Loading...
Resolution 2019-30705 RESOLUTION NO. 2019-30705 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE RECOMMENDATION OF THE FINANCE AND CITYWIDE PROJECTS COMMITTEE ("FCWPC") AT ITS JANUARY 25, 2019 MEETING, TO PROCEED WITH THE REPAVING OF SPECIFIED STREETS IN THE CENTRAL BAYSHORE SOUTH NEIGHBORHOOD, BETWEEN 28TH STREET AND 34TH STREET; FURTHER, BASED ON THE ADMINISTRATION'S UPDATED COST ESTIMATES FOR THE STREET REPAVING WORK, MODIFYING THE FCWPC'S RECOMMENDATION WITH RESPECT TO THE RE-ALLOCATION OF $150,000 FOR THE COMPLETION OF SUCH WORK, AND APPROVING THE RE-ALLOCATION OF $191,300 FOR THE STREET REPAVING WORK, PLUS A TEN PERCENT (10%) OWNER'S CONTINGENCY IN THE AMOUNT OF $19,130, FOR TOTAL BUDGET AUTHORITY OF$210,600 FOR THE STREET REPAVING WORK,WITH PREVIOUSLY APPROPRIATED FUNDING FROM THE PAVEMENT & SIDEWALK PROGRAM PROJECT. WHEREAS, on October 17, 2018, the Mayor and City Commission discussed the condition of City streets in the Central Bayshore South project area, generally bounded by W. 28th Street to the south, Prairie Avenue to the west, Sheridan Avenue to the east and W. 34th Street to the north, as well as North Meridian Avenue between W. 28th Street and Dade Boulevard; and authorized the Administration to temporarily resurface Prairie Avenue, from 28th through 34th Streets, in the not-to-exceed amount of$100,000, with previously appropriated funding; and WHEREAS, the Prairie Avenue repaving work between W. 28th Street and 34th Street was subsequently completed under the direction of the City's Office of Capital Improvements Projects; and WHEREAS, at the October 17, 2018 meeting, the Mayor and City Commission referred an item to the Finance and Citywide Projects Committee (FCWPC), to develop a list of any other streets in the Central Bayshore area that are in dire need of repairs; and WHEREAS, as a result of a pavement assessment survey of the Central Bayshore area, the following streets were determined to be in need of remedial action: • 28th Street, from Sheridan to Prairie Avenue: Critical need for remediation, due to length and degree of deterioration and volume of traffic; • Sheridan Ave, from 28th Street to 30th Street: Critical need for remediation, due to residential complaints and volume of traffic • Royal Palm Avenue, from 29th Street to 34th Street • 29th Street, from Royal Palm Avenue to Prairie Avenue • 31st Street, from Sheridan Avenue to Prairie Avenue (collectively, the "Street Repaving Work"); and WHEREAS, at its January 25, 2019 meeting, the FCWPC approved proceeding with the foregoing Street Repaving Work, in the estimated not-to-exceed amount of$150,000; and WHEREAS, notwithstanding that the FCWPC recommended$150,000 be allocated for the completion of the Street Repaving Work, since January 25, 2019, the Administration has updated its cost estimates, based on current City contract pricing, and currently believes that the Street Repaving Work will cost $191,300; and WHEREAS, ;based on the updated cost estimates for the Street Repaving Work, the Administration recommends that the City Commission re-allocate funds in the amount of$191,300, plus a ten percent (10%) Owner's Contingency in the amount of $19,300, for a total budget authority of$210,600 for the Street Repaving Work, with previously appropriated funding from the Pavement & Sidewalk Program Project referenced in the Commission Memorandum accompanying this Resolution. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission hereby accept the recommendation of the FCWPC at its January 25, 2019 meeting, to proceed with the repaving of specified streets in the Central Bayshore South neighborhood, between 28th Street and 34th Street; further, based on the Administration's updated cost estimates for the Street Repaving Work, modifying the FCWPC's recommendation with respect to the re-allocation of $150,000 for completion of such work, and approving the re-allocation of$191,300 for the Street Repaving Work, plus a ten percent (10%) Owner's Contingency in the amount of $19,130, for a total budget authority of $210,600 for the Street Repaving Work, with previously appropriated funding from the Pavement & Sidewalk Program Project. PASSED and ADOPTED this 13th day of February, 2019. ATTEST: Dan Gelber, Mayor Rafael . Granado, Ci Cler L) moo " }: APPROVED AS TO = `�• 1` FORM& ► UAGE IkORP ORATED: f TION •4' • �/ �?ris_ .2''Attorney ateb Agenda Item -_C7 L Date .2-/3-/9' m MIAMI BEACH City of Miami Beach, 1700 Convention Center Drive,Miami Beach, Florida 33139,www.miamibeachfl.gov COMMISSION MEMORANDUM TO: Mayor Dan Gelber and Member of the C' ommission FROM: Jimmy Morales, City Manager DATE: February 13, 2019 SUBJECT: A RESOLUTION OF THE MA OR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, A CEPTING THE RECOMMENDATION OF THE FINANCE AND CITYWIDE PROJECTS COMMITTEE ("FCWPC") AT ITS JANUARY 25, 2019 MEETING, TO PROCEED WITH THE REPAVING OF SPECIFIED STREETS IN THE CENTRAL BAYSHORE SOUTH NEIGHBORHOOD, BETWEEN 28TH STREET AND 34TH STREET; FURTHER, BASED ON THE ADMINISTRATION'S UPDATED COST ESTIMATES FOR THE STREET REPAVING WORK, MODIFYING THE FCWPC'S RECOMMENDATION WITH RESPECT TO THE RE-ALLOCATION OF$150,000 FOR THE COMPLETION OF SUCH WORK,AND APPROVING THE RE-ALLOCATION OF$191,300 FOR THE STREET REPAVING WORK, PLUS A TEN PERCENT (10%) OWNER'S CONTINGENCY IN THE AMOUNT OF $19,130, FOR TOTAL BUDGET AUTHORITY OF $210,600 FOR THE STREET REPAVING WORK, WITH PREVIOUSLY APPROPRIATED FUNDING FROM THE PAVEMENT&SIDEWALK PROGRAM PROJECT. BACKGROUND On October 17, 2018,the Mayor and City Commission discussed the condition of City streets in the Central Bayshore South project area, generally bounded by W. 28th Street to the south, Prairie Avenue to the west, Sheridan Avenue to the east and W. 34th Street to the north, as well as North Meridian Avenue between W. 28th Street and Dade Boulevard; and authorized the Administration to temporarily resurface Prairie Avenue, from 28th through 34th Streets, in the not-to-exceed amount of$100,000, with previously appropriated funding. The Prairie Avenue repaving work between W. 28th Street and 34th Street was subsequently completed under the direction of the City's Office of Capital Improvements Projects; and At the October 17, 2018 meeting, the Mayor and City Commission referred an item to the Finance and Citywide Projects Committee(FCWPC),to develop a list of any other streets in the Central Bayshore area that are in dire need of repairs; and As a result of a pavement assessment survey of the Central Bayshore area, the following streets were determined to be in need of remedial action: • 28th Street,;from Sheridan to Prairie Avenue: Critical need for remediation, due to length and degree of deterioration and volume of traffic; i City Commission Memorandum—Street Repair February 13,2019 Page2of2 . • Sheridan Ave, from 28th Street to 30th Street: Critical need for remediation, due to residential complaints and volume of traffic • Royal Palm Avenue, from 29th Street to 34th Street • 29th Street, from Royal Palm AvenUe to Prairie Avenue • 31st Street, from Sheridan Avenue to Prairie Avenue At its January 25, 2019 meeting, the FCWPC approved proceeding with the foregoing Street Repaving Work, in the estimated not-to-exceed amount of$150,000; and Notwithstanding that the FCWPC recommended$150,000 be allocated for the completion of the Street Repaving Work, since January 25, 2019, the Administration has updated its cost estimates, based on current City contract pricing, and currently believes that the Street Repaving Work will cost $191,300; and Based on the updated cost estimates for the Street Repaving Work, the Administration recommends that the City Commission re-allocate funds in the amount of$191,300, plus a ten percent (10%) Owner's Contingency in the amount of$19,300, for a total budget authority of $210,600 for the Street Repaving Work, with previously appropriated funding from the Pavement & Sidewalk Program Project referenced in the Commission Memorandum accompanying this Resolution. CONCLUSION The Admin.:- - •n recommends approving the Resolution. 4 ii JLM/ETC/ T:\AGENDA\2019\01 January\Public Works\street repair MEMO.doc