,technology centers,libraries,art galleries,restaurants,catering facilities,health clinics,office space,etc.The charrette is an intensive planning session where stakeholders collaborate on a vision for the project.It provides a forum for ideas and offers the unique advantage of giving immediate feedback to the designer and stakeholders.More importantly,it allows everyone who participates to be a mutual author of the plan. After the deliverable from the Visioning Charrette,TSAO created color,three dimensional massing studies showing the proposed program on the site. Renderings included exterior public spaces,landscaping,hardscaping, buildings,and shadows. .PRIDFCFNTFR teswb I , i R ` e.ssyy�p TIMOR0011 1 1 \ MIST FLOOR 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI,FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV.3x2013)PAGE 3 72 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20 EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 9 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22.YEAR COMPLETED RITZ-CARLTON SOUTH BEACH,POOL DECK RENOVATION PROFESSIONAL SERVICES CONSTRUCTION (If applicable) MIAMI BEACH,FLORIDA 2014 2014 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER FLAG LUXURY/LIONSTONE KEVIN KELLY (650)712-7000 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size,and cost) The Ritz Carlton South Beach scope included renovation of the existing 30,000 sf pool deck area,including new landscaping,planters,hard-scaping, plumbing,electrical and plumbing. Project scope included complete pre-design,schematic design,design development,construction documents,and construction administration.Challenges involved guest occupied construction,abbreviated construction schedule,on-site construction management. TSAO Design Group also provided full design,phasing and construction management services for this project. The entire renovation occurred on an expedided eight week period while the pool deck was being used by guests.This project highlights TSAO's ability to work creatively and under pressure. All of the pool deck drainage pipes were replaced,non waterproofed pool deck areas that were excavated and re waterproofed,non functioning site irrigation pipes were replaced,including non code compliant lighting. Design highlights include two 40 foot high green walls,new landscaping,Ipe wood cladding,decking,new turtle safe lighting,new furniture,and new tile work. Project cost:$1,000,000 ' \ , 0 : sa. 1 --'- ..ay._ ► -a,:;,, iii f „........ii, -. - ,-_to .0 ' . I !I . �` R ... ,a:..,. 5� ,Jlr-IL 1 w m [E �i r p 1 IN t f i -. \' 'i i 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI INCORPORATED MIAMI,FLORIDA ARCHITECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV 3/2013)PAGE 3 73 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 10 Complete one Section F for each project.) 21 TITLE AND LOCATION (City and State) 22.YEAR COMPLETED ONBOARD MEDIA OFFICES PROFESSIONAL SERVICES CONSTRUCTION (If applicable) DORAL, FLORIDA 2015-2017 2017 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME C.POINT OF CONTACT TELEPHONE NUMBER ONBOARD MEDIA CRISTY VIERA (305)673-0315 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope.size.and cost) The client is an integrated media company specializing in the global travel and cruise ship industry. The client has vacated its Miami Beach offices near the Lincoln Road mall to move adjacent to their sister company. The design concept was conceived from the notion of bringing the vibrant Lincoln Road promenade to the suburban development of Doral. This office is a 10,000 SF interior fit-out in class A office building in Doral Florida. The newly renovated suite on the 5th floor is connected to the larger sister company suite via internal double doors. The new office does differ greatly from the more formal sister company suite. The office plan is an open-office layout with low panel work stations along windows with enclosed offices toward the building core. The space plan is an open-office arrangement except for few glass-partitioned offices and a conference room off the employee lounge. This conference room houses an unconventional reclaimed steel sewing machine conference table with wood top. The reception area takes cues from the ocean liner interiors of 1930's. The floating slatted wood ceiling is inspired by ship hull construction. All existing ceiling plenum equipment and mechanical systems are exposed; the existing concrete floor is polished for economy of means. The office communal living room, in combination with the reception area, create a center social hub. Suspended swing pod chairs and the long banquettes with tropical fabrics by the perimeter windows add an air of unconventionality and provide work place setting options to this office of creatives. BOW.d STERN CONSTRUCTION aC 3 a a I Y r% e°,11 � 4., 11 r. 'I iw ' - z 1 • 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE a. TSAO DESIGN GROUP MIAMI,FLORIDA ARCHITECT MIAMI INCORPORATED (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE f. STANDARD FORM 330(REV 3/2013)PAGE 3 74 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY 27 ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill in "Example Projects Key"section below before completing table. (From Section E, Block 12) (From Section E. Block 13) Place "X"under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Jason Hagopian, AIA, LEED AP Principal X X X X X X X X X X Janie Coka IIDA, LEED AP Principal/Project Manager X X X X X X Alex Betancourt Technical Director X X X X X X X Yaprak Markeset Senior Designer X X X X X X X 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT(From Section F) NUMBER TITLE OF EXAMPLE PROJECT(From Section F) 1 Public Works Waste Management 6 Palm Spring-Mile Multiple Improvement Projects, Hialeah, Northeast Transfer Station Office, Miami, Florida Florida 2 ASPCA/ASD Liberty City Animal Clinic, Miami, Florida 7 Royal Palm Hotel, Miami Beach, Florida 3 Public Housing UFAS Upgrades, Miami, Florida 8 The Pride Center at Equality Park,Wilton Manners, Florida 4 Helen Sawyer Adult Care Center, Miami, Florida g Ritz-Carlton Pool Deck&Grounds Renovation, Miami Beach, Florida 5 Miami-Dade Aviation Department Misc. Services, Miami, 10 Onboard Media Offices Opa-Loca,Tamiami, Florida STANDARD FORM 330(REV. 8/2016)PAGE 4 75 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE 04.30.18 33. NAME AND TITLE Jasbn-Hag6plan,AIA, LEED AP, Principal STANDARD FORM 330(REV.8/2016)PAGE 5 76 -1.1111111, 1 1.SOLICITATION NUMBER (If any) ARCHITECT-ENGINEER QUALIFICATIONS LOI NO. 18-A-002 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a.FIRM(OR BRANCH OFFICE)NAME 3.YEAR ESTABLISHED 4.DUNS NUMBER TSAO DESIGN GROUP INCORPORATED 2002 10-281-6837 2b.STREET 5.OWNERSHIP 7610 NE 4TH COURT#5 SUITE 101 a.TYPE 2c.CITY 2d.STATE 2c.ZIP CODE CORPORATION MIAMI FL 33138 b.SMALL BUSINESS STATUS 6a.POINT OF CONTACT NAME AND TITLE MINORITY OWNED JASON HAGOPIAN, AIA, LEED AP-PRINCIPAL 7.NAME OF FIRM (If block 2a is a branch office) 66.TELEPHONE NUMBER 6c E-MAIL ADDRESS TSAO DESIGN GROUP (305)576.2006 X 15 JHAGOPIAN@TSAODESIGN.COM INCORPORATED 8a.FORMER FIRM NAME(S) Of any) 8b.YR.ESTABLISHED 8c.DUNS NUMBER TGA ARCHITECTS, INC 1984 102816837 9.EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function c.No.of Employees a.Profile c.Revenue Index Code b.Discipline b.Experience Number (1)FIRM (2)BRANCH Code (see below) 02 ADMINISTRATIVE 2 1 A06 AIRPORTS, TERMINALS 2 06 ARCHITECT 4 3 C05 CHILD CARE/DEVELOPMENT 1 08 CADD TECHNICIAN 6 2 C08 CODES, STANDARDS, ORDIN. 3 37 INTERIOR DESIGNER 3 2 C10 _CODES, SHOPPING CNT 4 48 PROJECT MANAGER 4 2 C15 CONSTRUCTION MGMT 2 E02 EDUCATION, CLASSROOMS 1 H08 HISTORICAL PRESERVATION 3 H10 HOTELS MOTELS 3 105 INTERIOR DESIGN 4 I L05 LIGHTING INTERIOR I 2 L06 LIGHTING EXTERIOR 2 001 OFFICE BUILDINGS 2 S11 SUSTAINABLE DESIGN 3 Z01 ZONING LAND USE STUDIES 2 Other Employees Total 19 10 11.ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR LAST 3 YEARS 1. Less than$100,000 6 $2 million to less than$5 million (Insert revenue index number shown at right) 2. $100,00 to less than$250,000 7. $5 million to less than$10 million a. Federal Work 0 3. $250,000 to less than$500,000 8. $10 million to less than$25 million b Non-Federal Work 5 4. $500,000 to less than$1 million 9. $25 million to less than$50 million c.Total Work 5 5. $1 million to less than$2 million 10. $50 million or greater 12.AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a.SIG RE b.DATE 05.03.18 c.NAME AND TITLE JASON HAGOPIAN,AIA, LEED AP-PRINCIPAL AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV.8/2016)PAGE 6 77