Loading...
Flamingo Park Project BreakdownFLAMINGO PARK PROJECT BREAKDOWN • Historic Lodge Renovation (complete building renovation), Butterfly Garden (sidewalk, landscaping, irrigation, lighting), water feature and center plaza renovation: $2,087,096 • Softball Field Renovation (artificial turf, drainage, dugouts, new sports lighting including poles): $3,398,398 • Baseball Field Renovation (new fencing w/wind screen; new backstop netting on existing poles; new pre-engineered storage shed with roll-up door, demolish existing building, new concrete pad footings and electrical; new LED sport lights to replace existing including remote controlling, existing poles to remain; upgrade all drinking fountains; address water intrusion in existing electrical room, assumes roof replacement; grading and paving/repairing access paths parallel to bullpens; new drainage system; new artificial turf and drainage; removal of existing asphalt around stadium seating area and add new landscaping; patch stucco and repaint; renovate ticket booth at entrance with paint, new roll-up door and counters; upgrade dugouts with new pre- engineered units; and install new padding to poles inside and behind home plate): $4,714,506 TOTAL: $10,200,000 • The GOB project also includes an item to incorporate resilient strategies. Strategies could include solar panels for pedestrian lighting, and the use of storm water storage systems, such as CUPOLEX, under the softball and baseball fields: $4,950,000 Total GOB amount for the Master plan and resiliency items is: $15,150,000