Loading...
Resolution 81-16717 1°,f7-./6 7 FORM 722-61 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 1-74 DIVISION OF ROAD OPERATIONS PAGE 1 OF 1 CITY RESOLUTION UTILITY INSTALLATIONS • 622877 COUNTY SECTION UTILITY JOB NO. STATE ROAD NO. COUNTY NAME PARCEL& R/W JOB NO. 87 000 6651 Bay Drive Dade 2 N/A A RESOLUTION REGARDING UTILITY JOINT PROJECT AGREEMENT BETWEEN THE CITY OF _,,,, Mi ami Beach. AND THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION; AUTHORIZING THE EXECUTION OF SUCII AGREEMENTS; AND AUTHORIZING THE PLACING OF FUNDS WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FOR THE COMPLETION OF THE UTILITY INSTALLATION. RESOLUTION NO._81-16717 WHEREAS, the State of Florida Department of Transportation is constructing, reconstructing or otherwise changing portion of the State Highway System, between __.ay Dri ve Bri dge over �ng a x,xc Normandy Isles which shall call for the installation of new City wrier al-- SPwe�--- facilities over and/or under said highway, AND WHEREAS, the City requires additional water and sewer capacity in certain locations within the construction limits of this project, AND WI-IEREAS, the City has heretofore authorized that plans and specifications be prepared for the installation of said new City facilities over and/or under said .highway, ' 4 and specifications have been. prepared and approved Post, Buckley, AND 1'1�IIERE�AS, the plans lp p I p by Schuh & Jernigan Engineering Company and the City Engineering Department; such plans and specifications to be made a part of the Department's highway construction contract, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF ami Beach __._ _-_�, FLORIDA: That the City of _.MiAEL.Beach enter into a JOINT PROJECT AGREEMENT with the State of Florida Department of Transportation for installationby the DEPARTMENT of said new City designatedas Job 6651 , Section 87000 , Parcel 2 facilities�,s Utility 1 R/W Job N/A , and that the City assume all costs incurred in the respective utility installations, / which costs are estimated to be $ 2,000.QO __.__; and, That the Mayor and City Clerk be authorized to enter into such agreements with the State of Florida Department of Transportation for the installation of said new City facilities, and, That the estimatedcosts of such utility installations as set forth above be paid in advance to the State of Florida Department of Transportation in accordance with such utility installation agreement. INTRODUCED AND PASSED by the CityCommission of the City of Miami Beach I 1 81 this 15th _ of__�___ July 9 Florida,� in regular session, day • • \ Mayor- : :. :,w•er ,• p •` •v s .A E /II L A'I'IAi,ST. City t .: - Clerk 44_' ByPuit'Jr /J 'r tiy ..... Date - _--�..�...... Date Ni . • FORM_722.05 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 11-79 DIVISION OF ROAD OPERATIONS PAGE 1 OF 1 UTILITY/RAILROAD RELOCATION SCHEDULE 622877 BOUNTY SECTION UTILITY JOB NO. STATE ROAD NO. COUNTY NAME PARCEL& R/W JOB NO. FAP NO. . 87 000 6651 Bay Drive Dade 1 N/A BRZ-006 (1) AGENCY CITY OF MIAMI BEACH A. Facilities Involved (Detail as to Type and Location): 12" SEWER FORCE MAIN AND 10" WATER MAIN ON EXISTING BRIDGE B. Relocation Work Anticipated (Describe and Relate to Location on Project): INSTALL NEW 12" SEWER FORCE MAIN AND 10" WATER MAIN ON EXISTING BRIDGE C. Anticipated Relocation Schedule (Based on normal schedule and 5-day work week): ITEM DAYS ESTIMATED Preliminary Engineering Material Procurement Right of Way Acquisition • Contract Negotiations (for utility/railroad work) Other Construction (actual utility/railroad relocation time at job site) 9O r ESTIMATED MAXIMUM TOTAL 90 Days ADJUSTED UTILITY/RAILROAD RELOCATION PERIOD (Allow for concurrent activities) ESTIMATED MINIMUM TOTAL ____ 60 Days See Highway Contract Special Provisions D. Special. Notation(s) to be included in Ilighway Contract Special Provisions: PLACEMENT OF SUPPORTS FOR, 12" SEWER FORCE MAIN AND 10'" WATER MAIN ON NEW BRIDGE r.. E.. This AGENCY proposes to commence actual relocation and/or adjustment work: (Check one) [� prior to highway contract advertisement, and relocation should be % complete by date of preconstruction conference. [1 concurrently with project advertisement. concurrently with commencement of hi_liwa r construction. The above data is based on construction plans and schedules prepared by the DEPARTMENT, and, therefore, is furnished for informational purposes only. This AGENCY is not responsible for circumstances beyond its normal control. However, the AGENCY will endeavor to fully cooperate with the DEPARTMENT, and its Contractor, in clearing; the project right of way as expeditiously as possible. The AGENCY'S Field Representatives can b•, contacted Representatives, at. _ n 1:700 ,N LE[�j�N, CENTER DIS I VE ._____, Telephone Number: 73-7020 SUBMITTED FOR VIII, AGE C� I � : Date.• la Frank Aymon i n, P.E. , Dir ctor of Pub1 i Works I j� j� DEPARTMENTAL APPROVAL BY: i t Date: ORIGINAL RESOLUTION NO. 81-16717 (Authorizing Utility joint project agree- ment between CMB and Florida State Dept. of Transportation for placement of supports for new 12" sewer force main and 10" water main on new Bay Drive bridge) • ' . . 110, 1 • 7