Loading...
HomeMy WebLinkAbout2003-25261 Reso RESOLUTION NO. 2003-25261 A RESOLUTION OF THE MAYOR AND CITY COMMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, DIRECTING THE ADMINISTRATION TO FULFILL THE CITY'S REQUIREMENTS, INCLUDING COMPLIANCE WITH THE HISTORIC PRESERVATION BOARD PROCEDURES, FOR THE DEMOLITION OF THE EXISTING FIRE STATION NO.4 STRUCTURE. WHEREAS, on March 20, 2002, the Fire Station No.4 site was designated as a historic structure by the Mayor and City Commission; and WHEREAS, consequently, the proposed improvements to Fire Station No. 4 were to be conducted in two (2) distinct phases: Phase 1 consisting generally of the relocation of the existing structure to a southwesterly position on the site; and Phase 2 consisting of the design and construction of a new state-of-the-art, three (3) bay apparatus Fire Station; and WHEREAS, due to site constraints, the new Fire Station would be built in the same location as the historic structure scheduled to be relocated; and WHEREAS, as a result, the relocation ofthe existing structure needed to be completed before construction of the new Fire Station could start; and WHEREAS, construction documents for Phase 1 are complete, and the cost for the relocation of the historic structure is estimated at $929,629; this amount represents approximately $424,573 over the Phase 1 current budget for construction; and WHEREAS, construction documents for Phase 2 are approximately 75% complete, and the probable construction cost estimated for Phase 2 by MCHarry and Associates, Inc., the City's consultant, is $1 ,746,277; this amount represents a current deficit of $311, 187 for Phase 2; and WHEREAS, the estimated shortfall for both phases combined is at between $736,187 and $761,187; and WHEREAS, fixtures, furniture, and equipment (FF&E)forthe Project are projected to cost approximately $200,000, and this item is unfunded; raising the overall Project shortfall to up to $961,187; and WHEREAS, on July 2, 2003, the Mayor and City Commission discussed at length the status of the Project, and subsequently unanimously passed a motion expressing consensus reached forthe demolition of the existing Fire Station NO.4 structure. NOW, THEREFORE BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, that the Mayor and City Commission direct the Administration to fulfill the City's requirements, including compliance with the Historic Preservation Board procedures, for the demolition of the existing Fire Station No.4 structure. PASSED AND ADOPTED this 2nd day of July ,2003. ~'e-~ ~ r CITY CLERK F:\CAPI\$aIllMAGMIC\GOBONDlFIRE SATION 4 DEMOLITION RESO.doc APPROVED AS 10 FORM & LANGUAGE & FOR EXECUTION 4!1tJiflb 2-;J-)-~ C. me~ Date 2 CITY OF MIAMI BEACH CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139 www.miamibeachfl.gov COMMISSION MEMORANDUM From: Mayor David Dermer and Members of the City Commission Jorge M. Gonzalez 4 City Manager~~ Date: July 2, 2003 To: Subject: DISCUSSION REGARDING THE STA REPORT OF THE GENERAL OBLIGATION BOND FUNDED PROJECT FOR THE REHABILITATION OF FIRE STATION NO.4. Previous Status Reports discussed the steps taken by the Administration to obtain construction permit approval from the City and County regulatory agencies in order to relocate the historic Fire Station No. 4 building to a southwesterly position on the site (Phase I), as well as the developments of the design effort for the new Fire Station building (Phase II). While plans and construction efforts have advanced as anticipated, new information has been developed that warrants a full City Commission review and discussion. Phase I Update The Job Order Contract (JOC) contractor to whom construction documents were submitted sent its initial cost proposal on June 18, 2003 (Attachment 1) for relocation of the existing historic Fire Station NO.4. The contractor proposes to furnish most of the necessary workmanship, equipment and engineering services for the relocation of the building for the amount of $664,943.05. This estimate is much higher than the previous projection. In addition to the costs of relocating the building, as noted below, some level of additional work will be necessary to structurally shore the building once it is moved. Unfortunately, the level of work needed cannot be known until the building is fully relocated because this work, in part, will be needed in order to address existing deficiencies as well as any that occur incidental to the relocation effort. The complete scope will be identified through a series of destructive tests, evaluation by the engineer, permitting by the Building Official, and then work by the contractor. MC Harry and Associates has previously estimated the amount of this effort to be $125,000, Additionally, the current cost proposal may be modified when all comments from the permitting agencies are complete and a new set of revised documents including those comments are resubmitted to the contractor. There are also additional costs that are not factored into the number above that must also be considered as the City is likely to incur a substantial portion, if not all, of them. All costs are outlined in the table below. Agenda Item Date fife 7-;J-tJ3 City Commission Memorandum July 2, 2003 Fire Station #4 Status Report Page 2 of 5 1. Building Relocation Costs $ 2. Proposed 2% contingency for additional changes required by $ permitting agencies changes or comments 3. Anticipated Structural Repairs (estimate, to be confirmed after $ exploratory tests are performed after building relocation) 4. Special Inspector required by Building Department $ 5. 10% Construction Contingency $ 6. 4% Professional Fees for The Gordian Group (JOC consulting firm) $ Total Estimated Costs for Relocations $ 664,943 13,299 125,000 9,828 80,324 35,775 929,169 Since Phase 1 costs were previously estimated to be $504,596, this presents an additional shortfall in the range of $425,000 to $450,000. The difference between the original cost estimate by the Architect and the actual cost of the Contractor are primarily due to the refinement and development of information and plans at this point in the process. The added items comprise generally the construction of a temporary road that would allow the heavy duty moving equipment (with the building) to transit safely from the building's current location to the specified southwesterly position on the site. In addition, the water table level in the immediate vicinity of the building would require the contractor to provide a stabilizing soil base in order to provide a solid maneuvering platform support for the cranes and jacks used to lift the building. These two elements were not anticipated in the original cost estimate. As indicated in previous Project Status Reports, the renovation of the building's interior is not funded. As a result, it is not included in the current scope of the Project. The current scope of the Project only relocates the building and provides structural improvements to stabilize it. The building will not be habitable until further renovations, outside this project, are completed. The following analysis is an illustration of the process that will be followed in the event the City Commission, on July 2, 2003, issues a directive to the Administration to either pursue additional funding sources to cover the projected deficit or the demolition of the existing building: A. Scenario 1: Additional fundinQ is authorized for the Proiect (see Table 1). On July 2,2003, if additional funding is authorized by the Mayor and City Commission to cover the projected deficit for the Project, those funds would need to be appropriated by the City Commission during the meeting of July 30, 2003. Consequently, the Phase 1 timeline for construction would be modified as follows: . July 30,2003: Presentation of a Resolution to the Mayor and City Commission for the appropriation of the additional funds. City Commission Memorandum July 2, 2003 Fire Station #4 Status Report Page 3 of 5 . August 2003: Issuance of a Notice to Proceed to the contractor to commence with the Work. . December 2003: Anticipated Substantial Completion . January 2004: Anticipated Project close-out B. Scenario 2: Additional fundinq is not available for the Proiect. In the event no additional funding is identified for the Project, the Administration, for illustration, is offering the following options: Option 1 (see Table 2): On July 2, 2003, the Mayor and City Commission may direct the Administration to put the Project on hold until additional funding sources are identified and further appropriation is made to cover the projected deficit. If Phase 1 was put on hold, the timeline for Phase 2, consisting of the construction of the new Fire Station would also be directly affected since the new building is planned to be constructed in the same location as the historic building. Option 2 (see Tables 3 and 4): If, on July 2, 2003, the Mayor and City Commission directs the Administration to pursue the demolition of the existing building, then the project would need to be presented to the Historic Preservation Board for a recommendation in the HPB meeting of September 9,2003: a) The HP Board may revise their initial order to relocate the building and may concur with the City Commission's decision to demolish the existing Fire Station. In that event, the impact on the project timeline would be minimal since both phases of the project would merge and the demolition of the historic Station would be bid as an integral part of the whole package. The cost for demolition of the entire historic structure is estimated to be $100,000. b) On September 9,2003, the HP Board's vote may be contrary to the City Commission's decision to demolish the building. In that event, the Project would be brought back to the City Commission on September 10, 2003 or October 15, 2003 for a final decision on the fate of the building. The cost for demolition of the entire historic structure is estimated to be $100,000. If the City Commission decides to override the HP Board's decision, the remaining project, including demolition, could be issued for bids in Fall 2003, and a Notice to Proceed could be issued in early 2004. Phase II Update Concurrent with the Phase I developments noted above, and as indicated in the Project Status Report of June 11,2003,75% construction documents were submitted for the City's review by MC Harry and Associates. This review is ongoing. City Commission Memorandum July 2, 2003 Fire Station #4 Status Report Page 4 of 5 During the months of May and June 2003, a series of meetings with Fire Department personnel were held to review the construction documents for the new building as well as telecommunications and Furniture, Fixtures and Equipment (FF&E) issues. The latest of such meetings was held on June 23, 2003, with Fire Department Senior Staff who expressed legitimate operational concerns regarding the current design limitations caused by the Project's budgetary constraints and the space constraints of the site. The areas of immediate concern are the Kitchen and Dormitory areas. In order to address the Fire Department's issues, CIP Staff will revisit specific design issues with MC Harry and Associates, the City's consultant. It must be noted that possible solutions may include extending the current building footprint to the South and to the West. Additional services fees for the consultant to do these changes are anticipated. The addition of more usable space to the Project would also augment the current deficit. If funding were made available to implement any changes in the design, a schedule adjustment of sixty (60) to ninety (90) days is anticipated. It should be noted that this project has been proceeding in an expedited fashion since final approval from the Historic Preservation Board was achieved in July 2002. Progress on the project has been focused on completing design and getting into construction as quickly as possible, with interior space layouts and ergonomic items taking a secondary priority to speed. At this point in time, the space, while functional, needs to be "tweaked" by the end user, the Fire Department, in order to ensure their operational concurrence. Although this may present an additional 60 to 90 days of time to the current project schedule, this is a normal adjustment, and an appropriate measure, to do this project right. If modifications are made to the current design, CIP staff estimates bidding of Phase II will move from the current projection of September/October 2003 to December 2003/January 2004, with a project construction commencement date moving from January 2004 to March 2004. At this time, Fire Department personnel, assisted by CIP staff, will prepare a comprehensive list of FF&E that are presently unfunded. At the commencement of the project, a decision was made to only include building related construction costs in the capital budget. As a result, there was no allocation made in the capital budget for FF&E. During recent G.O. Bond Oversight Committee meetings and City Commission meetings, several expressions of interest have been made by members to include the FF&E amounts in the discussion of the overall funding for Fire Station NO.4. For Fire Station No.2, an allocation of $165,000 was set aside for FF&E, suggesting that the respective budgets for the two stations were treated differently. As an FF&E budget has not yet been established for Fire Station NO.4 and because the FF&E amount for Fire Station NO.2 may not be adequate (the final number will be determined through future sessions with the Fire Station NO.2 team), staff is recommending a planning number of $200,000 be used at this time. As reported in the last Status Report, the current estimate from MC Harry for Phase 2 of the project (Attachment 2) is $2,250,873. Total construction funding for Phase 2 is $1 ,939,686, which leaves a current shortfall for Phase 2 at approximately $311,187. As noted above, for City Commission Memorandum July 2, 2003 Fire Station #4 Status Report Page 5 of 5 planning purposes, staff estimates FF&E for the Fire Station NO.4 facility to be in the area of $200,000. This amount is presently being evaluated by staff and is subject to change as the list is developed. For Phase 1 and Phase 2, the project is short an estimated $736,187 to $761,187, plus the amount estimated for FF&E of $200,000, for a total estimated shortfall of $936,000 to $961,187. The Administration will continue informing the Mayor and City Commission on the important events of the Project. CONCLUSION Essentially, the current situation represents the convergence of two highly important and emotional issues: historic preservation and fire safety, respectively. The City has, and continues to, vigorously support both areas through funding commitments, ordinances, and policies. In fact, with this project, we have attempted to satisfy both of these policy goals by trying to preserve a cultural and historic icon that is clearly obsolete as a Fire Station, and by trying to design a state-of-the-art Fire Station that will serve the North Beach community for the next 30 to 50 years. We have, however, reached a crossroads, where it has become clear that the present pot of funding, $1,939,686, is sufficient to accomplish only one of these two policy goals. We can choose to add almost $1 million to this project to address both of these policy goals, or we can decide to revisit the previous discussions on the cultural significance of the historic building. Please keep in mind that the historic building requires an estimated $770,000 in additional funds, over and above the $1 million noted above, to make it a useable facility. With this situation, the Administration can provide the factual and detailed information needed by the Commission to assist in making such a decision. However, the decision is one that represents the community's cultural and historic values. While staff can determine whether or not a building is architecturally significant, whether or not a building reflects the historic nature of the area, or whether or not the building is a final remaining example of an architect's work, staff is not in the best position to determine if a building has an intrinsic value to the community that rises to a level of spending $1.8 million of taxpayer dollars to preserve. In considering your decision, please be aware that this highly visible and important project is "on hold" until a decision is made. The City may be able to allocate sufficient funds from various reserves, such as the Capital Reserve Fund, to fund both projects. Depending upon the source of funds, various other issues may arise on our financial rating, operations or other capital projects. If the Commission wishes to fund these added costs the Administration will make every effort to work through any of the issues that may arise for a designated funding source. JMG/RCMITH/MM T:\AGENDA \2003~uI0203\regular\ST 4ST A TU 7 -02-03.doc Fire Station #4 City Commission Status Report for July 2, 2003 Summary Chart of Options Projected Estimated Construction Projected Funding Costs Shortfall Start Construction Finish Current Situation Phase 1 $ 504,596 $ 929,169 $ (424,573) August-03 January-Q4 Phase 2 $ 1,435,090 $ 1,746,277 $ (311,187) January-04 January-05 FF&E (estimated) $ $ 200,000 $ (200,000) Total $ 1,939,686 $ 2,875,446 $ (935,760) TABLE 1 Scenario 1 . Additional Funds Available Phase 1 $ 929,169 $ 929,169 $ August-03 January-04 Phase 2 $ 1,746,277 $ 1,746,277 $ March-04 March-05 FF&E (estimated) $ 200,000 $ 200,000 $ Total $ 2,875,446 $ 2,875,446 $ Action Required by City Commission on July 30, 2003: Appropriation of $935,760 from Capital Reserve Fund, or other source Assumes additional time on Phase 2 of 90 days to address dormitory and kitchen issues Assumes additional costs for structural shoring is limited to AlE estimate of $125,000 TABLE 2 Scenario 2 . No Additional Funds Available Ootion 1 Phase 1 $ 504,596 $ Phase 2 $ 1,435,090 $ FF&E (estimated) $ $ Total $ 1,939,686 $ 929,169 1,746,277 200,000 2,875,446 $ (424,573) $ (311,187) $ (200,000) $ (935,760) Placed on Hold Placed on Hold Action Required by City Commission on July 30, 2003: Direction to place project on hold Assumes additional time on Phase 2 of 90 days to address dormitory and kitchen issues Assumes additional costs for structural shoring is limited to AlE estimate of $125,000 TABLE 3 Scenario 2 . No Additional Funds Available Ootion 2A Phase 1 $ 100,000 $ Phase 2 $ 1,839,686 $ FF&E (estimated) $ $ Total $ 1,939,686 $ 100,000 1,746,277 200,000 2,046,277 Building demolished with HPB Approval $ $ 93,409 $ (200,000) $ (106,591) N/A March-04 N/A March-05 Action Required by City Commission on July 30, 2003: Direction to demolish historic building Action Required by Historic Preservation Board on September 9, 2003: Approval to demolish historic building Assumes additional time on Phase 2 of 90 days to address dormitory and kitchen issues Assumes additional costs for structural shoring is limited to AlE estimate of $125,000 TABLE 4 Scenario 2 - No Additional Funds Available Ootion 2B Phase 1 $ 100,000 $ Phase 2 $ 1,839,686 $ FF&E (estimated) $ $ Total $ 1,939,686 $ 100,000 1,746,277 200,000 2,046,277 Building demolished without HPB Approval $ $ 93,409 $ (200,000) $ (106,591) N/A March-04 N/A March-Q5 Action Required by City Commission on July 30, 2003: Direction to demolish historic building Action Required by Historic Preservation Board on September 9, 2003: Denial to demolish historic building Action Required by City Commission on October 15, 2003: Override HPB denial and 2nd direction to demolish historic building Assumes additional time on Phase 2 of 90 days to address dormitory and kitchen issues Assumes additional costs for structural shoring is limited to AlE estimate of $125,000 ~ ATTACHMENT 1 June 18, 2003 COST PROPOSAL DETAIL ~ Job Order Construction Services Project Number Fire Station N04 relocation - 75.01.02.CIP .004.00 City of Miami Beach Wbs Sect. Item Mod. UOM User Note Section 01-General Conditions 01152 1122 CRW 3 Person Survey Crew (Surveyor, Rodman, Chainman, Equipment And Instruments) Quantity 48.00 x WBS - 01000 WBS - 01000 Description Line Total $4,853.50 Installation Unit Price Fact. 97.46 x 1.0375 = Total 4,853.5080 Survey points and Pile layout 01152 1211 $57.50 WBS - 01000 WBS - 01000 EA Install Survey Monument Quantity Installation 1.00 x Unit Price Fact. 55.43 x 1.0375 = Total 57.5086 01501 1003 WBS - 01000 WBS - 01000 MO Portable Toilets, Chemical Quantity Installation 6.00 x $373.50 Unit Price Fact. 60.00 x 1.0375 = Total 373.5000 01501 2001 WBS - 01000 WBS - 01000 EA Construction Sign, (Temporary-Post Mounted) Quantity Unit Price Fact. Installation 1.00 x 226.38 x 1.0375 = $234.86 Total 234.8693 $8,190.85 01530 2003 WBS - 02000 WBS - 02000 LF Temporary 8' High Chain Link Fence & Posts, Up To 12 Months, Excluding Vehicle Gates Quantity 1,080.00 x Installation Unit Price Fact. 7.31 x 1.0375 = Total 8,190.8550 $1,111.66 01530 2008 WBS - 02000 WBS - 02000 EA Temporary 8' High Chain Link Vehicle Gate & Posts Set In Earth 2 Ft Deep, With Double Rail. Includes Digging Hole & Removal Quantity Unit Price Fact. 6.00 x 178.58 x 1.0375 = Installation Total 1,111.6605 01530 2013 WBS - 01000 WBS - 01000 EA 6' x 6' Temporary Tree Guard, 2x4 Construction, 4 Uprights Set In Earth 2 Ft Deep, With Double Rail. Includes Digging Hole & Removal Quantity Unit Price Fact. 8.00 x 64.80 x 1.0375 = $537.84 Installation Total 537.8400 $2,522.21 01610 3003 WBS - 01000 WBS - 01000 MO Roiling Scaffolding 14' To 20' Complete With Wheels, Railings, Etc., (5' Wide X 7' Long Section) Quantity 15.00 x Installation Unit Price Fact. 162.07 x 1.0375 = Total 2,522.2144 U.. Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Description Line Total Wbs 01630 2014 $1,494.00 WBS - 01000 was - 01000 User Note EA 20 CY Dumpster (7 Ton Capacity) .Construction Debris" Note: Price Includes -Service To Deliver And Pick-up Of Dumpster, Hauling Of Debris, Rental Of Dumpster And Disposal Fee. Quantity 6.00 x Installation Unit Price Fact. 240.00 x 1.0375 = Total 1,494.0000 01630 2015 WBS - 01000 WBS - 01000 EA 30 CY Dumpster (10 Ton Capacity) "Construction Debris" Note: Price Includes Service To Deliver And Pick-up Of Dumpster, Hauling Of Debris, Rental Of Dumpster And Disposal Fee. Quantity 12.00 x $4,108.50 Installation Unit Price Fact. 330.00 x 1.0375 = Total 4,108.5000 $831.66 01630 4001 WBS - 01000 WBS - 01000 CY Rubbish Handling Via Stairs, Per CY Of Material Per Floor Quantity Unit Price Fact. Installation 480.00 x 1.67 x 1.0375 = Total 831.6600 $1,245.00 01641 0116 WBS - 01000 WBS-01000 MO Air-Compressor, Gas Portable, 175 CFM, 90 HP Lift Quantity Unit Price Fact. Installation 2.00 x 600.00 x 1.0375 = Total 1,245.0000 $1,239.21 01641 2316 WBS - 01000 was - 01000 MO 8' X 28' Office, With Toilet Lift Quantity Installation 6.00 x Unit Price Fact. 199.07 x 1.0375 = Total 1,239.2108 $155.62 01641 2316 2331 WBS - 01000 WBS - 01000 MO For Delivery And Set-Up (Block & Level), Add Per Each Quantity Unit Price Fact. Installation 1.00 x 150.00 x 1.0375 = Total 155.6250 $119.31 01641 2316 2332 WBS - 01000 WBS - 01000 MO For Knock-down & Pick-up, Add Per Each Quantity Unit Price Fact. Installation 1.00 x 115.00 x 1.0375 = Total 119.3125 01641 2316 2333 MO For Anchoring Into Dirt, Add $62.25 Quantity Unit Price Fact. Total WBS - 01000 Installation 1.00 x 60.00 x 1.0375 = 62.2500 WBS - 01000 01641 2412 MO Storage Container, 8'x8'x20' Lift $458.78 Quantity Unit Price Fact. Total WBS - 01000 Installation 6.00 x 73.70 x 1.0375 = 458.7825 WBS - 01000 01641 2412 2415 MO For Drop-off Or Pick-up (Each Way), Add $155.62 Quantity Unit Price Fact. Total WBS - 01000 Installation 2.00 x 75.00 x 1.0375 = 155.6250 WBS - 01000 it Job Order Proposal 75.01.02.CIP.004.00 Fire Station No4 relocation Sect. Item Mod. UOM Description Line Total $64.11 Unit Price Fact. Total 10.30 x 1.0375 = 64.1175 $46.99 Unit Price Fact. Total 45.30 x 1.0375 = 46.9988 $179.46 Unit Price Fact. Total 28.83 x 1.0375 = 179.4668 $128.17 Unit Price Fact. Total 20.59 x 1.0375 = 128.1728 $205.11 Unit Price Fact. Total 32.95 x 1.0375 = 205.1138 Wbs 01641 2422 WBS - 01000 WBS - 01000 User Note MO Desk Chair, Rolling Lift Quantity Installation 6.00 x 01641 2431 WBS - 01000 WBS-01000 EA Phone Hook-Up Lift Quantity Installation 1.00 x 01641 2432 WBS - 01000 WBS - 01000 MO Local Phone Service Lift Quantity Installation 6.00 x 01641 2433 WBS - 01000 WBS - 01000 MO Fax Machine Lift Quantity Installation 6.00 x 01641 2434 WBS - 01000 WBS - 01000 MO Copier Lift Quantity Installation 6.00 x 01641 2435 WBS - 01000 WBS - 01000 MO Steps Lift $232.06 Installation Quantity 6.00 x Unit Price Fact. 37.28 x 1.0375 = Total 232.0680 $25,527.72 01641 3823 WBS - 01000 WBS - 01000 MO Loader-Backhoe, 1-3/4 CY, 30. Bucket, 18'-0" Depth, 112 HP With Full-time Operator Installation Quantity 3.00 x Unit Price Fact. 8,201.68 x 1.0375 = Total 25,527.7290 $5,079.00 01641 4066 WBS - 01000 was - 01000 MO Platform 39" x 120. x 60' Height, 1250# PSI, With Coupling Quantity Unit Price Fact. Installation 3.00 x 1,631.81 x 1.0375 = Total 5,079.0086 $9,365.20 01641 5138 WBS - 01000 WBS - 01000 WK Tandem Dump Truck, 12 Ton Payload With Full-time Truck Driver Quantity Unit Price Fact. Installation 3.00 x 3,008.90 x 1.0375 = Total 9,365.2013 $3,307.68 01641 5731 WBS - 01000 WBS - 01000 DAY Cranes Hydraulic, 70 Ton Lift, With Full-time Operator (Per Person Needed, Per Day) Installation Quantity 3.00 x Unit Price Fact. 1,062.71 x 1.0375 = Total 3,307.6849 ~. Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod, UOM Description Line Total Wbs 01641 7402 $1,401.61 WBS - 01000 was - 01000 User Note WK 4000 To 5999 LB Forklift With Full-time Operator (Per Person Needed, Per --Day) - Installation Quantity 1.00 x Total 1,401.6161 Unit Price Fact. 1,351.15 x 1.0375 = $2,242.69 01641 7532 WBS - 02000 was - 02000 WK Excavator, 1-1/2 To 1-3/6 CY With Full-time Operator (Per Person Needed, Per Day) Installation Quantity 1.00 x Total 2,242.6900 Unit Price Fact. 2,242.69 x 1.0000 = $766.25 01641 6204 WBS - 01000 WBS - 01000 DAY 3000 PSI Gas Pressure Washer With Full-time Operator (Per Person Needed, Per Day) Installation Quantity 1.00 x Total 766.2564 Unit Price Fact. 740.49 x 1.0375 = $5,676.74 01641 6406 WBS - 01000 WBS - 01000 MO 60' Wide, 1/3 CY Bobcat, Diesel With Full-time Operator Driver Quantity Unit Price Fact. Installation 1.00 x 5,473.49 x 1.0375 = Total 5,676.7459 01641 6409 WBS - 01000 WBS - 01000 MO Hydraulic Hammer Attachment Driver Quantity Unit Price Fact. Installation 1.00 x 1,292.73 x 1.0375 = $1,341.20 Total 1,341.2074 $2,316.66 01641 8646 WBS - 02000 WBS - 02000 WK 11-12 Ton Smooth Drum, Selfpropelled, With Full-time Operator Quantity Unit Price Fact. Installation 1.00 x 2,233.14 x 1.0375 = Total 2,316.8626 MO 90-105 HP, D4 Or D5 Bulldozer, With Fulltime Operator Fee, Delivery On Truck With Trailer, Set-up & Retum Quantity Unit Price 1.00 x 8,497.96 x 1.0375 = $8,616.63 01641 9306 WBS - 01 000 WBS - 01000 Fact. Total 8,616.6335 Installation $61.52 01641 9904 WBS - 01000 WBS - 01000 EA Bobcat Delivery (Or Similar Sized Equipment), Equipment Delivery Fee, Delivery On Truck With Trailer, Set-up & Return Quantity Unit Price Fact. Installation 1.00 x 76.56 x 1.0375 = Total 61.5268 01641 9905 WBS - 01000 WBS - 01000 EA Backhoe, Dozer, Loader Or Excavator (Or Similar Sized Equipment) Up To 250 HP Equipment Delivery Fee, Delivery On Truck With Trailer, Set-up & Return $369.63 Installation Quantity 1.00 x Unit Price Fact. 356.27 x 1.0375 = Total 369.6301 ~. Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Description Line Total Wbs 01641 9906 $554.36 WBS - 01000 WBS - 01000 User Note EA Backhoe, Dozer, Loader Or Excavator (Or Similar Sized Equipment) > 250 HP Equipment Delivery Fee, Delivery On-truck wilfiTraTIer,set-up & Return Quantity Unit Price Fact. 1.00 x 534.33 x 1.0375 = Installation Total 554.3674 01661 1112 WBS - 01000 was - 01000 EA Laboratory Compaction Test, ASTM D1557 Note: 2 test minimum. Quantity Unit Price Fact. Installation 20.00 x 117 .15 x 1.0375 = $2,430.86 Total 2,430.8625 $315.40 01661 1121 WBS - 01000 WBS - 01000 EA Proctor Compaction 6" Standard Mold Note: Florida Department of Health and Rehabilitative Services, Chapter 100-6.57. 2 per job minimum. Quantity Unit Price Fact. 2.00 x 152.00 x 1.0375 = Installation Total 315.4000 01661 2111 WBS - 01000 WBS - 01000 EA Compression, 6 X 12 Cylinder ASTM C 39 Note: Price is per mix, first of any -----series. Materials furnished by supplier, laboratory sampling included, 1 trial batch and 6 cyl. tests. Quantity Unit Price Fact. Total Installation 20.00 x 15.00 x 1.0375 = 311.2500 $311.25 01661 6342 WBS - 01000 WBS - 01000 HR Pile Driving Inspection Note: 4 hour minimum. Quantity Unit Price Fact. Installation 40.00 x 35.00 x 1.0375 = $1,452.50 Total 1,452.5000 Subtotal for 01 $99,969.25 Section 02-Site Work 02011 8001 EA WBS - 02000 WBS - 02000 $1,348.75 Minimum Set-up Charge For Boring For projects where the total boring charge is less than the minimum set-up charge. Use this item exclusively. This item should not be used in conjunction with any other items in this section. Quantity Unit Price Fact. 2.00 x 650.00 x 1.0375 = Installation Total 1,348.7500 For relocating monitoring wells 02102 1404 $1,280.73 WBS - 02000 WBS - 02000 EA Slump Removal, >24" To 36" (>61 em To 91 em) Diameter, Includes Loading Quantity Unit Price Fact. Total Installation 9.00 x 137.16 x 1.0375 = 1,280.7315 EA Tree Removal, >36" To 48" (>91 em To 121 em) D.B.H. (Diameter & Breast & Height), Includes Culling Up Tree, Chipping & Loading. Quantity Unit Price Fact. 9.00 x 485.33 x 1.0375 = $4,531.76 02102 1415 WBS - 02000 WBS - 02000 Installation Total 4,531.7689 \1. Job Ordef Proposal 75.01.02.CIP.004.00 Fife Station N04 felocation Sect. Item Mod. UOM Description Line Total Wbs 02111 3204 $27,135.25 WBS - 02000 WBS - 02000 User Note CCF Demo Reinforced Concrete Building With Bulldozer/Excavator Remove -SulJdlng, By Building Volume Quantity 547.05 x Installation Unit Price Fact. 47.81 x 1.0375 = 27,135.2528 Total 02112 1111 WBS - 02000 WBS - 02000 SY Break-up Bituminous Pavement With Loader, 1"To 3" Hammer. 1" To 3" --- Quantity Unit Price Fact. 720.00 x 2.22 x 1.0375 = $1,658.34 Installation Total 1,658.3400 $1,781.12 02112 1211 WBS - 02000 WBS - 02000 SY Break-up And Demo To 3' Thick Concrete Or Bituminous, Without Reinforcing Note: Work includes breaking into manageable size by machine, removal and loading onto a truck or dumpster. Quantity Unit Price Fact. 315.00 x 5.45 x 1.0375 = Installation Total 1,781.1281 02119 1209 WBS - 02000 WBS - 02000 TON Landfill Dump Fee (All Materials Except Hazardous & Tires) -- Quantity Unit Price Fact. Installation 240.00 x 61.46 x 1.0375 = $15,303.54 Total 15,303.5400 $1,397.46 02210 1005 WBS - 02000 WBS - 02000 SY Rough Grade Small Area With Dozer Concrete Placement Quantity Unit Price Fact. Installation 4,345.00 x 0.31 x 1.0375 = Total 1,397.4606 $806.13 02210 3103 WBS - 02000 WBS - 02000 SY Subgrade Structure Grading Structures & Slabs, With Bobcat Concrete --Placement Quantity 2,100.00 x Installation Unit Price Fact. 0.37 x 1.0375 = Total 806.1375 $473.10 02210 3202 SF Finish Grade Structures & Slabs, By Hand, Hand Clean For Concrete Placement Quantity Unit Price Fact. Total WBS - 02000 Installation 2,400.00 x 0.19 x 1.0375 = 473.1000 WBS - 02000 02210 4212 SY Trim & Shape Area With Bobcat Or Front End Loader $1,622.85 Quantity Unit Price Fact. Total WBS - 02000 Installation 4,345.00 x 0.36 x 1.0375 = 1,622.8575 WBS - 02000 02213 4037 TON Umestone, 3/8" To 7/8" $53,992.22 Quantity Unit Price Fact. Total WBS - 02000 Installation 5,455.00 x 9.54 x 1.0375 = 53,992.2263 WBS - 02000 02244 1001 CSF Soil Poisoning $984.17 Quantity Unit Price Fact. Total was - 03000 Installation 340.00 x 2.79 x 1.0375 = 984.1725 WBS - 03000 Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Description Line Total Wbs 02264 2101 $146.06 WBS - 02000 WBS - 02000 User Note LF 2' High Silt Fence with Stakes at 4' O.C With Stakes ----- Quantity Unit Price Fact. Installation 220.00 x 0.64 x 1.0375 = Total 146.0600 $51,441.64 02311 3003 WBS - 02000 WBS - 02000 VLF Concrete Pile, >15-20 FT Quantity Installation 750.00 x Unit Price Fact. 66.11 x 1.0375 = Total 51,441.6438 $15,656.32 02530 1101 WBS - 02000 WBS - 02000 LF Deliver, Install & Removal otWell Point System Available) Quantity Unit Price Fact. Installation 480.00 x 31.64 x 1.0375 = Total 15,856.3200 02530 1205 WBS - 02000 WBS - 02000 LFD Well Point System 401 To 500 Foot In Length (LF x Days = Quantity.) Quantity Unit Price Fact. Installation 480.00 x 0.96 x 1.0375 = $476.06 Total 478.0800 $17,696.89 02530 1302 WBS - 02000 WBS - 02000 WK Operation Costs Per Week Quantity Installation 3.00 x Unit Price Fact. 5,665.75 x 1.0375 = Total 17,696.8969 $726.66 02711 1109 WBS - 02000 WBS - 02000 VLF 12" (31 cm) Diameter Hole, Auger By Machine Fence Post Hole In Soil Quantity Unit Price Fact. Installation 136.00 x 5.15 x 1.0375 = Total 726.6650 Fence around relocated building 02711 1318 WBS - 02000 WBS - 02000 VLF Concrete Fill, 12" (31 em) Diameter Hole 6' In Length --- Quantity Unit Price Fact. Installation 136.00 x 7.47 x 1.0375 = $1,054.01 Total 1,054.0170 LF 5' Galvanized Chain Link Fence, 9 Gauge Coiled Spring Mesh, Top Rail, Line Post @ 10' O.C. Quantity 275.00 x $2,530.72 02711 3102 WBS - 02000 WBS - 02000 Installation Unit Price Fact. 8.87 x 1.0375 = Total 2,530.7219 Fence Around Relocated Building 02713 2003 LF Board Fence, 3 - 2" x 4" Rails, 5' High 1" x 4" Boards, Preservative Treated Quantity Unit Price Fact. Total $229.99 WBS - 02000 WBS - 02000 Demolition 326.00 x For demolition of existing wood fence 0.66 x 1.0375 = 229.9930 02771 1101 WBS - 02000 WBS - 02000 EA 22" x 26" x 28" Benches With Backs Legs Quantity Unit Price $15.12 Fact. Total Demolition 1.00 x 14.56 x 1.0375 = 15.1268 Subtotal for 02 $202,491.21 q. Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Wbs Sect. Item Mod. UOM User Note Description Line Total Section 03-Concrete 03110 1204 SF WBS - 03000 WBS - 03000 Grade Beam Forms, Plywood Forms, Form & Strip With Accessories Form & Strip With Accessories Quantity 2,400.00 x Installation $4,656.30 Unit Price Fact. 1.87 x 1.0375 = Total 4,656.3000 $4,656.30 03110 1204 WBS - 03000 WBS - 03000 SF Grade Beam Forms, Plywood Forms, Form & Strip With Accessories Form & - Strip With Accessories Quantity 2,400.00 x Installation Unit Price Fact. 1.87 x 1.0375 = Total 4,656.3000 03110 1314 WBS - 03000 WBS - 03000 SF Pile Cap Forms, Square Or Rectangular, Plywood Forms, Form & Strip With Accessories Installation Quantity 364.00 x $887.47 Unit Price Fact. 2.35 x 1.0375 = Total 887.4775 $246.63 03110 1324 WBS - 03000 WBS - 03000 SF Pile Cap Forms, Triangular Or Hexagonal, Plywood Forms, Form & Strip With Accessories Installation Quantity 84.00 x Unit Price Fact. 2.83 x 1.0375 = Total 246.6345 $19,627.98 03210 1006 WBS - 03000 WBS - 03000 TON Grade 60 Resteel, Footings & Slabs, #7-Up em Long), Deformed Quantity Unit Price Fact. Installation 18.00 x 1,051.03 x 1.0375 = Total 19,627.9853 $5,651.26 03311 1151 WBS - 03000 WBS - 03000 CY Pour Grade Beam, Regular, Crane & Bucket, 3000 PSI Concrete Foundations Quantity Unit Price Fact. Total Installation 65.00 x 83.80 x 1.0375 = 5,651.2625 $508.47 03311 1151 3008 WBS - 03000 WBS - 03000 CY For 5000 PSI, Add 200 CY Quantity Installation 65.00 x Unit Price Fact. 7.54 x 1.0375 = Total 508.4788 Subtotal for 03 $36,234.43 Section 07-Thermal and Moisture 07322 1101 SQ Concrete Roof Tile, 13"x16-1/2", 90/SQ, 950 LB/SQ, Earthtone Colors, Corrugated Quantity 3.00 x 3.00 x WBS - 07000 WBS - 07000 Installation Demolition For roof tile work $1,169.67 Unit Price Total 899.2013 270.4763 288.90 x 86.90 x Fact. 1.0375 = 1.0375 = Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Descri ption Line Total Wbs 07542 1002 $1,493.78 was - 07000 WBS - 07000 User Note SQ Vinyl Liquid Roofing, 4 Mils Quantity Installation 3.00 x Unit Price Fact. 479.93 x 1.0375 = Total 1,493.7821 07590 1142 $828.17 WBS - 07000 WBS - 07000 For front canopy roofing EA Minimum Charge For Roof Repair Quantity Unit Price Fact. Installation 8.00 x 99.78 x 1.0375 = Total 828.1740 $791.82 07620 1304 WBS - 07000 WBS - 07000 SF Copper Flashing, 20 Ounce < 500# With Galvanized Steel Anchor Plate Quantity Unit Price Fact. Installation 120.00 x 6.36 x 1.0375 = Total 791.8200 $990.19 07620 1402 WBS - 07000 WBS - 07000 LF 24" Copper Roof Transition Cover With Galvanized Steel Anchor Plate Quantity Unit Price Fact. Installation 80.00 x 11.93 x 1.0375 = Total 990.1900 $5,113.11 07920 1002 WBS - 07000 WBS - 07000 CLF Oil Base Caulk & Seal, 1/4"x3/8" Joint Note: For unglazed tile or unpolished stone, matte finish. Quantity Unit Price Fact. Installation 85.00 x 45.94 x 1.0375 = Demolition 85.00 x 12.04 x 1.0375 = Removal and re-caulking of windows & doors Total 4,051.3338 1,061.7775 Subtotal for 07 Section 08-Windows and Doors 08210 1011 EA 3'xT Pine Exterior Door Frame Custom Made With Threshold & Trim Quantity Unit Price Fact. 5.00 x 145.22 x 1.0375 = 2.00 x 14.87 x 1.0375 = WBS - 08000 WBS - 08000 Installation Demolition $10,386.75 $784.18 Total 753.3288 30.8553 $509.30 Total 509.3088 $218.26 Total 199.0029 19.2664 $136.38 Total 136.3898 08210 1011 2103 WBS - 08000 WBS - 08000 EA For Mahogany Add Quantity Installation 5.00 x Unit Price Fact. 98.18 x 1.0375 = 08210 1015 WBS - 08000 WBS - 08000 EA 6'x7' Pine Exterior Door Frame Custom Made With Threshold & Trim Quantity Unit Price Fact. 1.00 x 191.81 x 1.0375 = 1.00 x 18.57 x 1.0375 = 08210 1015 2103 WBS - 08000 WBS - 08000 Installation Demolition EA For Mahogany Add Quantity Installation 1.00 x Unit Price Fact. 131.46 x 1.0375 = 'h Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Description Line Total Wbs 08210 3464 $676.36 WBS - 08000 WBS - 08000 User Note EA 3'x7'x1-3/4" Solid Core, Walnut Faced Door Add Quantity Unit Price Fact. 5.00 x 125.20 x 1.0375 = 2.00 x 12.96 x 1.0375 = Total 649.4750 26.8920 Installation Demolition $257.55 08210 3464 3486 WBS . 08000 was - 08000 EA For Solid Wood Staved Core (Glued Blocik), Add Quantity Unit Price Fact. Installation 5.00 x 49.65 x 1.0375 = Total 257.5594 $16.47 08210 3464 3494 WBS - 08000 WBS - 08000 EA For 6 Panel Doors, Add Quantity Installation 2.00 x Unit Price Fact. 7.94 x 1.0375 = Total 16.4755 $49.44 08210 3464 3519 was - 08000 WBS - 08000 EA For 1 Foot Of Additional Door Height, Add Quanlity Unit Price Fact. Installation 2.00 x 23.83 x 1.0375 = Total 49.4473 $283.60 08210 3469 WBS - 08000 WBS - 08000 EA Pair 3'x7'x1-3/4" Solid Core, Walnut Faced Door Add Quantity Unit Price Fact. 1.00 x 248.42 x 1.0375 = 1.00 x 24.93 x 1.0375 = Total 257.7358 25.8649 $103.02 08210 3469 3486 WBS - 08000 WBS - 08000 Installation Demolition EA For Solid Wood Staved Core (Glued Block), Add Quantity Unit Price Fact. Installation 1.00 x 99.30 x 1.0375 = Total 103.0238 $16.48 08210 3469 3494 WBS - 08000 WBS - 08000 EA For 6 Panel Doors, Add Quantity Installation 1.00 x Unit Price Fact. 15.89 x 1.0375 = Total 16.4859 $49.44 08210 3469 3519 WBS - 08000 WBS - 08000 EA For 1 Foot Of Additional Door Height, Add -_.._---~-_._-- Quantity Unit Price Fact. Installation 1.00 x 47.66 x 1.0375 = Total 49.4473 $123.00 08362 2002 WBS - 08000 WBS - 08000 EA 16'x7' Sectional Metal Overhead Door, Residential Grade, Including Track & Fittings Quantity Unit Price Fact. Total 123.0060 $619.18 08362 3001 WBS - 08000 WBS - 08000 Demolition 2.00 x 59.28 x 1.0375 = Total 619.1800 $673.70 08520 1104 WBS - 08000 WBS - 08000 SF Remove & Reinstall Sectional Metal Overhead Door & Supports Quantity Unit Price Fact. Installation 160.00 x 3.73 x 1.0375 = SF' Aluminum Single Hung Windows, Standard Brush Finish, Grade "C" Quantity Unit Price Fact. 45.00 x 12.87 x 1.0375 = 45.00 x 1.56 x 1.0375 = Installation Demolition Total 600.8681 72.8325 Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Description Line Total Wbs 08520 1104 1182 $96.64 WBS - 08000 WBS - 08000 User Note SF For Installation In Concrete, Brick Or Block Openings Add Quantity Unit Price Fact. Installation 45.00 x 2.07 x 1.0375 = Total 96.6431 $134.46 08520 1104 1306 WBS - 08000 WBS - 08000 SF For Duranar Finish, Add Quantity Installation 45.00 x Unit Price Fact. 2.88 x 1.0375 = Total 134.4600 $40.61 08520 1104 1307 WBS - 08000 WBS - 08000 SF For Anodized Aluminum Finish, Add Quantity Unit Price Fact. Installation 45.00 x 0.87 x 1.0375 = Total 40.6181 PR 4-1/2x4-1/2" Wrought Steel, Standard Duty, Butts Half Surface, Ball Bearing Quantity Unit Price Fact. Total 10.00 x 40.02 x 1.0375 = 415.2075 7.00 x 2.85 x 1.0375 = 20.6981 $435.90 08710 1242 WBS . 08000 WBS - 08000 Installation Demolition $143.90 08710 1242 1274 WBS - 08000 WBS - 08000 PR For Stainless Steel, Add 156.18 Quantity Unit Price Fact. Installation 10.00 x 13.87 x 1.0375 = Total 143.9013 $39.21 08710 1242 1275 WBS - 08000 WBS - 08000 PR For Heavy Duty, Add 156.18 Quantity Installation 10.00 x Unit Price Fact. 3.78 x 1.0375 = Total 39.2175 EA Surface Mounted Heavy Duty Door Closer Acting Quantity Unit Price Fact. 4.00 x 245.39 x 1.0375 = 4.00 x 7.51 x 1.0375 = $1,049.53 Total 1,018.3685 31.1665 $469.11 Total 469.1160 $1,682.11 Total 1,661.9505 20.1690 $679.77 Total 679.7700 $760.07 Total 739.5300 20.5425 08710 5103 was - 08000 WBS - 08000 Installation Demolition 08710 5103 5852 WBS - 08000 WBS - 08000 EA For Stainless Steel. Add 156.18 Quantity Unit Price Installation 4.00 x 113.04 x Fact. 1.0375 = EA Bored Entry Lockset F82, Removable Core Plated, BHMA E0421 Quantity Unit Price Fact. 6.00 x 266.98 x 1.0375 = 3.00 x 6.48 x 1.0375 = 08710 6417 WBS - 08000 WBS - 08000 Installation Demolition 08710 6417 6124 WBS - 08000 WBS - 08000 EA For Satin Stainless Steel, US 32D (BHMA 630) Add 156.18 Quantity Unit Price Fact. Installation 6.00 x 109.20 x 1.0375 = 08710 6802 WBS - 08000 WBS - 08000 EA 2-3/4" Backset, Oil Stained Bronze Finish, Best #67TK1DDI613 Quantity Unit Price Fact. 6.00 x 118.80 x 1.0375 = 3.00 x 6.60 x 1.0375 = Installation Demolition % Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Description Line Total Wbs 08720 3001 $79.96 WBS - 08000 WBS - 08000 User Note EA 36" Door Sweep. Aluminum & Neoprene Weatherstrip Quantity Unit Price Fact. Installation 7.00 x 11.01 x 1.0375 = Total 79.9601 08720 4001 WBS - 08000 WBS - 08000 EA U-Shaped. Slide On. Bottom Mounted Door Shoe With Drip Cap And Sponge Neoprene Seal For MetaIDoo~1-3/4"-Wide Quantity Unit Price Fact. 4.00 x 12.02 x 1.0375 = $49.88 Installation Total 49.8830 LF Aluminum Finish Thresholds. Interior, 3" Width, 1/4" Height 1/4" Height Quantity Unit Price Fact. 7.00 x 9.66 x 1.0375 = 3.00 x 2.07 x 1.0375 = $76.59 08730 3121 WBS - 08000 WBS - 08000 Installation Demolition Total 70.1558 6.4429 Subtotal for 08 $10,254.24 Section 09.Finishes 09210 2001 SF WBS - 08000 WBS - 08000 Gypsum Plaster Smooth Finish. 3 Coats On Wall Quantity Unit Price Fact. $899.51 Total Demolition 850.00 x 1.02 x 1.0375 = 899.5125 SF Stucco, Float Finish, 3 Coats, 1" Note: Interior or exterior one side. Lath and fell not included. Quantity 1,460.00 x 960.00 x $3,986.07 09220 1102 WBS - 08000 WBS - 08000 Unit Price Fact. Total 3,059.7950 926.2800 Installation Demolition 2.02 x 1.0375 = 0.93 x 1.0375 = $1,843.22 09220 1103 WBS - 09000 WBS - 09000 SF Stucco, Trowel Finish, 3 Coats, 1" Including Lath and Felt Note: Interior or exterior, one side. Quantity Installation 420.00 x Demolition 420.00 x For Demolition of item # 26 and new #26 Unit Price .Fact. 1.0375 = 1.0375 = Total 1,437.9750 405.2475 3.30 x 0.93 x 09250 1202 SF 518" Fire Rated Drywall Installation (1/4" thick fiber-cement board with tapered edges over 112" thick type "X" gypsum board) Quantity Unit Price 820.00 x 0.63 x 1.0375 = 820.00 x 0.13 x 1.0375 = $646.57 WBS - 08000 WBS - 08000 Fact. Total 535.9725 110.5975 Installation Demolition $248.17 09511 1101 WBS - 09000 WBS - 09000 SF 2' x 2' x 518" Fiberglass Acoustical Ceiling Panel (Suspension System Not Included) Quantity Unit Price Total Fact. Demolition 1,840.00 x 0.13 x 1.0375 = 248.1700 $298.80 09511 2101 WBS - 09000 WBS - 09000 SF 2' x 2' x 5/8" Mineral Fiber Acoustical Ceiling Panels Quantity Unit Price Fact. Total Demolition 1,800.00 x 0.16 x 1.0375 = 298.8000 ~. Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Description Line Total Wbs 09540 1002 $248.17 WBS - 09000 WBS - 09000 User Note SF T Bar Ceilings Suspension System 2'x 2', Standard 15/16" To 5" Width), ---Standard15/16" ------ Quantity Unit Price Fact. Total Demolition 1,840.00 x 0.13 x 1.0375 = 248.1700 09910 1604 WBS - 09000 WBS - 09000 SF Paint Exterior Stucco Surfaces One Coat Primer, Brush/Roller Work Quantity Unit Price Fact. Installation 7,300.00 x 0.25 x 1.0375 = $1,893.43 Total 1,893.4375 $378.68 09910 1604 2493 SF For Work Above 20' To 25', Add (Includes Loss Of Productivity And Use Of Ladder) WBS - 09000 WBS - 09000 Installation Quantity 7,300.00 x Total 378.6875 Unit Price Fact. 0.05 x 1.0375 = 09910 1606 WBS - 09000 WBS - 09000 SF Paint Exterior Stucco Surfaces, Two Coats Paint, Brush/Roller Work --- Quantity Unit Price Fact. Total Installation 7,300.00 x 0.54 x 1.0375 = 4,089.8250 $4,089.82 09910 1606 2493 SF For Work Above 20' To 25', Add (Includes Loss Of Productivity And Use Of -~dder) - WBS - 09000 WBS - 09000 $681.63 Installation Quantity 7,300.00 x Total 681.6375 Unit Price Fact. 0.09 x 1.0375 = Subtotal for 09 $15,214.10 Section 10"Specialties 10351 4006 EA WBS - 10000 WBS - 10000 45' (13.7 m) Tapered Aluminum Flagpole Fully Rigged, Without Concrete Base Quantity Unit Price Fact. Total $360.09 Demolition 1.00 x For Demolition of existing flagpole 347.08 x 1.0375 = 360.0955 10715 3101 SF Up To 36" High Bahama Shutter, Up To 36" Wide Quantity Unit Price Fact. 464.00 x 28.45 x 1.0375 = 464.00 x 1.19 x 1.0375 = $14,268.69 WBS -10000 WBS - 10000 Installation Demolition Total 13,695.8300 572.8660 Subtotal for 10 $14,628.79 Section 15-Mechanical 15661 1002 EA WBS - 15000 WBS - 15000 7.5 Ton Air Cooled Condensing Unit With Compressor, Condenser, Fan & Motor $302.32 Quantity Unit Price Fact. Total Demolition 1.00 x 291.40 x 1.0375 = 302.3275 I\. Job Order Proposal 75.01.02.CIP.004.00 Fire Station N04 relocation Sect. Item Mod. UOM Description Line Total Wbs 15661 1003 User Note EA 10 Ton Air Cooled Condensing Unit With Compressor, Condenser, Fan & Motor $743.90 WBS -15000 WBS - 15000 Quantity Unit Price Fact. Total Demolition 2.00 x 356.51 x 1.0375 = 743.9063 LB Recovery Of Refrigerant $1,093.00 Quantity Unit Price Fact. Total Installation 350.00 x 3.01 x 1.0375 = 1,093.0063 15699 9101 WBS - 15000 WBS - 15000 To Recover the Refrigerent before Demo Subtotal for 15 $2,139.24 Section 18-Non Prepriced 16002 1002 EA Fire Station # 4 Building Relocation Quantity Unit Price Fact. 1.00 x 273,625.00 x 1.0000 = $273,625.00 WBS - 02000 WBS - 02000 Installation Total 273,625.0000 Subtotal for 18 $273,625.00 Job Order Cost Proposal Total The work order proposal Iota I represents the correct total for the proposal. Any discrepancy between line tolals. sub-totals and the proposal tolal are due to rounding of the line lotals and sub-lotals. $664,943.05 / ~, ~" ATTACHMENT 2 Miami Beach Fire Station #4 City of Miami Beach Estimated Construction Cost. 75%CD Fire Station #4 Expansion I Restoration: Off-Site: Cost of street improvements to accomodate new station; New Construction of three new back-in apparatus bays and associated administrative and living spaces. Approx 8,000 sf of new construction. Restoration: prepare new foundation; relocate and stablize old building; remove structural red-tag; no restoration for occupancy included; NIC: parking at police; prominade at seawall; seawall; site grading at old firestation. Off-Site Work New Construction $/st Restor J Renovation $/st Total - _~J 24~701 !~.~:L~ -. ---.!___~en_~-"-~_:.E~_~.!__ $25,996 $320,524 19.72% $39 $50 ~471,~~.!..L3.1~ ...00 __...______n ------ _.--- __~___~ite_~or~_______. . $95,225 $205,975 12.67% $25 ._.!49,6!~1-.~~~-~ $20 __.~~~.~,8!!.~L1.6.::- . _..__.._-~._._-- ....--.-----... --- 3 CONCRETE $232,900 14.33% $28 $285,150 I 56.51% $114 $518,050 I 23% 4 MASONRY $95,000 5.85% $12 $0 I 0.00% $0 $95,000 I 4% 5 METAL $27,360 1.68% $3 ~~!~5~..j..11flo/_ $2 $33,210 I 1% ......... ...............".... ....... ".",.n ...... ............_. ".---. ... 6 WOOD $26,300 1.62% $3 $0 I 0.00% $0 $26,300 i 1% .....--.........-.......---......,...-...-----..-......-...------..---., -- ..--..........--...--...-............--... . ____..___.______n -----......---..... --.-..-..........--.-.--...T.---........ .....-.....--.............-..........-..'1--.....--..... 7 ROOFING / SELANTS $47,480 2.92% $6 $20,535 4.07% $8 $68,015 I 3% 8 DOORS & WINDOWS $139,094 8.56% $17 $0 0.00% $0 $139,094 I 6% --.----------.--. -. ________H --- ------ ------ r----.--.--....--..-. 9 FINISHES $139,208 8.57% $17 $16,500 3.27% $7 $155,7081 7% ---.--..-.-..----..--..--- - N' ._.__.____.__._. -_.__..~.- --.-....---.-. ---$2:240 r~44;;: .----------t---- 10 SPECIALTIES $21,765 1.34% $3 $1 $24,005 I 1% 11 EQUIPMENT $25,000 1.54% $3 _____!D~--.?:90% $0 $25,000 I 1 % -----..--.-.-.---.-...- ------ ------ -.---. -------$010% 12 FURNISHINGS $0 0.00% $0 $0 I 0.00% $0 ..........._n_. ........."....... _m_ - ....----1- ...........-1-. . 15 MECHANICAL $0 I 0% HVAC $138,358 8.51% $17 $0 I 0.00% $0 --~~2~~.L-~ c-.-.------.---.-. ...-----..--... -- ----ili---- PLUMBING $63,100 3.88% $8 _.__.__~__O:<,JE,!- $0 $63,100 I 3% -----------~._.__.__.__._--_.._- "-- ___H._____. ------.--- -..--...- $01 -.-...-..-......---..--.-.,.-..'.-.-..- FIRE SPRINKLERS $16,750 1.03% $2 0.00% $0 $16,750 I 1% 16 ELECTRICAL $126,243 7.77% $15 ___._!~ OOO.!_ __ ~SJ.. __~~6,2:!~_L.6..'1~ ------.--- --.- ___" ---.-".-.----- ,- "---.--- ...1-.----.-. -. .-- -----,---.------. Sub T olal Construction Cost $121,221 1,625,056 100% 504,596 100% 2,250,873 DO estimate $115,016 $1,549.427 $504,702 $2,169,144 Difference $6,206 $75,629 (5106) $81,729 5% 50/. 0% 4% Budget 1,939,686 OVER BUDGET 311,187 was previously over budget 229,719 change (81,468) MC HARRY ASSOCIATES Architects! Engineers ( Planners June 3 2003 Miami Beach Fire Station #4 City of Miami Beach EstImated Construction Cost - 75% CD The following compares the estimate completed at DD phase to the 75% CD estimate; and INCLUDES both phase 1 (historic building move budgeted at $505,000); and phase 2 (new building and site work). Previous $/sf Current Difference "_n. ....-..."...... ....... ......-.... .... . .._.H.H.... 1 Gen Cond + GC OHP $470,578 22% $57 $471,221 21% $643 0% 2 Site Work $329,551 15% $40 $350,820 16% $21,269 6% increase fill requirements 3 CONCRETE $515,817 _..?~~ $63 f--~518!050_ ~ $2,233 0% ~---_._------ ------.----- 4 MASONRY $98,000 --~!,,- $12 _..--!~5,0.!l! ~!~ (53.000) -3% ---.--.---.----".----. - _. n__'_____,_ 5 METAL $33,850 2% $4 $33,210 1% ($6401 -2% 6 WOOD $33,701 2% $4 $26,300 1% (57.401) -22% --.------------- - ..--.---------- 1------_. _.... 7 ROOFING / SELANTS $64,200 3% $8 $68,015 3% $3,815 6% __._.____.__.._______..'H___. . - ____.____._n___ ---- ~---,,--_... 8 DOORS & WINDOWS $110,660 5% $13 $139,094 I 6% $28,434 26% +OH doors + storefront 9 FINISHES $152,175 7% $19 $155,708 7% $3.533 2% 10 SPECIALTIES _ ___~34~~ 2% $4 $24,005 1% ($10.555) -31% -.------------------ . --- 11 EQUIPMENT $25,101 1% $3 $25,000 1% ($101) 0% -_._,,-_._"--~--,----._--_..._,-_._-_..- - ......"__H._.."_____n -.-----.--- -.-- 12 FURNISHINGS $0 0% $0 $0 0% $0 100% -- .--- $0 ---t--- _"H_'____. .. ------ --..-- 15 MECHANICAL $0 _.,~h._...N~..'.___"_"_.""".._._."__.._____._______"._.~_"_. '" -----_...."_.,._-~_....._-- .._~"h__._.. ---S138,35Sr--S% HVAC $96,800 4% $12 $41,558 43% ADD premuim veh exh 1---- PLUMBING $63,000 3% $8 $63,100 I 3% $100 0% FIRE SPRINKLERS $16,600 1% $2 -.. --sm:~::l 1% $150 1% ._~.... ...-..... . ......._..~...... "... ...-...-..... ._.-,,-~. 16 ELECTRICAL $124,551 6% $15 6% $1.691 1% Sub Total Construction Cost 2,169,144 100% $265 2,250,873 81,729 4% Budget 1,939,686 over (under) previously change 311,187 229,719 (81,468) Project Is currently OVER budget Project is 16% OVER Me HARRY ASSOCIATES Architects I Engineers! Planners June 3 2003 % ~. Miami Beach Fire Station #4 City of Miami Beach Estimated Construction Cost - 75%CD Restoration I Renovation MCHarry Associatel 2780 SW Douglas Road 06/03103 Restoration I Renovation Page 1 Miami Beach Fire Station #4 City of Miami Beach Estimated Construction Cost. 75%CD Restoration / Renovation 2 SITE WORK T--- I 30,000 I 1,261 o 5,000 230 MCHarry Associates 2780 SW Douglas Road 06/03/03 Unn Unit Cost sf cv sf 80 80 80 80 80 1 50 If If If If ea If sf If 3 CONCRETE/MASONRY ------...----------.,..-------.--.-------------- --- ~~ndations (Piles) 75 cy ___":Iir:'()~t::?n_c~Elpai!________________ 1___~_.___._ Crawl space exterior wall (mas+stu. +pat) 600 sf Restore/Repair/Upgrade Struc Frame 3,550 sf Move Building 1 LS 4 MASONRY 5 METAL Steel Repair - at front steps 6 WOOD 7 MOISTURE/THERMAL PROTECTION Windows Shutters -.....----.--.......-.....---....-.-... ...-.""'.-.........-..-......- .......................... Roofing Repair Joint Sealers Is Sub-Total If $12,610 $0.92 $27,600 $10.00 $12,610 $5.00 $0 $0 $10,000 $10,000.00 $10,000 ...._........._...._................_....._.__,..........._........_H_.. $960 ,._m_ ..-...,.-...-....-............ $12.00 $960 $0 $18,850 $40.00 $3,200 $25.00 $2,000 $75.00 $6,000 $30 $2,400 $1,500 $1,500 $75 $3,750 $0 $7,211.0 $0.75 $3,750 $15 $3,450 $2~!i, 1511. $200 $15,000 --~g~---~.?,~._--------- $14 $8,400 $35 $124,250 $125,000 $125,000 $0 $5,850 ..-...---..--..----.--.--.---.---.-.-.-.-..-....---------'-'---'$0" $5,850 $5,850 5,000 sf 5,000 ~_ Page 2 $20,535 54 sf $65 $3,510 540. sf $25 $13,500 .. _____ ------------ ------1--. .silOW------S2,SOO---S2,5OCi------- .. 2.500 Is $0.20 $500 $0 $16,500 $3_00 0.30 $15,000 1,500 --- 8 DOORS and WINDOWS 9 FINISHES Refinish Exterior Painting (quantity corrected) ~, '4. Miami Beach Fire Station #4 MCHarry Associates City of Miami Beach 2180 SW Douglas Road Estimated Construction Cost - 15%CD 06/03103 Restoration / Renovation f--------- 10 SPECIALTIES/BUILT.INS $2,240 Wall Louvers I 56 I sf $40 $2,240 1------------------ ---...---.-.-------- - -I 11 EQUIPMENT $0 , ~_URNISHINGS --- $0 13 SPECIAL CONSTRUCTION $0 14 CONVEYANCE $0 - 15 MECHANICAL $0 PLUMBING - $0 FIRE SPRINKLERS 0 $0 f------._--------- f--_16 ~~ECTRICAL $0 SUB-TOTAL ALL TRADES -- $319,895 ._-~._...._---"_.._.__._..._._----~--------_._-_._------ __~_EN~~L CQNDITIONS_ $124,701 Estimate Contingency 5% $18,995 Difficulty Factor 0% --------------- 15% $59,833 General Conditions BOND & FEES 10% $45,872 GRANO TOTAL $504,596 $$/sf = $201.84 Page 3 Miami Beach Fire Station #4 I MCHarry Associates City of Miami Beach I 2780 SW Douglas Road Estimated Construction Cost. 75%CD 06/03/03 I Offsne I I Base Calculations 9,235.00 1 GENERAL CONDITIONS Unit Unit Cost Sub-Total --- General Conditions 15% $14,284 GC ohp 10% $9,523 - -- BOND 2% $2,190 $25,996 $25,996 PAVING $75,725 Paving w. base 13,045 sf $5.00 $65,225 Paving overlay sf $0.67 $0 Retaining Willis If $350.00 $0 OFFSITE PAVING sf $2.50 $0 Conc Curbs 200 If $15.00 $3,000 reduce unit price per URS 200 If ($5.00) ($1,000) Curb Cuts 100 sf $25.00 $2,500 Parking lot Markings w. mise allow 200 ea $30.00 $6,000 Parking Bumpers ea $25 $0 HC Parking w. signs ea $215.00 $0 SITE UTILITIES $12,000 Chilled Water Piping - 4" If $45.00 $0 Site Electrical Duct Bank If $40.00 $0 Site Communications $25.00 $0 Site Lighting pole $3,200.00 $0 Site Water If $35.00 $0 Site Sewer If $30 $0 Lift Station ea $40,000 $0 Site Drainage Inlets 3 ea $1,500 $4,500 Drainage wells ea $25,000 $0 Backflow preventors ea $2,500 $0 Site Drainage Exfiltration 100 If $75 $7,500 ax8 tap ea $4,500 $0 Relocation of Fire Hydrant ea $1.000 $0 LANDSCAPE-HARDSCAPE $7,500 Irrigation systems sf $0.75 $0 Sidewalks 1,500 sf $5.00 $7,500 Fences If $15 $0 Exterior Signage Is $10,000 $0 . SUB-TOTAL TRADES $95,225 GENERAL CONDITIONS $25,996 GRAND TOTAL CONSTRUCTION $121,221 #REF! Page 1 of 1 \\; ~, Miami Beach Fire Station #4 I MCHarry Associates City of Miami Beach I 2780 SW Douglas Road Estimated Construction Cost. 75%CD 06/03/03 New ConstructT~-'----~I---" 1 GENERAL CONDITIONS Quantity Unit ,Unit Cost Sub-Total I General Conditions 15.00% $195,680 $320,524 GC ohp 8.42% $109,842 BOND 1.00% $15,002 : $320,524 2 SITEWORK SITE PREP $53,020 Remove Curbs 300 If $4.00 $1,200.00 Embankment (fill) 4,100 cy $10,00 $41,000.00 - ~emove SidewalksfPaving 1,500 sf $1.00 $1,500.00 Remove Trees 10 ea $200.00 $2,000.00 Termite treat. 8,300 sf $0.40 $3,320.00 Demo Fnds 2,000 sf $2.00 $4,000.00 PAVING $46,745 Asphalt pavement & fill 1,000 sf $3.00 $3,000.00 Conc. Pavement and sidewalks 4,210 sf $3.00 $12,630.00 - -_. Retaining Walls 165 If $200.00 $33,000.00 Curb Cuts 3 ea $100.00 $300.00 Parking lot Markings w. misc I allow 1 Is $500.00 $500.00 Parking Bumpers 1 ea $100.00 $100.00 HC Parking w. signs 1 ea $215.00 $215.00 SITE UTILITIES $77,700 Site Electrical Duct Bank 100 If $40.00 $4,000.00 Site Communications 100 If $25.00 $2,500.00 Site Water 100 If $35.00 $3,500.00 Site Sewer 100 If $30.00 $3,000.00 Site Drainage Inlets 1 Is $1,500.00 $1,500.00 Drainage wells 2 ea $25,000.00 $50,000.00 2 Backflow preventor 2 ea $3,600.00 $7,200.00 Site Drainage Exfiltration 0 If $75.00 $0.00 8x8 tap and side walk restoration 1 ea $4,500.00 $4,500.00 Dumpster drain connect 1 ea $500.00 $500.00 Relocation of Fire Hydrant 1 ea $1,000.00 $1,000.00 LANDSCAPE $28,510 Irrigation systems 20,600 sf $0.85 $17,510.00 Exterior Signage 1 Is $5,000.00 $5,000.00 Planting 20 ea $300.00 $6,000.00 Sod 20,600 sf $0.30 $6,180.00 3 CONCRETE $232,900 SLAB-aN-GRADE Apparatus Bay 98 cy $300.00 $29,400.00 Dorm. Kitchen 41 cy $300.00 $12,300.00 Other Areas 61 cy $300.00 $18,300.00 Conc piles 125 cy $200.00 $25,000.00 Page 1 of 5 Miami Beach Fire Station #4 ! MCHarry Associates City of Miami Beach 2780 SW Douglas Road ~!matec!~ons~ruction Cost -!5%CD -- 06/03/03 New Construction I I l , IGrade Beams I 150 cy $300.00 $45,000.00 WALLS I COLUMNS , lArch. PIP wall 34 cy $500.00 $17,000.00 IColumns 30 cy $450.00 $13,500.00 ROOF STRUCTURE Roof and Tie Beams 52 cy I $300.00 $15,600.00 App. / Kit Slab 56 cv $275.00 $15,400.00 Office / Dorm Slab 76 cy $300.00 $22,800.00 12" PC Joists 9 ea $400.00 $3,600.00 24" PC Joists 6 ea $2,500.00 $15,000.00 4 MASONRY $95,000 8" masonry 4,500 sf $9.00 $40,500.00 1-- 8" masonry 1,900 sf $9.00 $17,100.00 ,------ - 12" Masonry 3,400 sf $11.00 $37,400.00 9,800 5 METAL $27,360 METAL FABRICATIONS Structural Steel - Rebar 10 ton $2,000.00 $20,000.00 Misc. metal fabrications 1 Is $5,000.00 $5,000.00 Wall Rail 16 If $15.00 $240.00 Dumpster Gates 1.5 pr $600.00 $900.00 Aluminum Stair Nosing 70 LF $10.00 $700.00 Angle at OH Door 52 If $10.00 $520.00 Metal Screens 210 sf $16.00 $3,360.00 6 WOOD $26,300 Rough Carpentry 8,300 sf $1.00 $8,300.00 Alarm Room Console 1 ea. $5,000.00 $5,000.00 Alarm Room desk/shelf 10 If. $300.00 $3,000.00 Kitchen Cabinet 16 If $250.00 $4,000.00 Kitchen Service Counter 20 If $300.00 $6,000.00 7 MOISTURElTHERMAL $47,480 Ext Wall Insulation 2,250 sf $0.40 $900.00 Int Wall Insulation 3,200 sf $0.40 $1,280.00 Roof Insulation - Rigid 8,300 sf $1.50 $12,450.00 Fireproofing (steel) 1 Is $5,000.00 $5,000.00 Louvers 200 sf $18.00 $3,600.00 Roofing - Mod. Bit. 83 sq $250.00 $20,750.00 Flashing & Cap Flashing 250 If $2.00 $500.00 Scuppers - Conc. 12 ea $250.00 $3,000.00 8 DOORS and WINDOWS $139,094 Exterior Doors, H.M. 2 ea $300.00 $600.00 Interior Doors, H.M. 17 ea $200.00 $3,400.00 24x24 Access Door 10 ea $100.00 $1,000.00 Hardware 19 ea $300.00 $5,700.00 Page 2 of 5 '\. '\. Miami Beach Fire Station #4 I I MCHarrv Associates City of Miami Beach : 2780 SW Douglas Road Estimated Construction Cost - 75%CD i 06/03/03 New Construction -1 ~ -~-_.- I Skylights 80 sf $70.00 $5,600.00 Roll up Doors 3 ea $6,500.00 $19,500.00 Glazed (sectional) Doors 3 ea I $4,000.00 $12.000.00 I nterior Storefront 286 sf I $25.00 $7,150.00 Exterior Storefront 1,522 sf $52.00 $79,144.00 Storefront Doors I 5 ea $1,000.00 $5,000.00 9 FINISHES $139,208 Stucco Exterior 3,950 sf $3.50 $13,825.00 PARTITIONS Inside exterior (Furred) 3,160 sf $2.00 $6,320.00 Drywall Partition Assembly 6,400 sf $4.00 $25,600.00 Toilet & Laundry - Tile 2,400 sf $5.00 $12,000.00 FLOORS Office, Hall, Kit - VCT 2.674.00 sf I $2.50 $6,685.00 Wet Areas - Tile 916 sf $8.00 $7,328.00 Dorm - Carpet 1,200 sf $32.00 $38,400.00 Other - Seled Cone. 3,510 sf $1.50 $5,265.00 CEILINGS Kitchen, Dorm - ACT 2,100 sf $2.50 $5,250.00 Wet Areas - M.R. 800 sf $5.00 $4,000.00 BASE I I Ext Walls - Rubber 250 If $1.50 $375.00 Interior Walls - Rubber 640 If $1.50 $960.00 PAINTING Painting Interior 15,760 sf $0.50 $7,880.00 Painting Doors 19 ea $50.00 $950.00 Painting Stucco 3,950 sf $0.60 $2,370.00 Paint Mech Equip 2 ea rm $1,000.00 $2,000.00 10 SPECIALTIES $14,880 Toilet Compartments - Plastic 2 ea I $800.00 $1,600.00 Urinal Screens - plastic 1 ea $230.00 $230.00 Signage 25 ea $50.00 $1,250.00 Exterior Signage - Alum. 1 Is $2,000.00 $2,000.00 Lockers - full ht 18x18x72 30 ea $260.00 $7,800.00 Marker Board 1 ea $500.00 $500.00 Fire Extinguishers & Cab 5 ea $300.00 $1,500.00 TOILET ACCESSORIES $6,885 Toilet Paper 5 ea $35.00 $175.00 Paper Towel/Waste 5 ea $175.00 $875.00 Fem napkin dispenser 1 $570.00 $570.00 Fem napkin disposal 3 $170.00 $510.00 Soap Dispenser 9 ea $100.00 $900.00 Mirrors 9 ea $200.00 $1,800.00 Rob Hooks 10 $20.00 $200.00 Shower Rods 7 $65.00 $455.00 Grab Bars 6 ea $100.00 $600.00 Misc Allowance (Bench) 2' units $400.00 $800.00 Page 3 of 5 ~. '\. Miami Beach Fire Station #4 I I MCHarry Associates I City of Miami Beach I 2780 SW Douglas Road Estimated Construction Cost. 75%CD I 06/03/03 _._---,---_.,--~- -- --- New Construction I ---- --r -.--- , I 11 EQUIPMENT NIC - by Owner KITCHEN EQUIPMENT $25,000 SS Counter 35 If $60.00 $2,100.00 Garbage disposal 1 I $1,000.00 $1,000.00 ALLOWANCE BALANCE $21,900.00 Refrigerator 3 NIC I $3,300.00 Freezer 1 NIC $1,800.00 Range 1 NIC I $5,300.00 Hood System 1 NIC $11,000.00 Garbage compactor 1 NIC $800.00 Laundry washer/dryer 2 NIC $2,000.00 Dishwasher 1 NIC $3,600.00 Ice maker 1 NIC $2,000.00 Special Decon. Rooom 0 NIC $10,000.00 Storage shelving 20 NIC $200.00 12 FURNISHINGS $0 Bunk 12 NIC $150.00 Desk 12 NIC $250.00 Wardrobe 12 NIC $300.00 Accordian Curtains 11 NIC $75.00 15 MECHANICAL $138,358 HVAC Apparatus Bay 3150 sf $5.00 $15,750.00 Dorm, Office Areas 3874 sf $15.00 $58,110.00 Other areas 1276 sf $15.00 $19,140.00 Vehicle Exhauset Syst. 1 ea $32,780.00 $32,780.00 TestJBal-10% ofmech 1 Is $12,578.00 $12,578.00 PLUMBING $63,100 Water Closets/showers 9 fixtu re $1,900.00 $17,100.00 Lavs / Sinks 9 fixture $1,500.00 $13,500.00 Urinals 2 fixture $1,200.00 $2,400.00 Laundry 1 Is $1,000.00 $1,000.00 Roof Drainage 10 ea $1,000.00 $10,000.00 Hot Water Htrs 1 ea $600.00 $600.00 Kitchen Sink 2 ea $1,200.00 $2,400.00 Hand Sink 1 ea $1,200.00 $1,200.00 Janitors Sink 1 ea $1,500.00 $1,500.00 Misc. appliance conn. 1 Is $500.00 $500.00 Pipe Protection 9 ea I $100.00 $900.00 Gen Fuel Tank -15000al 1 ea i $12,000.00 $12,000.00 FIRE SPRINKLERS $16,750 Sprinklers 8,300 sf $1.50 $12,450.00 Dbl Detection Check Valve 1 ea $4,000.00 $4,000.00 Connect to source 1 ea $300.00 $300.00 Page 4 of 5 \\, I\; Miami Beach Fire Station #4 I MCHarrv Associates City of Miami Beach 2780 SW Douglas Road Estimated Construction Cost. 75%CD 06/03/03 New Construction 16 ELECTRICAL ELECTRICAL - POWER $73,278 Emergency Generator 1 ea. $35,000.00 $35,000.00 UG conduit to pad 600 If $25.00 $15,000.00 Lightning Protection 1,200 sf $5.00 $6,000.00 Apparatus Bay 3,150 sf $1.00 $3,150.00 Other areas 1,276 sf $5.00 $6,380.00 Dorm, office areas 3,874 sf $2.00 $7,748.00 ELECTRICAL - LIGHTING I $39,227 Apparatus Bay 3,150 sf $3.50 $11,025.00 Other areas 1,276 sf $3.50 $4,466.00 Dorm, office areas 3,874 sf $4.00 $15,496.00 Landscape & Security 20,600 sf I $0.40 $8,240.00 , TELEPHONE/DATA/PA SYSTEM $13,738 PA system 8,300 sf $1.00 $8,300.00 Apparatus Bay 3,150 sf-conduit $0.50 $1,575.00 Other areas 1,276 sf-conduit $0.75 $957.00 Dorm, office areas 3,874 sf-conduit $0.75 $2,905.50 8,300 SUB-TOTAL TRADES I $1,304,533 GENERAL CONDITIONS $320,524 GRAND TOTAL CONSTRUCTION $1,625,056 $195.79 Page 5 of 5