Implementation Plan & Criteria Definitions
General Obligation Bond Program
City of Miami Beach
Implementation Plan Criteria Definitions
Shovel Ready
Project has a contract; and, or
Design completed (or not necessary); and, or
Minimal or fast approval process; and, or
Permits are ready; and, or
Community engagement is completed or not necessary (if required); and, or
No anticipated objections or controversy; and, or
No known interference or interruptions from 3rd party agencies; and, or
No known private development that would cause disruption or delays.
Big Impact
Extent of benefit to the most amount of people; and, or
Number of different benefits; and, or
Project has Resilience / Permeable benefits; and, or
Project is an economic catalyst for the area.
Quick Win
Smaller projects; and, or
Faster and easier to Implement; and, or
Fast quality of life improvements spread throughout the entire city; and, or
Visible and important for different neighborhoods; and, or
Public Safety.
General Note: Project Vulnerability, Interdependency with other Non-GOB projects, and
Efficiencies also considered.
Summary Proposed G.O. Bond Implementation Plan FIRST DRAFT
COSTS
Tranche 1
$150M
2019
Tranche 2
$100M
2022
Tranche 3
$100M
2025
Tranche 4
$89M
2028
Total
Total Project Costs per Tranche 148,414,000 101,526,000 98,030,000 87,145,000 435,115,000
Estimated Issuance Costs and Rounding 1,327,449 884,966 884,966 787,620 3,885,000
Total per Tranche 149,741,449 102,410,966 98,914,966 87,932,620 439,000,000
Planned Amounts per Tranche 150,000,000 100,000,000 100,000,000 89,000,000 439,000,000
Difference (258,551) 2,410,966 (1,085,034) (1,067,380) 0
CATEGORY
Tranche 1
$150M
2019*
Tranche 2
$100M
2022
Tranche 3
$100M
2025
Tranche 4
$89M
2028
Total
Parks, Recreational Facilities, and Cultural Facilities 87,749,000 55,476,000 23,730,000 945,000 167,900,000
Police, Fire, and Public Safety 32,665,000 14,850,000 8,000,000 15,700,000 71,215,000
Neighborhoods and Infrastructure 28,000,000 31,200,000 66,300,000 70,500,000 196,000,000
Total per Tranche 148,414,000 101,526,000 98,030,000 87,145,000 435,115,000
*To be approved at March 13 City Commission
LOCATION
Tranche 1
$150M
2019
Tranche 2
$100M
2022
Tranche 3
$100M
2025
Tranche 4
$89M
2028
Total
North 20,362,000 45,855,000 10,750,000 5,840,000 82,807,000
Mid 29,948,000 4,390,000 11,850,000 23,105,000 69,293,000
South 46,849,000 19,581,000 37,630,000 24,700,000 128,760,000
Citywide 51,255,000 31,700,000 37,800,000 33,500,000 154,255,000
Total per Tranche 148,414,000 101,526,000 98,030,000 87,145,000 435,115,000
Implementation Tracking Sheet v.9.5 1 of 1 1/30/2019
Quick Wins List Proposed G.O. Bond Implementation Plan FIRST DRAFT
#Category Location Impl Dept Project GO Bond
Budget Quick Win Notes Quick Win
$ Amount
1 Public Safety CW Parks LED Lighting in Parks 4,500,000 Yes (Tranche 1
locations)
Tranche 1: Stillwater Park, Crespi Park, Tatum
Park, Normandy Isle Parkk
Tranche 2: Flamingo Park and North Shore Park
1,000,000
2 Parks Mid Prop Mgmt Scott Rakow Youth Center 5,088,000
Yes (sec cameras,
windows, fire
alarm, generator,
HVAC, painting,
roof)
Tranche 1: pool restroom and locker room;
security cameras; generator; impact windows;
HVAC; roof replacement; fire alarm;
Interior/exterior painting
Tranche 2: useful life remaining for: basketball
flooring; gymnastics flooring; mondo flooring at
ice rink; outdoor patio flooring
3,910,000
3 Public Safety South PW Security for Public Spaces 4,350,000 Yes (portable
bollards)
Prioritize portable bollards b/c can be used for
special events; all can be implemented in Tier 1
except for Lincoln Road bollards which are
dependent on that project schedule (approx. 5
years), assuming Tier 2
600,000
4 Public Safety CW Police/Fire License Plate Readers 1,950,000 Yes (non-state/
Co. roads)
Tranche 1; improves public safety; use of state
road right of way still being negotiated; need
$480,000 for 8 quick win (non-state/county)
locations
480,000
5 Infrastructure CW Transp Neighborhood Traffic Calming
& Pedestrian-Friendly Streets 2,000,000 Yes (Nautilus)
Tranche 1: Nautilus (quick win), Central Bayshore
North; Central Bayshore South is funded but tied
to Neighorhood Improvement Project
Tranche 2: Normandy and Palmview
500,000
6 Parks North Prop Mgmt North Shore Park & Youth
Center 5,725,000
Yes (generator,
roof, sec cameras,
painting, walking
path)
Tranche 1: painting center interior, youth LED
lighting, security cameras; roof; generator; jogging
path; shade structure; baseball field conversion;
baseball LED lighting
Tranche 2: useful life remaining for playground
and flooring; fence may be impacted by baseball
field conversion; reforestation
1,256,000
7 Public Safety South Police/Fire Security Cameras in
Entertainment District 1,490,000 Yes (except Collins
Ave locations)
Tranche 1; quick win except for Collins Ave
locations because use of state road right of way
still being negotiated; improves public safety
700,000
8 Public Safety CW Police/Fire Public Safety Radio System 10,000,000 Yes
Tranche 1; City already under contract with Harris
Corporation, with projected December 2019
delivery
10,000,000
9 Infrastructure CW PW Street Pavement Program 30,000,000 Yes
Use pavement assessment study and
neighborhood project schedule to prioritize the
projects at approximately $2.5M annually;
consider traffic impacts
4,000,000
10 Parks Mid CIP Middle Beach Beachwalk 4,500,000 Yes Tranche 1; quick win; grants have been awarded 4,500,000
11 Parks South Special
Projects Soundscape Park 4,500,000 Yes Tranche 1; cameras/projectors are quick wins;
restroom/storage facility will take longer 4,500,000
12 Infrastructure CW PW Sidewalk Improvement
Program 13,000,000 Yes
Use sidewalk assessment study and neighborhood
project schedule to prioritize the projects at
approximately $1M annually
2,000,000
13 Parks CW Prop Mgmt Roof Replacement for Cultural
Facilities 2,980,000 Yes Tranche 1; quick win; reduces water intrusion and
operating costs 2,980,000
14 Infrastructure CW Env Street Tree Master Plan 5,000,000 Yes Complete plan in year one and implement within
5 years; quick win for limited locations 500,000
15 Infrastructure South CIP Palm & Hibiscus
Neighborhood Enhancements 1,000,000 Yes Tranche 1; Neighborhood improvement project
currently in progress 1,000,000
16 Parks South Parks Collins Park 640,000 Yes Tranche 1; quick win; addresses safety concerns
with pavers 640,000
17 Parks Mid Parks Polo Park 500,000 Yes Tranche 1; quick win; helps expand programming 500,000
18 Public Safety South Police/Fire Security Cameras on Beach
Walk 400,000 Yes Tranche 1; quick win; improves public safety 400,000
19 Parks North Parks Fairway Park 260,000 Yes Tranche 1; quick win; concurrent with CIP project 260,000
20 Parks North Parks Crespi Park 211,000 Yes Tranche 1; quick win; improve security 211,000
21 Parks North Parks Stillwater Park 145,000 Yes Tranche 1; quick win; improve security 145,000
Total Quick Wins 40,082,000
Implementation Tracking Sheet v.9.0 1 of 1 1/30/2019
Proposed G.O. Bond Implementation Plan FIRST DRAFT
Item
No.
Project
No.Category Location Impl. Dept.Project Name GO Bond
Budget
Shovel
Ready
Big
Impact Quick Win Notes
Tranche 1
$150M
2019
Tranche 2
$100M
2022
Tranche 3
$100M
2025
Tranche 4
$89M
2028
1 15 Parks Mid CIP Bayshore Park (Par 3 /
Community Park)15,700,000 Yes Yes No
Regional impact project for Mid Beach; in Tranche
1 as project has been stalled for lack of funding for
years; Design being updated for blue/green
infrastructure; significant resiliency component
15,700,000 - - -
2 5 Parks South CIP PAL Facility, Flamingo Park &
Youth Center 30,550,000 No Yes No
Regional impact project for South Beach; PAL in
Tranche 1; Security Lighting in a separate GOB
project; Master Plan Elements and Resiliency
Strategies in Tranche 3
15,400,000 - 15,150,000 -
3 1 Parks North Special
Projects
72nd Street Park, Library, and
Aquatic Center 53,800,000 No Yes No Regional impact project for North Beach; Tranche
1: design, Tranche 2: construction 10,800,000 43,000,000 - -
4 23 Parks South CIP Baywalk 15,000,000 No Yes No
Tranche 1: MacArthur Pedestrian Bridge ($10M),
assumes prioritized due to 500 Alton development
Tranche 2 to build consensus with property
owners and obtain permitting: South Bay Club
($2.8M); Bayview Terrace ($850K); Bay Garden
Manor ($1.35M)
10,000,000 5,000,000 - -
5 49 Public Safety CW Police/Fire Public Safety Radio System 10,000,000 Yes Yes Yes
Tranche 1; City already under contract with Harris
Corporation, with projected December 2019
delivery
10,000,000 - - -
6 39 Infrastructure CW PW Resilient Seawalls and Living
Shorelines 10,000,000 Yes No No
Tranche 1 and 2; consultant to be engaged to
update existing matrix to prioritize City-owned
seawalls
8,000,000 2,000,000 - -
7 38 Infrastructure CW PW Street Pavement Program 30,000,000 Yes Yes Yes
Use pavement assessment study and
neighborhood project schedule to prioritize the
projects at approximately $2.5M annually;
consider traffic impacts
7,500,000 7,500,000 7,500,000 7,500,000
8 45 Public Safety South Special
Projects Replace Fire Station #1 10,000,000 No Yes No
Tranche 1; high priority for Fire and Police; need to
resolve location concerns; include 911 call center
(helps create space in Police HQ)
6,000,000 4,000,000 - -
9 55 Public Safety CW PW Street Lighting Improvements 10,000,000 No Yes No
Tranche 1 & 2; Individual projects will come from
master plan which is currently being developed.
Design is still pending. Improves public safety and
results in O&M savings.
5,000,000 5,000,000 - -
10 13 Parks North Prop Mgmt North Shore Park & Youth
Center 5,725,000 Yes Yes
Yes
(generator,
roof, sec
cameras,
painting,
walking path)
Tranche 1: painting center interior, interior
lighting, security cameras; roof; generator; jogging
path; shade structure; baseball field conversion;
baseball LED lighting
Tranche 2: useful life remaining for playground
and flooring; fence may be impacted by baseball
field conversion; reforestation
4,930,000 795,000 - -
11 8 Parks South Special
Projects Lummus Park 4,737,000 No Yes No Tranche 1; sequence before Ocean Drive project 4,737,000 - - -
12 24 Parks Mid CIP Middle Beach Beachwalk 4,500,000 Yes Yes Yes Tranche 1; quick win; grants have been awarded 4,500,000 - - -
Implementation Tracking Sheet v.9.5 1 of 4 1/30/2019
Proposed G.O. Bond Implementation Plan FIRST DRAFT
Item
No.
Project
No.Category Location Impl. Dept.Project Name GO Bond
Budget
Shovel
Ready
Big
Impact Quick Win Notes
Tranche 1
$150M
2019
Tranche 2
$100M
2022
Tranche 3
$100M
2025
Tranche 4
$89M
2028
13 19 Parks South Special
Projects Soundscape Park 4,500,000 Yes Yes Yes Tranche 1; cameras/projectors are quick wins;
restroom/storage facility will take longer 4,500,000 - - -
14 18 Parks Mid Prop Mgmt Scott Rakow Youth Center 5,088,000 Yes Yes
Yes (sec
cameras,
windows, fire
alarm,
generator,
HVAC,
painting,
roof)
Tranche 1: pool restroom and locker room;
security cameras; generator; impact windows;
HVAC; roof replacement; fire alarm;
Interior/exterior painting
Tranche 2: useful life remaining for: basketball
flooring; gymnastics flooring; mondo flooring at ice
rink; outdoor patio flooring
4,448,000 640,000 - -
15 48 Public Safety CW Prop Mgmt Police Headquarters
Renovations 10,000,000 No No No
Tranche 1: feasibility study and new space design;
firing range renovation; HVAC controls and
window refurbishment
Tranche 2 for remaining improvements
4,000,000 - 6,000,000 -
16 37 Infrastructure CW PW Sidewalk Improvement
Program 13,000,000 Yes Yes Yes
Use sidewalk assessment study and neighborhood
project schedule to prioritize the projects at
approximately $1M annually
3,500,000 3,000,000 3,500,000 3,000,000
17 10 Parks Mid CIP Maurice Gibb Park 3,300,000 No No No
Tranche 1; design is substantially complete;
permitting process and remediation will drive
timeline; these funds are in addition to existing
project funds
3,300,000 - - -
18 26 Parks CW Prop Mgmt Roof Replacement for Cultural
Facilities 2,980,000 Yes No Yes Tranche 1; quick win; reduces water intrusion and
operating costs 2,980,000 - - -
19 33 Infrastructure CW Env Street Tree Master Plan 5,000,000 Yes Yes Yes Complete plan in year one and implement within 5
years; quick win for limited locations 2,500,000 2,500,000 - -
20 43 Infrastructure CW Transp Protected Bicycle Lanes and
Shared Bike/Pedestrian Paths 5,000,000 No No No
Tranche 1: Chase Ave $830K; 23rd Street $1.5M;
Alton road design $170K
Tranche 2: Alton Rd construction $1.2M
Tranche 3: 63rd street (FDOT timing) need $2.3M
but have $1.3M
2,500,000 1,200,000 1,300,000 -
21 53 Public Safety South PW Security for Public Spaces 4,350,000 Yes Yes
Yes
(portable
bollards)
Prioritize portable bollards b/c can be used for
special events; all can be implemented in Tier 1
except for Lincoln Road bollards which are
dependent on that project schedule (approx. 5
years), assuming Tier 2
2,000,000 2,350,000 - -
22 12 Parks North CIP North Beach Oceanside Park
Beachwalk 2,000,000 No Yes No Tranche 1; Completely designed; Pending grant
from FDOT slows down timeline 2,000,000 - - -
23 47 Public Safety CW Police/Fire License Plate Readers 1,950,000 Yes Yes
Yes (non-
state/ Co.
roads)
Tranche 1; improves public safety; use of state
road right of way still being negotiated; need
$480,000 for 8 quick win (non-state/county)
locations
1,950,000 - - -
24 40 Infrastructure Mid Special
Projects 41st Street Corridor 15,000,000 No No No
Tranche 1 & 2: shade structures, lighting, and bike
lanes
Tranche 2 & 3: widening of sidewalks (timing of
FDOT approval); replacement parking
1,500,000 1,500,000 6,000,000 6,000,000
Implementation Tracking Sheet v.9.5 2 of 4 1/30/2019
Proposed G.O. Bond Implementation Plan FIRST DRAFT
Item
No.
Project
No.Category Location Impl. Dept.Project Name GO Bond
Budget
Shovel
Ready
Big
Impact Quick Win Notes
Tranche 1
$150M
2019
Tranche 2
$100M
2022
Tranche 3
$100M
2025
Tranche 4
$89M
2028
25 42 Infrastructure CW Transp Neighborhood Traffic Calming
& Pedestrian-Friendly Streets 2,000,000 No No Yes
(Nautilus)
Tranche 1: Nautilus (quick win), Central Bayshore
North; Central Bayshore South is funded but tied
to Neighorhood Improvement Project
Tranche 2: Normandy and Palmview
1,500,000 500,000 - -
26 57 Public Safety South Police/Fire Security Cameras in
Entertainment District 1,490,000 Yes Yes
Yes (except
Collins Ave
locations)
Tranche 1; quick win except for Collins Ave
locations because use of state road right of way
still being negotiated; improves public safety
1,490,000 - - -
27 27 Parks North CIP Log Cabin Reconstruction 1,076,000 No No No
Tranche 1; anticipate extensive review and public
input; currently paying for storage; need to include
in design of North Beach Oceanside Park
1,076,000 - - -
28 52 Public Safety CW Parks LED Lighting in Parks 4,500,000 Yes No
Yes
(Tranche 1
locations)
Tranche 1: Stillwater Park, Crespi Park, Tatum
Park, Normandy Isle Parkk
Tranche 2: Flamingo Park and North Shore Park
1,041,000 3,459,000 - -
29 29 Parks North Special
Projects West Lots Redevelopment 5,000,000 No Yes No Distribute funds over Tranches 1, 2, and 3 to
incentivize development 1,000,000 2,000,000 2,000,000 -
30 32 Infrastructure South CIP Palm & Hibiscus Neighborhood
Enhancements 1,000,000 Yes No Yes Tranche 1; Neighborhood improvement project
currently in progress 1,000,000 - - -
31 50 Public Safety CW Police/Fire Security Cameras in Business
Districts 825,000 Yes Yes No
Tranche 1; improves public safety; timing depends
on using FDOT/County right of way or using our
own infrastructure
825,000 - - -
32 9 Parks South Parks Marjory Stoneman Douglas
Park 682,000 No No No
Tranche 1; playground and shade structure need
replacement; permitting with turtle-lighting will
take time
682,000 - - -
33 2 Parks South Parks Collins Park 640,000 No No Yes Tranche 1; quick win; addresses safety concerns
with pavers 640,000 - - -
34 17 Parks Mid Parks Polo Park 500,000 No No Yes Tranche 1; quick win; helps expand programming,
baseball fields & dugouts 500,000 - - -
35 56 Public Safety South Police/Fire Security Cameras on Beach
Walk 400,000 Yes Yes Yes Tranche 1; quick win; improves public safety 400,000 - - -
36 4 Parks North Parks Fairway Park 260,000 No No Yes Tranche 1; quick win; concurrent with CIP project 260,000 - - -
37 3 Parks North Parks Crespi Park 211,000 No No Yes Tranche 1; quick win; improve security 211,000 - - -
38 21 Parks North Parks Stillwater Park 145,000 No No Yes Tranche 1; quick win; improve security 145,000 - - -
39 34 Infrastructure CW CIP Neighborhood Above Ground
Improvements 43,000,000 No Yes No
Spread between Tranches 2, 3, & 4; includes
several different neighborhoods - based on
existing schedule of planned Stormwater/Water &
Sewer neighborhood improvement projects
- 5,000,000 15,000,000 23,000,000
40 31 Infrastructure South Special
Projects
Ocean Drive Improvement
Project 20,000,000 No Yes No Sequence after Lincoln Road project to limit
disruption to tourism - 4,000,000 8,000,000 8,000,000
Implementation Tracking Sheet v.9.5 3 of 4 1/30/2019
Proposed G.O. Bond Implementation Plan FIRST DRAFT
Item
No.
Project
No.Category Location Impl. Dept.Project Name GO Bond
Budget
Shovel
Ready
Big
Impact Quick Win Notes
Tranche 1
$150M
2019
Tranche 2
$100M
2022
Tranche 3
$100M
2025
Tranche 4
$89M
2028
41 41 Infrastructure Mid CIP La Gorce Neighborhood
Improvements 14,000,000 No Yes No
A portion in Tranche 2 based on preliminary
schedule; remainder in Tranche 3 & 4 based on
existing schedule of planned Stormwater/Water &
Sewer neighborhood improvement projects
- 2,000,000 3,000,000 9,000,000
42 28 Parks South Special
Projects Art Deco Museum Expansion 2,000,000 No No No Tranche 2; sequence before Ocean Drive project in
Tranche 3 - 2,000,000 - -
43 36 Infrastructure South Special
Projects Washington Ave Corridor 10,000,000 No Yes No
Pending consensus regarding improvements;
design in Tranche 2; construction in Tranches 3
and 4
- 2,000,000 6,000,000 2,000,000
44 25 Parks CW Env Waterway Restoration 6,000,000 No No No
Locations are Collins Canal and Biscayne Point;
permitting is time consuming; design in Tranche 2
and construction in Tranche 3
- 1,500,000 4,500,000 -
45 16 Parks Mid Parks Pinetree Park 700,000 No No No Tranche 2; permitting for kayak launch is
challenging - 700,000 - -
46 14 Parks South Parks Palm Island Park 231,000 No No No Tranche 2; existing playground in moderate
condition - 231,000 - -
47 35 Infrastructure South CIP Flamingo Park Neighborhood 20,000,000 No Yes No
Tranche 3 and 4 based on existing schedule of
planned Stormwater/Water & Sewer
neighborhood improvement projects
- - 8,000,000 12,000,000
48 44 Infrastructure North CIP North Shore Neighborhood
Improvements 8,000,000 No Yes No
Tranche 3 based on existing schedule of planned
Stormwater/Water & Sewer neighborhood
improvement projects
- - 8,000,000 -
49 51 Public Safety Mid Special
Projects Replace Fire Station #3 10,000,000 No No No
Prioritized after Fire Station #1 and recent mold
remediation project provides additional useful life;
Design in Tranche 3 and construction in Tranche 4
- - 2,000,000 8,000,000
50 30 Parks North CIP Skate Park Improvements 750,000 No No No Tranche 3; evaluate usage of new temporary skate
park and new facility at Haulover Park - - 750,000 -
51 20 Parks South Parks South Pointe Park 480,000 No No No Tranche 3; existing playground and restroom
facility in good condition - - 480,000 -
52 11 Parks Mid Parks Muss Park 250,000 No No No Tranche 2; recently resodded the sports fields;
sequence after planned pump station project - - 250,000 -
53 7 Parks Mid Parks La Gorce Park 150,000 No No No Tranche 3; existing playground in good condition - - 150,000 -
54 46 Public Safety North CIP Ocean Rescue North Beach
Facility 5,000,000 No No No
Tranche 4; existing trailer is brand new and
provides more time for County to contribute
approx. $2M
- - - 5,000,000
55 54 Public Safety South CIP Marine Patrol Fire/Police
Facility 2,700,000 No No No Tranche 4; separate project from Maurice Gibb
Park project; lower priority for Police and Fire - - - 2,700,000
56 22 Parks North Parks Tatum Park 840,000 No No No Tranche 4; existing playground in newer condition
and additional for water feature - - - 840,000
57 6 Parks Mid Parks Fisher Park 105,000 No No No Tranche 4; existing playground in newer condition - - - 105,000
Total per Tranche 148,515,000 101,875,000 97,580,000 87,145,000
Implementation Tracking Sheet v.9.5 4 of 4 1/30/2019