Loading...
Fire Station 1 PresentationLOCATIONS ASSESSED Reconstruct Fire Station No. 1 on the Existing Site. Construct a new Fire Station No. 1 at Michigan and 13 street. Construct a new Fire Station No. 1 in P10 Parking Lot located at Michigan and 15 street. Construct a new Fire Station No. 1 in the P9 Parking Lot adjacent to the PAL. Construct a new Fire Station No. 1 at Washington Ave & 2nd Street. Construct a new Fire Station No. 1 on the existing site of the South Shore Community Center located at 6 street between Jefferson Avenue and Meridian Avenue. 1 1 2 2 3 34 4 5 56 6 LOCATION #1 Reconstruct Fire Station No. 1 on the Existing Site Requires construction of a temporary facility at the former Flamingo Park Property Management Compound located at Michigan and 13 street for a period of 18 months. This site was not favorable due to the space constraints in maintaining the existing master sanitary sewer pump station and associated underground infrastructure located on-site and due to the new FEMA finished floor elevation requirements that impact site circulation as well as on-site roadway access. LOCATION #2 Construct a new Fire Station No. 1 at Michigan and 13 street The new Fire Station No.1 facility would take ½ an acre of the existing green area. This site was not favorable by the fire department due to access and response times. F i r e S t a t i o n P a r k i n g L o t ( 2 0 t o 2 5 ) exist. lift station Proposed Parking Lot (35 to 40 spaces) Option 3 -Fire Station No. 1 @ Property Management Lot & Convert Old Fire Station No. 1 Site to a Surface Parking Lot Restore area back to green space Historic Lodge to Remain LOCATION #3 Construct a new Fire Station No. 1 in P10 Parking Lot located at Michigan and 15 street The existing parking lot (approximately 136 spaces) will be lost to accommodate the new fire station. This site was deemed not feasible by the fire department because it was located at the northern limit of the service area. The fire department anticipates to move the service area south and this location would inadequate. F i r e S t a t i o n P a r k i n g L o t ( 2 0 t o 2 5 ) exist. lift station Proposed Parking Lot (35 to 40 spaces) Option 3 -Fire Station No. 1 @ Property Management Lot & Convert Old Fire Station No. 1 Site to a Surface Parking Lot Restore area back to green space Historic Lodge to Remain LOCATION #4 Construct a new Fire Station No. 1 in the P9 Parking Lot adjacent to the PAL Approximately all 1 15 spaces will be lost in order to accommodate the new fire station. This location was not favorable due to Community Feedback. LOCATION #5 Construct Fire Station No. 1 using a portion of the off leash dog park (Washington Ave & 2nd Street) This site encompasses a contributing structure building that is occupied by the Police Department (PD) and an adjoining off leash dog park. PD personnel will have to be relocated to an alternate facility. The existing off leash dog park will be reduced to the southernmost end of the site and will preserve two large existing trees and other elements, approx. area is 0.13 Acre. Due to community feedback, the commission deemed this site to be unfavorable. LOCATION #6 Construct a new Fire Station No. 1 on the existing site of the South Shore Community Center located at 6 street between Jefferson Avenue and Meridian Avenue. This is a new site that is currently being assessed. The existing site is approx. 2 acres.