Loading...
Resolution 2019-30739 RESOLUTION NO. 2019-30739 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE WRITTEN RECOMMENDATION OF THE CITY MANAGER (AS SET FORTH IN THE CITY COMMISSION MEMORANDUM ACCOMPANYING THIS RESOLUTION) AND WAIVING, BY A 5/7TH VOTE, THE FORMAL COMPETITIVE BIDDING REQUIREMENT, FINDING SUCH WAIVER TO BE IN THE CITY'S BEST INTEREST, AND APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A WORK ORDER WITH LEE CONSTRUCTION GROUP, INC., IN THE NOT TO EXCEED AMOUNT OF $325,242.84, FOR THE PURPOSE OF COMPLETING THE PUBLIC WORKS OPERATIONS EMERGENCY GENERATOR AND TRANSFER SWITCH PROJECT, WHICH INCLUDES THE NON-PRE-PRICED ITEMS IN THE AMOUNT OF $198,044.16, PURSUANT TO THE COMPETITIVELY BID SOURCEWELL COOPERATIVE CONTRACT FOR CONSTRUCTION SERVICES (FORMERLY KNOWN AS NATIONAL JOINT POWERS ALLIANCE (NJPA)), WITH THE FOREGOING WORK TO BE COMPLETED WITH PREVIOUSLY APPROPRIATED FUNDING; FURTHER, RESCINDING RESOLUTION NO. 2018-30626, WHICH APPROVED THE AWARD OF THE SAME WORK TO SOLARES ELECTRIC, INC. THROUGH THE NJPA PROCESS, AS SOLARES ELECTRIC, INC., IS NO LONGER AN AUTHORIZED VENDOR UNDER THE SOURCEWELL COOPERATIVE CONTRACT. WHEREAS, the City needs to install one (1) emergency generator at the Public Works Department(the Project); and WHEREAS the project consists of one (1) 600KW generator, which are available via the competitively procured National Joint Powers Alliance (NJPA) 120617-KOH award to Lee Construction Group, Inc., as well as a number of ancillary items (e.g. automatic transfer switch); and WHEREAS, the Administration desires to expedite the project, which is crucial to keep Public Works operational in the event of a storm or other catastrophe that results in loss of Power to the facility; and WHEREAS the Administration is requesting to issue a work order to Lee Construction Group, Inc., pursuant to the competitively bid Sourcewell cooperative contract for construction services (formerly known as National Joint Powers Alliance (NJPA)); and WHEREAS, the Administration recommends that the City Commission rescind Resolution No. 2018-30626, awarding the same work to Solares Electric, Inc. through the NJPA process, as Solares Electric, Inc. is no longer an authorized vendor under the NJPA; and , WHEREAS, the Finance and Citywide Projects Committee (the Committee), on February 21, 2014, endorsed a recommendation by the Administration, as a pilot to reintroduce this efficient process of Job Order Contracting ("JOC") project delivery to the City, and to begin utilizing the Gordian Group's indefinite quantity contract (IQC), for construction services to expedite the delivery of construction or maintenance projects under $250,000, or for emergency projects, as approved by the City Manager; and WHEREAS, Sourcewell awarded Contract No. 071415-GGI for IQC construction services, and said contract includes an award to Lee Construction Group, Inc., through the Gordian Group's IQC process, to provide services to the City pursuant to the contract; and WHEREAS, on January 15, 2014, via Resolution No 2014-28462, the City Commission authorized the Administration to utilize NJPA cooperative awards, pursuant to Section 2-369 of the Miami Beach City Code; and WHEREAS, on April 23, 2015, the City Commission authorized the Administration, for projects up to $250,000, or emergency awards exceeding $250,000, to be acquired through the Gordian Indefinite Quantity Contract (IQC) process as a means of expediting small or emergency projects with the approval of the City Manager; and WHEREAS, the IQC process, which is used extensively by local, state and federal governmental agencies throughout the United States, expedites the delivery of construction projects and the City, as a governmental agency, is authorized to utilize the IQC process for construction services competitively awarded by the National Joint Powers Alliance (NJPA) to the Gordian Group, the Managers of IQC; and WHEREAS,the Gordian Group, in the IQC process, established a fixed price Construction Task Catalog (Catalog) for a wide range of construction activities; and WHEREAS, in the interest of time, the City has chosen to expedite this project and utilize the Indefinite Quantity Contract (IQC) process; and WHEREAS, through the NJPA process, Lee Construction Group, Inc., was identified as the contractor that has the qualifications and experience in performing the identified scope; and WHEREAS, on February 13, 2019, after negotiations, the Contractor submitted a bid proposal in the amount of $295,649.75, for the Project plus an additional $29,593.09 project contingency; and WHEREAS, the original scope of work included to provide automatic transfer switch and generator including all conduit and wiring, excavation, surfacing repairs, testing, permits, and concrete slab as depicted in the approved construction documents; and WHEREAS, the purchase of one (1) 600KW Kohler generator and automatic transfer switch, constitute Non-Pre-Priced (NPP) items in the Catalog; and WHEREAS, Lee Construction Group, Inc., is a certified contractor for the purchase and installation of one (1) 600KW Kohler generator, switchgear and ancillary items; and WHEREAS, Kohler generators are preferred, as this brand of generator is in service at a majority of the City's facilities; and WHEREAS, the IQC proposal received is over the $250,000 threshold limit approved by the City Commission for projects through the NJPA IQC process, and, since the value of the non- pre-priced items exceeds the $50,000 authority of the City Manager, the approval of the City Commission is required to award the Project through the IQC process; and WHEREAS, accordingly, the City Manager recommends waiving, by a 5/7ths vote, the formal competitive bidding requirement, finding such waiver to be in the City's best interest, and authorizing the purchase of one (1) 600 kW Kohler generator, switchgear and ancillary items; and in an amount not to exceed $198,044.16; and WHEREAS, the Administration recommends, as being in the City's best interest, to award the Project to Lee Construction Group, Inc., through the IQC process, in the not to exceed amount of$325,242.84, including the Non-Pre-Priced items in the amount of$198,044.16. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby accept the written recommendation of the City Manager and waive, by a 5/7ths vote, the formal competitive bidding requirement, finding such waiver to be in the City's best interest, and approve and authorize the City Manager to execute a Work Order with Lee Construction Group, Inc., in the not to exceed amount of$325,242.84 for the purpose of completing the Public Works Operations Emergency Generator and Transfer Switch Project, which includes non-pre-priced items in the amount of $167,435.42, pursuant to the competitively bid Sourcewell cooperative contract for construction services (formerly known as National Joint Powers Alliance (NJPA)),with the foregoing work to be completed with previously appropriated funding; further, rescinding Resolution No. 2018-30626, which approved the award of the same work to Solares Electric, Inc., as Solares Electric, Inc., is no longer an authorized vendor under the Sourcewell cooperative contract. PASSED and ADOPTED this /3 day of MarCA , 2019. .. ,,iiiiiilli DAN GELR, ' ' . - ATTEST: i , RAF L E. ANA , CI CLERK APPROVED AS TO FORM&LANGUAGE ''may 0..._uy11 &FOR EXECUTION 4:1 Jr t ............................. pQ(_._,. 3- 1-11 cj2:Q f�=_ City y n Date '°-'` INCORT____ ORATED, 0 40 L; ♦ 4 • 41 c Resolutions -C7 S MIAMI BEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: March 13, 2019 SUBJECT:A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE WRITTEN RECOMMENDATION OF THE CITY MANAGER AND WAIVING, BYA 5/7TH VOTE, THE FORMAL COMPETITIVE BIDDING REQUIREMENT, FINDING SUCH WAIVER TO BE IN THE CITY'S BEST INTEREST, AND APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A WORK ORDER WITH LEE CONSTRUCTION GROUP, INC., IN THE NOT TO EXCEED AMOUNT OF $325,242.84, FOR THE PURPOSE OF COMPLETING THE PUBLIC WORKS OPERATIONS EMERGENCY GENERATOR AND TRANSFER SWITCH PROJECT, WHICH INCLUDES THE NON-PRE- PRICED ITEMS IN THE AMOUNT OF $198,044.16, PURSUANT TO THE COMPETITIVELY BID SOURCEWELL COOPERATIVE CONTRACT FOR CONSTRUCTION SERVICES (FORMERLY KNOWN AS NATIONAL JOINT POWERS ALLIANCE (NJPA)), AND RESCINDING RESOLUTION NO. 2018- 30626, APPROVING THE AWARD OF THE SAME WORK TO LEE CONSTRUCTION GROUP, INC., THROUGH THE NJPA PROCESS, AS SOLARES ELECTRIC, INC., IS NO LONGER AN AUTHORIZED VENDOR UNDER THE NJ PA, WITH PREVIOUSLYAPPROPRIATED FUNDING. RECOMMENDATION The Administration recommends adopting the Resolution. ANALYSIS The City needs to install one (1) emergency generator at the Public Works Department (the Project). The Capital Renewal and Replacement project consists of one (1) 600 kW Kohler generator, as well as a number of ancillary items such as the automatic transfer switch, enclosure, fuel system and concrete base. The Project procured via the Gordian Indefinite Quantity Contract (IQC) was awarded to Lee Construction Group, Inc. Administration rescinds Resolution No. 2018-30626 to Solares Electric, Inc. through the NJ PA process, as Solares Electric, Inc., previously approved for this project is no longer an authorized vendor under the NJ PA. Page 734 of 1418 On February 21, 2014 the Finance and Citywide Projects Committee (the Committee) endorsed a recommendation by the Administration to reintroduce this efficient process of project delivery to the City, to begin utilizing the Gordian Group's indefinite quantity contract (IQC), alternatively known as JOC, for construction services to expedite the delivery of construction or maintenance projects under $250,000, or for emergency projects, as approved by the City Manager. Sourcewell, formally known as National Joint Powers Alliance (NJ PA), a national cooperative that bids contracts aggregating the spend volume of agencies across the country, has awarded Contract No. #071415-GGI for IQC construction services to the Gordian Group. The NJPA contract with the Gordian Group includes a number of contractors prequalified to provide services to the City pursuant to the contract under an IQC pre-priced methodology. The contract also has a provision for non-pre-priced items which requires the contractor to secure three quotes for every item that does not correspond to a pre-priced contract line item. In the interest of time, the City has chosen to expedite the Project, which is crucial to keep Public Works operational in the event of a storm or other catastrophe that results in loss of power to the facility; and utilize the IQC process. Through the IQC process, Lee Construction Group, Inc. ("Contractor") was identified as the most qualified and experienced contractor to complete the identified scope. The City and the Gordian Group met with the Contractor to review the scope for the Project. On February 13, 2019, after negotiations, the Contractor submitted a bid proposal, utilizing the Catalog in the amount of $325,242.84 for the Project including an owner's project contingency of$29,593.09. However, the original scope of work included to provide automatic transfer switch and generator including all conduit and wiring, excavation, surfacing repairs, testing, permits, and concrete slab as depicted in the approved construction documents. Of these items the 600 kW Kohler Generator and Kohler automatic transfer switch are a Non-Pre-Priced (NPP) items in the Catalog in the amount of $198,044.16. Kohler generators are preferred, as this brand of generator is in service at a majority of the City's facilities and in efforts of standardization, ease of maintenance, expeditious repairs and cost efficiency it is in the best interest of the City. In such cases, the Administration is requesting the acceptance by the Mayor and City Commission of the written recommendation of the City Manager and waiving, by a 5/7ths vote, the formal competitive bidding requirement, finding such waiver to be in the City's best interest. The IQC proposal received does exceed the $250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award and the value of the NPP items exceeds the $50,000 authority of the City Manager, the approval of the City Commission is required to award the Project through the IQC process. The cost proposal was reviewed and analyzed by the engineer of record, staff, and the Gordian Group and was found to be fair and reasonable. Therefore, the Administration believes that it is in the City's best interest to award the Project to Lee Construction Group, Inc., through the IQC process, in the not to exceed amount of $325,242.84, for completing the Public Works Operations Emergency Generator, with previously appropriated funds. CONCLUSION The Administration recommends adopting the Resolution. Page 735 of 1418 FINANCIAL INFORMATION Previously appropriated as part of the Capital Renewal and Replacement budget of fiscal year 2019. Legislative Tracking Property Management ATTACHMENTS: Description ❑ IQC Proposal-Contract ❑ Resolution-PW Generator Lee Construction Page 736 of 1418 4440. ,s1,4„A .14-4QC Work Order Signature Document THE GORDIAN GROUP NJPA EZIQC Contract No.: FLO4GC4-051716-LCI X New Work Order Modify an Existing Work Order Work Order Number.: 062104.00 Work Order Date: 02/13/2019 Work Order Title: Miami Beach Public Works Office New Generator Owner Name: City of Miami Beach Contractor Name: LEE Construction Group. Inc. Contact: Adrian Morales Contact: Andres Solares Phone: 305-673-7000 Phone: ' Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIQC Contract No FLO4GC4-051716-LCI. Brief Work Order Description: Install new 600KW Generator Time of Performance Estimated Start Date: Estimated Completion Date: Liquidated Damages Will apply: 1-1 Will not apply: 111 Work Order Firm Fixed Price: $295,649.75 Owner Purchase Order Number: Approvals Owner Date Contractor Date Work Order Signature Document Page 1 of 1 2/13/2019 Page 737 of 1418 TAI Detailed Scope of Work THE GORDIAN GROUP To: Andres Solares From: Adrian Morales Solares Electrical Services, Inc City of Miami Beach 10421 NW 28th Street 1700 Convention Center Drive Miami, Fl 33172 Miami Beach, FL 33139 No Data Input 305-673-7000 Date Printed: February 13,2019 Work Order Number: 062104.00 Work Order Title: Miami Beach Public Works Office New Generator Brief Scope: Install new 600KW Generator nPreliminary n Revised n Final The following items detail the scope of work as discussed at the site.All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Provide automatic transfer switch and generator including all conduit and wiring,excavation,surfacing repairs,testing, permit, concrete slabs. Subject to the terms and conditions of JOC Contract FLO4GC4-051716-LCI. Contractor Date Owner Date Scope of Work Page 1 of 1 2/13/2019 Page 738 of 1418 Contractor's Price Proposal - Summary Date: February 13,2019 Re: IQC Master Contract#: FL04GC4-051716-LCI Work Order#: 062104.00 Owner PO#: Title: Miami Beach Public Works Office New Generator Contractor: LEE Construction Group.Inc. Proposal Value: $295,649.75 Section-01 $25,856.70 Section-02 $1,272.54 Section-03 $7,195.93 Section-22 $1,245.11 Section-23 $2,012.43 Section-26 $244,175.12 Section-28 $681.79 Section-32 $13,210.13 Proposal Total $295,649.75 Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 66.99% Contractor's Price Proposal-Summary Page 1 of 1 2/13/2019 Page 739 of 1418 Contractor's Price Proposal - Detail Date: February 13,2019 Re: IQC Master Contract#: FLO4GC4-051716-LCI Work Order#: 062104.00 Owner PO#: Title: Miami Beach Public Works Office New Generator Contractor: LEE Construction Group.Inc. Proposal Value: $295,649.75 Sect. Item Mod. UOM Description Line Total Labor Equip. Material (Excludes) Section-01 01 22 16 00 0002 EA Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible $5,808.00 costs. The base cost of the Reimbursable Fee is$1.00.Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee(e.g.quantity of 125=$125.00 Reimbursable Fee).If there are multiple Reimbursable Fees, list each one separately and add a comment in the"note"block to identify the Reimbursable Fee(e.g.sidewalk closure,road cut,various permits,extended warrantee,expedited shipping costs,etc.).A copy of each receipt shall be submitted with the Price Proposal. Quantity Unit Price Factor Total Installation5,280.00 x 1.00 x 1.1000 = 5,808.00 permit fees 2 01 22 16 00 0002 EA Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible $3,300.00 costs. The base cost of the Reimbursable Fee is$1.00.Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee(e.g.quantity of 125=$125.00 Reimbursable Fee).If there are multiple Reimbursable Fees, list each one separately and add a comment in the"note"block to identify the Reimbursable Fee(e.g.sidewalk closure,road cut,various permits,extended warrantee,expedited shipping costs,etc.).A copy of each receipt shall be submitted with the Price Proposal. Quantity Unit Price Factor Total Installation3,000.00 x 1.00 x 1.1000 = 3,300.00 FPL fees to open vault for core drilling 3 01 22 20 00 0049 HR Investigating Senior Engineer Or Specialty ConsultantFor special investigatory $3,562.20 engineering requirements or other miscellaneous professional services. Quantity Unit Price Factor Total Installation24.00 x 125.00 x 1.1874 = 3,562.20 for testing and owners training 4 01 22 23 00 0389 WK 1/2 To 5/8 CY,65 HP,Loader-Backhoe With Standard Bucket And Full-Time $911.19 Operator Quantity Unit Price Factor Total Installation0.30 x 2,557.94 x 1.1874 = 911.19 5 01 22 23 00 0729 DAY 650 KW A/C Resistive Loadbank $1,277.88 Quantity Unit Price Factor Total Installation2 00 x 538.10 x 1.1874 = 1,277.88 6 01 22 23 00 0747 EA Fuel Reimbursement For GeneratorsPurchases made by the contractor for $2,374.80 fuel will be reimbursed to the Contractor at the actual cost of the purchase, without mark-up,for which a receipt or bill is received.The Adjustment Factor applied to Reimbursable Fees will be 1.0000.The base cost of the purchase is$1.00,quantity will adjust cost to actual purchase cost;i.e.,quantity of 125 =$125.00 purchase.If there are multiple purchases,each one shall be listed separately with a comment in the"note"block to identify the purchase. Quantity Unit Price Factor Total Installation2,000.00 x 1.00 x 1.1874 = 2,374.80 Contractor's Price Proposal-Detail Page 1 of 5 2/13/2019 Page 740 of 1418 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062104.00 Work Order Title: Miami Beach Public Works Office New Generator Section-01 7 01 22 23 00 1194 WK 3 Ton Capacity,12'To 16'Bed,4 x 2 Flat Bed Truck With Full-Time Truck $3,589.52 Driver Quantity Unit Price Factor Total Installation1.00 x 3,023.01 x 1.1874 = 3,589.52 generator delivery 8 01 45 23 00 0011 EA Proctor Compaction 4"Standard Mold ASTM D698,Field Soils Test $420.74 Quantity Unit Price Factor Total Installation2 00 x 177.17 x 1.1874 = 420.74 9 01 71 13 00 0005 EA Up To 20 Ton Lift Move On/Off Cost,Truck Mounted Cranelncludes delivery $317.63 and pickup. Quantity Unit Price Factor Total Installation1.00 x 267.50 x 1.1874 = 317.63 10 01 71 23 16 0023 ACR Survey Clear Area For Underground Utilities $3,002.98 Quantity Unit Price Factor Total Installation1.00 x 2,529.04 x 1.1874 = 3,002.98 11 01 71 36 00 0003 EA X-Ray Or Electromagnetic Survey Minimum Set-Up ChargeFor projects where $378.27 the total charges are less than the minimum set-up charge,use this task exclusively.This task should not be used in conjunction with any other tasks in this section. Quantity Unit Price Factor Total Installation 1.00 x 318.57 x 1.1874 378.27 12 01 74 19 00 0015 EA 30 CY Dumpster(5 Ton)"Construction Debris"Includes delivery of dumpster, $913.49 rental cost,pick-up cost,hauling,and disposal fee.Non-hazardous material. Quantity Unit Price Factor Total Installation1 00 x 769.32 x 1.1874 = 913.49 Subtotal for Section-01 $25,856.70 Section-02 13 02 41 19 13 0063 EA Saw Cut Minimum ChargeFor projects where the total saw cutting charge is $574.04 less than the minimum charge,use this task exclusively.This task should not be used in conjunction with any other tasks in this section. Quantity Unit Price Factor Total Installation1.00 x 483.44 x 1.1874 - 574.04 14 02 41 19 13 0089 EA Drill 2"Diameter Core In>4"To 6"Concrete $85.73 Quantity Unit Price Factor Total Installation2 00 x 36.10 x 1.1874 = 85.73 15 02 41 19 13 0103 EA Drill 4"Diameter Core In>6"To 8"Concrete $470.28 Quantity Unit Price Factor Total Installation6.00 x 66.01 x 1.1874 - 470.28 16 02 66 23 00 0065 SF Cleanup And Re-Grade Working Surface $142.49 Quantity Unit Price Factor Total Installation2,000.00 x 0.06 x 1.1874 = 142.49 Subtotal for Section-02 $1,272.54 Section-03 17 03 11 13 00 0026 SF Elevated Slab Wood Formwork $336.98 Quantity Unit Price l Factor Total Installation60.00 x 4.73 x 1.1874 = 336.98 Contractor's Price Proposal-Detail Page 2 of 5 2/13/2019 Page 741 of 1418 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062104.00 Work Order Title: Miami Beach Public Works Office New Generator Section-03 18 03 21 11 00 0130 LF #6,Grade 60,Slab On Grade,Steel Reinforcement Bar $4,642.97 Quantity Unit Price Factor Total Installation2,660.00 X 1.47 x 1.1874 = 4,642.97 19 03 31 13 00 0018 CY Direct Chute,Place 3,000 PSI Concrete Continuous Footings $1,463.47 Quantity Unit Price Factor Total Installation10.00 X 123.25 X 1.1874 = 1,463.47 20 03 31 13 00 0018 0042 MOD For Up To 20,Add $77.18 Quantity Unit Price Factor Total Installation10.00 x 6.50 x 1.1874 = 77.18 21 03 31 13 00 0104 HR 35 CY/HR,66 HP Trailer Mounted Concrete Pumpincludes hoses $675.33 Quantity Unit Price Factor Total Installation7 00 X 81.25 X 1.1874 = 675.33 Subtotal for Section-03 $7,195.93 Section-22 22 22 11 16 00 0007 LF 2"Schedule 40 Threaded Galvanized Steel Pipe With 150 LB Malleable Iron $1,245.11 Fitting Assemblylncludes all hangers and all galvanized malleable iron fittings (couplings,elbows,tees and reducer fittings).All hangers are complete assemblies.Not for use where detail is available. Quantity Unit Price Factor Total Installation70.00 X 14.98 X 1.1874 = 1,245.11 Subtotal for Section-22 $1,245.11 Section-23 23 23 05 48 00 0021 EA 550-1,920 LB Rubber In Shear Vibration Isolation With 0.48"Deflection $1,868.49 Quantity Unit Price Factor Total Installation4.00 X 393.40 X 1.1874 = 1,868.49 24 23 09 23 00 0086 EA Install And Wire Break Glass Switch $143.94 Quantity Unit Price Factor Total Installation1 00 x 121.22 x 1.1874 = 143.94 Subtotal for Section-23 $2,012.43 Section-26 25 26 00 00 00 0001 EA Furnish 600KW Generator $198,044.16 Quantity Unit Price Factor Total NPP Installation1.00 X 171,200.00 x 1.1568 = 198,044.16 26 26 05 13 00 0226 EA 300 MCM Crimp Compression Connection For Bare Aluminum Wire $1,169.59 Quantity Unit Price Factor Total Installation10.00 X 98.50 X 1.1874 1,169.59 27 26 05 19 16 0254 MLF #6 AWG Cable-XLPE-USE-RHH-RHW 600 Volt Copper,Single Stranded, $563.37 Placed In Conduit Quantity Unit Price Factor Total Installation0.42 X 1,129.66 X 1.1874 = 563.37 28 26 05 19 16 0261 MLF #3/0 AWG Cable-XLPE-USE-RHH-RHW 600 Volt Copper,Single Stranded, $4,884.72 Placed In Conduit Quantity Unit Price Factor Total Installation0.79 X 5,207.33 X 1.1874 = 4,884.72 Contractor's Price Proposal-Detail Page 3 of 5 2/13/2019 Page 742 of 1418 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062104.00 Work Order Title: Miami Beach Public Works Office New Generator Section-26 29 26 05 19 16 0287 MLF #1/0 AWG Cable-Type THHN-THWN 600 Volt Copper,Single Stranded, $1,309.05 Placed In Conduit Quantity Unit Price Factor Total Installation0.41 x 2,673.47 x 1.1874 = 1,301.54 Demolition 0.02 x 316.44 x 1.1874 = 7.51 30 26 05 19 16 0292 MLF 300 MCM Cable-Type THHN-THWN 600 Volt Copper,Single Stranded,Placed $21,742.14 In Conduit Quantity • Unit Price Factor Total Installation3.00 x 6,103.57 x 1.1874 = 21,742.14 31 26 05 19 16 0296 MLF 600 MCM Cable-Type THHN-THWN 600 Volt Copper,Single Stranded,Placed $2,368.81 In Conduit Quantity Unit Price Factor Total Installation0.16 x 11,936.17 x 1.1874 = 2,267.68 Demolition 0.12 x 709.73 x 1.1874 = 101.13 32 26 05 26 00 0099 EA 5/8"Diameter x 10'Long Copper-Clad Ground Rods $801.73 Quantity Unit Price Factor Total Installation10.00 x 67.52 x 1.1874 = 801.73 33 26 05 29 00 0029 LF >2'Length x 1-5/8"Wide x 1-5/8"High,12 Gauge,Steel Unistrut Channel $907.17 Quantity Unit Price Factor Total • Installation100.00 x 6.84 x 1.1874 812.18 Demolition 80.00 x 1.00 x 1.1874 = 94.99 34 26 05 29 00 0057 EA 3-Hole,1-5/8"x 4-1/8",90 Degree Angle,Steel,Unistrut Channel Fitting $66.26 Quantity Unit Price Factor Total Installation10.00 x 5.58 x 1.1874 = 66.26 35 26 05 29 00 0093 EA 4"Diameter,Steel,Standard Pipe And Rigid Conduit Clamp For Unistrut $24.94 Channel Quantity Unit Price Factor Total Installation4.00 x 5.25 x 1.1874 = 24.94 36 26 05 29 00 0138 EA 5/8-11,Steel Lock Nut With Spring For Unistrut Channel $279.69 Quantity Unit Price Factor Total Installation35.00 x 6.73 x 1.1874 = 279.69 37 26 05 33 13 0034 CLF 1"Rigid Galvanized Steel(RGS)With 4#12 THHN/THWN Wire $1,138.95 Assemblylncludes conduit,terminations,straps,wire as indicated.Not for use where detail is available. Quantity Unit Price Factor Total Installation1.60 x 599.50 x 1.1874 = 1,138.95 38 26 05 43 00 0156 LF 4 At 4",Duplex Polyvinyl Chloride(PVC),Type EB Duct Bank $426.93 Quantity Unit Price Factor Total Installation15.00 x 23.97 x 1.1874 = 426.93 39 26 05 43 00 0167 LF 1 At 2",Duplex Polyvinyl Chloride(PVC),Type DB Duct Bank $66.08 Quantity Unit Price Factor Total Installation15.00 x 3.71 x 1.1874 = 66.08 40 26 05 43 00 0188 EA 4"Adapter $244.15 Quantity Unit Price Factor Total Installation6.00 x 34.27 x 1.1874 = 244.15 41 26 05 83 00 0024 EA 1/0 AWG Low Voltage(To 600 Volts)One Hole Compression Lug $341.38 Quantity Unit Price Factor Total Installation10.00 x 28.75 x 1.1874 = 341.38 Contractor's Price Proposal-Detail Page 4 of 5 2/13/2019 Page 743 of 1418 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062104.00 Work Order Title: Miami Beach Public Works Office New Generator Section-26 42 26 05 83 00 0049 EA 750 MCM Low Voltage(To 600 Volts)Two Hole Compression Lug $957.31 Quantity Unit Price Factor Total Installation9 00 x 89.58 x 1.1874 = 957.31 43 26 32 13 13 0021 EA 600 KW Diesel Generator Set,3 Phase(Cummins DQCA) $8,838.69 Quantity Unit Price Factor Total X Installation 1.00 x 7,443.73 x 1.1874 - 8,838.69 Subtotal for Section-26 $244,175.12 Section-28 44 28 05. 13 23 0005 MLF 2-Pair,18 AWG,Twisted Pair,Non-Shielded,Plenum Rated,Solid Type FPLP $197.13 (Red),Fire Alarm/Life Safety Cable,Installed In Conduit Quantity Unit Price Factor Total Installation0.10 x 1,660.22 x 1.1874 = 197.13 45 28 31 23 00 0332 EA Remote Annunciator,80 Character LCD,Common System Indicators,Beige $484.66 Housing,Mounts To 4"Box With Supplied Ring(EST3 RLCD) Quantity Unit Price Factor Total Installation100 x 408.17 x 1.1874 = 484.66 Subtotal for Section-28 $681.79 Section-32 46 32 11 26 19 0002 CY Bituminous Stabilized Base Course3/4"ASTM C33. $3,385.80 Quantity Unit Price Factor Total Installation24.00 x 118.81 x 1.1874 = 3,385.80 47 32 12 13 19 0002 SY Surface Prime Coat,0.28 Gallon/SY $28.78 Quantity Unit Price Factor Total Installation 24.00 x 1.01 x 1.1874 28.78 48 32 12 13 19 0002 0339 MOD For Up To 150,Add $6.55 Quantity Unit Price Factor Total Installation24.00 x 0.23 x 1.1874 = 6.55 49 32 12 16 13 0005 SY 2"Thick Binder Courselncludes placement,rolling,finishing and sweeping. $8,321.30 . Quantity Unit Price Factor Total Installation600.00 x 11.68 x 1.1874 = 8,321.30 50 32 12 16 13 0023 TON Base Course,PC-I $978.47 Quantity Unit Price Factor Total Installation6.00 x 137.34 x 1.1874 = 978.47 51 32 12 16 13 0023 0486 MOD For>5 To 10,Add $489.23 Quantity Unit Price Factor Total Installation6.00 x 68.67 x 1.1874 = 489.23 Subtotal for Section-32 $13,210.13 Proposal Total $295,649.75 This total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 66.99% Contractor's Price Proposal-Detail Page 5 of 5 2/13/2019 Page 744 of 1418 C Subcontractor Listing THE GORDIAN GROUP Date: February 13,2019 Re: IQC Master Contract#: FLO4GC4-051716-LCI Work Order#: 062104.00 Owner PO#: Title: Miami Beach Public Works Office New Generator Contractor: LEE Construction Group.Inc. Proposal Value: $295,649.75 Name of Contractor Duties Amount No Subcontractors have been $0.00 0.00 selected for this Work Order Subcontractor Listing Page 1 of 1 2/13/2019 Page 745 of 1418 QUOTE II TANK GAL GENSET MODEL GENSET FOOTPRINT am'wow 33787 1100GAL DS5D0 132" X'74" X LBS 1 Em( . - SD.OP AlTE1112/ 170.613'OVERALL POT_W PE11161R°N of ENGINEERING 652 AI aWIBr00Mcae8ATIIIT L°°°) I- FOR ARCHITECTURE ��//Jj .gs43 iBF1.eN slEucxlle xEuliOaEffalil I 5757 awe Lagoon o1. �''� 65p1 ' 8 Suite 400 1'l 6901 SW4L55 SIAL AMOSISA WNMfR MIem1,FL 86.65 11� 66d1 /ICW MARE NUPRSIN[LdhYA PIroIre'305.288.6553 le 6500 p3tfuene COL Fex 305.268.6885 ?� R;i\. T 6900 ]'BUCK Pohl IR911UE101! www.80enpweenRcom 10 d 00 is muff®Lg eu amman suvvueo FLEA ®!00000!5 —_ I )w. JM', I - I_.V, 6640 EPO SUPPUEO 068 SYSRE91 oawrW ma mE�.wtrw0mna: e I T9PTIIJ 1I-11 R' .�._. - 4489 RATA OHAA I RUMP=MARRED SAMBA. FE�I - S.E-GR-OB-XXIAR t a I .:-...;....,,T..... .,1,19,1711. I $q AU K&9Ib`0.YR OK4loOte' k=JL t i. �M5 ea7o CL@Orf.4-of-c3mD. — ^ I.... - DYE PAN CAP.PF-65-..01-08 - . I ■ 8616 EA1[Mi 8 2 6NPAFS 10 06E608 gra r-_.. �lLY i.'_!!rt 1`,-'* 69D2 4065�Orx xval'x. 17.5 p Awl! l—^ .690+ LLWxr b WIRE war cwt.'? OPEN (3 I I �nmiw1.,m�1® a +- 8148?AWA MULL1006.0 r000 Va£LS Z .91161 PAM WLUR£OO911231 MBE W ± ac I 1 20.5 OPEN <J a v - I }} 11E0U LL , _ . . 84�ONSTIALLW 'ixs O IIII I J � 1M1111,711 1111 lliri i.11.—LM W 11 riftll j 1 a. al_a u waRitItilirdit , ,,z4 III .0;7. ,. . , _.___;11.. ,_:„.. I, . . mar,..ip-q-,,,-.-iii 181 IS DE 0.11111.11,1 Rev.. I� MIIII *I1 OVERALL �_ �� ' 146:5 �w- 1 _a Q 108 li I■ I hies _� 01 I� �I'�. E I j'. bf0 -•--1 ` HEISSIT _- 1,1„.._,—.„„..Ai,,....::: rE�,a! — 9999911 IIU �I,��y'-11� o tir 1 0 1 r . �5 sv „xo,sei 8011800,P.E. ,„,g Dcense!63096 Lj60. .1 1..._________70___:______.1 _ I THIS AUTOCAD DRAWINGS THE PROPERTY OF GLOBAL POWER COMPONENTS AND PAY NOT BE USED IN ANY WAY DETRIMENTAL TO THE INTERESTS,OF C.P.C.ANYMANUAL CHANGES WLL WID LIDS DRAWING.SPECTICATIONS MAY CHANGE WITHOUT NOTICE I ASSY REV DATE: REVISIONS CHANGE MADE BY REV DATE: REVISIONS MADE BY G141E-A1-500-1100 ASSEMBLY CUSTOMER/ID:FLORIDA ODA- 3 JOB REF: - DRAWING RER AAAQ33767 631860*: 618043 DWG :91 POWER COMPONENTS �••e• DATE:5/30/17 0441-2018 3 DRAWN BY.MTB. ommlar TLC pao.m aY TLC gm 0080610* tl STANDBY GENERATOR - o DIMENSIONS 0 2 K Oa P t, E-1.02 tines s Pape NS alum SCOPE OF WORK: 1 L( SET NW I 09. THE SCOPE OF VIDRK FOR THE PRESENT 0 01091900010STRIBUTION_ _ DESIGN IS TO PROVIDE STANBY POWER TO REFER TO MAIM!BEACH-PUBLIC WORK FACILITY. Q NEWAurawnC TRANSFER SwrO1.ERW:EERATEDm,emalwtz.aw. 009 OF vur°°°"°"Kttae'1°";"°rx"°I°Ix°a°• THIS SHALL BE DONE BY INSTALLING A mOkV ECOA•3 POLE.8010 30100.01.90,009 10F I.. QQ NEW xs lxsrutmursERDRDua REFER TO DIESELFUELEDGENERATOR@}48d2/TV- THREE PHASE ENGINEERING FEL \ B.PIAN LNS FENCE ONEw1:9900 CONDUIT R .TTSa�.°roESTERaRw,u.0E0 To piss, FOR ARCHITECTURE V?.LT '\ - 0NEw 0.tDEaawuu m eroxEFER TO 5757BIu 43 Or, Surto 0 • Mleml FL 33128 \ • Q 0.15040 PAPEEL PLOWED AT CA+0.0 004 19001.009090.91E C000 0E00 TO F-000.00.00,BULT0019009910.PROADE MEL Phone:305288.8553 09/0.0 PRE00/0 00900 MEL SC009.0 099100.013190001000 5. en2ne.re Hm1 www0RWlerem\ ASPH. FAVAEVT OFx MO marrsnura e 03 10000015 04,41 bn100900R0001n Y. \ QHY 900E0 GENERVOR.MO 04 R� 0 nonvx0FUEL TISK OWE.ro NEWSvomovsooRIOR. 0 GENERATOR 0.00000107.0 \ 6)5550EnxrvuvauoR 000. 000091. • \ 0 O A � co �;'� I 1 DD5lt'e c. II II II 9.00 • m 0 V7,4[00 -------\\) • ' MEC-/ELCT RE I I I 1 w r• O_ m • • ^• a I 1 ..oe. .n rn, t S Enrrvc i =W o Dry rye.TANK R9.090199 W '4,-'• I 900 Aa Ri••eR� CCVTRO_ROTE it Qo I _ vmc c Rnw m { • FF.EL=-SSA• 1 ur • . III1��1 0.99 00 e r . 1.• n 1.r.,.mr nw 2 IiiIIII \\\�1' Ij, [TLRnTUT sim, 099009^ +wa e.m n _ sL m_ m., .r I� • ,eo: ELECTRICAL SITE PLAN • Lay,RA No. o.m YNE INA 1',0' ruT+tl 0e0100 0 -0 -0 __ .tea — • KEY NOTES: _ CO Manuel Mollinedo,P.E — ! eD,mixarsEr Q xDIESEL FULED.BASIS Or Ew or Ter mux eQ NEW SIAM�wiVmm E Ew 0 Florida license X63096 GENERATOR ocla+r emlrol60. AE NEW SERVIC1 — ^ O la K 1 17°77"3 ®.`�"im Q SEAS r ro,,I.v laucEm�m,,,,A, m 011011,01(MAL 1 BE COMECTED toy -0 1 El' OI�sErs Exxs;w:.l�m.aAT .r.In \+7'rl b `e "� O r"C1OWM. O.1 eeWo�mlmuera.a 01.1.10 WATER NEATER JACKET,CONVE1.01.0 e AAVO i11.1. P U l''.4rI.,I I ©Gay w3SHAM BE ®PLA 1. IGUR�n30001001`E' 00 oi I. E ° EPo EMO WEE WE SOr, wI q� I 0 009.0910 0E00 0000109019092900E0 1,00590..99 Irn IWI1EDe.Rr,vam.MR ill mureDmemm 003AM.000,90, 0009IDE HEW 099-000 aRamenEa Hravnox u.lerorEm R` rv�' 678002 ^ V R 050011000500. r°°.7oanm 001515 uxa.RErEn :...d� g ®11.15.0 111UND•noERCAPO s�rolwlc 03-31-08 ®EISIn,c 000 0., TLC SPEEXER 190 Ea 900.POT 0 4.0100099/0 � n Tc ®a1.10 1,101.BE 1/81=Por BE PEI0VED.09500001040090 Da ro m .,.,Twp CAP GENERATOR ,Rw MEL 0E0 00090,00111 FM TO E. DONDUn.r sMTxees 9000001 0909.1P0090000E.uFLOOR PLAN& e RISER DIAGRAM a PARTIAL RISER DIAGRAM o 00.011ro. SC.xn m E-101 GENERAL SPECIFICATIONS: JOBB TANK GAL GENSET MODEL GENSEF FOOTPRINT TOTAL WEIGHT -CERTIFICATIONS AND STANDARDS: • NEC 2014 EMISSIONS:COMPLYING WITH EPA TIER 3. 5000 GAL DS1250 198.25"X 90" 48,750 LBS1 L(. ALL VERTICAL WALL& MANUFACTURED IN ISO 9001 AND ISO 381 OVERALL DOOR PANELS&ROOF mu.trF'ATErau 14001 CERTIFIED FACILITY. 16925 102.25 • INSULATPANION BOAARD2. RW/ Pun I DESCRIPTION otr mw-Al DIA9Dw ca i]Buclwn Cow-MI I ' �` PERF. 6349 166 MPH TO FAR 6 RDMOR900 t UL 2200 COMPLIANT. SPECK6505ObACT MD PO IlAU4/'A10i TLS1N4 t 1 i 1 ,H, _ _ _ 1 _ asos kc65 000R ISO 8528-5 FOR TRANSIENT RESPONSE. ENGINEERING 6510 STANLFEL stm ICOM WAWA&& FOR ARCHITECTURE - O t) o p O o - _ — COO f xu VERTICAL INTAKE HOOD— POWER RATING:ACCEPTS DESIGN LOAD IN 5757 Blue Lagoon Dr. BB1e ALV'PhourGE won ONE STEP PER NEC 110. Sults 400 NW '1. ,�. _ TNAL E RYEA_IIsuldn'N Doi Mlaml FL 33128 1 7'" - SAGS RHE IrnEp[rtr uuu¢+uu ffnP POWER FACTOR>0.8. Ph 0526666053 -9111W11;''.11.��I.1'` —____!- 0---!! --- ---t 690.5 RN/COOM Phone: 305.288.8895 I`I llWirvP'�II 11 • • . •_ 6640 CUM,.sDPPum COMM'5 FM z 2 YEAR STANDARD WARRANTY. vnvw.uoen050015 a.mm _ [ -— 69An AWACPC AMU.RSUPPL001158 MIFM EB 10000015 E I M 18 0 MOUNTED , ewru.,maTtcDams9vAennrck /! I • 69s ELECTRIC STARTING MOTOR-24V. �l J__ �-_,_ SIM fFUE-L-IS-fe-D]Sh9W 1 1.�� - VFRTP'x SUMER DOOM..i CHARGING ALTERNATOR-24V. 112 T --- -- - SUSTAINED SHORT CIRCUIT CURRENT UP TO 1.4 8970 Flinn:FL-16F -C6000 1 OPEN �'es PAN CP:MUD FA9-95-0.l-IS I 3007.IN 70 SEC. SP 1 ••••=•Non owl IXHW9f EYIEHyCN S _ '_�I�I�1 I _ _-`i..�i�� - esa DM RaFs7D9ws IMAM mfsm DIGITAL.SOLID STATE,VOLT-PER-HERR _!!!.1.11111111111811110,,. .�.�,r �I� 1'.➢'Er,.•�iLIITY� � 6901 MOUNT a W¢BATTERY CHAR= t REGULATOR. '' III•�'�' 1"- � 6902 MOUNT 6,WIRE BLOCK HEATED 1 ��1 �IIII-•' 6910 INCANDESCQD LIGHT PA°OGE -_ ®® OILS II,Gvarcpt 00_ {oo-L,E _ +/-0.25 9.VOLTAGE REGULATION. U691] R StYRC1 1` ° O6916 rsLa ovnsr]2O JAP COMMUNICATION TO REMOTE ANNUNCIATOR. LL691E GER Ie()IECYED 80801(20 uv ENGINE JACKET WATER HEATER. ® o.. o �� • I� o - __ 6Y14 IOOAUA D6 PA 1 4.12OT 1-.< a ` - ' 94se Naar n VMS Loin 9ua WPM. FUEL CONSUMPTION AT 100 9=4.2.69 MOUNT t ORE LOAD DANN Z cc 6, `- i -------- —y 900107 PAM COLOR EGGLp1 WHRE. GL/HR Q OQ 11-48 SNB UP V' DPBR #10 MFT-10468 FUEL CONSUMPTION AT 75 0=3.3 W.‘,~ R M. GL/HR a Q ,u Lu 22 22 EMERGENCY POWSYSTEM. w ER -E 381 POWER SUPPLY-GENERAL REQUIREMENTS 2 _ 124 OVERALL STANDBY FAILURE OF THEE NORMAL POWER.THE EIMERGENCYTOR SHALL BE SUCH THAT.IN EPOWER SHALL BE CC EVENT OF ` ( AVAILABLE WITHIN 1HE PRE REQUIRED FOR THE APPLICATION BUT NOT LEI �In I FD,,I . I TO EXCEED 30 SECONDS D. L.1 ERSTWG EMERGENCY LIGHTS ARE CURRENTLY POWERED WITH BATTERY 0 `� BACKUP AND READY TO STAR 10 SECONDS AFTER THE POWER a' \ iii. :,�� 4r .•.. 11`.-� EPICURE Q. \ / _I:. a.� I EMERGENCYOMBSTIOGENERATOREFPRIME MOVERS SE SNAIL2T BE AN SUB-BASE I1• - , - • COMBUSTION ENGINE NAT BY DIESEL 12 TYPE A StATiNG. NEL .Y III -- - TANK SHALL BE PROVIDED WITH ENOUGH CAPACITY FOR 12 HOURS OF O . _I. - - -"z LOMINUOUS OPERATION AT A LOAD OF 100%POWER RATING. ntE ' ,I� / _ NIKILFARY NEL TANK WITH CAPACITY FOR SO HOURS IS EVENING AT E. C.- - THE FACILITY. DT I. M.11'177. aa N�Perium �� I,F 1 7Z7 i CLASSIFICATION OF ME EMERGENCY POWER SUPPLY SYSTEM. 9 _ A • _ -- - THIS STANDBY GENERATOR AND THE ATS SHALL BE PART OF THE 1, • • I EPSS AND SHALL BE CLASSIFIED l5 LEVEL 2.TYPE 30.AND cuss • • 2 _ IIIIIE S --- C 12.ELECTRICAL CONTRACTOR SHALL VERIFY THAT THE EPOS IS LT' fi • _ CAPABLE TO ACTUATE IN LESS THAN 30 SECONDS FROM THE INSTANT c' I I ., - .— THE NORMAL POWER FAILS.ELECTRICAL CONTRACTOR SHALL MADE THE fit1 I •1111111E.----..-----.711/111111^ 6 20256 4—gp, ' _-_ - -^ 1 - REQUIRED ADJUSTING TO GET THAT TIME I�_A,_ II�AII�II,II IIII�IIIIi:.H.�I. �I _ I ElEil DBY TOR BE HERO AS NECESSARY TO L 'r� Y li_Nr1/ 1:: IJ1 E`11 �i' wL193 SHIP HEIGHT _j 8 hE�MV MANUFAMAINTAIN ME CTURER FOR JACKECO R START 0 LOPDD BATTER! NACCEPRE E ACCEPTANCE e� 0 a 0^ " PPNTHEEMERGENCY GENERATOR SHALL EL CGVTMNING THE FOLLOWING:BE PROVIDED WRH A CONTROL 1 A-AUTOMA9C REMOTE START CAPRACTD. sin Manuel Mollinedo,P.E B.-`PUN-QEF-AUNNATIC"SWITCH. Florida License�6309fi C.-SHUTDOWNS,ALARMS.AND CONTROLS AS REQUIRED BY NEPA 110 66 THE CONTROL PANEL SHALL BE CAPABLE TO OFFER THE FOLLOWING INFORMATION: • A-HIGH ENGINE TEMPERATORE PRE-ALARM • B.-HIGH ENGINE TEMPERATURE(AND SHUTDOWN). C.-LOW LUBE OIL PRESSURE PRE-ALARM $FM2' D.-LOW LUBE PRESSURE ALARM(AND SHUTDOWN). ¢ 76 Z34�H9 TURF I I RADE 1ED8 END •I E-OVERSPEED(AND F.-LOW NEL MAN TANK.SHUTDOWN). Ue G.-CONTROL SWITCH NOT IN AUTOMATIC POST1ON. E H.-LOW VOLTAGE IN BATTERY. El L-BATTERY CHARGER AC FAILURE 12 J.-AIR SHUTDOWN DAMPER WHEN USED(AND SHUTDOWN). PH.005: 618043 K.-REMOTE EMERGENCY STOP. ISsue 7-' a I ASSY AN EMERGENCY MANUAL STOP STATION SNAILBE FACTORY BUILT-IN Da. 04.11.2018 T REVISIONS REV610NS ON THE GENERATOR HOUSING.ADDITIONAL A 501000 EMERGENCYOmen By: 3 REV DATE: CHANCE MADE BY REV DATE: CHANGE MADE BY GINE-A1-1250-2000 ASSEMBLY INMARINDEL EPATROL MAIN OFFlCEP STATION SHILL ETMRO`A REMOTE INSIDE THE PCS AREA A5 AEp TLC o � 1 02/8 CHANGE LENGHT&WIDTH,ADD LOAD BANK MTB CUSTOMER/ID:FLORIDA DDA . SHALL BE lABDED. Scale 1/8•,1•'01^ g UPDATED SILENCER,ELBOW,&RAINCAP JOB REF:MIAMI AIRPORT m 501/0100 2 12/16 MTB REQUIRED WIRING BETWEEN TRANSFER MICH AND GENERATOR MOVE DOORS DRAWING REF:AAAQ14276 CONTROL PANEL SNAIL BE RUN BY THE ELECTRICAL COMPACTOR. 0 STANDBY DWG :45-25377 PRONDE NECESSARY CONDUITS AND WIRES FOR CONTROL NNCRONSur R POWER COMPONENTS COORDINATE WOH GENERATOR/TRANSFER SWITCH MANUFACTURER'S GENERATOR DATE:10/22/15 REPRESENTATNE FOR M ANON AND SIZES. O DIMENSIONS DRAWN BY:SK 4. ae Drer49N4. g B E-102 J08 P TAW GAL GDSET MODEL I GENSEF FVOIPR9AF TRIO WOWR 1 L( 5000 GAL DS1250 19$25'X 90' 16,525 LBS BILL DF MAMMAL ENGINEERING FDEP: *= 2"PIPE TO TANK TOP UNLESS OTHERWISE NOTED ='e41 - LETTER PART# DESCRIPRON TRY FOR ARCHITECTURE TANK#EQ716S 3168 F CPLG,B'_E-VENT 1 5757 Blue Lagoon Dr. Suite 400 u SPILL BOX#EQ567 I T 3655 F CPLD 2',REI M,WON 4'DIP TUBE 1 Miami,FL33126 BASIN ALARM#EQ817 I. U 3655 F GPM,2',SUPPLY,11/3/4'DIP TUBE 1 P83 HIGH LEVEL#EQ817 % s 1003 RANGE.2',FUEL LEVEL GAUGE 1 www.UE0 5 8 1003 2 F CPLD 25.1E RIMER ren 1 EB 40000015 a, R $ Y 3152 F CPLD,2',STANDARD VENT CAP 1 o GyygVN96=Weep IV...le I 5Z 3005 FLANGE 2',LOCKING FILL CAP 1 U g 2 �I e9 S?$ 8 22R 2$ 0 9 S� $ m"' 4301 of-I/ PPE TOE L 3:-1/ 7 0 1/ 1 • _ A SPECIAL F CFLC,1-1/Y,IOiA-8615 RIIU 1 IIISOLATOR SUPPORT CHANNEL 11/ -a I" t8 I TrP I 8 3502 FLANGE,1/2',BASIN DRAIN 1 ffff r �1 I I F I I (M55-1E-2575N) MY:12 0 8410 1/2 RLSH MOUNT DF11NG PLATE B /(�� d MAT:C4%S.4 W/.25'PLATE, D 8003 REMOVABLE END PLA1E-3'BEND 1 ' ' 0 I;l A :4111. 1.5i `r�I_ E 4000 48'SFNIWRD ELECTRICAL SNB UP 1 U ®J r a `IE) F 3600 F CUtE.2;FDIING W 1 2 1:TUBE 2 : :. URaez ees Lab:mmnee.I0a 4 �I @ G 1093 F !',]B B. CONTAINMENT 1 LL 1 c UL l4zusIEG PRODUCT I71 1 'I SIF i"' - ;Ile J 31666 RANGE.8',COMNNMENf E-VENT 1 L_ MH106811.1670 MH25279 K 3198 FIANCE,3",FITTING W/PWG 8 G POxEtimMFu1O+S L 3190 FIANCE 3/B',FITTING W/PLUG I- 1 W S S M 3191 F.CPLG,1/2',FRANCPLUG W/ 2 o 11ao GIS UL14z SUB-BASE -E06 s6] 8220 7 GAL SPEL CONTAINMENT BOX 1 W ¢'C age wreem�r 8420 8'1-OL TORAJA GENII SUPPORT a <I m� 8420 ISOLATOR SUPPORT PLATE 12 Z Z 5 8428 FAC 8841 E0 GCM S(RISS-IE-25751 12 ¢W _ v.."' ....,..-p,..........._ -_ 1380 3T�SS 400 OIIf10I1EA(3YiE/ABhR5E1 1 2 0 m E � 2025 SINGLE SUPPLY PUMP SYSTEM 1 -(ICwn R.MIX+HEA 1/3 HP CARBONATE MOTOR.1Q •6.EIORROLIENT H6wAsrnl F1Ss<cR,imxwHORmL1s. 1 �� °� 6040 115/230V.50/60Hz,48YZ FRAME 1 CC W PSI C.D.CONCRETE. BRONZE CLOSED COUPLED 4GPM W A00AFCY GEAR PUMP,3/B'POR15 0. • N PROVIDE SIGN AS PERHFPArw FOR FUEL SUM, 6400 F8IWE RIP MEV an SPRY PIP 1 0 rt u 0 FUELING PM.AND OUTSIDE'ME GENERATOR ROOK 2010 REVERSE PUMP SYSTEM 1 iNDICAMG1HEFOL FOLLOWING: a F1wnMa6LEMAMBO- z ©. 1/2 HP CAPACITOR START MOTOR I 23 0 OO' 6270 1Q,115/230V,80112,48 FRAME 1 .(7�: tl I I -SPECCIIL HAZARD N/A N. BRONZE CLOSED COUPLED 7GPM 1 m. NOTARY LFA?PUMP,1/2'PORTS — y 70-1525 I/2-FUEL STRAINER 1 17 "cry �e J { SUBBASE FUELTANK 100-10� 1/2'SPRING CHECK VALVE 1 ReMena: � P� BJ ®f3 f 7 700-1096 1/2'SOLENOID VALVE 12DVAL,NC 1 - I a I 714 tP9f:x 11E'S1OTSf UI MR-C 2.R FIRE RATED DOUBLE WALL TANK 1 No Data 7TP MX) 9638 PAINT COLOR GLOSS BLACK GEN SET OFFSET 6" TO LEFT SIDE 6 124 $ R Y 115 HEW- - 4 3796 6225 25.66 69Li%11F'SLOTS I I I �'�' i ]T3� 41 ,L2'25 I I_'_' F TIP(24)Q' TN 5 8 I;^� TR 'L�!�I sm Manuel Mollinedo,P.E. :I II �� �IV ,_:I a �: TMP FIANCE l7�il`���—�'lh Ronda License#63096 0 00Eg g. Prof.. 616043n. Il 2 ::,.mom 04-11-2018 9 E 2 H1'NG, T� RADIATOR END ?:�i1' o,.".R, mc LL1Y�� I I IRIGHT SIDE' I Tm(t.t I I gum r..,J Eq, TLc 5. 088 Pdt7 S g 8 61 BOT1O1 1.5 F- 115 I "ME '° 1B•=1•-0" 5 118 5 Drawing SUB-BASE TANK W DAILY I °o FUEL TANK R REVISIONS REVISIONS SUB BASE TANK W RUPTURE BASIN & STUB UP Millil a 9 REV I DATE:,._ _ CHANGE MADE I BY I REV I DATE: CHANGE MADE _ I BY o . E-103 • 8- l 7 1 6 I 5 1 4 I 3 I 2 I 1 1 L( GENERAL NOTES lam I tram� ram .D I wM MR A`.w�.�OI �tanto.C O` sNa. !Imam ENGINEERING D \i�,. II\\Si f 0 ss name..rte,. D FOR 5ARCHITECTURE Blue Lagoon Dr.R E Ivo saw 5 Suite 400 MI' xt Ne a wa+wm COM*erne.1 wu MR m n.marc Phone:l306 2L 33120 816553 �• 11/1'..,I' ll• I. A'A r‘,?.ate[.r.r.C. a "2022 C S JCcn s Polo 305.268.8695 • t/--,.-N �—�,r 1 �r M uruno vo.w n rr[. .8o-en Ineere.com ;� _r I ,I (C(eo=�BIZ.B.r 15.10(P=v�m ur...e l WW1) e ®}0000015 � Pae I O,11.�LWt.�5.1-6/71.6 w.s1 04100MEW..deftse.eon.. ineilltrY , 7.ellIKWO Fon mart ut.we man t ron min,.Taman sivroi PQM 10 wmP%MAMIN.rwru0 am'urm a.N —am—w mm am SPECIFICATION$ RE SPORT 0.11.1 R11119-65.P.PIPS m>K aa onaa,PLBT CC .m w M650115 O • APPLICABLE m: 1. v1-smttwE r ea ese u:atwce lamoll, C 1 i 1.Z'47r 0. mx CABLING NOTES C J O a B 4t sms. (sand u6t TM PLAT0 RICH. m sillffLL ''. *Ill ,L. 11.▪ERN WM:KLIMA/ALLOY 002-79.1 ElLITRO VT PORED MU 6 lk 115110.1.[LEERED. • 1 1?I 1 $LmW nom.eW,a,N0.M C ES±1313111 6-nn.�oy'�'� :OWE.*0-.��1.m,N.xN1P.,.'o WILL Rwim CO cFq li+Ili +4 I � 1822)4 5 r 1 ,. , • r,NOTES'1600-2000 AMP$ 2 FRONT ELEVATION 40001'WV!.300'SPRIKS SIRE HEY/ REAR VIEW +'T9 as •e'c—, _ .(uauo:efs tig5.61E r11 t.V1a+or C i bpb-E oo /u uee OM FOR iS so so. 1NIFRIOR VIFY( surf..rt+s 650'/7 v'cc 6 moven ca iw 5o se(0 em.a pmts P5R T1Rv.ut '..7::,,,,FAriCAL. wr(tcwmm o%tlrz..em +v om'Pwzm.°M4 c4' a,OC A..vn.a SLRPewA WA"a 50.'06¶0-w m 50 Lel 50505 5000$5101100 0 e nm 'em AOC ..pe)vo°-aim 00.022°-0 roust. B C 0,.004 ONF LINE OIAGR?MS' a _ NM t,,,� �• CIRCUIT BREAKER: ITEM 52U °k�OV 4I \ to,NO•Y'eot .W.aea 12.0.15 ea maw/Beau mm.B5 R&M.,.111/7 051016 EY EY ,.$-\ fu-m�� wm Loc 000 ..e+uaamn um _ 611710 mlaa¢ .. IIIl alll I/nl 1 [4. — wrowmr L a "'°GENERATOR SET 1 — weIA t TO.SFDe ' SMUG 0110. e / PIAN 0)40 SWPT. N 1 R 1 'j vt 93:6m11 �..--1�\ --------- • -- "-- - i '''VD-1, Manuel Mollinedo,P.E �\ B, " Florida 505)a BfiJ096 ewe kg an w mn.. co.rr�yr n Oea000 / u N1iO1a A m 111.'Nva/o' BaA.w 111 nr A �`," 'f-M I m 1 lI mam _ 1+) J sro. `H 4 5w611.AO. al.wcs m®oo, 61.11 s. A l f E t atm 1 h,1s le 40340 -� � •� 1 CUs 100. 0 50006AiP.6C PPP15.9L t y 00. � \ / 0 0«_ ___ I__ _ , '.5^,9..'... 1.11• (WITH SOLID NEUTRAL) (0iIIH SWITCHEO,/OYERLAPPING NEUTRAL) — "'�'* .i. ASN ^ r'4 --?457—05_1 8 I 7 I 6 I 5 * 4 I 3 I 2- I 1 PWKIN.: 618002 I..oewre: L 0331-08 1.V SUPPLED LUGWali STANDARD MECHANOL EACH SUITABLE LUGS ON THE 001005 a EMERGENCY BUS STABS ^, ONE(1)LUG PER PHASE AND NEUTRAL EACH SUITABLE FOR CONNECTION OF THREE SETS OF CABLES OmOCCO TLC UP TO 3002CM CU/AL 0..50.. TLc a 2. GROUND LUGS ARE PROVIDED STAN0VPDAS FOLLOWS:0)61)0-30 ANG CU/AL CABLE Me16 1/8"=1'-0' Non OU CIRCUIT BREAKER:ITEM 520 gi AUTOMATIC TRANSFER SWITCH 1. 100%RATED MOLDED CASE CIRCUIT BREAKER,BOOAFMOGATSOLID STATE ELECTRONIC TRIP. C DIAGRAM O • C M 0a 500x. E-104 ®d�l�� TAW POWER SYSTEMS, INC. ,��$ 1500 NW 15th Ave Pompano Beach, FL 33069 TAw Ph.: (954) 977-0202 x1759 (800) 876-0990 Fax: (954) 977-9249 John.Potts@tawinc.com 17/ '7‘ Kohler Generator Systems Distributors KOHLER POWER SYSTEMS DISTRIBUTOR FOR ALABAMA,SOUTH GEORGIA,FLORIDA,LOUISIANA AND MISSISSIPPI Date: August 8, 2018 Offer No: P1808-0105 Contact: John Potts Contact Cell#: (954)-234-4226 Project: City of Miami Beach—Public Works ****************************************************************************************************************************** One New KOHLER Model 600REOZVB, EPA Certified Diesel Generator Set, 600KW, @ 0.8 PF, 60 Hz, 3 Phase, UL 2200, 277/480 Volt with the following: CONTROLLER: ADDITIONAL ACCESSORIES: APM402 Certified Factory Test @ 0.8 P.F. Controller meets NFPA 110 3 Engine, Generator Parts, Maintenance Manuals 1 Electronic Manual ENCLOSURE: Vibration Isolators: Internal Aluminum Sound Enclosure 5 Year Comprehensive Warranty 181 MPH Wind Load Rated Load Center Critical Silencer SUPPLIED BY OTHERS New Fuel—First Fill of New Tank COOLING: Installation Unit Mounted Radiator Local and State Permitting by Others Block Heater, 120 Volt All Infrared, 3rd Party and NETA Testing if Required FUEL SYSTEM: Flexible Fuel Lines Sub-base Fuel Tank, 550 Gallon, UL142 Listed TOTAL NET LOT: $125,870.00 FDEP Package Fuel Transfer Pumps—Supply& Return Fuel Water Separator ESTIMATED LEAD TIME: 16 to 18 weeks after release of the order. This GENERATOR ACCESSORIES (Electrical): estimated lead time is subject to change daily due to Line Circuit Breakers, 3 Pole, 100 % Rated availability Qty(1) 800 Amps, Electronic, F.O.B. FACTORY, FREIGHT ALLOWED TO JOB SITE ENGINE ELECTRICAL ACCESSORIES: Battery Rack and Cables SALES TAX NOT INCLUDED Starting Battery, Lead Acid Battery Charger: 10 Amps Regards, CONTROLLER ACCESSORIES LOOSE: Remote Emergency Stop, Break Glass TAW Power Systems, Inc. Remote Annunciator Panel John Potts Senior Sales Engineer AUTOMATIC TRANSFER SWITCH: Qty(1) Kohler Model KEP-DMTA-0800-NK 208 Volt, 3 Ph., 3 Pole, 800A, NEMA 1, OFFER VALID FOR 30 DAYS FROM THIS OFFER DATE Service Entrance Rated (LISTED ABOVE) Page 751 of 1418 EXCEPTIONS/CLARIFICATIONS/NOTES: (OFFER ACCEPTANCE BELOW) Delivery, start up, and load testing are quoted as during normal business hours. If after hour, weekend, or holiday work hours are required, the Contractor will be responsible COMPANY for the overtime differential unless otherwise noted. AUTHORIZED SIGNATURE OFFER BASED UPON: TITLE • Drawing E-101 PRINT NAME DATE NOTE: TAW's STANDARD TERMS and CONDITIONS apply to all TERMS & CONDITIONS ACKNOWLEDGED: offers for purchase and any purchase orders accepted by TAW.You may find a copy under the terms and conditions section at TAWINC.com or please contact our office at 800-456-9449 and we will forward you a copy.TAW will transmit a written delivery schedule based on the INITIAL manufacturer's confirmation,approximately fifteen(15)days after product release. Also included will be the related progress invoice values based on material shipments. All TAW offers,plans,specifications,and technical drawings are copyrighted works and contain proprietary know-how of TAW,and Buyer has no right to reproduce,distribute or publish copies of TAW's copyrighted works or to create derivative works of TAW's copyrighted works without the express written permission of an authorized representative of TAW. Page 752 of 1418