Loading...
Resolution 2019-30740RESOLUTION NO. 2019 -30740 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE WRITTEN RECOMMENDATION OF THE CITY MANAGER (AS SET FORTH IN THE CITY COMMISSION MEMORANDUM ACCOMPANYING THIS RESOLUTION) AND WAIVING, BY A 5 /7THS VOTE, THE FORMAL COMPETITIVE BIDDING REQUIREMENT, FINDING SUCH WAIVER TO BE IN THE CITY'S BEST INTEREST, AND APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A WORK ORDER WITH LEE CONSTRUCTION GROUP, INC., IN THE NOT TO EXCEED AMOUNT OF $248,000.00, FOR THE PURPOSE OF COMPLETING THE PROPERTY MANAGEMENT EMERGENCY GENERATOR AND TRANSFER SWITCH PROJECT, WHICH INCLUDES THE NON - PRE - PRICED ITEMS IN THE AMOUNT OF $129,966.48, PURSUANT TO THE COMPETITIVELY BID SOURCEWELL COOPERATIVE CONTRACT FOR CONSTRUCTION SERVICES (FORMERLY KNOWN AS NATIONAL JOINT POWERS ALLIANCE (NJPA)), AND WITH THE FOREGOING WORK TO BE COMPLETED WITH PREVIOUSLY APPROPRIATED FUNDING; FURTHER, RESCINDING RESOLUTION NO. 2019 - 30674, WHICH APPROVED THE AWARD OF THE SAME WORK TO SOLARES ELECTRIC, INC., AS SOLARES ELECTRIC, INC., IS NO LONGER AN AUTHORIZED VENDOR UNDER THE SOURCEWELL COOPERATIVE CONTRACT. WHEREAS, the City needs to install one (1) emergency generator at the Property Management Department (the Project); and WHEREAS the project consists of one (1) 500KW generator, which are available via the competitively procured National Joint Powers Alliance (NJPA) 120617 -KOH award to Lee Construction Group, Inc., as well as a number of ancillary items (e.g., automatic transfer switch); and WHEREAS, the Administration desires to expedite the project, which is crucial to keep Property Management operational in the event of a storm or other catastrophe that results in loss of power to the facility; and WHEREAS, the Administration is requesting to issue a work order to Lee Construction Group, Inc., pursuant to the competitively bid Sourcewell, cooperative contract for construction services (formerly known as National Joint Powers Alliance (NJPA), cooperative contract for construction services; and WHEREAS, the Administration recommends that the City Commission rescind Resolution No. 2019 -30674 awarding the same work to Solares Electric, Inc. through the NJPA process, as Solares Electric, Inc., is no longer an authorized vendor under the NJPA; and WHEREAS, the Finance and Citywide Projects Committee (the Committee), on February 21, 2014, endorsed a recommendation by the Administration, as a pilot to reintroduce this efficient process of Job Order Contracting ( "JOC ") project delivery to the City, and to begin utilizing the Gordian Group's indefinite quantity contract (IQC), for construction services to expedite the delivery of construction or maintenance projects under $250,000, or for emergency projects, as approved by the City Manager; and WHEREAS, awarded Contract No. 071415 -GGI for IQC construction services, and said contract includes an award to Lee Construction Group, Inc., through the Gordian Group's IQC process, to provide services to the City pursuant to the contract; and WHEREAS, on January 15, 2014, via Resolution No 2014 - 28462, the City Commission authorized the Administration to utilize NJPA cooperative awards, pursuant to Section 2 -369 of the Miami Beach City Code; and WHEREAS, on April 23, 2015, the City Commission authorized the Administration, for projects up to $250,000, or emergency awards exceeding $250,000, to be acquired through the Gordian Indefinite Quantity Contract (IQC) process as a means of expediting small or emergency projects with the approval of the City Manager; and WHEREAS, the IQC process, which is used extensively by local, state and federal governmental agencies throughout the United States, expedites the delivery of construction projects and the City, as a governmental agency, is authorized to utilize the IQC process for construction services competitively awarded by the National Joint Powers Alliance (NJPA) to the Gordian Group, the Managers of IQC; and WHEREAS, the Gordian Group, in the IQC process, established a fixed price Construction Task Catalog (Catalog) for a wide range of construction activities; and WHEREAS, in the interest of time, the City has chosen to expedite this project and utilize the Indefinite Quantity Contract (IQC) process; and WHEREAS, through the NJPA process Lee Construction Group, Inc., was identified as the contractor that has the qualifications and experience in performing the identified scope; and WHEREAS, on February 14, 2019, after negotiations, the Contractor submitted a bid proposal in the amount of $248,000.00, for the Project plus an additional $19,143.74 project contingency; and WHEREAS, the original scope of work included to provide automatic transfer switch and generator including all conduit and wiring, excavation, surfacing repairs, testing, permits, and concrete slab as depicted in the approved construction documents; and WHEREAS, the purchase of one (1) 500KW Kohler generator and automatic transfer switch, constitute Non - Pre - Priced (NPP) items in the Catalog; and WHEREAS, Lee Construction Group, Inc., a certified contractor for the purchase and installation of one (1) 500KW Kohler generator, switchgear and ancillary items; and WHEREAS, Kohler generators are preferred, as this brand of generator is in service at a majority of the City's facilities; and WHEREAS, the IQC proposal received is under the $250,000 threshold limit approved by the City Commission for projects through the NJPA IQC process, however, since the value of the non - pre - priced items exceeds the $50,000 authority of the City Manager, the approval of the City Commission is required to award the Project through the IQC process; and WHEREAS, accordingly, the City Manager recommends waiving, by a 5 /7ths vote, the formal competitive bidding requirement, finding such waiver to be in the City's best interest, and authorizing the purchase of one (1) 600 kW Kohler generator, switchgear and ancillary items; and WHEREAS, the Administration recommends, as being in the City's best interest, to award the Project to Lee Construction Group, Inc., through the IQC process, in the not to exceed amount of $248,000.00, including the Non - Pre - Priced items in the amount of $129,966.48. NOW, THEREFORE, BE IT DULY RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA that the Mayor and City Commission hereby accept the written recommendation of the City Manager and waive, by a 5 /7ths vote, the formal competitive bidding requirement, finding such waiver to be in the City's best interest, and approve and authorize the City Manager to execute a Work Order with Lee Construction Group, Inc., in the not to exceed amount of $248,000.00, for the purpose of completing the Property Management Emergency Generator and Transfer Switch project, which includes the non -pre- priced items in the amount of $129,966.48, pursuant to the competitively bid Sourcewell cooperative contract for construction services (formerly known as National Joint Powers Alliance (NJPA)), with the foregoing work to be completed with previously appropriated funding; further, rescinding Resolution No. 2019 - 30674, which approved the award of the same work to Solares Electric, Inc., as Solares Electric, Inc., is no longer an authorized vendor under the Sourcewell cooperative contract. PASSED and ADOPTED this /3 day of fii/r'c% 2019. ATTEST: Rafael E. Grana•o, City Clerk I. r' JOR %iiED' sf 1 L Dan GelbeVr or APPROVED AS TO FORM & LANGUAGE & FOR EXECUTION G2,t 3 - City Attorney (77 Date MIAMI BEACH Resolutions - C7 T COMMISSION MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM: Jimmy L. Morales, City Manager DATE: March 13, 2019 SUBJECT: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, ACCEPTING THE WRITTEN RECOMMENDATION OF THE CITY MANAGER AND WAIVING, BYA 5/7TH VOTE, THE FORMAL COMPETITIVE BIDDING REQUIREMENT, FINDING SUCH WAIVER TO BE IN THE CITY'S BEST INTEREST, AND APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A WORK ORDER WITH LEE CONSTRUCTION GROUP, INC., IN THE NOT TO EXCEED AMOUNT OF $248,000.00, FOR THE PURPOSE OF COMPLETING THE PROPERTY MANAGEMENT EMERGENCY GENERATOR AND TRANSFER SWITCH PROJECT, WHICH INCLUDES THE NON - PRE - PRICED ITEMS IN THE AMOUNT OF $129,966.48, PURSUANT TO THE COMPETITIVELY BID SOURCEWELL COOPERATIVE CONTRACT FOR CONSTRUCTION SERVICES (FORMERLY KNOWN AS NATIONAL JOINT POWERS ALLIANCE (NJPA)), AND RESCINDING RESOLUTION NO. 2019 - 30674, APPROVING THE AWARD OF THE SAME WORK TO LEE CONSTRUCTION GROUP, INC., THROUGH THE NJPA PROCESS, AS SOLARES ELECTRIC, INC., IS NO LONGER AN AUTHORIZED VENDOR UNDER THE NJPA, WITH PREVIOUSLYAPPROPRIATED FUNDING. RECOMMENDATION The Administration recommends adopting the Resolution. ANALYSIS The City needs to install one (1) emergency generator at the Property Management Department (the Project). The Project consists of a 500 kW generator as per specifications noted in the permit drawings by TLC Engineering, the engineer of record for the Project. The installation of this equipment is essential to keep the Property Management facility operational in the event of a storm or other catastrophe that would result in Toss of power. Accordingly, the Property Management Department (the Department) issued Invitation to Quote (ITQ) ITQ- 2019 - 018 -MT pursuant to Section 3.2 of City of Miami Beach contract ITB 2018 -039 (the Agreement) to Furnish, Installation, Maintenance and Repair of Generators Citywide. Consequently, a quote was requested from R & D Electric Inc. and All Power Generators, the awarded vendors under this Agreement. All Power did not Page 756 of 1418 respond. R & D Electric provided a lump sum proposal in the amount of $286,442.00. In efforts to expedite the installation of the generator and transfer switch at the Property Management Department, the above referenced project has been selected as a project appropriate for acquiring construction services through the Gordian IQC process. Details of the scope of work of the project are included in the attached proposal from Lee Construction Group, Inc., a prequalified vendor providing construction services to the City pursuant to Gordian Group's IQC contract awarded by NJPA. A proposal from Lee Construction Group, Inc., in the amount of $248,000.00 with a contingency for the installation of one (1) 500 kW generator and transfer switch, which includes non - pre- priced items in the amount of $129,966.48. Accordingly, Administration rescinds Resolution No. 2019 -30674 to Solares Electric, Inc. through the NJ PA process, as Solares Electric, Inc., previously approved for this project is no longer an authorized vendor under the NJ PA. On February 21, 2014 the Finance and Citywide Projects Committee (the Committee) endorsed a recommendation by the Administration to reintroduce this efficient process of project delivery to the City, to begin utilizing the Gordian Group's indefinite quantity contract (IQC), alternatively known as JOC, for construction services to expedite the delivery of construction or maintenance projects under $250,000, or for emergency projects, as approved by the City Manager. Sourcewell, formally known as National Joint Powers Alliance (NJPA), a national cooperative that bids contracts aggregating the spend volume of agencies across the country, has awarded Contract No. #071415 -GGI for IQC construction services to the Gordian Group. The NJPA contract with the Gordian Group includes a number of contractors prequalified to provide services to the City pursuant to the contract under an IQC pre - priced methodology. The contract also has a provision for non - pre - priced items which requires the contractor to secure three quotes for every item that does not correspond to a pre - priced contract line item. The IQC proposal received does not exceed the $250,000 threshold limit approved by the City Commission for projects through the NJPA IQC contract award but the value of the NPP items exceeds the $50,000 authority of the City Manager; the approval of the City Commission is required to award the Project through the IQC process. The cost proposal was reviewed and analyzed by the engineer of record, staff, and the Gordian Group and was found to be fair and reasonable. Therefore, the Administration believes that it is in the City's best interest to award the Project to Lee Construction Group, Inc., through the IQC process, in the not to exceed amount of $248,000.00, for completing the Property Management Emergency Generator, with previously appropriated funds. CONCLUSION The Administration recommends adopting the Resolution. FINANCIAL INFORMATION Previously appropriated as part of the Capital Renewal and Replacement budget of fiscal year 2019. Page 757 of 1418 Legislative Tracking Property Management ATTACHMENTS: Description ❑ IQC Lee Construction Property Man. Generator D Reso- PM Generator IQC Page 758 of 1418 Work Order Signature Document THE GORDIAN GROUP Work Order Number.: 062105.00 Work Order Title: Miami Owner Name: City of NJPA EZIQC Contract New Work Order Property Management Beach No.: FLO4GC4- 051716 -LCI Modify an Existing Work Order Order Date: 02/14/2019 X Beach Miami Work Office Contractor New Generator Name: LEE Construction Group. Inc. Contact: Adrian Morales Contact: Andres Solares Phone: 305 - 673 -7000 Phone: Work to be performed as per the EZIQC Contract No FLO4GC4- 051716 Brief Work Order Description: Work to be Performed Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA -LCI. Generator, ATS, conduit, wiring, concrete pad, demo, etc. Provide and install new 500 KW Time of Performance Estimated Start Estimated Completion Liquidated Damages Will apply: Date: Date: Will not apply: X Work Order Firm Fixed Price: $228,856.26 Owner Purchase Order Number: Approvals Owner Date Contractor Date Work Order Signature Document Page 759 of 1418 Page 1 of 1 2/14/2019 Detailed Scope of Work SIQC THE GORDIAN GROUP To: Andres Solares Solares Electrical Services, Inc 10421 NW 28th Street Miami, Fl 33172 No Data Input Date Printed: February 14, 2019 Work Order Number: 062105.00 From: Adrian Morales City of Miami Beach 1700 Convention Center Drive Miami Beach, FL 33139 305 - 673 -7000 Work Order Title: Miami Beach Property Management Office New Generator Brief Scope: Provide and install new 500 KW Generator, ATS, conduit, wiring, concrete pad, demo, etc. Preliminary n Revised Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Provide and install new generator, ATS, conduit, wiring, concrete pad, demo etc as indicated in the electrical drawings E1.01. Subject to the terms and conditions of JOC Contract FLO4GC4- 051716 -LCI. Contractor Date Owner Date Scope of Work Page 1 of 1 2/14/2019 Page 760 of 1418 Contractor's Price Proposal - Summary Date: February 14, 2019 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: FL04GC4- 051716 -LCI 062105.00 Miami Beach Property Management Office New Generator LEE Construction Group. Inc. $228,856.26 Section - 01 Section - 02 Section - 03 Section - 22 Section - 23 Section - 26 Section - 28 Section - 32 Proposal Total Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub - totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 56.79% $26,010.49 $716.53 $6,829.33 $1,245.11 $2,012.43 $178,150.45 $681.79 $13,210.13 $228,856.26 Contractor's Price Proposal - Summary Page 761 of 1418 Page 1 of 1 2/14/2019 Contractor's Price Proposal - Detail Date: February 14, 2019 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: FLO4GC4- 051716 -LCI 062105.00 Miami Beach Property Management Office New Generator LEE Construction Group. Inc. $228,856.26 Sect. Item Mod. UOM Description Line Total Labor Equip. Material (Excludes) Section - 01 1 01 22 16 00 0002 EA Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible costs. The base cost of the Reimbursable Fee is $1.00. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee (e.g. quantity of 125 = $125.00 Reimbursable Fee). If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warrantee, expedited shipping costs, etc.). A copy of each receipt shall be submitted with the Price Proposal. Quantity Unit Price Factor Installation 4,427.00 x 1.00 x 1.1000 permit fees Total 4,869.70 $4,869.70 2 01 22 20 00 0010 HR ElectricianFor tasks not included in the Construction Task Catalog® and as directed by owner only. Quantity Unit Price Factor Installation 32.00 x 48.55 x 1.1874 work related to note #12 page E1.01 Total 1,844.74 $1,844.74 3 01 22 20 00 0049 HR Investigating Senior Engineer Or Specialty ConsultantFor special investigatory engineering requirements or other miscellaneous professional services. Quantity Unit Price Factor Installation 24.00 x 125.00 x 1.1874 for testing and owners training Total 3,562.20 $3,562.20 4 01 22 23 00 0389 WK 1/2 To 5/8 CY, 65 HP, Loader - Backhoe With Standard Bucket And Full -Time $3,037.30 Operator Installation Quantity 1.00 x Unit Price 2,557.94 x Factor Total 1.1874 3,037.30 5 01 22 23 00 0729 DAY 650 KW A/C Resistive Loadbank $1,277.88 Installation Quantity 2.00 Unit Price 538.10 x Factor Total 1.1874 1,277.88 6 01 22 23 00 0747 EA Fuel Reimbursement For GeneratorsPurchases made by the contractor for fuel will be reimbursed to the Contractor at the actual cost of the purchase, without mark -up, for which a receipt or bill is received. The Adjustment Factor applied to Reimbursable Fees will be 1.0000. The base cost of the purchase is $1.00, quantity will adjust cost to actual purchase cost; i.e., quantity of 125 = $125.00 purchase. If there are multiple purchases, each one shall be listed separately with a comment in the "note" block to identify the purchase. Quantity Unit Price Factor Total Installation 2,000.00 x 1.00 x 1.1874 = 2,374.80 $2,374.80 7 01 22 23 00 1194 WK 3 Ton Capacity, 12' To 16' Bed, 4 x 2 Flat Bed Truck With Full -Time Truck $3,589.52 Driver Installation 3,023.01 x 1.1874 = 3,589.52 generator delivery Quantity 1.00 Unit Price Factor Total Contractor's Price Proposal - Detail Page 1 of 5 2/14/2019 Page 762 of 1418 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062105.00 Work Order Title: Miami Beach Property Management Office New Generator Section - 01 8 01 45 23 00 0011 EA Proctor Compaction 4" Standard Mold ASTM D698, Field Soils Test $420.74 Installation Quantity Unit Price Factor 2.00 x 177.17 x 1.1874 Total 420.74 9 01 71 13 00 0005 EA Up To 20 Ton Lift Move On /Off Cost, Truck Mounted Cranelncludes delivery and pickup. Quantity Unit Price Factor Installation 1.00 267.50 x 1.1874 Total 317.63 $317.63 10 01 71 23 16 0005 HR 2 Person Survey Crew (Unit Of Measure Is Per Crew Hour Worked)Includes surveyor, rodman, equipment and instruments. Quantity Unit Price Factor Installation 1.00 x 120.76 1.1874 Total 143.39 $143.39 11 01 71 23 16 0023 ACR Survey Clear Area For Underground Utilities $3,002.98 Quantity Unit Price Factor Total Installation 100 x 2,529.04 x 1.1874 - 3,002.98 12 01 71 36 00 0003 EA X -Ray Or Electromagnetic Survey Minimum Set -Up ChargeFor projects where the total charges are less than the minimum set -up charge, use this task exclusively. This task should not be used in conjunction with any other tasks in this section. Quantity Unit Price Factor Installation 1.00 x 318.57 x 1.1874 Total 378.27 $378.27 13 01 74 19 00 0015 EA 30 CY Dumpster (5 Ton) "Construction Debris "Includes delivery of dumpster, rental cost, pick -up cost, hauling, and disposal fee. Non - hazardous material. Quantity Unit Price Factor Installation 1.00 x 769.32 x 1.1874 Total 913.49 $913.49 14 01 74 19 00 0036 CYM Hauling On Paved Roads, Miles Over Initial 15 Miles $277.85 Installation Quantity 600.00 x Unit Price Factor Total 0.39 x 1.1874 - 277.85 Subtotal for Section - 01 $26,010.49 Section - 02 15 02 41 19 13 0063 EA Saw Cut Minimum ChargeFor projects where the total saw cutting charge is less than the minimum charge, use this task exclusively. This task should not be used in conjunction with any other tasks in this section. Quantity Unit Price Factor Installation 1.00 x 483.44 x 1.1874 Total 574.04 $574.04 16 02 66 23 00 0065 SF Cleanup And Re -Grade Working Surface $142.49 Installation Quantity 2,000.00 x Unit Price Factor Total 0.06 x 1.1874 = 142.49 Subtotal for Section - 02 $716.53 Section - 03 17 03 11 13 00 0026 SF Elevated Slab Wood Formwork $336.98 Quantity Unit Price Factor Total Installation 60.00 4.73 x 1.1874 336.98 18 03 21 11 00 0130 LF #6, Grade 60, Slab On Grade, Steel Reinforcement Bar $4,642.97 Installation Quantity 2,660.00 x Unit Price Factor Total 1.47 x 1.1874 = 4,642.97 19 03 31 13 00 0018 CY Direct Chute, Place 3,000 PSI Concrete Continuous Footings $1,463.47 Installation Quantity 10.00 x Unit Price Factor Total 123.25 1.1874 1,463.47 Contractor's Price Proposal - Detail Page 2 of 5 2/14/2019 Page 763 of 1418 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062105.00 Work Order Title: Miami Beach Property Management Office New Generator Section - 03 20 03 31 13 00 0104 HR 35 CY /HR, 66 HP Trailer Mounted Concrete Pumpincludes hoses Quantity Unit Price Factor 4.00 x 81,25 x 1.1874 Installation Total 385.91 $385.91 Subtotal for Section - 03 $6,829.33 Section - 22 21 22 11 16 00 0007 LF 2" Schedule 40 Threaded Galvanized Steel Pipe With 150 LB Malleable Iron Fitting Assemblylncludes all hangers and all galvanized malleable iron fittings (couplings, elbows, tees and reducer fittings). All hangers are complete assemblies. Not for use where detail is available. Quantity Unit Price Factor Installation 70.00 x 14.98 x 1.1874 Total 1,245.11 $1,245.11 Subtotal for Section - 22 $1,245.11 Section - 23 22 23 05 48 00 0021 EA 550 -1,920 LB Rubber In Shear Vibration Isolation With 0.48" Deflection $1,868.49 Installation Quantity 4.00 x Unit Price 393.40 x Factor Total 1.1874 1,868.49 23 23 09 23 00 0086 EA Install And Wire Break Glass Switch $143.94 Installation Quantity 1.00 x Unit Price 121.22 x Factor Total 1.1874 143.94 Subtotal for Section - 23 $2,012.43 Section - 26 24 26 00 00 00 0000 EA Furnish 500KW Generator NPP installation Quantity Unit Price Factor Total 1.00 x 112,350.00 x 1.1568 = 129,966.48 $129,966.48 25 26 05 13 00 0182 EA 500 MCM Cable Splice, To 5 KV One Conductor, Shielded Medium Voltage To $1,999.20 5 KV Installation Quantity 8.00 x Unit Price 210.46 x Factor Total 1.1874 1,999.20 26 26 05 19 16 0254 MLF #6 AWG Cable - XLPE- USE - RHH -RHW 600 Volt Copper, Single Stranded, Placed In Conduit Quantity Unit Price Factor Installation 0.20 x 1,129.66 x 1.1874 Total 268.27 $268.27 27 26 05 19 16 0261 MLF #3/0 AWG Cable - XLPE- USE - RHH -RHW 600 Volt Copper, Single Stranded, Placed In Conduit Quantity Unit Price Factor Installation 0.50 5,207.33 x 1.1874 Total 3,091.59 $3,091.59 28 26 05 19 16 0287 MLF #1/0 AWG Cable - Type THHN -THWN 600 Volt Copper, Single Stranded, Placed In Conduit Quantity Unit Price Factor Total Installation 0.41 x 2,673.47 x 1.1874 = 1,301.54 Demolition 0.02 x 316.44 x 1.1874 = 7.51 $1,309.05 29 26 05 19 16 0296 MLF 600 MCM Cable - Type THHN -THWN 600 Volt Copper, Single Stranded, Placed $19,659.88 In Conduit Quantity Unit Price Factor Total Installation 138 x 11,936.17 x 1.1874 - 19,558.75 Demolition 0.12 x 709.73 x 1.1874 = 101.13 Contractor's Price Proposal - Detail Page 3 of 5 2/14/2019 Page 764 of 1418 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062105.00 Work Order Title: Miami Beach Property Management Office New Generator Section - 26 30 26 05 26 00 0099 EA 5/8" Diameter x 10' Long Copper -Clad Ground Rods $320.69 Installation Quantity 4.00 x Unit Price 67.52 x Factor Total 1.1874 320.69 31 26 05 29 00 0029 LF >2' Length x 1 -5/8" Wide x 1 -5/8" High, 12 Gauge, Steel Unistrut Channel $907.17 Installation Demolition Quantity 100.00 80.00 x x Unit Price 6.84 1.00 x x Factor 1.1874 1.1874 = Total 812.18 94.99 32 26 05 29 00 0048 EA 4 -Hole, 7 -1/4" Length, In -Line, Flat Splice Plate, Steel, Unistrut Channel Fitting $56.40 Installation Quantity 10.00 x Unit Price Factor Total 4.75 x 1.1874 = 56.40 33 26 05 29 00 0057 EA 3 -Hole, 1 -5/8" x 4 -1/8 ", 90 Degree Angle, Steel, Unistrut Channel Fitting $39.75 Installation Quantity 6.00 Unit Price Factor x 5.58 x 1.1874 Total 39.75 34 26 05 29 00 0074 EA 5 -Hole, 1 -5/8" x 1 -5/8 ", U- Connector, Steel, Unistrut Channel Fitting $36.05 Installation Quantity 6.00 x Unit Price Factor Total 5.06 x 1.1874 = 36.05 35 26 05 29 00 0093 EA 4" Diameter, Steel, Standard Pipe And Rigid Conduit Clamp For Unistrut $24.94 Channel Installation Quantity 4.00 x Unit Price Factor Total 5.25 x 1.1874 = 24.94 36 26 05 29 00 0138 EA 5/8 -11, Steel Lock Nut With Spring For Unistrut Channel $159.82 Quantity Unit Price Factor Total Installation 20.00 x 6.73 x 1.1874 = 159.82 37 26 05 33 13 0034 CLF 1" Rigid Galvanized Steel (RGS) With 4 #12 THHN/THWN Wire Assemblylncludes conduit, terminations, straps, wire as indicated. Not for use where detail is available. Quantity Unit Price Factor Installation 0.15 x 599.50 x 1.1874 Total 106.78 $106.78 38 26 05 33 13 0820 EA 4" Polyvinyl Chloride (PVC) Coated, Urethane Lined, Rigid Galvanized Steel (RGS) Standard Radius Elbow Quantity Unit Price Factor Installation 6.00 x 257.72 x 1.1874 Total 1,836.10 $1,836.10 39 26 05 43 00 0174 LF 2 At 4 ", Duplex Polyvinyl Chloride (PVC), Type DB Duct Bank $2,344.40 Quantity Unit Price Factor Total Installation 160.00 x 12.34 x 1.1874 = 2,344.40 40 26 05 43 00 0188 EA 4" Adapter $244.15 Installation Quantity 6.00 x Unit Price Factor Total 34.27 x 1.1874 = 244.15 41 26 05 83 00 0024 EA 1/0 AWG Low Voltage (To 600 Volts) One Hole Compression Lug $136.55 Installation Quantity 4.00 x Unit Price Factor Total 28.75 x 1.1874 = 136.55 42 26 05 83 00 0049 EA 750 MCM Low Voltage (To 600 Volts) Two Hole Compression Lug Installation Quantity 48.00 x Unit Price Factor Total 89.58 x 1.1874 = 5,105.63 $5,105.63 43 26 27 13 00 0027 EA 4 Meters And Main, 120/240 Volt, 1,200 Amp Bus, 4 Jaw Sockets, 200 Amp $1,698.86 Max Installation Quantity 1.00 x Unit Price 1,430.74 x Factor Total 1.1874 1,698.86 Contractor's Price Proposal - Detail Page 4 of 5 2/14/2019 Page 765 of 1418 Contractor's Price Proposal - Detail Continues.. Work Order Number: 062105.00 Work Order Title: Miami Beach Property Management Office New Generator Section - 26 44 26 32 13 13 0021 EA 600 KW Diesel Generator Set, 3 Phase (Cummins DQCA) $8,838.69 X Installation Quantity 1.00 Unit Price 7,443.73 x Factor Total 1.1874 8,838.69 Subtotal for Section - 26 $178,150.45 Section - 28 45 28 05 13 23 0005 MLF 2 -Pair, 18 AWG, Twisted Pair, Non - Shielded, Plenum Rated, Solid Type FPLP (Red), Fire Alarm /Life Safety Cable, Installed In Conduit Quantity Unit Price Factor Installation 010 x 1,660.22 1.1874 Total 197.13 $197.13 46 28 31 23 00 0332 EA Remote Annunciator, 80 Character LCD, Common System Indicators, Beige Housing, Mounts To 4" Box With Supplied Ring (EST3 RLCD) Quantity Unit Price Factor Installation 1.00 x 408.17 x 1.1874 Total 484.66 $484.66 Subtotal for Section - 28 $681.79 Section - 32 47 32 11 26 19 0002 CY Bituminous Stabilized Base Course3 /4" ASTM C33. $3,385.80 Quantity Unit Price Factor Total Installation 24.00 x 118.81 x 1.1874 3,385.80 48 32 12 13 19 0002 SY Surface Prime Coat, 0.28 Gallon /SY $28.78 Installation Quantity 24.00 x Unit Price Factor Total 1.01 x 1.1874 = 28.78 49 32 12 13 19 0002 0339 MOD For Up To 150, Add Quantity Installation 24.00 x Unit Price Factor Total 0.23 x 1.1874 = 6.55 $6.55 50 32 12 16 13 0005 SY 2" Thick Binder Courselncludes placement, rolling, finishing and sweeping. $8,321.30 Quantity Unit Price Factor Total Installation 600.00 x 11.68 x 1.1874 8,321.30 51 32 12 16 13 0023 TON Base Course, PC -I $978.47 Installation Quantity 6.00 x Unit Price 137.34 x Factor Total 1.1874 978.47 52 32 12 16 13 0023 0486 MOD For >5 To 10, Add $489.23 Quantity Unit Price Factor Total Installation 6.00 68.67 x 1.1874 = 489.23 Subtotal for Section - 32 $13,210.13 Proposal Total This total represents the correct total for the proposal. Any discrepancy between line totals, sub - totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 56/9% $228,856.26 Contractor's Price Proposal - Detail Page 766 of 1418 Page 5 of 5 2/14/2019 Subcontractor Listing SIQC THE GORDIAN GROUP Date: February 14, 2019 Re: IQC Master Contract #: Work Order #: Owner PO #: Title: Contractor: Proposal Value: FLO4GC4- 051716 -LCI 062105.00 Miami Beach Property Management Office New Generator LEE Construction Group. Inc. $228,856.26 Name of Contractor Duties Amount No Subcontractors have been selected for this Work Order $0.00 0.00 Subcontractor Listing Page 1 of 1 2/14/2019 Page 767 of 1418 6£L££'ld'HOV39 MIN OVOH AV9 ££11L A1nIOVd 1N31613DVNVW ALH13dOdd s' N W r 5 Q Q N x�7 O J V CD 0 , ,, oo Isr") cc 0 W Z w 0Z Eb- 0 Z Z w F NO P fW 1.311 11113110OMd %OOL wz°muwtlumee .2 a3ry 0019 =14.. n:a 0 o® G 8 0 OrT,, ¶ L0050 0301 0 60% PROGRESS SET oSoOeo € ii1V40FkqkU''" 4 g Pag0 7139 or 1418 -0 z Z.! !2 „/-/ LJ 0 MIAMI BEACH PUBLIC WORKS GENERATOR 451 Dade Blvd, Miami Beach, FL 33140 0 0 0 0 0 0 rl ...g . ' A: M5fi i = 21 1 - Ilz Mt tivv. ft 1 MIAMI BEACH PUBLIC WORKS GENERATOR 451 Dade Blvd, Miami Beach, FL 33140 0 0 0 0 0 0 rl M.M.VMPM CR.n.ocaWa MEP_ a.dm.R .M K O °zg g mr1,4 Fr^oCJ — =yz a PT 100% P800488 SET 000) 1151. i zmo 05 co Z0{ CD Fm�� n� nn 8 F Pave 770 of 1418 5 4544 S mg�gm 44 5 4 4 4 i AP 3Po,, g4_ 1 4 5 5 PROPERTY MANAGEMENT FACILITY GENERATOR 1833 RAY ROAD MIAMI BEACH. FL. 33139 fm� V rl -i4 g2 3/15/20113 26 23PM 4J m z A O Z NISM StIfl11df1 JOB 5 TANK GAL CENSET MODEL 0EGSET FQOTPPoNr TANK MOGHT 5000 GAL DS1250 198.25' X 9016,525 LBS I _ _ BILL OF MATERIAL FDEP: * = 2" PIPE TO TANK TOP UNLESS OTHERWISE NOTED I ' $_ I- PART /I DESCRIPRON Gtt TANK# EQ716 - 5 1 3166 1 F CPLG, 6 EVENT 1 SPILL BOX EQ567 hill , # _ T 1 3655 'F CPLO Y RE71F8! WJ 3J4 qP TUEE 1 BASIN ALARM# EQ817 " 0 3655 1F FxC, 2 SUPPLY, w/ 3/4 DIP 116E 1 HIGH LEVEL# EQ817 3 s ' i - X 1003 I FLANGE 2', FUEL LEVEL GAUGE 1 ffi 4003 -151 80000160 00L41E ABVER (51564802.47) 1 Y 3152 F CPIE 2 STANDARD VENT CAP 1 'S 4 5 S 9 'ag, X TiP Z 3005 FLANGE, 2', LOCKING FILL CAP 1 _ Y i g °a P $ 8 Snr P 2 o ( 1 n 4301 01-1/2' PIPE TOE, L 30 -1/2' 1 (. 3 A SPECIAL 1 CFLG. 1-1/2", I0 -FPI -8615 FLOAT 1 9 \ 1 "i ' 15 -TYP I ISOLATOR SUPPORT CHANNEL 8 3502 FLANGE, 1%2 BASIN GRAIN 1 V■',-- EV►sIAIIANImi (MSS- 1E- 2575N) WY: 12 C 8410 1/2 FLUSH MOUNT LIMNS RATE 8 ° 11, -�-- 1 MAT. C4X5.4 W/ .25' PLATE /(�� II I.) f 1, 1 1.5J (� -. -.. D 8003 ;REMOVABLE END PUTS r BEND 1 (�' a. E 4000 48 STANDARD ELECTRICAL STUB 14 1 I1111 1a1 1 6-1 A LIntlec4nlef s Laboralones , Inc F 3600 IF DIG, 2 WING W / A1 //2 MP TUBE 2 [n 01 12 LISTED PRODUCT _ G 1093 F (185 T' 7- 81/180942 al81860 01/08) 1 NI IN I d i.! ill I` A 0H1781Ha57aJMH25219 K 3196 FLANGE,, 3 °,. 211(10GEW` PLUG 8 DLOBALPOIR6 CDMPONENIB - L 3190 FLANGE, 3/8', F11DNG W/ PLUG 1 M 3191 F. CPLG, 1/2', - 171(1186 W/ PLUG 2 rtm 817 ULta2 SUB DfSE TARP EON SE] ._ 8220 7 GAL SPILL 0061296618! 800 1 8303 6 1 BEAM GENSET SUPPORT 8 sm�. 8420 ISOLATOR SUPPORT PLATE 12_ BERG - P��� 8428 GPC SIPRED 604015 I6S_tE -1575 /2 1380 , SERIES 400 000ROIIER (916LF/ 1 2025 SINGLE SUPPLY PUMP SYSTEM 1 00778100710807 : 1/3 HP CARBONATE MOTOR, 14 Ifs, .0 PAM Ref HEAD As1N Ff.,. 105 ANCHOR E'JLTS i k 6 k <O<7 es DM ED 08071rc 6040 115 /230V, 50/60H2, 48YZ FRAME �� "" I `.�'Er 1� I PI cRACrc - BRONZE CLOSED COUPLED 4GPM 1 I _ ROTARY GEAR PUMP. 3/6" PORTS SIGN AS PER NFPA 7O<FDP FUEL SUPPLYT 6400 ROME PIP BB: 1I/ Del. FOR APPLY RIP 1 H.7 PROVIDE ANx, FUELING lfR De rHec8470AroP ROOM _- - LY v Iu 7457 ND. - 2010 _ REVERSE PULP SYSTEM 1 ._�. L FLAMMABLE f iT HP CAPACITOR mar MOTOR � • (10/M , u Ns na ' 14 115 /230V 60Ht 48 FRAME 1 I\ s IIAi� 6070 BRONZE CLOSED COUPLED 7GPM • _ I 4R J '" sPFC A< _ 'WA f' ° U v Y I ..® TP 1 (ROTARY GEAR PUMP 1/2 PORTS 1 �arAmo iiiislima'_ 1/2• FUEL STRMNER 1_ [No-3221 SUB-BASE FUEL TANK 1701- 10651 1/26 SPRING CHECK VALVE 1 48 of -,_ TOP 'DP- 69. X18' BLOTS 1710- 1896j1/2 00GEN010 VALVE (120VAC, NC) 1 e •I 1YP (82) 111150.512HR FIRE 68155 DOUBLE WALL TIM 1 I PAIN( COLOR GLOSS BLACK GEN SET OFFSET 6" TO LEFT SIDE B K' 2 5.? _ �� 11825215 — 2528 -4 i° 2 _ 807, 1 I � P8F. X M (2}%J. '' ��'° , I 7 Y--i 8 -1I1 -125 1.';:I I 11 �r �� i��r - _ �r �� FTYP FLANGE J ••���1■ l . 0 L 1 o 1-1 of 1 es 1 • li�mlaum 2 I I I RIGHT SIDE I Al" 2 .22 I I �I RADIATOR END I 1K Al' —II aND No suPral: 3 8 m sorrow 1,5 115 n6 100% 11110011088 SET F n n � Page 7 1 of 14 PROPERTY MANAGEMENT FACILITY GENERATOR 1833 BAY ROAD MIAMI BEACH, FL. 33139 i;. 3 E0% PROGRESS SET Page 772 of 14111 1 0 r M ii fi is 4 Is e' b ig m Sa A f Co G F MIAMI BEACH PUBLIC WORKS GENERATOR 451 Dade Blvd, Miami Beach, FL 33140 TAW I\ TAW POWER SYSTEMS, INC. 1500 NW 15th Ave Pompano Beach, FL 33069 Ph.: (954) 977 -0202 x1759 (800) 876 -0990 Fax: (954) 977 -9249 John.Potts(.c'i,tawinc.com Kohler Generator Systems Distributors KOHLER POWER SYSTEMS DISTRIBUTOR FOR ALABAMA, SOUTH GEORGIA, FLORIDA, LOUISIANA AND MISSISSIPPI Date: August 8, 2018 Contact: John Potts Project: City of Miami Beach — Property Management One New KOHLER Model 500KW, @ 0.8 PF, 60 Hz, CONTROLLER: APM402 Controller meets NFPA 110 ENCLOSURE: Aluminum Sound Enclosure 181 MPH Wind Load Rated Critical Silencer COOLING: Unit Mounted Radiator Block Heater, 120 Volt FUEL SYSTEM: Flexible Fuel Lines Sub -base Fuel Tank, 1,700 Gallon, UL142 Listed FDEP Package Fuel Water Separator GENERATOR ACCESSORIES (Electrical): Line Circuit Breaker, 3 Pole, 100 % Rated Qty (1) 800 Amps, Electronic, ENGINE ELECTRICAL ACCESSORIES: Battery Rack and Cables Starting Battery, Lead Acid Battery Charger: 10 Amps CONTROLLER ACCESSORIES LOOSE: Remote Emergency Stop, Break Glass Remote Annunciator Panel AUTOMATIC TRANSFER SWITCH: Qty (1) Kohler Model KEP -DMTC- 0800 -NK 208 Volt, 3 Ph., 3 Pole, 800A, NEMA 3R, Service Entrance Rated Offer No: P1808 -0106 Contact CeII #: (954)- 234 -4226 500REOZJ, EPA Certified Diesel Generator Set, 3 Phase, UL 2200, 277/480 Volt with the following: ADDITIONAL ACCESSORIES: Certified Factory Test @ 0.8 P.F. 3 Engine, Generator Parts, Maintenance Manuals 1 Electronic Manual Vibration Isolators: Internal 5 Year Comprehensive Warranty SUPPLIED BY OTHERS New Fuel — First Fill of New Tank Installation Local and State Permitting by Others All Infrared, 3rd Party and NETA Testing if Required TOTAL NET LOT: $103,950.00 ESTIMATED LEAD TIME: 16 to 18 weeks after release of the order. This estimated lead time is subject to change daily due to availability F.O.B. FACTORY, FREIGHT ALLOWED TO JOB SITE SALES TAX NOT INCLUDED Regards, TAW Power Systems, Inc. John Potts Senior Sales Engineer OFFER VALID FOR 30 DAYS FROM THIS OFFER DATE (LISTED ABOVE) Page 773 of 1418 EXCEPTIONS/ CLARIFICATIONS/ NOTES: (OFFER ACCEPTANCE BELOW) Delivery, start up, and load testing are quoted as during normal business hours. If after hour, weekend, or holiday work hours are required, the Contractor will be responsible COMPANY for the overtime differential unless otherwise noted. AUTHORIZED SIGNATURE OFFER BASED UPON: TITLE • Drawing E -101 NOTE: TAW's STANDARD TERMS and CONDITIONS apply to all offers for purchase and any purchase orders accepted by TAW. You may find a copy under the terms and conditions section at TAWINC.com or please contact our office at 800 -456 -9449 and we will forward you a copy. TAW will transmit a written delivery schedule based on the manufacturer's confirmation, approximately fifteen (15) days after product release. Also included will be the related progress invoice values based on material shipments. All TAW offers, plans, specifications, and technical drawings are copyrighted works and contain proprietary know -how of TAW, and Buyer has no right to reproduce, distribute or publish copies of TAW's copyrighted works or to create derivative works of TAW's copyrighted works without the express written permission of an authorized representative of TAW. PRINT NAME DATE TERMS & CONDITIONS ACKNOWLEDGED: INITIAL Page 774 of 1418 0 w h Sg 5 8 5 B 8 8 ESE 8 8 5 0 z 8 8 68188'18 ' 4oea8 8weipr '8V08 AV8 8881 1O1V0:13N39 J.BONt/1S .l 11IOdd IN3013OVMdW A1213dO2:1d HOV38 ILJVIW $ 8 8 8 E 55 5 o �Na 88 5585 5€ s 8w a 8 g 65 � =_ „a$G aa83� 85 8g ,h 855 sa< x S 5 88 8 8 8 55 gi 5 58 8 9 5 6B 5 86 6 6 88 FLORIDA WIND LORGS: PER BUILDING GmE SE 17511,1■3 EEG. GUM) 8 a gg 8 A 58 8 555 88 35 Sm EJ n; 58 a .15 o4”: ...... $ .b� 5 s z a zN 8 58 5 Gpia �, Gg 88 �a� 5 5 555. y 9 55 "8 F 6 $ a 5LL 55 in 8 <a 86 g 55 55 z O UJ wawa��ww, , a- �eae ,w.wHw�.��.�w..Mwv��a,waraom,d uoawn08,a.o a,00040n„0a,.0. waa.SO.r a1.02/116 ■ JOVgN3eAEIeNV1Su111Ga INRINAOVNVIN egdO d NOVAS] IIAIV w oL A ) ); A! ; , § \)= uJz- 2 2 ■�______� ( : I , DNS .I.I. STRUCTURAL ANALYSIS AND COMPUTATIONS PROPERTY MANAGEMENT FACILITY GENERATOR GENERATOR ANCHORAGE CALCULATIONS JULY 18, 2018 TLC ENGINEERING FOR ARCHITECTURE 874 Dixon Blvd Cocoa, Florida 32922 (321) 636 -0274 COA #15 Project No. 618043 ENGINEERING FOR ARCHITECTURE Page 777 of 1418 Structural Analysis and Computations Property Management Facility Generator Anchorage Calculations July 18, 2018 The below signature and seal is for the attached 11 calculation pages, 1 to 11: Cathy G. Tiedge, PE FL PE 47763 TLC Engineering for Architecture 874 Dixon Boulevard Cocoa, FL 32922 321 - 877 -4231 COA #15 Page 778 of 1418 1L( ENGINEERING FOR. ARCHITECTURE JOB Pt WPERSY I z.b�,G�� rc lY ry Et2�Tt)wz JOB NO. .oI cZa'{-`> SHEET NO. OF CALCULATED BY 1A ' DATE /1e7, t13 CHECKED BY DATE TLC ADDRESS C- C-'4 e E [ -c" .1 - 4 -r-OAA I .. L r. [9-5 VP4-k YAGt, = 413 ver4 {sue s -10 , 4 — 12. acFroP STt tCTi..td2.5S & r` tA-LPNLi<1JT ce7e StALL-Dn. e,s W / —` ioa FT ���� •�s 91-K r- 0, 00 236 � k� 2 � -,. Cr riet7f.4 ?C ib20 (a 1-1.net? -dwr 4-- t2t5S w' A 1 °1 l 0 3 It F is 10c-te-EAS D Fitotvl r. 4 e. h.. TO Sh. • &V. - Sk = 4.0 j40e,4 4t - 4.0 644-I1-41Jey� T�t1KS� % 0, q (_ s t I ttn.dclQ 5TiGUCT J U 36.22 FsF vaR.-r took I. vA121ES Fie.00 1,0 -+ N7 A5 r Gs IN G As 2 'tztjM 0- 131_ Ar = P>L GGr = OPktrT 016,??1 -Y i•Fotetzvtn ViEleTIC,A L. Page 779 of 1418 ENG -002 11 /16 1LC ENGINEERING FOR ARCHITECTURE JOB JOB NO. SHEET NO. CALCULATED BY TLC ADDRESS DATE CHECKED BY em OF DATE �Y2sk'rR — T4 44V-- Cal.nPTY..) — C1-05 E — 0-00 LAS L-S ct 2,42 L� t ve I-B C EC 1A-LI .( ' LoNf,_c o C.-e1r351 Tat2 5 r - PRY 14/ 17 FLL 'F' 10T CASE pa csciJG#c�� Sb.22 fSfr('14-' - -44-" rJ' 2G7 Pl_f F./ - 36.22 PSF (1 +' -2-") V2-C2 go,-0 611- It /2--") 2 2 9(0, 09S t.B ~FT T = C - 3(a; :-s -� = 5i 5(0 Lb 520 s' r_ wee? 1.-45s sL7 - 51 VO t✓t5 2O 2' C7' 1.-1a 5,w s 5 C. r2— 1�- 1EICNT OF ktra T vim, - ccac. Fy ' T' t 1 g' (5) A t C . SiCe A+ " ecrliffRATae- TAN K 1445 ?MX- 1442, tom, T stol.� 90 '2F (t■'- 614") (t? 2 4- L' S--,41'4. Pagfjw 4414111 ENG -002 11!16 1LC ENGINEERING FOR ARCHITFCTIIRE JOB JOB NO. SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE TLC ADDRESS •Ji2.T ®�Z y �Gv rl c , .) G4+ C+ Cf{t7z- Fob,. Cmit8ttJED 7-013SE04 stke- l+. %1 b 5-RA F 1 55`x' 15/(0` C� %b L5 t1J GetJ kZATt 2, ,. .> sue' Y 6r1 s" c4 u� A -ro 'i) A 17 SP- G 24 "4", C. LI & ENG -002 1111e Page 781 of 1418 ., 1� www.hilti.us Company: Specifier: Address: Phone I Fax: E -Mail: 1■■111 1'1 Profis Anchor 2.7.5 Page: Project: Sub - Project 1 Pos. No.: Date: 1 MB Prop. Management Generator Anchor 7/18/2018 Specifiers comments: 1 Input data Anchor type and diameter: Effective embedment depth: Material: Proof: Stand -off installation: Anchor plate: Profile: Base material: Reinforcement: Geometry [in.] & Loading [Ib, in.Ib] Hex Head ASTM F 1554 GR. 36 3/4 hef = 6.000 In. ASTM F 1554 Design method ACI 318 -14 / CIP eb = 0.000 in. (no stand -off); t = 0.500 in. Ix x 1, x t = 3.000 in. x 24.000 in. x 0.500 in.; (Recommended plate thickness: not calculated no profile uncracked concrete, 3000, fb' = 3000 psi; h = 8.000 in. tension: condition B, shear: condition B; edge reinforcement: none or < No. 4 bar 4Z _ Z X ••• Input data and results must be checked for agreement with the existing conditions and �ikiilj�!) h 1418 PROFIS Anchor ( c ) 2003 -2009 Hilti AG, FL -9494 Schaan Hilti is a registered Traderha i r�p((f�� ha2n www.hilti.us Company: Specifier: Address: Phone I Fax: E -Mail: mium-r1 Profis Anchor 2.7.5 Page: 2 Project: MB Prop. Management Sub - Project I Pos. No.: Generator Anchor Date: 7/18/2018 2 Load case /Resulting anchor forces Load case: Design loads Anchor reactions [Ib] Tension force: ( +Tension, - Compression) Anchor Tension force Shear force Shear force x Shear force y 1 1448 614 614 0 max. concrete compressive strain: - [ %o] max. concrete compressive stress: - [psi] resulting tension force in (x /y)= (0.000 /0.000): 1448 [Ib] resulting compression force in (x/y)= (0.000/0.000): 0 [Ib] 3 Tension Toad Load Nua [lb] Capacity $ N„ [Ib] Utilization YN = Nua /4) N„ Status Steel Strength* 1448 14529 10 OK Pullout Strength* 1448 15382 10 OK Concrete Breakout Strength** 1448 16905 9 OK Concrete Side -Face Blowout, direction ** N/A N/A N/A N/A * anchor having the highest loading * *anchor group (anchors in tension) 3.1 Steel Strength Nsa = AseN futa Nsa Nua ACI 318 -14 Eq. (17.4.1.2) ACI 318 -14 Table 17.3.1.1 Variables [Psi] AseN [in.z] futa [Psi] 0.33 58000 Calculations Nsa [Ib] 19372 Results Nsa [Ib] 19372 3.2 Pullout Strength NPN = tV c,P NP Np = 8 Ably fc NPN > Nua Variables W c 1.400 Calculations Np [Ib] 15696 Results N. [Ib] 21974 steel 0.750 Nsa [Ib] Nua [Ib] 14529 1448 ACI 318 -14 Eq. (17.4.3.1) ACI 318 -14 Eq. (17.4.3.4) ACI 318 -14 Table 17.3.1.1 Abry [in.2] 0.65 () concrete 0.700 a, a 1.000 fc [psi] 3000 N. [Ib] Nua [Ib] 15382 1448 Input data and results must be checked for agreement with the existing conditions anclO si yS.j 4h 1418 PROFIS Anchor ( c ) 2003 -2009 Hilti AG, FL -9494 Schaan Hilti is a registered Traderr ,a i YAW:, haAn www.hilti.us Company: Specifier: Address: Phone I Fax: E -Mail: Profis Anchor 2.7.5 Page: Project: Sub - Project 1 Pos. No.: Date: 3 MB Prop. Management Generator Anchor 7/18/2018 3.3 Concrete Breakout Strength ANc Ncb — (ANc0/ w ed,N tV c,N yf cp,N Nb Ncb ?Nua ANc see ACI 318 -14, Section 17.4.2.1, Fig. R 17.4.2.1(b) p`Nco = 9 hef 1 Wec,N= (i+e)�1.O hef Wec,N 0.7 +0.3 (Camin)51.0 `1.5hef J/ W cp,N = MAX(Ca,min 1.5hef) < 1.0 Cec Cac Nb = kc a a V Nis Variables he [in.] 6.000 ect,N [in.] ec2,N [in.] ACI 318 -14 Eq. (17.4.2.1a) ACI 318 -14 Table 17.3.1.1 ACI 318 -14 Eq. (17.4.2.1c) ACI 318 -14 Eq. (17.4.2.4) ACI 318 -14 Eq. (17.4.2.5b) ACI 318 -14 Eq. (17.4.2.7b) ACI 318 -14 Eq. (17.4.2.2a) Ca,min [in.] W c,N 0.000 ca, [in.] k� 24 Calculations ANC [In.2] 324.00 Results Ncb [Ib] 24150 0.000 ANm [in.2] 324.00 concrete 0.700 1.000 W ecl,N 1.000 12.000 Ncb [lb] 16905 fc [psi] 3000 W ec2,N 1.000 Nua [lb] 1448 1.250 W ed,N 1.000 W cp,N 1.000 Nb [Ib] 19320 Input data and results must be checked for agreement with the existing conditions andrfy�ibilj�y}I 1418 PROFIS Anchor ( c ) 2003 -2009 Hilti AG, FL -9494 Schaan Hilti is a registered Traderha i i WGr, a n www.hilti.us Company: Specifier: Address: Phone I Fax: E -Mail: 1■■11`TI Profis Anchor 2.7.5 Page: 4 Project: MB Prop. Management Sub - Project I Pos. No.: Generator Anchor Date: 7/18/2018 4 Shear load Load Vua [Ib] Capacity 4) Vn [Ib] Utilization ]v = V„aI4) Vn Status Steel Strength* 614 7555 9 OK Steel failure (with lever arm)* N/A N/A N/A N/A Pryout Strength ** 614 33809 2 OK Concrete edge failure in direction x + ** 614 8925 7 OK * anchor having the highest loading * *anchor group (relevant anchors) 4.1 Steel Strength Vsa = 0.6 Ase,V futa ACI 318 -14 Eq. (17.5.1.2b) Vsteel > Vua ACI 318 -14 Table 17.3.1.1 Variables Ase,v [in.2] futa [psi] 0.33 58000 Calculations Vsa [Ib] 11623 Results Vsa [Ib] 11623 steel 0.650 Vsa [Ib] Vua [Ib] 7555 614 4.2 Pryout Strength 1 V, - kcp [(AN:0 ed,N 11/ c,N fIf cp,N Nb] Vcp > Vua AN, see ACI 318 -14, Section 17.4.2.1, Fig. R 17.4.2.1(b) z ANco = 9 I•6 1 Wec,N= 1 +2eN) 51.0 3 hef/ tVed,N = 0.7 +0.3 (15Ca,minhf ) 51.0 ` W cp,N = MAX(Ca,min 1.5hef1 < 1.0 � �Cac Cac J Nb = kc A. a Vrc heib Variables ACI 318 -14 Eq. (17.5.3.1a) ACI 318 -14 Table 17.3.1.1 ACI 318 -14 Eq. (17.4.2.1c) ACI 318 -14 Eq. (17.4.2.4) ACI 318 -14 Eq. (17.4.2.5b) ACI 318 -14 Eq. (17.4.2.7b) ACI 318 -14 Eq. (17.4.2.2a) kcp hef [in.] ect,N [in.] ec2,N [in.] Ca,min [in.] 2 6.000 0.000 0.000 12.000 1-11 c,N Cac [in.] kc 7v a fc [psi] 1.250 24 1.000 3000 Calculations AN, [in.2] 324.00 Results Vcp [Ib] 48299 ANco [in.2] 324.00 concrete 0.700 Uf ecl,N 1.000 ec2,N 1.000 4 Vcp [lb] Vua [Ib] 33809 614 tI1 ed,N 1.000 cp,N Nb [Ib] 1.000 19320 Input data and results must be checked for agreement with the existing conditions andifisii7i4ibt f 1418 PROFIS Anchor ( c ) 2003 -2009 Hilti AG, FL -9494 Schaan Hilti is a registered Tradeena i W, ha n www.hilti.us Company: Specifier: Address: Phone I Fax: E -Mail: Profis Anchor 2.7.5 Page: 5 Project: MB Prop. Management Sub - Project I Pos. No.: Generator Anchor Date: 7/18/2018 4.3 Concrete edge failure in direction x+ _ ( Avc AV, cb '4Vc0 ) W ed,V W c,V W h,V y/ parallel,V Vb Y Vcb > Vua Ave see ACI 318 -14, Section 17.5.2.1, Fig. R 17.5.2.1(b) Avco = 4.5 Cal 1 kV ec,v = (1 + 2e„ <- 1.0 3cat Wed,V = 0.7+0.3(1 5Cat/ 1.0 yJhV = .J1.5haaca,?1.0 � Vb = 9 X a J Caii Variables Cai [in.] 8.000 cat [in.] ecv [in.] 12.000 0.000 ACI 318 -14 Eq. (17.5.2.1a) ACI 318 -14 Table 17.3.1.1 ACI 318 -14 Eq. (17.5.2.1c) ACI 318 -14 Eq. (17.5.2.5) ACI 318 -14 Eq. (17.5.2.6b) ACI 318 -14 Eq. (17.5.2.8) ACI 318 -14 Eq. (17.5.2.2b) lVc,v 1.400 8.000 ha [in.] le [In.] R a da [in.] fc [psi] 6.000 1.000 0.750 3000 Calculations Avc [in.2] Avco [in.2] W ec,V W ed,V 192.00 288.00 1.000 1.000 Results Vcb [Ib] ( concrete 4) Vcb [Ib] Vua [Ib] 12750 0.700 8925 614 5 Combined tension and shear Toads W parallel,V 1.000 W h,V Vb [lb] 1.225 11154 I3N (3v Utilization (3N,V [%] Status 0.100 0.081 5/3 4 OK RNV = A +f3 <= 1 6 Warnings • The anchor design methods in PROFIS Anchor require rigid anchor plates per current regulations (ETAG 001 /Annex C, EOTA TR029, etc.). This means load re- distribution on the anchors due to elastic deformations of the anchor plate are not considered - the anchor plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the design loading. PROFIS Anchor calculates the minimum required anchor plate thickness with FEM to limit the stress of the anchor plate based on the assumptions explained above. The proof if the rigid base plate assumption is valid is not carried out by PROFIS Anchor. Input data and results must be checked for agreement with the existing conditions and for plausibility! • Condition A applies when supplementary reinforcement is used. The c factor is increased for non -steel Design Strengths except Pullout Strength and Pryout strength. Condition B applies when supplementary reinforcement is not used and for Pullout Strength and Pryout Strength. Refer to your local standard. • Checking the transfer of loads into the base material and the shear resistance are required in accordance with ACI 318 or the relevant standard! Fastening meets the design criteria! Input data and results must be checked for agreement with the existing conditions anditV sii PROFIS Anchor (c ) 2003 -2009 Hilti AG, FL -9494 Schaan Hilti is a registered Tradertla liI i 41418 www.hilti.us 1■■III�TI Profis Anchor 2.7.5 Company: Specifier: Address: Phone I Fax: E -Mail: Page: Project: Sub - Project I Pos. No.: Date: 6 MB Prop. Management Generator Anchor 7/18/2018 7 Installation data Anchor plate, steel: - Profile: no profile Hole diameter in the fixture: df = 0.813 in. Plate thickness (input): 0.500 in. Recommended plate thickness: not calculated Drilling method: - Cleaning: No cleaning of the drilled hole is required Anchor type and diameter: Hex Head ASTM F 1554 GR. 36 3/4 Installation torque: - Hole diameter in the base material: - in. Hole depth in the base material: 6.000 in. Minimum thickness of the base material: 7.000 in. 1.500 1.500 T Coordinates Anchor in. 1.500 1.500 Anchor x y c -x cax c -y c.l, 1 0.000 0.000 14.500 24.000 12.000 12.000 x Input data and results must be checked for agreement with the existing conditions andrptylsif AA 18 PROFIS Anchor ( c ) 2003 -2009 Hilti AG, FL -9494 Schaan Hilti is a registered Trade a i i a n 0 0 0 N 12.000 12.000 1 1 ' 0 0 0 N T Coordinates Anchor in. 1.500 1.500 Anchor x y c -x cax c -y c.l, 1 0.000 0.000 14.500 24.000 12.000 12.000 x Input data and results must be checked for agreement with the existing conditions andrptylsif AA 18 PROFIS Anchor ( c ) 2003 -2009 Hilti AG, FL -9494 Schaan Hilti is a registered Trade a i i a n www.hilti.us Company: Specifier: Address: Phone I Fax: E -Mail: 11411I-TI Profis Anchor 2.7.5 Page: 7 Project: MB Prop. Management Sub - Project I Pos. No.: Generator Anchor Date: 7/18/2018 8 Remarks; Your Cooperation Duties • Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be strictly complied with by the user. All figures contained therein are average figures, and therefore use - specific tests are to be conducted prior to using the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in. Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be put in by you. Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific application. You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do not use the AutoUpdate function of the Software, you must ensure that you are using the current and thus up -to -date version of the Software in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or programs, arising from a culpable breach of duty by you. Input data and results must be checked for agreement with the existing conditions and ,sigil{g11.1 c 1418 PROFIS Anchor ( c ) 2003 -2009 Hilti AG, FL -9494 Schaan Hilti is a registered Trade a i }q'� ha2n 1L( ENGINEERING FOR ARCHITECTURE JOB JOB NO. SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE TLC ADDRESS Ca�lJ X12 L1,TG7!'K SA5T C44-EG OVfipZTt,t12�.tI�C� EDE2 SASS 1` = 5 2O PL-F ( PAGE P2.) M ovT aAS'S 520 PL-F (1-4'_ t ty ") l/ (I�2'/L} -2 ") $to, %3 ? 1.43-FT rtr IA.(,T C —f To►Q. = q 205 UCb y�GT SL-,hg = (44)( -0 „) (1`-/- 16,5o f'GFi t1)41-(01 l.{3 ►�T Ci1to 1 Art4 -S = /-6 (# PsF) x2�- ) 35 tG T FC7C7ri (-46, = (1 ') (2 ) (14-1- cr) (10 7 -) x 2 = g, (0 00 L.€3 ToT4d.- 1/4T = '3C:7,410q. 1,13 iVf = 3 b gal- t- X S ?2 - i � 628 I-Pv -FT 0 + 1. 0 D = 0 , 6 ( 25 22 t,8-FT 26,(04 t,e - F'C Page 789 of 1418 ENG -002 11/16