Loading...
Contract with TCS Contracting Corp. MIAMIBEACH - CONTRACT c 211 THIS CONTRACT is by and between the City of Miami Beach, Florida, a municipal corporation of the State of Florida, ("City"), and TCS Contracting Corp., 3750 NW 28 Street, Unit 201, Miami, FL. 33142 ("Contractor"). WITNESSETH, that Contractor and City, for the considerations hereinafter named, agree as follows: ARTICLE 1 SCOPE OF WORK Contractor hereby agrees to furnish all of the labor, materials, equipment, services and incidentals necessary to perform all of the Work described in the Contract Documents and related thereto for the Project. ARTICLE 2 CONTRACT TIME 2.1 Contractor shall be instructed to commence the Work by written instructions in the form of a Notice to Proceed issued by the Contract Administrator. Two (2) Notices to Proceed will be issued for this Contract. Contractor shall commence scheduling activities, permit applications and other preconstruction work within five (5) calendar days after the Project Initiation Date, which shall be the same as the date of the first Notice to Proceed. The first Notice to Proceed will not be issued until Contractor's submission to City o f all required documents (including but limited to: Payment and Performance Bonds, and Insurance Certificate) and after execution of the Contract by both parties. 2.1.1. The receipt of all necessary permits by Contractor and acceptance of the full progress schedule in accordance with technical specifications section, submittal schedule and schedule of values is a condition precedent to the issuance of a second Notice to Proceed to mobilize on the Project site and commence with physical construction of the Work. The Contractor shall submit all necessary documents required by this provision within twenty-one (21) calendar days of the issuance of the first Notice to Proceed. 2.2 Time is of the essence throughout this Contract. This project shall be substantially completed within one hundred fifty (150) calendar days from the issuance of the first Notice to Proceed, and completed and ready for final payment in accordance with Article 5 within thirty (30) calendar days from the date certified by Consultant as the date of Substantial Completion. 2.3 Upon failure of Contractor to substantially complete the Contract within the specified period of time, plus approved time extensions, Contractor shall pay to City the sum of three hundred dollars ($300.00) for each calendar day after the time specified in Section 2.2 above, plus any approved time extensions, for Substantial Completion. After Substantial Completion should Contractor fail to complete the remaining work within the ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 1 time specified in Section 2.2 above, plus approved time extensions thereof, for completion and readiness for final payment, Contractor shall pay to City the sum of three hundred dollars ($300.00) for each calendar day after the time specified in Section 2.2 above, plus any approved extensions, for completion and readiness for final payment. These amounts are not penalties but are liquidated damages to City for its inability to obtain full beneficial occupancy and/or use of the Project. Liquidated damages are hereby fixed and agreed upon between the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by City as a consequence of such delay, and both parties desiring to obviate any question of dispute concerning the amount of said damages and the cost and effect of the failure of Contractor to complete the Contract on time. The above-stated liquidated damages shall apply separately to each portion of the Project for which a time for completion is given. 2.4 City is authorized to deduct liquidated damages from monies due to Contractor for the Work under this Contract or as much thereof as City may, in its sole discretion, deem just and reasonable. 2.5 Contractor shall be responsible for reimbursing City, in addition to liquidated damages, for all costs incurred by Consultant in administering the construction of the Project beyond the completion date specified above, plus approved time extensions. Consultant construction administration costs shall be pursuant to the contract between City and Consultant, a copy of which is available upon request of the Contract Administrator. All such costs shall be deducted from the monies due Contractor for performance of Work under this Contract by means of unilateral credit change orders issued by City as costs. are incurred by Consultant and agreed to by City. ARTICLE 3 THE CONTRACT SUM [ ] This is a Unit Price Contract:* 3.1 City shall pay to Contractor the amounts determined for the total number of each of the units of work completed at the unit price stated in the schedule of prices bid. The number of units contained in this schedule is an estimate only, and final payment shall be made for the actual number of units incorporated in or made necessary by the Work covered by the Contract Documents. 3.2 Payment shall be made at the unit prices applicable to each integral part of the Work. These prices shall be full compensation for all costs, including overhead and profit, associated with completion of all the Work in full conformity with the requirements as stated or shown, or both, in the Contract Documents. The cost of any item of work not covered by a definite Contract unit price shall be included in the Contract unit price or lump sum price to which the item is most applicable. [X] This is a Lump Sum Price Contract:* ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 2 3.1 City shall pay to Contractor for the performance of the Work described in the Contract Documents, the total price stated as awarded. 3.2 The Contract Price is $552,225.00, consisting of. a base bid in the amount of $502,025.00 and a separate line item in the amount of $50,200.00 for the Owner's Contingency (to be used solely by the City at its sole discretion for the purposes described in the Contract Documents). The Contract Price, excluding the Owner's Contingency, shall be full compensation for all labor, materials, equipment, costs, and expenses, including overhead and profit, associated with completion of all the Work accordance with the requirements of the Contract Documents, including all Work reasonably inferable therefrom, even if such item of Work is not specifically or expressly identified as part of a line item in the ITB Price Form'. *Note: Some projects include both unit prices and lump sums in which case both sections shall apply to the Work identified for each type of Contract. ARTICLE 4 PROGRESS PAYMENTS 4.1 Contractor may make Application for Payment for work completed during the Project at intervals of not more than once a month. Contractor's application shall show a complete breakdown of the Project components, the quantities completed and the amount due, together with such supporting evidence as may be required by Consultant and City. Contractor shall include, but same shall not be limited to, with each Application for Payment, an updated progressschedule acceptable to Consultant as required by the Contract Documents and a release of liens and consent of surety relative to the Work which is the subject of the Application for Payment. Following submission of an acceptable updated progress schedule and the other documents required herein a log with the Application for Payment, City shall make payment to Contractor after approval by Consultant of an Application for Payment, less retainage as herein provided for and/or withholding of any other amounts pursuant to the Contract Documents, within twenty-five (25) days in accordance with Section 218.735 of the Florida Statutes. 4.2 The City shall withhold from each progress payment made to Contractor retainage in the amount of ten percent (10%) of each such payment until fifty percent (50%) of the Work has been completed. The Work shall be considered 50% complete at the point at which the City has expended 50% of the approved Cost of the Work together with all costs associated with existing change orders or other additions or modifications to the construction services provided for in this Agreement. Thereafter, the Contract Administrator shall reduce to five percent (5%) the amount of retainage withheld from each subsequent progress payment made to the Contractor, until Substantial Completion as provided in ITB Section 0500, Sub-Section 43. Any reduction in retainage shall be in accordance with Section 255.078 of the Florida Statutes, as may be amended, and shall otherwise be at the sole discretion of the' Contract Administrator, after considering any recommendation of Consultant with respect thereto. Contractor shall have no entitlement to a release of, or reduction in, retainage, except as may be required herein or by Florida law. Any interest earned on retainage shall accrue to the benefit of City. All requests for retainage reduction shall be in writing in a stand-alone document, separate from monthly applications for payment. ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 3 All requests for release of retainage shall be made in accordance with, and shall be subject to, the requirements of Section 255.078 of the Florida Statutes, as may be amended. Except as provided by law, the City shall have no obligation to release or disburse retainage until Substantial Completion of the Project. Upon receipt by the Contractor of a Certificate of Substantial Completion pursuant to ITB Section 0500, Sub- Section 43, fully executed by the City establishing the Date of Substantial Completion, and after completion of all items on the punch list and/or other incomplete work, the Contractor may submit a payment request for all remaining retainage. It shall be the. City's sole determination as to whether any of the items have been completed. For items deemed not to have been completed, the City may withhold retainage up to one and one-half times the total cost to complete such items. Any interest earned on retainage shall accrue to the benefit of City. City shall disburse the amounts withheld upon the City's acceptance of the completion of the items for which they were withheld. 4.3 City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 4.3.1 Defective work not remedied. 4.3.2 Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or City because of Contractor's performance. 4.3.3 Failure of Contractor to make payments properly to Subcontractors or for material or labor. 4.3.4 Damage to another contractor not remedied. 4.3.5 Liquidated damages and costs incurred by Consultant for extended construction administration. 4.3.6 Failure of Contractor to provide any and all documents required by the City. When the above grounds are removed or resolved satisfactory to the Contract Administrator, payment shall be made in whole or in part. ARTICLE 5 ACCEPTANCE AND FINAL PAYMENT 5.1 Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance, Consultant shall, within ten (10) calendar days, make an inspection thereof. If Consultant and Contract Administrator find the Work acceptable, the requisite documents have been submitted and the requirements of the Contract Documents fully satisfied, and all conditions of the permits and regulatory agencies have been met, a Final Certificate of Payment (ITB Attachment D-6) shall be issued by Consultant, over its signature, stating that the requirements of the Contract Documents have been performed and the Work is ready for acceptance under the terms and conditions thereof. 5.2 Before issuance of the Final Certificate for Payment, Contractor shall deliver to Consultant a complete release of all liens arising out of this Contract; a consent of surety ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 4 to final payment; the final corrected as-built drawings; an affidavit certifying that all suppliers and subcontractors have been paid in full and that all other indebtedness connected with the Work has been paid; and the final bill of materials, if required, and invoice. 5.3 If, after the Work has been substantially completed, full completion thereof is materially delayed through no fault of Contractor, and Consultant so certifies, City shall, upon certificate of Consultant, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. 5.4 Final payment shall be made only after the City Manager or his designee has reviewed a written evaluation of the performance of Contractor prepared by the Contract Administrator, and approved the final payment. The acceptance of final payment shall constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the General;Conditions and identified by Contractor as unsettled at the time of the application for final payment. ARTICLE 6—MISCELLANEOUS 6.1 The requirements of the Contract Documents, as such term is defined in the Invitation to Bid, are hereby incorporated by reference as if fully set forth herein. This Contract is part of, and incorporated in, the Contract Documents as defined herein. Accordingly, all of the documents incorporated by the Contract Documents shall govern this Project. 6.2 Where there is a conflict between any provision set forth within the Contract Documents and a more stringent provision elsewhere in the Contract Documents or under any law, regulation, statute or code requirement which is applicable to this Project, the more stringent provision shall prevail and govern the performance of the Work. 6.3 Public Entity Crimes Contractor acknowledges that the provisions of the Public Entity Crimes Act, Section ' 287.133, Florida Statutes, shall apply to this Contract, which statute provides, in pertinent part, that a person or affiliate who is a contractor, consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with the City, and may not transact any business with the City in excess of the threshold amount provided in Section 287.017, Florida Statutes, for category two purchases for a period of 36 months from the date of being placed on the convicted vendor list. Violation of this section by Contractor shall result in cancellation of the City purchase and may result in Contractor debarment. ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 5 IN WITNESS WHEREOF, the parties have set their hands and seals the day and year first above written. ATTEST: THE CITY OF MI , MI BEACH FLORIDA Ii 3/ `I Rafael:-/V ranada, City Clerk Jimly L. Mo al-s, City Manager ATTEST: TCS ONTRACTINGr RP. , 4 if,41. Signa ur /Secreta „, Signature/ esi•ent T Si-VRI— 5941 74 1,,t Print Name Print Name ) 1,1 i) !' Date ATTACHMENTS ATTACHMENT A- Resolution, Commission Item Summary, and Commission Memorandum ATTACHMENT B - Invitation to Bid ("ITB") ATTACHMENT C - Bidder's Response to the ITB ATTACHMENT D - Insurance APPENDIX D: Required Forms 'APPENDIX D-1: Form of Performance Bond APPENDIX D-2: Form of Payment Bond APPENDIX D-3: Certificate of Corporate Principal APPENDIX D-4: Performance and Payment Guaranty Form: Unconditional Letter of Credit APPENDIX D-5: Certificate of Substantial Completion , APPENDIX D-6: Final Certificate of Payment APPENDIX D-7: Form of Final Receipt . APPROVED AS TO � aalkvilot. FORM &LANGUAGE J� ," OP,I.v� " &�411 &FOR EXECUTION 15- Wii,;1- 1.-- (4-IR Il `/NCoRP p'RA'D.) City AttorMy Date .��-5•.. =/ .� ITB 2019-044-JC ,,40y��rf �"ar ovation of Suns= -r_1•r,:' and II Guardhouse Page 10 6.4 Independent Contractor Contractor is an independent contractor under this Contract. Services provided by Contractor pursuant to this Contract shall be subject to the supervision of Contractor. In providing such services, neither Contractor nor its agents shall act as officers, employees, or agents of the City. This Contract shall not constitute or make the parties a partnership or joint venture. 6.5 Third Party Beneficiaries • Neither Contractor nor City intends to directly or substantially benefit a third party by this Contract. Therefore, the parties agree that there are no third party beneficiaries to this Contract and that no third party shall be entitled to assert a claim against either of them based upon this Contract. The parties expressly acknowledge that it is not their intent to create any rights or obligations in any third person or entity under this Contract. 6.6 Notices Whenever either party desires to give notice to the other,,such notice must be in writing, sent by certified United States Mail, postage prepaid, return receipt requested, or by hand-delivery with a request for a written receipt of acknowledgment of delivery, addressed to the party for whom it is intended at the place last specified. The place for giving notice shall remain the same as set forth herein until changed in writing in the manner provided in this section. For the present, the parties designate the following: For City: Capital Improvement Project(CIP) Department 1700 Convention Center Drive, 3rd Floor Miami Beach, FL. 33139 Attn: David Martinez, P.E. - Director With copies to: City Attorney City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 For Contractor: TCS Contracting Corp. 3750 NW 28 Street Unit 201 Miami, FL. 33142 Attn: T.H. Smith/President Phone: 305-756-8700 Email: the a tcsccorp.com ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 6 6.7 Assignment and Performance Neither this Contract norany interest herein shall be assigned, transferred, or encumbered by either party. In addition, Contractor shall not subcontract any portion of the work required by this Contract except as authorized by Section 28 of the General Conditions. Contractor represents that all persons delivering the services required by this Contract have the knowledge and skills, either by training, experience, education, or a combination thereof, to adequately and competently perform the duties, obligations, and services set forth in the Scope ofWork and to provide and perform such services to City's satisfaction for the agreed compensation. Contractor shall perform its duties, obligations, and services under this Contract in a . skillful and respectable manner. The quality of Contractor's performance and all interim and final product(s) provided to or on behalf of City shall be comparable to the best local and national standards. 6.8 Materiality and Waiver of Breach City and Contractor agree that each requirement, duty, and obligation set forth in these Contract Documents is substantial and important to the formation of this Contract and, therefore, is a material term hereof. City's failure to enforce any provision of this Contract shall not be deemed a waiver of such provision or modification of this Contract. A waiver of any breach of a provision of this Contract shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Contract. 6.9 Severability In the event a portion of this Contract is found by a court of competent jurisdiction to be invalid, the remaining provisions shall continue to be effective unless City or Contractor elects to terminate this Contract. An election to terminate this Contract based upon this provision shall be made within seven (7) days after the finding by the court becomes final. 6.10 Applicable Law and Venue This Contract shall be enforceable in'Miami-Dade County, Florida, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein exclusive venue for the enforcement of same shall lie in Miami-Dade County, Florida. BY ENTERING INTO THIS,CONTRACT, CONTRACTOR AND CITY HEREBY EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO, OR ARISING OUT OF THE PROJECT. CONTRACTOR SHALL SPECIFICALLY BIND ALL SUBCONTRACTORS TO THE PROVISIONS OF THIS CONTRACT. ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 7 No modification, amendment, or alteration in the terms or conditions contained herein shall be effective unless contained in a written document prepared with the same or similar formality as this Contract and executed by the City and Contractor. 6.12 Prior Agreements This document 'incorporates and includes all prior negotiations, correspondence, conversations, agreements, and understandings applicable to the matters contained herein and the parties agree that there are no commitments, agreements or understandings concerning the subject matter of thisContract that are not contained in this document. Accordingly,the parties agree that no deviation from the terms hereof shall be predicated upon any prior representations or agreements, whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless set forth in writing in accordance with Section 6.11 above. 6.13 Public Records City of Miami Beach is a public agency subject to Chapter 119, Florida Statutes. As required by Chapter 119, Florida Statues, the Contractor and all sub-contractors for services shall comply with Florida's Public Records Law. Specifically, the contractor and sub-contractors shall: 6.13.1 Keep and maintain public records that ordinarily and necessarily would be required by the City in order to perform the service; 6.13.2 Provide the public with access to such public records on the same terms and conditions that the City would provide the records and at a cost that does not exceed that provided in Chapter 119, Fla. Stat., or as otherwise provided by law; 6.13.3 Ensure that public records that are exempt or that are confidential and exempt from public record requirements are not disclosed except as authorized by law; and 6.13.4 Meet all requirements for retaining public records and transfer to the City, at no cost, all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt. 6.13.5 The failure of Contractor to comply with the provisions set forth in this Article shall constitute a Default and Breach of this Contract and the county shall enforce the Default in accordance with the provisions set forth in the General Terms and Conditions, Article 16. 6.14. Indemnification. Subsection 7 of Section 0500 of the General,Terms and Conditions is hereby deleted in its entirety and replaced with the following: Contractor shall indemnify and hold harmless City, it's officers, agents, directors, and employees, and the Sunset Islands Property Owners, Inc., and its respective officers, agents, directors and employees, from any liability, damages, losses, and costs, including, but not limited to reasonable attorney's fees, to the extent caused by,the negligence, recklessness or intentional wrongful misconduct of Contractor and persons employed or ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 8 utilized by Contractor in the performance of this Agreement. Except as specifically provided herein, this Agreement does not require Contractor to indemnify City or the Sunset Islands Property Owners, Inc., or their respective employees, officers, directors, or agents from any liability, damage, loss, claim, action, or proceeding. This indemnification provision shall survive the term of this Agreement. In the event that any action or proceeding is brought against City or the Sunset Islands Property Owners, Inc., by reason of any such claim or demand, Contractor shall, upon written notice from the City, resist and defend such action or proceeding by counsel satisfactory to City. The indemnification provided above shall obligate Contractor to defend at its own expense to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at City's option, any and all claims of liability and all suits and actions of every name and description covered by this Section 6.14 above which may be brought against City or the HOA, as applicable, whether performed by Contractor, or persons employed or utilized by Contractor. 6.15 Additional Insured Coveraqe for the Sunset Islands Property Owners, Inc. In addition to the insurance requirements set forth in Subsection 8 of Section 0500 of the General Terms and.Conditions, and the requirements therein for the Contractor to name the City as an additional insured with respect to.the insurance policie's specified in Subsection 8.1(B) through 8.1(F) of Section 0500 of the General Terms and Conditions,.the Contractor shall name the Sunset Islands Property Owners, Inc. as an additional insured under the policies specified in Subsection 8.1(B) through 8.1(F) of Section 0500 of the General Terms and Conditions. Contractor shall furnish the Certificate(s)of Insurance evidencing compliance with the requirements herein prior to City's issuance of the first Notice to Proceed. ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 9 IN WITNESS WHEREOF, the parties have set their hands and seals the day and year first above written. ATTEST: THE CITY OF MIAMI BEACH, FLORIDA % iV •••e/t'h�1 •.1 1111 Ra'ael Gra -do, ity Clerk \ ,. y L. = :l 11161P, Manager • $ :INCORP ORATED: ATTEST: G11 ;•' 1� ONTR ING RP. Sign-ture .ecretary Signaturresident Print Name Print Name Date ATTACHMENTS ATTACHMENT A- Resolution, Commission Item Summary, and Commission Memorandum ATTACHMENT B - Invitation to Bid ("ITB") ATTACHMENT C - Bidder's Response to the ITB ATTACHMENT D - Insurance APPENDIX D: Required Forms APPENDIX D-1: Form of Performance Bond APPENDIX D-2: Form of Payment Bond APPENDIX D-3: Certificate of Corporate Principal APPENDIX D-4: Performance and Payment Guaranty Form: Unconditional Letter of Credit APPENDIX D-5: Certificate of Substantial Completion APPENDIX D-6: Final Certificate of Payment APPENDIX D-7: Form of Final Receipt APPROVED AS TO FORM &LANGUAGE &FOR EXECUTION cRk o' l City Attorney 12, Q Date ITB 2019-044-JC Construction and Renovation of Sunset Islands I and II Guardhouse Page 10 ATTACHMENT A RESOLUTION COMMISSION ITEMS AND COMMISSION MEMORANDUM Competitive Bid Reports -C2 B MIAMIBEACH COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: January 16, 2019. SUBJECT: REQUEST FOR APPROVAL TO AWARD INVITATION TO BID (ITB) 2019- 044-JC, CONSTRUCTION AND RENOVATION OF SUNSET ISLANDS I & II GUARDHOUSE, SUBJECT TO FY18/19 THIRD CAPITAL BUDGET AMENDMENT. RECOMMENDATION The Administration recommends that the Mayor and City Commission of the City of Miami Beach, Florida approve the City Manager's recommendation pertaining to the bids received, pursuant to ITB 2019-044-JC, Construction and Renovation of Sunset Islands I and II Guardhouse. ANALYSIS Due to its increasingly worn condition, Sunset Islands 1 & 2 neighborhood homeowners' association (HOA) requested construction modification to their existing security guardhouse (kiosk), which is positioned at the entrance to their neighborhood. In order to initiate the procurement process, the HOA executed maintenance and funding agreements with the City. The project's enhancements entail, but are not limited to, the following deliverables: renovation of the existing Guard House, including the restroom, cooling system, lighting, new roof and the construction of a new Guard House Kiosk in the center of the entrance road (West 29 Street) including widening of the existing median, hardscape improvements and brick pavers, conduits for the HOA's security system, new security gates, landscaping and irrigation system. Additionally, with respect to funding, the HOA is providing a majority portion of the funding for this enhancement project, in the amount of$448,225. ITB PROCESS ITB No. 2019-044-JC was issued on October 18, 2018, with a bid opening date of November 20, 2018. Two (2) addenda were issued. The Procurement Department issued bid notices to approximately 800 companies utilizing direct email blasts and www.publicpurchase.com website. Eighty-seven (87) prospective bidders accessed the advertised solicitation. The notices resulted in the receipt of six (6) responses from: Azulejo, Inc., Caliste Construction, LLC, Stone Concept Miami, Inc., Stonehenge Construction, LLC, TCS Contracting Corp., and Waypoint Contracting, Inc. See tabulation sheet(Attachment A). The ITB stated that the lowest responsive, responsible bidder meeting all terms, conditions, Page 31 of 2168 and specifications of the ITB will be recommended for award. In its due diligence, the Procurement and CI P Departments verified that the lowest responsive bid submitted by TCS Contracting Corp., ("TCS")met the requirements of the ITB, including: 1 . Bid Guaranty: Bidder shall submit, with its bid, either an original bid bond executed by a surety company meeting the qualifications for surety companies as specified in Section 0500, General Conditions, or by certified check, cashier's check. TCS submitted a bid bond for 5% of the bid amount, as required. 2 . Licensing Requirements: Bidder shall be a Miami-Dade County or State of Florida Certified General Contractor in the State of Florida, Division of Business and Professional Regulations to be considered for award. TCS is State certified as a General Contractor. State license number is: CGC060131. and expires on August 31, 2020. 3 . Previous Experience of Bidder (Firm): Bidder should have successfully completed a total of three (3) projects similar in size (1000 square feet) and scope within the last five (5)years. TCS provided five (5) projects similar in scope, which included: 1) President Hotel: interior and exterior renovations of existing 3-story structure in Miami Beach 2) Dade County Courthouse: removal of 250kW generator, demolition of concrete structure, installation of new foundation and 500kW generator, plumbing, and electrical work 3) William Lehman Rail Facility: interior renovations, demolition, concrete, flooring, masonry, plumbing, and electrical work. Accordingly, TCS has been deemed the lowest responsive and responsible bidder meeting all terms, conditions, and specifications of the ITB. Below is a brief summary of the firm. TCS Contracting Corp. TCS has been in business for over 20 years in South Florida. It offers a full range of construction services including general contracting, project management to residential, commercial and telecommunications industries. TCS has successfully completed hundreds of projects including office towers, government facilities, condominiums, and - subdivisions, delivering a finished project efficiently, on time, and within projected costs. CONCLUSION After considering the bids received and the evaluation of staff, pursuant to ITB 2019-044-JC, I recommend that the Mayor and City Commission of the City of Miami Beach, Florida, approve the award.of a contract to TCS Contracting Corp., the lowest responsive, responsible bidder to the ITB and further authorize the City Manager and City Clerk to execute a contract. KEY INTENDED OUTCOMES SUPPORTED Build And Maintain Priority Infrastructure With Full Accountability FINANCIAL INFORMATION Below is a breakdown of the complete cost for this project: Page 32 of 2168 Bid Tabulation 2019-0444C Construction of Sunset Islands I&II Guardhouse tem Na. Description Azuiejo Caliste Stone Concepts Stonehenge TCS(1) Waypoint 'Lump Sum Grand Total(Total ease Bid) $ 562.02540 S 639.025.00 S 562,110.00 S 55403483!S 502420.00 S • 562,439.00 .•..',,.: '- ,: .f..;. ...ALTERNATEA(DeDUCT) ...-J-.. . . .. .,.r r r Milling and Resurfacing of the area instead of Pavers $ 8,025.00 S 20,709.00 S 2,000.00 S 10,176.00 S 20,000.00 S 26,262.00 on Concrete Slab Installation(tem 34) • • (1)Recommended for award. • • • Page 34 of 2168 • • • • Project Construction Cost: $502,025 Contingency $ 50.200 Total $552,225 . Account#302-0820-069357-00-410-522-00-00-00-24530 $ 53,800 Account#302-0820-069357-00-410-522-00-00-00-24530 $ 50,200 (Owner's Contingency) HOA Contribution-Subject to FY 18/19 Third Capital Budget Amendment 5448.225 Total -- $552,225 Grant funding will not be utilized'for this project. Amount 1 $53,800 Account 1 302-0820-069357-00-410-522-00-00-00- 24530 Amount 2 $50,200 Account 2 302-0820-069357-00-410-522-00-00-00- (Owner's 24530 Contingency) Amount 3 $448,225 Account 3 Funds provided by the HOA- Subject to FY18/19 Third Capital Budget Amendment Total $552,225 Legislative Tracking Capital Improvement Projects/Procurement ATTACHMENTS: Description o Attachment A Page 33 of 2168